Clippy ran in front of the test-binary archive inside Workspace Lint and Build, so every workspace test waited 13 to 17 minutes for a lint that shares no compiler output with the archive.
Move the unchanged Clippy step into its own workspace-clippy job with the same condition, needs, runner and cache key. Workspace Lint and Build keeps its ID and name as the archive producer. The aggregate and the scheduled alert depend on the new job, and the plan contract moves to 4 so a base planner that predates the job set falls back to the full matrix.
ci_gate.py now rejects a workflow where the lint is conditional, duplicated, outside the aggregate, scoped differently from the archive producer, or back on the archive consumers' dependency chain, and where the workflow's plan-contract marker differs from the planner's.
* fix(kms): read back SSE objects written through the AWS backend
The AWS backend returned the GenerateDataKey blob bare, so the read path took the unrecognized bytes for a locally wrapped key and asked for RUSTFS_SSE_S3_MASTER_KEY without ever calling AWS Decrypt. Every SSE-KMS and SSE-S3 object written through this backend was unreadable, and UploadPart failed the same way.
The backend now wraps the blob in the data-key envelope the other backends use. A stored key that is neither an envelope nor a local-master-key wrap is offered to the KMS when its backend reports that released versions persisted it bare, so objects written by 1.0.4 and 1.0.5 read back without being rewritten.
* fix(admin): percent-decode the key id in the KMS describe path
GET /rustfs/admin/v3/kms/keys/{key_id} read the path segment verbatim, so an AWS key ARN, which has to be escaped to fit in one segment, was looked up, authorized and audited under its escaped spelling and answered 404.
* fix(policy): match an AWS key ARN as its key id in KMS statements
A key-scoped statement was matched against the key identifier exactly as the request spelled it. A Deny on key/<id> therefore did not cover a request naming the same key by its AWS ARN, on the SSE-KMS write, on the read of an object stored under the ARN spelling, and on the per-key admin endpoints.
A key ARN is now reduced to its key id before matching. A request naming a key by alias, which only the backend can resolve, fails closed against key-scoped statements. The deletion impact report compares key references the same way.
Adds the AWS KMS backend guide in English and Chinese.
* fix(kms): read rio-v2 objects that carry a bare AWS data key
A rio-v2 build stores a sealed object key beside the data key, so an AWS-backed object written before the envelope carries the same shape as a MinIO object and was sent to the MinIO decoder, failing before AWS Decrypt was tried.
MinIO's sealing is authenticated, so opening the data key under the local master key is a proof: the bare blob reaches the KMS only once that has failed, or when no local master key exists. Without a backend that reads bare ciphertext the MinIO route is unchanged.
* docs(kms): describe pairing an AWS KMS site with a Vault site
Site replication synchronizes key names and never keys, and AWS assigns key ids, so in a mixed pair the Vault site has to name its keys after the AWS key ids.
fix(replication): replicate SSE-KMS objects under key enforcement
With RUSTFS_KMS_ENFORCE_SSE_KEY_POLICY=true the receiving site authorizes a replica PUT of an SSE-KMS object for kms:GenerateDataKey against the key it resolves to. The managed site-replicator account held no kms grant, so every SSE-KMS object stayed FAILED with AccessDenied.
Grant kms:GenerateDataKey on every key and treat a stored policy without it as outdated so the reconcile tick refreshes existing accounts. kms:Decrypt stays out: reads proxied to a peer run as this account.
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* refactor(auth): share authorization core with owned entry points
Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* refactor(admin): move remaining admin handlers to owned requests
Migrate the ten table-catalog commit and publication handlers to the
owned admin Operation trait, redeem object zip download tokens through
authorize_owned_request, and remove the s3s-typed router Operation
trait. S3Router now converts the s3s request into an AdminRequest and
the AdminResponse back at its edge, so no admin operation takes an s3s
type (rustfs/backlog#2788).
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* fix(auth): keep owned authorization in the app layer and fail closed
Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.
* test(auth): move owned parity tests to the app layer
Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.
* test(admin): convert the tagged table catalog request before installing identity
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* fix(admin): keep owned router entry points crate-visible
* test(auth): read storage-private parity facts through test accessors
The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.
* test(auth): owned and legacy entry points reach the same decisions
Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).
* fix(admin): drop the owned trait bound from S3Router's inherent impls
* test(auth): satisfy clippy on the parity test facade
* test(admin): cover zip download token redemption authorization
* test(auth): report every decision mismatch in the parity matrix
* refactor(admin): move the admin route table out of the s3s router
* test(auth): cover multipart staging in the owned/legacy decision matrix
* fix(admin): authorize warehouse locations with the owned commit request
* fix(admin): return the owned table catalog authorization result unchanged
* fix(table-catalog): restore owned request lines the main merge reverted
The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.
* fix(auth): make an absent caller secret unrepresentable as a key
RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.
* fix(auth): keep the test-only credentials rebuild out of the lib build
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
test(guards): let the split probe check sources that are already split
The end-to-end split probe simulated every split itself and stopped on a tree where bucket_usecase.rs is already split. It now decides per source (ecfs.rs, bucket_usecase.rs, multipart_usecase.rs) whether the tree is unsplit or split: unsplit sources are simulated as before, split sources get the same planted violations at the top of real split files plus a silence check over every other real split file, and a source in neither state fails with its name. Refs rustfs/backlog#2765.
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* test(guards): read file plus split directory in text guards
Text guards that read one file with include_str! or by path broke, or silently stopped seeing the code they guard, when that code moved to another file. They now read the file they read today, which stays required, plus the sibling directory a mechanical split will populate (storage/legacy_edge, app/bucket_usecase, app/multipart_usecase, app/lifecycle_transition_api_test). Counts are summed over the set and split markers must occur exactly once across it. Refs rustfs/backlog#2765.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* test(guards): avoid a typos false positive in a fixture
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* test(guards): address review of the split-safe text guards
Make the super:: import rules depth-aware for split files, cover ecfs_test.rs moving to legacy_edge/tests, read production text only in the Rust count and contains guards, bound method slices by their own closing line, keep the split arrays safe on bash 3.2, and add an end-to-end split probe for the architecture, layer and logging guards. Refs rustfs/backlog#2765.
* test(guards): plant the lifecycle split probe in its own file
P4 created lifecycle_transition_api_test/put.rs; the end-to-end split probe now plants its violations in split_probe.rs instead of overwriting it.
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* refactor(auth): share authorization core with owned entry points
Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* refactor(admin): move remaining admin handlers to owned requests
Migrate the ten table-catalog commit and publication handlers to the
owned admin Operation trait, redeem object zip download tokens through
authorize_owned_request, and remove the s3s-typed router Operation
trait. S3Router now converts the s3s request into an AdminRequest and
the AdminResponse back at its edge, so no admin operation takes an s3s
type (rustfs/backlog#2788).
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* fix(auth): keep owned authorization in the app layer and fail closed
Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.
* test(auth): move owned parity tests to the app layer
Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.
* test(admin): convert the tagged table catalog request before installing identity
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* fix(admin): keep owned router entry points crate-visible
* test(auth): read storage-private parity facts through test accessors
The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.
* test(auth): owned and legacy entry points reach the same decisions
Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).
* fix(admin): drop the owned trait bound from S3Router's inherent impls
* test(auth): satisfy clippy on the parity test facade
* test(admin): cover zip download token redemption authorization
* test(auth): report every decision mismatch in the parity matrix
* test(auth): cover multipart staging in the owned/legacy decision matrix
* fix(admin): authorize warehouse locations with the owned commit request
* fix(admin): return the owned table catalog authorization result unchanged
* fix(table-catalog): restore owned request lines the main merge reverted
The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.
* fix(auth): make an absent caller secret unrepresentable as a key
RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.
* fix(auth): keep the test-only credentials rebuild out of the lib build
* fix(app): drop the PutObjectInput re-export main now provides
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* test(e2e): allow a pinned release binary as differential reference side
RUSTFS_E2E_REFERENCE_BINARY makes side A of the dual-stack differential a released rustfs binary, started without RUSTFS_S3_STACK. A missing, non-file or non-executable path fails the run instead of falling back to the same-binary mode. The report records which side is the reference and each side's --version output.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* test(e2e): update smoke selection for reference-binary unit tests
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* ci(parity): run the dual-stack differential against the pinned reference
Adds a differential job to reference-parity.yml: side A is the pinned release, side B the candidate artifact built for the s3-tests comparison. The job prints reference_side, version_a and version_b from the report, fails when side A is not the reference or both versions are equal, and lists every difference in the job summary.
* ci(parity): print the first version line in the differential summary
* chore: restore main's Cargo and baseline files after merging main
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
ci(e2e): keep reference-selection unit tests out of e2e-full
The eight dual_stack_differential::reference tests added in #9285 entered the e2e-full selection and changed its digest. They are hermetic and already run in e2e-smoke on every pull request, so exclude them from e2e-full; the selection digest returns to the value recorded in .config/e2e-full-selection.txt.
AddUser reads the current secret only for a self-rotation, orphan-bucket recovery only to seal a /minio/admin compat response, and a missing secret key answers AccessDenied instead of InternalError in AddUser, bucket recovery and ChangeOwnPassword.
On the Vault KV2 and Vault Transit backends, an immediate deletion of a
key that was not already pending deletion only marked it PendingDeletion
and still reported success, so objects under the key stayed readable
after the caller was told the key was gone.
Key destruction is now two explicit steps on the Local, Vault KV2 and
Vault Transit backends: a deletion is scheduled first, and
`force_immediate` only destroys a key that is already PendingDeletion.
A request against an Enabled or Disabled key is refused with an invalid
state error and changes nothing. Vault Transit's "encryption key not
found" answer for a destroyed key now maps to KeyNotFound instead of a
backend error.
Document the feature in docs/operations/kms-key-destruction.md with a
Chinese translation.
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* build(deps): re-pin rustfs/gateway to 371d91b2
* fix(protocols): pass copy sources as CopySourceValue
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* test(protocols): raise rustfs test-count baseline for copy source tests
* fix(protocols): keep refusing listings without object ETags
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* build(deps): re-pin rustfs/gateway to f9aa6045
* build(deps): re-pin rustfs/gateway to aa1d1a29
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
The built-in notify and audit queue directories /opt/rustfs/events and
/opt/rustfs/audit are persisted cluster-wide as literal defaults. On
native Windows they have no drive prefix, so every target that kept the
default failed validation as a non-absolute path.
Treat those two literals as logical defaults and resolve them on each
node when a queue directory is validated or opened. A new
RUSTFS_TARGET_STORE_DIR relocates both default queues on any platform;
without it, Windows uses %ProgramData%\RustFS. Explicit operator paths,
the persisted configuration, and Linux/macOS behavior are unchanged, and
pending entries are not migrated when the root changes.
Expose the variable through the Helm chart as
config.rustfs.target_store_dir and document the resolution rules.
* fix(obs): bound the log directory with default settings
With the defaults the active log file had no size limit (size rolling was off), and the cleaner counted only rolled files older than the minimum file age against the byte budget, on a 30-minute interval. A log storm could therefore fill the disk for up to two hours without the budget applying.
The active file now rolls at 256 MiB when the single-file limit is unset; an explicit 0 still turns size rolling off, and the cleaner's per-file trim keeps its previous default. The appender wakes the cleaner after every roll, and once the rolled files exceed the byte budget the cleaner processes the oldest ones regardless of age. The README no longer calls the budget a hard cap on the directory and states the actual bound.
* fix(obs): trim only what the log byte budget needs
Lifting the minimum file age for an over-budget pass merged fresh files into the regular selection, so the keep_files ceiling and the per-file limit applied to them too: one byte over the budget could process every fresh file but keep_files of them. The override is now a byte trim on the files that would remain, oldest first, until the budget holds.
An unset single-file limit now rolls at a quarter of a small byte budget instead of 256 MiB, so a freshly rolled file is not larger than the whole budget. Both logging setups open the appender through one function that returns the roll signal the cleanup task listens on. The README states that a log directory must not be shared by processes whose file names match the same pattern.
* fix(ecstore): bound bitrot and remote disk failure logs
A failing drive logs one error per shard block of every read it serves, and an unreachable peer logs one warning per in-flight operation. Neither had a rate limit, so a degraded drive or peer could produce log volume at the speed of the failing I/O.
The three bitrot read failures (short shard, hash mismatch, read error) and the two remote disk failures (timeout, network-like error) now log at most once per five seconds and report how many events were suppressed. The remote disk throttles belong to each disk handle, so one noisy peer cannot hide another peer's first warning. Error results, health marking and the per-operation counters are unchanged.
* fix(ecstore): bound reader retirement warnings in the decoder
A slow shard reader is retired once per stripe of every read it lags on, and a parity reader that cannot be aligned is retired with a warning each time. Both lines name only a shard index. They now log at most once per five seconds with the number suppressed; the retirement itself and the error recorded for the shard are unchanged.
* fix(windows): release rebuild source pins and align test fixtures
Release the multipart source directory pin as soon as the upload head is
decoded during online index rebuild. On Windows the pin denies delete
sharing, so keeping it while indexing made a concurrent abort fail with a
sharing violation.
Align three test fixtures with Windows path and handle semantics:
- heal bucket pass targets use the endpoint string form, matching
production disk endpoint identity;
- scanner erasure probe injection keys are normalized with path_join_buf
so they match the scanner's lookup keys;
- the targets queue budget test changes mtime through a writable handle,
which Windows requires.
* test(scanner): look up failed objects by the scanner's key form
The scanner records failed objects under keys built with path_join_buf,
which uses `/` separators on every platform. Three erasure probe tests
looked them up with a native `root.join(..)` path, so on Windows the
expected key never matched and the assertions failed. Build the expected
key the same way the scanner does; the assertions still require the exact
key to be present.
* test: bypass the disk independence check in path-only topology tests
These tests parse endpoints whose local paths are never created. Unix
leaves missing paths out of the physical-disk independence check, but
Windows resolves them to their volume, so every disk counted as one
shared device and the parsing assertions never ran. The check keeps its
own coverage in the dedicated shared-volume tests.
* fix(ecstore): name the target record when a migration write fails
The existence probe reports a blocked record with its path, but the
commit path returns bare disk errors. On Windows a regular file in the
record's place reads as missing, so migration only fails at the write,
and startup reported "File access denied" without naming the record.
* test: make app fixtures portable to native Windows
- Token- and cache-shaped keys use Windows-legal spellings at the same
sort position, so pagination still runs without relaxing key admission.
- The TLS root test falls back to a directory junction only when a
symlink needs a privilege the runner lacks, and asserts the root is a link.
- Snapshot timestamps step by 1 us, which Windows SystemTime can represent.
- The receiver disk URL uses a slash-led path instead of a raw drive path.
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* refactor(auth): share authorization core with owned entry points
Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* fix(auth): keep owned authorization in the app layer and fail closed
Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.
* test(auth): move owned parity tests to the app layer
Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* test(auth): read storage-private parity facts through test accessors
The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.
* test(auth): owned and legacy entry points reach the same decisions
Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).
* test(auth): satisfy clippy on the parity test facade
* test(auth): report every decision mismatch in the parity matrix
* test(auth): cover multipart staging in the owned/legacy decision matrix
* fix(table-catalog): restore owned request lines the main merge reverted
The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.
* fix(auth): make an absent caller secret unrepresentable as a key
RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.
* fix(auth): keep the test-only credentials rebuild out of the lib build
* fix(app): drop the PutObjectInput re-export main now provides
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* test(e2e): allow a pinned release binary as differential reference side
RUSTFS_E2E_REFERENCE_BINARY makes side A of the dual-stack differential a released rustfs binary, started without RUSTFS_S3_STACK. A missing, non-file or non-executable path fails the run instead of falling back to the same-binary mode. The report records which side is the reference and each side's --version output.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* test(e2e): update smoke selection for reference-binary unit tests
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* chore: restore main's Cargo and baseline files after merging main
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(gateway-adapter): add IAM-backed CredentialProvider
Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).
- Pin rustfs-gateway at the existing gateway rev with
default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
legacy empty secret); IAM not ready or not initialized -> Unavailable;
unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
NotFound; other IAM errors -> Backend; invalid or "off" principals
resolve disabled; STS credentials carry a SessionBinding, and an STS
credential without an expiry is a Backend fault rather than a
never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
error text is dropped after classification.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* feat(gateway-adapter): add IAM-backed PolicySource
Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.
- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
account's own secret for service accounts), and is_owner mirrors the
legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* feat(gateway-adapter): add Observer and AuthzAuditSink adapters
Map the gateway's answered-request event onto the labels of
rustfs_s3_http_requests_total, bounded as the legacy counter bounds them,
and write one audit record per authorization decision (allow, deny and
indeterminate) in the shape of the legacy authorization-denial entry,
with the gateway's verified caller as accessKey.
Both adapters stop at RustFS-side sink traits. The legacy metric and
audit field names, with the file:line that emits each and the owner
that supplies it under the gateway, are committed as
tests/fixtures/observability-contract.json and held to the code.
* fix(gateway-adapter): share live root and refuse short secrets
Address the security review of the T2.1 adapters (rustfs/backlog#2760).
- Add RootCredentials (validated: root secret and STS signing key at
least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
RootCell. IamAdapters::new is now the only constructor of
IamCredentials and IamPolicySource, so both read one live root source
per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
in the credential provider and DISABLED_PRINCIPAL in the policy
source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
accounts of root, the name live groups are read under, and another
session's token.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* fix(gateway-adapter): effective secret length and unsplittable pair
Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).
- One rule for every secret: its length after trailing NUL bytes are
removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
so trailing NULs add nothing; interior NULs count. Applied to the root
secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
together through the consuming install(builder, make_authenticator);
compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
binary reads its live root accessor directly; RootCell is now a
test-only helper.
* refactor(gateway-adapter): audit only refusals the gateway enforced
Drop the Observer adapter: request metrics stay with the outer tower
layer and the use-case code on both stacks, and the gateway already
logs every refusal it makes, so nothing is left for an observer to add.
Rework the AuthzAuditSink adapter to record only a Deny or
Indeterminate at an enforcing stage. An Allow and the GetObject
missing-object visibility probe produce no record. The audit switch
and the denial rate limiter are asked before a record is built, and
the record carries the legacy denial entry's fields only.
Remove the observability contract fixture and its tests.
* chore(gateway-adapter): drop the dependencies the observer needed
* docs(gateway-adapter): state what install guarantees about the provider handle
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* test(app): add per-operation test seams for oracle use-case calls
* chore(codemods): add lifecycle transition test split codemod
* test(app): split lifecycle transition tests by operation owner
* test: call oracle use-cases through test seams in cross-owner tests
* ci: guard cross-owner tests to call use-cases through test seams
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* fix(ci): run the mint lane on ubuntu-latest, which has a Docker daemon
* fix(docker): let BuildKit populate TARGETARCH for the rc download
* fix(docker): derive the rc architecture when TARGETARCH is not set
* test(e2e): expect ServiceUnavailable for degraded ListParts after #9149
PR #9149 made ServiceUnavailable the default API code for storage
read-quorum failures and limited SlowDownRead to GET/HEAD object reads.
ListParts maps its storage error through ApiError::from, so a degraded
ListParts now answers 503 ServiceUnavailable. The two distributed
acceptance cases still expected the previous SlowDownRead code and have
failed every nightly e2e-distributed run since 2026-11-05.
The 503 status and the fail-closed (non-empty-list) assertions are
unchanged; only the error code tracks the intended contract.
* style(e2e): apply rustfmt to the ListParts error-code assertion
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(gateway-adapter): add IAM-backed CredentialProvider
Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).
- Pin rustfs-gateway at the existing gateway rev with
default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
legacy empty secret); IAM not ready or not initialized -> Unavailable;
unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
NotFound; other IAM errors -> Backend; invalid or "off" principals
resolve disabled; STS credentials carry a SessionBinding, and an STS
credential without an expiry is a Backend fault rather than a
never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
error text is dropped after classification.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* feat(gateway-adapter): add IAM-backed PolicySource
Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.
- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
account's own secret for service accounts), and is_owner mirrors the
legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* feat(gateway-adapter): add host, bucket-owner and request-id adapters
* fix(gateway-adapter): avoid ecstore path in doc comment
* fix(gateway-adapter): keep the s3s path pattern out of docs
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* test(gateway-adapter): make the test carrier Clone for Extensions::insert
* fix(gateway-adapter): share live root and refuse short secrets
Address the security review of the T2.1 adapters (rustfs/backlog#2760).
- Add RootCredentials (validated: root secret and STS signing key at
least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
RootCell. IamAdapters::new is now the only constructor of
IamCredentials and IamPolicySource, so both read one live root source
per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
in the credential provider and DISABLED_PRINCIPAL in the policy
source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
accounts of root, the name live groups are read under, and another
session's token.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* fix(gateway-adapter): effective secret length and unsplittable pair
Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).
- One rule for every secret: its length after trailing NUL bytes are
removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
so trailing NULs add nothing; interior NULs count. Applied to the root
secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
together through the consuming install(builder, make_authenticator);
compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
binary reads its live root accessor directly; RootCell is now a
test-only helper.
* test(gateway-adapter): use bucket names the rules accept in host tests
* refactor(gateway-adapter): never refuse on request id; owner is the reported constant
* docs(gateway-adapter): state what install guarantees about the provider handle
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
Dispatch-only workflow that compiles the current main commit with a
caller-supplied version and uploads zip, deb, and rpm artifacts.
Co-authored-by: hector <majinghe@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(gateway-adapter): add IAM-backed CredentialProvider
Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).
- Pin rustfs-gateway at the existing gateway rev with
default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
legacy empty secret); IAM not ready or not initialized -> Unavailable;
unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
NotFound; other IAM errors -> Backend; invalid or "off" principals
resolve disabled; STS credentials carry a SessionBinding, and an STS
credential without an expiry is a Backend fault rather than a
never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
error text is dropped after classification.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* feat(gateway-adapter): add IAM-backed PolicySource
Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.
- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
account's own secret for service accounts), and is_owner mirrors the
legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* fix(gateway-adapter): share live root and refuse short secrets
Address the security review of the T2.1 adapters (rustfs/backlog#2760).
- Add RootCredentials (validated: root secret and STS signing key at
least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
RootCell. IamAdapters::new is now the only constructor of
IamCredentials and IamPolicySource, so both read one live root source
per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
in the credential provider and DISABLED_PRINCIPAL in the policy
source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
accounts of root, the name live groups are read under, and another
session's token.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* fix(gateway-adapter): effective secret length and unsplittable pair
Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).
- One rule for every secret: its length after trailing NUL bytes are
removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
so trailing NULs add nothing; interior NULs count. Applied to the root
secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
together through the consuming install(builder, make_authenticator);
compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
binary reads its live root accessor directly; RootCell is now a
test-only helper.
* docs(gateway-adapter): state what install guarantees about the provider handle
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
A multipart index marker is recorded before its staging root is published, and a listing prunes markers whose root is gone. The window in between was covered by a five-minute age check, which cannot prove that the publisher's filesystem work has ended: a publisher stalled past it lost its marker, and the upload it then published stayed out of ListMultipartUploads on that drive until restart.
The publisher now holds an in-memory publication pin from before it records the marker until the filesystem work that publishes the root has returned. The pin travels with that work (the blocking closure or the lease owner chain), so it also covers work that outlives a cancelled caller. Pruning reads the pin first and the staging root second, under the marker lease. The age check and the per-write marker touch are removed.
Lands gateway/integration on main: the guard rails and the domain
decoupling for replacing s3s with rustfs/gateway (rustfs/backlog#2734,
Phase 0 and Phase 1). The S3 edge is still s3s and no wire behaviour
change is intended.
- Guard rails: lower-only s3s footprint baseline and edge allow-list,
per-crate test-count floor, 39 byte-level goldens for the persisted
bucket-config XML families, a two-server differential harness over
all 73 S3 operations, a JUnit differ, and a reference-parity lane
against the sha256-pinned 1.0.5 binary.
- Owned types: rustfs-s3-types (S3Error, S3ErrorCode, Body),
RequestEnvelope, AuthzFacts.
- Engine crates off s3s: ecstore, lifecycle, replication, scanner,
protocols, s3select, s3-client, rpc.
- Admin: error types moved; 300 of 314 Operation impls take the owned
AdminRequest.
- Server: the s3s-compat tower layers grouped under
server/legacy_compat; RUSTFS_S3_STACK=legacy|gateway selector, where
gateway refuses to start until the gateway edge exists.
Fixes made on the branch that change ecstore and heal behaviour are
listed in the pull request description. The per-commit history stays
on gateway/integration.
* fix(ecstore): let missing-key deletes complete on UUID-named folders
Deleting a key that does not exist probes the key's directory for
interrupted delete transactions. The probe was bounded at 4096 entries
per drive and charged every entry inside a UUID-named child, so a key
naming a folder of roughly 1,400 or more UUID-named child keys answered
503 SlowDown on every retry.
Inside a UUID-named child only journal files and data-directory markers
can be evidence, so every other name (a child key's own xl.meta, data
directories or children) is now skipped unread at 1/64 like plain
children of the folder. The per-call allowance of the bounded protocol
rises to 262,144 entries per drive; the resumable background step keeps
4096 and the request budget keeps its sizing, so the per-request total
is unchanged. The probe runs on the durable-mutation lane instead of
the one-worker foreground lane, and stops incomplete when its caller
goes away or after a third of the drive timeout (at most 10 s), so a
slow walk answers SlowDown instead of timing out the drive.
* test(ecstore): keep discovery fixtures meaningful under 1/64 charging
Part files inside a data directory are inert to object-scoped discovery
now, so reclaim_orphan_data_dirs_drains_empty_discovery_pages fills its
first step with the referenced data directories of many versions, which
still cost a full entry each. The charging test drives the walk directly
instead of through the wall-clock-limited disk entry point, so a loaded
machine cannot turn it into an incomplete probe.
Add unaligned-boundary SIMD vs scalar equivalence unit tests and on-demand (#[ignore]) utility-level throughput microbenchmarks across rustfs-utils, rustfs-rio, and rustfs-checksums:
- crates/utils/src/hash.rs: verify HighwayHasher SIMD (AVX2/SSE4.1/NEON) against highway::PortableHash scalar reference and contiguous hash_encode vs odd-chunked hash_encode_slices across unaligned tail boundaries; provide on-demand throughput microbenchmark.
- crates/rio/src/checksum.rs: verify SIMD-accelerated CRC32, CRC32C, and CRC64_NVME against bitwise scalar reference implementations across vector tail boundaries and measure utility-level throughput across all 10 BASE_CHECKSUM_TYPES.
- crates/checksums/src/lib.rs: verify streaming chunked update + finalize + headers() against one-shot digests across all 9 ChecksumAlgorithm variants for unaligned chunk and payload sizes, plus on-demand throughput microbenchmark.
The single-process usage overlay clears usage_snapshot_complete when it
holds counts it cannot reconcile with the persisted snapshot, for
example writes into a bucket that has no verified baseline. The admin
datausageinfo path then judged the overlaid document as structurally
incomplete and replaced it with an empty one, hiding every bucket the
scanner had measured. Because each write restarts that bucket's scanner
fence, a continuously written bucket kept the whole response empty
indefinitely.
Decide whether the persisted snapshot is usable before the overlay is
applied, and report overlay-induced incompleteness as a non-converged
snapshot instead, as is already done for buckets the scan never reached
(rustfs#5806).
Use the larger GitHub-hosted macOS runner for the macos-aarch64
release target. The target id, triple, and other platforms stay the same.
Co-authored-by: hector <majinghe@users.noreply.github.com>
* fix(ecstore): allow bucket creation after failed decommission
* fix(scanner): preserve backlog membership across pool reindexing
* test(scanner): cover partial publication after pool reindexing
When a fused recoverable delete is interrupted after publishing the transaction directory and before updating xl.meta, xl.meta and <transaction>/xl.meta.bkp remain hardlinks to the same inode. Under POSIX rename semantics, renaming xl.meta.bkp over xl.meta during rollback succeeds as a no-op without unlinking xl.meta.bkp, which leaves xl.meta.bkp in the transaction directory after journal removal and strands the transaction in DeleteRecoveryState::LegacyAmbiguous.
Unlink xl.meta.bkp after syncing the restored object directory and before syncing the rollback directory and removing journal markers, and extend delete_recovery_fused_prepare_checkpoint_reopens_before_head_publication to preserve the hardlink and verify rollback completion and retry.
* fix(ecstore): share immutable pool metadata authority reads
* fix(ecstore): read pool metadata authority without the save gate
Health inferred pool metadata write authority from acquiring the local
authority gate within 100 ms. Sharing the gate among read-only
admissions still left held writers, and writers queued behind a reader
parked on the pool.bin fence, turning into cluster-write 503s.
Each writer now publishes the authority it leaves before releasing the
gate, and health reads that published state without acquiring it.
Transaction latches stay shared with the published copy; recovery
clears the latch and its failure under one lock so inspection never
observes a half-cleared state. The inspection-timeout path that can no
longer occur (check_timed_out, the check_timeout admin state, the
pool_metadata_check_timeout reason, the node timeout cache and its
metric) is removed.
* fix(rpc): index nonce expiry by signed validity
* fix(rpc): size replay cache from allocated storage layout
* fix(rpc): make replay admission atomic and release expired tables
* fix(rpc): preserve replay admission refusal at the S3 boundary
* ci: align full e2e selection with retired catalog test
* ci: verify pinned tools through GitHub release asset API
* ci: fetch pinned typos through the release asset API
* ci: download pinned actionlint through the release asset API
* ci: ensure GitHub CLI exists before pinned mc download
* ci: budget full quick checks after tool installation
* feat(observability): record unary read RPC durations
Record complete server-side durations for ReadMultiple and BatchReadVersion, including error and cancellation paths.\n\nCo-Authored-By: heihutu <heihutu@gmail.com>\nCo-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(observability): cover unary duration handlers
Exercise ReadMultiple and BatchReadVersion missing-disk paths and assert operation duration histograms.\n\nCo-Authored-By: heihutu <heihutu@gmail.com>\nCo-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(observability): cache unary read RPC duration handles
Reuse cached duration histograms for ReadMultiple and BatchReadVersion once
the stable server label is available. Preserve the existing ReadVersion
handle and the fallback for other operations and backends.
Add an integration regression for handle reuse, startup fallback, labels,
and recorded values using the production cache path.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(observability): separate server duration from client RTT
Record unary ReadMultiple and BatchReadVersion handler lifetimes in a
separate server duration histogram while preserving existing client RTT
series and allocation-free cached handles for both measurements.
Cover client/server sample separation, cache reuse, startup and backend
fallbacks, and missing-disk handlers. Document the new server metric.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
* fix(table-catalog): reject storage credentials for catalog access
* fix(table-catalog): avoid growing the s3s error macro footprint
Use the existing S3Error constructor for the storage-credential rejection
while preserving its AccessDenied code and message. Keep the merged PR
within the current s3s footprint baseline without relaxing the guard.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
Use a direct response future for originless requests and forward through
the polled-ready service. Nominate every retained CORS header input and
transfer evaluated headers without rebuilding the map.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): prevent cached usage snapshot rollback
Order refreshed snapshots by their authoritative lineage before replacing cached usage. Share the rule with early bucket refreshes while retaining quota baselines, invalidation fencing, legitimate deletions, and clock recovery.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(server): skip trace propagation for disabled RPC spans
Avoid extracting and assigning a remote parent when RPC tracing is disabled after authentication and admission. Cover disabled logging and the production HTTP span propagation path.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): preserve usage ordering across refresh recovery
Retain the last good snapshot independently of negative-cache status. Order observations within the same authoritative baseline by their own coordinated epoch and cycle before wall time, including clock rollback and recovery. Capture persisted baseline identity without cloning its bucket maps.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(server): centralize request trace propagation
Let the HTTP span factory own parent extraction and assignment. Use actual span filtering, preserve span-only subscribers, and remove repeated tracing work from RPC authentication.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(s3): retain protected multipart ETags in object listings
Record encrypted part ETag provenance, aggregate it at read quorum, and attest completed multipart ETags for keyless listings. Preserve legacy fingerprint protection and test versioned SSE-KMS and SSE-C upload, listing, and replay paths.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(s3): stream multipart ETag aggregation
Restore the preserved ETag fast path when selected parts lack protected provenance. Stream native part digests through a fixed stack buffer, preserve legacy hex-or-raw semantics, and strengthen exact-output and override regression coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(s3): preserve encrypted ETag proof during data movement
Capture quorum-backed source proof before multipart completion metadata updates, require exact preserved ETag and version identity, and retain proof only when publication keeps the source version. Cover real two-pool rebalance, null versions, legacy sources, and injected or rewritten identities.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(s3): retain encrypted multipart ETag proof on restore
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
* test(storage): reproduce HTTPS rejoin readiness in Docker
Compare cluster-only and node-ready/write gates on immutable native binaries. Preserve first-failure and latest-acknowledged-content evidence across recovery, capture lock diagnostics before restart, and limit cleanup to verified owned resources.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(testing): unify Docker repro ownership and controls
Use typed resource absence and one verified container inventory for staging, partial setup and retained nodes. Reject inherited experiment overrides before creating resources and remove duplicated state.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(testing): guard staging volumes and interrupted capture
Verify volume ownership before privileged staging and disable implicit image-content copying. Preserve failed evidence and continue owned finalization when capture or cleanup is interrupted.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(testing): capture live rejoin logs and verify trace coverage
Read live tmpfs logs inside the verified container and use one explicit stdout sink for diagnostics. Record bounded capture provenance and fail diagnostic coverage when acquisition, guard-drop or physical-release records are missing, without masking HTTP failures.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(testing): reject inherited aliases and finalize on SIGTERM
Reject inherited MINIO compatibility settings before Docker resource creation. Route SIGTERM through interrupt-aware finalization and restore the previous handler after each run. Cover real process signals and failure preservation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(testing): normalize legacy controls and termination
Reject inherited MINIO compatibility aliases in neutral runtime images. Bridge run-mode SIGTERM into the existing interruption finalization and restore the caller signal handler on return or exception.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Apply cache variation at the shared response boundary, preserve existing
Vary selectors, and reuse parsed global policy and compact CORS inputs.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bound wide bucket-root fanout memory (#8961)
Root prefixes were excluded from ordinary compaction and force_compact only
flattened the root above a hardcoded 250k child ceiling, so buckets with
tens of thousands of top-level prefixes kept one cache entry each after
#8971. Compact wide roots outside checkpointed forward sweeps, and honor
force_compact's limit for root fanout.
* fix(scanner): keep root fanout on interrupted force_compact
Interrupted sweeps seal a resume frontier after force_compact. Applying
the ordinary 10k root limit there flattened frontier-named children and
made the next cycle replay completed prefixes. Use the emergency FORCE
ceiling on the interrupted path; successful completions still honor the
ordinary limit. Drop clippy assertions_on_constants in the new tests.
Signed-off-by: Chris An <anzhengchao@gmail.com>
* test(scanner): seal reloaded frontier after interrupted compaction
Const assertions keep the wide-root preconditions without tripping
clippy::assertions_on_constants. The interrupted and finished sweep
paths share one limit helper, and a cache wider than the ordinary
10k limit still seals its frontier child after reload.
Co-authored-by: Chris An <overtrue@users.noreply.github.com>
* fix(scanner): isolate unreadable children during root compaction
* fix(scanner): isolate compacted namespace child errors
* fix(scanner): preserve compacted scan accounting and coverage
Commit isolated namespace child usage only after successful traversal, while retaining completed accounting on cancellation and resource deferral. Synchronize reduced root totals before the cancellation-prone flush boundary.
Treat skipped namespaces as incomplete coverage and invalidate legacy sampling baselines until a fresh verification pass succeeds. Keep provisional usage out of progress updates and retain the upstream symlink regression.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): preserve legacy retry coverage
* test(scanner): regress cancel overwrite after wide-root reduce
houseme's 714f590 already refreshes the root accumulator from the
compacted cache entry before flush_pacing. Add a unit regression that
simulates the interrupt replace_hashed path so a future regression
cannot reintroduce dangling child links over the aggregate.
Signed-off-by: overtrue <anzhengchao@gmail.com>
---------
Signed-off-by: Chris An <anzhengchao@gmail.com>
Signed-off-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: Cursor Agent <cursoragent@cursor.com>
Co-authored-by: Chris An <overtrue@users.noreply.github.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(container): explain log directory initialization failures
Report failed log directory creation with ownership guidance and a Compose quote hint while preserving configured values. Add a corrected example and real entrypoint regression coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(container): unify startup directory preparation
Share directory creation, diagnostics, and best-effort ownership across data and log paths. Skip delimiter and regex subprocesses for ordinary volume paths without introducing a second parser. Expand real-entrypoint coverage for ownership, failures, delimiters, distributed ranges, and setup command counts.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Record end-to-end durations for ReadAll, WriteAll, ReadMultiple, and BatchReadVersion alongside existing request, error, and payload metrics. This makes direct unary payload ABBA results observable through the internode operation duration family.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Release the per-peer prewarm deduplication marker when the best-effort dial fails, allowing a later RemoteDisk construction to retry the connection warmup without changing lazy connect fallback behavior.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
SFTP subdirectory mkdir and rmdir sent the on-disk __XLDIR__ marker
through the public S3 API. After the suffix was reserved, those calls
were rejected as invalid client keys, so ordinary directory operations
failed while bucket mkdir still succeeded.
Send the logical trailing-slash key and let storage encode the marker.
Co-authored-by: Cursor Agent <cursoragent@cursor.com>
Co-authored-by: Chris An <overtrue@users.noreply.github.com>
* test(server): cover recovered-node admission boundaries
Document backend readiness and write-availability checks during rejoin.
Extend the existing regression through the production middleware order
without changing runtime admission or cluster-quorum semantics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(server): bound rejoin waits and preserve recovery ownership
Enforce startup and unreachable-grace bounds while consuming peer replies.
Release admission when every set has its required peer majority and cancel
surplus read-only probes without carrying votes between rounds.
Bound local readiness observations and polling sleeps. Retain initialized
IAM across preparation failures, install the context once, and retry only
publication after readiness timeouts. Share preparation with inline startup.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(server): make peer admission folding incremental
Compile peer-to-set memberships once and retain compact per-edge votes.
Consume each reply once, discard its payload, and update only affected
set counters instead of rescanning all sets and retained responses.
Recheck the captured deadline after polling and folding a reply so late
work cannot admit the node or clear an expired unreachable grace period.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore,heal,select): bound storage-layer work driven by client input
Scan findings in the erasure store, heal, file metadata and S3 Select
layers, grouped because they share the disk walk, the multipart staging
area, delete recovery and the select snapshot lease:
- Multipart: upload ids are canonicalized before they name a staging path
or a lock key (backlog#3027); trailing-slash keys are encoded like every
other handler (backlog#3055); unlisted parts are removed at completion
(backlog#3106); per-bucket uploads are found through a signed per-disk
index instead of a scan of the shared staging area (backlog#3121);
encrypted part ETags carry a per-upload secret so a write-only user
cannot confirm plaintext guesses (backlog#3044).
- Delete and recovery: recovery walks are bounded per request
(backlog#3038); a delete marker on a key whose xl.meta path is a
directory, and sidecar names used as child keys, no longer wedge the
journal (backlog#3035, backlog#3105); over-quota PUTs no longer list the
bucket under the ledger lock (backlog#3128).
- Listing: scan_dir sends metadata without inline data (backlog#3052),
counts delete markers against max-keys (backlog#3108), and rejects a
marker that carries the cursor tag (backlog#3059).
- Heal: bucket metadata and heal records live in separate namespaces so
DeleteBucket cannot erase a drive rebuild (backlog#3039), a deleted
bucket is skipped instead of failing the rebuild (backlog#3040), and
directory objects are encoded on readback (backlog#3061).
- Restore and tiering: RestoreObject preserves tags and the version's
modification time (backlog#3073, backlog#3074); Snowball transport
headers are not forwarded to the tier (backlog#3090); an epoch
modification time round-trips through xl.meta (backlog#3063).
- Locks: PutObject takes its bucket locks after the body is staged
(backlog#3131); SelectObjectContent releases its namespace locks once
the snapshot is taken (backlog#3132).
- RPC and peers: the v3 signature check consumes the v2 nonce
(backlog#3129); a bucket-metadata reload timeout no longer marks the
peer offline (backlog#3124); replication target requests carry an
operation deadline (backlog#3102); the scanner resumes its interrupted
wait after a lifecycle write (backlog#3118).
- S3 Select: bounded schema inference, column cap and budgeted CSV
batches, Parquet dictionary bounds and pre-planner projection checks
(backlog#3075, backlog#3076, backlog#3077, backlog#3078).
* test(e2e): seed legacy duplicate bucket tags offline for the OPA contract
* fix(s3): authorize what handlers store and bound request-driven work
Scan findings in the S3 request layer (access hooks, object use cases,
HTTP server layers), grouped because they share the authorization
condition builder, the PutObject admission path and the response
layers. Builds on the storage-layer batch for the bounded recovery and
multipart APIs it calls.
Authorization and policy conditions:
- copy source is percent-decoded and version-canonical before the
s3:x-amz-copy-source condition (backlog#3135); CopyObject authorizes
the tag set it copies (backlog#3034); HeadObject with the replication
check header still authorizes s3:GetObject (backlog#3047); the
x-rustfs-source-version-id header feeds s3:versionid (backlog#3072);
recursive force-delete with a REPLICA header authorizes every
descendant as a delete (backlog#3070); include-deleted listings require
s3:ListBucketVersions (backlog#3099); the metadata listing route keeps
table isolation and uses the same prefix it authorizes (backlog#3053,
backlog#3054); If-Match probing needs read permission (backlog#3097);
Object Lambda checks s3:GetObjectVersion (backlog#3058); replication
proxy fallback keeps ExistingObjectTag denies (backlog#3089); HeadObject
returns lock and tag headers only with permission (backlog#3113);
IPv4 clients on the dual-stack listener match IPv4 SourceIp conditions
(backlog#3049); bucket policies are parsed once and cached
(backlog#3032); keystone: access keys no longer verify with an empty
secret (backlog#3043).
Admission and resource bounds:
- GetObject releases disk-read permits when the client stops reading
(backlog#3023); PutObject takes buffer and foreground admission only
after body bytes arrive and bounds the wait (backlog#3031,
backlog#3084); xl.meta size is bounded on the write path
(backlog#3100); XML compat layers stream instead of buffering whole
bodies (backlog#3094); tier GETs stream the remote body (backlog#3046); on-demand migration pulls release permits on
unread GETs (backlog#3110); SSE-KMS key policy covers UploadPart and
completion (backlog#3130); MinIO admin decryption runs Argon2id off the
async worker (backlog#3024).
Input validation and leaks:
- replication headers are validated (source ETag shape, original size)
(backlog#3092, backlog#3093); control characters in keys and lifecycle
rule IDs are rejected (backlog#3101, backlog#3117); Snowball member
mtime needs s3:ReplicateObject (backlog#3083); DeleteObjects checks
Content-MD5 and admin/STS reject SigV2 replays with altered query or
body (backlog#3037, backlog#3026); request logs redact presigned
queries and handler spans skip credentials (backlog#3068,
backlog#3107); SSE-C listings and completions withhold plaintext
metadata and checksums (backlog#3120, backlog#3050); CORS resolves the
bucket like s3s does (backlog#3104); PutBucketTagging rejects duplicate
keys (backlog#3126); notifications fire after a client disconnect
(backlog#3127); ListenNotification streams re-check access
(backlog#3119).
* fix(api): drop imports left unused by the base merge
* test(s3): move the KMS multipart denial test to the app layer
The test drives app-layer multipart use cases, so it belongs with them;
living in the SSE module it imported app code from the infra layer and
failed the layer dependency guard. The SSE test helpers it borrows are
exposed through the storage and app facades.
* fix(s3): keep the SSE-C key fingerprint on keyless multipart completion
The backlog#3050 fix withheld both the plaintext checksums and the
customer-key MD5 header from a CompleteMultipartUpload that did not
present the key. The checksums are a digest of the plaintext and stay
hidden; the key MD5 identifies the key only, and the S3 conformance suite
(test_copy_part_enc) expects it on a keyless completion, so it is echoed
again.
* fix(tier): stream GET bodies and document replication budgets
* fix(ecstore,s3): keep the multipart index and cold fill off disk lifetimes
Two lifecycle regressions surfaced once the storage and request batches
ran together against main:
- The multipart index owner cloned the disk's pinned publication root and
bootstrapped on a task of its own. That kept the mount alive past the
last LocalDisk owner (the disk lifecycle allows exactly three holders of
the root FD) and left a stray task behind, which the local-disk and
read-repair tests detect. The owner now keeps only the root path and
reopens it for identity checks, and the bootstrap scan rides the disk's
existing cleanup task, where stopping the disk abandons it and a
reconnect resumes it.
- The disk-read admission wrapper defers releasing its permit until an
in-flight read completes, so a cancelled client cannot widen disk
concurrency. The cold-fill producer, however, drops a read it has
already classified as stalled when its deadline fires, and that permit
stayed pinned for the lifetime of the stuck read. The producer now
abandons the admission explicitly on timeout.
* test(ecstore): pass the index owner to the Linux cleanup-loop test
* fix(s3): release cold-fill admission after watchdog handoff
* fix(s3,ecstore): close the round-1 adversarial review findings
Adversarial review of the combined request- and storage-layer batch found
fixes that fell short of their issues, two behaviour regressions for
legitimate clients and several unrequested costs:
- backlog#3038: a bulk DeleteObjects reserved the whole per-disk
inspection allowance up front for every key in flight and exhausted the
16 Mi request budget on any set wider than eight drives, failing healthy
keys with SlowDown. Calls are now admitted while budget remains and
charged for the entries they actually visited. Object-scoped discovery
charges plain child keys at one entry per 64 names instead of one each,
so deleting a missing key that names a folder prefix completes instead
of answering 503 forever while a hostile prefix stays bounded. A peer
still on the previous binary is reported
as an unsupported participant, the repository's rolling-upgrade
contract, instead of as a budget verdict.
- backlog#3037/#3026: a SigV2 configuration PUT without Content-MD5 was
still replayable with another body; it is refused with MissingContentMD5
while SigV4 keeps the optional-MD5 contract.
- backlog#3072: DeleteObject now resolves x-rustfs-source-version-id before
authorization like PUT and COPY, so a replica delete cannot remove a
version the policy never saw.
- backlog#3121: the multipart index no longer fsyncs a marker and four
directories per multipart metadata write (it is rebuilt on every start),
and ListMultipartUploads discovers roots concurrently.
- backlog#3077: Parquet SelectObjectContent decodes budget-sized batches
instead of one row per batch.
- backlog#3031: a full upload buffer pool hands out an unpooled buffer
instead of refusing the upload; the progress floor already bounds stalls.
- backlog#3023: the GET disk-read idle cut-off is configurable
(RUSTFS_GET_DISK_READ_IDLE_TIMEOUT_SECS, default 120 s) so a paused
client is not truncated after 30 s.
- backlog#3075: JSON Lines schema inference keeps the sample collected at
the 4 MiB bound instead of failing the query.
- backlog#3024: compat admin decryption queues briefly for a slot instead
of refusing the third concurrent request.
- backlog#3113: HEAD skips its permission probes for the bucket owner.
- backlog#3117: control characters in a lifecycle rule ID are rejected on
PutBucketLifecycle as well.
The lock-crate publication FIFO serves backlog#3111 and moves to the
table-catalog PR. Also fixed: a lossy admin error message, an unused
s3-client function, two unused test-util features, a duplicated key
validation, the s3s footprint baseline, and a stale log event name in the
reverse-proxy runbook. The ODM multipart write-back test runs on the large
test stack like its sibling.
* fix(table-catalog): bound maintenance work and isolate table namespaces (#9174)
* fix(table-catalog): bound maintenance work and isolate table namespaces
Scan findings in the Iceberg table catalog:
- Metadata maintenance deleted every unreferenced *.metadata.json in a
table's directory without checking whether a renamed table in another
namespace still owned those files (backlog#3060); it now resolves the
owning table through the directory index before deleting.
- Manifest lists and manifests were decoded with the embedded Avro
writer schema and no recursion depth limit; a self-referencing record
schema overflowed the stack (backlog#3080). Schemas are validated for
depth before decoding.
- Compaction decoded every input Parquet file into Arrow batches held in
memory; a decompression bomb OOM-killed the server (backlog#3085). Row
groups are streamed through a byte budget and oversized inputs are
refused.
- An S3 request for a key outside an indexed table prefix listed the
bucket's whole namespaces/ catalog prefix and failed once it held more
than 4096 objects (backlog#3086); a per-bucket directory index answers
index misses without the listing.
- The maintenance planner read whole orphan files to obtain their
modification time (backlog#3087); it reads metadata only.
- A client disconnect between persisting active_rename_id and clearing it
left the bucket's catalog entry locked at 503 (backlog#3088); the rename
runs detached from the request future and clears the flag on every exit.
- Table commits held the bucket publication fence until publication,
starving every object write (backlog#3111); commits now hold it under a
deadline and object writes are admitted between commits.
The directory index is managed through three new admin routes under
{warehouse}/catalog/directory, registered in the admin route policy.
The durable-strong store is left as is (its snapshot partitioning for
backlog#3109 and the strong-path deadline are not ported): that backing
is being retired separately, so the new tests cover the object backing.
* fix(table-catalog): close the review gaps in the scan-fix batch
Adversarial review of the table-catalog batch found the fixes narrower
than the issues they close and two cost regressions:
- backlog#3085: the compaction footer check bounded nothing a page header
could not override; parquet sizes its page buffers from the header.
Walk every column chunk's page headers (Thrift compact, no decompression)
and hold each page and the chunk total to the budget before decoding.
The stored-input budget is per rewrite group, so a multi-group job no
longer fails after writing earlier outputs.
- backlog#3086: the default index-miss scan still counted maintenance
reports toward its 4096-object limit; only table entries count now, and
the listing itself is bounded to 64 pages. The directory index remains
an optional accelerator.
- backlog#3111: a create wrote its metadata file under the fence as the
first durable mutation, which disarmed the deadline before the unbounded
registration inventory. The write precedes publication now. The deadline
gets its own knob (RUSTFS_TABLE_CATALOG_PUBLICATION_PREPARATION_TIMEOUT_SECS,
default 30 s, never below the lock-acquire timeout) instead of reusing
the 5 s lock timeout, and the ownership inventory reads entries
concurrently.
- Directory candidates are written only while a directory exists; the
backfill covers earlier entries. A directory on the migration-fence
path is reported as a conflict instead of a parse error.
- Dead test hooks, a stale comment and the support-matrix text that did
not match the code are removed or corrected.
* fix(select): preserve complete samples and Parquet batch limits
* fix(s3,ecstore): close the round-2 adversarial review findings
DeleteObject resolved x-rustfs-source-version-id for authorization on
every request while storage consumes it only for a REPLICA request, so a
non-replica caller with s3:DeleteObjectVersion could trigger a plain
delete of the current version. The hook now resolves the header under
the same predicate as storage, and the regression test covers the
non-replica case.
HEAD no longer skips its permission probes for the bucket owner; an
explicit bucket-policy Deny on the metadata actions binds the owner too.
Multipart index pages verify each root against the staging area and
prune markers whose staging root is gone, under the marker's own lease
with a re-check, so the per-drive index stays proportional to live
uploads instead of every key ever multipart-initiated on the drive.
SigV2 configuration PUTs that declare an empty body need no Content-MD5:
there is no body to replay. The minimum-progress floor stays independent
of RUSTFS_HTTP_REQUEST_BODY_READ_TIMEOUT; the knob's documentation now
says so instead of claiming 0 disables it. The quota bootstrap window
(503 until the background scan publishes the ledger) is kept, because
ledger admission must not come from scanner reporting; the compatibility
matrix now documents it.
The S3 compatibility matrix gains a section for the client-visible
validation bounds, and the drive-timeout tuning guide tabulates
RUSTFS_GET_DISK_READ_IDLE_TIMEOUT_SECS.
* fix(lock): queue table-bucket publication writers fairly
Table commits take the bucket publication fence as a write lock; under a
stream of commits the lock's try-and-retry acquisition let a new commit
jump ahead of object writers that had been waiting longer, which is part
of what starved them (backlog#3111). Requests for the publication lock
path now take a FIFO ticket per shard: a waiter is admitted only when it
is at the head of the queue, cancelled waiters release their turn, and
batch acquisitions join the same queue. Other lock paths are unchanged.
This moved here from the request-layer batch, where no cited issue
covered it; it serves the table-catalog issue this PR closes.
* fix(table-catalog): close the round-2 adversarial review findings
Parquet page-header walker: read the size fields by field id as parquet
does, accepting I16/I32/I64 wire kinds and rejecting any other kind, so
a header encoding uncompressed_page_size as I64 can no longer bypass the
budget while parquet allocates it. Bound every list, set and map count by
the bytes remaining in the chunk, and reject bool collection elements
(parquet skips them with zero width, so either width would desynchronize
the two parsers); this removes the 2^63-iteration spin on LIST<BOOL>.
Start each column-chunk walk at the dictionary page offset whenever the
footer declares one, exactly as parquet's byte_range does, instead of
min(dictionary, data).
Footer pre-walk: before parquet decodes a footer, walk FileMetaData with
the hardened cursor and charge the declared row_groups count times the
RowGroupMetaData size to the decode budget, because parquet 59 reserves
that Vec before reading one element.
Preparation deadline: clamp the
RUSTFS_TABLE_CATALOG_PUBLICATION_PREPARATION_TIMEOUT_SECS knob to 86,400
seconds so Instant + Duration cannot overflow.
Index-miss scan: after each listing page, jump the cursor past the
maintenance subtree the page ended in, and allow one extra page per table
entry already listed, so job-report history scales with the catalog while
a report flood under one table stays bounded.
Migration fence: read the fence-path object once and decide from its
stored kind whether it is directory state or a fence.
Expired or failed create: remove the initial metadata file when the
registration fails before any catalog write may have begun; nothing else
references it. Correct the comment and support matrix that claimed
maintenance reclaims it.
Tests cover each walker divergence, the footer row-group reservation, the
deadline ceiling, the paging budget for honest catalogs and for a report
flood, and the removal of the unpublished metadata file.
* test(admin): register the catalog directory routes in the route matrix
The table-catalog batch added GET, POST and DELETE
{warehouse}/catalog/directory on both the Iceberg and the compat admin
prefixes without listing them in the admin route matrix, so
test_admin_route_matrix_matches_registered_routes failed on CI.
* fix(s3,ecstore): close the round-3 adversarial review findings
Multipart index pages now treat the cursor as the last examined marker
rather than the last root, so a page that pruned a stale marker still
validates and ListMultipartUploads keeps using the index. A marker is
written before its staging root is published, so pruning spares markers
younger than a five-minute grace period and an existing marker is
touched on every new upload; the prune re-checks both under the marker
lease. Bounded delete-recovery inspection rides the durable-mutation
lane like the unbounded path instead of the one-worker foreground lane.
The on-demand-migration inline body budget scales with the object size
(at least 64 KiB/s) instead of a flat 120 s. The control-body digest
service honors RUSTFS_HTTP_REQUEST_BODY_READ_TIMEOUT=0 as "no
inactivity timeout" like every other reader of that knob.
Quota reconciliation throttle objects are deleted together with a
retired generation's ledger, so bucket turnover leaves no residue. The PUT guard
test shim is gone; tests call the shared guard. Bounded DiskAPI defaults
answer MethodNotAllowed like their siblings. Stale
budget docs, an unreachable CSV arm, an always-Some limit parameter,
commented-out constants and a misplaced doc comment are cleaned up;
weak test assertions name the expected error; lifecycle rule-ID control
characters gain a test. The compatibility matrix records the CopyObject
tag-copy permission, the exact SigV2 empty-body predicate, replica and
migration writes of control-character keys, and the SigV2 DeleteObjects
digest rule.
* fix(table-catalog,heal): close the round-3 review findings
A. Pack compaction rewrite groups to min(max-rewrite-bytes-per-job,
TABLE_COMPACTION_MAX_STORED_BYTES), reject an over-ceiling group before
any output is written, and name the ceiling in the commit-path errors;
document the effective cap in the support matrix and scheduler runbook.
B. Keep TaskCancelled/TaskTimeout classification on replacement passes:
the namespace verification runs only for completed or storage-failed
passes, in the erasure healer and the task bucket prepass.
C. Compare the replacement bucket pass per bucket: a recorded identity
that is gone or replaced still errors or restarts the pass, buckets
created mid-pass are appended to the identities, pending_buckets and a
persisted positional order without rewinding progress or the
checkpoint; verification ignores additions.
D. Read the migration-fence object once in the object-backed write permit
and dispatch on its kind.
E. Drop the strong store's copy of maintenance_cleanup_roots.
F. Remove the unused test hooks fail_put_prefix, corrupt_put_prefix and
pause_after_metadata; make compact_parquet_data_files and
PublicationTicket.state private.
G. Document the body-revision identity, the legacy revalidation budget
and its HTTP 503 in the support matrix.
H. Define HEAL_REPLACEMENT_RECOVERY_DIR once in ecstore and consume it
from heal through the storage_api facade.
* fix(ecstore): cap the index pages one disk may answer
Pruned multipart index pages may carry few roots, so the page cursor no
longer bounds how many pages a peer can make a listing fetch. Cut a disk
off after 4096 pages (about one million examined markers) so it
contributes no coverage and the listing falls back to the staging scan.
* fix(ecstore,table-catalog): close the round-4 adversarial review findings
Multipart index markers dated in the future (a backwards clock step
between recording a marker and publishing its staging root) were judged
old and could be pruned while their upload was in flight; a future-dated
marker is now kept. The marker touch on EEXIST is best effort, so a
filesystem that refuses to set times no longer fails the upload commit.
Pruning runs on the durable-mutation lane instead of the one-worker
foreground lane.
Quota reconciliation keeps one throttle object per bucket incarnation (a
quota revision change replaces it instead of orphaning the previous
revision's object), the retirement cleanup deletes it ahead of the ledger
and also when the ledger is already gone, and a scan the retirement
already refused writes nothing back. Bounded DiskAPI defaults answer
UnsupportedDisk, the verdict the aggregate gives a peer without the
protocol. The compaction ceiling pre-check runs over every rewrite group
before any output is written, and the worker's ceiling error no longer
names a placeholder group.
Docs: the inline on-demand-migration client budget, the protocol-2
downgrade conflict of replacement passes, the exact footprint numbers.
* fix(ecstore): retry metadata writes rejected before staging
* fix(ecstore): reuse registered disks during startup
* fix(ecstore): retain remote health monitors during reconnect
* test(heal): release the commit barrier during graceful shutdown
* test(e2e): register graceful shutdown barrier regressions
* fix(ecstore): roll back interrupted pool metadata commits
* test(upgrade): honor the 1.0.4 delete recovery protocol
* fix(heal): bound admission during object rate pressure
* test(e2e): handle rebalance completion before stop
* test(e2e): observe rebalance activity before the start reply
* test(rebalance): hold the first run until stop cancels admission
Use explicit buckets that preserve millisecond lock acquisitions while retaining visibility into long-held delete and recovery locks. Add an exporter-backed regression test for both histogram instruments.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(s3): treat duplicate CreateBucket as owned by the requester
The duplicate-bucket response was decided from the requester's root-owner
flag, so every IAM user recreating a bucket received 409
BucketAlreadyExists, including a user recreating a bucket it created.
BucketAlreadyExists means the bucket belongs to another account; a
deployment owns a single namespace, so the answer is purely region-based:
the default region returns the legacy 200 OK, any other region returns
BucketAlreadyOwnedByYou.
Both the existing-bucket fast path and the BucketExists path now share one
helper. Authorization still runs first, so a requester without
s3:CreateBucket gets AccessDenied and cannot probe bucket existence.
Refs #8493
* test(ci): refresh e2e selections for duplicate CreateBucket
The two new create_bucket_region cases join the e2e-smoke and e2e-full
selections, which main also extended with multipart_upload_id tests.
smoke is measured from a local nextest listing: removing the two new cases
reproduces main's committed digest exactly. e2e-full is derived the same way
from main's listing artifact (run 41933823399, babfeaed0) plus the two
multipart_upload_id cases, which reproduces main's committed linux digest
before the new cases are added; CI re-verifies both platforms.
test_bucket_create_exists_nonowner asserts BucketAlreadyExists for a second
identity, which a single-owner deployment cannot produce. Move it to
excluded_tests.txt with the deployment-ownership rationale; the IAM-user
duplicate paths stay covered by crates/e2e_test/src/create_bucket_region_test.rs.
UploadPart, UploadPartCopy, ListParts and CompleteMultipartUpload returned 400 InvalidArgument for a malformed upload ID, while AbortMultipartUpload returned 404 NoSuchUpload. AWS S3 documents NoSuchUpload for an upload ID that might be invalid.
Report MalformedUploadID as NoSuchUpload through one helper used by all operations that address an existing upload, replacing the Abort-only special case. ListMultipartUploads keeps InvalidArgument for a malformed upload-id-marker.
Add the multipart_upload_id_test e2e module to the e2e-smoke profile. It asserts 404 NoSuchUpload from every operation that addresses an existing upload, for a malformed upload ID and for an aborted one, and updates the e2e-smoke and Linux e2e-full selection digests.
Co-authored-by: Karl Bastarache <bastarachek@google.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
* perf(ecstore): probe bulk-delete write locks in parallel waves
Bulk delete acquired one distributed write lock per key in serialized
order, paying a full quorum round-trip per key. Probe the unique keys in
bounded parallel waves with a short timeout instead; any contention drops
the whole wave and the canonical serial order resolves it as before, so
two overlapping batches can never deadlock.
* perf(ecstore): probe bulk-delete transaction locks in parallel
The set-layer delete-transaction locks were also acquired one quorum
round-trip per key after the raw write locks. Apply the same optimistic
all-or-nothing probe wave with a canonical serial fallback, and keep the
per-key error reporting the fallback already provided.
* perf(ecstore): pre-fetch bulk-delete source metadata in parallel
The admission loop ran one metadata quorum fan-out per key in sequence
on top of the per-key lock round-trips. Pre-fetch the source reads the
loop needs with bounded parallelism under the locks already held, and
derive the per-key read inputs from one shared helper so the pre-fetch
and the loop cannot disagree.
* test(ecstore): drop unused import in batch-delete probe test
* refactor(ecstore,lock): await wave releases and unify probe waves
Adversarial review of the bulk-delete lock waves found three real
issues. Distributed guard release is fire-and-forget on drop, so the
serial fallback could re-acquire keys while unlock RPCs were still in
flight and block on locks it already owned: guards are now released
with an awaited unlock before the fallback runs. The wave also probed
every key after the first failure, adding up to one probe timeout per
chunk of pure overhead under contention: probing now stops at the
first failing chunk. Finally the two copy-pasted wave implementations
are replaced by one shared probe_lock_wave, and the per-key delete
read inputs are resolved once instead of being recomputed.
Tests now assert the wave/fallback counters so they prove which path
ran, and an overlapping-batch test pins the no-deadlock property.
* refactor(ecstore,lock): batch bulk-delete lock rounds per key
Replace the optimistic probe waves with the bulk lock primitive the lock
layer already supports on the wire: one lock_batch RPC per lock client
for a whole DeleteObjects key set, per-key quorum guards with the usual
TTL heartbeat, and per-key outcomes. The batched round is deadlock-free
by construction (every lock server orders concurrent batches by the
same global (shard, key) order), so the probe timeout, the wave
release-and-wait dance, and the canonical serial fallback all go away.
Per-key lock outcomes are now reported per key end to end: a locked-out
key fails alone in the response while the rest of the batch proceeds,
matching the S3 DeleteObjects contract and the set layer's existing
behavior. The set layer's raw-write-lock and delete-transaction-lock
waves fold into the same primitive via one shared resource-folding
helper, and the fast-lock batch fast path now counts acquisitions so
shard metrics keep their meaning.
* perf(ecstore): move journal publish off the one-worker namespace lane
A bulk delete publishes one recovery transaction per key, and every
journal inspection and settle-plan closure ran on the per-disk
foreground namespace lane (one worker), serializing the whole publish
phase per drive behind every other mutation. Route those closures onto
the durable-mutation lane the fused delete prepare already uses (eight
workers per disk, fsyncs coalesce in the filesystem journal), and keep
32 journal publications in flight so a 16-drive set can feed those
lanes.
* test(ecstore): flatten lock-error iteration in overlap test
* fix(ecstore,lock): refresh duplicate keys after recovery, bound unlock
Review findings on the batched lock rounds. A batch entry whose recovery
rolls back an interrupted prepared delete can bring a retained version
back; a later duplicate of the same key still held its pre-fetched
source-missing read, skipped the object-lock check, and deleted the
restored version. Recovery now evicts the pre-fetched reads of every
other entry naming the same object, so those entries take the loop's
live re-read and see the restored version.
The batch rollback release awaited the full unlock retry schedule,
including the deferred background pass, parking the request behind an
unreachable peer. The synchronous phase is now a single release pass
with the deferred retries spawned in the background.
* fix(ecstore): release local batch locks before deferred recovery
A set-layer batch delete that runs deferred key recovery re-acquires a
write lock on the same keys through recover_delete_object, but the raw
local batch guards were only ever released at function exit — the
distributed path releases its batch ids before the deferred loop and the
local path missed the mirror release, so the recovery deadlocked against
the batch's own locks and surfaced as a spurious Lock(Timeout) for every
deferred key.
A regression test plants the interrupted prepared delete this needs and
pins the end-to-end contract: a batch naming a GOVERNANCE-retained
version twice must deny both entries after the first entry's recovery
rolls the prepared delete back, and the restored version must survive.
* test(lock): cover batch acquire partial-grant rollback
The distributed acquire_guard_batch rollback path — a key granted by
fewer than quorum clients must fail alone and release its partial grants
before the call returns — was only reachable in distributed mode and had
no coverage. A scripted per-object LockClient pins both halves: the
below-quorum key reports QuorumNotReached with its partial vote, and the
orphaned grant is released synchronously while the quorate key's guard
stays held.
Track active descriptor volumes, exact paths, and component prefixes in FdCacheTracker so unmatched invalidate_under, invalidate_volume, and invalidate_exact calls return without scanning Moka or waking the background maintenance task.
* fix(s3): honor presigned x-amz-meta-* query parameters
The AWS SDK presigners hoist signable x-amz-* headers into the query
string (smithy moveHeadersToQuery), and AWS S3 accepts the hoisted form
as the header it came from. RustFS read user metadata from headers only,
so a presigned PutObject carrying ?x-amz-meta-user-id=u1 returned 200 and
stored an object with empty metadata (rustfs/rustfs#9142).
Add one shared extractor for user-metadata query parameters and wire it
into every metadata-accepting write path (PutObject including snowball
members, CreateMultipartUpload, CopyObject REPLACE) plus the snowball
extract trigger, instead of normalizing per operation the way the
presigned UploadPart checksum fix did. The stored key form is produced by
the same helper as the header path, so the hoisted and header forms land
on disk identically.
Only a signature-covered query is honored: SigV4 signs the canonical
query string, while SigV2 signs headers plus a fixed subresource list
only, so honoring its query would let a presigned-URL holder add object
properties the presigner never authorized. Keys and values that could not
have arrived as a header are rejected rather than stored, since the read
path turns them into header fields and a control character would fail
every Head/Get of that object.
* refactor(s3): hoist signed x-amz query params at the request boundary
Replace the per-write-path query metadata extractor with one boundary
mechanism: restore the `x-amz-*` request properties the SigV4 presigners
hoist into the query (`@smithy/signature-v4` `moveHeadersToQuery`) as
request headers before s3s routes and deserializes the request.
One hook now covers every reader at once — s3s input parsing,
`extract_metadata_from_mime`, the snowball extract trigger and its
transport-key filter, tagging, storage class, object lock and copy
source — so PutObject, CreateMultipartUpload and CopyObject need no
changes at all. It also replaces repeated query parsing along the write
path with a single pass at the boundary.
An existing header always wins, so the hoist is purely additive and the
unsigned-header guard keeps rejecting anything the signer did not sign;
that guard now also accepts a header whose single value equals a
same-named query parameter, which is what the hoist produces and what
the signature covers.
`query_string_is_signed` rules out SigV2 before it trusts any SigV4
marker. SigV2's string-to-sign covers headers plus a fixed subresource
list rather than arbitrary query parameters, so a SigV2 presigned URL
stays valid after `X-Amz-Algorithm`/`X-Amz-Signature` markers are
appended to it; without this rule a URL holder could turn on
`x-amz-meta-snowball-auto-extract` and have a plain upload untarred
(review of #9146).
* fix(s3): hoist signed query params after s3s signature verification
The request-boundary hoist ran before s3s, so the restored `x-amz-*`
headers reached s3s's own verifier, which rejects any `x-amz-*` header
outside `X-Amz-SignedHeaders` (s3s `ops/signature.rs`,
`reject_unsigned_amz_headers`). A valid presigned PUT with
`SignedHeaders=host` and `?x-amz-meta-user-id=u1` therefore came back
with 403 AccessDenied before any handler ran (review of #9146).
Move the hoist to `authorize_request`, RustFS's shared authorization
entry: s3s has already verified the signature there, and policy
evaluation plus the handler read request properties after it, so the
restored headers reach every operation without ever appearing unsigned
to the verifier. The mechanism is unchanged — one gated, validated pass
over the signature-covered query.
CopyObject's replacement metadata now also reads the headers, because
s3s parsed `input.metadata` before the hoist ran.
The hoist itself and its tests stay in `server::layer`; the tower layer
is gone.
* perf(s3): single-pass signature-aware query hoist in auth
Move the query hoist into `auth.rs`, next to the unsigned-header rules it
is part of, so `storage` no longer reaches into `server` for it. Its
documented contract — which request properties the signature covers, and
why SigV2 must never be widened — now lives with the rule it protects.
Make the hot path allocation-free and single-pass. The caller no longer
clones the query just to satisfy the borrow checker, the function no
longer clones it again, and one `form_urlencoded::parse` pass both
recognizes the presigned-SigV4 marker set and stages the hoistable
parameters. Nothing is validated or applied until the gate passes, so a
request whose query is not signature-covered is never rejected here. A
single ASCII scan skips the whole thing when the query names no `x-amz-`
parameter at all, which is every ordinary `?versionId=`/`?uploadId=`
request and every queryless one.
The duplicate-parameter and header-value checks stay strict; only when
they moved, not how they behave.
* fix(s3): keep verifying a query-carried payload hash after the hoist
The hoist restores `?x-amz-content-sha256=<digest>` as a header, but it
runs after s3s has already built the request body. s3s reads its
payload-hash input from the headers only, so it installs no hash
validator for a digest that arrived in the query, and the restored header
then made `get_content_sha256_with_query` conclude the auth layer was
enforcing it. Neither layer verified the body, so a presigned PUT whose
digest exists only in the query accepted a modified payload (review of
#9146).
The question is not whether a digest header is present but whether the
digest reached the request as a query parameter: that one is always the
storage layer's to verify. A digest sent as a header is still left to the
auth layer, which wraps the body in a hash-validating reader for it, so
no payload is hashed twice.
* fix(auth): limit late query hoisting to user metadata
* refactor(s3): drop the stale payload-hash compensation, scope the pre-filter
Limiting the hoist to `x-amz-meta-*` user metadata means it never
manufactures an `x-amz-content-sha256` header, so the payload-hash
predicate's original signal — a digest header present at handler time is
one s3s is enforcing — is exact again. Restore it and drop the
query-aware form: that change existed only to undo a header the hoist is
no longer allowed to create, and it would have hashed a payload twice
for a presigned request that declared a real digest both in the query and
as a header.
Match the pre-filter to the same scope so a query carrying only a typed
property (`x-amz-tagging`, `x-amz-storage-class`, `versionId`) skips the
parse entirely instead of scanning past it.
* test(access): use explicit imports in the signed-query lock regression
The architecture migration rule requires RustFS storage-owner modules to
name their imports instead of pulling the parent module in wholesale, and
`signed_query_lock_permission_regression` was still on `use super::*`.
Import the two symbols it actually uses and drop the unused one.
* test(access): reference FS through the parent import
The layer dependency guard tracks `use crate::...` edges, and naming
`crate::storage::ecfs::FS` from the signed-query regression looked like a
new `infra -> interface` reverse dependency. `access.rs` already reaches
the same type through `use super::ecfs::FS`, so reuse that import instead
of introducing a second, tracked spelling of an edge the module has
always had. No baseline entry, no new edge.
---------
Co-authored-by: overtrue <anzhengchao@gmail.com>
Scan findings in the alternate-protocol front ends and the KMS and
Keystone integrations:
- WebDAV and FTPS read RUSTFS_WEBDAV_CA_FILE / RUSTFS_FTPS_CA_FILE,
checked that the file existed, and then built their TLS listeners
with with_no_client_auth(), so mTLS was never enforced. A shared
protocols::common::tls::server_config builds the rustls config with a
client-certificate verifier from the configured CA, startup fails on
an invalid CA, and a CA cannot be combined with cleartext
(backlog#3069).
- The KMS readiness probe used a fixed key id that the key-lifecycle
admin routes accepted like any customer key, so kms:DisableKey on it
failed readiness on every node. The probe key is reserved from key
management and a disabled probe key no longer counts as a backend
failure (backlog#3115).
- The Keystone middleware answered anonymous requests carrying a junk
X-Auth-Token with the configured Keystone URL in the body while
Keystone was unreachable; failures no longer disclose upstream
locations, and the login cache is bypassed when a subscription token
refresh is required (backlog#3116).
Scan findings in crates whose behavior is driven by untrusted input and
that stand alone from the storage core:
- trusted-proxies: the simple implementation takes the client address
from the right-most untrusted X-Forwarded-For hop instead of the
left-most (backlog#3082); the legacy validator never falls back to the
proxy identity when the chain is rejected and reads X-Forwarded-For
unless RFC 7239 is explicitly selected (backlog#3051).
- targets: webhook and similar outbound clients drain responses up to a
byte limit instead of buffering arbitrary bodies (backlog#3062); the
on-disk notification queue has a shared byte budget in addition to the
entry count, configurable via RUSTFS_TARGET_STORE_MAX_BYTES
(backlog#3122); AMQP and Redis manifests declare the broker url as a
secret and bind credentials to their connection fields, and the
plugin-instance PUT refuses to restore a redacted secret when the
connection fields changed (backlog#3065, backlog#3066).
- obs: the debug-level s3s response dump is filtered so STS and
service-account credentials never reach the log (backlog#3029).
Scan findings in the IAM crate and the admin identity handlers, grouped
because they share the IamCache mutation lock, the STS session sweep and
the admin client-address plumbing:
- Admin and STS authorization used the socket peer as aws:SourceIp
behind a trusted proxy; they now read the verified client address the
S3 path already uses (backlog#3025), and the admin usage route passes
the bucket named in the path to the s3:ListBucket check (backlog#3033).
- AssumeRoleWithWebIdentity accepted HS256 ID tokens MACed with the OIDC
client secret; only provider-signed tokens verify (backlog#3028), and
JWKS refresh is single-flight with a failure cool-down (backlog#3103).
- A disabled group emptied the member's whole policy list, dropping
every Deny; direct and other-group policies are preserved (backlog#3042).
- Identity rewrites (secret change, add-user, status) ran without a lock
and without re-reading the record, so a user's password change could
undo an admin disable or reset (backlog#3048). add-user on an existing
user and in-flight AssumeRole both left sessions minted under the old
secret valid (backlog#3071, backlog#3079); rotation now revokes under
the per-key mutation lock and derived-credential publication is ordered
with it.
- aws:groups never carried a built-in user's IAM group membership and
jwt:iss was always the local marker, so group- and issuer-scoped
Denies never matched; both now come from live IAM state
(backlog#3095, backlog#3096).
- OPA mode skipped the account-status gates for service accounts and STS
sessions of a disabled user (backlog#3057).
- The periodic IAM reload published nothing when any cache write raced
it and kept stale partitions when a prefix listed empty, so a missed
revocation never applied (backlog#3064, backlog#3114).
- update-group-members never evaluated admin:RemoveUserFromGroup
(backlog#3098); ExportIAM compared the site-replicator account against
a name it never has (backlog#3045); add-user accepted the access key of
a live STS session or service account (backlog#3134); a service account
could create or extend a lifetime beyond its own (backlog#3112);
sts:DurationSeconds and svc:DurationSeconds were never populated
(backlog#3136); temporary-account-info returned service accounts
(backlog#3137); an access key the object layer refuses no longer holds
the service-account lock through the write retries (backlog#3133).
A put-like write without a version id to a key that is not
versioning-Enabled replaces the key's null version in place. The
commit-time Object Lock gate in put_object_with_old_current_size_inner
ran only when the write carried an explicit version id, and the
request-layer pre-check reads the key's latest version. When the
retained null version was not the latest entry (a UUID version or a
delete marker sat above it), a user holding only s3:PutObject could
overwrite it together with its COMPLIANCE retention or legal hold, and
CompleteMultipartUpload had no commit-time gate at all.
Name the version a commit replaces (the explicit id, or the nil id when
the write is not versioned and the bucket's Object Lock snapshot is not
ConfirmedAbsent) and run the existing WORM gate against it, tolerating
a null delete marker. complete_multipart_upload gets the same gate at
its commit point, and ECStore::handle_complete_multipart_upload attaches
the bucket's Object Lock snapshot the way a single PUT already does.
Refs rustfs/backlog#3019 (ANT-2026-EH17ZP59).
Eight scan findings in the shared policy engine, each a case where a
Deny did not apply or an Allow was broader than written:
- A bare `*` Action was parsed as `s3:*`, so `Deny *` never matched
admin:, kms: or sts: actions. `Action::All` now denies every family
while the historical S3-only Allow is preserved (backlog#3041).
- A bare IPv6 address in aws:SourceIp got `/32` appended, matching a
2^96-address network; a bare address now means one host, and IPv4
clients on a dual-stack listener are matched through their mapped
form (backlog#3030).
- Date conditions on aws:EpochTime parsed the epoch seconds as RFC 3339
and never matched, so a time-bounded Deny failed open (backlog#3036).
- NumericNotEquals and DateNotEquals evaluated to false when the key was
absent; negated operators now follow the AWS rule and match
(backlog#3123).
- Every trailing IfExists on a condition operator added a level of
recursion without bound; the chain is rejected before parsing
(backlog#3091).
- Policy variable substitution re-expanded its own output for up to ten
passes, so an access key holding k placeholders grew to k^10; values
are now substituted once as literal data (backlog#3067).
- A bucket-policy Service principal was matched against the signing
access key, so a service account named after the service received its
grants; Service principals round-trip but never match (backlog#3081).
- Resource matching cleaned the trailing slash off a directory object,
so a Deny on `prefix/*` missed `prefix/` itself (backlog#3125).
Also deduplicate large Resource sets through a HashSet instead of a
quadratic scan.
PutObjectLegalHold and PutObjectTagging apply the value in their XML
body, and a POST upload applies its form fields, while the
s3:object-lock-legal-hold, s3:RequestObjectTag/<key> and
s3:RequestObjectTagKeys condition keys (and every other header-derived
key for POST) were built from the HTTP headers. The policy engine
therefore judged a value the handler did not store: absent when the
client sent no header, and whatever the caller wrote when it did. A
user limited by a Deny on the requested legal hold or tag value could
release a hold and delete the held version, or retag an object so a
tag-based grant exposed it.
Record the body value in request extensions before authorization, the
way PutObjectRetention already does, and let authorization_conditions
replace the header-derived keys with it. For POST uploads project the
parsed form fields over the headers that feed the condition map, removing
a header whose field is absent.
Refs rustfs/backlog#3018 (ANT-2026-KONBE376).
DeleteObjects ran its Object Lock check on one version of a key and then
removed a different one. For an entry without a version id on a key that
is not versioning-Enabled, delete_objects_with_accounting judged the
key's latest entry and then had the disks remove the null version. When
a UUID version or a delete marker sat above a null version under
COMPLIANCE retention or legal hold, that retention was never read and a
user holding only s3:DeleteObject could remove the retained version. The
single-object DELETE on a Suspended key had the same gap.
Add SetDisks::check_null_version_object_lock_delete, which looks up the
null version under the lock the caller already holds and runs the
existing check_object_lock_delete against it when the latest entry
carries a UUID version id. The batch path is not gated on
source_missing because a delete marker on top makes the latest-version
lookup report the key as missing. Plain unversioned keys and
versioning-Enabled keys keep a single lookup and unchanged behavior.
Refs rustfs/backlog#3017 (ANT-2026-6ED2F7II).
Storage encodes a directory object `photos/` as `photos__XLDIR__/xl.meta`
and LocalDisk::scan_dir decodes every directory entry ending in the
suffix back into a marker. The S3 write path never refused the suffix in
client keys, so a 1-byte PutObject to the key `__XLDIR__` made the walk
schedule the directory being scanned as its own child and recurse until
the stack overflowed, aborting the server on every restart until the
directory was removed by hand. Keys below a `*__XLDIR__/` segment were
stored but hidden from every listing and from quota accounting.
validate_object_key now rejects any client key containing the suffix,
which covers PutObject, CopyObject, Snowball extraction and the admin
internal put; CreateMultipartUpload and CompleteMultipartUpload now run
the same validation so uploads created before the key was reserved
cannot publish it. scan_dir additionally ignores a marker whose decoded
name is empty, so malformed markers left by older writers or corrupt
disks can no longer recurse into their parent.
Refs rustfs/backlog#3020 (ANT-2026-SBJ1JLC2).
POST /rustfs/admin/v3/kms/reconfigure and configure accepted
server-local file paths in the Vault request body (Kubernetes jwt_path,
AppRole secret_id_file, TokenFile path, TLS ca/client cert and key
paths), read the named file with the server's own authority and sent
its content to the Vault address given in the same body. A user holding
only kms:Configure could read any UTF-8 file the process can read,
including /proc/self/environ with the root credentials, and exfiltrate
it to an address of their choosing.
normalize_configure_request_secrets now runs
validate_vault_local_file_access for both handlers: a Vault request
that names a server-local file, or inherits the stored credentials by
sending a blank token, must keep the operator-configured address and
namespace, the same file-based auth method (role, path, mount) and the
same TLS paths and verification setting. Requests with explicit inline
credentials and no file paths are unchanged.
Refs rustfs/backlog#3021 (ANT-2026-F8MRFKCC).
The object handlers accept several spellings of one version id (upper
case, unhyphenated, braced, urn:uuid:) and the storage layer resolves
all of them to the same version, but the s3:VersionId condition value
was the client string verbatim. A Deny with StringEquals on one version
could therefore be bypassed by re-spelling the id in ?versionId=.
Canonicalize the id once where the condition value is produced so every
hook and policy type (IAM, bucket, session) sees the spelling the server
emits: hyphenated lower-case UUID, with null in any case and the nil UUID
mapped to null. Non-UUID strings pass through unchanged and are rejected
by the handlers as before.
Refs rustfs/backlog#3022 (ANT-2026-O5MHY8VJ).
* fix(replication): replay the MRF journal periodically
The persisted MRF journal was replayed only at startup. Delete-marker
purges whose watch window drained with targets unreachable, and
replications that overflowed the worker queues, reach the journal while
the server runs, so they waited for a restart to converge.
Move the startup pass into replay_mrf_journal and rerun it every five
minutes from a background loop. The existing recovery leader lock keeps
one pass at a time across the cluster, including the startup pass.
* fix(replication): space periodic MRF replay across nodes
Every node runs the MRF replay loop and the recovery leader lock only
serializes passes, so an N-node cluster replayed the same retained
backlog N times per interval while a target stayed down.
Record the start time of a pass that finds entries in a shared replay
stamp and skip a periodic pass when any node started one within the
interval. The startup pass still always runs.
* fix(heal): treat SlowDown as a rate signal and bound page churn
* refactor(heal): unify page rate control and drop checkpoint clones
* refactor(heal): one pass-wide rate controller, single SlowDown observe
* fix(heal): address SlowDown backoff and checkpoint baseline review
Replace the single-mutex PREPARED_DELETE_RECEIPTS and ACTIVE_MULTIPART_SOURCE_HEADS maps in rustfs-ecstore with a 64-shard ShardedPathCache backed by SWAR canonical byte keys and xxh3_64 hashing. Replace PUT_FILE_TARGET_LOCKS in rustfs internode RPC with a 64-shard ShardedPutFileTargetLockRegistry using stack-buffered binary keys, in-place dead-Weak slot reuse, and amortized garbage collection.
* fix(replication): skip site-replication rules in replica delete fan-out
A site that receives a replicated delete forwards it to its own targets
so chained replication keeps propagating deletes. The fan-out used the
whole bucket config, including derived site-replication rules, so in a
site-replication mesh a replicated purge was echoed back to its origin
and duplicated to every other peer. The echo could remove the origin's
pending-purge version before its own delivery state was written back.
Ignore derived site-replication rules when computing the replica delete
fan-out. The origin already delivers and retries every delete to each
peer itself. Operator rules still fan out, so chained replication is
unchanged.
* fix(replication): keep operator rules matching the site-repl shape
Rule ids and target ARN shapes are not reserved for site replication:
an ordinary bucket target ARN carries its target id, so an operator rule
named site-repl-<target id> matched the derived shape and was dropped
from replica delete fan-out, breaking an A -> B -> C chain.
Skip a rule only when its deployment id is a current remote
site-replication peer, reading the peer set only when a rule has the
derived shape. If the state cannot be read, skip nothing.
Large metacache elements (an xl.meta grown past 16 MiB with its version
history) were accumulated in fixed 64 KiB reads, paying hundreds of
read rounds per entry on the listing path. Double the per-round chunk up
to a 4 MiB bound so each reservation stays incremental and bounded
(rustfs/rustfs#2715 corrupt-length-prefix safety is unchanged) while
wide listings and oversized entries decode in far fewer rounds.
Add regression coverage for rustfs/rustfs#9120: a listing whose
aggregate stream exceeds the per-value 16 MiB bound, and an oversized
entry listed among ordinary neighbors with peek/skip interleaving.
The rustfs_cluster_servers_offline_total gauge was event-driven only:
record_peer_reachable fired solely after a fresh connector.connect()
succeeded. When post-recovery traffic was served by a cached channel
(tonic auto-reconnect, addr-form cache-key split, or delete-recovery
channel), no fresh dial occurred and the gauge stayed stale until the
process restarted.
Add record_peer_reachable_if_offline (fast-path read / slow-path write)
and wire it into every successful peer interaction:
- remote-disk recovery probe success (gRPC DiskInfo)
- periodic TCP connectivity check success (bounded-interval reconcile)
- data-path RPC success (execute_with_timeout_for_op_and_health_action)
- lock-path RPC success (record_rpc_success and detached completion)
Fixesrustfs/rustfs#9119
Tracking: rustfs/backlog#3138
After the nightly packages are on the auto-testing nightly release and
the schema 2 R2 candidate exists, post repository_dispatch to
rustfs/auto-testing. Vault lanes stay parallel, and the workflow_run
functional chain is left in place.
Co-authored-by: hector <majinghe@users.noreply.github.com>
Remove pull_request from the distributed and upgrade workflows. Distributed
stays on the nightly cron, and upgrade stays on the Monday cron plus
version tags. Both remain manual-dispatch lanes and stay outside the
required merge checks.
Co-authored-by: majinghe <majinghe@users.noreply.github.com>
Give each mixed-workload request a bounded policy for the server's
explicit namespace lock timeout response and Retry-After advice. Keep
unrelated SDK failures and data mismatches immediately visible.
Preserve 24 workers, four rounds, cross-node checks and all retained
objects. Cover exhausted SDK retries, bodyless HEAD, fatal responses,
persistent contention and incorrect acknowledged bytes, and include the
new cases in the protected distributed profile inventory.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* ci(validation): resolve the newest nightly build on scheduled sweeps
The first scheduled sweep failed at candidate resolution: a schedule
carries no workflow inputs and resolve_functional_candidate.py only
derives a build from a workflow_run payload, so the empty
BUILD_RUN_ID crashed int(). Look up the newest successful
nightly-gnu run explicitly when the inputs are empty and feed it to
the resolver. Also downgrade the evidence artifact to
if-no-files-found: warn so an early infra failure does not cascade
into a second red step.
* ci(validation): read the resolver chain envelope correctly
CHAIN_OUTPUT is the chain envelope {schema, run_id, attempt,
workflow_sha, testing_sha, candidate}; the manifest lives under
candidate.manifest and the testing sha at the top level.
* ci(validation): sweep harness fixes from the first live run
- ssh -n in the inter-case cleanup loop: plain ssh consumed the case
list from the loop's stdin, so the first dispatch executed only one
of the twelve selected cases.
- Provide the managed Python 3.12 runtime for pool/ilm/replication
cases, mirroring the chain validation job (pool.status reported
INFRA_ERROR after its assertions passed; the missing runtime is the
prime suspect).
- Record the auto-testing sha in the report step environment.
- Retain the last case's evidence tree in the sweep artifact so gate
verdicts like INFRA_ERROR can be diagnosed from the run itself.
* ci(validation): install sweep Python client dependencies
Scheduled sweeps failed pool.status before any assertion because
pool_behavior.py exits when boto3 is missing. Install the auto-testing
validation requirements into a per-run virtualenv and put it on PATH,
matching the functional chain, so case scripts can import the client.
Co-authored-by: hector <majinghe@users.noreply.github.com>
---------
Co-authored-by: hector <majinghe@users.noreply.github.com>
* chore(deps): refresh crates and adopt openidconnect 4.1
Use published OIDC/OAuth2 releases and reject malformed HMAC signature
lengths before upstream verification. Refresh workspace and fuzz locks,
and advance the local zstd compatibility patch to 0.13.4 while retaining
the fixed 0.14.3 codec backend.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* chore(deps): refresh compatible lockfile resolutions
Resolve Prost build and derive dependencies with itertools 0.14 and
prefer windows-sys 0.61.2 within the existing supported version ranges.
Retain all package versions, sources and checksums.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(connect): separate cleanup checks from short probe windows
Use the functional measurement budget for the cleanup HTTP fixture so
setup and measured I/O can finish before checking delete status handling.
Exercise both normal scheduling and an in-flight PUT clock advance, and
include target classification in unexpected-failure diagnostics.
Retain the cleanup deadline, outer timeout and delete-stage assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): isolate stalled multipart disk timeouts
Apply the short injected timeout only to the deliberately stalled disk.
Healthy disks retain their normal operation budgets, while logical lock,
physical owner, immediate CopyObject and final shard assertions remain.
Keep overrides scoped across cloned and reconnected handles, preserve
shorter caller deadlines and explicit zero timeouts, and report drive
health when the real CopyObject assertion fails.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(rebalance): retry metadata write lock quorum admission
Recognize typed write-lock quorum failures for rebalance.bin within the
existing bounded metadata admission retry policy. Each attempt must
acquire quorum before loading or saving metadata; data writes are not
replayed by this retry.
Cover recovered and persistent quorum failures, cancellation after a
failed attempt, and rejection of unrelated resource or read-lock errors.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Add an opt-in `fips` Cargo feature to `rustfs` and `rustfs-tls-runtime`
that enables `rustls/fips` and `tokio-rustls/fips` (activating
`aws-lc-rs/fips` / `aws-lc-fips-sys` and `rustls-webpki/aws-lc-rs-fips`).
When compiled with `--features fips`, `startup_runtime_hooks` installs
`rustls::crypto::default_fips_provider()` as the process-wide default
crypto provider and asserts `provider.fips()` at startup.
Also lock `aws-lc-fips-sys v0.14.4` in `Cargo.lock`, allow the `OpenSSL`
license on `aws-lc-fips-sys` in `deny.toml`, and update
`docs/operations/kms-cryptographic-compliance.md` to document the scope
of `-p rustfs --features fips` vs. `rustfs-crypto`.
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Characterize how scanner metadata decoding and object listing handle a leading free version and a later delete marker.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Define the scope, authority, coverage, persistence, and resource guarantees needed before scanner-derived current-object statistics can be enabled.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* ci(validation): sweep the migrated canonical validation cases nightly
The canonical release-validation cases migrated into auto-testing by
rustfs/auto-testing#113 (66 implemented, all non-heal) currently run
only through the manual validation flow; the last fleet executions
stopped on 2026-10-27 and nothing schedules them. Add a scheduled
validation sweep that closes the gap:
- nightly at 19:30 UTC (after the functional chain settles), rotating
windows of the implemented catalog cases so the whole catalog is
covered roughly weekly, with a bounded batch per night
- workflow_dispatch for a single case (--case), one module (--module),
or an explicit batch (--limit), mirroring how the lanes are testable
standalone
- fleet admission through functional_environment enter/finish with the
same quarantine discipline as the lanes, inter-case node cleanup,
per-case logs + reports retained as a sweep artifact
- a markdown sweep report uploaded to rustfs/dashboard under
functional-reports/validation/ so the cases appear next to the lane
reports, plus an alert-on-failure job for scheduled runs
- heal.* cases stay on the interactive validation flow: many need the
reviewed native/tool collectors built by separate validation-tools
runs before fleet execution
The registry gains the workflow responsibility (monitor: workflow,
max-age 60h so the watchdog notices a dead sweep) and the wiring test
baseline count moves with it.
Verified locally: check_wiring, check_test_wiring, test_validation_registry
(9/9), test_functional_chain + test_functional_chain_health +
test_security_workflow (99/99).
* ci(validation): group the sweep report by catalog module
The validation cases cover distinct areas (pool lifecycle, ILM
expiration, bucket/site replication, kms, data services, identity,
s3 compatibility), so a flat case table hides the category breakdown.
Render one section per catalog module with its own case table and a
Subtotal line, and keep the single grand - Total:/- PASS:/- FAIL:
block for the dashboard overview parser. Subtotals deliberately use
a different bullet prefix so the overview regexes cannot mistake a
module subtotal for the grand total.
* ci(validation): sweep the eight planned cases whose executors exist
The planned catalog entries are not all unimplemented: all eight
(kms.sse-kms-round-trip, tiering.transition-and-restore,
events.delivery, audit.request-correlation, iam.policy-enforcement,
oidc.login-and-session, s3.basic-object-round-trip and
scanner.usage-convergence) have dedicated executors routed in
run_validation_case.sh and live PASS evidence recorded in the
migration map. Widen the sweep filter to include them: the rotating
nightly batch now covers 74 cases (66 implemented + these 8), and the
fresh evidence each sweep produces feeds their acceptance review.
heal.* procedure-ready cases remain excluded - their executors need
the reviewed native/tool collectors built by separate
validation-tools runs before fleet execution.
---------
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
* perf(ecstore): fuse multipart commit, cache active upload heads, and scale fsync workers (#9077)
- Cache active multipart upload heads, committed part records, and per-part
transaction state in ACTIVE_MULTIPART_SOURCE_HEADS with invalidation on
mutation, retirement, abort, and delete paths.
- Fuse destination metadata preparation into MultipartFusedCommitOutcome,
coalesce prepared metadata writes before sync_data(), and gate direct
local part transaction settlement on disk.is_local().
- Retain quorum commit receipt publication before physical delete cleanup
using PREPARED_DELETE_RECEIPTS, batch TARGET and PREPARED syncs, and skip
redundant pre-reservation directory syncs for inline deletes.
- Scale DiskBlockingLane::Fsync to 8 workers per disk with idle_workers
accounting and bounded per-disk batch fairness so concurrent fsyncs
coalesce in the filesystem journal.
- Cache verified small stripe proof records in VERIFIED_STRIPE_RECORDS while
recomputing payload digests on every read.
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* fix(ecstore): align test/prod commit and cache paths and hold source lock across cache publication
* fix(ecstore): preserve fused commit cancellation/panic semantics and retire excess idle fsync workers
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
---------
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
Replace the immediate post-replacement leader identity comparison with a
polling stabilization loop (up to 20 x 500ms). A leader-lock refresh gap
during old-binary replacement can make leader() briefly observe a different
node; the loop waits for the measured new coordinator to be confirmed. A
persistent change to an old-binary node still fails with the observed
identity in the error message.
Removes the redundant immediate assertion that the stabilization loop
supersedes. Also consolidates the non-mixed leader/pid resolution to avoid
a double leader query.
Extend test_buffer_brotli_responses to verify body bytes are preserved
and Content-Length matches the exact body length. Add two new cases:
non-brotli responses pass through unmodified, and a body stream error
strips Content-Encoding so clients do not attempt to decode an empty
body as brotli (covers the fix from #9085).
backlog#2918 retires the usage floor as a quota proof. After dual-corruption
recovery has been attempted, an unreadable floor is reported and rebuilt
through a CAS overwrite with a bootstrap marker rather than stopping the
leader iteration for a supervisor retry. Transient I/O errors that prevent
reading the floor revision fall through to the existing stop-and-retry path.
The identity-less floor regression from rustfs/rustfs#8670 now verifies
automatic rebuild and recovery instead of bounded backoff.
When sequential test fixtures share the bootstrap InstanceContext, the
BucketMetadataSys stores a Weak<ECStore> to avoid a reference cycle. The
ExpiryState holds an Arc<ECStore> that keeps the store alive past the
test's own Arc drop; the next fixture's resize_workers releases it and
the weak goes dangling before init_bucket_metadata_sys installs a fresh
BucketMetadataSys. Any object_store() call in that window panicked.
Add Drop for ECStore that clears the context's BucketMetadataSys slot
when its weak handle is stale, so the next fixture always finds a clean
slot. Fixes the heal absence_receipt_regressions and dangling_grace
test failures under sequential execution.
When sequential test fixtures share the bootstrap InstanceContext, the
BucketMetadataSys stores a Weak<ECStore> to avoid a reference cycle. The
ExpiryState holds an Arc<ECStore> that keeps the store alive past the
test's own Arc drop; the next fixture's resize_workers releases it and
the weak goes dangling before init_bucket_metadata_sys installs a fresh
BucketMetadataSys. Any object_store() call in that window panicked.
Add Drop for ECStore that clears the context's BucketMetadataSys slot
when its weak handle is stale, so the next fixture always finds a clean
slot. Fixes the heal absence_receipt_regressions and dangling_grace
test failures under sequential execution.
* ci: gate the plan on a contract marker
A base planner predating the NIGHTLY_JOBS split still emits the old required
set, and the strict verifier would reject it. Select now stamps plan_contract=2
and the workflow refuses any plan without the current marker, falling back to
the full matrix, so a stale base planner can neither authorize the new narrower
selection nor force a job the new workflow no longer schedules.
* ci: rename the workspace lint-and-build job key and evidence path
The job key test-and-lint named a job that runs no tests: it does Clippy, the
test-binary archive, doctests and the log-rule anchors, while the tests live in
workspace-tests. Anyone reading needs: [test-and-lint] would conclude tests had
already gated that dependency. The key becomes workspace-lint-and-build to
match its display name, and the shared evidence directory becomes
artifacts/workspace so the path stops asserting the same thing. The aggregate's
display name stays Test and Lint because that is the live ruleset check
context. ci-gates.md also stops attributing the ECStore test run to the wrong
job.
Add a fail-closed release certification path so incomplete or substituted
evidence blocks every official publication exit. scripts/release/release_gate.py
validates the versioned release-validation plan, the candidate identity and the
G01 evidence-envelope set, then re-checks promoted bytes against the passed
list. build/docker/package/helm publication jobs require that certification and
stage artifacts before promoting identical bytes.
Connect Feature Boundaries, real io_uring and the rio-v2, Swift, SFTP and
HTTP/3 feature lanes no longer gate a merge. They run only in the scheduled
and manual full-validation runs, which report a regression within a day; on
the pull-request path they bought no earlier signal worth the runner
occupancy (Connect alone measured 53.5 median minutes and occasionally set
the wall). Workspace lint and tests, the short core contract, the debug
build, E2E smoke and the S3 lanes stay required on PRs and merge groups.
* ci: retain CI01 timing sample and fix the OIDC live gate tool
Record the measured PR feedback and runner occupancy for the CI plan's CI01
criterion, including the honest gap between the experimental targets and the
sampled medians, and replace the awscurl dependency in the live Keycloak gate
with the AWS CLI so the security suite runs on PEP 668 managed fleets.
* docs(testing): attach live run evidence to the event-drill index
Run cargo update --verbose and cargo upgrade --verbose twice from the
current main baseline. Upgrade the Tonic family to 0.14.9, Redis to 1.8.1,
sysinfo to 0.40.1, and hotpath to 0.30.2 with compatible transitive updates.
Synchronize the standalone fuzz lockfile and retain its PKCS#1 rc.4
resolution for compatibility with pinned RSA rc.18.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
When to_bytes fails in buffer_brotli_responses the error path replaced
the body with empty while keeping Content-Encoding: br, producing a
malformed response (empty body claiming brotli encoding). Strip the
header and log a warning so the degradation is visible and the client
does not attempt to decode a missing body.
tower_http's CompressionLayer streams brotli via Transfer-Encoding: chunked
without a Content-Length header. Firefox's incremental brotli decoder aborts
on this combination (NS_BINDING_ERROR), making the web console unusable in
Firefox. Chrome and Safari buffer the full body before decoding so they are
unaffected.
Add a thin middleware (buffer_brotli_responses) that runs after CompressionLayer,
collects the complete body for any brotli response that lacks Content-Length, and
re-emits it with the correct length header.
* feat(scanner): bound first-build enumeration with the cycle budget
Charge raw directory entries and their name bytes, and let one bucket scan hold a child budget that stops its own token while charging the cycle. A count budget also bounds one directory listing, so a wide first build can no longer finish a full read_dir before the first object is charged.
The new stop reason maps onto the persisted Directories variant so older readers keep decoding checkpoints. A directory with queued children keeps its index until they end, and every index on the active walk path is saved as an optional map field: losing either one would recharge its replay and stop a fixed budget from advancing.
* feat(scanner): keep bucket service order across restarts
Save each set's first-in-first-out bucket order as an optional map field of its usage cache, including after an incomplete cycle, which otherwise writes nothing. Durable age now outranks the dirty-first and leader-local cohort orders, which only break its ties, so a restart cannot hand the budget back to the same first buckets. Failed turns add visible debt without moving a bucket forward; a budget stop or a resource veto adds none. A bucket that spends its quantum and saves forward motion returns to the queue tail within the cycle.
The order authorizes nothing: another movement epoch or a corrupt value starts a new one, and a recreated bucket joins as a new arrival.
* test(scanner): cover quantum handoff and saved service order
Run the real worker queue with injected bucket shares and verify a spent bucket yields to waiters, a share without durable motion ends its turn, and the saved order keeps certified coverage while rejecting older owners.
* docs(scanner): describe budgeted first build and service order
* test(scanner): pin index retention and requeue motion
Bound the nested restart fixture tightly enough that dropping a directory index fails it, and cover a repeated share whose frontier never moves.
* fix(scanner): keep service generations and owner stops intact
Queue a new bucket behind waiters but ahead of buckets that already had a turn, matching the leader-local cohort, and keep the set cache untouched when the owner was cancelled so an interrupted cycle cannot advance its revision. The order holds one record per inventory bucket, like the set cache's entries, so a truncating bound that could starve the long-waiting buckets is removed. Publish the incomplete scope before saving so a contended lock cannot delay it.
* ci(e2e): refresh the full selection digests
* fix(scanner): correct a comment spelling
* fix(scanner): separate service debt from vetoes and stale owners
Keep a resource veto and a remote count-budget stop out of failure debt,
settle the claim before a requeue exposes the bucket to another worker, and
stamp the service order with its leader so an older owner cannot replace it
after an incomplete save. The checkpoint fixture's budget now covers both
service orders.
* fix(ecstore): create parents before resource-scoped writes
#9064 moved parent creation into the lazy writer, so a write that holds a
resource unit reached the native open without its parent directory and
failed with FileNotFound on nested paths.
* fix(e2e): retry SlowDown codes during upgrade write readiness
The rolling-upgrade readiness probe only retried 503 ServiceUnavailable,
so a transient 503 SlowDown from a still-recovering node failed the
four_node_rolling_upgrade test immediately. Accept SlowDown and
SlowDownRead alongside ServiceUnavailable, matching the existing chaos
test transient-error set.
* feat(scanner): share node admission with background heal
* fix(scanner): drain candidates after listing completion
* fix(scanner): yield cache leases for shared node admission
* test(scanner): attest adaptive admission in process receipts
* fix(concurrency): declare Tokio time dependency
* feat(concurrency): retain bounded physical resource subsets
* fix(scanner): retain resource ownership in native filesystem jobs
* feat(concurrency): acquire physical groups before node work
* feat(scanner): gate background reads by physical device
* feat(concurrency): combine preallocated resource selections
* feat(scanner): share physical topology across disk plans
* fix(storage): retain only native disk resource subsets
* feat(storage): admit auxiliary physical resources without waiting
* feat(heal): admit physical resources before object repair
* fix(storage): retain resources during native format probes
* fix(storage): retain resources through direct writer I/O
* fix(storage): retain resources through buffered writer I/O
* fix(storage): retain physical resources through streamed reads
* fix(storage): retain resources through native filesystem jobs
* fix(storage): retain physical ownership during bitrot reads
* fix(ecstore): retain resources during positioned reads
* fix(ecstore): retain staged metadata write ownership
* fix(ecstore): retain native io_uring read ownership
* fix(ecstore): enforce receiver-side background admission
* fix(ecstore): retain resources through whole-file native I/O
* fix(ecstore): retain physical ownership during durable rename sync
* fix(storage): account for retained background stream buffers
* fix(storage): retain memory charges for background read results
* fix(storage): account for native io_uring read allocations
* fix(storage): retain memory charges for direct-write buffers
* fix(ecstore): account for heal and RPC reader buffers
* test(scanner): verify samples and clean concurrent collectors
* fix(storage): retain inline and HTTP writer memory reservations
* perf(rio): reuse reserved HTTP writer storage
* fix(rpc): reserve background scanner pipe storage
* perf(rpc): reuse reserved response reader storage
* feat(scanner): measure cache copy allocation requests
* fix(rpc): budget namespace scanner responses
* fix(scanner): retain the enabled supervisor task handle
* fix(scanner): budget namespace frame read staging
* fix(scanner): account namespace envelope decode storage
* fix(heal): retain and join the MRF consumer on shutdown
* test(heal): isolate process-global MRF consumer fixture
* fix(heal): join manager workers during shutdown
* test(heal): verify shutdown at native read boundaries
* fix(heal): drain channel commands before stopping MRF
* fix(heal): admit resume scans and retain replacement workers
* build: pin profiling sources and trust fixed ownership dependencies
* fix(heal): yield node admission while accepted native work drains
* fix(startup): retain shutdown work and preserve deadline failures
* fix(heal): admit inventory probes and retain replacement work
* fix(shutdown): preserve maintenance and frontend join failures
* fix(shutdown): retain HTTP child tasks through real retirement
* fix(shutdown): join actual TLS reload work before retirement
* test(multipart): preserve failures before fault barriers
* fix: keep physical admission inside repository guards
Route the multipart lock diagnostics filter through the e2e storage
compatibility module, reuse the parent module's s3s body aliases in the
namespace memory test, and share one Reed-Solomon verify error mapping
across the reserved-buffer and default paths.
* fix: reconcile physical admission with main's new call sites
Main added a source-admission metadata write layer, a CAS write fence,
fixture writers and scanner handoff tests against the old borrowed-slice
and node-permit shapes. Pass owned Bytes through the new metadata layer,
answer the scanner handoff with ScannerNodePermit, gate the test-only
disk lookup re-export, and clear the lint findings that stable 1.99
reports for the shutdown and admission code without suppressions.
* test(concurrency): name reversed attachment groups clearly
* fix(ecstore): box disk operation futures below admission layers
Every LocalDiskWrapper operation reaches the LocalDisk future through the
health, admission and timeout layers (track_cleanup_mutation, the
track_disk_health family, the io-permit and native-resource admission
split, and track_admitted_disk_operation). Each layer embedded that future,
and unoptimized builds copy it into every awaiting frame, so one local
delete cost about 1.3 MiB of stack and 16 tests overflowed libtest's
default 2 MiB stack.
Box the operation future once where track_admitted_disk_operation creates
it, through a non-async helper so the temporary never stays in a polled
frame. The layers above now hold only a pointer; the cost is one
allocation per local disk operation.
* fix(heal): box object heal futures below admission
The admission wrappers took the object heal future by value, so unoptimized
builds copied it into three awaiting frames, about 650 KiB per heal. Create
it through a non-async helper instead, leaving only a pointer in those frames.
* test(ecstore): count the I/O backend's root FD owner
* test(heal): isolate durable repair during root recovery
* test(heal): isolate the direct repair fallback
* fix(lock): use remaining acquire budget for retries
* test(lock): use virtual time for retry budget
* fix(lock): retain quorum failures across deadline retries
* test(heal): isolate multi-pool crash recovery
* fix(lock): retain quorum error on final timeout
* fix(heal): allow reads during read repair reconstruction
* fix(heal): retain deep scan retry for read repair
* test(heal): wait for metadata write tail
* perf(ecstore): fuse local PUT/DELETE commit I/O and eliminate redundant metadata disk reads (#9038)
- Fuse authoritative bucket metadata existence and parse reads via tokio::join!, add a LOCAL_META_MUTATION_GEN-validated local authority cache, and piggyback one-shot quota snapshot reads onto single-PUT Object Lock snapshot loads.
- Reuse prepared ObjectOptions in post-write lifecycle transition checks instead of re-reading bucket versioning and Object Lock config after commit.
- Defer temporary shard file open/mkdir/write into a single spawn_blocking call via LazyLocalFileWriter, pre-sync single-block shards before page-cache reclaim, and fuse rename_data preparation + commit into a single Fsync-lane dispatch on Linux.
