Compare commits

..

137 Commits

Author SHA1 Message Date
overtrue fbd192242f ci: run workspace clippy beside the test binary build
Clippy ran in front of the test-binary archive inside Workspace Lint and Build, so every workspace test waited 13 to 17 minutes for a lint that shares no compiler output with the archive.

Move the unchanged Clippy step into its own workspace-clippy job with the same condition, needs, runner and cache key. Workspace Lint and Build keeps its ID and name as the archive producer. The aggregate and the scheduled alert depend on the new job, and the plan contract moves to 4 so a base planner that predates the job set falls back to the full matrix.

ci_gate.py now rejects a workflow where the lint is conditional, duplicated, outside the aggregate, scoped differently from the archive producer, or back on the archive consumers' dependency chain, and where the workflow's plan-contract marker differs from the planner's.
2026-11-12 07:24:51 +08:00
唐小鸭 e2bd880fa4 fix(kms): make AWS-backed SSE objects readable and key policies hold (#9334)
* fix(kms): read back SSE objects written through the AWS backend

The AWS backend returned the GenerateDataKey blob bare, so the read path took the unrecognized bytes for a locally wrapped key and asked for RUSTFS_SSE_S3_MASTER_KEY without ever calling AWS Decrypt. Every SSE-KMS and SSE-S3 object written through this backend was unreadable, and UploadPart failed the same way.

The backend now wraps the blob in the data-key envelope the other backends use. A stored key that is neither an envelope nor a local-master-key wrap is offered to the KMS when its backend reports that released versions persisted it bare, so objects written by 1.0.4 and 1.0.5 read back without being rewritten.

* fix(admin): percent-decode the key id in the KMS describe path

GET /rustfs/admin/v3/kms/keys/{key_id} read the path segment verbatim, so an AWS key ARN, which has to be escaped to fit in one segment, was looked up, authorized and audited under its escaped spelling and answered 404.

* fix(policy): match an AWS key ARN as its key id in KMS statements

A key-scoped statement was matched against the key identifier exactly as the request spelled it. A Deny on key/<id> therefore did not cover a request naming the same key by its AWS ARN, on the SSE-KMS write, on the read of an object stored under the ARN spelling, and on the per-key admin endpoints.

A key ARN is now reduced to its key id before matching. A request naming a key by alias, which only the backend can resolve, fails closed against key-scoped statements. The deletion impact report compares key references the same way.

Adds the AWS KMS backend guide in English and Chinese.

* fix(kms): read rio-v2 objects that carry a bare AWS data key

A rio-v2 build stores a sealed object key beside the data key, so an AWS-backed object written before the envelope carries the same shape as a MinIO object and was sent to the MinIO decoder, failing before AWS Decrypt was tried.

MinIO's sealing is authenticated, so opening the data key under the local master key is a proof: the bare blob reaches the KMS only once that has failed, or when no local master key exists. Without a backend that reads bare ciphertext the MinIO route is unchanged.

* docs(kms): describe pairing an AWS KMS site with a Vault site

Site replication synchronizes key names and never keys, and AWS assigns key ids, so in a mixed pair the Vault site has to name its keys after the AWS key ids.
2026-11-11 18:09:43 -05:00
唐小鸭 acf0d3ff72 fix(replication): replicate SSE-KMS objects under key-policy enforcement (#9340)
fix(replication): replicate SSE-KMS objects under key enforcement

With RUSTFS_KMS_ENFORCE_SSE_KEY_POLICY=true the receiving site authorizes a replica PUT of an SSE-KMS object for kms:GenerateDataKey against the key it resolves to. The managed site-replicator account held no kms grant, so every SSE-KMS object stayed FAILED with AccessDenied.

Grant kms:GenerateDataKey on every key and treat a stored policy without it as outdated so the reconcile tick refreshes existing accounts. kms:Decrypt stays out: reads proxied to a peer run as this account.
2026-11-11 18:09:25 -05:00
Chris An 013a4ae3b3 refactor(admin): move the admin route table out of the s3s router (#9320)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* refactor(auth): share authorization core with owned entry points

Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* refactor(admin): move remaining admin handlers to owned requests

Migrate the ten table-catalog commit and publication handlers to the
owned admin Operation trait, redeem object zip download tokens through
authorize_owned_request, and remove the s3s-typed router Operation
trait. S3Router now converts the s3s request into an AdminRequest and
the AdminResponse back at its edge, so no admin operation takes an s3s
type (rustfs/backlog#2788).

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* fix(auth): keep owned authorization in the app layer and fail closed

Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.

* test(auth): move owned parity tests to the app layer

Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.

* test(admin): convert the tagged table catalog request before installing identity

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* fix(admin): keep owned router entry points crate-visible

* test(auth): read storage-private parity facts through test accessors

The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.

* test(auth): owned and legacy entry points reach the same decisions

Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).

* fix(admin): drop the owned trait bound from S3Router's inherent impls

* test(auth): satisfy clippy on the parity test facade

* test(admin): cover zip download token redemption authorization

* test(auth): report every decision mismatch in the parity matrix

* refactor(admin): move the admin route table out of the s3s router

* test(auth): cover multipart staging in the owned/legacy decision matrix

* fix(admin): authorize warehouse locations with the owned commit request

* fix(admin): return the owned table catalog authorization result unchanged

* fix(table-catalog): restore owned request lines the main merge reverted

The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.

* fix(auth): make an absent caller secret unrepresentable as a key

RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.

* fix(auth): keep the test-only credentials rebuild out of the lib build

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 18:08:28 -05:00
Chris An 6e82e08f8e test(guards): let the split probe check already-split sources (#9343)
test(guards): let the split probe check sources that are already split

The end-to-end split probe simulated every split itself and stopped on a tree where bucket_usecase.rs is already split. It now decides per source (ecfs.rs, bucket_usecase.rs, multipart_usecase.rs) whether the tree is unsplit or split: unsplit sources are simulated as before, split sources get the same planted violations at the top of real split files plus a silence check over every other real split file, and a source in neither state fails with its name. Refs rustfs/backlog#2765.
2026-11-11 17:39:16 -05:00
Chris An e98b9132ca test(guards): read file plus split directory in text guards (#9292)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* test(guards): read file plus split directory in text guards

Text guards that read one file with include_str! or by path broke, or silently stopped seeing the code they guard, when that code moved to another file. They now read the file they read today, which stays required, plus the sibling directory a mechanical split will populate (storage/legacy_edge, app/bucket_usecase, app/multipart_usecase, app/lifecycle_transition_api_test). Counts are summed over the set and split markers must occur exactly once across it. Refs rustfs/backlog#2765.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* test(guards): avoid a typos false positive in a fixture

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* test(guards): address review of the split-safe text guards

Make the super:: import rules depth-aware for split files, cover ecfs_test.rs moving to legacy_edge/tests, read production text only in the Rust count and contains guards, bound method slices by their own closing line, keep the split arrays safe on bash 3.2, and add an end-to-end split probe for the architecture, layer and logging guards. Refs rustfs/backlog#2765.

* test(guards): plant the lifecycle split probe in its own file

P4 created lifecycle_transition_api_test/put.rs; the end-to-end split probe now plants its violations in split_probe.rs instead of overwriting it.

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 17:09:38 -05:00
Chris An 0e69351973 refactor(admin): move remaining admin handlers to owned requests (#9287)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* refactor(auth): share authorization core with owned entry points

Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* refactor(admin): move remaining admin handlers to owned requests

Migrate the ten table-catalog commit and publication handlers to the
owned admin Operation trait, redeem object zip download tokens through
authorize_owned_request, and remove the s3s-typed router Operation
trait. S3Router now converts the s3s request into an AdminRequest and
the AdminResponse back at its edge, so no admin operation takes an s3s
type (rustfs/backlog#2788).

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* fix(auth): keep owned authorization in the app layer and fail closed

Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.

* test(auth): move owned parity tests to the app layer

Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.

* test(admin): convert the tagged table catalog request before installing identity

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* fix(admin): keep owned router entry points crate-visible

* test(auth): read storage-private parity facts through test accessors

The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.

* test(auth): owned and legacy entry points reach the same decisions

Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).

* fix(admin): drop the owned trait bound from S3Router's inherent impls

* test(auth): satisfy clippy on the parity test facade

* test(admin): cover zip download token redemption authorization

* test(auth): report every decision mismatch in the parity matrix

* test(auth): cover multipart staging in the owned/legacy decision matrix

* fix(admin): authorize warehouse locations with the owned commit request

* fix(admin): return the owned table catalog authorization result unchanged

* fix(table-catalog): restore owned request lines the main merge reverted

The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.

* fix(auth): make an absent caller secret unrepresentable as a key

RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.

* fix(auth): keep the test-only credentials rebuild out of the lib build

* fix(app): drop the PutObjectInput re-export main now provides

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 16:01:44 -05:00
Chris An 09811acf91 ci(parity): run dual-stack differential against pinned release (#9315)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* test(e2e): allow a pinned release binary as differential reference side

RUSTFS_E2E_REFERENCE_BINARY makes side A of the dual-stack differential a released rustfs binary, started without RUSTFS_S3_STACK. A missing, non-file or non-executable path fails the run instead of falling back to the same-binary mode. The report records which side is the reference and each side's --version output.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* test(e2e): update smoke selection for reference-binary unit tests

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* ci(parity): run the dual-stack differential against the pinned reference

Adds a differential job to reference-parity.yml: side A is the pinned release, side B the candidate artifact built for the s3-tests comparison. The job prints reference_side, version_a and version_b from the report, fails when side A is not the reference or both versions are equal, and lists every difference in the job summary.

* ci(parity): print the first version line in the differential summary

* chore: restore main's Cargo and baseline files after merging main

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 15:15:12 -05:00
Chris An 0872f0be9b ci(e2e): exclude reference unit tests from e2e-full selection (#9342)
ci(e2e): keep reference-selection unit tests out of e2e-full

The eight dual_stack_differential::reference tests added in #9285 entered the e2e-full selection and changed its digest. They are hermetic and already run in e2e-smoke on every pull request, so exclude them from e2e-full; the selection digest returns to the value recorded in .config/e2e-full-selection.txt.
2026-11-11 14:13:10 -05:00
Chris An 773a5c34a5 fix(admin): read the caller secret only where a handler uses it (#9339)
AddUser reads the current secret only for a self-rotation, orphan-bucket recovery only to seal a /minio/admin compat response, and a missing secret key answers AccessDenied instead of InternalError in AddUser, bucket recovery and ChangeOwnPassword.
2026-11-11 14:12:54 -05:00
唐小鸭 056ddce8f1 fix(kms): require a scheduled deletion before destroying a key (#9337)
On the Vault KV2 and Vault Transit backends, an immediate deletion of a
key that was not already pending deletion only marked it PendingDeletion
and still reported success, so objects under the key stayed readable
after the caller was told the key was gone.

Key destruction is now two explicit steps on the Local, Vault KV2 and
Vault Transit backends: a deletion is scheduled first, and
`force_immediate` only destroys a key that is already PendingDeletion.
A request against an Enabled or Disabled key is refused with an invalid
state error and changes nothing. Vault Transit's "encryption key not
found" answer for a destroyed key now maps to KeyNotFound instead of a
backend error.

Document the feature in docs/operations/kms-key-destruction.md with a
Chinese translation.
2026-11-11 14:07:20 -05:00
Chris An 153d6b880d build(deps): re-pin rustfs/gateway to 7915d069 (#9283)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* build(deps): re-pin rustfs/gateway to 371d91b2

* fix(protocols): pass copy sources as CopySourceValue

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* test(protocols): raise rustfs test-count baseline for copy source tests

* fix(protocols): keep refusing listings without object ETags

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* build(deps): re-pin rustfs/gateway to f9aa6045

* build(deps): re-pin rustfs/gateway to aa1d1a29

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 12:16:15 -05:00
唐小鸭 20c046af6c fix(targets): resolve default queue dirs per node (#9262)
The built-in notify and audit queue directories /opt/rustfs/events and
/opt/rustfs/audit are persisted cluster-wide as literal defaults. On
native Windows they have no drive prefix, so every target that kept the
default failed validation as a non-absolute path.

Treat those two literals as logical defaults and resolve them on each
node when a queue directory is validated or opened. A new
RUSTFS_TARGET_STORE_DIR relocates both default queues on any platform;
without it, Windows uses %ProgramData%\RustFS. Explicit operator paths,
the persisted configuration, and Linux/macOS behavior are unchanged, and
pending entries are not migrated when the root changes.

Expose the variable through the Helm chart as
config.rustfs.target_store_dir and document the resolution rules.
2026-11-11 11:01:00 -05:00
cxymds 1f823d4ee8 fix(lock): preserve batch ownership and bound peer waits (#9266)
* chore(observability): classify bulk delete failure stages

* fix(lock): retain cleanup ownership for batch acquisition

* fix(lock): bound batch waits and retry confirmed rejections
2026-11-11 10:54:38 -05:00
Chris An 0622419f65 fix(obs): bound the log directory with default settings (#9327)
* fix(obs): bound the log directory with default settings

With the defaults the active log file had no size limit (size rolling was off), and the cleaner counted only rolled files older than the minimum file age against the byte budget, on a 30-minute interval. A log storm could therefore fill the disk for up to two hours without the budget applying.

The active file now rolls at 256 MiB when the single-file limit is unset; an explicit 0 still turns size rolling off, and the cleaner's per-file trim keeps its previous default. The appender wakes the cleaner after every roll, and once the rolled files exceed the byte budget the cleaner processes the oldest ones regardless of age. The README no longer calls the budget a hard cap on the directory and states the actual bound.

* fix(obs): trim only what the log byte budget needs

Lifting the minimum file age for an over-budget pass merged fresh files into the regular selection, so the keep_files ceiling and the per-file limit applied to them too: one byte over the budget could process every fresh file but keep_files of them. The override is now a byte trim on the files that would remain, oldest first, until the budget holds.

An unset single-file limit now rolls at a quarter of a small byte budget instead of 256 MiB, so a freshly rolled file is not larger than the whole budget. Both logging setups open the appender through one function that returns the roll signal the cleanup task listens on. The README states that a log directory must not be shared by processes whose file names match the same pattern.
2026-11-11 10:47:23 -05:00
GatewayJ ac8d81319b fix(s3-tables): reclaim dropped table maintenance configs (#9331) 2026-11-11 10:43:57 -05:00
Chris An 1b3c477f05 fix(ecstore): bound bitrot and remote disk failure logs (#9328)
* fix(ecstore): bound bitrot and remote disk failure logs

A failing drive logs one error per shard block of every read it serves, and an unreachable peer logs one warning per in-flight operation. Neither had a rate limit, so a degraded drive or peer could produce log volume at the speed of the failing I/O.

The three bitrot read failures (short shard, hash mismatch, read error) and the two remote disk failures (timeout, network-like error) now log at most once per five seconds and report how many events were suppressed. The remote disk throttles belong to each disk handle, so one noisy peer cannot hide another peer's first warning. Error results, health marking and the per-operation counters are unchanged.

* fix(ecstore): bound reader retirement warnings in the decoder

A slow shard reader is retired once per stripe of every read it lags on, and a parity reader that cannot be aligned is retired with a warning each time. Both lines name only a shard index. They now log at most once per five seconds with the number suppressed; the retirement itself and the error recorded for the shard are unchanged.
2026-11-11 10:42:51 -05:00
唐小鸭 ea286defc6 fix(windows): release rebuild source pins and align test fixtures (#9263)
* fix(windows): release rebuild source pins and align test fixtures

Release the multipart source directory pin as soon as the upload head is
decoded during online index rebuild. On Windows the pin denies delete
sharing, so keeping it while indexing made a concurrent abort fail with a
sharing violation.

Align three test fixtures with Windows path and handle semantics:
- heal bucket pass targets use the endpoint string form, matching
  production disk endpoint identity;
- scanner erasure probe injection keys are normalized with path_join_buf
  so they match the scanner's lookup keys;
- the targets queue budget test changes mtime through a writable handle,
  which Windows requires.

* test(scanner): look up failed objects by the scanner's key form

The scanner records failed objects under keys built with path_join_buf,
which uses `/` separators on every platform. Three erasure probe tests
looked them up with a native `root.join(..)` path, so on Windows the
expected key never matched and the assertions failed. Build the expected
key the same way the scanner does; the assertions still require the exact
key to be present.
2026-11-11 10:39:00 -05:00
唐小鸭 7cfa5c3d28 fix(ecstore): name blocked migration records; port fixtures to Windows (#9261)
* test: bypass the disk independence check in path-only topology tests

These tests parse endpoints whose local paths are never created. Unix
leaves missing paths out of the physical-disk independence check, but
Windows resolves them to their volume, so every disk counted as one
shared device and the parsing assertions never ran. The check keeps its
own coverage in the dedicated shared-volume tests.

* fix(ecstore): name the target record when a migration write fails

The existence probe reports a blocked record with its path, but the
commit path returns bare disk errors. On Windows a regular file in the
record's place reads as missing, so migration only fails at the write,
and startup reported "File access denied" without naming the record.

* test: make app fixtures portable to native Windows

- Token- and cache-shaped keys use Windows-legal spellings at the same
  sort position, so pagination still runs without relaxing key admission.
- The TLS root test falls back to a directory junction only when a
  symlink needs a privilege the runner lacks, and asserts the root is a link.
- Snapshot timestamps step by 1 us, which Windows SystemTime can represent.
- The receiver disk URL uses a slash-led path instead of a raw drive path.
2026-11-11 10:38:01 -05:00
Chris An c44eebfe1c test(kms): use absolute fixture paths on Windows (#9274) 2026-11-11 10:35:54 -05:00
Chris An d62d63cdea test(sftp): match structured Windows host-key warning (#9273) 2026-11-11 10:35:00 -05:00
Chris An e5691e7d1a refactor(auth): share authorization core with owned entry points (#9281)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* refactor(auth): share authorization core with owned entry points

Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* fix(auth): keep owned authorization in the app layer and fail closed

Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.

* test(auth): move owned parity tests to the app layer

Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* test(auth): read storage-private parity facts through test accessors

The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.

* test(auth): owned and legacy entry points reach the same decisions

Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).

* test(auth): satisfy clippy on the parity test facade

* test(auth): report every decision mismatch in the parity matrix

* test(auth): cover multipart staging in the owned/legacy decision matrix

* fix(table-catalog): restore owned request lines the main merge reverted

The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.

* fix(auth): make an absent caller secret unrepresentable as a key

RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.

* fix(auth): keep the test-only credentials rebuild out of the lib build

* fix(app): drop the PutObjectInput re-export main now provides

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 09:43:29 -05:00
Chris An 46594e2dfd test(e2e): pinned release binary as differential reference side (#9285)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* test(e2e): allow a pinned release binary as differential reference side

RUSTFS_E2E_REFERENCE_BINARY makes side A of the dual-stack differential a released rustfs binary, started without RUSTFS_S3_STACK. A missing, non-file or non-executable path fails the run instead of falling back to the same-binary mode. The report records which side is the reference and each side's --version output.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* test(e2e): update smoke selection for reference-binary unit tests

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* chore: restore main's Cargo and baseline files after merging main

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 08:28:14 -05:00
Chris An 9fe0ff6d80 feat(gateway-adapter): audit refusals the gateway enforces (#9298)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(gateway-adapter): add IAM-backed CredentialProvider

Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).

- Pin rustfs-gateway at the existing gateway rev with
  default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
  adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
  is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
  legacy empty secret); IAM not ready or not initialized -> Unavailable;
  unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
  NotFound; other IAM errors -> Backend; invalid or "off" principals
  resolve disabled; STS credentials carry a SessionBinding, and an STS
  credential without an expiry is a Backend fault rather than a
  never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
  error text is dropped after classification.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* feat(gateway-adapter): add IAM-backed PolicySource

Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.

- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
  never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
  with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
  account's own secret for service accounts), and is_owner mirrors the
  legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* feat(gateway-adapter): add Observer and AuthzAuditSink adapters

Map the gateway's answered-request event onto the labels of
rustfs_s3_http_requests_total, bounded as the legacy counter bounds them,
and write one audit record per authorization decision (allow, deny and
indeterminate) in the shape of the legacy authorization-denial entry,
with the gateway's verified caller as accessKey.

Both adapters stop at RustFS-side sink traits. The legacy metric and
audit field names, with the file:line that emits each and the owner
that supplies it under the gateway, are committed as
tests/fixtures/observability-contract.json and held to the code.

* fix(gateway-adapter): share live root and refuse short secrets

Address the security review of the T2.1 adapters (rustfs/backlog#2760).

- Add RootCredentials (validated: root secret and STS signing key at
  least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
  RootCell. IamAdapters::new is now the only constructor of
  IamCredentials and IamPolicySource, so both read one live root source
  per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
  in the credential provider and DISABLED_PRINCIPAL in the policy
  source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
  instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
  accounts of root, the name live groups are read under, and another
  session's token.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* fix(gateway-adapter): effective secret length and unsplittable pair

Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).

- One rule for every secret: its length after trailing NUL bytes are
  removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
  so trailing NULs add nothing; interior NULs count. Applied to the root
  secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
  together through the consuming install(builder, make_authenticator);
  compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
  binary reads its live root accessor directly; RootCell is now a
  test-only helper.

* refactor(gateway-adapter): audit only refusals the gateway enforced

Drop the Observer adapter: request metrics stay with the outer tower
layer and the use-case code on both stacks, and the gateway already
logs every refusal it makes, so nothing is left for an observer to add.

Rework the AuthzAuditSink adapter to record only a Deny or
Indeterminate at an enforcing stage. An Allow and the GetObject
missing-object visibility probe produce no record. The audit switch
and the denial rate limiter are asked before a record is built, and
the record carries the legacy denial entry's fields only.

Remove the observability contract fixture and its tests.

* chore(gateway-adapter): drop the dependencies the observer needed

* docs(gateway-adapter): state what install guarantees about the provider handle

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 08:27:16 -05:00
Chris An 8125128d05 test(app): split lifecycle tests by owner and add use-case seams (#9316)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* test(app): add per-operation test seams for oracle use-case calls

* chore(codemods): add lifecycle transition test split codemod

* test(app): split lifecycle transition tests by operation owner

* test: call oracle use-cases through test seams in cross-owner tests

* ci: guard cross-owner tests to call use-cases through test seams

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 06:22:25 -05:00
Chris An ff84f2b5bf fix(ci): fix mint runner and Dockerfile.source rc arch (#9310)
* fix(ci): run the mint lane on ubuntu-latest, which has a Docker daemon

* fix(docker): let BuildKit populate TARGETARCH for the rc download

* fix(docker): derive the rc architecture when TARGETARCH is not set
2026-11-11 06:18:31 -05:00
Chris An def5418168 test(e2e): expect ServiceUnavailable for degraded ListParts after #9149 (#9313)
* test(e2e): expect ServiceUnavailable for degraded ListParts after #9149

PR #9149 made ServiceUnavailable the default API code for storage
read-quorum failures and limited SlowDownRead to GET/HEAD object reads.
ListParts maps its storage error through ApiError::from, so a degraded
ListParts now answers 503 ServiceUnavailable. The two distributed
acceptance cases still expected the previous SlowDownRead code and have
failed every nightly e2e-distributed run since 2026-11-05.

The 503 status and the fail-closed (non-empty-list) assertions are
unchanged; only the error code tracks the intended contract.

* style(e2e): apply rustfmt to the ListParts error-code assertion
2026-11-11 06:18:24 -05:00
Chris An 85f5cc9ead feat(gateway-adapter): host, bucket-owner and request-id adapters (#9289)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(gateway-adapter): add IAM-backed CredentialProvider

Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).

- Pin rustfs-gateway at the existing gateway rev with
  default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
  adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
  is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
  legacy empty secret); IAM not ready or not initialized -> Unavailable;
  unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
  NotFound; other IAM errors -> Backend; invalid or "off" principals
  resolve disabled; STS credentials carry a SessionBinding, and an STS
  credential without an expiry is a Backend fault rather than a
  never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
  error text is dropped after classification.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* feat(gateway-adapter): add IAM-backed PolicySource

Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.

- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
  never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
  with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
  account's own secret for service accounts), and is_owner mirrors the
  legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* feat(gateway-adapter): add host, bucket-owner and request-id adapters

* fix(gateway-adapter): avoid ecstore path in doc comment

* fix(gateway-adapter): keep the s3s path pattern out of docs

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* test(gateway-adapter): make the test carrier Clone for Extensions::insert

* fix(gateway-adapter): share live root and refuse short secrets

Address the security review of the T2.1 adapters (rustfs/backlog#2760).

- Add RootCredentials (validated: root secret and STS signing key at
  least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
  RootCell. IamAdapters::new is now the only constructor of
  IamCredentials and IamPolicySource, so both read one live root source
  per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
  in the credential provider and DISABLED_PRINCIPAL in the policy
  source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
  instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
  accounts of root, the name live groups are read under, and another
  session's token.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* fix(gateway-adapter): effective secret length and unsplittable pair

Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).

- One rule for every secret: its length after trailing NUL bytes are
  removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
  so trailing NULs add nothing; interior NULs count. Applied to the root
  secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
  together through the consuming install(builder, make_authenticator);
  compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
  binary reads its live root accessor directly; RootCell is now a
  test-only helper.

* test(gateway-adapter): use bucket names the rules accept in host tests

* refactor(gateway-adapter): never refuse on request id; owner is the reported constant

* docs(gateway-adapter): state what install guarantees about the provider handle

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 06:16:20 -05:00
hector 75292c6224 ci: add manual packaging of the origin/main tip (#9291)
Dispatch-only workflow that compiles the current main commit with a
caller-supplied version and uploads zip, deb, and rpm artifacts.

Co-authored-by: hector <majinghe@users.noreply.github.com>
2026-11-11 04:55:02 +00:00
Chris An 16e3071f84 feat(gateway-adapter): IAM CredentialProvider and PolicySource (#9284)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(gateway-adapter): add IAM-backed CredentialProvider

Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).

- Pin rustfs-gateway at the existing gateway rev with
  default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
  adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
  is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
  legacy empty secret); IAM not ready or not initialized -> Unavailable;
  unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
  NotFound; other IAM errors -> Backend; invalid or "off" principals
  resolve disabled; STS credentials carry a SessionBinding, and an STS
  credential without an expiry is a Backend fault rather than a
  never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
  error text is dropped after classification.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* feat(gateway-adapter): add IAM-backed PolicySource

Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.

- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
  never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
  with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
  account's own secret for service accounts), and is_owner mirrors the
  legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* fix(gateway-adapter): share live root and refuse short secrets

Address the security review of the T2.1 adapters (rustfs/backlog#2760).

- Add RootCredentials (validated: root secret and STS signing key at
  least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
  RootCell. IamAdapters::new is now the only constructor of
  IamCredentials and IamPolicySource, so both read one live root source
  per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
  in the credential provider and DISABLED_PRINCIPAL in the policy
  source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
  instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
  accounts of root, the name live groups are read under, and another
  session's token.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* fix(gateway-adapter): effective secret length and unsplittable pair

Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).

- One rule for every secret: its length after trailing NUL bytes are
  removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
  so trailing NULs add nothing; interior NULs count. Applied to the root
  secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
  together through the consuming install(builder, make_authenticator);
  compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
  binary reads its live root accessor directly; RootCell is now a
  test-only helper.

* docs(gateway-adapter): state what install guarantees about the provider handle

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 04:29:40 -05:00
Chris An 04bcb57e6a fix(ecstore): pin multipart index markers while their root is published (#9318)
A multipart index marker is recorded before its staging root is published, and a listing prunes markers whose root is gone. The window in between was covered by a five-minute age check, which cannot prove that the publisher's filesystem work has ended: a publisher stalled past it lost its marker, and the upload it then published stayed out of ListMultipartUploads on that drive until restart.

The publisher now holds an in-memory publication pin from before it records the marker until the filesystem work that publishes the root has returned. The pin travels with that work (the blocking closure or the lease owner chain), so it also covers work that outlives a cancelled caller. Pruning reads the pin first and the staging root second, under the marker lease. The age check and the per-write marker touch are removed.
2026-11-11 03:22:46 -05:00
Chris An 31e1e42ad7 refactor: land the s3s decoupling groundwork on main (#9276)
Lands gateway/integration on main: the guard rails and the domain
decoupling for replacing s3s with rustfs/gateway (rustfs/backlog#2734,
Phase 0 and Phase 1). The S3 edge is still s3s and no wire behaviour
change is intended.

- Guard rails: lower-only s3s footprint baseline and edge allow-list,
  per-crate test-count floor, 39 byte-level goldens for the persisted
  bucket-config XML families, a two-server differential harness over
  all 73 S3 operations, a JUnit differ, and a reference-parity lane
  against the sha256-pinned 1.0.5 binary.
- Owned types: rustfs-s3-types (S3Error, S3ErrorCode, Body),
  RequestEnvelope, AuthzFacts.
- Engine crates off s3s: ecstore, lifecycle, replication, scanner,
  protocols, s3select, s3-client, rpc.
- Admin: error types moved; 300 of 314 Operation impls take the owned
  AdminRequest.
- Server: the s3s-compat tower layers grouped under
  server/legacy_compat; RUSTFS_S3_STACK=legacy|gateway selector, where
  gateway refuses to start until the gateway edge exists.

Fixes made on the branch that change ecstore and heal behaviour are
listed in the pull request description. The per-commit history stays
on gateway/integration.
2026-11-11 02:39:52 -05:00
Chris An 0e402b2534 fix(scanner): retain child objects beneath object prefixes (#9277) 2026-11-11 14:36:53 +08:00
Chris An db39cd5634 fix(ecstore): let missing-key deletes complete on UUID-named folders (#9280)
* fix(ecstore): let missing-key deletes complete on UUID-named folders

Deleting a key that does not exist probes the key's directory for
interrupted delete transactions. The probe was bounded at 4096 entries
per drive and charged every entry inside a UUID-named child, so a key
naming a folder of roughly 1,400 or more UUID-named child keys answered
503 SlowDown on every retry.

Inside a UUID-named child only journal files and data-directory markers
can be evidence, so every other name (a child key's own xl.meta, data
directories or children) is now skipped unread at 1/64 like plain
children of the folder. The per-call allowance of the bounded protocol
rises to 262,144 entries per drive; the resumable background step keeps
4096 and the request budget keeps its sizing, so the per-request total
is unchanged. The probe runs on the durable-mutation lane instead of
the one-worker foreground lane, and stops incomplete when its caller
goes away or after a third of the drive timeout (at most 10 s), so a
slow walk answers SlowDown instead of timing out the drive.

* test(ecstore): keep discovery fixtures meaningful under 1/64 charging

Part files inside a data directory are inert to object-scoped discovery
now, so reclaim_orphan_data_dirs_drains_empty_discovery_pages fills its
first step with the referenced data directories of many versions, which
still cost a full entry each. The charging test drives the walk directly
instead of through the wall-clock-limited disk entry point, so a loaded
machine cannot turn it into an incomplete probe.
2026-11-10 23:24:50 -05:00
Ramakrishna Chilaka 89d01aef4f perf(ecstore): reduce syscalls and directory re-opens in PUT and DELETE (#9264)
Co-authored-by: RustFS <hello@rustfs.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
2026-11-11 00:06:11 +00:00
dependabot[bot] 86c3395d07 chore(deps): bump the dependencies group across 1 directory with 12 updates (#9251)
Bumps the dependencies group with 12 updates in the / directory:

| Package | From | To |
| --- | --- | --- |
| [async-nats](https://github.com/nats-io/nats.rs) | `0.51.0` | `0.52.0` |
| [tar-codec](https://github.com/astral-sh/astral-codec) | `0.0.15` | `0.0.16` |
| [tar-framing](https://github.com/astral-sh/astral-codec) | `0.0.15` | `0.0.16` |
| [flate2](https://github.com/rust-lang/flate2-rs) | `1.1.10` | `1.1.11` |
| [smallvec](https://github.com/servo/rust-smallvec) | `1.16.4` | `1.16.5` |
| [starshard](https://github.com/houseme/starshard) | `2.4.0` | `2.4.1` |
| [zip](https://github.com/zip-rs/zip2) | `9.3.0` | `9.4.1` |
| [dial9](https://github.com/dial9-rs/dial9) | `0.5.7` | `0.5.8` |
| [rustfs-mimalloc](https://github.com/houseme/rustfs-mimalloc) | `0.7.3` | `0.7.4` |
| [hotpath](https://github.com/hotpath-rs/hotpath) | `0.30.3` | `0.31.1` |
| [rustfs-mimalloc-sys](https://github.com/houseme/rustfs-mimalloc) | `0.7.3` | `0.7.4` |
| [toml](https://github.com/toml-rs/toml) | `1.2.0+spec-1.1.0` | `1.2.1+spec-1.1.0` |



Updates `async-nats` from 0.51.0 to 0.52.0
- [Release notes](https://github.com/nats-io/nats.rs/releases)
- [Commits](https://github.com/nats-io/nats.rs/compare/async-nats/v0.51.0...async-nats/v0.52.0)

Updates `tar-codec` from 0.0.15 to 0.0.16
- [Release notes](https://github.com/astral-sh/astral-codec/releases)
- [Commits](https://github.com/astral-sh/astral-codec/compare/v0.0.15...v0.0.16)

Updates `tar-framing` from 0.0.15 to 0.0.16
- [Release notes](https://github.com/astral-sh/astral-codec/releases)
- [Commits](https://github.com/astral-sh/astral-codec/compare/v0.0.15...v0.0.16)

Updates `flate2` from 1.1.10 to 1.1.11
- [Release notes](https://github.com/rust-lang/flate2-rs/releases)
- [Changelog](https://github.com/rust-lang/flate2-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/rust-lang/flate2-rs/compare/1.1.10...v1.1.11)

Updates `smallvec` from 1.16.4 to 1.16.5
- [Release notes](https://github.com/servo/rust-smallvec/releases)
- [Commits](https://github.com/servo/rust-smallvec/compare/v1.16.4...v1.16.5)

Updates `starshard` from 2.4.0 to 2.4.1
- [Changelog](https://github.com/houseme/starshard/blob/main/CHANGELOG.md)
- [Commits](https://github.com/houseme/starshard/compare/2.4.0...2.4.1)

Updates `zip` from 9.3.0 to 9.4.1
- [Release notes](https://github.com/zip-rs/zip2/releases)
- [Changelog](https://github.com/zip-rs/zip2/blob/master/CHANGELOG.md)
- [Commits](https://github.com/zip-rs/zip2/compare/v9.3.0...v9.4.1)

Updates `dial9` from 0.5.7 to 0.5.8
- [Release notes](https://github.com/dial9-rs/dial9/releases)
- [Changelog](https://github.com/dial9-rs/dial9/blob/main/CHANGELOG.md)
- [Commits](https://github.com/dial9-rs/dial9/compare/dial9-v0.5.7...dial9-v0.5.8)

Updates `rustfs-mimalloc` from 0.7.3 to 0.7.4
- [Release notes](https://github.com/houseme/rustfs-mimalloc/releases)
- [Changelog](https://github.com/houseme/rustfs-mimalloc/blob/main/CHANGELOG.md)
- [Commits](https://github.com/houseme/rustfs-mimalloc/compare/v0.7.3...v0.7.4)

Updates `hotpath` from 0.30.3 to 0.31.1
- [Release notes](https://github.com/hotpath-rs/hotpath/releases)
- [Changelog](https://github.com/hotpath-rs/hotpath/blob/main/CHANGELOG.md)
- [Commits](https://github.com/hotpath-rs/hotpath/compare/v0.30.3...v0.31.1)

Updates `rustfs-mimalloc-sys` from 0.7.3 to 0.7.4
- [Release notes](https://github.com/houseme/rustfs-mimalloc/releases)
- [Changelog](https://github.com/houseme/rustfs-mimalloc/blob/main/CHANGELOG.md)
- [Commits](https://github.com/houseme/rustfs-mimalloc/compare/v0.7.3...v0.7.4)

Updates `toml` from 1.2.0+spec-1.1.0 to 1.2.1+spec-1.1.0
- [Commits](https://github.com/toml-rs/toml/compare/toml-v1.2.0...toml-v1.2.1)

---
updated-dependencies:
- dependency-name: async-nats
  dependency-version: 0.52.0
  dependency-type: direct:production
  update-type: version-update:semver-minor
  dependency-group: dependencies
- dependency-name: tar-codec
  dependency-version: 0.0.16
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: tar-framing
  dependency-version: 0.0.16
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: flate2
  dependency-version: 1.1.11
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: smallvec
  dependency-version: 1.16.5
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: starshard
  dependency-version: 2.4.1
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: zip
  dependency-version: 9.4.1
  dependency-type: direct:production
  update-type: version-update:semver-minor
  dependency-group: dependencies
- dependency-name: dial9
  dependency-version: 0.5.8
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: rustfs-mimalloc
  dependency-version: 0.7.4
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: hotpath
  dependency-version: 0.31.1
  dependency-type: direct:production
  update-type: version-update:semver-minor
  dependency-group: dependencies
- dependency-name: rustfs-mimalloc-sys
  dependency-version: 0.7.4
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: toml
  dependency-version: 1.2.1+spec-1.1.0
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
2026-11-11 00:04:47 +00:00
cxymds c9743f166e fix(s3): normalize leading-slash keys in bulk deletes (#9258)
* fix(s3): normalize leading-slash keys in bulk deletes

* test(s3): align bulk delete reserved-prefix guard expectations
2026-11-10 17:56:00 -05:00
Boyi (Elliot) Li 50707a610c test(utils,rio,checksums): add checksum SIMD equivalence and bench UTs (#9217)
Add unaligned-boundary SIMD vs scalar equivalence unit tests and on-demand (#[ignore]) utility-level throughput microbenchmarks across rustfs-utils, rustfs-rio, and rustfs-checksums:
- crates/utils/src/hash.rs: verify HighwayHasher SIMD (AVX2/SSE4.1/NEON) against highway::PortableHash scalar reference and contiguous hash_encode vs odd-chunked hash_encode_slices across unaligned tail boundaries; provide on-demand throughput microbenchmark.
- crates/rio/src/checksum.rs: verify SIMD-accelerated CRC32, CRC32C, and CRC64_NVME against bitwise scalar reference implementations across vector tail boundaries and measure utility-level throughput across all 10 BASE_CHECKSUM_TYPES.
- crates/checksums/src/lib.rs: verify streaming chunked update + finalize + headers() against one-shot digests across all 9 ChecksumAlgorithm variants for unaligned chunk and payload sizes, plus on-demand throughput microbenchmark.
2026-11-10 17:54:11 -05:00
Patrick Wicki ba3e0e1546 fix(admin): keep measured bucket usage when the overlay is unconverged (#9243)
The single-process usage overlay clears usage_snapshot_complete when it
holds counts it cannot reconcile with the persisted snapshot, for
example writes into a bucket that has no verified baseline. The admin
datausageinfo path then judged the overlaid document as structurally
incomplete and replaced it with an empty one, hiding every bucket the
scanner had measured. Because each write restarts that bucket's scanner
fence, a continuously written bucket kept the whole response empty
indefinitely.