- Enable rename_data old_current_source reuse by default across all-local sets, guard early-ack commit on quorum source stability, and skip redundant post-commit tmp_delete when all online local disks succeeded.
- Enable data-first batch_shard_pread when deferred parity handles are available and replace zero-filled allocation with Vec::with_capacity + read_to_end for offset-0 shard reads.
- Defer pre-delete get_object_info_for_delete to PrefixAccessDenied error handling, skip redundant single-pool unversioned delete pre-stats, and add a fused local delete preparation and 2-barrier settlement fast path.
Fixes#9038
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* fix(ecstore): preserve delete identity and durability policy
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): cover fused delete recovery stages
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): preserve inline versions after commit sync failure
* perf(ecstore,s3): accelerate PutObjectLegalHold, CopyObject, and large PUT fdatasync (#9038)
- Fuse LocalDisk::update_metadata (read xl.meta + FileMeta::load + update_object_version_with_opts + marshal_msg + staged tmp write + rename_all_with_precondition_and_parent_sync_std) into a single Fsync-lane blocking operation, and skip redundant get_bucket_info / get_object_info calls in put_object_legal_hold when object lock is enabled and replication is not configured (PutObjectLegalHold: 314.8 -> 988.3 ops/s, 3.14x faster, 0.95x of MinIO).
- Pass destination bucket as orig_volume through create_bitrot_writer_with_orig_volume into LocalDisk::create_file so single-shot non-inline part.1 writes under syncs_data_shards() durability run fdatasync before fadvise(POSIX_FADV_DONTNEED) and skip the duplicate sync_dir_files_std(src_data_path) in FusedCommitAttempt without fsyncing the temporary parent directory (warp PUT 1MiB: 658.3 vs MinIO 656.8 obj/s, 1.00x parity, p50 26.10ms vs MinIO 46.60ms).
- Add single_pool() fast paths to ECStore::handle_copy_object and ECStore::handle_new_multipart_upload, skip no-op destination prelookup get_object_info when put_like_write_creates_new_version is true, and backfill previous_current_size from OldCurrentSize in copy_object (CopyObject 1KB: 398.4 -> 1,086.1 ops/s, 2.73x faster, 1.01x faster than MinIO).
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* fix(ecstore): provide non-Linux has_rename_data_test_failpoints stub for Windows CI
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* fix(ecstore): preserve presynced shard directory durability
Sync the shard directory before publishing presynced payloads and keep the file sync test probe available on non-Linux targets.
* fix(ecstore,s3): fix non-consuming crash_inject check, test hooks, and rubber-duck findings (#9038)
- Add non-consuming crash_inject::is_armed(point, key) so FusedCommitAttempt and LocalDisk::update_metadata do not consume one-shot crash arms before the fallback path runs (fixes crash_consistency::* and meta_write_crash_consistency::* tests).
- Check INLINE_PREPARATION_BEFORE_BACKUP and RENAME_DATA_AFTER_FIRST_PUBLICATION in has_rename_data_test_failpoints so inline preparation admission and observed-owner panic tests run on their expected path.
- Resolve staged_dir via get_object_path_for_io in test_rename_data_presynced_shard_keeps_directory_sync and avoid premature orig_volume access check during tmp staging in put_object (fixes put_object_failure_cleans_tmp_workspace_inline).
- Address rubber-duck review findings: fall back from FusedCommitAttempt on any existing xl.meta when sync_commit_metadata is true, fsync object dir after activating delete rollback dir before unlinking xl.meta, classify data-dir entries before removal in fused delete finalization, include self_copy_lock in copy_prelookup_required, and avoid .expect() on non-test mutexes.
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* fix(ecstore): defer shard sync until destination is known
* test(rustfs): cover legal hold replication fast path
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* fix(s3select): match request enum values case-insensitively
ExpressionType, CompressionType, CSV FileHeaderInfo, JSON Type and CSV
QuoteFields were compared exactly, so lowercase values such as
`lines`, `document` or `gzip` were rejected. MinIO accepts any case.
Match them ASCII case-insensitively in request validation and rewrite
them to the canonical uppercase spelling, so every later comparison
keeps working unchanged. Unknown values keep their existing errors.
* fix(s3select): keep source key order for JSON LINES input
Arrow's JSON schema inference walks each record as a serde_json::Map,
which sorts keys unless serde_json's process-wide preserve_order
feature is on. JSON LINES `SELECT *` therefore returned keys sorted,
and CSV output columns were permuted.
Infer the LINES schema from the same object bytes and record limit as
DataFusion's JsonFormat, keep Arrow's types, and reorder fields
(nested structs included) by first-seen key order. Enabling
preserve_order globally was rejected: it changes map ordering for the
whole binary.
Drop the test-only preserve_order dependency so the crate's tests run
with production features; the DOCUMENT inference reference now
compares against Arrow's types in source order.
* fix(s3select): name nested path projections after their last key
`SELECT s.obj0.id` returned the key `s.obj0[id]`, DataFusion's display
name for the field access. AWS names an unaliased path projection after
its last key, e.g. `{"id": ...}`.
Alias such projections to their last key when that name is unique among
the output and ORDER BY column names. Queries with a wildcard keep
today's names, since the expanded columns could collide.
* fix(s3select): preserve names beside computed projections
* fix(s3select): preserve names for ambiguous path projections
* fix(s3select): name path projections from the planned schema
Path projections that the SQL rewrite leaves unaliased are now named
after their last key once DataFusion has planned the query. A path takes
its key only if no other output column keeps or receives that name. A
colliding rename is dropped and the check repeats, so the final names
are unique whenever DataFusion's own names are.
The SQL rewrite is unchanged, so GROUP BY can still refer to the names
it assigns and every query that planned before still plans.
Review cases:
- s.obj0.id, s.obj1.id, s.obj2."s.obj0[id]" keeps the three generated
names: the third key would duplicate the first retained name.
- s.obj."lower(s.id)", LOWER(s.id), in either order, keeps the generated
path name: its key is the computed column's name.
Paths beside computed columns, beside duplicated keys, and in
parentheses now take their key, as AWS S3 Select names them. Paths stay
unnamed when an ORDER BY expression is not projected, as before.
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: GatewayJ <835269233@qq.com>
A request refused by the authorization layer was logged as
s3_authorization_denied but never reached the audit stream. Emit an audit
entry from DenialContext::deny with the account, bucket, object, denied
action and denial reason. Entries are bounded by a per-class token bucket
(lower for anonymous callers) with a suppressed count carried on the next
entry, quiet probe denials are skipped, DeleteObjects audits its refused
keys as one aggregate entry, and the S3 response is unchanged.
A replicated force-delete that a target rejected (for example a peer whose
credentials lack s3:ForceDeleteObject) was only logged; the per-target
replication counters never saw it, so `replication status` reported zero
failures while the sites had already diverged.
Build a ReplicatedTargetInfo for every target outcome of
replicate_force_delete_to_targets (missing client, offline target,
rejected remove, success) with a Pending previous status, and feed each
through ReplicationStats::update so rejections count as failures and
accepted force-deletes count as replicated.
Document that the managed site-replicator-0 policy must name
s3:ForceDeleteObject explicitly and that a bucket-replication target with
its own credentials needs the same grant.
* fix: preserve PUT lock failure diagnostics
Propagate the request operation into spawned PUT commit tasks so lock failures retain their metric attribution. Record bounded lock error classifications without exposing lock resources.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test: remove redundant clone in PUT lock test
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix: bound PUT commit context stack usage
Pin the commit future before wrapping it with request context to reduce stack pressure in PUT callers.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* ci(ft): update the lane gate to the 54-case manifest with scenario F
auto-testing #118/#119 added FT scenario F and case B5, so the lane now
runs 54 cases over scenarios A,B,C,C2,D,E,F and passes 54/54 — but the
workflow gate still pinned the 44-case A-E manifest and failed the
report step. Align the gate and the contract-test fixture with the
54-case manifest.
* ci(heal): give heal a 90-minute run budget inside a 120-minute job
The heal task was still progressing (scanned 494 -> 571+, failed=0)
when the 45-minute step cap killed it, so the verification steps never
ran and the lane produced invalid evidence (chain 40796474356). The
step budget is now 90 minutes, and the job-level budget rises from 60
to 120 minutes so the enclosing job cannot cancel the raised step
budget. The timeout contract now records heal as the exception to the
shared 60/45 baseline.
* ci(chain): force the performance probe offline while pf-testing is broken
The pf-testing environment is temporarily broken, so every nightly
chain would end red in the performance lane. performance is
required=false in scheduled-validations.json, so forcing the probe's
performance_ready output to offline takes the chain through its
designed skip path: the lane job is skipped, aggregate receives
--allow-skipped performance, and the report records the optional-lane
skip with its reason. Marked TEMPORARY; restore the probe once the
environment is healthy again.
* test(table): drop a stale workflow-comment pin left by #9059#9059 rewrote the table suite step comments but kept the assertion for
the old '# Red only for harness/environment breakdowns' line, so
test_security_workflow.py fails against current main. The semantics
stay pinned by the continue-on-error and HARNESS_OK assertions.
* fix(audit): replay queued payloads for internal event names
Audit entries are persisted by the store targets and read back through
serde. Three internal events (CreateMultipartUpload, AbortMultipartUpload,
DeleteObjects) serialized to a string that EventName::deserialize rejected,
so every queued entry for them was dropped on replay. Read the persisted
event name through a lenient deserialize_with function; EventName's own
Deserialize and parse stay strict because they also back notification
configuration.
* fix(audit): emit entries for multipart parts and bucket config writes
UploadPart, UploadPartCopy, AbortMultipartUpload and the mutating bucket
configuration operations never produced an audit entry: the audit path
required a bucket notification event and these operations have none, or
(AbortMultipartUpload) never built a helper. Add an audit-only
OperationHelper constructor that builds no notification event and wrap
the S3 handlers for these operations with it. Operations without a
notification event use one coarse audit-only event name, with the
operation in api.name.
---------
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Since #9059 the shared test archives and debug binaries are named
with the run attempt, and the archive identity binds the attempt. A
"Re-run failed jobs" attempt does not rerun the successful producer,
so its consumers look for <name>-2, fail with "Artifact not found",
and every flaky test forces a full rerun.
Give those artifacts one name per run, overwrite them when a producer
does rerun, and bind the archive identity to the run instead of the
attempt. Source, tree, lock, toolchain and environment stay bound, and
an archive from another run is still rejected.
The planned package list is passed to cargo as bare -p names. The zstd
compat crate is named zstd so it can patch crates.io, and with zstd
0.14.3 also locked, cargo rejects -p zstd as ambiguous, failing
Workspace Lint and Build on main since #9059.
Qualify such names with the local version from Cargo.lock, and fail
loudly if even that cannot disambiguate.
* chore(deps): refresh crates and adopt released aws-sigv4
Run two update/upgrade rounds for the main and standalone fuzz workspaces.
Replace the temporary SigV4a Git override with aws-sigv4 1.6.4 from the
registry and remove its obsolete source permission.
Pin OpenID Connect to e20ddbb01ca68356f2979bc125f5613ab45b4e7e. Upgrade
async-nats to 0.51.0, hotpath to 0.30.0, libunftp to 0.24.0, and the TOML
test dependency to 1.1.8. Retain Arrow/Parquet 59.3.2 for DataFusion 55.2.0
and keep the fuzz PKCS#1 version compatible with pinned RSA rc.18.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(deps): retain safe openidconnect pin against HMAC panic
The e20ddbb pin verifies HMAC signatures with mac.verify(signature.into()),
which panics in generic-array on malformed length instead of returning
InvalidIdentityToken. Retain the previous reviewed pin that uses
verify_slice and add a malformed-signature regression covering HS256,
HS384, and HS512.
* chore(deps): upgrade sysinfo to 0.40.0
Update the main and standalone fuzz lockfiles. Adapt fallible system
queries, CPU usage accessors, and OS-native network interface names.
Preserve process sampling fallbacks and report unavailable diagnostic
sources without panicking. Cover missing host and process collectors.
Validation: 167 focused tests passed; production and all five fuzz targets
passed cargo check. Formatting, logging guardrails, and the existing
dependency policy passed. Linux and Windows runtime checks were not run.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ci): use the admin error facade for sysinfo failures
Keep the sysinfo initialization error behind the existing admin S3 facade.
The facade builds the same error code and message without expanding the
direct S3 error-macro surface guarded by the migration ratchet.
Validation: S3 footprint guard, formatting, whitespace, and production
cargo check with sftp, hotpath, and connect_top_net passed.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* chore(deps): refresh hotpath and ctutils (#9055)
Run two cargo update/upgrade rounds in both the main and fuzz workspaces
on top of PR #9047. Upgrade the hotpath family to 0.30.1 and ctutils to
0.4.7. Retain fuzz pkcs1 0.8.0-rc.4 for the pinned RSA 0.10.0-rc.18;
rc.5 fails to compile against that RSA version.
Validation: 1096 library tests passed with 19 skipped; upstream ctutils
and hotpath-drain property/concurrency suites passed. Production and all
five fuzz targets passed cargo check. Formatting, S3 footprint, and the
existing dependency policy passed.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Probe local data roots and fixed metadata directories before admitting disks. Report runtime and owner IDs with migration guidance for root-created volumes, while retaining unavailable registry slots for existing quorum handling.
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
* perf(ecstore): avoid eager parity reads for demand-bound GET
Reuse the existing batch setup and quorum targets to retain deferred parity
without materializing bytes that demand-bound reads immediately discard.
Keep legacy all-shard batching and verify degraded and ranged recovery.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(ecstore): validate batch reads on the opened shard
Avoid repeated pathname traversal by reading metadata from the descriptor
used for positioned I/O. Reject nonregular shards without blocking and
preserve range, metrics, and cancellation behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Eliminate redundant .bucket-incarnation/xl.meta quorum reads and distributed
bucket-metadata transaction read locks under held lifecycle read locks and
Object Lock configuration snapshots across put_object_metadata, CopyObject,
UploadPartCopy, RestoreObject, read_object_versions_for_lifecycle, and
get_bucket_incarnation_id_for_options_in.
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
Wait for eight completed delete attempts instead of auto-advancing through
300 seconds of replay scans against a durable on-disk store. Retain the
original virtual upper bound and assert hook/store state after cancelling
and joining the worker.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Reuse the owned frame's decoded record with bounded canonical size checks
and the existing scanner validation/application core. Keep the complete
outer parser and own the journal state fields without a JSON round trip.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Cover the neighboring accepted and rejected nesting depths in an owned
replay frame so a future inner-root decode cannot relax its depth limit.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* ci: move lightweight jobs to GitHub-hosted Ubuntu
Move API-only control jobs and prebuilt Docker image packaging to ubuntu-latest. Keep lab suites and heavy compilation on their existing runners, and remove redundant GitHub CLI installation.
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
* ci: retain functional health on the automation runner
Restore smoke-testing and the GitHub CLI installation fallback for functional-chain health, as requested by the runner operator.
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
---------
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
* fix(ecstore): identify stale multipart cleanup failures
Preserve quorum failure metrics while avoiding an UploadPart warning for background cleanup. Keep the existing write quorum and source recovery checks intact.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(ecstore): skip redundant stale upload part scans
Once the default deadline is due, lifecycle rules cannot make an upload ineligible. Avoid querying lifecycle and listing parts in that case while preserving the locked recheck.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): validate multipart lifecycle size
Skip part scans when no abort rule uses size. Treat unavailable, incomplete or overflowing sizes as unknown and keep size-independent lifecycle rules eligible.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): select the latest version at read quorum like MinIO
GET and HEAD escalated latest-version selection to write quorum when
enough metadata answered and skipped a newer version below write quorum
on degraded reads. LIST and heal already pick the newer side of a split
write at read quorum, so such keys listed but answered 503 until heal.
Select with MinIO's getObjectFileInfo rule: the most common mod time
that reaches the object's data blocks wins, ties go to the newer time,
and one content identity at that time must reach the same quorum. Two
identities tied at the selected time fail instead of resolving by hash
order, and the selected identity's version-stack shape follows disk
order.
* fix(ecstore): resolve selection ties by disk order and guard writes
Review of the read-quorum selection found three gaps:
- Rejecting a same-time half split made explicit-version reads of a
partially applied tagging update fail and blocked the retry that
repairs it. Resolve ties to the identity on the lowest-index disk,
for reads and heal alike, instead of rejecting or using map order.
- Delete markers and empty versions can lower the common read quorum
below the selected version's data blocks, so HEAD could report a
version GET cannot decode. Require that many copies, as MinIO's
getLatestFileInfo does.
- A selection can now return exactly read-quorum disks, and partial
metadata writes are not rolled back. Refuse an update before writing
when its target disks cannot reach write quorum.
* fix(ecstore): count identity copies in the data-blocks guard
The first-candidate shortcut counts byte-identical copies, so copies
that differ only in identity-neutral fields such as replication status
were missing from the data-blocks check. When the shortcut's count
falls short, count every copy of the selected content identity before
refusing the version.
* fix(ecstore): keep commit-proof selection for system-bucket reads
Pool metadata's PREPARE/COMMIT recovery and identity epochs treat an
ordinary read of pool.bin as proof that the record committed. Under the
read-quorum rule, a COMMIT that reached only half of a 2+2 set was served
as committed, and the pool_meta_native_physical_* integration tests
failed.
Route reads through select_fileinfo_for_read: S3 buckets keep MinIO's
read-quorum rule, while is_meta_bucketname reads use the previous
algorithm unchanged as select_committed_fileinfo, so a split stays
unreadable until native recovery resolves it.
* fix(ecstore): serve the latest readable version past dangling versions
A failed versioned PUT whose rollback also failed can leave the new
version on top of fewer drives than its data blocks. Reading only each
drive's top version then left the committed version below it short of
read quorum, so GET and HEAD of the latest version answered 503 although
that version is intact in every stack. MinIO resolves the stacks in
pickLatestQuorumFilesInfo.
When every drive answered and an S3 latest read still cannot select a
version, walk the newest version headers of each stack through
exact-version reads: serve the readable version with the newest selected
modification time, skip versions whose exact read proves them dangling
(the NoSuchVersion an explicit GET reports) and queue heal for them, and
keep the read-quorum error on any other outcome. Candidates are ordered
by each version's newest modification time across drives, and at most
eight exact reads are spent.
Test PUTs now wait for every drive so tests that edit one drive's
metadata no longer race the PUT's background tail writes.
* fix(ecstore): resolve dangling latest versions in metadata updates
A failed versioned PUT whose rollback also failed can leave the new
version on fewer drives than its data blocks. GET and HEAD of the
latest version already look past such versions, but read-before-write
callers without a version id still answered 503: object tagging read
each drive's top version with the quorum-error read, and
put_object_metadata and the CopyObject source read selected from
read_all_xl, whose merged latest version is missing on the other
drives, so object_quorum_from_meta failed before selection.
Object tagging now reads through a variant that runs the same walk past
dangling versions as a latest GET while keeping the quorum error for a
dangling key. put_object_metadata and the CopyObject source try the walk
when their quorum or selection step fails with read quorum, before the
existing dangling cleanup could report a key with a committed version
absent. A version-only copy takes the served version's own copies and
write quorum. The walk still applies only to S3 buckets, latest reads,
and sets where every drive answered, and the update still targets only
the served version's disks, so a version below write quorum is refused
before writing.
* fix(ecstore): refuse version-only copies below write quorum up front
Review of the dangling-latest metadata updates found three gaps:
- A version-only CopyObject wrote the new version and reverted on a
write-quorum miss; refuse it before writing when the served version's
disks cannot reach its write quorum, like update_object_meta_with_opts.
- Replication status write-back, including the zero-write ValidateOnly
mode, now keeps its read-quorum error and never walks past dangling
versions, since the walk queues heal for the versions it skips.
- The erasure-coding doc overstated that these callers never report a
dangling key as absent; put_object_metadata and CopyObject keep their
existing dangling cleanup when the walk finds no readable version.
Run cargo update --verbose and cargo upgrade --verbose twice in the
standalone fuzz workspace. Refresh its lockfile, including the fixed
rustls-webpki, webpki-root-certs, zstd, and zstd-safe releases.
Repeat main's pinned SigV4a fix in the standalone workspace and redirect
its shared Smithy types to registry crates, removing crypto-bigint 0.5.5.
Keep pkcs1 at 0.8.0-rc.4 to remain compatible with the workspace-pinned
rsa 0.10.0-rc.18; rc.5 changes the PKCS#1 key types and fails to compile.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Record local batch eligibility, blocking queue and execution time, shard
outcomes, and actual read bytes behind the existing GET-stage metrics gate.
Keep captured metric handles with the blocking worker after cancellation
and use scoped low-latency histogram buckets for the new duration series.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(rebalance): reuse the target pool holding a dangling copy
Rebalance places a version with a fresh free-space choice whenever the
exact-version pool lookup finds no target copy. An attempt that loses
write quorum can leave the version on fewer drives than read quorum,
and object reads report such a copy as absent (#8963), so the retry
could commit the version on a different pool and leave it in two. The
distributed kill-before-source-cleanup case saw this: a delete marker
whose first copy failed with InsufficientWriteQuorum ended on pools 1
and 3 after the source was cleaned up.
Before the free-space fallback, data movement without a decommission
capacity owner now targets an eligible pool where any drive already
holds the exact version, so the retry rewrites that copy to full
quorum instead of creating a second one. This covers both the object
copy path and the delete-marker path.
* fix(rebalance): check free space before reusing a holding pool
The pool holding an earlier copy was returned before any space check,
so a full holder pinned every retry and could stall a deferred entry.
The holder now passes through the same filters as the free-space
choice (suspended, rebalancing and source pools, has_space_for for the
expected size, and the max-used filter), computed once per selection;
placement falls back to that weighted choice when the holder does not
qualify. The two free-space helpers share one implementation.
The tests no longer rely on random placement. A test-only override
pins each target pool's reported capacity so the free-space choice
always picks the non-holder pool, the earlier copies keep the version
ids but carry different bytes and modification times, and the moved
versions are checked for marker state, modification time, data on
every drive and readable bytes. A second test covers a full holder.
* chore(ci): shrink the error(format!) ratchet baseline for rebalance
The rebalance control and meta modules on main now have fewer
Error::other(format!) call sites than the baseline records, which
fails the shrink-only ratchet in Quick Checks. Record the smaller
counts.
* fix(ecstore): select the latest version at read quorum like MinIO
GET and HEAD escalated latest-version selection to write quorum when
enough metadata answered and skipped a newer version below write quorum
on degraded reads. LIST and heal already pick the newer side of a split
write at read quorum, so such keys listed but answered 503 until heal.
Select with MinIO's getObjectFileInfo rule: the most common mod time
that reaches the object's data blocks wins, ties go to the newer time,
and one content identity at that time must reach the same quorum. Two
identities tied at the selected time fail instead of resolving by hash
order, and the selected identity's version-stack shape follows disk
order.
* fix(ecstore): resolve selection ties by disk order and guard writes
Review of the read-quorum selection found three gaps:
- Rejecting a same-time half split made explicit-version reads of a
partially applied tagging update fail and blocked the retry that
repairs it. Resolve ties to the identity on the lowest-index disk,
for reads and heal alike, instead of rejecting or using map order.
- Delete markers and empty versions can lower the common read quorum
below the selected version's data blocks, so HEAD could report a
version GET cannot decode. Require that many copies, as MinIO's
getLatestFileInfo does.
- A selection can now return exactly read-quorum disks, and partial
metadata writes are not rolled back. Refuse an update before writing
when its target disks cannot reach write quorum.
* fix(ecstore): count identity copies in the data-blocks guard
The first-candidate shortcut counts byte-identical copies, so copies
that differ only in identity-neutral fields such as replication status
were missing from the data-blocks check. When the shortcut's count
falls short, count every copy of the selected content identity before
refusing the version.
* fix(ecstore): keep commit-proof selection for system-bucket reads
Pool metadata's PREPARE/COMMIT recovery and identity epochs treat an
ordinary read of pool.bin as proof that the record committed. Under the
read-quorum rule, a COMMIT that reached only half of a 2+2 set was served
as committed, and the pool_meta_native_physical_* integration tests
failed.
Route reads through select_fileinfo_for_read: S3 buckets keep MinIO's
read-quorum rule, while is_meta_bucketname reads use the previous
algorithm unchanged as select_committed_fileinfo, so a split stays
unreadable until native recovery resolves it.
* fix(ecstore): serve the latest readable version past dangling versions
A failed versioned PUT whose rollback also failed can leave the new
version on top of fewer drives than its data blocks. Reading only each
drive's top version then left the committed version below it short of
read quorum, so GET and HEAD of the latest version answered 503 although
that version is intact in every stack. MinIO resolves the stacks in
pickLatestQuorumFilesInfo.
When every drive answered and an S3 latest read still cannot select a
version, walk the newest version headers of each stack through
exact-version reads: serve the readable version with the newest selected
modification time, skip versions whose exact read proves them dangling
(the NoSuchVersion an explicit GET reports) and queue heal for them, and
keep the read-quorum error on any other outcome. Candidates are ordered
by each version's newest modification time across drives, and at most
eight exact reads are spent.
Test PUTs now wait for every drive so tests that edit one drive's
metadata no longer race the PUT's background tail writes.
* chore(ci): shrink the error(format!) ratchet baseline for rebalance
The rebalance control and meta modules now have fewer
Error::other(format!) call sites than the baseline records, which
fails the shrink-only ratchet in Quick Checks. Record the smaller
counts.
* fix(ecstore): preserve canonical order in latest-version fallback
* test(decommission): cover held target lock and partial-copy resume
Port two tests from the closed lock-recovery branch onto the deferral
that defers any typed namespace lock timeout on a version copy.
- A version commits, then every attempt at the next one times out on
the target lock: the entry is deferred as a lock-timeout deferral, no
failed item is counted, both source versions stay, and the resumed
entry moves both versions with their exact bytes.
- A real write lock held on the target key makes target selection
return a typed object-lock timeout, the entry defers instead of
failing, and once the lock is released selection recovers and the
resumed entry completes the move.
* chore(ci): shrink the error(format!) ratchet baseline for rebalance
The rebalance control and meta modules on main now have fewer
Error::other(format!) call sites than the baseline records, which
fails the shrink-only ratchet in Quick Checks. Record the smaller
counts.
* fix(sftp): allow bucket-scoped root listings
Listing the SFTP root required s3:ListAllMyBuckets. Without it a
bucket-scoped user got PermissionDenied on `ls /`; with it they saw every
bucket on the instance. S3 ListBuckets and the WebDAV root (#6298)
already fall back to a per-bucket filtered listing.
When the global ListAllMyBuckets check is denied, list buckets through
the session-aware ListBuckets path instead, so IAM filters the result to
buckets the principal may ListBucket or GetBucketLocation. Principals
with ListAllMyBuckets keep the unfiltered listing, and IAM outages and
timeouts still fail as before.
list_buckets_for_session and its request builder were WebDAV-only; they
are now also compiled with the sftp feature.
* fix(protocols): re-check the session key for bucket-scoped listings
list_buckets_for_session built its request from the identity captured at
login. Through the SFTP root-listing fallback, a service account disabled
or expired after login could keep listing bucket names, unfiltered when
its parent may list every bucket.
Validate the session key with check_key_valid_with_context, as
authorize_protocol_request does for every other protocol operation, build
the request from the fresh credentials and is_owner, map an invalid key
to AccessDenied, and attach the server context.
The SFTP fallback now passes the session's request headers and transport
security, like every other SFTP authorization. DummyBackend fails closed
when no session listing is queued, matching the trait default, and gains
a stall_authorization hook. New tests cover a service account disabled
mid-session, IAM outage and timeout on the global check (no fallback),
non-AccessDenied backend errors, truncation of fallback output and the
fail-closed default.
* test(protocols): compare error code without referencing s3s
The session-listing test compared against s3s::S3ErrorCode, which made
policy_test.rs a new s3s-referencing file and tripped the s3s footprint
ratchet (210 files against a baseline of 209). Compare the code's string
form instead.
* fix(protocols): refresh session bucket discovery without stale copies
Build bucket listing requests directly from freshly validated credentials
and server-scoped ownership instead of cloning and replacing login state.
Reuse the same authorization path for WebDAV capacity discovery.
Preserve typed access-denied checks through the protocol facade, and cover
request conditions, session-policy updates, revocation, listing bounds,
and fallback deadlines with regression tests.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
A node killed mid-copy leaves its namespace lock on the peers until the
lock lease expires. When the restarted leader resumes the decommission
and reaches that key inside the lease, every in-place copy attempt times
out acquiring the lock, and the version was counted as a failed object,
so the pool decommission could no longer complete.
A lock acquisition timeout leaves the source in place, like a version
copy that lost drive quorum, so defer the entry to the end of the round
instead of counting it as failed. A replay that still times out pauses
the decommission through the existing durable-pause path, which is
relaunched automatically.
This is the intermittent failure of the distributed e2e case
scanner_heal_topology_decommission_kill_before_source_cleanup_resumes_without_loss.
Report selected integer offsets and widths with strict member and payload validation. Cross-check compiler fixtures with bpftool and independent C offsetof/sizeof results.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): select the latest version at read quorum like MinIO
GET and HEAD escalated latest-version selection to write quorum when
enough metadata answered and skipped a newer version below write quorum
on degraded reads. LIST and heal already pick the newer side of a split
write at read quorum, so such keys listed but answered 503 until heal.
Select with MinIO's getObjectFileInfo rule: the most common mod time
that reaches the object's data blocks wins, ties go to the newer time,
and one content identity at that time must reach the same quorum. Two
identities tied at the selected time fail instead of resolving by hash
order, and the selected identity's version-stack shape follows disk
order.
* fix(ecstore): resolve selection ties by disk order and guard writes
Review of the read-quorum selection found three gaps:
- Rejecting a same-time half split made explicit-version reads of a
partially applied tagging update fail and blocked the retry that
repairs it. Resolve ties to the identity on the lowest-index disk,
for reads and heal alike, instead of rejecting or using map order.
- Delete markers and empty versions can lower the common read quorum
below the selected version's data blocks, so HEAD could report a
version GET cannot decode. Require that many copies, as MinIO's
getLatestFileInfo does.
- A selection can now return exactly read-quorum disks, and partial
metadata writes are not rolled back. Refuse an update before writing
when its target disks cannot reach write quorum.
* fix(ecstore): count identity copies in the data-blocks guard
The first-candidate shortcut counts byte-identical copies, so copies
that differ only in identity-neutral fields such as replication status
were missing from the data-blocks check. When the shortcut's count
falls short, count every copy of the selected content identity before
refusing the version.
* fix(ecstore): keep commit-proof selection for system-bucket reads
Pool metadata's PREPARE/COMMIT recovery and identity epochs treat an
ordinary read of pool.bin as proof that the record committed. Under the
read-quorum rule, a COMMIT that reached only half of a 2+2 set was served
as committed, and the pool_meta_native_physical_* integration tests
failed.
Route reads through select_fileinfo_for_read: S3 buckets keep MinIO's
read-quorum rule, while is_meta_bucketname reads use the previous
algorithm unchanged as select_committed_fileinfo, so a split stays
unreadable until native recovery resolves it.
- Resolve existing directories below base on Linux in a single openat2(BENEATH | NO_SYMLINKS) syscall in open_existing_directory_below_base_std instead of opening and closing every ancestor component.
- Reuse the pinned source directory guard across sibling metadata reads and control probes in validate_source_mutation, load_source, OrdinaryMultipartDeleteCheck::validate, and prepare_multipart_commit_staging.
- Read normal multipart source heads (<= 64 KiB) in a single pass in load_source while preserving constant-memory streaming observation for large prepared histories.
- Record root_missing during load_source, reuse loaded.original in restore_original, and coalesce finish source directory fsync into persist_with_source_sync.
- Reuse the opened commit directory in prepare_rename_commit_guard and LinuxCommitDirectories::validate when source_parent == destination_parent.
* test(scanner): add memory acceptance runner and budget probes
Add owned S3 workload phases with process, endpoint, cgroup and binary
identity checks for scanner memory and scanner-disabled request bursts.
Keep scale, restart, heap-attribution and overall-acceptance limits explicit.
Characterize healthy and seeded coverage-gap cache retention through the
real folder walker and production cache codec without changing runtime code.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bind acceptance capacity to effective storage
Validate the serving process's complete local disk inventory before load
writes and during runtime sampling. Resolve each disk inside the owned
storage root, reject nested mounts and filesystem mismatches, and bind
storage observations to phase identity for container and native runs.
Cover the unused-mount bypass, CLI-overridden environment, native paths,
symlink escapes, named volumes and stable multi-disk inventory ordering.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): fence status observations before workload writes
Close each status API window with a second storage-bound process sample
before Phase entry can authorize bucket creation or PUT requests.
Add a fail-before regression for a process change during the initial status
request, asserting no ownership or workload writes occur.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Retain original prepare and commit-settlement RPCs beyond failed replacement and Abort cleanup, with and without bucket recreation. Require typed refusal or a physically verified idempotent result, unchanged fresh-upload bytes and complete object reads.
Extend scoped proxy observations without rewriting signed frames or trailers, and preserve registered test membership and existing budgets.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(tools): add read-only BTF prototype inspection
Expose bounded declared prototype headers through a standard-library CLI, preserve explicit void and failure semantics, and wire local contracts plus an independent compiler/bpftool reference into CI.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(tools): retain native reference failure diagnostics
Clear checkout credentials and capture bounded native stderr alongside stdout, preserving exact exit status and owned child cleanup. Keep the first reference failure unresolved rather than guessing its missing diagnostics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* ci(tools): select a concrete bpftool file parser
The hosted PATH wrapper can exist without tools for its Azure kernel. Select an executable ELF by availability/version before comparing the fixed fixture, installing generic tools only when needed. Data comparison errors remain fatal and never trigger tool switching.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Verify a sixteen-drive set rejects reads and writes after two nodes stop,
then resumes complete S3 reads and new writes when only one node returns.
Keep the fourth node stopped throughout checks from all three live
coordinators and verify the original 12+4 shard geometry on disk.
Let the existing GET recovery probe retry the compatible SlowDownRead
response only with HTTP 503, retaining fatal status and byte checks.
Register the case in both platform selections and document the boundary
between process recovery and physical disk reattachment acceptance.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
- Document rules in crates/ecstore/AGENTS.md and the adversarial performance lens against per-disk spawn_blocking hopping, parent-chain openat amplification, un-sized read_to_end buffers, and redundant state reloads under the same lock.
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* fix(observability): correlate physical namespace lock releases
Map logical namespace guards to their actual granted peer lock IDs and local physical guard identities. Record physical completion only after successful manager release and registry removal, and record validated positive remote unlock responses without changing release behavior.
Exercise real distributed ownership, asynchronous cleanup, duplicate and disabled guards, stale-owner retirement, and explicit release followed by Drop. Document the required diagnostic filters and the remaining filesystem-tail boundaries.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): remove unused lock manager test import
The diagnostic regression uses inherent manager methods and does not need the LockManager trait import. Remove it to pass strict warning checks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): compact completed subtrees during checkpoint sweeps
Release completed object entries while preserving resumable frontier nodes,
including heal rewalks and coverage gaps. Borrow child links during usage
aggregation and remove duplicate update-cache subtree copies.
Add real-disk restart and allocation-retention regressions for #8961.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(scanner): avoid unused progress trees and traversal copies
Bind progress caches to actual subscribers and keep durable scanner metadata
in one authoritative cache. Remove mirror-only heal synchronization, use one
tagged folder queue, and consume child ownership when deleting subtrees.
Preserve observer output, restart coverage and failed-object retry semantics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(scanner): compact completed leaf entries in place
Keep completed-folder eligibility and frontier handling in one compaction
boundary. Borrow leaf statistics and update the cached sampling flag without
cloning, deleting, or reinserting the entry; aggregate only non-leaf nodes.
Pin allocation identity, complete metadata, failure guards and caller state
with a regression that fails under the previous compaction implementation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
A cursor for a key that literally ends in a legacy-shaped tag is issued
wrapped in one extra `[rustfs_cache:v2,return:]`, because the listing layer
still strips one legacy tag from incoming markers. ListObjects (V1)
unwrapped it in `calculate_next_marker`; the client then sent the bare key
back as `marker`, the listing layer stripped the key's own tail, and the
next page restarted at the stem and returned the same key forever. Keep the
wrapper in V1 NextMarker and cover the V1 resume path (marker sent back as
StartAfter) on a real store.
Document that sampled list quorum modes can also omit committed objects
whose copies mostly sit outside the sample, and recommend `strict` for
backup, sync, replication and lifecycle tooling.
- Coalesce InternalBuf::Ref and InternalBuf::Owned in write_all_internal
onto a single blocking_queue operation, avoiding 3-5 extra spawn_blocking
round-trips per disk on metadata writes.
- Short-circuit recover_part_transaction when no disk reports an active
part transaction (new.meta), skipping redundant rollback and part.N.meta
reads on normal UploadPart calls.
- Pre-allocate exact buffer capacity from file.metadata().len() in
read_file_all and read_multipart_metadata, reducing per-file read()
syscalls to 1 and avoiding Vec growth reallocations.
- Collapse os_mkdir_all and make_dir_all to a single fast-path blocking
call via create_dir_all_std.
- Accept &Path in BucketExistenceCache and use cached_access in
rename_file, create_file, and read_version.
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* chore(deps): upgrade russh to 0.65.0 and refresh crates
Run two cargo update and cargo upgrade rounds from origin/main.
Adapt SFTP public-key callbacks to PublicKeyOffer and VerifiedPublicKey,
preserving explicit rejection and password-only authentication.
Cover the rejection policy with a pinned-host-key SSH handshake test.
Refresh Arrow, Parquet, Brotli, ZIP, and compatible dependencies.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(deps): route legacy zstd consumers to fixed codecs
Replace the old registry implementation with a private version-constraint
adapter backed only by zstd 0.14.3 and zstd-safe 8.2.0. Preserve legacy
features and Avro, Arrow IPC, Parquet, and Kafka formats.
Cover abandoned contexts, legacy decode errors, seekable bounds, stored
frames, consumer interoperability, and resolved implementation versions.
Record the adapter removal condition in the compatibility register.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): renew faulty local drives after partial recovery
Make local online detection honor the same faulty gate as foreground I/O
and remote drives, allowing the existing reconnect path to replace a
stranded handle once its original format is readable again.
Cover partial EC:4 recovery, health-state admission, and preserve explicit
test faults across handle renewal.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(ecstore): reconnect set endpoints concurrently
Poll independent endpoint recovery futures within the existing maximum
erasure-set width so a stalled format probe cannot delay a ready drive.
Keep outer-set traversal and per-slot validation and publication unchanged.
Remove repetitive per-drive reconnect-loop info logs.
Add an authenticated two-peer regression that holds the first format read
while the second slot is admitted and serves data with its validated ID.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* refactor(listing): list latest versions with MinIO's listing quorum
Latest-version SetDisks::list_path now follows MinIO's er.listPath:
ceil(asked/2) is the listing quorum for min_disks, directories and
objects, agreed entries are emitted as read, and a split sample goes
through MetaCacheEntries::resolve. One object can no longer fail a
page. A set with fewer than half of its drives online still fails the
page with ErasureReadQuorum.
Remove the write-quorum layer this replaces: ListingSupplement,
ListingReconciler and the LIST object read lock, the latest_listing_*
quorum helpers, resolve_agreed_entry, resolve_with_write_quorum and the
enforce_write_quorum / write_quorum_slack merge branches, and the
per-version listing quorum helpers in filemeta.
Make merge_file_meta_borrowed_streams pick a version id's most common
header regardless of reader order, so an interrupted null-version
overwrite no longer drops the committed generation from the merge.
* test(listing): do not assert sampled optimal listings are deterministic
optimal asks a random half of the drives, so an EC:8 object committed on nine
of sixteen drives can miss the four-copy listing quorum in roughly one sample
in six, exactly as in MinIO. Keep the deterministic assertion for strict and
for optimal when every online drive is asked.
* fix(storage): 404 for dangling objects and strict list quorum default
Stage F.0 of the ListObjects quorum plan. Once listing returns to MinIO's listing quorum, a PUT that reached half of the drives but not read quorum becomes visible in LIST, so GET and HEAD must not answer it with a retryable 503.
GET, HEAD and prepared GET metadata now report a metadata read-quorum failure as ObjectNotFound or VersionNotFound when every drive answered with valid metadata of a single generation or not-found and is_object_dangling proves the object or version dangling, matching MinIO's getObjectFileInfo. Offline or unanswered drives, timeouts, corrupt xl.meta, two generations, remote versions and the meta bucket keep the read-quorum error. Nothing is deleted on the read path; heal keeps owning cleanup and its grace window. Read-before-write callers of get_object_fileinfo keep the quorum error.
RUSTFS_LIST_OBJECTS_QUORUM now defaults to strict, matching MinIO, and the operations doc explains that optimal samples drives and can briefly show deleted objects.
A new test pins the write-path precondition: a PUT that misses write quorum leaves no new version or data directory on any drive once its rollback completes.
* test(listing): prove the list quorum env var is read with a non-default value
* perf(ecstore): optimize cold HEAD and GET metadata read paths
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* perf(ecstore): cache verified inline body and avoid early-stop allocations
- Store verified_inline_body on GetObjectMetadataCacheEntry so warm GET
cache hits serve the pre-verified inline Bytes payload in O(1) without
re-running HighwayHash256S bitrot verification across shards.
- Verify inline shard slices directly in verify_inline_body_from_observations
without acquiring MODERN_REED_SOLOMON_CACHE or allocating InlineBitrotReaders.
- Gate MetadataFanoutDiagnostics timers and latency sorting on
get_stage_metrics_enabled().
- Avoid pinning full xl.meta buffers in GetObjectMetadataCacheEntry by
using stack Uuid::encode_buffer() lookup without Bytes::slice_ref.
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* fix(ecstore): restore inline verification test context
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
Version listings bypassed listing quorum: SetDisks::list_path returned
early into list_versions_authoritatively, whose resolver seeds unread
slots as DiskNotFound. With any one drive of the set offline, every
version held by fewer than ceil(n/2) drives (for example a deleted
version kept by drives that were offline during the delete) failed the
whole page with ErasureReadQuorum, surfaced as S3 503.
Route merged version pages through the listing-quorum branch of
SetDisks::list_path, as MinIO's listPath does with requestedVersions =
0, so such versions are omitted instead of failing the page. Keep the
set-level floor: fewer than ceil(n/2) online drives still fails the
page.
Set walks (tier reference proofs, tier-delete journals, pool
maintenance) and the recursive prefix-delete scan act on absence, so
they keep the authoritative per-version scan and fail closed.
* refactor(listing): make cursors plain keys and opaque V2 tokens
RustFS inherited MinIO's metacache cursor tag and appended
`[rustfs_cache:v2,id:<uuid>,src:walker,gen:live]` to every internal
continuation marker, although nothing ever consumed the id: four parsers
had drifted apart, V1 NextMarker had to be stripped on the way out, and
ListObjectVersions leaked the tag onto the wire as NextKeyMarker.
ecstore stops assigning `list_id` in `ECStore::list_path` and
`SetDisks::list_path_result`, drops `append_list_cache_id_to_marker` and
the `cache_id` parameters of the pagination helpers, and removes the
unused `ListPathOptions::encode_marker`; internal markers are the plain
last key, last common prefix or last raw scanned key.
The API layer builds the V2 NextContinuationToken as base64 of the
server-side cursor in one place and decodes it in one place; V1
NextMarker is the decoded cursor and the `public_list_marker` tag
stripper is gone; NextKeyMarker is the plain key. Base64 of the plain
key is what nodes from earlier releases already read, so a rolling
upgrade needs no switch.
Compatibility, registered as `listing-cursor-legacy-tag`: `parse_marker`
and `list_marker_key` still strip a trailing legacy tag from incoming
markers so a client that paginates across the upgrade keeps its position.
* fix(listing): preserve literal cache-tag cursor boundaries
* test(e2e): wait for known quota reporting snapshots
Wait for the expected numeric usage before asserting quota statistics or
projected checks. Preserve null as unknown and keep the existing quota
assertions, authorization failures, and bounded convergence deadline.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): refresh full-suite membership locks
Regenerate the Darwin and Linux e2e-full digests from compiled nextest
listings after merging main. Both selections retain all base members
and add exactly the five quota reporting regressions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(s3-client): make range preflight assertion deterministic
Assert that an overflowing range returns its specific InvalidInput error
on the first poll instead of waiting for an idle shared TCP port.
This avoids unrelated connections affecting the local-validation oracle
and removes the listener-permission skip from this test.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): make lock error metric fixture deterministic
Pass a typed quorum failure through the existing admission result resolver
so the lock-error metric test does not race a real 250 ms acquire deadline.
Preserve the exact metric assertions and verify the typed storage error.
Existing acquisition tests retain distributed quorum and timeout coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): isolate durable I/O regression fixtures
Reserve nextest capacity for eight native storage regressions without
changing deadlines, retries, or internal concurrency. Observe physical
publication independently of expired async wrappers, and stop endpoint
reconnection before the fenced format-heal fixture takes ownership.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test: isolate drive provenance and receipt fixtures
Use the existing Linux shared-memory fixture pattern for the bounded
drive CLI provenance probe, retaining its one-second request and exact
binary/signature checks. Seed the full 1001-receipt pagination fixture
one durable source/target pair at a time instead of issuing 32 at once.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Replace the yanked crypto-bigint 0.7.7 release and raise ctutils to its required 0.4.6 minimum. Preserve all other package resolutions, features and dependency policy.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): read publication logs incrementally
Retain the complete matching lock history while reading only appended bytes after an initial scan before remote DELETE is held. Keep the original field projection, file ordering, polling cadence, lock deadlines and same-attempt assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): remove redundant publication fixture clone
Serialize the existing root by reference through json! without cloning the Value. Keep all compatibility rows and assertions unchanged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): avoid per-set max_entries truncation before cross-set prefix usage merge
compute_prefix_usage applies the caller's max_entries cap to each individual erasure set's loaded.prefix_usage(bucket, prefix, max_entries) before merging sub_prefix_map across sets, silently dropping and under-counting sub-prefix usage in multi-set deployments.
Root Cause:
In crates/scanner/src/prefix_usage.rs, compute_prefix_usage queries each erasure set with loaded.prefix_usage(bucket, prefix, max_entries) (line 178) and then merges the returned query.sub_prefixes across sets into sub_prefix_map (lines 216-218). When sets_total > 1 and the number of distinct child prefixes exceeds max_entries, any sub-prefix that ranks within the top max_entries on one set and outside the top max_entries on another set has its non-top set contributions discarded prior to merging, producing silently under-counted size, objects, versions, and delete_markers.
Fix:
Pass usize::MAX as the per-set limit when sets_total > 1 in compute_prefix_usage so each erasure set returns its full sub-prefix breakdown, and apply max_entries truncation only after merging and sorting sub_prefix_map across all sets.
Signed-off-by: czcbangkai <czcbangkai@google.com>
* test(scanner): use snake_case in prefix_usage regression test name
---------
Signed-off-by: czcbangkai <czcbangkai@google.com>
Co-authored-by: Hauser <housemecn@gmail.com>
* perf(ilm): back off idle tier-delete journal recovery
Use bounded idle backoff only after complete empty journal and dispatch scans, while preserving immediate notifications and the retry cadence for observed work.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): reconcile interrupted pool metadata publication
Bind pool metadata CAS and Undo to exact native predecessors. Recover an interrupted physical publication only from an ordinary committed authority and complete verified identity, current and backup evidence, then require normal V3 CAS and quorum readback.
Preserve known-conflict gates, startup and heal lock ordering, targeted admission and the original kill-recovery deadline. Wake proof-ready recovery immediately and bound parallel capacity sampling without removing mutation fences.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(ecstore): reuse proven pool metadata durability
Publish native rollback backups directly in their owned UUID directories. Reuse a one-shot data-durability receipt only for an exact hardlink to the pinned, fully synchronized head and root.
Preserve new-head and directory synchronization, native predecessor CAS, conditional Undo and uncertainty gates. Keep unknown, copied, raw-parent, cancelled and failed operations cold. Add bounded diagnostics, sync-call regressions and path-isolated test hooks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(multipart): exercise selective RPC delay and peer loss
Add authenticated method-entry barriers for metadata and lifecycle locks under e2e-test-hooks. Verify real dispatch, write quorum, prior part payloads, lock drain and incarnation isolation without changing production budgets.
Record cancellation separately from normal exits so late filesystem completion cannot overwrite Drop evidence.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* docs: define multipart delay gates and receipt invariants
Document RPC entry evidence, peer-loss and cancellation oracles, remaining incident attribution limits, and immutable head inodes required for durability receipts.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(readiness): expose missing runtime drive slots
Report configured slots without a runtime handle separately from unavailable inventoried drives. Preserve quorum and probe status semantics. Wait for every coordinator to regain its complete live inventory before multipart RPC fault windows and single-attempt recovery oracles.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): retry committed promotion convergence safely
Require peer reload convergence on every worker attempt, including unchanged retries. Recheck durable identity, replicas, namespace fence, generation and cancellation before allowing any data movement.
Keep known committed promotions active on a verified propagation pause. Release precise owners, retain queued successors and reuse the existing watchdog. Preserve uncertainty gates and terminal operation behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): guard native metadata mutation aliases
Reject protected RenamePart source and destination paths before I/O. Classify the protected namespace through the native path resolver, and require canonical conditional RenameData and Undo keys so aliases cannot create separate lease domains.
Preserve ordinary multipart and canonical CAS behavior, warm durability receipts and zero-allocation canonical fast paths. Cover real alias, byte identity, receipt and normal mutation behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): register Darwin multipart RPC delay gates
Update distributed membership from the actual Darwin listing. Preserve the full-profile digest and leave Linux unchanged until its own listing is produced, as required by the contributor guide.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(multipart): fence native publication and recovery
Publish multipart data through private hardlinks and atomically consume the
prepared source head. Bind exact compensation capabilities and native recovery
to the physical cohort, source generation and durable publication state. Require
fresh terminal confirmation for native replay and preserve indeterminate data
when no safe recovery witness exists.
Release logical guards only after validated irreversible quorum success while
retaining physical mutation leases, accounting and resource ownership through
actual callbacks. Preserve local instance proof authority and historical Copy
metadata without granting healed donors fresh publication authority.
Keep general movement identity strict while preserving directory capacity
compatibility in a separate checked comparison.
Cover native fault and cancellation boundaries, zero-byte objects, real Copy,
heal and migration, exact physical readback and distributed RPC delay. Retain
all quorum and durability requirements and document rollout limitations.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): fix ratchet scan and Windows fault hooks
Move native pool metadata inventory tests after production items so the
error-format ratchet sees the existing call site. Preserve the baseline
instead of accepting a false count decrease.
Make the directory-barrier failure hook available on every test platform
and exercise the parent-barrier failure/retry cases in Windows CI. Keep
production synchronization behavior and all existing assertions intact.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(protos): remove redundant recovery request clone
Move the baseline into its final struct update while retaining the earlier
clone needed to construct the first request variant.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): align RPC delay gates with native abort
* fix(storage): validate native source recovery and CI gates
Preserve wire layouts while bounding native response sizes and fix the
last-use recovery request clone. Avoid destination replay reads only for
fully observed initial native sources; keep upgraded and recovered sources
conservative. Cover real legacy publication after a cold restart.
Align upgrade acceptance with the native mixed-version mutation pause and
use exact upload-scoped test completion evidence before advancing time.
Keep all original quorum, ownership, byte and deadline assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): verify native abort under partial admission
Delay native cleanup at the exact upload root after all-participant closure.
Verify quorum-only admissions retain every source byte on refused Abort and
complete the same upload without creating a missing original participant.
Keep sub-quorum orphans and their discoverable identities isolated while a
fresh all-participant upload proves service recovery. Route shared constants
through the existing E2E storage facade.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): avoid formatting a fixed invalid upload path
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): align native MPU fault recovery assertions
Verify real source participants, preserved orphan bytes and same-upload completion after quorum-only admission. Require full physical inventories so an expected read-quorum error cannot hide unrelated leakage. Preserve ordinary quorum and recovery budgets, and document listing availability through the affected set.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): keep MPU tail deadlines on the wall clock
Global Tokio time advancement can expire drive-health probes while real
filesystem callbacks are pending. Use a short real drive deadline with the
existing physical-entry and cleanup barriers, retaining the byte, lock,
resource-permit and final-shard assertions.
Fixes#8937
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(storage): align native fixtures with instance ownership
Open independent disks for the simulated capacity-loss instance, scope four coordinator journal disks without rebinding source authority, and probe configured namespace keys while retaining physical I/O hooks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): isolate native multipart future construction
Construct optional native publication futures behind synchronous heap boundaries so ordinary rename callers do not carry their state machines. Preserve native guards and ownership without adding allocations to ordinary PUT, copy or heal branches.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): assert coordinator journal scope after rejoin
Check the exact original four-member journal map after every rejoin and manager stop while preserving all sixteen native data slots. Reconnect expansion fails the test rather than being filtered away.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): bound object repair future construction
Construct the normal and FileCorrupt deep-retry state machines behind a synchronous heap boundary. Preserve guards and cancellation while bounding the shared rename and deletion call stacks without increasing test stacks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): qualify fixture disk identity checks
Call the same DiskAPI method explicitly so the independently reopened disk identity assertion compiles under every target and feature combination.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): isolate native inspection from mutation state
Select a dedicated read-only inspection future behind the existing single Box allocation. Preserve validation, source ownership and the canonical inspection body while keeping mutation state out of inline read callers. Reject misrouted operations with typed errors and retain source evidence.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): pause abort time after native cleanup
Wait for durable source deletion on the wall clock before advancing the
capacity lease clock at the post-delete barrier. Paused time can otherwise
expire the barrier while native filesystem cleanup is still pending.
Retain lease-loss injection, durable inflight-byte accounting and restart
reconciliation assertions. Document the test-util feature required to
select the native decommission fixtures in package-scoped regressions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): reclaim data from owned multipart undo
Retain exact runtime-only Undo ownership through deferred snapshot cleanup. Revalidate every target metadata version and the retirement anchor, keep the delete claim through the physical callback, and remove the anchor after the payload barrier. Preserve generic cleanup refusal when metadata is missing.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): preserve unformatted bootstrap routes
Keep explicitly unformatted local paths reachable by an in-flight elected formatter while quarantining their service slots and disk-ID membership. Own bounded legacy-read handles so the actual asynchronous creator future remains Send.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(s3): bound CopyObject tracing poll frames
Construct the business future behind an outlined single-Box boundary and lazily instrument its handle. Preserve Send, Unpin, span timing and cancellation without embedding concrete business-state construction in the tracing poll.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(mpu): observe recovery after direct legacy bootstrap
Seed all sixteen real previous-release sources before attaching the same-port method observers. Require exact per-peer disk-route Unimplemented responses with zero publication calls, retain byte and cleanup assertions, and remove superseded raw transport. Register the two new regressions from actual Linux and macOS listings.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(mpu): prepare the homogeneous previous-release fleet
Reuse the existing release baseline before creating the genuine legacy multipart sources. Restart old processes with their normal budgets and require every drive through the reduced-redundancy probes before installing the mixed-version observers and current fault budgets.
Keep standard EC:4, single-attempt calls, all mixed-version byte and reclamation assertions, and their original deadlines unchanged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(mpu): isolate release compatibility from fault profiles
Keep normal component configuration for the observed mixed-release rollout, which injects no RPC delay or loss. Retain the short component profile in actual method-fault scenarios and preserve the single-attempt 45-second probe and every typed error, routing, source byte and reclamation assertion.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(mpu): use normal shutdown for planned release replacements
Use the existing bounded SIGTERM path during homogeneous release preparation and the observed mixed-version rollout. Preserve every multipart inventory, routing, quorum and byte assertion, and keep actual crash recovery on its original hard-kill path.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* revert: retain the verified release compatibility fixture
Restore the published fixture after the local configuration and lifecycle experiments failed to resolve the macOS startup failures. Keep their diagnostic records separate from the delivered implementation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(copy): bound inherent handler polling stack
Build the inherent CopyObject future through a synchronous noinline
factory at the existing trait await. This keeps its large state out of
the trait wrapper's active polling frame during historical self-copy.
Preserve cancellation, tracing and post-write notifications, with one
additional allocation restricted to COPY.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): validate authoritative quota and native pool heals
Require actual authoritative quota usage in the existing readiness loop
instead of treating HTTP success or unknown usage as a numeric baseline.
Keep the original quota assertions and convergence budgets.
Allow the owning pool metadata CAS to republish into a fresh valid data
directory while retaining exact version, layout, completeness and shard
fingerprints. Require every node's real metadata/read/write readiness
before accepting recovery. Keep ordinary object manifests and the original
180-second recovery deadline unchanged, with negative oracle regressions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): distinguish certified native Abort recovery
Require native participants with a persisted full closure certificate to retire their heads and reclaim every surviving source on retry. Keep uncertified legacy authority below identity quorum conservative, while retaining actual partial-delete and committed-object byte checks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
* refactor(listing): keep paginated listing on ECStore only
`Sets` and `SetDisks` carried their own copies of `inner_list_objects_v2`,
`list_objects_generic`, `inner_list_object_versions`, `list_path` and
`list_merged`, plus a third copy of the task that converts merged raw entries
into the walk result stream. Only `ECStore` can answer a paginated listing,
since a page merges every set of every pool; the copies drifted (the `Sets`
copy still rejected `//` prefixes that #8605 made literal on `ECStore`) and
were reachable only from tests and one decommission helper.
Remove the `ListOperations` impls for `Sets` and `SetDisks` together with the
duplicated pagination code. `SetDisks::walk` stays as an inherent method for
set-scoped callers and now honors `versions_sort` like the store-wide walk;
`SetDisks::list_path_result` stays for the recursive delete lister. The walk
entry conversion moves into one `spawn_walk_entry_forwarder` shared by both
walks. The decommission receipt lister walks its pool's sets instead of
paginating through the removed `Sets` listing.
Tests that exercised the removed layers now exercise `ECStore` for pagination
or `SetDisks::walk` for per-pool version inspection. The architecture and
logging guard rows that pinned the removed `SetDisks`/`Sets` listing entry
points are dropped, and the error-other ratchet baseline shrinks by one.
* fix(listing): exclude synthetic directories from receipt walks
* refactor(listing): remove env-gated ListObjects index provider
Delete the experimental, default-off key-only / verified-page /
metadata-fast index provider from `ECStore::list_objects_generic` together
with everything only it drove: the `RUSTFS_LIST_OBJECTS_INDEX_*`,
`RUSTFS_LIST_OBJECTS_NAMESPACE_JOURNAL_*` and
`RUSTFS_LIST_OBJECTS_METADATA_FAST_*` readers, the persistent key-only
index and its on-disk format, the namespace mutation journal (state,
chaos injector, system/local backends, degraded set, global lock), the
index lifecycle/health/source-selection types, the verified-index
candidate pager, the `list-chaos` cargo feature, the
`rustfs_s3_list_objects_index_*` metrics and the archived bench script.
`list_objects_generic` now always walks. The write-path hooks
`observe_list_objects_mutation(s)` are gone; their callers bump the scanner
namespace generation directly through `observe_scanner_namespace_mutations`,
which is the sub-step the old hook performed before taking the journal
lock, so the generation observed by the scanner, the node RPC service and
the data-movement lease checks is unchanged while PUT/DELETE no longer take
a global tokio RwLock or read environment variables.
`ListSourceMode::{metadata_authority, requires_live_metadata_verification,
can_satisfy_strong_listing}` and `ListMetadataAuthority` were only reachable
from the provider and are removed as well; the enum, its variants, the
cursor encoding and `ListContinuationV2` are left untouched.
* docs(listing): define index retirement upgrade prerequisites
* fix(ci): retire the removed listing index test requirement
test(e2e): assert Abort refusal below identity quorum
Keep exactly-quorum success and recoverable cleanup assertions. For
minority staging authority, require typed refusal, zero further Delete
RPCs, unchanged per-disk metadata and the previous object body. This
aligns the phase matrix with the existing conservative recovery contract.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): assert Abort refusal below identity quorum
Keep exactly-quorum success and recoverable cleanup assertions. For
minority staging authority, require typed refusal, zero further Delete
RPCs, unchanged per-disk metadata and the previous object body. This
aligns the phase matrix with the existing conservative recovery contract.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): exercise simultaneous multipart terminal contenders
Retain the four pairwise resend cases and add live/cancelled three-way Complete, Abort and resend races. Observe distinct forwarded lock owners and verify terminal bytes and physical cleanup.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): freeze contender evidence before multipart cleanup
Retire the passive lock observer before terminal ListParts checks so the reported count identifies only the two contenders at the preparation barrier.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): require both multipart terminal race outcomes
Retain the free races and select both terminal winners with independently released, owner-scoped lock gates. Verify real contender admission, unchanged signed packets and exact terminal bytes for live and cancelled part waiters.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): isolate losing coordinator lock votes
Hold every remote vote for the losing coordinator while the same gate observes the winner. Prevent partial lock grants from delaying the requested terminal order and retain ordinary RPC caller lifetime.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* refactor(listing): keep paginated listing on ECStore only
`Sets` and `SetDisks` carried their own copies of `inner_list_objects_v2`,
`list_objects_generic`, `inner_list_object_versions`, `list_path` and
`list_merged`, plus a third copy of the task that converts merged raw entries
into the walk result stream. Only `ECStore` can answer a paginated listing,
since a page merges every set of every pool; the copies drifted (the `Sets`
copy still rejected `//` prefixes that #8605 made literal on `ECStore`) and
were reachable only from tests and one decommission helper.
Remove the `ListOperations` impls for `Sets` and `SetDisks` together with the
duplicated pagination code. `SetDisks::walk` stays as an inherent method for
set-scoped callers and now honors `versions_sort` like the store-wide walk;
`SetDisks::list_path_result` stays for the recursive delete lister. The walk
entry conversion moves into one `spawn_walk_entry_forwarder` shared by both
walks. The decommission receipt lister walks its pool's sets instead of
paginating through the removed `Sets` listing.
Tests that exercised the removed layers now exercise `ECStore` for pagination
or `SetDisks::walk` for per-pool version inspection. The architecture and
logging guard rows that pinned the removed `SetDisks`/`Sets` listing entry
points are dropped, and the error-other ratchet baseline shrinks by one.
* fix(listing): exclude synthetic directories from receipt walks
* fix(listing): stop abandoned walks and filter directory entries
While a remote namespace scanner walk runs, the fence watcher reads the
persisted cycle state every 5 s and stops the walk on any error. A read
that hits the 5 s distributed-lock timeout on .bloomcycle.bin is then
reported as a fence change: the bucket scan fails, the set cache is not
published and the cycle ends without a durable usage snapshot.
Return ScannerError::CycleStateUnavailable (same message as before) when
the state cannot be read, and let the watcher tolerate up to 12
consecutive such polls before stopping, logging a warning each time and
resetting the count after a successful poll. A mismatching fence and any
other error still stop the walk at once; the fence check when the stream
opens is unchanged.
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
* fix(ecstore): preserve uncertainty after partial multipart abort
Keep recovery callers from reporting NoSuchUpload while minority primary metadata remains. Retain all quorum and deletion checks. Exercise actual partial Abort and explicitly retained late RPC packets after caller retirement, staging cleanup and bucket recreation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): prevent retired multipart staging resurrection
Require the upload root to exist before preparing recovery publication. Preserve rooted directory walks for nested bases on non-Linux Unix and cover missing-source native work, configured aliases and pinned mixed-version coordinator recovery.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): use IPv4 peer aliases for pinned mixed recovery
Keep direct IPv6 S3 listeners behind IPv4 RPC proxies for the pinned previous release, whose peer health resolver rejects bracketed IPv6 hosts. Preserve signed authorities, ports and strict recovery assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): separate pinned startup from MPU fault budgets
Use the old fleet defaults during bootstrap, then apply the original short fault budgets to the current replacement. Keep direct S3 URLs aligned with IPv6 listeners and preserve all quorum and physical cleanup assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): seed legacy MPU through transparent transport
Retire raw proxy connections before enabling method faults so legacy streaming setup stays byte-transparent and every later scoped mutation must traverse the fault barrier. Verify raw and adapted protocol authority, bodies and trailers.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): retain direct listeners for legacy MPU peers
Advertise same-port localhost peers for the pinned resolver while retaining direct IPv4 S3 listeners. Exact scoped RPC hit counts still reject bypassed injection and all physical authority assertions remain unchanged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(server): keep startup gRPC on the authenticated router
Use the hybrid protocol predicate for startup RPC admission so early control responses retain production authentication and owner validation. Keep REST FullReady gating and pinned replay capability rejection intact. Add deterministic regressions, scoped diagnostics and bounded legacy fixture resources.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ci): verify MPU recovery across upgrade source versions
Run the exact sixteen-drive mixed MPU case for every checksum-verified upgrade source, independently of generic compatibility failures. Require one listed test and retain per-version logs while preserving the historical distributed source pin and every recovery assertion.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ci): trigger upgrade MPU checks for fixture changes
Include distributed fixtures and the RPC fault proxy in the upgrade
workflow paths so test-only changes schedule the strict recovery gate.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(storage): verify resend owners across MPU finalization
Hold real part-transaction RPCs while another coordinator completes or
aborts the upload, with both live and cancelled client response waiters.
Require full object bytes, terminal upload state, and all staging roots
to remain consistent after the part owner drains.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): expose startup phases and attempt deadlines
Share one node-local startup snapshot between native status and metrics.
Track actual waits and first attempts without changing admission timing,
coverage acknowledgement, or publication semantics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): observe startup recovery before initialization
Create the observation owner at enabled startup entry and move it through
the existing initializer, preserving admission timing and disabled cleanup.
Cover blocked recovery discovery and cancellation through the public entry.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(s3): normalize UploadPartCopy source versionId and populate source versioning state
execute_upload_part_copy forwards CopySource::Bucket.version_id verbatim without normalizing 'null' to Uuid::nil() or validating UUID syntax up front (returning 500 InternalError instead of succeeding on versionId=null or returning 400 InvalidArgument on malformed versionId), and neither execute_upload_part_copy nor execute_copy_object populates src_opts.versioned / src_opts.version_suspended from BucketVersioningSys.
Root Cause:
Unlike execute_copy_object (issue #4238) and get_opts, execute_upload_part_copy in rustfs/src/app/multipart_usecase.rs extracts version_id from CopySource::Bucket without trimming, converting 'null' to Uuid::nil().to_string(), or validating UUID syntax via Uuid::parse_str, causing prepare_get_object_reader to fail with 500 InternalError when versionId=null or an invalid UUID is passed in x-amz-copy-source. Additionally, neither execute_upload_part_copy nor execute_copy_object populates src_opts.versioned and src_opts.version_suspended from BucketVersioningSys, and execute_upload_part_copy returns x-amz-copy-source-version-id without gating on whether versioning is enabled or suspended on the source bucket (issue #4976).
Fix:
Add normalize_copy_source_version_id() and format_copy_source_version_id() in rustfs/src/app/multipart_usecase.rs, populate src_opts.versioned and src_opts.version_suspended from BucketVersioningSys on both UploadPartCopy and CopyObject, and gate x-amz-copy-source-version-id on source bucket versioning state.
Signed-off-by: czcbangkai <czcbangkai@google.com>
* fix(s3): keep copy version validation within footprint guard
---------
Signed-off-by: czcbangkai <czcbangkai@google.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
* test(ecstore): pin historical compression index reads
Exercise fixed pre-varint index bytes through the production reader,
including full and ranged reads, index fallback, and body CRC failure.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): use typed compression plan offsets
Use the existing usize storage offsets directly in the compatibility fixtures, fixing the same-type conversion errors reported by Clippy. Keep the planned-offset and decoded-byte assertions unchanged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Workers::give() decrements in_use to 0 before calling semaphore.add_permits(1), while a queued Workers::take() task only increments in_use after its woken future is scheduled and polled, allowing Workers::wait() to return prematurely while a woken worker is still in flight.
Root Cause:
In crates/concurrency/src/workers.rs, Workers::give() decrements in_use inside self.in_use.send_modify() before calling self.semaphore.add_permits(1), while Workers::take() only increments in_use after self.semaphore.acquire().await returns and the woken task is scheduled and polled. During the handoff window when the last active worker calls give() and transfers its semaphore permit to a queued take() waiter (so semaphore.available_permits() < limit), in_use is 0, causing Workers::wait() (rx.wait_for(|&held| held == 0)) to complete prematurely while work is still in flight and Workers::available() to over-report available capacity.
Fix:
Require both held == 0 and self.semaphore.available_permits() == self.limit in Workers::wait(), notify self.in_use watchers after self.semaphore.add_permits(1) in Workers::give() and via an AcquireCancelGuard in Workers::take(), and bound Workers::available() by self.semaphore.available_permits().
Signed-off-by: czcbangkai <czcbangkai@google.com>
Co-authored-by: Hauser <housemecn@gmail.com>
* perf(ecstore): unify per-disk blocking workers with spin keep-alive and coalesce DELETE hops
Unify per-disk blocking I/O and fsync workers under a 3-lane DiskBlockingQueue
(Foreground, Isolated, Fsync) with MAX_NAMESPACE_WORKERS_PER_DISK = 1 and a
bounded user-space spin/yield keep-alive (WORKER_IDLE_SPIN_ITERS = 256), and
coalesce redundant blocking dispatches along the DELETE hot path:
- Expand DiskBlockingQueue to 3 lanes (Foreground, Isolated, Fsync) with 1
warm worker per disk/lane and a 256-iteration spin/yield keep-alive before
exiting spawn_blocking, preventing Tokio BlockingPool shared.idle futex
wake/wait thrashing between back-to-back stages of PUT and DELETE.
- Route fsync_dir, fsync_dir_with_owner, and namespace file-sync barriers
through the per-disk Fsync lane on FSYNC_RUNTIME, and replace LocalDisk's
duplicate MetadataReadQueue with LocalDisk::run_metadata_read backed by
self.blocking_queue.
- Route write_all_internal(Owned), open_file(O_TRUNC), remove_file_with_owner,
and remove_dir_with_owner through DiskBlockingQueue with pre-execution
cancellation checks.
- Coalesce DELETE directory scans in commit_reserved_version_delete and
finish_version_delete into single blocking passes with periodic cancellation
polling, batch rollback file writes in write_delete_rollback_files, batch
rollback unlinks + directory fsync in remove_files_and_fsync_with_owner, and
coalesce post-rename directory fsyncs in activate_delete_preparation.
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
* perf(ecstore): isolate durable work and reduce idle queue locking
Route coalesced writes and delete settlement through the fsync lane while preserving namespace leases, cancellation ownership, and durability ordering. Keep relaxed work on the foreground lane and replace idle mutex polling with an advisory atomic hint; dequeue and worker retirement remain mutex-protected.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): yield disk workers across shared blocking pools
Limit each draining task to 64 completed jobs and reuse the worker guard to reschedule remaining work behind other disks. Preserve per-disk FIFO, worker limits, and per-operation ownership. Add a deterministic two-disk regression with one blocking thread.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): release queued jobs when workers cannot start
Construct the worker guard before submission and track whether execution began. Release pending jobs outside the lane mutex when the last worker is rejected, so waiters, resource units, and self-owning namespace leases cannot remain stranded. Cover closed runtimes and shutdown during batch handoff.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(connect): synchronize restart with observed inventory
Wait for the received POST instead of treating transport backoff as proof of delivery. Inject a pre-HTTP connection drop and use a verified loopback IP fixture without changing timeout or replay assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(ecstore): unify disk worker lifecycle and drain loop
Represent submitted, running, and retired workers explicitly. Share dequeue, execution, idle recheck, and retirement in one loop while preserving bounded handoff and rejected-task ownership cleanup.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(storage): separate real I/O from paused-clock assertions
Complete durable fixtures before pausing virtual time, drive the immediate scanner tick before freezing time during filesystem waits, and keep checkpoint-backed retry accounting on a real clock. Preserve default fsync isolation, disk deadlines, retry counts, and all outcome assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
A delete-all lifecycle expiry is a prefix delete that takes the bucket
lifecycle write lock, while the rebalance entry holds that lock for read
through the inline apply and its bucket incarnation fence. The write
waited out the lock timeout, stalled every lifecycle read in the bucket,
and failed the entry on every retry.
Like decommission (#8777), rebalance now moves such a version live and
lifecycle expires it on the target.
Refs rustfs/backlog#2873
The listing pipeline signalled "this page exhausted the namespace" by
setting `MetaCacheEntriesSortedResult.err = Some(Error::Unexpected)` and
had every consumer filter that variant, so any future `Unexpected` on the
producer path would have been read as a complete listing. A second truth
source, the shared `producer_limit_reached` atomic, was last-writer-wins
across the disks of a page and was never serialized to remote peers.
Collectors now return `ListPage { entries, exhausted }`, errors surface as
errors, and the early empty-listing exits return an exhausted empty page.
The producer's stop reason travels in the metacache stream itself:
`MetacacheWriter::close_with_limit_reached` appends it after the `false`
terminator as repeated terminator markers (the only trailing bytes a
deployed reader tolerates, because `list_path_raw_inner` keeps polling
readers after EOF), `MetacacheReader::limit_reached` decodes it, and
`list_path_raw_inner` folds every reader's trailer into a
`ListPathRawOutcome` that reaches the collector. Remote disks therefore
report their per-disk limit stops as well, and the `producer_limit_reached`
fields on `WalkDirOptions`, `ListPathRawOptions` and `ListPathOptions` are
removed.
* test(e2e): tighten scoped multipart fault acceptance
Target Abort root deletion instead of child transaction cleanup, require
actual metadata peer hits, and keep faulted APIs single-attempt. Validate
bounded ordinary recovery and safe quorum refusal for partial mutations,
with the recovery enhancement tracked in backlog#2940.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): drive concurrent TLS reads independently
Give each coordinator its own supervised task and cooperative polling
budget while retaining the existing workload, deadline and byte/hash
assertions. Preserve node logs after fixture teardown and report the
operation, response phase and received bytes when a transfer times out.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(listing): honor persisted erasure quorum
Separate metadata admission and primary-reader sizing from each version's
persisted erasure requirements. Propagate agreed-entry uncertainty and
report LIST read-quorum failures as storage unavailability.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(listing): borrow metadata during quorum resolution
Keep validated metadata inspection and agreed-version selection in
filemeta. Resolve independent reader votes through borrowed slots and
retain owned buffers until a filtered result is required.
Preserve fixed-baseline legacy comparisons, cached latest fast paths,
quorum policy, and disk fan-out. Add ownership regressions and paired
release benchmarks for cold and cached version histories.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): remove redundant fallback clone
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Run two cargo update and cargo upgrade rounds from origin/main.
Update mimalloc to 0.7.2, hotpath to 0.29.1, and ZIP to 9.1.0,
with compatible crypto, compression, and smallvec updates.
Retain the generic-array version required by crypto-common 0.1.7.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scripts): collect scanner host telemetry on macOS
Use platform-supported iostat arguments and expose optional collector
failures without interrupting scanner-status collection.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(ecstore): reuse validated metadata read path buffers
Share the checked bucket/object tuple across metadata read consumers and borrow clean normalization inputs without skipping filesystem validation. Keep Windows reconstruction and the second bucket check intact.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scripts): finalize scanner telemetry for failed runs
Initialize host telemetry artifacts before external captures so reused output directories cannot retain prior successes. Share normal and error-path finalization, reap collectors on request failure, and preserve the primary exit status even if status recording fails.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): distinguish unreadable recovery inventories
Treat only the exact system-prefix read-quorum result as incomplete during bounded polling. Preserve strict final reads and the shutdown/drain assertions, record failed observations, and cover interrupted empty streaks and unrelated errors.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(rio): ZigZag-encode signed delta varints and widen scratch buffer in compress_index
Index::append_to passes signed delta residuals (c_off and u_off, which are negative whenever a compressed block is smaller than est_block_uncomp / 2) to write_varint(buf, v: i64), which checks while v >= 0x80 without ZigZag encoding and truncates every negative delta to a single byte, while tmp = [0u8; 8] panics out-of-bounds on 9-10 byte varints.
Root Cause:
In crates/rio/src/compress_index.rs, Index::append_to delta-encodes u_off and c_off (c_off -= prev.compressed_offset + c_predict, where c_predict starts at est_block_uncomp / 2) as signed i64 residuals and passes them to write_varint(buf, v: i64). However, write_varint checks while v >= 0x80 on the signed i64 without ZigZag encoding (unlike Go binary.PutVarint / binary.Varint in the S2 index format): for any negative v, v >= 0x80 is false, so write_varint writes a single truncated byte v as u8 without continuation bits, either silently corrupting compressed_offset on Index::load (when (v as u8) < 0x80) or desynchronizing the varint stream (when (v as u8) >= 0x80). Additionally, tmp = [0u8; 8] at line 223 panics with an out-of-bounds index when encoding 9-10 byte varints, and read_varint lacks an overflow check on 10-byte inputs.
Fix:
Use ZigZag encoding and decoding in write_varint and read_varint, reject 64-bit varint overflows in read_varint, and widen the scratch buffer tmp in Index::append_to from [0u8; 8] to [0u8; 10].
Signed-off-by: czcbangkai <czcbangkai@google.com>
* test(rio): use est_block_uncomp field and compare IndexInfo fields in compress_index test
---------
Signed-off-by: czcbangkai <czcbangkai@google.com>
`LocalDisk::walk_dir` stored its own `limit_reached` into the
`producer_limit_reached` flag that every producer of a page shares, so a
walk reaching EOF after a sibling stopped at its per-disk limit cleared the
signal and the collector reported a complete page. Use `fetch_or` so the
flag answers "did any bounded walk stop early", whatever the finish order.
`MetaCacheEntry::is_in_dir` stripped the directory prefix repeatedly, so
`a/a/b` counted as a direct child of `a/`. `MetaCacheEntriesSorted::
forward_past` kept every entry when none sorted after the marker and split
on an index computed over the flattened entries. Both are masked today by
the collector's pre-filtering; fix them and pin the contracts with tests.
* fix(multipart): allow abort after partial commit
Read staging metadata at read quorum during Abort while retaining the
delete write quorum and generation checks. Bound post-fault lock recovery,
isolate quorum rows from peer breaker history, and cover the metadata and
deletion boundaries.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(multipart): release topology guards before metadata I/O
Read multipart metadata from owned disk snapshots so slow I/O does not
block registry renewal. Cover read and write lookups with a deterministic
paused-I/O regression.
Reuse one cluster per quorum matrix after observing fresh responses from
every peer. Preserve fault-hit and quorum assertions without repeatedly
starting clusters or disabling peer request breakers.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* perf(ecstore): avoid head-of-line blocking in delete recovery
Recover independent keys through a bounded rolling window while preserving per-key hint generations, admission budgets, cancellation retry, and the existing transaction decision engine.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(ecstore): bound durable delete preparation and bootstrap recovery
Prepare independent Linux delete transactions with bounded concurrency while retaining per-key result order and serial fallback for overlapping, rollback, and legacy requests. Preserve startup discovery until bucket metadata is initialized, and add release performance and process-crash acceptance runners.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): verify clean exits in recovery acceptance
Reject forced or OOM exits when measuring clean startup and verify original ETags across mixed-layout crash recovery and a second restart.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): distinguish prepared and decided batch crashes
Observe real preparation and receipt states separately, retain non-vacuous acknowledged-delete sentinels, and require read-only physical convergence before S3 reads can trigger cleanup.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): move final delete recovery options
Move the options value into the batch-ordering regression's final case
instead of cloning it. Keep the earlier clone needed for reuse.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): replay delete receipts after interrupted proof GC
Retire only the exact empty transaction leaf before journal activation. Preserve occupied directories and prefix children, and cover partial cross-disk proof GC without a fresh delete. Tighten crash evidence to distinguish directory-only remnants from retained content.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bound implicit startup delay and publish config early
Limit warm-cache startup to the smaller of the cycle interval and one
minute before jitter, while preserving explicit startup settings.
Publish configuration gauges when applying runtime settings and retain
timeout diagnostics until an actual new cycle begins.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): unify startup waits and skip unchanged configuration
Bound read-only startup inspection and make startup and pre-leadership
retries respond to cancellation and configuration changes. Preserve one
startup deadline and discover replication behind lifecycle-only buckets.
Avoid irrelevant bucket listings and repeated per-disk reconfiguration.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): retain effective startup policy and fallback metrics
Keep the sampled startup deadline when configuration changes leave its
normalized policy unchanged. Initialize retained runtime metrics after
an invalid first refresh without suppressing the validation error or
replacing a newer accepted configuration.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
get_online_offline_disks_stats() counts and demotes all root_disk entries regardless of drive state, underflowing online_disks[ep] (0usize - 1) and double-counting offline_disks[ep] when a root_disk drive is offline or unknown alongside healthy non-root drives.
Root Cause:
In crates/ecstore/src/diagnostics/admin_server_info.rs: (1) root_disk_count counts every drive with root_disk = true even if the drive was already classified into offline_disks or unknown_disks; (2) the subsequent demotion loop unconditionally decrements online_disks[ep] and increments offline_disks[ep] for every disk.root_disk without checking whether disk.state was classified as online (ok or unformatted). When an endpoint has an offline or unknown root_disk drive and zero online drives, *online_disks.get_mut(ep) -= 1 underflows 0usize (panicking in debug/checked builds or wrapping to usize::MAX) and inflates offline_disks.
Fix:
Introduce is_online_drive_state() and only count and demote root_disk drives whose state was classified as online (ok or unformatted), preserving the offline and unknown bucket tallies and keeping online + offline + unknown equal to disks_info.len().
Signed-off-by: czcbangkai <czcbangkai@google.com>
* perf(rpc): remove redundant boxing from read streams
Keep the capped read stream concrete until StreamingBlob owns its type erasure. Add verified four-node TLS coverage for full, unaligned range and concurrent reads, with bounded client memory and explicit integrity checks.
Document protocol comparison commands and the old-node workaround during rolling upgrades.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): preserve TLS trust for alternate credentials
Derive credential-specific clients from the cluster configuration so they retain the generated CA. Exercise successful trusted reads and reject an invalid replacement identity instead of inheriting root credentials.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): collapse acceptance report path guard
Combine the optional report path and existing-file checks into a let chain
without changing the report or PID sidecar collision behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
HttpCompressionConfig::extract_filename_from_content_disposition() calls header_value.to_lowercase() and slices &header_value[start..] using the byte index from lower.find("filename="), panicking on multi-byte Unicode characters whose UTF-8 byte length changes under case mapping and matching unanchored *filename= parameter suffixes.
Root Cause:
In rustfs/src/server/compress.rs, extract_filename_from_content_disposition() computes lower = header_value.to_lowercase() and uses the byte offset idx from lower.find("filename=") to slice &header_value[start..]. Because Unicode case mapping can expand or shrink UTF-8 byte lengths (e.g., U+0130 "İ" is 2 bytes in UTF-8 but lowercases to 3 bytes; U+212A "K" is 3 bytes in UTF-8 but lowercases to 1 byte), start can land inside a multi-byte UTF-8 codepoint or past the end of header_value, causing a runtime panic. In addition, lower.find("filename=") matches any parameter ending in filename= (such as x-filename=).
Fix:
Use header_value.to_ascii_lowercase() so byte offsets remain 1:1 with header_value, and require filename= to appear either at the start of the header or after a semicolon parameter delimiter.
Signed-off-by: czcbangkai <czcbangkai@google.com>
StdBackend::pread_bytes caches FdCacheEntry { file, len } and skips fstat on cache hits, passing cached len directly to unsafe { mmap_options.map(file) }. However, StdBackend::open_write / UringBackend::open_write (create_file, append_file), LocalDisk::write_all_private (write_all), LocalDisk::rename_part, and directory LocalDisk::rename_file fail to invalidate FdCache, causing mmap past EOF (SIGBUS), false DiskError::FileCorrupt on grown files, or stale reads after renames.
Root Cause:
In crates/ecstore/src/disk/local.rs, StdBackend::pread_bytes caches open File handles and their initial fstat byte length in FdCache and uses the cached len directly for bounds checks and unsafe { mmap_options.map(file) }. While LocalDisk::rename_file (non-directory) and LocalDisk::delete invalidate FdCache, five mutation paths omit invalidation: (1) StdBackend::open_write (called by create_file with O_TRUNC and append_file), (2) LocalDisk::write_all_private (called by write_all with O_TRUNC), (3) LocalDisk::rename_part, (4) LocalDisk::rename_file when src_is_dir is true, and (5) UringBackend::open_write / unlink / rename which fail to forward invalidations to self.inner. Truncating a cached file across a page boundary causes mmap to map beyond EOF and trigger SIGBUS; growing a cached file causes false DiskError::FileCorrupt.
Fix:
Invalidate FdCache in StdBackend::open_write, UringBackend::open_write/unlink/rename, LocalDisk::write_all_private, LocalDisk::rename_part (both src and dst), and directory LocalDisk::rename_file (via invalidate_prefix on src and dst).
Signed-off-by: czcbangkai <czcbangkai@google.com>
* test(e2e): add MPU RPC quorum and recovery acceptance
Exercise separate storage and lock RPC delays across multipart phases,
including quorum boundaries, cancellation, bucket recreation, and bounded
eight-node load. Honor TMPDIR for isolated cluster drive directories.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(lock): probe healthy voters behind silent peers
Spread additional probes across the existing acquisition attempt budget
when the initial quorum-plus-spare wave stalls. Preserve quorum thresholds,
fast-path fan-out, and existing ownership and late-response cleanup.
Cover every four-node read-voter ordering, a stalled eight-node write
quorum, and normal fan-out. Extend MPU acceptance to EC12+4 at twelve and
eleven metadata acknowledgements.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Recover independent keys through a bounded rolling window while preserving per-key hint generations, admission budgets, cancellation retry, and the existing transaction decision engine.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(s3): preserve aws-chunked error responses
Map named aws-chunked failures through the shared bounded body classifier,
keeping typed source precedence and the dependency's S3 response contract.
Cover exact responses, upload publication, and valid signed/trailer limits.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(s3): classify upload stream errors once per cause
Reuse the typed UploadStreamError result for digest and incomplete-body
classification while preserving the shared classifier's marker priorities.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): refresh aws-chunked profile selections
Record the two new aws-chunked regression cases in smoke and full profiles.
Verify exact additions against the CI Linux inventory and native Darwin
listings, recovering each previous digest when those two cases are removed.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(rio): isolate internode streams with pooled HTTP/1.1
Default the internode HTTP data plane to reusable HTTP/1.1 connections so paused shard bodies cannot consume shared HTTP/2 receive credit. Retain explicit auto negotiation and the existing TLS, pooling, and recovery paths.
Refs rustfs/rustfs#8843 and rustfs/backlog#2934.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(rpc): frame bounded shard reads for connection reuse
Preserve the bounded read cap and stream-to-EOF sentinel while making connection completion independent of a chunked terminator. Cover exact reads without EOF polling, pooled TLS reuse, and partial-body truncation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(deps): migrate signer and OIDC to patched crypto
Pin the requested signer fix and upstream OIDC/OAuth2 crypto migrations to immutable commits. Preserve registry SDK type identity, remove the old bigint and elliptic-curve chains, and verify independent login state, nonce, and PKCE values.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
ConditionalCorsLayer took the bucket from the first path segment only.
With RUSTFS_SERVER_DOMAINS set, a virtual-hosted-style request such as
OPTIONS http://mybucket.localhost:9000/x.jpg was evaluated against a
bucket named "x.jpg", so a preflight never matched the bucket's CORS
configuration and returned 200 without Access-Control-* headers, while
the same request in path style succeeded.
Resolve the bucket from the host prefix first, reusing the virtual-host
matching that the API rate limiter already uses, and fall back to the
first path segment for path-style requests. A bucket-level request on a
virtual host ("/") is now treated as a bucket request instead of the
server root.
Co-authored-by: cozima <8464261+cozima@users.noreply.github.com>
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
* test(scanner): isolate async checkpoint log capture
Scope captured tracing subscribers to each future poll and cover the
competing-dispatcher failure without weakening checkpoint assertions.
Verify exact bounded erasure-probe accounting around the 64-entry limit.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): classify erasure candidates in one budgeted walk
Continue directory classification in cooperative 64-entry batches until
part evidence or EOF, retaining normal checkpoint and namespace work.
Defer metadata accounting and namespace reuse until classification ends.
Distinguish vanished opens from incomplete iteration and preserve quota,
sampling, failed-object and non-destructive heal behavior.
Pin test callsite interest alongside poll-scoped capture to prevent an
unsubscribed sibling from caching the checkpoint callsite as disabled.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): purge every explicit delete-marker version
Keep explicit marker removals on the canonical version-delete path so
same-key batches are not truncated and pending replication does not retain
source markers. Preserve marker identity and timestamps in the response.
Add real four-disk regressions for mixed version cleanup, duplicate marker
IDs, pending replication, and null/UUID marker removal.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(filemeta): index explicit delete-marker batches
Reuse the batch index and final compaction for ordinary marker removals.
Keep small marker-only histories on the scalar path and preserve fallback
for free versions and complex mutations.
Add scalar-equivalence, boundary, corruption and deterministic scan-count
coverage, a real-disk mixed-history regression, and reproducible marker
benchmark cases. Preserve existing benchmark defaults while honoring CLI
sampling overrides.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(filemeta): remove redundant marker fixture clone
Move the original metadata into its final test fixture after the last
borrow, avoiding the redundant clone reported by strict Clippy checks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(storage): validate explicit marker deletion and recovery
Exercise UUID/null and duplicate explicit marker removals over real HTTP
with retries disabled, including immediate four-node visibility and exact
retained payloads. Cover all-drive PREPARED/APPLIED/DECISION process
termination, rollback/commit recovery, and old-ID retries across a second
restart without deleting a fresh marker.
Use flat sampling and fixed per-case fixture batches in the metadata
benchmark. Update profile selection digests for the added regressions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): synchronize crash fixture startup and flush readiness
Give disk setup and the durable flush boundary separate readiness gates,
keeping each phase bounded to ten seconds. Preserve the real SIGKILL and
restart assertions while reporting early child exits and retaining output.
Reap fixture children on assertion failure and cover early-exit diagnostics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): roll a wedged pause backlog forward to its proven ledger
For rustfs/backlog#2873 defect E.
Two interleaved writers could leave a replica state that no claim could
leave. Writer B read writer A's partial commit and selected the stable
rollback point. A's commit then completed and A verified it. B's rollback
stabilization overwrote every member it had read after the commit, and A's
stabilization reached only the remaining member. No commit survived and the
stable fields differed, so every claim and every decommission retirement
failed with "neither a surviving membership commit nor a stable rollback
point".
- When no commit survives and stable consensus fails, select the unique
newest stable ledger by (writer epoch, generation). A stable field is
written only after its ledger was selected as authority, so that ledger is
the last proven one. The next claim stabilizes it and advances normally.
- Keep failing closed for an invalid or unreadable replica, for two
different stable ledgers at the newest key, and for a missing replica that
a stored commit names as a member.
- A rollback proof written without an authoritative commit names only
members that already store a record, so a failed first write to a new
member cannot turn it into a named member that reads as lost.
- Retirement refuses a rolled-forward ledger until the writer has
stabilized it, as a retryable handoff conflict rather than a terminal
authority conflict.
- Tests replay the interleaving on real storage: it converges and retires,
it converges after another expansion with a failed first write to a new
member, and a same-key fork or a lost named member still refuses.
* fix(scanner): let retirement stabilize a rolled-forward pause backlog
Follow-up to the defect E roll-forward for rustfs/backlog#2873.
- Retirement no longer waits for a scanner writer. When no commit
survives and the native selector over every read member (survivors,
retiring source and queued pools) rolls forward, the planner commits and
stabilizes that ledger on the survivors under the writers' object fence.
The previous retryable handoff could exhaust its ~13.5 s budget long
before a writer re-claimed, and failed the decommission terminally.
- A writer's roll-forward refuses when a stored commit names a member that
is missing or outside its read, such as a retiring source excluded from
the writable set. Retirement, which reads that member, decides instead.
- A writer stabilizing a rolled-forward ledger writes missing members
first and stops at the first failure. A member that only read as missing
rejects the create, so no surviving proof can omit its newer record.
- Docs describe the actual roll-forward preconditions and the retirement
exit.
- Tests: retirement converges the wedge with no writer; a writer refuses to
roll forward past an unread source that holds the newest ledger and
retirement keeps it; a spurious missing read changes no record and the
next claim converges on the newest ledger.
* fix(decommission): create missing pause backlog survivors first
Follow-up to the defect E retirement roll-forward for rustfs/backlog#2873.
- Retirement creates survivors that read as missing one at a time, before
any stored survivor, and stops at the first failed create. A transient
create failure on a new pool's set no longer leaves every other survivor
holding a commit that names a still-missing member, which no later
selection could leave.
- A rolled-forward retirement first seeds a rollback proof that names only
the survivors that store a record; the commit still names every survivor.
- Retirement rolls forward only when the survivors cannot select a ledger
on their own or select the same one. Survivors that agree on a different
ledger keep the source-authority check.
- The scanner writer applies the same missing-first, stop-at-first-failure
order to every stabilization with a missing member, including a seed from
an old commit selected as the rollback proof.
- Tests: a failed new-pool create during retirement retries to convergence;
a spurious missing read cannot seed an old commit over a newer member;
the rolled-forward precedence over source stable records is pinned.
* docs(decommission): state the all-missing survivor limit of backlog roll-forward
* test(e2e): use the resumed decommission completion budget
* test(heal): exercise checkpoints written by rc.5
* test(heal): route upgrade fixtures through the storage facade
* fix(deps): update ctutils to address constant-time advisory
* test(lifecycle): gate recovery I/O while advancing test time
* fix(decommission): count settled entries once and back off repeated pauses
Follow-up to rustfs/rustfs#8824 for rustfs/backlog#2873 defect F.
- Count an entry's versions when the entry settles (copied and cleaned up,
or retained) instead of as each version copies. A partially moved entry
that is deferred, paused and resumed, or interrupted, no longer counts its
already-moved versions again when the resumed pass finds them on the
target.
- Hold the watchdog relaunch of a decommission that pauses again on the
same cause without progress, doubling from 30 s up to 15 min, and warn with
the cause. A first pause still relaunches on the next pass; the pause never
becomes a terminal failure.
- Log each drive's error when a delete version loses write quorum, so the
cause of a sub-quorum delete-marker copy is recorded instead of only its
rollback.
- Tests: pause/resume counting, a target whose metadata is below read
quorum, the copy-quorum pause cause, the relaunch backoff, and a rollback
test that asserts the restore attempt instead of a tracing log.
* fix(decommission): measure pause progress by cleaned entries
Review follow-up on the pause/resume counting and relaunch backoff.
- A pause now carries this generation's progress counters into the
pool metadata it persists, like a progress checkpoint. Before, everything
counted since the last checkpoint was dropped at the pause.
- A retained entry (one whose source stays) is relisted by every resumed
pass. A per-instance ledger counts its versions once per decommission
generation, so retained versions no longer grow per round in one process.
- The relaunch backoff measures progress by entries moved off the pool and
completed buckets, which a relisted retained entry cannot advance. Before,
the recounted retained entry looked like progress and reset the backoff.
- Tests: exact totals across a pause and a resume from persisted metadata;
a target kept below quorum defers the entry with nothing counted; a
retained entry plus a repeated cause escalates the backoff over three
pauses, with the watchdog path relaunching a first pause and holding a
repeat.
* fix(ecstore): bound retained decommission accounting
* feat(scanner): configure startup recovery backoff cap
* test(scanner): compare recovery retry count without narrowing
* docs(scanner): document recovery backoff cap and expose it in Helm
List scanner.recovery_backoff_cap in the runtime controls table, drop the
fixed ten-minute wording from the follower recovery section, and map
config.rustfs.scanner.recovery_backoff_cap_secs to
RUSTFS_SCANNER_RECOVERY_BACKOFF_CAP_SECS in the chart.
Run two cargo update and cargo upgrade rounds from origin/main.
Upgrade the hotpath crate family to 0.29.0 and refresh compatible
AWS, Redis, profiling, crypto, UUID, and certificate dependencies.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(quota): retire degraded floors from durable usage reports
* docs(quota): clarify retained usage cache refresh behavior
* fix(admin): report unknown bucket usage as null in GetBucketQuota
GetBucketQuota serialized missing usage as size 0, which contradicted the
D3 rule that unknown usage is never reported as zero and, after retiring
degraded floors, made a bucket near its limit look empty. Make size
optional and stop collapsing a missing or unreadable usage snapshot to 0.
* fix(scanner): recover dual corruption with retained epoch fencing
* fix(scanner): preserve recovery markers and legacy quota floors
* test(scanner): expect retained usage recovery marker state
* docs(scanner): register dual-corruption recovery evidence objects
Add the .bloomcycle.bin.dual-recovery/ evidence family to the persisted
objects table and describe its owner, write-once lifecycle and recovery
rule in Deletion And Recovery Rules.
* fix(s3): expose typed causes for unavailable responses
Keep the existing S3 retry contract while distinguishing namespace lock
timeouts, other lock refusals, and storage write quorum failures. Reuse one
bounded typed-source walk and document multipart session attribution.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(s3): preserve XML type on attributed errors
Keep application/xml when the pinned serializer replaces generated headers
with the custom cause map. Assert the media type on direct and wrapped lock
timeouts and namespace/write-quorum error responses.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): unify multipart generation fence lifetimes
Own registry registration before asynchronous incarnation validation so
cancellation cannot preserve a memo beyond real lifecycle-lock coverage.
Reuse successful validation for overlapping PUT and multipart operations,
and retain the full owner through detached part commits and orphan cleanup.
Keep cold validation concurrent and preserve authoritative snapshot,
borrowed-fence, and disabled-lock checks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): remove redundant pending closure
Pass std::future::pending directly to the incarnation validator in the
cancellation regression test so strict Clippy accepts the test target.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(decommission): keep partially moved versions readable and defer lost-quorum copies
A version copy whose target write kept losing drive quorum was counted as a
permanent per-object failure, and a partially moved entry made every copied
version unreadable: the retained source lists all versions while the target
lists only the copied ones, and the cross-pool identity check treated that
version-list difference as a same-time conflict (SlowDownRead).
- Compare the version-list fields (num_versions, successor_mod_time,
is_latest) only for exact identities; data-movement equivalent copies of a
version stay readable while the entry is partially moved.
- Defer a delete marker, object or tiered version copy that exhausts its
in-place retries on a drive quorum error to the end-of-round replay instead
of counting it failed; a persistent loss pauses the decommission, which the
local decommission watchdog resumes.
- Skip the backup rename when rolling back a delete transaction whose journal
recorded no original metadata, so a marker created on a missing key no
longer logs a NotFound that reads as the cause of the failed write.
Refs rustfs/backlog#2873
* fix(ecstore): close copy quorum and tiered read gaps
* test(ecstore): synchronize capacity fixtures by object
* fix(s3): report payload SHA256 mismatches accurately
Distinguish signed payload SHA256 failures from MD5 and additional
checksum failures at the shared API error boundary. Preserve the
payload error through archive extraction and use typed s3s errors.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(s3): classify body failures in one bounded pass
Share typed body-error classification across direct and storage I/O.
Retain marker precedence while replacing repeated source-chain scans,
and map storage-wrapped short HashReader bodies to IncompleteBody.
Cover nested priorities, real short reads, and one traversal budget.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(s3): route upload stream errors through the app facade
Keep the real stream-error fixtures behind the existing test-only S3
boundary without increasing the direct s3s import footprint.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(s3): preserve typed body failures across archive reads
Route TAR entry failures through the shared archive error adapter and
preserve every classified body error. Keep generic archive parsing as
InvalidArgument without formatting discarded transport diagnostics.
Use the existing timeout marker for PUT and Snowball body guards. Add
regressions for real stream verification after sniffing and timeout
responses, and tighten the reduced S3 macro footprint baseline.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
An edit that omits the name, as mc admin replicate update --endpoint
does, was normalized with a name inferred from the new endpoint host and
overwrote the stored peer, renaming the site on every peer map while its
own state name stayed unchanged.
update_peer now keeps the stored name for a known deployment ID when the
edit carries none, covering the public edit, the endpoint-refresh commit
and internal peer deliveries. The public handler also fills the stored
name before planning so the fan-out and refresh journal carry it to
receivers running older versions. Add and join of unknown peers still
infer the name from the endpoint.
A set-remote-target update with the creds group on a bucket target that
belongs to a site-replication peer skipped the connection change, logged a
warning, and still returned 200. The Console's bucket replication form sends
exactly that request when an endpoint changes, so operators saw success while
the stored endpoint, credentials, and TLS settings stayed unchanged.
Return 400 InvalidRequest instead, naming the target and the evidence that
makes it peer-owned, and pointing at a site-replication edit. The ownership
probes are unchanged; the decision is extracted so it can be unit tested.
Document how to change a site's address: the local endpoint is recorded once
at setup and never re-derived, edits must reach every other peer at its stored
endpoint, so sites move one at a time (or old addresses are restored
temporarily), followed by a resync. Commands use rc because mc's resync does
not work against RustFS and its update renames the site.
GET /v3/info and /v3/storageinfo have wrapped the madmin InfoMessage and
StorageInfo under an `info` key since the cluster snapshot view (#3803).
madmin decodes these bodies directly, so `mc admin info` printed empty
values and `mc admin replicate resync start` rejected every alias because
the local deploymentID read as empty.
Requests on the MinIO-compatible /minio/admin prefix now receive the bare
madmin body, following the existing is_compat_admin_request convention.
The /rustfs/admin prefix keeps the envelope that rc (which requires the
`info` key), the console, e2e tests, and auto-testing scripts read.
* perf(s3): borrow options during delete preflight
Pass the existing request options by reference to the metadata preflight instead of cloning them solely for that borrow. Keep the getter's mutable snapshot copy and the later owned-delete copy.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): fence backlog writes against stale pool membership
Reject native scanner publications unless their captured writable pool cohort
matches the fenced durable topology. A smaller startup view must not replace
an expanded membership commit with its older stable rollback.
Keep single-replica test injection fenced by the complete current cohort and
cover rejected startup claims, unchanged CAS revisions, and recovery of the
acknowledged expanded commit.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): use current cohort for healthy scanner CAS writes
Keep the writer's cached topology stale while explicitly capturing the
surviving membership for healthy-target publication and CAS checks. Also
assert that the old cohort rejects healthy-target writes without publishing.
Preserve retiring-source rejection, payload and ETag checks, and canceled
source membership repair without changing production admission.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Record a bounded failure boundary for each non-successful logical remote
walk while preserving the existing outcome, error source and retry behavior.
Distinguish stream open/read, downstream write/flush, wrapper admission and
deadline failures, and unfinished operations dropped before completion.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Include single-pool, status, and expansion fixtures in the existing
native scanner reservation without changing budgets or assertions.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Fence native backlog writes against their captured pool membership and retain
queued replicas as read-only proof members during retirement. Stabilize the
topology test workload and bound pre-ACK recovery separately.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* chore(deps): upgrade workspace parking_lot to 0.13
Move all six direct workspace consumers to parking_lot 0.13 while
retaining the 0.12 dependency line required by upstream crates.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(connect): stabilize client failure classification
Use an ephemeral loopback listener that explicitly rejects proxy CONNECT
and direct TLS connection establishment instead of assuming fixed ports
will promptly refuse connections. Give classification its own bounded
transport and measurement budget while retaining the timeout tests.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Share the existing canonical identity resolver with a non-authoritative source eligibility query. Group borrowed intents and create owned anchors only for retired generations, preserving cache and responsibility contracts and moving proof keys.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): restore marker write quorum on decommission resume
Verify equivalent target markers at write quorum and republish partial
copies before completion. Preserve exact marker creation semantics and
legacy birth identities while retaining ordinary delete and purge guards.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(odm): run delete marker regression on a bounded stack
Construct and run the deep real-storage future on the existing large-stack
test worker so the default libtest stack does not overflow. Preserve the
registered test name, serial guard, and single-part/multipart assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): use marker majority for resumed copies
Confirm existing and republished delete markers at the configured-set
majority used by their delete transaction instead of the EC data quorum.
For a twelve-drive EC4 set this accepts seven equivalent markers while
still rejecting six, including when the online inventory is shortened.
Cover named/null markers on a real rebalance retry with retained source
history. The regression fails with InsufficientReadQuorum before the fix.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): keep catch-up fixture timestamps consistent
Admit the seeded catch-up using its observation timestamp so a durable
writer claim crossing a wall-clock second cannot spuriously rate-limit it.
Model an older claim timestamp to exercise that boundary deterministically.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Use a conservative work hint for verified and typed legacy events, retaining the original capacity-maintenance pass and metrics publication. Preserve durable identities, journal retention, retries, and shutdown behavior, with isolated real-runtime and queue lifecycle regressions.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* perf(ecstore,filemeta): batch local walk_dir metadata reads and buffer metacache streams
* fix(ecstore): stream completed listing metadata reads
Publish each result before starting the next blocking read, preserving
per-object progress and cancellation without a timed chunk queue.
Keep dispatch batching, byte limits, and namespace/error stops intact.
Cover multiple batches, page boundaries, and oversized-envelope resumption.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore,filemeta): verify production listing streams
Replace the simulated directory-walk benchmark with the public local disk
path. Validate fixture output before timing and retain metacache-only
stream benchmarks. Pin fragmented reads, read coalescing, and canonical
UUID namespace probing against the reference behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): route listing benchmark through storage API
Centralize local listing benchmark imports in the shared benchmark
storage API boundary required by the architecture migration rules.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): keep catch-up fixture timestamps consistent
Admit the seeded catch-up using its observation timestamp so a durable
writer claim crossing a wall-clock second cannot spuriously rate-limit it.
Model an older claim timestamp to exercise that boundary deterministically.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* chore(deps): refresh GCS, profiling and allocator dependencies
Update published GCS, Pyroscope, mimalloc, and PPMd crate versions.
Align the pinned erasure-fixture test recursion limit with ECStore
to compile GCS-enabled test targets.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* chore(deps): update AWS SDKs, Tokio and memmap2
Refresh compatible AWS service and Smithy dependencies, Tokio timers,
and memory mapping support with the regenerated lockfile.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): identify scanner retirement planner failure phases
Bind the existing native planner error context to each retirement phase while preserving typed retry classification and all storage fences. Exercise the actual wrapper in an isolated process across unavailable and typed failures.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): type the unavailable retirement planner error
Replace the new formatted other error with a private typed error so the error-construction ratchet remains intact. Preserve all phase messages and the existing native retry classification.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): cover unavailable planner error identity
Check the private unavailable cause for every phase through the existing IO boundary. Retain native handoff classification and verify same-phase quorum bucketing after fallible disk narrowing.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(obs): cover contended identity under netlink denial
Check that the production identity entry stays nonblocking while a name
writer is held and real netlink discovery is denied, then observes the
published name after release. Release the writer before joining so a
blocking regression reports a bounded failure.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(obs): keep identity contention behind common helpers
Move the held-writer fixture behind a test-only common helper and enable
it through the Linux x86_64 obs dev-dependency. Preserve the timeout,
writer release before reader join, and identity restoration ordering.
Exercise callback completion and unwind cleanup in the common regression.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Record the first dispatch or undispatched termination at the existing
external request boundary, with entry-gated timing and owned task scope.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* perf(heal): reuse the verified repair proof queue
Retain proof events in place under the existing registry lock and keep
the pre-consumption capacity target and exact identity matching.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(common): move the final proof mismatch fixture
Avoid a redundant clone in the last owned mismatch fixture.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* perf(filemeta,ecstore): avoid redundant decodes and clones on xl.meta write and delete paths
* perf(filemeta): remove restore parsing allocations and add guards
Borrow restore header fields instead of allocating temporary vectors and
reuse the canonical dual-prefix metadata key guard. Cover scanner/full
decoder equivalence on historical and mutated records, restore grammar,
and the complete old-current observation tuple. Add the missing Criterion
entry for unshared data-directory selection.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* bench(filemeta): isolate metadata mutation and batch deletion costs
Move the metadata-only Criterion target to filemeta so it does not build
ECStore. Add deterministic physical and inline dense/sparse deletion
cases with the same fixtures available to baseline and candidate builds.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(filemeta): index ordinary metadata deletion batches
Use a batch-local version lookup, compact directory summaries, and lazy
physical reference counts for larger ordinary V2 deletion batches. Decode
each indexed body at most once and compact the version vector once.
Flush pending removals before canonical fallback and preserve per-request
validation, partial failures, inline-key aliases, and cleanup decisions.
Keep small batches and transition/legacy/ambiguous records on the scalar
path. Cover indexed/scalar state equivalence and fail-closed cache errors.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(filemeta): enforce linear batch decoding and safe fallbacks
Count V2 scans in tests to guard the indexed path's linear work contract.
Exercise marker, retention, restore, transition, free-version, and pending
purge requests against the canonical sequential path. Compare logical
state and deterministic headers for re-encoded maps while retaining exact
byte equality for ordinary indexed deletion and opaque metadata.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Capture existing diagnostic operation, caller and first-entry context at bucket, background and tracked-mutation handoffs. Keep absent context absent and retain deferred work and admission ownership through the established storage facades.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Keep the original storage results and all required request/replication
ownership while dropping two bindings with no consumers.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Consume completed aggregation entries at their terminal conversion so
bucket and replication target keys can move into the output maps.