Decide whether the persisted snapshot is usable before the overlay is
applied, and report overlay-induced incompleteness as a non-converged
snapshot instead, as is already done for buckets the scan never reached
(rustfs#5806).
2026-11-10 17:52:06 -05:00
Chris An 95e128336d ci: narrow checks for stable installation metadata (#9269)
* ci: narrow checks for stable installation metadata

* fix: reject release metadata marker collisions
2026-11-10 16:10:04 -05:00
Chris An 8b7bbdb17d chore(release): align installation references for 1.0.5 (#9268) 2026-11-10 14:48:02 -05:00
Chris An 2780bba67b ci: stage release builds and promote verified artifacts (#9265)
* ci: stage release builds and promote verified artifacts

* fix: preserve release package and channel retry contracts

* fix: align installation chart versions with sealed candidates
2026-11-10 13:15:05 -05:00
hector 3a23122104 ci: run macOS release builds on macos-latest-xlarge (#9260)
Use the larger GitHub-hosted macOS runner for the macos-aarch64
release target. The target id, triple, and other platforms stay the same.

Co-authored-by: hector <majinghe@users.noreply.github.com>
2026-11-10 18:55:19 +08:00
Ramakrishna Chilaka 0b1ebeffec perf(ecstore): reduce syscalls in multipart copy, commit, and delete (#9247) 2026-11-10 12:27:10 +08:00
Chris An 0f9258594c fix: preserve scanner backlog authority after pool replacement (#9252)
* fix(ecstore): allow bucket creation after failed decommission

* fix(scanner): preserve backlog membership across pool reindexing

* test(scanner): cover partial publication after pool reindexing
2026-11-09 20:46:20 -05:00
Chris An 33fc735ee2 chore(release): prepare 1.0.5 (#9249) 2026-11-09 17:19:35 -05:00
Chris An 509869cfc5 fix(tier): recover orphaned prepared mutations (#9246) 2026-11-09 22:18:14 +08:00
Ramakrishna Chilaka 395876ccd0 fix(ecstore): remove hardlinked backup during delete rollback (#9239)
When a fused recoverable delete is interrupted after publishing the transaction directory and before updating xl.meta, xl.meta and <transaction>/xl.meta.bkp remain hardlinks to the same inode. Under POSIX rename semantics, renaming xl.meta.bkp over xl.meta during rollback succeeds as a no-op without unlinking xl.meta.bkp, which leaves xl.meta.bkp in the transaction directory after journal removal and strands the transaction in DeleteRecoveryState::LegacyAmbiguous.

Unlink xl.meta.bkp after syncing the restored object directory and before syncing the rollback directory and removing journal markers, and extend delete_recovery_fused_prepare_checkpoint_reopens_before_head_publication to preserve the hardlink and verify rollback completion and retry.
2026-11-09 06:41:04 +08:00
Chris An 6083fbbeea fix(catalog): enumerate table owners without skipping namespaces (#9242) 2026-11-09 06:38:58 +08:00
Chris An 42d3267d88 fix(ecstore): decouple pool metadata health from the authority gate (#9241)
* fix(ecstore): share immutable pool metadata authority reads

* fix(ecstore): read pool metadata authority without the save gate

Health inferred pool metadata write authority from acquiring the local
authority gate within 100 ms. Sharing the gate among read-only
admissions still left held writers, and writers queued behind a reader
parked on the pool.bin fence, turning into cluster-write 503s.

Each writer now publishes the authority it leaves before releasing the
gate, and health reads that published state without acquiring it.
Transaction latches stay shared with the published copy; recovery
clears the latch and its failure under one lock so inspection never
observes a half-cleared state. The inspection-timeout path that can no
longer occur (check_timed_out, the check_timeout admin state, the
pool_metadata_check_timeout reason, the node timeout cache and its
metric) is removed.
2026-11-09 06:38:30 +08:00
Chris An 1d35e381b7 fix(rpc): bound replay memory and atomically admit signed requests (#9238)
* fix(rpc): index nonce expiry by signed validity

* fix(rpc): size replay cache from allocated storage layout

* fix(rpc): make replay admission atomic and release expired tables

* fix(rpc): preserve replay admission refusal at the S3 boundary
2026-11-09 06:36:55 +08:00
Chris An 0b109b4885 fix(select): bound LZ4 scratch and Arrow schema expansion (#9237)
* fix(select): admit legacy and linked LZ4 working memory

* fix(select): bound embedded Arrow schema expansion
2026-11-09 06:36:44 +08:00
cxymds 1dea00ffa7 ci: repair e2e selection and verify tool downloads via API (#9240)
* ci: align full e2e selection with retired catalog test

* ci: verify pinned tools through GitHub release asset API

* ci: fetch pinned typos through the release asset API

* ci: download pinned actionlint through the release asset API

* ci: ensure GitHub CLI exists before pinned mc download

* ci: budget full quick checks after tool installation
2026-11-08 14:09:26 +00:00
cxymds addf7a6219 fix: reduce scanner backoff and classify downstream closures (#9235) 2026-11-08 02:18:17 -05:00
Ramakrishna Chilaka 420cf32b2a perf(ecstore): optimize PUT, DELETE, and multipart commit hotpaths (#9227) 2026-11-08 02:12:40 -05:00
Chris An 907410b2f5 fix(select): bound Parquet allocations before decoding (#9231) 2026-11-08 01:36:12 -05:00
Chris An f10079f1a3 fix(rpc): size and reserve replay cache for compact entries (#9233) 2026-11-08 01:35:58 -05:00
Chris An a6c3016493 fix(cache): respect process cgroup memory limits (#9232) 2026-11-08 01:35:49 -05:00
Hauser Zhi 68fb52b752 chore(deps): update flake.lock (#9236) 2026-11-08 01:34:01 -05:00
cxymds 16f618d41b fix: correct scanner pacing and unverified MRF outcomes (#9225)
Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-11-08 06:48:25 +08:00
Henry Guo 565d262ede refactor(table-catalog): retire durable-strong backing (#9130)
* refactor(table-catalog): retire durable-strong backing

* fix(table-catalog): avoid backup locks during S3 authorization

* fix(table-catalog): preserve directory and maintenance behavior

* fix(table-catalog): back up retained v1 snapshot history

* test(table-catalog): cover retained v1 backup recovery

Exercise backup inventory sealing and restore after a v1-to-v2 upgrade, including missing or corrupt references, nonzero inline snapshot sequences, v2 manifests in retained v1 history, and unchanged commit admission rules.

Clarify when direct maintenance can replace reports and discard retry budgets, and require quiescing scheduler admission and workers before invocation.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Chris An <anzhengchao@gmail.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-08 05:03:55 +08:00
Chris An 7b010ddd70 fix(ci,ecstore): restore validation and defer capacity exhaustion (#9223) 2026-11-07 15:17:25 -05:00
Chris An 272b6587e0 fix(ci): bound workspace archive builds to two workers (#9222) 2026-11-07 06:32:41 -05:00
Chris An e3ed2cf2f4 fix(decommission): reserve owned source usage during activation (#9220) 2026-11-07 01:49:42 -05:00
Chris An bf03b1117a fix(swift): preserve bucket metadata with Swift tag values (#9218) 2026-11-07 01:49:12 -05:00
Boyi (Elliot) Li c3fe0f9649 test(rio,ecstore): add negative-branch durability unit tests (#9216)
Expand positive and negative branch unit test coverage across durability-critical modules:
- crates/rio/src/checksum.rs: Checksum::matches (unset hasher, multipart want_parts mismatch, digest mismatch), new_with_type, as_map, obj_type, from_header, add_part (CRC32/CRC32C/CRC64_NVME combine + error branches), and get_content_checksum header validation.
- crates/rio/src/hash_reader.rs: HashReader::new wrapping invariants (already-read inner reader, conflicting MD5 checksum, conflicting positive size, unbounded size propagation) and checksum helper error paths.
- crates/ecstore/src/set_disk/ops/bitrot_self_verify.rs: verify_written_bitrot_shards missing inline data, missing disk shard, and under-quorum rejection.
- crates/ecstore/src/erasure/coding/encode.rs: read_full_buf_or_eof immediate read error, InvalidData preservation after partial fill, and UnexpectedEof normalization.
- crates/ecstore/src/io_support/shard_integrity.rs: ShardVerifier out-of-bounds coding_index, empty proof sources fail-closed, and spilled (>1 MiB) index disk write + verify_index_file + restore_proof_replicas round-trip and all-corrupt fail-closed boundary.
- crates/ecstore/src/services/integrity/tests.rs: JobRequest::validate boundary/format checks with exact error messages and model::protection / model::unsupported classifications.
2026-11-07 02:38:43 +00:00
唐小鸭 6e31f6a183 fix(ecstore): complete and abort native multipart uploads on Windows (#9191) 2026-11-06 22:36:16 -05:00
Hauser Zhi d66d144309 feat(observability): record unary read RPC durations (#9202)
* feat(observability): record unary read RPC durations

Record complete server-side durations for ReadMultiple and BatchReadVersion, including error and cancellation paths.\n\nCo-Authored-By: heihutu <heihutu@gmail.com>\nCo-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(observability): cover unary duration handlers

Exercise ReadMultiple and BatchReadVersion missing-disk paths and assert operation duration histograms.\n\nCo-Authored-By: heihutu <heihutu@gmail.com>\nCo-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(observability): cache unary read RPC duration handles

Reuse cached duration histograms for ReadMultiple and BatchReadVersion once
the stable server label is available. Preserve the existing ReadVersion
handle and the fallback for other operations and backends.

Add an integration regression for handle reuse, startup fallback, labels,
and recorded values using the production cache path.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(observability): separate server duration from client RTT

Record unary ReadMultiple and BatchReadVersion handler lifetimes in a
separate server duration histogram while preserving existing client RTT
series and allocation-free cached handles for both measurements.

Cover client/server sample separation, cache reuse, startup and backend
fallbacks, and missing-disk handlers. Document the new server metric.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-11-07 09:16:18 +08:00
cxymds 150836d707 feat(tier): support native Azure Blob endpoints (#9200)
* feat(tier): support native Azure Blob endpoints

* fix(tier): guard Azure version cleanup and prefix limits

* fix(tier): preserve Azure quoted headers and document version gate

* fix(tier): handle Azure forbidden current-version deletion

* test(tier): control transition commit lock failure timing
2026-11-07 09:16:06 +08:00
Henry Guo e4057b6746 fix(table-catalog): reject storage credentials for catalog access (#9185)
* fix(table-catalog): reject storage credentials for catalog access

* fix(table-catalog): avoid growing the s3s error macro footprint

Use the existing S3Error constructor for the storage-credential rejection
while preserving its AccessDenied code and message. Keep the merged PR
within the current s3s footprint baseline without relaxing the guard.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-11-07 08:07:58 +08:00
Hauser Zhi cfdd705b62 fix(cors): preserve readiness and complete cache selectors (#9207)
Use a direct response future for originless requests and forward through
the polled-ready service. Nominate every retained CORS header input and
transfer evaluated headers without rebuilding the map.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-07 08:07:04 +08:00
Hauser Zhi a1d0fa41d0 fix: preserve usage generations and unify request tracing (#9204)
* fix(ecstore): prevent cached usage snapshot rollback

Order refreshed snapshots by their authoritative lineage before replacing cached usage. Share the rule with early bucket refreshes while retaining quota baselines, invalidation fencing, legitimate deletions, and clock recovery.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(server): skip trace propagation for disabled RPC spans

Avoid extracting and assigning a remote parent when RPC tracing is disabled after authentication and admission. Cover disabled logging and the production HTTP span propagation path.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): preserve usage ordering across refresh recovery

Retain the last good snapshot independently of negative-cache status. Order observations within the same authoritative baseline by their own coordinated epoch and cycle before wall time, including clock rollback and recovery. Capture persisted baseline identity without cloning its bucket maps.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(server): centralize request trace propagation

Let the HTTP span factory own parent extraction and assignment. Use actual span filtering, preserve span-only subscribers, and remove repeated tracing work from RPC authentication.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-07 08:06:47 +08:00
Chris An 7d4982f206 fix(storage): fence bounded deletes during rolling upgrades (#9214) 2026-11-07 08:06:28 +08:00
Chris An 1a7fb2461d fix(webdav): join connection and reload tasks on shutdown (#9213) 2026-11-07 08:06:14 +08:00
Chris An e1b9d1cb94 fix(ecstore): preserve ownership across multi-pool recovery (#9212) 2026-11-07 08:06:04 +08:00
Chris An 85313fc06f fix(runtime): release retained replay and allocator memory (#9211) 2026-11-07 08:05:46 +08:00
cxymds b5f3207378 fix(lock): preserve acquisition progress during multipart uploads (#9209)
* fix(lock): retain slow responses within the quorum deadline

* fix(lock): retain partial quorum timeout diagnostics

* fix(lock): avoid guard registry scheduling convoys

* chore(ecstore): trace metadata transaction lock purposes

* fix(scanner): keep capability probes on read fences

* fix(lock): preserve renewal and contention progress
2026-11-07 08:05:26 +08:00
Hauser Zhi 5490e493ab fix(s3): retain protected multipart ETags in object listings (#9208)
* fix(s3): retain protected multipart ETags in object listings

Record encrypted part ETag provenance, aggregate it at read quorum, and attest completed multipart ETags for keyless listings. Preserve legacy fingerprint protection and test versioned SSE-KMS and SSE-C upload, listing, and replay paths.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(s3): stream multipart ETag aggregation

Restore the preserved ETag fast path when selected parts lack protected provenance. Stream native part digests through a fixed stack buffer, preserve legacy hex-or-raw semantics, and strengthen exact-output and override regression coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): preserve encrypted ETag proof during data movement

Capture quorum-backed source proof before multipart completion metadata updates, require exact preserved ETag and version identity, and retain proof only when publication keeps the source version. Cover real two-pool rebalance, null versions, legacy sources, and injected or rewritten identities.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): retain encrypted multipart ETag proof on restore

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-11-07 08:04:54 +08:00
Hauser Zhi 134820c1e0 test(storage): reproduce HTTPS rejoin readiness in Docker (#9206)
* test(storage): reproduce HTTPS rejoin readiness in Docker

Compare cluster-only and node-ready/write gates on immutable native binaries. Preserve first-failure and latest-acknowledged-content evidence across recovery, capture lock diagnostics before restart, and limit cleanup to verified owned resources.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(testing): unify Docker repro ownership and controls

Use typed resource absence and one verified container inventory for staging, partial setup and retained nodes. Reject inherited experiment overrides before creating resources and remove duplicated state.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(testing): guard staging volumes and interrupted capture

Verify volume ownership before privileged staging and disable implicit image-content copying. Preserve failed evidence and continue owned finalization when capture or cleanup is interrupted.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(testing): capture live rejoin logs and verify trace coverage

Read live tmpfs logs inside the verified container and use one explicit stdout sink for diagnostics. Record bounded capture provenance and fail diagnostic coverage when acquisition, guard-drop or physical-release records are missing, without masking HTTP failures.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(testing): reject inherited aliases and finalize on SIGTERM

Reject inherited MINIO compatibility settings before Docker resource creation. Route SIGTERM through interrupt-aware finalization and restore the previous handler after each run. Cover real process signals and failure preservation.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(testing): normalize legacy controls and termination

Reject inherited MINIO compatibility aliases in neutral runtime images. Bridge run-mode SIGTERM into the existing interruption finalization and restore the caller signal handler on return or exception.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-07 08:04:28 +08:00
Chris An 2b9217b6f9 test(e2e): fix quota and conditional write fixtures (#9210) 2026-11-07 08:03:00 +08:00
Hauser Zhi 70a46d0e8c fix(webdav): support configured browser CORS access (#9205)
* fix(webdav): support configured browser CORS access

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Signed-off-by: Hauser Zhi <housemecn@gmail.com>

* perf(webdav): streamline CORS policy and preflight parsing

Borrow connection-owned policy state and clone the backend only for actual requests. Validate borrowed header names and normalize HTTP lists when required.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Signed-off-by: Hauser Zhi <housemecn@gmail.com>

---------

Signed-off-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 14:01:06 -05:00
Hauser Zhi a910ef0dd0 fix(cors): isolate cache variants and streamline policy evaluation (#9203)
Apply cache variation at the shared response boundary, preserve existing
Vary selectors, and reuse parsed global policy and compact CORS inputs.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 12:40:11 -05:00
Chris An 430ade191f fix(scanner): bound wide bucket-root fanout memory (#9193)
* fix(scanner): bound wide bucket-root fanout memory (#8961)

Root prefixes were excluded from ordinary compaction and force_compact only
flattened the root above a hardcoded 250k child ceiling, so buckets with
tens of thousands of top-level prefixes kept one cache entry each after
#8971. Compact wide roots outside checkpointed forward sweeps, and honor
force_compact's limit for root fanout.

* fix(scanner): keep root fanout on interrupted force_compact

Interrupted sweeps seal a resume frontier after force_compact. Applying
the ordinary 10k root limit there flattened frontier-named children and
made the next cycle replay completed prefixes. Use the emergency FORCE
ceiling on the interrupted path; successful completions still honor the
ordinary limit. Drop clippy assertions_on_constants in the new tests.

Signed-off-by: Chris An <anzhengchao@gmail.com>

* test(scanner): seal reloaded frontier after interrupted compaction

Const assertions keep the wide-root preconditions without tripping
clippy::assertions_on_constants. The interrupted and finished sweep
paths share one limit helper, and a cache wider than the ordinary
10k limit still seals its frontier child after reload.

Co-authored-by: Chris An <overtrue@users.noreply.github.com>

* fix(scanner): isolate unreadable children during root compaction

* fix(scanner): isolate compacted namespace child errors

* fix(scanner): preserve compacted scan accounting and coverage

Commit isolated namespace child usage only after successful traversal, while retaining completed accounting on cancellation and resource deferral. Synchronize reduced root totals before the cancellation-prone flush boundary.

Treat skipped namespaces as incomplete coverage and invalidate legacy sampling baselines until a fresh verification pass succeeds. Keep provisional usage out of progress updates and retain the upstream symlink regression.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): preserve legacy retry coverage

* test(scanner): regress cancel overwrite after wide-root reduce

houseme's 714f590 already refreshes the root accumulator from the
compacted cache entry before flush_pacing. Add a unit regression that
simulates the interrupt replace_hashed path so a future regression
cannot reintroduce dangling child links over the aggregate.

Signed-off-by: overtrue <anzhengchao@gmail.com>

---------

Signed-off-by: Chris An <anzhengchao@gmail.com>
Signed-off-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: Cursor Agent <cursoragent@cursor.com>
Co-authored-by: Chris An <overtrue@users.noreply.github.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 12:36:25 -05:00
Hauser Zhi c5b15b7279 fix(container): unify directory setup and startup diagnostics (#9201)
* fix(container): explain log directory initialization failures

Report failed log directory creation with ownership guidance and a Compose quote hint while preserving configured values. Add a corrected example and real entrypoint regression coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(container): unify startup directory preparation

Share directory creation, diagnostics, and best-effort ownership across data and log paths. Skip delimiter and regex subprocesses for ordinary volume paths without introducing a second parser. Expand real-entrypoint coverage for ownership, failures, delimiters, distributed ranges, and setup command counts.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 11:49:09 -05:00
cxymds 2a6da8208b fix(lock): converge cleanup after lost release acknowledgements (#9199)
* fix(lock): converge cleanup after lost release acknowledgements

* fix(log-analyzer): track updated unlock cleanup logs

* test(lock): align clocks in unlock cleanup regression
2026-11-06 10:40:28 -05:00
cxymds 93b704420f fix(ecstore): preserve multipart shards within write budgets (#9197) 2026-11-06 10:37:24 -05:00
Ramakrishna Chilaka dfd4d3e213 perf(ecstore): fuse overwrite commits and optimize delete recovery (#9194) 2026-11-06 03:32:34 -05:00
Hauser Zhi 1c1baa6b08 fix(observability): avoid duplicate process metric labels (#9182) 2026-11-05 23:07:02 -05:00
Chris An 0147b8671d ci: bump overtrue/cla-bot to v0.1.1 (#9189)
Co-authored-by: cursoragent <cursoragent@users.noreply.github.com>
2026-11-06 07:01:52 +08:00
Hauser Zhi 8cd751f9d1 feat(ecstore): record unary gRPC operation duration (#9187)
Record end-to-end durations for ReadAll, WriteAll, ReadMultiple, and BatchReadVersion alongside existing request, error, and payload metrics. This makes direct unary payload ABBA results observable through the internode operation duration family.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 07:01:38 +08:00
Hauser Zhi 5ea2991850 fix(ecstore): retry failed internode channel prewarm (#9186)
Release the per-peer prewarm deduplication marker when the best-effort dial fails, allowing a later RemoteDisk construction to retry the connection warmup without changing lazy connect fallback behavior.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 07:01:26 +08:00
Chris An 1556e05b8a fix(sftp): put directory objects as trailing-slash keys (#9180)
SFTP subdirectory mkdir and rmdir sent the on-disk __XLDIR__ marker
through the public S3 API. After the suffix was reserved, those calls
were rejected as invalid client keys, so ordinary directory operations
failed while bucket mkdir still succeeded.

Send the logical trailing-slash key and let storage encode the marker.

Co-authored-by: Cursor Agent <cursoragent@cursor.com>
Co-authored-by: Chris An <overtrue@users.noreply.github.com>
2026-11-06 07:00:58 +08:00
Hauser Zhi 32238a179c fix(server): bound rejoin waits and preserve recovery ownership (#9181)
* test(server): cover recovered-node admission boundaries

Document backend readiness and write-availability checks during rejoin.
Extend the existing regression through the production middleware order
without changing runtime admission or cluster-quorum semantics.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(server): bound rejoin waits and preserve recovery ownership

Enforce startup and unreachable-grace bounds while consuming peer replies.
Release admission when every set has its required peer majority and cancel
surplus read-only probes without carrying votes between rounds.

Bound local readiness observations and polling sleeps. Retain initialized
IAM across preparation failures, install the context once, and retry only
publication after readiness timeouts. Share preparation with inline startup.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(server): make peer admission folding incremental

Compile peer-to-set memberships once and retain compact per-edge votes.
Consume each reply once, discard its payload, and update only affected
set counters instead of rescanning all sets and retained responses.

Recheck the captured deadline after polling and folding a reply so late
work cannot admit the node or clear an expired unreachable grace period.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 07:00:36 +08:00
Chris An 6b70584dde chore(ci): bump overtrue/cla-bot to v0.1.0 (#9188)
Pin CLA Check to f054da99 (v0.1.0) so built-in bot allowlist skips
cursoragent, Dependabot, GitHub Actions, Renovate, and Copilot without
requiring a CLA signature.

Co-authored-by: cursoragent <cursoragent@users.noreply.github.com>
2026-11-05 23:54:13 +08:00
Chris An d6210ac17b fix(s3,ecstore,table-catalog): bound work driven by client input (#9172)
* fix(ecstore,heal,select): bound storage-layer work driven by client input

Scan findings in the erasure store, heal, file metadata and S3 Select
layers, grouped because they share the disk walk, the multipart staging
area, delete recovery and the select snapshot lease:

- Multipart: upload ids are canonicalized before they name a staging path
  or a lock key (backlog#3027); trailing-slash keys are encoded like every
  other handler (backlog#3055); unlisted parts are removed at completion
  (backlog#3106); per-bucket uploads are found through a signed per-disk
  index instead of a scan of the shared staging area (backlog#3121);
  encrypted part ETags carry a per-upload secret so a write-only user
  cannot confirm plaintext guesses (backlog#3044).
- Delete and recovery: recovery walks are bounded per request
  (backlog#3038); a delete marker on a key whose xl.meta path is a
  directory, and sidecar names used as child keys, no longer wedge the
  journal (backlog#3035, backlog#3105); over-quota PUTs no longer list the
  bucket under the ledger lock (backlog#3128).
- Listing: scan_dir sends metadata without inline data (backlog#3052),
  counts delete markers against max-keys (backlog#3108), and rejects a
  marker that carries the cursor tag (backlog#3059).
- Heal: bucket metadata and heal records live in separate namespaces so
  DeleteBucket cannot erase a drive rebuild (backlog#3039), a deleted
  bucket is skipped instead of failing the rebuild (backlog#3040), and
  directory objects are encoded on readback (backlog#3061).
- Restore and tiering: RestoreObject preserves tags and the version's
  modification time (backlog#3073, backlog#3074); Snowball transport
  headers are not forwarded to the tier (backlog#3090); an epoch
  modification time round-trips through xl.meta (backlog#3063).
- Locks: PutObject takes its bucket locks after the body is staged
  (backlog#3131); SelectObjectContent releases its namespace locks once
  the snapshot is taken (backlog#3132).
- RPC and peers: the v3 signature check consumes the v2 nonce
  (backlog#3129); a bucket-metadata reload timeout no longer marks the
  peer offline (backlog#3124); replication target requests carry an
  operation deadline (backlog#3102); the scanner resumes its interrupted
  wait after a lifecycle write (backlog#3118).
- S3 Select: bounded schema inference, column cap and budgeted CSV
  batches, Parquet dictionary bounds and pre-planner projection checks
  (backlog#3075, backlog#3076, backlog#3077, backlog#3078).

* test(e2e): seed legacy duplicate bucket tags offline for the OPA contract

* fix(s3): authorize what handlers store and bound request-driven work

Scan findings in the S3 request layer (access hooks, object use cases,
HTTP server layers), grouped because they share the authorization
condition builder, the PutObject admission path and the response
layers. Builds on the storage-layer batch for the bounded recovery and
multipart APIs it calls.

Authorization and policy conditions:
- copy source is percent-decoded and version-canonical before the
  s3:x-amz-copy-source condition (backlog#3135); CopyObject authorizes
  the tag set it copies (backlog#3034); HeadObject with the replication
  check header still authorizes s3:GetObject (backlog#3047); the
  x-rustfs-source-version-id header feeds s3:versionid (backlog#3072);
  recursive force-delete with a REPLICA header authorizes every
  descendant as a delete (backlog#3070); include-deleted listings require
  s3:ListBucketVersions (backlog#3099); the metadata listing route keeps
  table isolation and uses the same prefix it authorizes (backlog#3053,
  backlog#3054); If-Match probing needs read permission (backlog#3097);
  Object Lambda checks s3:GetObjectVersion (backlog#3058); replication
  proxy fallback keeps ExistingObjectTag denies (backlog#3089); HeadObject
  returns lock and tag headers only with permission (backlog#3113);
  IPv4 clients on the dual-stack listener match IPv4 SourceIp conditions
  (backlog#3049); bucket policies are parsed once and cached
  (backlog#3032); keystone: access keys no longer verify with an empty
  secret (backlog#3043).
Admission and resource bounds:
- GetObject releases disk-read permits when the client stops reading
  (backlog#3023); PutObject takes buffer and foreground admission only
  after body bytes arrive and bounds the wait (backlog#3031,
  backlog#3084); xl.meta size is bounded on the write path
  (backlog#3100); XML compat layers stream instead of buffering whole
  bodies (backlog#3094); tier GETs stream the remote body (backlog#3046); on-demand migration pulls release permits on
  unread GETs (backlog#3110); SSE-KMS key policy covers UploadPart and
  completion (backlog#3130); MinIO admin decryption runs Argon2id off the
  async worker (backlog#3024).
Input validation and leaks:
- replication headers are validated (source ETag shape, original size)
  (backlog#3092, backlog#3093); control characters in keys and lifecycle
  rule IDs are rejected (backlog#3101, backlog#3117); Snowball member
  mtime needs s3:ReplicateObject (backlog#3083); DeleteObjects checks
  Content-MD5 and admin/STS reject SigV2 replays with altered query or
  body (backlog#3037, backlog#3026); request logs redact presigned
  queries and handler spans skip credentials (backlog#3068,
  backlog#3107); SSE-C listings and completions withhold plaintext
  metadata and checksums (backlog#3120, backlog#3050); CORS resolves the
  bucket like s3s does (backlog#3104); PutBucketTagging rejects duplicate
  keys (backlog#3126); notifications fire after a client disconnect
  (backlog#3127); ListenNotification streams re-check access
  (backlog#3119).

* fix(api): drop imports left unused by the base merge

* test(s3): move the KMS multipart denial test to the app layer

The test drives app-layer multipart use cases, so it belongs with them;
living in the SSE module it imported app code from the infra layer and
failed the layer dependency guard. The SSE test helpers it borrows are
exposed through the storage and app facades.

* fix(s3): keep the SSE-C key fingerprint on keyless multipart completion

The backlog#3050 fix withheld both the plaintext checksums and the
customer-key MD5 header from a CompleteMultipartUpload that did not
present the key. The checksums are a digest of the plaintext and stay
hidden; the key MD5 identifies the key only, and the S3 conformance suite
(test_copy_part_enc) expects it on a keyless completion, so it is echoed
again.

* fix(tier): stream GET bodies and document replication budgets

* fix(ecstore,s3): keep the multipart index and cold fill off disk lifetimes

Two lifecycle regressions surfaced once the storage and request batches
ran together against main:

- The multipart index owner cloned the disk's pinned publication root and
  bootstrapped on a task of its own. That kept the mount alive past the
  last LocalDisk owner (the disk lifecycle allows exactly three holders of
  the root FD) and left a stray task behind, which the local-disk and
  read-repair tests detect. The owner now keeps only the root path and
  reopens it for identity checks, and the bootstrap scan rides the disk's
  existing cleanup task, where stopping the disk abandons it and a
  reconnect resumes it.
- The disk-read admission wrapper defers releasing its permit until an
  in-flight read completes, so a cancelled client cannot widen disk
  concurrency. The cold-fill producer, however, drops a read it has
  already classified as stalled when its deadline fires, and that permit
  stayed pinned for the lifetime of the stuck read. The producer now
  abandons the admission explicitly on timeout.

* test(ecstore): pass the index owner to the Linux cleanup-loop test

* fix(s3): release cold-fill admission after watchdog handoff

* fix(s3,ecstore): close the round-1 adversarial review findings

Adversarial review of the combined request- and storage-layer batch found
fixes that fell short of their issues, two behaviour regressions for
legitimate clients and several unrequested costs:

- backlog#3038: a bulk DeleteObjects reserved the whole per-disk
  inspection allowance up front for every key in flight and exhausted the
  16 Mi request budget on any set wider than eight drives, failing healthy
  keys with SlowDown. Calls are now admitted while budget remains and
  charged for the entries they actually visited. Object-scoped discovery
  charges plain child keys at one entry per 64 names instead of one each,
  so deleting a missing key that names a folder prefix completes instead
  of answering 503 forever while a hostile prefix stays bounded. A peer
  still on the previous binary is reported
  as an unsupported participant, the repository's rolling-upgrade
  contract, instead of as a budget verdict.
- backlog#3037/#3026: a SigV2 configuration PUT without Content-MD5 was
  still replayable with another body; it is refused with MissingContentMD5
  while SigV4 keeps the optional-MD5 contract.
- backlog#3072: DeleteObject now resolves x-rustfs-source-version-id before
  authorization like PUT and COPY, so a replica delete cannot remove a
  version the policy never saw.
- backlog#3121: the multipart index no longer fsyncs a marker and four
  directories per multipart metadata write (it is rebuilt on every start),
  and ListMultipartUploads discovers roots concurrently.
- backlog#3077: Parquet SelectObjectContent decodes budget-sized batches
  instead of one row per batch.
- backlog#3031: a full upload buffer pool hands out an unpooled buffer
  instead of refusing the upload; the progress floor already bounds stalls.
- backlog#3023: the GET disk-read idle cut-off is configurable
  (RUSTFS_GET_DISK_READ_IDLE_TIMEOUT_SECS, default 120 s) so a paused
  client is not truncated after 30 s.
- backlog#3075: JSON Lines schema inference keeps the sample collected at
  the 4 MiB bound instead of failing the query.
- backlog#3024: compat admin decryption queues briefly for a slot instead
  of refusing the third concurrent request.
- backlog#3113: HEAD skips its permission probes for the bucket owner.
- backlog#3117: control characters in a lifecycle rule ID are rejected on
  PutBucketLifecycle as well.

The lock-crate publication FIFO serves backlog#3111 and moves to the
table-catalog PR. Also fixed: a lossy admin error message, an unused
s3-client function, two unused test-util features, a duplicated key
validation, the s3s footprint baseline, and a stale log event name in the
reverse-proxy runbook. The ODM multipart write-back test runs on the large
test stack like its sibling.

* fix(table-catalog): bound maintenance work and isolate table namespaces (#9174)

* fix(table-catalog): bound maintenance work and isolate table namespaces

Scan findings in the Iceberg table catalog:

- Metadata maintenance deleted every unreferenced *.metadata.json in a
  table's directory without checking whether a renamed table in another
  namespace still owned those files (backlog#3060); it now resolves the
  owning table through the directory index before deleting.
- Manifest lists and manifests were decoded with the embedded Avro
  writer schema and no recursion depth limit; a self-referencing record
  schema overflowed the stack (backlog#3080). Schemas are validated for
  depth before decoding.
- Compaction decoded every input Parquet file into Arrow batches held in
  memory; a decompression bomb OOM-killed the server (backlog#3085). Row
  groups are streamed through a byte budget and oversized inputs are
  refused.
- An S3 request for a key outside an indexed table prefix listed the
  bucket's whole namespaces/ catalog prefix and failed once it held more
  than 4096 objects (backlog#3086); a per-bucket directory index answers
  index misses without the listing.
- The maintenance planner read whole orphan files to obtain their
  modification time (backlog#3087); it reads metadata only.
- A client disconnect between persisting active_rename_id and clearing it
  left the bucket's catalog entry locked at 503 (backlog#3088); the rename
  runs detached from the request future and clears the flag on every exit.
- Table commits held the bucket publication fence until publication,
  starving every object write (backlog#3111); commits now hold it under a
  deadline and object writes are admitted between commits.

The directory index is managed through three new admin routes under
{warehouse}/catalog/directory, registered in the admin route policy.

The durable-strong store is left as is (its snapshot partitioning for
backlog#3109 and the strong-path deadline are not ported): that backing
is being retired separately, so the new tests cover the object backing.

* fix(table-catalog): close the review gaps in the scan-fix batch

Adversarial review of the table-catalog batch found the fixes narrower
than the issues they close and two cost regressions:

- backlog#3085: the compaction footer check bounded nothing a page header
  could not override; parquet sizes its page buffers from the header.
  Walk every column chunk's page headers (Thrift compact, no decompression)
  and hold each page and the chunk total to the budget before decoding.
  The stored-input budget is per rewrite group, so a multi-group job no
  longer fails after writing earlier outputs.
- backlog#3086: the default index-miss scan still counted maintenance
  reports toward its 4096-object limit; only table entries count now, and
  the listing itself is bounded to 64 pages. The directory index remains
  an optional accelerator.
- backlog#3111: a create wrote its metadata file under the fence as the
  first durable mutation, which disarmed the deadline before the unbounded
  registration inventory. The write precedes publication now. The deadline
  gets its own knob (RUSTFS_TABLE_CATALOG_PUBLICATION_PREPARATION_TIMEOUT_SECS,
  default 30 s, never below the lock-acquire timeout) instead of reusing
  the 5 s lock timeout, and the ownership inventory reads entries
  concurrently.
- Directory candidates are written only while a directory exists; the
  backfill covers earlier entries. A directory on the migration-fence
  path is reported as a conflict instead of a parse error.
- Dead test hooks, a stale comment and the support-matrix text that did
  not match the code are removed or corrected.

* fix(select): preserve complete samples and Parquet batch limits

* fix(s3,ecstore): close the round-2 adversarial review findings

DeleteObject resolved x-rustfs-source-version-id for authorization on
every request while storage consumes it only for a REPLICA request, so a
non-replica caller with s3:DeleteObjectVersion could trigger a plain
delete of the current version. The hook now resolves the header under
the same predicate as storage, and the regression test covers the
non-replica case.

HEAD no longer skips its permission probes for the bucket owner; an
explicit bucket-policy Deny on the metadata actions binds the owner too.

Multipart index pages verify each root against the staging area and
prune markers whose staging root is gone, under the marker's own lease
with a re-check, so the per-drive index stays proportional to live
uploads instead of every key ever multipart-initiated on the drive.

SigV2 configuration PUTs that declare an empty body need no Content-MD5:
there is no body to replay. The minimum-progress floor stays independent
of RUSTFS_HTTP_REQUEST_BODY_READ_TIMEOUT; the knob's documentation now
says so instead of claiming 0 disables it. The quota bootstrap window
(503 until the background scan publishes the ledger) is kept, because
ledger admission must not come from scanner reporting; the compatibility
matrix now documents it.

The S3 compatibility matrix gains a section for the client-visible
validation bounds, and the drive-timeout tuning guide tabulates
RUSTFS_GET_DISK_READ_IDLE_TIMEOUT_SECS.

* fix(lock): queue table-bucket publication writers fairly

Table commits take the bucket publication fence as a write lock; under a
stream of commits the lock's try-and-retry acquisition let a new commit
jump ahead of object writers that had been waiting longer, which is part
of what starved them (backlog#3111). Requests for the publication lock
path now take a FIFO ticket per shard: a waiter is admitted only when it
is at the head of the queue, cancelled waiters release their turn, and
batch acquisitions join the same queue. Other lock paths are unchanged.

This moved here from the request-layer batch, where no cited issue
covered it; it serves the table-catalog issue this PR closes.

* fix(table-catalog): close the round-2 adversarial review findings

Parquet page-header walker: read the size fields by field id as parquet
does, accepting I16/I32/I64 wire kinds and rejecting any other kind, so
a header encoding uncompressed_page_size as I64 can no longer bypass the
budget while parquet allocates it. Bound every list, set and map count by
the bytes remaining in the chunk, and reject bool collection elements
(parquet skips them with zero width, so either width would desynchronize
the two parsers); this removes the 2^63-iteration spin on LIST<BOOL>.
Start each column-chunk walk at the dictionary page offset whenever the
footer declares one, exactly as parquet's byte_range does, instead of
min(dictionary, data).

Footer pre-walk: before parquet decodes a footer, walk FileMetaData with
the hardened cursor and charge the declared row_groups count times the
RowGroupMetaData size to the decode budget, because parquet 59 reserves
that Vec before reading one element.

Preparation deadline: clamp the
RUSTFS_TABLE_CATALOG_PUBLICATION_PREPARATION_TIMEOUT_SECS knob to 86,400
seconds so Instant + Duration cannot overflow.

Index-miss scan: after each listing page, jump the cursor past the
maintenance subtree the page ended in, and allow one extra page per table
entry already listed, so job-report history scales with the catalog while
a report flood under one table stays bounded.

Migration fence: read the fence-path object once and decide from its
stored kind whether it is directory state or a fence.

Expired or failed create: remove the initial metadata file when the
registration fails before any catalog write may have begun; nothing else
references it. Correct the comment and support matrix that claimed
maintenance reclaims it.

Tests cover each walker divergence, the footer row-group reservation, the
deadline ceiling, the paging budget for honest catalogs and for a report
flood, and the removal of the unpublished metadata file.

* test(admin): register the catalog directory routes in the route matrix

The table-catalog batch added GET, POST and DELETE
{warehouse}/catalog/directory on both the Iceberg and the compat admin
prefixes without listing them in the admin route matrix, so
test_admin_route_matrix_matches_registered_routes failed on CI.

* fix(s3,ecstore): close the round-3 adversarial review findings

Multipart index pages now treat the cursor as the last examined marker
rather than the last root, so a page that pruned a stale marker still
validates and ListMultipartUploads keeps using the index. A marker is
written before its staging root is published, so pruning spares markers
younger than a five-minute grace period and an existing marker is
touched on every new upload; the prune re-checks both under the marker
lease. Bounded delete-recovery inspection rides the durable-mutation
lane like the unbounded path instead of the one-worker foreground lane.
The on-demand-migration inline body budget scales with the object size
(at least 64 KiB/s) instead of a flat 120 s. The control-body digest
service honors RUSTFS_HTTP_REQUEST_BODY_READ_TIMEOUT=0 as "no
inactivity timeout" like every other reader of that knob.

Quota reconciliation throttle objects are deleted together with a
retired generation's ledger, so bucket turnover leaves no residue. The PUT guard
test shim is gone; tests call the shared guard. Bounded DiskAPI defaults
answer MethodNotAllowed like their siblings. Stale
budget docs, an unreachable CSV arm, an always-Some limit parameter,
commented-out constants and a misplaced doc comment are cleaned up;
weak test assertions name the expected error; lifecycle rule-ID control
characters gain a test. The compatibility matrix records the CopyObject
tag-copy permission, the exact SigV2 empty-body predicate, replica and
migration writes of control-character keys, and the SigV2 DeleteObjects
digest rule.

* fix(table-catalog,heal): close the round-3 review findings

A. Pack compaction rewrite groups to min(max-rewrite-bytes-per-job,
   TABLE_COMPACTION_MAX_STORED_BYTES), reject an over-ceiling group before
   any output is written, and name the ceiling in the commit-path errors;
   document the effective cap in the support matrix and scheduler runbook.
B. Keep TaskCancelled/TaskTimeout classification on replacement passes:
   the namespace verification runs only for completed or storage-failed
   passes, in the erasure healer and the task bucket prepass.
C. Compare the replacement bucket pass per bucket: a recorded identity
   that is gone or replaced still errors or restarts the pass, buckets
   created mid-pass are appended to the identities, pending_buckets and a
   persisted positional order without rewinding progress or the
   checkpoint; verification ignores additions.
D. Read the migration-fence object once in the object-backed write permit
   and dispatch on its kind.
E. Drop the strong store's copy of maintenance_cleanup_roots.
F. Remove the unused test hooks fail_put_prefix, corrupt_put_prefix and
   pause_after_metadata; make compact_parquet_data_files and
   PublicationTicket.state private.
G. Document the body-revision identity, the legacy revalidation budget
   and its HTTP 503 in the support matrix.
H. Define HEAL_REPLACEMENT_RECOVERY_DIR once in ecstore and consume it
   from heal through the storage_api facade.

* fix(ecstore): cap the index pages one disk may answer

Pruned multipart index pages may carry few roots, so the page cursor no
longer bounds how many pages a peer can make a listing fetch. Cut a disk
off after 4096 pages (about one million examined markers) so it
contributes no coverage and the listing falls back to the staging scan.

* fix(ecstore,table-catalog): close the round-4 adversarial review findings

Multipart index markers dated in the future (a backwards clock step
between recording a marker and publishing its staging root) were judged
old and could be pruned while their upload was in flight; a future-dated
marker is now kept. The marker touch on EEXIST is best effort, so a
filesystem that refuses to set times no longer fails the upload commit.
Pruning runs on the durable-mutation lane instead of the one-worker
foreground lane.

Quota reconciliation keeps one throttle object per bucket incarnation (a
quota revision change replaces it instead of orphaning the previous
revision's object), the retirement cleanup deletes it ahead of the ledger
and also when the ledger is already gone, and a scan the retirement
already refused writes nothing back. Bounded DiskAPI defaults answer
UnsupportedDisk, the verdict the aggregate gives a peer without the
protocol. The compaction ceiling pre-check runs over every rewrite group
before any output is written, and the worker's ceiling error no longer
names a placeholder group.

Docs: the inline on-demand-migration client budget, the protocol-2
downgrade conflict of replacement passes, the exact footprint numbers.
2026-11-05 23:32:54 +08:00
Chris An 158aa276e9 fix(storage): bound heal retries and recover pool metadata (#9164)
* fix(ecstore): retry metadata writes rejected before staging

* fix(ecstore): reuse registered disks during startup

* fix(ecstore): retain remote health monitors during reconnect

* test(heal): release the commit barrier during graceful shutdown

* test(e2e): register graceful shutdown barrier regressions

* fix(ecstore): roll back interrupted pool metadata commits

* test(upgrade): honor the 1.0.4 delete recovery protocol

* fix(heal): bound admission during object rate pressure

* test(e2e): handle rebalance completion before stop

* test(e2e): observe rebalance activity before the start reply

* test(rebalance): hold the first run until stop cancels admission
2026-11-05 21:42:19 +08:00
Hauser Zhi 3362421240 fix(obs): add fine-grained object lock histograms (#9177)
Use explicit buckets that preserve millisecond lock acquisitions while retaining visibility into long-held delete and recovery locks. Add an exporter-backed regression test for both histogram instruments.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-05 08:11:08 +00:00
GatewayJ 57df9181d0 fix(audit): preserve OIDC identity in S3 request audits (#9178) 2026-11-05 06:03:33 +00:00
Hauser Zhi 371f5e4ffc fix(ecstore): streamline lock RPC and listing ownership (#9176)
* fix(ecstore): preserve lock cleanup and listing trace context

Own remote lock admission and dispatched RPC cleanup across caller cancellation. Reuse bounded late-result cleanup and retain the listing request span in metacache tasks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): streamline lock RPC and listing fanout

Poll RPCs in callers and transfer pending work before channel eviction. Share walk options across producers and borrow cached peer keys. Keep deadline classification deterministic.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-05 05:59:05 +00:00
cxymds 8a5a2c9c93 fix(s3): treat duplicate CreateBucket as owned by the requester (#9167)
* fix(s3): treat duplicate CreateBucket as owned by the requester

The duplicate-bucket response was decided from the requester's root-owner
flag, so every IAM user recreating a bucket received 409
BucketAlreadyExists, including a user recreating a bucket it created.
BucketAlreadyExists means the bucket belongs to another account; a
deployment owns a single namespace, so the answer is purely region-based:
the default region returns the legacy 200 OK, any other region returns
BucketAlreadyOwnedByYou.

Both the existing-bucket fast path and the BucketExists path now share one
helper. Authorization still runs first, so a requester without
s3:CreateBucket gets AccessDenied and cannot probe bucket existence.

Refs #8493

* test(ci): refresh e2e selections for duplicate CreateBucket

The two new create_bucket_region cases join the e2e-smoke and e2e-full
selections, which main also extended with multipart_upload_id tests.

smoke is measured from a local nextest listing: removing the two new cases
reproduces main's committed digest exactly. e2e-full is derived the same way
from main's listing artifact (run 41933823399, babfeaed0) plus the two
multipart_upload_id cases, which reproduces main's committed linux digest
before the new cases are added; CI re-verifies both platforms.

test_bucket_create_exists_nonowner asserts BucketAlreadyExists for a second
identity, which a single-owner deployment cannot produce. Move it to
excluded_tests.txt with the deployment-ownership rationale; the IAM-user
duplicate paths stay covered by crates/e2e_test/src/create_bucket_region_test.rs.
2026-11-05 03:06:50 +00:00
Hauser Zhi babfeaed00 fix(io-core): preserve pooled capacity and accounting (#9171)
* fix(io-core): preserve pooled capacity and accounting

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(io-core): preserve pool allocation admission order

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* docs(io-core): clarify pool return locking

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-04 22:07:58 +00:00
Jose Meira 736bf777b4 feat(container): add declarative bucket bootstrap (#9162)
* feat(container): add declarative bucket bootstrap

* fix(container): handle false bucket versioning setting

* Update Rust base image to version 1.99.1-trixie

Signed-off-by: Hauser Zhi <housemecn@gmail.com>

* Update Rust base image version to 1.99.1

Signed-off-by: Hauser Zhi <housemecn@gmail.com>

---------

Signed-off-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
2026-11-04 16:59:50 +00:00
KarlEmm 7babc7d621 fix(s3): report malformed multipart upload IDs as NoSuchUpload (#9147)
UploadPart, UploadPartCopy, ListParts and CompleteMultipartUpload returned 400 InvalidArgument for a malformed upload ID, while AbortMultipartUpload returned 404 NoSuchUpload. AWS S3 documents NoSuchUpload for an upload ID that might be invalid.

Report MalformedUploadID as NoSuchUpload through one helper used by all operations that address an existing upload, replacing the Abort-only special case. ListMultipartUploads keeps InvalidArgument for a malformed upload-id-marker.

Add the multipart_upload_id_test e2e module to the e2e-smoke profile. It asserts 404 NoSuchUpload from every operation that addresses an existing upload, for a malformed upload ID and for an aborted one, and updates the e2e-smoke and Linux e2e-full selection digests.

Co-authored-by: Karl Bastarache <bastarachek@google.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
2026-11-04 16:25:00 +00:00
Hauser Zhi 4d46bd25f8 perf(ecstore): parallelize bulk-delete lock and metadata fan-out (#9155)
* perf(ecstore): probe bulk-delete write locks in parallel waves

Bulk delete acquired one distributed write lock per key in serialized
order, paying a full quorum round-trip per key. Probe the unique keys in
bounded parallel waves with a short timeout instead; any contention drops
the whole wave and the canonical serial order resolves it as before, so
two overlapping batches can never deadlock.

* perf(ecstore): probe bulk-delete transaction locks in parallel

The set-layer delete-transaction locks were also acquired one quorum
round-trip per key after the raw write locks. Apply the same optimistic
all-or-nothing probe wave with a canonical serial fallback, and keep the
per-key error reporting the fallback already provided.

* perf(ecstore): pre-fetch bulk-delete source metadata in parallel

The admission loop ran one metadata quorum fan-out per key in sequence
on top of the per-key lock round-trips. Pre-fetch the source reads the
loop needs with bounded parallelism under the locks already held, and
derive the per-key read inputs from one shared helper so the pre-fetch
and the loop cannot disagree.

* test(ecstore): drop unused import in batch-delete probe test

* refactor(ecstore,lock): await wave releases and unify probe waves

Adversarial review of the bulk-delete lock waves found three real
issues. Distributed guard release is fire-and-forget on drop, so the
serial fallback could re-acquire keys while unlock RPCs were still in
flight and block on locks it already owned: guards are now released
with an awaited unlock before the fallback runs. The wave also probed
every key after the first failure, adding up to one probe timeout per
chunk of pure overhead under contention: probing now stops at the
first failing chunk. Finally the two copy-pasted wave implementations
are replaced by one shared probe_lock_wave, and the per-key delete
read inputs are resolved once instead of being recomputed.

Tests now assert the wave/fallback counters so they prove which path
ran, and an overlapping-batch test pins the no-deadlock property.

* refactor(ecstore,lock): batch bulk-delete lock rounds per key

Replace the optimistic probe waves with the bulk lock primitive the lock
layer already supports on the wire: one lock_batch RPC per lock client
for a whole DeleteObjects key set, per-key quorum guards with the usual
TTL heartbeat, and per-key outcomes. The batched round is deadlock-free
by construction (every lock server orders concurrent batches by the
same global (shard, key) order), so the probe timeout, the wave
release-and-wait dance, and the canonical serial fallback all go away.

Per-key lock outcomes are now reported per key end to end: a locked-out
key fails alone in the response while the rest of the batch proceeds,
matching the S3 DeleteObjects contract and the set layer's existing
behavior. The set layer's raw-write-lock and delete-transaction-lock
waves fold into the same primitive via one shared resource-folding
helper, and the fast-lock batch fast path now counts acquisitions so
shard metrics keep their meaning.

* perf(ecstore): move journal publish off the one-worker namespace lane

A bulk delete publishes one recovery transaction per key, and every
journal inspection and settle-plan closure ran on the per-disk
foreground namespace lane (one worker), serializing the whole publish
phase per drive behind every other mutation. Route those closures onto
the durable-mutation lane the fused delete prepare already uses (eight
workers per disk, fsyncs coalesce in the filesystem journal), and keep
32 journal publications in flight so a 16-drive set can feed those
lanes.

* test(ecstore): flatten lock-error iteration in overlap test

* fix(ecstore,lock): refresh duplicate keys after recovery, bound unlock

Review findings on the batched lock rounds. A batch entry whose recovery
rolls back an interrupted prepared delete can bring a retained version
back; a later duplicate of the same key still held its pre-fetched
source-missing read, skipped the object-lock check, and deleted the
restored version. Recovery now evicts the pre-fetched reads of every
other entry naming the same object, so those entries take the loop's
live re-read and see the restored version.

The batch rollback release awaited the full unlock retry schedule,
including the deferred background pass, parking the request behind an
unreachable peer. The synchronous phase is now a single release pass
with the deferred retries spawned in the background.

* fix(ecstore): release local batch locks before deferred recovery

A set-layer batch delete that runs deferred key recovery re-acquires a
write lock on the same keys through recover_delete_object, but the raw
local batch guards were only ever released at function exit — the
distributed path releases its batch ids before the deferred loop and the
local path missed the mirror release, so the recovery deadlocked against
the batch's own locks and surfaced as a spurious Lock(Timeout) for every
deferred key.

A regression test plants the interrupted prepared delete this needs and
pins the end-to-end contract: a batch naming a GOVERNANCE-retained
version twice must deny both entries after the first entry's recovery
rolls the prepared delete back, and the restored version must survive.

* test(lock): cover batch acquire partial-grant rollback

The distributed acquire_guard_batch rollback path — a key granted by
fewer than quorum clients must fail alone and release its partial grants
before the call returns — was only reachable in distributed mode and had
no coverage. A scripted per-object LockClient pins both halves: the
below-quorum key reports QuorumNotReached with its partial vote, and the
orphaned grant is released synchronously while the quorate key's guard
stays held.
2026-11-04 13:20:13 +00:00
Ramakrishna Chilaka ff5f491c5a perf(ecstore): skip unmatched FdCache scans and maintenance wakeups (#9165)
Track active descriptor volumes, exact paths, and component prefixes in FdCacheTracker so unmatched invalidate_under, invalidate_volume, and invalidate_exact calls return without scanning Moka or waking the background maintenance task.
2026-11-04 13:12:11 +00:00
Hauser Zhi a8be876fd9 fix(s3): honor presigned x-amz-meta-* query parameters (#9146)
* fix(s3): honor presigned x-amz-meta-* query parameters

The AWS SDK presigners hoist signable x-amz-* headers into the query
string (smithy moveHeadersToQuery), and AWS S3 accepts the hoisted form
as the header it came from. RustFS read user metadata from headers only,
so a presigned PutObject carrying ?x-amz-meta-user-id=u1 returned 200 and
stored an object with empty metadata (rustfs/rustfs#9142).

Add one shared extractor for user-metadata query parameters and wire it
into every metadata-accepting write path (PutObject including snowball
members, CreateMultipartUpload, CopyObject REPLACE) plus the snowball
extract trigger, instead of normalizing per operation the way the
presigned UploadPart checksum fix did. The stored key form is produced by
the same helper as the header path, so the hoisted and header forms land
on disk identically.

Only a signature-covered query is honored: SigV4 signs the canonical
query string, while SigV2 signs headers plus a fixed subresource list
only, so honoring its query would let a presigned-URL holder add object
properties the presigner never authorized. Keys and values that could not
have arrived as a header are rejected rather than stored, since the read
path turns them into header fields and a control character would fail
every Head/Get of that object.

* refactor(s3): hoist signed x-amz query params at the request boundary

Replace the per-write-path query metadata extractor with one boundary
mechanism: restore the `x-amz-*` request properties the SigV4 presigners
hoist into the query (`@smithy/signature-v4` `moveHeadersToQuery`) as
request headers before s3s routes and deserializes the request.

One hook now covers every reader at once — s3s input parsing,
`extract_metadata_from_mime`, the snowball extract trigger and its
transport-key filter, tagging, storage class, object lock and copy
source — so PutObject, CreateMultipartUpload and CopyObject need no
changes at all. It also replaces repeated query parsing along the write
path with a single pass at the boundary.

An existing header always wins, so the hoist is purely additive and the
unsigned-header guard keeps rejecting anything the signer did not sign;
that guard now also accepts a header whose single value equals a
same-named query parameter, which is what the hoist produces and what
the signature covers.

`query_string_is_signed` rules out SigV2 before it trusts any SigV4
marker. SigV2's string-to-sign covers headers plus a fixed subresource
list rather than arbitrary query parameters, so a SigV2 presigned URL
stays valid after `X-Amz-Algorithm`/`X-Amz-Signature` markers are
appended to it; without this rule a URL holder could turn on
`x-amz-meta-snowball-auto-extract` and have a plain upload untarred
(review of #9146).

* fix(s3): hoist signed query params after s3s signature verification

The request-boundary hoist ran before s3s, so the restored `x-amz-*`
headers reached s3s's own verifier, which rejects any `x-amz-*` header
outside `X-Amz-SignedHeaders` (s3s `ops/signature.rs`,
`reject_unsigned_amz_headers`). A valid presigned PUT with
`SignedHeaders=host` and `?x-amz-meta-user-id=u1` therefore came back
with 403 AccessDenied before any handler ran (review of #9146).

Move the hoist to `authorize_request`, RustFS's shared authorization
entry: s3s has already verified the signature there, and policy
evaluation plus the handler read request properties after it, so the
restored headers reach every operation without ever appearing unsigned
to the verifier. The mechanism is unchanged — one gated, validated pass
over the signature-covered query.

CopyObject's replacement metadata now also reads the headers, because
s3s parsed `input.metadata` before the hoist ran.

The hoist itself and its tests stay in `server::layer`; the tower layer
is gone.

* perf(s3): single-pass signature-aware query hoist in auth

Move the query hoist into `auth.rs`, next to the unsigned-header rules it
is part of, so `storage` no longer reaches into `server` for it. Its
documented contract — which request properties the signature covers, and
why SigV2 must never be widened — now lives with the rule it protects.

Make the hot path allocation-free and single-pass. The caller no longer
clones the query just to satisfy the borrow checker, the function no
longer clones it again, and one `form_urlencoded::parse` pass both
recognizes the presigned-SigV4 marker set and stages the hoistable
parameters. Nothing is validated or applied until the gate passes, so a
request whose query is not signature-covered is never rejected here. A
single ASCII scan skips the whole thing when the query names no `x-amz-`
parameter at all, which is every ordinary `?versionId=`/`?uploadId=`
request and every queryless one.

The duplicate-parameter and header-value checks stay strict; only when
they moved, not how they behave.

* fix(s3): keep verifying a query-carried payload hash after the hoist

The hoist restores `?x-amz-content-sha256=<digest>` as a header, but it
runs after s3s has already built the request body. s3s reads its
payload-hash input from the headers only, so it installs no hash
validator for a digest that arrived in the query, and the restored header
then made `get_content_sha256_with_query` conclude the auth layer was
enforcing it. Neither layer verified the body, so a presigned PUT whose
digest exists only in the query accepted a modified payload (review of
#9146).

The question is not whether a digest header is present but whether the
digest reached the request as a query parameter: that one is always the
storage layer's to verify. A digest sent as a header is still left to the
auth layer, which wraps the body in a hash-validating reader for it, so
no payload is hashed twice.

* fix(auth): limit late query hoisting to user metadata

* refactor(s3): drop the stale payload-hash compensation, scope the pre-filter

Limiting the hoist to `x-amz-meta-*` user metadata means it never
manufactures an `x-amz-content-sha256` header, so the payload-hash
predicate's original signal — a digest header present at handler time is
one s3s is enforcing — is exact again. Restore it and drop the
query-aware form: that change existed only to undo a header the hoist is
no longer allowed to create, and it would have hashed a payload twice
for a presigned request that declared a real digest both in the query and
as a header.

Match the pre-filter to the same scope so a query carrying only a typed
property (`x-amz-tagging`, `x-amz-storage-class`, `versionId`) skips the
parse entirely instead of scanning past it.

* test(access): use explicit imports in the signed-query lock regression

The architecture migration rule requires RustFS storage-owner modules to
name their imports instead of pulling the parent module in wholesale, and
`signed_query_lock_permission_regression` was still on `use super::*`.
Import the two symbols it actually uses and drop the unused one.

* test(access): reference FS through the parent import

The layer dependency guard tracks `use crate::...` edges, and naming
`crate::storage::ecfs::FS` from the signed-query regression looked like a
new `infra -> interface` reverse dependency. `access.rs` already reaches
the same type through `use super::ecfs::FS`, so reuse that import instead
of introducing a second, tracked spelling of an edge the module has
always had. No baseline entry, no new edge.

---------

Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-11-04 10:41:52 +00:00
Hauser Zhi fe3ada0689 chore(deps): refresh Cargo dependencies (#9156)
* chore(deps): refresh Cargo dependencies

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): update rustfs kafka to 1.4.1

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-04 09:03:37 +00:00
Hauser Zhi 926355ae1f fix(api): keep SlowDownRead off write-path quorum failures (#9149)
* fix(api): keep SlowDownRead off write-path quorum failures

* refactor(api): write-safe quorum default, GET opts into SlowDownRead

* fix(api): keep object-read mapping behind error.rs architecture boundary

* refactor(api): drop redundant object-read mapper wrapper
2026-11-04 08:08:23 +00:00
Chris An 7f5fa4b8f6 fix(protocols,kms,keystone): enforce client CA, protect the KMS probe (#9168)
Scan findings in the alternate-protocol front ends and the KMS and
Keystone integrations:

- WebDAV and FTPS read RUSTFS_WEBDAV_CA_FILE / RUSTFS_FTPS_CA_FILE,
  checked that the file existed, and then built their TLS listeners
  with with_no_client_auth(), so mTLS was never enforced. A shared
  protocols::common::tls::server_config builds the rustls config with a
  client-certificate verifier from the configured CA, startup fails on
  an invalid CA, and a CA cannot be combined with cleartext
  (backlog#3069).
- The KMS readiness probe used a fixed key id that the key-lifecycle
  admin routes accepted like any customer key, so kms:DisableKey on it
  failed readiness on every node. The probe key is reserved from key
  management and a disabled probe key no longer counts as a backend
  failure (backlog#3115).
- The Keystone middleware answered anonymous requests carrying a junk
  X-Auth-Token with the configured Keystone URL in the body while
  Keystone was unreachable; failures no longer disclose upstream
  locations, and the login cache is bypassed when a subscription token
  refresh is required (backlog#3116).
2026-11-04 20:25:55 +08:00
Chris An a97c65895c fix(proxies,targets,obs): bound untrusted input in leaf crates (#9166)
Scan findings in crates whose behavior is driven by untrusted input and
that stand alone from the storage core:

- trusted-proxies: the simple implementation takes the client address
  from the right-most untrusted X-Forwarded-For hop instead of the
  left-most (backlog#3082); the legacy validator never falls back to the
  proxy identity when the chain is rejected and reads X-Forwarded-For
  unless RFC 7239 is explicitly selected (backlog#3051).
- targets: webhook and similar outbound clients drain responses up to a
  byte limit instead of buffering arbitrary bodies (backlog#3062); the
  on-disk notification queue has a shared byte budget in addition to the
  entry count, configurable via RUSTFS_TARGET_STORE_MAX_BYTES
  (backlog#3122); AMQP and Redis manifests declare the broker url as a
  secret and bind credentials to their connection fields, and the
  plugin-instance PUT refuses to restore a redacted secret when the
  connection fields changed (backlog#3065, backlog#3066).
- obs: the debug-level s3s response dump is filtered so STS and
  service-account credentials never reach the log (backlog#3029).
2026-11-04 19:49:53 +08:00
Chris An 73e7afa01a fix(iam): close identity, session and admin-authorization gaps (#9163)
Scan findings in the IAM crate and the admin identity handlers, grouped
because they share the IamCache mutation lock, the STS session sweep and
the admin client-address plumbing:

- Admin and STS authorization used the socket peer as aws:SourceIp
  behind a trusted proxy; they now read the verified client address the
  S3 path already uses (backlog#3025), and the admin usage route passes
  the bucket named in the path to the s3:ListBucket check (backlog#3033).
- AssumeRoleWithWebIdentity accepted HS256 ID tokens MACed with the OIDC
  client secret; only provider-signed tokens verify (backlog#3028), and
  JWKS refresh is single-flight with a failure cool-down (backlog#3103).
- A disabled group emptied the member's whole policy list, dropping
  every Deny; direct and other-group policies are preserved (backlog#3042).
- Identity rewrites (secret change, add-user, status) ran without a lock
  and without re-reading the record, so a user's password change could
  undo an admin disable or reset (backlog#3048). add-user on an existing
  user and in-flight AssumeRole both left sessions minted under the old
  secret valid (backlog#3071, backlog#3079); rotation now revokes under
  the per-key mutation lock and derived-credential publication is ordered
  with it.
- aws:groups never carried a built-in user's IAM group membership and
  jwt:iss was always the local marker, so group- and issuer-scoped
  Denies never matched; both now come from live IAM state
  (backlog#3095, backlog#3096).
- OPA mode skipped the account-status gates for service accounts and STS
  sessions of a disabled user (backlog#3057).
- The periodic IAM reload published nothing when any cache write raced
  it and kept stale partitions when a prefix listed empty, so a missed
  revocation never applied (backlog#3064, backlog#3114).
- update-group-members never evaluated admin:RemoveUserFromGroup
  (backlog#3098); ExportIAM compared the site-replicator account against
  a name it never has (backlog#3045); add-user accepted the access key of
  a live STS session or service account (backlog#3134); a service account
  could create or extend a lifetime beyond its own (backlog#3112);
  sts:DurationSeconds and svc:DurationSeconds were never populated
  (backlog#3136); temporary-account-info returned service accounts
  (backlog#3137); an access key the object layer refuses no longer holds
  the service-account lock through the write retries (backlog#3133).
2026-11-04 18:44:50 +08:00
Chris An e0f26a540d fix(ecstore): gate null-version overwrites under Object Lock (#9157)
A put-like write without a version id to a key that is not
versioning-Enabled replaces the key's null version in place. The
commit-time Object Lock gate in put_object_with_old_current_size_inner
ran only when the write carried an explicit version id, and the
request-layer pre-check reads the key's latest version. When the
retained null version was not the latest entry (a UUID version or a
delete marker sat above it), a user holding only s3:PutObject could
overwrite it together with its COMPLIANCE retention or legal hold, and
CompleteMultipartUpload had no commit-time gate at all.

Name the version a commit replaces (the explicit id, or the nil id when
the write is not versioned and the bucket's Object Lock snapshot is not
ConfirmedAbsent) and run the existing WORM gate against it, tolerating
a null delete marker. complete_multipart_upload gets the same gate at
its commit point, and ECStore::handle_complete_multipart_upload attaches
the bucket's Object Lock snapshot the way a single PUT already does.

Refs rustfs/backlog#3019 (ANT-2026-EH17ZP59).
2026-11-04 17:26:54 +08:00
Chris An 3b3cc018aa fix(policy): close condition, action, principal and resource gaps (#9160)
Eight scan findings in the shared policy engine, each a case where a
Deny did not apply or an Allow was broader than written:

- A bare `*` Action was parsed as `s3:*`, so `Deny *` never matched
  admin:, kms: or sts: actions. `Action::All` now denies every family
  while the historical S3-only Allow is preserved (backlog#3041).
- A bare IPv6 address in aws:SourceIp got `/32` appended, matching a
  2^96-address network; a bare address now means one host, and IPv4
  clients on a dual-stack listener are matched through their mapped
  form (backlog#3030).
- Date conditions on aws:EpochTime parsed the epoch seconds as RFC 3339
  and never matched, so a time-bounded Deny failed open (backlog#3036).
- NumericNotEquals and DateNotEquals evaluated to false when the key was
  absent; negated operators now follow the AWS rule and match
  (backlog#3123).
- Every trailing IfExists on a condition operator added a level of
  recursion without bound; the chain is rejected before parsing
  (backlog#3091).
- Policy variable substitution re-expanded its own output for up to ten
  passes, so an access key holding k placeholders grew to k^10; values
  are now substituted once as literal data (backlog#3067).
- A bucket-policy Service principal was matched against the signing
  access key, so a service account named after the service received its
  grants; Service principals round-trip but never match (backlog#3081).
- Resource matching cleaned the trailing slash off a directory object,
  so a Deny on `prefix/*` missed `prefix/` itself (backlog#3125).

Also deduplicate large Resource sets through a HashSet instead of a
quadratic scan.
2026-11-04 17:16:17 +08:00
Chris An f4f5635aab fix(auth): build policy conditions from the value a write stores (#9159)
PutObjectLegalHold and PutObjectTagging apply the value in their XML
body, and a POST upload applies its form fields, while the
s3:object-lock-legal-hold, s3:RequestObjectTag/<key> and
s3:RequestObjectTagKeys condition keys (and every other header-derived
key for POST) were built from the HTTP headers. The policy engine
therefore judged a value the handler did not store: absent when the
client sent no header, and whatever the caller wrote when it did. A
user limited by a Deny on the requested legal hold or tag value could
release a hold and delete the held version, or retag an object so a
tag-based grant exposed it.

Record the body value in request extensions before authorization, the
way PutObjectRetention already does, and let authorization_conditions
replace the header-derived keys with it. For POST uploads project the
parsed form fields over the headers that feed the condition map, removing
a header whose field is absent.

Refs rustfs/backlog#3018 (ANT-2026-KONBE376).
2026-11-04 17:00:42 +08:00
Chris An 36ad5a6b87 fix(ecstore): judge the null version a versionless delete removes (#9151)
DeleteObjects ran its Object Lock check on one version of a key and then
removed a different one. For an entry without a version id on a key that
is not versioning-Enabled, delete_objects_with_accounting judged the
key's latest entry and then had the disks remove the null version. When
a UUID version or a delete marker sat above a null version under
COMPLIANCE retention or legal hold, that retention was never read and a
user holding only s3:DeleteObject could remove the retained version. The
single-object DELETE on a Suspended key had the same gap.

Add SetDisks::check_null_version_object_lock_delete, which looks up the
null version under the lock the caller already holds and runs the
existing check_object_lock_delete against it when the latest entry
carries a UUID version id. The batch path is not gated on
source_missing because a delete marker on top makes the latest-version
lookup report the key as missing. Plain unversioned keys and
versioning-Enabled keys keep a single lookup and unchanged behavior.