Preserve validation, rejection and publication behavior.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(decommission): finish multipart null versions superseded on target
A decommission entry for an unversioned multipart source whose key
already holds a newer null version on the target settles as superseded
and aborts its staged upload. The cleanup's target proof saw the newer
object, could not match it to the staged identity, and failed closed
with a capacity-blocked error, so the routine paused, the source was
never cleaned up, and the error read like a minimum-free-drive block.
The staged upload is already proven absent and the target lookup is
exact: a different version id, or a null target with another
modification time (one null slot per key), is a different object, so
the staged copy holds nothing on the target and the pending intent is
cleared. Only a versioned target with the staged version id but another
modification time stays fail-closed. The remaining identity-proof
failures use a typed error without capacity wording.
Add three-pool decommission regressions for restored-transitioned and
plain multipart null sources superseded on the target.
* test(decommission): pin multipart target proof failures as terminal
Document the accepted residual of the null-slot proof: a metadata-only
self-copy keeps a published but uncharged staged copy's data while
moving its modification time, so its marker is released and one
object's bytes stay uncharged.
Add a three-pool routine test where the target already holds an
unowned null object with the source's exact identity: the cleanup's
ownership-proof failure fails the decommission with no capacity-blocked
reason instead of pausing it.
Require every security candidate to name the lower-trust principal, the crossed boundary, the affected resource, and the observable result, and to land under exactly one of `confirmed`, `needs_validation`, or `rejected`. Only confirmed findings carry severity; a trace blocked on an unresolved deployment fact is reported as that fact instead of an assumption.
A versioned multipart completion minted a new version when the staged version id was absent or nil, so an inbound replica of a source null version written by multipart landed under a fresh UUID. Keep the null version for authorized inbound replicas, and address the null version as versionId=null on the worker convergence HEAD like the other target reads.
Refs rustfs/rustfs#8747
* fix(decommission): move the free version of an expired tier version
Decommission only queued the lifecycle expiry of a transitioned version, so a source cleanup that ran first deleted the version itself and appended its tier free version after the entry's last pass. The post-check then failed the decommission until an operator re-ran it.
Apply the expiry of a transitioned version synchronously, as rebalance does. Its free version is on the source before the cleanup preflight, which reports the entry changed, and the retried entry moves the record to a target in the same pass. An expiry that cannot be applied leaves the version live, so it moves like any other version.
Refs rustfs/backlog#2873
* fix(decommission): move a delete-all expired tier version live
Applying a delete-all expiry inline made its prefix delete wait for the bucket lifecycle write lock behind the entry's own read lock until the lock timeout, blocking every write in the bucket meanwhile. Move such a transitioned version live and leave the delete-all to lifecycle on the target.
Cover a genuinely unapplied expiry and a free-version worker that consumes the source record before the entry moves it.
Refs rustfs/backlog#2873
* fix(heal): explain unverified legacy heal outcomes
Preserve storage diagnostics in canonical unknown outcomes and explain
legacy payload identity limits through the shared local/peer status path.
Borrow expected receipt identities while preserving all proof checks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): keep diagnostics from pausing merged MRF repairs
Require the actual MRF executor before publishing legacy pause events.
An ordinary queued owner can retain a merged durable MRF notice without
having performed the specialized deep check. Preserve its diagnostic
without granting it authority to park the repair responsibility.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): type MRF outcomes and defer status diagnostics
Carry storage-owned legacy observations in process and return a typed
terminal result only after the qualified MRF Deep check. Publish pause
events from that result and exact identities instead of source or text.
Keep object names out of retry classification and compute only the
status diagnostic selected by the canonical execution state.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Capture an existing ReadVersion caller and earliest entry before spawning config transactions. Restore them with the existing scoped wrapper while retaining default-feature operation propagation and detached task ownership.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(s3): classify empty multipart completion as InvalidPart
Treat absent per-drive multipart transaction directories as empty listings so
completion reaches the existing InvalidPart validation. Preserve quorum and
transaction recovery, and cover the HTTP and degraded-drive boundaries.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(ecstore): move multipart completion metadata in one pass
Reuse quorum-validated part metadata instead of repeatedly inserting, sorting,
finding and cloning parts. Keep legacy cleanup identities and ordering while
moving the original part allocation into the completion manifest. Compare ETags
by borrowing their normalized values.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(metrics): expose usage candidate rejection outcomes
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): borrow usage candidate fixtures
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): reserve capacity for decommission probes
Reserve all nextest slots for the two eight-disk decommission fixtures under both default and CI profiles. Keep their internal concurrency, production lock budgets, assertions and zero-retry policy intact.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(ecstore): scope prewrite capacity probes to the target pool
After persisting a new capacity intent, refresh only the target pool baseline. Preserve the global admission and finalization scans, lock order, fencing, and accounting formulas. Verify the reduced probe count with real disk metrics and preserve injected snapshot/error behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Capture the caller operation before the tracked mutation task is spawned. Keep detached completion, owned guards, result errors and panic join failures intact.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): add scanner/heal topology protection matrix
Add the S00 protection baseline for the Scanner/Heal program
(rustfs/backlog#2873, program rustfs/backlog#2872): seven
scanner_heal_topology_ cases in the distributed e2e lane that pin pool
expansion, rebalance and decommission behavior before the runtime changes.
The fixture seeds a deterministic inventory (empty, inline, external,
multipart, special and nested keys; a versioned bucket with an explicit
null version, three history versions and a delete marker per key; an
Object Lock bucket with legal hold and COMPLIANCE retention), records
every version with its requested and listed version id, length and
SHA-256, verifies the manifest through every node, reads physical
placement from xl.meta on the pool drives, and reads the strict
durability mode back from the admin API and the node logs.
Fault cases hold the mover at proven windows through file barriers that
compile only with the e2e-test-hooks feature: before the multipart target
commit and before source cleanup (shared by decommission and rebalance),
plus the existing pool-metadata before_publish cutpoint. An unreached
window fails the case. DistCluster gains capture_logs_under so a case can
read node startup events without a global environment variable.
docs/testing/scanner-heal-topology-gates.md maps the gates to the tests
and records the timeout basis.
* test(e2e): keep the barrier failure message static
The error(format!) ratchet rejects new formatted io::Error::other call
sites in ecstore. The reached observation already records the stage and
object, so the injected failure needs no per-call detail.
* test(e2e): require e2e-test-hooks for topology fault cases
The four scanner_heal_topology_ fault cases inject at server barriers that
exist only with the e2e-test-hooks feature. Against a default server they
waited for the barrier timeout and reported it as not reached. Check the
verified binary's features first so the missing prerequisite fails
immediately and is named.
* ci(e2e): build the distributed lane with e2e-test-hooks
Every other e2e lane builds and runs the fault-test hooks server. The
distributed lane alone used the default server, so the topology fault
cases could never reach their barriers there. Build and run with the same
feature so the receipt matches, and update the documented local commands.
The upgrade cases spawn the pinned previous release directly and do not
compare feature sets.
* test(e2e): keep topology artifacts under RUSTFS_E2E_LOG_DIR
The topology fixture captured node logs, barrier observations and evidence
in a temp dir removed on drop, so the distributed workflow uploaded nothing
for these cases. Fall back to RUSTFS_E2E_LOG_DIR, which the workflow
uploads, when no explicit evidence directory is set.
* test(e2e): remove retired pools before restart; race the pre-ACK start
The queue case restarted with decommissioned pools 0 and 1 still on the
command line, which the server rightly refuses. Add
remove_single_node_pools and restart without them, then expect the
remaining pools renumbered to 0 and 1.
The pre-ACK case now races the start request against the barrier. A start
that returns first, or stays in flight past the documented 60 s budget, is
reported as such instead of as an unreached barrier, and the evidence
records the reach latency.
capture_logs_under now overrides a log path assigned from
RUSTFS_E2E_LOG_DIR, so the seed node logs into the case directory too.
* test(e2e): bound fault-window waits by the movement budget
On Linux CI a busy target capacity gate delayed the first fault object by
about two minutes, past the 120 s wait borrowed from the server's release
poll. Wait for a movement window within the 240 s movement budget instead,
and fail at once when the decommission or rebalance ends without entering
the window, so an uninjected fault is never counted.
* test(e2e): bound status probes while waiting for a fault window
The admin decommission status request can wait on a mover held at a test
barrier until the barrier's own 120 s release timeout. The window wait
issued that request each loop, so a reached barrier went unnoticed until
the server timed it out and failed the decommission, which surfaced as a
false resume failure. Bound each status probe to 5 s and treat a slow probe
as still running.
* test(e2e): retry a busy decommission start
A decommission start that meets a busy movement gate can answer a
retryable 503 instead of waiting. The harness treated any non-proof
failure as fatal. Share one start helper that retries 503 within the
case's movement budget and the fleet-proof 500 for 45 s, and keeps every
other status fatal. The pre-ACK case retries 503 within its window budget.
ci(pool): finalize decommission removal and verify surviving pools (rustfs#8726)
Select suite step 10 together with step 9 and pass
--finalize-decommission so the nightly exercises the post-removal
survivor path: pool ids must stay unique, bucket metadata writes must
keep succeeding across a restart, and no node may log 'pool metadata
layout changed'. Step 10 self-skips when decommission is disabled.
Co-authored-by: Hauser <housemecn@gmail.com>
Track active walks, scratch capacity and accepted bytes while preserving the existing 1 MiB stream copy behavior.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(decommission): defer source cleanup quorum failures
A quorum failure while deleting the source of an already copied entry
was fatal and marked the whole pool failed, although the copied source
is still in place and an uncommitted delete transaction is settled by
delete recovery. Carry the cleanup error typed and resolve a quorum
failure as Deferred: the entry is replayed at the end of the round, and
a deferral that persists takes the existing capacity-blocked pause path
instead of a terminal failure. Other cleanup errors and quorum errors
from other stages stay terminal.
Add set-level regressions for parent and child keys (`a/b`, `a/b/c`):
parent cleanup leaves every child file untouched, and parent cleanup
reaches quorum while the child is cleaned up or rewritten concurrently.
* test(ecstore): keep source cleanup errors typed in prefix cleanup tests
Return SourceCleanupError from the test helper instead of formatting it
into Error::other, and shrink the error(format!) ratchet baseline for
core/pools.rs, which lost one call site in the cleanup failure change.
* fix(decommission): retry cleanup quorum failures and count replays once
Retry a source cleanup quorum failure in place, up to three attempts
with the existing source-cleanup backoff, before deferring the entry.
Carry the versions an entry already counted on its deferral, so the
end-of-round replay does not add a fully counted entry to
items_decommissioned and bytes_done again.
A deferral that persists pauses the pool through the existing deferred
drain path. When source cleanup caused it, persist a reason led by
"source cleanup blocked" without the carrier error's free-drive wording,
and report waitingReason "source_cleanup" instead of "capacity".
Add a source_cleanup test fault stage and a routine test that drives a
cleanup quorum fault through deferral and replay to completion.
* fix(decommission): wait seconds between cleanup quorum retries
Give the in-place source cleanup quorum retry a fixed floor of one and
then two seconds, with the existing jitter on top, so it can ride out a
drive reconnect or health-check blip instead of retrying within a few
hundred milliseconds. The wait stays bounded and cancel-safe.
Find a source cleanup pause reason through stage wrappers, as the
capacity-blocked check does, and add a routine test where cleanup keeps
losing quorum: the decommission pauses with a source cleanup reason, the
bucket stays queued and the source stays in place.
Document the additive waitingReason value source_cleanup and its
compatibility with older nodes reading the same pool.bin.
* fix(decommission): never retry a lost source cleanup fence
The cleanup retry classifier used is_quorum_error(), which also matches
NamespaceLockQuorumUnavailable. The delete commit fence reports a lost
namespace lock or mutation fence with that variant, so a lost fence was
retried in place and only stopped later at the pre-cleanup fence check.
A lost fence means this worker no longer owns the key; it must stop
without retrying. Retry and defer only drive quorum failures:
ErasureReadQuorum, ErasureWriteQuorum, InsufficientReadQuorum and
InsufficientWriteQuorum.
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Cover actual journal and lifecycle checkpoint replay when an unknown historical source coexists with an exact source-bound repair. Reject a pre-restart lease and retain the complete unresolved record after the new repair is discharged and replayed again.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(decommission): let a failed start roll back its own activation
A fresh decommission start whose peer reload failed could not roll back:
the pool metadata stale-write guard from #6604 refuses any save that
clears a persisted active or queued decommission, so the pool stayed
active with no worker until the watchdog or a leader restart picked it
up.
The rollback save now carries the activation that start committed. The
guard exempts a pool only while its persisted record still equals that
activation field for field, so a worker checkpoint or a later start
keeps the rejection. A canceled record is not an active decommission
and is cleared by the rollback as well. Every other save path passes no
activation and is guarded as before.
A peer may already have reloaded the activation and started a worker
before the rollback. Saves are now fenced by decommission generation: a
write carrying a start_time is rejected when the persisted record
belongs to a later start, or has no decommission state and was updated
after that start_time, so such a worker cannot make the pool active
again. Its queued promotion and progress checkpoint also adopt the
persisted record and stop the worker.
Refs rustfs/backlog#2873
* fix(decommission): fence terminal writes of a withdrawn decommission
Terminal records carry no start_time, so the generation fence did not
cover them: after a start rollback, a peer worker of the rolled back
generation that failed (for example on a bucket completion) could still
persist a failed record over the restored pool. The merge now rejects a
failed, canceled or complete record over a persisted record without
decommission state; every attempt persists decommission state first, so
no legitimate path writes a terminal record there.
Peers also drop a withdrawn decommission sooner. A pool metadata reload
replaces a running decommission with a newer record that withdrew it,
even under an active worker; bucket completion adopts such a record like
promotion and progress checkpoints do; and a withdrawn progress
checkpoint stops the worker instead of logging a failed save and moving
more entries.
Tests cover the peer failure mark, a rollback retry that sees a worker
checkpoint land between attempts, and the reload withdrawal. A heal
fixture that wrote complete records over a fresh pool.bin now persists
the active attempt first.
Refs rustfs/backlog#2873
* fix(decommission): fence peer writes after a retry start rollback
A retry start replaces a failed or canceled record that keeps its
unresolved ledger, so its rollback restores that terminal record rather
than clearing the pool. The withdrawal checks only recognized a record
without decommission state, and the generation fence ignored a persisted
record without a start_time. A peer worker of the rolled back retry
could therefore checkpoint the pool back to active.
The generation fence now compares the persisted last_update whenever
the persisted record has no start_time of its own (cleared, terminal or
queued). The progress checkpoint also checks the generation against the
record read under the pool metadata lock, as bucket completion already
does, and the save-path withdrawal check treats a terminal record newer
than the running view as a withdrawal, so the peer adopts it and stops.
A reload still never lets a newer terminal record replace an active
worker's view, so after a retry's rollback a peer worker stops at its
next bucket completion or progress checkpoint rather than on reload.
Tests cover the retry rollback against a peer checkpoint and direct
write, and a peer bucket completion after a fresh start's rollback.
Refs rustfs/backlog#2873
* fix(decommission): keep a retry rollback's restored record intact
After a retry start rolls back, the restored record is failed, so a
peer worker's own failure mark passed every merge guard and replaced
it. A failure mark now saves through save_current_pool_meta_checked,
which runs the withdrawal check against the record read under the pool
metadata lock and adopts that record instead of writing.
The withdrawal check compared the restored record with the worker's
in-memory last_update, which a rejected save had already raised, so the
peer never adopted the rollback and the watchdog kept resuming it. It
now compares against the running generation (start_time), and a
rejected unresolved-entry save undoes its in-memory change.
save_current_pool_meta_for_decommission_start is also compiled for the
test-util feature again; a test-util helper still calls it, which broke
the workspace clippy and Connect builds.
Refs rustfs/backlog#2873
* fix(decommission): keep an unresolved entry when its own save fails
The rollback of a rejected unresolved-entry save also dropped the entry
on transient failures such as a quorum or lock-fence error, so the
following failure mark persisted a failed record without it and an
operator could clear a decommission that skipped an unreadable object.
Keep the entry and undo only the last_update bump, which is all a
withdrawn worker needs to still see the withdrawal.
Refs rustfs/backlog#2873
Under sustained writes nearly every cycle fell back to a full walk: scope
admission required the global dirty generation to stay unchanged across the
bucket listing, and after a Complete cycle the dirty-usage wake ran the next
full walk immediately, back to back.
- Track dirty-map removals with a process-local removal generation and admit
a scoped walk when no entry was removed or replayed during the listing
(`covers_listed_pending`). Writes to listed buckets in the window join the
start snapshot; unlisted buckets dirtied after the cutoff stay pending and
are never cleared by compare-and-remove certification. The strict
`covers_all_pending` still gates segment-reuse evidence.
- Classify scope fallbacks (removal during listing, generation exhausted,
dirty-bucket overflow, no listed dirty bucket, baseline unavailable, peer
scope unavailable), log `scoped_scan_fallback`, and report them in
usage_freshness as additive serde(default) fields.
- Pace the cycle after a Complete fallback while dirty buckets remain on the
capped retry schedule clamped to the cycle interval, with the dirty wake
disabled; the paced timer wake still requests a scope.
- Update the per-bucket convergence design doc.
No persisted format or internode protocol change.
Co-authored-by: Chris <anzhengchao@gmail.com>
Delete-marker replication re-reads the source marker by version before sending. Multi-pool get_object_info rejects explicit marker version reads with MethodNotAllowed, so every marker failed verification and was never replicated. Add a defaulted ObjectOperations::get_object_info_for_delete, override it on ECStore with the marker-tolerant snapshot, and route both replication marker reads through it.
Fixesrustfs/rustfs#8746
* fix(ecstore): ignore child-key prefixes in delete settlement fingerprint
A batch delete of prefix-sharing keys (foo/bar and foo/bar/xyzzy) could
leave foo/bar's commit proof on disk: the child's finalization removed
foo/bar/xyzzy/ between the parent's GC inspection and settlement, the
fingerprint mismatch surfaced as OutdatedXLMeta, and publish_delete_commit
dropped the error. An immediate DeleteBucket then returned BucketNotEmpty.
Fingerprint only this key's protocol evidence (files, UUID dirs and the
transaction dir), retry published cleanup on OutdatedXLMeta with a fresh
inspection, and warn when cleanup is deferred to the recovery hint.
* test(ecstore): cover delete fingerprint narrowing and cleanup retry
Only canonical hyphenated UUID directories count as protocol evidence, so
a child key named as a simple-hex UUID cannot recreate the race. Add
negative fingerprint checks for this key's own changes, and tests for the
published-cleanup retry: success on retry, the attempt bound with the
deferred warning, and no retry after a lost fence.
* fix(ecstore): require canonical UUID names across delete recovery
Discovery, explicit legacy discard and staged-dir checks still accepted
simple, braced and URN UUID spellings. A child key named as the simple
form of a referenced data dir could then be deleted by DiscardLegacy.
Use one canonical-name predicate everywhere and register exactly one
test hook per expected cleanup attempt.
The scanner heal gate dropped Some(Uuid::nil()) along with None, so null versions in versioned buckets never reached existing-object replication. Skip only unversioned listings, matching MinIO, and recognize the nil UUID as the null version in the newer-target guard and version comparison.
Fixesrustfs/rustfs#8747
* fix(iam): derive bucket location conditions from XML
Capture the parsed CreateBucket LocationConstraint at the access boundary
and move it into shared authorization conditions independently of signing
and server regions. Cover conditional allow/deny across user, session and
anonymous requests, including absent and spoofed values.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(iam): pass bucket location directly to authorization
Replace temporary request-extension storage with an explicit owned XML
argument to the single authorization core, keeping the public entry point
compatible. Remove the marker allocation and typemap insert/remove path.
Cover Object Lock and Versioning dependent authorizations with an absent
location condition and verify their enabled state through real HTTP.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(connect): isolate bounded object probe storage
Use an independent temporary volume on Linux shared memory when available
so the real endpoint/CLI fixture does not depend on contended CI disk IO.
Await server shutdown before dropping the caller-owned storage directory.
Retain the production cleanup deadline, measurement budget, assertions,
and existing nextest capacity reservation without adding retries.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(runtime): isolate configured region per store instance
Resolve the default RegionInterface through the owning ECStore context
and keep ambient fallback only for requests without an explicit context.
Preserve ambient constructors and injected interfaces, with store and
real HTTP multi-instance regression coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(storage): stabilize quorum and heal crash fixtures
Keep forced-offline disks attached across reconnects and reconnect before every delete retry. Bound SIGKILL fixture I/O while preserving recovery scope, receipts, data integrity, and deadlines; include child execution phases in timeout diagnostics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* docs(test): clarify forced-offline disk fixture behavior
Describe handle retention instead of claiming a newly reconnected health
tracker inherits the test outage. Execution and assertions are unchanged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(rebalance): move tier free versions with their entry
Rebalance built its version snapshot with MetaCacheEntry::file_info_versions,
which drops tier free versions, while the source-cleanup preflight reads the
exact snapshot that keeps them inline. Any entry holding a free version (left
by deleting a transitioned version) therefore failed the preflight on every
pass and was deferred forever, so the source pool could never be drained of it.
Mirror decommission: keep free versions in the snapshot, skip lifecycle and
the last-delete-marker policy for them, and move them to the target as tier
metadata through decommission_tiered_object. A free version reads as a delete
marker with no transition status, so the migrator routes it explicitly;
written as a delete marker it would drop the remote owner and orphan the
remote object. A moved free version may be consumed from the source before
cleanup, like decommission; free versions hold no pool data and stay out of
the rebalance stats.
Refs rustfs/backlog#2873
* test(rebalance): cover tier free version movement edge cases
Pin the lifecycle skip, the delete-marker count, the allowed-missing and
not-found consumption paths, the stats exclusion, multiple free versions per
entry, and the unversioned superseded source's free version moving on the
next pass.
Refs rustfs/backlog#2873
* fix(s3): validate bucket location constraints
Reject explicit bucket locations outside the configured server region
before mutation admission, preserve site-default and EU alias compatibility,
and return an empty GetBucketLocation element for us-east-1.
Cover matching and rejected locations over real S3 HTTP requests, including
rejection without creating a bucket.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): refresh bucket region profile selection digests
Include both new region regression tests in the smoke and Darwin/Linux
full selection pins without changing filters or checker behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Establish the first bucket operation before fresh-task dispatch and carry its bounded value into nested config and background work. Preserve cancellation, permit ownership, lock order, and error mapping without importing diagnostic owner or sampling instrumentation.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): leave no source free version for a moved tier version
Data-movement source cleanup deletes each source version separately and
never set skip_tier_free_version, so every transitioned version that
decommission or rebalance had already copied to a target pool left a new
tier free version on the source. Decommission then failed its post-check
for any pool with tiered objects; rebalance left the record behind. The
record claims the remote object the target copy still reads and stays
blocked behind that live reference.
Decommission and rebalance now pass the identities of transitioned
versions whose copy committed on a target, and the cleanup skips the
free version for exactly those. A transitioned version that did not
move, such as one lifecycle expired during the move, still gets its free
version because that record is its only remote-delete owner.
Refs rustfs/backlog#2873, rustfs/backlog#2872
* fix(ecstore): keep the free version of a superseded moved source
Data movement treats a source null version as complete when a newer
unversioned object already sits on the target, without copying it.
That outcome returned the same Ok as a committed copy, so a restored
transitioned null version superseded this way was recorded as
transferred and lost its source free version, leaving its remote object
with no owner.
The copy paths now return DataMovementCopy::Committed or ::Superseded,
and decommission and rebalance record only committed copies of
transitioned versions. A superseded source keeps its free version.
Tests cover the superseded restored null version for rebalance and
decommission, a restored and a null transitioned version moving by
rebalance, an entry with one lifecycle-expired and one moved version,
the per-version skip with two versions of one key, and a directory
object. The tiered stale-target routine test from #8724 now expects the
decommission to complete. The ILM ownership contract and the
decommission notes describe the moved, superseded, expired and legacy
cases.
Refs rustfs/backlog#2873, rustfs/backlog#2872
* test(ecstore): build the decommission ILM fixtures without s3s
The superseded and expiry-mix decommission tests named s3s request and
lifecycle types directly, which added pools_test.rs to the ecstore
files that reference s3s and failed the footprint ratchet. Set the
restore request through ObjectOptions, and store the lifecycle rule as
bucket metadata XML and load it with get_expiry_configs, as the
decommission routine does.
* test(ecstore): pin restored decommission copies and multipart supersession
Decommission recorded a committed data copy of a restored transitioned
version without any test failing if the record were dropped; add a
routine-level decommission of a restored version that checks the post-
check passes, the source keeps nothing, and the target keeps the full
remote tuple. Add the multipart variant of the superseded restored null
version (rebalance), and a unit test that separates committed,
superseded and mismatched targets in the overwrite resume adjudication.
* fix(obs): skip address discovery for initialized node identity
Check the nonblocking node name before resolving the local IP, retaining the final name recheck after fallback. Add portable publication regressions and Linux worker-local netlink fault coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(obs): keep identity contention checks in common
Exercise the real held-writer getter inside its owning module. Publish through the existing runtime helper from obs tests, retaining the kernel netlink failure and recovery coverage without bypassing architecture guards.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(obs): scope unsafe allowance to seccomp test helper
Document the bounded prctl FFI safety contract and allow unsafe code only
inside the Linux fault-filter installer so workspace unsafe-code denial
continues to apply everywhere else.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(decommission): run the leader-side start to completion
A forwarded decommission start awaits `ECStore::decommission` inline in
the RPC handler. When the forwarding node's RPC times out, the stream is
reset and the handler future is dropped wherever it is. Dropped after
`pool.bin` records the pool as active but before the peers reload and
the worker is spawned, the start left the pool active with no worker and
peers on the old metadata, and a retry was rejected as already active.
An admin client that disconnects can do the same.
Run the start in its own task and let the caller await only its result.
The start then always reaches its end: it fails before persisting
anything, or persists the pool, has the peers reload and spawns the
local workers, rolling back if the reload fails. A retry still cannot
start twice: it waits on the start gate held by the running start and
either reports the busy gate or is rejected because the pool is active.
`decommission` now takes `self: &Arc<Self>` and spawns workers on that
store instead of looking up the global object store, which is the same
store in production and makes the path testable; the unused
`require_decommission_store` helper is removed.
Refs rustfs/backlog#2873
* fix(decommission): detach the leader-side start from its caller
9ac4c10de carried only the reproduction (the testable entry point, the
peer-reload pause point and the proof test). This adds the fix it
describes: `ECStore::decommission` spawns the start as its own task and
awaits only its result, so a caller that stops waiting, such as a
forwarded start whose internode RPC timed out, can no longer drop the
start between persisting the pool as active and having the peers reload
and the local worker start.
Also prove a retry while the first start runs cannot start the pool
twice, update the operator and architecture docs for the new behavior,
and shrink the error(format!) ratchet baseline for the removed helper.
Refs rustfs/backlog#2873
* fix(decommission): single-flight start, recheck pool state under gate
Review of 3a5276c5b:
- A start re-checks the pool state under the start gate before it
cancels routines, so a start racing another one can no longer cancel
the worker the other start just spawned.
- Only one start runs per instance at a time: another request, including
the retry of an operator whose request timed out, is rejected as
already running instead of stacking a second detached start and its
preflight heals. The start runs through `run_detached_mutation`, and a
failure nobody waits for any more is logged.
- Tests: the proof test pins its drop after the save and requires a
worker that persists a cancellation; the retry test really drops the
first caller; new tests cover the under-gate recheck and a peer reload
failure after the caller is gone. That last one shows the start
rollback cannot clear a fresh start because the pool metadata
stale-write guard refuses it; the gap is asserted and documented and
tracked in rustfs/backlog#2873.
- The start tests run on their own large-stack thread: the io_uring lane
(`uring_`, which also selects `during_`) runs them with libtest's 2 MiB
default stack, where the proof test overflowed.
- Docs: single-flight starts, status and cancel during preflight, the
rollback gap and its recovery, and the release requirement.
Refs rustfs/backlog#2873
* fix(decommission): turn away local start retries at the start slot
Second review of 29253430a:
- The leader-local admin pre-check refreshed rebalance metadata under
the start gate before the start slot was checked, so a local retry
waited out its 20 s gate budget behind a running start (which holds
the gate through its peer reload) and then got a 503. The pre-check
now checks the slot first and returns `DecommissionAlreadyRunning`,
which the handler reports as a 400 that keeps the reason.
- Prove the reload-failure path really ran in the detached start (the
injection is consumed), add a test that a fresh start's failed
rollback reports both the reload error and the stale-write refusal,
and assert an abandoned start stays tracked for shutdown.
Refs rustfs/backlog#2873
* fix(decommission): retry every stale target selection without failing
The tier free-version copy path counted a version as failed as soon as
a capacity failure came back and then handed the error to the entry
retry, so a retry that succeeded left the decommission failed. Return
the failure without counting it, like the other copy paths.
A selected pool can also stop fitting the mutation before admission
without going over a budget: the reservation estimate is exhausted, the
pending intent no longer fits the committed-copy budget, or a temporary
write no longer fits the headroom. Report these as "no longer fits the
selected mutation" and treat them like an over-budget pool under one
StaleTargetSelection class: retry, select again, defer once the retry
budget is spent.
Also refresh the over-budget gauge of every allocation before rejecting
growth, correct the sticky-target doc on stranded markers, and cover
each copy path, the pinned path and both retry branches with tests.
Refs rustfs/backlog#2873
* fix(decommission): name the last deferral cause in the pause reason
A round that ends with deferred entries pauses the routine with a
generic "deferred entries remaining" reason, so a pinned entry that no
longer fits its pool hides its cause in the logs. The pause reason now
appends the last deferral's error.
Keep the committed-copy check on the pending intent fatal: growth and
owner admission reject any mutation that would fail it first, so it
only fires on an inconsistent ledger.
Tests:
- a multipart part that does not fit target 1's temporary-copy
headroom is deferred and pauses with the headroom shape;
- a pinned object whose remaining allocation is below its peak pauses
with the exhausted-estimate cause, and the over-budget pinned test
checks its own cause;
- the stale-target tests assert where the pause lands: the held entry
is on neither target, the anchor is already on target 1, and target
1 holds exact inflight bytes in the multipart cases;
- share the stale-target store, barrier and pinned-copy setup.
* fix(decommission): prefer a stale selection as the pause cause
The pause reason named whichever deferral of the set finished last, so
a transient busy gate could hide another entry's permanent shortfall.
A stale target selection, which waiting does not clear, now outranks
transient contention, and the reason reads "; deferral cause: <error>".
Tests:
- a pinned object that no longer fits and a later object whose gate is
busy, in the same set, pause with the pinned cause; a unit test checks
both orders;
- the tiered and intent-conflict tests check where the pause lands, and
the tiered test asserts the known post-check failure so that fixing
the source cleanup defect flips it.
Second review of 652c56875..0ef02a485:
- The operator doc and the budget comment claimed a forwarded start that
outlives the internode RPC timeout still completes on the leader. The
leader drops it wherever it is, possibly after pool.bin records the
pool as active but before its worker starts or the peers reload.
Document that state, the watchdog that resumes the worker, and the
checks to run; the cancel-safety fix is tracked in rustfs/backlog#2873.
- Prove the budget is shared across waits (paused clock: a 60 ms wait
leaves 40 ms for the next gate).
- Prove the rebalance-refresh start gate and activation gate waits and
the decommission() entry are bounded and named.
Refs rustfs/backlog#2873
Review of 652c56875 found that the 30 s start budget was a wall-clock
deadline fixed when the start began, so slow preflight work (bucket heals,
capacity scans) could spend it before the activation gates were reached.
A gate held for a few milliseconds then failed the start at once, and a
retry repeated the preflight.
- Replace the deadline with a budget that only counts time spent actually
waiting for a gate; a free gate is always taken, and the lock timeout
reports the time waited.
- Lower the budget to 20 s, below the default 30 s internode RPC timeout,
so a forwarded start gets the leader's answer instead of an RPC timeout.
- Name each bounded wait (rebalance metadata refresh or decommission
activation, and which gate), and route every start-gate rebalance load
through one load_rebalance_meta_within.
- Move the admin pre-check error mapping into a function and test it.
- Add proof tests: a slow preflight followed by a brief gate wait still
starts; the activation wait and the admin pre-check are bounded and
named; the rebalance status read does not wait for an in-flight
rebalance entry.
- Correct the operator doc: preflight bucket heals are outside the budget,
and forwarded starts report a generic internal error.
Refs rustfs/backlog#2873
The data-movement operation gate is a write-preferring RwLock. A scanner
publication lease stores a read guard on the leasing node, and the
coordinator's lease-scoped rename, delete and validation on that node
queued a second read. A movement writer queued in between (a decommission
start, a status refresh, a peer reload) then waited for the lease while
the coordinator's second read waited for the writer, so both stalled
until the 60 s lease TTL. Admin status reads also took the movement
writer, so every status call waited for the slowest in-flight copy or
cleanup and stalled new movement reads while it queued.
- Lease-scoped target admission shares the read admission the lease
already holds instead of queueing a new read.
- Pool and rebalance status reads publish under the gates only when they
are free; otherwise they merge the persisted metadata into a private
copy and publish nothing.
- A decommission start bounds its start, activation and movement gate
waits with one 30 s budget and fails with a retryable lock timeout
before persisting anything; the admin handler maps it to 503 with
Retry-After.
Refs rustfs/backlog#2873
The test derived its inputs from Zoned::now() and assumed that now - 60s is still on the same local calendar day, so it failed deterministically in the first minute after local midnight. Build the inputs from fixed local wall-clock times instead, covering same day, previous day and the 23:59:59 -> 00:00:00 crossing.
* fix(decommission): adopt target intents left by a killed leader
A decommission leader killed after persisting a target capacity intent and
before finalizing it left that intent in the exclusive pending slot of the
still-active reservation. The resumed routine derives the same reservation
identity, but every other mutation on that target was rejected as "another
mutation" until the interrupted object happened to be retried on the same
target, so the resumed decommission exhausted its retries and stalled.
At routine start, before any worker runs, the resumed routine now adopts the
reservation's pending intents: under the target fence (or the legacy pool
metadata fence) it moves each one into a mutation-scoped inflight marker that
keeps its identity and bytes. The interrupted mutation's retry settles the
marker through the existing commit, temporary-release and equivalent-target
paths, and an equivalent committed target now settles a mutation's own marker
when no pending intent remains. Adoption is pinned to the persisted
decommission start time and reservation identity, never runs mid-incarnation,
and a failure pauses the routine instead of marking the decommission failed.
* fix(decommission): keep adopted intents within budget and settle them once
Address the adversarial review of the leftover intent adoption.
- Merge an adopted intent into its mutation's staged marker by summing only
while the target's temporary-copy budget allows, never below the larger of
the two. A multipart completion moves its staged parts into the object, so
summing them could exceed the budget and pause every later routine start;
the adopted marker now exceeds the budget only where the completion's own
finalize would have. Reuse resolve and record_inflight for the move.
- Distinguish a temporary release that proved the exact committed target from
one that could not prove the target identity. When the committed mutation no
longer has a pending intent, release only the bytes the cleanup freed and
keep the adopted completion for the equivalent-target reconciliation.
- Let an equivalent target settle a mutation's own marker while another
mutation holds the pending slot, instead of failing on that unrelated intent.
- Cover real leader kills before and after the target commit at routine level
for both lock models, an injected adoption failure that pauses and then
completes, an adopted multipart completion surviving a background abort, and
a live legacy intent. Routine tests reuse the large-stack test helper.
* fix(decommission): pause instead of failing on target slot contention
The S00 leader-kill run with the null-version fix merged ended the resumed
decommission as failed. A re-run of a versioned key reconciled its delete
marker against an already charged target copy while another worker of the
same incarnation held the target's pending slot between a failed write and
its retry. The reconciliation rejected that unrelated intent, the entry
context wrapper flattened the error to a string the intent-conflict retry
could not recognize, and the bucket runner reported a sibling bucket's
OperationCanceled instead of the capacity block, so the routine marked the
decommission failed.
- An equivalent-target reconciliation, including the temporary checkpoint
variant, no longer depends on another mutation's pending intent: a target
holds one pending intent at a time, so this mutation has none to settle.
- The entry context keeps the typed cause, and the capacity-block and
intent-conflict classifiers also recognize the rendered message that an
error clone keeps.
- Concurrent bucket and listing failures keep the root cause over sibling
cancellations, so a capacity block pauses the routine.
* test(decommission): delete marker copy waits for a busy target gate
The Linux run of the S00 matrix showed the delete marker copy meeting a busy
target capacity gate without any leader kill. The copy already waits on that
gate like an ordinary object copy; pin it with an entry-level test that holds
the gate, checks the entry keeps waiting, and expects the key to migrate once
the gate is released. Share the versioned delete marker fixture with the
foreign pending slot test.
* fix(decommission): keep an adopted completion unless the target is absent
Close the remaining path where an adopted completion could lose its record
before being charged. A multipart cleanup that found a target it could not
prove as the exact owned copy still dropped the whole marker of a mutation
without a pending intent, after which the equivalent-target reconciliation
would treat the commit as already charged.
Any cleanup that did not prove the exact target absent now releases only the
bytes it freed when the mutation has no pending intent, and leaves the rest
for the reconciliation. This makes the three-state release unnecessary, so
the release proof goes back to the existing clear-pending flag.
* chore(ci): shrink the error format ratchet baseline for pools.rs
9eae47ce8 removed one Error::other(format!) call site from crates/ecstore/src/core/pools.rs, so the ratchet requires the baseline to drop from 178 to 177.
* fix(decommission): keep adopted completions in their own capacity marker
An adopted completion shared the mutation's staged marker, so whether
it survived a cleanup depended on the pool-wide free-space delta, and a
cleanup that freed little space left staged bytes behind and repeated
forever.
Record each adopted intent under a mutation id derived from the
interrupted mutation (decommission_adopted_intent_mutation_id) as a
separate temporaryMutations entry. A commit or an equivalent-target
reconciliation settles both markers, a temporary cleanup releases the
staged marker as before, and only a cleanup that proved the exact
target absent drops the adopted one. While the target holds only that
adopted completion, a cleanup keeps the delayed-release exemption of
the published pending intent it replaced. Older nodes see an ordinary
temporary mutation they never release, which only over-reserves.
Also log capacity_intents_adopted as soon as the adopted ledger is
durable, merge the root-cause helpers into decommission_root_cause,
drop the decommission_capacity_blocked: prefix fallback, and log the
already-charged equivalent-target branch at debug level.
Refs rustfs/backlog#2873, rustfs/backlog#2872
* fix(decommission): return uncommitted retries to their adopted target
A retry that had not committed yet went to the reserved target with the
most remaining allocation. When that was not the target holding the
mutation's adopted completion, the commit settled only its own target
and the adopted marker stayed inflight until the reservation was
released.
Prefer a reserved target that holds the mutation's adopted marker while
it still fits the object (decommission_reserved_target_choice).
Also cover the remaining settlement paths of the derived marker
(non-growing replacement, equivalent temporary reconciliation and its
discovery gate, scanner backlog retirement), repeated adoption of one
mutation and the zero-byte staging record in both lock models, drop two
conditions that always equal another one, and correct the adopted-id
doc comment about nodes without adoption.
Refs rustfs/backlog#2873, rustfs/backlog#2872
* fix(decommission): count a completion adopted twice only once
A mutation killed twice leaves an adopted completion and then a new
intent for the same object version. Adoption added the two, so an
11-byte object counted 22 inflight bytes and could trip the capacity
check once later commits shrank the budget. Both reserve the same
completion, so merge them by their maximum before adding staged parts;
a single adoption is unchanged.
Also assert in the three-pool sticky test that no entry failed, the
retry is charged on its adopted target and the source is cleaned, run
it for the legacy lock model too, stop saying operators rely on the
adoption log before rollback, and document that the selection fallback
cannot help an adopted completion.
Refs rustfs/backlog#2873, rustfs/backlog#2872
* fix(decommission): log where an adopted retry is placed
An e2e run could not show whether a resumed retry went back to the
target holding its adopted completion. Target selection now logs
adopted_target_reused when it does, and adopted_target_bypassed with
the adopted target pools when the object no longer fits there and the
adopted marker stays behind. Both carry the mutation id and the source
and target pools.
Refs rustfs/backlog#2873, rustfs/backlog#2872
* test(ecstore): pin null-version migration behind a delete marker
Decommission and rebalance must move a pre-versioning null version that
sits behind a delete marker, with its content and SHA-256 intact, before
removing the source entry (rustfs/backlog#2873).
* fix(ecstore): address the null version exactly during data movement
Decommission and rebalance read each source version with
`version.version_id.map(to_string)`. A null version, written before
versioning was enabled, has no version id, so the read used `None`,
which selects the latest version. Behind a delete marker that read
returned not found, the mover counted the version as already gone, and
source cleanup deleted the still-present null version with the entry.
Address the null version by the nil UUID, the existing exact selector,
on every data-movement lookup: the source read, the target put, new
multipart and complete options, the target resume lookup, and the
source revalidation before publication. The stale-target replacement
check treats the nil selector and an id-less null version as the same
identity, so unversioned buckets keep their current behavior. Target
pool selection still places a null version with the object's latest
version, as before, so a later null-slot overwrite replaces it there.
A version the mover skips as not found must also really be gone before
cleanup. It is dropped from the expected cleanup snapshot, so the
preflight reports SourceChanged while that exact version still exists
and the existing retry and exhaustion path retains the source.
Refs rustfs/backlog#2873, rustfs/backlog#2872
* fix(ecstore): prove multipart null-version staging absence exactly
The multipart staging cleanup proof in
abort_multipart_uploads_for_data_movement looked up the target with the
abort options' version id. Those options keep an id-less null version
as `None`, because the staged upload identity is derived from them, so
the proof resolved the target's latest version. Versions move newest
first, so it found the delete marker or newer version already moved and
refused every attempt with "cannot prove the exact staged identity is
absent". The legacy capacity model runs this proof on every attempt and
the exact model after any interrupted upload, so a multipart null
version behind a newer version could never be decommissioned. Look up
the exact null version for the proof and keep the abort options as they
are.
Cover the paths review found unprotected: multipart null versions under
the legacy model and after an interrupted upload, null versions behind
a newer version (lost without any not-found), the cleanup guard for
versions reported as not found while they still exist (decommission
read and delete-marker copy, rebalance read, and a control where the
version really vanished), and a retry after the null version committed
but before cleanup. The decommission fault hook can now inject a chosen
error, and rebalance gains a test-only source read fault.
Refs rustfs/backlog#2873, rustfs/backlog#2872
* test(heal): add failing regressions for a source-independent absent verdict
Add the regression tests for backlog#2900 that fail on the current code,
where the same object-level not-found is treated as deleted on the plain
heal path but as recreate_failed on the recreate path, and where the
erasure-set healer, the task predicates and the error helpers disagree on
wrapped not-found and transient inputs.
Also add the per-object disposition cache module with its unit tests, the
manager admission tests for it, the compat register entry for the display
boundary, and the admission-invariant notes. The module and the manager
tests are not declared yet, so nothing is wired into the build.
* fix(heal): decide object absence from storage evidence, not request source
Replace the five heal error classifiers (erasure-set healer outcome
mapping, task-level not-found and lock predicates, error.rs recovery
helpers and the storage existence-check matcher) with one typed
classify_heal_error. An object-level not-found from the locked storage
read is Absent for every source and every recreate_missing value; the
recreate path, the usage-observation and scanner object-dir whitelists
are gone, and display-text matching survives only in the marked
classify_error_display boundary.
Add a bounded, expiring per-object disposition memory consulted before
queue admission so a best-effort producer cannot requeue an absent or
terminally failed object on every tick; durable MRF, admin, forced,
high-priority and dry-run requests bypass it. The read-repair producer no
longer forces recreate_missing.
* fix(heal): keep rendered grace windows out of task retries
A grace window rendered into a task message belongs to an attempt that
already finished; its owner schedules the next one. Only typed grace
errors replay the task, as before the classifier merge. Update the
ecstore read-repair black-box test: the producer no longer forces
recreate_missing.
* fix(heal): classify ambiguous legacy delete residue as permanent explicitly
* fix(heal): scope disposition memory and bound absence parsing
A restarted node published FullReady from its own view while survivors still counted its drives unavailable (stale DNS for the old pod IP, then the Offline->Returning->Online hysteresis). A rolling update could then stop the next pod and cost a set its read quorum (#8669).
Add a read-only PeerDriveAdmission internode RPC that reports how a peer sees another host's drives, and gate the startup FullReady transition until a strict majority of each erasure set's peers count this node's drives online. The gate shares the startup budget, releases after 15s of unreachable peers, skips immediately when older peers cannot answer, and can be disabled with RUSTFS_STARTUP_PEER_READMISSION_ENABLE=false.
Apply the placement rule in .github/workflows/README.md to the 22 jobs
still on sm-standard-2 that only call APIs, read workflow metadata, print
summaries or scan published images, including cla.yml, the busiest
workflow. Moving the ODM cloud-source lane also stops it restoring the
ci-odm-interop key across images, since its writer already runs on
ubuntu-latest; targets-live gets a -hosted cache key for the same reason.
Clippy ran only after merge, so lint regressions merged freely and then
failed every main run until fixed (10 of 12 main runs on 2026-10-17/18).
Run the workspace Clippy step on every event, warm its check-mode
artifacts in cache-warm with the identical invocation so pull requests
re-check only what they touch, and pin the unconditional step in the
ci_gate contract and its self-test.
Hard quota admission is owned by the durable reservation ledger (decision
D3, rustfs/backlog#2872), but the request-path quota check still read
scanner usage on every write and mapped `UsageUnavailable` to a retryable
503 even for buckets the ledger admits. For a durable quota the checker now
treats scanner usage as reporting input: an unavailable lookup yields
`current_usage = None` and `allowed = true`, counted and logged at debug
level, and admin quota stats report the usage as null instead of zero.
Buckets without a reservation protocol keep the fail-closed snapshot path.
Quotas saved before the reservation protocols are re-saved under protocol
v2 with the same limit, type and created_at. The write goes through a new
guarded save that keeps the admin save's lifecycle/transaction guards,
incarnation check and fleet capability proof and additionally refuses when
the quota revision moved since the cached read, so a concurrent quota edit
wins. It is triggered lazily from the quota read path (background, one
attempt per bucket with a retry interval, never blocking the read) and in
bulk by `POST /rustfs/admin/v3/quota-migration`, which reports every bucket.
The ADR's Consequences section inventories the remaining scanner-usage
"authority" consumers with their meaning after D3, retirement condition and
compatibility window; the operations guide documents the migration and the
report-only usage semantics.
Refs rustfs/backlog#2904, rustfs/backlog#2872, rustfs/rustfs#8678,
rustfs/rustfs#5716, rustfs/rustfs#7350
Co-authored-by: Hauser <housemecn@gmail.com>
* fix(scanner): stop treating an ordinary PUT as data movement in cycle termination
A continuously written deployment never reached a `Complete` scanner cycle
(#8494, #8305, #7108). Three places in the termination path vetoed the cycle
for an ordinary PUT; each now lets the write shade its bucket, the path
per-bucket certification (#8542) built, and keeps the data-movement fences.
1. Usage publication is fenced by data movement only.
`scanner_data_usage_publication_blocked` no longer includes
`namespace_commits_pending()`, so the post-walk probe, the local defer
decision, the post-lease recheck and the usage-store route probes stop
superseding or deferring a cycle for a pending rename fanout. The scanner
publication leases (acquire, validate, target guard) drop the
pending-commit rejection and the namespace-generation staleness check and
keep the movement generation, the operation gate, generation exhaustion
and the purpose/target restriction. A test-util probe lets fixtures wait
for tails directly.
2. The plan identity is split into a coverage identity and a reuse identity.
`scanner_activity_coverage_digest` (peer set, protocol, topology, movement,
and a remote peer's generations) is what a bucket checkpoint is started
and resumed under, through `ScannerBucketScanPlan::checkpoint_coverage_digest`,
`DataUsageCacheReuseOptions::checkpoint_plan_digest` and
`prepare_bucket_checkpoint_with_coverage`. The reuse identity
(`scanner_activity_structural_digest`) keeps `instance_id` and
`maintenance_generation`, so a restart or a maintenance change still
invalidates the baseline and the set caches; a completed sweep is stored
under it. `publication_blocked` leaves every digest and stays a guardrail
veto. A remote worker still resumes under the single digest on the wire.
3. A bucket walk that stops early no longer makes the cycle `Incomplete`
when the bucket has a certified value. The set scan stands in with the
bucket's flattened value from its previous complete set cache
(`carry_partial_bucket_values`), the cycle reports it pending
(`ScannerBucketScanStatus::PartialCarried`), keeps it in the dirty map,
and the next scoped cycle walks it because the baseline's pending list
joins the dirty buckets. A bucket with no certified value keeps the cycle
`Incomplete`; failed buckets are unchanged.
No persisted file, generation, receipt or environment variable is added.
Refs #8494, #8305, #7108, rustfs/backlog#2903.
* chore(ecstore): gate the namespace commit probe to test builds
The scanner publication barrier no longer consults
InstanceContext::namespace_commits_pending, so it has no production
caller left; keep it for tests and the test-util facade only.
* test(rustfs): observe namespace commit ownership directly in node_service tests
The scanner usage publication barrier is movement-only now, so it no
longer reports a pending rename. The node_service tests that assert a
cancelled handler keeps its physical owner, or that wait for rename
tails to drain, read the namespace commit state through a test-only
ECStore probe instead.
* fix(scanner): preserve checkpoints on identity read failures
Distinguish confirmed missing incarnation sidecars from lookup errors before
cache preparation. Preserve durable checkpoint progress when identity reads
are unavailable and report post-scan uncertainty separately from replacement.
Reuse the transaction-fenced reader for optional and required lookups while
retaining existing missing, malformed, system-bucket and lock-loss behavior.
Verify preservation and recovery through a real coordinator with the identity
sidecar write-locked, including unchanged cache revisions and dirty work.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(ecstore): share required incarnation conversion
Keep the missing-incarnation error contract in one conversion used by both
required lookup entry points. This removes a duplicate formatted error site
and satisfies the existing error-format ratchet without changing its baseline.
Pin the full missing-identity error text in the real SetDisks regression.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): bound cross-disk MRF checkpoint I/O
Run independent journal disks with bounded concurrency while retaining each
replica's payload, companion and manifest ordering and the mirror phases.
Share encoded bodies, deduplicate local roots and collect every result
without changing receipt deadlines or persistence failure semantics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): pin Normal mode when no bitrot start is recorded
Regression for rustfs/backlog#2905: three consecutive cycles that find no
recorded bitrot start currently run Deep through the selection window, and a
Normal cycle never records the cadence start.
* fix(scanner): anchor the bitrot cadence and budget per-disk I/O
Decide the scan mode from a recorded Deep window start only. A cycle that
finds no recorded start runs Normal and anchors the bitrot cadence in
process memory instead of opening the selection window; the Deep cycle that
follows the elapsed cadence records the window start exactly as before. A
missing record used to be read as a window that started at cycle 0, which
ran Deep for deep_window_cycles cycles whenever the start could not be read
back (rustfs/rustfs#8015). The recorded start is also remembered across a
skipped or failed save, and /v3/scanner/status reports the cadence state
under a new bitrot object.
Add a per-local-disk background I/O budget (operations and bytes per second,
defaults by detected media, auto|off|<rate>) that DynamicSleeper charges
before directory listings and object metadata reads as a hard ceiling
layered on the foreground-priority disk admission gate, with runtime config
keys, per-disk status, cycle metrics, pacing pressure, usage_freshness,
Prometheus series, Helm values, admin config help, and operator docs.
Refs rustfs/backlog#2905, rustfs/rustfs#8015, rustfs/rustfs#8377.
* test(scanner): expect Normal retries on erasure sets without a bitrot start
The pending-PUT retry fixture asserted that a 4-drive set revisits every
bucket because the cycle ran Deep. Without a recorded Deep window the cycle
now runs Normal on every layout and reuses the cold inventory.
Count only post-format rebuild failures against the replacement retry
budget; handoffs, format fences, outages, grace waits and conflicts keep
their durable reason without spending an attempt. Retired generations
(committed handoff or approved legacy migration) no longer own their set,
so fresh admission for other slots proceeds, and a committed predecessor
becomes collectible once its successor is verified.
Block discovery conflicts per generation instead of per set, re-evaluate
them on every pass, and expose the blocked entries with reasons. Report
root heal inventory conflicts per record and keep replaying the others.
Revalidate blocked checkpoints hourly with the current reader and clear
markers the reader accepts. Return a dedicated error for ambiguous legacy
delete residue instead of the retryable SlowDown.
Implements rustfs/backlog#2902. Fixesrustfs/rustfs#8664. Addresses
rustfs/rustfs#8366, rustfs/rustfs#8565, rustfs/rustfs#8645 and part of
rustfs/rustfs#8608.
Co-authored-by: Hauser <housemecn@gmail.com>
The first pull-request run at CARGO_BUILD_JOBS=3 that met a contended
node (39193827281) hit the 75-minute nextest timeout before any test
started. Its sampler shows cargo spinning for 70 minutes with the pod's
io.pressure "full" at 86-88% and cpu.pressure at zero, with node-level
IO pressure already at 36% when the step began: three concurrent
workspace-scale compile units saturate the pod's shared storage, the
mechanism the original #5394 mitigation named. Keep 3 on main pushes and
dispatches, where three runs succeeded, and 2 on pull requests, in both
the nextest and the serial ILM step; pin the ILM budget guard back to
that expression and record the evidence in the step comment.
* fix(scanner): give startup gates automatic exits instead of a pause
Every fail-closed scanner gate now has a bounded automatic exit without
deleting quarantine evidence or relaxing the leader, CAS, movement or
usage-floor fences (rustfs/backlog#2901).
- Recovery retries back off instead of pausing: after the short budget the
observation reads `backoff`, stays retryable, names the next attempt and is
capped at ten minutes; one success resets the count and a 24 h window
restarts the budget (rustfs/rustfs#8297, #8670). The usage-floor failure no
longer carries the retry count across attempts.
- A corrupt `.bloomcycle.bin` is rebuilt on the iteration after its quarantine
marker is durable: the fenced leadership claim CAS-replaces the quarantined
revision under a higher epoch and the marker stays as evidence.
`future_schema` and `cleanup-pending` remain blocked.
- An unclaimable pause ledger runs the leader degraded: cycles run untracked
behind the data-movement fence, `persistence_state` reports `degraded`, and
the claim is retried at most every five minutes (rustfs/rustfs#8251).
- The usage-state full-rebuild reset starts from the empty baseline when every
usage slot is corrupt and no cycle state exists (rustfs/rustfs#8670, #6951).
- A cycle-state save reconciles non-conflict failures against durable state
and retries under the same epoch; an exhausted save reloads durable state in
place. Only a newer owner or an unreadable primary ends the iteration, so
peers see a changed fence only when ownership changed (rustfs/rustfs#8141).
* test(scanner): align usage-state reset tests with the empty-baseline rebuild
The full-rebuild reset no longer refuses corrupt or identity-less usage slots
when no cycle state exists (rustfs/rustfs#8670). The two tests that encoded
that refusal now check the new contract: the reset starts from the empty
baseline with a bootstrap-pending marker, never an authoritative zero floor,
and a valid backup still supplies the recovery floor.
---------
Co-authored-by: cxymds <cxymds@gmail.com>
Decommission listing failed closed on `.rustfs.sys/buckets/.heal/`, a
directory that holds only the node-local MRF journals on one drive and
no xl.meta. The partial-listing resolver rejected the single prefix
directory below dir quorum and recorded it as unresolved object
metadata, failing the run before the worker's directory skip ran.
Treat a partial sample made only of empty-metadata directory candidates
with zero disk errors as the prefix it is and hand it to the callback
like a quorum-resolved directory; the recursive walk lists any object
beneath it on its own. Samples with disk errors, objects below the
metadata quorum, and mixed samples stay unresolved.
Fixes#8667
* fix(ci): refresh the e2e-full selection for the new policy tests
#8615 and #8671 added three e2e tests without refreshing the e2e-full
selection digest, so "Verify e2e full membership" has failed on every
main push since. Regenerate the Linux digest from the listing the failed
run uploaded; the same procedure reproduces the previously committed
value from the last green run's listing, and the name-level diff shows
three additions and no removals. The darwin digest is refreshed
separately from a real macOS listing.
* fix(ci): refresh the darwin e2e-full selection digest
Regenerated from a real `cargo nextest list --profile e2e-full -p e2e_test`
on macOS (rustc 1.99.0, cargo-nextest 0.9.140), so the local check on
macOS agrees with the three policy tests added by #8615 and #8671.
#8682 replaced the cold `cargo check -p rustfs --release` with a
`cargo rustc ... -C debug-assertions=off` on the rustfs lib alone. That
leaves the dependencies on the dev-profile cfg, so the lib also fails on
items gated on one side of cfg(debug_assertions) only (E0599 on
Filenames::Embedded), and the step's "fails solely at the compile_error"
assertion can never hold; the lane has been red on main and every pull
request since. Restore the whole-graph release check, drop the two-job
limit that only a linking step needed, and record why the single-crate
variant is unsound.
Reuse the fingerprint-validated snapshot while the metadata owner fences an unchanged key. Refresh only after absent-key preparation, retaining destructive preflights, sibling refreshes and final inspection.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
An empty storageclass.dataStorageSize used to be the way to run on
user-supplied drives (extraVolumes/extraVolumeMounts, e.g. JBOD hostPath),
but the chart now always renders data PVC templates, with an invalid empty
storage request.
When the value is empty, render no data volumeClaimTemplates and no data
volumeMounts, drop the data directory preparation from the init container
(and the init container itself when there is nothing left to prepare), and
omit volumeClaimTemplates when no PVC template remains. Standalone mode skips
the data PVC and data volume unless existingClaim.dataClaim is set. Pools may
override the value independently. Default renders are byte-identical.
Fixes#8665
Raise CARGO_BUILD_JOBS to 3 on every event in the workspace test lane and
record the closed backlog#1601 experiment: the test-profile compile took
28m21s at 2 on a pull request and 16-23 min at 3 across three successful
main runs.
Merge the two Connect boundary jobs into connect-feature-boundaries. The
offline enrollment gate no longer exports a fresh CARGO_TARGET_DIR, so it
rebuilds only the rustfs crate on top of the restored ci-dev cache; the E2E
root is isolated by the feature gate and the dedicated binary name, not by
the target directory. The short-credential release guard is now
`cargo rustc -p rustfs --lib --features connect-e2e-short-credentials --
-C debug-assertions=off`, which trips the same cfg(not(debug_assertions))
compile_error against cached dev-profile dependencies instead of a cold
release check of the whole graph. Every assertion of both lanes is kept.
Update ci_gate.py and the ci-gates.md PR matrix for the merged job.
* ci: move compile-free and prebuilt-binary lanes to hosted runners
Standard GitHub-hosted runners are free for this public repository, while
every sm-standard minute is paid self-hosted capacity. Move the jobs that
never compile (quick checks, typos, scope selection, the required-checks
aggregate, audit, closed-PR cancellation) and the two s3-tests lanes that
only run the prebuilt debug binary to ubuntu-latest, drop the wget install
the custom image needed for typos, and move the upgrade-compatibility
workflow, whose build shape already runs on hosted runners in
e2e-distributed, with renamed cache keys so the hosted and self-hosted
images never share a rust-cache entry. Gate the package summary job on
resolve having run, so development builds stop starting a pod to report a
skipped job.
* docs(ci): document runner billing and placement rules
Record in .github/workflows/README.md which runner labels GitHub bills
(none for this public repository), which ones RustFS pays for, the rule for
when a job may leave ubuntu-latest, the rust-cache single-writer and
same-image constraints, the patterns that have leaked self-hosted minutes,
and a checklist for new or moved jobs. Point to it from .github/AGENTS.md,
docs/testing/ci-gates.md and the ci.yml placement comment so the rule has a
single home.
Supersede the 2026-09-03 decision: hard quota admission is owned by the
durable reservation ledger, and scanner data usage is best-effort reporting
input. Record that a pending ordinary PUT commit is a write-barrier event
rather than a usage-publication veto, and split the scanner plan identity
into a coverage identity and a reuse identity.
Refs rustfs/backlog#2872, rustfs/backlog#2903, rustfs/backlog#2904.
* feat(policy): support object creation operation conditions
Derive the condition from the resolved S3 operation and keep multipart staging separate from object publication. Reject request and claim spoofing and cover policy evaluation and HTTP upload paths.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(protocols): preserve multipart staging authorization
Keep the trusted protocol operation until the shared policy context is built, so FTPS and SFTP honor object creation conditions on multipart staging. Reuse the server-only marker and test real backend decisions for IAM and bucket policies.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): cover ObjectCreationOperation in STS session policies
Run AWS's conditional-write example 1 as an inline AssumeRole session
policy: object publication needs a request header, while multipart
staging is exempt through s3:ObjectCreationOperation.
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: oc7o <oc7o@sloow.de>
Co-authored-by: overtrue <anzhengchao@gmail.com>
* fix(heal): move impls before test module to satisfy clippy items_after_test_module lint
Clippy in Rust 1.99 flags items defined after #[cfg(test)] mod tests.
Move Serialize and Deserialize impls for CheckpointJson before the
test module in crates/heal/src/heal/resume/checkpoint/integrity.rs.
* fix(heal): restore checkpoint integrity file newline
Add the missing final newline so cargo fmt --all --check passes.
The checkpoint serializer implementations and tests remain unchanged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* perf(filemeta): avoid clones and intermediate allocations in xl.meta codec
- Slice version headers and metadata payloads directly from the xl.meta buffer in FileMeta::unmarshal_msg instead of allocating temporary header/metadata buffers per version.
- Decode FileInfo directly from borrowed xl.meta slices in get_file_info without constructing an intermediate FileMeta, Vec<FileMetaShallowVersion>, or InlineData copy.
- Validate and search InlineData keys on borrowed slices without per-key Vec/String allocations.
- Borrow FileMetaVersion in FileMetaVersionHeader::from and stream object/delete-marker signatures directly into Xxh64Writer instead of cloning full version structs and marshaling temporary buffers.
- Encode FileMetaVersionHeader into a stack buffer in FileMeta::marshal_msg and pre-size output buffers.
- Decode msgpack struct field names onto a 16-byte stack buffer via read_small_str and unwrap PrependByteReader after reading submap headers.
* test(filemeta): pin xl.meta codec compatibility
Pin pre-optimization signatures for historical RustFS and MinIO fixtures,
and cover direct reads across selectors and decode options. Preserve null
inline keys, free-version selection, empty histories, and allocation
boundaries for large version bodies.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(policy): support s3:if-none-match and s3:if-match condition keys
Bucket, IAM, and STS session policies that enforce conditional writes
with s3:if-none-match or s3:if-match were rejected with "invalid key
name". Accept both keys and populate them from the If-None-Match and
If-Match request headers. A blank header is left out of the condition
values because the write ignores it, so it cannot satisfy a Null check
for a write that runs unconditionally.
* fix(policy): classify conditional write keys as request-derived
s3:if-match and s3:if-none-match are filled from request headers, but
is_server_derived() reported them as server-derived because their names
lack the x-amz- prefix. Add an explicit arm so header input is never
refused for these keys if they join COMMON_KEYS.
* fix(s3): reject non-wildcard If-None-Match on writes
S3 accepts If-None-Match on PutObject, CopyObject and
CompleteMultipartUpload only as "*" and answers other values with 501
NotImplemented. RustFS compared such a value as an ETag, so a write with
If-None-Match: "<other etag>" overwrote the key while satisfying a
policy that requires s3:if-none-match.
Reject ETag values in the three handlers before any I/O. The store-level
check now treats any non-blank If-None-Match as create-only, so a caller
that skips the handler check cannot weaken the precondition. Drop the
CompleteMultipartUpload ETag pre-check that the rejection supersedes.
* test: tighten conditional write policy coverage
Pin trimming and the non-UTF-8 case in the condition values, and drop
the auth test that re-ran policy evaluation already covered by the
policy crate. Run the three policy e2e scenarios on one server, assert
that ETag If-None-Match cannot overwrite under a Null: false policy and
that CompleteMultipartUpload with If-None-Match: * returns 412. Share
the AssumeRole response parser through common.rs.
* test(ecstore): isolate manual delete recovery from workers
Stop fixture background services before seeding recovery journals so the
explicit recovery pass owns the decisions its assertions inspect.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(s3): enforce request-derived conditional write guards
Validate raw If-None-Match headers as well as DTO fields so POST form
uploads cannot skip rejection of unsupported ETag preconditions. Derive
conditional policy keys after identity claims and clear colliding claims
when the actual request has no usable precondition.
Align multipart and pinned Ceph regressions with wildcard-only writes,
retaining If-Match, object-content, version and delete-marker assertions.
Document that 501 is the implementation's unsupported-value response.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(s3): eliminate conditional write request copies
Borrow request headers during policy condition collection and exclude
conditional keys at the identity-claim boundary instead of inserting and
removing them. Preserve existing aliases and multivalue header behavior.
Move the CompleteMultipartUpload input out of its request, compare strong
ETags by reference, and remove the ETag If-None-Match branch made unreachable
by the write guard. Keep both form/HTTP input checks and storage commit
preconditions intact.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(s3): align ignored conditional PUT and COPY cases
Use If-None-Match: * for the existing-object 412 regressions and assert 501
for matching and nonmatching ETag values. Cover both header-only callers
and parsed DTO-plus-header requests in the serial ILM fixtures.
Check object bytes and live version counts after each rejected operation.
Keep the existing test names and ignored-test lane selection unchanged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(oidc): make the Console session duration configurable
The OIDC callback hard-coded the Console credential lifetime at 3600
seconds, so a Console session always ended after about an hour.
RUSTFS_CONSOLE_AUTH_TIMEOUT, the documented knob next to this behaviour,
is the Console HTTP request timeout and cannot extend a session.
Resolve the lifetime from the process-level
RUSTFS_CONSOLE_OIDC_SESSION_DURATION instead and forward it to
complete_authorization_code(). Unset, unparseable, zero, and negative
values keep DEFAULT_CONSOLE_OIDC_SESSION_DURATION_SECS (3600), so
existing deployments keep the previous behaviour and a misconfigured
variable can never issue an already expired credential. Values above
CONSOLE_OIDC_SESSION_DURATION_MAX_SECS (7 days) are clamped to that
maximum with a warning, which also caps how far an operator can stretch a
credential by accident.
Keep the Console logout token for that same lifetime. OidcStateStore
pinned the logout cache to a hard-coded hour, so a session configured to
last longer than that dropped its logout token while the credential was
still valid: RP-initiated logout could no longer resolve, and the browser
was sent back to the Console login page with the IdP session still
active. The logout cache now derives its TTL from the same
console_session_duration_secs(), which applies the same clamp, and the
callback reads its lifetime from that one function instead of a local
copy, so the credential lifetime and the logout-token retention cannot
drift apart. Add tests covering the default hour, an extended session,
the maximum, and out-of-range values.
The variable is deliberately not part of ENV_IDENTITY_OPENID_KEYS: that
list is suffix-scanned per provider, and this setting applies to every
provider. It has no identity_openid KVS equivalent and needs a restart,
like the other process-level settings in the same document.
Document the setting in the login flow, the process-level table, and the
troubleshooting table, and clarify that RUSTFS_CONSOLE_AUTH_TIMEOUT is a
request timeout rather than a session lifetime.
* test(ecstore): retain offline marker fixtures across reconnect
Keep simulated drive handles attached and reject I/O until explicit rejoin.
Attempt reconnect in the current-marker case so the former CI race is
deterministic while retaining physical cleanup and historical-data checks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(oidc): align session diagnostics and lifetime regression tests
Use structured IAM diagnostics for clamping and move configuration tests
to their owning crate. Cover duration boundaries, logout retention and
signed credential expiration through the federation binding.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Chris <anzhengchao@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): expose mixed sweep checkpoint transitions
Correlate checkpoint admission, incomplete sweeps, and successful terminal
Partial persistence by bucket/source and cycle/leader epoch. Share the
traversal-position predicate and local/remote save diagnostic without
changing certification, acknowledgement, or persistence contracts.
Extend real-disk cache regressions across cycles and leader changes and
verify that failed terminal saves retain an older periodic frontier until
a successful terminal save permits fresh certification.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): report the aggregate incomplete sweep gate
Expose the existing unresolved_objects decision in the incomplete-sweep
event. Nested cache-entry failures can keep a sweep partial while both
the root counter and the capped diagnostic failure map are empty.
Extend the real-disk regression with diagnostics disabled and distinguish
this case from mixed-only coverage without adding another cache walk.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): preserve inline heal rollback staging lifetime
Retain the TMP source prefix in the existing publication lease until the owned receiver finishes rollback. Serialize recursive cleanup and stale GC with the same key, and avoid decoding an unused old version during inline healing.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): reuse staging lease during parent cleanup
Reuse the existing staging lease when pruning its parent directory, including already-missing prefixes, and retain it in the physical rmdir executor after cancellation. Match the inline-heal fsync test hook to the canonical group path on Linux.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(table-catalog): qualify current backing contracts
* fix(table-catalog): verify smoke cleanup after object rename
* fix(ci): include the baseline writer test in full E2E selection
* fix(ci): reserve test capacity for disk-backed lock probes
---------
Co-authored-by: Henry Guo <marshawcoco@users.noreply.github.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
* fix(heal): verify checkpoint integrity before applying defaults
Validate the persisted JSON shape so intact signed legacy checkpoints can
reach the existing safe schema rewind. Preserve deployed field ordering and
read historical sorted-key digests without changing the checkpoint schema.
Reuse the signing value when saving and retain strict duplicate-field parsing.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): preserve checkpoint writer rollback compatibility
Keep ordered checkpoint parsing local rather than enabling preserve_order
throughout the server. Sort writer keys recursively to retain the production
base reader's digest format while accepting both historical read orders.
Cover real writer canonicalization, nested scalar ordering and depth limits.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
FileMetaShallowVersion::into_fileinfo and to_fileinfo_with_part_checksums previously decoded an owned FileMetaVersion and then converted it via shared reference (&self), cloning meta_user, meta_sys, part_etags, and part_indices before dropping the temporary FileMetaVersion and scanning the metadata map up to 10 times for optional internal suffixes. Additionally, metadata_compat helpers (get_str, contains_key_str, remove_str, get_consistent_value) allocated two temporary heap Strings via both_keys(suffix) on every absent-key fallback.
- Replace both_keys(suffix) in case-insensitive fallback scans with allocation-free prefix+suffix slice matching.
- Add consuming into_fileinfo_with_part_checksums on FileMetaVersion and MetaObject to move decoded part vectors and metadata maps in place.
- Fold transition-version metadata formatting and optional suffix presence detection into the single meta_sys pass, and skip target_delete_marker_versions in get_internal_replication_state when no delete-marker version keys are present.
* perf(ecstore): keep inline heal rollback backups in staging
Keep inline repair rollback local to the disk commit and avoid publishing
a live backup that needs a second cleanup operation. Preserve legacy peer
and non-inline backup reclamation, with production-mode rollback coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Co-Authored-By: Ramakrishna Chilaka <rkchilaka378@gmail.com>
* test(ecstore): route inline heal imports through test facade
Keep ECStore integration-test API access behind storage_api.rs to satisfy
the architecture migration boundary without changing test behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Ramakrishna Chilaka <rkchilaka378@gmail.com>
* fix(scanner): attribute incomplete census and lease waits
Report bucket sweep blockers and correlate partial remote work and rejected
roots with their set and cycle. Keep distinct accepted bucket names in the
result collector so completion counts and missing-bucket attribution share
one source of truth, including during cancellation drain.
Distinguish worker completion from coverage, retain peer/purpose context in
lease failures without changing retry suffixes, and avoid claiming that an
unverified leader fence changed or a waiting scan was complete.
Document the census stages and preserve publication, dirty acknowledgement,
remote failure classification and checkpoint safety rules.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(scanner): move set caches through the result collector
Give the sole result collector exclusive ownership of the aggregate cache
and return it together with the accepted bucket names after channel drain.
Move that cache into complete persistence or incomplete updates instead of
sharing a mutex and cloning the terminal cache.
Return each accepted result's owned name from cache application so coverage
tracking also avoids an extra name allocation. Preserve worker joins,
cancellation drain, publication metadata and all certification fences.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): treat replication status writebacks as status-class hits
A replication status writeback (persist_replication_state_if_current in
Update mode, including the heals the scanner queues during its own walk)
marked the bucket dirty on the namespace path: it advanced the dirty-usage
generation, woke the scanner, reached the durable dirty journal and
entered the activity snapshot. Any replicated bucket therefore made every
scanner cycle Superseded, the authoritative usage baseline was never
certified and usage freshness stayed stale for as long as replication ran
(#8375).
The writeback is now status class: record_status_class_mutation records
only the process-local producer coverage bit and nothing else. There is
no rescan queue for it, because a deployment with an active replication
rule already walks every bucket on every cycle
(ScannerMaintenanceFeatures::needs_regular_cycle) and that walk refreshes
replication_stats. The routing lives in a named, unit-tested function in
rustfs/src/storage/storage_api.rs; tier-expiration cleanup removes data
and stays on the namespace path.
No persisted format, protocol, admin API or configuration changes.
This is phase 1 of docs/architecture/scanner-per-bucket-convergence.md,
which this change adds together with its index entry.
Refs #8375, #8494, rustfs/backlog#2816.
* fix(scanner): refresh replication statistics during maintenance
Refresh compacted prefixes and completed bucket caches during replication maintenance. Bind set execution reuse to the observed replication statistics so a same-cycle retry cannot restore older counters.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): avoid expanding the legacy S3 DTO surface
Decode the existing replication configuration type from a JSON fixture instead of adding direct S3 DTO references to a new file. Preserve the compacted-prefix and same-cycle assertions and the footprint ratchet.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): attribute activity guardrail vetoes per field
The post-walk cluster activity proof compared the whole activity snapshot,
so any namespace or dirty-usage generation movement vetoed publication.
Veto only on the fields that change which heap the walk described
(peer set, instance id, protocol version, topology, maintenance
generation, data movement, movement generation, publication blocked) and
name the field and host in the log and in a new usage-freshness counter.
Generation movement is a shade signal consumed per bucket. A remote peer
whose dirty-usage state moved keeps the whole-cycle outcome until scoped
acknowledgements can name its buckets.
* feat(data-usage): carry pending-bucket certification in DataUsageInfo
Add the additive fields a per-bucket certified scanner snapshot needs:
the sorted list and count of buckets whose dirty-usage generation moved
during the walk, and an explicit observational marker for snapshots whose
authoritative publication was vetoed. All three default when absent and
are skipped when empty, so older readers see the existing snapshot shape.
* feat(scanner): certify dirty usage per bucket and complete cycles with pending buckets
A structurally complete walk that the guardrail did not veto is now
`Complete` even when the dirty-usage generation moved during the walk.
Certification keeps the compare-and-remove semantics of
clear_dirty_usage_buckets: buckets whose generation still equals the start
snapshot are cleared, buckets written during the walk stay in the dirty map
and are published as the pending set, so usage_snapshot_converged becomes
`pending == 0`. The authoritative object is written for such cycles; the
observed route is selected by the explicit observational mark that vetoed
cycles carry instead of by the convergence flag, and the root publication
proof is read for every authoritative save. The post-lease activity recheck
compares the guardrail fields, with the peer dirty-usage fallback, instead
of the full snapshot digest.
* feat(scanner): accept unconverged complete publications as the cache baseline
complete_scanner_cache_baseline_plan_digest required the authoritative
snapshot to be converged, so a site whose cycles always left a bucket
pending could never scope a rescan and every cycle was a full walk. The
authoritative object is now a structural baseline whenever it carries a
convergence marker and no observational mark; bucket-cache reuse is then
governed by certification, because pending buckets stay in the dirty map
and are selected for the rescan while certified buckets reuse their set
cache. Observed candidates keep requiring the unconverged marker, and
segment reuse evidence keeps requiring a converged baseline.
Add the single-disk cycle test: a bucket written during the walk is the
only pending bucket, the others are certified, the publication is
authoritative and unconverged, and the next cycle is scoped to that
bucket; a held PUT tail still supersedes onto the observed route.
* feat(admin): expose scanner guardrail vetoes in usage freshness
Carry the attributed guardrail veto counter, timestamp and <field>@<host>
reason from the scanner metrics report into the madmin scanner status so
an operator can tell a rebalance or a PUT tail from a broken probe. The
fields are additive with serde defaults and merge like the deferral
fields.
* docs(scanner): record per-bucket certification in the design and changelog
Amend the convergence design where the implementation deviates: pending
buckets carry their walked value, maintenance_generation stays a veto,
guardrail localisation and the remaining phase-2 items ship separately,
last_cycle_result keeps its success label, and the admin surface gains the
guardrail veto fields. Update the publication contract for the post-lease
guardrail recheck and the explicit observational routing mark.
* refactor(scanner): drop the unreachable failed-bucket input from the pending set
A failed bucket never reaches a Complete cycle, so the pending set only
needs the start snapshot. Also remove a redundant clone in the data-usage
round-trip test.
* test(scanner): name the activity field mutation table type
* test(scanner): fill the post-walk gate in merged replication fixtures
The replication maintenance fixture merged from main builds a
ScannerCycleRequest literal and predates the test-only post_walk_gate
field; give it the default so the test target compiles on the rebased
branch.
* ci(nextest): run the admin target-repair fixtures on the ecstore base stack
repair_transaction_rejects_a_bucket_recreated_after_target_validation
overflowed the 2 MiB libtest default twice in a row on Linux CI for this
branch. Measured by sweeping RUST_MIN_STACK with the ci profile on macOS
arm64: main (65f30bd5c) passes at 2032 KiB and overflows at 2016 KiB,
this branch passes at 2040 KiB and overflows at 2032 KiB; on both trees
the overflow is in the test's delete_bucket step on the real store, and
the futures on that path are small (the peak is nested poll depth, not
one large future). The module was given this stack in #7272 and removed
in #7280 to check that boxing (#7277) sufficed; with the default now
exhausted on main itself, give the fixtures the same 4 MiB base stack as
the other real-storage rustfs fixtures, in both profiles.
* test(scanner): fill the post-walk gate in the walkers-per-disk fixture
The merge from main brought the walkers_per_disk cycle fixture (#8539),
whose ScannerCycleRequest initializer predates the test-only
post_walk_gate field this branch adds; the scanner test target did not
compile. Fill the default so the merged head builds.
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): reclaim rollback backups after object heal
Retire only the backup returned by a successful, fenced heal publication.
Keep child keys, live data directories, and delete recovery evidence safe.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): retain heal cleanup ownership through cancellation
Forward publication and repair key owners to the existing owned delete
executor so local unlink cannot outlive its exact-key serialization.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Separate completed traversal from persisted object health debt so leader
handoffs reuse healthy subtrees and retry failures without losing progress.
Fence old readers with a new receipt digest domain and preserve exact
accounting under diagnostic eviction, compaction and punctuation ordering.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(filemeta): read large metacache records incrementally
Replace the aggregate 16 MiB guard with fallible chunked growth so
versioned xl.meta records remain listable without trusting length prefixes.
Discard skipped payloads with a bounded buffer and distinguish truncated
records from compatible empty or between-entry EOF.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(filemeta): remove redundant metacache reader copies
Track the returned entry with a boolean instead of cloning its metadata,
decode object names directly from the borrowed slice, and derive the read
position from buffer length. Preserve scratch reuse, exact output capacity,
wire framing, and sticky corruption errors.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(utils): NUL-terminate and extend paths passed to Win32 volume APIs
`get_volume_name` returned the volume root truncated at its NUL and the
result was then passed to `GetVolumeInformationW` as a PCWSTR, an
out-of-bounds read. The disk-space and volume APIs also received the
caller's raw path, so they failed beyond MAX_PATH, and a UNC share root
lacked the trailing backslash these APIs require.
- Wrap every Win32 path in a NUL-terminated `WidePath` that rejects
interior NULs; volume roots returned by `GetVolumePathNameW` keep
their terminator.
- Convert inputs to the extended-length `\\?\` / `\\?\UNC\` form after
`GetFullPathNameW` normalization, and give directory queries a
trailing backslash.
- Query `GetDiskFreeSpaceW` and `GetVolumeInformationW` on the volume
root as documented; size buffers to the documented MAX_PATH + 1 or
the input length.
- Report Win32 error codes instead of raw HRESULTs so `ErrorKind`
matches `std::fs`.
- Keep volume ids in their conventional `C:\` / `\\server\share\` form.
Add Windows-only `os::` tests for long directories, UNC share roots and
non-empty fstype, and run them in the Windows filesystem workflow.
* fix(utils): report Windows network volumes to the fs guard
Windows names the server's filesystem (usually NTFS) for SMB shares, so
the startup unsupported-filesystem guard, which matches fstype names
such as cifs or smb2, never fired for UNC paths or mapped drives.
- Add `DiskInfo::remote`. On Windows it is set when the directory handle
answers `FileRemoteProtocolInfo` (only network redirectors do, and the
handle follows symlinks and junctions to their target) or the volume
root's `GetDriveTypeW` is `DRIVE_REMOTE`. Unix keeps it false because
the client fstype already names network mounts.
- Treat remote volumes as unsupported in the startup guard and label
them "<fstype> on network share".
- Cover UNC shares, paths beyond MAX_PATH below a share, a directory
symlink to a share and a `net use` mapped drive with Windows-only
`os::` tests that skip when `\\localhost\<drive>$` is unreachable;
the Windows filesystem workflow maps the drive before running them.
* chore(deps): replace yanked inout 0.2.3 with 0.2.4
cargo-deny's advisories check rejects the yanked inout 0.2.3 that main's lockfile pins, failing every open PR. Lockfile-only patch bump.
* fix(utils): detect network targets from the final NT path
On the Windows runner, a directory symlink to \\localhost\C$ was reported as local: FileRemoteProtocolInfo did not identify it, and the volume root of the link is a fixed drive.
Also treat a handle whose final NT path (GetFinalPathNameByHandleW with VOLUME_NAME_NT) lies under \Device\Mup\ as remote; the Multiple UNC Provider fronts every UNC and mapped-drive target. The tests now assert the handle probe on its own for local and share paths and report both signals when it disagrees.
---------
Co-authored-by: overtrue <anzhengchao@gmail.com>
* fix(ecstore): share metadata cache identity across Windows key aliases
Windows disks treat `\` as a path separator and `path_join_buf` drops the
empty segments that leaves, so `a\b`, `a\\b`, `\a\b` and `a\b\` all
address the xl.meta of `a/b`. The GetObject metadata cache keyed and
hashed the raw spelling, so DELETE `a\b` retired nothing cached for
`a/b`: GET/HEAD `a/b` kept returning the deleted object for up to the
2s cache TTL.
Fold the object name into the same segment form the disk resolves to
before computing the cache hash, key and lookup key. Off Windows the
name stays verbatim and borrowed, so `\` remains an ordinary key byte.
* fix(ecstore): serialize Windows backslash key aliases on one namespace lock
Windows disks treat `\` as a path separator and drop the empty segments
it leaves, so `a\b`, `a\\b`, `\a\b` and `a\b\` all address the xl.meta
of `a/b`. Namespace locks keyed the raw spelling, so writes, deletes and
heals through different spellings ran concurrently on one xl.meta and a
read-modify-write in rename_data could drop a version.
Fold the object name into its disk identity (rustfs_utils::path::
object_name_disk_identity, a no-op off Windows) wherever a namespace
lock key is formed:
- SetDisks::new_ns_lock, which every object lock path goes through;
- the batch delete lock request and its dedup/lookups, which build
ObjectKeys directly.
Two consumers compared lock identities by spelling and follow along:
- WriteCommitGuard records the folded key from the lock resource, so
matching a borrowed guard now folds the target name too;
- CopyObject holds the source read guard until EOF on streaming reads.
`a\b\` -> `a/b` is not a same-object copy by path_join_buf, but shares
one lock, so it now takes the self-copy lock instead of waiting on
itself until the lock timeout.
Distributed lock keys are folded by the requesting node only; lock
servers compare them verbatim.
* refactor(ecstore): key the metadata cache by the shared disk identity
The metadata cache fix carried its own copy of the Windows backslash
folding rule. Use rustfs_utils::path::object_name_disk_identity, which
namespace locks already use, so cache and lock identities cannot drift.
* ci(windows): run filesystem tests when key identity rules change
The Windows backslash folding for object names lives in utils path.rs
and is consumed by the namespace lock and write commit guard; run the
windows_ tests when any of them changes.
* fix(ecstore): keep Windows disk roots out of verbatim form
The disk root comes from GetFinalPathNameByHandleW, which returns a
verbatim path. `simplified` only strips `\\?\C:` below MAX_PATH, so a
data directory past 260 characters (or one reached through a UNC share)
kept the prefix. Disk IO extends the root by joining `/`-separated
relative paths as strings (`read_raw` builds `<object>/xl.meta` with
`path_join`), and inside a verbatim path `/` is not a separator: the
first metadata read, pool.bin.identity, failed with ERROR_INVALID_NAME
until startup gave up.
Add `rustfs_utils::non_verbatim`, which strips the disk and UNC verbatim
prefixes without a length limit while still keeping paths whose
components Win32 would rewrite, and use it for the publication root.
std re-adds the extended-length prefix for long paths.
Cover a root past MAX_PATH with a disk-level read/write test and run all
`dunce::` tests in the Windows filesystem workflow.
* fix(ecstore): query Win32 volume APIs with extended long disk roots
A disk root past the legacy limit used to reach `rustfs_utils::os` in
verbatim form, which the Win32 volume APIs accept. Now that the root
stays non-verbatim, GetDiskFreeSpaceExW rejected it with
ERROR_PATH_NOT_FOUND and LocalDisk::new failed in the Windows filesystem
workflow. Pass long roots to `get_info` and `get_physical_device_ids` in
extended-length form; shorter roots stay unchanged so reported volume
identities keep their `C:\` form.
On Windows, URL endpoints such as http://host:9000/C:/data{1...4} (the only
form multi-node and pool-expansion layouts accept) produced the disk path
`/C:/data1`: `try_from` stripped the synthetic slash, but `Url::set_path`
put it back, and `get_file_path` only removed it for `file` endpoints.
Windows resolves `/C:/data1` as an invalid `C:` component under the current
drive, so disk validation and `resolve_local_disk_root` failed.
- `get_file_path` now restores `/X:/...` to `X:/...` for every scheme on
Windows; URL paths without a drive (`/export1`, `/C:foo`) are unchanged.
- UNC shares (`\\nas\share\d1`, `//nas/share/d1`, `\\?\UNC\...`) are rejected
with an explicit error instead of becoming a file URL whose host is the
share server and whose path drops the share name.
- A drive root (`http://host:9000/D:/`) is accepted in URL form, matching
the path-style `D:\` endpoint that was already accepted.
- The "distinct physical disks" error explains on Windows that directories
on one volume share a device identity, alongside the existing
RUSTFS_UNSAFE_BYPASS_DISK_CHECK hint.
- The Windows filesystem lane now runs on layout changes and runs the
layout::endpoint:: tests; new Windows tests carry the windows_ prefix.
- Document Windows endpoint forms, the same-volume check, and the SNSD
expansion limit in cluster-lifecycle-operations.md.
`run_process` called `block_on(async_main())` on the native main thread,
so the whole startup chain ran on whatever stack the platform hands the
main thread: 8 MiB from `ulimit -s` on Linux and macOS, but the 1 MiB PE
default on Windows. A Windows debug build overflowed before it listened.
`RUST_MIN_STACK` does not reach the native main thread.
Run the runtime on a `rustfs-main` thread with an explicit 8 MiB stack,
keeping the budget Linux and macOS already had and making it independent
of the linker, toolchain (msvc/gnu) and `ulimit`. Panics are re-raised
on the main thread so the exit status is unchanged.
Measured on macOS arm64 by lowering the main-thread stack with
`ulimit -s` before this change: debug startup overflows at 1792 KiB and
reaches /health/ready at 2048 KiB; release overflows at 512 KiB and is
ready at 768 KiB. After it, debug starts with a 256 KiB main thread.
Add a Windows `Startup Smoke` job that builds the debug server, runs
`--version`, and waits for /health/ready on a single volume.
* fix(ecstore): admit CopyObject destinations like PutObject
Object-key platform checks were split across call sites with gaps:
CopyObject only ran check_bucket_and_object_names on its destination and
then reached the pools' put_object directly, so it admitted keys PutObject
rejects (over 1024 bytes, leading slash, and on Windows reserved characters
or unaddressable segments, the "writes but cannot be read" case of #3449).
- rustfs-utils: expose check_windows_file_name as the single per-segment
Win32 rule set; dunce's simplified() reuses it. Reserved device names now
include COM/LPT with superscript digits and CONIN$/CONOUT$.
- ecstore: replace the duplicated reserved-name table with that function;
Windows also rejects control characters 0x01-0x1F (NUL keeps its
platform-independent ObjectNameInvalid answer).
- ecstore: add check_new_object_args as the shared admission entry for
PutObject, cross-key CopyObject destinations and CreateMultipartUpload.
In-place copies (metadata replace, restore) keep the copy-only check so
existing keys stay rewritable. CreateMultipartUpload now also rejects
over-NAME_MAX segments up front instead of failing at completion.
- CI: run bucket::utils and dunce tests in the Windows filesystem job.
* fix(ecstore): reject new backslash keys on Windows hosts
A Windows disk treats '\' as a path separator, so a new key `a\b` lands on
the same xl.meta as `a/b` and the two keys overwrite each other.
Reject '\' only where a key enters the namespace (check_new_object_args:
PutObject, cross-key CopyObject destinations, CreateMultipartUpload) and
only on Windows. Reads, deletes, in-flight multipart operations, in-place
copies, data movement and internal meta buckets keep accepting it, so keys
already stored with '\' stay readable, deletable and movable.
Pending owner ruling: whether new '\' keys should be rejected at all, and
whether reads/deletes should keep accepting them.
* ci(windows): quote filtered test runs and drop duplicate path
fix(data-usage): retain dirty counts over observations
Preserve unreconciled local mutations when an observed snapshot completes later. Add focused selection-to-overlay regressions for writes, deletes and authority boundaries.
Validation checkpoint: the pre-fix regression failed as expected. Post-fix tests, formatting and runtime verification were not run before the user stopped the task. This local commit is not ready for publication.
tempfile's Windows `persist` passes the raw paths to MoveFileExW and
SetFileAttributesW, bypassing std's extended-length handling. Once
`<object>/<rollback>/xl.meta.bkp` reached 260 UTF-16 units every delete
of that key failed with 500, while PUT and GET kept working.
Add `rustfs_utils::extended_length_path`, which normalizes a path with
GetFullPathNameW and prefixes it with `\\?\` (or `\\?\UNC\`), and use it
for the staging directory and destination handed to tempfile. Cover the
single and batch delete paths with a deep-key regression test and run the
helper's Windows assertions in the Windows filesystem workflow.
Fixes#8545
Since 1.0.2 an encrypted object's ETag is a keyed fingerprint, not the
plaintext MD5. A target that computes its own ETag (AWS S3, Wasabi) never
reports it, so every "find the existing replica by exact ETag" step missed
encrypted objects on targets that mint their own version ids:
- a heal / MRF re-drive after a lost PUT response wrote a second version;
- an existing-object resync re-PUT a replica its ledger already named
(the ledger-located HEAD was confirmed by ETag only), and on the AWS
400 shape the ledger was not consulted at all;
- resync verification counted such replicas as failed;
- a ledger-less version purge reported the replica as already gone.
Encrypted sources now recognise their replica by shape: the byte count the
replication PUT sent (plaintext for managed SSE, ciphertext for SSE-C) and
a target write time no earlier than the source version. An ETag match
still wins (RustFS/MinIO targets). The ledger is consulted first on both
the 404 and the AWS 400 shape. Without a ledger, only a unique shape match
among the unclaimed ListObjectVersions candidates is adopted and recorded;
several shape matches mean re-PUT for convergence and a refused purge. The
AWS current-version fallback stays ETag-only, and a listing the
target refuses on the 400/403 shape keeps that fallback (re-PUT) rather
than stalling. An unversioned target's `null` version is never matched by
shape: it holds whichever generation was written last. Plaintext sources keep exact
ETag identity.
Builds on the ETag-computing fake target mode and the ComputesOwnEtags
matrix row from rustfs#8583. Adds an SSE-S3 variant of the mint-own-ids
re-drive test (red before this change: the heal left two target versions),
and both variants now also assert the purge.
* fix(scanner): treat replication status writebacks as status-class hits
A replication status writeback (persist_replication_state_if_current in
Update mode, including the heals the scanner queues during its own walk)
marked the bucket dirty on the namespace path: it advanced the dirty-usage
generation, woke the scanner, reached the durable dirty journal and
entered the activity snapshot. Any replicated bucket therefore made every
scanner cycle Superseded, the authoritative usage baseline was never
certified and usage freshness stayed stale for as long as replication ran
(#8375).
The writeback is now status class: record_status_class_mutation records
only the process-local producer coverage bit and nothing else. There is
no rescan queue for it, because a deployment with an active replication
rule already walks every bucket on every cycle
(ScannerMaintenanceFeatures::needs_regular_cycle) and that walk refreshes
replication_stats. The routing lives in a named, unit-tested function in
rustfs/src/storage/storage_api.rs; tier-expiration cleanup removes data
and stays on the namespace path.
No persisted format, protocol, admin API or configuration changes.
This is phase 1 of docs/architecture/scanner-per-bucket-convergence.md,
which this change adds together with its index entry.
Refs #8375, #8494, rustfs/backlog#2816.
* fix(scanner): refresh replication statistics during maintenance
Refresh compacted prefixes and completed bucket caches during replication maintenance. Bind set execution reuse to the observed replication statistics so a same-cycle retry cannot restore older counters.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): avoid expanding the legacy S3 DTO surface
Decode the existing replication configuration type from a JSON fixture instead of adding direct S3 DTO references to a new file. Preserve the compacted-prefix and same-cycle assertions and the footprint ratchet.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(scanner): keep raw enumeration bookkeeping linear per entry
The page writer inserted into its building page with a push-and-sort on
every entry and committed each page through a clone. Insert in sorted
position and move the committed page into the index instead.
Add a regression test that records 20,000 entries in one prefix and pins
the cost to one hash per entry and well under a second, so the quadratic
re-normalization removed by #8114 (rustfs#8113) cannot return once pacing
builds on this walker.
* feat(scanner): decouple bucket walkers from disk count
Add the scanner key walkers_per_disk (RUSTFS_SCANNER_WALKERS_PER_DISK,
1 through 16, default 1). Each local coordinator disk of a set spawns that
many bucket walkers; remote disks keep one. The walker count is what
max_concurrent_disk_scans caps and the disk count stays the floor.
The walkers of one disk share its scanner admission through
LocalDiskAdmissionShare: the first walker to start a bucket takes the
per-disk permit and the last to finish releases it, so a peer's remote
request still sees one scan session per physical disk. Without the share
the second walker was rejected as busy and retired.
The disk_concurrency_budget log line reports walkers_per_disk, walkers and
the reason for the effective limit. The default stays 1 because no local
disk reports rotational media today; the design keeps a higher flash
default as the intent.
* docs(scanner): document walkers_per_disk in the Helm chart and configuration manuals
RUSTFS_SCANNER_WALKERS_PER_DISK was only described in the scanner runtime
controls table. Add it to the Helm chart (values, configmap rendering,
README table, template test), the configuration crate's environment
reference with operator guidance, and a short section in the operations
manual on when to raise it and how to confirm it took effect.
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* chore(deps): refresh workspace dependencies
Run cargo update and cargo upgrade twice from origin/main.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(deps): pin Pulsar 6.9.0 until recovery is bounded
Keep Pulsar on 6.9.0 after reproducing background recovery and lookup activity after delivery timeout and target destruction in 6.9.1. Use an exact requirement to prevent a later cargo update from selecting the affected release.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Enable preserve_order for the Arrow JSON schema reference in tests and verify first-seen field ordering across nested records.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Since #8535 DeleteObjects honours Quiet=true the way S3 does and omits the
successful entries from the response, so the quota batch-delete test has
been asserting two Deleted entries against an empty list on every main run.
The test only needs the batch to succeed and free quota; make it verbose so
the existing assertion holds and check that no entry failed.
* test(e2e): gate the rc.5 baseline restarts on drive re-admission
The mixed-version rolling upgrade failed three times on unrelated branches
with `MultipartAcknowledgementDeadline { node: 2, key: "one-current-node/..." }`.
The baseline kills the next rc.5 node about 10 ms after the previous one
reports ListBuckets, while that node is still replaying its startup traffic.
Two failed operations drop the peer's drive to Offline on the pinned release,
and only the 2 s recovery probe brings it back three successes later. In both
failing runs node 2 held node 3's drive as `faulty` when the multipart load
started three seconds later; it then committed every upload at three of four
drives with a heal per object, and on a two-vCPU runner one upload exceeded
the 30 s acknowledgement budget. The green run on the same branch only
reached `suspect`. An all-rc.5 cluster reproduces the same degradation after
the same restart sequence and an all-current cluster shows none of it.
Write a slash-free probe object before the first restart and, after each
baseline restart, block until every node reports all four drives of that
object as `ok` through a dry-run object heal. `storageinfo` and `info` only
carry each node's local drives; the object heal runs on the receiving node and
classifies a short-circuited remote drive as `faulty`. The gate stays in the
all-rc.5 baseline: admin heal first probes every peer's heal-control
capability, and a mixed-version cluster fails that probe on both binaries.
Record every node's lock table in `mixed-multipart-failure.json`; the stalled
writer is a previous-release node whose table the current node cannot show.
The 30 s budget, layout, load and assertions are unchanged.
* test(e2e): probe drive re-admission with a parity-0 write per node
The dry-run heal gate observed only node 0: the pinned rc.5 admin heal
forwards start and status requests to the heal-control coordinator whatever
node receives them, so the loop checked node 0's drive handles four times
and never the restarted peers' handles.
Run the cluster with `RUSTFS_STORAGE_CLASS_RRS=EC:0` and probe each node
with a reduced-redundancy PUT instead. A parity-0 write on the four-drive
set needs all four drives (`write_quorum = data_drives`), so the PUT fails
with 503 `ServiceUnavailable` until the serving node writes through every
one of its own drive handles. The probe is plain S3 and executes on the
receiving node on both binaries, so the gate now also runs before each
mixed-version load and after the last upgrade. Standard-class objects keep
the default layout.
`parity_zero_write_needs_every_drive` pins the premise on the workspace
build: with one node down a standard write still commits, the
reduced-redundancy write fails with 503, and the gate converges once the
node returns. The diagnostic snapshot test now checks the per-node lock
probe array.
* fix(rebalance): avoid contention when peers join the same run
* fix(rebalance): wait for fleet proof during initialization
* test(rebalance): check contextualized competing run errors
* fix(rebalance): retain typed worker admission lock errors
* test(rebalance): retry the init readiness 503 and pin the retry error shape (#8586)
The e2e harness only retried the pre-fix 500 carrying the fleet-proof
marker; the init stage now answers 503 + Retry-After after its own
readiness budget, so start_rebalance treats that as the same wait. The
missing-proof regression also asserts the typed error shape that the admin
handler's retry predicate depends on, not only the rendered message.
---------
Co-authored-by: Chris <anzhengchao@gmail.com>
* fix(multipart): retain commit guards across request cancellation
* fix(multipart): preserve commit task error context
* fix(multipart): reclaim verified orphan upload staging (#8572)
* fix(multipart): reclaim verified orphan upload staging
* fix(multipart): share orphan guards across matching lock domains
* fix(multipart): preserve orphan cleanup task error context
* fix(ecstore): box guarded delete transition identity
* fix(multipart): keep NoSuchUpload when orphan recovery cannot prove absence (#8587)
Recovery is a side path of an idempotent Abort. An offline disk, lock
contention, partially overlapping lock domains or unreadable bucket
metadata all stop the staging-absence proof before any deletion; those
used to propagate as 503/500, where the base answered NoSuchUpload. They
now keep that answer and delete nothing; only failures inside the
deletion task remain request failures, because a retry can finish them.
---------
Co-authored-by: Chris <anzhengchao@gmail.com>
* feat(diagnostics): attribute storage reads to request origins
Port the diagnostics instrumentation from its experiment base onto main
without carrying the base branch's unrelated changes.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(diagnostics): consolidate read context scopes
Keep caller and entry provenance in one task-local context, combine the object-read scope, and classify source paths without allocating.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Read the connection peer address using the stored extension type and distinguish retryable stale epochs from terminal signature errors. Cover diagnostics and authenticated ReadAll recovery without changing replay protection.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
The outbound target matrix only modeled targets that adopt the forwarded
source ETag, so the post-PUT replica ETag audit was never exercised against
a target that computes its own ETag (AWS S3 and most compatible stores),
and no matrix shape was encrypted. That gap let the SSE-S3 "replica etag
mismatch" regression fixed in #8573 ship unnoticed.
Add an ignore_source_etags mode to the fake S3 target, a ComputesOwnEtags
matrix row that uses it, and an SseS3 object shape (the source runs with the
local KMS). The shape asserts its source ETag is not the plaintext MD5 so
the cell cannot pass vacuously. Against a build without #8573 the new row
fails exactly computes-own-etags/SseS3 with "replica etag mismatch"; with it
the whole matrix passes.
Also correct the #8573 docs and comment that called the replication PUT
checksum the integrity check for encrypted sources: managed-SSE sources
forward no checksum, so their replicas have no post-PUT content audit.
* fix(scanner): persist partial progress after budget cancellation
Separate progress-only cycles from observational and authoritative usage
updates. Keep peer movement leases alive under the parent cycle context
for a bounded drain after the scan budget stops the walk, while preserving
the existing strict publication fences for emitted usage updates.
Skip root rename fences and the usage persister when no update was emitted.
Cover real lease admission, cancellation, bounded retries, and durable
partial-cycle advancement without usage publication or dirty acknowledgement.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(scanner): consolidate publication policy and ownership
Classify emitted updates directly in the publication plan constructor and
exercise that single policy from the namespace-admission tests.
Share the parent cancellation state for read-only progress proof checks
and move the one-use root fence into the persister, avoiding a child token
allocation and a JSON string copy without changing lease or commit rules.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
`cargo clippy --all-targets -- -D warnings` fails on main since #8535:
`CurrentDeleteGeneration::Present` carries a `CurrentDeleteTransition`
(three Strings, an Option<String>, a 32-byte identity and two small
fields, ~211 bytes) while `Absent` carries nothing, which trips
clippy::large_enum_variant. The workflow only runs clippy on pushes to
main (`if: github.event_name != 'pull_request'`), so the PR CI stayed
green and main's CI has been red since 606d8a3a.
Store the transition behind a Box so the enum is pointer-sized plus the
small fields. The value is transient ("never persisted in object
metadata") and its serde form is unchanged, because serde treats Box<T>
transparently; PartialEq/Clone/Debug derive through it. The two tests
that matched the struct through the Option now bind the Box and check
the same fields in a guard.
Claude-Session: https://claude.ai/code/session_01CezCdjE9AdShFUi9tNk797
Co-authored-by: Claude Fable 5.1 <noreply@anthropic.com>
New encrypted writes store a keyed HMAC fingerprint as the object ETag
(docs/operations/encrypted-etags.md). Replication forwards that ETag on
x-rustfs-source-etag, but a target that computes its own ETag (AWS S3 and
most compatible stores) answers the plaintext PUT with the MD5 of what it
received. Both values are 32 hex characters, so verify_single_part_replica
treated the fingerprint as a comparable MD5 and failed every single-part
SSE-S3 / SSE-KMS replica with "replica etag mismatch"; MRF and resync then
retried the object forever. RustFS and MinIO targets adopt the source ETag
and were unaffected.
Exempt sources whose stored ETag cannot describe the wire bytes: any
managed-SSE or SSE-C source, decided by the existing replication
source-encryption classifier. The checksum header on the replication PUT
remains the integrity check for those objects; plaintext sources keep the
audit unchanged.
Claude-Session: https://claude.ai/code/session_01CezCdjE9AdShFUi9tNk797
Co-authored-by: Claude Fable 5.1 <noreply@anthropic.com>
A user-bucket delete fans out through the delete-transaction RPC. When a
participant answers Unimplemented (a peer still running a release without
that RPC, or a protocol-version mismatch) the coordinator reports
StorageError::UnsupportedDisk, which had no S3 mapping: clients received a
500 InternalError whose message was the variant's Display text,
"drive does not support O_DIRECT". That text describes the startup drive
probe and sends an operator mid-upgrade after the wrong cause.
Map UnsupportedDisk to 503 ServiceUnavailable with a constant message that
names the protocol-version cause and the remedy (finish upgrading every
node, then retry). The typed source is retained for diagnostics and no
Retry-After is added, since retrying the same node does not help until the
cluster upgrade completes. No request path other than delete recovery
produces this variant; the startup drive probe still fails startup as
before.
Claude-Session: https://claude.ai/code/session_01CezCdjE9AdShFUi9tNk797
Co-authored-by: Claude Fable 5.1 <noreply@anthropic.com>
* fix(ecstore): retain system metadata repair ownership
Return system metadata convergence failures to the fenced writer after
committed cleanup instead of submitting an unexecutable MRF handoff.
Drain system rename tails before acknowledging and preserve ordinary
incarnation-bound object repair.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(ecstore): separate PUT commit and completion outcomes
Keep committed metadata writes on their retained cleanup owner when the
writer must handle repair. Propagate the completion error at the API
boundary without a duplicate temporary-data deletion or worker wait.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): scope repair completion to pool metadata owners
Keep ordinary system metadata quorum-compatible and explicitly select
owner-observed repair completion for fenced pool metadata CAS writes.
Seed format-heal metadata before injecting the missing-format fault.
Preserve degraded bucket recreation and test all completion modes.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Map DiskFull through the existing StorageFull S3 response contract instead
of falling back to InternalError. Preserve the typed cause and keep lock
retry advice separate from capacity failures.
Reuse the PUT storage-failure fixture to cover capacity refusals and the
existing read-quorum stages without adding a runtime normalization layer.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Retain typed retryable catalog lock failures and route S3 publication
errors through the canonical storage conversion for bounded metrics,
public-message redaction, and existing retry advice.
Borrow CAS results for metrics instead of cloning opaque error sources.
Cover authorization under a real publication writer, HTTP serialization,
source preservation, recovery, and established catalog error categories.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): treat replication status writebacks as status-class hits
A replication status writeback (persist_replication_state_if_current in
Update mode, including the heals the scanner queues during its own walk)
marked the bucket dirty on the namespace path: it advanced the dirty-usage
generation, woke the scanner, reached the durable dirty journal and
entered the activity snapshot. Any replicated bucket therefore made every
scanner cycle Superseded, the authoritative usage baseline was never
certified and usage freshness stayed stale for as long as replication ran
(#8375).
The writeback is now status class: record_status_class_mutation records
only the process-local producer coverage bit and nothing else. There is
no rescan queue for it, because a deployment with an active replication
rule already walks every bucket on every cycle
(ScannerMaintenanceFeatures::needs_regular_cycle) and that walk refreshes
replication_stats. The routing lives in a named, unit-tested function in
rustfs/src/storage/storage_api.rs; tier-expiration cleanup removes data
and stays on the namespace path.
No persisted format, protocol, admin API or configuration changes.
This is phase 1 of docs/architecture/scanner-per-bucket-convergence.md,
which this change adds together with its index entry.
Refs #8375, #8494, rustfs/backlog#2816.
* fix(scanner): refresh replication statistics during maintenance
Refresh compacted prefixes and completed bucket caches during replication maintenance. Bind set execution reuse to the observed replication statistics so a same-cycle retry cannot restore older counters.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): avoid expanding the legacy S3 DTO surface
Decode the existing replication configuration type from a JSON fixture instead of adding direct S3 DTO references to a new file. Preserve the compacted-prefix and same-cycle assertions and the footprint ratchet.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): seed the ordinary-timeout peer fixture under the default drive deadline
The one-second ENV_DRIVE_MAX_TIMEOUT_DURATION in
target_ordinary_timeout_keeps_its_physical_namespace_owner wrapped the
whole test, so the fixture's write_metadata and the final read_version
were bounded by it too. On a loaded CI runner the seed took longer than a
second and the test failed with "seed real metadata: Timeout" before the
paused rename under test ran. Only the rename now runs under the
one-second deadline; the fixture and the tail read use the default.
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
Add a one-second Retry-After hint at the canonical S3 error conversion
only for ServiceUnavailable responses retaining a typed lock timeout.
Keep existing error codes, source chains, and lock budgets unchanged.
Cover actual HTTP/XML serialization, nested causes, private-resource
redaction, and unrelated disk/quorum/text failures. Document the response
contract and the limits of log-count and five-second timeout attribution.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): remove needless returns from Linux disk helpers
* fix(test): verify encrypted purge replicas by version body
* fix(test): expire namespace timeout after fixture preparation
* fix(ci): remove remaining needless collection and borrows
* fix(test): wait for active admin heal at interruption checkpoint
* fix(heal): unblock automatic replacement recovery
Repair bucket publication directories before adopting survivor delete proofs.
Keep explicit empty-volume removal after proof settlement and preserve the
admitted bucket incarnation for administrator replay.