Refs rustfs/backlog#3017 (ANT-2026-6ED2F7II).
2026-11-04 15:59:48 +08:00
Chris An 6c14128072 fix(s3): reserve the __XLDIR__ directory-marker suffix in client keys (#9153)
Storage encodes a directory object `photos/` as `photos__XLDIR__/xl.meta`
and LocalDisk::scan_dir decodes every directory entry ending in the
suffix back into a marker. The S3 write path never refused the suffix in
client keys, so a 1-byte PutObject to the key `__XLDIR__` made the walk
schedule the directory being scanned as its own child and recurse until
the stack overflowed, aborting the server on every restart until the
directory was removed by hand. Keys below a `*__XLDIR__/` segment were
stored but hidden from every listing and from quota accounting.

validate_object_key now rejects any client key containing the suffix,
which covers PutObject, CopyObject, Snowball extraction and the admin
internal put; CreateMultipartUpload and CompleteMultipartUpload now run
the same validation so uploads created before the key was reserved
cannot publish it. scan_dir additionally ignores a marker whose decoded
name is empty, so malformed markers left by older writers or corrupt
disks can no longer recurse into their parent.

Refs rustfs/backlog#3020 (ANT-2026-SBJ1JLC2).
2026-11-04 15:39:48 +08:00
Chris An addc258a24 fix(admin): keep Vault local-file reads on the operator connection (#9152)
POST /rustfs/admin/v3/kms/reconfigure and configure accepted
server-local file paths in the Vault request body (Kubernetes jwt_path,
AppRole secret_id_file, TokenFile path, TLS ca/client cert and key
paths), read the named file with the server's own authority and sent
its content to the Vault address given in the same body. A user holding
only kms:Configure could read any UTF-8 file the process can read,
including /proc/self/environ with the root credentials, and exfiltrate
it to an address of their choosing.

normalize_configure_request_secrets now runs
validate_vault_local_file_access for both handlers: a Vault request
that names a server-local file, or inherits the stored credentials by
sending a blank token, must keep the operator-configured address and
namespace, the same file-based auth method (role, path, mount) and the
same TLS paths and verification setting. Requests with explicit inline
credentials and no file paths are unchanged.

Refs rustfs/backlog#3021 (ANT-2026-F8MRFKCC).
2026-11-04 15:39:43 +08:00
Chris An 73ea527f55 fix(auth): canonicalize s3:VersionId before policy evaluation (#9150)
The object handlers accept several spellings of one version id (upper
case, unhyphenated, braced, urn:uuid:) and the storage layer resolves
all of them to the same version, but the s3:VersionId condition value
was the client string verbatim. A Deny with StringEquals on one version
could therefore be bypassed by re-spelling the id in ?versionId=.

Canonicalize the id once where the condition value is produced so every
hook and policy type (IAM, bucket, session) sees the spelling the server
emits: hyphenated lower-case UUID, with null in any case and the nil UUID
mapped to null. Non-UUID strings pass through unchanged and are rejected
by the handlers as before.

Refs rustfs/backlog#3022 (ANT-2026-O5MHY8VJ).
2026-11-04 15:39:38 +08:00
hector 55da14ad82 ci(nightly): embed the console UI in the GNU nightly build (#9158) 2026-11-04 15:21:41 +08:00
唐小鸭 116a5299b2 fix(replication): replay the MRF journal periodically (#9139)
* fix(replication): replay the MRF journal periodically

The persisted MRF journal was replayed only at startup. Delete-marker
purges whose watch window drained with targets unreachable, and
replications that overflowed the worker queues, reach the journal while
the server runs, so they waited for a restart to converge.

Move the startup pass into replay_mrf_journal and rerun it every five
minutes from a background loop. The existing recovery leader lock keeps
one pass at a time across the cluster, including the startup pass.

* fix(replication): space periodic MRF replay across nodes

Every node runs the MRF replay loop and the recovery leader lock only
serializes passes, so an N-node cluster replayed the same retained
backlog N times per interval while a target stayed down.

Record the start time of a pass that finds entries in a shared replay
stamp and skip a periodic pass when any node started one within the
interval. The startup pass still always runs.
2026-11-03 17:06:14 +00:00
Hauser Zhi fbc54f7212 fix(heal): treat SlowDown as a rate signal and bound page churn (#9144)
* fix(heal): treat SlowDown as a rate signal and bound page churn

* refactor(heal): unify page rate control and drop checkpoint clones

* refactor(heal): one pass-wide rate controller, single SlowDown observe

* fix(heal): address SlowDown backoff and checkpoint baseline review
2026-11-03 17:05:05 +00:00
Ramakrishna Chilaka 3aa492f5ee perf(ecstore,rpc): shard hot-path delete, multipart, and RPC lock tables (#9143)
Replace the single-mutex PREPARED_DELETE_RECEIPTS and ACTIVE_MULTIPART_SOURCE_HEADS maps in rustfs-ecstore with a 64-shard ShardedPathCache backed by SWAR canonical byte keys and xxh3_64 hashing. Replace PUT_FILE_TARGET_LOCKS in rustfs internode RPC with a 64-shard ShardedPutFileTargetLockRegistry using stack-buffered binary keys, in-place dead-Weak slot reuse, and amortized garbage collection.
2026-11-03 15:11:58 +00:00
Hauser Zhi 00a81b4048 chore(deps): refresh crate requirements and lockfile (#9140)
Run cargo update and cargo upgrade twice to bump compatible requirements (jiff, zip, dial9) and refresh transitive lockfile entries.
2026-11-03 15:04:29 +00:00
唐小鸭 20ef9ebf15 fix(replication): skip site-replication rules in replica delete fan-out (#9138)
* fix(replication): skip site-replication rules in replica delete fan-out

A site that receives a replicated delete forwards it to its own targets
so chained replication keeps propagating deletes. The fan-out used the
whole bucket config, including derived site-replication rules, so in a
site-replication mesh a replicated purge was echoed back to its origin
and duplicated to every other peer. The echo could remove the origin's
pending-purge version before its own delivery state was written back.

Ignore derived site-replication rules when computing the replica delete
fan-out. The origin already delivers and retries every delete to each
peer itself. Operator rules still fan out, so chained replication is
unchanged.

* fix(replication): keep operator rules matching the site-repl shape

Rule ids and target ARN shapes are not reserved for site replication:
an ordinary bucket target ARN carries its target id, so an operator rule
named site-repl-<target id> matched the derived shape and was dropped
from replica delete fan-out, breaking an A -> B -> C chain.

Skip a rule only when its deployment id is a current remote
site-replication peer, reading the peer set only when a rule has the
derived shape. If the state cannot be read, skip nothing.
2026-11-03 12:08:08 +00:00
Boyi (Elliot) Li cc08e0d11b feat(fips): route internode RPC HMAC through aws-lc-rs FIPS (#9137)
* feat(fips): route internode RPC HMAC through aws-lc-rs FIPS

* Revise KMS cryptographic compliance details

Updated the KMS cryptographic compliance documentation to reflect changes in HMAC authentication and added details about the internode RPC HMAC authentication.

Co-authored-by: Copilot Autofix powered by AI <175728472+Copilot@users.noreply.github.com>
Signed-off-by: Hauser Zhi <housemecn@gmail.com>

---------

Signed-off-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: Copilot Autofix powered by AI <175728472+Copilot@users.noreply.github.com>
2026-11-03 06:56:56 +00:00
Hauser Zhi 69294523d5 fix(heal): preserve lock, format, and repair identity (#9132)
* fix(heal): preserve lock, format, and repair identity

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): keep pool meta legacy error message stable for ratchet

Co-authored-by: houseme <4829346+houseme@users.noreply.github.com>

* fix(heal): drop redundant clone in MRF dedup test

Co-authored-by: houseme <4829346+houseme@users.noreply.github.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
Co-authored-by: copilot-swe-agent[bot] <198982749+Copilot@users.noreply.github.com>
Co-authored-by: houseme <4829346+houseme@users.noreply.github.com>
2026-11-03 04:59:06 +00:00
Chris An cd4d86f28a fix(replication): finish writeback for already purged versions (#9135) 2026-11-03 02:08:32 +00:00
Hauser Zhi 2f55cf69e1 perf(filemeta): grow metacache read chunks geometrically (#9133)
Large metacache elements (an xl.meta grown past 16 MiB with its version
history) were accumulated in fixed 64 KiB reads, paying hundreds of
read rounds per entry on the listing path. Double the per-round chunk up
to a 4 MiB bound so each reservation stays incremental and bounded
(rustfs/rustfs#2715 corrupt-length-prefix safety is unchanged) while
wide listings and oversized entries decode in far fewer rounds.

Add regression coverage for rustfs/rustfs#9120: a listing whose
aggregate stream exceeds the per-value 16 MiB bound, and an oversized
entry listed among ordinary neighbors with peek/skip interleaving.
2026-11-03 06:07:41 +08:00
Hauser Zhi fff6e94378 fix(metrics): reconcile peer-health gauge on successful RPCs and probes (#9134)
The rustfs_cluster_servers_offline_total gauge was event-driven only:
record_peer_reachable fired solely after a fresh connector.connect()
succeeded. When post-recovery traffic was served by a cached channel
(tonic auto-reconnect, addr-form cache-key split, or delete-recovery
channel), no fresh dial occurred and the gauge stayed stale until the
process restarted.

Add record_peer_reachable_if_offline (fast-path read / slow-path write)
and wire it into every successful peer interaction:
- remote-disk recovery probe success (gRPC DiskInfo)
- periodic TCP connectivity check success (bounded-interval reconcile)
- data-path RPC success (execute_with_timeout_for_op_and_health_action)
- lock-path RPC success (record_rpc_success and detached completion)

Fixes rustfs/rustfs#9119
Tracking: rustfs/backlog#3138
2026-11-02 19:07:37 +00:00
Hauser Zhi 41b13aeb8b fix(tls): unify FIPS provider policy across clients (#9125)
* fix(tls): enforce active FIPS provider at startup

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* ci: provision FIPS validation runner

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(tls): validate FIPS before observability startup

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(tls): reuse the installed crypto provider

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): gate Linux-only commit helpers

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(tls): centralize FIPS provider policy

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-11-02 16:58:42 +00:00
weile321 88587a8f94 fix(s3select-api): clamp overflowing u64 GetRange values to i64::MAX (#9118) 2026-11-02 14:05:07 +00:00
hector 8c8b5da63f ci(nightly): dispatch nightly-candidate-ready after asset publish (#9131)
After the nightly packages are on the auto-testing nightly release and
the schema 2 R2 candidate exists, post repository_dispatch to
rustfs/auto-testing. Vault lanes stay parallel, and the workflow_run
functional chain is left in place.

Co-authored-by: hector <majinghe@users.noreply.github.com>
2026-11-02 23:05:07 +08:00
Henry Guo 00a238f838 fix(table-catalog): resolve superseded staged commits (#9124)
fix(table-catalog): diagnose superseded staged commits

Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-11-02 23:04:22 +08:00
hector 965d805a4f ci: run distributed and upgrade e2e on schedule only (#9126)
Remove pull_request from the distributed and upgrade workflows. Distributed
stays on the nightly cron, and upgrade stays on the Monday cron plus
version tags. Both remain manual-dispatch lanes and stay outside the
required merge checks.

Co-authored-by: majinghe <majinghe@users.noreply.github.com>
2026-11-02 23:03:36 +08:00
Hauser Zhi 9d66e04ae3 test(e2e): honor namespace backpressure in mixed workload (#9122)
Give each mixed-workload request a bounded policy for the server's
explicit namespace lock timeout response and Retry-After advice. Keep
unrelated SDK failures and data mismatches immediately visible.

Preserve 24 workers, four rounds, cross-node checks and all retained
objects. Cover exhausted SDK retries, bodyless HEAD, fatal responses,
persistent contention and incorrect acknowledged bytes, and include the
new cases in the protected distributed profile inventory.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-02 23:02:22 +08:00
dependabot[bot] 12c58d25b5 chore(deps): bump the dependencies group across 1 directory with 5 updates (#9113)
* chore(deps): bump the dependencies group across 1 directory with 5 updates

Bumps the dependencies group with 5 updates in the / directory:

| Package | From | To |
| --- | --- | --- |
| [pulsar](https://github.com/streamnative/pulsar-rs) | `6.9.0` | `6.9.1` |
| [arrow-array](https://github.com/apache/arrow-rs) | `59.3.2` | `60.1.0` |
| [arrow-ipc](https://github.com/apache/arrow-rs) | `59.3.2` | `60.1.0` |
| [arrow-schema](https://github.com/apache/arrow-rs) | `59.3.2` | `60.1.0` |
| [parquet](https://github.com/apache/arrow-rs) | `59.3.2` | `60.1.0` |



Updates `pulsar` from 6.9.0 to 6.9.1
- [Release notes](https://github.com/streamnative/pulsar-rs/releases)
- [Commits](https://github.com/streamnative/pulsar-rs/compare/v6.9.0...v6.9.1)

Updates `arrow-array` from 59.3.2 to 60.1.0
- [Release notes](https://github.com/apache/arrow-rs/releases)
- [Changelog](https://github.com/apache/arrow-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/apache/arrow-rs/compare/59.3.2...60.1.0)

Updates `arrow-ipc` from 59.3.2 to 60.1.0
- [Release notes](https://github.com/apache/arrow-rs/releases)
- [Changelog](https://github.com/apache/arrow-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/apache/arrow-rs/compare/59.3.2...60.1.0)

Updates `arrow-schema` from 59.3.2 to 60.1.0
- [Release notes](https://github.com/apache/arrow-rs/releases)
- [Changelog](https://github.com/apache/arrow-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/apache/arrow-rs/compare/59.3.2...60.1.0)

Updates `parquet` from 59.3.2 to 60.1.0
- [Release notes](https://github.com/apache/arrow-rs/releases)
- [Changelog](https://github.com/apache/arrow-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/apache/arrow-rs/compare/59.3.2...60.1.0)

---
updated-dependencies:
- dependency-name: arrow-array
  dependency-version: 60.1.0
  dependency-type: direct:production
  update-type: version-update:semver-major
  dependency-group: dependencies
- dependency-name: arrow-ipc
  dependency-version: 60.1.0
  dependency-type: direct:production
  update-type: version-update:semver-major
  dependency-group: dependencies
- dependency-name: arrow-schema
  dependency-version: 60.1.0
  dependency-type: direct:production
  update-type: version-update:semver-major
  dependency-group: dependencies
- dependency-name: parquet
  dependency-version: 60.1.0
  dependency-type: direct:production
  update-type: version-update:semver-major
  dependency-group: dependencies
- dependency-name: pulsar
  dependency-version: 6.9.1
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
...

Signed-off-by: dependabot[bot] <support@github.com>

* chore(deps): update dependencies and pin pulsar 6.9.0

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): ignore pulsar 6.9 updates