Discover unfinished intents across every local set and resume the durable
owner with its exact target scope before admitting new sibling replacements.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): route scanner fixtures through the storage boundary
Expose the existing disk-layout bootstrap symbols as test-only aliases in
heal::storage_api and use that boundary from scanner recovery regressions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(heal): index replacement discovery within each scan
Keep a single endpoint-keyed disk inventory with first-snapshot precedence
and deterministic discovery order. Index local target lookups and move
resume state into generation candidates instead of cloning it.
Retain fresh durable reads and the existing conflict and mutation fences.
Cover duplicate disk handles, endpoint uniqueness and discovery ordering.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): retain committed journals in recovery fixtures
Build one certified survivor delete decision for both replacement and
empty-volume removal tests. Clear target contents without moving its root
inode so Linux disk handles observe the same empty target. Drain PUT tails
and assert the proof remains before the real Heal entry.
Expose the existing recovery state through the ECStore disk API for typed
fixture checks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): use server stack for replacement regression
The replacement regression polls the composed Heal future on libtest's
smaller calling-thread stack and aborts before reporting an assertion.
Run it on a bounded 8 MiB test thread and Tokio workers, matching the
debug server's stack budget. Keep all storage and object assertions intact.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): prepare pinned Compose for Connect acceptance
Install the verified Compose CLI through one local action shared by all 11 connected acceptance entry points. Publish only checksum-verified binaries and keep daemon, provenance and timeout gates unchanged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ci): use daemon-visible Connect temporary inputs
Match the existing official Connect acceptance TMPDIR contract in all 11 real E2E invocations so daemon bind mounts can read generated inputs. Preserve key modes, read-only mounts and cleanup checks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
The shared connected preflight uses uuid.uuid7, which is unavailable in older runner Python environments. Select Python 3.14 with the existing pinned setup action in all eleven acceptance callers.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(replication): skip version-addressed marker pre-check on targets that mint their own version ids
* fix(replication): keep bodiless 403 fail-closed and verify resynced markers on targets that mint their own ids
---------
Co-authored-by: Chris <anzhengchao@gmail.com>
* fix(build): pin gnu glibc baseline to 2.31 and report compile target in version metadata
gnu release binaries were built natively on Ubuntu 24.04, embedding
GLIBC_2.38/2.39 symbol references while the RPM/DEB metadata promised
glibc >= 2.31, so Rocky/RHEL 9 (glibc 2.34) could not run them (#8062).
The two linux-gnu legs now build through cargo-zigbuild pinned to the
2.31 baseline (same-arch; zig acts as the linker), with post-build
guards asserting both the embedded version metadata and the highest
referenced GLIBC symbol version, keeping the package declarations
honest.
Version metadata itself now comes from cargo's TARGET cfg instead of
shadow-rs' host stamping, so builds whose host differs from their
target (cross compilation, musl targets on a glibc-hosted toolchain)
report the platform they were compiled for (#8048 follow-up).
The cross toolchain (zig 0.14.x, cargo-zigbuild 0.23.4) is pinned in
the setup action now that it is load-bearing for releases, the build
job gets an explicit matrix-independent name so the connect-*
acceptance workflows keep matching it when matrix fields change, and
the preview-release workflow contract is updated for the TARGET_ARG
build commands.
Fixes#8062
Follow-up on #8048
* fix(build): enforce GNU ABI floor and canonical target metadata
Pin Zig 0.17.0 and cargo-zigbuild, isolate cross-toolchain caches, and
build GNU releases against the declared glibc 2.31 floor. Validate both
release ELF binaries using their loader version requirements.
Generate target metadata once through shadow-rs and check the actual
release version output without adding a parallel metadata facade.
Refs: rustfs/backlog#2824
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(build): reuse GNU release profile across binaries
Switching the CLI back to the default strip profile restarted 419
compilation units after the server build. Keep the profiling build
profile for both binaries, then strip only the CLI artifact.
Retain serial links, server profiling symbols, and post-strip ABI gates.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(build): limit release artifacts to the rustfs server
Build only rustfs in the release workflow and remove the CLI build,
strip, and packaging paths. Preserve GNU profiling symbols and catalog
sidecars, and align strict acceptance archive readers with the new set.
Exercise all six build targets, Linux package checks, and all four
strict acceptance extractors using their actual workflow scripts.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: majinghe <42570491+majinghe@users.noreply.github.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(deps): patch profiling dependency for RUSTSEC-2026-0344
Vendor the published Pyroscope package with an object 0.40 dependency and
lock ruzstd 0.9.1. Preserve runtime sources and profiling features, add
bounded decoder regressions, and run the patched package in audit CI.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Signed-off-by: Hauser <housemecn@gmail.com>
* fix(deps): correct vendored pyroscope documentation typos
Correct copied comments and changelog spelling for the repository typo
check, and describe these comment-only changes in the vendor provenance.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Signed-off-by: Hauser <housemecn@gmail.com>
* fix(ecstore): refresh compact transition proof per test case
Install the short-lived homogeneous fleet proof immediately before each
kill-point transaction. Earlier cancellation and recovery work must not
age the next case's writer capability fixture.
Report an early transition result instead of waiting for an unreachable
kill point. Preserve cancellation, remote-owner and payload assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Signed-off-by: Hauser <housemecn@gmail.com>
---------
Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Tie watchdog cancellation to response future ownership before the first
poll, and prefer cancellation when the watchdog deadline is also ready.
Preserve completion logging and genuine slow-request warnings.
Add paused-clock regression coverage for dropped, completed, panicking,
and still-pending request futures.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
refactor(heal): index replacement generation reconciliation
Reconcile owned records and their definitive sources in one pass. Group claims by target slot and use a shared-anchor fast path while retaining pairwise ambiguity checks.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Read the optional socket peer extension supplied by external ingress so
API and Console client limits remain effective without trusted proxies.
Keep validated client precedence and the existing missing-peer policy.
Exercise the full external stack across HTTP request versions, direct
IPv4/IPv6 peers, forged headers, and distinct trusted proxy clients.
Align API and Console fixtures with the production extension contract.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
fix(ecstore): suppress clippy too_many_arguments on rename_data_commit_from_observations
The function takes 9 slice parameters for the renamedata commit phase.
Annotate with #[allow(clippy::too_many_arguments)] to match the existing
codebase pattern for internal multi-slice commit helpers.
Group disk observations into a borrowed struct to keep the commit helper
within Clippy's argument limit without changing quorum snapshot logic.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Capture the authenticated request access key when building the audit entry
and preserve it through completion instead of replacing it with root
credentials. Resolve remotehost from validated client context or the
socket peer, and ignore untrusted forwarding headers.
Cover request identities, completion outcomes, client address precedence,
and audit serialization without credential secrets.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Keep same-name buckets in independent clusters separate while deduplicating
replicated usage observations. Document the existing scanner-backed exporter
and cover its gauge contract and cluster-scoped queries.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): bound scanner witnesses by the reported schedule
Require a fresh completed observed walk and account once for planned
superseded waiting, preserving the active-cycle execution budget.
Cover invalid schedules and early wakeup, and refresh exact platform
selection digests without removing existing tests.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): refresh nightly scanner budget membership
Record the three scanner budget regressions in both platform nightly
selection digests, preserving every previously selected test.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Preserve canonical claim encoding for the signature tamper test and pause the admin cancellation fixture at its existing run fence instead of durable deletion.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): reuse observations and expose complete usage
Allow superseded retries to reach the existing validated cache planner while
bootstrap remains pending. Serve complete observations in server info without
changing quota authority or dirty acknowledgements.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): route fixture setup through storage boundary
Keep the single-disk scanner fixture on the existing storage_api boundary
instead of importing the ECStore API facade directly.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
The conditional_get_304_uses_metadata_without_decoding_damaged_data test
constructed the data directory path from info.data_dir.to_string(), but
the on-disk directory name may not match the UUID string form. Switch to
iterating subdirectories of the object path (matching the
delete_object_part_shards helper) so the test is robust regardless of
the data_dir naming convention.
Verified: cargo nextest run -p rustfs -- conditional_get_304 → PASS
* test(upgrade): separate rc.5 data and candidate query checks
Verify historical fixture bytes before upgrading without requiring the
pinned rc.5 reader to satisfy the candidate's cross-part range contract.
Reuse the complete-body oracle and retain all upgraded range, partNumber,
attributes and replication assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): replace timing races with recovery evidence
Prove no_lock batch progress with the existing cleanup barrier while the
caller retains its guard. Check namespace counters and every drive's
metadata absence rather than using a one-second disk I/O deadline.
Keep durable ILM's manual recovery as the sole tier journal consumer and
verify exact migrated input before retaining the original recovery stats,
receipts and remote-version assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
fix(ecstore): preserve retry evidence during delete cleanup
Bind normal cleanup to the coordinator transaction after quorum succeeds, and remove the rollback backup before marked data. Preserve data and markers if backup cleanup fails.
Add deterministic LocalDisk crash and retry regressions plus real four-disk single and batch coordinator coverage. This prevents one post-quorum cleanup window; it does not resolve ambiguous inline or historical residue in #8464.
Co-authored-by: Zhengchao An <overtrue.us@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(s3): evaluate conditional reads before opening object bodies
Reuse locked metadata snapshots for conditional GETs and unify HEAD
preconditions and cache headers. Preserve body-cache hooks and validate
encryption metadata and key authorization before returning bodyless errors.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(s3): unify conditional reads at metadata quorum
Apply scoped metadata conditions to the existing reader pipeline instead
of maintaining parallel prepared-read branches. Preserve quorum checks,
early-stop, coalescing, and cache-hook behavior on condition misses.
Track metadata-only termination through selection and reject body access
or a changed decision. Keep concrete reader futures off request stacks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(s3): strengthen conditional read acceptance evidence
Assert zero shard, decode, cache-fill, and remote-body calls on matching
conditions with live positive controls. Exercise GET and HEAD through
s3s and Hyper with conditional-header and precedence matrices.
Add reproducible paired application-read benchmarks with isolated
metadata controls and strict drift, artifact, and resource gates.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(s3): remove obsolete conditional comparison helper
Keep ETag comparison tests on the canonical read-condition evaluator,
remove unused date-trait imports, and name the HTTP case type.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(s3): validate full conditional etag fields
Reject adjacent tags and malformed trailing list members before accepting a
match. Keep the existing request-scoped metadata read and authorization order,
while removing redundant validation wrappers and unused benchmark overrides.
Replace simulated phase coverage with real 304/412 cache-fill probes and extend
HTTP/1.1 and HTTP/2 ingress regressions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): cache terminal conditional metadata safely
Preserve quorum-validated conditional metadata when early termination
cancels the remaining fanout. Restrict those entries to terminal GET
readers; body and full-layout consumers still obtain their own metadata.
Serialize cache publication per key so conditional entries cannot replace
complete layouts or renew their TTL. Retain generation fencing and the
final selected-metadata predicate check before any body access.
Cover real four-disk hedging, nonterminal body and range reads, consumer
isolation, generation races, atomic publication and actual cache expiry.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(log-analyzer): align heal writer failure rule with current logs
Match the current structured all-targets failure, retain legacy log support, and reject partial or unrelated failures.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Reject causal cycles before source repair and share conservative backup
classification between discovery and inspection. Fence public raw deletion
and derive exact-key removals from successful settlement without an extra
metadata read. Preserve the existing physical phases and strict source checks.
Make outage and renewal fixtures deterministic without weakening their
convergence assertions, and complete strict TLS/RPC lint cleanup.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): bound sentinel tests by the lock wait, not recreation IO
Both bucket incarnation sentinel tests gave the bucket recreation that
follows the paused delete (force delete_bucket, make_bucket, put_object
on four fsync'ing disks) 10 s in total. The delete releases the sentinel
milliseconds after the barrier, but on a runner starved for IO the
recreation alone can exceed 10 s:
delete_objects_holds_bucket_incarnation_sentinel_through_commit failed
that way on main in run 37760321449 (job 113259251979).
That bound is not what catches a kept sentinel: delete_bucket waits for
it on its lifecycle write lock, which fails after the lock acquire
timeout, and the recreation's expect reports the lock error. Keep that
check and give the recreation 120 s only as a hang guard.
The recreation starts that lock wait before the barrier is released, so
the wait also has to cover the delete's own commit, and the 5 s default
leaves a starved runner little room for it. Run both tests with
RUSTFS_OBJECT_LOCK_ACQUIRE_TIMEOUT=30 and bound the delete, which was
not bounded, by the same 30 s. A kept sentinel still fails the tests,
after 30 s instead of 5 s.
Signed-off-by: Petr Slavyagin <disident47@gmail.com>
* test(ecstore): keep background recovery out of dispatch rollback tests
dispatch_manifest_detached_workers_are_store_bounded_and_shutdown_cancellable
seeds six aborting dispatch manifests, installs a pause hook and expects
its own recovery passes to park four detached workers on it. Its first
store also ran the background tier-delete journal recovery loop, which
runs a pass every TIER_DELETE_JOURNAL_RECOVERY_INTERVAL (60 s). When the
setup took longer than that, a background pass rolled the manifests
back before the hook was installed, no worker paused, and the 30 s wait
failed. This happened on main on a runner starved for IO, in run
37760321449 (job 113259251979).
Build the first store with background recovery suppressed, as the
neighbouring dispatch tests do. The restarted store keeps it: the second
half of the test checks that it picks up the retained manifests.
dispatch_manifest_rollback_bounded_concurrency_reaches_tail_behind_slow_member
and dispatch_manifest_page_timeout_detaches_one_deduplicated_worker_until_convergence
have the same exposure: each seeds an aborting manifest on a store with
background recovery and only then installs its slow-delete hook. They
have not failed in CI, but with the setup stretched past 60 s they fail
the same way. Suppress background recovery for them too.
Signed-off-by: Petr Slavyagin <disident47@gmail.com>
---------
Signed-off-by: Petr Slavyagin <disident47@gmail.com>
* fix(ecstore): recover crash-interrupted delete retries
Retain set-quorum cleanup proof and restore metadata before dropping rollback
markers. Reclaim eligible exact-key residue during explicit delete retries,
with bucket identity, version, retention and namespace fencing guards.
Preserve prefix children and snapshot ownership through batched physical
cleanup, and cover interrupted transactions and failure boundaries.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): route recovery test imports through contracts
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): preserve missing-key deletes at quorum
* feat(ecstore): add certified set-wide delete recovery
Atomically prepare deletion journals and exact targets, publish durable set
receipts, and recover through one fenced disk/RPC core used by startup and
scoped administrator healing. Preserve returning generations, ordinary
missing-key quorum semantics, and legacy rollback wire compatibility.
Retain namespace and volume ownership through late physical operations,
order related transactions causally, and keep proof until full convergence.
Remove the superseded local-only recovery path and add storage, protocol,
RPC, durability and isolated Docker regression coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): reclaim completed multipart delete sidecars
* fix(ecstore): recover multipart sidecars with verified proofs
Recognize native multipart sidecars at the shared recovery boundary and
restore them without treating metadata or proof files as shard payloads.
Validate required proof generations and bind every present live/staged
shard copy to its metadata-bound Merkle proof before restoring metadata.
Cover protected native MPU rollback, split source layouts, missing or
corrupt proofs, and payload corruption with recomputed bitrot checksums.
Add real multipart Docker regressions in both integrity modes.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): settle superseded committed version deletes
Allow a validated committed decision to finish its own data cleanup after
a later decision removes current metadata. Prepared copies need an
inspected same-transaction receipt matching immutable local intent before
promotion, and retain their local journal without importing peer hashes.
Reuse the authority matcher for dry-run and settlement. Cover chained
explicit-version deletions, partial receipt publication, mismatch rejection
and no-resurrection, while retaining the no-decision absence protection.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): clarify delete recovery case label
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): restore recovery CI guard coverage
Keep production error sites visible to the ratchet by placing test modules last. Preserve native encoding errors, group preparation identity and ownership, and reduce RPC enum size without changing the wire payload.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(admin): preserve owned OIDC validation errors
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(ecstore): unify recovery authority and snapshot work
Use one user-bucket legacy settlement boundary and one adoption source predicate for preview and execution. Reuse immutable snapshot digests, consume owned generation metadata, index version membership, and prepare empty witnesses through the canonical journal path.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): preserve delete recovery invariants
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
* feat(tls): reload external certificate snapshots coherently
Pin projected certificate generations, validate complete TLS material, coordinate server consumers, and invalidate outbound RPC caches coherently. Add externally managed TLS Secret support and rotation guidance.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(tls): publish server certificates through a fenced admin API
Add opt-in server-leaf publication with dedicated IAM actions, actual TLS
transport checks, immutable generations, durable captured-token CAS and
idempotent receipts. Preserve independent trust and client identity sources
and distinguish visible publication state from the full serving chain.
Validate 64 TLS tests, 41 TLS-runtime tests, the focused IAM policy test,
and eight live local API scenarios including least privilege and restart.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(admin): route certificate handler types through S3 facade
Use the existing admin S3 facade to keep direct s3s imports within the footprint ratchet.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(admin): include TLS certificate routes in route matrix
Account for the registered certificate-state GET and certificate publication POST without changing route behavior or weakening matrix assertions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(tls): reconcile startup trust before skipping reloads
Compare the initialized listener bundle with coherently published outbound material, retain startup trust and client identity when sources disappear, and cover independent startup rotations through real reload passes.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(tls): reuse pinned generations and prepared listener state
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(tls): preserve startup trust source requirements
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
A child prefix can be deleted after its parent listed it and before scan_folder opens it. read_dir then returned NotFound, which propagated through the compacted subtree and dropped the whole top-level child (child_scan_failed), so the cycle never produced a durable usage snapshot under continuous deletes.
Treat NotFound on open like a directory that vanished during iteration for non-root folders. A missing bucket root still reports NotFound so namespace removal handling is unchanged.
Refs #8478
Co-authored-by: Anton <5527364+basic-system@users.noreply.github.com>
use_stdout was forced to true whenever the root RUSTFS_OBS_ENDPOINT was
empty, so a deployment that sets only a per-signal endpoint such as
RUSTFS_OBS_TRACE_ENDPOINT could not turn the stdout exporters off: every
exported span was also printed to stdout as a multi-line text block.
Count a non-empty trace, metric or log endpoint as a configured endpoint.
With no endpoint at all the stdout default is still forced on. Add a test
covering each per-signal endpoint and an empty value.
* fix(storage): preserve heal failures and timeout responses
Stop repairs with no writable target before opening source readers. Consolidate target failure aggregation, preserve typed causes, and distinguish all-ignored diagnostics from actual successful nil entries. Map typed disk timeouts to retryable S3 responses without changing quorum decisions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(heal): unify staging failure cleanup
Route data-stage failures through one local result boundary after temporary
readers and writers are released. Preserve typed report failures, outer
reconstruction errors, partial repair, and the existing commit fences.
Exercise actual source loss after second-part writer admission using the
existing test pause registry. Assert all staged parts are removed, committed
metadata stays unchanged, and restoring the source allows a full-byte retry.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: Chris <anzhengchao@gmail.com>
* fix(scanner): bound old-cache lookups and recover checkpoint saves
Keep missing child lookups read-only and preserve the checkpoint receiver
after ordinary persistence errors. Reload on stale CAS or indeterminate
revision refresh, and report confirmed periodic saves separately.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): remove redundant checkpoint error conversion
Return the existing StorageError directly so strict Clippy passes.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* docs(scanner): clarify checkpoint persistence guarantees
Distinguish a confirmed periodic save from validated restart coverage.
Keep adoption and subtree-skip requirements explicit.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): preserve resumable periodic coverage
Materialize active ancestor accounting in bounded periodic snapshots and
seal completed coverage independently of raw enumeration state. Preserve
durable coverage during early resumed enumeration and exclude unfinished
out-of-order heal work from periodic and cancellation receipts.
Reuse ancestor frame slots to avoid growing child-set copies on descent,
retain compacted accumulator safety, and report checkpoint adoption resets.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): reject covered active ancestors in checkpoints
Check every suspended ancestor alongside the current folder before
certifying completed coverage. An unfinished covered ancestor must not
become a resumable subtree merely because its descendant sorts later.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): retain an incomplete root for missing namespaces
Create the empty bucket root explicitly at the missing-namespace boundary.
Preserve nonempty durable caches and keep namespace results unpublished.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix: repair s3s footprint ratchet violation, clippy warnings, and stack overflow
- Replace s3_error! macro with S3Error::with_message in ecfs.rs to keep
s3s footprint ratchet at baseline (1586) after retention validation refactor
- Remove redundant clone on Copy type in list_objects.rs (clippy::redundant_clone)
- Remove clone_on_copy calls in access.rs test (clippy::clone_on_copy)
- Use manual thread with 8MB stack for heal_concurrent_delete_test to fix
stack overflow on macOS (consistent with sibling tests in same file)
* test: align CI assertions with version authorization rules
* fix(listing): continue versioned delimiter listings from raw key
Versioned listings with a delimiter could end a page with
IsTruncated=false while keys remained past the folded scan window.
Continue from the last raw scanned key; a folded prefix cannot
advance forward_past on versioned walks.
Fixes#8423
* fix(listing): filter resumed version prefixes
Apply the ListObjectVersions CommonPrefixes key-marker boundary before
page truncation and resume at the last raw key represented by the final
returned prefix.
Refs rustfs/backlog#2791
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: RustFS <hello@rustfs.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(lifecycle): coordinate tier free-version recovery scans
* fix(lifecycle): remove obsolete recovery enqueue entry point
* test(upgrade): wait for writers after each rolling replacement
* fix(ecstore): keep object deletes running when the caller is dropped
DeleteObject and DeleteObjects commit on every disk and then run a
separate cleanup pass, both inside the request future. When the client
disconnects, hyper drops that future and the delete stops between the
two passes: xl.meta is gone, but the rollback backup and the marked data
dir stay on disk, hidden from listings and never reclaimed (#6898).
Run the ECStore delete entry points on a detached task tracked by the
instance context. The task owns the object locks, both disk passes and
any rollback, so dropping the caller only stops the wait. Server
shutdown waits up to 30s for detached deletes after the HTTP drain.
Two smaller leaks of the same kind: a cancelled data-dir delete no
longer leaves its snapshot-lease entry marked as deleting forever, and
DiskStore::delete_versions releases its waiting slot through a guard.
Signed-off-by: Petr Slavyagin <disident47@gmail.com>
* fix(ecstore): finish committed delete residue on repeated deletes
Residue that an older build stranded (#6898) has no xl.meta, so deleting
the key again reports it missing and leaves everything in place. On a
disk, a delete-data.<T> marker in one of the object's data dirs proves
that transaction T removed the metadata there and committed: the data it
marked can no longer be read, healed or rolled back on that disk.
When delete_versions or delete_version finds no xl.meta, remove what the
cleanup pass of every transaction proven that way would have removed,
under the object's metadata lease. The rollback backup goes before the
marked data dirs, so an attempt cut short still leaves the marker for
the next one. Reserved markers, rollback backups without a committed
marker and directories that also hold xl.meta or other keys are left
alone. The disk result stays FileNotFound; the extra cost is one
directory read per missing key inside the disk call that already runs,
with no new RPC, and the read stops at the first child that is not a
data dir. Finished transactions are counted in
rustfs_disk_delete_residue_finished_total instead of logged per object.
A single DeleteObject in an unversioned bucket answers a missing key
from the metadata read quorum without reaching the disks, so existing
residue is reclaimed by DeleteObjects or by the empty-listing purge.
Signed-off-by: Petr Slavyagin <disident47@gmail.com>
* fix(ecstore): purge the rollback backup of a committed delete on listing
After an empty listing, the orphan purge (#7955, #8261) already removes
data dirs that carry a committed delete-data.<T> marker, but it treated
the <object>/<T>/xl.meta.bkp rollback backup of the same delete as data
and blocked the whole object directory and its ancestors. Residue left
by an abandoned delete (#6898) therefore survived the listing, and
DeleteBucket kept failing with BucketNotEmpty.
Treat a UUID dir that holds only xl.meta.bkp as purgeable when a
purgeable data dir of the same object on the same disk carries the
committed marker of that transaction. A backup without such a marker
still blocks as before, since it may be needed to roll the delete back.
The other purge gates are unchanged: every disk of the set must be
online, and the backoff applies. xl.meta or unmarked data on any disk
blocks that directory and its ancestors on every disk. Like a marked
data dir before, a backup below such a directory is still removed from
a disk that holds no xl.meta there and proves the transaction with its
own marker.
Signed-off-by: Petr Slavyagin <disident47@gmail.com>
* fix(ecstore): move caller-held delete locks into the detached delete
A force (recursive) delete takes the bucket lifecycle write lock in the
S3 handler and passes only its fence down, so the store does not take
that lock again. Since the delete runs on a detached task, dropping the
request released the lock while the delete kept running: a PUT under
the same prefix could succeed and then be removed by the old delete.
Lifecycle expiry had the same shape with its table-bucket publication
read lock, of which only the lock-lost signal reaches the delete.
Add ECStore::delete_object_with_tier_delete_journal_and_guards. It
moves the caller's guards into the detached task and releases them
after the delete and its listing bookkeeping. The force-delete handler
and lifecycle expiry hand their guards over; DeleteObjects holds none.
Signed-off-by: Petr Slavyagin <disident47@gmail.com>
* fix(startup): keep unclean-shutdown markers while deletes still run
Shutdown waits up to 30s for detached deletes, but it cleared the
unclean-shutdown markers even when that wait timed out. A delete then
cut short by the runtime teardown went unnoticed: the next startup
skipped the erasure-set heal that the marker triggers.
Clear the markers only when the heal handoff completed and every
detached mutation finished, and log that they are kept otherwise. Wait
after the FTP, FTPS, SFTP and WebDAV servers have stopped as well,
since their deletes take the same detached path.
Signed-off-by: Petr Slavyagin <disident47@gmail.com>
* test(ecstore): simulate tier-delete crashes below the detached delete
The chunk crash-boundary tests model a crash by aborting the task that
runs delete_object_with_tier_delete_journal while it is paused at a
TierDeleteChunkTestBarrier. That entry point now runs the delete on a
detached task, so aborting the caller no longer stops it: the delete
resumed on the old store once the barrier was dropped, and building the
restarted store on the same disks tripped the tier-delete journal proof
assertion (tier_delete_chunk_crash_boundaries_resume_without_skipping_sources
failed in CI).
Run the delete through handle_delete_object_with_journal, the body
below the detached task, so the abort stops it at the barrier as before.
tier_delete_chunk_missing_child_with_journals_fails_closed used the same
pattern; its resumed delete only failed fast because the tier rejects
removes, so it gets the same change.
Signed-off-by: Petr Slavyagin <disident47@gmail.com>
---------
Signed-off-by: Petr Slavyagin <disident47@gmail.com>
Reuse the existing UTF-8 byte minimum for credential creation so long service account secrets remain intact. Keep generated secrets at 40 bytes and document older receiver and import constraints.
* fix: resume stalled GET bodies
Retry a stalled source through the existing identity-fenced resume budget so transient stalls do not truncate committed responses.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix: preserve data usage read quorum errors
Apply the existing system-volume error mapping to snapshot body reads so a metadata-volume outage remains a retryable quorum failure.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix: handle transient heal lock failures
Align erasure-set heal classification with the shared lock taxonomy and avoid duplicate error logging for retried scanner journal writes.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): scope observational publication leases
Separate ordinary namespace commit churn from data-movement fences and retry transient lease acquisition conflicts. Bind observational leases to the observed usage object while preserving strict authoritative publication checks.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): expect namespace admission conflict
Assert the retryable namespace-specific result when a commit finishes while strict lease admission awaits its snapshot.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(connect): add headroom to real performance probes
Give real filesystem and object integration probes enough bounded time on slow CI runners, and keep cleanup independent from measurement latency. Use a genuinely unwritable Linux fixture when tests run as root.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(targets): support Kafka SASL without TLS
Propagate the explicit Kafka transport mode through notify and audit targets while retaining TLS as the default.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* chore(deps): update RustFS Kafka crates to 1.4.0
Use the published Kafka clients after the SASL plaintext transport support release.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Merge main into gateway/integration every weekday with a --no-ff merge
commit; abort a conflicting merge and open a sync/<source>-<date> pull
request listing the conflicting files instead. Run ci.yml on pull requests
that target gateway/integration so the branch ruleset's required checks can
report, and document both in the CI gate matrix.
Refs rustfs/backlog#2736, rustfs/backlog#2734
* fix(ecstore): skip warning for absent .minio.sys volume
Startup MinIO migrations read from .minio.sys and treat its absence as expected, but resolve_read_all_result logged a disk_local_read_version_fallback warning for every such read. Keep the access check and the VolumeNotFound return, and skip only the warning for the migrating metadata volume.
Refs #8372
* test(ecstore): cover .minio.sys descendants and lookalike volumes
---------
Co-authored-by: Chris <anzhengchao@gmail.com>
* feat(table-catalog): support disabling empty catalogs
* fix(admin): use the storage error domain module
* style(admin): format the publication fence error
* fix(table-catalog): use shared API error constructors
* fix(tier): drop reserved internal headers from transition PUT
* test(tier): transition PUT against a target rejecting reserved headers
The fake S3 target gains a mode that answers 400 InvalidArgument to any
PutObject or UploadPart carrying an x-minio-internal-* request header,
the rule MinIO and the Storj gateway enforce. RT-14 transitions an
inline and a non-inline object through a real server to that target and
asserts the stored bytes, both transition identity pairs and read-back.
The e2e-full linux selection digest is refreshed for the new test.
---------
Co-authored-by: Vector <vector@wcomp.io>
Co-authored-by: cxymds <cxymds@gmail.com>
fix(compose): Refactor volume paths and add service_completed_successfully
The volume paths for the volume-permission-helper service have been updated and the command has been adjusted to reflect the new paths.
Ensure that the volume-permission-helper service runs successfully before starting the rustfs service.
Signed-off-by: Sven Gottwald <2502366+svengo@users.noreply.github.com>
The test used
with default stack size, but
the 16-disk deep heal path overflows the default macOS thread stack
(~8MB). Switch to an explicit with 32MB stack
and manual tokio runtime, matching the pattern used by sibling tests
in the same file.
Verified: test passes in isolation after the change.
* fix(auth): return ExpiredToken for retained STS credentials
Validate session identity independently of credential expiry in both IAM
rejection and claims validation, and preserve typed S3 errors at the caller.
Keep token binding, disabled-account precedence, and service-account behavior.
Add exact expiry, IAM, and HTTP/XML regression coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): synchronize the metadata slowtail hedge regression
Park the slow metadata task at a test-only fault checkpoint and release
healthy reads after the fault is active. Assert the spare response and
cancelled-task drain without imposing a 300 ms disk/scheduler deadline.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ilm): synchronize copy compensation transition stages
Observe automatic compensation reaching the mock tier PUT checkpoint before
waiting for the final metadata commit. Assert forced enqueue failure,
automatic backfill, one completed tier upload, and payload integrity.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Consolidate the three page collectors, preserve completed worker failures, and abort nested merges when their owner is dropped.
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
timeout-minutes requires a numeric value, but inputs.pool_timeout_minutes
is a string, so '${{ inputs.pool_timeout_minutes || 240 }}' evaluated to
the string '240' and the runner rejected the template: 'An error occurred
when attempting to determine the step timeout ... Unexpected value 240'
(chain run 36505625402 job at 02:25:52, standalone run 36393453114 at
07:46:37). Both pool runs since #8155 merged have therefore executed
without the intended step budget. Wrap the expression in fromJSON and
update the policy test that pinned the broken literal.
timeout-minutes requires a numeric value, but inputs.pool_timeout_minutes
is a string, so '${{ inputs.pool_timeout_minutes || 240 }}' evaluated to
the string '240' and the runner rejected the template: 'An error occurred
when attempting to determine the step timeout ... Unexpected value 240'
(chain run 36505625402 job at 02:25:52, standalone run 36393453114 at
07:46:37). Both pool runs since #8155 merged have therefore executed
without the intended step budget. Wrap the expression in fromJSON and
update the policy test that pinned the broken literal.
* fix(scanner): isolate and coalesce dirty usage journals
Bind dirty replay records to a stable node owner so peers cannot overwrite
or delete another node's pending journal. Replace the unbounded command
queue with bounded coalesced state and revision-aware background saves.
Keep legacy records isolated and enforce replay byte limits with conservative
whole-bucket or unverified fallback. Add publication-stage diagnostics and
storage regressions for ownership, clearing, retry, and restart behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): collapse confirmed journal clear condition
Use a let-chain to retain the generation fence before removing a confirmed
bucket and updating its scope byte accounting. Satisfy collapsible_if
without changing journal clearing behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(oidc): ignore groups without a matching policy at login
OIDC login failed with "OIDC policy mapping did not resolve to current
policies" whenever any mapped group lacked a policy of the same name.
Directory-backed providers such as Active Directory always emit groups
like `DOMAIN\Domain Users` that can never be mapped, so group-based
authorization was impossible there.
Keep only policy names that resolve to an existing policy and are valid
in session claims, and reject the login only when none remain. The
signed `policy` claim still lists only resolved names, so request-time
evaluation and site replication receivers keep their invariant.
Refs #8163
* fix(oidc): only ignore unmapped groups-claim values
Limit the relaxed resolution to policy names derived solely from the
groups claim. Names from ROLE_POLICY, a dedicated CLAIM_NAME claim, or
an explicit IAM policy mapping must still all resolve.
Reject the login when a mapped name refers to an existing policy whose
name is not allowed in session claims: dropping it could remove an
explicit Deny and broaden access.
Claim-unsafe names are only checked against the in-memory policy cache
and never passed to storage-backed policy loading.
Refs #8163
* docs(oidc): document ignorable roles claim values and cover wiring
Roles claim values are merged into the canonical groups, so values
without a matching policy are ignored like groups-claim values. This
covers built-in provider roles such as Keycloak's `offline_access`.
Document that in the field and method docs and in the provider
requirements, and pin it with a test.
Assert that the OIDC authorization carries the group claim policies so
a regression in the wiring cannot silently disable the relaxation.
Refs #8163
* fix(oidc): ignore group policies only after confirmed absence
merge_policies drops names whose load fails, so a storage or decode
error for an uncached group policy was indistinguishable from a missing
one. The group name was then ignored and the session signed without it,
which could remove an existing Deny that request-time checks cannot
restore.
Add IamSys::policy_exists, which consults the cache and then storage and
reports false only for NoSuchPolicy while returning every other error.
The OIDC binding now ignores a group-derived name only after a confirmed
absence and rejects the login when a lookup fails.
Refs #8163
---------
Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: Chris <anzhengchao@gmail.com>
* feat(iam): expose stored bucket tags to OPA
* fix(ci): lint bucket tag fixtures and register new e2e tests
* fix(ecstore): restore strict Clippy compatibility on Rust 1.99
Use try_update without changing atomic ordering or overflow behavior. Keep
recursive storage futures boxed once at each frame and remove the redundant
async-recursion macro, including its non-recursive SQL planner use. Remove
needless closure borrows and orphaned dependency entries.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
(cherry picked from commit 537c15277a)
* fix(deps): replace yanked yoke-derive release
(cherry picked from commit b54b32b8a9)
* perf(iam): borrow unchanged OPA bucket tag conditions
Reuse clean conditions for bucketless and untagged OPA decisions. Keep the existing clone-and-sanitize path for tagged requests, reserve enrichment capacity, and preserve authoritative lookup errors. Cover borrowed input, reserved namespaces, immutable request state, and both paths in the OPA input regression.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(iam): clarify OPA bucket policy fallback semantics
Document that an OPA tag mismatch remains an implicit IAM denial which a bucket-policy Allow can supplement. Extend the existing S3 contract test to contrast a normal OPA denial with corrupt bucket metadata, whose lookup error must abort the same Allow fallback.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ci): isolate durable progress fixtures from competing IO
Reserve the nextest execution budget for schedule, streaming lock, retirement, MRF checkpoint/crash, and native scanner progress scenarios. Preserve their internal concurrency, existing deadlines, typed failure assertions, and zero-retry policy in default and CI profiles.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: rjregenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
* fix: emit NextPartNumberMarker only when ListParts is truncated
ListPartsInfo.next_part_number_marker was a non-optional usize that
defaulted to 0 and was only assigned when the response was truncated.
The S3 serializer then emitted it unconditionally as Some(0), causing
AWS SDK paginators to loop infinitely on part_number_marker=0 instead
of terminating.
Change the field to Option<usize> (None by default) and set it only
inside the is_truncated branch. The S3 output layer now uses
.and_then() so NextPartNumberMarker is absent when IsTruncated=false,
matching AWS S3 behavior.
Fixes#8208
* fix(s3): honor sparse ListParts markers and verify termination
Resume part listings at the first part above the numeric marker, even
when that marker is absent. Use binary search over the sorted part
numbers and retain the existing exact-tail empty-slice path.
Add storage, XML, and real AWS SDK paginator regressions for empty and
terminal pages, sparse markers, and multipart completion integrity.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ci): register ListParts E2E in selection manifests
Register the intentional paginator regression in the smoke selection
and Linux full-suite inventory. Audit the actual CI test identities
and verify that removing the new case restores both prior digests.
Keep the profile filters, strict digest checks, and Darwin full entry
unchanged. The latter has an independent pre-existing selection drift.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
* fix(scanner): preserve checkpoint children in large prefixes
* fix(ecstore): restore strict Clippy compatibility on Rust 1.99
Use try_update without changing atomic ordering or overflow behavior. Keep
recursive storage futures boxed once at each frame and remove the redundant
async-recursion macro, including its non-recursive SQL planner use. Remove
needless closure borrows and orphaned dependency entries.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
(cherry picked from commit 537c15277a)
* fix(deps): replace yanked yoke-derive release
(cherry picked from commit b54b32b8a9)
* chore: keep scanner repair separate from CI corrections
* test(scanner): verify large-prefix resume and compaction lifecycle
Exercise Normal and Deep scans across cycle and leader changes. Validate
persisted frontiers, bound replay to interrupted boundary objects, and
prove that a completed same-plan sweep restores compaction without losing
object or byte totals.
Refs: rustfs/backlog#2710
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
dav-server queries get_quota once per PROPFIND without a path, so the
driver now reports a single session-scoped (used, total) pair:
- when every bucket visible to the session has a hard quota: the summed
cached bucket usage against the summed quota limits (a bucket whose
usage cache has no scanner snapshot yet counts as zero);
- otherwise: the cluster's usable capacity, the same erasure-aware
used/total the console dashboard shows, cached for 30s since WebDAV
clients poll quota and storage-info fans out to every disk;
- when neither source is available the properties are omitted from the
response, which is the previous behavior.
All inputs are cache or snapshot reads; reporting never triggers a
scanner cycle or a live listing. Backend failures surface as
FsError::GeneralFailure instead of a bogus zero capacity.
Adds a session_capacity_view hook to the protocols StorageBackend trait
(default: no capacity support, keeping quota properties omitted), its
rustfs-side implementation, aggregation unit tests, and an e2e test
covering both reporting modes.
* fix(ci): include pagination regression in full E2E selection
* fix(deps): replace yanked yoke-derive release
* fix(scanner): expose pause backlog replica diagnostics (#8258)
* fix(scanner): expose pause backlog replica diagnostics
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(connect): stabilize runtime profile lease cancellation
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(connect): tolerate delayed schedule startup in CI
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): retry quota reads during usage warmup
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): avoid meta-bucket incarnation self-deadlock
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(test): use persisted incarnation in heal fixture
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(usage): reconcile stale counters after lifecycle expiration (#8108)
* fix(usage): reconcile stale counters after lifecycle expiration
* fix(usage): account lifecycle expiry during continuous writes
* test(usage): run lifecycle usage scenarios on one scanner store
* test(usage): use a Windows-representable pre-mutation offset
* fix(usage): harden expiry accounting recovery and quota checks
Borrow expiry receipt bucket names and avoid allocating a map key on cache hits. Cover cancelled receipts, durable snapshot recovery, and legacy quota admission after scanner confirmation. Use representable timestamp offsets in the quota regression.
Refs rustfs/backlog#2689
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(usage): recover stale persisted counts through the scanner
Seed incorrect complete usage for empty and retained-object buckets, then run the real scanner and publication consumer without further object mutations. Verify durable and admin usage over two cycles instead of writing a corrected snapshot in the test.
Refs rustfs/backlog#2689
Refs rustfs/backlog#2691
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(e2e): bound delimiter pagination fixture concurrency
The 120-second smoke timeout expired after 1018 of 1200 serial fixture PUTs, before LIST ran. Prepare the same objects with at most eight concurrent requests and await every PUT. Retain the timeout and strengthen exact prefix, KeyCount, empty Contents, and continuation-token assertions with phase diagnostics.
Refs rustfs/backlog#2689
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(upgrade): establish a persisted previous-release baseline
Seed the pinned previous-release cluster and restart it once with its data intact before replacing any node. Require every old writer to pass the strict readiness probe and preserve the seed through both mixed phases and the final current cluster. Keep InternalError fail-fast behavior and all existing compatibility deadlines and assertions.
Refs rustfs/backlog#2689
Refs rustfs/backlog#2384
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): bound cancellation metadata persistence waits
Use the system-bucket incarnation boundary now supplied by main PR #8268. Bound the three cancellation waits that previously hung during pool.bin persistence, retaining their remote-generation, target-cohort, and durable-state assertions.
Refs rustfs/backlog#2697
Refs rustfs/backlog#2689
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Chris <anzhengchao@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): retain startup and shutdown failure diagnostics
* fix(test): supply CPU workload for sampler regression
* fix(ci): locate security chain scripts in the workspace
* fix(usage): recover historical counters with generation fencing (#8273)
* fix(usage): recover historical counters during continued writes
Use newer converged scanner snapshots to reconcile stale absolute usage
baselines while preserving concurrent mutation and expiry receipt fences.
Cover durable publication, admin and quota reads, and legacy generations.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(usage): fence snapshots and move preserved cache entries
Apply the cached scanner generation floor before every reconciliation path
and retain it even when an older snapshot happens to match core counts.
Move preserved usage entries instead of cloning their histogram maps under
the cache lock, retaining expiry receipt identity and cancellation fences.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): verify checkpoint takeover and repair dispatch (#8275)
* test(scanner): cover checkpoint handoff and repair dispatch
Drive runtime budget expiry, partial-cycle persistence, leadership claims,
and stale checkpoint rejection between real disk-backed fixture scans.
Verify that a metadata repair beyond the first bounded prefix is saved in
the scanner ledger and dispatched by the MRF consumer.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* ci: isolate scanner fixtures and refresh full e2e membership
Reserve nextest capacity for the real-disk scanner publication and MRF
admission fixtures. Bind both platform membership checks to the reviewed
pagination deadline test added on main.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(scanner): consolidate checkpoint fixture lifecycle
Keep one durable control store across timeout and leadership transitions,
and inject generation advancement into the shared checkpoint scenario.
Check the actual saved metadata path so late-write rejection also proves
that existing checkpoint bytes remain intact.
Centralize MRF fixture isolation and reuse nextest process isolation when
the startup environment already satisfies the test contract.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(obs): distinguish allocator counters from live memory (#8274)
* fix(obs): distinguish allocator counters from live memory
Preserve count/counter semantics and mark requested-byte attribution unavailable when live statistics or sampling are missing. Document sustained multipart memory diagnosis.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(obs): parse allocator statistics from one node
Resolve each statistic before interpreting its shape, avoiding unsupported-field tree scans and mixing data across wrapper scopes. Preserve unavailable-statistics policy and add precedence regressions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): isolate late parity recovery from metadata hedges
Use the existing object-scoped hedge timer barrier in exact-count recovery fixtures. Preserve payload and total-read assertions and verify that the omitted parity disk is read only during late refresh.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(usage): combine identical snapshot retention branches
* fix(test): await HTTP sender readiness in Top RPC fixture
* [release/1.0.1] Gate multipart copy through write admission (#8284)
Gate multipart copy through write admission
Make UploadPartCopy acquire the shared foreground write admission permit before lifecycle locks or source readers so server-side multipart copy cannot bypass the same backpressure used by UploadPart. Document the shared queue semantics and add focused coverage for saturation, cancellation, lock ordering, and disabled admission.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* Gate multipart copy through write admission (#8283)
Make UploadPartCopy acquire the shared foreground write admission permit before lifecycle locks or source readers so server-side multipart copy cannot bypass the same backpressure used by UploadPart. Document the shared queue semantics and add focused coverage for saturation, cancellation, lock ordering, and disabled admission.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix: add UploadPart OOM validation guardrails (#8287)
* docs(release): validate candidates on release branch
* fix(scanner): validate checkpoints against global cycle fence (#8278)
## Related Issues
Related to rustfs/backlog#2701.
## Summary of Changes
Route scanner checkpoint cycle and leader validation through the global store while retaining the owning set for cache persistence, CAS revisions and publication admission.
## Verification
Two independent final-diff source reviews found no issues across correctness, concurrency and durability, test coverage, compatibility, performance and simplicity on head `8b8fe51d092090b053f552ae283960e2e306be33`. Root approval `5373624714` is bound to that exact head. Regression tests cover real two-pool routing, stale fences, post-save rejection and CAS conflicts; their reported local execution belongs to the PR author, not this merge operation. Current required CI remains pending, and this authorized admin squash does not establish CI or runtime acceptance.
## Impact
Restores checkpoint progress when global cycle and leader state differ from a set-scoped view. No format, retry, timeout, assertion or scanner-policy changes are introduced by this diff. The three prior main scanner failures remain unproved repaired.
## Additional Notes
Full validation must run on the resulting exact main revision. Reverting this patch restores the earlier set-scoped fence lookup and its checkpoint rejection behavior.
* fix(ci): restore E2E membership and pagination timeouts (#8281)
* ci: locate the auto-testing checkout for lanes that run evidence from a subdirectory (#8279)
## Related Issues
Follow-up to #8229.
## Summary of Changes
Locate the private auto-testing checkout from the lane root or the workspace root so the nested security checkout can record functional-chain evidence.
## Verification
The exact PR head b66129ab9f passed one mechanical correctness and simplicity review, nine real-Git layout and provenance checks, and sixteen existing evidence/envelope tests. The baseline sibling layout failed with git exit 128; the corrected layout succeeded while revision mismatches and missing checkouts stayed rejected. Current PR checks are completed with successful or skipped conclusions, including the aggregate.
## Impact
Both lane and private-script revision checks remain intact. No time limits, assertions, production behavior, or evidence validation requirements change. The synthetic layout checks do not execute the actual scheduled security suite; integrated main CI and release acceptance remain separate gates.
## Additional Notes
Approved review 5374559393 is bound to the exact head above. Reverting the single-file change restores the previous checkout lookup.
* fix: add UploadPart OOM validation guardrails
Add a Docker validation harness for backlog#2704 so the ordinary UploadPart
low-concurrency memory workload can be reproduced with comparable case metadata,
process/cgroup sampling, TLS and metrics toggles, cache-env controls, and write
reclaim/direct-write experiments.
Warn when operators set the unrecognized RUSTFS_OBJECT_CACHE_* variables that
appeared in the reporter compose file. The variables are reported but remain
ignored, so startup does not silently change object data cache behavior.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: AL <allan.bednarowski@gmail.com>
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): pass fence store to checkpoint fixture
* fix(s3): queue bucket operations and restore strict Clippy checks (#8290)
* fix(s3): queue concurrent bucket creation and deletion
Keep eight active bucket transactions and bound admission waiting to 128 requests and 30 seconds. Preserve detached transaction ownership and return Retry-After with overload responses.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): restore strict Clippy compatibility on Rust 1.99
Use try_update without changing atomic ordering or overflow behavior. Keep
recursive storage futures boxed once at each frame and remove the redundant
async-recursion macro, including its non-recursive SQL planner use. Remove
needless closure borrows and orphaned dependency entries.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* chore: refresh dependencies and atomic update APIs
Update workspace dependencies and the lockfile. Replace deprecated
atomic fetch_update aliases with try_update while preserving closures
and memory ordering.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* improve
* fix(scanner): diagnose and verify pause backlog recovery (#8293)
* fix(scanner): diagnose and verify pause backlog recovery
Expose the retained replica snapshot and claimed membership in abnormal
admin status responses. Keep diagnostics off metrics updates and verify
single-pool recovery and conflicting-proof preservation across 24 sets.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* refactor(scanner): move replica snapshots into diagnostics
Consume the terminal admin read snapshot in a single state match and move
membership, revision, and error buffers into the response. Verify buffer
handoff and the unchanged JSON contract without altering ledger authority.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): wait for held legacy responsibility in replay test
* ci: remove Docker Hub description sync
* fix: emit NextPartNumberMarker only when ListParts is truncated
ListPartsInfo.next_part_number_marker was a non-optional usize that
defaulted to 0 and was only assigned when the response was truncated.
The S3 serializer then emitted it unconditionally as Some(0), causing
AWS SDK paginators to loop infinitely on part_number_marker=0 instead
of terminating.
Change the field to Option<usize> (None by default) and set it only
inside the is_truncated branch. The S3 output layer now uses
.and_then() so NextPartNumberMarker is absent when IsTruncated=false,
matching AWS S3 behavior.
Fixes#8208
(cherry picked from commit 44de803a38)
* fix(s3): honor sparse ListParts markers and verify termination
Resume part listings at the first part above the numeric marker, even
when that marker is absent. Use binary search over the sorted part
numbers and retain the existing exact-tail empty-slice path.
Add storage, XML, and real AWS SDK paginator regressions for empty and
terminal pages, sparse markers, and multipart completion integrity.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
(cherry picked from commit 673031eea1)
* fix(storage): publish delete rollback backups atomically
Stage rollback metadata outside the rollback directory and publish it only after the full write succeeds. A short write must not leave a backup that quorum rollback can rename over acknowledged version history.
Add an isolated real short-write regression and register the backported ListParts SDK test in the smoke and Linux full inventories.
* test(e2e): register paginator regression in Darwin inventory
* fix(release): install yq before Helm template checks
* chore(release): align installation references for 1.0.1
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Peder Bergan <pederbe@users.noreply.github.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: AL <allan.bednarowski@gmail.com>
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: Chapman <touch65536@gmail.com>
* feat(s3select): support quoted record delimiters
* fix(s3select): preserve CSV comment limits and CR fields
* fix(s3select): preserve CRLF fields and compressed record limits
* feat(table-catalog): expose durable strong diagnostics
* fix(table-catalog): stabilize snapshot diagnostics and metadata scans
Reuse one recovery observation for exports and diagnostics in both backing
modes. Follow the persisted metadata directory for renamed and registered
tables, and bound diagnostics under continuous snapshot changes.
Remove redundant recovery work and fix the production dead-code and clone
lint failures without relaxing checks. Add deterministic race, retry, and
metadata reachability coverage and clarify read-only candidate semantics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): bound pagination fixture upload concurrency
Keep the 1200-object delimiter boundary fixture while preparing it with
at most 16 concurrent PUTs. Serial preparation exhausted the existing
120-second smoke deadline before the listing request was issued.
Report fixture preparation time and verify the exact common prefixes,
empty contents, KeyCount, and absent continuation token without relaxing
the timeout, durability settings, or dataset size.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: Henry Guo <marshawcoco@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: GatewayJ <835269233@qq.com>
* fix(sse): count copy-source SSE-C headers in the TLS transport guard
The SSE-C transport guard only looked at the object's own customer-key
headers. A CopyObject or UploadPartCopy that read an SSE-C source into a
non-SSE-C destination carried the source key only in the
x-amz-copy-source-server-side-encryption-customer-* headers, so it was
accepted on a plaintext transport with RUSTFS_SSE_C_REQUIRE_TLS=true and
was missing from rustfs_ssec_plaintext_requests_total.
Treat the copy-source triple as SSE-C headers too.
* fix(sse): reject a KMS context key that replaces the location entry
Managed SSE wraps each data key under an encryption context that carries
{bucket: bucket/key}, added with or_insert, while only the client context
is persisted and the entry is rebuilt on read. A client context entry
keyed by the bucket name therefore replaced the location entry on write
and on every read, so the data key was no longer tied to the object's
location.
Reject such a context with 400 InvalidArgument at the single managed-SSE
write entry, before the KMS is called. The read side is unchanged, so
objects stored with such an entry stay readable, and other keys,
including other bucket names, are still accepted.
---------
Co-authored-by: Hauser <housemecn@gmail.com>
## Related Issues
Follow-up to #8229.
## Summary of Changes
Locate the private auto-testing checkout from the lane root or the workspace root so the nested security checkout can record functional-chain evidence.
## Verification
The exact PR head b66129ab9f passed one mechanical correctness and simplicity review, nine real-Git layout and provenance checks, and sixteen existing evidence/envelope tests. The baseline sibling layout failed with git exit 128; the corrected layout succeeded while revision mismatches and missing checkouts stayed rejected. Current PR checks are completed with successful or skipped conclusions, including the aggregate.
## Impact
Both lane and private-script revision checks remain intact. No time limits, assertions, production behavior, or evidence validation requirements change. The synthetic layout checks do not execute the actual scheduled security suite; integrated main CI and release acceptance remain separate gates.
## Additional Notes
Approved review 5374559393 is bound to the exact head above. Reverting the single-file change restores the previous checkout lookup.
## Related Issues
Related to rustfs/backlog#2701.
## Summary of Changes
Route scanner checkpoint cycle and leader validation through the global store while retaining the owning set for cache persistence, CAS revisions and publication admission.
## Verification
Two independent final-diff source reviews found no issues across correctness, concurrency and durability, test coverage, compatibility, performance and simplicity on head `8b8fe51d092090b053f552ae283960e2e306be33`. Root approval `5373624714` is bound to that exact head. Regression tests cover real two-pool routing, stale fences, post-save rejection and CAS conflicts; their reported local execution belongs to the PR author, not this merge operation. Current required CI remains pending, and this authorized admin squash does not establish CI or runtime acceptance.
## Impact
Restores checkpoint progress when global cycle and leader state differ from a set-scoped view. No format, retry, timeout, assertion or scanner-policy changes are introduced by this diff. The three prior main scanner failures remain unproved repaired.
## Additional Notes
Full validation must run on the resulting exact main revision. Reverting this patch restores the earlier set-scoped fence lookup and its checkpoint rejection behavior.
* fix(test): establish a writable previous-release upgrade baseline
* fix(ci): reserve capacity for durable admin fixtures
* fix(ci): group durable IAM state fixtures by resource needs
* ci: run E2E doctests with the E2E dependency graph
* fix(ci): separate fixture startup from transport deadlines
* fix(ci): bound pagination after seeding and revisit restored copies
* fix(ci): make filesystem fixture timing deterministic
* fix(ecstore): avoid metadata lock reentry during internal mutations
* test: align recovery fixtures with durable ownership contracts
## Related Issues
N/A
## Summary of Changes
Reject system-bucket incarnation lookups before entering the pool metadata owner. Keep each selected scanner backlog publication cohort in one task so waiter cancellation cannot abandon its remaining serialized conditional writes. Bind repair and replay fixtures to persisted bucket incarnations.
## Verification
Head f6d44603fc received an approval from houseme in review 5365588011. This merge does not add a local runtime validation claim. Full main CI remains a separate publication gate.
## Impact
System metadata writes avoid recursive pool locking. Publication retains per-replica conditional writes and stops a cancelled caller from advancing to its next publication phase. Fixture changes supply the identities required by existing repair admission rules.
## Additional Notes
Reverting this change restores the previous behavior.
## Related Issues
Related to rustfs/backlog#2688.
## Summary of Changes
Reclaim metadata-less orphan directory trees after a complete, first-page, empty recursive root listing in an authoritative never-versioned bucket. Both listing implementations use the same fail-closed cleanup decision.
## Verification
Head b4a9120173 received an approval from loverustfs in review 5365460152. This merge does not add a local runtime validation claim. Full main CI remains a separate publication gate.
## Impact
Empty recursive root listings can remove otherwise unaddressable physical residue. Versioned buckets and populated listings remain excluded; unreadable disks, object metadata, unknown files, and uncommitted data prevent cleanup.
## Additional Notes
Reverting this change restores the previous orphan-directory behavior.
Include helm/rustfs/README.md in the uploaded helm-package artifact so
publish-helm-package updates the root README.md in rustfs/helm.
The build-helm-package job copies helm/README.md into helm/rustfs/
before running helm package, but upload-artifact previously uploaded
only helm/rustfs/*.tgz. Because both files share the helm/rustfs/
parent directory, actions/upload-artifact places both the chart
archive and README.md at the artifact root, and download-artifact
extracts README.md into the root of rustfs/helm alongside the tarball.
## Related Issues
Resolves the corrected lifecycle fixture findings in PR #8254.
## Summary of Changes
Preserve separate incarnation-bound durable MRF responsibilities and their lifecycle audit records, and align replay fixtures with their checkpoint identities.
## Verification
Two independent source reviews and changed-delta reviews are complete. The final review approved 607a0b9bb0 with no remaining supported findings. Local runtime claims were not independently reproduced for this pull request.
## Impact
Keeps storage generation fences and retained responsibility semantics. Test-capacity reservations preserve existing deadlines and assertions.
## Additional Notes
Squash merge of the currently approved fix under the authorized CI-bypass exception. Main CI and release acceptance remain required.
## Related Issues
Follow-up to #8233.
## Summary of Changes
Registration runtime fixtures timed out in the workspace CI lane while the same cases passed in the feature lanes. Reserve nextest capacity for the exact `connect_registration` binary, as already done for related inventory and drive fixtures. Keep its existing deadlines, internal concurrency, assertions and zero-retry policy; report the last watch status on failure.
Rolling upgrades could pass `ListBuckets` readiness while restarted peers still lacked write quorum. Before each mixed-version phase, probe writes through every node outside the asserted workload prefixes. A shared 30-second deadline includes requests and sleeps; only HTTP 503 with `ServiceUnavailable` is retryable, with SDK retries disabled for these probes. The actual compatibility writes, reads, multipart operations and listing assertions remain unchanged.
Add four fast regression tests to the existing PR smoke profile, with matching exclusion from the full profile. No new workflow or job is introduced.
## Verification
- `cargo nextest run --locked --profile ci -p rustfs --lib --test connect_registration --test-threads 4 -E 'binary(/^connect_registration$/) | test(=connect::diagnostics::trace_runtime::tests::local_runtime_rejects_non_private_state)' --no-tests fail --status-level pass --final-status-level fail` passed 23/23 twice in 5.088s and 5.097s: 22 macOS registration tests plus one unrelated control. JUnit intervals confirm capacity reservation; no retries or test-process leaks occurred. The Linux-only inventory case remains for CI.
- `cargo nextest run -p e2e_test --lib --profile ci -E 'test(upgrade_write_readiness_tests)' --no-fail-fast --no-tests fail` passed 4/4 twice in 1.068s and 1.072s, with zero retries. Regressions cover metadata readiness followed by write unavailability, recovery through every writer, immediate permanent-error failure despite an incoming SDK retry configuration, and deadlines for repeated 503s and stalled requests. The original failure is recorded in [the mixed-version upgrade job](https://github.com/rustfs/rustfs/actions/runs/36569700716/job/109415806473).
- `cargo fmt --all --check`, `git diff --check`, `python3 scripts/check_test_wiring.py` and compiled smoke/full membership checks passed. Smoke membership changes from 188 to 192 by adding exactly these four tests; full membership is unchanged. The expected Linux smoke digest was derived from the actual prior Linux listing plus those four platform-independent additions and still requires confirmation by this PR's CI.
Local verification covers the exact source committed in `9b2ea836317ed035a91d1fc9fcf725f70c3098e2` on main `380e98a42cb4fcd0994fed79b30c2c7605deb0bc`. An independent final-diff correctness and reliability review found no findings. Fresh Linux workspace and real mixed-version upgrade runs are required before treating the remediation as fully verified; local fake-target tests do not establish that result.
## Impact
Test scheduling and readiness only; no production behavior, API, dependency, test deadline or compatibility assertion changes. Reserving capacity serializes registration fixture processes within a nextest run. The bounded readiness probes may add startup time while peer write health converges; permanent errors still fail immediately.
## Additional Notes
Rollback by reverting this PR. Existing CI restructuring from #8233 is independent of these follow-up fixes.
* fix(ci): reduce duplicate work and preserve reliable test failures
* fix(ci): retain protocol evidence and repair stale test fixtures
* test(connect): honor parent deadline during API fixture readiness
* fix(ci): reserve IO capacity for state writer proofs
* test(connect): align RPC fixtures with service capture contracts
* test(connect): cover pinned service capture failures
* feat(connect): capture offline network performance in server
* fix(connect): use storage facade in RPC test
* fix(connect): keep RPC test body behind storage facade
A bucket sweep that ends mixed clears its position and records the finishing cycle's plan as started. The next cycle requests a new plan whenever the bucket was written in between, so a fresh sweep inherited a stale started plan and ended mixed again. On a continuously written bucket no sweep could ever certify and the census kept the old root.
Start a fresh verification sweep under the requested plan when no durable position remains. Resumed sweeps keep their started plan, so a clean tail still cannot certify an old prefix.
Refs #7108
The security workflow checks the repository out into rustfs-repo/ (#7212)
but its chain evidence steps still invoke
scripts/functional_chain_evidence.py relative to the workspace root, which
on the persistent shared runner resolves to a stale checkout left by another
job. The evidence gate then compares that checkout's HEAD against the chain
workflow_sha and rejects the lane before any case runs
("lane checkout differs from chain workflow source").
Run the evidence script from the lane's own checkout so ROOT resolves to
rustfs-repo/, whose HEAD is exactly the chain-pinned workflow_sha.
## Related Issues
rustfs/rustfs#8217 and rustfs/backlog#2683.
## Summary of Changes
Reviewed 539ed275db against d2175d1e1e. No findings. Capable callers requesting missing-path reporting recover explicit pre-output FileNotFound or VolumeNotFound errors; partial-output and other failures continue to fail the stream.
## Verification
Two independent source reviews completed across all lenses below; the frozen diff matches Git and passes diff whitespace checks. Traced the authenticated handler, bounded first-chunk preflight, cancellation ownership, HTTP status/token classification and quorum error handling. The new tests cover ordinary streaming, typed missing errors, byte preservation and mixed missing/I/O failures.
Author-reported focused tests and Docker reproduction were not rerun or independently audited in this review. The reported Docker comparison predates the final report_notfound-only gate; its scope is not distributed acceptance of the final head.
## Impact
Correctness: no findings; missing errors remain typed only before output. Security/trust: no findings; authentication, body digest and operation/status/token restrictions remain. Compatibility: no findings; legacy clean EOF remains, with the documented old-server limitation. Concurrency/durability: no findings; receiver ownership cancels an abandoned producer. Simplicity: no findings. Coverage: no blocking gap identified. Performance: no findings; preflight retains one bounded chunk and ordinary report_notfound=false streams start immediately.
## Additional Notes
This review does not establish that the patch fixes any current main CI failure. Full main CI and release acceptance remain separate gates.
## Related Issues
rustfs/backlog#2682 and rustfs/rustfs#8192.
## Summary of Changes
Reviewed ca970f55ec against d2175d1e1e. No blocking code findings. The hold requires a completed healthy legacy check and an exact incarnation, lease, object, version and scope; it preserves the durable journal and rechecks on restart.
## Verification
Two independent source reviews completed, covering the lenses below. The frozen diff matches Git and passes diff whitespace checks. Reported Cargo and Docker results were not rerun or independently audited in this review.
One factual correction to the PR description: `legacy_sigkill_replay_repairs_without_releasing_unverified_responsibility` uses the default four-member fixture, with three replicas before restoration and four afterward (`mrf_partial_write_test.rs:559,567`). That named regression exercises the production manager path, but is not EC12+4. Other tests in the file use sixteen disks.
## Impact
Correctness: no findings; proofless legacy health never becomes a verified receipt. Security/trust: no findings; exact identity fences remain. Compatibility: no findings; journal encoding remains unchanged. Concurrency/durability: no findings; replay retains one checkpointed owner and replacement generations become retryable. Simplicity: no findings. Coverage: no blocking gap identified, with the test-scope correction above. Performance: no findings; held entries leave the retry index without adding per-admission queue scans.
## Additional Notes
The current main journal failure concerns DecodeFailure, which follows the separate ECDecode task path. This review does not establish that this PR fixes that failure or the scanner-cycle failure, and does not establish a passing main CI or release gate.
Commit 151103a609 added the field to
StorageReadinessDetails but did not update two test initializers in
readiness.rs, causing E0063 compile errors in --all-targets builds.
* fix(iam): require an explicit permission for force-delete
A force-delete header no longer inherits s3:* or consoleAdmin. Bucket
force-delete requires s3:ForceDeleteBucket whenever the header is present,
and recursive object force-delete requires s3:ForceDeleteObject. A plain
delete keeps the existing checks.
Co-authored-by: RustFS <hello@rustfs.com>
Signed-off-by: loverustfs <155562731+loverustfs@users.noreply.github.com>
* test(e2e): keep force-delete header names static
The bucket force-delete helper must pass a static header name into the
SDK request mutator.
Co-authored-by: RustFS <hello@rustfs.com>
Signed-off-by: loverustfs <155562731+loverustfs@users.noreply.github.com>
* test(e2e): move the force-delete header into the request mutator
The SDK request customizer requires a static header name owned by the
closure.
Co-authored-by: RustFS <hello@rustfs.com>
Signed-off-by: loverustfs <155562731+loverustfs@users.noreply.github.com>
* fix(iam): keep force-delete out of NotAction grants
NotAction now uses plain wildcard matching, so NotAction "s3:*" still
excludes force-delete. An Allow statement grants s3:ForceDeleteObject or
s3:ForceDeleteBucket only when its Action list names the action; a
NotAction-only Allow never does. The rule applies to both IAM and bucket
policy statements.
Also build the invalid-header errors with S3Error::with_message to keep
the s3s footprint at its baseline, and fix a clippy single_match.
---------
Signed-off-by: loverustfs <155562731+loverustfs@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
Record the upload id on the completed object so a lost-response retry
returns that object's ETag instead of NoSuchUpload, while a different
part list or a replaced object keeps the existing errors.
Signed-off-by: loverustfs <155562731+loverustfs@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Two Connect tests fail on main in every Test and Lint lane.
Heartbeat: #8155 replaced "today's capabilities minus
profile.memory.service@1" with "the pre-health set minus it". That drops
the release that advertised health.check.service@1 but not yet in-service
memory profiling, so a pending heartbeat persisted by that release now
fails validation and the runtime stops. Accept that release as its own
frozen list.
Top disk/net: execute_*_job sets max_duration_millis to the requested
duration, then the capture compared the measured sleep against it. The
timer only overshoots, so a job that ran exactly as requested was
rejected with LimitExceeded whenever the overshoot reached 1 ms. Report
the authorized window, as Top API already does; validate_capture bounds
it by the limit.
* fix(ci): restore mainline and scheduled test reliability
* fix(ci): provide GitHub CLI for CPU acceptance
* ci: provide Docker for CPU service acceptance
* ci: provision Python and Docker for OIDC validation
* ci: restore hosted runners for Docker validation
* ci: use verified MinIO release packages for interop
* ci: preserve host ownership of MinIO fixtures
* fix(ci): correct diagnostic limits and isolate startup checks
* test(connect): include object CLI failure details
* test(readiness): initialize unavailable drive diagnostics
* ci: give the pool run a real wall-clock budget
The pool suite budgets up to 24h each for rebalance and decommission
(REBALANCE_TIMEOUT / DECOMMISSION_TIMEOUT in rustfs_pool_expand.sh),
but the workflow step capped it at 45 minutes. Four consecutive runs
died identically: steps 1-7 all PASS, then the rebalance wait was
killed at exactly 45:12 - chain 35680308150, standalone 35702803577,
chain 35757773373, chain 36283120750 - with rebalance at completed=1/4
(~21 minutes in), so a full pass has never been observed.
Make the budget an input (default 240 minutes: covers the observed
rebalance pace plus one decommission pass) and document why. The suite
keeps failing the job through its [POOL-STEP] marker adjudication.
* fix(ci): align pool job budget and timeout contract tests
* fix(connect): preserve legacy heartbeats and isolate I/O tests
---------
Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: RustFS <hello@rustfs.com>
Bound the release catalog to 32 MiB and 200,000 symbols based on the GNU build measurement; keep complete names and reject catalogs beyond either limit.
A restarted peer can accept a pooled connection and never send response
headers, so HttpReader::open waited past the client body timeout before
the body-stall timer or erasure hedge could run. Bound that header wait
by the stall timeout and retry the open once on a fresh connection.
After write quorum, MultiWriter still waited out the full disk stall
for a silent peer, which matches the client timeout. Give remaining
writers one second, then drop them so the caller returns.
Signed-off-by: loverustfs <155562731+loverustfs@users.noreply.github.com>
The contract check asserts exact lines in build.yml, and five recent
build-workflow PRs drifted it out of sync, so Security Audit's Workflow
Pin Report job fails for every PR and every push to main since Sep 27
17:34Z (first failure on push run 36337450094). Refresh the assertions
to the current, intentional shapes - contract intent is preserved and
in fact tightened:
- #8160 added PROFILE_ARGS to the cross/native cargo build lines.
- #8171 added 'should_publish == true' as a stricter prefix on the R2
publication guard and the create-release / upload-release-assets /
publish-release / update-latest-version conditions.
Verified locally: the full check (including the docker and helm
workflow contract tests) passes against main's files with these
assertions.
EC 2+2 still meets read quorum with two of four nodes up. A survivor
that had not cached a bucket returned 503 on GET, HEAD, and List, and
/health/ready left the Service once write quorum was lost. Reads and
Service membership now follow read quorum and shared locks. Writes and
/minio/health/cluster still require write quorum and exclusive locks.
Signed-off-by: loverustfs <155562731+loverustfs@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Route the two linux-aarch64-* release legs to the dedicated arm64 runner
and build them natively (cross: false) instead of cross-compiling via
cargo-zigbuild on x86_64 hosts.
With native legs now executable, extend the packaged-artifact checks that
were previously gated to x86_64-unknown-linux-gnu only:
- Every Linux leg runs rustfs --version and rustfs-cli --help from its own
package, proving the artifact matches the runner architecture.
- The packaged-console runtime smoke (server boot + console HTTP 200) also
covers aarch64-unknown-linux-gnu, so both architectures get full runtime
verification. Musl legs run the binary checks but skip server boot for
now.
* ci: run the chain orchestration jobs where the gh CLI exists
#8112 moved these jobs to the sm-standard-2 pool, whose images ship
without the gh CLI (a known property of the build fleet, see #7572).
Last night's chain died in prepare before any suite ran:
resolve_functional_candidate.py:34 does subprocess.run(["gh", "api"])
and got FileNotFoundError; complete-chain and the hourly
functional-chain-health canary fail the same way. On Sep 22/23 the same
jobs ran green on GitHub-hosted runners.
Move prepare, complete-chain and the health canary to ubuntu-latest.
The suite lanes stay on smoke-testing.
* ci: run the chain orchestration jobs where the gh CLI exists
#8112 moved these jobs to the sm-standard-2 pool, whose images ship
without the gh CLI (a known property of the build fleet, see #7572).
Last night's chain died in prepare before any suite ran:
resolve_functional_candidate.py:34 does subprocess.run(["gh", "api"])
and got FileNotFoundError; complete-chain and the hourly
functional-chain-health canary fail the same way. On Sep 22/23 the same
jobs ran green on GitHub-hosted runners.
Move prepare, complete-chain and the health canary to ubuntu-latest.
The suite lanes stay on smoke-testing.
* ci: point the chain orchestration jobs at the smoke-testing runner
Per maintainer decision, consolidate them onto the same runner as the
test lanes. Verified on rustfs-smoke-testing as the runner user:
gh 2.45.0, jq 1.7.
* ci: point the chain orchestration jobs at the smoke-testing runner
Per maintainer decision, consolidate them onto the same runner as the
test lanes. Verified on rustfs-smoke-testing as the runner user:
gh 2.45.0, jq 1.7.
The health diagnostics module imported directly from
crate::storage::storage_api, bypassing the architecture migration
guardrail. Add a connect facade module to rustfs/src/storage_api.rs
and redirect the imports. Also fix a clippy::redundant-guards lint
in the coarse-flags match arm.
The sm-standard-2 fleet has no gh CLI (see #7572), so moving the release publication jobs onto it in #8112 broke every tag release: the 1.0.1-preview.12 build failed in Create GitHub Release with 'gh: command not found'. Move create-release, upload-release-assets, publish-release, cleanup-preview-releases, and package.yml resolve/package back to ubuntu-latest.
* fix(storage): weight automatic multipart admission by part size
* fix(ci): restore filesystem runner capabilities and typos dependency
* fix(ci): make release guard portable and spell out part variables
* ci: restore sm-standard-2 runners for io_uring and distributed e2e jobs
---------
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
* fix(ecstore): admit cold bucket metadata at read quorum
Encode a durable creation-commit state in bucket metadata so committed Object Lock buckets can use read quorum for cold loads while pre-physical creation intents remain fail-closed. Drain commit-write fan-out, keep write quorum for uncommitted intents, and add regression coverage for exact, below, migrated, and partial-create quorum boundaries.
* fix(ecstore): fence bucket creation-commit persistence
Address review findings on the creation-commit proof.
Persist the proof only under the bucket metadata transaction fence: at bucket creation, and through a fenced migration that re-reads the authoritative metadata and revalidates physical presence at write quorum before writing. This stops a stale snapshot from reverting an acknowledged configuration update or outliving a delete/recreate.
Establish commitment when Object Lock is enabled on an existing bucket, inside the same configuration mutation, so a healthy cluster no longer rejects object operations with ErasureWriteQuorum.
* fix(ecstore): keep commit fence error message stable
The error(format!) ratchet requires a stable Display for quorum bucketing; use a fixed message instead of embedding the bucket name.
* test(ecstore): reuse canonical Object Lock fixture in regression tests
The s3s footprint ratchet is shrink-only. Use the existing ENABLED_OBJECT_LOCK_CONFIG static instead of naming s3s DTO types in store tests.
---------
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Companion to rustfs/auto-testing#109: the 4x1 topology is removed from
MATRIX_TOPOS because the product rejects a 1-drive-per-node distributed
pool at startup (FATAL BelowMinimum). The unfiltered sweep is now 36
combinations / 300 cases; update the contract totals and comments so an
unfiltered sweep is still held to an exact expected case count.
#8112 replaced ubuntu-latest with sm-standard-2 across workflows. Both nightly
KMS Vault lanes need a working Docker daemon; the sm-standard-2 pool does not
provide one, so both lanes die in seconds on 'Docker is not available' while
the package compiles and publishes fine - and the functional chain never fires
because its gate requires a successful build run. Restore the lanes to
ubuntu-latest, as documented in the lane comment before #8112.
* fix(scanner): bound SNSD deep scans and checkpoint cloning
* ci: run mount-dependent jobs on hosted VMs
---------
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
docs(github): clarify supported storage in bug reports
State that local disks, SAN/Fibre Channel volumes, and JBOD are supported,
recommend XFS, and keep the existing unsupported remote/shared filesystem rule.
Co-authored-by: Cursor Agent <cursoragent@cursor.com>
* ci: replace ubuntu-latest runner with sm-standard-2 across workflows
* ci: keep scheduled-validation monitors on hosted runners
The freshness and watchdog jobs report stalled scheduled validations.
Running them on the same sm-standard-2 pool means a pool outage stalls
the monitors too, so nothing reports it.
---------
Co-authored-by: overtrue <anzhengchao@gmail.com>
A flat (recursive) listing resumed inside "s/" re-emitted everything in
its sibling "s-x/". scan_dir dropped the entries before forward_to by
comparing directory names without their trailing slash, where "s" sorts
before "s-x", while the keys they stand for sort the other way round:
'-' (0x2d) is below '/' (0x2f), so all of "s-x/..." precedes "s/...".
The drain stopped at "s" and kept "s-x".
The next page then started with keys at or before the marker; the
listing layer filtered all of them out, found no more candidates and
answered IsTruncated=false. A bucket of 104,137 objects with backup
directories named "<id>" and "<id>-rollbacks" listed as 5,000; two such
directories of 1,200 keys each listed as 2,000.
Compare every remaining entry as the key prefix it stands for, slash
included, and keep it only when it sorts at or after forward_to or
contains it. The remainder of forward_to is taken before `current` is
trimmed, so this also holds below the bucket root; retain also drops
entries when all of them precede forward_to, which the drain never did.
* feat(connect): sample memory within the running service
* test(connect): add official memory service acceptance
* test(connect): consume the final memory job without cloning
* ci(package): build gnu and musl DEB/RPM variants with distinct file names
The Build and Release workflow produces four Linux binaries
(x86_64-gnu, aarch64-gnu, x86_64-musl, aarch64-musl), but packaging
only consumed the two gnu artifacts. Add matrix entries for the two
musl artifacts so every release ships all four DEB/RPM variants.
The libc variant is now part of the package file names, which would
otherwise collide between gnu and musl builds of the same version:
- deb: rustfs_<version>_<libc>_<arch>.deb
- rpm: rustfs-<libc>-<version>-<release>.<arch>.rpm
The dpkg Package and rpm Name stay plain "rustfs", so gnu and musl
remain mutually exclusive upgrades of one package rather than
co-installable packages fighting over /usr/bin/rustfs.
Dependency declarations now follow the linkage: gnu binaries
dynamically link glibc and keep Depends: libc6 (>= 2.31) /
glibc >= 2.31; musl binaries are statically linked and declare no
libc dependency. The libc variant is also visible in the package
description.
scripts/release/package_versions.sh gains a LIBC argument and its
contract tests cover both variants plus the invalid-libc cases.
* ci(package): align deb/rpm file names with the zip artifact naming
Rename the package file names so every release asset of one build
shares the same stem as its binary artifact, differing only by
extension:
- before: rustfs_<deb_version>_<libc>_<deb_arch>.deb
rustfs-<libc>-<rpm_version>-<rpm_release>.<rpm_arch>.rpm
- after: rustfs-linux-<arch>-<libc>-v<version>.deb / .rpm
e.g. rustfs-linux-x86_64-gnu-v1.0.0.zip,
rustfs-linux-x86_64-gnu-v1.0.0.deb,
rustfs-linux-x86_64-gnu-v1.0.0.rpm.
Non-development builds embed the raw release tag (with 'v'), like the
zips; development builds embed dev-<full sha>. The dpkg/rpm versions
(including the '~' prerelease ordering) are unchanged - they live in
the package metadata, and a side effect is that release asset names no
longer contain '~' (which GitHub normalizes to '.').
package_versions.sh now takes the target arch (x86_64|aarch64) instead
of the deb/rpm arch pair; the deb Architecture (amd64/arm64) in the
control metadata still comes from the workflow matrix. The two test
workflows that assemble deb download URLs from a release tag
(rustfs-table-test, rustfs-upgrade-test) are updated to the new name,
which also removes their '~'-to-'.' asset name workaround.
* fix(startup): retry transient bucket metadata quorum failures
* fix(ecstore): retain recovered shard damage for read repair
* fix(ecstore): reconnect missing read sources before GET
* test(heal): prove exact marker replay preserves history
* fix(ecstore): fence reconnect retries at the deadline
Reject expired reconnect waiters before dispatch and start cooldown on sweep completion, including timeout and cancellation. Cover exact-deadline admission independently of cooldown and preserve the original strict RPC-count regression.
* fix(ecstore): bound decommission target gate contention
Target capacity gate contention during pool decommission escalated a
per-object transient into a durable bucket pause: each contended object
failed its bucket entry, which re-ran the whole bucket listing and amplified
attempts on the same objects.
- centralize the decommission capacity failure classification so gate
contention, benign contention and fatal failures are decided once
- retry target-gate contention inline (bounded, jittered) before a mutation
is admitted, covering put, part, complete, new-multipart and abort
- defer contended entries to the end of the round instead of failing the
bucket entry, and require the deferred set to drain before a set completes
- treat a missing object or version, an overwrite and a superseded upload id
as benign contention that is neither counted as a failure nor escalated
- use full-jitter exponential backoff, capped, for decommission retries
- expose the capacity pause reason, the waiting reason and a cumulative
pause count in the admin pool status, plus gate-retry and per-object
attempt metrics
Related: rustfs/backlog#2644
* fix(ecstore): correct deferred replay and metadata compatibility
Adds rustfs-fault-tolerance-matrix.yml, a manually dispatched workflow that
runs the --matrix topology x EC outage sweep from rustfs/auto-testing (38
combinations, 320 cases). The scenario suite hardcodes --all and a 60-minute
budget, so the exhaustive sweep had no CI entry point.
The expiry-date field of the x-amz-expiration response header was
rendered as RFC 3339 (e.g. 2026-10-02T00:00:00Z). AWS SDKs parse this
value with an RFC 822 parser; the Java SDK v1 rejects the ISO-8601
shape, drops the whole header, and logs a WARN from
ObjectExpirationHeaderHandler. S3 specifies HTTP-date (RFC 1123 with a
literal GMT zone), which is also what MinIO emits.
Render via the shared HTTP-date formatter (extracted alongside
format_expires_header) and pin the exact output in the unit test.
The 09-22 nightly chain failed all 12 lanes in seconds at the 'Bind
functional candidate' step:
ValueError: private script pin differs from chain
resolve_functional_candidate.py's >24h staleness fallback (added by
#8026, made functional by #8041's token fix) legitimately sets
manifest.testing_sha to auto-testing main HEAD, but current_chain()
still required it to equal .config/functional-script-revision.txt -
a check written for the pre-fallback world where the two could never
diverge. Once the fallback finally fired, prepare produced testing_sha
21edcf4 while the pin file still holds 27e9584 and every lane aborted
before checking out the test scripts.
Drop the pin-file comparison and keep what the lane actually needs to
guarantee: testing_sha is a valid commit sha (current_chain), the lane
checked out exactly that sha (record: private_head == testing_sha, kept
as-is), and the health checker validates the same format instead of
re-reading the pin file. Tests updated: a fallback testing_sha that
differs from the pin is accepted; a non-sha testing_sha is rejected.
Verified: python3 -m unittest test_functional_chain
test_functional_chain_health -> 39 tests OK.
#8052 renamed the fault-tolerance step to 'Run fault-tolerance
scenarios (A, B, C, C2, D, E)' and raised the evidence gate to 44
cases, but scripts/test_security_workflow.py still expected the old
step name and a 38-case fixture, breaking Quick Checks with three
KeyErrors and one assertion failure. Update DIRECT_TESTS and the
write_result fixture to the new contract.
* fix(ecstore): bound decommission capacity gate waits
* fix(ecstore): keep rebalance meta save lock errors retryable
The rebalance metadata retry policy only retries when the source chain still
carries the typed lock error, but resolve_rebalance_meta_save_result collapsed
every failure into a plain string. A transient rebalance.bin write-lock timeout
therefore bypassed retry_rebalance_metadata_access entirely and surfaced as a
hard failure of the periodic and terminal rebalance metadata saves.
Wrap the failure with the data-movement stage context instead, which keeps the
original lock error reachable through rebalance_error_source so the existing
transient lock policy applies. The rendered message is unchanged.
Add a regression test that feeds the wrapped meta save lock timeout through the
retry helper and asserts the retry engages.
* chore(ecstore): refresh error format ratchet baseline
Removing the string-wrapped meta save failure drops one `::other(format!`
call site in the rebalance worker, so the shrink-only baseline must be
regenerated in the same change.
The fault-tolerance suite now registers and runs scenario E
(rustfs/auto-testing#100): --all covers A, B, C, C2, D, E with 38 + 6
= 44 expected cases. The chain-evidence assertion still hardcoded
[A, B, C, C2, D] and 38 everywhere, which would fail every green FT
run's evidence validation once E is registered.
Bump the scenario list to include E and all count assertions from 38
to 44; step name updated to match. No other lanes reference 38.
Retry the transient missing fleet capability proof in both the admin start flow and node RPC activation. Return a retryable 503 with Retry-After after rollback when readiness does not converge.
JSON log layers synthesized span lifecycle events for every span and
embedded the full ancestor span list on every record. With INFO spans on
object hot paths that produced multi-megabyte lines, which journald
truncated at 48 KiB: the payload was silently dropped and the volume
itself became the dominant load.
Add RUSTFS_OBS_LOG_SPAN_EVENTS (none|close|full) with a default of none,
and keep with_span_list enabled only for verbose (debug/trace) levels so
the ancestor chain stops being re-serialized per record. The request_id
promotion path reads the span scope, not the span list, so it is
unaffected.
Refs rustfs/backlog#2642
resolve_functional_candidate.py probes rustfs/auto-testing (private) to
age the pinned functional-script revision and fall back to main HEAD
after 24h. The prepare step passed github.token, which cannot see the
private repo, so every nightly chain logged
staleness probe failed (...exit status 1.); keeping pinned revision
and replayed the 09-14 harness. On the 09-20 nightly that harness died
on the dpkg conffile prompt in all 12 lanes (see rustfs/auto-testing#97)
because the --force-confold and other fixes never reached the chain.
Use PF_TESTING_GH_TOKEN - already required by the other steps in this
workflow - so the probe can actually run and the >24h fallback works.
Docker Hub's overview is a separate `full_description` field that
`docker push` never touches, so it had drifted into an 8 KB snapshot of
an old README.md that still linked to
https://docs.rustfs.com/introduction.html (now 404).
Add a `sync-dockerhub-description` job to docker.yml that runs after the
images are pushed and republishes README.md from the same commit via
peter-evans/dockerhub-description (pinned to v5.0.0). It reuses the
existing DOCKERHUB_USERNAME / DOCKERHUB_TOKEN credentials, so no new
secrets are needed. Relative links (docs/, CONTRIBUTING.md) are
rewritten to github.com URLs so they resolve on Docker Hub.
Docker Hub caps the field at 25,000 bytes and the action truncates to
fit with only a warning; README.md is at 22,879 bytes today. Read the
published overview back after the sync and fail the job if it hit the
cap, so a truncated overview cannot be published silently.
Fixes#7995
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
Co-authored-by: Hauser <housemecn@gmail.com>
* chore: pin s3s to upstream git revision
Use the upstream s3s git repository at 50c94aeb1e5ea9ef8e7393ef6bbc87b72f6891c6 for both s3s and s3s-sigv4.
Allow the official s3s git source in cargo-deny so source checks continue to pass.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(get): skip futile resume for single-disk objects
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
The functional chain pins the test harness to the revision recorded in
.config/functional-script-revision.txt, which is only refreshed by
release syncs - it went stale on Sep 16 and the nightly chain has been
replaying a Sep-17-era harness ever since. Last night that meant:
the performance lane died on a dpkg conffile prompt (fix merged as
#88 but never reached the chain), the FT lane died on 'unknown option:
--results-file' (harness/workflow version mismatch), and the
STS-105 signing fix (#94) sat untested.
When the pinned revision's commit is older than 24 hours, fall back to
auto-testing main HEAD so the chain always runs the current harness.
Any staleness-probe failure keeps the pinned revision (fail-safe).
The revision file stays in place as the audit trail and the release
sync continues to manage it.
* fix(package): preserve service state across upgrades
* fix(package): match legacy DEB versions in tilde form
Published prerelease packages carry ~ in the dpkg control version
(package_versions.sh maps the SemVer prerelease - to ~), so the
legacy fallback list written with dots never matched 1.0.0~rc.x and
upgrades away from those DEBs still left the service stopped (#8011).
Fix the legacy glob to the tilde form and update the contract test,
which had enshrined the dot form. Verified on Ubuntu 24.04 systemd
containers: DEB upgrade 1.0.0~rc.5 -> 1.0.1 now keeps the service
running; 1.0.0 -> 1.0.1 and 1.0.1 -> 1.0.2 marker path still pass.
* docs(package): expand /etc/default/rustfs example template
Document the commonly used RUSTFS_* settings as commented examples in
the packaged conffile and point to docs.rustfs.com.
Startup finalizes IAM before init_notification_runtime publishes the notification system, and IAM finalization is what starts the fleet capability probe. The first probe pass therefore always failed closed and then slept the full ten-second probe interval. On a single node that left every durable capability, including the durable hard quota fence, unavailable for about ten seconds after /health already reported ok, so SetBucketQuota answered 503 durable quota capability is not confirmed across the cluster during that window.
Publishing the notification system now wakes the probe immediately through a Notify permit, with a 100ms bootstrap poll as the fallback for a wakeup that races the availability check. The probe keeps failing closed while the system is absent and logs the wait once. The four probe futures no longer carry an unreachable notification-system-unavailable arm, and the seven proof slots are revoked through one helper.
Fixes#8014
Pre-release RPM versions replaced the SemVer `-` with `_`, which rpm treats as an ordinary segment separator, so `1.0.0_rc.5` compared as newer than `1.0.0` and a host with an rc RPM installed could not `dnf upgrade` to the GA package. DEB previews had the mirror-image problem: only the first `-` became `~`, so `1.0.0~rc.5-preview.2` carried `preview.2` as its Debian revision and sorted above `1.0.0~rc.5`.
Both formats now spell every pre-release separator as `~`, which dpkg and rpm (>= 4.10) both treat as "sorts before anything". Verified with rpm 4.16 (AlmaLinux 9) and dpkg 1.21: `1.0.0~rc.5 < 1.0.0`, `1.0.0~rc.5~preview.2 < 1.0.0~rc.5 < 1.0.0~rc.6`, alpha < beta < rc, and `rc.9 < rc.10`; fpm 1.18 passes `~` through into both package headers, and `dnf upgrade` from a `~rc.5` RPM to the GA RPM succeeds where the `_rc.5` one refused. The test now pins the full ordering contract under both package managers and fails against the previous spelling.
The release-checksum step already normalizes `~` to `.` for every uploaded asset, so RPM assets need no further handling. Hosts that already installed an `_rc`/`_beta` RPM need a one-time `dnf install rustfs-1.0.0` or `rpm -Uvh --oldpackage` to reach GA.
Fixes#8012
The legacy bucket metadata migration writes the `.bucket-incarnation`
sidecar before `.metadata.bin`. A crash or a lost namespace lease between
the two writes left the bucket with a sidecar and no metadata, and every
later load failed closed with "bucket incarnation sidecar exists without
bucket metadata", so the bucket answered 500 to every request on every
node with no repair path (rustfs/rustfs#8003).
Load the sidecar-only state as a legacy bucket so the migration runs
again. The migration and the force-create path re-read the sidecar under
the transaction lock and keep its incarnation when persisting the
metadata, so the retry never replaces an identity other nodes fenced on.
A retired incarnation is never adopted: it is residue of a deleted
bucket, and re-publishing it would let heal reclaim the new objects.
Consolidate the operator entry point for planning, storage classes and
EC:0 consequences, expansion, rebalance, decommission, heal, drive
replacement, restart recovery, and the rc CLI mapping. Every claim was
checked against the current handlers, storage-class validation, quorum
arithmetic, and the rustfs/cli admin reference; the runbook links the
normative contracts instead of restating them.
Refs rustfs/backlog#2607, rustfs/backlog#2608
fix(ci): align security workflow test with the performance suite's own concurrency group
#7984 moved rustfs-performance-test.yml to the rustfs-performance-suite group but left test_all_suites_hold_the_shared_lock_for_manual_and_chain_runs asserting the shared functional group, so Quick Checks (make script-tests) fails on main and on every PR. Expect the dedicated group for the performance suite and drop the workflow comment that still described the shared lock.
The performance suite runs on the pf-testing fleet - a completely
separate environment (own runner, own target nodes) from the
smoke-testing fleet the functional suites share. Holding
rustfs-shared-functional-tests-v2 made an in-flight performance run
block every functional dispatch (observed: kms queued pending with
zero jobs for 4+ hours behind a 4-hour performance run), and
performance benchmarks queued behind functional suites in return.
Give it its own group; nothing else changes.
* test(ecstore): bind MRF manifest CAS dirsync recovery (#7482)
Cover the committed MRF manifest path through LocalDisk conditional CAS when the metadata directory fsync fails. The fixture proves the previous manifest anchor survives rollback, an unanchored first successor is removed, and the legacy MRF journal remains readable even while global durability is relaxed.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): derive evidence runner profile from registry (#7484)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require mixed-version evidence roles (#7485)
Tighten the Scanner/Heal release bundle checker so mixed-version, scoped-ACK, and rollback fields cannot reuse a generic versions list without proving the expected evidence role.
Require version lists to use source revision identities and include the tested source revision. Also require profile evidence fields to name the core profiling artifacts before release approval.
The release gate remains blocked until measured field evidence is present.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): publish committed MRF runtime checkpoints (#7490)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind profile artifacts in release evidence (#7487)
Require Scanner/Heal release bundles to attach every required profiling artifact to P1 profile evidence with relative paths, artifact formats, non-empty files, hashes, and optional per-artifact measurement-window checks.
Document the tightened release bundle profile contract and cover missing, tampered, and mismatched-window profile artifact regressions in the existing checker self-test.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden measured ABBA evidence claims (#7491)
Reject measured Scanner/Heal ABBA manifests whose mixed-version evidence uses the same baseline and candidate source revision or binary hash.
Require crash fault modes and profile artifact names to match the exact supported sets, rejecting missing, duplicate, and unknown values.
Update harness fixtures and regression coverage for same-build mixed-version claims and exact-set release evidence fields.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): group scanner heal evidence payload (#7494)
Group the EC8+4 Scanner/Heal evidence writer inputs into a typed payload so the distributed e2e crate stays within the clippy argument limit without weakening the lint.
The evidence writer still validates the same S3 bodies, physical shard census, process restart PIDs, and node listings.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF replay bundle fields (#7486)
Bind Scanner/Heal release bundle evidence for MRF durable replay to replay counts, retained responsibility anchors, and successor snapshot publication evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): profile EC84 evidence case runs (#7495)
Give Scanner/Heal evidence cases explicit runtime profiles so EC8+4 background restart and crash cases use their own object count, object size, and partial-progress timeout defaults instead of inheriting the legacy 4x1 case assumptions.
Expose the runtime profile in plan-only output and cover every registry case in the script self-test.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): reject empty release evidence artifacts (#7496)
Require Scanner/Heal release bundle artifact paths to resolve to non-empty files before hashing them.
Cover empty hard-gate artifacts in the existing release bundle checker self-test and keep profile artifact size checking on the shared artifact boundary.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require G14 same-window field coverage (#7489)
Tighten the Scanner/Heal release bundle checker so G14 same-window evidence must name the EC8+4, multi-set, and multi-pool fields covered in that measurement window.
Keep the release gate blocked when same-window evidence omits one of the required G14 fields, without changing production runtime behavior.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require two-hour measured ABBA windows (#7493)
Reject measured Scanner/Heal release ABBA manifests and summaries whose evidence window is shorter than the W21 two-hour release requirement.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF idle checkpoint cleanup (#7497)
Add a runtime cleanup regression test that publishes both retained replay and runtime committed checkpoints, writes scoped and legacy journals, and verifies idle cleanup removes every recovery anchor from the registered local disks.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): ignore untracked files in build identity (#7498)
Align e2e_test build provenance with Scanner/Heal evidence receipts and server binary provenance by treating only tracked source changes as dirty.
This prevents unrelated untracked worktrees or evidence directories from causing compiled test identity mismatches before real evidence cases can run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF disk-full evidence fields (#7499)
Require the Scanner/Heal release registry and bundle checker to carry explicit G08 MRF capacity, disk-full, and replica-loss evidence fields before release approval can pass.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind release JSON artifact provenance (#7500)
Require scanner/heal release evidence JSON artifacts to repeat their measured source revision, run identity, measurement window, gate, and field identity inside the artifact payload. This keeps a refreshed outer bundle hash from accepting stale summary or profile JSON from another run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF rollback mirror filtering (#7501)
Add a regression oracle that keeps scoped-only MRF responsibilities in the authoritative runtime snapshot while omitting them from the v1 legacy rollback mirror.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require segment activation evidence (#7504)
* test(scanner): require segment activation evidence
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): cover activation proof inputs
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF crash matrix cases (#7505)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require release bundle domain evidence (#7502)
Reject scanner/heal release bundles that omit field-level domain evidence for scoped ACK, durable intent, mixed-version, scheduler pressure, profile cost, and two-hour pressure lanes.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF retention GC evidence (#7506)
Require P4 retained-responsibility release bundle evidence to list the retained replay anchor and idle cleanup cases, prove a two-hour retention window, and record both idle cleanup and verified-proof discharge observations.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF cleanup GC soak evidence (#7507)
Require the P4 release bundle to carry measured cleanup/GC soak evidence for retained MRF replay responsibilities. The bundle now needs a two-hour cleanup window, exact cleanup case coverage, observed verified idle GC, and zero pending responsibilities or stale journals after GC.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF disk-full commit anchors (#7509)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): report port allocator bind errors (#7510)
Surface the scanned port window, attempt count, and last bind error when the e2e port allocator cannot reserve a localhost port. This keeps Scanner/Heal evidence failures actionable when the environment blocks binds before business assertions run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(sse): resolve 1.0.0 SSE/KMS blockers and P1 findings (#7511)
* fix(sse): resolve bucket default encryption per request
PUT and the POST-object/extract path resolved a bucket's default
encryption with a hard-coded "no explicit SSE-C" flag, so the default was
layered onto a request that already carried an SSE-C header triple and
then tripped that request's own mutual-exclusion check. Every bucket with
default encryption refused SSE-C single PUTs with 400 InvalidArgument,
while CreateMultipartUpload on the same bucket succeeded because it
resolves SSE elsewhere. Both call sites now derive the flag from the
request headers, as COPY already did.
The bucket default's KMS key id was also inherited independently of the
effective algorithm, so an explicit AES256 request against an aws:kms
default bucket produced a self-contradictory algorithm/key-id pair and
was rejected. The key id is now inherited only when the effective
algorithm is aws:kms, matching the storage-layer resolver.
Refs backlog#2368 B1, B2.
* fix(sse): refuse SSE-KMS without a running KMS service
A write requesting aws:kms on a node with no KMS service fell back to the
node-local SSE-S3 provider: the data key was wrapped with
RUSTFS_SSE_S3_MASTER_KEY while the object metadata still recorded
aws:kms and the requested KMS key id. The stored object claimed a KMS
protection it never had, under a key that was never consulted, and no
signal distinguished it from a genuine SSE-KMS object.
The managed-encryption path now asks the resolved DEK provider whether it
wraps with a node-local master key and refuses SSE-KMS in that case:
InvalidRequest when KMS was never configured, ServiceUnavailable when a
configured service is not running. The check sits after the per-key
authorization gate so an unauthorized caller still receives AccessDenied
whatever the KMS runtime state is, and asks the provider rather than a
parallel availability signal because the provider is what actually wraps
the key. A missing master key no longer answers an SSE-KMS request with
an SSE-S3-worded configuration error.
The SSE-S3 local fallback is unchanged.
Refs backlog#2368 B4.
* fix(ecstore): restore and archive tiers in stored coordinates
Multipart restore addressed the remote tier in plaintext coordinates
while the copy-back reads the stored representation. Each part received a
misaligned slice of the remote object whose length still satisfied the
range, the hash reader and the completion size check, so the restore
reported success and silently replaced the object's bytes. Encrypted and
compressed multipart objects were both affected. Restore now accumulates
stored part sizes, passes the stored length to the hash reader alongside
the plaintext length, and validates against the stored size.
The copy-back digests stored bytes, so its computed MD5 is not the
object's public ETag. Restore now preserves the object ETag on both the
single-part and multipart paths, and gives each restored part its own
recorded part ETag rather than the object-level value.
Transition also handed the tier the object's SSE headers and its
RustFS-wrapped data key as request headers. Any S3 target rejected an
SSE-C archive outright, an SSE-KMS archive asked the target to encrypt a
second time under a key id it does not own, and the wrapped DEK left the
cluster. The archive request now strips every SSE header and encryption
marker with the predicate the replication path already uses; the local
xl.meta keeps all of it, so read-through and restore are unaffected.
Objects restored by an affected release are not detected or repaired
retroactively and must be re-restored from the tier.
Refs backlog#2368 B3, B5; backlog#2369 P7.1.
* fix(rio): lock the v1 nonce layout within a segment
Decrypting a v1 segment tried three historical nonce layouts per frame,
independently for every frame. The last of them exists for streams
written before 1.0.0-alpha.91, which reused a segment's part nonce for
every block in it; because block zero's derived nonce equals that base
nonce, a frame encrypted at index zero authenticated at any position. An
attacker able to rewrite the underlying shards could replay it and have
the forged plaintext returned with 200 and an unchanged length. Shard
integrity uses a keyed-hash-free checksum, which such an attacker can
recompute, so it is not a barrier.
A segment now locks onto whichever layout decoded its first non-zero-index
frame and rejects any later frame needing a different one. That leaves one
residual shape: a stream built purely from repeats of frame zero has no
later frame to disagree. New RUSTFS_ENCRYPTION_LEGACY_NONCE_FALLBACK
(default true, so pre-alpha.91 objects keep decrypting) drops the third
layout entirely when set to false, which closes it. Turning it off refuses
pre-alpha.91 objects, so migrate them first by rewriting in place.
Refs backlog#2369 P2.
* fix(kms): reload a service that failed to start
POST /rustfs/admin/v3/kms/reload short-circuited whenever the persisted
configuration matched the in-memory one byte for byte. A node whose KMS
failed to start keeps that configuration and sits in Error, so the
documented recovery call returned "reloaded successfully" while leaving
the node down. Peers reached the same path through the reload broadcast,
so a cluster that lost Vault during a rolling restart had no working
recovery route other than the node-local start endpoint. Reload now
short-circuits only for a service that is actually running, and otherwise
reconfigures, which starts a service that is not running.
The AWS backend also advertised key-version enumeration through
kms/status, which its own documentation says it cannot do; the capability
and its golden snapshot now say false.
Refs backlog#2369 P1, P7.3.
* docs: record the SSE and KMS changes for 1.0.0
The Unreleased changelog section carried no entry for any encryption work
merged since 1.0.0-rc.5, including three items with operational impact:
the config-secret variable whose absence persists secrets in cleartext
with only a warning, the v2 frame write switch and its rolling-upgrade
constraint, and per-key authorization making a public bucket incompatible
with SSE-KMS objects. Adds those plus this batch, including the SSE-KMS
refusal as a breaking change with both routes out.
Also corrects four places where documentation contradicted the code: the
cleanup register still called encrypted range seek opt-in after its
default flipped, the Helm README claimed vault_mount_path only applies to
Transit while the template also feeds the KV2 mount, the disaster-recovery
drill listed bundle contents for backends whose export is refused with
501, and the Chinese README capability table predated most of the feature
set. Documents the SSE-S3 local master key as a first-class operational
mode with its rotation dead end, and what the v1 frame layout does and
does not authenticate.
Refs backlog#2369 P5.
* fix(kms): classify data-path KMS failures by what the caller can do
Only "key not found" and a backend outage were classified; every other
KMS failure that reached the S3 data path fell through to
500 InternalError with a generic message. A disabled or pending-deletion
key, a denied KMS grant, an encryption-context mismatch, an unsupported
algorithm, a credential or timeout failure, and a capability the
configured backend does not have all looked identical to a server fault.
SDKs therefore applied exponential backoff to configuration errors no
retry can fix, and monitoring counted every one of them against the
server's own error rate.
Unusable-key and request-side failures now answer 400, a denied grant
403, transient backend failures 503, and a missing backend capability
501. Damaged, unreadable, or unknown-format key material keeps its 500:
it is a server-side integrity fault, and existing tests pin it.
The classifier is deliberately separate from the admin lifecycle
mapping, which answers 404 for a missing key because there a key id is
the resource being addressed; on the data path it arrives inside a
request header or a bucket default. Messages either name what the caller
asked for or stay generic, with deployment-side detail left on the error
source the way the storage-IO mapping already does.
Refs backlog#2368 B6.
* fix(kms): track and renew static Vault tokens
Token authentication hard-coded "this token carries no lease", so the
renewal task never started, the remaining-TTL gauge was never published,
and nothing looked wrong. `vault token create` grants a 768-hour TTL by
default, so a cluster that had been healthy for a month turned every KMS
call into a 403 and could not recover without a restart or a
reconfigure. Production configuration validation only rejects the
literal dev-token, so an ordinary expiring token reaches a whole cluster.
The source now reads `auth/token/lookup-self` at login and adopts what
Vault reports. A token with no expiry behaves exactly as before. An
expiring renewable one is picked up by the existing renewal loop and
renewed at half TTL like every other auth method. An expiring
non-renewable one warns with its remaining lifetime and publishes the
gauge, so the fail-closed window is visible before it arrives.
The probe never fails the login: a policy that omits lookup-self, or a
Vault that is briefly unreachable, warns and falls back to exactly the
previous behaviour rather than taking down a deployment that works
today. The scripted Vault test double answers the lookup out of band so
existing scripts keep describing only the protocol under test.
Refs backlog#2369 P3.
* feat(sse): report SSE-C requests that arrive without TLS
An SSE-C request carries the customer's AES key in a request header, so
AWS S3 and MinIO both refuse one that did not arrive over TLS. RustFS
accepted them on any transport: a plaintext hop hands the key to anyone
on the path, and since the object cannot be read without that same key,
the exposure lasts as long as the object does.
Refusing outright is the correct end state but not a safe default to
adopt inside a release window, because the project's own s3-tests and
e2e lanes and most staging deployments speak plain HTTP. This release
reports instead: each such request increments
rustfs_ssec_plaintext_requests_total and logs one warning per process, so
an operator can confirm nothing would break before the default flips.
RUSTFS_SSE_C_REQUIRE_TLS=true opts into the AWS 400 now.
The verdict is per connection rather than per deployment: the layer is
built with whether this listener terminated TLS, and additionally accepts
an https protocol forwarded by a proxy the trusted-proxy configuration
already vetted. It sits beside the rate limiter, after the layer that
makes a forwarded protocol trustworthy and after the request context, so
a rejection can echo the request id.
Refs backlog#2369 P7.2.
* fix(kms): say what a node-local backend means for a cluster
The Local backend keeps key material on each node's own disk and
generates its Argon2id salt per node, so two nodes derive different keys
from the same master_key and an object encrypted on one node cannot be
decrypted on another. Behind a load balancer that surfaces as
intermittent 500s on reads that succeeded moments earlier, with nothing
tying the symptom to the cause: the only signal was a generic
"development, testing and demos only" positioning warning that says
nothing about what actually breaks.
Configuring or reconfiguring Local while the deployment is distributed
now logs a dedicated event and appends the consequence to the configure
response, so the operator who made the change sees it. The product
decision to warn rather than refuse is unchanged.
Refs backlog#2369 P7.4.
* docs: record the remaining SSE and KMS changes for 1.0.0
Adds changelog entries for the KMS data-path status classification, the
Vault static-token lease probe, the SSE-C plaintext-transport report and
its switch, and the node-local backend warning.
Documents two things the backend security guide never stated: that SSE-C
belongs on a secure transport, with the counter and switch to plan the
change around, and that the Local backend cannot be shared by a
multi-node deployment because each node derives different keys from the
same master key.
Refs backlog#2368 B6; backlog#2369 P3, P5, P7.2, P7.4.
* fix(kms): report an unreadable key store as an outage on the S3 path
A backend now distinguishes a key store it could not read from a key
that is genuinely absent, but the S3 boundary collapsed the first one
back onto 500 InternalError through the fallthrough for integrity
faults. The distinction was therefore invisible to the client: a
temporary key-directory outage looked exactly like a permanently damaged
key record, and neither the status nor the metric said the request was
worth retrying.
An unreadable key store joins the retryable class and answers 503, next
to a backend error and a credential failure. Damaged, unreadable or
unknown-format key material keeps its 500.
Refs backlog#2368 B6; builds on rustfs/rustfs#7470.
* test(storage): cover MRF cleanup delete ENOSPC anchor (#7513)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require heal retry stats evidence (#7514)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add release bundle dry-run fixture (#7515)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): confirm recovery intent accept readback (#7516)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF cleanup delete ENOSPC evidence (#7518)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require bounded retry window evidence (#7517)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): emit scanner heal G09 upgrade evidence (#7519)
Record measured Scanner/Heal G09 evidence artifacts from the upgrade compatibility lanes when a fresh evidence directory is provided.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): persist MRF rollback mirror boundary (#7520)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G09 upgrade evidence runner (#7522)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(scanner): add G09 upgrade evidence runner
Add a reusable Linux x86_64 runner for the Scanner/Heal G09 mixed-version and rollback upgrade evidence lanes.
The helper reads the pinned previous-release asset metadata from the upgrade workflow, verifies the downloaded binary, builds the current head, runs both ignored E2E tests, and fails unless the expected G09 JSON artifacts exist.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): implement V2 evidence preflights (#7523)
* feat(scanner): wire dirty usage producer identities
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add segment activation preflight proof
Keep scanner segment reuse behind a structured activation preflight so release evidence can prove the production gate remains disabled until every producer, generation, overflow, cold-oracle, and distributed invalidation check is satisfied.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): expose distributed invalidation evidence
Record an explicit distributed segment invalidation evidence summary when remote dirty usage snapshots are bound to the current activity window and the authenticated scoped ACK capability probe succeeds.
Reject peer dirty usage snapshots that contradict the peer activity pending bit so scoped ACKs fail closed instead of clearing an unadvertised remote mutation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): assemble release evidence bundles (#7526)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G09 upgrade evidence runner (#7524)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(scanner): add G09 upgrade evidence runner
Add a reusable Scanner/Heal G09 runner for Linux PR-head validation. The script downloads the pinned previous release, builds the current checkout, runs the mixed-version and rollback upgrade E2E lanes, and validates the measured raw artifacts before they can be consumed by the release bundle gate.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): replay recovery intents while disabled (#7521)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): preflight G09 evidence disk space (#7527)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* fix(targets): reject trailing batch items (#7508)
* test(scanner): preflight G09 evidence disk space
Fail the Scanner/Heal G09 upgrade evidence runner before downloading or building when the validation host does not have enough free space for a full raw evidence pass.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): respect cargo target dir in G09 runner (#7528)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* fix(targets): reject trailing batch items (#7508)
* fix(scanner): respect cargo target dir in G09 runner
Write the RustFS feature stamp under the resolved Cargo target directory so remote validation hosts with CARGO_TARGET_DIR set can reuse the built PR-head binary.
Extend the runner plan/self-test path to cover relative target-dir resolution.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): add G09 upgrade evidence runner (#7525)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(e2e): add G09 upgrade evidence runner
Add a Linux x86_64 runner that downloads the pinned previous release, builds the current RustFS binary, runs the mixed-version and rollback upgrade compatibility lanes, and verifies the required Scanner/Heal G09 raw evidence artifacts.
Document the runner and add a shell self-test for help, dry-run, SHA validation, and non-empty artifact directory guards.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): emit G09 release bundle gate evidence (#7530)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* fix(targets): reject trailing batch items (#7508)
* test(scanner): emit G09 release bundle gate evidence
Write a bundle-ready G09 gate descriptor from the Linux upgrade evidence runner and validate the single G09 gate with the shared release-bundle rules without approving the full Scanner/Heal release.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): reject invalid G09 runner test selection (#7531)
Validate the selected G09 evidence lane before process-substitution case expansion so --plan-only cannot turn an unknown --test value into an empty successful plan.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): keep G09 source binary path clean (#7532)
Keep checksum verification output out of the command substitution that resolves the previous-release binary for the G09 runner.
Also tolerate non-GNU sha256sum in local self-tests by falling back to shasum when GNU --check support is unavailable.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF replay proof cleanup (#7534)
Exercise the committed MRF replay checkpoint path with a real ECStore-backed bucket incarnation, retain the replay anchor until an exact verified proof arrives, then delete the proof-discharged checkpoint and prove a subsequent restart does not resurrect the replayed work.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): carry segment activation preflight evidence (#7535)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): surface cold segment reuse oracle (#7536)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require hard evidence artifact payloads (#7537)
Require Scanner/Heal release bundle JSON artifacts to carry hard-domain evidence fields for mixed-version, crash, capacity, disk-full, replica-loss, and MRF cleanup gates. This prevents a descriptor from approving a hard gate while pointing at a generic measured artifact that lacks the boundary-specific oracle fields.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): bind producer evidence to dirty generations (#7538)
Record scanner segment producer identities with the dirty usage generation they invalidated, then expose a cycle-local producer evidence snapshot for segment reuse activation preflight.
Production activation remains fail-closed until durable producer identity and restart-gap proof are available.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): persist segment invalidation proof metadata (#7539)
* test(scanner): wait for EC8+4 heal control readiness (#7540)
* test(scanner): list full P4 release evidence fields (#7542)
Align the Scanner/Heal release requirement registry with the release bundle gate for P4 so the closure checklist advertises MRF scale, replay cost, retained responsibility, and cleanup/GC soak evidence together.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add W16 release evidence runner (#7543)
Add a W16 Scanner/Heal evidence runner that executes the recovery-intent crash-boundary and quota-authority lanes, emits measured G04/G12 JSON artifacts, and validates the resulting single-gate release descriptors.
Wire its shell self-test into script-tests and document the release evidence entry point.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix: address release acceptance regressions (#7541)
* feat(scanner): admit durable segment proof replay (#7544)
* feat(scanner): admit durable segment proof evidence
Validate complete set snapshot segment invalidation proof metadata against the current dirty usage generation window and scanner process epoch before clearing durable producer and restart-gap activation blockers.
Production segment reuse remains gated by the explicit activation flag.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): replay segment proof from root snapshots
Carry segment invalidation proof metadata into root snapshot set states so a complete published baseline can replay the durable producer evidence recorded by each set cache.
Keep the field additive for older readers and leave incomplete or LKG set states unproven.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind MRF release artifacts to evidence kinds (#7545)
Require Scanner/Heal G07/G08/P4 JSON artifacts to declare the exact MRF evidence kind expected for each release-bundle field. This keeps generic measured JSON from satisfying durable replay, ENOSPC, replica-loss, scale, replay-cost, retained-responsibility, or cleanup-GC soak gates.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): enable segment reuse activation gate (#7546)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): run scoped fallback cases on dedicated stack (#7550)
Linux libtest defaults can abort these deep EC-store futures before the assertions run. Wrap the async scoped fallback cases in the repository's dedicated-stack test pattern so the default cargo test path exercises the oracle directly.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): roll out distributed e2e selection (#7549)
Refresh the committed e2e-distributed selection digest after the EC8+4 Scanner/Heal evidence case joined the profile, and document the registry-aware runner entry for the distributed case.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add W13 MRF evidence runner (#7547)
Add a W13 durable MRF evidence runner that emits measured G07, G08, and P4 JSON artifacts and release descriptors through the existing scanner/heal bundle gate.
The runner now executes the ignored MRF replay evidence test with an exact full test path, validates raw artifact kinds and gate decisions, prepares Linux tmpfs-backed ENOSPC roots for G08, and documents the Linux/long-soak boundaries.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): fix segment proof fixtures
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): reduce W13 evidence helper arguments
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* ci(test): enable local KMS for s3 compatibility tests (#7553)
Configure the s3-tests harness with a local KMS key so SSE-KMS cases run in CI without relying on an external KMS service.
Also move the anonymous POST default SSE-KMS regression onto the shared local KMS test environment.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bind segment proof to typed dirty suffix (#7564)
Track producer identity completeness per pending bucket and retain process coverage across durable acknowledgements. Admit a prior same-process segment proof only for an exact or strictly earlier fully typed generation window.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): validate scoped ACK clear receipts (#7563)
Fail closed when a signed scoped ACK response claims more cleared entries than its request contained, while preserving partial-clear semantics and zero-mutation capability probes.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bind cold scoped cache reuse (#7565)
Record an explicit cold bucket reuse proof for scoped set scans and treat fully cold sets as valid cold-zero-walk reuse when the baseline and bucket incarnations are bound.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(s3): preserve delete marker read error headers (#7558)
* chore(release): sync configurable nightly build workflow from main (#7567)
feat(nightly): make the build branch configurable (NIGHTLY_BRANCH var + dispatch input) (#7557)
* docs(obs): correct metric export interval and explain alert timing (#7571)
* fix(heal): persist scoped admin admission handoff (#7569)
* fix(heal): persist root admission handoff
Persist administrator root heal ownership before queue publication so crash restart can replay an admitted control-plane start without relying on process-local replay cache state.
Protect queued durable root owners from priority displacement; callers must use forceStart cancellation semantics to replace them.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): persist admin heal handoff types
Extend durable admin heal admission handoff beyond cluster roots while preserving legacy root recovery records. Persist the heal type in schema v2, replay typed admin requests after restart, keep non-admin requests out of the durable control-plane handoff, and allow path cancellation to clear durable-only non-root records.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): preserve disjoint durable admin owners
Limit admin forceStart durable-owner cleanup to overlapping heal requests after the admin recovery journal begins storing non-root work. Add fail-closed and displacement tests so durable bucket owners cannot be silently dropped by unrelated replacement or priority pressure.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): persist admin terminal receipts
Persist terminal receipts for durable administrator heal starts before retiring their pending intent so restart can answer completed or cancelled scoped tasks without replaying them.
Retain pending work when terminal publication fails and keep timeout owners on checkpoint-only replay semantics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): mark committed replication and tier mutations (#7568)
* fix(scanner): mark committed replication and tier mutations
Bridge ECStore committed replication status writebacks and lifecycle tier expiration cleanup into scanner dirty-usage producer identity tracking. Only successful replication metadata updates mark Replication; validate-only, superseded, and retry paths remain unmarked.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): replay durable dirty producer records
Add a strict scanner dirty-usage producer replay schema that can restore typed producer coverage after restart without treating ordinary process-local mutations as durable evidence. Replay records validate schema, cache key format, generations, scopes, producer identities, duplicate buckets, byte limits, and entry limits before modifying dirty state.
Keep segment activation fail-closed unless the restored bucket state came from durable replay; subsequent local mutations clear the durable authority bit for that bucket. Also fix the release scanner clippy lint in scoped cold-reuse proof creation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): recover expansion buckets and resume retirement (#7574)
* fix(ecstore): recover partially created expansion bucket volumes
* fix(ecstore): resume retirement after startup safety checks
* fix(ci): align S3 KMS fixtures and default key expectations (#7573)
* fix(heal): prune retained root terminal receipts (#7576)
Bound durable root-heal terminal receipt retention to the completed-status TTL while keeping expired receipts authoritative enough to retire stale pending intents before deleting the receipt itself.
Add a budgeted background GC pass and fail closed on corrupt or non-terminal receipt records.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(storage): preserve retryable publication guard errors (#7561)
* fix(storage): preserve retryable publication guard errors
* fix(scanner): satisfy scoped cache clippy lint
Use bool::then_some for the scoped cold bucket reuse proof construction after merging the latest release branch.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(health): report storage quorum in node readiness (#7566)
* fix: preserve scanner backlog during pool retirement (#7555)
* fix: hand off native scanner backlog before pool retirement
* test: initialize optional proof in data usage fixtures
* perf: bound parallel V3 pool metadata phase writes
* test: keep native backlog fault errors typed
* test: skip unchanged pool metadata in crash barriers
---------
Co-authored-by: cxymds <cxymds@gmail.com>
* test(scanner): bind profile artifact provenance (#7577)
* fix(scanner): persist dirty producer journal (#7580)
Persist scanner dirty producer replay records from committed replication and tier mutations, hydrate journal state on restart, and clear durable records only after acknowledged dirty generations.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test: add scanner heal scheduler pressure evidence (#7584)
Add measured G10/P1/P3 scheduler-pressure release descriptor generation, ABBA scheduler/profile provenance, and focused self-tests for the release bundle gate.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test: add scanner heal G14 multiset evidence (#7583)
Add EC8+4 multi-set and multi-pool scanner/heal release evidence coverage, including e2e registry cases, oracle checks, and a G14 descriptor assembler for measured case artifacts.
Signed-off-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(nightly): push assets with plain git on release — the build fleet has no gh CLI (#7586)
fix(nightly): push assets with plain git — the build fleet has no gh CLI
The sm-standard-4 runners used by the nightly build have no gh binary
(functional-chain workflows run elsewhere, on the jumpbox). The assets
publish step died on 'gh: command not found' at the credential-helper
setup, and the preceding clone failure had been masked by 2>/dev/null,
misleading the step into the orphan path. Swap clone and remote setup
to plain git with the token embedded in the URL; push semantics are
unchanged.
* fix(scanner): stabilize retired backlog survivor commits (#7585)
Treat an authoritative scanner pause-backlog commit as stable when every member in that commit stores the matching stable and committed record. Retired source replicas can remain missing in the observed topology while survivor membership is already stable.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(metrics): prevent duplicate drive reporting across nodes (#7582)
Co-authored-by: houseme <housemecn@gmail.com>
* fix(ecstore): avoid Windows batch-delete cleanup sharing conflicts (#7579)
Co-authored-by: houseme <housemecn@gmail.com>
* feat(ilm): inspect legacy transition version state (#7581)
* test(scanner): add release evidence ingestion gates (#7588)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix: reuse admin error boundary for legacy tier reconciliation (#7587)
* fix(test): stabilize release CI heal fixtures (#7589)
Keep heal admission-only tests off durable root recovery so mock storage does not require local metadata disks. Align forceStart retry assertions with replacement semantics and fix the e2e metric clippy collapse.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)
Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).
- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
the 'nightly' release via the REST API, deletes same-name assets,
uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
body with the build provenance (ref@sha, run link, sizes, SHA256).
Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
exercised end-to-end against the real release with probe files
(create / upload / overwrite / download round-trip / body update).
* test(scanner): add release bundle evidence descriptors (#7595)
* test(scanner): merge release evidence descriptors
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add authority and legacy release descriptors
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add scoped ack release descriptor
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require all release evidence fields
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add mrf release descriptor producer
Add a standalone W13 MRF descriptor producer for measured G07/G08/P4 raw artifacts, with fail-closed self-tests for missing responsibility cases, disk-full ENOSPC observations, synthetic artifacts, and short P4 cleanup soaks.
Also bind G12 quota path evidence to explicit case lists so W16 descriptors cannot pass without reset and settlement coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): reuse mrf release descriptor producer
Route the W13 runner through the shared MRF descriptor producer so measured runs and offline re-packaging use the same fail-closed validation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(ilm): backfill proven legacy transition state (#7591)
* feat(ilm): backfill proven legacy transition state
* fix(ilm): remove redundant reconcile test clone
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): remove redundant transition clone (#7597)
Drop an unnecessary clone in the legacy transition state digest regression so release CI clippy lanes can run with warnings denied.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): seed current backlog members before committing (#7594)
* fix(scanner): seed current backlog members before committing
* test(app): run recursive force delete test on large stack
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind raw profile artifacts (#7598)
Require Scanner/Heal release profile wrappers to carry bundled raw profile artifacts plus the matching profile cost metrics.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): surface first failed object in status (#7599)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover retry budget across attempts (#7600)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden durable producer evidence gate (#7601)
Require Scanner/Heal G11 maintenance evidence to prove durable dirty producer journal replay, replay-state hydration, generation-bound ACK clearing, and invalid journal fail-closed cases before segment reuse can be activated.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden scoped ack evidence proof (#7602)
Require Scanner/Heal G03 scoped ACK evidence fields to carry their own measured provenance and concrete ACK, capability, and mixed-peer observations before release-bundle gate verification.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind status outcome raw provenance (#7603)
Require measured G05/G06/R-D raw status, compatibility, and disposition artifacts to share run identity before producing release bundle descriptors.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): retry fully recoverable batch failures (#7604)
Allow recursive bucket and cluster heal attempts whose retained batch failure is entirely retryable to use the existing bounded manager retry budget. Permanent or mixed batch failures remain terminal so heal outcome semantics stay strict.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): avoid movement debt for stale remote lease (#7605)
Classify a final remote scanner publication lease validation failure from a fresh activity snapshot instead of treating every validation error as data movement. If the peer session and movement generation still match the granted leases and publication is otherwise allowed, keep the publication rejected as an activity-baseline miss without creating pause backlog movement debt. Preserve DataMovement for expired leases, peer restarts, movement generation changes, and active publication blocks.
Tests cover namespace-only validation invalidation and the remote fence-loss cases that must still defer as DataMovement.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* chore(deps): refresh workspace dependencies (#7606)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind G14 case artifacts (#7611)
Require Scanner/Heal G14 release bundle JSON wrappers to mirror their outer evidence and carry self-contained case artifact provenance.
Copy proof-json case artifacts into the generated G14 descriptor bundle so assembled release bundles can validate case file hashes after relocation.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): retry contended decommission cancel target locks (#7612)
* test: align transition fixtures and KMS context expectations (#7610)
* test(scanner): stabilize W13 release gate evidence (#7613)
* feat(nightly): publish packages as assets of the rolling 'nightly' release (sync from release) (#7593)
feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)
Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).
- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
the 'nightly' release via the REST API, deletes same-name assets,
uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
body with the build provenance (ref@sha, run link, sizes, SHA256).
Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
exercised end-to-end against the real release with probe files
(create / upload / overwrite / download round-trip / body update).
* test(scanner): stabilize W13 release gate evidence
Treat only real raw-entry windows as replayed scanner enumeration in the restart diagnostic, so final completion rounds without raw entries are not fail-closed as raw replays.
Allow the EC8:4 multi-pool heal evidence case to select an outage object key that routes to an online pool while an entire target pool is down, preserving strict behavior for single-pool cases.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bound native backlog fixture resources (#7609)
* fix(scanner): bound native backlog fixture resources
Keep native scanner backlog restart fixtures within low file descriptor limits by reducing the native-only disk layout, making fixture shutdown drain background work, and avoiding long-lived ECStore retention from background loops.
Convert ECStore-backed background refresh/recovery/monitor tasks to upgrade weak owners only while doing work so completed test stores release their disk graph before the next native fixture starts.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(tier): refresh release-merged failure fixtures
Reuse the raw legacy-transition fixture helper so delete-all expiry actually exercises Unknown transitioned history metadata after the release merge.
Rewrite restore-failure disk fixtures through per-disk xl.meta snapshots so stale destination identities can be persisted without tripping ordinary metadata update guards.
Update the SSE KMS mismatch expectation to the InvalidRequest/context_mismatch behavior now returned by the rio-v2 path.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): align release E2E gate and repair regression tests (#7607)
* fix(scanner): harden heal release gates (#7614)
* test(scanner): reject synthetic heal evidence inputs (#7617)
Harden the Scanner/Heal checkpoint restart and G14 EC evidence producers so release descriptors cannot be assembled from marked fixture, dry-run, or synthetic case inputs.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): collect status outcome raw evidence (#7618)
Normalize live Scanner/Heal status/outcome observations into the measured raw artifacts consumed by the G05/G06/R-D release descriptor producer.
Reject synthetic observations, incomplete required cases, and reused run/window identities before raw artifacts can enter the release bundle flow.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bind scoped ack confirmation to generation (#7619)
Require lost scoped dirty-usage ACK reconciliation to observe a clean peer activity generation that covers the requested ACK generation. Apply the same guard in the scanner aggregation path so a stale clean activity snapshot cannot discharge pending maintenance after an uncertain ACK response.
Refs rustfs/backlog#2427
Refs rustfs/backlog#2281
Refs rustfs/backlog#2240
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test: report tier reference proof setup failures without hanging (#7608)
* test(scanner): plan Linux evidence validation (#7620)
Add a Scanner/Heal Linux release-evidence planner that emits a machine-readable execution manifest for the remaining measured validation lanes.
The planner can run only lightweight preflight checks and keeps plan-only output distinct from measured release evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): select G14 replacement drive by evidence (#7622)
Choose the replacement disk from the target node by the presence of complete pool metadata instead of assuming the first configured drive is the scanner metadata holder. This keeps the G14 multi-set harness aligned with multi-drive EC layouts and adds clearer diagnostics when multi-pool outage writes fail closed.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): report Linux evidence plan status (#7624)
Add a status mode for the Scanner/Heal Linux evidence planner so operators can identify missing or incomplete artifacts before final bundle assembly.
The status output stays plan-only and never reports release approval.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G14 multi-pool background heal evidence (#7628)
test(scanner): align G14 multi-pool outage evidence
Treat the localhost multi-pool topology as whole-pool loss when the target node is down. If that topology cannot admit the outage object while the pool is offline, defer that object write until the pool rejoins and record the oracle marker instead of failing before the real crash/restart evidence runs.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): verify deferred multipool outage evidence (#7629)
Validate the G14 multi-pool oracle field that records down-window outage PUT refusal and requires the deferred post-rejoin outage object to be accepted and checked through S3.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): allow metadata snapshots at read quorum (#7627)
fix(ecstore): admit metadata snapshots at read quorum
Allow guarded bucket metadata snapshot existence checks to use read quorum so degraded erasure sets can continue Object Lock snapshot reads without weakening bucket mutation or object write quorum.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* chore(deps): refresh release dependencies (#7632)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): use pool lock quorum for set writes (#7630)
Use the pool-wide namespace lock client domain for every set in a pool so degraded EC8+4 multi-set writes are gated by node-level lock quorum instead of the narrower per-set endpoint host slice.
Keep namespace-lock domain deduplication tied to both the pool namespace and shared clients, and add regression coverage for three-locker degraded writes plus cross-pool domain separation.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): keep G14 multi-set restart graceful (#7633)
test(e2e): keep multi-set restart graceful
Include the EC8+4 multi-set restart scenario in the graceful interruption lane so the unclean-shutdown marker assertion matches the scenario semantics.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): record deferred G14 outage writes (#7637)
Include optional outage-write diagnostics in G14 evidence oracles so deferred multi-pool outage writes bind their down-window refusals and post-rejoin acceptance.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bound G14 multi-pool evidence size (#7640)
Keep the multi-pool evidence runner within the registry object budget while retaining deferred outage-write diagnostics for release-gate validation.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): find nextest junit fallback for evidence cases (#7643)
Handle cargo-nextest writing JUnit reports under the workspace target directory even when the Rust build uses CARGO_TARGET_DIR. This keeps measured Scanner/Heal evidence cases from passing the real test but failing final receipt packaging.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ilm): preserve cleanup ownership on tiered overwrites (#7639)
* fix(ilm): preserve cleanup ownership on tiered overwrites
* fix(ci): refresh E2E selection for tier overwrite regression
* test(ilm): restore noncurrent compensation tests to serial CI (#7645)
* fix(heal): preserve null-version tags and encoded object paths (#7644)
* fix(e2e): record EC8+4 drive restart set size (#7648)
* fix(e2e): record EC8+4 drive restart set size
Include the erasure set drive count in the distributed EC8+4 drive restart oracle so Scanner/Heal release evidence matches the registry contract.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(s3): tighten s3s footprint ratchet
Replace release-merge s3_error! macro calls with equivalent S3Error constructors so the s3gate migration ratchet does not grow on the PR merge tree.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): target multi-set outage heal candidate (#7653)
* test(e2e): target multi-set outage heal candidate
Require the outage write used by EC8+4 multi-set root-heal evidence to miss the same erasure index owned by the selected replacement drive. This avoids accepting a candidate from a different set and turning a valid heal into a false negative.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): satisfy G14 heal lint gates
Remove clippy-only noise from the G14 multi-set heal evidence test and align the admin route policy inventory with the registered heal catch-all route.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* update
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): reuse API error boundary for decoding failures (#7647)
* fix(heal): reuse API error boundary for decoding failures
* Update heal.rs
Signed-off-by: houseme <housemecn@gmail.com>
* test(ecstore): synchronize batch cleanup metadata reads
Acquire object read locks while observing unversioned and explicit-version batch cleanup, then release them before waiting for progress. This prevents snapshots from spanning per-disk marker removal while retaining the existing quorum, timeout, and remote delete count assertions.
Validation: cargo fmt --all --check and git diff --check passed. The focused nextest test passed 20 stress iterations each with test-util and test-util,rio-v2, with retries disabled.
---------
Signed-off-by: houseme <housemecn@gmail.com>
Co-authored-by: houseme <housemecn@gmail.com>
* fix(scanner): wait for ABBA telemetry window (#7660)
Size the scanner collector wait budget from the requested sample count and interval instead of using a fixed 120 second timeout. This preserves the full duration/60+1 telemetry sample set for measured ABBA runs.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(ci): add fault-tolerance degradation suite to the functional chain
Adds a fault-tolerance suite that verifies read/write behavior under
drive and node loss against the erasure-coding contract and snapshots
health-endpoint responses at every degradation tier. Scenarios are
derived from product source (default_parity_count, erasure set sizing):
- A: single-node 4 drives (EC:2, read quorum 2): hide 1/2/3 drives
- B: multi-node 4x1 (one set of 4, EC:2): stop 1/2/3 nodes
- C: multi-node 4x4 (one set of 16, EC:4, read quorum 12): 1 node down
lands exactly on the read-quorum boundary; 2 nodes down breaks it
- C2: multi-node 4x4 with RUSTFS_STORAGE_CLASS_STANDARD=EC:8 (read
quorum 8, write quorum 9, lock majority 9): 2 nodes down puts reads
inside the reported divergence window (read quorum met while the
lock majority is broken)
By default a reads-refused-despite-met-read-quorum observation is
reported as known-divergence without failing the suite; the strict
input escalates it. Chain order becomes:
upgrade -> s3 -> kms -> tier -> storage -> heal -> pool -> security ->
replication -> fault-tolerance -> performance.
Covers the findings of the 2026-09 external degradation report
(reads at read quorum, health-endpoint readiness truthfulness,
degradedReasons capture) as automated regression probes.
* Revert "feat(ci): add fault-tolerance degradation suite to the functional chain" (#7666)
This reverts commit 6eb200022e.
* fix(ecstore): preserve multi-pool version histories (#7658)
* fix(ecstore): preserve multi-pool version histories
* fix(ecstore): satisfy clippy in rebalance test
* fix(ecstore): preserve decommission delete compatibility
* fix(heal): recover stale peer state after restart (#7665)
* fix(heal): select writable recovery intent owner (#7668)
* feat(ci): add fault-tolerance degradation suite to the functional chain (#7669)
* fix(get): reject pre-header read quorum failures (#7670)
* fix(get): reject pre-header read quorum failures
* fix(ci): unblock get pre-header quorum checks
* ci: stop defaulting suite dispatches to a pinned release (#7681)
The rustfs_version dispatch input defaulted to 1.0.0-rc.4-preview.1,
which shadowed the nightly fallback and started 404ing once that
release was deleted. Manual dispatches with no inputs now fall through
to the nightly package (same contract the pool suite already has);
passing rustfs_version or package_url still pins the build exactly as
before. Chain (repository_dispatch) runs are unaffected: the inputs
context is empty there, so they always used the nightly fallback.
* ci: manage backlog issues by signal instead of per-run filing (#7680)
* ci: manage backlog issues by signal instead of per-run filing
The suite workflows used to file one backlog issue per failed run
(dedup was by run ID, which never matched), so issues accumulated
without bound. Replace the inline filing step in every suite workflow
(s3, kms, tier, storage, heal, pool, security, replication, upgrade,
performance) with a single call to
auto-testing/scripts/issue_manager.py, which:
- dedups by signal: failing cases are searched among open issues by
label (suite category + case ID); covered cases become a coalesced
comment on the existing issue, only uncovered cases file a new one
- labels new issues with functional-test, the suite category, one
label per failing case ID (lazily created), and env for
bootstrap-class failures (no cases ran, wholesale failure, or
404/ssh/clone/dpkg signatures in the log)
- closes open issues of the suite after a fully green run, citing the
run as evidence; cancelled runs never file or close anything
The step is skipped cleanly when auto-testing (private checkout) does
not contain the manager, or when PF_TESTING_GH_TOKEN is unset.
* fix(ci): satisfy actionlint and workflow contract tests for the manager step
- heal and performance workflows have no rustfs_version dispatch input;
referencing `${{ inputs.rustfs_version }}` in the manager step failed
actionlint's expression type check. Their package source now resolves
from package_url with the nightly fallback.
- scripts/test_security_workflow.py pinned the removed inline filing
step. The wiring assertions now pin the manager step (manager path +
per-suite report argument), and the evidence/stale-file tests assert
the skip contract instead: without the private auto-testing checkout
present, the step exits 0, publishes nothing, and leaves stale
evidence untouched.
Verified locally: actionlint clean, shellcheck clean,
test_security_workflow.py 21/21.
* fix(storage): alias legacy meta bucket over internode rpc (#7685)
* fix(storage): alias legacy meta bucket over internode rpc
Retry read-only internode RPC metadata access from legacy .minio.sys to .rustfs.sys when mixed-version peers report missing metadata during rolling upgrades.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): target durable ILM receipt quorum fixture
Use the actual durable ILM receipt object path when taking target disks offline so the test exercises receipt write quorum instead of whichever set owns the source record path.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): stabilize cancelled rename test (#7684)
* test(scanner): report Linux descriptor drift ledger (#7692)
Add a read-only descriptor ledger mode to the Scanner/Heal Linux evidence planner so release operators can separate current-head measured descriptors from old-head measured artifacts and case-level inputs before final bundle assembly.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): retry recovery readback SlowDownRead (#7695)
Allow the Scanner/Heal interruption oracle to retry transient retryable GET failures after replacement recovery has converged. The readback still verifies exact object bytes and keeps a bounded timeout, so permanently unreadable objects continue to fail the case.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(pool): default the node-endpoints fallback to the 4-node fleet (#7696)
RUSTFS_POOL_NODE_ENDPOINTS has no secret/var configured, so the suite
ran with the workflow's inline 3-endpoint fallback and the explicit
--node-endpoints flag overrode the script default fixed in
rustfs/auto-testing#61 — every dispatch died at startup with 'must
provide at least 4 direct node endpoints' (run 34677538650). Add
rustfs-node4 to the fallback; explicit secret/var still wins.
* fix(scanner): require ABBA collector credentials (#7700)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): label G14 recovery read failures (#7701)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): preserve settings in token status (#7691)
* fix(heal): preserve settings in token status
* fix(heal): group status response context
* fix(heal): decode partial status settings
* ci: green runs for case failures; red only for harness breakdowns (#7698)
A failing product case used to turn the whole workflow red, so the run
conclusion carried no signal beyond 'something failed' and the report
was suppressed. New semantics across the functional suites:
- Suite steps run with continue-on-error: the outcome is still recorded
for the report and the backlog issue manager (security/tier already
carried the flag).
- Generate report always publishes the full per-case table plus a
'Product result: N passed, M failed' summary, and its exit gate is
harness health: red only when the suite never reached case level (no
case verdicts), failed wholesale (zero passes, >=3 failures), or was
cancelled/skipped. performance is unchanged (parked).
- tier's structured gate no longer fails on case failures; it keeps red
for evidence-init and missing-gate-result breakdowns.
- pool/performance keep their existing red sources (install/benchmark).
Workflow contract tests updated to the new exit semantics: the security
report matrix keys green off the suite outcome, the evidence matrix
expects green for failure outcomes with recorded case rows (except
performance), the heal staged-rerun block expects the per-step table to
always publish, and run steps are now required to carry
continue-on-error.
Verified locally: actionlint clean; test_security_workflow.py 21/21.
* test(heal): retry G14 deferred outage put (#7703)
Treat SlowDownRead as a bounded retryable deferred PUT response after the target pool rejoins, and label terminal deferred outage PUT failures with stage context.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): retry G14 outage put probes (#7704)
Treat SlowDownRead as a retryable outage PUT probe response in the G14 multi-pool runner, and label terminal candidate failures with stage context.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): remove unused G14 put helper (#7705)
Remove the superseded ServiceUnavailable-only PUT helper after the G14 outage PUT probe switched to the shared retry classifier.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(tables): authorize reserved metadata reads (#7672)
* ci: harden report steps after first full new-semantics run (#7708)
First full serial pass with the green-on-case-failure semantics
(run 34693745171 / 34695021651) exposed three report-layer defects:
security: the report step referenced LOG_FILE, which is undefined in
this workflow (set -u killed the step before writing report.md), and
the verdict greps could not match the ANSI-escaped [PASS]/[FAIL] tags
in the real suite log. Point it at the artifacts suite.log, allow any
number of color escapes before the verdict tag, and count [SKIP]
lines separately (45 passed, 6 failed, 3 skipped was reported as an
unbound-variable crash).
pool: warp is stopped early (SIGINT) at the storage threshold and
only writes its final report on a clean exit, so an empty warp.log is
the expected shape of a healthy run - require its presence, not its
size. A mid-script die() abort or a FAIL step verdict must also turn
the validator red now that the run step is continue-on-error.
tier: add the standard 'Product result: N passed, M failed' summary
line computed from the case table, matching the other suites.
The contract test fixture previously injected LOG_FILE into the
environment and wrote verdict lines without ANSI escapes, which hid
both real-world defects; the fixture now mirrors the real suite
(stdout+tee with color tags) and asserts the pass/fail/skip counters.
* ci: tolerate ANSI reset escapes in security verdicts; fix tier product counts (#7712)
The overnight run after #7708 proved the security verdict greps still
counted zero: real verdict lines are '\e[1;31m[FAIL]\e[0m STS-105 ...'
— the reset escape sits between the tag and the case id, and the
pattern only tolerated escapes before the tag. Allow escapes on both
sides; the fixture now emits the reset too, mirroring the real suite.
The tier case table is produced by rustfs_tier_report.py and its rows
lead with the topology column, so the case-ID-first table grep matched
nothing ('Product result: 0 passed, 0 failed'). Parse the PASS/FAIL
counts from the '## Case Summary' bullets the report always emits,
falling back to a topology-aware table grep.
* fix(heal): reject overlapping admin heal owners (#7723)
* fix(heal): reject invalid admin selectors before admission (#7724)
* fix(heal): pass endpoints to overlap receipt test (#7738)
Reuse the heal-control endpoint fixture in the overlap receipt regression so the test matches the updated execution helper signature and selector validation boundary.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: hehutu <hehutu@gmail.com>
* fix(heal): verify inline shard bitrot during deep scans (#7731)
* fix(heal): verify inline shard bitrot during deep scans
* test(heal): fix CI lint and topology fixtures
* fix(heal): persist and retry partial-write repairs (#7729)
* fix(heal): persist and retry partial-write repairs
* test(heal): pass topology to overlap RPC tests
Use the existing coordinator endpoint fixture for the three overlap-test
calls to the endpoint-aware heal control executor. This repairs the E0061
test-build failure inherited from the release base.
* fix(scanner): prove dirty ACK after confirmed root write (#7732)
Allow a confirmed scanner root data-usage CAS write to prove its own publication when the follow-up root readback cannot provide a proof. Keep AlreadyDurable and all stale or companion paths on the existing readback-only proof boundary.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): rebuild truncated xl.meta from healthy quorum (#7730)
* fix(heal): rebuild truncated xl.meta from healthy quorum
* fix(test): pass topology to heal overlap RPC regression
* fix(test): drive heal admission alongside partial PUT
Poll the partial PUT and its mock heal receiver together, bound their handshake, and retain the existing repair-scope assertions.
* fix(test): prepare durable MRF fixtures and Linux heal stack
* fix(test): drive tier cleanup recovery after deferred attempts
---------
Co-authored-by: Hauser <housemecn@gmail.com>
* fix(heal): prove completed historical version cleanup (#7736)
* fix(heal): prove completed historical version cleanup
* test(heal): use debug runtime stack for C06 regression
* test(ecstore): acknowledge partial PUT heal admission concurrently
* test(mrf): fix journal fault and ownership fixtures
* fix(tables): retain dropped warehouse protection (#7675)
* fix(ecstore): gate shard integrity and preserve legacy recovery (#7741)
* fix(ecstore)!: bind bitrot shards to immutable part identities
Verify part, coding-index, and block identity across write, GET, and Heal
paths. Preserve identities across metadata-only copies and repair, include
them in multipart quorum selection, and require payload proof for receipts.
Keep legacy decoding with conservative parity and target-digest validation,
and document its unsupported cases and additional verification I/O.
BREAKING CHANGE: New bound-v1 shards require compatible readers throughout
the fleet. Legacy objects without sufficient integrity evidence return an
error; binary rollback after new writes requires verified data migration.
Refs: rustfs/backlog#2497
* fix(ecstore): preserve shard framing with independent integrity
Commit immutable part-generation Merkle roots and replicated proof indexes without changing existing checksum frames. Verify reads, reconstruction and Deep Heal against metadata quorum; keep legacy reads and explicitly defer unproven legacy data repair.
Preserve multipart rollback generations, require acknowledged durable index publication, and add decoder compatibility and donor-shard regression coverage.
* fix(heal): verify protected partial-write replay
* fix(heal): retire stale delete markers after bucket recreation (#7743)
* fix(heal): prove completed historical version cleanup
* test(heal): use debug runtime stack for C06 regression
* fix(heal): retire stale delete markers after bucket recreation
* test(ecstore): fix Clippy in retired marker regressions
* fix(heal): preserve historical null version identity (#7749)
* fix(s3): preserve version identities on suspended reads (#7751)
* fix(rebalance): retry contended runtime metadata access (#7752)
* fix(rebalance): retry contended runtime metadata access
* chore(rebalance): shrink typed error ratchet baseline
* fix(heal): bind bucket recovery to its original incarnation (#7744)
* fix(heal): bind bucket recovery to its original incarnation
* fix(heal): preserve stable bucket heal task errors
* fix(s3): classify copy source part read failures (#7746)
Map PartMissingOrCorrupt to SlowDownRead only at the GetObject/CopyObject source-reader boundary so quota metadata corruption keeps its internal fail-closed response.
Add store and e2e coverage for Harbor-style multipart staging CopyObject boundaries.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(tier): classify invalid remote credentials (#7753)
* fix(tier): classify invalid remote credentials
Classify deterministic remote-tier auth rejections before the probe cleanup fallback, and preserve the admin 4xx status for invalid credential responses.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): stabilize delete-marker movement regressions
Ignore target-local bucket incarnation fence metadata when comparing data-movement delete-marker identities, keep the release null-version listing fixture valid, and fix the nextest decommission-family filter so fault-hook tests actually join the serial group.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): serialize tier cleanup owner matrix (#7765)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): run bootstrap usage rebuild promptly (#7758)
Treat non-authoritative usage floor startup as pending bootstrap rebuild work so reset-published bootstrap markers cannot sit behind clean-idle or empty pause-backlog delay.
Wire recovery wakeups into the normal scanner cycle wait and expose the pending rebuild state in scanner status.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(tier): preserve cleanup scheduling for overwrites (#7766)
Queue committed tier free-version cleanup receipts for PUT and materialized CopyObject overwrites of transitioned null versions, while keeping remote deletion behind the existing persisted free-version cleanup path.
Tighten data-movement delete-marker retry equivalence by ignoring local bucket-incarnation fencing metadata, avoid retry fallback to the source pool, and keep version-list pagination from manufacturing an empty final page.
Refresh the e2e-distributed selector hash for the current release test set.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(release): backport main fixes and stabilize tier cleanup tests (#7793)
* fix(ecstore): stop pruning at nonempty directories (#7616)
* fix(ecstore): stop pruning at nonempty directories
* test(ecstore): release pruning fixtures before temp cleanup
(cherry picked from commit 8f150d1d8e)
* fix(heal): preserve retryable batch failures during recovery (#7642)
* fix(heal): preserve retryable batch failures during recovery
* test(heal): pin prebuilt hooks binaries in ci
(cherry picked from commit 5cd58319ed)
* fix(s3): reject oversize single PUT early and map body errors to 4xx (#7635)
* fix(s3): reject oversize single PUT early and map body errors to 4xx
A single PutObject above the 5 GiB single-request ceiling was only
rejected after the client had streamed 5 GiB into s3s's read-time body
budget, and the resulting BodySizeLimitExceeded surfaced from the erasure
writer as 500 InternalError. A body whose connection hit EOF before
Content-Length bytes arrived (hyper's IncompleteBody) was also a 500.
SDKs retry 500s, so one oversize upload was resent from offset 0 five
times.
- PutObject and UploadPart reject a declared length above
MAX_SINGLE_PUT_OBJECT_SIZE with 400 EntityTooLarge before reading the
body; the constant moves to rustfs_config so the s3s limit and the
admission check share one value.
- ApiError maps BodySizeLimitExceeded to EntityTooLarge and a hyper body
EOF to IncompleteBody across both io::Error conversions.
Fixes#7596.
* test(s3): cover UploadPart admission, aws-chunked length, real s3s limit
- Poll-counting test body proves PutObject and UploadPart reject a
declared size above the ceiling with zero body polls; exact-cap and
zero-length parts pass admission.
- A STREAMING-* aws-chunked PUT whose framed Content-Length exceeds the
cap is admitted when the decoded length is within it and rejected when
the decoded length is over it.
- The display-based BodySizeLimitExceeded matcher is checked against the
real error produced by the pinned s3s Body budget.
(cherry picked from commit 50b31bc75b)
* fix(ecstore): make directory mtime fixture portable (#7623)
* fix(ecstore): make directory mtime fixture portable
* style(ecstore): format mtime fixture assertion
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
(cherry picked from commit b1cc286cac)
* fix(storage): prevent readiness after native migration failures (#7652)
* fix(storage): prevent readiness after native migration failures
* fix(storage): skip unsupported IAM records before reading
* fix(storage): use stable typed migration metadata errors
* fix(storage): include migration record in startup errors
* test(storage): cover native migration startup failures
* test(storage): use array chunks in migration fixture
---------
Co-authored-by: RJ Regenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: cxymds <cxymds@gmail.com>
(cherry picked from commit 0cbc3ffe61)
* fix(admin): expose OIDC account display fields (#7654)
Expose verified OIDC username and email claims as display-only metadata on self-account responses while preserving the virtual parent as the authorization identity.\n\nKeep rustfs-madmin public response structs unchanged by adding the optional wire fields through private handler response wrappers.
(cherry picked from commit f02bc947cd)
* fix(replication): correct peer joins and remote-state reporting (#7650)
* fix(replication): propagate verified peer deployment identities
* fix(replication): report actual remote peer state
* fix(replication): defer initial sync until all peers join
* test(replication): shut down TLS fixtures cleanly
---------
Co-authored-by: houseme <housemecn@gmail.com>
(cherry picked from commit 853ae63b6a)
* fix(s3): bound stalled UploadPart request bodies (#7659)
* fix(s3): bound stalled UploadPart request bodies
* fix(ci): preserve the S3S footprint ratchet
(cherry picked from commit 666dfd9f9f)
* fix(tables): reject reserved warehouse locations (#7671)
Co-authored-by: cxymds <cxymds@gmail.com>
(cherry picked from commit 414176c47f)
* fix(ci): bind nightly lanes to one resolved source (#7688)
(cherry picked from commit 01d8e4347f)
* fix(replication): close the pre-stable convergence gaps from backlog#2367 (#7626)
* fix(replication): total-order rule sort and honor V1 top-level Prefix
Rule matching had two defects from the pre-GA replication audit
(rustfs/backlog#2367 C-1 and C-2):
- The actionable-rule sort compared same-destination rules by priority but
answered Equal for any other pair, which is not a total order; the
standard library sort panics on such comparators once a slice exceeds the
insertion-sort threshold, so an object matching more than 20 enabled rules
across two or more targets could panic the PUT or DELETE task. Rules now
sort by priority descending with destination and id as tie-breakers, and
filter_target_arns preserves that order instead of draining a HashSet.
- A V1 rule written without a <Filter> carries its prefix at the top level;
that field was never read, so <Prefix>logs/</Prefix> matched every object.
ReplicationRuleExt::prefix now falls back to it, with a <Filter> keeping
precedence. The existing prefix fixtures were built this way and had been
asserting nothing.
* fix(admin): advertise data-usage and listen capabilities to rc
The rc client gated `rc du` and `rc watch` on a pinned contract that
matched server versions by the string prefix `1.0.0-rc.`; a server that
reports `1.0.0` no longer matches, and the dynamic `advertised` list did
not carry either name, so `rc du` against a GA server fails with an
unsupported-capability error (rustfs/backlog#2367 E-2).
Advertise `admin.data-usage` from the admin route inventory like the IAM
entries, and `listen_notification` for the bucket `?events=` extension
route the admin router dispatches. The client merges advertised entries
ahead of its pinned contract, so no version sniffing is needed.
* fix(site-replication): stop notifying the local site on remove and rotate
The pending-remove and pending-rotation notification loops skipped the
local site by endpoint only, while finalization identifies it by
deployment id or endpoint. The reconcile tick resolves the local peer from
the node's own listen address (and a handler from the request Host), so
`remove --all` dialed the site's registered endpoint, waited out the
request timeout against the lifecycle lock it was holding, and answered
`Partial: failed to notify 1 peer(s)` for a removal that had succeeded
(rustfs/backlog#2367 A-4, backlog#2195 item 3).
Both loops now iterate the peers still awaiting notification through one
helper that applies the finalization identity.
* fix(site-replication): promote and settle IAM retries without a tick of slack
Two retry-queue behaviours kept an IAM change from converging for ten to
twenty minutes after a peer came back (rustfs/backlog#2367 A-1 and A-3,
backlog#2305):
- The lightweight 30-second pass filtered its reachability probe to bucket
ops, so a backed-off IAM or bucket-metadata snapshot waited for the
600-second tick to notice the peer. It now probes every backed-off class
and still replays only bounded bucket ops; promotion is a state flip the
heavyweight tick acts on.
- Backoffs are multiples of the tick interval, so a failure stamped δ
seconds after a tick was 600 − δ old at the next tick and slipped a whole
extra interval. The heavyweight drain now evaluates backoff halfway to its
next tick.
- An IAM entry first created by a non-deletion failure (the add bootstrap's
snapshot send, the drain's own replay, an import-iam schedule) was never
stamped `deletions_recorded`, so a later recorded deletion could not
settle it and it escalated to the marker only `replicate repair` clears.
Entries created by this binary now start recorded; a row persisted by an
older binary keeps the escalation semantics.
* fix(site-replication): reload peer node caches after bucket wiring writes
Every S3 bucket-config write ends by asking the other nodes of the cluster
to reload the bucket's metadata; the site-replication writers never did.
On a multi-node site the node that ran the pairing (or applied a peer's
bucket-meta item) rewrote the bucket targets and the derived replication
rules on disk, while every other node kept serving its cached copy for up
to the 15-minute refresh. A `resync start` routed to such a node reported
every freshly wired bucket as `Config not found` and a bucket whose
operator target the pairing had replaced as `recorded remote target no
longer exists` (rustfs/backlog#2367 A-5, backlog#2195 item 2; functional
SITE-105).
Add one best-effort reload helper in the site-replication hooks and call it
after the bucket setup, versioning, peer bucket-meta apply, removed-peer
cleanup, make-with-versioning, and endpoint-refresh writes; the ensure
helpers now report whether they wrote so unchanged passes stay silent. The
resync manifest and start now read the persisted wiring instead of the
node-local cache, matching the target read the start path already did.
The new four-node e2e pairs two clusters and starts a resync through a
non-coordinator node right after pairing; it also covers an IAM user
created on a non-coordinator node converging to the peer site.
* test(e2e): cover delete-marker replication from a multi-node source
The functional suite reported delete markers created on a 3-node source
never reaching the target (rustfs/backlog#2195 item 4, REP-105). The report
was a probe defect, but the shape had no coverage: the existing
delete-marker e2e runs a single-node source. Pin it against a four-node
source replicating to a four-node peer and to a single-node target, with
the write and the delete issued through different nodes.
* ci(e2e): refresh the distributed selection for the new replication cases
Four distributed cases were added (two site-replication, two delete-marker
replication). The linux digest is derived from the last CI listing of the
lane (34 cases, matching the previous pin) plus the four new names; the
darwin digest is the local listing, which selects the same 38 cases.
(cherry picked from commit aeaba86d73)
* fix(e2e): require a verified server binary for every e2e run (#7687)
* fix(ci): share quick checks and lint workflows
* fix(ci): install actionlint from its verified release
* fix(ci): reject dependencies on required quick checks
* feat(test): verify the E2E server build and source identity
* test(e2e): register verified Darwin test membership
* test(e2e): record verified Linux receipt test membership
* test(e2e): record compiled Darwin receipt test membership
* test(e2e): record compiled Linux receipt test membership
* test(e2e): record Darwin e2e-full membership after merging main
* fix(test): route scanner/heal evidence E2E runs through the verified server binary
The evidence runners built rustfs with plain cargo and then ran e2e_test directly, which now fails without a run receipt. They build through scripts/e2e_binary.py and run the e2e_test invocations under e2e_binary.py run; the obsolete rustfs.features stamp is removed.
* docs(e2e): run server-backed e2e commands through the verified binary wrapper
* test(e2e): record Linux e2e-full membership from the branch CI listing
(cherry picked from commit 2909b1bfe1)
* fix(kms): classify KMS/SSE error contracts and SSE-S3 headers (#7697)
* fix(sse): classify bare SSE-KMS writes when no KMS is available
A `aws:kms` request without a key id, on a bucket without a default key,
returned `500 InternalError` whenever no KMS service was running: the
"no KMS key available" branch exited with an untyped storage error before
the availability classification that the keyed form already received.
Route that branch through the same split: `503 ServiceUnavailable` while
a configured KMS is stopped, `400 InvalidRequest` when KMS was never
configured, and `400 InvalidRequest` naming the missing key id when a
running KMS has no default key. `CreateMultipartUpload` shares the path.
Adds a unit test for the bare form and an e2e module that stops KMS
through the admin API, runs a master-key-only node, and runs a Local KMS
without a default key; refreshes the e2e-full selection digests.
(cherry picked from commit c3259dadc3d603a9185a5b0ad9f83dfb884e61c8)
* fix(sse): keep KMS error classes on the encrypted read path
GetObject, CopyObject and UploadPartCopy on an SSE-KMS object whose key
no longer exists answered `500 InternalError` ("KMS key not found") while
PutObject under the same key already answered `400 KMS.NotFoundException`.
The read path carries its classification through ecstore's
`EncryptionResolutionErrorKind`, which had no kind for a missing key, a
denied KMS grant or a missing backend capability, so all three folded
onto `DecryptionFailed` and the S3 layer reported an internal fault.
Add `KeyNotFound`, `AccessDenied` and `NotImplemented` kinds, map them on
both sides of the boundary, and give an envelope the configured backend
cannot unwrap a diagnosable message while keeping its `500`.
Unit tests cover the kind round trip and the reader wrapping; a new e2e
test deletes a key immediately and checks GET/Copy return 400 with
`KMS.NotFoundException` while HEAD stays 200. The e2e-full selection
digests are refreshed from the current listing (the previous digests
predated the delete-authorization tests) and the e2e `create_default_key`
helper is updated to the accepted `EncryptDecrypt` spelling.
(cherry picked from commit 2523a9814e97caea318d4ff1a51bef3a4d4445b2)
* fix(kms): classify key-management errors on the admin routes
`POST /kms/keys`, the legacy `create-key` alias and `generate-data-key`
reported every backend refusal as `500`: a blank key name (which each
backend failed on differently, the Local backend by writing a key file
with an empty stem), a name already taken, an unknown key, a disabled key
and a capability the backend lacks. `delete` and the lifecycle routes
already classified the same errors.
Refuse a blank or whitespace name in `KmsManager::create_key` before any
backend sees it, and share one `KmsError` to status mapping across
create, delete and generate-data-key (400 for validation and key state,
404 for an unknown key, 409 for a taken name, 501 for a missing
capability, 500 only for damaged material). The XML-error routes carry
the same status explicitly since s3s derives none for a custom code.
The read-only Static backend now reports create, delete and
cancel-deletion as `UnsupportedCapability`, matching its rotate and
enable/disable answers, so the admin API returns 501 for all of them.
(cherry picked from commit e33cac5493c4d9d6662e0d2980b58ba2b24a6d1b)
* fix(sse): stop SSE-S3 responses from naming the wrapping KMS key
`x-amz-server-side-encryption-aws-kms-key-id` is defined for `aws:kms`
objects only, but PutObject, CopyObject, CreateMultipartUpload and
GetObject returned it for `AES256` objects too, carrying the KMS key that
wraps the SSE-S3 data key (the service default, or the literal `default`
on a node without KMS). The write paths copied `kms_key_id` from the
encryption material unconditionally, and the single-decrypt GET
classification did the same after resolving the key for authorization.
Add `EncryptionMaterial::response_kms_key_id`, which yields the id only
for SSE-KMS, use it at the four write-response sites, and gate the GET
classification the same way. CompleteMultipartUpload and HeadObject
already omitted the header.
Unit tests pin both directions; a new e2e test covers Put/Get/Head/Copy
and CreateMultipartUpload for AES256 with an aws:kms control. The
e2e-full selection digests are refreshed from the current listing.
(cherry picked from commit 29d793a63352b0b60fd53c565e80fdbede8964bb)
* fix(s3): validate PutBucketEncryption rules before storing them
A default-encryption rule naming an unknown `SSEAlgorithm` (for example
`AES128`), a rule without `ApplyServerSideEncryptionByDefault`, an empty
rule list, or a `KMSMasterKeyID` on an `AES256` rule was stored as
written: the only algorithm check on the route decided whether to fill
in the default KMS key. `GetBucketEncryption` then advertised that
configuration while the write path encrypted header-less writes under
its `AES256` fallback, so the bucket's declared and actual schemes
disagreed. Two comments claimed the route already refused unknown
algorithms.
Validate the configuration before any of it is applied: `MalformedXML`
for a malformed rule set or unknown algorithm, `InvalidArgument` for a
key id on a non-KMS rule, and nothing stored on refusal. Correct the two
comments to describe when the AES256 fallback is still reachable.
Unit tests cover every refusal and the accepted shapes; an e2e test
checks the refusals leave the previous configuration in place. The
e2e-full selection digests are refreshed from the current listing.
(cherry picked from commit 29e4486dce41197ed93f5253cdbabc57d27a4ddb)
* test(e2e): refresh e2e-full selection for the combined KMS/SSE fixes
* test: align two unit tests with the new KMS and bucket-encryption contracts
`scheduled_deletion_carries_a_deadline_and_can_be_cancelled` still
expects the state error (`InvalidOperation`) for cancelling a key that
is not pending deletion; only the Static backend's mutations moved to
`UnsupportedCapability`. The uninitialized-store PutBucketEncryption
test now sends a well-formed AES256 rule so it reaches the store lookup
instead of the new configuration validation.
(cherry picked from commit e2e6a2535a)
* fix(site-replication): keep an operator's bucket-level target to a peer instead of taking it over (#7709)
* fix(site-replication): keep an operator's bucket-level target to a peer instead of taking it over
Site replication wired each bucket by looking for an existing replication
target "to the same peer" and rewriting the first match in place as its own
same-name target. An operator's bucket-level target that happened to point
at that site (different target bucket, operator credentials) was the first
match whenever it pre-dated the join, and the reconciler repeats the pass
every 600s, so the takeover also depended on target order afterwards. The
operator's rule then named an ARN no target backed and their bucket
replication stopped silently, while the inherited bucket-level reset id
made every site resync report the bucket as owned by another resync
(rustfs/backlog#2479, rustfs/backlog#2489).
Follow MinIO's `getRemoteARN` / `getRemoteARNForPeer` shape instead:
- Wiring updates a target in place only under the same ARN, or when it is
recognisably the site's own under an older ARN shape (same peer,
same-name target bucket, site replication service account). Anything
else gets the site target added next to it.
- The site resync manifest takes the target the derived
`site-repl-<deployment id>` rule names (same-name shape as fallback), so
an operator target to the peer neither aborts the bucket as "multiple
remote targets matched peer" nor gets resynced into.
- Peer removal prunes only targets a pruned derived rule names or the
same-name target bucket; operator targets stamped with the peer's
deployment id survive together with their rules.
Unit tests cover the three predicates. e2e
`test_site_replication_keeps_operator_bucket_target_to_peer` runs a
bucket-level replication plus `replication-reset` to the future peer, joins
the sites, and requires the operator target untouched, both paths
delivering, the site resync completing against the site target, and the
operator target and rule surviving `replicate remove --all`; without the
fix it fails at the join with the operator target gone. The repl-nightly
selection digest is refreshed for the new case.
* test(site-replication): drop a redundant clone flagged by clippy
The reconcile unit test cloned the remote peer into the state map although
the binding is not used afterwards; workspace clippy (-D warnings) rejects
that as redundant_clone.
(cherry picked from commit ecdc55fa4b)
* fix: enforce S3 permissions for recursive force deletion (#7661)
* fix: enforce S3 authorization for recursive deletion
* fix: satisfy the s3s footprint guard
* fix: restore list versions policy compatibility (#7686)
(cherry picked from commit 3fd1ce414d)
* fix(ci): repair functional defaults and chain regression checks (#7664)
* fix(ci): default functional suites to nightly packages
* test(ci): follow the fault-tolerance chain handoff
(cherry picked from commit 509a0fa90c)
* fix(ci): align security workflow tests with chain (#7679)
(cherry picked from commit d9e47d2813)
* test(ecstore): keep tier cleanup tests stable after immediate receipt queueing
Release PR #7766 made PUT/CopyObject overwrites queue the tier free-version cleanup receipt immediately, which broke two ecstore tests on release CI. In tier_overwrite_put_and_self_copy_recover_persisted_cleanup_owners the restarted store already runs expiry workers from the second iteration on, so they deleted the remote bytes before the test could assert that the commit leaves them in place; the test now fails the first remote DELETE via set_remove_failure(true) so the cleanup owner stays durable and the later restart still has to rediscover it from xl.meta (the failed remove does not bump remove_count, and the test re-enables removes before the recovery wait). In batch_transitioned_delete_post_commit_failures_roll_back_without_free_version_receipt the convergence loop now treats a transient InsufficientReadQuorum as "not yet converged", because cleanup rewrites xl.meta disk by disk and a racing read can briefly miss quorum (seen in the rio-v2 lane); any other error still panics.
* Revert "fix(ci): align security workflow tests with chain (#7679)"
This reverts commit 4544359f6d.
* Revert "fix(ci): repair functional defaults and chain regression checks (#7664)"
This reverts commit 5ba7ec0291.
* fix(ecstore): pass shard integrity to backported ingest-mode test
The stalled-reader test backported with #7659 used main's four-argument encode_with_ingest_mode, but release's signature takes an optional IntegrityBuilder, so pass None to keep the test focused on ingest-mode cleanup.
---------
Co-authored-by: Henry Guo <marshawcoco@gmail.com>
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: RJ Regenold <rregenold@teamraft.com>
Co-authored-by: RJ Regenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: GatewayJ <835269233@qq.com>
Co-authored-by: Jason Kossis <jkossis@gmail.com>
* fix(ci): restore release test compilation and e2e membership (#7799)
* fix(s3): return stored content language on local GET (#7755)
* fix(s3): return resolved object tagging version identities (#7757)
* fix(tables): bound warehouse index recovery (#7677)
Co-authored-by: Chris <anzhengchao@gmail.com>
* fix(upgrade): probe legacy IAM namespace before migration (#7816)
* fix(release): backport IAM migration startup fixes and recent main fixes (#7825)
* fix(auth): reject unsigned x-amz headers on header-signed SigV4 requests (release) (#7813)
* fix(s3): preserve missing version errors on object reads (#7800)
* fix(s3): preserve missing version errors on object reads
* test(s3): align missing-version assertions with read contract
* fix(heal): bind admin traversal to bucket incarnation (#7802)
* fix(heal): bind admin traversal to bucket incarnation
* fix(ecstore): reopen healthy hedged readers after peer loss
* test(ecstore): isolate tier overwrite recovery scheduling
* test(ecstore): observe tier cleanup under object read locks
* fix(ecstore): bound decommission entry tracing
* test(ecstore): drain incarnation heal fixture writes
* test(heal): match debug server stack in deep heal fixtures
* test(heal): include identities in C06 count failures
* test(heal): drain PUT tails before inspecting B920 fixtures
* test(scanner): isolate retained MRF retry slots
* fix(ecstore): separate PUT cleanup intent from persisted metadata
* fix(ecstore): capture failed object lock acquisitions (#7803)
* fix(ecstore): capture failed object lock acquisitions
* test(heal): include identities in C06 count failures
* test(heal): drain PUT tails before inspecting B920 fixtures
* fix(ecstore): reopen healthy hedged readers after peer loss
* test(ecstore): isolate tier overwrite recovery scheduling
* test(ecstore): observe tier cleanup under object read locks
* fix(ecstore): bound decommission entry tracing
* test(ecstore): drain incarnation heal fixture writes
* test(heal): match debug server stack in deep heal fixtures
* test(scanner): isolate retained MRF retry slots
* fix(ecstore): separate PUT cleanup intent from persisted metadata
* fix(heal): retain terminal outcomes across restart (#7805)
* fix(heal): retain terminal outcomes across restart
* test(heal): use octal mode for terminal recovery fixture
* fix(ecstore): reopen healthy hedged readers after peer loss
* test(ecstore): isolate tier overwrite recovery scheduling
* test(ecstore): observe tier cleanup under object read locks
* fix(ecstore): bound decommission entry tracing
* test(ecstore): drain incarnation heal fixture writes
* test(heal): match debug server stack in deep heal fixtures
* test(heal): include identities in C06 count failures
* test(heal): drain PUT tails before inspecting B920 fixtures
* test(scanner): isolate retained MRF retry slots
* fix(ecstore): separate PUT cleanup intent from persisted metadata
* fix(heal): recover replacement ownership across VM restarts (#7810)
* fix(heal): recover replacement ownership across VM restarts
* test(ecstore): isolate tier overwrite recovery scheduling
* test(ecstore): observe tier cleanup under object read locks
* fix(ecstore): bound decommission entry tracing
* test(ecstore): drain incarnation heal fixture writes
* fix(ecstore): reopen healthy hedged readers after peer loss
* test(heal): match debug server stack in deep heal fixtures
* test(heal): include identities in C06 count failures
* test(heal): drain PUT tails before inspecting B920 fixtures
* test(scanner): isolate retained MRF retry slots
* fix(ecstore): separate PUT cleanup intent from persisted metadata
* fix(tables): isolate protected S3 listings (#7676)
Co-authored-by: overtrue <anzhengchao@gmail.com>
* fix(ci): restore Linux E2E selection and split offline enrollment (#7843)
* fix(heal): assign stable identities to scanner repair requests (#7823)
* fix(heal): assign stable identities to scanner repair requests
* test(s3): isolate UploadPart inactivity timing
* fix(heal): backport pool metadata scope to release (#7846)
* fix(heal): scope replacement pool metadata to its owning set
(cherry picked from commit a72a75569c)
* fix(heal): use domain imports in pool metadata regression test
(cherry picked from commit e8c5448e21)
* test(heal): set pool metadata regression recursion limit
---------
Co-authored-by: Hiroaki KAWAI <1468181+hkwi@users.noreply.github.com>
* fix(heal): persist pool/set outcomes and recovery scope (#7839)
* fix(heal): persist pool/set outcomes and recovery scope
* test(heal): verify selector receipts and process-crash recovery
* fix(heal): scope replacement pool metadata to its owning set
(cherry picked from commit a72a75569c)
* fix(heal): use domain imports in pool metadata regression test
(cherry picked from commit e8c5448e21)
* test(heal): set pool metadata regression recursion limit
---------
Co-authored-by: Hiroaki KAWAI <1468181+hkwi@users.noreply.github.com>
* fix(ecstore): scope recursive walks to object prefixes (#7850)
* fix(heal): scope nested walks and reject admin read-repair (#7851)
* fix(heal): scope nested walks and reject admin read-repair
* fix(ci): allocate stack for heal metadata regression
* test: cover overlapped multipart staging copy (#7865)
Add Harbor-style E2E coverage for a CopyObject racing with CompleteMultipartUpload. The test allows the copy to observe an unpublished source as NoSuchKey, but rejects 5xx leakage and proves retrying the completed source remains readable.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(release): repair acceptance checks and prepare 1.0.0 (#7866)
* test(e2e): stabilize release acceptance checkpoints
* chore(release): prepare 1.0.0
* test(scanner): stabilize W13 release evidence gates (#7870)
Add the object-only completion diagnostic case and make the evidence runner resolve CARGO_TARGET_DIR before recording the rustfs binary path.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(kms): cover non-default Vault Transit paths (#7657)
Backport the Vault coverage from 4d31621f0a. Keep the release cleanup polls synchronized with object read locks.
* fix(replication): count a bodiless 405 as a replicated delete marker (#7756)
* fix(replication): accept a bodiless 405 as a replicated delete marker during resync
A resync verifies each delete marker with `HEAD ?versionId=<marker>` on the
target. S3 targets (RustFS, MinIO, AWS) answer that with 405 and no body,
and the SDK only synthesizes an error code for 404, so the error arrived
with `code() == None`. `is_retryable_delete_replication_head_error` then
treated it as an ambiguous failure: every delete marker counted as a failed
object with `target service error`, and a site resync over any bucket that
holds a delete marker reported the whole bucket as failed
(rustfs/backlog#2479, SITE-105 on rc.6 and nightly).
Use the raw HTTP status the way the 404 path already does: a 405 without a
code confirms the marker propagated. Ambiguous statuses still fail.
- Unit tests drive `verify_resync_head_result` against a scripted target
answering 405 (accepted) and 503 (still failed).
- e2e `test_site_replication_resync_replicates_delete_marker` joins two
sites, converges a live object and a delete marker, and requires the site
resync to complete with zero failed objects; the repl-nightly selection
digest is refreshed for the new case.
* fix(replication): verify marker-version purges by absence during resync
A delete-marker resync entry with a pending or failed version purge asks
the target to remove the marker, so the bodiless 405 that proves a
created marker propagated proves the purge did not happen. Accept the
405-as-success mapping only for marker creation (empty
version_purge_status); a purge counts as replicated only when the target
answers not found, and any other HEAD outcome stays failed. Unit tests
drive both purge statuses against the 405 fixture and the 404 fixture.
(cherry picked from commit 1ef3974bad)
* fix(kms): refuse key ids that leave the key prefix on the Vault backends (#7727)
Only the Local backend refused a key identifier containing a path
separator. On Vault KV2 a create with the name bad/name succeeded and
produced a nested KV2 path that the listing then reported as a
directory rather than a key, and an identifier containing .. addressed
a record outside the configured key prefix once the HTTP client
normalised the URL; Vault Transit built its transit key name and its
metadata path from the same unchecked identifier.
Lift the Local backend's containment rule into a shared segment check
(empty, /, backslash, NUL, . and ..) and apply it at the single point
where each backend turns the identifier into a path or a Transit key
name, so create, describe, encrypt, delete and the metadata writes all
refuse with InvalidKey before any request reaches Vault. The admin API
already maps that to 400. The AWS backend is untouched: it addresses
keys by ARN and alias, both of which contain /.
Refs rustfs/backlog#2474 (KMS-213 CreateNegatives on vault-kv2).
Co-authored-by: Hauser <housemecn@gmail.com>
(cherry picked from commit 2f2e775655)
* fix: resume GET body after peer short EOF (#7852)
Backport GET recovery from afc8861fec. The Connect TLS classification change requires the main-only proxy transport layer.
* fix(s3): honor presigned UploadPart checksum queries (#7748)
* fix(s3): honor presigned UploadPart checksum queries
* fix(s3): keep checksum errors within gateway boundary
---------
Co-authored-by: Hauser <housemecn@gmail.com>
(cherry picked from commit a8ace89516)
* fix(table-catalog): map transient lock failures to unavailable (#7841)
(cherry picked from commit 5c73a3d602)
* fix(ecstore): preserve ready read errors during encoding (#7798)
Backport the erasure fix from c95b65a7fc while retaining release shard integrity support. Dependency upgrades and the main-only Connect proxy and diagnostic fixes are excluded.
* ci: add the S3 Tables (Iceberg REST Catalog) functional suite workflow (#7873)
New workflow rustfs-table-test.yml following the shared suite contract:
Initialize functional evidence (FUNCTIONAL_ARTIFACTS_DIR/LOG_FILE/
REPORT_FILE/TMPDIR), checkout for the report parser, auto-testing
clone with retry, continue-on-error on the run step, report generation
through scripts/functional_case_report.py with the product gate (case
failures stay green; harness breakdowns turn red), dashboard upload
under functional-reports/table/, backlog issue manager wiring
(--suite table --category table), artifact upload (report.md, cases.md,
suite.log), before/after environment cleanup, and the chain handoff
step (repository_dispatch only, next: pool expansion).
The suite script itself lives in rustfs/auto-testing (TBL-101..107,
paired PR). The run step passes the product smoke script path
(scripts/table-catalog/pyiceberg_smoke.py) via --smoke-script and the
log via --log-file, matching the other suites.
Contract tests: the table suite is registered in the generic evidence
and workflow matrices (JOBS/DIRECT_TESTS/allowlist) plus a dedicated
TableSuiteTests wiring check. Full run: 21/21.
* test(ecstore): tolerate slow read-repair diagnostics CI (#7892)
* fix(heal): report verified normal shard repairs (#7890)
* fix(heal): retry interrupted internode shard writes
(cherry picked from commit 0bd75f47b6326edd8167ee43b8776f6276692e92)
* fix(deps): update rustls for RUSTSEC-2026-0285
(cherry picked from commit 938e1259d13da7832d85ac5c066a59ab3a28bc63)
* test(heal): wait for replacement disk and coordinator readiness
(cherry picked from commit feeaa6f053aac4b7c8e32477c0ab5ebbd3dcdff3)
* fix(heal): retain RPC transport failures across metadata probes
(cherry picked from commit f48ec9f0c6e37b1f941620c666a9357c4b892d68)
* fix(s3): resume GET bodies after erasure read quorum loss
(cherry picked from commit a38e859905)
* test(heal): keep outage objects in the replacement erasure set
(cherry picked from commit a669f50a366e35505e7745f8b680d8ecf1aa31be)
* fix(rpc): retry authenticated requests after peer epoch changes
Backport the stale-epoch recovery fix from main follow-up #7889. Keep invalid signatures and nonce replays terminal.
* test(rpc): assert retryable rejection of stale boot epochs
(cherry picked from commit 1c4b39b99)
* ci: bound concurrent heal clusters in the full E2E gate
Apply the #7889 scheduling fix while preserving release test membership and zero retries.
* fix(ecstore): hide pending purge entries from listings (#7895)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): scope pending purge listing regression (#7897)
Keep the store-level pending purge listing regression focused on the ordinary recursive path and exact-prefix shortcut. The deeper delimiter CommonPrefix case is a separate physical-walker boundary and should not leave the release test suite red.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(obs): expose scanner usage freshness metrics (#7896)
Add Prometheus scanner metrics for dirty-usage pending buckets, usage-cache save/publication timestamps, publication result codes, and deferred publication state. This gives operators a direct scrape path for confirming scanner dirty ACK behavior without relying on admin JSON.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): backport delete quorum rollback to release (#7902)
* ci: rotate the shared functional-tests concurrency group to -v2 (#7900)
* fix(s3): render null write version IDs consistently (#7904)
* fix(heal): quarantine corrupt root recovery records (#7905)
* fix(heal): quarantine corrupt root recovery records
Keep invalid root-heal records durable while isolating them from healthy recovery owners. Serialize startup replay with administrator admission and fence quarantined task IDs so independent compensation heals can proceed safely.
* fix(ci): align release workflow contract tests
* fix: satisfy root recovery clippy checks
* fix(heal): fence canonical repair receipts (#7909)
* fix(heal): fence canonical repair receipts
* fix(heal): preserve unversioned receipt identity
* fix(heal): persist replacement intent on remote survivor (#7912)
* chore(release): merge main into release (#7913)
* feat(nightly): publish packages as assets of the rolling 'nightly' release (sync from release) (#7593)
feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)
Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).
- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
the 'nightly' release via the REST API, deletes same-name assets,
uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
body with the build provenance (ref@sha, run link, sizes, SHA256).
Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
exercised end-to-end against the real release with probe files
(create / upload / overwrite / download round-trip / body update).
* fix(ecstore): stop pruning at nonempty directories (#7616)
* fix(ecstore): stop pruning at nonempty directories
* test(ecstore): release pruning fixtures before temp cleanup
* fix(replication): close the pre-stable convergence gaps from backlog#2367 (#7626)
* fix(replication): total-order rule sort and honor V1 top-level Prefix
Rule matching had two defects from the pre-GA replication audit
(rustfs/backlog#2367 C-1 and C-2):
- The actionable-rule sort compared same-destination rules by priority but
answered Equal for any other pair, which is not a total order; the
standard library sort panics on such comparators once a slice exceeds the
insertion-sort threshold, so an object matching more than 20 enabled rules
across two or more targets could panic the PUT or DELETE task. Rules now
sort by priority descending with destination and id as tie-breakers, and
filter_target_arns preserves that order instead of draining a HashSet.
- A V1 rule written without a <Filter> carries its prefix at the top level;
that field was never read, so <Prefix>logs/</Prefix> matched every object.
ReplicationRuleExt::prefix now falls back to it, with a <Filter> keeping
precedence. The existing prefix fixtures were built this way and had been
asserting nothing.
* fix(admin): advertise data-usage and listen capabilities to rc
The rc client gated `rc du` and `rc watch` on a pinned contract that
matched server versions by the string prefix `1.0.0-rc.`; a server that
reports `1.0.0` no longer matches, and the dynamic `advertised` list did
not carry either name, so `rc du` against a GA server fails with an
unsupported-capability error (rustfs/backlog#2367 E-2).
Advertise `admin.data-usage` from the admin route inventory like the IAM
entries, and `listen_notification` for the bucket `?events=` extension
route the admin router dispatches. The client merges advertised entries
ahead of its pinned contract, so no version sniffing is needed.
* fix(site-replication): stop notifying the local site on remove and rotate
The pending-remove and pending-rotation notification loops skipped the
local site by endpoint only, while finalization identifies it by
deployment id or endpoint. The reconcile tick resolves the local peer from
the node's own listen address (and a handler from the request Host), so
`remove --all` dialed the site's registered endpoint, waited out the
request timeout against the lifecycle lock it was holding, and answered
`Partial: failed to notify 1 peer(s)` for a removal that had succeeded
(rustfs/backlog#2367 A-4, backlog#2195 item 3).
Both loops now iterate the peers still awaiting notification through one
helper that applies the finalization identity.
* fix(site-replication): promote and settle IAM retries without a tick of slack
Two retry-queue behaviours kept an IAM change from converging for ten to
twenty minutes after a peer came back (rustfs/backlog#2367 A-1 and A-3,
backlog#2305):
- The lightweight 30-second pass filtered its reachability probe to bucket
ops, so a backed-off IAM or bucket-metadata snapshot waited for the
600-second tick to notice the peer. It now probes every backed-off class
and still replays only bounded bucket ops; promotion is a state flip the
heavyweight tick acts on.
- Backoffs are multiples of the tick interval, so a failure stamped δ
seconds after a tick was 600 − δ old at the next tick and slipped a whole
extra interval. The heavyweight drain now evaluates backoff halfway to its
next tick.
- An IAM entry first created by a non-deletion failure (the add bootstrap's
snapshot send, the drain's own replay, an import-iam schedule) was never
stamped `deletions_recorded`, so a later recorded deletion could not
settle it and it escalated to the marker only `replicate repair` clears.
Entries created by this binary now start recorded; a row persisted by an
older binary keeps the escalation semantics.
* fix(site-replication): reload peer node caches after bucket wiring writes
Every S3 bucket-config write ends by asking the other nodes of the cluster
to reload the bucket's metadata; the site-replication writers never did.
On a multi-node site the node that ran the pairing (or applied a peer's
bucket-meta item) rewrote the bucket targets and the derived replication
rules on disk, while every other node kept serving its cached copy for up
to the 15-minute refresh. A `resync start` routed to such a node reported
every freshly wired bucket as `Config not found` and a bucket whose
operator target the pairing had replaced as `recorded remote target no
longer exists` (rustfs/backlog#2367 A-5, backlog#2195 item 2; functional
SITE-105).
Add one best-effort reload helper in the site-replication hooks and call it
after the bucket setup, versioning, peer bucket-meta apply, removed-peer
cleanup, make-with-versioning, and endpoint-refresh writes; the ensure
helpers now report whether they wrote so unchanged passes stay silent. The
resync manifest and start now read the persisted wiring instead of the
node-local cache, matching the target read the start path already did.
The new four-node e2e pairs two clusters and starts a resync through a
non-coordinator node right after pairing; it also covers an IAM user
created on a non-coordinator node converging to the peer site.
* test(e2e): cover delete-marker replication from a multi-node source
The functional suite reported delete markers created on a 3-node source
never reaching the target (rustfs/backlog#2195 item 4, REP-105). The report
was a probe defect, but the shape had no coverage: the existing
delete-marker e2e runs a single-node source. Pin it against a four-node
source replicating to a four-node peer and to a single-node target, with
the write and the delete issued through different nodes.
* ci(e2e): refresh the distributed selection for the new replication cases
Four distributed cases were added (two site-replication, two delete-marker
replication). The linux digest is derived from the last CI listing of the
lane (34 cases, matching the previous pin) plus the four new names; the
darwin digest is the local listing, which selects the same 38 cases.
* feat(console): support a configurable console URL prefix (#7634)
Co-authored-by: houseme <housemecn@gmail.com>
* chore(release): merge release into main for rc.6 (#7638)
* test(heal): cover MRF manifest CAS legacy transition (#7443)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): enable release branch checks and repair test imports (#7441)
* test(scanner): structure heal release evidence lanes (#7442)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): require segment producer identities (#7444)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): expose recovery intent identity (#7445)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): summarize failed heal perf reports (#7446)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(common): retain unmatched MRF repair proofs (#7447)
Add a recorded verified-repair consumer that discharges only exact retained anchors for the requested bucket while leaving unmatched proofs in the event ring. This gives the future durable successor writer a fail-closed primitive before any tombstone or GC path is enabled.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): route replication read plan through boundary (#7448)
* test(scanner): cover flat-bucket quantum fairness (#7449)
Add a production-entry scanner cohort regression that combines a wide flat bucket with a small bucket under a fixed object budget. The test keeps partial budgeted rounds unpublished, verifies small buckets are only marked after real execution, and confirms a later unbudgeted round can publish the complete aggregate.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): reuse same admission request id (#7451)
Keep a retried heal start with the same request id from bypassing admission deduplication when the transport replay cache is unavailable but the manager still owns the task.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require perf summary evidence fields (#7453)
Fail closed when measured passing Scanner/Heal ABBA summaries omit W10/W11 foreground pressure, lock wait, or attempt-cost evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind release evidence fields (#7452)
Require explicit scanner/heal release evidence field contracts for the scoped ACK and mixed-version rollback gates.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): tag dirty usage producer identities (#7454)
Record production-facing segment invalidation producer identities when existing object-level dirty usage hooks observe PUT, CopyObject, DeleteObject/DeleteMarker, and CompleteMultipartUpload mutations. Keep the data non-authoritative and process-local so segment reuse activation still requires durable generation-window proof.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): gate release evidence bundles (#7457)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require hard evidence ABBA manifest (#7459)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(heal): add MRF committed snapshot writer (#7458)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover EC8+4 restart shard rebuild (#7461)
Retry heal-control RPCs once after transport auth rejects a stale replay-scope epoch, and add a distributed EC8+4 restart heal evidence case that rebuilds a replaced drive with exact shard/body assertions.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): echo measured release evidence in ABBA fake adapter (#7460)
Keep the synthetic ABBA test adapter aligned with the measured release evidence contract so result validation covers release_evidence drift.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require complete ABBA summary matrix (#7462)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: retain MRF replay journal after accepted/merged replays
Keep startup replay journal until a durable successor snapshot exists after Accepted/Merged admission.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: reclaim superseded MRF snapshots after readback
Add a committed snapshot predecessor cleanup primitive that deletes only an older slot after the successor is read back as the current committed snapshot.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: require exact owner for object receipts
Require object heal receipts to match the expected bucket incarnation before they can be recorded as positive repair evidence. This prevents stale or cross-incarnation receipts from clearing the wrong heal responsibility.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: latch object receipt owner before repair
Capture the expected bucket incarnation before invoking object repair so a post-repair owner change cannot rewrite the responsibility that a storage receipt is allowed to prove.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: replay committed MRF checkpoints durably (#7465)
Prefer committed MRF checkpoints during startup replay, retain accepted replay responsibilities until exact verified repair proofs arrive, and reclaim committed manifests only after discharge.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind hard evidence bundle provenance (#7467)
Require Scanner/Heal release bundle fields to carry source, run, window, timestamp, command, and artifact format provenance before a measured gate can pass.
Keep EC8+4 and performance gate fields tied to a single measurement window so unrelated artifacts cannot be stitched into a release approval.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: reject dry-run object repair receipts
Do not record positive storage repair receipts for dry-run object heal tasks, even if a producer accidentally returns a matching receipt.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: reject cancelled object repair receipts
Do not record positive storage repair receipts once an object heal task has been cancelled, even if the receipt still matches the requested owner and object identity.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): reject failed object repair receipts
Cover the receipt consumer path where a storage repair result carries both an error and a matching positive receipt. The failure may be recorded, but the receipt must not create repaired, healthy, or absent proof.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover bucket object repair receipts (#7468)
Cover bucket and root heal sweeps recording authoritative object outcomes only when storage receipts match the latched bucket incarnation.
Verify unavailable or stale receipt ownership keeps object repair execution intact while leaving canonical outcome proof as Unknown.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add EC8+4 heal restart evidence (#7469)
Register and wire Scanner/Heal background target restart and crash evidence cases for the 3x4 EC8+4 topology.
Validate the observed data/parity geometry in scanner-heal evidence receipts so multi-drive runs cannot satisfy the gate without proving EC8+4 metadata.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: verify replacement pool metadata repair (#7471)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover quorum and mixed repair receipts
Add focused oracles for transient quorum results that carry a matching receipt and for mixed grace plus repaired receipt batches. Only the repaired object may produce positive proof.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: verify admin recreate pool metadata (#7474)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: preserve merged result for duplicate submits
Keep same-request-id replay receipts accepted for the receipt API, but preserve the legacy submit_heal_request duplicate admission result as Merged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): preserve EC84 restart semantics (#7478)
Keep the EC8+4 background restart lane on the graceful-stop path and assert clean-restart marker absence only for restart scenarios. This prevents the hard evidence gate from silently exercising the crash path when it claims restart coverage.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF snapshot torn successor recovery
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): write EC84 distributed restart oracle (#7481)
Bind the distributed EC8+4 restart evidence lane to a scanner/heal oracle artifact so release validation can consume the real nextest run instead of accepting only a passing test.
Require the registry to assert 8+4 erasure geometry for the three-node, four-drive case.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): harden MRF replay boundaries (#7483)
Reject journal records with unknown version-presence flags even when their CRC is valid, so rollback/future payloads cannot be accepted as known records.
Gate committed checkpoint cleanup by the writer owner captured from the replay source, preserving retained manifests from other owners inside the same sequence window.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): bind MRF manifest CAS dirsync recovery (#7482)
Cover the committed MRF manifest path through LocalDisk conditional CAS when the metadata directory fsync fails. The fixture proves the previous manifest anchor survives rollback, an unanchored first successor is removed, and the legacy MRF journal remains readable even while global durability is relaxed.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): derive evidence runner profile from registry (#7484)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require mixed-version evidence roles (#7485)
Tighten the Scanner/Heal release bundle checker so mixed-version, scoped-ACK, and rollback fields cannot reuse a generic versions list without proving the expected evidence role.
Require version lists to use source revision identities and include the tested source revision. Also require profile evidence fields to name the core profiling artifacts before release approval.
The release gate remains blocked until measured field evidence is present.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): publish committed MRF runtime checkpoints (#7490)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind profile artifacts in release evidence (#7487)
Require Scanner/Heal release bundles to attach every required profiling artifact to P1 profile evidence with relative paths, artifact formats, non-empty files, hashes, and optional per-artifact measurement-window checks.
Document the tightened release bundle profile contract and cover missing, tampered, and mismatched-window profile artifact regressions in the existing checker self-test.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden measured ABBA evidence claims (#7491)
Reject measured Scanner/Heal ABBA manifests whose mixed-version evidence uses the same baseline and candidate source revision or binary hash.
Require crash fault modes and profile artifact names to match the exact supported sets, rejecting missing, duplicate, and unknown values.
Update harness fixtures and regression coverage for same-build mixed-version claims and exact-set release evidence fields.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): group scanner heal evidence payload (#7494)
Group the EC8+4 Scanner/Heal evidence writer inputs into a typed payload so the distributed e2e crate stays within the clippy argument limit without weakening the lint.
The evidence writer still validates the same S3 bodies, physical shard census, process restart PIDs, and node listings.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF replay bundle fields (#7486)
Bind Scanner/Heal release bundle evidence for MRF durable replay to replay counts, retained responsibility anchors, and successor snapshot publication evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): profile EC84 evidence case runs (#7495)
Give Scanner/Heal evidence cases explicit runtime profiles so EC8+4 background restart and crash cases use their own object count, object size, and partial-progress timeout defaults instead of inheriting the legacy 4x1 case assumptions.
Expose the runtime profile in plan-only output and cover every registry case in the script self-test.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): reject empty release evidence artifacts (#7496)
Require Scanner/Heal release bundle artifact paths to resolve to non-empty files before hashing them.
Cover empty hard-gate artifacts in the existing release bundle checker self-test and keep profile artifact size checking on the shared artifact boundary.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require G14 same-window field coverage (#7489)
Tighten the Scanner/Heal release bundle checker so G14 same-window evidence must name the EC8+4, multi-set, and multi-pool fields covered in that measurement window.
Keep the release gate blocked when same-window evidence omits one of the required G14 fields, without changing production runtime behavior.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require two-hour measured ABBA windows (#7493)
Reject measured Scanner/Heal release ABBA manifests and summaries whose evidence window is shorter than the W21 two-hour release requirement.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF idle checkpoint cleanup (#7497)
Add a runtime cleanup regression test that publishes both retained replay and runtime committed checkpoints, writes scoped and legacy journals, and verifies idle cleanup removes every recovery anchor from the registered local disks.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): ignore untracked files in build identity (#7498)
Align e2e_test build provenance with Scanner/Heal evidence receipts and server binary provenance by treating only tracked source changes as dirty.
This prevents unrelated untracked worktrees or evidence directories from causing compiled test identity mismatches before real evidence cases can run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF disk-full evidence fields (#7499)
Require the Scanner/Heal release registry and bundle checker to carry explicit G08 MRF capacity, disk-full, and replica-loss evidence fields before release approval can pass.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind release JSON artifact provenance (#7500)
Require scanner/heal release evidence JSON artifacts to repeat their measured source revision, run identity, measurement window, gate, and field identity inside the artifact payload. This keeps a refreshed outer bundle hash from accepting stale summary or profile JSON from another run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF rollback mirror filtering (#7501)
Add a regression oracle that keeps scoped-only MRF responsibilities in the authoritative runtime snapshot while omitting them from the v1 legacy rollback mirror.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require segment activation evidence (#7504)
* test(scanner): require segment activation evidence
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): cover activation proof inputs
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF crash matrix cases (#7505)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require release bundle domain evidence (#7502)
Reject scanner/heal release bundles that omit field-level domain evidence for scoped ACK, durable intent, mixed-version, scheduler pressure, profile cost, and two-hour pressure lanes.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF retention GC evidence (#7506)
Require P4 retained-responsibility release bundle evidence to list the retained replay anchor and idle cleanup cases, prove a two-hour retention window, and record both idle cleanup and verified-proof discharge observations.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF cleanup GC soak evidence (#7507)
Require the P4 release bundle to carry measured cleanup/GC soak evidence for retained MRF replay responsibilities. The bundle now needs a two-hour cleanup window, exact cleanup case coverage, observed verified idle GC, and zero pending responsibilities or stale journals after GC.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF disk-full commit anchors (#7509)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): report port allocator bind errors (#7510)
Surface the scanned port window, attempt count, and last bind error when the e2e port allocator cannot reserve a localhost port. This keeps Scanner/Heal evidence failures actionable when the environment blocks binds before business assertions run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(sse): resolve 1.0.0 SSE/KMS blockers and P1 findings (#7511)
* fix(sse): resolve bucket default encryption per request
PUT and the POST-object/extract path resolved a bucket's default
encryption with a hard-coded "no explicit SSE-C" flag, so the default was
layered onto a request that already carried an SSE-C header triple and
then tripped that request's own mutual-exclusion check. Every bucket with
default encryption refused SSE-C single PUTs with 400 InvalidArgument,
while CreateMultipartUpload on the same bucket succeeded because it
resolves SSE elsewhere. Both call sites now derive the flag from the
request headers, as COPY already did.
The bucket default's KMS key id was also inherited independently of the
effective algorithm, so an explicit AES256 request against an aws:kms
default bucket produced a self-contradictory algorithm/key-id pair and
was rejected. The key id is now inherited only when the effective
algorithm is aws:kms, matching the storage-layer resolver.
Refs backlog#2368 B1, B2.
* fix(sse): refuse SSE-KMS without a running KMS service
A write requesting aws:kms on a node with no KMS service fell back to the
node-local SSE-S3 provider: the data key was wrapped with
RUSTFS_SSE_S3_MASTER_KEY while the object metadata still recorded
aws:kms and the requested KMS key id. The stored object claimed a KMS
protection it never had, under a key that was never consulted, and no
signal distinguished it from a genuine SSE-KMS object.
The managed-encryption path now asks the resolved DEK provider whether it
wraps with a node-local master key and refuses SSE-KMS in that case:
InvalidRequest when KMS was never configured, ServiceUnavailable when a
configured service is not running. The check sits after the per-key
authorization gate so an unauthorized caller still receives AccessDenied
whatever the KMS runtime state is, and asks the provider rather than a
parallel availability signal because the provider is what actually wraps
the key. A missing master key no longer answers an SSE-KMS request with
an SSE-S3-worded configuration error.
The SSE-S3 local fallback is unchanged.
Refs backlog#2368 B4.
* fix(ecstore): restore and archive tiers in stored coordinates
Multipart restore addressed the remote tier in plaintext coordinates
while the copy-back reads the stored representation. Each part received a
misaligned slice of the remote object whose length still satisfied the
range, the hash reader and the completion size check, so the restore
reported success and silently replaced the object's bytes. Encrypted and
compressed multipart objects were both affected. Restore now accumulates
stored part sizes, passes the stored length to the hash reader alongside
the plaintext length, and validates against the stored size.
The copy-back digests stored bytes, so its computed MD5 is not the
object's public ETag. Restore now preserves the object ETag on both the
single-part and multipart paths, and gives each restored part its own
recorded part ETag rather than the object-level value.
Transition also handed the tier the object's SSE headers and its
RustFS-wrapped data key as request headers. Any S3 target rejected an
SSE-C archive outright, an SSE-KMS archive asked the target to encrypt a
second time under a key id it does not own, and the wrapped DEK left the
cluster. The archive request now strips every SSE header and encryption
marker with the predicate the replication path already uses; the local
xl.meta keeps all of it, so read-through and restore are unaffected.
Objects restored by an affected release are not detected or repaired
retroactively and must be re-restored from the tier.
Refs backlog#2368 B3, B5; backlog#2369 P7.1.
* fix(rio): lock the v1 nonce layout within a segment
Decrypting a v1 segment tried three historical nonce layouts per frame,
independently for every frame. The last of them exists for streams
written before 1.0.0-alpha.91, which reused a segment's part nonce for
every block in it; because block zero's derived nonce equals that base
nonce, a frame encrypted at index zero authenticated at any position. An
attacker able to rewrite the underlying shards could replay it and have
the forged plaintext returned with 200 and an unchanged length. Shard
integrity uses a keyed-hash-free checksum, which such an attacker can
recompute, so it is not a barrier.
A segment now locks onto whichever layout decoded its first non-zero-index
frame and rejects any later frame needing a different one. That leaves one
residual shape: a stream built purely from repeats of frame zero has no
later frame to disagree. New RUSTFS_ENCRYPTION_LEGACY_NONCE_FALLBACK
(default true, so pre-alpha.91 objects keep decrypting) drops the third
layout entirely when set to false, which closes it. Turning it off refuses
pre-alpha.91 objects, so migrate them first by rewriting in place.
Refs backlog#2369 P2.
* fix(kms): reload a service that failed to start
POST /rustfs/admin/v3/kms/reload short-circuited whenever the persisted
configuration matched the in-memory one byte for byte. A node whose KMS
failed to start keeps that configuration and sits in Error, so the
documented recovery call returned "reloaded successfully" while leaving
the node down. Peers reached the same path through the reload broadcast,
so a cluster that lost Vault during a rolling restart had no working
recovery route other than the node-local start endpoint. Reload now
short-circuits only for a service that is actually running, and otherwise
reconfigures, which starts a service that is not running.
The AWS backend also advertised key-version enumeration through
kms/status, which its own documentation says it cannot do; the capability
and its golden snapshot now say false.
Refs backlog#2369 P1, P7.3.
* docs: record the SSE and KMS changes for 1.0.0
The Unreleased changelog section carried no entry for any encryption work
merged since 1.0.0-rc.5, including three items with operational impact:
the config-secret variable whose absence persists secrets in cleartext
with only a warning, the v2 frame write switch and its rolling-upgrade
constraint, and per-key authorization making a public bucket incompatible
with SSE-KMS objects. Adds those plus this batch, including the SSE-KMS
refusal as a breaking change with both routes out.
Also corrects four places where documentation contradicted the code: the
cleanup register still called encrypted range seek opt-in after its
default flipped, the Helm README claimed vault_mount_path only applies to
Transit while the template also feeds the KV2 mount, the disaster-recovery
drill listed bundle contents for backends whose export is refused with
501, and the Chinese README capability table predated most of the feature
set. Documents the SSE-S3 local master key as a first-class operational
mode with its rotation dead end, and what the v1 frame layout does and
does not authenticate.
Refs backlog#2369 P5.
* fix(kms): classify data-path KMS failures by what the caller can do
Only "key not found" and a backend outage were classified; every other
KMS failure that reached the S3 data path fell through to
500 InternalError with a generic message. A disabled or pending-deletion
key, a denied KMS grant, an encryption-context mismatch, an unsupported
algorithm, a credential or timeout failure, and a capability the
configured backend does not have all looked identical to a server fault.
SDKs therefore applied exponential backoff to configuration errors no
retry can fix, and monitoring counted every one of them against the
server's own error rate.
Unusable-key and request-side failures now answer 400, a denied grant
403, transient backend failures 503, and a missing backend capability
501. Damaged, unreadable, or unknown-format key material keeps its 500:
it is a server-side integrity fault, and existing tests pin it.
The classifier is deliberately separate from the admin lifecycle
mapping, which answers 404 for a missing key because there a key id is
the resource being addressed; on the data path it arrives inside a
request header or a bucket default. Messages either name what the caller
asked for or stay generic, with deployment-side detail left on the error
source the way the storage-IO mapping already does.
Refs backlog#2368 B6.
* fix(kms): track and renew static Vault tokens
Token authentication hard-coded "this token carries no lease", so the
renewal task never started, the remaining-TTL gauge was never published,
and nothing looked wrong. `vault token create` grants a 768-hour TTL by
default, so a cluster that had been healthy for a month turned every KMS
call into a 403 and could not recover without a restart or a
reconfigure. Production configuration validation only rejects the
literal dev-token, so an ordinary expiring token reaches a whole cluster.
The source now reads `auth/token/lookup-self` at login and adopts what
Vault reports. A token with no expiry behaves exactly as before. An
expiring renewable one is picked up by the existing renewal loop and
renewed at half TTL like every other auth method. An expiring
non-renewable one warns with its remaining lifetime and publishes the
gauge, so the fail-closed window is visible before it arrives.
The probe never fails the login: a policy that omits lookup-self, or a
Vault that is briefly unreachable, warns and falls back to exactly the
previous behaviour rather than taking down a deployment that works
today. The scripted Vault test double answers the lookup out of band so
existing scripts keep describing only the protocol under test.
Refs backlog#2369 P3.
* feat(sse): report SSE-C requests that arrive without TLS
An SSE-C request carries the customer's AES key in a request header, so
AWS S3 and MinIO both refuse one that did not arrive over TLS. RustFS
accepted them on any transport: a plaintext hop hands the key to anyone
on the path, and since the object cannot be read without that same key,
the exposure lasts as long as the object does.
Refusing outright is the correct end state but not a safe default to
adopt inside a release window, because the project's own s3-tests and
e2e lanes and most staging deployments speak plain HTTP. This release
reports instead: each such request increments
rustfs_ssec_plaintext_requests_total and logs one warning per process, so
an operator can confirm nothing would break before the default flips.
RUSTFS_SSE_C_REQUIRE_TLS=true opts into the AWS 400 now.
The verdict is per connection rather than per deployment: the layer is
built with whether this listener terminated TLS, and additionally accepts
an https protocol forwarded by a proxy the trusted-proxy configuration
already vetted. It sits beside the rate limiter, after the layer that
makes a forwarded protocol trustworthy and after the request context, so
a rejection can echo the request id.
Refs backlog#2369 P7.2.
* fix(kms): say what a node-local backend means for a cluster
The Local backend keeps key material on each node's own disk and
generates its Argon2id salt per node, so two nodes derive different keys
from the same master_key and an object encrypted on one node cannot be
decrypted on another. Behind a load balancer that surfaces as
intermittent 500s on reads that succeeded moments earlier, with nothing
tying the symptom to the cause: the only signal was a generic
"development, testing and demos only" positioning warning that says
nothing about what actually breaks.
Configuring or reconfiguring Local while the deployment is distributed
now logs a dedicated event and appends the consequence to the configure
response, so the operator who made the change sees it. The product
decision to warn rather than refuse is unchanged.
Refs backlog#2369 P7.4.
* docs: record the remaining SSE and KMS changes for 1.0.0
Adds changelog entries for the KMS data-path status classification, the
Vault static-token lease probe, the SSE-C plaintext-transport report and
its switch, and the node-local backend warning.
Documents two things the backend security guide never stated: that SSE-C
belongs on a secure transport, with the counter and switch to plan the
change around, and that the Local backend cannot be shared by a
multi-node deployment because each node derives different keys from the
same master key.
Refs backlog#2368 B6; backlog#2369 P3, P5, P7.2, P7.4.
* fix(kms): report an unreadable key store as an outage on the S3 path
A backend now distinguishes a key store it could not read from a key
that is genuinely absent, but the S3 boundary collapsed the first one
back onto 500 InternalError through the fallthrough for integrity
faults. The distinction was therefore invisible to the client: a
temporary key-directory outage looked exactly like a permanently damaged
key record, and neither the status nor the metric said the request was
worth retrying.
An unreadable key store joins the retryable class and answers 503, next
to a backend error and a credential failure. Damaged, unreadable or
unknown-format key material keeps its 500.
Refs backlog#2368 B6; builds on rustfs/rustfs#7470.
* test(storage): cover MRF cleanup delete ENOSPC anchor (#7513)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require heal retry stats evidence (#7514)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add release bundle dry-run fixture (#7515)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): confirm recovery intent accept readback (#7516)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF cleanup delete ENOSPC evidence (#7518)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require bounded retry window evidence (#7517)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): emit scanner heal G09 upgrade evidence (#7519)
Record measured Scanner/Heal G09 evidence artifacts from the upgrade compatibility lanes when a fresh evidence directory is provided.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): persist MRF rollback mirror boundary (#7520)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G09 upgrade evidence runner (#7522)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(scanner): add G09 upgrade evidence runner
Add a reusable Linux x86_64 runner for the Scanner/Heal G09 mixed-version and rollback upgrade evidence lanes.
The helper reads the pinned previous-release asset metadata from the upgrade workflow, verifies the downloaded binary, builds the current head, runs both ignored E2E tests, and fails unless the expected G09 JSON artifacts exist.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): implement V2 evidence preflights (#7523)
* feat(scanner): wire dirty usage producer identities
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add segment activation preflight proof
Keep scanner segment reuse behind a structured activation preflight so release evidence can prove the production gate remains disabled until every producer, generation, overflow, cold-oracle, and distributed invalidation check is satisfied.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): expose distributed invalidation evidence
Record an explicit distributed segment invalidation evidence summary when remote dirty usage snapshots are bound to the current activity window and the authenticated scoped ACK capability probe succeeds.
Reject peer dirty usage snapshots that contradict the peer activity pending bit so scoped ACKs fail closed instead of clearing an unadvertised remote mutation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): assemble release evidence bundles (#7526)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G09 upgrade evidence runner (#7524)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(scanner): add G09 upgrade evidence runner
Add a reusable Scanner/Heal G09 runner for Linux PR-head validation. The script downloads the pinned previous release, builds the current checkout, runs the mixed-version and rollback upgrade E2E lanes, and validates the measured raw artifacts before they can be consumed by the release bundle gate.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): replay recovery intents while disabled (#7521)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): preflight G09 evidence disk space (#7527)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics…
* fix(list): reconcile split overwrite metadata (#7910)
fix(list): fail closed on split overwrite metadata
* fix(heal): persist explicit delete-marker purges (#7908)
* fix(heal): persist explicit delete-marker purges
* fix(ecstore): remove unused object info wrapper
* test(rpc): use valid incarnation in digest gate
---------
Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
* ci(table): pass --outcome to the backlog issue manager (#7914)
The manager step failed with 'the following arguments are required:
--outcome' in the first table run (hidden by continue-on-error): every
other suite workflow passes the test step outcome through.
* fix(list): reconcile encoded directory objects (#7915)
* fix(ci): restore release checks after marker purge changes (#7918)
* fix(rpc): recover tier reloads after peer capability revocation (#7920)
* test(ecstore): drain expiry workers before restart (#7923)
* test: report tier cleanup recovery progress on timeout (#7922)
* fix(heal): resume replacement generation after target restart (#7926)
* ci(release): use sm-standard-4 for Linux builds (#7925)
* feat(release): add workspace cargo publish tooling
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* chore(release): prepare 1.0.1 metadata
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix
* revert
---------
Signed-off-by: houseme <housemecn@gmail.com>
Signed-off-by: dependabot[bot] <support@github.com>
Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: xiaomage <devops008@sina.com>
Co-authored-by: GatewayJ <835269233@qq.com>
Co-authored-by: hehutu <hehutu@gmail.com>
Co-authored-by: Henry Guo <marshawcoco@gmail.com>
Co-authored-by: RJ Regenold <rregenold@teamraft.com>
Co-authored-by: RJ Regenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: Jason Kossis <jkossis@gmail.com>
Co-authored-by: Hiroaki KAWAI <1468181+hkwi@users.noreply.github.com>
Co-authored-by: Hiroaki KAWAI <hiroaki.kawai@gmail.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Source cleanup treated a retryable conflict such as a lock acquisition
timeout as a permanent cleanup warning. The warning was persisted, mapped
the pool to failed_ignored, and blocked pool completion for the rest of
the run while the source replica stayed on disk. Retryable storage
failures now defer the bucket instead, and only non-retryable failures
keep a permanent warning, so completion still requires a resolved delete
or a successful not-found check.
Recording a bucket deferral no longer overwrites the pool's pending
migration-deferral marker, because that marker is the only signal keeping
a pool from completing at the free-space goal while an entry is retried.
Teach the transient matchers the rendered lock timeout text, unwrap
data-movement stage context before classifying not-found and transient
cleanup failures, and raise the bounded source cleanup deferral budget.
Keep recent writable observations during transient pool metadata inspection timeouts while preserving confirmed write blocks and fail-closed behavior. Consolidate the runtime observation cache into one ordered state machine and expose timeout metrics.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): hide ancestors of delete residue in prefix listings
Since #7342 the never-versioned fast path hides a directory whose children are all deleted-version data dirs, but only that one level: the date-style ancestors above a deleted key (`metrics/<stream>/2026/08/28/23/`) still surfaced as empty folders that nothing could remove, which is what #6898 keeps reporting on rc.6 and 1.0.0. The residue probe now walks down through metadata-less ancestors depth-first, ending at the first file met outside a UUID data dir, with a total read budget so a large residue tree surfaces and is hidden one level down instead of costing an unbounded walk. An empty delimiter listing of the ancestor then reclaims the whole committed residue tree in one pass.
Refs #6898
* fix(ecstore): sample before full reads in the residue probe and purge orphan subtrees independently
Adversarial pass 1 findings: the probe read a wide directory in full at every level of a genuine prefix once its 8-entry batch was full, so a leaf holding thousands of objects was materialised per listed prefix; the probe now descends into the sampled children first and only reads the remainder once every sample proved unlistable, and a test pins one bounded read per level and zero complete reads on a wide genuine prefix. Hiding ancestors also made purge_orphan_dir_object fail closed on a whole ancestor when committed residue shared it with residue an older build left without markers, which 1.0.0 users could still reclaim by browsing one level lower; the purge now blocks only the ancestor chain of unpurgeable data and reclaims purgeable sibling subtrees. A UUID directory holding a subdirectory surfaces again as before.
Refs #6898
* fix(ecstore): back off repeated orphan purge scans of unpurgeable trees
Adversarial pass 2: with ancestors hidden, every empty listing of a phantom prefix scanned the whole residue subtree on every disk even when nothing under it can be purged (no committed marker), and the scan no longer stops at the first blocked directory. Remember such prefixes per set for 60 s and skip the rescan. Build committed residue file paths like directory paths so the blocked filter matches under keys containing repeated slashes.
Refs #6898
This is particularly useful for integration testing of services that use
an S3 API, as it lets many different instances bind a port on different
IPs.
Co-authored-by: Chris <anzhengchao@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
The fault-tolerance suite was the only one without a dashboard upload
step - its reports never reached functional-reports/fault-tolerance/
without manual uploads. Add the standard upload step (continue-on-error,
same shape as the other ten suites), placed before the artifact upload.
Co-authored-by: Hauser <housemecn@gmail.com>
* fix(heal): certify metadata health and marker repair receipts
* fix(heal): match nil selectors to absent null metadata
* test(heal): satisfy clippy for nil selector proof
* test(heal): align normal-scan receipt with nil selector proof
A nil or omitted selector now matches only a nil or absent metadata
version, so a normal scan of the latest UUID version leaves
metadata_verified unset and issues no receipt.
Assert metadata health through the exact latest version id instead, and
pin the omitted-selector path to fail closed.
---------
Co-authored-by: Hauser <housemecn@gmail.com>
Route capacity-owned unversioned multipart uploads through the durable decommission target reservation and fail closed when the reservation lease has expired.
* test(scanner): derive evidence runner profile from registry (#7484)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require mixed-version evidence roles (#7485)
Tighten the Scanner/Heal release bundle checker so mixed-version, scoped-ACK, and rollback fields cannot reuse a generic versions list without proving the expected evidence role.
Require version lists to use source revision identities and include the tested source revision. Also require profile evidence fields to name the core profiling artifacts before release approval.
The release gate remains blocked until measured field evidence is present.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): publish committed MRF runtime checkpoints (#7490)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind profile artifacts in release evidence (#7487)
Require Scanner/Heal release bundles to attach every required profiling artifact to P1 profile evidence with relative paths, artifact formats, non-empty files, hashes, and optional per-artifact measurement-window checks.
Document the tightened release bundle profile contract and cover missing, tampered, and mismatched-window profile artifact regressions in the existing checker self-test.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden measured ABBA evidence claims (#7491)
Reject measured Scanner/Heal ABBA manifests whose mixed-version evidence uses the same baseline and candidate source revision or binary hash.
Require crash fault modes and profile artifact names to match the exact supported sets, rejecting missing, duplicate, and unknown values.
Update harness fixtures and regression coverage for same-build mixed-version claims and exact-set release evidence fields.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): group scanner heal evidence payload (#7494)
Group the EC8+4 Scanner/Heal evidence writer inputs into a typed payload so the distributed e2e crate stays within the clippy argument limit without weakening the lint.
The evidence writer still validates the same S3 bodies, physical shard census, process restart PIDs, and node listings.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF replay bundle fields (#7486)
Bind Scanner/Heal release bundle evidence for MRF durable replay to replay counts, retained responsibility anchors, and successor snapshot publication evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): profile EC84 evidence case runs (#7495)
Give Scanner/Heal evidence cases explicit runtime profiles so EC8+4 background restart and crash cases use their own object count, object size, and partial-progress timeout defaults instead of inheriting the legacy 4x1 case assumptions.
Expose the runtime profile in plan-only output and cover every registry case in the script self-test.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): reject empty release evidence artifacts (#7496)
Require Scanner/Heal release bundle artifact paths to resolve to non-empty files before hashing them.
Cover empty hard-gate artifacts in the existing release bundle checker self-test and keep profile artifact size checking on the shared artifact boundary.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require G14 same-window field coverage (#7489)
Tighten the Scanner/Heal release bundle checker so G14 same-window evidence must name the EC8+4, multi-set, and multi-pool fields covered in that measurement window.
Keep the release gate blocked when same-window evidence omits one of the required G14 fields, without changing production runtime behavior.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require two-hour measured ABBA windows (#7493)
Reject measured Scanner/Heal release ABBA manifests and summaries whose evidence window is shorter than the W21 two-hour release requirement.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF idle checkpoint cleanup (#7497)
Add a runtime cleanup regression test that publishes both retained replay and runtime committed checkpoints, writes scoped and legacy journals, and verifies idle cleanup removes every recovery anchor from the registered local disks.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): ignore untracked files in build identity (#7498)
Align e2e_test build provenance with Scanner/Heal evidence receipts and server binary provenance by treating only tracked source changes as dirty.
This prevents unrelated untracked worktrees or evidence directories from causing compiled test identity mismatches before real evidence cases can run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF disk-full evidence fields (#7499)
Require the Scanner/Heal release registry and bundle checker to carry explicit G08 MRF capacity, disk-full, and replica-loss evidence fields before release approval can pass.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind release JSON artifact provenance (#7500)
Require scanner/heal release evidence JSON artifacts to repeat their measured source revision, run identity, measurement window, gate, and field identity inside the artifact payload. This keeps a refreshed outer bundle hash from accepting stale summary or profile JSON from another run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF rollback mirror filtering (#7501)
Add a regression oracle that keeps scoped-only MRF responsibilities in the authoritative runtime snapshot while omitting them from the v1 legacy rollback mirror.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require segment activation evidence (#7504)
* test(scanner): require segment activation evidence
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): cover activation proof inputs
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF crash matrix cases (#7505)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require release bundle domain evidence (#7502)
Reject scanner/heal release bundles that omit field-level domain evidence for scoped ACK, durable intent, mixed-version, scheduler pressure, profile cost, and two-hour pressure lanes.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF retention GC evidence (#7506)
Require P4 retained-responsibility release bundle evidence to list the retained replay anchor and idle cleanup cases, prove a two-hour retention window, and record both idle cleanup and verified-proof discharge observations.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF cleanup GC soak evidence (#7507)
Require the P4 release bundle to carry measured cleanup/GC soak evidence for retained MRF replay responsibilities. The bundle now needs a two-hour cleanup window, exact cleanup case coverage, observed verified idle GC, and zero pending responsibilities or stale journals after GC.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF disk-full commit anchors (#7509)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): report port allocator bind errors (#7510)
Surface the scanned port window, attempt count, and last bind error when the e2e port allocator cannot reserve a localhost port. This keeps Scanner/Heal evidence failures actionable when the environment blocks binds before business assertions run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(sse): resolve 1.0.0 SSE/KMS blockers and P1 findings (#7511)
* fix(sse): resolve bucket default encryption per request
PUT and the POST-object/extract path resolved a bucket's default
encryption with a hard-coded "no explicit SSE-C" flag, so the default was
layered onto a request that already carried an SSE-C header triple and
then tripped that request's own mutual-exclusion check. Every bucket with
default encryption refused SSE-C single PUTs with 400 InvalidArgument,
while CreateMultipartUpload on the same bucket succeeded because it
resolves SSE elsewhere. Both call sites now derive the flag from the
request headers, as COPY already did.