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-02 23:01:55 +08:00
Ramakrishna Chilaka 1ac1d883f4 perf(ecstore): shard disk path lock registries with SWAR byte keys (#9127) 2026-11-02 23:00:48 +08:00
1012 changed files with 157351 additions and 50830 deletions
+21 -26
View File
@@ -1,43 +1,38 @@
---
name: rustfs-release-publish
description: Publish a RustFS version through Console, release-branch CI, preview acceptance, human confirmation, and final publication. Use only for an explicit release request.
description: Publish a RustFS version through frozen Linux candidate acceptance, desktop completion, manifest approval, byte-preserving publication and post-release follow-up. Use only for an explicit release request.
---
# RustFS Release
Require the exact final SemVer target before version edits or publication. If unspecified, inspect current releases/tags and ask with concrete candidates; do not guess the channel or bump. A named bump type resolves to an exact version that still needs confirmation. Report the confirmed target verbatim; resolve any later mismatch before proceeding. Independent read-only preflight may continue.
Require the exact final SemVer target before version edits or publication. If unspecified, inspect releases/tags and ask with concrete candidates; do not guess the channel or bump. Reuse the user's confirmed target and authorized delivery scope. Independent read-only preflight may continue.
## Invariants
- Cargo stores `<target>`, never `-preview.N`. Before publication, installation defaults retain the previous available deliverable. Final and preview binaries embed their own tag names, so version/asset names differ despite identical source.
- Use annotated tags without `v`. Preview names are exactly `<target>-preview.<digits>`; choose the next unused iteration after fetching tags. Preview Releases are prereleases, never Latest; publish only versioned assets/exact Docker tags, never latest assets, R2, Helm, moving Docker channels, or installation/banner updates.
- `release/<target>` owns the candidate. Retain its history, backport only reviewed fixes, and never merge main wholesale or force-push it. Pin `PREVIEW_HASH` to its exact commit with complete passing CI. Preview and final tags both point there; never tag a later main/branch HEAD or insert another bump.
- Phase failures block dependents. Keep preview Releases until final publication and notes generation finish; CI removes Releases while retaining tags. Never move an existing preview or final tag.
- Cargo and every candidate executable contain the final product version. `<target>-preview.<run_number>` is an immutable candidate identifier, not a public tag or displayed binary version.
- Freeze the exact source, reviewed workflow recipe, toolchain, Console, CLI, dependency lock, previous stable version and validation plan. Newer unrelated main or Console releases do not change those inputs.
- Retain `release/<target>` history when a release branch is used; backport only reviewed fixes. Pin `CANDIDATE_SHA` to its exact CI-validated commit. Never force-push a release branch or move a public tag.
- Build Linux first. Complete field acceptance before macOS/Windows and packaging. Full certification and final acceptance are required before publication; a partial Linux PASS grants no release authority.
- Promote the accepted bytes. Final publication never recompiles binaries or rebuilds packages/images. Infrastructure retries reuse successful artifacts; changed source or inputs require a new candidate and affected acceptance.
- Phase failures block dependents. No latest/default-channel update before versioned delivery. Use the [pipeline runbook](../../../docs/operations/release-pipeline.md) for executable entry points, locks and recovery.
## Read by Phase
Read only the current phase's procedure; retain completed evidence across turns. Follow root verification, Git/PR, and authorization rules.
## Read by phase
| Phase | Procedure |
|---|---|
| 0 | Clean tree, fetch main/tags, verify GitHub access, then complete the mandatory [Console release gate](references/console-gate.md). A green Console build alone is insufficient. |
| 1–2 | [Prepare/reuse the release candidate and run exact-SHA branch CI](references/release-candidate.md). Source version changes use `rustfs-release-version-bump` with authorized delivery scope. |
| 3 | [Verify the preview build, assets, channels, and notes](references/preview-release.md). |
| 4–5 | [Run the downloaded binary, Console CRUD, and latest-rc matrix](references/preview-acceptance.md). Every check must pass. |
| Confirmation | Complete the gate below and end the turn. |
| 6 | After fresh confirmation, [publish and verify the final tag](references/final-release.md) at `PREVIEW_HASH`. |
| 7 | [Reconcile Security Advisories, milestones, installation references, and the website; reconcile main and remove the completed release branch](references/post-release-updates.md) only after complete publication. |
| 0 | Clean tree, fetch main/tags, verify access, then complete the mandatory [Console gate](references/console-gate.md). |
| 1–2 | [Prepare the exact source and run branch CI](references/release-candidate.md). Version edits use `rustfs-release-version-bump`. |
| 3 | [Build and verify the Linux candidate](references/preview-release.md). |
| 4–5 | [Run artifact, field, Console and rc acceptance](references/preview-acceptance.md), then complete desktop/package/image/chart validation. |
| Confirmation | Report the complete manifest and obtain the confirmation below. |
| 6 | [Publish the accepted manifest](references/final-release.md). |
| 7 | [Reconcile advisories, milestones, installation references, website and release branch](references/post-release-updates.md). |
## Human Confirmation
## Human confirmation
After Phases 3–5 pass, recheck that the release branch still equals `PREVIEW_HASH` and that the current Console asset tag/digest match the preview's recorded build inputs. Report the target, branch, preview tag/hash, branch CI run, preview Release URL, accepted Console asset identity/result, and rc matrix. Explicitly ask whether to publish the final tag and end the turn without creating/pushing it.
After all acceptance passes, report the target, source SHA, source CI run, Linux and completion run URLs, final manifest SHA-256, accepted Console/CLI identities, compatibility/performance results and backlog report. Explicitly ask whether to publish this exact manifest and end the turn without dispatching publication.
Only a new affirmative user reply to that exact report authorizes Phase 6. The original release request, earlier confirmation, silence, or automated follow-up does not count. Confirmation binds the target, preview tag, hash, and accepted build inputs; a changed value or repeated/failed acceptance cycle invalidates it. Revalidate and obtain fresh confirmation before continuing.
Only a new affirmative reply to that exact report authorizes Phase 6. An earlier general release request, silence or automatic continuation does not count. Reuse confirmation for retries of that same manifest; do not ask again merely because a destination failed. A changed source, input, manifest or acceptance result invalidates it and requires renewed acceptance/confirmation.
## Recovery
## Recovery and reporting
- Before the final tag exists, land fixes on main, backport to the candidate, verify target versions, and restart branch CI/acceptance. Use a new preview iteration once a preview was tagged; main may advance independently.
- If only an external build input changed, record it, create a new preview iteration even when the source SHA is unchanged, and repeat the affected build and artifact acceptance before fresh confirmation. Reuse source checks whose inputs remain valid.
- Once the final tag exists, retry publication jobs for that exact tag. A source fix requires a newly confirmed target, not retagging or a newer preview. Phase 7 retries recheck artifact availability and superseding releases.
- If abandoned after the bump merged, report the unpublished version on main and record whether to revert or let the next release overwrite it. Deleting unpublished candidate branches or preview tags requires an explicit decision. Completed release branches follow Phase 7 cleanup; keep release tags.
Report completed phase results and incomplete work with evidence: Console previous/latest tags, release need, hash and run/Release URLs; target, branch CI/SHA, previews and hash, confirmation state; preview/final assets, latest-channel state, Console/rc results and cleanup; advisory reconciliation results and pending disclosure decisions; both milestone states, installation PR checks/merge state, and website text/link/PR/deployment state. Keep artifact publication separate from follow-up delivery; do not call an open PR a live update. Report deviations and their authorization.
Resume failed infrastructure jobs without rebuilding successful units. Fix product defects on main, backport when needed, and start a new candidate. After a final tag exists, retry the same bytes or use a new patch version; never move the tag. Do not conflate implemented, CI-passed, field-accepted, approved, published and post-release-complete states. Report incomplete work and deviations with evidence; a tag or green build alone is not a completed release.
@@ -4,7 +4,7 @@ Read during Phase 0, before changing RustFS version files or tags. Follow the pa
### Console release gate
Complete this gate before changing any RustFS version file or creating any RustFS tag. RustFS `build.yml` downloads the asset returned by `repos/rustfs/console/releases/latest`, so a successful Console build alone is insufficient.
Complete this gate before changing any RustFS version file or creating any RustFS tag. Candidate creation resolves `repos/rustfs/console/releases/latest` once and freezes the exact asset for every build, so a successful Console build alone is insufficient. After freezing, later Console releases do not silently change or invalidate the accepted inputs.
1. Read the latest published Console tag and compare it with Console `main`:
@@ -1,22 +1,13 @@
# Final Release Publication
# Final release publication
Read only after fresh user confirmation of the preview acceptance report. The [parent confirmation gate](../SKILL.md#human-confirmation) applies.
Read only after fresh confirmation of the complete candidate report. The [parent confirmation gate](../SKILL.md#human-confirmation) applies.
## Phase 6 — Publish the final tag on the validated commit
Dispatch `release-publish.yml` on main with the successful completion run ID and approved `release-manifest.json` SHA-256. Do not create the tag manually. The workflow revalidates source, bytes and trusted certification, then creates the annotated final tag at `CANDIDATE_SHA`. A recipe change fails closed and requires a new candidate; unrelated main changes do not require a rebuild.
No second source version bump. Before creating the final tag, recheck the remote `release/<target>` HEAD equals `PREVIEW_HASH` and the current Console release tag/asset digest still match the accepted preview inputs. If either changed after confirmation, the approval no longer applies; validate the changed inputs with a new preview and obtain fresh confirmation. The final tag goes on the exact commit the preview validated:
Require both versioned publication and channel publication jobs to succeed. Verify the final tag's commit and manifest identity; all six platform ZIPs and compatibility aliases; DEB/RPM, checksums, SBOM, provenance and evidence bundle; both multi-architecture image variants in Docker Hub, GHCR and Quay; and the accepted Helm chart in the chart repository. Download a host-compatible final artifact and confirm its digest is exactly the accepted candidate digest and its version/source output agrees.
```bash
git fetch origin --tags
git rev-parse "<preview-tag>^{commit}" # must equal PREVIEW_HASH — abort if not
git tag -a "<target>" -m "Release <target>" "$PREVIEW_HASH"
git push origin "<target>"
```
For stable releases verify GitHub Latest, R2 download aliases and `latest.json` unless a newer stable release already owns those channels. Prereleases must remain GitHub prereleases and leave stable pointers unchanged. Verify generated release notes compare against the frozen previous stable release, excluding internal previews.
- CI rebuilds from the same source with a different tag name, so the binary self-reports `<target>`. Other inputs can change: `build.yml` reads Console `releases/latest` during each build. Compare the actual Console tag, URL, and verified digest in every final build job with the accepted preview record, and inspect available build provenance for other relevant changes. A pre-tag check cannot prevent a later input change. On a mismatch or missing evidence, repeat affected acceptance against the final artifacts and report the limitation; failed acceptance leaves release validation incomplete even if publication already succeeded. Never move the final tag to conceal a failure.
- Verify the final tag's complete publication path: all matrix and release jobs green; `gh release view "<target>"` shows the full versioned and `-latest` asset set plus checksums, SBOM, and provenance; Docker and Helm workflows succeed; `latest.json` points to `<target>`. A stable target must have `isPrerelease=false` and `isLatest=true`. An alpha/beta/rc target must have `isPrerelease=true`; GitHub does not permit prereleases to be Latest, but the project `latest.json` still advances to the final non-preview target.
- Verify the final Release body contains `## What's Changed` and a Full Changelog link. When `PREVIOUS_DELIVERABLE` exists, the link MUST be `https://github.com/rustfs/rustfs/compare/<PREVIOUS_DELIVERABLE>...<target>` and the baseline MUST equal the preview Release baseline; for example, both `1.0.0-beta.12-preview.1` and `1.0.0-beta.12` compare from `1.0.0-beta.11`.
- Verify the preview cleanup: `cleanup-preview-releases` must succeed and `gh release view "<preview-tag>"` must then report `release not found` for every preview iteration of this target. Each surviving preview tag must still resolve to its own recorded commit; the accepted preview resolves to `PREVIEW_HASH`. If the job failed, delete the leftover Releases manually with `gh release delete "<preview-tag>" --yes` and report it.
- Verify a host-compatible final artifact's checksum and `./rustfs --version`; it must report `<target>` and the expected source SHA. This identity check does not replace affected acceptance when build inputs changed.
On infrastructure failure retry the same workflow/seal; matching destinations are reused. Never clobber an asset, force a tag, rebuild the image or silently accept a changed digest. A source fix after the final tag requires a new patch version. Cross-registry writes are not atomic: report the unfinished destination rather than claiming publication complete.
Never pass `--cleanup-tag` when removing preview Releases. Remove them manually only if `cleanup-preview-releases` failed, after final publication and notes generation. Record deleted Releases and surviving tags.
New candidates create no preview Releases to clean up. For a legacy preview release, preserve its tag and remove its Release only after final delivery and notes are verified. Do not pass `--cleanup-tag`. Complete the [post-release follow-up](post-release-updates.md) separately.
@@ -24,7 +24,7 @@ Reconcile advisories after every completed final release, including Console-only
1. Re-read the published deliverable state before edits or a retry. If a newer release has superseded this target, do not downgrade installation references or the website announcement. Report the superseding release and leave those defaults intact.
2. Invoke `rustfs-release-version-bump` with stage `post-release`, the exact target, and the authorized delivery scope. Prepare the follow-up on current main; do not edit or move either validated release tag. Cargo versions may already be preparing the next target and must remain untouched.
3. Verify the exact Docker image manifest, Release download links, RPM source archive, and Helm repository entry before publishing the installation PR. The chart workflow overrides chart/app versions from the final tag, pins the source checkout to that release, and waits for its default Docker image before packaging.
3. Verify the exact Docker image manifest, Release download links, RPM source archive, and Helm repository entry before publishing the installation PR. The chart is packaged and tested before sealing; publication uploads those same bytes only after versioned Docker images are available.
4. Report the installation PR and its merge state separately from the completed release. Reuse existing merge authorization and repository checks; do not infer new merge authority from this reference.
## rustfs.com top banner
@@ -54,4 +54,4 @@ Use the existing announcement configuration from [website PR #112](https://githu
1. Compare the exact published tag with current main. Audit every release-side commit since their merge base, including inherited backports. An ahead count is a history difference, not proof of missing changes. Use ancestry and patch equivalence, then inspect current code and regression evidence for squashed, adapted, superseded, or reverted changes. Record each commit as present, superseded, release-only, or missing; a positive `git cherry` result alone does not prove a missing fix.
2. Bring missing shared changes to main through a reviewed PR and the required checks before closing the follow-up. Preserve main's later changes; decide version bumps and pinned Console configuration separately. If a history merge is needed, use a merge commit and verify the release commit is an ancestor of main; squash does not establish that ancestry. Do not merge main into the published release branch or move its tags. Report unresolved changes instead of claiming reconciliation is complete.
3. After publication and authorized follow-ups are complete, delete the remote `release/<target>` branch. Immediately before deletion, verify its HEAD still equals the published tag's commit and no open PR targets or originates from it. Preserve a branch with newer work or open PRs and report the blocker. Use a deletion with an expected-old-SHA check to avoid removing a concurrently advanced branch.
4. Verify the remote branch is absent and the final and preview tags still resolve to their recorded commits. Remove a local release branch only if it is task-owned, unchecked out, and has no unpreserved work. Record cleanup separately from artifact publication; an explicitly authorized deletion before reconciliation does not make unresolved main changes complete.
4. Verify the remote branch is absent and the final tag and any legacy preview tags still resolve to their recorded commits. Remove a local release branch only if it is task-owned, unchecked out, and has no unpreserved work. Record cleanup separately from artifact publication; an explicitly authorized deletion before reconciliation does not make unresolved main changes complete.
@@ -1,10 +1,10 @@
# Preview Artifact Acceptance
# Candidate Artifact Acceptance
Read after Phase 3 succeeds. Complete every check below before the parent skill's manual confirmation gate. These checks cover the downloaded artifact, embedded Console, and latest rc client.
Read after Phase 3 succeeds. Complete every check below before the parent skill's manual confirmation gate. These checks cover the downloaded artifact, embedded Console, and the rc release frozen in the candidate inputs.
## Phase 4 — Run the artifact locally, verify the console
Use a unique task-owned scratch directory. Select the versioned archive matching the host OS, architecture, and runtime, download its checksum file, and verify the archive before extraction. Do not substitute a different build when a matching artifact is unavailable; report that acceptance gap. The shell example below assumes the verified executable is at `RUSTFS_BINARY` (`rustfs.exe` on Windows), `SCRATCH` is the task directory, and `S3_PORT` and `CONSOLE_PORT` are distinct available ports. Use equivalent native commands when the shell differs.
Use a unique task-owned scratch directory. Select the versioned archive matching the acceptance host, and verify it against the sealed manifest before extraction. Before desktop completion, use the Linux acceptance environment rather than rebuilding for the local desktop. Do not substitute a different build when a matching artifact is unavailable; report that acceptance gap. The shell example below assumes the verified executable is at `RUSTFS_BINARY` (`rustfs.exe` on Windows), `SCRATCH` is the task directory, and `S3_PORT` and `CONSOLE_PORT` are distinct available ports. Use equivalent native commands when the shell differs.
Bind both listeners to loopback. Choose task-only credentials, set loopback proxy exclusions for the server/client processes, and record the server PID. A port probe does not reserve a port; retry startup with fresh ports on a bind conflict rather than connecting to an existing service.
@@ -24,16 +24,16 @@ PREVIEW_SERVER_PID=$!
Checks (all must pass):
- `"$RUSTFS_BINARY" --version` reports the preview tag name and the short SHA of `PREVIEW_HASH`. Reporting `<target>` without the `-preview.N` suffix means the build did not embed the tag — treat as FAIL and investigate before proceeding.
- `"$RUSTFS_BINARY" --version` reports the exact final `<target>` and full `CANDIDATE_SHA`. A preview suffix, another version or another source is a failure.
- Wait with a bounded readiness deadline while checking the recorded server process remains alive; `curl --noproxy '*' -fsS "$S3_ENDPOINT/health/ready"` must return ready from this process's listener.
- Startup log shows the embedded console being served (this was the regression that `fix(release): require embedded console assets` guards).
- Open `CONSOLE_ENDPOINT` in the browser and log in with the task credentials. The dashboard must render without JS console errors; create a bucket, upload a file, download it back (byte-identical), and delete the object and bucket. Keep the server running for Phase 5.
## Phase 5 — Validate with the latest rc client
## Phase 5 — Validate with the pinned rc client
`rc` is the RustFS CLI client from <https://github.com/rustfs/cli>.
- Resolve the latest release with `gh api repos/rustfs/cli/releases/latest --jq .tag_name`; verify the local client's version or download and verify a host-compatible client into the task directory. Set `RC_BIN` to that executable and record its version/digest. Avoid changing the user's installed client for this check.
- Read the CLI release and asset digests from `inputs.json`; verify the local client's version or download a host-compatible asset from that exact release into the task directory. If the host is a desktop, resolve its asset within the same pinned CLI release and record the digest; do not independently follow `latest`. Set `RC_BIN` to that executable and record its version/digest. Avoid changing the user's installed client for this check.
- Inspect the client's current help for an isolated configuration option and use it when supported. Otherwise choose a unique `PREVIEW_ALIAS` and confirm it is absent before creating it; never overwrite an existing alias. Use task-owned bucket/user names and input/output files. The names below are safe only inside the newly started isolated server.
- Point the client at `S3_ENDPOINT` with loopback proxy exclusions and run the command matrix, recording PASS/FAIL per command:
@@ -60,3 +60,9 @@ cmp <local-file> "$SCRATCH/out"
```
- Any FAIL blocks acceptance. On success or failure, stop only the recorded task process and remove only task-created aliases/data after retaining the needed failure evidence. Do not erase an existing client configuration or unrelated server data.
## Field acceptance and desktop completion
Before accepting the Linux manifest, record Scanner/Heal, multi-pool, memory, major features, high-concurrency 503, performance and previous-version integrity/upgrade results in backlog. Preserve the release-specific agreed limits and baseline; a PASS label without artifact identities or test results does not satisfy acceptance.
Dispatch `release-complete.yml` only after that report passes, using the exact Linux manifest digest and backlog URL. Require native macOS/Windows checks, package extraction, image startup/scans, chart tests and complete certification to pass. Complete any desktop Console/client checks applicable to the release against these same archives. Record the completion run and final manifest SHA-256 before entering the parent confirmation gate. Partial Linux acceptance does not authorize final publication.
@@ -1,25 +1,9 @@
# Preview Release Verification
# Linux candidate verification
Read for Phase 3 after the candidate passed exact-SHA CI. The [parent release invariants](../SKILL.md) apply.
Read for Phase 3 after the source passed exact-SHA CI. The [parent invariants](../SKILL.md) apply; commands and recovery live in the [pipeline runbook](../../../../docs/operations/release-pipeline.md).
## Preview channels
Dispatch `release-candidate.yml` on main with the confirmed final version and `CANDIDATE_SHA`. Record the run ID, frozen `inputs.json`, every Linux archive digest and `linux-manifest.json` SHA-256. Require the four Linux builds, native startup/S3 checks, previous-release upgrade matrix and Linux seal to succeed. Missing, skipped, cancelled or failed required work is incomplete acceptance.
- Use `<target>-preview.N` for every target, e.g. `1.0.0-beta.10-preview.3` or `1.1.0-preview.1`.
- The canonical suffix is exactly `-preview.<digits>`. `build.yml` recognizes it before alpha/beta/rc classification and routes it to the preview-only path; any other tag containing `-preview` fails closed instead of being treated as a release.
- A preview Release MUST be published with `isPrerelease=true` and `isLatest=false`. Any `*-latest` preview asset or preview-triggered `latest.json`, R2, Helm, or moving Docker channel tag is a pipeline failure. Docker images may use the exact preview version tag, including its existing variant suffixes.
- Preview Releases are cleaned up by the `cleanup-preview-releases` job after `publish-release` succeeds for the deliverable tag. It deletes every Release whose tag is exactly `<target>-preview.<digits>` and never passes `--cleanup-tag`, so the tags survive.
Verify the frozen Console identity equals the one accepted in Phase 0. Every matrix job consumes that same digest and exact toolchain. The binary must report the final product version and source commit; its candidate ID is separate. No public tag, Release, registry tag, R2 release path, Helm repository or latest pointer should change during this stage.
## Phase 3 — CI and preview Release verification
- Find and watch the tag build: `gh run list --workflow build.yml --branch "<preview-tag>" --limit 1` then `gh run watch <run-id>`. Every build matrix target must succeed (linux x86_64/aarch64 × musl/gnu, macos-aarch64, windows-x86_64).
- Confirm the preview tag resolves to the Phase 2 CI-validated `PREVIEW_HASH`. If the release branch advances during acceptance, repeat Phases 2–5 with a new preview tag.
- Confirm the Release publication jobs (`create-release`, `upload-release-assets`, and `publish-release`) succeed while `update-latest-version` is skipped.
- Record the inputs actually consumed by each build job: source SHA and the embedded Console release tag, asset URL, and verified SHA256 from the download logs. The workflow reads Console `releases/latest` separately for each build; confirm the matrix used the Console asset accepted in Phase 0. A missing identity or differing asset blocks acceptance until resolved. Retain available toolchain and build provenance with the artifact checksums; the same source SHA alone does not establish equivalent builds.
- Verify `gh release view "<preview-tag>" --json isPrerelease,assets,url`: `isPrerelease` must be `true`, and the Release must contain all 6 versioned platform zips, checksums, SBOM, and provenance with no `-latest` assets. Confirm `gh api repos/{owner}/{repo}/releases/latest --jq .tag_name` does not return `<preview-tag>`.
- Record `PREVIOUS_DELIVERABLE`, selected from published Releases by `publishedAt` after excluding the current tag and every `-preview.N` tag. Verify `gh release view "<preview-tag>" --json body --jq .body` contains `## What's Changed` and, when `PREVIOUS_DELIVERABLE` exists, `**Full Changelog**: https://github.com/rustfs/rustfs/compare/<PREVIOUS_DELIVERABLE>...<preview-tag>`. For a repository with no previous deliverable, verify a Full Changelog link exists and record the GitHub baseline fallback.
- Confirm Helm is skipped. If preview Docker images are published, confirm they use only exact preview tags (and variant suffixes), with no `latest`, `alpha`, `beta`, or `rc` channel updates. Preview validation covers the built RustFS binaries, embedded console, and rc compatibility; it does not authorize advancing any installation default.
## Release notes
- When a previous deliverable exists, GitHub Release notes for the preview and final tags MUST use it as their shared comparison baseline: the most recently published non-preview Release before the target. Internal `-preview.N` Releases are explicitly excluded from that selection, even when they point at the same commit as the final tag — cleanup runs after the notes are generated, so the preview Release is still present and would otherwise be picked as the baseline. If no previous deliverable exists, omit `previous_tag_name` and record that GitHub's default baseline fallback was used.
- Generated Release notes carry a workflow-management marker so retries can repair them. Before manually curating a generated body, remove that marker; unmarked non-placeholder notes are preserved by later workflow runs.
A green Linux run is ready for field acceptance, not publication. The partial certification must have `publish_allowed: false`. Retain the exact Linux manifest for the next stage; a new source/build-input candidate must not inherit the old approval. A newer unrelated main commit does not invalidate this evidence.
@@ -16,22 +16,13 @@ Read for Phases 1–2. The [parent release invariants](../SKILL.md) and Console
- Only when neither the release branch, an unfinished preview tag, nor current main already has `<target>`: if main is at a later version, select and verify a historical commit containing `<target>` rather than downgrading main; block if none exists. Otherwise invoke the `rustfs-release-version-bump` skill with stage `prepare`, the final `<target>` (NOT a preview version), and full GitHub flow (commit/push/PR).
- If a bump PR was needed, get it merged into main and record its merge commit. For a new release branch when main already has `<target>`, identify the main commit that introduced those versions. Phase 2 chooses a release candidate containing that commit; an existing release branch keeps its own history and a newer main HEAD is not required.
Do not wait for the moving latest main HEAD to become green. The release-branch CI in Phase 2 validates the chosen commit before a preview tag is created.
Do not wait for the moving latest main HEAD to become green. The release-branch CI in Phase 2 validates the chosen commit before a candidate build is dispatched.
## Phase 2 — Pin and validate the release candidate, then publish the preview tag
## Phase 2 — Pin and validate the release source
- Use `release/<target>`. On the first attempt, create it from a selected main commit containing the version bump and intended changes; it need not be the latest main HEAD. On a restart, retain the existing branch and backport only reviewed fixes from main. Verify the branch's Cargo versions still equal `<target>`. If adopting an existing preview, run this branch CI before continuing its acceptance; reuse the tag only when it points to the validated SHA.
- The current `ci.yml` runs automatically on main pushes, not release-branch pushes. Dispatch it explicitly with `gh workflow run ci.yml --ref "release/<target>"`. Locate that dispatch run, verify its `head_sha` equals the release branch's remote HEAD, and require the full expected CI job set to pass, including `Quick Checks`, `Test and Lint`, and `End-to-End Tests (full merge gate)`. Treat a missing or skipped required lane as incomplete. A successful PR check or CI run for a different SHA does not qualify. If the branch advances or a run is cancelled, validate the new SHA again. Do not tag a candidate with failing or incomplete CI.
- Use `release/<target>`. On the first attempt, create it from a selected main commit containing the version bump and intended changes; it need not be the latest main HEAD. On a restart, retain the existing branch and backport only reviewed fixes from main. Verify the branch's Cargo versions still equal `<target>`. A legacy preview can anchor source selection, but its tag and old artifacts do not constitute a candidate in the new protocol; freeze and verify a new candidate after the release recipe is aligned.
- The current `ci.yml` runs automatically on main pushes, not release-branch pushes. Dispatch it explicitly with `gh workflow run ci.yml --ref "release/<target>"`. Locate that dispatch run, verify its `head_sha` equals the release branch's remote HEAD, and require the full expected CI job set to pass, including `Quick Checks`, `Test and Lint`, and `End-to-End Tests (full merge gate)`. Treat a missing or skipped required lane as incomplete. A successful PR check or CI run for a different SHA does not qualify. If the branch advances or a run is cancelled, validate the new SHA again. Do not dispatch a candidate with failing or incomplete CI.
- Prefer protecting `release/*` against force pushes and deletion and requiring reviewed backport PRs. Check live rulesets rather than assuming the main ruleset covers release branches; report a missing release-branch rule as a gap.
- Set `PREVIEW_HASH` to the CI-validated release-branch commit and recheck the remote branch HEAD immediately before tagging. Report the branch, commit, and CI run URL; do not derive `PREVIEW_HASH` from a later `origin/main` fetch. When adopting an existing preview tag at this SHA, skip tag creation and continue Phase 3.
```bash
git tag -a "<preview-tag>" -m "Release <preview-tag>" "$PREVIEW_HASH"
git push origin "<preview-tag>"
```
Pushing the tag triggers `.github/workflows/build.yml` ("Build and Release"); `docker.yml` chains off it via `workflow_run`.
The preview run builds versioned artifacts and publishes them in a GitHub prerelease. Docker may publish exact preview image tags. Latest-channel, R2, and Helm publication must be skipped; installation references and the website announcement stay unchanged.
On a restart after a backport, re-run release-branch CI before setting the new `PREVIEW_HASH`. Use the next unused preview iteration when the validated commit differs from an existing preview tag; never move an existing tag.
- Set `CANDIDATE_SHA` to the CI-validated release-branch commit. Record the branch, exact commit and CI run URL. The new candidate protocol starts from a commit whose release recipe matches the reviewed main dispatcher; backport the recipe before freezing an older release branch if needed.
- Dispatch the Linux candidate as described in [candidate verification](preview-release.md). Do not create a preview or final tag here. The final executable already contains `<target>`; publication later promotes those same bytes.
- After a source or build-input change, run the affected source checks and create a new candidate. Reuse the frozen candidate after an infrastructure failure. Do not restart acceptance for unrelated main advances.
@@ -4,18 +4,18 @@ description: Prepare an exact RustFS Cargo version or align installation referen
---
# Release Version Files
Require an exact target; ask if missing or ambiguous. Reject targets containing `-preview`: those are tag-only. Infer `post-release` only from an explicit request or parent workflow; otherwise use `prepare`. Delivery defaults to local edit/verify; commit, push, PR, and merge follow existing authorization and [Git rules](../../references/pull-requests.md).
Require an exact target; ask if missing or ambiguous. Reject targets containing `-preview`: those identify candidates, not product versions or new public tags. Infer `post-release` only from an explicit request or parent workflow; otherwise use `prepare`. Delivery defaults to local edit/verify; commit, push, PR, and merge follow existing authorization and [Git rules](../../references/pull-requests.md).
| Stage | Files and constraints |
|---|---|
| `prepare` | Only `Cargo.toml` and `Cargo.lock`: workspace package, internal dependency, and workspace member versions become `<target>`. External dependencies stay unchanged. |
| `post-release` | Only `README.md`, `README_ZH.md`, `flake.nix`, `helm/rustfs/Chart.yaml`, and `rustfs.spec`. Cargo may already target the next release; leave it untouched. |
Before installation edits, verify the exact non-preview Release, downloadable assets/source archive, pullable `rustfs/rustfs:<target>` image manifest, and published Helm chart. Block on missing artifacts. Do not downgrade defaults if a newer deliverable superseded the target. Preview preparation retains the previous published installation references; follow-up commits never replace either validated tag.
Before installation edits, verify the exact non-preview Release, downloadable assets/source archive, pullable `rustfs/rustfs:<target>` image manifest, and published Helm chart. Block on missing artifacts. Do not downgrade defaults if a newer deliverable superseded the target. Candidate preparation retains the previous published installation references; follow-up commits never replace validated tags or sealed artifacts.
Packaging policy:
- Docker image tags have no `v` prefix. Derive chart/app versions with `scripts/helm_chart_version.sh <target>` (`beta.N -> 0.N.0`; other versions unchanged). Helm CI derives versions from the final tag, so no early chart bump is required.
- Docker image tags have no `v` prefix. Derive chart/app versions with `scripts/helm_chart_version.sh <target>`; both equal the final product SemVer, including prerelease suffixes. Helm CI uses the frozen candidate version before sealing, so no early installation chart bump is required. Previously published chart versions remain unchanged.
- RPM `Version` is numeric; `Release` is the prerelease suffix or `1` for stable. Expanded `Source0` and the unpack directory must resolve to the exact target including its suffix. Add the changelog entry using current git identity, date, and target; never copy an example identity/date.
- Changing these mappings requires explicit confirmation.
+2 -2
View File
@@ -1,2 +1,2 @@
sha256-linux=686dcc075e41a75dde3d37e5bd0393d016469f02f83aa3508f92bfc17f26a4d4
sha256-darwin=686dcc075e41a75dde3d37e5bd0393d016469f02f83aa3508f92bfc17f26a4d4
sha256-linux=348fa5eed9ae58962c06b33283ff4f15122cff97bce9b4eb1e3ffcb227264b0b
sha256-darwin=348fa5eed9ae58962c06b33283ff4f15122cff97bce9b4eb1e3ffcb227264b0b
+2 -2
View File
@@ -1,2 +1,2 @@
sha256-darwin=7c705942d3a9e583ebaa85845daa21c4f81fdbf36def24db931aaef38636c53e
sha256-linux=5c33dc395233671cb77452f8fb12900ecdbeb368632222b96835d310bce1aab8
sha256-darwin=0374e6b9b061dd5d622686301386232a4aa1cb22eedc18af70d2a7411bc66f8d
sha256-linux=f2cee240f7a744ae991971820f48a6c9c28d19f525e8b2345fcb76eeaaf1e382
+2 -2
View File
@@ -1,2 +1,2 @@
sha256-darwin=3814cdde8cacf4187e18188d342ed70931cc32e268e42e5bb438d565bb4d0f81
sha256-linux=663025a80273579f95ae3f49af02c0afcbfce94df09701c360a13e607b7637db
sha256-darwin=e84e04208f19dc0596b10d4d1b799ce43d6cc431415902f9c5458aa8232bc2d8
sha256-linux=1f9c7add72c44d1c12ef4ac050bb7917431be657c0c90b29f70c3df56f8bbae3
+1 -1
View File
@@ -1 +1 @@
sha256=e4ee3898b840a8374cb02c64342cc15f8d7ecd1becaf4b4a2a4657290f9e7ff1
sha256=4eac269f9a59b2f9be4e7a87ea6aa38454f5ebe10ede35c9b8d4218137d2cd35
+1 -1
View File
@@ -1 +1 @@
sha256=00f8a56b75990b487a594b97c36610b94476a6944ba00473e37187ea654d42bf
sha256=21e9a1561ac20382503c38353bbb9b830658534a4f277c254a42d0afc6ebed8b
+10
View File
@@ -70,6 +70,16 @@ s3s-footprint-check: ## Check the s3s dependency footprint ratchet stays frozen
@echo "📦 Checking s3s footprint ratchet..."
./scripts/check_s3s_footprint.sh
.PHONY: test-count-ratchet-check