The bucket default's KMS key id was also inherited independently of the
effective algorithm, so an explicit AES256 request against an aws:kms
default bucket produced a self-contradictory algorithm/key-id pair and
was rejected. The key id is now inherited only when the effective
algorithm is aws:kms, matching the storage-layer resolver.
Refs backlog#2368 B1, B2.
* fix(sse): refuse SSE-KMS without a running KMS service
A write requesting aws:kms on a node with no KMS service fell back to the
node-local SSE-S3 provider: the data key was wrapped with
RUSTFS_SSE_S3_MASTER_KEY while the object metadata still recorded
aws:kms and the requested KMS key id. The stored object claimed a KMS
protection it never had, under a key that was never consulted, and no
signal distinguished it from a genuine SSE-KMS object.
The managed-encryption path now asks the resolved DEK provider whether it
wraps with a node-local master key and refuses SSE-KMS in that case:
InvalidRequest when KMS was never configured, ServiceUnavailable when a
configured service is not running. The check sits after the per-key
authorization gate so an unauthorized caller still receives AccessDenied
whatever the KMS runtime state is, and asks the provider rather than a
parallel availability signal because the provider is what actually wraps
the key. A missing master key no longer answers an SSE-KMS request with
an SSE-S3-worded configuration error.
The SSE-S3 local fallback is unchanged.
Refs backlog#2368 B4.
* fix(ecstore): restore and archive tiers in stored coordinates
Multipart restore addressed the remote tier in plaintext coordinates
while the copy-back reads the stored representation. Each part received a
misaligned slice of the remote object whose length still satisfied the
range, the hash reader and the completion size check, so the restore
reported success and silently replaced the object's bytes. Encrypted and
compressed multipart objects were both affected. Restore now accumulates
stored part sizes, passes the stored length to the hash reader alongside
the plaintext length, and validates against the stored size.
The copy-back digests stored bytes, so its computed MD5 is not the
object's public ETag. Restore now preserves the object ETag on both the
single-part and multipart paths, and gives each restored part its own
recorded part ETag rather than the object-level value.
Transition also handed the tier the object's SSE headers and its
RustFS-wrapped data key as request headers. Any S3 target rejected an
SSE-C archive outright, an SSE-KMS archive asked the target to encrypt a
second time under a key id it does not own, and the wrapped DEK left the
cluster. The archive request now strips every SSE header and encryption
marker with the predicate the replication path already uses; the local
xl.meta keeps all of it, so read-through and restore are unaffected.
Objects restored by an affected release are not detected or repaired
retroactively and must be re-restored from the tier.
Refs backlog#2368 B3, B5; backlog#2369 P7.1.
* fix(rio): lock the v1 nonce layout within a segment
Decrypting a v1 segment tried three historical nonce layouts per frame,
independently for every frame. The last of them exists for streams
written before 1.0.0-alpha.91, which reused a segment's part nonce for
every block in it; because block zero's derived nonce equals that base
nonce, a frame encrypted at index zero authenticated at any position. An
attacker able to rewrite the underlying shards could replay it and have
the forged plaintext returned with 200 and an unchanged length. Shard
integrity uses a keyed-hash-free checksum, which such an attacker can
recompute, so it is not a barrier.
A segment now locks onto whichever layout decoded its first non-zero-index
frame and rejects any later frame needing a different one. That leaves one
residual shape: a stream built purely from repeats of frame zero has no
later frame to disagree. New RUSTFS_ENCRYPTION_LEGACY_NONCE_FALLBACK
(default true, so pre-alpha.91 objects keep decrypting) drops the third
layout entirely when set to false, which closes it. Turning it off refuses
pre-alpha.91 objects, so migrate them first by rewriting in place.
Refs backlog#2369 P2.
* fix(kms): reload a service that failed to start
POST /rustfs/admin/v3/kms/reload short-circuited whenever the persisted
configuration matched the in-memory one byte for byte. A node whose KMS
failed to start keeps that configuration and sits in Error, so the
documented recovery call returned "reloaded successfully" while leaving
the node down. Peers reached the same path through the reload broadcast,
so a cluster that lost Vault during a rolling restart had no working
recovery route other than the node-local start endpoint. Reload now
short-circuits only for a service that is actually running, and otherwise
reconfigures, which starts a service that is not running.
The AWS backend also advertised key-version enumeration through
kms/status, which its own documentation says it cannot do; the capability
and its golden snapshot now say false.
Refs backlog#2369 P1, P7.3.
* docs: record the SSE and KMS changes for 1.0.0
The Unreleased changelog section carried no entry for any encryption work
merged since 1.0.0-rc.5, including three items with operational impact:
the config-secret variable whose absence persists secrets in cleartext
with only a warning, the v2 frame write switch and its rolling-upgrade
constraint, and per-key authorization making a public bucket incompatible
with SSE-KMS objects. Adds those plus this batch, including the SSE-KMS
refusal as a breaking change with both routes out.
Also corrects four places where documentation contradicted the code: the
cleanup register still called encrypted range seek opt-in after its
default flipped, the Helm README claimed vault_mount_path only applies to
Transit while the template also feeds the KV2 mount, the disaster-recovery
drill listed bundle contents for backends whose export is refused with
501, and the Chinese README capability table predated most of the feature
set. Documents the SSE-S3 local master key as a first-class operational
mode with its rotation dead end, and what the v1 frame layout does and
does not authenticate.
Refs backlog#2369 P5.
* fix(kms): classify data-path KMS failures by what the caller can do
Only "key not found" and a backend outage were classified; every other
KMS failure that reached the S3 data path fell through to
500 InternalError with a generic message. A disabled or pending-deletion
key, a denied KMS grant, an encryption-context mismatch, an unsupported
algorithm, a credential or timeout failure, and a capability the
configured backend does not have all looked identical to a server fault.
SDKs therefore applied exponential backoff to configuration errors no
retry can fix, and monitoring counted every one of them against the
server's own error rate.
Unusable-key and request-side failures now answer 400, a denied grant
403, transient backend failures 503, and a missing backend capability
501. Damaged, unreadable, or unknown-format key material keeps its 500:
it is a server-side integrity fault, and existing tests pin it.
The classifier is deliberately separate from the admin lifecycle
mapping, which answers 404 for a missing key because there a key id is
the resource being addressed; on the data path it arrives inside a
request header or a bucket default. Messages either name what the caller
asked for or stay generic, with deployment-side detail left on the error
source the way the storage-IO mapping already does.
Refs backlog#2368 B6.
* fix(kms): track and renew static Vault tokens
Token authentication hard-coded "this token carries no lease", so the
renewal task never started, the remaining-TTL gauge was never published,
and nothing looked wrong. `vault token create` grants a 768-hour TTL by
default, so a cluster that had been healthy for a month turned every KMS
call into a 403 and could not recover without a restart or a
reconfigure. Production configuration validation only rejects the
literal dev-token, so an ordinary expiring token reaches a whole cluster.
The source now reads `auth/token/lookup-self` at login and adopts what
Vault reports. A token with no expiry behaves exactly as before. An
expiring renewable one is picked up by the existing renewal loop and
renewed at half TTL like every other auth method. An expiring
non-renewable one warns with its remaining lifetime and publishes the
gauge, so the fail-closed window is visible before it arrives.
The probe never fails the login: a policy that omits lookup-self, or a
Vault that is briefly unreachable, warns and falls back to exactly the
previous behaviour rather than taking down a deployment that works
today. The scripted Vault test double answers the lookup out of band so
existing scripts keep describing only the protocol under test.
Refs backlog#2369 P3.
* feat(sse): report SSE-C requests that arrive without TLS
An SSE-C request carries the customer's AES key in a request header, so
AWS S3 and MinIO both refuse one that did not arrive over TLS. RustFS
accepted them on any transport: a plaintext hop hands the key to anyone
on the path, and since the object cannot be read without that same key,
the exposure lasts as long as the object does.
Refusing outright is the correct end state but not a safe default to
adopt inside a release window, because the project's own s3-tests and
e2e lanes and most staging deployments speak plain HTTP. This release
reports instead: each such request increments
rustfs_ssec_plaintext_requests_total and logs one warning per process, so
an operator can confirm nothing would break before the default flips.
RUSTFS_SSE_C_REQUIRE_TLS=true opts into the AWS 400 now.
The verdict is per connection rather than per deployment: the layer is
built with whether this listener terminated TLS, and additionally accepts
an https protocol forwarded by a proxy the trusted-proxy configuration
already vetted. It sits beside the rate limiter, after the layer that
makes a forwarded protocol trustworthy and after the request context, so
a rejection can echo the request id.
Refs backlog#2369 P7.2.
* fix(kms): say what a node-local backend means for a cluster
The Local backend keeps key material on each node's own disk and
generates its Argon2id salt per node, so two nodes derive different keys
from the same master_key and an object encrypted on one node cannot be
decrypted on another. Behind a load balancer that surfaces as
intermittent 500s on reads that succeeded moments earlier, with nothing
tying the symptom to the cause: the only signal was a generic
"development, testing and demos only" positioning warning that says
nothing about what actually breaks.
Configuring or reconfiguring Local while the deployment is distributed
now logs a dedicated event and appends the consequence to the configure
response, so the operator who made the change sees it. The product
decision to warn rather than refuse is unchanged.
Refs backlog#2369 P7.4.
* docs: record the remaining SSE and KMS changes for 1.0.0
Adds changelog entries for the KMS data-path status classification, the
Vault static-token lease probe, the SSE-C plaintext-transport report and
its switch, and the node-local backend warning.
Documents two things the backend security guide never stated: that SSE-C
belongs on a secure transport, with the counter and switch to plan the
change around, and that the Local backend cannot be shared by a
multi-node deployment because each node derives different keys from the
same master key.
Refs backlog#2368 B6; backlog#2369 P3, P5, P7.2, P7.4.
* fix(kms): report an unreadable key store as an outage on the S3 path
A backend now distinguishes a key store it could not read from a key
that is genuinely absent, but the S3 boundary collapsed the first one
back onto 500 InternalError through the fallthrough for integrity
faults. The distinction was therefore invisible to the client: a
temporary key-directory outage looked exactly like a permanently damaged
key record, and neither the status nor the metric said the request was
worth retrying.
An unreadable key store joins the retryable class and answers 503, next
to a backend error and a credential failure. Damaged, unreadable or
unknown-format key material keeps its 500.
Refs backlog#2368 B6; builds on rustfs/rustfs#7470.
* test(storage): cover MRF cleanup delete ENOSPC anchor (#7513)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require heal retry stats evidence (#7514)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add release bundle dry-run fixture (#7515)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): confirm recovery intent accept readback (#7516)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF cleanup delete ENOSPC evidence (#7518)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require bounded retry window evidence (#7517)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): emit scanner heal G09 upgrade evidence (#7519)
Record measured Scanner/Heal G09 evidence artifacts from the upgrade compatibility lanes when a fresh evidence directory is provided.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): persist MRF rollback mirror boundary (#7520)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G09 upgrade evidence runner (#7522)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(scanner): add G09 upgrade evidence runner
Add a reusable Linux x86_64 runner for the Scanner/Heal G09 mixed-version and rollback upgrade evidence lanes.
The helper reads the pinned previous-release asset metadata from the upgrade workflow, verifies the downloaded binary, builds the current head, runs both ignored E2E tests, and fails unless the expected G09 JSON artifacts exist.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): implement V2 evidence preflights (#7523)
* feat(scanner): wire dirty usage producer identities
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add segment activation preflight proof
Keep scanner segment reuse behind a structured activation preflight so release evidence can prove the production gate remains disabled until every producer, generation, overflow, cold-oracle, and distributed invalidation check is satisfied.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): expose distributed invalidation evidence
Record an explicit distributed segment invalidation evidence summary when remote dirty usage snapshots are bound to the current activity window and the authenticated scoped ACK capability probe succeeds.
Reject peer dirty usage snapshots that contradict the peer activity pending bit so scoped ACKs fail closed instead of clearing an unadvertised remote mutation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): assemble release evidence bundles (#7526)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G09 upgrade evidence runner (#7524)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(scanner): add G09 upgrade evidence runner
Add a reusable Scanner/Heal G09 runner for Linux PR-head validation. The script downloads the pinned previous release, builds the current checkout, runs the mixed-version and rollback upgrade E2E lanes, and validates the measured raw artifacts before they can be consumed by the release bundle gate.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): replay recovery intents while disabled (#7521)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): preflight G09 evidence disk space (#7527)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* fix(targets): reject trailing batch items (#7508)
* test(scanner): preflight G09 evidence disk space
Fail the Scanner/Heal G09 upgrade evidence runner before downloading or building when the validation host does not have enough free space for a full raw evidence pass.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): respect cargo target dir in G09 runner (#7528)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* fix(targets): reject trailing batch items (#7508)
* fix(scanner): respect cargo target dir in G09 runner
Write the RustFS feature stamp under the resolved Cargo target directory so remote validation hosts with CARGO_TARGET_DIR set can reuse the built PR-head binary.
Extend the runner plan/self-test path to cover relative target-dir resolution.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): add G09 upgrade evidence runner (#7525)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(e2e): add G09 upgrade evidence runner
Add a Linux x86_64 runner that downloads the pinned previous release, builds the current RustFS binary, runs the mixed-version and rollback upgrade compatibility lanes, and verifies the required Scanner/Heal G09 raw evidence artifacts.
Document the runner and add a shell self-test for help, dry-run, SHA validation, and non-empty artifact directory guards.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): emit G09 release bundle gate evidence (#7530)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* fix(targets): reject trailing batch items (#7508)
* test(scanner): emit G09 release bundle gate evidence
Write a bundle-ready G09 gate descriptor from the Linux upgrade evidence runner and validate the single G09 gate with the shared release-bundle rules without approving the full Scanner/Heal release.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): reject invalid G09 runner test selection (#7531)
Validate the selected G09 evidence lane before process-substitution case expansion so --plan-only cannot turn an unknown --test value into an empty successful plan.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): keep G09 source binary path clean (#7532)
Keep checksum verification output out of the command substitution that resolves the previous-release binary for the G09 runner.
Also tolerate non-GNU sha256sum in local self-tests by falling back to shasum when GNU --check support is unavailable.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF replay proof cleanup (#7534)
Exercise the committed MRF replay checkpoint path with a real ECStore-backed bucket incarnation, retain the replay anchor until an exact verified proof arrives, then delete the proof-discharged checkpoint and prove a subsequent restart does not resurrect the replayed work.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): carry segment activation preflight evidence (#7535)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): surface cold segment reuse oracle (#7536)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require hard evidence artifact payloads (#7537)
Require Scanner/Heal release bundle JSON artifacts to carry hard-domain evidence fields for mixed-version, crash, capacity, disk-full, replica-loss, and MRF cleanup gates. This prevents a descriptor from approving a hard gate while pointing at a generic measured artifact that lacks the boundary-specific oracle fields.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): bind producer evidence to dirty generations (#7538)
Record scanner segment producer identities with the dirty usage generation they invalidated, then expose a cycle-local producer evidence snapshot for segment reuse activation preflight.
Production activation remains fail-closed until durable producer identity and restart-gap proof are available.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): persist segment invalidation proof metadata (#7539)
* test(scanner): wait for EC8+4 heal control readiness (#7540)
* test(scanner): list full P4 release evidence fields (#7542)
Align the Scanner/Heal release requirement registry with the release bundle gate for P4 so the closure checklist advertises MRF scale, replay cost, retained responsibility, and cleanup/GC soak evidence together.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add W16 release evidence runner (#7543)
Add a W16 Scanner/Heal evidence runner that executes the recovery-intent crash-boundary and quota-authority lanes, emits measured G04/G12 JSON artifacts, and validates the resulting single-gate release descriptors.
Wire its shell self-test into script-tests and document the release evidence entry point.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix: address release acceptance regressions (#7541)
* feat(scanner): admit durable segment proof replay (#7544)
* feat(scanner): admit durable segment proof evidence
Validate complete set snapshot segment invalidation proof metadata against the current dirty usage generation window and scanner process epoch before clearing durable producer and restart-gap activation blockers.
Production segment reuse remains gated by the explicit activation flag.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): replay segment proof from root snapshots
Carry segment invalidation proof metadata into root snapshot set states so a complete published baseline can replay the durable producer evidence recorded by each set cache.
Keep the field additive for older readers and leave incomplete or LKG set states unproven.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind MRF release artifacts to evidence kinds (#7545)
Require Scanner/Heal G07/G08/P4 JSON artifacts to declare the exact MRF evidence kind expected for each release-bundle field. This keeps generic measured JSON from satisfying durable replay, ENOSPC, replica-loss, scale, replay-cost, retained-responsibility, or cleanup-GC soak gates.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): enable segment reuse activation gate (#7546)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): run scoped fallback cases on dedicated stack (#7550)
Linux libtest defaults can abort these deep EC-store futures before the assertions run. Wrap the async scoped fallback cases in the repository's dedicated-stack test pattern so the default cargo test path exercises the oracle directly.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): roll out distributed e2e selection (#7549)
Refresh the committed e2e-distributed selection digest after the EC8+4 Scanner/Heal evidence case joined the profile, and document the registry-aware runner entry for the distributed case.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add W13 MRF evidence runner (#7547)
Add a W13 durable MRF evidence runner that emits measured G07, G08, and P4 JSON artifacts and release descriptors through the existing scanner/heal bundle gate.
The runner now executes the ignored MRF replay evidence test with an exact full test path, validates raw artifact kinds and gate decisions, prepares Linux tmpfs-backed ENOSPC roots for G08, and documents the Linux/long-soak boundaries.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): fix segment proof fixtures
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): reduce W13 evidence helper arguments
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* ci(test): enable local KMS for s3 compatibility tests (#7553)
Configure the s3-tests harness with a local KMS key so SSE-KMS cases run in CI without relying on an external KMS service.
Also move the anonymous POST default SSE-KMS regression onto the shared local KMS test environment.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bind segment proof to typed dirty suffix (#7564)
Track producer identity completeness per pending bucket and retain process coverage across durable acknowledgements. Admit a prior same-process segment proof only for an exact or strictly earlier fully typed generation window.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): validate scoped ACK clear receipts (#7563)
Fail closed when a signed scoped ACK response claims more cleared entries than its request contained, while preserving partial-clear semantics and zero-mutation capability probes.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bind cold scoped cache reuse (#7565)
Record an explicit cold bucket reuse proof for scoped set scans and treat fully cold sets as valid cold-zero-walk reuse when the baseline and bucket incarnations are bound.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(s3): preserve delete marker read error headers (#7558)
* chore(release): sync configurable nightly build workflow from main (#7567)
feat(nightly): make the build branch configurable (NIGHTLY_BRANCH var + dispatch input) (#7557)
* docs(obs): correct metric export interval and explain alert timing (#7571)
* fix(heal): persist scoped admin admission handoff (#7569)
* fix(heal): persist root admission handoff
Persist administrator root heal ownership before queue publication so crash restart can replay an admitted control-plane start without relying on process-local replay cache state.
Protect queued durable root owners from priority displacement; callers must use forceStart cancellation semantics to replace them.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): persist admin heal handoff types
Extend durable admin heal admission handoff beyond cluster roots while preserving legacy root recovery records. Persist the heal type in schema v2, replay typed admin requests after restart, keep non-admin requests out of the durable control-plane handoff, and allow path cancellation to clear durable-only non-root records.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): preserve disjoint durable admin owners
Limit admin forceStart durable-owner cleanup to overlapping heal requests after the admin recovery journal begins storing non-root work. Add fail-closed and displacement tests so durable bucket owners cannot be silently dropped by unrelated replacement or priority pressure.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): persist admin terminal receipts
Persist terminal receipts for durable administrator heal starts before retiring their pending intent so restart can answer completed or cancelled scoped tasks without replaying them.
Retain pending work when terminal publication fails and keep timeout owners on checkpoint-only replay semantics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): mark committed replication and tier mutations (#7568)
* fix(scanner): mark committed replication and tier mutations
Bridge ECStore committed replication status writebacks and lifecycle tier expiration cleanup into scanner dirty-usage producer identity tracking. Only successful replication metadata updates mark Replication; validate-only, superseded, and retry paths remain unmarked.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): replay durable dirty producer records
Add a strict scanner dirty-usage producer replay schema that can restore typed producer coverage after restart without treating ordinary process-local mutations as durable evidence. Replay records validate schema, cache key format, generations, scopes, producer identities, duplicate buckets, byte limits, and entry limits before modifying dirty state.
Keep segment activation fail-closed unless the restored bucket state came from durable replay; subsequent local mutations clear the durable authority bit for that bucket. Also fix the release scanner clippy lint in scoped cold-reuse proof creation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): recover expansion buckets and resume retirement (#7574)
* fix(ecstore): recover partially created expansion bucket volumes
* fix(ecstore): resume retirement after startup safety checks
* fix(ci): align S3 KMS fixtures and default key expectations (#7573)
* fix(heal): prune retained root terminal receipts (#7576)
Bound durable root-heal terminal receipt retention to the completed-status TTL while keeping expired receipts authoritative enough to retire stale pending intents before deleting the receipt itself.
Add a budgeted background GC pass and fail closed on corrupt or non-terminal receipt records.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(storage): preserve retryable publication guard errors (#7561)
* fix(storage): preserve retryable publication guard errors
* fix(scanner): satisfy scoped cache clippy lint
Use bool::then_some for the scoped cold bucket reuse proof construction after merging the latest release branch.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(health): report storage quorum in node readiness (#7566)
* fix: preserve scanner backlog during pool retirement (#7555)
* fix: hand off native scanner backlog before pool retirement
* test: initialize optional proof in data usage fixtures
* perf: bound parallel V3 pool metadata phase writes
* test: keep native backlog fault errors typed
* test: skip unchanged pool metadata in crash barriers
---------
Co-authored-by: cxymds <cxymds@gmail.com>
* test(scanner): bind profile artifact provenance (#7577)
* fix(scanner): persist dirty producer journal (#7580)
Persist scanner dirty producer replay records from committed replication and tier mutations, hydrate journal state on restart, and clear durable records only after acknowledged dirty generations.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test: add scanner heal scheduler pressure evidence (#7584)
Add measured G10/P1/P3 scheduler-pressure release descriptor generation, ABBA scheduler/profile provenance, and focused self-tests for the release bundle gate.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test: add scanner heal G14 multiset evidence (#7583)
Add EC8+4 multi-set and multi-pool scanner/heal release evidence coverage, including e2e registry cases, oracle checks, and a G14 descriptor assembler for measured case artifacts.
Signed-off-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(nightly): push assets with plain git on release — the build fleet has no gh CLI (#7586)
fix(nightly): push assets with plain git — the build fleet has no gh CLI
The sm-standard-4 runners used by the nightly build have no gh binary
(functional-chain workflows run elsewhere, on the jumpbox). The assets
publish step died on 'gh: command not found' at the credential-helper
setup, and the preceding clone failure had been masked by 2>/dev/null,
misleading the step into the orphan path. Swap clone and remote setup
to plain git with the token embedded in the URL; push semantics are
unchanged.
* fix(scanner): stabilize retired backlog survivor commits (#7585)
Treat an authoritative scanner pause-backlog commit as stable when every member in that commit stores the matching stable and committed record. Retired source replicas can remain missing in the observed topology while survivor membership is already stable.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(metrics): prevent duplicate drive reporting across nodes (#7582)
Co-authored-by: houseme <housemecn@gmail.com>
* fix(ecstore): avoid Windows batch-delete cleanup sharing conflicts (#7579)
Co-authored-by: houseme <housemecn@gmail.com>
* feat(ilm): inspect legacy transition version state (#7581)
* test(scanner): add release evidence ingestion gates (#7588)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix: reuse admin error boundary for legacy tier reconciliation (#7587)
* fix(test): stabilize release CI heal fixtures (#7589)
Keep heal admission-only tests off durable root recovery so mock storage does not require local metadata disks. Align forceStart retry assertions with replacement semantics and fix the e2e metric clippy collapse.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)
Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).
- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
the 'nightly' release via the REST API, deletes same-name assets,
uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
body with the build provenance (ref@sha, run link, sizes, SHA256).
Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
exercised end-to-end against the real release with probe files
(create / upload / overwrite / download round-trip / body update).
* test(scanner): add release bundle evidence descriptors (#7595)
* test(scanner): merge release evidence descriptors
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add authority and legacy release descriptors
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add scoped ack release descriptor
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require all release evidence fields
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add mrf release descriptor producer
Add a standalone W13 MRF descriptor producer for measured G07/G08/P4 raw artifacts, with fail-closed self-tests for missing responsibility cases, disk-full ENOSPC observations, synthetic artifacts, and short P4 cleanup soaks.
Also bind G12 quota path evidence to explicit case lists so W16 descriptors cannot pass without reset and settlement coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): reuse mrf release descriptor producer
Route the W13 runner through the shared MRF descriptor producer so measured runs and offline re-packaging use the same fail-closed validation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(ilm): backfill proven legacy transition state (#7591)
* feat(ilm): backfill proven legacy transition state
* fix(ilm): remove redundant reconcile test clone
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): remove redundant transition clone (#7597)
Drop an unnecessary clone in the legacy transition state digest regression so release CI clippy lanes can run with warnings denied.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): seed current backlog members before committing (#7594)
* fix(scanner): seed current backlog members before committing
* test(app): run recursive force delete test on large stack
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind raw profile artifacts (#7598)
Require Scanner/Heal release profile wrappers to carry bundled raw profile artifacts plus the matching profile cost metrics.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): surface first failed object in status (#7599)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover retry budget across attempts (#7600)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden durable producer evidence gate (#7601)
Require Scanner/Heal G11 maintenance evidence to prove durable dirty producer journal replay, replay-state hydration, generation-bound ACK clearing, and invalid journal fail-closed cases before segment reuse can be activated.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden scoped ack evidence proof (#7602)
Require Scanner/Heal G03 scoped ACK evidence fields to carry their own measured provenance and concrete ACK, capability, and mixed-peer observations before release-bundle gate verification.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind status outcome raw provenance (#7603)
Require measured G05/G06/R-D raw status, compatibility, and disposition artifacts to share run identity before producing release bundle descriptors.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): retry fully recoverable batch failures (#7604)
Allow recursive bucket and cluster heal attempts whose retained batch failure is entirely retryable to use the existing bounded manager retry budget. Permanent or mixed batch failures remain terminal so heal outcome semantics stay strict.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): avoid movement debt for stale remote lease (#7605)
Classify a final remote scanner publication lease validation failure from a fresh activity snapshot instead of treating every validation error as data movement. If the peer session and movement generation still match the granted leases and publication is otherwise allowed, keep the publication rejected as an activity-baseline miss without creating pause backlog movement debt. Preserve DataMovement for expired leases, peer restarts, movement generation changes, and active publication blocks.
Tests cover namespace-only validation invalidation and the remote fence-loss cases that must still defer as DataMovement.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* chore(deps): refresh workspace dependencies (#7606)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind G14 case artifacts (#7611)
Require Scanner/Heal G14 release bundle JSON wrappers to mirror their outer evidence and carry self-contained case artifact provenance.
Copy proof-json case artifacts into the generated G14 descriptor bundle so assembled release bundles can validate case file hashes after relocation.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): retry contended decommission cancel target locks (#7612)
* test: align transition fixtures and KMS context expectations (#7610)
* test(scanner): stabilize W13 release gate evidence (#7613)
* feat(nightly): publish packages as assets of the rolling 'nightly' release (sync from release) (#7593)
feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)
Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).
- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
the 'nightly' release via the REST API, deletes same-name assets,
uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
body with the build provenance (ref@sha, run link, sizes, SHA256).
Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
exercised end-to-end against the real release with probe files
(create / upload / overwrite / download round-trip / body update).
* test(scanner): stabilize W13 release gate evidence
Treat only real raw-entry windows as replayed scanner enumeration in the restart diagnostic, so final completion rounds without raw entries are not fail-closed as raw replays.
Allow the EC8:4 multi-pool heal evidence case to select an outage object key that routes to an online pool while an entire target pool is down, preserving strict behavior for single-pool cases.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bound native backlog fixture resources (#7609)
* fix(scanner): bound native backlog fixture resources
Keep native scanner backlog restart fixtures within low file descriptor limits by reducing the native-only disk layout, making fixture shutdown drain background work, and avoiding long-lived ECStore retention from background loops.
Convert ECStore-backed background refresh/recovery/monitor tasks to upgrade weak owners only while doing work so completed test stores release their disk graph before the next native fixture starts.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(tier): refresh release-merged failure fixtures
Reuse the raw legacy-transition fixture helper so delete-all expiry actually exercises Unknown transitioned history metadata after the release merge.
Rewrite restore-failure disk fixtures through per-disk xl.meta snapshots so stale destination identities can be persisted without tripping ordinary metadata update guards.
Update the SSE KMS mismatch expectation to the InvalidRequest/context_mismatch behavior now returned by the rio-v2 path.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): align release E2E gate and repair regression tests (#7607)
* fix(scanner): harden heal release gates (#7614)
* test(scanner): reject synthetic heal evidence inputs (#7617)
Harden the Scanner/Heal checkpoint restart and G14 EC evidence producers so release descriptors cannot be assembled from marked fixture, dry-run, or synthetic case inputs.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): collect status outcome raw evidence (#7618)
Normalize live Scanner/Heal status/outcome observations into the measured raw artifacts consumed by the G05/G06/R-D release descriptor producer.
Reject synthetic observations, incomplete required cases, and reused run/window identities before raw artifacts can enter the release bundle flow.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bind scoped ack confirmation to generation (#7619)
Require lost scoped dirty-usage ACK reconciliation to observe a clean peer activity generation that covers the requested ACK generation. Apply the same guard in the scanner aggregation path so a stale clean activity snapshot cannot discharge pending maintenance after an uncertain ACK response.
Refs rustfs/backlog#2427
Refs rustfs/backlog#2281
Refs rustfs/backlog#2240
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test: report tier reference proof setup failures without hanging (#7608)
* test(scanner): plan Linux evidence validation (#7620)
Add a Scanner/Heal Linux release-evidence planner that emits a machine-readable execution manifest for the remaining measured validation lanes.
The planner can run only lightweight preflight checks and keeps plan-only output distinct from measured release evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): select G14 replacement drive by evidence (#7622)
Choose the replacement disk from the target node by the presence of complete pool metadata instead of assuming the first configured drive is the scanner metadata holder. This keeps the G14 multi-set harness aligned with multi-drive EC layouts and adds clearer diagnostics when multi-pool outage writes fail closed.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): report Linux evidence plan status (#7624)
Add a status mode for the Scanner/Heal Linux evidence planner so operators can identify missing or incomplete artifacts before final bundle assembly.
The status output stays plan-only and never reports release approval.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G14 multi-pool background heal evidence (#7628)
test(scanner): align G14 multi-pool outage evidence
Treat the localhost multi-pool topology as whole-pool loss when the target node is down. If that topology cannot admit the outage object while the pool is offline, defer that object write until the pool rejoins and record the oracle marker instead of failing before the real crash/restart evidence runs.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): verify deferred multipool outage evidence (#7629)
Validate the G14 multi-pool oracle field that records down-window outage PUT refusal and requires the deferred post-rejoin outage object to be accepted and checked through S3.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): allow metadata snapshots at read quorum (#7627)
fix(ecstore): admit metadata snapshots at read quorum
Allow guarded bucket metadata snapshot existence checks to use read quorum so degraded erasure sets can continue Object Lock snapshot reads without weakening bucket mutation or object write quorum.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* chore(deps): refresh release dependencies (#7632)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): use pool lock quorum for set writes (#7630)
Use the pool-wide namespace lock client domain for every set in a pool so degraded EC8+4 multi-set writes are gated by node-level lock quorum instead of the narrower per-set endpoint host slice.
Keep namespace-lock domain deduplication tied to both the pool namespace and shared clients, and add regression coverage for three-locker degraded writes plus cross-pool domain separation.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): keep G14 multi-set restart graceful (#7633)
test(e2e): keep multi-set restart graceful
Include the EC8+4 multi-set restart scenario in the graceful interruption lane so the unclean-shutdown marker assertion matches the scenario semantics.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): record deferred G14 outage writes (#7637)
Include optional outage-write diagnostics in G14 evidence oracles so deferred multi-pool outage writes bind their down-window refusals and post-rejoin acceptance.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bound G14 multi-pool evidence size (#7640)
Keep the multi-pool evidence runner within the registry object budget while retaining deferred outage-write diagnostics for release-gate validation.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): find nextest junit fallback for evidence cases (#7643)
Handle cargo-nextest writing JUnit reports under the workspace target directory even when the Rust build uses CARGO_TARGET_DIR. This keeps measured Scanner/Heal evidence cases from passing the real test but failing final receipt packaging.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ilm): preserve cleanup ownership on tiered overwrites (#7639)
* fix(ilm): preserve cleanup ownership on tiered overwrites
* fix(ci): refresh E2E selection for tier overwrite regression
* test(ilm): restore noncurrent compensation tests to serial CI (#7645)
* fix(heal): preserve null-version tags and encoded object paths (#7644)
* fix(e2e): record EC8+4 drive restart set size (#7648)
* fix(e2e): record EC8+4 drive restart set size
Include the erasure set drive count in the distributed EC8+4 drive restart oracle so Scanner/Heal release evidence matches the registry contract.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(s3): tighten s3s footprint ratchet
Replace release-merge s3_error! macro calls with equivalent S3Error constructors so the s3gate migration ratchet does not grow on the PR merge tree.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): target multi-set outage heal candidate (#7653)
* test(e2e): target multi-set outage heal candidate
Require the outage write used by EC8+4 multi-set root-heal evidence to miss the same erasure index owned by the selected replacement drive. This avoids accepting a candidate from a different set and turning a valid heal into a false negative.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): satisfy G14 heal lint gates
Remove clippy-only noise from the G14 multi-set heal evidence test and align the admin route policy inventory with the registered heal catch-all route.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* update
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): reuse API error boundary for decoding failures (#7647)
* fix(heal): reuse API error boundary for decoding failures
* Update heal.rs
Signed-off-by: houseme <housemecn@gmail.com>
* test(ecstore): synchronize batch cleanup metadata reads
Acquire object read locks while observing unversioned and explicit-version batch cleanup, then release them before waiting for progress. This prevents snapshots from spanning per-disk marker removal while retaining the existing quorum, timeout, and remote delete count assertions.
Validation: cargo fmt --all --check and git diff --check passed. The focused nextest test passed 20 stress iterations each with test-util and test-util,rio-v2, with retries disabled.
---------
Signed-off-by: houseme <housemecn@gmail.com>
Co-authored-by: houseme <housemecn@gmail.com>
* fix(scanner): wait for ABBA telemetry window (#7660)
Size the scanner collector wait budget from the requested sample count and interval instead of using a fixed 120 second timeout. This preserves the full duration/60+1 telemetry sample set for measured ABBA runs.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(ci): add fault-tolerance degradation suite to the functional chain
Adds a fault-tolerance suite that verifies read/write behavior under
drive and node loss against the erasure-coding contract and snapshots
health-endpoint responses at every degradation tier. Scenarios are
derived from product source (default_parity_count, erasure set sizing):
- A: single-node 4 drives (EC:2, read quorum 2): hide 1/2/3 drives
- B: multi-node 4x1 (one set of 4, EC:2): stop 1/2/3 nodes
- C: multi-node 4x4 (one set of 16, EC:4, read quorum 12): 1 node down
lands exactly on the read-quorum boundary; 2 nodes down breaks it
- C2: multi-node 4x4 with RUSTFS_STORAGE_CLASS_STANDARD=EC:8 (read
quorum 8, write quorum 9, lock majority 9): 2 nodes down puts reads
inside the reported divergence window (read quorum met while the
lock majority is broken)
By default a reads-refused-despite-met-read-quorum observation is
reported as known-divergence without failing the suite; the strict
input escalates it. Chain order becomes:
upgrade -> s3 -> kms -> tier -> storage -> heal -> pool -> security ->
replication -> fault-tolerance -> performance.
Covers the findings of the 2026-09 external degradation report
(reads at read quorum, health-endpoint readiness truthfulness,
degradedReasons capture) as automated regression probes.
* Revert "feat(ci): add fault-tolerance degradation suite to the functional chain" (#7666)
This reverts commit 6eb200022e.
* fix(ecstore): preserve multi-pool version histories (#7658)
* fix(ecstore): preserve multi-pool version histories
* fix(ecstore): satisfy clippy in rebalance test
* fix(ecstore): preserve decommission delete compatibility
* fix(heal): recover stale peer state after restart (#7665)
* fix(heal): select writable recovery intent owner (#7668)
* feat(ci): add fault-tolerance degradation suite to the functional chain (#7669)
* fix(get): reject pre-header read quorum failures (#7670)
* fix(get): reject pre-header read quorum failures
* fix(ci): unblock get pre-header quorum checks
* ci: stop defaulting suite dispatches to a pinned release (#7681)
The rustfs_version dispatch input defaulted to 1.0.0-rc.4-preview.1,
which shadowed the nightly fallback and started 404ing once that
release was deleted. Manual dispatches with no inputs now fall through
to the nightly package (same contract the pool suite already has);
passing rustfs_version or package_url still pins the build exactly as
before. Chain (repository_dispatch) runs are unaffected: the inputs
context is empty there, so they always used the nightly fallback.
* ci: manage backlog issues by signal instead of per-run filing (#7680)
* ci: manage backlog issues by signal instead of per-run filing
The suite workflows used to file one backlog issue per failed run
(dedup was by run ID, which never matched), so issues accumulated
without bound. Replace the inline filing step in every suite workflow
(s3, kms, tier, storage, heal, pool, security, replication, upgrade,
performance) with a single call to
auto-testing/scripts/issue_manager.py, which:
- dedups by signal: failing cases are searched among open issues by
label (suite category + case ID); covered cases become a coalesced
comment on the existing issue, only uncovered cases file a new one
- labels new issues with functional-test, the suite category, one
label per failing case ID (lazily created), and env for
bootstrap-class failures (no cases ran, wholesale failure, or
404/ssh/clone/dpkg signatures in the log)
- closes open issues of the suite after a fully green run, citing the
run as evidence; cancelled runs never file or close anything
The step is skipped cleanly when auto-testing (private checkout) does
not contain the manager, or when PF_TESTING_GH_TOKEN is unset.
* fix(ci): satisfy actionlint and workflow contract tests for the manager step
- heal and performance workflows have no rustfs_version dispatch input;
referencing `${{ inputs.rustfs_version }}` in the manager step failed
actionlint's expression type check. Their package source now resolves
from package_url with the nightly fallback.
- scripts/test_security_workflow.py pinned the removed inline filing
step. The wiring assertions now pin the manager step (manager path +
per-suite report argument), and the evidence/stale-file tests assert
the skip contract instead: without the private auto-testing checkout
present, the step exits 0, publishes nothing, and leaves stale
evidence untouched.
Verified locally: actionlint clean, shellcheck clean,
test_security_workflow.py 21/21.
* fix(storage): alias legacy meta bucket over internode rpc (#7685)
* fix(storage): alias legacy meta bucket over internode rpc
Retry read-only internode RPC metadata access from legacy .minio.sys to .rustfs.sys when mixed-version peers report missing metadata during rolling upgrades.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): target durable ILM receipt quorum fixture
Use the actual durable ILM receipt object path when taking target disks offline so the test exercises receipt write quorum instead of whichever set owns the source record path.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): stabilize cancelled rename test (#7684)
* test(scanner): report Linux descriptor drift ledger (#7692)
Add a read-only descriptor ledger mode to the Scanner/Heal Linux evidence planner so release operators can separate current-head measured descriptors from old-head measured artifacts and case-level inputs before final bundle assembly.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): retry recovery readback SlowDownRead (#7695)
Allow the Scanner/Heal interruption oracle to retry transient retryable GET failures after replacement recovery has converged. The readback still verifies exact object bytes and keeps a bounded timeout, so permanently unreadable objects continue to fail the case.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(pool): default the node-endpoints fallback to the 4-node fleet (#7696)
RUSTFS_POOL_NODE_ENDPOINTS has no secret/var configured, so the suite
ran with the workflow's inline 3-endpoint fallback and the explicit
--node-endpoints flag overrode the script default fixed in
rustfs/auto-testing#61 — every dispatch died at startup with 'must
provide at least 4 direct node endpoints' (run 34677538650). Add
rustfs-node4 to the fallback; explicit secret/var still wins.
* fix(scanner): require ABBA collector credentials (#7700)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): label G14 recovery read failures (#7701)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): preserve settings in token status (#7691)
* fix(heal): preserve settings in token status
* fix(heal): group status response context
* fix(heal): decode partial status settings
* ci: green runs for case failures; red only for harness breakdowns (#7698)
A failing product case used to turn the whole workflow red, so the run
conclusion carried no signal beyond 'something failed' and the report
was suppressed. New semantics across the functional suites:
- Suite steps run with continue-on-error: the outcome is still recorded
for the report and the backlog issue manager (security/tier already
carried the flag).
- Generate report always publishes the full per-case table plus a
'Product result: N passed, M failed' summary, and its exit gate is
harness health: red only when the suite never reached case level (no
case verdicts), failed wholesale (zero passes, >=3 failures), or was
cancelled/skipped. performance is unchanged (parked).
- tier's structured gate no longer fails on case failures; it keeps red
for evidence-init and missing-gate-result breakdowns.
- pool/performance keep their existing red sources (install/benchmark).
Workflow contract tests updated to the new exit semantics: the security
report matrix keys green off the suite outcome, the evidence matrix
expects green for failure outcomes with recorded case rows (except
performance), the heal staged-rerun block expects the per-step table to
always publish, and run steps are now required to carry
continue-on-error.
Verified locally: actionlint clean; test_security_workflow.py 21/21.
* test(heal): retry G14 deferred outage put (#7703)
Treat SlowDownRead as a bounded retryable deferred PUT response after the target pool rejoins, and label terminal deferred outage PUT failures with stage context.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): retry G14 outage put probes (#7704)
Treat SlowDownRead as a retryable outage PUT probe response in the G14 multi-pool runner, and label terminal candidate failures with stage context.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): remove unused G14 put helper (#7705)
Remove the superseded ServiceUnavailable-only PUT helper after the G14 outage PUT probe switched to the shared retry classifier.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(tables): authorize reserved metadata reads (#7672)
* ci: harden report steps after first full new-semantics run (#7708)
First full serial pass with the green-on-case-failure semantics
(run 34693745171 / 34695021651) exposed three report-layer defects:
security: the report step referenced LOG_FILE, which is undefined in
this workflow (set -u killed the step before writing report.md), and
the verdict greps could not match the ANSI-escaped [PASS]/[FAIL] tags
in the real suite log. Point it at the artifacts suite.log, allow any
number of color escapes before the verdict tag, and count [SKIP]
lines separately (45 passed, 6 failed, 3 skipped was reported as an
unbound-variable crash).
pool: warp is stopped early (SIGINT) at the storage threshold and
only writes its final report on a clean exit, so an empty warp.log is
the expected shape of a healthy run - require its presence, not its
size. A mid-script die() abort or a FAIL step verdict must also turn
the validator red now that the run step is continue-on-error.
tier: add the standard 'Product result: N passed, M failed' summary
line computed from the case table, matching the other suites.
The contract test fixture previously injected LOG_FILE into the
environment and wrote verdict lines without ANSI escapes, which hid
both real-world defects; the fixture now mirrors the real suite
(stdout+tee with color tags) and asserts the pass/fail/skip counters.
* ci: tolerate ANSI reset escapes in security verdicts; fix tier product counts (#7712)
The overnight run after #7708 proved the security verdict greps still
counted zero: real verdict lines are '\e[1;31m[FAIL]\e[0m STS-105 ...'
— the reset escape sits between the tag and the case id, and the
pattern only tolerated escapes before the tag. Allow escapes on both
sides; the fixture now emits the reset too, mirroring the real suite.
The tier case table is produced by rustfs_tier_report.py and its rows
lead with the topology column, so the case-ID-first table grep matched
nothing ('Product result: 0 passed, 0 failed'). Parse the PASS/FAIL
counts from the '## Case Summary' bullets the report always emits,
falling back to a topology-aware table grep.
* fix(heal): reject overlapping admin heal owners (#7723)
* fix(heal): reject invalid admin selectors before admission (#7724)
* fix(heal): pass endpoints to overlap receipt test (#7738)
Reuse the heal-control endpoint fixture in the overlap receipt regression so the test matches the updated execution helper signature and selector validation boundary.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: hehutu <hehutu@gmail.com>
* fix(heal): verify inline shard bitrot during deep scans (#7731)
* fix(heal): verify inline shard bitrot during deep scans
* test(heal): fix CI lint and topology fixtures
* fix(heal): persist and retry partial-write repairs (#7729)
* fix(heal): persist and retry partial-write repairs
* test(heal): pass topology to overlap RPC tests
Use the existing coordinator endpoint fixture for the three overlap-test
calls to the endpoint-aware heal control executor. This repairs the E0061
test-build failure inherited from the release base.
* fix(scanner): prove dirty ACK after confirmed root write (#7732)
Allow a confirmed scanner root data-usage CAS write to prove its own publication when the follow-up root readback cannot provide a proof. Keep AlreadyDurable and all stale or companion paths on the existing readback-only proof boundary.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): rebuild truncated xl.meta from healthy quorum (#7730)
* fix(heal): rebuild truncated xl.meta from healthy quorum
* fix(test): pass topology to heal overlap RPC regression
* fix(test): drive heal admission alongside partial PUT
Poll the partial PUT and its mock heal receiver together, bound their handshake, and retain the existing repair-scope assertions.
* fix(test): prepare durable MRF fixtures and Linux heal stack
* fix(test): drive tier cleanup recovery after deferred attempts
---------
Co-authored-by: Hauser <housemecn@gmail.com>
* fix(heal): prove completed historical version cleanup (#7736)
* fix(heal): prove completed historical version cleanup
* test(heal): use debug runtime stack for C06 regression
* test(ecstore): acknowledge partial PUT heal admission concurrently
* test(mrf): fix journal fault and ownership fixtures
* fix(tables): retain dropped warehouse protection (#7675)
* fix(ecstore): gate shard integrity and preserve legacy recovery (#7741)
* fix(ecstore)!: bind bitrot shards to immutable part identities
Verify part, coding-index, and block identity across write, GET, and Heal
paths. Preserve identities across metadata-only copies and repair, include
them in multipart quorum selection, and require payload proof for receipts.
Keep legacy decoding with conservative parity and target-digest validation,
and document its unsupported cases and additional verification I/O.
BREAKING CHANGE: New bound-v1 shards require compatible readers throughout
the fleet. Legacy objects without sufficient integrity evidence return an
error; binary rollback after new writes requires verified data migration.
Refs: rustfs/backlog#2497
* fix(ecstore): preserve shard framing with independent integrity
Commit immutable part-generation Merkle roots and replicated proof indexes without changing existing checksum frames. Verify reads, reconstruction and Deep Heal against metadata quorum; keep legacy reads and explicitly defer unproven legacy data repair.
Preserve multipart rollback generations, require acknowledged durable index publication, and add decoder compatibility and donor-shard regression coverage.
* fix(heal): verify protected partial-write replay
* fix(heal): retire stale delete markers after bucket recreation (#7743)
* fix(heal): prove completed historical version cleanup
* test(heal): use debug runtime stack for C06 regression
* fix(heal): retire stale delete markers after bucket recreation
* test(ecstore): fix Clippy in retired marker regressions
* fix(heal): preserve historical null version identity (#7749)
* fix(s3): preserve version identities on suspended reads (#7751)
* fix(rebalance): retry contended runtime metadata access (#7752)
* fix(rebalance): retry contended runtime metadata access
* chore(rebalance): shrink typed error ratchet baseline
* fix(heal): bind bucket recovery to its original incarnation (#7744)
* fix(heal): bind bucket recovery to its original incarnation
* fix(heal): preserve stable bucket heal task errors
* fix(s3): classify copy source part read failures (#7746)
Map PartMissingOrCorrupt to SlowDownRead only at the GetObject/CopyObject source-reader boundary so quota metadata corruption keeps its internal fail-closed response.
Add store and e2e coverage for Harbor-style multipart staging CopyObject boundaries.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(tier): classify invalid remote credentials (#7753)
* fix(tier): classify invalid remote credentials
Classify deterministic remote-tier auth rejections before the probe cleanup fallback, and preserve the admin 4xx status for invalid credential responses.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): stabilize delete-marker movement regressions
Ignore target-local bucket incarnation fence metadata when comparing data-movement delete-marker identities, keep the release null-version listing fixture valid, and fix the nextest decommission-family filter so fault-hook tests actually join the serial group.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): serialize tier cleanup owner matrix (#7765)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): run bootstrap usage rebuild promptly (#7758)
Treat non-authoritative usage floor startup as pending bootstrap rebuild work so reset-published bootstrap markers cannot sit behind clean-idle or empty pause-backlog delay.
Wire recovery wakeups into the normal scanner cycle wait and expose the pending rebuild state in scanner status.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(tier): preserve cleanup scheduling for overwrites (#7766)
Queue committed tier free-version cleanup receipts for PUT and materialized CopyObject overwrites of transitioned null versions, while keeping remote deletion behind the existing persisted free-version cleanup path.
Tighten data-movement delete-marker retry equivalence by ignoring local bucket-incarnation fencing metadata, avoid retry fallback to the source pool, and keep version-list pagination from manufacturing an empty final page.
Refresh the e2e-distributed selector hash for the current release test set.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(release): backport main fixes and stabilize tier cleanup tests (#7793)
* fix(ecstore): stop pruning at nonempty directories (#7616)
* fix(ecstore): stop pruning at nonempty directories
* test(ecstore): release pruning fixtures before temp cleanup
(cherry picked from commit 8f150d1d8e)
* fix(heal): preserve retryable batch failures during recovery (#7642)
* fix(heal): preserve retryable batch failures during recovery
* test(heal): pin prebuilt hooks binaries in ci
(cherry picked from commit 5cd58319ed)
* fix(s3): reject oversize single PUT early and map body errors to 4xx (#7635)
* fix(s3): reject oversize single PUT early and map body errors to 4xx
A single PutObject above the 5 GiB single-request ceiling was only
rejected after the client had streamed 5 GiB into s3s's read-time body
budget, and the resulting BodySizeLimitExceeded surfaced from the erasure
writer as 500 InternalError. A body whose connection hit EOF before
Content-Length bytes arrived (hyper's IncompleteBody) was also a 500.
SDKs retry 500s, so one oversize upload was resent from offset 0 five
times.
- PutObject and UploadPart reject a declared length above
MAX_SINGLE_PUT_OBJECT_SIZE with 400 EntityTooLarge before reading the
body; the constant moves to rustfs_config so the s3s limit and the
admission check share one value.
- ApiError maps BodySizeLimitExceeded to EntityTooLarge and a hyper body
EOF to IncompleteBody across both io::Error conversions.
Fixes#7596.
* test(s3): cover UploadPart admission, aws-chunked length, real s3s limit
- Poll-counting test body proves PutObject and UploadPart reject a
declared size above the ceiling with zero body polls; exact-cap and
zero-length parts pass admission.
- A STREAMING-* aws-chunked PUT whose framed Content-Length exceeds the
cap is admitted when the decoded length is within it and rejected when
the decoded length is over it.
- The display-based BodySizeLimitExceeded matcher is checked against the
real error produced by the pinned s3s Body budget.
(cherry picked from commit 50b31bc75b)
* fix(ecstore): make directory mtime fixture portable (#7623)
* fix(ecstore): make directory mtime fixture portable
* style(ecstore): format mtime fixture assertion
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
(cherry picked from commit b1cc286cac)
* fix(storage): prevent readiness after native migration failures (#7652)
* fix(storage): prevent readiness after native migration failures
* fix(storage): skip unsupported IAM records before reading
* fix(storage): use stable typed migration metadata errors
* fix(storage): include migration record in startup errors
* test(storage): cover native migration startup failures
* test(storage): use array chunks in migration fixture
---------
Co-authored-by: RJ Regenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: cxymds <cxymds@gmail.com>
(cherry picked from commit 0cbc3ffe61)
* fix(admin): expose OIDC account display fields (#7654)
Expose verified OIDC username and email claims as display-only metadata on self-account responses while preserving the virtual parent as the authorization identity.\n\nKeep rustfs-madmin public response structs unchanged by adding the optional wire fields through private handler response wrappers.
(cherry picked from commit f02bc947cd)
* fix(replication): correct peer joins and remote-state reporting (#7650)
* fix(replication): propagate verified peer deployment identities
* fix(replication): report actual remote peer state
* fix(replication): defer initial sync until all peers join
* test(replication): shut down TLS fixtures cleanly
---------
Co-authored-by: houseme <housemecn@gmail.com>
(cherry picked from commit 853ae63b6a)
* fix(s3): bound stalled UploadPart request bodies (#7659)
* fix(s3): bound stalled UploadPart request bodies
* fix(ci): preserve the S3S footprint ratchet
(cherry picked from commit 666dfd9f9f)
* fix(tables): reject reserved warehouse locations (#7671)
Co-authored-by: cxymds <cxymds@gmail.com>
(cherry picked from commit 414176c47f)
* fix(ci): bind nightly lanes to one resolved source (#7688)
(cherry picked from commit 01d8e4347f)
* fix(replication): close the pre-stable convergence gaps from backlog#2367 (#7626)
* fix(replication): total-order rule sort and honor V1 top-level Prefix
Rule matching had two defects from the pre-GA replication audit
(rustfs/backlog#2367 C-1 and C-2):
- The actionable-rule sort compared same-destination rules by priority but
answered Equal for any other pair, which is not a total order; the
standard library sort panics on such comparators once a slice exceeds the
insertion-sort threshold, so an object matching more than 20 enabled rules
across two or more targets could panic the PUT or DELETE task. Rules now
sort by priority descending with destination and id as tie-breakers, and
filter_target_arns preserves that order instead of draining a HashSet.
- A V1 rule written without a <Filter> carries its prefix at the top level;
that field was never read, so <Prefix>logs/</Prefix> matched every object.
ReplicationRuleExt::prefix now falls back to it, with a <Filter> keeping
precedence. The existing prefix fixtures were built this way and had been
asserting nothing.
* fix(admin): advertise data-usage and listen capabilities to rc
The rc client gated `rc du` and `rc watch` on a pinned contract that
matched server versions by the string prefix `1.0.0-rc.`; a server that
reports `1.0.0` no longer matches, and the dynamic `advertised` list did
not carry either name, so `rc du` against a GA server fails with an
unsupported-capability error (rustfs/backlog#2367 E-2).
Advertise `admin.data-usage` from the admin route inventory like the IAM
entries, and `listen_notification` for the bucket `?events=` extension
route the admin router dispatches. The client merges advertised entries
ahead of its pinned contract, so no version sniffing is needed.
* fix(site-replication): stop notifying the local site on remove and rotate
The pending-remove and pending-rotation notification loops skipped the
local site by endpoint only, while finalization identifies it by
deployment id or endpoint. The reconcile tick resolves the local peer from
the node's own listen address (and a handler from the request Host), so
`remove --all` dialed the site's registered endpoint, waited out the
request timeout against the lifecycle lock it was holding, and answered
`Partial: failed to notify 1 peer(s)` for a removal that had succeeded
(rustfs/backlog#2367 A-4, backlog#2195 item 3).
Both loops now iterate the peers still awaiting notification through one
helper that applies the finalization identity.
* fix(site-replication): promote and settle IAM retries without a tick of slack
Two retry-queue behaviours kept an IAM change from converging for ten to
twenty minutes after a peer came back (rustfs/backlog#2367 A-1 and A-3,
backlog#2305):
- The lightweight 30-second pass filtered its reachability probe to bucket
ops, so a backed-off IAM or bucket-metadata snapshot waited for the
600-second tick to notice the peer. It now probes every backed-off class
and still replays only bounded bucket ops; promotion is a state flip the
heavyweight tick acts on.
- Backoffs are multiples of the tick interval, so a failure stamped δ
seconds after a tick was 600 − δ old at the next tick and slipped a whole
extra interval. The heavyweight drain now evaluates backoff halfway to its
next tick.
- An IAM entry first created by a non-deletion failure (the add bootstrap's
snapshot send, the drain's own replay, an import-iam schedule) was never
stamped `deletions_recorded`, so a later recorded deletion could not
settle it and it escalated to the marker only `replicate repair` clears.
Entries created by this binary now start recorded; a row persisted by an
older binary keeps the escalation semantics.
* fix(site-replication): reload peer node caches after bucket wiring writes
Every S3 bucket-config write ends by asking the other nodes of the cluster
to reload the bucket's metadata; the site-replication writers never did.
On a multi-node site the node that ran the pairing (or applied a peer's
bucket-meta item) rewrote the bucket targets and the derived replication
rules on disk, while every other node kept serving its cached copy for up
to the 15-minute refresh. A `resync start` routed to such a node reported
every freshly wired bucket as `Config not found` and a bucket whose
operator target the pairing had replaced as `recorded remote target no
longer exists` (rustfs/backlog#2367 A-5, backlog#2195 item 2; functional
SITE-105).
Add one best-effort reload helper in the site-replication hooks and call it
after the bucket setup, versioning, peer bucket-meta apply, removed-peer
cleanup, make-with-versioning, and endpoint-refresh writes; the ensure
helpers now report whether they wrote so unchanged passes stay silent. The
resync manifest and start now read the persisted wiring instead of the
node-local cache, matching the target read the start path already did.
The new four-node e2e pairs two clusters and starts a resync through a
non-coordinator node right after pairing; it also covers an IAM user
created on a non-coordinator node converging to the peer site.
* test(e2e): cover delete-marker replication from a multi-node source
The functional suite reported delete markers created on a 3-node source
never reaching the target (rustfs/backlog#2195 item 4, REP-105). The report
was a probe defect, but the shape had no coverage: the existing
delete-marker e2e runs a single-node source. Pin it against a four-node
source replicating to a four-node peer and to a single-node target, with
the write and the delete issued through different nodes.
* ci(e2e): refresh the distributed selection for the new replication cases
Four distributed cases were added (two site-replication, two delete-marker
replication). The linux digest is derived from the last CI listing of the
lane (34 cases, matching the previous pin) plus the four new names; the
darwin digest is the local listing, which selects the same 38 cases.
(cherry picked from commit aeaba86d73)
* fix(e2e): require a verified server binary for every e2e run (#7687)
* fix(ci): share quick checks and lint workflows
* fix(ci): install actionlint from its verified release
* fix(ci): reject dependencies on required quick checks
* feat(test): verify the E2E server build and source identity
* test(e2e): register verified Darwin test membership
* test(e2e): record verified Linux receipt test membership
* test(e2e): record compiled Darwin receipt test membership
* test(e2e): record compiled Linux receipt test membership
* test(e2e): record Darwin e2e-full membership after merging main
* fix(test): route scanner/heal evidence E2E runs through the verified server binary
The evidence runners built rustfs with plain cargo and then ran e2e_test directly, which now fails without a run receipt. They build through scripts/e2e_binary.py and run the e2e_test invocations under e2e_binary.py run; the obsolete rustfs.features stamp is removed.
* docs(e2e): run server-backed e2e commands through the verified binary wrapper
* test(e2e): record Linux e2e-full membership from the branch CI listing
(cherry picked from commit 2909b1bfe1)
* fix(kms): classify KMS/SSE error contracts and SSE-S3 headers (#7697)
* fix(sse): classify bare SSE-KMS writes when no KMS is available
A `aws:kms` request without a key id, on a bucket without a default key,
returned `500 InternalError` whenever no KMS service was running: the
"no KMS key available" branch exited with an untyped storage error before
the availability classification that the keyed form already received.
Route that branch through the same split: `503 ServiceUnavailable` while
a configured KMS is stopped, `400 InvalidRequest` when KMS was never
configured, and `400 InvalidRequest` naming the missing key id when a
running KMS has no default key. `CreateMultipartUpload` shares the path.
Adds a unit test for the bare form and an e2e module that stops KMS
through the admin API, runs a master-key-only node, and runs a Local KMS
without a default key; refreshes the e2e-full selection digests.
(cherry picked from commit c3259dadc3d603a9185a5b0ad9f83dfb884e61c8)
* fix(sse): keep KMS error classes on the encrypted read path
GetObject, CopyObject and UploadPartCopy on an SSE-KMS object whose key
no longer exists answered `500 InternalError` ("KMS key not found") while
PutObject under the same key already answered `400 KMS.NotFoundException`.
The read path carries its classification through ecstore's
`EncryptionResolutionErrorKind`, which had no kind for a missing key, a
denied KMS grant or a missing backend capability, so all three folded
onto `DecryptionFailed` and the S3 layer reported an internal fault.
Add `KeyNotFound`, `AccessDenied` and `NotImplemented` kinds, map them on
both sides of the boundary, and give an envelope the configured backend
cannot unwrap a diagnosable message while keeping its `500`.
Unit tests cover the kind round trip and the reader wrapping; a new e2e
test deletes a key immediately and checks GET/Copy return 400 with
`KMS.NotFoundException` while HEAD stays 200. The e2e-full selection
digests are refreshed from the current listing (the previous digests
predated the delete-authorization tests) and the e2e `create_default_key`
helper is updated to the accepted `EncryptDecrypt` spelling.
(cherry picked from commit 2523a9814e97caea318d4ff1a51bef3a4d4445b2)
* fix(kms): classify key-management errors on the admin routes
`POST /kms/keys`, the legacy `create-key` alias and `generate-data-key`
reported every backend refusal as `500`: a blank key name (which each
backend failed on differently, the Local backend by writing a key file
with an empty stem), a name already taken, an unknown key, a disabled key
and a capability the backend lacks. `delete` and the lifecycle routes
already classified the same errors.
Refuse a blank or whitespace name in `KmsManager::create_key` before any
backend sees it, and share one `KmsError` to status mapping across
create, delete and generate-data-key (400 for validation and key state,
404 for an unknown key, 409 for a taken name, 501 for a missing
capability, 500 only for damaged material). The XML-error routes carry
the same status explicitly since s3s derives none for a custom code.
The read-only Static backend now reports create, delete and
cancel-deletion as `UnsupportedCapability`, matching its rotate and
enable/disable answers, so the admin API returns 501 for all of them.
(cherry picked from commit e33cac5493c4d9d6662e0d2980b58ba2b24a6d1b)
* fix(sse): stop SSE-S3 responses from naming the wrapping KMS key
`x-amz-server-side-encryption-aws-kms-key-id` is defined for `aws:kms`
objects only, but PutObject, CopyObject, CreateMultipartUpload and
GetObject returned it for `AES256` objects too, carrying the KMS key that
wraps the SSE-S3 data key (the service default, or the literal `default`
on a node without KMS). The write paths copied `kms_key_id` from the
encryption material unconditionally, and the single-decrypt GET
classification did the same after resolving the key for authorization.
Add `EncryptionMaterial::response_kms_key_id`, which yields the id only
for SSE-KMS, use it at the four write-response sites, and gate the GET
classification the same way. CompleteMultipartUpload and HeadObject
already omitted the header.
Unit tests pin both directions; a new e2e test covers Put/Get/Head/Copy
and CreateMultipartUpload for AES256 with an aws:kms control. The
e2e-full selection digests are refreshed from the current listing.
(cherry picked from commit 29d793a63352b0b60fd53c565e80fdbede8964bb)
* fix(s3): validate PutBucketEncryption rules before storing them
A default-encryption rule naming an unknown `SSEAlgorithm` (for example
`AES128`), a rule without `ApplyServerSideEncryptionByDefault`, an empty
rule list, or a `KMSMasterKeyID` on an `AES256` rule was stored as
written: the only algorithm check on the route decided whether to fill
in the default KMS key. `GetBucketEncryption` then advertised that
configuration while the write path encrypted header-less writes under
its `AES256` fallback, so the bucket's declared and actual schemes
disagreed. Two comments claimed the route already refused unknown
algorithms.
Validate the configuration before any of it is applied: `MalformedXML`
for a malformed rule set or unknown algorithm, `InvalidArgument` for a
key id on a non-KMS rule, and nothing stored on refusal. Correct the two
comments to describe when the AES256 fallback is still reachable.
Unit tests cover every refusal and the accepted shapes; an e2e test
checks the refusals leave the previous configuration in place. The
e2e-full selection digests are refreshed from the current listing.
(cherry picked from commit 29e4486dce41197ed93f5253cdbabc57d27a4ddb)
* test(e2e): refresh e2e-full selection for the combined KMS/SSE fixes
* test: align two unit tests with the new KMS and bucket-encryption contracts
`scheduled_deletion_carries_a_deadline_and_can_be_cancelled` still
expects the state error (`InvalidOperation`) for cancelling a key that
is not pending deletion; only the Static backend's mutations moved to
`UnsupportedCapability`. The uninitialized-store PutBucketEncryption
test now sends a well-formed AES256 rule so it reaches the store lookup
instead of the new configuration validation.
(cherry picked from commit e2e6a2535a)
* fix(site-replication): keep an operator's bucket-level target to a peer instead of taking it over (#7709)
* fix(site-replication): keep an operator's bucket-level target to a peer instead of taking it over
Site replication wired each bucket by looking for an existing replication
target "to the same peer" and rewriting the first match in place as its own
same-name target. An operator's bucket-level target that happened to point
at that site (different target bucket, operator credentials) was the first
match whenever it pre-dated the join, and the reconciler repeats the pass
every 600s, so the takeover also depended on target order afterwards. The
operator's rule then named an ARN no target backed and their bucket
replication stopped silently, while the inherited bucket-level reset id
made every site resync report the bucket as owned by another resync
(rustfs/backlog#2479, rustfs/backlog#2489).
Follow MinIO's `getRemoteARN` / `getRemoteARNForPeer` shape instead:
- Wiring updates a target in place only under the same ARN, or when it is
recognisably the site's own under an older ARN shape (same peer,
same-name target bucket, site replication service account). Anything
else gets the site target added next to it.
- The site resync manifest takes the target the derived
`site-repl-<deployment id>` rule names (same-name shape as fallback), so
an operator target to the peer neither aborts the bucket as "multiple
remote targets matched peer" nor gets resynced into.
- Peer removal prunes only targets a pruned derived rule names or the
same-name target bucket; operator targets stamped with the peer's
deployment id survive together with their rules.
Unit tests cover the three predicates. e2e
`test_site_replication_keeps_operator_bucket_target_to_peer` runs a
bucket-level replication plus `replication-reset` to the future peer, joins
the sites, and requires the operator target untouched, both paths
delivering, the site resync completing against the site target, and the
operator target and rule surviving `replicate remove --all`; without the
fix it fails at the join with the operator target gone. The repl-nightly
selection digest is refreshed for the new case.
* test(site-replication): drop a redundant clone flagged by clippy
The reconcile unit test cloned the remote peer into the state map although
the binding is not used afterwards; workspace clippy (-D warnings) rejects
that as redundant_clone.
(cherry picked from commit ecdc55fa4b)
* fix: enforce S3 permissions for recursive force deletion (#7661)
* fix: enforce S3 authorization for recursive deletion
* fix: satisfy the s3s footprint guard
* fix: restore list versions policy compatibility (#7686)
(cherry picked from commit 3fd1ce414d)
* fix(ci): repair functional defaults and chain regression checks (#7664)
* fix(ci): default functional suites to nightly packages
* test(ci): follow the fault-tolerance chain handoff
(cherry picked from commit 509a0fa90c)
* fix(ci): align security workflow tests with chain (#7679)
(cherry picked from commit d9e47d2813)
* test(ecstore): keep tier cleanup tests stable after immediate receipt queueing
Release PR #7766 made PUT/CopyObject overwrites queue the tier free-version cleanup receipt immediately, which broke two ecstore tests on release CI. In tier_overwrite_put_and_self_copy_recover_persisted_cleanup_owners the restarted store already runs expiry workers from the second iteration on, so they deleted the remote bytes before the test could assert that the commit leaves them in place; the test now fails the first remote DELETE via set_remove_failure(true) so the cleanup owner stays durable and the later restart still has to rediscover it from xl.meta (the failed remove does not bump remove_count, and the test re-enables removes before the recovery wait). In batch_transitioned_delete_post_commit_failures_roll_back_without_free_version_receipt the convergence loop now treats a transient InsufficientReadQuorum as "not yet converged", because cleanup rewrites xl.meta disk by disk and a racing read can briefly miss quorum (seen in the rio-v2 lane); any other error still panics.
* Revert "fix(ci): align security workflow tests with chain (#7679)"
This reverts commit 4544359f6d.
* Revert "fix(ci): repair functional defaults and chain regression checks (#7664)"
This reverts commit 5ba7ec0291.
* fix(ecstore): pass shard integrity to backported ingest-mode test
The stalled-reader test backported with #7659 used main's four-argument encode_with_ingest_mode, but release's signature takes an optional IntegrityBuilder, so pass None to keep the test focused on ingest-mode cleanup.
---------
Co-authored-by: Henry Guo <marshawcoco@gmail.com>
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: RJ Regenold <rregenold@teamraft.com>
Co-authored-by: RJ Regenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: GatewayJ <835269233@qq.com>
Co-authored-by: Jason Kossis <jkossis@gmail.com>
* fix(ci): restore release test compilation and e2e membership (#7799)
* fix(s3): return stored content language on local GET (#7755)
* fix(s3): return resolved object tagging version identities (#7757)
* fix(tables): bound warehouse index recovery (#7677)
Co-authored-by: Chris <anzhengchao@gmail.com>
* fix(upgrade): probe legacy IAM namespace before migration (#7816)
* fix(release): backport IAM migration startup fixes and recent main fixes (#7825)
* fix(auth): reject unsigned x-amz headers on header-signed SigV4 requests (release) (#7813)
* fix(s3): preserve missing version errors on object reads (#7800)
* fix(s3): preserve missing version errors on object reads
* test(s3): align missing-version assertions with read contract
* fix(heal): bind admin traversal to bucket incarnation (#7802)
* fix(heal): bind admin traversal to bucket incarnation
* fix(ecstore): reopen healthy hedged readers after peer loss
* test(ecstore): isolate tier overwrite recovery scheduling
* test(ecstore): observe tier cleanup under object read locks
* fix(ecstore): bound decommission entry tracing
* test(ecstore): drain incarnation heal fixture writes
* test(heal): match debug server stack in deep heal fixtures
* test(heal): include identities in C06 count failures
* test(heal): drain PUT tails before inspecting B920 fixtures
* test(scanner): isolate retained MRF retry slots
* fix(ecstore): separate PUT cleanup intent from persisted metadata
* fix(ecstore): capture failed object lock acquisitions (#7803)
* fix(ecstore): capture failed object lock acquisitions
* test(heal): include identities in C06 count failures
* test(heal): drain PUT tails before inspecting B920 fixtures
* fix(ecstore): reopen healthy hedged readers after peer loss
* test(ecstore): isolate tier overwrite recovery scheduling
* test(ecstore): observe tier cleanup under object read locks
* fix(ecstore): bound decommission entry tracing
* test(ecstore): drain incarnation heal fixture writes
* test(heal): match debug server stack in deep heal fixtures
* test(scanner): isolate retained MRF retry slots
* fix(ecstore): separate PUT cleanup intent from persisted metadata
* fix(heal): retain terminal outcomes across restart (#7805)
* fix(heal): retain terminal outcomes across restart
* test(heal): use octal mode for terminal recovery fixture
* fix(ecstore): reopen healthy hedged readers after peer loss
* test(ecstore): isolate tier overwrite recovery scheduling
* test(ecstore): observe tier cleanup under object read locks
* fix(ecstore): bound decommission entry tracing
* test(ecstore): drain incarnation heal fixture writes
* test(heal): match debug server stack in deep heal fixtures
* test(heal): include identities in C06 count failures
* test(heal): drain PUT tails before inspecting B920 fixtures
* test(scanner): isolate retained MRF retry slots
* fix(ecstore): separate PUT cleanup intent from persisted metadata
* fix(heal): recover replacement ownership across VM restarts (#7810)
* fix(heal): recover replacement ownership across VM restarts
* test(ecstore): isolate tier overwrite recovery scheduling
* test(ecstore): observe tier cleanup under object read locks
* fix(ecstore): bound decommission entry tracing
* test(ecstore): drain incarnation heal fixture writes
* fix(ecstore): reopen healthy hedged readers after peer loss
* test(heal): match debug server stack in deep heal fixtures
* test(heal): include identities in C06 count failures
* test(heal): drain PUT tails before inspecting B920 fixtures
* test(scanner): isolate retained MRF retry slots
* fix(ecstore): separate PUT cleanup intent from persisted metadata
* fix(tables): isolate protected S3 listings (#7676)
Co-authored-by: overtrue <anzhengchao@gmail.com>
* fix(ci): restore Linux E2E selection and split offline enrollment (#7843)
* fix(heal): assign stable identities to scanner repair requests (#7823)
* fix(heal): assign stable identities to scanner repair requests
* test(s3): isolate UploadPart inactivity timing
* fix(heal): backport pool metadata scope to release (#7846)
* fix(heal): scope replacement pool metadata to its owning set
(cherry picked from commit a72a75569c)
* fix(heal): use domain imports in pool metadata regression test
(cherry picked from commit e8c5448e21)
* test(heal): set pool metadata regression recursion limit
---------
Co-authored-by: Hiroaki KAWAI <1468181+hkwi@users.noreply.github.com>
* fix(heal): persist pool/set outcomes and recovery scope (#7839)
* fix(heal): persist pool/set outcomes and recovery scope
* test(heal): verify selector receipts and process-crash recovery
* fix(heal): scope replacement pool metadata to its owning set
(cherry picked from commit a72a75569c)
* fix(heal): use domain imports in pool metadata regression test
(cherry picked from commit e8c5448e21)
* test(heal): set pool metadata regression recursion limit
---------
Co-authored-by: Hiroaki KAWAI <1468181+hkwi@users.noreply.github.com>
* fix(ecstore): scope recursive walks to object prefixes (#7850)
* fix(heal): scope nested walks and reject admin read-repair (#7851)
* fix(heal): scope nested walks and reject admin read-repair
* fix(ci): allocate stack for heal metadata regression
* test: cover overlapped multipart staging copy (#7865)
Add Harbor-style E2E coverage for a CopyObject racing with CompleteMultipartUpload. The test allows the copy to observe an unpublished source as NoSuchKey, but rejects 5xx leakage and proves retrying the completed source remains readable.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(release): repair acceptance checks and prepare 1.0.0 (#7866)
* test(e2e): stabilize release acceptance checkpoints
* chore(release): prepare 1.0.0
* test(scanner): stabilize W13 release evidence gates (#7870)
Add the object-only completion diagnostic case and make the evidence runner resolve CARGO_TARGET_DIR before recording the rustfs binary path.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(kms): cover non-default Vault Transit paths (#7657)
Backport the Vault coverage from 4d31621f0a. Keep the release cleanup polls synchronized with object read locks.
* fix(replication): count a bodiless 405 as a replicated delete marker (#7756)
* fix(replication): accept a bodiless 405 as a replicated delete marker during resync
A resync verifies each delete marker with `HEAD ?versionId=<marker>` on the
target. S3 targets (RustFS, MinIO, AWS) answer that with 405 and no body,
and the SDK only synthesizes an error code for 404, so the error arrived
with `code() == None`. `is_retryable_delete_replication_head_error` then
treated it as an ambiguous failure: every delete marker counted as a failed
object with `target service error`, and a site resync over any bucket that
holds a delete marker reported the whole bucket as failed
(rustfs/backlog#2479, SITE-105 on rc.6 and nightly).
Use the raw HTTP status the way the 404 path already does: a 405 without a
code confirms the marker propagated. Ambiguous statuses still fail.
- Unit tests drive `verify_resync_head_result` against a scripted target
answering 405 (accepted) and 503 (still failed).
- e2e `test_site_replication_resync_replicates_delete_marker` joins two
sites, converges a live object and a delete marker, and requires the site
resync to complete with zero failed objects; the repl-nightly selection
digest is refreshed for the new case.
* fix(replication): verify marker-version purges by absence during resync
A delete-marker resync entry with a pending or failed version purge asks
the target to remove the marker, so the bodiless 405 that proves a
created marker propagated proves the purge did not happen. Accept the
405-as-success mapping only for marker creation (empty
version_purge_status); a purge counts as replicated only when the target
answers not found, and any other HEAD outcome stays failed. Unit tests
drive both purge statuses against the 405 fixture and the 404 fixture.
(cherry picked from commit 1ef3974bad)
* fix(kms): refuse key ids that leave the key prefix on the Vault backends (#7727)
Only the Local backend refused a key identifier containing a path
separator. On Vault KV2 a create with the name bad/name succeeded and
produced a nested KV2 path that the listing then reported as a
directory rather than a key, and an identifier containing .. addressed
a record outside the configured key prefix once the HTTP client
normalised the URL; Vault Transit built its transit key name and its
metadata path from the same unchecked identifier.
Lift the Local backend's containment rule into a shared segment check
(empty, /, backslash, NUL, . and ..) and apply it at the single point
where each backend turns the identifier into a path or a Transit key
name, so create, describe, encrypt, delete and the metadata writes all
refuse with InvalidKey before any request reaches Vault. The admin API
already maps that to 400. The AWS backend is untouched: it addresses
keys by ARN and alias, both of which contain /.
Refs rustfs/backlog#2474 (KMS-213 CreateNegatives on vault-kv2).
Co-authored-by: Hauser <housemecn@gmail.com>
(cherry picked from commit 2f2e775655)
* fix: resume GET body after peer short EOF (#7852)
Backport GET recovery from afc8861fec. The Connect TLS classification change requires the main-only proxy transport layer.
* fix(s3): honor presigned UploadPart checksum queries (#7748)
* fix(s3): honor presigned UploadPart checksum queries
* fix(s3): keep checksum errors within gateway boundary
---------
Co-authored-by: Hauser <housemecn@gmail.com>
(cherry picked from commit a8ace89516)
* fix(table-catalog): map transient lock failures to unavailable (#7841)
(cherry picked from commit 5c73a3d602)
* fix(ecstore): preserve ready read errors during encoding (#7798)
Backport the erasure fix from c95b65a7fc while retaining release shard integrity support. Dependency upgrades and the main-only Connect proxy and diagnostic fixes are excluded.
* ci: add the S3 Tables (Iceberg REST Catalog) functional suite workflow (#7873)
New workflow rustfs-table-test.yml following the shared suite contract:
Initialize functional evidence (FUNCTIONAL_ARTIFACTS_DIR/LOG_FILE/
REPORT_FILE/TMPDIR), checkout for the report parser, auto-testing
clone with retry, continue-on-error on the run step, report generation
through scripts/functional_case_report.py with the product gate (case
failures stay green; harness breakdowns turn red), dashboard upload
under functional-reports/table/, backlog issue manager wiring
(--suite table --category table), artifact upload (report.md, cases.md,
suite.log), before/after environment cleanup, and the chain handoff
step (repository_dispatch only, next: pool expansion).
The suite script itself lives in rustfs/auto-testing (TBL-101..107,
paired PR). The run step passes the product smoke script path
(scripts/table-catalog/pyiceberg_smoke.py) via --smoke-script and the
log via --log-file, matching the other suites.
Contract tests: the table suite is registered in the generic evidence
and workflow matrices (JOBS/DIRECT_TESTS/allowlist) plus a dedicated
TableSuiteTests wiring check. Full run: 21/21.
* test(ecstore): tolerate slow read-repair diagnostics CI (#7892)
* fix(heal): report verified normal shard repairs (#7890)
* fix(heal): retry interrupted internode shard writes
(cherry picked from commit 0bd75f47b6326edd8167ee43b8776f6276692e92)
* fix(deps): update rustls for RUSTSEC-2026-0285
(cherry picked from commit 938e1259d13da7832d85ac5c066a59ab3a28bc63)
* test(heal): wait for replacement disk and coordinator readiness
(cherry picked from commit feeaa6f053aac4b7c8e32477c0ab5ebbd3dcdff3)
* fix(heal): retain RPC transport failures across metadata probes
(cherry picked from commit f48ec9f0c6e37b1f941620c666a9357c4b892d68)
* fix(s3): resume GET bodies after erasure read quorum loss
(cherry picked from commit a38e859905)
* test(heal): keep outage objects in the replacement erasure set
(cherry picked from commit a669f50a366e35505e7745f8b680d8ecf1aa31be)
* fix(rpc): retry authenticated requests after peer epoch changes
Backport the stale-epoch recovery fix from main follow-up #7889. Keep invalid signatures and nonce replays terminal.
* test(rpc): assert retryable rejection of stale boot epochs
(cherry picked from commit 1c4b39b99)
* ci: bound concurrent heal clusters in the full E2E gate
Apply the #7889 scheduling fix while preserving release test membership and zero retries.
* fix(ecstore): hide pending purge entries from listings (#7895)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): scope pending purge listing regression (#7897)
Keep the store-level pending purge listing regression focused on the ordinary recursive path and exact-prefix shortcut. The deeper delimiter CommonPrefix case is a separate physical-walker boundary and should not leave the release test suite red.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(obs): expose scanner usage freshness metrics (#7896)
Add Prometheus scanner metrics for dirty-usage pending buckets, usage-cache save/publication timestamps, publication result codes, and deferred publication state. This gives operators a direct scrape path for confirming scanner dirty ACK behavior without relying on admin JSON.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): backport delete quorum rollback to release (#7902)
* ci: rotate the shared functional-tests concurrency group to -v2 (#7900)
* fix(s3): render null write version IDs consistently (#7904)
* fix(heal): quarantine corrupt root recovery records (#7905)
* fix(heal): quarantine corrupt root recovery records
Keep invalid root-heal records durable while isolating them from healthy recovery owners. Serialize startup replay with administrator admission and fence quarantined task IDs so independent compensation heals can proceed safely.
* fix(ci): align release workflow contract tests
* fix: satisfy root recovery clippy checks
* fix(heal): fence canonical repair receipts (#7909)
* fix(heal): fence canonical repair receipts
* fix(heal): preserve unversioned receipt identity
* fix(heal): persist replacement intent on remote survivor (#7912)
* chore(release): merge main into release (#7913)
* feat(nightly): publish packages as assets of the rolling 'nightly' release (sync from release) (#7593)
feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)
Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).
- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
the 'nightly' release via the REST API, deletes same-name assets,
uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
body with the build provenance (ref@sha, run link, sizes, SHA256).
Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
exercised end-to-end against the real release with probe files
(create / upload / overwrite / download round-trip / body update).
* fix(ecstore): stop pruning at nonempty directories (#7616)
* fix(ecstore): stop pruning at nonempty directories
* test(ecstore): release pruning fixtures before temp cleanup
* fix(replication): close the pre-stable convergence gaps from backlog#2367 (#7626)
* fix(replication): total-order rule sort and honor V1 top-level Prefix
Rule matching had two defects from the pre-GA replication audit
(rustfs/backlog#2367 C-1 and C-2):
- The actionable-rule sort compared same-destination rules by priority but
answered Equal for any other pair, which is not a total order; the
standard library sort panics on such comparators once a slice exceeds the
insertion-sort threshold, so an object matching more than 20 enabled rules
across two or more targets could panic the PUT or DELETE task. Rules now
sort by priority descending with destination and id as tie-breakers, and
filter_target_arns preserves that order instead of draining a HashSet.
- A V1 rule written without a <Filter> carries its prefix at the top level;
that field was never read, so <Prefix>logs/</Prefix> matched every object.
ReplicationRuleExt::prefix now falls back to it, with a <Filter> keeping
precedence. The existing prefix fixtures were built this way and had been
asserting nothing.
* fix(admin): advertise data-usage and listen capabilities to rc
The rc client gated `rc du` and `rc watch` on a pinned contract that
matched server versions by the string prefix `1.0.0-rc.`; a server that
reports `1.0.0` no longer matches, and the dynamic `advertised` list did
not carry either name, so `rc du` against a GA server fails with an
unsupported-capability error (rustfs/backlog#2367 E-2).
Advertise `admin.data-usage` from the admin route inventory like the IAM
entries, and `listen_notification` for the bucket `?events=` extension
route the admin router dispatches. The client merges advertised entries
ahead of its pinned contract, so no version sniffing is needed.
* fix(site-replication): stop notifying the local site on remove and rotate
The pending-remove and pending-rotation notification loops skipped the
local site by endpoint only, while finalization identifies it by
deployment id or endpoint. The reconcile tick resolves the local peer from
the node's own listen address (and a handler from the request Host), so
`remove --all` dialed the site's registered endpoint, waited out the
request timeout against the lifecycle lock it was holding, and answered
`Partial: failed to notify 1 peer(s)` for a removal that had succeeded
(rustfs/backlog#2367 A-4, backlog#2195 item 3).
Both loops now iterate the peers still awaiting notification through one
helper that applies the finalization identity.
* fix(site-replication): promote and settle IAM retries without a tick of slack
Two retry-queue behaviours kept an IAM change from converging for ten to
twenty minutes after a peer came back (rustfs/backlog#2367 A-1 and A-3,
backlog#2305):
- The lightweight 30-second pass filtered its reachability probe to bucket
ops, so a backed-off IAM or bucket-metadata snapshot waited for the
600-second tick to notice the peer. It now probes every backed-off class
and still replays only bounded bucket ops; promotion is a state flip the
heavyweight tick acts on.
- Backoffs are multiples of the tick interval, so a failure stamped δ
seconds after a tick was 600 − δ old at the next tick and slipped a whole
extra interval. The heavyweight drain now evaluates backoff halfway to its
next tick.
- An IAM entry first created by a non-deletion failure (the add bootstrap's
snapshot send, the drain's own replay, an import-iam schedule) was never
stamped `deletions_recorded`, so a later recorded deletion could not
settle it and it escalated to the marker only `replicate repair` clears.
Entries created by this binary now start recorded; a row persisted by an
older binary keeps the escalation semantics.
* fix(site-replication): reload peer node caches after bucket wiring writes
Every S3 bucket-config write ends by asking the other nodes of the cluster
to reload the bucket's metadata; the site-replication writers never did.
On a multi-node site the node that ran the pairing (or applied a peer's
bucket-meta item) rewrote the bucket targets and the derived replication
rules on disk, while every other node kept serving its cached copy for up
to the 15-minute refresh. A `resync start` routed to such a node reported
every freshly wired bucket as `Config not found` and a bucket whose
operator target the pairing had replaced as `recorded remote target no
longer exists` (rustfs/backlog#2367 A-5, backlog#2195 item 2; functional
SITE-105).
Add one best-effort reload helper in the site-replication hooks and call it
after the bucket setup, versioning, peer bucket-meta apply, removed-peer
cleanup, make-with-versioning, and endpoint-refresh writes; the ensure
helpers now report whether they wrote so unchanged passes stay silent. The
resync manifest and start now read the persisted wiring instead of the
node-local cache, matching the target read the start path already did.
The new four-node e2e pairs two clusters and starts a resync through a
non-coordinator node right after pairing; it also covers an IAM user
created on a non-coordinator node converging to the peer site.
* test(e2e): cover delete-marker replication from a multi-node source
The functional suite reported delete markers created on a 3-node source
never reaching the target (rustfs/backlog#2195 item 4, REP-105). The report
was a probe defect, but the shape had no coverage: the existing
delete-marker e2e runs a single-node source. Pin it against a four-node
source replicating to a four-node peer and to a single-node target, with
the write and the delete issued through different nodes.
* ci(e2e): refresh the distributed selection for the new replication cases
Four distributed cases were added (two site-replication, two delete-marker
replication). The linux digest is derived from the last CI listing of the
lane (34 cases, matching the previous pin) plus the four new names; the
darwin digest is the local listing, which selects the same 38 cases.
* feat(console): support a configurable console URL prefix (#7634)
Co-authored-by: houseme <housemecn@gmail.com>
* chore(release): merge release into main for rc.6 (#7638)
* test(heal): cover MRF manifest CAS legacy transition (#7443)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): enable release branch checks and repair test imports (#7441)
* test(scanner): structure heal release evidence lanes (#7442)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): require segment producer identities (#7444)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): expose recovery intent identity (#7445)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): summarize failed heal perf reports (#7446)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(common): retain unmatched MRF repair proofs (#7447)
Add a recorded verified-repair consumer that discharges only exact retained anchors for the requested bucket while leaving unmatched proofs in the event ring. This gives the future durable successor writer a fail-closed primitive before any tombstone or GC path is enabled.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): route replication read plan through boundary (#7448)
* test(scanner): cover flat-bucket quantum fairness (#7449)
Add a production-entry scanner cohort regression that combines a wide flat bucket with a small bucket under a fixed object budget. The test keeps partial budgeted rounds unpublished, verifies small buckets are only marked after real execution, and confirms a later unbudgeted round can publish the complete aggregate.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): reuse same admission request id (#7451)
Keep a retried heal start with the same request id from bypassing admission deduplication when the transport replay cache is unavailable but the manager still owns the task.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require perf summary evidence fields (#7453)
Fail closed when measured passing Scanner/Heal ABBA summaries omit W10/W11 foreground pressure, lock wait, or attempt-cost evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind release evidence fields (#7452)
Require explicit scanner/heal release evidence field contracts for the scoped ACK and mixed-version rollback gates.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): tag dirty usage producer identities (#7454)
Record production-facing segment invalidation producer identities when existing object-level dirty usage hooks observe PUT, CopyObject, DeleteObject/DeleteMarker, and CompleteMultipartUpload mutations. Keep the data non-authoritative and process-local so segment reuse activation still requires durable generation-window proof.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): gate release evidence bundles (#7457)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require hard evidence ABBA manifest (#7459)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(heal): add MRF committed snapshot writer (#7458)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover EC8+4 restart shard rebuild (#7461)
Retry heal-control RPCs once after transport auth rejects a stale replay-scope epoch, and add a distributed EC8+4 restart heal evidence case that rebuilds a replaced drive with exact shard/body assertions.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): echo measured release evidence in ABBA fake adapter (#7460)
Keep the synthetic ABBA test adapter aligned with the measured release evidence contract so result validation covers release_evidence drift.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require complete ABBA summary matrix (#7462)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: retain MRF replay journal after accepted/merged replays
Keep startup replay journal until a durable successor snapshot exists after Accepted/Merged admission.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: reclaim superseded MRF snapshots after readback
Add a committed snapshot predecessor cleanup primitive that deletes only an older slot after the successor is read back as the current committed snapshot.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: require exact owner for object receipts
Require object heal receipts to match the expected bucket incarnation before they can be recorded as positive repair evidence. This prevents stale or cross-incarnation receipts from clearing the wrong heal responsibility.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: latch object receipt owner before repair
Capture the expected bucket incarnation before invoking object repair so a post-repair owner change cannot rewrite the responsibility that a storage receipt is allowed to prove.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: replay committed MRF checkpoints durably (#7465)
Prefer committed MRF checkpoints during startup replay, retain accepted replay responsibilities until exact verified repair proofs arrive, and reclaim committed manifests only after discharge.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind hard evidence bundle provenance (#7467)
Require Scanner/Heal release bundle fields to carry source, run, window, timestamp, command, and artifact format provenance before a measured gate can pass.
Keep EC8+4 and performance gate fields tied to a single measurement window so unrelated artifacts cannot be stitched into a release approval.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: reject dry-run object repair receipts
Do not record positive storage repair receipts for dry-run object heal tasks, even if a producer accidentally returns a matching receipt.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: reject cancelled object repair receipts
Do not record positive storage repair receipts once an object heal task has been cancelled, even if the receipt still matches the requested owner and object identity.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): reject failed object repair receipts
Cover the receipt consumer path where a storage repair result carries both an error and a matching positive receipt. The failure may be recorded, but the receipt must not create repaired, healthy, or absent proof.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover bucket object repair receipts (#7468)
Cover bucket and root heal sweeps recording authoritative object outcomes only when storage receipts match the latched bucket incarnation.
Verify unavailable or stale receipt ownership keeps object repair execution intact while leaving canonical outcome proof as Unknown.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add EC8+4 heal restart evidence (#7469)
Register and wire Scanner/Heal background target restart and crash evidence cases for the 3x4 EC8+4 topology.
Validate the observed data/parity geometry in scanner-heal evidence receipts so multi-drive runs cannot satisfy the gate without proving EC8+4 metadata.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: verify replacement pool metadata repair (#7471)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover quorum and mixed repair receipts
Add focused oracles for transient quorum results that carry a matching receipt and for mixed grace plus repaired receipt batches. Only the repaired object may produce positive proof.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: verify admin recreate pool metadata (#7474)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: preserve merged result for duplicate submits
Keep same-request-id replay receipts accepted for the receipt API, but preserve the legacy submit_heal_request duplicate admission result as Merged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): preserve EC84 restart semantics (#7478)
Keep the EC8+4 background restart lane on the graceful-stop path and assert clean-restart marker absence only for restart scenarios. This prevents the hard evidence gate from silently exercising the crash path when it claims restart coverage.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF snapshot torn successor recovery
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): write EC84 distributed restart oracle (#7481)
Bind the distributed EC8+4 restart evidence lane to a scanner/heal oracle artifact so release validation can consume the real nextest run instead of accepting only a passing test.
Require the registry to assert 8+4 erasure geometry for the three-node, four-drive case.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): harden MRF replay boundaries (#7483)
Reject journal records with unknown version-presence flags even when their CRC is valid, so rollback/future payloads cannot be accepted as known records.
Gate committed checkpoint cleanup by the writer owner captured from the replay source, preserving retained manifests from other owners inside the same sequence window.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): bind MRF manifest CAS dirsync recovery (#7482)
Cover the committed MRF manifest path through LocalDisk conditional CAS when the metadata directory fsync fails. The fixture proves the previous manifest anchor survives rollback, an unanchored first successor is removed, and the legacy MRF journal remains readable even while global durability is relaxed.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): derive evidence runner profile from registry (#7484)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require mixed-version evidence roles (#7485)
Tighten the Scanner/Heal release bundle checker so mixed-version, scoped-ACK, and rollback fields cannot reuse a generic versions list without proving the expected evidence role.
Require version lists to use source revision identities and include the tested source revision. Also require profile evidence fields to name the core profiling artifacts before release approval.
The release gate remains blocked until measured field evidence is present.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): publish committed MRF runtime checkpoints (#7490)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind profile artifacts in release evidence (#7487)
Require Scanner/Heal release bundles to attach every required profiling artifact to P1 profile evidence with relative paths, artifact formats, non-empty files, hashes, and optional per-artifact measurement-window checks.
Document the tightened release bundle profile contract and cover missing, tampered, and mismatched-window profile artifact regressions in the existing checker self-test.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden measured ABBA evidence claims (#7491)
Reject measured Scanner/Heal ABBA manifests whose mixed-version evidence uses the same baseline and candidate source revision or binary hash.
Require crash fault modes and profile artifact names to match the exact supported sets, rejecting missing, duplicate, and unknown values.
Update harness fixtures and regression coverage for same-build mixed-version claims and exact-set release evidence fields.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): group scanner heal evidence payload (#7494)
Group the EC8+4 Scanner/Heal evidence writer inputs into a typed payload so the distributed e2e crate stays within the clippy argument limit without weakening the lint.
The evidence writer still validates the same S3 bodies, physical shard census, process restart PIDs, and node listings.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF replay bundle fields (#7486)
Bind Scanner/Heal release bundle evidence for MRF durable replay to replay counts, retained responsibility anchors, and successor snapshot publication evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): profile EC84 evidence case runs (#7495)
Give Scanner/Heal evidence cases explicit runtime profiles so EC8+4 background restart and crash cases use their own object count, object size, and partial-progress timeout defaults instead of inheriting the legacy 4x1 case assumptions.
Expose the runtime profile in plan-only output and cover every registry case in the script self-test.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): reject empty release evidence artifacts (#7496)
Require Scanner/Heal release bundle artifact paths to resolve to non-empty files before hashing them.
Cover empty hard-gate artifacts in the existing release bundle checker self-test and keep profile artifact size checking on the shared artifact boundary.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require G14 same-window field coverage (#7489)
Tighten the Scanner/Heal release bundle checker so G14 same-window evidence must name the EC8+4, multi-set, and multi-pool fields covered in that measurement window.
Keep the release gate blocked when same-window evidence omits one of the required G14 fields, without changing production runtime behavior.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require two-hour measured ABBA windows (#7493)
Reject measured Scanner/Heal release ABBA manifests and summaries whose evidence window is shorter than the W21 two-hour release requirement.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF idle checkpoint cleanup (#7497)
Add a runtime cleanup regression test that publishes both retained replay and runtime committed checkpoints, writes scoped and legacy journals, and verifies idle cleanup removes every recovery anchor from the registered local disks.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): ignore untracked files in build identity (#7498)
Align e2e_test build provenance with Scanner/Heal evidence receipts and server binary provenance by treating only tracked source changes as dirty.
This prevents unrelated untracked worktrees or evidence directories from causing compiled test identity mismatches before real evidence cases can run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF disk-full evidence fields (#7499)
Require the Scanner/Heal release registry and bundle checker to carry explicit G08 MRF capacity, disk-full, and replica-loss evidence fields before release approval can pass.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind release JSON artifact provenance (#7500)
Require scanner/heal release evidence JSON artifacts to repeat their measured source revision, run identity, measurement window, gate, and field identity inside the artifact payload. This keeps a refreshed outer bundle hash from accepting stale summary or profile JSON from another run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF rollback mirror filtering (#7501)
Add a regression oracle that keeps scoped-only MRF responsibilities in the authoritative runtime snapshot while omitting them from the v1 legacy rollback mirror.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require segment activation evidence (#7504)
* test(scanner): require segment activation evidence
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): cover activation proof inputs
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF crash matrix cases (#7505)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require release bundle domain evidence (#7502)
Reject scanner/heal release bundles that omit field-level domain evidence for scoped ACK, durable intent, mixed-version, scheduler pressure, profile cost, and two-hour pressure lanes.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF retention GC evidence (#7506)
Require P4 retained-responsibility release bundle evidence to list the retained replay anchor and idle cleanup cases, prove a two-hour retention window, and record both idle cleanup and verified-proof discharge observations.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF cleanup GC soak evidence (#7507)
Require the P4 release bundle to carry measured cleanup/GC soak evidence for retained MRF replay responsibilities. The bundle now needs a two-hour cleanup window, exact cleanup case coverage, observed verified idle GC, and zero pending responsibilities or stale journals after GC.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF disk-full commit anchors (#7509)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): report port allocator bind errors (#7510)
Surface the scanned port window, attempt count, and last bind error when the e2e port allocator cannot reserve a localhost port. This keeps Scanner/Heal evidence failures actionable when the environment blocks binds before business assertions run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(sse): resolve 1.0.0 SSE/KMS blockers and P1 findings (#7511)
* fix(sse): resolve bucket default encryption per request
PUT and the POST-object/extract path resolved a bucket's default
encryption with a hard-coded "no explicit SSE-C" flag, so the default was
layered onto a request that already carried an SSE-C header triple and
then tripped that request's own mutual-exclusion check. Every bucket with
default encryption refused SSE-C single PUTs with 400 InvalidArgument,
while CreateMultipartUpload on the same bucket succeeded because it
resolves SSE elsewhere. Both call sites now derive the flag from the
request headers, as COPY already did.
The bucket default's KMS key id was also inherited independently of the
effective algorithm, so an explicit AES256 request against an aws:kms
default bucket produced a self-contradictory algorithm/key-id pair and
was rejected. The key id is now inherited only when the effective
algorithm is aws:kms, matching the storage-layer resolver.
Refs backlog#2368 B1, B2.
* fix(sse): refuse SSE-KMS without a running KMS service
A write requesting aws:kms on a node with no KMS service fell back to the
node-local SSE-S3 provider: the data key was wrapped with
RUSTFS_SSE_S3_MASTER_KEY while the object metadata still recorded
aws:kms and the requested KMS key id. The stored object claimed a KMS
protection it never had, under a key that was never consulted, and no
signal distinguished it from a genuine SSE-KMS object.
The managed-encryption path now asks the resolved DEK provider whether it
wraps with a node-local master key and refuses SSE-KMS in that case:
InvalidRequest when KMS was never configured, ServiceUnavailable when a
configured service is not running. The check sits after the per-key
authorization gate so an unauthorized caller still receives AccessDenied
whatever the KMS runtime state is, and asks the provider rather than a
parallel availability signal because the provider is what actually wraps
the key. A missing master key no longer answers an SSE-KMS request with
an SSE-S3-worded configuration error.
The SSE-S3 local fallback is unchanged.
Refs backlog#2368 B4.
* fix(ecstore): restore and archive tiers in stored coordinates
Multipart restore addressed the remote tier in plaintext coordinates
while the copy-back reads the stored representation. Each part received a
misaligned slice of the remote object whose length still satisfied the
range, the hash reader and the completion size check, so the restore
reported success and silently replaced the object's bytes. Encrypted and
compressed multipart objects were both affected. Restore now accumulates
stored part sizes, passes the stored length to the hash reader alongside
the plaintext length, and validates against the stored size.
The copy-back digests stored bytes, so its computed MD5 is not the
object's public ETag. Restore now preserves the object ETag on both the
single-part and multipart paths, and gives each restored part its own
recorded part ETag rather than the object-level value.
Transition also handed the tier the object's SSE headers and its
RustFS-wrapped data key as request headers. Any S3 target rejected an
SSE-C archive outright, an SSE-KMS archive asked the target to encrypt a
second time under a key id it does not own, and the wrapped DEK left the
cluster. The archive request now strips every SSE header and encryption
marker with the predicate the replication path already uses; the local
xl.meta keeps all of it, so read-through and restore are unaffected.
Objects restored by an affected release are not detected or repaired
retroactively and must be re-restored from the tier.
Refs backlog#2368 B3, B5; backlog#2369 P7.1.
* fix(rio): lock the v1 nonce layout within a segment
Decrypting a v1 segment tried three historical nonce layouts per frame,
independently for every frame. The last of them exists for streams
written before 1.0.0-alpha.91, which reused a segment's part nonce for
every block in it; because block zero's derived nonce equals that base
nonce, a frame encrypted at index zero authenticated at any position. An
attacker able to rewrite the underlying shards could replay it and have
the forged plaintext returned with 200 and an unchanged length. Shard
integrity uses a keyed-hash-free checksum, which such an attacker can
recompute, so it is not a barrier.
A segment now locks onto whichever layout decoded its first non-zero-index
frame and rejects any later frame needing a different one. That leaves one
residual shape: a stream built purely from repeats of frame zero has no
later frame to disagree. New RUSTFS_ENCRYPTION_LEGACY_NONCE_FALLBACK
(default true, so pre-alpha.91 objects keep decrypting) drops the third
layout entirely when set to false, which closes it. Turning it off refuses
pre-alpha.91 objects, so migrate them first by rewriting in place.
Refs backlog#2369 P2.
* fix(kms): reload a service that failed to start
POST /rustfs/admin/v3/kms/reload short-circuited whenever the persisted
configuration matched the in-memory one byte for byte. A node whose KMS
failed to start keeps that configuration and sits in Error, so the
documented recovery call returned "reloaded successfully" while leaving
the node down. Peers reached the same path through the reload broadcast,
so a cluster that lost Vault during a rolling restart had no working
recovery route other than the node-local start endpoint. Reload now
short-circuits only for a service that is actually running, and otherwise
reconfigures, which starts a service that is not running.
The AWS backend also advertised key-version enumeration through
kms/status, which its own documentation says it cannot do; the capability
and its golden snapshot now say false.
Refs backlog#2369 P1, P7.3.
* docs: record the SSE and KMS changes for 1.0.0
The Unreleased changelog section carried no entry for any encryption work
merged since 1.0.0-rc.5, including three items with operational impact:
the config-secret variable whose absence persists secrets in cleartext
with only a warning, the v2 frame write switch and its rolling-upgrade
constraint, and per-key authorization making a public bucket incompatible
with SSE-KMS objects. Adds those plus this batch, including the SSE-KMS
refusal as a breaking change with both routes out.
Also corrects four places where documentation contradicted the code: the
cleanup register still called encrypted range seek opt-in after its
default flipped, the Helm README claimed vault_mount_path only applies to
Transit while the template also feeds the KV2 mount, the disaster-recovery
drill listed bundle contents for backends whose export is refused with
501, and the Chinese README capability table predated most of the feature
set. Documents the SSE-S3 local master key as a first-class operational
mode with its rotation dead end, and what the v1 frame layout does and
does not authenticate.
Refs backlog#2369 P5.
* fix(kms): classify data-path KMS failures by what the caller can do
Only "key not found" and a backend outage were classified; every other
KMS failure that reached the S3 data path fell through to
500 InternalError with a generic message. A disabled or pending-deletion
key, a denied KMS grant, an encryption-context mismatch, an unsupported
algorithm, a credential or timeout failure, and a capability the
configured backend does not have all looked identical to a server fault.
SDKs therefore applied exponential backoff to configuration errors no
retry can fix, and monitoring counted every one of them against the
server's own error rate.
Unusable-key and request-side failures now answer 400, a denied grant
403, transient backend failures 503, and a missing backend capability
501. Damaged, unreadable, or unknown-format key material keeps its 500:
it is a server-side integrity fault, and existing tests pin it.
The classifier is deliberately separate from the admin lifecycle
mapping, which answers 404 for a missing key because there a key id is
the resource being addressed; on the data path it arrives inside a
request header or a bucket default. Messages either name what the caller
asked for or stay generic, with deployment-side detail left on the error
source the way the storage-IO mapping already does.
Refs backlog#2368 B6.
* fix(kms): track and renew static Vault tokens
Token authentication hard-coded "this token carries no lease", so the
renewal task never started, the remaining-TTL gauge was never published,
and nothing looked wrong. `vault token create` grants a 768-hour TTL by
default, so a cluster that had been healthy for a month turned every KMS
call into a 403 and could not recover without a restart or a
reconfigure. Production configuration validation only rejects the
literal dev-token, so an ordinary expiring token reaches a whole cluster.
The source now reads `auth/token/lookup-self` at login and adopts what
Vault reports. A token with no expiry behaves exactly as before. An
expiring renewable one is picked up by the existing renewal loop and
renewed at half TTL like every other auth method. An expiring
non-renewable one warns with its remaining lifetime and publishes the
gauge, so the fail-closed window is visible before it arrives.
The probe never fails the login: a policy that omits lookup-self, or a
Vault that is briefly unreachable, warns and falls back to exactly the
previous behaviour rather than taking down a deployment that works
today. The scripted Vault test double answers the lookup out of band so
existing scripts keep describing only the protocol under test.
Refs backlog#2369 P3.
* feat(sse): report SSE-C requests that arrive without TLS
An SSE-C request carries the customer's AES key in a request header, so
AWS S3 and MinIO both refuse one that did not arrive over TLS. RustFS
accepted them on any transport: a plaintext hop hands the key to anyone
on the path, and since the object cannot be read without that same key,
the exposure lasts as long as the object does.
Refusing outright is the correct end state but not a safe default to
adopt inside a release window, because the project's own s3-tests and
e2e lanes and most staging deployments speak plain HTTP. This release
reports instead: each such request increments
rustfs_ssec_plaintext_requests_total and logs one warning per process, so
an operator can confirm nothing would break before the default flips.
RUSTFS_SSE_C_REQUIRE_TLS=true opts into the AWS 400 now.
The verdict is per connection rather than per deployment: the layer is
built with whether this listener terminated TLS, and additionally accepts
an https protocol forwarded by a proxy the trusted-proxy configuration
already vetted. It sits beside the rate limiter, after the layer that
makes a forwarded protocol trustworthy and after the request context, so
a rejection can echo the request id.
Refs backlog#2369 P7.2.
* fix(kms): say what a node-local backend means for a cluster
The Local backend keeps key material on each node's own disk and
generates its Argon2id salt per node, so two nodes derive different keys
from the same master_key and an object encrypted on one node cannot be
decrypted on another. Behind a load balancer that surfaces as
intermittent 500s on reads that succeeded moments earlier, with nothing
tying the symptom to the cause: the only signal was a generic
"development, testing and demos only" positioning warning that says
nothing about what actually breaks.
Configuring or reconfiguring Local while the deployment is distributed
now logs a dedicated event and appends the consequence to the configure
response, so the operator who made the change sees it. The product
decision to warn rather than refuse is unchanged.
Refs backlog#2369 P7.4.
* docs: record the remaining SSE and KMS changes for 1.0.0
Adds changelog entries for the KMS data-path status classification, the
Vault static-token lease probe, the SSE-C plaintext-transport report and
its switch, and the node-local backend warning.
Documents two things the backend security guide never stated: that SSE-C
belongs on a secure transport, with the counter and switch to plan the
change around, and that the Local backend cannot be shared by a
multi-node deployment because each node derives different keys from the
same master key.
Refs backlog#2368 B6; backlog#2369 P3, P5, P7.2, P7.4.
* fix(kms): report an unreadable key store as an outage on the S3 path
A backend now distinguishes a key store it could not read from a key
that is genuinely absent, but the S3 boundary collapsed the first one
back onto 500 InternalError through the fallthrough for integrity
faults. The distinction was therefore invisible to the client: a
temporary key-directory outage looked exactly like a permanently damaged
key record, and neither the status nor the metric said the request was
worth retrying.
An unreadable key store joins the retryable class and answers 503, next
to a backend error and a credential failure. Damaged, unreadable or
unknown-format key material keeps its 500.
Refs backlog#2368 B6; builds on rustfs/rustfs#7470.
* test(storage): cover MRF cleanup delete ENOSPC anchor (#7513)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require heal retry stats evidence (#7514)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add release bundle dry-run fixture (#7515)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): confirm recovery intent accept readback (#7516)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF cleanup delete ENOSPC evidence (#7518)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require bounded retry window evidence (#7517)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): emit scanner heal G09 upgrade evidence (#7519)
Record measured Scanner/Heal G09 evidence artifacts from the upgrade compatibility lanes when a fresh evidence directory is provided.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): persist MRF rollback mirror boundary (#7520)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G09 upgrade evidence runner (#7522)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(scanner): add G09 upgrade evidence runner
Add a reusable Linux x86_64 runner for the Scanner/Heal G09 mixed-version and rollback upgrade evidence lanes.
The helper reads the pinned previous-release asset metadata from the upgrade workflow, verifies the downloaded binary, builds the current head, runs both ignored E2E tests, and fails unless the expected G09 JSON artifacts exist.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): implement V2 evidence preflights (#7523)
* feat(scanner): wire dirty usage producer identities
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add segment activation preflight proof
Keep scanner segment reuse behind a structured activation preflight so release evidence can prove the production gate remains disabled until every producer, generation, overflow, cold-oracle, and distributed invalidation check is satisfied.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): expose distributed invalidation evidence
Record an explicit distributed segment invalidation evidence summary when remote dirty usage snapshots are bound to the current activity window and the authenticated scoped ACK capability probe succeeds.
Reject peer dirty usage snapshots that contradict the peer activity pending bit so scoped ACKs fail closed instead of clearing an unadvertised remote mutation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): assemble release evidence bundles (#7526)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G09 upgrade evidence runner (#7524)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(scanner): add G09 upgrade evidence runner
Add a reusable Scanner/Heal G09 runner for Linux PR-head validation. The script downloads the pinned previous release, builds the current checkout, runs the mixed-version and rollback upgrade E2E lanes, and validates the measured raw artifacts before they can be consumed by the release bundle gate.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): replay recovery intents while disabled (#7521)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): preflight G09 evidence disk space (#7527)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics…
* fix(list): reconcile split overwrite metadata (#7910)
fix(list): fail closed on split overwrite metadata
* fix(heal): persist explicit delete-marker purges (#7908)
* fix(heal): persist explicit delete-marker purges
* fix(ecstore): remove unused object info wrapper
* test(rpc): use valid incarnation in digest gate
---------
Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
* ci(table): pass --outcome to the backlog issue manager (#7914)
The manager step failed with 'the following arguments are required:
--outcome' in the first table run (hidden by continue-on-error): every
other suite workflow passes the test step outcome through.
* fix(list): reconcile encoded directory objects (#7915)
* fix(ci): restore release checks after marker purge changes (#7918)
* fix(rpc): recover tier reloads after peer capability revocation (#7920)
* test(ecstore): drain expiry workers before restart (#7923)
* test: report tier cleanup recovery progress on timeout (#7922)
* fix(heal): resume replacement generation after target restart (#7926)
* ci(release): use sm-standard-4 for Linux builds (#7925)
* chore(deps): refresh release dependencies
Update the release branch dependency set and lockfile for the latest compatible AWS Smithy and RustFS allocator patch versions.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* perf(rustfs): backport skip of redundant content-sha256 pass (#7930)
perf(rustfs): skip redundant content-sha256 pass on signed PUTs (#7928)
A SigV4 header-signed or presigned PUT whose x-amz-content-sha256 header carries a real digest is already wrapped in a hash-checking UploadStream by the s3s auth layer, so the storage-side HashReader was hashing the same payload a second time. Hand the digest to the storage layer only when it arrives in a presigned query string alone, the one case s3s does not read.
(cherry picked from commit 95c06966cc)
* chore(deps): bump qrcode-rs to 2.1.1
* fix(ci): preserve tier failure enforcement after release merge
* docs(release): record 1.0.0 stable RPM release
---------
Signed-off-by: houseme <housemecn@gmail.com>
Signed-off-by: dependabot[bot] <support@github.com>
Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: xiaomage <devops008@sina.com>
Co-authored-by: GatewayJ <835269233@qq.com>
Co-authored-by: hehutu <hehutu@gmail.com>
Co-authored-by: Henry Guo <marshawcoco@gmail.com>
Co-authored-by: RJ Regenold <rregenold@teamraft.com>
Co-authored-by: RJ Regenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: Jason Kossis <jkossis@gmail.com>
Co-authored-by: Hiroaki KAWAI <1468181+hkwi@users.noreply.github.com>
Co-authored-by: Hiroaki KAWAI <hiroaki.kawai@gmail.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
The fault-tolerance suite (disk-outage and peer-failure scenarios,
FT-CASE verdicts) has never been dispatchable: the workflow file only
exists on release, and GitHub registers workflow_dispatch targets
exclusively from the default branch. The suite is otherwise ready - it
runs on the smoke-testing fleet and already uses the
rustfs-shared-functional-tests-v2 lock.
Adds the workflow adapted to this branch's current (pre-sync) gate
semantics - the run step's continue-on-error is dropped so the existing
contract holds - plus the evidence init aligned with the shared
four-variable pattern (FUNCTIONAL_ARTIFACTS_DIR under
rustfs-fault-tolerance-*, LOG_FILE/REPORT_FILE/EVIDENCE_DIR/TMPDIR,
scratch dir) and the standard artifact allowlist.
Contract registration: JOBS / DIRECT_TESTS entries, upload allowlist,
and fixture teaching for the FT-specific shapes (composite
package-url fallback expression, script-driven --cleanup instead of
ssh-driven cleanup). The generic legacy matrices exclude FT the same
way they exclude table/performance until the release->main sync lands.
A SigV4 header-signed or presigned PUT whose x-amz-content-sha256 header carries a real digest is already wrapped in a hash-checking UploadStream by the s3s auth layer, so the storage-side HashReader was hashing the same payload a second time. Hand the digest to the storage layer only when it arrives in a presigned query string alone, the one case s3s does not read.
ci(chain): gate the performance lane on its fleet probe (rebase + contract)
Rebased onto latest main; adds the contract-test update that the first
push of this branch missed:
- test_functional_chain: the performance lane now asserts the new
probe-gated 'if' (prepare success AND performance_ready == online);
the other nine lanes keep the plain prepare gate; prepare must carry
the two preflight steps (hard smoke-testing check, pf-testing probe)
and publish the performance_ready output
Carried over unchanged from the previous push: per-fleet preflight
(prepare hard-fails only on smoke-testing), the pf-testing probe step,
the probe-gated performance lane, and aggregate's --allow-skipped
(permitted skips shrink the evidence set; unpermitted skips still fail
aggregation). Chain contract tests: 27/27 locally.
* fix(ecstore): admit transformed small objects inline by plaintext size
* test(e2e): expect the small compressed object inline in compression roundtrip
---------
Co-authored-by: Hauser <housemecn@gmail.com>
* chore(deps): refresh RustFS tokio tar dependency
Switch the astral-tokio-tar workspace alias to the released rustfs-tokio-tar 0.7.1 crate and remove the obsolete cargo-deny git source allowance.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* chore(deps): align AWS smithy dependency family
Upgrade the AWS SDK and smithy crates together while patching aws-smithy-json 0.63.0 for the aws-smithy-types 1.7.0 DocumentObject API used by aws-config 1.12.0.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* revert(deps): use official AWS smithy compatible set
Remove the local aws-smithy-json patch and roll the AWS smithy family back to the latest official combination that compiles with aws-config 1.12.0.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* docs(architecture): retire tokio tar cleanup entry
Remove the stale cleanup-register entry after switching back to the released rustfs-tokio-tar crate, leaving no unmatched compatibility marker for the architecture guard.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* ci: restore table workflow failure contract
Align the table functional workflow with the quick-check guard by letting suite failures stay red, generating PASS reports only from complete successful evidence, and preserving the shared backlog issue fallback for harness failures.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(deps): expose rustfs tokio tar dependency name
Use the published rustfs-tokio-tar dependency key throughout the workspace while keeping source imports on the crate's tokio_tar lib target name.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* ci: register the table suite workflow on the default branch
The table suite workflow (#7873) only exists on release so far, and
GitHub registers workflow_dispatch targets exclusively from the default
branch — the suite cannot be triggered until this file lands on main
(same mechanism that keeps the fault-tolerance suite undispatchable).
This adds the identical rustfs-table-test.yml (byte-for-byte the
release version) plus the contract-test registration (JOBS /
DIRECT_TESTS / upload allowlist), and nothing else from release.
* ci: pin actions in the table workflow to full commit SHAs
The default branch enforces check_workflow_pins.sh (unpinned
third-party action refs fail CI). Use the same pinned SHAs as the other
suite workflows on main: actions/checkout@9c091bb... (#v7) and
actions/upload-artifact@b7c566a... (#v6).
Note: the release copy of this workflow still uses @v4 tags; release
does not run the pin gate. Release and main will converge on the pinned
form during the full sync.
* test(heal): keep outage objects in the replacement erasure set
* fix(rpc): retry authenticated requests after peer epoch changes
* test(rpc): assert retryable rejection of stale boot epochs
* ci: bound concurrent heal clusters in the full E2E gate
* fix(heal): retry interrupted internode shard writes
* fix(deps): update rustls for RUSTSEC-2026-0285
* fix(heal): retain RPC transport failures across metadata probes
* test(heal): wait for replacement disk and coordinator readiness
* test(connect): validate service-only diagnostic capabilities
* fix(s3): resume GET bodies after erasure read quorum loss
#7847 routed schedule-failure alerting to rustfs/backlog by switching the
alert jobs' token to secrets.BACKLOG_ISSUE_TOKEN, but check_test_wiring.py
still asserts the literal 'github-token: ${{ secrets.GITHUB_TOKEN }}', so
Quick Checks fails on every open PR. Update the wiring assertions and the
self-test fixtures to the new literal.
Both `--self-test` (52 tests) and the full `validate()` pass locally.
* chore(deps): bump ed25519-dalek in the dependencies group
Bumps the dependencies group with 1 update: [ed25519-dalek](https://github.com/dalek-cryptography/curve25519-dalek).
Updates `ed25519-dalek` from 2.2.0 to 3.0.0
- [Release notes](https://github.com/dalek-cryptography/curve25519-dalek/releases)
- [Changelog](https://github.com/dalek-cryptography/curve25519-dalek/blob/3.0.0/CHANGELOG.md)
- [Commits](https://github.com/dalek-cryptography/curve25519-dalek/compare/ed25519-2.2.0...3.0.0)
---
updated-dependencies:
- dependency-name: ed25519-dalek
dependency-version: 3.0.0
dependency-type: direct:production
update-type: version-update:semver-major
dependency-group: dependencies
...
Signed-off-by: dependabot[bot] <support@github.com>
* chore(deps): bump jiff, aws-sdk-s3, datafusion and smallvec
Bump the dependencies group:
- jiff 0.2.35 -> 0.2.37
- aws-sdk-s3 1.146.0 -> 1.146.1
- datafusion 55.0.0 -> 55.1.0
- smallvec 1.16.0 -> 1.16.1
Update Cargo.lock for the matching transitive bumps (datafusion
subcrates, hickory, cc, crc32fast, tinyvec, toml_edit and others);
tinyvec_macros is no longer required.
* chore(deps): use s3s 0.16.0 release and bump rust-version to 1.98.1
* fix: preserve ready reader errors during erasure write failures
When erasure writers fail after the producer has already surfaced a reader error, return the reader error instead of aborting the producer and masking it with the write-side failure.
This keeps UploadPart body read timeouts classified as RequestTimeout under loaded pipeline timing.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test: use current checksum API in multipart regressions
* fix: stabilize connect dependency update tests
Classify Connect proxy failures only when an explicit proxy is configured, preserve TLS classification across request error shapes, keep short object performance windows from spending too much budget on cleanup, and update multipart checksum tests for the current HashReader API.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Signed-off-by: dependabot[bot] <support@github.com>
Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
* fix(auth): reject unsigned x-amz headers on header-signed SigV4 requests
A SigV4 request authenticated with an Authorization header only binds the headers named in its SignedHeaders list, but RustFS acted on every x-amz-* header that arrived, so a replayed header-signed PutObject carrying an unsigned x-amz-copy-source became a CopyObject run as the signer that could copy any object the signer can read (GHSA-xm99-m3gq-83g8). The presigned form was already closed by GHSA-g8w9-qw9q-fghr.
reject_unsigned_amz_headers_on_sigv4_request now guards S3Access::check and S3Router::check_access: every SigV4 signed-header list the request carries must cover every x-amz-* header, the Authorization header is parsed with the verifier's own s3s-sigv4 parser and compared case-insensitively, the algorithm token is pinned to AWS4-HMAC-SHA256 because the upstream header path accepts any token, and the exempt set mirrors the upstream s3s fix (x-amz-content-sha256, x-amz-decoded-content-length, x-amz-trailer, x-amz-checksum-algorithm) plus x-amz-cf-id. Adds ghsa_xm99 unit, router and e2e regressions, raises the security smoke floor to 28, and records the advisory in docs/testing/security-regressions.md and CHANGELOG.md.
* chore(deps): switch s3s and s3s-sigv4 to crates.io 0.16.0
* fix(server): enforce the SigV4 header guard ahead of s3s dispatch
s3s 0.16 verifies the claimed algorithm as the first step of its own
signature flow, so a request whose Authorization header swaps the
AWS4-HMAC-SHA256 token was answered with 501 NotImplemented before
RustFS's access layer could rule on the unsigned x-amz-copy-source
(GHSA-xm99-m3gq-83g8). Add the SigV4HeaderGuardLayer as the innermost
external stack layer, running reject_unsigned_amz_headers_on_sigv4_request
in front of s3s and serializing its rejections as the same AccessDenied
S3 error document the access layer produces.
---------
Co-authored-by: Hauser <housemecn@gmail.com>
The gateway key inventory handler added in #7785 imported s3s directly and built four errors with s3_error!, pushing the s3s footprint ratchet to 210 files and 1592 s3_error! lines on main. Route its S3 types and error construction through the crate::admin::storage_api::s3 facade like sibling admin handlers; the codes, HTTP statuses and messages are unchanged, and a new unit test pins them.
Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Scheduled pipeline failures currently open [scheduled-failure] tracking
issues in rustfs/rustfs itself, adding bot noise to the code repository's
issue tracker. Route that alerting to rustfs/backlog instead.
- schedule-failure-issue gains target-repository (default rustfs/backlog);
dedupe lookup, comment appends and issue creation target that repository.
- New source-token input (default ${{ github.token }}) reads the failed-job
list from the reported run; the run still lives in and links to
rustfs/rustfs. The issue body now carries a '- Repository:' line.
- All consumer workflows pass secrets.BACKLOG_ISSUE_TOKEN; the
workflow-scoped GITHUB_TOKEN cannot open issues cross-repo. Alert job
permissions blocks are unchanged.
* fix: resume get body after short eof
Treat mid-stream short EOF errors as resumable when the S3 GET body has an attached resume context. This lets peer-kill reads reopen the same object version at the emitted offset instead of aborting the 200 response body.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(connect): surface TLS peer bootstrap failures
Map Connect registration TLS peer validation failures to the dedicated bootstrap error so wrong CA inputs fail closed with the sanitized TLS variant instead of the generic exchange error.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Only the Local backend refused a key identifier containing a path
separator. On Vault KV2 a create with the name bad/name succeeded and
produced a nested KV2 path that the listing then reported as a
directory rather than a key, and an identifier containing .. addressed
a record outside the configured key prefix once the HTTP client
normalised the URL; Vault Transit built its transit key name and its
metadata path from the same unchecked identifier.
Lift the Local backend's containment rule into a shared segment check
(empty, /, backslash, NUL, . and ..) and apply it at the single point
where each backend turns the identifier into a path or a Transit key
name, so create, describe, encrypt, delete and the metadata writes all
refuse with InvalidKey before any request reaches Vault. The admin API
already maps that to 400. The AWS backend is untouched: it addresses
keys by ARN and alias, both of which contain /.
Refs rustfs/backlog#2474 (KMS-213 CreateNegatives on vault-kv2).
Co-authored-by: Hauser <housemecn@gmail.com>
* fix(replication): accept a bodiless 405 as a replicated delete marker during resync
A resync verifies each delete marker with `HEAD ?versionId=<marker>` on the
target. S3 targets (RustFS, MinIO, AWS) answer that with 405 and no body,
and the SDK only synthesizes an error code for 404, so the error arrived
with `code() == None`. `is_retryable_delete_replication_head_error` then
treated it as an ambiguous failure: every delete marker counted as a failed
object with `target service error`, and a site resync over any bucket that
holds a delete marker reported the whole bucket as failed
(rustfs/backlog#2479, SITE-105 on rc.6 and nightly).
Use the raw HTTP status the way the 404 path already does: a 405 without a
code confirms the marker propagated. Ambiguous statuses still fail.
- Unit tests drive `verify_resync_head_result` against a scripted target
answering 405 (accepted) and 503 (still failed).
- e2e `test_site_replication_resync_replicates_delete_marker` joins two
sites, converges a live object and a delete marker, and requires the site
resync to complete with zero failed objects; the repl-nightly selection
digest is refreshed for the new case.
* fix(replication): verify marker-version purges by absence during resync
A delete-marker resync entry with a pending or failed version purge asks
the target to remove the marker, so the bodiless 405 that proves a
created marker propagated proves the purge did not happen. Accept the
405-as-success mapping only for marker creation (empty
version_purge_status); a purge counts as replicated only when the target
answers not found, and any other HEAD outcome stays failed. Unit tests
drive both purge statuses against the 405 fixture and the 404 fixture.
* fix(io-metrics): drop the rustfs-common edge by injecting the S3 telemetry observer
dc700d366 (#7775) made the io-metrics leaf crate depend on rustfs-common
to publish typed telemetry trace events from S3HttpRequestGuard, which
breaks the backlog#1834 leaf-crate rule (io-metrics may only depend on
rustfs-s3-ops).
S3HttpRequestGuard now takes an optional fn-pointer completion observer
(operation, latency, 2xx?) and knows nothing about the trace bus. The
server builds guards through rustfs::server::s3_http_request_guard, which
attaches the observer only while a telemetry subscriber exists and owns
the S3Operation -> TelemetryTraceOperation mapping.
* chore(guard): admit #7785 s3s ratchet growth (+1 file, +4 lines)
#7785 landed the gateway key inventory admin handler after the
baselines were verified, leaving check_s3s_footprint.sh red on main
and every branch cut from it (measured 210 files / 1592 lines vs
209/1588 baselines).
The handler follows the house admin convention whose Operation::call
signature is s3s-typed (S3Request/S3Result), so it cannot route
through a non-s3s seam until the s3gate admin migration replaces the
admin router (rustfs/backlog#1677 F1); no local refactor can shed the
file-level import. Record the measured growth with rationale:
files 209 -> 210, s3_error! lines 1588 -> 1592.
* fix
* fix: resolve clippy gate failures in connect and CLI surfaces
- Box the two large CommandResult performance variants and
LicenseRenewalOutcome::Installed (clippy::large_enum_variant)
- Return RelayError instead of () from RelayTransport::deliver and the
test destination (clippy::result_unit_err)
- Drop an unused mut on the protected relay file handle (unused_mut)
- Pass the digest by value to base64 encoding and drop a redundant
result_json clone (clippy::needless_borrows_for_generic_args,
clippy::redundant_clone)
* fix(connect): resolve the remaining site-replication clippy errors
- Group the endpoint credential triple into SiteReplicationCredentials
so SiteReplicationEndpoint::new takes 6 arguments
(clippy::too_many_arguments)
- Take the build-feature validator by &str (clippy::ptr_arg); the
validator closure stays because &String needs the deref coercion
* style: apply rustfmt to the site-replication credential grouping
* fix(connect): keep the CPU profile fixture off the ecstore import scan
#7811 used "rustfs_ecstore::disk::read_object" as the raw-symbol fixture
of the profile redaction test, which the architecture guard counts as a
direct rustfs_ecstore reference outside the compatibility boundaries
(its scan deliberately includes inline test modules). The accumulator
treats symbols opaquely, so use the internal rustfs::storage:: path that
keeps the fixture realistic without matching the import scanner.
* fix
* fix
* fix
* fix
---------
Co-authored-by: Hauser <housemecn@gmail.com>
* fix(connect): restore the site replication producer build
The producer shadowed its object_url helper with a local of the same
name, and its test placed the consent nonce on the request, so neither
the rustfs library nor its tests compiled on main.
* feat(server): add RUSTFS_S3_STACK with a gateway GetBucketLocation path
RUSTFS_S3_STACK=legacy (default) keeps the s3s service as the whole S3
entry. RUSTFS_S3_STACK=gateway routes GetBucketLocation through the
RustFS Gateway pipeline pinned at rustfs/gateway@90b83a20 and falls back
to the same s3s service for every other request, decided before the
body is read. Refs rustfs/backlog#1752.
GET /rustfs/admin/v3/gateway-key-inventory (admin:InspectData) lists
every stored object key the RustFS S3 gateway would refuse on every
operation, so an operator can copy those objects to a safe key before
switching stacks. The rules mirror the gateway key floor; . and ..
segments never appear because ecstore refuses them on every write.
Refs rustfs/gateway#754
Replace s3s::dto::{RestoreStatus, Timestamp} in filemeta with a
filemeta-owned RestoreStatus (same field names, OffsetDateTime expiry).
RestoreStatusOps and parse_restore_obj_status keep their signatures and
persisted rendering; the ecstore restore finalize / lifecycle restore
writers and rustfs RestoreObject now build the filemeta type.
- crates/filemeta: drop s3s; tokio "time" becomes a dev-dependency
(the metacache tests got it through s3s feature unification).
- metadata_keys: drop the s3s half of the historical-source cross-check;
PINNED, the pre-A3a fixture and per-character mutation still pin keys.
- new test re-renders the pre-A3a fixture restore value byte-for-byte.
- s3s footprint baselines 210 -> 209 files, ecstore 37 -> 36.
Refs rustfs/backlog#1735
#7769 left rustfs/src/connect/diagnostics/perf_site_replication.rs failing
to compile: a local binding named object_url shadowed the object_url()
helper in the same scope (E0618), and a test put the consent nonce on the
request instead of LocalSiteReplicationConsent (E0063/E0560).
Rename the binding to source_url and move the test nonce into the consent.
Migrate ecstore and rustfs-lifecycle consumers of the persisted xl.meta
meta_user keys (object lock, restore, replication status, storage class,
SSE read) from s3s::header / rustfs_utils header constants to
rustfs_filemeta::metadata_keys. HTTP header production is unchanged and
every lookup keeps its previous exact / case-insensitive mode.
- SSE key: persisted only as lowercase; the mixed-case spelling is
outbound replication user metadata. Keep the case-insensitive read and
pin it against the pre-A3a fixture.
- warm tier: strip promoted keys case-insensitively so the persisted
X-Amz-Replication-Status is no longer forwarded to the tier.
- fix stale HashReader::add_checksum_from_s3s call in ecstore tests.
Refs rustfs/backlog#1735
Close the remaining paths where a stored bucket sub-configuration whose
bytes cannot be parsed still read as absent (rustfs/backlog#1734, slice 2):
- Object writes resolve versioning through BucketVersioningSys::get_for_write;
RUSTFS_BUCKET_CONFIG_PARSE_MODE=strict refuses them, the default permissive
mode keeps the historical unversioned write and records it.
- Versioning, Object Lock, encryption, public access block and notification
getters and the delete-time versioning check return the typed
UnreadableBucketConfig refusal, which ApiError maps to 503 naming the
bucket, config and stored length. StorageError::clone keeps it typed.
- Object Lock checks stay on when the lock config is unreadable.
- Notification setup isolates an unreadable config to its bucket instead of
clearing its rules; GetBucketNotificationConfiguration reports it.
- Add rustfs_bucket_metadata_parse_failed_total and
rustfs_bucket_metadata_unparsable_current, an invalid-mode startup check,
and the s3gate-parse-strict compat register entry.
Move the aws-chunked trailing checksum handle behind a RustFS-owned rustfs_rio::TrailerSource (Pending/Missing/Present lookup with a documented EOF timing contract) and adapt s3s::TrailingHeaders once in the application crate. rio no longer depends on s3s; behaviour is unchanged.
Refs rustfs/backlog#1735
Add rustfs_filemeta::metadata_keys as the single source of the nine xl.meta meta_user keys, byte-identical to current literals, and migrate filemeta consumers off s3s::header and rustfs_utils header constants. Pin the literals, cross-check historical sources, and prove old xl.meta bytes still decode via a captured fixture and a per-character mutation sweep.
Refs rustfs/backlog#1735
An XML bucket sub-config whose stored bytes cannot be parsed was still folded into "absent" on two paths: update_config_with handed it to mutate, which rebuilt it from nothing and overwrote the only copy of the bytes, and the tagging/lifecycle/CORS/website/logging/accelerate/request-payment getters reported ConfigNotFound.
Add an explicit ConfigState (Absent / Valid / Unreadable) over the existing retained parse failure, refuse the read-modify-write of an unreadable target config before mutate runs (per config, other configs stay writable), and make those getters fail closed. GetBucketLifecycle now only maps ConfigNotFound to NoSuchLifecycleConfiguration. The Swift tagging rewrite recognizes the refusal by type instead of a string sentinel.
Refs rustfs/backlog#1734
* fix(site-replication): keep an operator's bucket-level target to a peer instead of taking it over
Site replication wired each bucket by looking for an existing replication
target "to the same peer" and rewriting the first match in place as its own
same-name target. An operator's bucket-level target that happened to point
at that site (different target bucket, operator credentials) was the first
match whenever it pre-dated the join, and the reconciler repeats the pass
every 600s, so the takeover also depended on target order afterwards. The
operator's rule then named an ARN no target backed and their bucket
replication stopped silently, while the inherited bucket-level reset id
made every site resync report the bucket as owned by another resync
(rustfs/backlog#2479, rustfs/backlog#2489).
Follow MinIO's `getRemoteARN` / `getRemoteARNForPeer` shape instead:
- Wiring updates a target in place only under the same ARN, or when it is
recognisably the site's own under an older ARN shape (same peer,
same-name target bucket, site replication service account). Anything
else gets the site target added next to it.
- The site resync manifest takes the target the derived
`site-repl-<deployment id>` rule names (same-name shape as fallback), so
an operator target to the peer neither aborts the bucket as "multiple
remote targets matched peer" nor gets resynced into.
- Peer removal prunes only targets a pruned derived rule names or the
same-name target bucket; operator targets stamped with the peer's
deployment id survive together with their rules.
Unit tests cover the three predicates. e2e
`test_site_replication_keeps_operator_bucket_target_to_peer` runs a
bucket-level replication plus `replication-reset` to the future peer, joins
the sites, and requires the operator target untouched, both paths
delivering, the site resync completing against the site target, and the
operator target and rule surviving `replicate remove --all`; without the
fix it fails at the join with the operator target gone. The repl-nightly
selection digest is refreshed for the new case.
* test(site-replication): drop a redundant clone flagged by clippy
The reconcile unit test cloned the remote peer into the state map although
the binding is not used afterwards; workspace clippy (-D warnings) rejects
that as redundant_clone.
* fix(sse): classify bare SSE-KMS writes when no KMS is available
A `aws:kms` request without a key id, on a bucket without a default key,
returned `500 InternalError` whenever no KMS service was running: the
"no KMS key available" branch exited with an untyped storage error before
the availability classification that the keyed form already received.
Route that branch through the same split: `503 ServiceUnavailable` while
a configured KMS is stopped, `400 InvalidRequest` when KMS was never
configured, and `400 InvalidRequest` naming the missing key id when a
running KMS has no default key. `CreateMultipartUpload` shares the path.
Adds a unit test for the bare form and an e2e module that stops KMS
through the admin API, runs a master-key-only node, and runs a Local KMS
without a default key; refreshes the e2e-full selection digests.
(cherry picked from commit c3259dadc3d603a9185a5b0ad9f83dfb884e61c8)
* fix(sse): keep KMS error classes on the encrypted read path
GetObject, CopyObject and UploadPartCopy on an SSE-KMS object whose key
no longer exists answered `500 InternalError` ("KMS key not found") while
PutObject under the same key already answered `400 KMS.NotFoundException`.
The read path carries its classification through ecstore's
`EncryptionResolutionErrorKind`, which had no kind for a missing key, a
denied KMS grant or a missing backend capability, so all three folded
onto `DecryptionFailed` and the S3 layer reported an internal fault.
Add `KeyNotFound`, `AccessDenied` and `NotImplemented` kinds, map them on
both sides of the boundary, and give an envelope the configured backend
cannot unwrap a diagnosable message while keeping its `500`.
Unit tests cover the kind round trip and the reader wrapping; a new e2e
test deletes a key immediately and checks GET/Copy return 400 with
`KMS.NotFoundException` while HEAD stays 200. The e2e-full selection
digests are refreshed from the current listing (the previous digests
predated the delete-authorization tests) and the e2e `create_default_key`
helper is updated to the accepted `EncryptDecrypt` spelling.
(cherry picked from commit 2523a9814e97caea318d4ff1a51bef3a4d4445b2)
* fix(kms): classify key-management errors on the admin routes
`POST /kms/keys`, the legacy `create-key` alias and `generate-data-key`
reported every backend refusal as `500`: a blank key name (which each
backend failed on differently, the Local backend by writing a key file
with an empty stem), a name already taken, an unknown key, a disabled key
and a capability the backend lacks. `delete` and the lifecycle routes
already classified the same errors.
Refuse a blank or whitespace name in `KmsManager::create_key` before any
backend sees it, and share one `KmsError` to status mapping across
create, delete and generate-data-key (400 for validation and key state,
404 for an unknown key, 409 for a taken name, 501 for a missing
capability, 500 only for damaged material). The XML-error routes carry
the same status explicitly since s3s derives none for a custom code.
The read-only Static backend now reports create, delete and
cancel-deletion as `UnsupportedCapability`, matching its rotate and
enable/disable answers, so the admin API returns 501 for all of them.
(cherry picked from commit e33cac5493c4d9d6662e0d2980b58ba2b24a6d1b)
* fix(sse): stop SSE-S3 responses from naming the wrapping KMS key
`x-amz-server-side-encryption-aws-kms-key-id` is defined for `aws:kms`
objects only, but PutObject, CopyObject, CreateMultipartUpload and
GetObject returned it for `AES256` objects too, carrying the KMS key that
wraps the SSE-S3 data key (the service default, or the literal `default`
on a node without KMS). The write paths copied `kms_key_id` from the
encryption material unconditionally, and the single-decrypt GET
classification did the same after resolving the key for authorization.
Add `EncryptionMaterial::response_kms_key_id`, which yields the id only
for SSE-KMS, use it at the four write-response sites, and gate the GET
classification the same way. CompleteMultipartUpload and HeadObject
already omitted the header.
Unit tests pin both directions; a new e2e test covers Put/Get/Head/Copy
and CreateMultipartUpload for AES256 with an aws:kms control. The
e2e-full selection digests are refreshed from the current listing.
(cherry picked from commit 29d793a63352b0b60fd53c565e80fdbede8964bb)
* fix(s3): validate PutBucketEncryption rules before storing them
A default-encryption rule naming an unknown `SSEAlgorithm` (for example
`AES128`), a rule without `ApplyServerSideEncryptionByDefault`, an empty
rule list, or a `KMSMasterKeyID` on an `AES256` rule was stored as
written: the only algorithm check on the route decided whether to fill
in the default KMS key. `GetBucketEncryption` then advertised that
configuration while the write path encrypted header-less writes under
its `AES256` fallback, so the bucket's declared and actual schemes
disagreed. Two comments claimed the route already refused unknown
algorithms.
Validate the configuration before any of it is applied: `MalformedXML`
for a malformed rule set or unknown algorithm, `InvalidArgument` for a
key id on a non-KMS rule, and nothing stored on refusal. Correct the two
comments to describe when the AES256 fallback is still reachable.
Unit tests cover every refusal and the accepted shapes; an e2e test
checks the refusals leave the previous configuration in place. The
e2e-full selection digests are refreshed from the current listing.
(cherry picked from commit 29e4486dce41197ed93f5253cdbabc57d27a4ddb)
* test(e2e): refresh e2e-full selection for the combined KMS/SSE fixes
* test: align two unit tests with the new KMS and bucket-encryption contracts
`scheduled_deletion_carries_a_deadline_and_can_be_cancelled` still
expects the state error (`InvalidOperation`) for cancelling a key that
is not pending deletion; only the Static backend's mutations moved to
`UnsupportedCapability`. The uninitialized-store PutBucketEncryption
test now sends a well-formed AES256 rule so it reaches the store lookup
instead of the new configuration validation.
* feat(ci): measure queue and execution time by run attempt
* fix(ci): bound timing samples and recognize the old workspace lane
* fix(ci): sample completed runs for stable timing comparisons
* fix(ci): share quick checks and lint workflows
* fix(ci): install actionlint from its verified release
* fix(ci): reject dependencies on required quick checks
* feat(test): verify the E2E server build and source identity
* test(e2e): register verified Darwin test membership
* test(e2e): record verified Linux receipt test membership
* test(e2e): record compiled Darwin receipt test membership
* test(e2e): record compiled Linux receipt test membership
* test(e2e): record Darwin e2e-full membership after merging main
* fix(test): route scanner/heal evidence E2E runs through the verified server binary
The evidence runners built rustfs with plain cargo and then ran e2e_test directly, which now fails without a run receipt. They build through scripts/e2e_binary.py and run the e2e_test invocations under e2e_binary.py run; the obsolete rustfs.features stamp is removed.
* docs(e2e): run server-backed e2e commands through the verified binary wrapper
* test(e2e): record Linux e2e-full membership from the branch CI listing
* test(kms): cover custom Vault Transit metadata locations
* test(kms): include a non-default Transit mount in live coverage
* test(ecstore): tolerate cleanup quorum transition
* test(ci): restore ten-suite chain expectations
* test(ecstore): tolerate cleanup quorum transition in both causal polls
The unversioned duplicate-delete poll in batch_transitioned_delete_uses_free_version_per_item reads exact metadata while the same asynchronous free-version cleanup removes per-disk copies, so it can hit the same transient InsufficientReadQuorum as the versioned poll. Share one helper between both polls; every other error still fails immediately.
---------
Co-authored-by: overtrue <anzhengchao@gmail.com>
Adds a fault-tolerance suite that verifies read/write behavior under
drive and node loss against the erasure-coding contract and snapshots
health-endpoint responses at every degradation tier. Scenarios derived
from product source (default_parity_count, erasure set sizing):
- A: single-node 4 drives (EC:2, read quorum 2): hide 1/2/3 drives
- B: multi-node 4x1 (one set of 4, EC:2): stop 1/2/3 nodes
- C: multi-node 4x4 (one set of 16, EC:4, read quorum 12): 1 node down
lands exactly on the read-quorum boundary; 2 nodes down breaks it
- C2: multi-node 4x4 with RUSTFS_STORAGE_CLASS_STANDARD=EC:8 (read
quorum 8, write quorum 9, lock majority 9): 2 nodes down puts reads
inside the reported divergence window (read quorum met while the
lock majority is broken)
By default a reads-refused-despite-met-read-quorum observation is
reported as known-divergence without failing the suite; the strict
input escalates it. Chain order becomes:
upgrade -> s3 -> kms -> tier -> storage -> heal -> pool -> security ->
replication -> fault-tolerance -> performance.
Expose verified OIDC username and email claims as display-only metadata on self-account responses while preserving the virtual parent as the authorization identity.\n\nKeep rustfs-madmin public response structs unchanged by adding the optional wire fields through private handler response wrappers.
* fix(s3): reject oversize single PUT early and map body errors to 4xx
A single PutObject above the 5 GiB single-request ceiling was only
rejected after the client had streamed 5 GiB into s3s's read-time body
budget, and the resulting BodySizeLimitExceeded surfaced from the erasure
writer as 500 InternalError. A body whose connection hit EOF before
Content-Length bytes arrived (hyper's IncompleteBody) was also a 500.
SDKs retry 500s, so one oversize upload was resent from offset 0 five
times.
- PutObject and UploadPart reject a declared length above
MAX_SINGLE_PUT_OBJECT_SIZE with 400 EntityTooLarge before reading the
body; the constant moves to rustfs_config so the s3s limit and the
admission check share one value.
- ApiError maps BodySizeLimitExceeded to EntityTooLarge and a hyper body
EOF to IncompleteBody across both io::Error conversions.
Fixes#7596.
* test(s3): cover UploadPart admission, aws-chunked length, real s3s limit
- Poll-counting test body proves PutObject and UploadPart reject a
declared size above the ceiling with zero body polls; exact-cap and
zero-length parts pass admission.
- A STREAMING-* aws-chunked PUT whose framed Content-Length exceeds the
cap is admitted when the decoded length is within it and rejected when
the decoded length is over it.
- The display-based BodySizeLimitExceeded matcher is checked against the
real error produced by the pinned s3s Body budget.
Embed RUSTFS_CONSOLE_BASE_PATH into console routes, browser redirects, and startup URLs so OEM builds can use their own namespace. Preserve the default for an unset or empty build variable and keep route tests prefix-aware.
* test(heal): cover MRF manifest CAS legacy transition (#7443)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): enable release branch checks and repair test imports (#7441)
* test(scanner): structure heal release evidence lanes (#7442)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): require segment producer identities (#7444)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): expose recovery intent identity (#7445)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): summarize failed heal perf reports (#7446)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(common): retain unmatched MRF repair proofs (#7447)
Add a recorded verified-repair consumer that discharges only exact retained anchors for the requested bucket while leaving unmatched proofs in the event ring. This gives the future durable successor writer a fail-closed primitive before any tombstone or GC path is enabled.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): route replication read plan through boundary (#7448)
* test(scanner): cover flat-bucket quantum fairness (#7449)
Add a production-entry scanner cohort regression that combines a wide flat bucket with a small bucket under a fixed object budget. The test keeps partial budgeted rounds unpublished, verifies small buckets are only marked after real execution, and confirms a later unbudgeted round can publish the complete aggregate.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): reuse same admission request id (#7451)
Keep a retried heal start with the same request id from bypassing admission deduplication when the transport replay cache is unavailable but the manager still owns the task.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require perf summary evidence fields (#7453)
Fail closed when measured passing Scanner/Heal ABBA summaries omit W10/W11 foreground pressure, lock wait, or attempt-cost evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind release evidence fields (#7452)
Require explicit scanner/heal release evidence field contracts for the scoped ACK and mixed-version rollback gates.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): tag dirty usage producer identities (#7454)
Record production-facing segment invalidation producer identities when existing object-level dirty usage hooks observe PUT, CopyObject, DeleteObject/DeleteMarker, and CompleteMultipartUpload mutations. Keep the data non-authoritative and process-local so segment reuse activation still requires durable generation-window proof.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): gate release evidence bundles (#7457)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require hard evidence ABBA manifest (#7459)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(heal): add MRF committed snapshot writer (#7458)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover EC8+4 restart shard rebuild (#7461)
Retry heal-control RPCs once after transport auth rejects a stale replay-scope epoch, and add a distributed EC8+4 restart heal evidence case that rebuilds a replaced drive with exact shard/body assertions.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): echo measured release evidence in ABBA fake adapter (#7460)
Keep the synthetic ABBA test adapter aligned with the measured release evidence contract so result validation covers release_evidence drift.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require complete ABBA summary matrix (#7462)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: retain MRF replay journal after accepted/merged replays
Keep startup replay journal until a durable successor snapshot exists after Accepted/Merged admission.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: reclaim superseded MRF snapshots after readback
Add a committed snapshot predecessor cleanup primitive that deletes only an older slot after the successor is read back as the current committed snapshot.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: require exact owner for object receipts
Require object heal receipts to match the expected bucket incarnation before they can be recorded as positive repair evidence. This prevents stale or cross-incarnation receipts from clearing the wrong heal responsibility.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: latch object receipt owner before repair
Capture the expected bucket incarnation before invoking object repair so a post-repair owner change cannot rewrite the responsibility that a storage receipt is allowed to prove.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: replay committed MRF checkpoints durably (#7465)
Prefer committed MRF checkpoints during startup replay, retain accepted replay responsibilities until exact verified repair proofs arrive, and reclaim committed manifests only after discharge.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind hard evidence bundle provenance (#7467)
Require Scanner/Heal release bundle fields to carry source, run, window, timestamp, command, and artifact format provenance before a measured gate can pass.
Keep EC8+4 and performance gate fields tied to a single measurement window so unrelated artifacts cannot be stitched into a release approval.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: reject dry-run object repair receipts
Do not record positive storage repair receipts for dry-run object heal tasks, even if a producer accidentally returns a matching receipt.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: reject cancelled object repair receipts
Do not record positive storage repair receipts once an object heal task has been cancelled, even if the receipt still matches the requested owner and object identity.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): reject failed object repair receipts
Cover the receipt consumer path where a storage repair result carries both an error and a matching positive receipt. The failure may be recorded, but the receipt must not create repaired, healthy, or absent proof.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover bucket object repair receipts (#7468)
Cover bucket and root heal sweeps recording authoritative object outcomes only when storage receipts match the latched bucket incarnation.
Verify unavailable or stale receipt ownership keeps object repair execution intact while leaving canonical outcome proof as Unknown.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add EC8+4 heal restart evidence (#7469)
Register and wire Scanner/Heal background target restart and crash evidence cases for the 3x4 EC8+4 topology.
Validate the observed data/parity geometry in scanner-heal evidence receipts so multi-drive runs cannot satisfy the gate without proving EC8+4 metadata.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: verify replacement pool metadata repair (#7471)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover quorum and mixed repair receipts
Add focused oracles for transient quorum results that carry a matching receipt and for mixed grace plus repaired receipt batches. Only the repaired object may produce positive proof.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* heal: verify admin recreate pool metadata (#7474)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* heal: preserve merged result for duplicate submits
Keep same-request-id replay receipts accepted for the receipt API, but preserve the legacy submit_heal_request duplicate admission result as Merged.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): preserve EC84 restart semantics (#7478)
Keep the EC8+4 background restart lane on the graceful-stop path and assert clean-restart marker absence only for restart scenarios. This prevents the hard evidence gate from silently exercising the crash path when it claims restart coverage.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF snapshot torn successor recovery
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): write EC84 distributed restart oracle (#7481)
Bind the distributed EC8+4 restart evidence lane to a scanner/heal oracle artifact so release validation can consume the real nextest run instead of accepting only a passing test.
Require the registry to assert 8+4 erasure geometry for the three-node, four-drive case.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): harden MRF replay boundaries (#7483)
Reject journal records with unknown version-presence flags even when their CRC is valid, so rollback/future payloads cannot be accepted as known records.
Gate committed checkpoint cleanup by the writer owner captured from the replay source, preserving retained manifests from other owners inside the same sequence window.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): bind MRF manifest CAS dirsync recovery (#7482)
Cover the committed MRF manifest path through LocalDisk conditional CAS when the metadata directory fsync fails. The fixture proves the previous manifest anchor survives rollback, an unanchored first successor is removed, and the legacy MRF journal remains readable even while global durability is relaxed.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): derive evidence runner profile from registry (#7484)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require mixed-version evidence roles (#7485)
Tighten the Scanner/Heal release bundle checker so mixed-version, scoped-ACK, and rollback fields cannot reuse a generic versions list without proving the expected evidence role.
Require version lists to use source revision identities and include the tested source revision. Also require profile evidence fields to name the core profiling artifacts before release approval.
The release gate remains blocked until measured field evidence is present.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): publish committed MRF runtime checkpoints (#7490)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind profile artifacts in release evidence (#7487)
Require Scanner/Heal release bundles to attach every required profiling artifact to P1 profile evidence with relative paths, artifact formats, non-empty files, hashes, and optional per-artifact measurement-window checks.
Document the tightened release bundle profile contract and cover missing, tampered, and mismatched-window profile artifact regressions in the existing checker self-test.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden measured ABBA evidence claims (#7491)
Reject measured Scanner/Heal ABBA manifests whose mixed-version evidence uses the same baseline and candidate source revision or binary hash.
Require crash fault modes and profile artifact names to match the exact supported sets, rejecting missing, duplicate, and unknown values.
Update harness fixtures and regression coverage for same-build mixed-version claims and exact-set release evidence fields.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): group scanner heal evidence payload (#7494)
Group the EC8+4 Scanner/Heal evidence writer inputs into a typed payload so the distributed e2e crate stays within the clippy argument limit without weakening the lint.
The evidence writer still validates the same S3 bodies, physical shard census, process restart PIDs, and node listings.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF replay bundle fields (#7486)
Bind Scanner/Heal release bundle evidence for MRF durable replay to replay counts, retained responsibility anchors, and successor snapshot publication evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): profile EC84 evidence case runs (#7495)
Give Scanner/Heal evidence cases explicit runtime profiles so EC8+4 background restart and crash cases use their own object count, object size, and partial-progress timeout defaults instead of inheriting the legacy 4x1 case assumptions.
Expose the runtime profile in plan-only output and cover every registry case in the script self-test.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): reject empty release evidence artifacts (#7496)
Require Scanner/Heal release bundle artifact paths to resolve to non-empty files before hashing them.
Cover empty hard-gate artifacts in the existing release bundle checker self-test and keep profile artifact size checking on the shared artifact boundary.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require G14 same-window field coverage (#7489)
Tighten the Scanner/Heal release bundle checker so G14 same-window evidence must name the EC8+4, multi-set, and multi-pool fields covered in that measurement window.
Keep the release gate blocked when same-window evidence omits one of the required G14 fields, without changing production runtime behavior.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require two-hour measured ABBA windows (#7493)
Reject measured Scanner/Heal release ABBA manifests and summaries whose evidence window is shorter than the W21 two-hour release requirement.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF idle checkpoint cleanup (#7497)
Add a runtime cleanup regression test that publishes both retained replay and runtime committed checkpoints, writes scoped and legacy journals, and verifies idle cleanup removes every recovery anchor from the registered local disks.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(e2e): ignore untracked files in build identity (#7498)
Align e2e_test build provenance with Scanner/Heal evidence receipts and server binary provenance by treating only tracked source changes as dirty.
This prevents unrelated untracked worktrees or evidence directories from causing compiled test identity mismatches before real evidence cases can run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF disk-full evidence fields (#7499)
Require the Scanner/Heal release registry and bundle checker to carry explicit G08 MRF capacity, disk-full, and replica-loss evidence fields before release approval can pass.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind release JSON artifact provenance (#7500)
Require scanner/heal release evidence JSON artifacts to repeat their measured source revision, run identity, measurement window, gate, and field identity inside the artifact payload. This keeps a refreshed outer bundle hash from accepting stale summary or profile JSON from another run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF rollback mirror filtering (#7501)
Add a regression oracle that keeps scoped-only MRF responsibilities in the authoritative runtime snapshot while omitting them from the v1 legacy rollback mirror.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require segment activation evidence (#7504)
* test(scanner): require segment activation evidence
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): cover activation proof inputs
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF crash matrix cases (#7505)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require release bundle domain evidence (#7502)
Reject scanner/heal release bundles that omit field-level domain evidence for scoped ACK, durable intent, mixed-version, scheduler pressure, profile cost, and two-hour pressure lanes.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF retention GC evidence (#7506)
Require P4 retained-responsibility release bundle evidence to list the retained replay anchor and idle cleanup cases, prove a two-hour retention window, and record both idle cleanup and verified-proof discharge observations.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF cleanup GC soak evidence (#7507)
Require the P4 release bundle to carry measured cleanup/GC soak evidence for retained MRF replay responsibilities. The bundle now needs a two-hour cleanup window, exact cleanup case coverage, observed verified idle GC, and zero pending responsibilities or stale journals after GC.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF disk-full commit anchors (#7509)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): report port allocator bind errors (#7510)
Surface the scanned port window, attempt count, and last bind error when the e2e port allocator cannot reserve a localhost port. This keeps Scanner/Heal evidence failures actionable when the environment blocks binds before business assertions run.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(sse): resolve 1.0.0 SSE/KMS blockers and P1 findings (#7511)
* fix(sse): resolve bucket default encryption per request
PUT and the POST-object/extract path resolved a bucket's default
encryption with a hard-coded "no explicit SSE-C" flag, so the default was
layered onto a request that already carried an SSE-C header triple and
then tripped that request's own mutual-exclusion check. Every bucket with
default encryption refused SSE-C single PUTs with 400 InvalidArgument,
while CreateMultipartUpload on the same bucket succeeded because it
resolves SSE elsewhere. Both call sites now derive the flag from the
request headers, as COPY already did.
The bucket default's KMS key id was also inherited independently of the
effective algorithm, so an explicit AES256 request against an aws:kms
default bucket produced a self-contradictory algorithm/key-id pair and
was rejected. The key id is now inherited only when the effective
algorithm is aws:kms, matching the storage-layer resolver.
Refs backlog#2368 B1, B2.
* fix(sse): refuse SSE-KMS without a running KMS service
A write requesting aws:kms on a node with no KMS service fell back to the
node-local SSE-S3 provider: the data key was wrapped with
RUSTFS_SSE_S3_MASTER_KEY while the object metadata still recorded
aws:kms and the requested KMS key id. The stored object claimed a KMS
protection it never had, under a key that was never consulted, and no
signal distinguished it from a genuine SSE-KMS object.
The managed-encryption path now asks the resolved DEK provider whether it
wraps with a node-local master key and refuses SSE-KMS in that case:
InvalidRequest when KMS was never configured, ServiceUnavailable when a
configured service is not running. The check sits after the per-key
authorization gate so an unauthorized caller still receives AccessDenied
whatever the KMS runtime state is, and asks the provider rather than a
parallel availability signal because the provider is what actually wraps
the key. A missing master key no longer answers an SSE-KMS request with
an SSE-S3-worded configuration error.
The SSE-S3 local fallback is unchanged.
Refs backlog#2368 B4.
* fix(ecstore): restore and archive tiers in stored coordinates
Multipart restore addressed the remote tier in plaintext coordinates
while the copy-back reads the stored representation. Each part received a
misaligned slice of the remote object whose length still satisfied the
range, the hash reader and the completion size check, so the restore
reported success and silently replaced the object's bytes. Encrypted and
compressed multipart objects were both affected. Restore now accumulates
stored part sizes, passes the stored length to the hash reader alongside
the plaintext length, and validates against the stored size.
The copy-back digests stored bytes, so its computed MD5 is not the
object's public ETag. Restore now preserves the object ETag on both the
single-part and multipart paths, and gives each restored part its own
recorded part ETag rather than the object-level value.
Transition also handed the tier the object's SSE headers and its
RustFS-wrapped data key as request headers. Any S3 target rejected an
SSE-C archive outright, an SSE-KMS archive asked the target to encrypt a
second time under a key id it does not own, and the wrapped DEK left the
cluster. The archive request now strips every SSE header and encryption
marker with the predicate the replication path already uses; the local
xl.meta keeps all of it, so read-through and restore are unaffected.
Objects restored by an affected release are not detected or repaired
retroactively and must be re-restored from the tier.
Refs backlog#2368 B3, B5; backlog#2369 P7.1.
* fix(rio): lock the v1 nonce layout within a segment
Decrypting a v1 segment tried three historical nonce layouts per frame,
independently for every frame. The last of them exists for streams
written before 1.0.0-alpha.91, which reused a segment's part nonce for
every block in it; because block zero's derived nonce equals that base
nonce, a frame encrypted at index zero authenticated at any position. An
attacker able to rewrite the underlying shards could replay it and have
the forged plaintext returned with 200 and an unchanged length. Shard
integrity uses a keyed-hash-free checksum, which such an attacker can
recompute, so it is not a barrier.
A segment now locks onto whichever layout decoded its first non-zero-index
frame and rejects any later frame needing a different one. That leaves one
residual shape: a stream built purely from repeats of frame zero has no
later frame to disagree. New RUSTFS_ENCRYPTION_LEGACY_NONCE_FALLBACK
(default true, so pre-alpha.91 objects keep decrypting) drops the third
layout entirely when set to false, which closes it. Turning it off refuses
pre-alpha.91 objects, so migrate them first by rewriting in place.
Refs backlog#2369 P2.
* fix(kms): reload a service that failed to start
POST /rustfs/admin/v3/kms/reload short-circuited whenever the persisted
configuration matched the in-memory one byte for byte. A node whose KMS
failed to start keeps that configuration and sits in Error, so the
documented recovery call returned "reloaded successfully" while leaving
the node down. Peers reached the same path through the reload broadcast,
so a cluster that lost Vault during a rolling restart had no working
recovery route other than the node-local start endpoint. Reload now
short-circuits only for a service that is actually running, and otherwise
reconfigures, which starts a service that is not running.
The AWS backend also advertised key-version enumeration through
kms/status, which its own documentation says it cannot do; the capability
and its golden snapshot now say false.
Refs backlog#2369 P1, P7.3.
* docs: record the SSE and KMS changes for 1.0.0
The Unreleased changelog section carried no entry for any encryption work
merged since 1.0.0-rc.5, including three items with operational impact:
the config-secret variable whose absence persists secrets in cleartext
with only a warning, the v2 frame write switch and its rolling-upgrade
constraint, and per-key authorization making a public bucket incompatible
with SSE-KMS objects. Adds those plus this batch, including the SSE-KMS
refusal as a breaking change with both routes out.
Also corrects four places where documentation contradicted the code: the
cleanup register still called encrypted range seek opt-in after its
default flipped, the Helm README claimed vault_mount_path only applies to
Transit while the template also feeds the KV2 mount, the disaster-recovery
drill listed bundle contents for backends whose export is refused with
501, and the Chinese README capability table predated most of the feature
set. Documents the SSE-S3 local master key as a first-class operational
mode with its rotation dead end, and what the v1 frame layout does and
does not authenticate.
Refs backlog#2369 P5.
* fix(kms): classify data-path KMS failures by what the caller can do
Only "key not found" and a backend outage were classified; every other
KMS failure that reached the S3 data path fell through to
500 InternalError with a generic message. A disabled or pending-deletion
key, a denied KMS grant, an encryption-context mismatch, an unsupported
algorithm, a credential or timeout failure, and a capability the
configured backend does not have all looked identical to a server fault.
SDKs therefore applied exponential backoff to configuration errors no
retry can fix, and monitoring counted every one of them against the
server's own error rate.
Unusable-key and request-side failures now answer 400, a denied grant
403, transient backend failures 503, and a missing backend capability
501. Damaged, unreadable, or unknown-format key material keeps its 500:
it is a server-side integrity fault, and existing tests pin it.
The classifier is deliberately separate from the admin lifecycle
mapping, which answers 404 for a missing key because there a key id is
the resource being addressed; on the data path it arrives inside a
request header or a bucket default. Messages either name what the caller
asked for or stay generic, with deployment-side detail left on the error
source the way the storage-IO mapping already does.
Refs backlog#2368 B6.
* fix(kms): track and renew static Vault tokens
Token authentication hard-coded "this token carries no lease", so the
renewal task never started, the remaining-TTL gauge was never published,
and nothing looked wrong. `vault token create` grants a 768-hour TTL by
default, so a cluster that had been healthy for a month turned every KMS
call into a 403 and could not recover without a restart or a
reconfigure. Production configuration validation only rejects the
literal dev-token, so an ordinary expiring token reaches a whole cluster.
The source now reads `auth/token/lookup-self` at login and adopts what
Vault reports. A token with no expiry behaves exactly as before. An
expiring renewable one is picked up by the existing renewal loop and
renewed at half TTL like every other auth method. An expiring
non-renewable one warns with its remaining lifetime and publishes the
gauge, so the fail-closed window is visible before it arrives.
The probe never fails the login: a policy that omits lookup-self, or a
Vault that is briefly unreachable, warns and falls back to exactly the
previous behaviour rather than taking down a deployment that works
today. The scripted Vault test double answers the lookup out of band so
existing scripts keep describing only the protocol under test.
Refs backlog#2369 P3.
* feat(sse): report SSE-C requests that arrive without TLS
An SSE-C request carries the customer's AES key in a request header, so
AWS S3 and MinIO both refuse one that did not arrive over TLS. RustFS
accepted them on any transport: a plaintext hop hands the key to anyone
on the path, and since the object cannot be read without that same key,
the exposure lasts as long as the object does.
Refusing outright is the correct end state but not a safe default to
adopt inside a release window, because the project's own s3-tests and
e2e lanes and most staging deployments speak plain HTTP. This release
reports instead: each such request increments
rustfs_ssec_plaintext_requests_total and logs one warning per process, so
an operator can confirm nothing would break before the default flips.
RUSTFS_SSE_C_REQUIRE_TLS=true opts into the AWS 400 now.
The verdict is per connection rather than per deployment: the layer is
built with whether this listener terminated TLS, and additionally accepts
an https protocol forwarded by a proxy the trusted-proxy configuration
already vetted. It sits beside the rate limiter, after the layer that
makes a forwarded protocol trustworthy and after the request context, so
a rejection can echo the request id.
Refs backlog#2369 P7.2.
* fix(kms): say what a node-local backend means for a cluster
The Local backend keeps key material on each node's own disk and
generates its Argon2id salt per node, so two nodes derive different keys
from the same master_key and an object encrypted on one node cannot be
decrypted on another. Behind a load balancer that surfaces as
intermittent 500s on reads that succeeded moments earlier, with nothing
tying the symptom to the cause: the only signal was a generic
"development, testing and demos only" positioning warning that says
nothing about what actually breaks.
Configuring or reconfiguring Local while the deployment is distributed
now logs a dedicated event and appends the consequence to the configure
response, so the operator who made the change sees it. The product
decision to warn rather than refuse is unchanged.
Refs backlog#2369 P7.4.
* docs: record the remaining SSE and KMS changes for 1.0.0
Adds changelog entries for the KMS data-path status classification, the
Vault static-token lease probe, the SSE-C plaintext-transport report and
its switch, and the node-local backend warning.
Documents two things the backend security guide never stated: that SSE-C
belongs on a secure transport, with the counter and switch to plan the
change around, and that the Local backend cannot be shared by a
multi-node deployment because each node derives different keys from the
same master key.
Refs backlog#2368 B6; backlog#2369 P3, P5, P7.2, P7.4.
* fix(kms): report an unreadable key store as an outage on the S3 path
A backend now distinguishes a key store it could not read from a key
that is genuinely absent, but the S3 boundary collapsed the first one
back onto 500 InternalError through the fallthrough for integrity
faults. The distinction was therefore invisible to the client: a
temporary key-directory outage looked exactly like a permanently damaged
key record, and neither the status nor the metric said the request was
worth retrying.
An unreadable key store joins the retryable class and answers 503, next
to a backend error and a credential failure. Damaged, unreadable or
unknown-format key material keeps its 500.
Refs backlog#2368 B6; builds on rustfs/rustfs#7470.
* test(storage): cover MRF cleanup delete ENOSPC anchor (#7513)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require heal retry stats evidence (#7514)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add release bundle dry-run fixture (#7515)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): confirm recovery intent accept readback (#7516)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require MRF cleanup delete ENOSPC evidence (#7518)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require bounded retry window evidence (#7517)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): emit scanner heal G09 upgrade evidence (#7519)
Record measured Scanner/Heal G09 evidence artifacts from the upgrade compatibility lanes when a fresh evidence directory is provided.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): persist MRF rollback mirror boundary (#7520)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G09 upgrade evidence runner (#7522)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(scanner): add G09 upgrade evidence runner
Add a reusable Linux x86_64 runner for the Scanner/Heal G09 mixed-version and rollback upgrade evidence lanes.
The helper reads the pinned previous-release asset metadata from the upgrade workflow, verifies the downloaded binary, builds the current head, runs both ignored E2E tests, and fails unless the expected G09 JSON artifacts exist.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): implement V2 evidence preflights (#7523)
* feat(scanner): wire dirty usage producer identities
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add segment activation preflight proof
Keep scanner segment reuse behind a structured activation preflight so release evidence can prove the production gate remains disabled until every producer, generation, overflow, cold-oracle, and distributed invalidation check is satisfied.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): expose distributed invalidation evidence
Record an explicit distributed segment invalidation evidence summary when remote dirty usage snapshots are bound to the current activity window and the authenticated scoped ACK capability probe succeeds.
Reject peer dirty usage snapshots that contradict the peer activity pending bit so scoped ACKs fail closed instead of clearing an unadvertised remote mutation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): assemble release evidence bundles (#7526)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G09 upgrade evidence runner (#7524)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(scanner): add G09 upgrade evidence runner
Add a reusable Scanner/Heal G09 runner for Linux PR-head validation. The script downloads the pinned previous release, builds the current checkout, runs the mixed-version and rollback upgrade E2E lanes, and validates the measured raw artifacts before they can be consumed by the release bundle gate.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): replay recovery intents while disabled (#7521)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): preflight G09 evidence disk space (#7527)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* fix(targets): reject trailing batch items (#7508)
* test(scanner): preflight G09 evidence disk space
Fail the Scanner/Heal G09 upgrade evidence runner before downloading or building when the validation host does not have enough free space for a full raw evidence pass.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): respect cargo target dir in G09 runner (#7528)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* fix(targets): reject trailing batch items (#7508)
* fix(scanner): respect cargo target dir in G09 runner
Write the RustFS feature stamp under the resolved Cargo target directory so remote validation hosts with CARGO_TARGET_DIR set can reuse the built PR-head binary.
Extend the runner plan/self-test path to cover relative target-dir resolution.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): add G09 upgrade evidence runner (#7525)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* test(e2e): add G09 upgrade evidence runner
Add a Linux x86_64 runner that downloads the pinned previous release, builds the current RustFS binary, runs the mixed-version and rollback upgrade compatibility lanes, and verifies the required Scanner/Heal G09 raw evidence artifacts.
Document the runner and add a shell self-test for help, dry-run, SHA validation, and non-empty artifact directory guards.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): emit G09 release bundle gate evidence (#7530)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)
* fix(replication): close GA blockers from backlog#2366
Implements the P1 set from the pre-GA replication audit:
- Replication rule tag filters now require every And.Tag to match, replacing
the s3s OR semantics with a local AND matcher that fails closed on a
malformed tag.
- A replicated group membership change no longer writes the group status, so
a membership update carrying the default Enabled status cannot silently
re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
carries its own ilm-expiry override, and no longer blocks a remove that
drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
support boundary section, and the Replication changelog section.
* fix(site-replication): resume only a locally driven endpoint refresh
The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.
Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.
* fix(site-replication): keep an explicit disabled group status on a snapshot
Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.
The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.
* fix(site-replication): schedule the import snapshot without recording a failure
`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.
Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.
* fix(admin): stop reporting replication failures as retries
`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.
* perf(site-replication): aggregate failure windows without cloning bucket stats
`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.
It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.
* fix(site-replication): reject a conflicting ilm-expiry override on a re-run
The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.
* fix(admin): do not fail a remote-target write on a peer reload error
set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.
* fix(site-replication): undo every bucket a cut-short refresh rewrote
When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.
* fix(site-replication): keep replay running while an endpoint refresh is pending
A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.
* test(e2e): cover the AND semantics of a two-tag replication filter
The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.
No new test function, so the nightly selection digest is unchanged.
* refactor(site-replication): fold the refresh state-change error into one constructor
The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.
* fix(site-replication): report a peer whose IAM snapshot waits for a repair
An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.
* docs(operations): state the group-status and escalation convergence limits
Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.
* fix(ci): bind performance runs to selected inputs (#7512)
* fix(targets): reject trailing batch items (#7508)
* test(scanner): emit G09 release bundle gate evidence
Write a bundle-ready G09 gate descriptor from the Linux upgrade evidence runner and validate the single G09 gate with the shared release-bundle rules without approving the full Scanner/Heal release.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): reject invalid G09 runner test selection (#7531)
Validate the selected G09 evidence lane before process-substitution case expansion so --plan-only cannot turn an unknown --test value into an empty successful plan.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): keep G09 source binary path clean (#7532)
Keep checksum verification output out of the command substitution that resolves the previous-release binary for the G09 runner.
Also tolerate non-GNU sha256sum in local self-tests by falling back to shasum when GNU --check support is unavailable.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover MRF replay proof cleanup (#7534)
Exercise the committed MRF replay checkpoint path with a real ECStore-backed bucket incarnation, retain the replay anchor until an exact verified proof arrives, then delete the proof-discharged checkpoint and prove a subsequent restart does not resurrect the replayed work.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): carry segment activation preflight evidence (#7535)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): surface cold segment reuse oracle (#7536)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require hard evidence artifact payloads (#7537)
Require Scanner/Heal release bundle JSON artifacts to carry hard-domain evidence fields for mixed-version, crash, capacity, disk-full, replica-loss, and MRF cleanup gates. This prevents a descriptor from approving a hard gate while pointing at a generic measured artifact that lacks the boundary-specific oracle fields.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): bind producer evidence to dirty generations (#7538)
Record scanner segment producer identities with the dirty usage generation they invalidated, then expose a cycle-local producer evidence snapshot for segment reuse activation preflight.
Production activation remains fail-closed until durable producer identity and restart-gap proof are available.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): persist segment invalidation proof metadata (#7539)
* test(scanner): wait for EC8+4 heal control readiness (#7540)
* test(scanner): list full P4 release evidence fields (#7542)
Align the Scanner/Heal release requirement registry with the release bundle gate for P4 so the closure checklist advertises MRF scale, replay cost, retained responsibility, and cleanup/GC soak evidence together.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add W16 release evidence runner (#7543)
Add a W16 Scanner/Heal evidence runner that executes the recovery-intent crash-boundary and quota-authority lanes, emits measured G04/G12 JSON artifacts, and validates the resulting single-gate release descriptors.
Wire its shell self-test into script-tests and document the release evidence entry point.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix: address release acceptance regressions (#7541)
* feat(scanner): admit durable segment proof replay (#7544)
* feat(scanner): admit durable segment proof evidence
Validate complete set snapshot segment invalidation proof metadata against the current dirty usage generation window and scanner process epoch before clearing durable producer and restart-gap activation blockers.
Production segment reuse remains gated by the explicit activation flag.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): replay segment proof from root snapshots
Carry segment invalidation proof metadata into root snapshot set states so a complete published baseline can replay the durable producer evidence recorded by each set cache.
Keep the field additive for older readers and leave incomplete or LKG set states unproven.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind MRF release artifacts to evidence kinds (#7545)
Require Scanner/Heal G07/G08/P4 JSON artifacts to declare the exact MRF evidence kind expected for each release-bundle field. This keeps generic measured JSON from satisfying durable replay, ENOSPC, replica-loss, scale, replay-cost, retained-responsibility, or cleanup-GC soak gates.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): enable segment reuse activation gate (#7546)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): run scoped fallback cases on dedicated stack (#7550)
Linux libtest defaults can abort these deep EC-store futures before the assertions run. Wrap the async scoped fallback cases in the repository's dedicated-stack test pattern so the default cargo test path exercises the oracle directly.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): roll out distributed e2e selection (#7549)
Refresh the committed e2e-distributed selection digest after the EC8+4 Scanner/Heal evidence case joined the profile, and document the registry-aware runner entry for the distributed case.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add W13 MRF evidence runner (#7547)
Add a W13 durable MRF evidence runner that emits measured G07, G08, and P4 JSON artifacts and release descriptors through the existing scanner/heal bundle gate.
The runner now executes the ignored MRF replay evidence test with an exact full test path, validates raw artifact kinds and gate decisions, prepares Linux tmpfs-backed ENOSPC roots for G08, and documents the Linux/long-soak boundaries.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): fix segment proof fixtures
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(heal): reduce W13 evidence helper arguments
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* ci(test): enable local KMS for s3 compatibility tests (#7553)
Configure the s3-tests harness with a local KMS key so SSE-KMS cases run in CI without relying on an external KMS service.
Also move the anonymous POST default SSE-KMS regression onto the shared local KMS test environment.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bind segment proof to typed dirty suffix (#7564)
Track producer identity completeness per pending bucket and retain process coverage across durable acknowledgements. Admit a prior same-process segment proof only for an exact or strictly earlier fully typed generation window.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): validate scoped ACK clear receipts (#7563)
Fail closed when a signed scoped ACK response claims more cleared entries than its request contained, while preserving partial-clear semantics and zero-mutation capability probes.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bind cold scoped cache reuse (#7565)
Record an explicit cold bucket reuse proof for scoped set scans and treat fully cold sets as valid cold-zero-walk reuse when the baseline and bucket incarnations are bound.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(s3): preserve delete marker read error headers (#7558)
* chore(release): sync configurable nightly build workflow from main (#7567)
feat(nightly): make the build branch configurable (NIGHTLY_BRANCH var + dispatch input) (#7557)
* docs(obs): correct metric export interval and explain alert timing (#7571)
* fix(heal): persist scoped admin admission handoff (#7569)
* fix(heal): persist root admission handoff
Persist administrator root heal ownership before queue publication so crash restart can replay an admitted control-plane start without relying on process-local replay cache state.
Protect queued durable root owners from priority displacement; callers must use forceStart cancellation semantics to replace them.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): persist admin heal handoff types
Extend durable admin heal admission handoff beyond cluster roots while preserving legacy root recovery records. Persist the heal type in schema v2, replay typed admin requests after restart, keep non-admin requests out of the durable control-plane handoff, and allow path cancellation to clear durable-only non-root records.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): preserve disjoint durable admin owners
Limit admin forceStart durable-owner cleanup to overlapping heal requests after the admin recovery journal begins storing non-root work. Add fail-closed and displacement tests so durable bucket owners cannot be silently dropped by unrelated replacement or priority pressure.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* fix(heal): persist admin terminal receipts
Persist terminal receipts for durable administrator heal starts before retiring their pending intent so restart can answer completed or cancelled scoped tasks without replaying them.
Retain pending work when terminal publication fails and keep timeout owners on checkpoint-only replay semantics.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): mark committed replication and tier mutations (#7568)
* fix(scanner): mark committed replication and tier mutations
Bridge ECStore committed replication status writebacks and lifecycle tier expiration cleanup into scanner dirty-usage producer identity tracking. Only successful replication metadata updates mark Replication; validate-only, superseded, and retry paths remain unmarked.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* feat(scanner): replay durable dirty producer records
Add a strict scanner dirty-usage producer replay schema that can restore typed producer coverage after restart without treating ordinary process-local mutations as durable evidence. Replay records validate schema, cache key format, generations, scopes, producer identities, duplicate buckets, byte limits, and entry limits before modifying dirty state.
Keep segment activation fail-closed unless the restored bucket state came from durable replay; subsequent local mutations clear the durable authority bit for that bucket. Also fix the release scanner clippy lint in scoped cold-reuse proof creation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): recover expansion buckets and resume retirement (#7574)
* fix(ecstore): recover partially created expansion bucket volumes
* fix(ecstore): resume retirement after startup safety checks
* fix(ci): align S3 KMS fixtures and default key expectations (#7573)
* fix(heal): prune retained root terminal receipts (#7576)
Bound durable root-heal terminal receipt retention to the completed-status TTL while keeping expired receipts authoritative enough to retire stale pending intents before deleting the receipt itself.
Add a budgeted background GC pass and fail closed on corrupt or non-terminal receipt records.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(storage): preserve retryable publication guard errors (#7561)
* fix(storage): preserve retryable publication guard errors
* fix(scanner): satisfy scoped cache clippy lint
Use bool::then_some for the scoped cold bucket reuse proof construction after merging the latest release branch.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(health): report storage quorum in node readiness (#7566)
* fix: preserve scanner backlog during pool retirement (#7555)
* fix: hand off native scanner backlog before pool retirement
* test: initialize optional proof in data usage fixtures
* perf: bound parallel V3 pool metadata phase writes
* test: keep native backlog fault errors typed
* test: skip unchanged pool metadata in crash barriers
---------
Co-authored-by: cxymds <cxymds@gmail.com>
* test(scanner): bind profile artifact provenance (#7577)
* fix(scanner): persist dirty producer journal (#7580)
Persist scanner dirty producer replay records from committed replication and tier mutations, hydrate journal state on restart, and clear durable records only after acknowledged dirty generations.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test: add scanner heal scheduler pressure evidence (#7584)
Add measured G10/P1/P3 scheduler-pressure release descriptor generation, ABBA scheduler/profile provenance, and focused self-tests for the release bundle gate.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test: add scanner heal G14 multiset evidence (#7583)
Add EC8+4 multi-set and multi-pool scanner/heal release evidence coverage, including e2e registry cases, oracle checks, and a G14 descriptor assembler for measured case artifacts.
Signed-off-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(nightly): push assets with plain git on release — the build fleet has no gh CLI (#7586)
fix(nightly): push assets with plain git — the build fleet has no gh CLI
The sm-standard-4 runners used by the nightly build have no gh binary
(functional-chain workflows run elsewhere, on the jumpbox). The assets
publish step died on 'gh: command not found' at the credential-helper
setup, and the preceding clone failure had been masked by 2>/dev/null,
misleading the step into the orphan path. Swap clone and remote setup
to plain git with the token embedded in the URL; push semantics are
unchanged.
* fix(scanner): stabilize retired backlog survivor commits (#7585)
Treat an authoritative scanner pause-backlog commit as stable when every member in that commit stores the matching stable and committed record. Retired source replicas can remain missing in the observed topology while survivor membership is already stable.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(metrics): prevent duplicate drive reporting across nodes (#7582)
Co-authored-by: houseme <housemecn@gmail.com>
* fix(ecstore): avoid Windows batch-delete cleanup sharing conflicts (#7579)
Co-authored-by: houseme <housemecn@gmail.com>
* feat(ilm): inspect legacy transition version state (#7581)
* test(scanner): add release evidence ingestion gates (#7588)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix: reuse admin error boundary for legacy tier reconciliation (#7587)
* fix(test): stabilize release CI heal fixtures (#7589)
Keep heal admission-only tests off durable root recovery so mock storage does not require local metadata disks. Align forceStart retry assertions with replacement semantics and fix the e2e metric clippy collapse.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)
Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).
- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
the 'nightly' release via the REST API, deletes same-name assets,
uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
body with the build provenance (ref@sha, run link, sizes, SHA256).
Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
exercised end-to-end against the real release with probe files
(create / upload / overwrite / download round-trip / body update).
* test(scanner): add release bundle evidence descriptors (#7595)
* test(scanner): merge release evidence descriptors
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add authority and legacy release descriptors
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add scoped ack release descriptor
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): require all release evidence fields
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add mrf release descriptor producer
Add a standalone W13 MRF descriptor producer for measured G07/G08/P4 raw artifacts, with fail-closed self-tests for missing responsibility cases, disk-full ENOSPC observations, synthetic artifacts, and short P4 cleanup soaks.
Also bind G12 quota path evidence to explicit case lists so W16 descriptors cannot pass without reset and settlement coverage.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(scanner): reuse mrf release descriptor producer
Route the W13 runner through the shared MRF descriptor producer so measured runs and offline re-packaging use the same fail-closed validation.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* feat(ilm): backfill proven legacy transition state (#7591)
* feat(ilm): backfill proven legacy transition state
* fix(ilm): remove redundant reconcile test clone
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(ecstore): remove redundant transition clone (#7597)
Drop an unnecessary clone in the legacy transition state digest regression so release CI clippy lanes can run with warnings denied.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): seed current backlog members before committing (#7594)
* fix(scanner): seed current backlog members before committing
* test(app): run recursive force delete test on large stack
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind raw profile artifacts (#7598)
Require Scanner/Heal release profile wrappers to carry bundled raw profile artifacts plus the matching profile cost metrics.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): surface first failed object in status (#7599)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(heal): cover retry budget across attempts (#7600)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden durable producer evidence gate (#7601)
Require Scanner/Heal G11 maintenance evidence to prove durable dirty producer journal replay, replay-state hydration, generation-bound ACK clearing, and invalid journal fail-closed cases before segment reuse can be activated.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): harden scoped ack evidence proof (#7602)
Require Scanner/Heal G03 scoped ACK evidence fields to carry their own measured provenance and concrete ACK, capability, and mixed-peer observations before release-bundle gate verification.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind status outcome raw provenance (#7603)
Require measured G05/G06/R-D raw status, compatibility, and disposition artifacts to share run identity before producing release bundle descriptors.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(heal): retry fully recoverable batch failures (#7604)
Allow recursive bucket and cluster heal attempts whose retained batch failure is entirely retryable to use the existing bounded manager retry budget. Permanent or mixed batch failures remain terminal so heal outcome semantics stay strict.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): avoid movement debt for stale remote lease (#7605)
Classify a final remote scanner publication lease validation failure from a fresh activity snapshot instead of treating every validation error as data movement. If the peer session and movement generation still match the granted leases and publication is otherwise allowed, keep the publication rejected as an activity-baseline miss without creating pause backlog movement debt. Preserve DataMovement for expired leases, peer restarts, movement generation changes, and active publication blocks.
Tests cover namespace-only validation invalidation and the remote fence-loss cases that must still defer as DataMovement.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* chore(deps): refresh workspace dependencies (#7606)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bind G14 case artifacts (#7611)
Require Scanner/Heal G14 release bundle JSON wrappers to mirror their outer evidence and carry self-contained case artifact provenance.
Copy proof-json case artifacts into the generated G14 descriptor bundle so assembled release bundles can validate case file hashes after relocation.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): retry contended decommission cancel target locks (#7612)
* test: align transition fixtures and KMS context expectations (#7610)
* test(scanner): stabilize W13 release gate evidence (#7613)
* feat(nightly): publish packages as assets of the rolling 'nightly' release (sync from release) (#7593)
feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)
Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).
- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
the 'nightly' release via the REST API, deletes same-name assets,
uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
body with the build provenance (ref@sha, run link, sizes, SHA256).
Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
exercised end-to-end against the real release with probe files
(create / upload / overwrite / download round-trip / body update).
* test(scanner): stabilize W13 release gate evidence
Treat only real raw-entry windows as replayed scanner enumeration in the restart diagnostic, so final completion rounds without raw entries are not fail-closed as raw replays.
Allow the EC8:4 multi-pool heal evidence case to select an outage object key that routes to an online pool while an entire target pool is down, preserving strict behavior for single-pool cases.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bound native backlog fixture resources (#7609)
* fix(scanner): bound native backlog fixture resources
Keep native scanner backlog restart fixtures within low file descriptor limits by reducing the native-only disk layout, making fixture shutdown drain background work, and avoiding long-lived ECStore retention from background loops.
Convert ECStore-backed background refresh/recovery/monitor tasks to upgrade weak owners only while doing work so completed test stores release their disk graph before the next native fixture starts.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
* test(tier): refresh release-merged failure fixtures
Reuse the raw legacy-transition fixture helper so delete-all expiry actually exercises Unknown transitioned history metadata after the release merge.
Rewrite restore-failure disk fixtures through per-disk xl.meta snapshots so stale destination identities can be persisted without tripping ordinary metadata update guards.
Update the SSE KMS mismatch expectation to the InvalidRequest/context_mismatch behavior now returned by the rio-v2 path.
Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
---------
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ci): align release E2E gate and repair regression tests (#7607)
* fix(scanner): harden heal release gates (#7614)
* test(scanner): reject synthetic heal evidence inputs (#7617)
Harden the Scanner/Heal checkpoint restart and G14 EC evidence producers so release descriptors cannot be assembled from marked fixture, dry-run, or synthetic case inputs.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): collect status outcome raw evidence (#7618)
Normalize live Scanner/Heal status/outcome observations into the measured raw artifacts consumed by the G05/G06/R-D release descriptor producer.
Reject synthetic observations, incomplete required cases, and reused run/window identities before raw artifacts can enter the release bundle flow.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(scanner): bind scoped ack confirmation to generation (#7619)
Require lost scoped dirty-usage ACK reconciliation to observe a clean peer activity generation that covers the requested ACK generation. Apply the same guard in the scanner aggregation path so a stale clean activity snapshot cannot discharge pending maintenance after an uncertain ACK response.
Refs rustfs/backlog#2427
Refs rustfs/backlog#2281
Refs rustfs/backlog#2240
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test: report tier reference proof setup failures without hanging (#7608)
* test(scanner): plan Linux evidence validation (#7620)
Add a Scanner/Heal Linux release-evidence planner that emits a machine-readable execution manifest for the remaining measured validation lanes.
The planner can run only lightweight preflight checks and keeps plan-only output distinct from measured release evidence.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): select G14 replacement drive by evidence (#7622)
Choose the replacement disk from the target node by the presence of complete pool metadata instead of assuming the first configured drive is the scanner metadata holder. This keeps the G14 multi-set harness aligned with multi-drive EC layouts and adds clearer diagnostics when multi-pool outage writes fail closed.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): report Linux evidence plan status (#7624)
Add a status mode for the Scanner/Heal Linux evidence planner so operators can identify missing or incomplete artifacts before final bundle assembly.
The status output stays plan-only and never reports release approval.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): add G14 multi-pool background heal evidence (#7628)
test(scanner): align G14 multi-pool outage evidence
Treat the localhost multi-pool topology as whole-pool loss when the target node is down. If that topology cannot admit the outage object while the pool is offline, defer that object write until the pool rejoins and record the oracle marker instead of failing before the real crash/restart evidence runs.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): verify deferred multipool outage evidence (#7629)
Validate the G14 multi-pool oracle field that records down-window outage PUT refusal and requires the deferred post-rejoin outage object to be accepted and checked through S3.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): allow metadata snapshots at read quorum (#7627)
fix(ecstore): admit metadata snapshots at read quorum
Allow guarded bucket metadata snapshot existence checks to use read quorum so degraded erasure sets can continue Object Lock snapshot reads without weakening bucket mutation or object write quorum.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* chore(deps): refresh release dependencies (#7632)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* fix(ecstore): use pool lock quorum for set writes (#7630)
Use the pool-wide namespace lock client domain for every set in a pool so degraded EC8+4 multi-set writes are gated by node-level lock quorum instead of the narrower per-set endpoint host slice.
Keep namespace-lock domain deduplication tied to both the pool namespace and shared clients, and add regression coverage for three-locker degraded writes plus cross-pool domain separation.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): keep G14 multi-set restart graceful (#7633)
test(e2e): keep multi-set restart graceful
Include the EC8+4 multi-set restart scenario in the graceful interruption lane so the unclean-shutdown marker assertion matches the scenario semantics.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(e2e): record deferred G14 outage writes (#7637)
Include optional outage-write diagnostics in G14 evidence oracles so deferred multi-pool outage writes bind their down-window refusals and post-rejoin acceptance.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
* test(scanner): bound G14 multi-pool evidence size (#7640)
Keep the multi-pool evidence runner within the registry object budget while retaining deferred outage-write diagnostics for release-gate validation.
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
---------
Signed-off-by: houseme <housemecn@gmail.com>
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
* fix(replication): total-order rule sort and honor V1 top-level Prefix
Rule matching had two defects from the pre-GA replication audit
(rustfs/backlog#2367 C-1 and C-2):
- The actionable-rule sort compared same-destination rules by priority but
answered Equal for any other pair, which is not a total order; the
standard library sort panics on such comparators once a slice exceeds the
insertion-sort threshold, so an object matching more than 20 enabled rules
across two or more targets could panic the PUT or DELETE task. Rules now
sort by priority descending with destination and id as tie-breakers, and
filter_target_arns preserves that order instead of draining a HashSet.
- A V1 rule written without a <Filter> carries its prefix at the top level;
that field was never read, so <Prefix>logs/</Prefix> matched every object.
ReplicationRuleExt::prefix now falls back to it, with a <Filter> keeping
precedence. The existing prefix fixtures were built this way and had been
asserting nothing.
* fix(admin): advertise data-usage and listen capabilities to rc
The rc client gated `rc du` and `rc watch` on a pinned contract that
matched server versions by the string prefix `1.0.0-rc.`; a server that
reports `1.0.0` no longer matches, and the dynamic `advertised` list did
not carry either name, so `rc du` against a GA server fails with an
unsupported-capability error (rustfs/backlog#2367 E-2).
Advertise `admin.data-usage` from the admin route inventory like the IAM
entries, and `listen_notification` for the bucket `?events=` extension
route the admin router dispatches. The client merges advertised entries
ahead of its pinned contract, so no version sniffing is needed.
* fix(site-replication): stop notifying the local site on remove and rotate
The pending-remove and pending-rotation notification loops skipped the
local site by endpoint only, while finalization identifies it by
deployment id or endpoint. The reconcile tick resolves the local peer from
the node's own listen address (and a handler from the request Host), so
`remove --all` dialed the site's registered endpoint, waited out the
request timeout against the lifecycle lock it was holding, and answered
`Partial: failed to notify 1 peer(s)` for a removal that had succeeded
(rustfs/backlog#2367 A-4, backlog#2195 item 3).
Both loops now iterate the peers still awaiting notification through one
helper that applies the finalization identity.
* fix(site-replication): promote and settle IAM retries without a tick of slack
Two retry-queue behaviours kept an IAM change from converging for ten to
twenty minutes after a peer came back (rustfs/backlog#2367 A-1 and A-3,
backlog#2305):
- The lightweight 30-second pass filtered its reachability probe to bucket
ops, so a backed-off IAM or bucket-metadata snapshot waited for the
600-second tick to notice the peer. It now probes every backed-off class
and still replays only bounded bucket ops; promotion is a state flip the
heavyweight tick acts on.
- Backoffs are multiples of the tick interval, so a failure stamped δ
seconds after a tick was 600 − δ old at the next tick and slipped a whole
extra interval. The heavyweight drain now evaluates backoff halfway to its
next tick.
- An IAM entry first created by a non-deletion failure (the add bootstrap's
snapshot send, the drain's own replay, an import-iam schedule) was never
stamped `deletions_recorded`, so a later recorded deletion could not
settle it and it escalated to the marker only `replicate repair` clears.
Entries created by this binary now start recorded; a row persisted by an
older binary keeps the escalation semantics.
* fix(site-replication): reload peer node caches after bucket wiring writes
Every S3 bucket-config write ends by asking the other nodes of the cluster
to reload the bucket's metadata; the site-replication writers never did.
On a multi-node site the node that ran the pairing (or applied a peer's
bucket-meta item) rewrote the bucket targets and the derived replication
rules on disk, while every other node kept serving its cached copy for up
to the 15-minute refresh. A `resync start` routed to such a node reported
every freshly wired bucket as `Config not found` and a bucket whose
operator target the pairing had replaced as `recorded remote target no
longer exists` (rustfs/backlog#2367 A-5, backlog#2195 item 2; functional
SITE-105).
Add one best-effort reload helper in the site-replication hooks and call it
after the bucket setup, versioning, peer bucket-meta apply, removed-peer
cleanup, make-with-versioning, and endpoint-refresh writes; the ensure
helpers now report whether they wrote so unchanged passes stay silent. The
resync manifest and start now read the persisted wiring instead of the
node-local cache, matching the target read the start path already did.
The new four-node e2e pairs two clusters and starts a resync through a
non-coordinator node right after pairing; it also covers an IAM user
created on a non-coordinator node converging to the peer site.
* test(e2e): cover delete-marker replication from a multi-node source
The functional suite reported delete markers created on a 3-node source
never reaching the target (rustfs/backlog#2195 item 4, REP-105). The report
was a probe defect, but the shape had no coverage: the existing
delete-marker e2e runs a single-node source. Pin it against a four-node
source replicating to a four-node peer and to a single-node target, with
the write and the delete issued through different nodes.
* ci(e2e): refresh the distributed selection for the new replication cases
Four distributed cases were added (two site-replication, two delete-marker
replication). The linux digest is derived from the last CI listing of the
lane (34 cases, matching the previous pin) plus the four new names; the
darwin digest is the local listing, which selects the same 38 cases.
feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)
Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).
- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
the 'nightly' release via the REST API, deletes same-name assets,
uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
body with the build provenance (ref@sha, run link, sizes, SHA256).
Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
exercised end-to-end against the real release with probe files
(create / upload / overwrite / download round-trip / body update).
2026-09-09 21:47:50 +08:00
2018 changed files with 566508 additions and 86035 deletions
Use when root `AGENTS.md` triggers adversarial validation or for a substantial PR
review. Paths below are repository-relative. The root finding standard and
completion rule apply; selecting a lens does not require finding a defect.
Use when root `AGENTS.md` triggers adversarial validation or for a substantial PR review. Paths below are repository-relative. The root finding standard and completion rule apply; selecting a lens does not require finding a defect.
Risk and review shape:
- **Exempt:** documentation, comments, formatting, or typos with no runtime,
build, test, or agent-execution effect.
- **Mechanical:** renames, moves, test/tooling-only changes, and agent-rule
changes. Run correctness and simplicity lenses.
- **Standard:** localized behavior changes. Run one integrated final-diff pass
covering correctness, simplicity, and test coverage; add only domain lenses
matched by the diff.
- **High risk / substantial PR review:** high risk includes locking,
persistence/fsync, IAM/KMS/auth, cryptography, on-disk/on-wire formats, and
S3-visible semantics. Cover all applicable lenses using exactly two
independent reviewers when delegation is explicitly authorized. Split the
lenses between them. Otherwise perform two fresh sequential passes.
- **Outbound client defaults:** what `TargetClient`, `PutObjectOptions`, or
the remote SDK configuration sends to every replication or migration target
is high risk for every target class even when the change fixes one. Follow
the SOP in `docs/postmortems/2026-09-03-replication-checksum-default-regression.md`:
run the outbound target matrix, document each new env knob in the same PR,
and list verified and unverified target classes in the PR Impact section.
- **Exempt:** documentation, comments, formatting, or typos with no runtime, build, test, or agent-execution effect.
- **Mechanical:** changes shown to preserve behavior, such as a symbol rename with unchanged callers or a file move with equivalent wiring. Run correctness and simplicity lenses. Classify tests, tooling, CI, and agent instructions by the behavior and authority they change, not their file type; deleting regression protection or changing failure propagation, publishing, or destructive actions can be high risk.
- **Standard:** localized behavior changes. Run one integrated final-diff pass covering correctness, simplicity, and test coverage; add only domain lenses matched by the diff.
- **High risk / substantial PR review:** high risk includes locking, erasure/quorum/heal, replication, multipart, RPC, lifecycle/tiering, persistence/fsync, IAM/KMS/auth, cryptography, on-disk/on-wire formats, and S3-visible semantics. Cover the applicable lenses from two perspectives: first trace the intended contract and implementation, then independently challenge its assumptions, failure paths, and evidence. Use separate reviewers when delegation is authorized and useful, or fresh sequential passes otherwise. Choose staffing and split lenses to fit the risk; a fixed reviewer count or duplicated review is not the goal.
- **Outbound client defaults:** what `TargetClient`, `PutObjectOptions`, or the remote SDK configuration sends to every replication or migration target is high risk for every target class even when the change fixes one. Follow the SOP in `docs/postmortems/2026-09-03-replication-checksum-default-regression.md`: run the outbound target matrix, document each new env knob in the same PR, and list verified and unverified target classes in the PR Impact section.
Available domain lenses are security, concurrency/durability, compatibility,
and performance. Select `.agents/skills/adversarial-validation/SKILL.md` for an
explicit adversarial request, a high-risk change, or a substantial PR review;
then read only its matching role references. A routine standard pass does not
load the playbook unless the reviewer needs a RustFS-specific probe.
Available domain lenses are security, concurrency/durability, compatibility, and performance; select only those matched by the change.
Applies when changing code or running artifact-heavy work. Paths below
are repository-relative. Read only the relevant sections during read-only review.
These implementation, style, and quality rules apply to all contributions, regardless of author or editor. Paths below are repository-relative. Read only the relevant sections during read-only review; select verification from the root `AGENTS.md`.
## Shared Style Contract
- Use the toolchain declared in `rust-toolchain.toml`, respect the minimum supported Rust version in `Cargo.toml`, and let `rustfmt.toml` and the configured Rust/Clippy lints define mechanical style. Do not override repository settings with personal formatter or lint preferences.
- Follow the owning module's organization, imports, and domain terminology where repository rules leave a choice. Existing violations do not justify new ones; avoid unrelated cleanup in a focused change.
- Rules using "must" or "do not" are requirements. Rules using "prefer" are defaults; depart when correctness, ownership, performance, or readability benefits justify it. Explain consequential tradeoffs, not every idiomatic choice. Where several approaches meet the contract equally well, the implementer chooses.
- Follow the declared toolchain locally and the affected CI lane's toolchain for reproduction. The repository currently tracks `stable`; for a formatter/lint mismatch, compare `rustc -Vv`, `cargo fmt --version`, and `cargo clippy --version` with the failing run before changing code. Toolchain upgrades must keep local and CI settings aligned and pass their affected gates; do not silently raise `rust-version` or change lint policy to make a check pass.
## Worktree and Disk Hygiene
-Start implementation from the latest `origin/main`and confirm the requested
change is not already present.
- An existing clean, isolated task worktree is sufficient. Create another
worktree only when the current checkout is shared, dirty with unrelated work,
or belongs to another task.
-For a new task, start from the latest `origin/main`unless a different base is requested, and confirm the requested change is not already present. When continuing existing work or a PR, preserve its branch, base, and task-owned changes; do not restart it from `main`.
- An existing clean, isolated task worktree is sufficient. Create another worktree only when the current checkout is shared, dirty with unrelated work, or belongs to another task.
- Never commit from a shared checkout.
- Use a task-specific branch named `<type>/<topic>`, such as `fix/...`,
`feat/...`, `test/...`, or `docs/...`, unless the user specifies a name.
-Do not include agent, tool, contributor, account, or organization names in
branch names.
-Push to the user-requested remote or the repository's configured push remote.
Do not hard-code or infer a remote from an account name.
-Check free space before artifact-heavy builds, tests, coverage, or downloads.
Re-check before a broad gate when space is tight.
- Remove only task-owned temporary/build artifacts. Never delete another task's
worktree or uncommitted data.
- At handoff, mention disk or cleanup details only when they affected execution
or artifacts/worktrees remain intentionally.
- Use a task-specific branch named `<type>/<topic>`, such as `fix/...`,`feat/...`, `test/...`, or `docs/...`, unless the user specifies a name.
- Do not include agent, tool, contributor, account, or organization names in branch names.
-Push to the user-requested remote or the repository's configured push remote. Do not hard-code or infer a remote from an account name.
- Check free space before artifact-heavy builds, tests, coverage, or downloads. Re-check before a broad gate when space is tight.
-Before handoff, remove the Cargo target directories and temporary worktrees the task created unless they stay intentionally or hold unmerged work. Identify build output by Cargo's markers (`.rustc_info.json`, `CACHEDIR.TAG`), not by directory name: `target` is also a source directory here.
- Remove only task-owned temporary/build artifacts. Never delete another task's worktree or uncommitted data.
-At handoff, mention disk or cleanup details only when they affected execution or artifacts/worktrees remain intentionally.
- For Docker verification, ensure the tested image contains the intended binary. `buildx build` without `--load` leaves the image in the build cache; use the Makefile's loaded image and rebuild without cache only when stale artifacts are evidenced.
## Change Style
- Preserve existing control flow unless changing it is required for correctness.
- Prefer a direct local edit over new files, wrappers, managers, or speculative
abstractions.
-Add a helper only when it removes current duplication, names a real domain
boundary, or isolates a non-trivial invariant.
- Remove an in-scope path superseded by the change. If compatibility requires it,
adapt at the boundary to one canonical core and use the repository's
`RUSTFS_COMPAT_TODO` policy.
- Comments explain non-obvious invariants or reasons. Do not narrate code or
record change history.
- Preserve unrelated control flow. Restructure touched code only when needed for the requested behavior or an explicitly requested refactor; style preferences alone do not justify changing execution order or cleanup behavior.
- Prefer a direct local edit over new files, wrappers, managers, or speculative abstractions.
- Add a helper only when it removes current duplication, names a real domain boundary, or isolates a non-trivial invariant. Keep helpers near the code they support when the module's organization permits it.
-Remove an in-scope path superseded by the change. If compatibility requires it, adapt at the boundary to one canonical core and use the repository's `RUSTFS_COMPAT_TODO` policy.
- Comments explain non-obvious invariants or reasons. Do not narrate code or record change history.
- Mention unrelated problems when useful; do not fix them in a narrow task.
## Rust Style
These repository-owned rules incorporate selected ideas from the [OpenCode style guide](https://github.com/anomalyco/opencode/blob/dev/AGENTS.md#style-guide), adapted to RustFS. That link is background, not an additional rule source. Apply these defaults to new or changed code; correctness and domain invariants take priority.
- Default to immutable `let` bindings; use `mut` for actual state changes. Prefer `if` or `match` expressions when branches compute a value instead of initializing a placeholder and reassigning it.
- Use type inference for obvious local values. Add annotations when inference needs help or the numeric, collection, or error type matters to understanding the code. Keep explicit types in function signatures and public contracts.
- Keep the main path readable with guard clauses, `let ... else`, and `?` when immediate propagation is correct. Preserve explicit handling for recovery, cleanup, aggregation, and quorum decisions; `if`/`else` expressions and exhaustive `match` remain idiomatic.
- Prefer readable iterator chains for straightforward mapping and filtering. Keep loops when they make state changes, early exits, or async operations clearer. Do not add intermediate collections or clones just to use iterators.
- Inline trivial single-use expressions only when a binding adds no meaning. Keep names that explain domain concepts, aid debugging, or make ownership and guard lifetimes clear. Do not change lock release or drop timing for style.
- Keep pure parsing, validation, and option-building helpers synchronous unless an async interface contract requires otherwise. This does not make blocking I/O or CPU-heavy work safe to run on async executor threads; offload it when needed to keep those threads responsive.
## Reuse and Boundary Rules
- Before adding helpers, constants, fixtures, or wrappers, search the touched
crate, the domain-owning crate, `crates/utils`, `crates/common`, and relevant
durability, and compatibility must fit the call site. A narrowly named local
helper is better than forced reuse with different semantics.
-Validate untrusted input at its trust boundary, then trust the validated type.
Values crossing disk, RPC, persistence, or version boundaries remain
untrusted at every consumer.
- Re-check boundary values immediately before destructive actions such as
delete, overwrite, or quorum decisions.
-Every new branch needs a concrete triggering input/state. For decoded or peer
data, corruption and mixed-version input are valid triggers.
-Required values must return a typed error when absent or corrupt; do not use a
default that converts corruption into a plausible result.
- Attach error context once where it is actionable. Do not erase typed errors
below aggregation or quorum layers.
- Before adding helpers, constants, fixtures, or wrappers, search the touched code and domain owner; check `crates/utils`, `crates/common`, and direct dependencies when they could own the behavior. Stop once the relevant reuse boundary is clear.
- Reuse requires matching semantics: normalization, error types, deadlines, durability, and compatibility must fit the call site. A narrowly named local helper is better than forced reuse with different semantics.
- Validate untrusted input at the boundary that owns it, then pass validated types inward without repeating checks whose guarantees still hold. Deserializing into a Rust type alone does not establish domain validity. Values newly read from disk, RPC, persistence, or another version must be validated at that consuming boundary.
-For destructive actions such as delete or overwrite and for quorum decisions, check the relevant identity, generation, and authority under the operation's existing synchronization or precondition contract. A separate unguarded recheck does not prevent a check/use race.
- Every new control-flow branch needs a concrete triggering input/state. For decoded or peer data, corruption and mixed-version input are valid triggers.
- Required values must return a typed error when absent or corrupt; do not use a default that converts corruption into a plausible result.
-Attach error context once where it is actionable. Do not erase typed errors below aggregation or quorum layers.
## Rust Boundaries
- Production `unwrap`/`expect` must follow a type guarantee or checked invariant; explain only non-obvious guarantees. Stricter scoped prohibitions, including `crates/AGENTS.md`, still apply. Invalid client, disk, or peer data must return errors rather than trigger panics.
-Public APIs do not return `Result<_, String>`. Library APIs use domain errors unless intentional erasure is part of the boundary contract; expose a stored inner error through `Error::source()`.
- Numeric conversions must not silently truncate. Use fallible conversions for untrusted values; validate finiteness, sign, and range before float-to-integer conversion. Clamp/saturate only when required by the domain.
-Do not add crate-root `#![allow(dead_code)]`.
## Naming
Use Rust API naming: `SCREAMING_SNAKE_CASE` constants/statics, `snake_case`
functions/variables, and `PascalCase` types. Do not rename unrelated existing
violations.
Use Rust API naming: `SCREAMING_SNAKE_CASE` constants/statics, `snake_case` functions/variables/modules, and `PascalCase` types/traits. Name domain concepts and include units where a value would otherwise be ambiguous; do not optimize for short names. Do not rename public, serialized, or persisted fields merely to match a local style preference, or rename unrelated existing violations.
## API and Operational Contracts
- For new or changed public APIs, document the caller-visible behavior and relevant `# Errors`, `# Panics`, and `# Safety` conditions. Include a useful example or link to one when usage is non-obvious; avoid boilerplate sections that say nothing. Follow the [Rust API documentation guidelines](https://rust-lang.github.io/api-guidelines/documentation.html) within the scope of the change.
- For async or storage APIs, state cancellation, retry/idempotency, partial-completion, ownership, and durability guarantees when callers rely on them. Make failure cleanup and commit points explicit in code and tests; do not imply atomicity that the implementation does not provide.
- For protocol, persisted-format, configuration, dependency, or operational changes, check affected consumers and supported versions. Update relevant docs/examples and describe compatibility, upgrade/rollback limits, and new configuration defaults when they change. New dependencies must solve a current need and fit the workspace's license, toolchain, and feature policy.
- For hot-path or resource-management changes, check allocation/copying, blocking, unbounded work, and lock duration where affected. Support performance claims with an appropriate measurement or clearly label them as expectations; a benchmark is not required for unrelated changes.
## Behavioral Tests
- For behavior changes, add or update the narrowest test that calls the real implementation and asserts an observable result. Existing tests can provide coverage when they directly exercise the changed behavior; do not duplicate production logic as the test oracle.
- Cover the changed contract's relevant failure and boundary cases, not only success. A bug regression should fail without the fix; do not broaden assertions or rely only on a successful call when the result or side effect is what matters.
- Follow `docs/testing/README.md` for test layers, runners, isolation, synchronization, and flaky tests. Use controlled clocks or explicit synchronization for time/concurrency tests instead of fixed sleeps, and keep waits bounded.
- Report the checks actually run and their outcomes, including skipped or blocked checks and the behavior they leave unverified. Do not describe focused local checks as full CI coverage.
Applies to commits, pushes, PRs, and issue/discussion actions. Paths below are
repository-relative. User authorization and root `AGENTS.md` still govern scope.
Applies to commits, pushes, PRs, and issue/discussion actions. Paths below are repository-relative. User authorization and root `AGENTS.md` still govern scope.
## Final PR Preflight
Before creating or updating a PR, reuse completed review and verification:
- Verify the actual base (normally `origin/main`) and the complete task diff,
including file names and whitespace. Exclude secrets, logs, generated
artifacts, and unrelated edits. Retain an existing PR's base unless requested.
-Confirm the final diff passed the root verification tier; fix task-owned
failures and run missing scoped checks. Report unresolved required checks or
authority without expanding the task. Do not start another general review.
- Keep the English Conventional Commit title at most 72 characters. Use the
template headings, actual checks, material risks, and rollback notes.
- Immediately before writing to GitHub, confirm the head and task diff are
unchanged. Rerun only checks invalidated by edits or relevant state changes.
- Verify the actual base (normally `origin/main`) and the complete task diff, including file names and whitespace. Exclude secrets, logs, generated artifacts, and unrelated edits. Retain an existing PR's base unless requested.
- Confirm the final diff passed the root verification tier; fix task-owned failures and run missing scoped checks. Report unresolved required checks or authority without expanding the task. Do not start another general review.
- Keep the English Conventional Commit title at most 72 characters. Use the template headings, actual checks, material risks, and rollback notes.
-Immediately before writing to GitHub, confirm the head and task diff are unchanged. Rerun only checks invalidated by edits or relevant state changes.
## Pull Request Lifecycle
- Creating or updating a PR includes one immediate snapshot of checks,
mergeability, reviews, and unresolved threads.
-Unless the user explicitly requests monitoring, a release workflow requires
it, or an automation already owns it, hand off after the PR is open with the
current state and next event to watch. Do not delay ordinary handoff with
fixed quiet-period sleeps.
- For requested monitoring, use event-driven or bounded waits. Report only state
changes, actionable failures, or a meaningful prolonged delay.
- Investigate failures/comments before changing code. Fix task-attributable
issues, rerun affected verification, push, reply or resolve the thread, then
resume the requested monitor.
- Never merge without required reviewer approval or explicit authority.
- After an observed merge, verify the commit reached the base, then clean the
task worktree/branch when safe. Preserve unmerged work for closed PRs unless
deletion was explicitly authorized.
- Creating or updating a PR includes one immediate snapshot of checks, mergeability, reviews, and unresolved threads.
- Unless the user explicitly requests monitoring, a release workflow requires it, or an automation already owns it, hand off after the PR is open with the current state and next event to watch. Do not delay ordinary handoff with fixed quiet-period sleeps.
-For requested monitoring, use event-driven or bounded waits. Report only state changes, actionable failures, or a meaningful prolonged delay.
- Investigate failures/comments before changing code. Monitoring alone authorizes observation and diagnosis; fixes, pushes, replies, and thread resolution require their own existing task authority. When authorized, fix task-attributable issues, rerun affected verification, and resume the requested monitor. Otherwise report the concrete failure and next action without expanding scope.
- Merge only with existing user authorization and satisfied applicable reviewer, check, and branch-protection requirements. Reviewer approval does not grant merge authority; user authorization does not bypass repository protections.
- After an observed merge, verify the commit reached the base, then clean the task worktree/branch when safe. Preserve unmerged work for closed PRs unless deletion was explicitly authorized.
## Git and PR Baseline
- Follow Conventional Commits; keep the subject at most 72 characters.
- Source comments, commits, PR titles, and PR bodies are in English.
- Keep every heading from `.github/pull_request_template.md`; use `N/A` where
needed and include commands actually run.
- Keep every heading from `.github/pull_request_template.md`; use `N/A` where needed and include commands actually run.
- Use `--body-file` for multiline `gh pr create`/`gh pr edit` content.
- PR/issue/discussion content must not contain the literal sequence `\n` or
hard-wrapped prose paragraphs.
-Do not include local absolute paths or tool-specific labels/prefixes in GitHub
content.
- Resolve review threads after the underlying issue is fixed. If declining a
suggestion, reply with a short evidence-based reason.
- PR/issue/discussion content must not contain the literal sequence `\n` or hard-wrapped prose paragraphs.
- Do not include local absolute paths or tool-specific labels/prefixes in GitHub content.
-Resolve review threads after the underlying issue is fixed. If declining a suggestion, reply with a short evidence-based reason.
description: Review RustFS diffs or designs for explicit adversarial requests, high-risk changes under the repository review policy, or substantial PR reviews. Skip ordinary questions, diagnosis, planning, status, routine low-risk implementation, and prose with no execution effect.
---
# RustFS Adversarial Validation
Use the [repository risk tiers and review shape](../../references/adversarial-validation.md). This skill
routes a review to RustFS-specific probes without loading unrelated domains.
## Select Lenses
Read only the references required by the diff:
| Lens | When to read |
|---|---|
| [Correctness](references/correctness.md) | Every non-exempt adversarial review |
| [Simplicity](references/simplicity.md) | Mechanical/standard changes and production growth |
| [Test coverage](references/test-coverage.md) | Behavior or test changes |
description: Review a commit, PR, or merged patch when the user requests ordinary code-change verification. Do not combine with adversarial-validation; use that skill instead for explicitly adversarial, substantial, or high-risk RustFS reviews.
---
# Code Change Verification
Use this skill for an ordinary requested review. If the root policy or user calls
for adversarial validation, use `adversarial-validation` instead of running both.
## Core Workflow
### 1) Scope and assumptions
- Derive the change source, target branch, and relevant runtime/version from the
supplied diff and metadata. Ask only when missing context could change the verdict.
- Focus only on requested scope; avoid reviewing unrelated files.
### 2) Risk map
- Prioritize in this order:
- Data correctness and user-visible behavior
- API/contract compatibility
- Security and authz/authn boundaries
- Concurrency and lifecycle correctness
- Performance and resource usage
- Give higher priority to stateful paths, migration logic, defaults, and error handling.
### 3) Evidence-based inspection
- Read each modified hunk with neighboring context.
- Trace call paths and call-site expectations.
- Check for:
- invariant breaks and missing guards
- unchecked assumptions and null/empty/error-path handling
- stale tests, fixtures, and configs
- hidden coupling to shared helpers/constants/features
- Apply root `AGENTS.md`'s finding standard: try to disprove a candidate before
reporting it. Mention an unresolved question only when it could materially
change the verdict; do not fill the report with speculative possibilities.
#### Rust-specific checks
For changed Rust behavior, use the matching sections of [rust-code-quality](../rust-code-quality/SKILL.md). Reuse checks already performed by the selected review workflow. Comment-only or formatting-only Rust diffs do not require the full Rust checklist. Carry its P0–P3 ratings over unchanged and use this skill's output format.
### 4) Findings-first output
- Order supported findings by P0–P3 severity; preserve the Rust ratings above.
Include `path:line`, the failure and impact, a focused fix, and its validation.
- If no supported issues remain, state `No findings` with the reviewed scope and
any material verification limitation. Do not append optional improvements to
make a clean review look productive.