test-count-ratchet-check: ## Check no workspace crate fell below its test floor or rose above its #[ignore] ceiling in the committed baseline
@echo "🧪 Checking per-crate test-count ratchet..."
./scripts/check_test_count_ratchet.sh
.PHONY: test-seams-check
test-seams-check: ## Check tests outside an operation's owner call its use-case only through rustfs/src/app/test_seams
@echo "🧪 Checking cross-owner test seams..."
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_seams.py
.PHONY: fips-wording-check
fips-wording-check: ## Check docs and crates/kms do not over-claim crypto capabilities
@echo "📣 Checking cryptographic capability wording guard..."
+2 -2
View File
@@ -20,11 +20,11 @@ planning-docs-check: ## Check that no planning-type documents are committed
./scripts/check_no_planning_docs.sh
.PHONY: pre-commit
pre-commit: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check quick-check ## Run fast pre-commit checks without clippy/full tests
pre-commit: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check test-count-ratchet-check test-seams-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check quick-check ## Run fast pre-commit checks without clippy/full tests
@echo "✅ All pre-commit checks passed!"
.PHONY: pre-pr
pre-pr: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check log-analyzer-rules-check offline-enrollment-e2e-check clippy-check test ## Run full pre-PR checks with clippy and tests
pre-pr: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check test-count-ratchet-check test-seams-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check log-analyzer-rules-check offline-enrollment-e2e-check clippy-check test ## Run full pre-PR checks with clippy and tests
@echo "✅ All pre-PR checks passed!"
.PHONY: dev-check
+23
View File
@@ -22,12 +22,21 @@ TEST_THREADS ?= 1
# differ from CI and .config/nextest.toml test-groups will NOT apply.
.PHONY: script-tests
.PHONY: release-package-tests
release-package-tests: ## Run release package integration on Linux with fpm, dpkg and rpm installed
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_packages.py
.PHONY: release-image-tests
release-image-tests: ## Run OCI integration with Docker, Go and skopeo; set RELEASE_IMAGE_VARIANT and RELEASE_IMAGE_OUTPUT
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_images.py
script-tests: ## Run shell script tests
@echo "Running script tests..."
trap 'status=$$?; printf "ERROR: script-tests failed (exit %s): %s\n" "$$status" "$$BASH_COMMAND" >&2; exit "$$status"' ERR
./scripts/test_build_rustfs_options.sh
./scripts/test_docker_runtime_timezone.sh
./scripts/test_entrypoint_credentials.sh
./scripts/test_entrypoint_directories.sh
./scripts/test_internode_grpc_ab_bench.sh
./scripts/test_object_batch_bench_enhanced.sh
./scripts/test_package_service_scripts.sh
@@ -51,10 +60,20 @@ script-tests: ## Run shell script tests
./scripts/test_python_bin.sh
$(RUSTFS_PYTHON_BIN) ./scripts/test_check_doc_paths.py
./scripts/check_embedded_secrets.sh --self-test
./scripts/check_s3s_footprint.sh --self-test
./scripts/test_check_test_count_ratchet.sh
./scripts/test_guard_source_set.sh
./scripts/test_split_guard_rules.sh
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_wiring.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/codemods/s3_error_to_s3_types.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/codemods/split_lifecycle_transition_api_test.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_seams.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/test_e2e_binary.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_download_release_asset.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_reference_binary.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_inspect_btf_prototypes.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_build_workflow.py
$(RUSTFS_PYTHON_BIN) -m unittest discover -s scripts/release -p "test_*.py"
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_glibc.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_upgrade_workflow.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_migration_gate_evidence.py
@@ -70,12 +89,16 @@ script-tests: ## Run shell script tests
$(RUSTFS_PYTHON_BIN) ./scripts/test_nightly_candidate.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_functional_chain.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_functional_chain_health.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_repro_rejoin_readiness_docker.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_validation_registry.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_inspect_validation_runner.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_retain_validation_evidence.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_ci_timing_report.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_junit_diff.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_report_compat.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_runner_tools.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_api_coverage.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_reference_parity.py
bash -n ./scripts/validate_object_data_cache_cold_stampede.sh
$(RUSTFS_PYTHON_BIN) ./scripts/check_object_data_cache_follower_samples.py --self-test
./scripts/validate_object_data_cache_cold_stampede.sh --self-test
+30 -4
View File
@@ -110,7 +110,7 @@ threads-required = "num-test-threads"
# Reserve capacity so sibling disk-heavy tests cannot consume its 2s
# registration budget; retain the queued backup and deadlock assertions.
[[profile.default.overrides]]
filter = 'package(rustfs) & test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits)'
filter = 'package(rustfs) & test(=admin::handlers::table_catalog::tests::cold_object_registration_completes_while_other_bucket_backup_waits)'
threads-required = "num-test-threads"
[[profile.default.overrides]]
@@ -356,6 +356,12 @@ threads-required = "num-test-threads"
filter = 'package(rustfs-ecstore) & test(=store::init::tests::dispatch_manifest_rollback_bounded_concurrency_reaches_tail_behind_slow_member)'
threads-required = "num-test-threads"
# These short-deadline real-disk progress probes need the test run's capacity
# for scanner and object-lock handoffs; keep their assertions and deadlines.
[[profile.default.overrides]]
filter = '(package(rustfs-scanner) & (test(=scanner::tests::cycle_persist_failure::later_cycle_post_commit_failure_reloads_durable_state) | test(=scanner::tests::running_main_loop_catches_up_pause_cleared_after_startup_observe))) | (package(rustfs-ecstore) & test(=store::init::tests::restored_transitioned_delete_causally_enqueues_free_version))'
threads-required = "num-test-threads"
# ---------------------------------------------------------------------------
# ci profile — the strict CI gate (ci.yml `cargo nextest run --profile ci`)
# ---------------------------------------------------------------------------
@@ -410,7 +416,7 @@ threads-required = "num-test-threads"
# Reserve capacity so sibling disk-heavy tests cannot consume its 2s
# registration budget; retain the queued backup and deadlock assertions.
[[profile.ci.overrides]]
filter = 'package(rustfs) & test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits)'
filter = 'package(rustfs) & test(=admin::handlers::table_catalog::tests::cold_object_registration_completes_while_other_bucket_backup_waits)'
threads-required = "num-test-threads"
[[profile.ci.overrides]]
@@ -424,6 +430,12 @@ threads-required = "num-test-threads"
filter = 'package(rustfs-scanner) & (test(/^scanner::backlog::tests::native_/) | test(=scanner_folder::tests::mrf_ownership::mrf_ownership_manager_completion_preserves_scanner_pending) | test(/^scanner_io::tests::service_cohort::/))'
threads-required = "num-test-threads"
# Keep short-deadline real-disk progress probes from competing with unrelated
# tests for scanner and object-lock capacity. Assertions and deadlines stay on.
[[profile.ci.overrides]]
filter = '(package(rustfs-scanner) & (test(=scanner::tests::cycle_persist_failure::later_cycle_post_commit_failure_reloads_durable_state) | test(=scanner::tests::running_main_loop_catches_up_pause_cleared_after_startup_observe))) | (package(rustfs-ecstore) & test(=store::init::tests::restored_transitioned_delete_causally_enqueues_free_version))'
threads-required = "num-test-threads"
# Emit this expensive fixture's stage timings in CI and use tmpfs when safe.
[[profile.ci.overrides]]
filter = 'package(rustfs-ecstore) & test(=store::init::tests::decommission_durable_ilm_receipt_pagination_fails_closed_on_second_page)'
@@ -698,14 +710,23 @@ test-group = 'ecstore-serial-flaky'
# the PR-lane e2e coverage for scanner usage snapshots consumed by quota and
# admin surfaces. It uses the same single-node, random-port, isolated-temp-dir
# fixture as the existing smoke modules.
#
# Dual-stack differential (rustfs/backlog#2740): `dual_stack_differential::`
# starts two single-node servers from the same binary, one per
# RUSTFS_S3_STACK value, on random ports with isolated temp dirs, and runs one
# SDK script covering every operation of `impl S3 for FS` against both. Its
# comparator unit tests need no server. It meets the admission criteria
# unchanged; the module clause admits a new differential test without another
# filter edit.
[profile.e2e-smoke]
default-filter = """
package(e2e_test) & (
test(/^(delete_marker_migration_semantics|version_id_regression|list_objects_v2_pagination|list_object_versions_regression|list_objects_duplicates|list_buckets_double_slash|list_buckets_auth|list_buckets_iam_filter|leading_slash_key|special_chars|create_bucket_region|delete_objects_versioning|head_object_consistency|head_object_range|copy_object_metadata|copy_object_tagging|copy_source_invalid_date|content_encoding|compression|multipart_storage_class|storage_class_capability|ssec_copy|anonymous_access|bucket_policy_check|presigned_negative|negative_sigv4|admin_auth|notification_webhook|tls_hot_reload|console_smoke|admin_iam_crud|admin_pools|sts_query_compat|data_usage)_test::|^fake_s3_target::/)
test(/^(delete_marker_migration_semantics|version_id_regression|list_objects_v2_pagination|list_object_versions_regression|list_objects_duplicates|list_buckets_double_slash|list_buckets_auth|list_buckets_iam_filter|leading_slash_key|special_chars|create_bucket_region|delete_objects_versioning|head_object_consistency|head_object_range|copy_object_metadata|copy_object_tagging|copy_source_invalid_date|content_encoding|compression|multipart_storage_class|multipart_upload_id|storage_class_capability|ssec_copy|anonymous_access|bucket_policy_check|presigned_negative|negative_sigv4|admin_auth|notification_webhook|tls_hot_reload|console_smoke|admin_iam_crud|admin_pools|sts_query_compat|data_usage)_test::|^fake_s3_target::/)
| test(/^replication_extension_test::(test_replication_check_succeeds_with_remote_target|test_replication_check_rejects_target_without_object_lock|test_set_remote_target_rejects_unversioned_source_bucket|test_replication_check_rejects_unversioned_source_bucket|test_replication_check_rejects_missing_replication_config|test_replication_check_rejects_invalid_bucket|test_set_remote_target_rejects_same_bucket_on_same_deployment|test_set_remote_target_rejects_unversioned_target_bucket|test_set_remote_target_update_requires_arn|test_set_remote_target_update_rejects_missing_target|test_set_remote_target_rejects_invalid_target_url|test_set_remote_target_rejects_self_signed_https_target_without_skip_tls_verify|test_set_remote_target_rejects_private_ca_https_target_without_ca_cert_pem|test_list_remote_targets_rejects_empty_bucket|test_list_remote_targets_rejects_invalid_bucket|test_remove_remote_target_rejects_missing_target|test_remove_remote_target_rejects_missing_arn|test_remove_remote_target_rejects_invalid_bucket|test_remove_remote_target_rejects_target_used_by_replication|test_delete_bucket_replication_removes_remote_target)$/)
| test(/^reliant::lifecycle::/)
| test(/^conditional_delete_objects_test::/)
| test(/^reliant::tiering::/)
| test(/^dual_stack_differential::/)
| test(/^upgrade_compatibility_test::upgrade_write_readiness_tests::/)
| test(/^on_demand_migration::(get_basic_test::(get_miss_pulls_inline_and_serves_locally_afterwards|head_miss_answers_from_the_source_without_persisting)|interaction_test::test_odm_admin_config_is_redacted_and_status_counts_match_the_source)$/)
)
@@ -827,7 +848,7 @@ slow-timeout = { period = "120s", terminate-after = 12, grace-period = "10s" }
# ---------------------------------------------------------------------------
# e2e-distributed profile — 4-node 4-disk Actions suite
# ---------------------------------------------------------------------------
# Storage-sensitive PR / nightly / dispatch lane owned by
# Nightly and manual-dispatch lane owned by
# .github/workflows/e2e-distributed.yml.
# Each case starts four rustfs processes (and for site replication, two
# clusters). Upgrade cases also require RUSTFS_UPGRADE_SOURCE_BINARY.
@@ -925,6 +946,10 @@ path = "junit.xml"
# parallel-safe — the same property e2e-smoke relies on. The exceptions are the
# 4-disk reliability / degraded-read fault-injection tests, multi-node heal
# clusters, and the fixed-port Vault tests, all serialized below.
# `dual_stack_differential::reference::` holds hermetic unit tests of how the
# differential picks side A (shell-script stand-ins, no server, no reference
# binary). They already run on every pull request in e2e-smoke, so e2e-full
# excludes them to keep its selection digest unchanged.
[profile.e2e-full]
default-filter = """
package(e2e_test)
@@ -935,6 +960,7 @@ default-filter = """
& !test(/^replication_target_matrix_test::/)
& !test(/^on_demand_migration::(concurrency_test|fault_test|interop_test|real_source_test)::/)
& !test(/^upgrade_compatibility_test::upgrade_write_readiness_tests::/)
& !test(/^dual_stack_differential::reference::/)
"""
fail-fast = false
+20
View File
@@ -0,0 +1,20 @@
# Pinned RustFS release used as the "reference" target of parity lanes
# (.github/workflows/reference-parity.yml). This is the single place that names
# the reference release; .github/actions/reference-binary resolves, downloads and
# verifies it, and fails on a missing pin, a missing asset or a digest mismatch.
#
# Bumping the reference is a reviewed event: every per-test difference between
# the candidate and the reference is measured against this exact build.
#
# Each sha256 is the value published in the release's SHA256SUMS asset, which
# matches the digest GitHub reports for the same asset. The action checks both.
schema = 1
repository = "rustfs/rustfs"
version = "1.0.5"
tag = "1.0.5"
[platforms.linux-x86_64-gnu]
asset = "rustfs-linux-x86_64-gnu-v1.0.5.zip"
sha256 = "5addae2f74756bf80104d0975e6347cda843bc2daffdfcd1f0cb80118b95cbd0"
executable = "rustfs"
+24
View File
@@ -0,0 +1,24 @@
# Targets of the s3-tests reference parity lane (.github/workflows/reference-parity.yml).
#
# Exactly one target uses `binary = "reference"` (the release pinned in
# .config/reference-binary.toml). Every other target uses `binary = "candidate"`
# (the binary built from the branch under test) and is compared per node id
# against the reference. All targets run the same harness, test list and server
# configuration; `env` adds only the target's own RUSTFS_* settings.
#
# Adding a target is one more [[targets]] table, for example:
#
# [[targets]]
# name = "candidate-gateway"
# binary = "candidate"
# env = { RUSTFS_S3_STACK = "gateway" }
schema = 1
[[targets]]
name = "reference"
binary = "reference"
[[targets]]
name = "candidate-legacy"
binary = "candidate"
+12
View File
@@ -0,0 +1,12 @@
# Tolerated per-test differences of the s3-tests reference parity lane.
#
# One entry per line, four fields separated by " | ":
#
# <target> | <pytest node id> | <tracking issue URL> | <reason>
#
# <target> is a candidate name from .config/reference-parity-targets.toml, the
# node id is exactly as the lane prints it (s3tests/functional/test_s3.py::...),
# and the issue URL is https://github.com/rustfs/<repo>/issues/<number>.
#
# Same semantics as scripts/junit_diff.py --allow: an entry whose difference no
# longer occurs is stale and fails the lane, so remove it when it is fixed.
+82 -24
View File
@@ -1,44 +1,93 @@
{
"schema_version": 1,
"plan_id": "rustfs-release-validation",
"description": "Versioned certification plan for every public RustFS release exit (rustfs/backlog#2662, R01). preview, prerelease and stable all require this explicit plan. Scripts/release/release_gate.py fail-closes publication on any missing, duplicate, stale, substituted or non-PASS required item.",
"release_types": ["preview", "prerelease", "stable"],
"description": "Certification for immutable candidates. All shipped platforms require native identity and startup; stable and prerelease require the pinned upgrade matrix. Linux-only acceptance never authorizes publication.",
"release_types": [
"preview",
"prerelease",
"stable"
],
"targets": [
{"os": "linux", "arch": "x86_64", "abi": "musl"},
{"os": "linux", "arch": "aarch64", "abi": "musl"},
{"os": "linux", "arch": "x86_64", "abi": "gnu"},
{"os": "linux", "arch": "aarch64", "abi": "gnu"},
{"os": "macos", "arch": "aarch64", "abi": "none"},
{"os": "windows", "arch": "x86_64", "abi": "msvc"}
{
"os": "linux",
"arch": "x86_64",
"abi": "musl"
},
{
"os": "linux",
"arch": "aarch64",
"abi": "musl"
},
{
"os": "linux",
"arch": "x86_64",
"abi": "gnu"
},
{
"os": "linux",
"arch": "aarch64",
"abi": "gnu"
},
{
"os": "macos",
"arch": "aarch64",
"abi": "none"
},
{
"os": "windows",
"arch": "x86_64",
"abi": "msvc"
}
],
"targets_basis": "Platform matrix of .github/workflows/build.yml (prepare-platform-matrix). gnu and macOS targets build with the pyroscope feature; musl and Windows targets build with no extra features.",
"features": ["pyroscope"],
"trusted_workflows": [
{"repository": "rustfs/s3chaos", "workflow_id": "release-gate.yml"}
"features": [
"pyroscope"
],
"trusted_workflows_basis": "The shared evidence envelope producer lives in rustfs/s3chaos (G01, fault/release_gate.rs) and its plan/live split workflow is .github/workflows/release-gate.yml there. Only results from these identities may enter a release certification; PR-uploaded JSON never gains release authority. R02 must extend this list when additional verifier workflows land, never widen it to untrusted sources.",
"trusted_workflows": [
{
"repository": "rustfs/rustfs",
"workflow_id": "release-candidate.yml"
},
{
"repository": "rustfs/rustfs",
"workflow_id": "release-complete.yml"
}
],
"trusted_workflows_basis": "Receipts are produced by the reviewed main workflows and fetched by exact run ID with GitHub artifact digest verification. Candidate inputs freeze the harness commit separately from product source.",
"lanes": [
{
"lane": "identity",
"harness_repository": "rustfs/s3chaos",
"harness_sha": "9a48f55c1d6d58ce63a8fb1ea7317e024f32f11d",
"harness_basis": "Fixed G01 evidence-envelope producer revision (rustfs/s3chaos PR #102 head recorded in rustfs/backlog#2658). R02 re-pins this when the live verifier ships.",
"harness_repository": "rustfs/rustfs",
"harness_sha": "candidate.workflow_sha",
"harness_basis": "The exact workflow commit is frozen in candidate inputs; no mutable branch is accepted as a harness identity.",
"timeout_seconds": 1800,
"environment_capabilities": ["process-exec"],
"cases": ["artifact-identity", "startup"],
"environment_capabilities": [
"process-exec"
],
"cases": [
"artifact-identity",
"startup"
],
"applies_to": {
"release_types": ["preview", "prerelease", "stable"],
"release_types": [
"preview",
"prerelease",
"stable"
],
"platforms": "all"
},
"applies_basis": "Artifact identity and startup checks are mandatory for every release type, preview included, on every shipped target (rustfs/backlog#2662 frozen design item 5)."
},
{
"lane": "upgrade",
"harness_repository": "rustfs/s3chaos",
"harness_sha": "9a48f55c1d6d58ce63a8fb1ea7317e024f32f11d",
"harness_basis": "Same fixed envelope producer as the identity lane; the workflow SHA and the product build SHA are bound separately and need not be equal.",
"harness_repository": "rustfs/rustfs",
"harness_sha": "candidate.workflow_sha",
"harness_basis": "The exact workflow commit is frozen in candidate inputs; no mutable branch is accepted as a harness identity.",
"timeout_seconds": 5400,
"environment_capabilities": ["process-exec", "previous-release-artifact"],
"environment_capabilities": [
"process-exec",
"previous-release-artifact"
],
"cases": [
"direct-upgrade",
"mixed-version-upgrade",
@@ -49,8 +98,17 @@
],
"cases_basis": "Case IDs of the pinned previous-release matrix in .github/workflows/e2e-upgrade.yml (source.version/asset/sha256 and the case list mapped there).",
"applies_to": {
"release_types": ["prerelease", "stable"],
"platforms": [{"os": "linux", "arch": "x86_64", "abi": "gnu"}]
"release_types": [
"prerelease",
"stable"
],
"platforms": [
{
"os": "linux",
"arch": "x86_64",
"abi": "gnu"
}
]
},
"applies_basis": "preview releases use the pre-declared smaller set (identity lane only). The upgrade lane is only exercised on linux-x86_64-gnu, the platform of the pinned source assets."
}
+37
View File
@@ -0,0 +1,37 @@
# Files that may still reference s3s (`s3s::` or `s3s_sigv4`) when Phase 1 of
# the gateway migration ends (rustfs/backlog#2734 task T0.6, rustfs/backlog#2741).
# Consumed only by `scripts/check_s3s_footprint.sh --mode allowlist`.
#
# One entry per line: a repository-relative file path or a git `:(glob)`
# pathspec. `**` matches across directories, `*` stays within one path
# component, and a directory entry matches everything under it. Blank lines
# and lines starting with `#` are ignored; an entry may not contain whitespace,
# so a note belongs on its own comment line.
#
# Every Rust file listed by `git grep -l '\bs3s\(::\|_sigv4\)' -- '*.rs'` that
# no entry matches fails the allowlist mode. Task T1.9 switches CI to that
# mode; until then `--dry-run` prints the files still outside this list, which
# is the Phase 1 tracking list.
#
# Never add crates/** other than crates/e2e_test: the engine crates leave s3s
# entirely, and the script rejects such an entry. Only the s3s-facing edge of
# the rustfs binary and the e2e oracle keep it.
# rustfs binary: the s3s-facing edge that survives Phase 1
rustfs/src/storage/ecfs.rs
rustfs/src/storage/s3_compat/**
rustfs/src/storage/access.rs
rustfs/src/auth.rs
rustfs/src/error.rs
rustfs/src/storage_api.rs
rustfs/src/app/storage_api.rs
rustfs/src/admin/router.rs
rustfs/src/app/metadata_route.rs
rustfs/src/server/http.rs
rustfs/src/server/layer.rs
rustfs/src/server/hybrid.rs
rustfs/src/protocols/client.rs
# e2e oracle: the test target that verifies S3 behaviour against s3s
crates/e2e_test/src/fake_s3_target/**
crates/e2e_test/src/**
+17
View File
@@ -0,0 +1,17 @@
# Exact baseline for the direct s3s footprint, consumed only by
# scripts/check_s3s_footprint.sh (rustfs/backlog#1677; rustfs/backlog#2734 T0.4).
#
# Each value is the exact measurement of the tree, not a ceiling. CI fails when a
# measured counter differs from its line here in either direction:
# - a larger measurement means new code widened the s3s surface: route it
# through the gateway abstractions instead; never raise a value here;
# - a smaller measurement means the PR shrank the surface: lower the matching
# value to the measured number in the same PR.
#
# files Rust files referencing s3s paths, repo-wide minus crates/e2e_test
# s3_error_lines lines holding s3_error!, same scope, minus those the script
# header's rule clears (rustfs_s3_types's macro); fails closed
# ecstore_files Rust files referencing s3s paths under crates/ecstore/src
files=63
s3_error_lines=217
ecstore_files=0
+67
View File
@@ -0,0 +1,67 @@
# Per-crate test-count baseline consumed by scripts/check_test_count_ratchet.sh
# (rustfs/backlog#2734 section 1 rule 3; T0.3 in rustfs/backlog#2738).
#
# One row per workspace member: <package>, tests, ignored, tab-separated.
# tests counts #[test], #[tokio::test], #[tokio::test(...)] and #[test_case(...)]
# attribute lines under the package directory; ignored counts #[ignore] and
# #[ignore = "..."]. The tests column is a floor and the ignored column is a
# ceiling: CI fails when a crate's tests fall below its row or its ignored count
# rises above it. Extra tests and fewer ignores pass; --update tightens the rows.
# Lowering a tests row or raising an ignored row is a reviewed statement that
# tests were intentionally removed or ignored; justify it in the PR description.
# Regenerate with:
# scripts/check_test_count_ratchet.sh --update
e2e_test 1026 20
rustfs 6449 64
rustfs-audit 70 0
rustfs-checksums 28 1
rustfs-common 36 0
rustfs-concurrency 87 0
rustfs-config 43 0
rustfs-connect-symbol-catalog 6 0
rustfs-credentials 24 0
rustfs-crypto 67 0
rustfs-data-usage 58 0
rustfs-ecstore 7858 2
rustfs-extension-schema 23 0
rustfs-filemeta 361 0
rustfs-gateway-adapter 74 0
rustfs-heal 1128 3
rustfs-heal-contracts 8 0
rustfs-iam 415 0
rustfs-io-core 52 0
rustfs-io-metrics 157 0
rustfs-keystone 31 0
rustfs-kms 716 25
rustfs-license 2 0
rustfs-lifecycle 156 0
rustfs-lock 182 0
rustfs-log-analyzer 91 0
rustfs-madmin 210 0
rustfs-notify 140 0
rustfs-object-capacity 92 0
rustfs-object-data-cache 141 0
rustfs-obs 387 0
rustfs-policy 758 0
rustfs-protocols 770 1
rustfs-protos 75 0
rustfs-replication 209 0
rustfs-rio 225 1
rustfs-rio-v2 34 6
rustfs-s3-client 71 0
rustfs-s3-ops 8 0
rustfs-s3-types 105 0
rustfs-s3select-api 232 0
rustfs-s3select-query 235 2
rustfs-scanner 1392 20
rustfs-scanner-metrics 90 0
rustfs-security-governance 20 0
rustfs-signer 34 0
rustfs-storage-api 34 0
rustfs-targets 612 26
rustfs-test-utils 1 0
rustfs-tls-runtime 44 0
rustfs-trusted-proxies 72 0
rustfs-utils 253 1
rustfs-zip 30 0
zstd 11 0
+33 -3
View File
@@ -22,9 +22,9 @@ The following files in the project root are essential for Docker operations:
| File | Description | Usage |
| :--- | :--- | :--- |
| **`docker-buildx.sh`** | **Multi-Arch Build Script**<br>Automates building and pushing Docker images for `amd64` and `arm64`. Supports release and dev channels. | `./docker-buildx.sh --push` |
| **`Dockerfile`** | **Production Image (Alpine)**<br>Lightweight image using musl libc. Downloads pre-built binaries from GitHub Releases. | `docker build -t rustfs:latest .` |
| **`Dockerfile.glibc`** | **Production Image (Ubuntu)**<br>Standard image using glibc. Useful if you need specific dynamic libraries. | `docker build -f Dockerfile.glibc .` |
| **`Dockerfile.source`** | **Development Image**<br>Builds RustFS from source code. Includes build tools. Ideal for local development and CI. | `docker build -f Dockerfile.source .` |
| **`Dockerfile`** | **Production Image (Alpine)**<br>Lightweight image using musl libc. Downloads verified RustFS and `rc` binaries from GitHub Releases and bundles `/etc/rustfs/bootstrap`. | `docker build -t rustfs:latest .` |
| **`Dockerfile.glibc`** | **Production Image (Ubuntu)**<br>Standard image using glibc. Includes the bundled bootstrap configuration. | `docker build -f Dockerfile.glibc .` |
| **`Dockerfile.source`** | **Development Image**<br>Builds RustFS from source code and bundles `rc` and the default bootstrap configuration. | `docker build -f Dockerfile.source .` |
### Docker Compose Configurations
@@ -110,6 +110,36 @@ docker compose up -d
---
## Docker Compose environment values
Use map syntax when quoting environment values in YAML:
```yaml
services:
rustfs:
image: rustfs/rustfs:latest
ports:
- "9000:9000"
- "9001:9001"
volumes:
- ./data:/data
- ./logs:/var/log/rustfs
environment:
RUSTFS_ADDRESS: ":9000"
RUSTFS_CONSOLE_ADDRESS: ":9001"
RUSTFS_CONSOLE_ENABLE: "true"
RUSTFS_OBS_LOGGER_LEVEL: error
RUSTFS_OBS_LOG_DIRECTORY: "/var/log/rustfs/"
RUSTFS_ACCESS_KEY: "${RUSTFS_ACCESS_KEY:?Set RUSTFS_ACCESS_KEY}"
RUSTFS_SECRET_KEY: "${RUSTFS_SECRET_KEY:?Set RUSTFS_SECRET_KEY}"
```
Create the host directories and grant the container user write access before starting this example; official images run as UID/GID `10001:10001`. Set both credential variables to your own values, then run `docker compose config` to inspect the resolved configuration locally before `docker compose up -d`. The resolved output includes credentials, so do not share it publicly.
With list syntax, use `- RUSTFS_OBS_LOG_DIRECTORY=/var/log/rustfs/` or quote the whole item as `- "RUSTFS_OBS_LOG_DIRECTORY=/var/log/rustfs/"`. Writing `- RUSTFS_OBS_LOG_DIRECTORY="/var/log/rustfs/"` passes the inner quotes literally, making this a relative path beginning with `"`, which can fail with `mkdir: cannot create directory '"': Permission denied`. This also applies to addresses and credentials: fix every affected list item, rather than only the log directory. The entrypoint preserves configured values, including literal quotes in valid paths and secrets.
---
## 🔧 Common Operations
### Cleaning Up
@@ -28,6 +28,15 @@ processors:
check_interval: 1s
limit_mib: 1024
spike_limit_mib: 256
transform/metrics:
error_mode: ignore
metric_statements:
# RustFS process metrics already expose process_pid as a metric label.
# Remove only the duplicate datapoint label and keep the shared resource
# process.pid available to sibling metrics and lock histograms.
- context: datapoint
statements:
- delete_key(attributes, "process_pid") where IsMatch(metric.name, "^rustfs_system_process_")
transform/logs:
error_mode: ignore
log_statements:
@@ -112,7 +121,7 @@ service:
exporters: [ otlp/tempo, otlp/jaeger ]
metrics:
receivers: [ otlp ]
processors: [ batch ]
processors: [ transform/metrics, memory_limiter, batch ]
exporters: [ prometheus ]
logs:
receivers: [ otlp ]
+40
View File
@@ -0,0 +1,40 @@
# syntax=docker/dockerfile:1.6
# Copyright 2026 RustFS Team
# Licensed under the Apache License, Version 2.0.
# A compatible native runtime with Python 3.11+, getent and stat is required by
# the isolated fixture's staging/provenance checks. This is a test image.
ARG RUNTIME_BASE=python:3.13-slim-trixie
FROM ${RUNTIME_BASE}
ARG SOURCE_REVISION
ARG BINARY_SHA256
ARG BUILD_PROFILE=dev
COPY rustfs /usr/bin/rustfs
RUN python3 - "$SOURCE_REVISION" "$BINARY_SHA256" "$BUILD_PROFILE" <<'PY'
import hashlib
import os
import re
import shutil
import sys
source, digest, profile = sys.argv[1:]
if not re.fullmatch(r"[0-9a-f]{40}", source):
raise SystemExit("invalid source revision")
if not re.fullmatch(r"[0-9a-f]{64}", digest):
raise SystemExit("invalid binary digest")
if profile not in ("dev", "release"):
raise SystemExit("invalid build profile")
with open("/usr/bin/rustfs", "rb") as binary:
if hashlib.file_digest(binary, "sha256").hexdigest() != digest:
raise SystemExit("binary digest mismatch")
for tool in ("getent", "stat"):
if shutil.which(tool) is None:
raise SystemExit(f"missing runtime tool: {tool}")
os.chmod("/usr/bin/rustfs", 0o755)
PY
LABEL io.rustfs.repro.source_revision="${SOURCE_REVISION}" \
io.rustfs.repro.binary_sha256="${BINARY_SHA256}" \
io.rustfs.repro.build_profile="${BUILD_PROFILE}"
USER 10001:10001
ENTRYPOINT ["/usr/bin/rustfs"]
+12 -3
View File
@@ -28,11 +28,12 @@ runs:
- name: Install actionlint
shell: bash
env:
GH_TOKEN: ${{ github.token }}
ASSET_DOWNLOADER: ${{ github.action_path }}/../setup/download_release_asset.py
run: |
actionlint_dir="$(mktemp -d "${RUNNER_TEMP}/actionlint.XXXXXX")"
curl --fail --location --silent --show-error \
--output "$actionlint_dir/actionlint.tar.gz" \
https://github.com/rhysd/actionlint/releases/download/v1.7.12/actionlint_1.7.12_linux_amd64.tar.gz
python3 "$ASSET_DOWNLOADER" --repository rhysd/actionlint --tag v1.7.12 --asset actionlint_1.7.12_linux_amd64.tar.gz --output "$actionlint_dir/actionlint.tar.gz" --sha256 8aca8db96f1b94770f1b0d72b6dddcb1ebb8123cb3712530b08cc387b349a3d8
echo "8aca8db96f1b94770f1b0d72b6dddcb1ebb8123cb3712530b08cc387b349a3d8 $actionlint_dir/actionlint.tar.gz" | sha256sum --check --status
tar -xzf "$actionlint_dir/actionlint.tar.gz" -C "$actionlint_dir" actionlint
rm "$actionlint_dir/actionlint.tar.gz"
@@ -96,6 +97,14 @@ runs:
shell: bash
run: ./scripts/check_s3s_footprint.sh
- name: Check per-crate test-count ratchet
shell: bash
run: ./scripts/check_test_count_ratchet.sh
- name: Check cross-owner tests use test seams
shell: bash
run: python3 ./scripts/check_test_seams.py
- name: Check cryptographic capability wording
shell: bash
run: ./scripts/check_fips_wording.sh
@@ -0,0 +1,96 @@
# Copyright 2026 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
name: "Reference RustFS binary"
description: "Download the pinned reference RustFS release, verify its sha256 and expose the executable path. A missing pin, missing asset or digest mismatch fails the step."
inputs:
pin-file:
description: "Pin file naming the reference release (repository-relative)"
required: false
default: ".config/reference-binary.toml"
platform:
description: "Platform table in the pin file"
required: false
default: "linux-x86_64-gnu"
destination:
description: "Directory that receives the executable; defaults to $RUNNER_TEMP/reference-binary"
required: false
default: ""
outputs:
path:
description: "Absolute path of the verified executable"
value: ${{ steps.unpack.outputs.path }}
version:
description: "Pinned reference version"
value: ${{ steps.pin.outputs.version }}
sha256:
description: "Pinned and verified archive sha256"
value: ${{ steps.pin.outputs.sha256 }}
runs:
using: "composite"
steps:
- name: Resolve reference pin
id: pin
shell: bash
env:
PIN_TOOL: ${{ github.action_path }}/reference_binary.py
PIN_FILE: ${{ inputs.pin-file }}
PIN_PLATFORM: ${{ inputs.platform }}
run: |
set -euo pipefail
resolved="$(python3 "$PIN_TOOL" resolve --pin "$PIN_FILE" --platform "$PIN_PLATFORM")"
printf '%s\n' "$resolved"
printf '%s\n' "$resolved" >> "$GITHUB_OUTPUT"
- name: Download and verify reference archive
id: download
shell: bash
env:
GH_TOKEN: ${{ github.token }}
ASSET_DOWNLOADER: ${{ github.action_path }}/../setup/download_release_asset.py
REF_REPOSITORY: ${{ steps.pin.outputs.repository }}
REF_TAG: ${{ steps.pin.outputs.tag }}
REF_ASSET: ${{ steps.pin.outputs.asset }}
REF_SHA256: ${{ steps.pin.outputs.sha256 }}
run: |
set -euo pipefail
archive="$RUNNER_TEMP/reference-archive/$REF_ASSET"
# Fails unless the release lists exactly one asset of this name whose
# published digest equals the pin and whose downloaded bytes match it.
python3 "$ASSET_DOWNLOADER" --repository "$REF_REPOSITORY" --tag "$REF_TAG" \
--asset "$REF_ASSET" --output "$archive" --sha256 "$REF_SHA256"
echo "archive=$archive" >> "$GITHUB_OUTPUT"
- name: Unpack reference executable
id: unpack
shell: bash
env:
PIN_TOOL: ${{ github.action_path }}/reference_binary.py
REF_ARCHIVE: ${{ steps.download.outputs.archive }}
REF_SHA256: ${{ steps.pin.outputs.sha256 }}
REF_EXECUTABLE: ${{ steps.pin.outputs.executable }}
REF_DESTINATION: ${{ inputs.destination }}
run: |
set -euo pipefail
destination="${REF_DESTINATION:-$RUNNER_TEMP/reference-binary}"
unpacked="$(python3 "$PIN_TOOL" unpack --archive "$REF_ARCHIVE" --sha256 "$REF_SHA256" \
--executable "$REF_EXECUTABLE" --destination "$destination")"
path="${unpacked#path=}"
test -x "$path"
echo "Reference executable: $path"
"$path" --version
echo "path=$path" >> "$GITHUB_OUTPUT"
+144
View File
@@ -0,0 +1,144 @@
#!/usr/bin/env python3
# Copyright 2026 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
"""Resolve and unpack the pinned reference RustFS release binary.
`resolve` reads the pin file and prints the selected platform's identity as
`key=value` lines (GitHub step-output format). `unpack` re-verifies the
downloaded archive digest against the pin and extracts exactly one executable.
Every missing or malformed input is a failure; nothing is skipped.
"""
import argparse
import hashlib
from pathlib import Path
import re
import sys
import tomllib
import zipfile
REPOSITORY = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.-]*/[A-Za-z0-9][A-Za-z0-9_.-]*")
TAG = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.+-]*")
PLATFORM = re.compile(r"[a-z0-9][a-z0-9_-]*")
ASSET = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.+-]*\.zip")
SHA256 = re.compile(r"[0-9a-f]{64}")
EXECUTABLE = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.-]*")
MAX_EXECUTABLE_BYTES = 1024 * 1024 * 1024
class PinError(Exception):
"""A pin, archive or argument that cannot be trusted."""
def field(table, key, pattern, where):
value = table.get(key)
if not isinstance(value, str) or not pattern.fullmatch(value):
raise PinError(f"{where}: missing or invalid '{key}'")
return value
def resolve(pin_path, platform):
if not PLATFORM.fullmatch(platform or ""):
raise PinError("invalid platform name")
try:
data = tomllib.loads(Path(pin_path).read_text(encoding="utf-8"))
except FileNotFoundError as exc:
raise PinError(f"{pin_path}: reference pin file is missing") from exc
except (OSError, UnicodeDecodeError, tomllib.TOMLDecodeError) as exc:
raise PinError(f"{pin_path}: cannot read reference pin: {exc}") from exc
if data.get("schema") != 1 or type(data.get("schema")) is not int:
raise PinError(f"{pin_path}: unsupported pin schema")
identity = {
"repository": field(data, "repository", REPOSITORY, pin_path),
"version": field(data, "version", TAG, pin_path),
"tag": field(data, "tag", TAG, pin_path),
}
platforms = data.get("platforms")
if not isinstance(platforms, dict) or not platforms:
raise PinError(f"{pin_path}: no pinned platforms")
entry = platforms.get(platform)
if not isinstance(entry, dict):
raise PinError(f"{pin_path}: no pin for platform '{platform}'")
where = f"{pin_path} [platforms.{platform}]"
identity["asset"] = field(entry, "asset", ASSET, where)
identity["sha256"] = field(entry, "sha256", SHA256, where)
identity["executable"] = field(entry, "executable", EXECUTABLE, where)
if identity["version"] not in identity["asset"]:
raise PinError(f"{where}: asset name does not carry version {identity['version']}")
unknown = set(entry) - {"asset", "sha256", "executable"}
if unknown:
raise PinError(f"{where}: unknown keys {sorted(unknown)}")
return identity
def file_sha256(path):
with open(path, "rb") as stream:
return hashlib.file_digest(stream, "sha256").hexdigest()
def unpack(archive, sha256, executable, destination):
if not SHA256.fullmatch(sha256 or "") or not EXECUTABLE.fullmatch(executable or ""):
raise PinError("invalid expected digest or executable name")
try:
actual = file_sha256(archive)
except OSError as exc:
raise PinError(f"{archive}: reference archive is missing or unreadable") from exc
if actual != sha256:
raise PinError(f"{archive}: sha256 {actual} does not match the pinned digest")
try:
with zipfile.ZipFile(archive) as bundle:
matches = [info for info in bundle.infolist() if info.filename == executable]
if len(matches) != 1:
raise PinError(f"{archive}: must contain exactly one top-level '{executable}'")
info = matches[0]
if info.is_dir() or not 0 < info.file_size <= MAX_EXECUTABLE_BYTES:
raise PinError(f"{archive}: '{executable}' is not a plausible executable")
destination = Path(destination)
destination.mkdir(parents=True, exist_ok=True)
target = destination / executable
with bundle.open(info) as source, open(target, "wb") as sink:
while chunk := source.read(1024 * 1024):
sink.write(chunk)
except zipfile.BadZipFile as exc:
raise PinError(f"{archive}: not a valid zip archive") from exc
target.chmod(0o755)
return target
def main(argv=None):
parser = argparse.ArgumentParser(description=__doc__.splitlines()[0])
sub = parser.add_subparsers(dest="mode", required=True)
res = sub.add_parser("resolve")
res.add_argument("--pin", required=True)
res.add_argument("--platform", required=True)
unp = sub.add_parser("unpack")
unp.add_argument("--archive", required=True)
unp.add_argument("--sha256", required=True)
unp.add_argument("--executable", required=True)
unp.add_argument("--destination", required=True)
args = parser.parse_args(argv)
try:
if args.mode == "resolve":
for key, value in resolve(args.pin, args.platform).items():
print(f"{key}={value}")
else:
print(f"path={unpack(args.archive, args.sha256, args.executable, args.destination)}")
except PinError as exc:
print(f"reference binary: {exc}", file=sys.stderr)
return 1
return 0
if __name__ == "__main__":
sys.exit(main())
+23 -5
View File
@@ -66,10 +66,7 @@ inputs:
runs:
using: "composite"
steps:
# protobuf-compiler is deliberately absent: the setup-protoc step below
# installs 35.1 into the tool cache and prepends it to PATH, so the apt
# build (older, and never version-matched) was shadowed on every run and
# simply never used.
# Use the pinned code generators rather than Ubuntu's older packages.
- name: Install system dependencies (Ubuntu)
if: runner.os == 'Linux'
shell: bash
@@ -79,7 +76,9 @@ runs:
build-essential \
pkg-config \
libssl-dev \
ripgrep
ripgrep \
python3 \
gh
# musl-gcc is needed by the native musl release leg, and zip/unzip by the
# release packaging steps. No CI test lane touches any of them.
@@ -88,13 +87,32 @@ runs:
shell: bash
run: sudo apt-get install -y musl-tools zip unzip
- name: Install pinned code generators through GitHub API (Linux x64)
if: runner.os == 'Linux' && runner.arch == 'X64'
shell: bash
env:
GH_TOKEN: ${{ github.token }}
ASSET_DOWNLOADER: ${{ github.action_path }}/download_release_asset.py
run: |
python3 "$ASSET_DOWNLOADER" --repository protocolbuffers/protobuf --tag v35.1 --asset protoc-35.1-linux-x86_64.zip --output "$RUNNER_TEMP/protoc.zip"
python3 "$ASSET_DOWNLOADER" --repository google/flatbuffers --tag v25.12.19 --asset 'Linux.flatc.binary.g++-13.zip' --output "$RUNNER_TEMP/flatc.zip"
python3 -m zipfile -e "$RUNNER_TEMP/protoc.zip" "$RUNNER_TEMP/protoc"
python3 -m zipfile -e "$RUNNER_TEMP/flatc.zip" "$RUNNER_TEMP/flatc"
chmod +x "$RUNNER_TEMP/protoc/bin/protoc" "$RUNNER_TEMP/flatc/flatc"
"$RUNNER_TEMP/protoc/bin/protoc" --version
"$RUNNER_TEMP/flatc/flatc" --version
echo "$RUNNER_TEMP/protoc/bin" >> "$GITHUB_PATH"
echo "$RUNNER_TEMP/flatc" >> "$GITHUB_PATH"
- name: Install protoc
if: runner.os != 'Linux' || runner.arch != 'X64'
uses: rustfs/setup-protoc@a3705324d8f9bf5b6c3573fb6cf8ae421db55dd6 # v3.0.1
with:
version: "35.1"
repo-token: ${{ github.token }}
- name: Install flatc
if: runner.os != 'Linux' || runner.arch != 'X64'
uses: Nugine/setup-flatc@698800de72a96bfb22cf60431dc21a2ff9a7e07b # v1
with:
version: "25.12.19"
@@ -0,0 +1,84 @@
#!/usr/bin/env python3
"""Download a named GitHub release asset through its API and verify its digest."""
import argparse
import hashlib
import json
from pathlib import Path
import re
import subprocess
import sys
import tempfile
from urllib.parse import quote
def download(repository, tag, name, output, expected_sha256=None):
if not re.fullmatch(r"[A-Za-z0-9][A-Za-z0-9_.-]*/[A-Za-z0-9][A-Za-z0-9_.-]*", repository):
raise ValueError("invalid release repository")
if not tag or not name or "/" in name or "\\" in name:
raise ValueError("invalid release tag or asset name")
if expected_sha256 is not None and not re.fullmatch(r"[0-9a-f]{64}", expected_sha256):
raise ValueError("invalid pinned asset digest")
result = subprocess.run(
["gh", "api", "--hostname", "github.com", f"repos/{repository}/releases/tags/{quote(tag, safe='')}"],
check=True, capture_output=True, text=True, timeout=60,
)
release = json.loads(result.stdout)
if not isinstance(release, dict) or release.get("tag_name") != tag:
raise ValueError("release metadata does not match the requested tag")
assets = release.get("assets")
if not isinstance(assets, list) or any(not isinstance(asset, dict) for asset in assets):
raise ValueError("invalid release asset inventory")
matches = [asset for asset in assets if asset.get("name") == name]
if len(matches) != 1:
raise ValueError("release must contain exactly one named asset")
asset = matches[0]
asset_id, size, digest = asset.get("id"), asset.get("size"), asset.get("digest")
if type(asset_id) is not int or asset_id <= 0 or type(size) is not int or not 0 < size <= 512 * 1024 * 1024:
raise ValueError("invalid release asset identity or size")
if not isinstance(digest, str) or not re.fullmatch(r"sha256:[0-9a-f]{64}", digest):
raise ValueError("release asset has no valid SHA-256 digest")
sha256 = digest.removeprefix("sha256:")
if expected_sha256 is not None and expected_sha256 != sha256:
raise ValueError("release digest differs from the pinned digest")
output = Path(output)
output.parent.mkdir(parents=True, exist_ok=True)
temporary = None
try:
with tempfile.NamedTemporaryFile(dir=output.parent, prefix=".release-asset-", delete=False) as stream:
temporary = Path(stream.name)
# gh authenticates to the API; its HTTP client strips credentials on
# cross-host redirects. No browser URL or token is supplied in argv.
subprocess.run(
["gh", "api", "--hostname", "github.com", "--header", "Accept: application/octet-stream", f"repos/{repository}/releases/assets/{asset_id}"],
check=True, stdout=stream, timeout=300,
)
with temporary.open("rb") as stream:
actual = hashlib.file_digest(stream, "sha256").hexdigest()
if temporary.stat().st_size != size or actual != sha256:
raise ValueError("downloaded release asset failed size or SHA-256 verification")
temporary.replace(output)
print(f"Verified release asset: {repository} {tag} {name} sha256={actual}")
finally:
if temporary is not None:
temporary.unlink(missing_ok=True)
def main():
parser = argparse.ArgumentParser(description=__doc__)
parser.add_argument("--repository", required=True)
parser.add_argument("--tag", required=True)
parser.add_argument("--asset", required=True)
parser.add_argument("--output", required=True, type=Path)
parser.add_argument("--sha256")
args = parser.parse_args()
try:
download(args.repository, args.tag, args.asset, args.output, args.sha256)
except (ValueError, KeyError, TypeError, json.JSONDecodeError, subprocess.SubprocessError, OSError) as error:
print(f"Release asset download failed: {error}", file=sys.stderr)
return 1
return 0
if __name__ == "__main__":
raise SystemExit(main())
+2
View File
@@ -32,6 +32,8 @@ updates:
- "overtrue"
- "majinghe"
ignore:
- dependency-name: "pulsar"
versions: [ "6.9.x" ]
- dependency-name: "object_store"
versions: [ "0.13.x" ]
- dependency-name: "libunftp"
+130 -26
View File
@@ -350,10 +350,10 @@
"roles": [
"periodic",
"manual",
"release"
"reusable"
],
"events": [
"push",
"workflow_call",
"schedule",
"workflow_dispatch"
],
@@ -367,7 +367,7 @@
"monitor": "workflow",
"max_age_hours": 36,
"result_owner": "build.yml",
"disposition": "retained independent entry",
"disposition": "Builds artifacts only; public release writes belong to release-publish.yml.",
"failure_owner": "workflow",
"origin": "baseline",
"alert_contract": "scheduled-validation"
@@ -745,14 +745,13 @@
},
{
"workflow": ".github/workflows/docker.yml",
"name": "Docker Images",
"name": "Build candidate images",
"roles": [
"manual",
"release"
"release",
"reusable"
],
"events": [
"workflow_run",
"workflow_dispatch"
"workflow_call"
],
"cadence": "event",
"timezone": "UTC",
@@ -761,7 +760,7 @@
"policy": "active",
"monitor": "none",
"result_owner": "docker.yml",
"disposition": "retained independent entry",
"disposition": "Builds artifacts only; public release writes belong to release-publish.yml.",
"monitor_reason": "Event-driven or operator-requested work has no periodic freshness obligation.",
"origin": "baseline"
},
@@ -769,12 +768,10 @@
"workflow": ".github/workflows/e2e-distributed.yml",
"name": "e2e-distributed",
"roles": [
"pr",
"periodic",
"manual"
],
"events": [
"pull_request",
"workflow_dispatch",
"schedule"
],
@@ -849,12 +846,11 @@
"workflow": ".github/workflows/e2e-upgrade.yml",
"name": "Upgrade Compatibility",
"roles": [
"pr",
"periodic",
"manual"
"manual",
"release"
],
"events": [
"pull_request",
"push",
"schedule",
"workflow_dispatch"
@@ -873,6 +869,33 @@
"failure_owner": "watchdog",
"origin": "baseline"
},
{
"workflow": ".github/workflows/reference-parity.yml",
"name": "Reference Parity",
"roles": [
"pr",
"periodic",
"manual"
],
"events": [
"pull_request",
"schedule",
"workflow_dispatch"
],
"cadence": "nightly",
"timezone": "UTC",
"schedule": [
"37 1 * * *"
],
"owner": "@overtrue",
"policy": "active",
"monitor": "workflow",
"max_age_hours": 36,
"result_owner": "reference-parity.yml",
"disposition": "s3-tests per-node-id parity of branch candidates against the pinned reference release",
"failure_owner": "watchdog",
"origin": "added"
},
{
"workflow": ".github/workflows/functional-chain-health.yml",
"name": "Functional chain health",
@@ -957,14 +980,13 @@
},
{
"workflow": ".github/workflows/helm-package.yml",
"name": "Publish helm chart to artifacthub",
"name": "Build candidate Helm chart",
"roles": [
"manual",
"release"
"release",
"reusable"
],
"events": [
"workflow_run",
"workflow_dispatch"
"workflow_call"
],
"cadence": "event",
"timezone": "UTC",
@@ -973,7 +995,7 @@
"policy": "active",
"monitor": "none",
"result_owner": "helm-package.yml",
"disposition": "retained independent entry",
"disposition": "Builds artifacts only; public release writes belong to release-publish.yml.",
"monitor_reason": "Event-driven or operator-requested work has no periodic freshness obligation.",
"origin": "baseline"
},
@@ -999,6 +1021,26 @@
"policy_reason": "Preserve operator-disabled state; enabling requires a separate policy decision.",
"origin": "baseline"
},
{
"workflow": ".github/workflows/manual-main-packages.yml",
"name": "Manual main packages",
"roles": [
"manual"
],
"events": [
"workflow_dispatch"
],
"cadence": "event",
"timezone": "UTC",
"schedule": [],
"owner": "@overtrue",
"policy": "active",
"monitor": "none",
"result_owner": "manual-main-packages.yml",
"disposition": "Packages the origin/main tip as workflow artifacts only. No GitHub Release or download-channel writes.",
"monitor_reason": "Operator-requested packaging has no periodic freshness obligation.",
"origin": "manual-main-packages"
},
{
"workflow": ".github/workflows/minio-interop.yml",
"name": "minio-interop",
@@ -1185,14 +1227,13 @@
},
{
"workflow": ".github/workflows/package.yml",
"name": "Package DEB/RPM",
"name": "Build candidate packages",
"roles": [
"manual",
"release"
"release",
"reusable"
],
"events": [
"workflow_run",
"workflow_dispatch"
"workflow_call"
],
"cadence": "event",
"timezone": "UTC",
@@ -1201,7 +1242,7 @@
"policy": "active",
"monitor": "none",
"result_owner": "package.yml",
"disposition": "retained independent entry",
"disposition": "Builds artifacts only; public release writes belong to release-publish.yml.",
"monitor_reason": "Event-driven or operator-requested work has no periodic freshness obligation.",
"origin": "baseline"
},
@@ -1730,6 +1771,69 @@
"disposition": "retained independent entry",
"monitor_reason": "Event-driven or operator-requested work has no periodic freshness obligation.",
"origin": "baseline"
},
{
"workflow": ".github/workflows/release-candidate.yml",
"name": "Release candidate (Linux)",
"roles": [
"manual",
"release"
],
"events": [
"workflow_dispatch"
],
"cadence": "event",
"timezone": "UTC",
"schedule": [],
"owner": "@overtrue",
"policy": "active",
"monitor": "none",
"result_owner": "release-candidate.yml",
"disposition": "Explicit immutable candidate stage",
"monitor_reason": "Operator-requested release stage has no periodic freshness obligation.",
"origin": "release-candidate-migration"
},
{
"workflow": ".github/workflows/release-complete.yml",
"name": "Release candidate (complete)",
"roles": [
"manual",
"release"
],
"events": [
"workflow_dispatch"
],
"cadence": "event",
"timezone": "UTC",
"schedule": [],
"owner": "@overtrue",
"policy": "active",
"monitor": "none",
"result_owner": "release-complete.yml",
"disposition": "Explicit immutable candidate stage",
"monitor_reason": "Operator-requested release stage has no periodic freshness obligation.",
"origin": "release-candidate-migration"
},
{
"workflow": ".github/workflows/release-publish.yml",
"name": "Publish accepted release",
"roles": [
"manual",
"release"
],
"events": [
"workflow_dispatch"
],
"cadence": "event",
"timezone": "UTC",
"schedule": [],
"owner": "@overtrue",
"policy": "active",
"monitor": "none",
"result_owner": "release-publish.yml",
"disposition": "Explicit immutable candidate stage",
"monitor_reason": "Operator-requested release stage has no periodic freshness obligation.",
"origin": "release-candidate-migration"
}
]
}
+11 -4
View File
@@ -5,7 +5,7 @@
## Billing facts
This repository is public. For a public repository, GitHub's standard hosted runners (`ubuntu-latest`, `windows-latest`, `macos-latest`) cost nothing and have no minute cap, whatever plan the organisation is on. GitHub bills only two things: larger hosted runners, which have custom labels and are not used here, and standard runners in private repositories.
This repository is public. For a public repository, GitHub's standard hosted runners (`ubuntu-latest`, `windows-latest`, `macos-latest`) cost nothing and have no minute cap, whatever plan the organisation is on. GitHub bills only two things: larger hosted runners, including the `macos-latest-xlarge` release lane used here, and standard runners in private repositories.
Every other label in this repository is capacity RustFS pays for. ARC pods and lab machines accrue cost while the machine exists. A Ubicloud label is metered for the minutes a job holds its VM:
@@ -13,6 +13,7 @@ Every other label in this repository is capacity RustFS pays for. ARC pods and l
|---|---|---|---|
| `ubuntu-latest` | nobody | GitHub-hosted, Ubuntu 24.04, 4 vCPU, 16 GB RAM, about 14 GB of free disk. Ships a C toolchain, `docker`, `gh`, `curl`, `wget`, `jq`, Python. Can `mount` tmpfs and loop devices; io_uring works | the default for every job |
| `windows-latest`, `macos-latest` | nobody | GitHub-hosted standard runners | Windows and macOS targets |
| `macos-latest-xlarge` | RustFS | GitHub-hosted larger Apple Silicon runner | macOS release builds, deferred until Linux acceptance for candidates |
| `sm-standard-2` | RustFS | ARC pod, Ubuntu 24.04, minimal image: no `gh`, no C toolchain; Docker only on the `dind-` label | only a job that a hosted runner cannot run (see the placement rule) |
| `sm-standard-4` | RustFS | ARC pod, Ubuntu 24.04, 14 CPUs and 28 GB (the label is not the core count), large disk | workspace-scale Cargo builds |
| `ubicloud-standard-16-arm` | RustFS | Ubicloud VM, alias of `ubicloud-standard-16-arm-ubuntu-2404`: Ubuntu 24.04 arm64, 16 vCPU, 48 GB, 300 GB disk. Reached through the `build.yml` matrix, so `actionlint.yaml` does not list it | native aarch64 release builds (`linux-aarch64-musl`, `linux-aarch64-gnu`) |
@@ -32,7 +33,7 @@ A job runs on `ubuntu-latest` unless it has one of these reasons, and the reason
Jobs that do only the following have no reason to be self-hosted: shell or Python scripts, `cargo fmt`, `cargo deny`, typos, actionlint, API calls (`gh`, dependency review, issue and stale bots, CLA checks), downloading an artifact and running a prebuilt binary, or a `cargo build -p rustfs` with its own cache key. `e2e-distributed.yml` and `e2e-upgrade.yml` build the server and the `e2e_test` harness on `ubuntu-latest` inside their budgets, so "it compiles something" alone is not a reason.
The functional chain's `prepare` and `complete-chain` jobs, the performance runner availability check, and runner hygiene use `ubuntu-latest`: they inspect APIs or artifacts, not the lab hosts. The actual functional and performance suites remain on their lab runners. Functional-chain health collection uses `ubuntu-latest` so a lab outage cannot also stop its independent monitor. Docker image packaging also uses `ubuntu-latest` for both musl and glibc variants; it downloads release binaries rather than compiling the workspace, and still sets up QEMU and Buildx explicitly.
The functional chain's `prepare` and `complete-chain` jobs, the performance runner availability check, and runner hygiene use `ubuntu-latest`: they inspect APIs or artifacts, not the lab hosts. The actual functional and performance suites remain on their lab runners. Functional-chain health collection uses `ubuntu-latest` so a lab outage cannot also stop its independent monitor. Docker image packaging also uses `ubuntu-latest` for both musl and glibc variants; it wraps verified candidate binaries rather than compiling the workspace, and still sets up QEMU and Buildx explicitly.
Moving these jobs off AKS reduces capacity demand, not necessarily the Azure bill immediately. VM costs fall only when nodes scale down or smaller capacity replaces them.
@@ -52,7 +53,7 @@ A hosted runner is also the only choice for a few things the pods cannot do: `mo
These are the patterns that have cost real money here without validating anything more:
- An `if: always()` summary or alert job on a self-hosted label inside a `workflow_run`-triggered workflow. The upstream workflow completes many times a day, the real jobs skip, and the summary still starts a pod each time. Gate it on the upstream job having run, and keep it on `ubuntu-latest`.
- Per-push workflows on `main`. A merge triggers the full `ci.yml` matrix, `cache-warm.yml` and the `build.yml` development build; with tens of merges a day that is as much self-hosted time as all pull requests together. Anything that does not verify the merged tree itself belongs on a schedule or behind a `paths` filter.
- Per-push workflows on `main`. A merge triggers the applicable `ci.yml` matrix and cache warming; `build.yml` development builds are scheduled or manual; with tens of merges a day that is as much self-hosted time as all pull requests together. Anything that does not verify the merged tree itself belongs on a schedule or behind a `paths` filter.
- `apt-get install` of tools the hosted image already ships. It is only needed on the minimal pod images.
- A throttled `CARGO_BUILD_JOBS` on a 14-CPU pod. The limit exists for link-storm reasons documented in `ci.yml`; measure before raising it, and measure before lowering it further.
- Tiny jobs on ARC pods. Each one pays roughly a minute of pod start-up before its first step; a compile-free job that takes ten seconds costs more to schedule than to run.
@@ -66,7 +67,7 @@ gh api "repos/rustfs/rustfs/actions/runs/<run_id>/jobs?per_page=100" \
--jq '.jobs[] | "\(.conclusion)\t\(.labels | join(","))\t\(.started_at)\t\(.completed_at)\t\(.name)"'
```
Only rows whose label starts with `sm-`, `dind-`, `ubicloud-`, `smoke-` or `pf-` cost anything. At the October 2026 review, a full pull-request run of `ci.yml` spent about 150 self-hosted minutes, a third of it in jobs that never compiled; treat that as the scale of what a placement mistake costs, not as a current figure.
Rows using `macos-latest-xlarge` or a label starting with `sm-`, `dind-`, `ubicloud-`, `smoke-` or `pf-` use paid capacity. At the October 2026 review, a full pull-request run of `ci.yml` spent about 150 self-hosted minutes, a third of it in jobs that never compiled; treat that as the scale of what a placement mistake costs, not as a current figure.
## Checklist for a new or moved job
@@ -76,3 +77,9 @@ Only rows whose label starts with `sm-`, `dind-`, `ubicloud-`, `smoke-` or `pf-`
- A self-hosted `runs-on` carries a comment naming its reason from the placement rule.
- Every `./.github/actions/setup` call states `cache-save-if`, and a key read from one pool is not written from the other.
- Moving a job does not change its check name, so the `main` ruleset and `docs/testing/ci-gates.md` stay as they are; renaming it does, and then that document's change checklist applies.
## Release stages
The [candidate release pipeline](../../docs/operations/release-pipeline.md) builds Linux first and defers paid desktop capacity until acceptance. Daily development builds also select Linux; use manual platform selection for desktop development artifacts. All six platforms remain required before publication. The pipeline records and promotes the exact tested bytes. Builder workflows have no public-release credentials. Keep periodic development builds, PR verification and field-test chains separate when their contracts differ; do not re-enable disabled workflows as part of a source-file migration.
Larger runners remain billed for public repositories; see [GitHub runner billing](https://docs.github.com/en/actions/concepts/runners/larger-runners#billing). Actual spending comes from organization billing, not runner labels or an estimated build duration.
+149 -8
View File
@@ -23,9 +23,16 @@ on:
- 'deny.toml'
- '.github/actions/**'
- '.github/workflows/**'
- 'scripts/release/create_or_update_release.sh'
- 'scripts/release/package_service_scripts.sh'
- 'scripts/release/package_versions.sh'
- 'scripts/release/**'
- 'scripts/security/generate_release_supply_chain_assets.py'
- '.config/release-validation-plan.json'
- '.github/scheduled-validations.json'
- 'scripts/test_helm_release_workflow.py'
- 'scripts/test_release_packages.py'
- 'scripts/test_release_images.py'
- 'Dockerfile*'
- 'entrypoint.sh'
- 'bootstrap/**'
- 'scripts/test_package_service_scripts.sh'
- 'scripts/test_package_versions.sh'
- 'scripts/test_docker_workflow.py'
@@ -41,9 +48,16 @@ on:
- 'deny.toml'
- '.github/actions/**'
- '.github/workflows/**'
- 'scripts/release/create_or_update_release.sh'
- 'scripts/release/package_service_scripts.sh'
- 'scripts/release/package_versions.sh'
- 'scripts/release/**'
- 'scripts/security/generate_release_supply_chain_assets.py'
- '.config/release-validation-plan.json'
- '.github/scheduled-validations.json'
- 'scripts/test_helm_release_workflow.py'
- 'scripts/test_release_packages.py'
- 'scripts/test_release_images.py'
- 'Dockerfile*'
- 'entrypoint.sh'
- 'bootstrap/**'
- 'scripts/test_package_service_scripts.sh'
- 'scripts/test_package_versions.sh'
- 'scripts/test_docker_workflow.py'
@@ -132,12 +146,38 @@ jobs:
if: github.repository == 'rustfs/rustfs' && (github.event_name != 'pull_request' || github.event.action != 'closed')
runs-on: ubuntu-latest
timeout-minutes: 5
permissions:
contents: read
actions: read
outputs:
release_changed: ${{ steps.scope.outputs.release_changed }}
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
fetch-depth: 0
persist-credentials: false
- name: Scope native packaging checks to release changes
id: scope
env:
BASE_SHA: ${{ github.event.pull_request.base.sha || github.event.before }}
run: |
python3 - <<'PY'
import os, re, subprocess
event, base = os.environ['GITHUB_EVENT_NAME'], os.environ.get('BASE_SHA', '')
changed = event == 'workflow_dispatch'
if event in ('push', 'pull_request'):
if not re.fullmatch(r'[0-9a-f]{40}', base) or base == '0' * 40:
changed = True
else:
paths = subprocess.check_output(['git', 'diff', '--name-only', base, os.environ['GITHUB_SHA']], text=True).splitlines()
pattern = r'^(scripts/release/|scripts/test_release_|Dockerfile|entrypoint.sh$|bootstrap/|\.dockerignore$|\.config/release-validation-plan.json$|\.github/workflows/(audit|build|docker|package|helm-package|release-[^.]+)\.yml$)'
changed = any(re.match(pattern, path) for path in paths)
with open(os.environ['GITHUB_OUTPUT'], 'a') as output:
output.write(f'release_changed={str(changed).lower()}\n')
PY
- name: Report unpinned GitHub Actions
run: ./scripts/security/check_workflow_pins.sh --enforce
@@ -150,8 +190,35 @@ jobs:
- name: Check checkouts clear their credentials
run: ./scripts/security/check_persist_credentials.sh
- name: Check preview release workflow policy
run: ./scripts/security/check_preview_release_workflow.sh
- name: Check release candidate and promotion contracts
run: python3 -m unittest discover -s scripts/release -p 'test_*.py'
- name: Prepare artifact transport rehearsal
run: |
mkdir -p "$RUNNER_TEMP/release-transport"
printf '{"purpose":"transport contract, not release evidence"}\n' > "$RUNNER_TEMP/release-transport/transport.json"
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: release-transport-contract-${{ github.run_attempt }}
path: ${{ runner.temp }}/release-transport/transport.json
if-no-files-found: error
retention-days: 1
- name: Verify actual GitHub artifact metadata and downloaded bytes
env:
GH_TOKEN: ${{ github.token }}
run: |
python3 - <<'PY'
import os, sys
from pathlib import Path
sys.path.insert(0, 'scripts/release')
import candidate as c
run = c.github(f"repos/{c.REPOSITORY}/actions/runs/{os.environ['GITHUB_RUN_ID']}")
destination = Path(os.environ['RUNNER_TEMP']) / 'release-transport-downloaded'
c.download_artifact(run, f"release-transport-contract-{os.environ['GITHUB_RUN_ATTEMPT']}", destination)
c.require(c.read_json(destination / 'transport.json') == {'purpose': 'transport contract, not release evidence'}, 'artifact round trip changed')
PY
- name: Check tier evidence workflow isolation
run: ./scripts/security/check_tier_artifact_workflow.sh
@@ -162,6 +229,80 @@ jobs:
- name: Check package service lifecycle contract
run: ./scripts/test_package_service_scripts.sh
release-package-contract:
name: Release package contract
needs: workflow-pin-report
if: needs.workflow-pin-report.outputs.release_changed == 'true'
runs-on: ubuntu-latest
timeout-minutes: 15
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Install real package managers
run: |
sudo apt-get update
sudo apt-get install -y ruby ruby-dev build-essential rpm fakeroot cpio
sudo gem install fpm --version 1.17.0 --no-document
- name: Exercise accepted and substituted payloads through both recipes
run: python3 scripts/test_release_packages.py
release-image-contract:
name: Release image contract (${{ matrix.variant }})
needs: workflow-pin-report
if: needs.workflow-pin-report.outputs.release_changed == 'true'
runs-on: ubuntu-latest
timeout-minutes: 35
strategy:
fail-fast: false
matrix:
variant: [musl, gnu]
env:
RELEASE_IMAGE_VARIANT: ${{ matrix.variant }}
NO_PROXY: 127.0.0.1,localhost,::1
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Install OCI tools
run: |
echo "RELEASE_IMAGE_OUTPUT=$RUNNER_TEMP/image-contract" >> "$GITHUB_ENV"
echo 'no_proxy=127.0.0.1,localhost,::1' >> "$GITHUB_ENV"
sudo apt-get update
sudo apt-get install -y skopeo
go version
- uses: docker/setup-qemu-action@c7c53464625b32c7a7e944ae62b3e17d2b600130 # v3
- uses: docker/setup-buildx-action@8d2750c68a42422c14e847fe6c8ac0403b4cbd6f # v3
- name: Exercise real OCI packaging, startup, registry retry and conflicts
run: python3 scripts/test_release_images.py
- name: Exercise amd64 OCI archive scanning
uses: aquasecurity/trivy-action@ed142fd0673e97e23eac54620cfb913e5ce36c25
env:
TRIVY_PLATFORM: linux/amd64
with:
input: ${{ runner.temp }}/image-contract-scan/image-${{ matrix.variant }}-amd64.tar
format: sarif
output: ${{ runner.temp }}/image-contract/scan-${{ matrix.variant }}-amd64.sarif
exit-code: "0"
- name: Exercise arm64 OCI archive scanning
uses: aquasecurity/trivy-action@ed142fd0673e97e23eac54620cfb913e5ce36c25
env:
TRIVY_PLATFORM: linux/arm64
with:
input: ${{ runner.temp }}/image-contract-scan/image-${{ matrix.variant }}-arm64.tar
format: sarif
output: ${{ runner.temp }}/image-contract/scan-${{ matrix.variant }}-arm64.sarif
exit-code: "0"
- name: Verify scan receipts before recording the archive
run: |
python3 - <<'PY'
import os, sys
from pathlib import Path
sys.path.insert(0, 'scripts/release')
import deliver, test_candidate
deliver.image_record(test_candidate.inputs(), os.environ['RELEASE_IMAGE_VARIANT'], Path(os.environ['RELEASE_IMAGE_OUTPUT']))
PY
dependency-review:
name: Dependency Review
runs-on: ubuntu-latest
File diff suppressed because it is too large Load Diff
+1 -1
View File
@@ -96,7 +96,7 @@ env:
RUST_BACKTRACE: 1
jobs:
# Readers: workspace-lint-and-build, workspace-tests (workspace and ILM), build-rustfs-debug-binary,
# Readers: workspace-clippy, workspace-lint-and-build, workspace-tests (workspace and ILM), build-rustfs-debug-binary,
# e2e-tests, e2e-full.
warm-ci-dev:
name: Warm ci-dev
+255 -23
View File
@@ -16,7 +16,9 @@ name: Continuous Integration
on:
push:
branches: [ main ]
# gateway/integration receives the daily merge of main as a direct push
# (rustfs/backlog#2734), so its pushes must prove the result like main's.
branches: [ main, gateway/integration ]
paths-ignore:
- "**.md"
- "docs/**"
@@ -113,7 +115,7 @@ jobs:
printf '%s\n' 'mode=full' >> "$GITHUB_OUTPUT"
echo "Base CI policy unavailable; running the full matrix."
fi
if ! grep -q '^plan=' "$GITHUB_OUTPUT" || ! grep -q '^plan_contract=2$' "$GITHUB_OUTPUT"; then
if ! grep -q '^plan=' "$GITHUB_OUTPUT" || ! grep -q '^plan_contract=4$' "$GITHUB_OUTPUT"; then
printf '%s\n' 'mode=full' 'connect=true' 'full_validation=true' 'rehearse_shards=false' 'packages=' 'plan=' >> "$GITHUB_OUTPUT"
echo "Base policy does not cover this workflow contract; retaining the full matrix."
fi
@@ -142,15 +144,23 @@ jobs:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Install pinned typos through GitHub API
env:
GH_TOKEN: ${{ github.token }}
TYPOS_VERSION: 1.50.2
run: |
python3 .github/actions/setup/download_release_asset.py --repository crate-ci/typos --tag "v${TYPOS_VERSION}" --asset "typos-v${TYPOS_VERSION}-x86_64-unknown-linux-musl.tar.gz" --output "$RUNNER_TEMP/typos.tar.gz"
mkdir -p "$RUNNER_TEMP/typos"
tar -xzf "$RUNNER_TEMP/typos.tar.gz" -C "$RUNNER_TEMP/typos"
- name: Typos check with custom config file
uses: crate-ci/typos@512fc24f32f44ab01972217aaaf3dc86ec234d53 # v1.50.2
run: '"$RUNNER_TEMP/typos/typos" .'
# Fail early with compile-free checks for every pull request.
quick-checks:
name: Quick Checks
if: github.event_name != 'pull_request' || github.event.action != 'closed'
runs-on: ubuntu-latest
timeout-minutes: 10
timeout-minutes: 20
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
@@ -160,6 +170,67 @@ jobs:
- name: Run shared quick checks
uses: ./.github/actions/quick-checks
# Clippy runs beside the test-binary build instead of in front of it. The two
# share no compiler output: Clippy writes check-mode metadata, the archive
# needs codegen and linked test binaries, and both restore the third-party
# artifacts of their own mode from ci-dev. As one job the lint held the
# archive, and every test that consumes it, back by its whole duration.
# scripts/ci_gate.py keeps this job in the Test and Lint aggregate and out
# of the archive consumer's dependency chain.
workspace-clippy:
name: Workspace Clippy
if: contains(fromJSON('["full", "e2e"]'), needs.classify-changes.outputs.mode) && (github.event_name != 'pull_request' || github.event.action != 'closed')
needs: [ quick-checks, classify-changes ]
# Reads the ci-dev cache that cache-warm.yml writes on this image, and the
# all-targets check of the workspace does not fit a hosted runner's disk.
runs-on: sm-standard-4
timeout-minutes: 60
env:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
CI_PACKAGES: ${{ needs.classify-changes.outputs.packages }}
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
# Checkout otherwise writes the token into .git/config, where a PR's
# own build.rs or proc-macro could read it back out.
persist-credentials: false
- name: Setup Rust environment
uses: ./.github/actions/setup
with:
rust-version: stable
# Read-only, like every other ci-dev reader; cache-warm.yml warms the
# check artifacts of this exact invocation.
cache-shared-key: ci-dev
cache-save-if: 'false'
install-build-packaging-tools: 'false'
# Clippy gates every event, pull requests included. When it ran only after
# merge, a lint regression merged freely and then failed every main run
# until someone fixed it (10 of 12 main runs on 2026-10-17/18). cache-warm
# writes the same invocation's check artifacts into ci-dev, so a pull
# request re-checks only the crates its diff touches. Main keeps the step
# because pull requests can merge without being up to date with main.
- name: Run clippy lints
run: |
./scripts/ci/resource_sampler.sh start clippy
trap './scripts/ci/resource_sampler.sh stop' EXIT
python3 scripts/ci_test_artifact.py cargo lint --configuration workspace
- name: Upload lint diagnostics
if: always()
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: workspace-clippy-diagnostics-${{ github.run_number }}-${{ github.run_attempt }}
path: artifacts/workspace
retention-days: 3
if-no-files-found: error
# Keeps its job ID and check name: it is the archive producer that
# workspace-tests and scripts/check_test_wiring.py bind to. The lint half
# is workspace-clippy above; this job builds the test archive, then runs
# the doctests and the log-analyzer anchor check on the same build output.
workspace-lint-and-build:
name: Workspace Lint and Build
if: contains(fromJSON('["full", "e2e"]'), needs.classify-changes.outputs.mode) && (github.event_name != 'pull_request' || github.event.action != 'closed')
@@ -201,21 +272,10 @@ jobs:
echo "started_at=$(date --utc --iso-8601=seconds)"
} > artifacts/workspace/run-metadata.txt
# Clippy gates every event, pull requests included. When it ran only after
# merge, a lint regression merged freely and then failed every main run
# until someone fixed it (10 of 12 main runs on 2026-10-17/18). cache-warm
# writes the same invocation's check artifacts into ci-dev, so a pull
# request re-checks only the crates its diff touches. Main keeps the step
# because pull requests can merge without being up to date with main.
- name: Run clippy lints
run: |
./scripts/ci/resource_sampler.sh start clippy
trap './scripts/ci/resource_sampler.sh stop' EXIT
python3 scripts/ci_test_artifact.py cargo lint --configuration workspace
- name: Archive workspace test binaries
env:
CARGO_BUILD_JOBS: ${{ (github.event_name == 'push' || github.event_name == 'workflow_dispatch') && '3' || '2' }}
# Workspace test compilation has high per-process memory use.
CARGO_BUILD_JOBS: "2"
run: |
./scripts/ci/resource_sampler.sh start workspace-archive
trap './scripts/ci/resource_sampler.sh stop' EXIT
@@ -262,7 +322,7 @@ jobs:
# rustfs/backlog#1289: fail if a seed rule's log anchor no longer exists
# verbatim in the source tree (log message drifted without updating the
# rule). Placed here where the workspace — including the la-dump-anchors
# bin — is already built by the clippy/test steps above.
# bin's dependencies — is already built by the test archive step above.
- name: Check log-analyzer rule anchors
run: ./scripts/check_log_analyzer_rules.sh
@@ -497,6 +557,63 @@ jobs:
- name: Check offline enrollment E2E root boundary
run: ./scripts/check_offline_enrollment_e2e.sh
fips-provider:
name: FIPS provider boundaries
if: needs.classify-changes.outputs.mode == 'full' && contains(fromJSON('["schedule", "workflow_dispatch"]'), github.event_name)
needs: [ quick-checks, classify-changes ]
# This builds the RustFS library test target, which exceeds hosted-runner disk capacity.
runs-on: sm-standard-4
timeout-minutes: 90
strategy:
fail-fast: false
matrix:
mode: [default, fips]
env:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
CARGO_BUILD_JOBS: "2"
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Setup Rust environment
uses: ./.github/actions/setup
with:
rust-version: stable
cache-shared-key: ci-fips-provider
cache-save-if: 'false'
install-build-packaging-tools: 'false'
- name: Install FIPS build tools
if: matrix.mode == 'fips'
run: sudo apt-get install -y cmake golang clang libclang-dev
- name: Verify provider installation
shell: bash
run: |
args=()
if [[ '${{ matrix.mode }}' == 'fips' ]]; then
args+=(--features fips)
fi
cargo nextest run --locked -p rustfs-tls-runtime --lib "${args[@]}" --no-tests fail -E 'test(provider_policy_isolated)'
cargo nextest run --locked -p rustfs-s3-client --lib "${args[@]}" --no-tests fail -E 'test(overflowing_closed_range_is_rejected_before_network_io)'
cargo nextest run --locked -p rustfs-targets --lib "${args[@]}" --no-tests fail -E 'test(validate_pulsar)'
cargo nextest run --locked -p rustfs-targets --lib "${args[@]}" --no-tests fail -E 'test(webhook_provider_policy_isolated)'
if [[ '${{ matrix.mode }}' == 'fips' ]]; then
cargo nextest run --locked -p rustfs-protocols --lib --features ftps,webdav,fips --no-tests fail -E 'test(protocols_reject_incompatible_host_provider)'
cargo nextest run --locked -p rustfs-targets --lib --features fips --no-tests fail -E 'test(fips_postgres_rejects_incompatible_host_provider)'
cargo nextest run --locked -p rustfs-s3-client --lib --features fips --no-tests fail -E 'test(fips_transition_rejects_incompatible_host_provider)'
fi
tests=(provider_installation_isolated prepared_generation_shares_crypto_and_serves_sni_with_mtls)
if [[ '${{ matrix.mode }}' == 'fips' ]]; then
tests+=(fips_provider_builds_fips_tls_configs fips_provider_tls_handshake_accepts_and_rejects_algorithms)
fi
for test_name in "${tests[@]}"; do
cargo nextest run --locked -p rustfs --lib "${args[@]}" --no-tests fail -E "test($test_name)"
done
cargo clippy --locked -p rustfs --lib "${args[@]}" -- -D warnings
test-and-lint-rio-v2:
name: Test and Lint (rio-v2)
# Specialized boundary, hardware and alternate-feature lanes run only on
@@ -899,6 +1016,8 @@ jobs:
# Retain the producer image and fixture paths until the runtime pilot passes.
runs-on: sm-standard-4
timeout-minutes: 30
env:
RUSTFS_S3_STACK: legacy
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
@@ -1019,18 +1138,122 @@ jobs:
path: ${{ runner.temp }}/rustfs-e2e-*/rustfs.log
retention-days: 3
# The same e2e-smoke suite against the same debug binary with the gateway
# S3 stack selected (rustfs/backlog#2734). Report-only: it is outside the
# Test and Lint aggregate and becomes required at T2.10. The test-binary
# download, identity, membership, run and completeness steps must stay
# identical to e2e-tests; scripts/ci_gate.py enforces that.
e2e-tests-gateway:
name: e2e-smoke (gateway, report-only until T2.10)
needs: [ build-rustfs-debug-binary ]
runs-on: sm-standard-2
timeout-minutes: 30
continue-on-error: true
env:
RUSTFS_S3_STACK: gateway
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Install verification runtime
uses: ./.github/actions/test-runtime
- name: Download E2E test binaries
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
name: e2e-test-binaries
path: ${{ runner.temp }}
- name: Verify E2E archive identity
run: python3 scripts/ci_test_artifact.py verify --configuration e2e --archive "$RUNNER_TEMP/e2e-tests.tar.zst"
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.12"
- name: Install awscurl
run: |
python3 -m pip install --user --upgrade pip "awscurl==0.44"
echo "AWSCURL_PATH=$HOME/.local/bin/awscurl" >> "$GITHUB_ENV"
- name: Verify awscurl
run: test -x "$AWSCURL_PATH"
# Download after the cache restore so the freshly built binary from the
# build job always wins over anything restored into target/debug.
- name: Download debug binary
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
name: rustfs-debug-binary
path: target/debug
- name: Make binary executable
run: chmod +x ./target/debug/rustfs
# Build the e2e test graph once. The archive is reused by the smoke
# selection guard, security exact-count check, and run below, avoiding a
# second compile of the same e2e_test target on cold runners (backlog#1645).
- name: Verify e2e smoke test membership
env:
NEXTEST_ARCHIVE: ${{ runner.temp }}/e2e-tests.tar.zst
NEXTEST_LISTING: ${{ runner.temp }}/rustfs-e2e-smoke-list.json
run: |
cargo nextest list --profile e2e-smoke --archive-file "${NEXTEST_ARCHIVE}" --workspace-remap "$GITHUB_WORKSPACE" --extract-to "$GITHUB_WORKSPACE" --extract-overwrite --message-format json > "${NEXTEST_LISTING}"
python3 ./scripts/check_test_wiring.py --check-profile e2e-smoke "${NEXTEST_LISTING}"
./scripts/check_security_smoke_count.sh check "${NEXTEST_LISTING}"
# PR smoke subset of the in-repo e2e suite (backlog#1149 ci-4). The
# profile.e2e-smoke default-filter in .config/nextest.toml is the single
# wiring mechanism for e2e tests in CI — extend that filter instead of
# adding new e2e jobs here. Each test spawns its own rustfs server on a
# random port and reuses the downloaded debug binary above.
- name: Run e2e smoke suite
env:
NEXTEST_ARCHIVE: ${{ runner.temp }}/e2e-tests.tar.zst
RUSTFS_E2E_LOG_DIR: ${{ runner.temp }}/rustfs-e2e-smoke-logs
SAMPLER_INTERVAL_SECS: "15"
run: |
./scripts/ci/resource_sampler.sh start e2e-smoke
trap './scripts/ci/resource_sampler.sh stop' EXIT
python3 scripts/e2e_binary.py run --features e2e-test-hooks -- cargo nextest run --profile e2e-smoke --cargo-metadata target/nextest/cargo-metadata.json --binaries-metadata target/nextest/binaries-metadata.json --workspace-remap "$GITHUB_WORKSPACE" --target-dir-remap "$GITHUB_WORKSPACE/target" \
--status-level all --final-status-level all --failure-output final
- name: Verify e2e smoke execution completeness
run: python3 scripts/ci_test_artifact.py evidence "$RUNNER_TEMP/rustfs-e2e-smoke-list.json" target/nextest/e2e-smoke/junit.xml
- name: Upload e2e smoke diagnostics
if: always()
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: e2e-smoke-gateway-diagnostics-${{ github.run_number }}-${{ github.run_attempt }}
path: |
${{ runner.temp }}/rustfs-e2e-smoke-logs/
${{ runner.temp }}/rustfs-e2e-smoke-list.json
if-no-files-found: warn
- name: Upload e2e smoke JUnit report
if: always()
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: e2e-smoke-gateway-junit-${{ github.run_number }}-${{ github.run_attempt }}
path: target/nextest/e2e-smoke/junit.xml
if-no-files-found: warn
e2e-full:
name: End-to-End Tests (full merge gate)