Close after the required review. Recommend additional verification only for an
identified unresolved risk or required gate; reuse evidence for unchanged code.
description: Assess whether a GitHub issue is fixed, needs implementation, or can be closed by checking related work and current code. Use for issue completion/triage requests. Status questions are read-only; comment, close, or change labels only when the conversation authorizes that action.
description: Verify issue completion against current implementation and merged work. Use for issue triage; comment, close, or change labels only when authorized.
---
# Issue Triage
Use this skill when the user provides a GitHub issue URL and asks "can this be closed?", "is this already implemented?", "check completion status", or similar triage questions.
- Resolve the issue repository separately from the implementation repository: `rustfs/backlog` tracks work in `rustfs/rustfs`. Pass `--repo` explicitly to GitHub queries.
- Read the issue body, relevant comments, linked PRs, checklist, and sub-issues with `gh issue view`. Search explicit links, the full issue URL, qualified references, and subject keywords; an empty search result does not prove implementation is absent.
- Fetch the implementation base and inspect its current code. For each merged candidate, verify `git merge-base --is-ancestor <merge-commit> <remote>/<base>`; a title, commit message, or merged state alone is insufficient. A local checkout may be stale or on another branch.
- Verify every checklist/sub-issue before declaring completion. For batches, paginate the entire requested issue scope, exclude PR entries, and filter by author only when requested.
- Recommend closing only when all requested behavior is present or evidence shows the issue is superseded. Otherwise name what remains. A status request is read-only; reuse existing authority for comments/closing/labels, and follow [Git and PR rules](../../references/pull-requests.md) before posting. Use Chinese for `rustfs/backlog`, existing repository labels only, and a closing comment naming the verified behavior and PRs.
Read the issue body to understand what was requested. Extract:
- The specific feature/fix/behavior described.
- Any linked PRs or commits mentioned in the body or comments.
- Any checklist items or sub-issues.
Resolve the issue repository and implementation repository separately (for example, `rustfs/backlog` tracks work in `rustfs/rustfs`). Pass the implementation repository explicitly to PR queries; the current checkout may belong to another repository.
### 2. Search for related work
Search git history for commits referencing the issue:
```bash
git log --oneline --all --grep="<N>"| head -30
```
Search for related PRs:
```bash
gh pr list --repo <implementation-repo> --search "<issue-url>" --state all --json number,title,state,mergedAt
```
Also search qualified issue references and subject keywords; for same-repository
issues, include `#<N>`. Follow explicit links even without a text match. A search
page with no match does not prove the work is absent.
If the issue mentions specific PRs, check their status:
Fetch the implementation repository's current base branch. For each merged candidate, verify its merge commit is present and inspect the current code for the claimed behavior; a commit message match alone is not proof:
If the issue describes a specific defect, inspect the fetched base's code rather than assuming the current checkout contains it:
```bash
git show <implementation-remote>/<base-branch>:crates/<relevant>/src/<file>.rs
```
For issues with checklists, verify each item individually. If sub-items are tracked as separate issues, check those too:
```bash
gh issue view <SUB_N> --repo <owner/repo> --json state
```
### 4. Determine verdict
- **All items fixed and merged**: Recommend closing; name the verified PRs and behavior.
- **Some items fixed, some remaining**: Keep open; report each remaining item.
- **Not yet implemented**: Keep open; report what remains.
- **Superseded or no longer relevant**: Recommend closing with evidence.
### 5. Take action
For a status-only request, return the assessment without GitHub writes. If commenting, closing, or label edits are authorized, perform only those actions; do not ask again for authority already given. Prepare the final assessment before asking for any missing authority. Write `rustfs/backlog` issue content in Chinese.
Close with comment:
```bash
gh issue close <N> --repo <owner/repo> --comment "<body>"
Always use `--body-file` for multiline content, never inline `--body`.
### 6. Handle multi-issue batches
When the user asks to check multiple issues (e.g., "check all issues by user X" or "scan backlog for closable issues"):
1. List the full requested scope with pagination (for example `gh api --paginate 'repos/<repo>/issues?state=open&per_page=100'`, excluding entries with `pull_request`). Add an author filter only when the user requested one; the default page/limit is not evidence that all issues were checked.
2. For each issue, run steps 1-5 above.
3. Report a summary table of all triaged issues with verdicts.
## Report
Identify the issue and current state, verified implementation/PR evidence,
remaining items, verdict, and action actually taken. Use a table for batches;
a single issue does not require a heading for each field. Follow step 4's
verdicts without repeating the assessment in another template.
## Notes
- The user may ask in Chinese ("是否可以关闭", "检查完成情况"); respond in the same language.
- When closing, always include a summary of what was fixed and which PRs resolved it — this creates a useful audit trail.
- For issues in `rustfs/backlog`, use `--repo rustfs/backlog`.
- For issues in `rustfs/rustfs`, use `--repo rustfs/rustfs`.
- If the issue has sub-issues (GitHub sub-issues API), check each one's state before declaring the parent complete.
Report the issue, current state, implementation evidence, remaining work, verdict, and action actually taken. Use a table for batches. Write multiline comments via `--body-file`; when closing, post the prepared comment before closing without an inline multiline body.
@@ -16,68 +16,28 @@ The "plugin system" spans four surfaces that must stay consistent:
## Hard invariants (verify before merging)
1.**Secrets have one source of truth.** Secret config keys are declared only
in the plugin manifest (`TargetPluginManifest.secret_fields`,
`crates/targets/src/manifest.rs`) and flow to admin via
`AdminTargetSpec.secret_fields`. Never add a hand-maintained per-service
secret table in a handler; if redaction misses a field, fix the manifest.
1.**Secrets have one source of truth.** Secret config keys are declared only in the plugin manifest (`TargetPluginManifest.secret_fields`, `crates/targets/src/manifest.rs`) and flow to admin via `AdminTargetSpec.secret_fields`. Never add a hand-maintained per-service secret table in a handler; if redaction misses a field, fix the manifest.
2.**Redaction must round-trip.** Instance GET responses replace secret values
with `***redacted***` (`REDACTED_SECRET_VALUE` in `plugins_instances.rs`).
Instance PUT restores the stored secret when it receives that placeholder
back (`restore_redacted_secret_values`). Any new read or write path for
target config must keep both halves: redact on the way out, restore the
placeholder on the way in. The placeholder literal must never be persisted.
2.**Redaction must round-trip.** Instance GET responses replace secret values with `***redacted***` (`REDACTED_SECRET_VALUE` in `plugins_instances.rs`). Instance PUT restores the stored secret when it receives that placeholder back (`restore_redacted_secret_values`). Any new read or write path for target config must keep both halves: redact on the way out, restore the placeholder on the way in. The placeholder literal must never be persisted.
`extension_catalog_never_exposes_example_or_external_fixtures`) enforce it.
3.**Fixtures never reach production responses.**`example_external_webhook_plugin()` (`crates/targets/src/catalog/mod.rs`) is a test/demo fixture for control-plane planning tests. Production catalog/extension handlers must not include it; regression tests (`plugin_catalog_never_exposes_example_or_external_fixtures`, `extension_catalog_never_exposes_example_or_external_fixtures`) enforce it.
4.**External plugin flow is planning-only and deny-by-default.**
`plan_external_target_plugin_action` returns decisions, it executes
nothing. `TargetPluginExternalFlowGate::default()` is fully closed and
`TargetPluginInstallPolicy::default().allowed_download_hosts` is empty —
keep it that way; tests opt in via explicit policies. Install validation
requires https, an allowlisted host, a full 64-hex-char sha256 digest,
signature and provenance URIs, and an artifact matching the host
`target_triple`.
4.**External plugin flow is planning-only and deny-by-default.**`plan_external_target_plugin_action` returns decisions, it executes nothing. `TargetPluginExternalFlowGate::default()` is fully closed and `TargetPluginInstallPolicy::default().allowed_download_hosts` is empty — keep it that way; tests opt in via explicit policies. Install validation requires https, an allowlisted host, a full 64-hex-char sha256 digest, signature and provenance URIs, and an artifact matching the host `target_triple`.
5.**Custom target types must not collide.** Unknown target types get an
interned unique `custom:<type>` plugin id (`custom_plugin_id` in
`manifest.rs`). Custom plugins with secrets must register via
`TargetPluginDescriptor::with_manifest` and declare `secret_fields`;
`::new` derives a manifest with no secrets.
5.**Custom target types must not collide.** Unknown target types get an interned unique `custom:<type>` plugin id (`custom_plugin_id` in `manifest.rs`). Custom plugins with secrets must register via `TargetPluginDescriptor::with_manifest` and declare `secret_fields`; `::new` derives a manifest with no secrets.
## Changing the admin JSON contract
- Shapes are locked twice in `plugin_contract.rs` tests: insta snapshots
(`rustfs/src/admin/snapshots/`) plus literal `json!` assertions. Update
both deliberately; a shape change is a console-facing API change.
- Field naming is `snake_case`, except discovery blocks
(`runtimeCapabilities`, `clusterSnapshot`, `extensionsCatalog`) which are
camelCase **by cross-endpoint convention** (same shape in `system.rs`,
`console.rs`, `pools.rs`). Do not "fix" that inconsistency locally.
(anti-corruption layer). Add a `From` impl; do not serialize internal
types directly.
- Shapes are locked twice in `plugin_contract.rs` tests: insta snapshots (`rustfs/src/admin/snapshots/`) plus literal `json!` assertions. Update both deliberately; a shape change is a console-facing API change.
- Field naming is `snake_case`, except discovery blocks (`runtimeCapabilities`, `clusterSnapshot`, `extensionsCatalog`) which are camelCase **by cross-endpoint convention** (same shape in `system.rs`, `console.rs`, `pools.rs`). Do not "fix" that inconsistency locally.
- Contract types deliberately duplicate `rustfs_targets` types (anti-corruption layer). Add a `From` impl; do not serialize internal types directly.
## Handler conventions
- Every new admin plugin/extension route needs authorization at the top of
`call` and an `include_str!` guard test asserting it (repo-wide pattern —
see `plugin_instance_handlers_require_admin_authorization_contract`).
- Reads use `GetBucketTargetAction` (instances) or `ServerInfoAdminAction`
(catalogs); writes use `SetBucketTargetAction`.
- Refresh persisted module switches once per request
(`refresh_persisted_module_switches`), then evaluate the sync
`module_disabled_block_reason` per domain — do not re-read the store per
domain or per instance.
- Every new admin plugin/extension route needs authorization at the top of`call` and an `include_str!` guard test asserting it (repo-wide pattern — see `plugin_instance_handlers_require_admin_authorization_contract`). The source guard checks wiring, not runtime authorization; use focused behavior evidence for changed allow/deny semantics.
- Reads use `GetBucketTargetAction` (instances) or `ServerInfoAdminAction` (catalogs); writes use `SetBucketTargetAction`.
- Refresh persisted module switches once per request (`refresh_persisted_module_switches`), then evaluate the sync `module_disabled_block_reason` per domain — do not re-read the store per domain or per instance.
## Generic bounds
Event-payload generics use the `PluginEvent` blanket trait
description: Review a GitHub PR from a URL or number using its actual base/head and risk-appropriate code review. Use when the user asks for a PR review, not a status lookup or PR wording edit. Publish a review only when authorized; delegation and monitoring follow the requested scope and root AGENTS.md.
description: Review a GitHub PR using its exact base/head and repository risk policy. Use for requested PR reviews; publish or fix only within conversation authorization.
---
# PR Review
Use this skill for PR context and review delivery. An ordinary review request is read-only unless the conversation also authorizes posting or fixes. Reuse that authorization without asking again; prepare the review before requesting any missing publication approval.
1. Resolve the PR repository and remote; the current checkout may belong elsewhere. Read the PR purpose and linked issues, then fetch the actual base and PR head:
- Follow root `AGENTS.md`; classify risk with the [review policy](../../references/adversarial-validation.md) and consult relevant [change-style and boundary rules](../../references/implementation.md).
- Select `code-change-verification` for ordinary review or `adversarial-validation` for explicitly adversarial, substantial, or high-risk review; do not run both on the same diff.
Resolve `<repo-remote>` to the PR repository; do not assume the current checkout's `origin` or `main` matches. Record the exact base/head used. If either moved during fetching, refresh the snapshot before reviewing. Classify using the repository review policy; instruction changes that affect agent execution are mechanical, not exempt.
### 3. Review the changed behavior
Group files by functional area to trace callers and invariants. Use the root risk tier's review shape and only matching lenses. File count does not authorize delegation. When delegation is explicitly authorized, high-risk/substantial reviews use exactly two independent reviewers with the applicable lenses split between them; otherwise use two fresh sequential passes. Reviewers do not spawn further agents.
Findings need a concrete failure scenario with `file:line`; a null verdict briefly names the relevant probes. Reuse existing evidence and choose local checks from the final diff under the root verification policy.
### 4. Check CI status
```bash
gh pr checks <N> --repo <owner/repo>
```
Investigate a failed check when it bears on a finding or the user requested CI diagnosis/merge readiness:
```bash
gh run view --repo <owner/repo> --log-failed --job=<JOB_ID>
```
Use current evidence to distinguish pre-existing, flaky, and PR-caused failures. Do not classify them by guesswork or turn a code-only review into unrelated CI repair.
### 5. Synthesize findings
Report the PR, reviewed base/head, and risk tier, then summarize the assessment.
Use the selected review's P0–P3 ratings and root finding standard: supported
findings with `file:line`, failure scenario, and fix, or `No findings`.
State the observed check status, including pending or unavailable checks, and
the verdict (`APPROVE`, `REQUEST_CHANGES`, or `COMMENT`). Do not infer a pass
from missing checks or add style nits to populate a clean review.
### 6. Post the review
Only when posting is authorized, write the review body to a temp file and post via CLI. Refresh the PR head first; if it changed, review the delta and update the verdict before posting:
For authorized inline comments, use [the submission example](references/posting.md).
Always use `--body-file` or `--input`, never inline multiline `--body`.
### 7. Handle follow-up
Follow the [PR lifecycle](../../references/pull-requests.md) and any explicit monitoring request. For follow-up, fetch the new head and compare the recorded reviewed SHA with the new SHA; revisit affected callers and findings. Never use an unfetched `origin/pull/<N>/head` ref as evidence. Update the posted review or resolve addressed threads only within existing authorization.
## Notes
- The user may ask for review in Chinese; respond in the same language but keep the review body in English per AGENTS.md rules.
- When the user asks for "多角色对抗 review", run the full adversarial validation protocol — this skill's step 3 covers that.
- If the PR is from a fork, check `maintainerCanModify` before attempting to push fixes.
- For very large PRs, batch the review by functional area while keeping the same bounded review shape.
Record both SHAs; refresh if either moved during fetching. Follow relevant [implementation boundaries](../../references/implementation.md).
2. Apply the [risk policy](../../references/adversarial-validation.md), including its two perspectives for high-risk work. Ordinary reviews use the root finding standard directly. File count does not determine risk or authorize delegation; keep any delegated review within the authorized scope.
3. Check `gh pr checks <N> --repo <owner/repo>`. Investigate failures when relevant to a finding or a requested CI/readiness diagnosis. Distinguish pending, unavailable, pre-existing, flaky, and PR-caused states using evidence; a code review does not authorize unrelated repairs.
4. Report the reviewed SHAs, risk tier, supported findings or `No findings`, material verification limits, check state, and verdict. Set severity from evidenced impact, triggering conditions, reach, and urgency: P0 is a critical issue requiring immediate action with broad or unavoidable impact; P1 is a high-impact defect requiring prompt correction; P2 is an ordinary concrete correctness, compatibility, performance, or maintainability defect; P3 is an optional improvement only when requested. A remote trigger, crash, or deadlock does not by itself establish P0. P0/P1 findings block approval; evaluate other findings and verification gaps against the actual acceptance requirements rather than approving automatically below that threshold.
5. When posting is authorized, follow [Git and PR rules](../../references/pull-requests.md), recheck the remote base and head, and review any changed diff or integration assumptions before submitting. Reuse unaffected evidence. Use `gh pr review` with `--approve`, `--request-changes`, or `--comment` and `--body-file`; use [the API example](references/posting.md) for authorized inline comments. Reuse existing authorization.
6. Follow the repository PR lifecycle and explicit monitoring scope. Fetch new heads before comparing to the reviewed SHA; never rely on an unfetched `origin/pull/<N>/head`. Push fixes or resolve threads only when authorized; check `maintainerCanModify` before a fork push.
description: Run a focused Rust quality review when the user requests one or a selected review workflow needs Rust-specific checks for changed behavior. Do not auto-load for every implementation edit, comment-only or formatting-only Rust diff, or repeat an already completed review.
---
# Rust Code Quality Gate
Use this skill for a dedicated Rust review to cover rules that `cargo clippy`
does not catch.
Search matches and checklist items are candidates, not findings. Apply the root
finding standard; distinguish a demonstrated bug, an explicit rule violation,
and an optional preference. P2/P3 suggestions do not need to be invented or
included in an otherwise clean correctness review.
## Quick Start
1. Identify changed `.rs` files.
2. Run the matching candidate searches on changed files.
3. Apply the manual checklist sections whose behavior the diff touches.
4. Report or rebut every finding with evidence; P0/P1 findings block approval.
Fix them when implementation is authorized; a read-only review reports them.
## Automated Checks
Use these searches to find candidates in changed `.rs` files. Inspect syntax,
`#[cfg(test)]` scope, and the changed hunk before reporting a finding; text
filters do not reliably distinguish production code from tests.
```bash
# 1. unwrap/expect candidates
rg -n '\.unwrap\(\)|\.expect\(' <changed-files>
# 2. Silent type truncation via `as` cast
rg -n ' as (u8|u16|u32|u64|usize|i8|i16|i32|i64|isize)\b' <changed-files>
# 3. String as error type
rg -n 'Result<.*String>' <changed-files>
# 4. Box<dyn Error> in public APIs
rg -n 'Box<dyn.*Error' <changed-files>
# 5. println/eprintln in production
rg -n 'println!|eprintln!' <changed-files>
# 6. Ordering::Relaxed usage (verify each is intentional)
rg -n 'Ordering::Relaxed' <changed-files>
# 7. Default substituted for a possibly-required value (judge each: is the value optional by domain?)
- [ ] Every production `unwrap()` or `expect()` is infallible by type or a checked invariant; explain only non-obvious invariants, using an existing type, a useful `expect` message, or a concise comment
- [ ] No `Result<_, String>` in public API signatures
- [ ] Public library APIs use domain errors unless deliberate error erasure at a boundary is part of the contract
- [ ]`Error::source()` is overridden when inner error is stored
- [ ] Error messages are actionable without exposing secret input
### Type Safety
- [ ] No silent `as` truncation (negative→unsigned, large→small)
- [ ] Fallible numeric conversions use `TryFrom`/`try_into()` and return a typed error; clamp or saturate only when the domain explicitly requires it
- [ ] Floating-point to integer conversion validates finiteness, sign, and range before conversion
### Concurrency
- [ ] Lock acquisition order is documented when multiple locks are used, and matches every other call site taking any overlapping subset (ABBA check)
- [ ] No `tokio::sync` lock guard (read or write) held across `.await` without bounded hold time — long-lived read guards wedge writers (#4195)
- [ ] Atomic read-modify-write uses the direct `fetch_*` operation when possible; use `compare_exchange` only for conditional updates
- [ ]`std::sync::Mutex` in async context is held only briefly, never across `.await`
### Memory and Performance
- [ ] On an identified hot path, report cloning or allocation only with a concrete per-request/per-object cost or benchmark signal
- [ ] Prefer borrowing, moving, `Bytes`/`Arc`, or capacity reservation only when it reduces that cost without obscuring ownership or APIs
### Recursion Safety
- [ ] Recursion over untrusted, persisted, or otherwise unbounded input has a depth limit or uses iterative traversal
- [ ] Tests have an observable failure criterion; delegated assertions, `#[should_panic]`, snapshot/property checks, and meaningful `Result` failures do not need a redundant `assert!`
- [ ] Use `expect` only when its message improves failure diagnosis; do not add boilerplate to self-evident test setup
- [ ] Test volume and line count are never treated as production-code growth
### Serde
- [ ] Structs from untrusted input reject unknown fields where the compatibility contract permits; otherwise validate security-critical fields explicitly and test the supported input shape
- [ ]`#[serde(default)]` not used on security-critical fields without validation
### Code Hygiene
- [ ] No `#![allow(dead_code)]` at crate root
- [ ] No camelCase statics or Hungarian notation
- [ ] New string literals don't duplicate existing constants
### Reuse and Necessity
- [ ] No new helper duplicates `crates/utils`, `crates/common`, the touched crate, the likely domain-owning crate, a relevant direct dependency, or plain std/tokio behavior; reused helpers match the call site's semantics
- [ ] No branch without a nameable concrete trigger; no re-validation of what a validated upstream layer on the same path already guarantees (Cross-Cutting Domain Invariant patterns and pre-destructive-action re-checks are load-bearing — keep them)
- [ ] Error context attached once where actionable, not re-wrapped at every hop; no typed→generic error conversion below aggregation/quorum layers
- [ ] Comments avoid narration and change history while completely stating non-obvious lock, `SAFETY`, durability, compatibility, and unwrap invariants
- [ ] No near-duplicate test pinning the same code path and poison-value class as an existing test (boundary companions — n==max vs max+1, absent/empty/nil UUID — are never near-duplicates)
## Severity Classification
- **P0 (Block merge)**: demonstrated data loss, security breach, remote crash, or deadlock
- **P1 (Must fix)**: concrete correctness, compatibility, or material hot-path regression
- **P2 (Should fix)**: avoidable duplication or maintainability issue with a concrete simpler replacement
- **P3 (Nice to fix)**: local style or clarity issue with no behavioral risk
## Output Template
Use the calling review's output format. For a standalone review, report supported
findings with severity, location, impact, fix, and validation, or `No findings`.
Include only material unverified checks. Candidate counts are not a quality
description: Add or review RustFS `tracing` events with the repository field shape, level policy, privacy boundaries, and guardrails. Use when a change adds or edits a tracing macro/instrumentation site or the logging guardrail script.
---
# RustFS Logging Governance
Apply this skill only to changed logging sites; do not turn a local log edit into
a broad logging cleanup.
## Workflow
1. Read the changed function/module context and classify the site as lifecycle,
request/hot path, fallback, external fetch, or summary.
2. Match neighboring structured events and reuse existing `EVENT_*`,
`LOG_COMPONENT_*`, and `LOG_SUBSYSTEM_*` constants.
3. Put stable fields first (`event`, `component`, `subsystem`, `state`/`result`,
description: "Run the end-to-end RustFS console gate, version bump, preview validation, human confirmation, and final-tag publication pipeline. Use only when the user explicitly asks to release or publish a RustFS version (发版/发布)."
description: Publish a RustFS version through frozen Linux candidate acceptance, desktop completion, manifest approval, byte-preserving publication and post-release follow-up. Use only for an explicit release request.
This skill orchestrates a full release. It wraps `rustfs-release-version-bump` (invoked here with the authorized commit/push/PR scope) with a mandatory preview-tag validation loop before the final tag is published.
Require the exact final SemVer target before version edits or publication. If unspecified, inspect releases/tags and ask with concrete candidates; do not guess the channel or bump. Reuse the user's confirmed target and authorized delivery scope. Independent read-only preflight may continue.
The binary reports its build tag (`build::TAG` via shadow_rs; `SHORT_VERSION` in
`rustfs/src/config/cli.rs`), and `build.yml` derives asset names and preview
classification from that tag. Cargo.toml supplies only the no-tag fallback.
Preview and final tags must therefore share the validated source commit;
their tag-dependent version and asset names differ. The channel and cleanup
constraints are defined once under Preview tag naming and Hard rules below.
## Invariants
Pipeline shape:
- Cargo and every candidate executable contain the final product version. `<target>-preview.<run_number>` is an immutable candidate identifier, not a public tag or displayed binary version.
- Freeze the exact source, reviewed workflow recipe, toolchain, Console, CLI, dependency lock, previous stable version and validation plan. Newer unrelated main or Console releases do not change those inputs.
- Retain `release/<target>` history when a release branch is used; backport only reviewed fixes. Pin `CANDIDATE_SHA` to its exact CI-validated commit. Never force-push a release branch or move a public tag.
- Build Linux first. Complete field acceptance before macOS/Windows and packaging. Full certification and final acceptance are required before publication; a partial Linux PASS grants no release authority.
- Promote the accepted bytes. Final publication never recompiles binaries or rebuilds packages/images. Infrastructure retries reuse successful artifacts; changed source or inputs require a new candidate and affected acceptance.
- Phase failures block dependents. No latest/default-channel update before versioned delivery. Use the [pipeline runbook](../../../docs/operations/release-pipeline.md) for executable entry points, locks and recovery.
```
check console main against its latest Release
-> if ahead: publish console -> wait for Release asset + latest API
-> bump RustFS version files to <target> (final version, ONE commit) -> merge
-> report preview acceptance results -> STOP for explicit human confirmation
-> tag <target> at the SAME commit (zero delta) -> re-verify CI/release
-> CI deletes the <target>-preview.N Releases (tags kept)
```
## Read by phase
On validation failure: fix lands on main via normal PR (version files are already at `<target>`, no new bump PR), then tag `<preview-tag N+1>` at the new main commit and restart from Phase 2.
| Phase | Procedure |
|---|---|
| 0 | Clean tree, fetch main/tags, verify access, then complete the mandatory [Console gate](references/console-gate.md). |
| 1–2 | [Prepare the exact source and run branch CI](references/release-candidate.md). Version edits use `rustfs-release-version-bump`. |
| 3 | [Build and verify the Linux candidate](references/preview-release.md). |
| 4–5 | [Run artifact, field, Console and rc acceptance](references/preview-acceptance.md), then complete desktop/package/image/chart validation. |
| Confirmation | Report the complete manifest and obtain the confirmation below. |
| 6 | [Publish the accepted manifest](references/final-release.md). |
- Final target version, for example `1.0.0-beta.10`.
- Preview iteration `N` (default: next unused preview tag for that target; check with `git tag -l '<target>-preview.*'` after `git fetch --tags`).
After all acceptance passes, report the target, source SHA, source CI run, Linux and completion run URLs, final manifest SHA-256, accepted Console/CLI identities, compatibility/performance results and backlog report. Explicitly ask whether to publish this exact manifest and end the turn without dispatching publication.
If the target version is missing or ambiguous, collect the current release/tag baseline and ask before version edits or publication. Continue independent read-only preflight while the answer is pending (see the semver gate below).
Only a new affirmative reply to that exact report authorizes Phase 6. An earlier general release request, silence or automatic continuation does not count. Reuse confirmation for retries of that same manifest; do not ask again merely because a destination failed. A changed source, input, manifest or acceptance result invalidates it and requires renewed acceptance/confirmation.
## Semver gate — resolve the target before version edits or publication
Numeric prerelease identifiers compare numerically (`beta.9 < beta.10`), not lexically — see [semver.org spec item 11](https://semver.org/#spec-item-11). Preview tags are internal validation tags layered on top of the target's prerelease channel — they are never themselves a deliverable version and never appear in version files.
Rules:
- A request like "发个版" / "release the next version" without an exact version string is ALWAYS ambiguous. Derive the current latest tag (`git tag --sort=-v:refname | head`), then ask the user to choose with concrete candidates, e.g. from `1.0.0-beta.10`: next prerelease `1.0.0-beta.11`, promote to `1.0.0-rc.1`, promote to stable `1.0.0`. Never guess between these — they have very different meanings (channel promotion vs. iteration) and different CI classification consequences.
- After a stable `X.Y.Z` exists, the next version must state which component bumps: patch `X.Y.(Z+1)` for fixes only, minor `X.(Y+1).0` for backward-compatible features, major `(X+1).0.0` for breaking changes. If the user names a bump type but not a number, compute it from the latest stable tag and echo the exact resulting version back for confirmation.
- Echo the final confirmed version string verbatim in your first status report; every later phase must use exactly that string. If at any point the user's wording and the confirmed version diverge, stop and re-confirm.
## Preview tag naming
- Use `<target>-preview.N` for every target, e.g. `1.0.0-beta.10-preview.3` or `1.1.0-preview.1`.
- The canonical suffix is exactly `-preview.<digits>`. `build.yml` recognizes it before alpha/beta/rc classification and routes it to the preview-only path; any other tag containing `-preview` fails closed instead of being treated as a release.
- A preview Release MUST be published with `isPrerelease=true` and `isLatest=false`. Any `*-latest` preview asset or preview-triggered `latest.json`, R2, Docker, or Helm publication is a pipeline failure.
- Preview Releases are cleaned up by the `cleanup-preview-releases` job after `publish-release` succeeds for the deliverable tag. It deletes every Release whose tag is exactly `<target>-preview.<digits>` and never passes `--cleanup-tag`, so the tags survive.
## Hard rules
- Version files (Cargo.toml, Cargo.lock, README, flake.nix, Chart.yaml, rustfs.spec) are bumped ONCE, directly to `<target>`. Never write a `-preview.N` suffix into any version file. If `rustfs-release-version-bump` is ever asked for a `-preview` version, that is a pipeline bug — stop.
- Preview Release assets are versioned and intentionally visible on the Releases page for the duration of validation. Do not label them Latest or use them to update any latest distribution channel.
- Never delete a preview Release by hand before Phase 6 finishes — Phase 4 downloads its assets and the final Release notes are generated while it still exists. Cleanup is CI's job; only step in manually (`gh release delete "<preview-tag>" --yes`, never `--cleanup-tag`) if `cleanup-preview-releases` failed.
- Tags have no `v` prefix. Always annotated: `git tag -a <tag> -m "Release <tag>"`.
- The final tag MUST point at exactly `PREVIEW_HASH` — the commit the validated preview tag points at. Never tag current `main` HEAD (commits merged after validation are unvalidated), and never create an extra version-bump commit between preview and final.
- When a previous deliverable exists, GitHub Release notes for the preview and final tags MUST use it as their shared comparison baseline: the most recently published non-preview Release before the target. Internal `-preview.N` Releases are explicitly excluded from that selection, even when they point at the same commit as the final tag — cleanup runs after the notes are generated, so the preview Release is still present and would otherwise be picked as the baseline. If no previous deliverable exists, omit `previous_tag_name` and record that GitHub's default baseline fallback was used.
- Generated Release notes carry a workflow-management marker so retries can repair them. Before manually curating a generated body, remove that marker; unmarked non-placeholder notes are preserved by later workflow runs.
- Phases run in order; a failure in any phase blocks everything after it. After the fix lands on main, restart from Phase 2 with the next preview iteration against the new `origin/main` hash — do not resume mid-pipeline against a stale hash.
- Completing preview acceptance does not authorize the final tag. After Phases 3–5 pass, report the acceptance evidence and stop until the user explicitly confirms continuation. The original release request, an earlier confirmation, silence, or an automated follow-up does not satisfy this gate.
- Confirmation is scoped to the reported `<target>`, `<preview-tag>`, and `PREVIEW_HASH`. A failed or repeated acceptance cycle, including any new preview iteration, invalidates prior confirmation and requires a new one.
- If the release is abandoned after Phase 1 merged, main's version files claim a version that was never tagged. Either revert the bump PR or leave it to be overwritten by the next release — but tell the user explicitly and record the decision.
- User-facing status updates in Chinese; commits, PR titles/bodies, and tag messages in English. No hard-wrapping in commit messages, PR bodies, or documentation prose — one logical line per sentence/paragraph, let soft wrap handle display.
## Phase 0 — Preflight
-`git status --short` clean; `git fetch origin main --tags`.
-`gh auth status` works; confirm you can view `gh release list -L 3`.
- Confirm the exact final target version with the user if not explicit.
### Console release gate
Read and complete [the Console gate](references/console-gate.md) before Phase 1. Verify the latest published Console asset and exact commit; if Console main is ahead, complete its release and asset verification first. A successful build alone does not satisfy this gate.
## Phase 1 — Version bump to the final target (once)
- If main's version files already read `<target>` (e.g. this is a restart after a failed preview), verify with `rg -n "<target>" Cargo.toml rustfs.spec helm/rustfs/Chart.yaml` and skip to Phase 2.
- Otherwise invoke the `rustfs-release-version-bump` skill with the final `<target>` (NOT a preview version), full GitHub flow (commit/push/PR).
- Get the PR merged into main. Record the resulting main commit:
```bash
git fetch origin main
PREVIEW_HASH=$(git rev-parse origin/main)# must contain the bump PR
```
`PREVIEW_HASH` is the single source of truth for the rest of the pipeline — report it to the user and reuse it verbatim in Phases 2 and 6. Both the preview tag and the final tag will point at it.
## Phase 2 — Publish the preview tag
```bash
git tag -a "<preview-tag>" -m "Release <preview-tag>""$PREVIEW_HASH"
git push origin "<preview-tag>"
```
Pushing the tag triggers `.github/workflows/build.yml` ("Build and Release"); `docker.yml` chains off it via `workflow_run`.
The preview run builds versioned artifacts and publishes them in a GitHub prerelease. Its latest-channel, R2, Docker, and Helm jobs must be skipped. Those publication paths run only after the final tag is pushed.
On a restart (N+1), refresh `PREVIEW_HASH=$(git rev-parse origin/main)` first — it must contain the fix — and re-report it.
## Phase 3 — CI and preview Release verification
- Find and watch the tag build: `gh run list --workflow build.yml --branch "<preview-tag>" --limit 1` then `gh run watch <run-id>`. Every build matrix target must succeed (linux x86_64/aarch64 × musl/gnu, macos-aarch64, windows-x86_64).
- Confirm the Release publication jobs (`create-release`, `upload-release-assets`, and `publish-release`) succeed while `update-latest-version` is skipped.
- Verify `gh release view "<preview-tag>" --json isPrerelease,assets,url`: `isPrerelease` must be `true`, and the Release must contain all 6 versioned platform zips, checksums, SBOM, and provenance with no `-latest` assets. Confirm `gh api repos/{owner}/{repo}/releases/latest --jq .tag_name` does not return `<preview-tag>`.
- Record `PREVIOUS_DELIVERABLE`, selected from published Releases by `publishedAt` after excluding the current tag and every `-preview.N` tag. Verify `gh release view "<preview-tag>" --json body --jq .body` contains `## What's Changed` and, when `PREVIOUS_DELIVERABLE` exists, `**Full Changelog**: https://github.com/rustfs/rustfs/compare/<PREVIOUS_DELIVERABLE>...<preview-tag>`. For a repository with no previous deliverable, verify a Full Changelog link exists and record the GitHub baseline fallback.
- Confirm preview-triggered Docker and Helm jobs are skipped. Preview validation covers the built RustFS binaries, embedded console, and rc compatibility; Docker image construction and Helm publication are deferred to the final tag because the Dockerfiles consume GitHub Release assets.
## Phases 4–5 — Local artifact, Console, and rc acceptance
Read and complete [preview acceptance](references/preview-acceptance.md): verify the downloaded binary's tag/SHA and readiness, exercise Console CRUD with byte-identical download, and pass the full latest-rc command matrix. Any failure blocks final publication. Retain the results for the confirmation gate below.
### Manual confirmation gate
After every Phase 3–5 check passes, report the target, preview tag, `PREVIEW_HASH`, preview Release URL, console result, and rc matrix, then explicitly ask the user whether to publish the final tag. End the turn without creating or pushing `<target>`.
Continue to Phase 6 only after a new user reply explicitly confirms the reported target, preview tag, and commit. A clear affirmative reply to that exact report, such as `确认继续`, is sufficient; if the reply is ambiguous or any reported value changed, ask again.
## Phase 6 — Publish the final tag on the validated commit
No second version bump, no release branch. The final tag goes on the exact commit the preview validated:
```bash
git fetch origin --tags
git rev-parse "<preview-tag>^{commit}"# must equal PREVIEW_HASH — abort if not
git tag -a "<target>" -m "Release <target>""$PREVIEW_HASH"
git push origin "<target>"
```
- CI rebuilds from the same source; the only changed input is the tag name, so the binary now self-reports `<target>`.
- Verify the final tag's complete publication path: all matrix and release jobs green; `gh release view "<target>"` shows the full versioned and `-latest` asset set plus checksums, SBOM, and provenance; Docker and Helm workflows succeed; `latest.json` points to `<target>`. A stable target must have `isPrerelease=false` and `isLatest=true`. An alpha/beta/rc target must have `isPrerelease=true`; GitHub does not permit prereleases to be Latest, but the project `latest.json` still advances to the final non-preview target.
- Verify the final Release body contains `## What's Changed` and a Full Changelog link. When `PREVIOUS_DELIVERABLE` exists, the link MUST be `https://github.com/rustfs/rustfs/compare/<PREVIOUS_DELIVERABLE>...<target>` and the baseline MUST equal the preview Release baseline; for example, both `1.0.0-beta.12-preview.1` and `1.0.0-beta.12` compare from `1.0.0-beta.11`.
- Verify the preview cleanup: `cleanup-preview-releases` must succeed, `gh release view "<preview-tag>"` must then report `release not found` for every preview iteration of this target, and `git rev-parse "<preview-tag>^{commit}"` must still resolve to `PREVIEW_HASH` (the tag is kept). If the job failed, delete the leftover Releases manually with `gh release delete "<preview-tag>" --yes` and report it.
- Optionally spot-check `./rustfs --version` from a final-tag artifact — it must report `<target>`.
## Output contract
Always report:
- Console gate result: previous/latest Console tags, whether merged changes required a release, `CONSOLE_HASH`, and Console run/Release URLs when a release was published.
- Target version, preview tag(s) used, `PREVIEW_HASH` (which both tags point at).
- Manual confirmation gate status (`WAITING_FOR_CONFIRMATION` or `CONFIRMED`) and its exact target, preview tag, and `PREVIEW_HASH`.
- Per-phase result (PASS/FAIL/BLOCKED) with key evidence: preview and final Release URLs, preview `isPrerelease`/`isLatest` state, final latest-channel state, console check results, the rc command matrix, and the preview-Release cleanup result (deleted Releases plus surviving tags).
- Any deviation from this pipeline and why the user approved it.
Resume failed infrastructure jobs without rebuilding successful units. Fix product defects on main, backport when needed, and start a new candidate. After a final tag exists, retry the same bytes or use a new patch version; never move the tag. Do not conflate implemented, CI-passed, field-accepted, approved, published and post-release-complete states. Report incomplete work and deviations with evidence; a tag or green build alone is not a completed release.
@@ -4,7 +4,7 @@ Read during Phase 0, before changing RustFS version files or tags. Follow the pa
### Console release gate
Complete this gate before changing any RustFS version file or creating any RustFS tag. RustFS `build.yml` downloads the asset returned by `repos/rustfs/console/releases/latest`, so a successful Console build alone is insufficient.
Complete this gate before changing any RustFS version file or creating any RustFS tag. Candidate creation resolves `repos/rustfs/console/releases/latest` once and freezes the exact asset for every build, so a successful Console build alone is insufficient. After freezing, later Console releases do not silently change or invalidate the accepted inputs.
1. Read the latest published Console tag and compare it with Console `main`:
@@ -37,7 +37,7 @@ git -C "$CONSOLE_SCRATCH/console" tag -a "<console-tag>" -m "Release <console-ta
Console tags include the `v` prefix. Pushing the tag triggers `.github/workflows/release.yml` (`🚀 Release`). Remove `CONSOLE_SCRATCH` after the gate completes.
Console tags include the `v` prefix. Pushing the tag triggers the Console repository's [release workflow](https://github.com/rustfs/console/blob/main/.github/workflows/release.yml) (`🚀 Release`). Remove the task-owned `CONSOLE_SCRATCH` after the gate completes.
3. Find the exact tag run and wait for completion:
@@ -55,4 +55,4 @@ test "$(gh api "repos/${CONSOLE_REPO}/releases/tags/<console-tag>" \
--jq '[.assets[] | select(.name == "rustfs-console-<console-tag>.zip" and .state == "uploaded" and .size > 0 and (.digest | startswith("sha256:")))] | length')" -eq 1
```
Treat a missing/mismatched asset, digest, latest tag, or failed/cancelled workflow as BLOCKED. Do not start Phase 1 until the Console gate passes. Record `CONSOLE_TAG`, `CONSOLE_HASH`, Console run URL, and Release URL for the final report.
Treat a missing/mismatched asset, digest, latest tag, or failed/cancelled workflow as BLOCKED. Do not start Phase 1 until the Console gate passes. Record `CONSOLE_TAG`, `CONSOLE_HASH`, the asset URL/SHA256, Console run URL, and Release URL for comparison with the inputs actually consumed by the RustFS builds and the final report.
Read only after fresh confirmation of the complete candidate report. The [parent confirmation gate](../SKILL.md#human-confirmation) applies.
Dispatch `release-publish.yml` on main with the successful completion run ID and approved `release-manifest.json` SHA-256. Do not create the tag manually. The workflow revalidates source, bytes and trusted certification, then creates the annotated final tag at `CANDIDATE_SHA`. A recipe change fails closed and requires a new candidate; unrelated main changes do not require a rebuild.
Require both versioned publication and channel publication jobs to succeed. Verify the final tag's commit and manifest identity; all six platform ZIPs and compatibility aliases; DEB/RPM, checksums, SBOM, provenance and evidence bundle; both multi-architecture image variants in Docker Hub, GHCR and Quay; and the accepted Helm chart in the chart repository. Download a host-compatible final artifact and confirm its digest is exactly the accepted candidate digest and its version/source output agrees.
For stable releases verify GitHub Latest, R2 download aliases and `latest.json` unless a newer stable release already owns those channels. Prereleases must remain GitHub prereleases and leave stable pointers unchanged. Verify generated release notes compare against the frozen previous stable release, excluding internal previews.
On infrastructure failure retry the same workflow/seal; matching destinations are reused. Never clobber an asset, force a tag, rebuild the image or silently accept a changed digest. A source fix after the final tag requires a new patch version. Cross-registry writes are not atomic: report the unfinished destination rather than claiming publication complete.
New candidates create no preview Releases to clean up. For a legacy preview release, preserve its tag and remove its Release only after final delivery and notes are verified. Do not pass `--cleanup-tag`. Complete the [post-release follow-up](post-release-updates.md) separately.
# Post-release Security Advisory, Milestone, Installation, and Website Updates
Read only after the final non-preview tag has passed Phase 6. Tag creation or a green binary build alone is insufficient: the release assets, source archive, container images, Helm package, and applicable latest channels must be available. Preview tags never enter this phase.
## Security Advisories
Reconcile advisories after every completed final release, including Console-only releases. Read-only preparation may start earlier; do not claim an unpublished artifact is an available fix.
1. Fetch every page of the repository's live Security Advisories, including triage, draft, published, and closed states. A permission error or partial response blocks reconciliation; it does not mean there are no advisories. Keep unpublished advisory details in private task artifacts, never in a public PR, release note, or issue.
2. For each potentially relevant advisory, map its fix to the exact published tag and verify the regression evidence. Main-branch reachability, a merged private fix, or a green build alone does not prove the shipped version is fixed. Check cherry-picked equivalents and reverted fixes explicitly. For embedded Console or dependency fixes, verify the shipped component version.
3. Determine the first available fixed release and affected version ranges from evidence. Preserve an earlier correct patched version; do not relabel all fixes as the current release. An unchanged server baseline such as a Console-only release requires checking the earlier server release as well. Leave unresolved reports and fixes absent from the tag pending; do not close them merely because a release shipped.
4. Prepare any necessary corrections to package identity, affected ranges, patched versions, fix/release links, and advisory text. Preserve unrelated fields, credit, CVE identifiers, and disclosure coordination. Apply updates only within existing user authorization; read back the result to verify it. Publishing a draft, requesting a CVE, or closing a report is a separate action: require explicit authorization for the concrete advisories and respect any embargo. Release-tag approval alone does not authorize those actions. Prepare the exact proposed changes before asking for missing authorization.
5. Record each relevant advisory's URL, current state, fix evidence, first fixed version, action taken or proposed, and remaining blocker in private task artifacts. Report advisory follow-up separately from artifact publication. A successful release with unresolved advisory work is not complete follow-up; retain that work for the release monitor or a concrete user decision.
## Version milestones
1. Query all pages of both open and closed milestones in the RustFS release repository, matching titles exactly to version strings without a `v` prefix. A failed or incomplete query is not evidence that a milestone is absent; resolve the lookup before making changes.
2. Close the milestone matching the published `<target>` if it is open; an already closed milestone needs no change. If it is missing, report the gap and continue checking the next version. Do not create a substitute for the released milestone or close/reassign its issues or PRs.
3. Use an explicitly planned next version when provided; otherwise, for a stable `X.Y.Z`, use `X.Y.(Z+1)`. For example, after `1.0.1` is published, close milestone `1.0.1` and ensure milestone `1.0.2` exists. For an alpha/beta/rc target with a trailing numeric counter, increment that counter within the same channel unless a different next version was specified. If the next version cannot be determined, ask for that version and report this follow-up as blocked. Creating a planning milestone does not confirm the target of a future release or bypass the semver gate.
4. Reuse an existing next-version milestone, whether open or closed; do not reopen it or create a duplicate. Only when the complete query confirms it is absent, create an open milestone with the exact next-version title. Do not invent a due date or description. After an uncertain creation result, query again before retrying.
5. Read back both milestones and report their titles, URLs, and actual states, including whether the next milestone was reused or created. A failed close, create, or verification leaves milestone maintenance incomplete; retry only the unfinished operation after refreshing live state. Continue independent installation and website work without moving or republishing the release tag.
## Installation references
1. Re-read the published deliverable state before edits or a retry. If a newer release has superseded this target, do not downgrade installation references or the website announcement. Report the superseding release and leave those defaults intact.
2. Invoke `rustfs-release-version-bump` with stage `post-release`, the exact target, and the authorized delivery scope. Prepare the follow-up on current main; do not edit or move either validated release tag. Cargo versions may already be preparing the next target and must remain untouched.
3. Verify the exact Docker image manifest, Release download links, RPM source archive, and Helm repository entry before publishing the installation PR. The chart is packaged and tested before sealing; publication uploads those same bytes only after versioned Docker images are available.
4. Report the installation PR and its merge state separately from the completed release. Reuse existing merge authorization and repository checks; do not infer new merge authority from this reference.
## rustfs.com top banner
Use the existing announcement configuration from [website PR #112](https://github.com/rustfs/rustfs.com/pull/112). Do not add a second banner or redesign the header.
1. In an isolated checkout of `rustfs/rustfs.com`, read its current `AGENTS.md`, PR template if present, `data/announcement.ts`, and the consuming header component. Search for an existing announcement PR for this target before creating another.
2. Update `homeAnnouncement` in `data/announcement.ts` after the release and installation availability checks pass. Keep `enabled: true`, `badge: 'New'`, and the existing component. For a stable release, use:
```ts
export const homeAnnouncement = {
enabled: true,
badge: 'New',
message: 'RustFS <target> is now available! Please',
linkText: 'upgrade and try',
href: '/download',
} as const
```
Replace `<target>` with the exact published version. Reserve GA wording for the actual first stable release. For a final alpha/beta/rc tag, explicitly call it a prerelease; use its GitHub Release URL if `/download` does not expose that target. Never announce a `-preview.N` build here.
3. Use the site's current package manager and required checks. For this config-only change, type-check and lint the changed file, build the site, and inspect the generated homepage for the version, visible link text, and destination. Confirm `/download` actually offers the announced version before using that link.
4. Commit, push, and create or update the website PR when included in the authorized release scope. Include the published RustFS Release URL and checks run. Keep merge and production-deployment authority separate; reuse permission already given, but this reference grants none by itself.
5. After an authorized merge/deployment, verify the live `https://rustfs.com/` banner and its destination. If only the PR is ready, report that state and URL; do not report the banner as deployed. A website failure does not invalidate or move the published release tag: retry this phase after resolving the failure.
## Reconcile main and remove the completed release branch
1. Compare the exact published tag with current main. Audit every release-side commit since their merge base, including inherited backports. An ahead count is a history difference, not proof of missing changes. Use ancestry and patch equivalence, then inspect current code and regression evidence for squashed, adapted, superseded, or reverted changes. Record each commit as present, superseded, release-only, or missing; a positive `git cherry` result alone does not prove a missing fix.
2. Bring missing shared changes to main through a reviewed PR and the required checks before closing the follow-up. Preserve main's later changes; decide version bumps and pinned Console configuration separately. If a history merge is needed, use a merge commit and verify the release commit is an ancestor of main; squash does not establish that ancestry. Do not merge main into the published release branch or move its tags. Report unresolved changes instead of claiming reconciliation is complete.
3. After publication and authorized follow-ups are complete, delete the remote `release/<target>` branch. Immediately before deletion, verify its HEAD still equals the published tag's commit and no open PR targets or originates from it. Preserve a branch with newer work or open PRs and report the blocker. Use a deletion with an expected-old-SHA check to avoid removing a concurrently advanced branch.
4. Verify the remote branch is absent and the final tag and any legacy preview tags still resolve to their recorded commits. Remove a local release branch only if it is task-owned, unchecked out, and has no unpreserved work. Record cleanup separately from artifact publication; an explicitly authorized deletion before reconciliation does not make unresolved main changes complete.
Read after Phase 3 succeeds. Complete every check below before the parent skill's manual confirmation gate. These checks cover the downloaded artifact, embedded Console, and latest rc client.
Read after Phase 3 succeeds. Complete every check below before the parent skill's manual confirmation gate. These checks cover the downloaded artifact, embedded Console, and the rc release frozen in the candidate inputs.
## Phase 4 — Run the artifact locally, verify the console
Work inside the session scratchpad directory; never leave stray data dirs.
Use a unique task-owned scratch directory. Select the versioned archive matching the acceptance host, and verify it against the sealed manifest before extraction. Before desktop completion, use the Linux acceptance environment rather than rebuilding for the local desktop. Do not substitute a different build when a matching artifact is unavailable; report that acceptance gap. The shell example below assumes the verified executable is at `RUSTFS_BINARY` (`rustfs.exe` on Windows), `SCRATCH` is the task directory, and `S3_PORT` and `CONSOLE_PORT` are distinct available ports. Use equivalent native commands when the shell differs.
Bind both listeners to loopback. Choose task-only credentials, set loopback proxy exclusions for the server/client processes, and record the server PID. A port probe does not reserve a port; retry startup with fresh ports on a bind conflict rather than connecting to an existing service.
-`./rustfs --version` reports the preview tag name and the short SHA of `PREVIEW_HASH`. Reporting `<target>` without the `-preview.N` suffix means the build did not embed the tag — treat as FAIL and investigate before proceeding.
-`"$RUSTFS_BINARY" --version` reports the exact final `<target>` and full `CANDIDATE_SHA`. A preview suffix, another version or another source is a failure.
-Wait with a bounded readiness deadline while checking the recorded server process remains alive; `curl --noproxy '*' -fsS "$S3_ENDPOINT/health/ready"` must return ready from this process's listener.
- Startup log shows the embedded console being served (this was the regression that `fix(release): require embedded console assets` guards).
- Open `http://localhost:9001` in the browser: login with `rustfsadmin`/`rustfsadmin`; dashboard renders without JS console errors; create a bucket, upload a file, download it back (byte-identical), delete the object and bucket. Keep the server running for Phase 5.
- Open `CONSOLE_ENDPOINT` in the browser and login with the task credentials. The dashboard must render without JS console errors; create a bucket, upload a file, download it back (byte-identical), and delete the object and bucket. Keep the server running for Phase 5.
## Phase 5 — Validate with the latest rc client
## Phase 5 — Validate with the pinned rc client
`rc` is the RustFS CLI client from <https://github.com/rustfs/cli>.
-Ensure the latest release is installed: compare `rc --version` against `gh api repos/rustfs/cli/releases/latest --jq .tag_name`; update via `brew upgrade rustfs/tap/rc` (or download the release binary).
-Point it at the preview server and run the command matrix, recording PASS/FAIL per command:
-Read the CLI release and asset digests from `inputs.json`; verify the local client's version or download a host-compatible asset from that exact release into the task directory. If the host is a desktop, resolve its asset within the same pinned CLI release and record the digest; do not independently follow `latest`. Set `RC_BIN` to that executable and record its version/digest. Avoid changing the user's installed client for this check.
-Inspect the client's current help for an isolated configuration option and use it when supported. Otherwise choose a unique `PREVIEW_ALIAS` and confirm it is absent before creating it; never overwrite an existing alias. Use task-owned bucket/user names and input/output files. The names below are safe only inside the newly started isolated server.
- Point the client at `S3_ENDPOINT` with loopback proxy exclusions and run the command matrix, recording PASS/FAIL per command:
"$RC_BIN" admin user add "$PREVIEW_ALIAS/" relcheckuser relchecksecret12
"$RC_BIN" admin user remove "$PREVIEW_ALIAS/" relcheckuser
"$RC_BIN"alias remove "$PREVIEW_ALIAS"
```
- Any FAIL blocks the release. Afterwards stop the server and delete the scratch data directory.
- Any FAIL blocks acceptance. On success or failure, stop only the recorded task process and remove only task-created aliases/data after retaining the needed failure evidence. Do not erase an existing client configuration or unrelated server data.
## Field acceptance and desktop completion
Before accepting the Linux manifest, record Scanner/Heal, multi-pool, memory, major features, high-concurrency 503, performance and previous-version integrity/upgrade results in backlog. Preserve the release-specific agreed limits and baseline; a PASS label without artifact identities or test results does not satisfy acceptance.
Dispatch `release-complete.yml` only after that report passes, using the exact Linux manifest digest and backlog URL. Require native macOS/Windows checks, package extraction, image startup/scans, chart tests and complete certification to pass. Complete any desktop Console/client checks applicable to the release against these same archives. Record the completion run and final manifest SHA-256 before entering the parent confirmation gate. Partial Linux acceptance does not authorize final publication.
Read for Phase 3 after the source passed exact-SHA CI. The [parent invariants](../SKILL.md) apply; commands and recovery live in the [pipeline runbook](../../../../docs/operations/release-pipeline.md).
Dispatch `release-candidate.yml` on main with the confirmed final version and `CANDIDATE_SHA`. Record the run ID, frozen `inputs.json`, every Linux archive digest and `linux-manifest.json` SHA-256. Require the four Linux builds, native startup/S3 checks, previous-release upgrade matrix and Linux seal to succeed. Missing, skipped, cancelled or failed required work is incomplete acceptance.
Verify the frozen Console identity equals the one accepted in Phase 0. Every matrix job consumes that same digest and exact toolchain. The binary must report the final product version and source commit; its candidate ID is separate. No public tag, Release, registry tag, R2 release path, Helm repository or latest pointer should change during this stage.
A green Linux run is ready for field acceptance, not publication. The partial certification must have `publish_allowed: false`. Retain the exact Linux manifest for the next stage; a new source/build-input candidate must not inherit the old approval. A newer unrelated main commit does not invalidate this evidence.
Read for Phases 1–2. The [parent release invariants](../SKILL.md) and Console gate apply.
## Candidate Resume Preflight
-`git status --short` clean; `git fetch origin main --tags`.
-`gh auth status` works; confirm you can view `gh release list -L 3`.
- Confirm the exact final target version with the user if not explicit.
- Check whether `release/<target>` already exists before creating it; a resumed release reuses the existing branch and its history. For an in-flight release that already has a preview tag but no branch, anchor the new branch to that tag's commit only after verifying its target versions and prior acceptance evidence.
## Phase 1 — Source version bump to the final target (once)
- If `release/<target>` exists, verify its Cargo.toml and workspace members in Cargo.lock read `<target>` and skip the source bump, even if main has advanced. If the branch versions differ, stop and resolve the mismatch without downgrading main.
- If no branch exists but an unfinished preview tag does, verify its commit has `<target>` in both version files and skip the bump; Phase 2 anchors the branch to that commit. Stop if those files disagree. Otherwise, if main already has `<target>` in both files, skip the bump. Installation references intentionally retain the previous published deliverable during preview; if they were advanced to an unavailable target, restore that baseline before choosing the next candidate.
- Only when neither the release branch, an unfinished preview tag, nor current main already has `<target>`: if main is at a later version, select and verify a historical commit containing `<target>` rather than downgrading main; block if none exists. Otherwise invoke the `rustfs-release-version-bump` skill with stage `prepare`, the final `<target>` (NOT a preview version), and full GitHub flow (commit/push/PR).
- If a bump PR was needed, get it merged into main and record its merge commit. For a new release branch when main already has `<target>`, identify the main commit that introduced those versions. Phase 2 chooses a release candidate containing that commit; an existing release branch keeps its own history and a newer main HEAD is not required.
Do not wait for the moving latest main HEAD to become green. The release-branch CI in Phase 2 validates the chosen commit before a candidate build is dispatched.
## Phase 2 — Pin and validate the release source
- Use `release/<target>`. On the first attempt, create it from a selected main commit containing the version bump and intended changes; it need not be the latest main HEAD. On a restart, retain the existing branch and backport only reviewed fixes from main. Verify the branch's Cargo versions still equal `<target>`. A legacy preview can anchor source selection, but its tag and old artifacts do not constitute a candidate in the new protocol; freeze and verify a new candidate after the release recipe is aligned.
- The current `ci.yml` runs automatically on main pushes, not release-branch pushes. Dispatch it explicitly with `gh workflow run ci.yml --ref "release/<target>"`. Locate that dispatch run, verify its `head_sha` equals the release branch's remote HEAD, and require the full expected CI job set to pass, including `Quick Checks`, `Test and Lint`, and `End-to-End Tests (full merge gate)`. Treat a missing or skipped required lane as incomplete. A successful PR check or CI run for a different SHA does not qualify. If the branch advances or a run is cancelled, validate the new SHA again. Do not dispatch a candidate with failing or incomplete CI.
- Prefer protecting `release/*` against force pushes and deletion and requiring reviewed backport PRs. Check live rulesets rather than assuming the main ruleset covers release branches; report a missing release-branch rule as a gap.
- Set `CANDIDATE_SHA` to the CI-validated release-branch commit. Record the branch, exact commit and CI run URL. The new candidate protocol starts from a commit whose release recipe matches the reviewed main dispatcher; backport the recipe before freezing an older release branch if needed.
- Dispatch the Linux candidate as described in [candidate verification](preview-release.md). Do not create a preview or final tag here. The final executable already contains `<target>`; publication later promotes those same bytes.
- After a source or build-input change, run the affected source checks and create a new candidate. Reuse the frozen candidate after an infrastructure failure. Do not restart acceptance for unrelated main advances.
description: "Prepare the version-file and release-asset bump for an exact RustFS alpha/beta/stable target, with verification and optional commit/push/PR delivery. Use for an explicit version bump or when invoked by the release-publish workflow."
description: Prepare an exact RustFS Cargo version or align installation references after publication. Use for requested version bumps or the release workflow.
---
# RustFS Release Version Bump
# Release Version Files
Use this skill to prepare and verify release version files. Commit, push, and PR steps apply only when included in the user's delivery scope; publishing release tags belongs to `rustfs-release-publish`.
Require an exact target; ask if missing or ambiguous. Reject targets containing `-preview`: those identify candidates, not product versions or new public tags. Infer `post-release` only from an explicit request or parent workflow; otherwise use `prepare`. Delivery defaults to local edit/verify; commit, push, PR, and merge follow existing authorization and [Git rules](../../references/pull-requests.md).
Validated baseline: release pattern used in PR `#2957`.
| Stage | Files and constraints |
|---|---|
| `prepare` | Only `Cargo.toml` and `Cargo.lock`: workspace package, internal dependency, and workspace member versions become `<target>`. External dependencies stay unchanged. |
| `post-release` | Only `README.md`, `README_ZH.md`, `flake.nix`, `helm/rustfs/Chart.yaml`, and `rustfs.spec`. Cargo may already target the next release; leave it untouched. |
## Required inputs
Before installation edits, verify the exact non-preview Release, downloadable assets/source archive, pullable `rustfs/rustfs:<target>` image manifest, and published Helm chart. Block on missing artifacts. Do not downgrade defaults if a newer deliverable superseded the target. Candidate preparation retains the previous published installation references; follow-up commits never replace validated tags or sealed artifacts.
- Exact target version, for example `1.0.0-beta.4`.
- Delivery scope: local (`edit/verify`), git (`commit/push`), or GitHub
(`commit/push/PR`). Derive it from the conversation; when unspecified, prepare
and verify locally without blocking on a delivery question.
Packaging policy:
If target version is missing or ambiguous, stop and ask before editing.
- Docker image tags have no `v` prefix. Derive chart/app versions with `scripts/helm_chart_version.sh <target>`; both equal the final product SemVer, including prerelease suffixes. Helm CI uses the frozen candidate version before sealing, so no early installation chart bump is required. Previously published chart versions remain unchanged.
- RPM `Version` is numeric; `Release` is the prerelease suffix or `1` for stable. Expanded `Source0` and the unpack directory must resolve to the exact target including its suffix. Add the changelog entry using current git identity, date, and target; never copy an example identity/date.
- Changing these mappings requires explicit confirmation.
Reject any target version containing `-preview`: preview identifiers are tag-only (see `rustfs-release-publish`) and must never be written into version files. If asked for one, stop and point to the release pipeline instead of editing.
Verification follows root tiers: `prepare` validates Cargo metadata with the updated lockfile and checks every workspace/internal version with no unrelated lockfile updates. `post-release` renders Helm with the verified image, runs `scripts/test_helm_chart_version.sh` for chart version edits, and checks README, Nix, and RPM references. Run `git diff --check`; report unresolved required checks as `BLOCKED` without unrelated fixes.
## Read before editing
-`AGENTS.md` (root and nearest path-specific files).
-`.github/pull_request_template.md` only when preparing a PR.
- Current branch status and diff against `origin/main`.
## Default release file scope
Treat the following file list as the default checklist for each release bump:
-`Cargo.toml`
-`Cargo.lock`
-`README.md`
-`README_ZH.md`
-`flake.nix`
-`helm/rustfs/Chart.yaml`
-`rustfs.spec`
Only drop a file when the current repository release process clearly no longer requires it.
## Hard release policy
- Docker doc tags use `<version>` (for example `rustfs/rustfs:1.0.0-beta.4`), not `v<version>`.
- Helm chart version mapping follows `beta.N -> 0.N.0`.
-`rustfs.spec``Release` uses prerelease suffix only (for example `beta.4`).
- Do not change these rules without explicit confirmation.
## Step-by-step workflow
1. Confirm intent and isolate scope
- Use the exact target and delivery scope already supplied; ask only for a missing or ambiguous target or a material release-policy choice.
- Inspect current branch and ensure only release-related files are touched for this task.
2. Update workspace versions
- Bump `[workspace.package].version` in `Cargo.toml`.
- Bump internal workspace crate dependency versions in `Cargo.toml`.
- Update `Cargo.lock` so workspace package versions match target version.
- Re-scan for partial leftovers.
3. Update release assets
-`README.md` and `README_ZH.md`: update versioned Docker examples to target version.
-`flake.nix`: update package version to target version.
-`helm/rustfs/Chart.yaml`:
-`appVersion` = target version.
-`version` follows chart mapping rule, for example:
-`1.0.0-beta.3` -> `0.3.0`
-`1.0.0-beta.4` -> `0.4.0`
-`rustfs.spec`:
- Set `Release` to prerelease suffix (example `beta.4`).
- Add/update top changelog entry with exact format:
-`* Thu May 20 2026 houseme <housemecn@gmail.com>`
-`- Update RPM package to RustFS 1.0.0-beta.4`
- Changelog identity and time must come from current environment:
-`git config --get user.name`
-`git config --get user.email`
-`date '+%a %b %d %Y'`
- Changelog version text must match target release version exactly.
4. Verify before shipping
- Run:
-`make pre-commit`
- If `make pre-commit` fails, fix task-attributable failures and rerun affected checks. Report unresolved required checks as `BLOCKED`; do not silently widen scope to fix unrelated issues.
5. Commit strategy (only when committing is authorized)
- Preferred split when both parts changed:
-`chore(release): prepare <version>` for `Cargo.toml` and `Cargo.lock`.
-`chore(release): align release assets for <version>` for docs and packaging files.
- If user asks for one commit, use one commit.
- Stage only intended release files; do not include unrelated working tree changes.
6. Push and PR (only for the authorized delivery scope)
- Push branch:
- Use the user-requested or configured push remote: `git push -u <push-remote> <branch>` (first push), or `git push` when tracking is already configured.
- Any assumptions or uncertainties requiring confirmation.
- Verification result (`PASSED` or `BLOCKED`) with key evidence.
- Commit message(s) used.
- Push status and PR URL when GitHub flow is requested.
For authorized commits, keep stages separate: `chore(release): prepare <target>` or `chore(release): align installation references for <target>`. Report target/stage, changed files, verification, material uncertainty, and actual commit/push/PR state.
description: Perform a dedicated RustFS security/advisory review for authn/authz, IAM, RPC trust, paths, secrets, browser isolation, encryption, Object Lock, or other security boundaries. Use only when the user requests a security/advisory review or an adversarial review explicitly escalates to the full advisory map; do not auto-load solely because code touches a sensitive path.
---
# RustFS Security Advisory Lessons
Use this skill as the deep security lens. For a normal adversarial review with a
matched security surface, the concise security reference under
`adversarial-validation` is sufficient.
## Workflow
1. Freeze the exact diff/head and identify the changed trust boundaries.
2. Inspect the headings in [advisory-patterns.md](references/advisory-patterns.md),
then read the matching sections. Read the full map only for a broad security
gh api repos/rustfs/rustfs/security-advisories/<GHSA_ID>
```
Update this file only when an advisory adds or changes a reusable lesson, affected surface, validation pattern, or regression-test expectation. Do not update it for state-only, URL-only, count-only, or timestamp-only changes.
## Pattern Index
### Admin authorization and route exposure
-`GHSA-pfcq-4gjr-6gjm`: notification target endpoints accepted authenticated users but skipped admin authorization. Lesson: distinguish authn from authz; admin target CRUD must call the operation-specific admin authorization path.
-`GHSA-mm2q-qcmx-gw4w`: `ListServiceAccount` used `UpdateServiceAccountAdminAction`, while update lacked target ownership checks. Lesson: exact action constants and ownership checks are both required; information disclosure can chain into secret rotation and takeover.
-`GHSA-vcwh-pff9-64cc`: `ImportIam` checked `ExportIAMAction` for an import/write operation. Lesson: every admin handler must authorize the action it actually performs.
-`GHSA-jqmc-mg33-v45g` and `GHSA-8784-9m7f-c6p6`: `/profile/cpu` and `/profile/memory` were whitelisted from auth and allowed expensive diagnostics plus path disclosure. Lesson: profiling/debug endpoints need admin auth, opt-in, rate limits, and non-sensitive responses.
-`GHSA-f5cv-v44x-2xgf`: `/rustfs/admin/v3/metrics` accepted any authenticated IAM user and skipped admin authorization. Lesson: read-only metrics and diagnostic admin endpoints still require an operation-specific admin action check.
-`GHSA-796f-j7xp-hwf4`: `/rustfs/admin/v3/list-remote-targets` checked only that credentials existed and leaked replication target credentials. Lesson: replication target reads are privileged admin operations, and stored remote credentials require strict authz plus response redaction review.
-`GHSA-xp32-gxq2-3v52`: console license metadata endpoint was public and exposed subject and expiration fields. Lesson: management metadata endpoints should require admin auth or return only coarse public status.
### IAM import, service accounts, and privilege boundaries
-`GHSA-566f-q62r-wcr8`: `ImportIam` accepted attacker-controlled service account `parent`, `claims`, `accessKey`, and `secretKey`, enabling persistent backdoor accounts under root. Lesson: imported IAM payloads are untrusted data and must be validated against privilege boundaries.
-`GHSA-3495-h8r9-gfqg`: `ExportIAM` wrote regular-user and service-account secret keys into exported ZIP data. Lesson: IAM export is a credential-disclosure boundary; redact, seal, or strictly justify every exported secret before treating export permission as safe.
-`GHSA-5354-r3w2-34m8`: `AddServiceAccount` checked `CreateServiceAccountAdminAction` but trusted caller-supplied `target_user`, allowing service accounts under the root parent. Lesson: service-account create paths must validate parent ownership or root/admin authority, not only the create action.
-`GHSA-xgr5-qc6w-vcg9`: `deny_only=true` skipped allow checks and let restricted service accounts mint unrestricted children. Lesson: deny-only logic must never become implicit allow for privilege creation.
-`GHSA-mm2q-qcmx-gw4w`: leaked service account access keys plus update-without-ownership formed an escalation chain. Lesson: service-account identifiers are security-sensitive because update APIs consume them.
### STS, OIDC, and federation flows
-`GHSA-5qfg-mf7r-jp3w` and `GHSA-3473-5353-xhwh`: `AssumeRoleWithWebIdentity` was reachable through unauthenticated `POST /` routing and could issue temporary credentials from crafted web identity input. Lesson: every STS route needs explicit SigV4 or trusted identity-provider validation before role assumption, and unauthenticated exemptions must be narrowed to the exact action with uniform failure responses.
-`GHSA-jxrr-r6pv-h958`: unsigned JWT issuer data was decoded before verification to select an OIDC provider, and distinguishable failures could expose provider configuration. Lesson: web-identity routing may be unauthenticated, but pre-verification claims are untrusted routing hints; bound and rate-limit the request, normalize public errors, and verify signature, issuer, audience, and expiration before issuing credentials.
-`GHSA-ccrv-v8v9-ch9q`, `GHSA-48rf-7j3q-3hfv`, and `GHSA-xvfh-7c9g-hpw2`: service-account-controlled material could self-sign JWT session tokens with forged policy claims, and missing `exp` was accepted for service-account tokens. Lesson: session tokens must be signed by a trusted issuer/key path, enforce required claims and expiration, and reject self-signed or principal-controlled tokens.
-`GHSA-9pjf-w3c2-m32r`, `GHSA-4x2q-cpx9-9h26`, and `GHSA-xvpm-p3f7-34c3`: public OIDC authorize/callback flows trusted request `Host` or forwarded scheme when building credential-bearing redirects. Lesson: OIDC redirects must use configured allowlisted origins and trusted-proxy handling; never derive the post-login credential destination from direct client headers.
-`GHSA-m479-9x88-94w6`, `GHSA-frwq-mfqx-83p8`, `GHSA-q9q8-rf9r-fg9f`, and `GHSA-j5c2-hhf7-6gf5`: OIDC validation accepted attacker-controlled discovery URLs because hostname checks rejected only literal forbidden IPs, allowing DNS rebinding SSRF. Lesson: outbound federation URL validation must resolve and classify hostnames at the connection boundary and reject loopback, private, link-local, and rebound addresses.
### IAM policy conditions and external policy plugins
-`GHSA-6r96-hmgc-726c`: request headers collided with lowercase server-derived condition keys such as `userid`, `groups`, `versionid`, and JWT/LDAP claims. Lesson: never let caller-controlled headers append to or replace server-derived policy context; reserve trusted condition keys and keep intentional request-header keys separate.
-`GHSA-v9cp-qfw9-9pfp`: quantified negated string conditions applied negation after aggregation, transposing `ForAllValues` and `ForAnyValue` semantics. Lesson: push negation into the per-value predicate for quantified operators and test partially overlapping multi-value sets.
-`GHSA-5w8r-p896-6vq2`: OPA policy mode skipped `ExistingObjectTag/*` loading, so tagged objects looked untagged to external policies. Lesson: external authorization plugins need the same object-tag and request context as built-in policy evaluation before they decide.
### S3 object actions, copy, multipart, and upload policy validation
-`GHSA-g8w9-qw9q-fghr` and `GHSA-xm99-m3gq-83g8`: a valid presigned `PutObject` accepted extra `x-amz-*` headers omitted from `SignedHeaders`; `x-amz-copy-source` could turn that upload capability into a cross-bucket read performed as the signer. Lesson: a presigned URL is a bounded capability; inspect all received security-sensitive headers and reject unsigned ones before selecting the S3 operation or reaching storage.
-`GHSA-3ppv-fx5m-m749`: explicit `versionId` reads and copy sources authorized `s3:GetObject` instead of `s3:GetObjectVersion`. Lesson: version-specific object access must select version-specific actions for direct reads, `CopyObject`, and `UploadPartCopy`, with tests proving the backend is not reached on denial.
-`GHSA-x298-9x87-fvjq`: anonymous `ListObjectVersions` fell back to `ListBucket` and returned before public-access-block gates. Lesson: compatibility fallbacks must converge on the same post-authorization checks as direct grants, especially `RestrictPublicBuckets` and anonymous data-plane denies.
-`GHSA-mx42-j6wv-px98`: `UploadPartCopy` missed source authorization and allowed cross-bucket object exfiltration. Lesson: multipart copy must enforce the same source and destination contract as `CopyObject`.
-`GHSA-wfxj-ph3v-7mjf`: `UploadPartCopy` checked source and destination independently but missed destination copy-source policy constraints. Lesson: source read and destination write checks are not sufficient when policy constrains allowed copy sources.
-`GHSA-w5fh-f8xh-5x3p`: presigned POST accepted uploads without enforcing signed policy conditions. Lesson: parse and enforce all POST policy constraints server-side, including size, key prefix, and content type.
### Protocol frontends and IAM parity
-`GHSA-3g29-xff2-92vp`: FTP `RETR` and `SIZE`/`MDTM` read paths authenticated the user but skipped IAM before calling storage. Lesson: non-HTTP protocol frontends must enforce the same per-operation authorization as the S3 API before backend access.
-`GHSA-g3vq-vv42-f647`: FTPS `MKD` called `create_bucket` without checking `s3:CreateBucket`. Lesson: protocol command handlers need action-specific checks even when sibling handlers already authorize correctly.
-`GHSA-3p3x-734c-h5vx`: FTPS and WebDAV compared secret keys with early-return string equality, while FTPS also returned distinguishable invalid-user and invalid-password failures. Lesson: password-style protocol auth needs constant-time secret comparison, indistinguishable failures where practical, and rate limiting.
### Filesystem paths and object key traversal
-`GHSA-pq29-69jg-9mxc`: RPC `read_file_stream` joined untrusted paths under a volume directory without canonical boundary checks. Lesson: `PathBuf::join` plus length checks are not path security.
-`GHSA-8r6f-hmq2-28rg`: object keys containing traversal sequences bypassed bucket/object authorization when mapped to filesystem paths. Lesson: reject traversal at object-key parsing and verify final storage paths remain under the expected bucket/key root.
-`GHSA-f4vq-9ffr-m8m3`: Snowball auto-extract accepted archive entries such as `../victim-bucket/object`, authorized the raw attacker-bucket path, then storage path cleaning crossed bucket boundaries. Lesson: archive entries become object keys and need traversal rejection plus consistent authz/storage normalization before writes.
### Secrets, defaults, and cryptographic misuse
-`GHSA-j59h-h7q5-q348`, `GHSA-3wm5-wpm5-hmfm`, `GHSA-6wc8-xm48-qhmx`, `GHSA-9gf3-jx4p-4xxf`, `GHSA-63xc-c3w3-m2cf`, and `GHSA-ch63-6q4v-hwp5`: RustFS shipped known default root credentials that could authenticate to S3, admin APIs, IAM, KMS, console, and token-signing surfaces. Lesson: root credentials must be operator-provided or generated per install; known defaults and warnings are not acceptable for network-reachable deployments.
-`GHSA-h956-rh7x-ppgj`: gRPC used the hard-coded token `rustfs rpc` on both client and server. Lesson: source-visible shared tokens are authentication bypasses.
-`GHSA-r5qv-rc46-hv8q`: internode RPC HMAC secret fell back to the public default `rustfsadmin`. Lesson: RPC/internode auth must fail closed instead of silently using public defaults.
-`GHSA-75fx-qg6f-8rm7` and `GHSA-68cw-96m3-h2cf`: internode RPC secrets were derivable from known root credentials, making raw storage RPC signatures forgeable when explicit RPC secrets were unset. Lesson: RPC auth keys must be independent random secrets, never derived from S3 root credentials, and raw storage RPC should not share the public S3 listener without an internode-only boundary.
-`GHSA-m77q-r63m-pj89`: STS JWTs used the root secret key as the shared token signing key, allowing token forgery when the root secret was known. Lesson: STS signing keys need key separation, rotation, and key IDs; do not reuse root credentials for JWT/HMAC signing.
-`GHSA-923g-jp7v-f97f`: license verification embedded a production RSA private key and used private-key decryption as authenticity. Lesson: ship verifying/public keys only and use real signature verification.
### Sensitive logging and debug output
-`GHSA-r54g-49rx-98cr`: STS credentials were logged at info level. Lesson: generated credentials must never be logged in plaintext.
-`GHSA-8cm2-h255-v749`: debug logs leaked session tokens, secret keys, JWT claims, and raw STS response bodies. Lesson: redaction must cover custom `Debug` implementations and dependency response-body logging.
-`GHSA-333v-68xh-8mmq`: invalid RPC signature logging included the shared HMAC secret and expected signature. Lesson: error paths often leak secrets; never log raw secrets or derived authenticators.
### RPC input validation and panic safety
-`GHSA-gw2x-q739-qhcr`: malformed gRPC `GetMetrics` payloads reached `unwrap()` on deserialization and caused remote DoS. Lesson: every network/RPC deserialization failure returns an error, not a panic.
-`GHSA-h956-rh7x-ppgj` and `GHSA-r5qv-rc46-hv8q`: weak RPC auth increased reachability of otherwise internal handlers. Lesson: panic bugs become more severe when internode auth is weak or defaulted.
-`GHSA-c667-rgrv-99vj`: NodeService authentication signed the service prefix instead of the concrete generated method path, so valid metadata for one RPC could be replayed to another method during the timestamp window. Lesson: RPC HMAC payloads must bind exact gRPC method path, HTTP method surrogate, timestamp, and secret.
### Browser, CORS, and console isolation
-`GHSA-v9fg-3cr2-277j`: object preview rendered attacker-controlled HTML in a same-origin iframe, exposing console credentials stored in `localStorage`. Lesson: user content must be origin-isolated from the console and protected with `nosniff`, CSP, and strict content-type handling.
-`GHSA-7gcx-wg4x-q9x6`: an incomplete preview fix reintroduced extension-based PDF detection and bypassed the sandboxed fallback for attacker-controlled content. Lesson: browser-surface fixes need regression tests for alternate viewers and file-type branches, and preview trust must come from validated content type plus sandboxing rather than object names.
-`GHSA-x5xv-223c-8vm7`: default CORS reflected arbitrary origins with credentials. Lesson: never combine reflected origins with `Access-Control-Allow-Credentials: true`; default should be fail-closed.
### Trusted proxy and source IP conditions
-`GHSA-fc6g-2gcp-2qrq`: `aws:SourceIp` trusted client-supplied `X-Forwarded-For` or `X-Real-IP`. Lesson: forwarded IP headers are valid only behind configured trusted proxies; direct clients use socket peer IP.
### SSE and on-disk storage invariants
-`GHSA-xrrf-67jm-3c2r`: SSE metadata reported encryption while reader composition bypassed `EncryptReader` and stored plaintext. Lesson: test actual bytes on disk and wrapper order, not only API metadata.
### Object Lock and retention invariants
-`GHSA-j548-9grx-fh4f`: Object Lock enforcement treated unreadable, fabricated, or unparsable bucket metadata as absent configuration and allowed retained objects to be deleted or expired. Lesson: retention must fail closed unless Object Lock absence is authoritative, and every delete, lifecycle, scanner, force-delete, and default-retention path needs the same state distinction.
### Serde deserialization and input validation
- Reject unknown fields in untrusted S3 API XML/JSON, lifecycle, policy, and replication input where compatibility permits. Check the current type and supported payload fixtures; do not infer the repository's current coverage from an older audit. Where extra fields are part of the compatibility contract, validate security-critical values explicitly.
-`#[serde(default)]` on security-critical fields silently accepts missing values as zero/empty. Lesson: when a field has security implications (retention days, permissions, limits), validate the deserialized value explicitly rather than relying on defaults.
- Integer fields deserialized from user input and cast with `as` (e.g., `i32 as u32`) can wrap negative values to large positives. Lesson: validate ranges before casting; use `try_into()` with a typed error, or clamp only when the domain explicitly requires saturation.
- XML config typos (e.g., `"NoncurentDays"` instead of `"NoncurrentDays"`) are silently accepted when `deny_unknown_fields` is absent. Lesson: strict deserialization prevents silent misconfiguration that could cause data loss or unexpected retention behavior.
## Useful Search Seeds
Use these targeted searches when a diff touches security-sensitive code:
- Authz fixes: include unauthenticated, valid low-privilege, wrong-action, correct-action, owner, non-owner, and root/admin cases as applicable.
- Protocol frontend authz fixes: include denied `RETR`, `SIZE`/`MDTM`, `MKD`, bucket probe, and sibling allowed-operation cases, and assert denied paths do not reach the storage backend.
- IAM fixes: include import/update/list service-account cases with attacker-controlled parent, claims, access key, secret key, and policy.
- Copy/upload fixes: include cross-bucket, cross-user, source-denied, destination-denied, copy-source-condition, and multipart completion cases.
- Presigned upload fixes: include a valid presign with extra unsigned tagging, redirect, storage-class, and cross-bucket copy-source headers; require rejection before source or destination storage access, and verify explicitly signed equivalents still work.
- Version-action fixes: include historical UUID, explicit current version, `null`, range, partNumber, presigned, STS/session, service-account, anonymous bucket-policy, copy source, and multipart-copy source cases.
- Policy-condition fixes: include reserved-key header collisions, missing keys, partially overlapping multi-value sets, plugin mode, and built-in policy mode.
- Path fixes: include encoded traversal, absolute path, nested traversal, archive entries with `..`, valid object keys that resemble traversal text but should be rejected, and canonical bucket/prefix boundary checks.
- Logging fixes: assert redacted output for structs and response bodies that may contain credentials.
- IAM export fixes: assert exported archives omit plaintext user and service-account secrets unless the format deliberately encrypts or seals them.
- RPC auth fixes: include captured metadata replay across two concrete methods, stale timestamps, wrong path, wrong method surrogate, wrong secret, and valid same-method calls.
- Browser/CORS fixes: assert no credentials on reflected/default origins, correct behavior for explicit allowlists, and no same-origin script execution for previewed object content.
- SSE fixes: inspect stored bytes and verify API metadata, read-back behavior, and on-disk ciphertext together.
description: Analyze a supplied coverage report or perform an explicitly requested RustFS coverage assessment, rank uncovered risks, and propose focused tests. Do not trigger for ordinary implementation verification, a single regression test, documentation wording, or release preparation without a coverage request.
---
# Test Coverage Improver
Use this skill when you need a prioritized, risk-aware plan to improve tests from coverage results.
## Usage assumptions
- Focus scope is either changed lines/files, a module, or the whole repository.
- Reuse a supplied coverage artifact when its revision, scope, and format match.
- If required context is missing, call out assumptions explicitly before proposing work.
## Workflow
1. Define scope and baseline
- Derive the revision and scope from the request, diff, or supplied report.
- Default to the affected files/module; whole-workspace coverage requires that
scope in the request. Ask only if a wrong scope would change the result.
2. Obtain coverage evidence
- First inspect a matching existing artifact; do not regenerate it merely
because this skill was selected.
- If measurement is needed, read the Coverage section of
[the testing guide](../../../docs/testing/README.md#coverage), check disk
space/tool availability, and select package/test-scoped `cargo llvm-cov`
using the repository's nextest configuration. `make coverage` measures the
whole workspace (excluding E2E) and is only for that requested scope.
- Collect only metrics the report supports. Missing branch/changed-line
coverage is unknown, not zero.
- If measurement cannot run, continue with code-based test proposals and
mark measured coverage unverified; do not invent a coverage percentage.
3. Rank highest-risk gaps
- Prioritize changed code, branch coverage gaps, and low-confidence boundaries.
- Apply the risk rubric in [coverage-prioritization.md](references/coverage-prioritization.md).
- Report up to 5–8 evidenced gaps; do not pad a small scope.
- For each gap, capture: file, lines, uncovered branches, and estimated risk score.
4. Propose high-impact tests
- For each gap, name the behavior and regression, distinguishing assertions,
relevant normal/edge/failure cases, necessary setup, and estimated effort.
- Include only scenarios and setup that apply; reuse shared fixture details.
5. Close with validation plan
- State which gaps remain after proposals.
- Give a scoped verification command and behavior-based acceptance criterion;
use a coverage threshold only when the task or repository requires one.
- List assumptions or blockers (environment, fixtures, flaky dependencies).
## Report
Summarize the supported metrics, then combine each ranked gap with its proposed
test and validation. Include source lines only when supplied or inspected;
mark missing metrics or locations as unknown. Do not duplicate gaps and tests
in separate templates or fill empty categories for an otherwise small report.
short_description:"Find top uncovered risk areas and propose high-impact tests."
default_prompt:"Use $test-coverage-improver to analyze coverage for the requested scope, reuse matching reports, and propose tests for evidenced risks."
@@ -20,11 +20,11 @@ planning-docs-check: ## Check that no planning-type documents are committed
./scripts/check_no_planning_docs.sh
.PHONY:pre-commit
pre-commit:fmt-checkunsafe-code-checkarchitecture-migration-checklogging-guardrails-checkerror-other-ratchet-checktokio-io-uring-checkextension-schema-checkbody-cache-whitelist-checks3s-footprint-checkfips-wording-checkembedded-secrets-checktest-wiring-checkdoc-paths-checkplanning-docs-checkquick-check## Run fast pre-commit checks without clippy/full tests
pre-commit:fmt-checkunsafe-code-checkarchitecture-migration-checklogging-guardrails-checkerror-other-ratchet-checktokio-io-uring-checkextension-schema-checkbody-cache-whitelist-checks3s-footprint-checktest-count-ratchet-checktest-seams-checkfips-wording-checkembedded-secrets-checktest-wiring-checkdoc-paths-checkplanning-docs-checkquick-check## Run fast pre-commit checks without clippy/full tests
@echo "✅ All pre-commit checks passed!"
.PHONY:pre-pr
pre-pr:fmt-checkunsafe-code-checkarchitecture-migration-checklogging-guardrails-checkerror-other-ratchet-checktokio-io-uring-checkextension-schema-checkbody-cache-whitelist-checks3s-footprint-checkfips-wording-checkembedded-secrets-checktest-wiring-checkdoc-paths-checkplanning-docs-checklog-analyzer-rules-checkoffline-enrollment-e2e-checkclippy-checktest## Run full pre-PR checks with clippy and tests
pre-pr:fmt-checkunsafe-code-checkarchitecture-migration-checklogging-guardrails-checkerror-other-ratchet-checktokio-io-uring-checkextension-schema-checkbody-cache-whitelist-checks3s-footprint-checktest-count-ratchet-checktest-seams-checkfips-wording-checkembedded-secrets-checktest-wiring-checkdoc-paths-checkplanning-docs-checklog-analyzer-rules-checkoffline-enrollment-e2e-checkclippy-checktest## Run full pre-PR checks with clippy and tests
"description":"Certification for immutable candidates. All shipped platforms require native identity and startup; stable and prerelease require the pinned upgrade matrix. Linux-only acceptance never authorizes publication.",
"release_types":[
"preview",
"prerelease",
"stable"
],
"targets":[
{
"os":"linux",
"arch":"x86_64",
"abi":"musl"
},
{
"os":"linux",
"arch":"aarch64",
"abi":"musl"
},
{
"os":"linux",
"arch":"x86_64",
"abi":"gnu"
},
{
"os":"linux",
"arch":"aarch64",
"abi":"gnu"
},
{
"os":"macos",
"arch":"aarch64",
"abi":"none"
},
{
"os":"windows",
"arch":"x86_64",
"abi":"msvc"
}
],
"targets_basis":"Platform matrix of .github/workflows/build.yml (prepare-platform-matrix). gnu and macOS targets build with the pyroscope feature; musl and Windows targets build with no extra features.",
"features":[
"pyroscope"
],
"trusted_workflows":[
{
"repository":"rustfs/rustfs",
"workflow_id":"release-candidate.yml"
},
{
"repository":"rustfs/rustfs",
"workflow_id":"release-complete.yml"
}
],
"trusted_workflows_basis":"Receipts are produced by the reviewed main workflows and fetched by exact run ID with GitHub artifact digest verification. Candidate inputs freeze the harness commit separately from product source.",
"lanes":[
{
"lane":"identity",
"harness_repository":"rustfs/rustfs",
"harness_sha":"candidate.workflow_sha",
"harness_basis":"The exact workflow commit is frozen in candidate inputs; no mutable branch is accepted as a harness identity.",
"timeout_seconds":1800,
"environment_capabilities":[
"process-exec"
],
"cases":[
"artifact-identity",
"startup"
],
"applies_to":{
"release_types":[
"preview",
"prerelease",
"stable"
],
"platforms":"all"
},
"applies_basis":"Artifact identity and startup checks are mandatory for every release type, preview included, on every shipped target (rustfs/backlog#2662 frozen design item 5)."
},
{
"lane":"upgrade",
"harness_repository":"rustfs/rustfs",
"harness_sha":"candidate.workflow_sha",
"harness_basis":"The exact workflow commit is frozen in candidate inputs; no mutable branch is accepted as a harness identity.",
"timeout_seconds":5400,
"environment_capabilities":[
"process-exec",
"previous-release-artifact"
],
"cases":[
"direct-upgrade",
"mixed-version-upgrade",
"bucket-config-upgrade",
"bucket-config-rollback",
"multipart-layout-upgrade",
"multipart-layout-baseline"
],
"cases_basis":"Case IDs of the pinned previous-release matrix in .github/workflows/e2e-upgrade.yml (source.version/asset/sha256 and the case list mapped there).",
"applies_to":{
"release_types":[
"prerelease",
"stable"
],
"platforms":[
{
"os":"linux",
"arch":"x86_64",
"abi":"gnu"
}
]
},
"applies_basis":"preview releases use the pre-declared smaller set (identity lane only). The upgrade lane is only exercised on linux-x86_64-gnu, the platform of the pinned source assets."
}
],
"upgrade_sources":{
"basis":"Exactly the two previous-release sources pinned in .github/workflows/e2e-upgrade.yml are exercised today (source.version / source.asset / source.sha256). No other N-1/N-2 compatibility is claimed, and these digests are not inferred from tags.",
"rollback_basis":"Only the bucket-config-rollback case (rollback_to_previous_release_reads_current_bucket_metadata) is exercised. Full data-plane rollback is not certified and is never a default claim."
@@ -22,9 +22,9 @@ The following files in the project root are essential for Docker operations:
| File | Description | Usage |
| :--- | :--- | :--- |
| **`docker-buildx.sh`** | **Multi-Arch Build Script**<br>Automates building and pushing Docker images for `amd64` and `arm64`. Supports release and dev channels. | `./docker-buildx.sh --push` |
| **`Dockerfile.glibc`** | **Production Image (Ubuntu)**<br>Standard image using glibc. Useful if you need specific dynamic libraries. | `docker build -f Dockerfile.glibc .` |
| **`Dockerfile.source`** | **Development Image**<br>Builds RustFS from source code. Includes build tools. Ideal for local development and CI. | `docker build -f Dockerfile.source .` |
| **`Dockerfile`** | **Production Image (Alpine)**<br>Lightweight image using musl libc. Downloads verified RustFS and `rc` binaries from GitHub Releases and bundles `/etc/rustfs/bootstrap`. | `docker build -t rustfs:latest .` |
| **`Dockerfile.glibc`** | **Production Image (Ubuntu)**<br>Standard image using glibc. Includes the bundled bootstrap configuration. | `docker build -f Dockerfile.glibc .` |
| **`Dockerfile.source`** | **Development Image**<br>Builds RustFS from source code and bundles `rc` and the default bootstrap configuration. | `docker build -f Dockerfile.source .` |
### Docker Compose Configurations
@@ -110,6 +110,36 @@ docker compose up -d
---
## Docker Compose environment values
Use map syntax when quoting environment values in YAML:
Create the host directories and grant the container user write access before starting this example; official images run as UID/GID `10001:10001`. Set both credential variables to your own values, then run `docker compose config` to inspect the resolved configuration locally before `docker compose up -d`. The resolved output includes credentials, so do not share it publicly.
With list syntax, use `- RUSTFS_OBS_LOG_DIRECTORY=/var/log/rustfs/` or quote the whole item as `- "RUSTFS_OBS_LOG_DIRECTORY=/var/log/rustfs/"`. Writing `- RUSTFS_OBS_LOG_DIRECTORY="/var/log/rustfs/"` passes the inner quotes literally, making this a relative path beginning with `"`, which can fail with `mkdir: cannot create directory '"': Permission denied`. This also applies to addresses and credentials: fix every affected list item, rather than only the log directory. The entrypoint preserves configured values, including literal quotes in valid paths and secrets.
PR conventions (English title/body, template usage, `--body-file` with the
heredoc pattern, review-thread etiquette) live in the root `AGENTS.md` under
"Git and PR Baseline" — that section is the single normative home; do not
duplicate its rules here.
PR conventions (English title/body, template usage, `--body-file` with the heredoc pattern, review-thread etiquette) live in [Git and PR rules](../.agents/references/pull-requests.md); do not duplicate them here.
## Workflow Changes
-Any change touching `.github/workflows/` must pass `actionlint` (run from
the repo root) with zero findings before commit/PR. Install via
`brew install actionlint`, or the download script in the actionlint repo
(rhysd/actionlint); `make pre-pr` does not cover workflow files, so this is
the required check for them.
- Custom self-hosted runner labels (`sm-standard-*`, `dind-*`) are declared
in `.github/actionlint.yaml`. When introducing a new `runs-on:` label,
declare it there in the same change. Never use the config or `-ignore` to
silence real findings — fix the workflow (root `AGENTS.md`: make checks
pass by fixing the cause, not by weakening the gate).
- If `shellcheck` is installed, actionlint also lints `run:` scripts; treat
those findings as part of the gate.
-Changes to workflow YAML or `.github/actionlint.yaml` must pass `actionlint` (run from the repo root) with zero findings before commit/PR. Install via `brew install actionlint`, or the download script in the actionlint repo (rhysd/actionlint); `make pre-pr` does not cover workflow files, so this is the required check for them.
- Custom self-hosted runner labels (`sm-standard-*`, `dind-*`) are declared in `.github/actionlint.yaml`. When introducing a new `runs-on:` label, declare it there in the same change. Never use the config or `-ignore` to silence real findings — fix the workflow (root `AGENTS.md`: make checks pass by fixing the cause, not by weakening the gate).
- If `shellcheck` is installed, actionlint also lints `run:` scripts; treat those findings as part of the gate.
- Runner placement and billing rules live in `.github/workflows/README.md`. A new job defaults to `ubuntu-latest` (free for this public repository); a self-hosted `runs-on` needs one of the reasons listed there, stated in a comment next to it, and a `rust-cache` key is never shared between the hosted and self-hosted images.
## CI Alignment
When changing CI-sensitive behavior, keep local validation aligned with
`.github/workflows/ci.yml`. Read the workflow file directly for the current
gate steps — do not rely on (or add) a copied command list here; copies go
stale. `make pre-pr` is the local equivalent of the main gate.
When changing CI-sensitive behavior, keep local validation aligned with`.github/workflows/ci.yml`. Read the workflow file directly for the current gate steps — do not rely on (or add) a copied command list here; copies go stale. `make pre-pr` covers the shared local gates, not the full CI feature, platform, or end-to-end matrix. Select checks using the root verification tiers.
**Supported:** local disks, SAN (Fibre Channel) attached volumes, or JBOD-mounted disks. We recommend formatting them with the **XFS** file system.
**Not supported:** NFS, SMB/Samba/CIFS, and other remote or shared filesystems as RustFS data directories. This also applies to the underlying host storage for Docker volumes and Kubernetes PersistentVolumes.
Reports that only reproduce on unsupported storage will be closed without investigation. Please reproduce the issue on supported storage before submitting a bug report.
See [Disk Planning and File System Selection](https://docs.rustfs.com/en/installation/linux/prerequisites-and-service) for details.
- type:checkboxes
id:storage-support
attributes:
label:Supported storage confirmation
options:
- label:I have reproduced this issue with all RustFS data directories on supported storage (local disks, SAN/Fibre Channel, or JBOD; XFS recommended), without NFS, SMB/Samba/CIFS, or other remote or shared filesystem mounts, including storage backing Docker volumes and Kubernetes PersistentVolumes.
required:true
- type:textarea
id:bug-description
attributes:
label:Describe the bug
description:A clear and concise description of what happened.
validations:
required:true
- type:textarea
id:reproduction-steps
attributes:
label:Steps to reproduce
description:Include the commands, configuration, or actions needed to reproduce the problem.
placeholder:|
1. Start RustFS with ...
2. Run ...
3. Observe ...
validations:
required:true
- type:textarea
id:expected-behavior
attributes:
label:Expected behavior
description:A clear and concise description of what you expected to happen.
validations:
required:true
- type:input
id:rustfs-version
attributes:
label:RustFS version
description:Provide the release version, container image tag, or commit hash.
validations:
required:true
- type:dropdown
id:deployment-method
attributes:
label:Deployment method
description:How are you running RustFS? Add any relevant details in Additional context.
options:
- Binary
- Docker / Docker Compose
- Kubernetes / Helm
- Built from source
- Other
- type:textarea
id:storage-mounts
attributes:
label:Data directory filesystems and mounts
description:|
Identify the filesystem type and mount source for every RustFS data directory.
On Linux, include output from `findmnt -T /path/to/data -o TARGET,SOURCE,FSTYPE,OPTIONS` for each data path; on other systems, provide equivalent mount information.
For Docker, identify the backing host path and filesystem, not just the container path or volume name.
For Kubernetes, identify the PV, StorageClass/CSI driver, and actual backing filesystem; a PVC name alone is not sufficient.
Remove credentials and other sensitive information before submitting.
placeholder:|
RustFS data paths:
Filesystem types and mount sources:
Mount command output:
Docker host paths or Kubernetes volume backing storage (if applicable):
validations:
required:true
- type:input
id:operating-system
attributes:
label:Server operating system and architecture
description:Include the operating system version and CPU architecture where RustFS is running.
placeholder:"For example: Ubuntu 24.04, x86_64"
validations:
required:true
- type:textarea
id:client-environment
attributes:
label:Client environment
description:Include the S3 client or SDK and version. For console issues, include the browser, operating system, and desktop or mobile device details.
- type:textarea
id:logs
attributes:
label:Relevant logs
description:Paste relevant log output. Remove credentials and other sensitive information before submitting.
render:shell
- type:textarea
id:screenshots
attributes:
label:Screenshots
description:If applicable, drag and drop screenshots here to help explain the problem.
- type:textarea
id:additional-context
attributes:
label:Additional context
description:Add any other context, such as deployment topology or relevant configuration. Remove credentials and other sensitive information before submitting.
RustFS data directories backed by NFS, SMB/Samba/CIFS, or other remote or shared filesystems are unsupported, including those behind Docker volumes or Kubernetes PersistentVolumes.
Troubleshooting requests for these deployments will be closed without investigation. Use this form for new or improved functionality.
options:
- label:This is a feature request and does not ask for troubleshooting an unsupported remote or shared filesystem deployment.
required:true
- type:textarea
id:problem-description
attributes:
label:Problem or use case
description:Describe the problem or use case that motivates this feature request.
placeholder:"For example: I am trying to ... but ..."
validations:
required:true
- type:textarea
id:proposed-solution
attributes:
label:Proposed solution
description:A clear and concise description of what you would like to happen.
validations:
required:true
- type:textarea
id:alternatives
attributes:
label:Alternatives considered
description:Describe any alternative solutions or features you have considered.
- type:textarea
id:additional-context
attributes:
label:Additional context
description:Add any other context or drag and drop screenshots about the feature request here.
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
name:"Reference RustFS binary"
description:"Download the pinned reference RustFS release, verify its sha256 and expose the executable path. A missing pin, missing asset or digest mismatch fails the step."
inputs:
pin-file:
description:"Pin file naming the reference release (repository-relative)"
required:false
default:".config/reference-binary.toml"
platform:
description:"Platform table in the pin file"
required:false
default:"linux-x86_64-gnu"
destination:
description:"Directory that receives the executable; defaults to $RUNNER_TEMP/reference-binary"
required:false
default:""
outputs:
path:
description:"Absolute path of the verified executable"
# Workflow runners: what is billed and where a job belongs
**Use this when:** adding a job, changing a `runs-on`, moving a lane between runner pools, or deciding whether a new check is worth its runner cost.
**Source of truth:**`runs-on` in each workflow file for current placement; `.github/actionlint.yaml` for the declared self-hosted labels; the organisation's Settings → Billing → Usage page for what is actually charged; `docs/testing/ci-gates.md` for which checks block a merge (that does not change when a runner changes).
## Billing facts
This repository is public. For a public repository, GitHub's standard hosted runners (`ubuntu-latest`, `windows-latest`, `macos-latest`) cost nothing and have no minute cap, whatever plan the organisation is on. GitHub bills only two things: larger hosted runners, including the `macos-latest-xlarge` release lane used here, and standard runners in private repositories.
Every other label in this repository is capacity RustFS pays for. ARC pods and lab machines accrue cost while the machine exists. A Ubicloud label is metered for the minutes a job holds its VM:
| Label | Paid by | What it is | Use it for |
|---|---|---|---|
| `ubuntu-latest` | nobody | GitHub-hosted, Ubuntu 24.04, 4 vCPU, 16 GB RAM, about 14 GB of free disk. Ships a C toolchain, `docker`, `gh`, `curl`, `wget`, `jq`, Python. Can `mount` tmpfs and loop devices; io_uring works | the default for every job |
| `windows-latest`, `macos-latest` | nobody | GitHub-hosted standard runners | Windows and macOS targets |
| `macos-latest-xlarge` | RustFS | GitHub-hosted larger Apple Silicon runner | macOS release builds, deferred until Linux acceptance for candidates |
| `sm-standard-2` | RustFS | ARC pod, Ubuntu 24.04, minimal image: no `gh`, no C toolchain; Docker only on the `dind-` label | only a job that a hosted runner cannot run (see the placement rule) |
| `sm-standard-4` | RustFS | ARC pod, Ubuntu 24.04, 14 CPUs and 28 GB (the label is not the core count), large disk | workspace-scale Cargo builds |
| `ubicloud-standard-16-arm` | RustFS | Ubicloud VM, alias of `ubicloud-standard-16-arm-ubuntu-2404`: Ubuntu 24.04 arm64, 16 vCPU, 48 GB, 300 GB disk. Reached through the `build.yml` matrix, so `actionlint.yaml` does not list it | native aarch64 release builds (`linux-aarch64-musl`, `linux-aarch64-gnu`) |
| `dind-sm-standard-2` | RustFS | ARC pod with Docker-in-Docker | Docker workloads with a measured resource or environment requirement beyond the hosted runner |
| `smoke-testing`, `pf-testing` | RustFS | long-lived lab machines | the packaged functional chain and performance suites |
The self-hosted pods and the hosted image are both Ubuntu 24.04, so a binary built on one runs on the other; `ci.yml` builds the debug binary on `sm-standard-4` and runs it on both pools.
## Placement rule
A job runs on `ubuntu-latest` unless it has one of these reasons, and the reason goes in a comment next to its `runs-on`:
1.**Disk.** It restores or produces the workspace `target/`: `cargo build` or `cargo test` with `--all-targets`, `cargo nextest run --all`, or any reader of the `ci-dev` / `ci-feat-*` caches. The workspace test build leaves about 64 GB in `target/`; a hosted runner has about 14 GB.
2.**Critical-path CPU.** It is a build that several downstream lanes wait on and would blow its timeout at 4 vCPU (`build-rustfs-debug-binary` gates the e2e and s3-tests lanes).
3.**Hardware or environment.** Native aarch64 or access to the lab machines. Docker alone is not a reason: hosted Ubuntu ships Docker and supports the QEMU and Buildx setup actions.
4.**Cache ownership.** It reads a `rust-cache` key that a self-hosted job writes (see the cache rule below).
Jobs that do only the following have no reason to be self-hosted: shell or Python scripts, `cargo fmt`, `cargo deny`, typos, actionlint, API calls (`gh`, dependency review, issue and stale bots, CLA checks), downloading an artifact and running a prebuilt binary, or a `cargo build -p rustfs` with its own cache key. `e2e-distributed.yml` and `e2e-upgrade.yml` build the server and the `e2e_test` harness on `ubuntu-latest` inside their budgets, so "it compiles something" alone is not a reason.
The functional chain's `prepare` and `complete-chain` jobs, the performance runner availability check, and runner hygiene use `ubuntu-latest`: they inspect APIs or artifacts, not the lab hosts. The actual functional and performance suites remain on their lab runners. Functional-chain health collection uses `ubuntu-latest` so a lab outage cannot also stop its independent monitor. Docker image packaging also uses `ubuntu-latest` for both musl and glibc variants; it wraps verified candidate binaries rather than compiling the workspace, and still sets up QEMU and Buildx explicitly.
Moving these jobs off AKS reduces capacity demand, not necessarily the Azure bill immediately. VM costs fall only when nodes scale down or smaller capacity replaces them.
A hosted runner is also the only choice for a few things the pods cannot do: `mount -o loop` and `mount -t tmpfs` fail inside the ARC pods, and a container runtime cannot guarantee that `io_uring_setup` is allowed. `uring-integration` and `e2e-distributed` are on `ubuntu-latest` for that reason, not for cost.
## Cache rule
`Swatinem/rust-cache` builds its key from the OS, architecture, toolchain and lockfile. It does not include the runner label or image, so a cache written on an `sm-standard-4` pod and one written on `ubuntu-latest` would overwrite each other under the same `shared-key`.
- Every `shared-key` has exactly one writer. `cache-warm.yml` owns `ci-dev`, `ci-feat-rio`, `ci-feat-proto` and `ci-uring`; every other `./.github/actions/setup` call states `cache-save-if` explicitly, and `scripts/security/check_cache_save_if.sh` fails the build when one does not.
- All readers of a key run on the same image as its writer. Keys that live on hosted runners say so in their name (`ci-uring` is warmed on `ubuntu-latest`; `ci-e2e-distributed-hosted`, `e2e-upgrade-server-hosted`, `e2e-upgrade-tests-hosted`).
- Moving a job between pools therefore means renaming its key. The new key is empty until a run from `main` (a scheduled run, or a manual dispatch of that workflow from `main`) saves it; until then that lane does a cold build. The `build.yml` aarch64 release legs append `-ubicloud-arm` for this reason. `cache-warm.yml` does not write those keys.
-`CARGO_BUILD_JOBS` and every other `CARGO*`, `CC*`, `CFLAGS*`, `CXX*`, `CMAKE*` and `RUST*` variable is hashed into the key. `ci.yml` sets `CARGO_BUILD_JOBS` at step level for that reason; promoting it to job level rotates the key for every lane that shares it.
## Where self-hosted minutes leak
These are the patterns that have cost real money here without validating anything more:
- An `if: always()` summary or alert job on a self-hosted label inside a `workflow_run`-triggered workflow. The upstream workflow completes many times a day, the real jobs skip, and the summary still starts a pod each time. Gate it on the upstream job having run, and keep it on `ubuntu-latest`.
- Per-push workflows on `main`. A merge triggers the applicable `ci.yml` matrix and cache warming; `build.yml` development builds are scheduled or manual; with tens of merges a day that is as much self-hosted time as all pull requests together. Anything that does not verify the merged tree itself belongs on a schedule or behind a `paths` filter.
-`apt-get install` of tools the hosted image already ships. It is only needed on the minimal pod images.
- A throttled `CARGO_BUILD_JOBS` on a 14-CPU pod. The limit exists for link-storm reasons documented in `ci.yml`; measure before raising it, and measure before lowering it further.
- Tiny jobs on ARC pods. Each one pays roughly a minute of pod start-up before its first step; a compile-free job that takes ten seconds costs more to schedule than to run.
## Measuring a run
To see which pool each job of a run used and for how long:
```bash
gh api "repos/rustfs/rustfs/actions/runs/<run_id>/jobs?per_page=100"\
Rows using `macos-latest-xlarge` or a label starting with `sm-`, `dind-`, `ubicloud-`, `smoke-` or `pf-` use paid capacity. At the October 2026 review, a full pull-request run of `ci.yml` spent about 150 self-hosted minutes, a third of it in jobs that never compiled; treat that as the scale of what a placement mistake costs, not as a current figure.
## Checklist for a new or moved job
-`runs-on` is a literal label. A new self-hosted label is declared in `.github/actionlint.yaml` in the same change (`.github/AGENTS.md`).
- The job declares `timeout-minutes` (`scripts/security/check_job_timeouts.sh`).
-`actionlint` reports nothing.
- A self-hosted `runs-on` carries a comment naming its reason from the placement rule.
- Every `./.github/actions/setup` call states `cache-save-if`, and a key read from one pool is not written from the other.
- Moving a job does not change its check name, so the `main` ruleset and `docs/testing/ci-gates.md` stay as they are; renaming it does, and then that document's change checklist applies.
## Release stages
The [candidate release pipeline](../../docs/operations/release-pipeline.md) builds Linux first and defers paid desktop capacity until acceptance. Daily development builds also select Linux; use manual platform selection for desktop development artifacts. All six platforms remain required before publication. The pipeline records and promotes the exact tested bytes. Builder workflows have no public-release credentials. Keep periodic development builds, PR verification and field-test chains separate when their contracts differ; do not re-enable disabled workflows as part of a source-file migration.
Larger runners remain billed for public repositories; see [GitHub runner billing](https://docs.github.com/en/actions/concepts/runners/larger-runners#billing). Actual spending comes from organization billing, not runner labels or an estimated build duration.
Some files were not shown because too many files have changed in this diff
Show More
Reference in New Issue
Block a user
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.