# Merge gate only (backlog#1149 ci-5): the never-automated user-visible
# suites — KMS, object_lock, multipart_auth, quota, checksum, encryption,
# security-boundary, ... — via the e2e-full nextest profile. Too heavy for
# every PR, so it is gated to main pushes, the merge queue, and manual
# dispatch. protocols / the 7 cluster suites / replication / #[ignore] are
# owned by other lanes (see .config/nextest.toml profile.e2e-full).
# every PR, so it is gated to main and gateway/integration pushes, the merge
# queue, and manual dispatch. protocols / the 7 cluster suites / replication
# / #[ignore] are owned by other lanes (see .config/nextest.toml profile.e2e-full).
if: >-
github.event_name == 'workflow_dispatch' ||
github.event_name == 'merge_group' ||
(github.event_name == 'push' && github.ref == 'refs/heads/main')
(github.event_name == 'push' && (github.ref == 'refs/heads/main' || github.ref == 'refs/heads/gateway/integration'))
needs: [ build-rustfs-debug-binary ]
# Retain the producer image and fixture paths until the runtime pilot passes.
runs-on: sm-standard-4
@@ -1079,11 +1302,16 @@ jobs:
- name: Install mc
env:
GH_TOKEN: ${{ github.token }}
MC_VERSION: RELEASE.2025-08-13T08-35-41Z
MC_SHA256: 01f866e9c5f9b87c2b09116fa5d7c06695b106242d829a8bb32990c00312e891
run: |
if ! command -v gh >/dev/null 2>&1; then
sudo apt-get update
sudo apt-get install -y gh
fi
MC_BINARY="mc.linux-amd64.${MC_VERSION}"
curl -fsSLo "$RUNNER_TEMP/mc" "https://github.com/minio/mc/releases/download/${MC_VERSION}/${MC_BINARY}"
python3 .github/actions/setup/download_release_asset.py --repository minio/mc --tag "$MC_VERSION" --asset "$MC_BINARY" --output "$RUNNER_TEMP/mc" --sha256 "$MC_SHA256"
echo "${MC_SHA256} $RUNNER_TEMP/mc" | sha256sum --check --status
chmod +x "$RUNNER_TEMP/mc"
echo "$RUNNER_TEMP" >> "$GITHUB_PATH"
@@ -1391,12 +1619,14 @@ jobs:
- classify-changes
- typos
- quick-checks
- workspace-clippy
- workspace-lint-and-build
- workspace-tests
- workspace-shards
- workspace-shard-evidence
- core-contract
- connect-feature-boundaries
- fips-provider
- test-and-lint-rio-v2
- test-and-lint-protocols
- build-rustfs-debug-binary
@@ -1424,9 +1654,11 @@ jobs:
needs:
- classify-changes
- connect-feature-boundaries
- fips-provider
- required-checks
- typos
- quick-checks
- workspace-clippy
- workspace-lint-and-build
- workspace-tests
- core-contract
+1 -1
View File
@@ -95,7 +95,7 @@ jobs:
- name: Run CLA Bot
if: github.event_name != 'merge_group'
uses: overtrue/cla-bot@5e5929846a60cfb42b16d0d38e135ef67d94fc88 # v0.0.9
uses: overtrue/cla-bot@4bd1387c19691168c42fcf5edfa17b15819b2ab3 # v0.1.1
with:
github-token: ${{ github.token }}
registry-token: ${{ steps.registry-token.outputs.token }}
+71 -751
View File
@@ -1,779 +1,99 @@
# Copyright 2024 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
# Docker Images Workflow
#
# This workflow builds Docker images using pre-built binaries from the build workflow.
#
# Trigger Types:
# 1. workflow_run: Automatically triggered when "Build and Release" workflow completes
# 2. workflow_dispatch: Manual trigger for standalone Docker builds
#
# Key Features:
# - Only triggers when Linux builds (x86_64 + aarch64) are successful
# - Independent of macOS/Windows build status
# - Uses workflow_run event for precise control
# - Only builds Docker images for releases and prereleases (development builds are skipped)
name: Docker Images
# Permissions needed for workflow_run event and Docker registry access
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Build candidate images
on:
workflow_call:
inputs:
candidate_manifest:
type: string
required: true
permissions:
contents: read
packages: write
on:
# Automatically triggered when build workflow completes
workflow_run:
workflows: [ "Build and Release" ]
types: [ completed ]
# Manual trigger with same parameters for consistency
workflow_dispatch:
inputs:
push_images:
description: "Push images to registries"
required: false
default: true
type: boolean
version:
description: "Version to build (latest, v1.0.0, v1.0.0-alpha1, or v1.0.1-preview.1)"
required: false
default: "latest"
type: string
force_rebuild:
description: "Force rebuild even if binary exists (useful for testing)"
required: false
default: false
type: boolean
env:
CONCLUSION: ${{ github.event.workflow_run.conclusion }}
HEAD_BRANCH: ${{ github.event.workflow_run.head_branch }}
HEAD_SHA: ${{ github.event.workflow_run.head_sha }}
TRIGGERING_EVENT: ${{ github.event.workflow_run.event }}
DOCKERHUB_USERNAME: rustfs
CARGO_TERM_COLOR: always
REGISTRY_DOCKERHUB: rustfs/rustfs
REGISTRY_GHCR: ghcr.io/${{ github.repository }}
REGISTRY_QUAY: quay.io/rustfs/rustfs
DOCKER_PLATFORMS: linux/amd64,linux/arm64
actions: read
jobs:
# Check if we should build Docker images.
# Short-circuit at job level so per-merge development builds (workflow_run
# from a push to main) skip the whole run without spawning a checkout job:
# images are only published for tag builds — build.yml push triggers cover
# only main and tags, so a non-main head_branch is a tag name — and for
# manual dispatch.
build-check:
name: Docker Build Check
if: >-
github.event_name == 'workflow_dispatch' ||
(github.event.workflow_run.conclusion == 'success' &&
github.event.workflow_run.event == 'push' &&
github.event.workflow_run.head_branch != 'main')
runs-on: ubuntu-latest
timeout-minutes: 30
outputs:
should_build: ${{ steps.check.outputs.should_build }}
should_push: ${{ steps.check.outputs.should_push }}
build_type: ${{ steps.check.outputs.build_type }}
version: ${{ steps.check.outputs.version }}
short_sha: ${{ steps.check.outputs.short_sha }}
is_prerelease: ${{ steps.check.outputs.is_prerelease }}
create_latest: ${{ steps.check.outputs.create_latest }}
source_ref: ${{ steps.check.outputs.source_ref }}
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
# For workflow_run events, checkout the specific commit that triggered the workflow
ref: ${{ github.event.workflow_run.head_sha || github.sha }}
- name: Check build conditions
id: check
env:
# dispatch inputs via env, not `${{ }}` interpolation: they are
# free-form strings and would otherwise be evaluated by bash.
INPUT_VERSION: ${{ github.event.inputs.version }}
INPUT_PUSH_IMAGES: ${{ github.event.inputs.push_images }}
INPUT_FORCE_REBUILD: ${{ github.event.inputs.force_rebuild }}
run: |
should_build=false
should_push=false
build_type="none"
version=""
short_sha=""
is_prerelease=false
create_latest=false
source_ref="$GITHUB_SHA"
# Pre-GA policy: until the first stable (vX.Y.Z) tag exists, every
# prerelease (alpha/beta/rc) also moves `latest`, so users pulling
# `latest` get the newest test build. Once a stable tag is published
# this returns false and `latest` follows stable releases only.
prerelease_moves_latest() {
local stable_tags
stable_tags=$(git ls-remote --tags --refs origin 2>/dev/null \
| awk '{print $2}' \
| grep -E '^refs/tags/v?[0-9]+\.[0-9]+\.[0-9]+$' || true)
if [[ -z "$stable_tags" ]]; then
return 0
fi
echo "ℹ️ Stable release tag(s) already exist; prereleases no longer update latest"
return 1
}
if [[ "${{ github.event_name }}" == "workflow_run" ]]; then
# Triggered by build workflow completion
echo "🔗 Triggered by build workflow completion"
# Check if the triggering workflow was successful
# If the workflow succeeded, it means ALL builds (including Linux x86_64 and aarch64) succeeded
if [[ "$CONCLUSION" == "success" ]]; then
echo "✅ Build workflow succeeded, all builds including Linux are successful"
should_build=true
should_push=true
else
echo "❌ Build workflow failed (conclusion: $CONCLUSION), skipping Docker build"
should_build=false
fi
# Extract version info from commit message or use commit SHA
# Use Git to generate consistent short SHA (ensures uniqueness like build.yml)
short_sha=$(git rev-parse --short "$HEAD_SHA")
source_ref="$HEAD_SHA"
# Determine build type based on triggering workflow event and ref
triggering_event="$TRIGGERING_EVENT"
head_branch="$HEAD_BRANCH"
echo "🔍 Analyzing triggering workflow:"
echo " 📋 Event: $triggering_event"
echo " 🌿 Head branch: $head_branch"
echo " 📎 Head SHA: $HEAD_SHA"
# Check if this was triggered by a tag push
if [[ "$triggering_event" == "push" ]]; then
# For tag pushes, head_branch will be like "refs/tags/v1.0.0" or just "v1.0.0"
if [[ "$head_branch" == refs/tags/* ]]; then
# Extract tag name from refs/tags/TAG_NAME
tag_name="${head_branch#refs/tags/}"
version="$tag_name"
elif [[ "$head_branch" =~ ^v?[0-9]+\.[0-9]+\.[0-9]+ ]]; then
# Direct tag name like "v1.0.0" or "1.0.0-alpha.1"
version="$head_branch"
elif [[ "$head_branch" == "main" ]]; then
# Regular branch push to main
build_type="development"
version="dev-${short_sha}"
should_build=false
echo "⏭️ Skipping Docker build for development version (main branch push)"
else
# Other branch push
build_type="development"
version="dev-${short_sha}"
should_build=false
echo "⏭️ Skipping Docker build for development version (branch: $head_branch)"
fi
# If we extracted a version (tag), determine release type
if [[ -n "$version" ]] && [[ "$version" != "dev-${short_sha}" ]]; then
# Remove 'v' prefix if present for consistent version format
if [[ "$version" == v* ]]; then
version="${version#v}"
fi
if [[ "$version" =~ -preview\.[0-9]+$ ]]; then
build_type="preview"
is_prerelease=true
echo "🔍 Building Docker image for preview: $version (version tags only)"
elif [[ "$version" == *"-preview"* ]]; then
echo "❌ Invalid preview tag: $version (expected suffix: -preview.<number>)" >&2
exit 1
elif [[ "$version" == *"alpha"* ]] || [[ "$version" == *"beta"* ]] || [[ "$version" == *"rc"* ]]; then
build_type="prerelease"
is_prerelease=true
# Pre-GA policy: prereleases update latest until the first stable tag exists.
if prerelease_moves_latest; then
create_latest=true
echo "🧪 Building Docker image for prerelease: $version (creating latest tag)"
else
echo "🧪 Building Docker image for prerelease: $version"
fi
else
build_type="release"
create_latest=true
echo "🚀 Building Docker image for release: $version"
fi
fi
else
# Non-push events
build_type="development"
version="dev-${short_sha}"
should_build=false
echo "⏭️ Skipping Docker build for development version (event: $triggering_event)"
fi
echo "🔄 Build triggered by workflow_run:"
echo " 📋 Conclusion: $CONCLUSION"
echo " 🌿 Branch: $HEAD_BRANCH"
echo " 📎 SHA: $HEAD_SHA"
echo " 🎯 Event: $TRIGGERING_EVENT"
elif [[ "${{ github.event_name }}" == "workflow_dispatch" ]]; then
# Manual trigger
input_version="$INPUT_VERSION"
version="${input_version}"
should_push="$INPUT_PUSH_IMAGES"
should_build=true
# Get short SHA
short_sha=$(git rev-parse --short HEAD)
echo "🎯 Manual Docker build triggered:"
echo " 📋 Requested version: $input_version"
echo " 🔧 Force rebuild: $INPUT_FORCE_REBUILD"
echo " 🚀 Push images: $should_push"
case "$input_version" in
"latest")
build_type="release"
create_latest=true
echo "🚀 Building with latest stable release version"
;;
*-preview*)
if [[ ! "$input_version" =~ ^v?[0-9]+\.[0-9]+\.[0-9]+(-[0-9A-Za-z.-]+)?-preview\.[0-9]+$ ]]; then
echo "❌ Invalid preview version: $input_version" >&2
exit 1
fi
build_type="preview"
is_prerelease=true
version="${input_version#v}"
echo "🔍 Building with preview version: $version (version tags only)"
;;
# Prerelease versions (must match first, more specific)
v*alpha*|v*beta*|v*rc*|*alpha*|*beta*|*rc*)
build_type="prerelease"
is_prerelease=true
# Pre-GA policy: prereleases update latest until the first stable tag exists.
if prerelease_moves_latest; then
create_latest=true
echo "🧪 Building with prerelease version: $input_version (creating latest tag)"
else
echo "🧪 Building with prerelease version: $input_version"
fi
;;
# Release versions (match after prereleases, more general)
v[0-9]*|[0-9]*.*.*)
build_type="release"
create_latest=true
echo "📦 Building with specific release version: $input_version"
;;
*)
# Invalid version for Docker build
should_build=false
echo "❌ Invalid version for Docker build: $input_version"
echo "⚠️ Only release versions (latest, v1.0.0, 1.0.0) and prereleases (v1.0.0-alpha1, 1.0.0-beta2) are supported"
;;
esac
if [[ "$should_build" == true && "$input_version" != "latest" ]]; then
tag_ref="refs/tags/$input_version"
if ! git ls-remote --exit-code origin "$tag_ref" >/dev/null 2>&1; then
if [[ "$input_version" == v* ]]; then
tag_ref="refs/tags/${input_version#v}"
else
tag_ref="refs/tags/v$input_version"
fi
fi
if ! git ls-remote --exit-code origin "$tag_ref" >/dev/null 2>&1; then
echo "❌ Release tag not found for Docker build: $input_version"
exit 1
fi
source_ref="$tag_ref"
fi
fi
{
echo "should_build=$should_build"
echo "should_push=$should_push"
echo "build_type=$build_type"
echo "version=$version"
echo "short_sha=$short_sha"
echo "is_prerelease=$is_prerelease"
echo "create_latest=$create_latest"
echo "source_ref=$source_ref"
} >> "$GITHUB_OUTPUT"
echo "🐳 Docker Build Summary:"
echo " - Should build: $should_build"
echo " - Should push: $should_push"
echo " - Build type: $build_type"
echo " - Version: $version"
echo " - Short SHA: $short_sha"
echo " - Is prerelease: $is_prerelease"
echo " - Create latest: $create_latest"
echo " - Source ref: $source_ref"
# Consume the trusted release certification for the exact version this
# workflow wraps and verify the certified input digests. A manual dispatch
# without that certification fails here and pushes no official tag; only
# results from the trusted verification sources carry release authority.
release-certification:
name: Release Certification
needs: build-check
if: needs.build-check.outputs.should_build == 'true'
runs-on: ubuntu-latest
timeout-minutes: 30
permissions:
contents: read
actions: read
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
ref: ${{ needs.build-check.outputs.source_ref }}
- name: Download and verify release certification
env:
GH_TOKEN: ${{ secrets.RELEASE_VALIDATION_TOKEN || github.token }}
TRIGGERING_RUN_ID: ${{ github.event.workflow_run.id }}
VERSION: ${{ needs.build-check.outputs.version }}
shell: bash
run: |
set -euo pipefail
mkdir -p certification
run_id="$TRIGGERING_RUN_ID"
if [[ -z "$run_id" ]]; then
run_id="$(gh api --method GET \
"repos/${GITHUB_REPOSITORY}/actions/workflows/build.yml/runs" \
-f branch="$VERSION" -f status=success -F per_page=1 \
--jq '.workflow_runs[0].id // empty' || true)"
fi
if [[ -z "$run_id" ]]; then
echo "No certified Build and Release run found for ${VERSION}; failing closed" >&2
exit 1
fi
if ! gh run download "$run_id" -n release-certification -D certification; then
echo "Build run ${run_id} published no release-certification artifact; failing closed" >&2
exit 1
fi
python3 scripts/release/release_gate.py verify-promotion \
--plan .config/release-validation-plan.json \
--candidate certification/candidate.json \
--summary certification/release-gate-output \
--artifact-sha256 "$(jq -r '.deliverables[0].sha256' certification/candidate.json)" \
--artifact-name "$(jq -r '.deliverables[0].name' certification/candidate.json)"
# Input digest binding: every zip this image wraps must be the
# certified byte-for-byte content, never a mutable latest pointer.
while IFS=$'\t' read -r name location expected; do
echo "Verifying certified input ${name}"
actual="$(curl -fsSL "$location" | sha256sum | awk '{print $1}')"
if [[ "$actual" != "$expected" ]]; then
echo "Certified input ${name} does not match its recorded digest" >&2
exit 1
fi
done < <(jq -r '.deliverables[] | select(.name | contains("linux")) | [.name, .location, .sha256] | @tsv' certification/candidate.json)
# Build multi-arch Docker images
# Strategy: Build images using pre-built binaries from dl.rustfs.com
# Supports both release and dev channel binaries based on build context
# Only runs when should_build is true (which includes workflow success check)
build-docker:
name: Build Docker Images
needs: [ build-check, release-certification ]
if: needs.build-check.outputs.should_build == 'true'
runs-on: ubuntu-latest
timeout-minutes: 60
timeout-minutes: 90
strategy:
fail-fast: false
matrix:
include:
- variant: musl
file: Dockerfile
suffix: ""
- variant: glibc
- variant: gnu
file: Dockerfile.glibc
suffix: "-glibc"
env:
CANDIDATE_MANIFEST: ${{ inputs.candidate_manifest }}
VARIANT: ${{ matrix.variant }}
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: ${{ fromJson(inputs.candidate_manifest).source_sha }}
persist-credentials: false
ref: ${{ needs.build-check.outputs.source_ref }}
- name: Login to Docker Hub
uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
username: ${{ env.DOCKERHUB_USERNAME }}
password: ${{ secrets.DOCKERHUB_TOKEN }}
- name: Login to GitHub Container Registry
uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
registry: ghcr.io
username: ${{ secrets.GHCR_USERNAME }}
password: ${{ secrets.GHCR_PASSWORD }}
- name: Login to Quay.io
uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
registry: quay.io
username: ${{ secrets.QUAY_USERNAME }}
password: ${{ secrets.QUAY_PASSWORD }}
- name: Set up QEMU
uses: docker/setup-qemu-action@c7c53464625b32c7a7e944ae62b3e17d2b600130 # v3
- name: Set up Docker Buildx
uses: docker/setup-buildx-action@8d2750c68a42422c14e847fe6c8ac0403b4cbd6f # v3
- name: Extract metadata and generate tags
id: meta
- name: Reuse completed image
id: reuse
env:
GH_TOKEN: ${{ github.token }}
run: python3 scripts/release/deliver.py reuse --kind image --target "$VARIANT"
- name: Install OCI tools
if: steps.reuse.outputs.reused != 'true'
run: |
BUILD_TYPE="${{ needs.build-check.outputs.build_type }}"
VERSION="${{ needs.build-check.outputs.version }}"
CREATE_LATEST="${{ needs.build-check.outputs.create_latest }}"
VARIANT_SUFFIX="${{ matrix.suffix }}"
# Convert version format for Dockerfile compatibility. The former
# DOCKER_CHANNEL was "release" down every branch and was passed as a
# build-arg no Dockerfile declares, so it is gone.
case "$VERSION" in
"latest")
DOCKER_RELEASE="latest"
;;
v*)
# For versioned releases (v1.0.0), remove 'v' prefix for Dockerfile
DOCKER_RELEASE="${VERSION#v}"
;;
*)
# For other versions, pass as-is
DOCKER_RELEASE="${VERSION}"
;;
esac
echo "docker_release=$DOCKER_RELEASE" >> "$GITHUB_OUTPUT"
echo "🐳 Docker build parameters:"
echo " - Original version: $VERSION"
echo " - Docker RELEASE: $DOCKER_RELEASE"
# Generate tags based on build type
# Only support release and prerelease builds (no development builds)
TAG_BASE="${VERSION}${VARIANT_SUFFIX}"
TAGS="${{ env.REGISTRY_DOCKERHUB }}:$TAG_BASE,${{ env.REGISTRY_GHCR }}:$TAG_BASE,${{ env.REGISTRY_QUAY }}:$TAG_BASE"
# Add latest when requested (stable releases, and prereleases before GA)
if [[ "$CREATE_LATEST" == "true" ]]; then
TAGS="$TAGS,${{ env.REGISTRY_DOCKERHUB }}:latest${VARIANT_SUFFIX},${{ env.REGISTRY_GHCR }}:latest${VARIANT_SUFFIX},${{ env.REGISTRY_QUAY }}:latest${VARIANT_SUFFIX}"
fi
# Always add the channel tag for prereleases, independent of latest
if [[ "$BUILD_TYPE" == "prerelease" ]]; then
# Prerelease channel tags (alpha, beta, rc)
if [[ "$VERSION" == *"alpha"* ]]; then
CHANNEL="alpha"
elif [[ "$VERSION" == *"beta"* ]]; then
CHANNEL="beta"
elif [[ "$VERSION" == *"rc"* ]]; then
CHANNEL="rc"
fi
if [[ -n "$CHANNEL" ]]; then
TAGS="$TAGS,${{ env.REGISTRY_DOCKERHUB }}:${CHANNEL}${VARIANT_SUFFIX},${{ env.REGISTRY_GHCR }}:${CHANNEL}${VARIANT_SUFFIX},${{ env.REGISTRY_QUAY }}:${CHANNEL}${VARIANT_SUFFIX}"
fi
fi
# Output tags
echo "tags=$TAGS" >> "$GITHUB_OUTPUT"
# Staging identity for this run's promotion: official tags are only
# created after the staged image verifies against the certification,
# and they point at this same digest (no rebuild-after-verify).
STAGING_TAG="staging-${GITHUB_RUN_ID}-${GITHUB_RUN_ATTEMPT}${VARIANT_SUFFIX}"
STAGING_TAGS="${{ env.REGISTRY_DOCKERHUB }}:${STAGING_TAG},${{ env.REGISTRY_GHCR }}:${STAGING_TAG},${{ env.REGISTRY_QUAY }}:${STAGING_TAG}"
echo "staging_tags=$STAGING_TAGS" >> "$GITHUB_OUTPUT"
echo "staging_tag=$STAGING_TAG" >> "$GITHUB_OUTPUT"
# Generate labels
LABELS="org.opencontainers.image.title=RustFS"
LABELS="$LABELS,org.opencontainers.image.description=RustFS distributed object storage system"
LABELS="$LABELS,org.opencontainers.image.version=$VERSION"
SOURCE_REVISION="$(git rev-parse HEAD)"
LABELS="$LABELS,org.opencontainers.image.revision=$SOURCE_REVISION"
LABELS="$LABELS,org.opencontainers.image.source=${{ github.server_url }}/${{ github.repository }}"
LABELS="$LABELS,org.opencontainers.image.created=$(date -u +'%Y-%m-%dT%H:%M:%SZ')"
LABELS="$LABELS,org.opencontainers.image.build-type=$BUILD_TYPE"
echo "labels=$LABELS" >> "$GITHUB_OUTPUT"
echo "🐳 Generated Docker tags:"
echo "$TAGS" | tr ',' '\n' | sed 's/^/ - /'
echo "📋 Build type: $BUILD_TYPE"
echo "🔖 Version: $VERSION"
- name: Build and push Docker image
sudo apt-get update
sudo apt-get install -y skopeo
- uses: docker/setup-qemu-action@c7c53464625b32c7a7e944ae62b3e17d2b600130 # v3
if: steps.reuse.outputs.reused != 'true'
- uses: docker/setup-buildx-action@8d2750c68a42422c14e847fe6c8ac0403b4cbd6f # v3
if: steps.reuse.outputs.reused != 'true'
- name: Supply accepted binaries and pinned CLI
if: steps.reuse.outputs.reused != 'true'
env:
GH_TOKEN: ${{ github.token }}
run: python3 scripts/release/deliver.py image-prepare --target "$VARIANT"
- name: Build OCI archive without registry writes
if: steps.reuse.outputs.reused != 'true'
uses: docker/build-push-action@10e90e3645eae34f1e60eeb005ba3a3d33f178e8 # v6
with:
context: .
file: ${{ matrix.file }}
platforms: ${{ env.DOCKER_PLATFORMS }}
push: ${{ needs.build-check.outputs.should_push == 'true' }}
# Push to staging tags only: official tags are created by the
# certification-gated promotion step below from this same digest.
tags: ${{ steps.meta.outputs.staging_tags }}
labels: ${{ steps.meta.outputs.labels }}
# No layer cache. This build compiles nothing — it downloads a
# release zip and runs apk/apt — so the cache could only save the
# minute or two those take, while creating a correctness problem: with
# RELEASE=latest the binary URL is resolved by curl *inside* a RUN
# layer, and the layer key does not include what that resolved to. A
# rebuild at the same RELEASE value (dispatch with version=latest, or
# a re-run of the same version) would hit the old layer and ship the
# previous release's binary. mode=max also consumed the same 10GB
# Actions cache quota the Rust lanes are fighting over.
#
# Only RELEASE is passed: it is the sole build-arg the Dockerfiles
# declare besides TARGETARCH. BUILDTIME, VERSION, BUILD_TYPE, REVISION
# and CHANNEL were never read by any stage (and BUILDTIME's $(date ...)
# was a literal here, not a shell substitution). BUILD_DATE and VCS_REF
# are declared by the Dockerfiles but deliberately left unset —
# supplying them would change the published image labels.
platforms: linux/amd64,linux/arm64
push: false
provenance: false
outputs: type=oci,dest=delivery/image-${{ matrix.variant }}.tar
build-args: |
RELEASE=${{ steps.meta.outputs.docker_release }}
provenance: true
sbom: true
# Add retry mechanism by splitting the build process
no-cache: false
pull: true
# A later-built wrapper: the staged image must complete this platform's
# own binary identity verification before any official tag is written.
# It may not inherit an unverified package's conclusion.
- name: Verify staged image against certification
if: needs.build-check.outputs.should_push == 'true'
env:
GH_TOKEN: ${{ secrets.RELEASE_VALIDATION_TOKEN || github.token }}
TRIGGERING_RUN_ID: ${{ github.event.workflow_run.id }}
VERSION: ${{ needs.build-check.outputs.version }}
shell: bash
run: |
set -euo pipefail
mkdir -p certification
run_id="$TRIGGERING_RUN_ID"
if [[ -z "$run_id" ]]; then
run_id="$(gh api --method GET \
"repos/${GITHUB_REPOSITORY}/actions/workflows/build.yml/runs" \
-f branch="$VERSION" -f status=success -F per_page=1 \
--jq '.workflow_runs[0].id // empty' || true)"
fi
gh run download "$run_id" -n release-certification -D certification
STAGING_REF="${{ env.REGISTRY_DOCKERHUB }}:staging-${GITHUB_RUN_ID}-${GITHUB_RUN_ATTEMPT}${{ matrix.suffix }}"
case "${{ matrix.variant }}" in
musl) libc="musl" ;;
glibc) libc="gnu" ;;
esac
for platform in linux/amd64 linux/arm64; do
case "$platform" in
linux/amd64) arch_sub="x86_64" ;;
linux/arm64) arch_sub="aarch64" ;;
esac
docker pull --platform "$platform" "$STAGING_REF"
container="$(docker create --platform "$platform" "$STAGING_REF")"
docker cp "$container:/usr/bin/rustfs" "$RUNNER_TEMP/staged-rustfs"
docker rm "$container" >/dev/null
actual="$(sha256sum "$RUNNER_TEMP/staged-rustfs" | awk '{print $1}')"
expected="$(jq -r --arg needle "linux-${arch_sub}-${libc}" \
'[.deliverables[] | select(.name | contains($needle)) | .binary_sha256][0] // empty' \
certification/candidate.json)"
if [[ -z "$expected" || "$actual" != "$expected" ]]; then
echo "Staged image binary for ${platform} does not match the certified binary digest" >&2
exit 1
fi
python3 scripts/release/release_gate.py verify-promotion \
--plan .config/release-validation-plan.json \
--candidate certification/candidate.json \
--summary certification/release-gate-output \
--artifact "$RUNNER_TEMP/staged-rustfs" \
--artifact-role binary
done
- name: Promote staged image to official tags
if: needs.build-check.outputs.should_push == 'true'
shell: bash
run: |
set -euo pipefail
STAGING_REF="${{ env.REGISTRY_DOCKERHUB }}:staging-${GITHUB_RUN_ID}-${GITHUB_RUN_ATTEMPT}${{ matrix.suffix }}"
IFS=',' read -r -a official_tags <<< "${{ steps.meta.outputs.tags }}"
for tag in "${official_tags[@]}"; do
docker buildx imagetools create -t "$tag" "$STAGING_REF"
echo "Promoted $tag -> $STAGING_REF"
done
# Downstream consumers (Helm) verify this record instead of inheriting
# an unverified wrapper's conclusion.
- name: Record image promotion
if: needs.build-check.outputs.should_push == 'true'
shell: bash
env:
GH_TOKEN: ${{ secrets.RELEASE_VALIDATION_TOKEN || github.token }}
TRIGGERING_RUN_ID: ${{ github.event.workflow_run.id }}
VERSION: ${{ needs.build-check.outputs.version }}
run: |
set -euo pipefail
mkdir -p certification
run_id="$TRIGGERING_RUN_ID"
if [[ -z "$run_id" ]]; then
run_id="$(gh api --method GET \
"repos/${GITHUB_REPOSITORY}/actions/workflows/build.yml/runs" \
-f branch="$VERSION" -f status=success -F per_page=1 \
--jq '.workflow_runs[0].id // empty' || true)"
fi
gh run download "$run_id" -n release-certification -D certification
STAGING_REF="${{ env.REGISTRY_DOCKERHUB }}:staging-${GITHUB_RUN_ID}-${GITHUB_RUN_ATTEMPT}${{ matrix.suffix }}"
digest="$(docker buildx imagetools inspect "$STAGING_REF" --format '{{json .Manifest}}' | jq -r '.digest')"
candidate_sha="$(python3 -c "import json,hashlib,sys; sys.path.insert(0,'scripts/release'); import release_gate; print(release_gate.canonical_sha256(json.load(open('certification/candidate.json'))))")"
jq -n \
--arg version "$VERSION" \
--arg digest "$digest" \
--arg staging_ref "$STAGING_REF" \
--arg candidate_sha256 "$candidate_sha" \
--arg tags "${{ steps.meta.outputs.tags }}" \
--slurpfile candidate certification/candidate.json \
'{schema_version: 1, version: $version, image_digest: $digest, staging_ref: $staging_ref,
promoted_tags: ($tags | split(",")), candidate_sha256: $candidate_sha256,
binary_sha256s: ($candidate[0].deliverables | map(.binary_sha256) | unique)}' \
> image-promotion-record.json
- name: Upload image promotion record
if: needs.build-check.outputs.should_push == 'true'
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: image-promotion-record${{ matrix.suffix }}
path: image-promotion-record.json
if-no-files-found: error
retention-days: 30
# Note: Manifest creation is no longer needed as we only build one variant
# Multi-arch manifests are automatically created by docker/build-push-action
# Report-only container image vulnerability scan
scan-docker-image:
name: Scan Docker Images
needs: [ build-check, build-docker ]
if: needs.build-check.outputs.should_build == 'true' && needs.build-check.outputs.should_push == 'true'
runs-on: ubuntu-latest
timeout-minutes: 30
permissions:
contents: read
security-events: write
strategy:
fail-fast: false
matrix:
include:
- variant: musl
suffix: ""
- variant: glibc
suffix: "-glibc"
steps:
- name: Login to GitHub Container Registry
# docker/login-action v3
uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9
with:
registry: ghcr.io
username: ${{ secrets.GHCR_USERNAME }}
password: ${{ secrets.GHCR_PASSWORD }}
- name: Scan image with Trivy
# aquasecurity/trivy-action v0.36.0
BINARY_SOURCE=supplied
RELEASE=${{ fromJson(inputs.candidate_manifest).version }}
VCS_REF=${{ fromJson(inputs.candidate_manifest).source_sha }}
- name: Verify wrapped binaries and startup on both architectures
if: steps.reuse.outputs.reused != 'true'
run: python3 scripts/release/deliver.py image-smoke --target "$VARIANT"
- name: Scan amd64 image before sealing
if: steps.reuse.outputs.reused != 'true'
uses: aquasecurity/trivy-action@ed142fd0673e97e23eac54620cfb913e5ce36c25
env:
TRIVY_PLATFORM: linux/amd64
with:
image-ref: ${{ env.REGISTRY_GHCR }}:${{ needs.build-check.outputs.version }}${{ matrix.suffix }}
input: delivery-scan/image-${{ matrix.variant }}-amd64.tar
format: sarif
output: trivy-${{ matrix.variant }}.sarif
ignore-unfixed: true
vuln-type: os,library
severity: CRITICAL,HIGH
output: delivery/scan-${{ matrix.variant }}-amd64.sarif
exit-code: "0" # Keep the repository's report-only vulnerability policy.
- name: Scan arm64 image before sealing
if: steps.reuse.outputs.reused != 'true'
uses: aquasecurity/trivy-action@ed142fd0673e97e23eac54620cfb913e5ce36c25
env:
TRIVY_PLATFORM: linux/arm64
with:
input: delivery-scan/image-${{ matrix.variant }}-arm64.tar
format: sarif
output: delivery/scan-${{ matrix.variant }}-arm64.sarif
exit-code: "0"
# Surface findings in the Security tab; an artifact alone is write-only
# reporting nobody reviews.
- name: Upload scan results to code scanning
uses: github/codeql-action/upload-sarif@99df26d4f13ea111d4ec1a7dddef6063f76b97e9 # v4.37.0
- name: Record verified OCI identity
if: steps.reuse.outputs.reused != 'true'
run: python3 scripts/release/deliver.py image-record --target "$VARIANT"
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
if: steps.reuse.outputs.reused != 'true'
with:
sarif_file: trivy-${{ matrix.variant }}.sarif
category: container-image-${{ matrix.variant }}
- name: Upload container scan report
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: container-image-scan-${{ matrix.variant }}
path: trivy-${{ matrix.variant }}.sarif
name: image-${{ matrix.variant }}
path: delivery/*
if-no-files-found: error
retention-days: 30
# Docker build summary
docker-summary:
name: Docker Build Summary
needs: [ build-check, build-docker ]
if: always() && needs.build-check.outputs.should_build == 'true'
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- name: Docker build completion summary
run: |
BUILD_TYPE="${{ needs.build-check.outputs.build_type }}"
VERSION="${{ needs.build-check.outputs.version }}"
CREATE_LATEST="${{ needs.build-check.outputs.create_latest }}"
echo "🐳 Docker build completed successfully!"
echo "📦 Build type: $BUILD_TYPE"
echo "🔢 Version: $VERSION"
echo "🚀 Strategy: Images using pre-built binaries (release channel only)"
echo ""
case "$BUILD_TYPE" in
"preview")
echo "🔍 Preview Docker image has been built with ${VERSION} tags"
echo "⏭️ Preview images do not update latest or prerelease channels"
;;
"release")
echo "🚀 Release Docker image has been built with ${VERSION} tags"
echo "✅ This image is ready for production use"
if [[ "$CREATE_LATEST" == "true" ]]; then
echo "🏷️ Latest tag has been created for stable release"
fi
;;
"prerelease")
echo "🧪 Prerelease Docker image has been built with ${VERSION} tags"
echo "⚠️ This is a prerelease image - use with caution"
# Prereleases move latest until the first stable tag exists (pre-GA policy).
if [[ "$CREATE_LATEST" == "true" ]]; then
echo "🏷️ Latest tag has been created for prerelease: $VERSION"
else
echo "🚫 Latest tag NOT created for prerelease"
fi
;;
*)
echo "❌ Unexpected build type: $BUILD_TYPE"
;;
esac
compression-level: 0
+2 -28
View File
@@ -17,8 +17,8 @@
# Each selected test starts a real localhost cluster via
# `RustFSTestClusterEnvironment` (4 processes; 4 drives per node unless the
# case is a two-site 4-node 1-drive pair or a 4-node upgrade). Membership is
# `[profile.e2e-distributed]` in `.config/nextest.toml`. Storage-sensitive PRs,
# nightly runs, and manual dispatches all execute the same fail-closed suite.
# `[profile.e2e-distributed]` in `.config/nextest.toml`. The nightly schedule
# and manual dispatches execute the same fail-closed suite.
# Upgrade cases download the same pinned previous release as e2e-upgrade.yml.
#
# Isolated pool filesystems: expand/decommission/rebalance cases require
@@ -33,32 +33,6 @@
name: e2e-distributed
on:
pull_request:
paths:
- "Cargo.lock"
- "Cargo.toml"
- ".config/nextest.toml"
- ".config/e2e-distributed-selection.txt"
- ".github/workflows/e2e-distributed.yml"
- "crates/audit/**"
- "crates/common/**"
- "crates/config/**"
- "crates/e2e_test/**"
- "crates/ecstore/**"
- "crates/filemeta/**"
- "crates/heal/**"
- "crates/iam/**"
- "crates/lock/**"
- "crates/madmin/**"
- "crates/notify/**"
- "crates/replication/**"
- "crates/s3-client/**"
- "crates/s3-ops/**"
- "crates/s3-types/**"
- "crates/scanner/**"
- "crates/storage-api/**"
- "crates/utils/**"
- "rustfs/**"
workflow_dispatch:
inputs:
filter:
+7 -18
View File
@@ -12,30 +12,19 @@
# See the License for the specific language governing permissions and
# limitations under the License.
# Single-node upgrade and rollback lane.
#
# The weekly Monday schedule, version tags, and workflow_dispatch run this
# suite. Distributed upgrade cases stay on the nightly e2e-distributed lane.
name: Upgrade Compatibility
on:
pull_request:
paths:
- ".github/workflows/e2e-upgrade.yml"
- "crates/e2e_test/src/common.rs"
- "crates/e2e_test/src/distributed/**"
- "crates/e2e_test/src/fake_s3_target/**"
- "crates/e2e_test/src/lib.rs"
- "crates/e2e_test/src/replication_extension_test.rs"
- "crates/e2e_test/src/rpc_fault_proxy.rs"
- "crates/e2e_test/src/upgrade_compatibility_test.rs"
- "crates/ecstore/**"
- "crates/filemeta/**"
- "crates/heal/**"
- "crates/kms/**"
- "crates/storage-api/**"
- "rustfs/**"
- "Cargo.lock"
push:
tags:
- "[0-9]*.[0-9]*.[0-9]*"
schedule:
# 03:17 UTC every Monday.
- cron: "17 3 * * 1"
workflow_dispatch:
@@ -44,7 +33,7 @@ permissions:
concurrency:
group: ${{ github.workflow }}-${{ github.ref }}
cancel-in-progress: ${{ github.event_name == 'pull_request' }}
cancel-in-progress: false
env:
CARGO_TERM_COLOR: always
+51 -277
View File
@@ -1,229 +1,26 @@
# Copyright 2024 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
name: Publish helm chart to artifacthub
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Build candidate Helm chart
on:
workflow_run:
workflows: [ "Build and Release" ]
types: [ completed ]
workflow_dispatch:
workflow_call:
inputs:
version:
description: "Release version to publish, e.g. 1.0.0-beta.1 or v1.0.0-beta.1"
required: true
default: "1.0.0-beta.1"
candidate_manifest:
type: string
required: true
permissions:
contents: read
actions: read
jobs:
# Consume the same trusted release certification as every other publication
# exit and verify the image promotion record of the Docker workflow. The
# chart wraps no binary of its own, so it may only reference an image whose
# platform verification already passed; it must not inherit an unverified
# package's conclusion. A run without that evidence fails closed here and
# never reaches the chart repository.
release-certification:
package:
runs-on: ubuntu-latest
timeout-minutes: 30
permissions:
contents: read
actions: read
outputs:
version: ${{ steps.version.outputs.raw_tag }}
timeout-minutes: 15
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: ${{ fromJson(inputs.candidate_manifest).source_sha }}
persist-credentials: false
- name: Normalize release version
id: version
env:
RAW_INPUT: ${{ github.event.inputs.version }}
RAW_BRANCH: ${{ github.event.workflow_run.head_branch }}
run: |
set -euo pipefail
if [ "${{ github.event_name }}" = "workflow_dispatch" ]; then
RAW="$RAW_INPUT"
else
RAW="$RAW_BRANCH"
fi
case "$RAW" in
refs/tags/*) RAW_TAG="${RAW#refs/tags/}" ;;
*) RAW_TAG="$RAW" ;;
esac
echo "raw_tag=$RAW_TAG" >> "$GITHUB_OUTPUT"
- name: Download and verify release certification and image record
env:
GH_TOKEN: ${{ secrets.RELEASE_VALIDATION_TOKEN || github.token }}
TRIGGERING_RUN_ID: ${{ github.event.workflow_run.id }}
RAW_TAG: ${{ steps.version.outputs.raw_tag }}
shell: bash
run: |
set -euo pipefail
mkdir -p certification image-record
build_run="$TRIGGERING_RUN_ID"
if [[ -z "$build_run" ]]; then
build_run="$(gh api --method GET \
"repos/${GITHUB_REPOSITORY}/actions/workflows/build.yml/runs" \
-f branch="$RAW_TAG" -f status=success -F per_page=1 \
--jq '.workflow_runs[0].id // empty' || true)"
fi
if [[ -z "$build_run" ]]; then
echo "No certified Build and Release run found for ${RAW_TAG}; failing closed" >&2
exit 1
fi
if ! gh run download "$build_run" -n release-certification -D certification; then
echo "Build run ${build_run} published no release-certification artifact; failing closed" >&2
exit 1
fi
python3 scripts/release/release_gate.py verify-promotion \
--plan .config/release-validation-plan.json \
--candidate certification/candidate.json \
--summary certification/release-gate-output \
--artifact-sha256 "$(jq -r '.deliverables[0].sha256' certification/candidate.json)" \
--artifact-name "$(jq -r '.deliverables[0].name' certification/candidate.json)"
docker_run="$(gh api --method GET \
"repos/${GITHUB_REPOSITORY}/actions/workflows/docker.yml/runs" \
-f branch="$RAW_TAG" -f status=success -F per_page=1 \
--jq '.workflow_runs[0].id // empty' || true)"
if [[ -z "$docker_run" ]] || ! gh run download "$docker_run" -n image-promotion-record -D image-record; then
echo "No image promotion record for ${RAW_TAG}; a chart may not wrap an unverified image" >&2
exit 1
fi
candidate_sha="$(python3 -c "import json,hashlib,sys; sys.path.insert(0,'scripts/release'); import release_gate; print(release_gate.canonical_sha256(json.load(open('certification/candidate.json'))))")"
record_sha="$(jq -r '.candidate_sha256 // empty' image-record/image-promotion-record.json)"
if [[ "$record_sha" != "$candidate_sha" ]]; then
echo "Image promotion record does not belong to this certification" >&2
exit 1
fi
overlap="$(jq -r --slurpfile candidate certification/candidate.json \
'[.binary_sha256s[]] - ($candidate[0].deliverables | map(.binary_sha256)) | length' \
image-record/image-promotion-record.json)"
if [[ "$overlap" -ne 0 ]]; then
echo "Image promotion record carries binary digests outside the certification" >&2
exit 1
fi
build-helm-package:
runs-on: ubuntu-latest
timeout-minutes: 30
needs: [ release-certification ]
if: |
(github.event_name == 'workflow_dispatch' && !contains(github.event.inputs.version, '-preview')) ||
(
github.event.workflow_run.conclusion == 'success' &&
github.event.workflow_run.event == 'push' &&
contains(github.event.workflow_run.head_branch, '.') &&
!contains(github.event.workflow_run.head_branch, '-preview')
)
outputs:
raw_tag: ${{ steps.version.outputs.raw_tag }}
app_version: ${{ steps.version.outputs.app_version }}
chart_version: ${{ steps.version.outputs.chart_version }}
steps:
- name: Checkout release source
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: ${{ github.event.workflow_run.head_sha || (startsWith(inputs.version, 'refs/tags/') && inputs.version || format('refs/tags/{0}', inputs.version)) }}
persist-credentials: false
# Both inputs reach the shell through env rather than `${{ }}`
# interpolation. A git ref name may contain `$(...)` — anything without a
# space is a legal tag — and interpolation pastes it into the script
# verbatim, where bash would run it. Reading "$RAW_INPUT" instead makes it
# data.
- name: Normalize release version
id: version
env:
RAW_INPUT: ${{ github.event.inputs.version }}
RAW_BRANCH: ${{ github.event.workflow_run.head_branch }}
run: |
set -eux
if [ "${{ github.event_name }}" = "workflow_dispatch" ]; then
RAW="$RAW_INPUT"
else
RAW="$RAW_BRANCH"
fi
case "$RAW" in
refs/tags/*)
RAW_TAG="${RAW#refs/tags/}"
;;
*)
RAW_TAG="$RAW"
;;
esac
./scripts/helm_chart_version.sh "$RAW_TAG"
# Docker and Helm share the binary-build trigger. Do not publish a chart
# until the image selected by its default appVersion is pullable.
- name: Wait for release image
timeout-minutes: 20
env:
APP_VERSION: ${{ steps.version.outputs.app_version }}
run: |
set -euo pipefail
if [[ ! "$APP_VERSION" =~ ^[0-9]+\.[0-9]+\.[0-9]+(-[0-9A-Za-z.-]+)?$ ]] ||
[[ "$APP_VERSION" == *-preview* ]]; then
echo "Invalid deliverable image version: $APP_VERSION" >&2
exit 1
fi
for attempt in {1..60}; do
if token=$(curl --fail --silent --show-error --connect-timeout 10 --max-time 20 \
'https://auth.docker.io/token?service=registry.docker.io&scope=repository:rustfs/rustfs:pull' \
| jq -er '.token // empty') &&
curl --fail --silent --show-error --head --connect-timeout 10 --max-time 20 \
--header "Authorization: Bearer $token" \
--header 'Accept: application/vnd.oci.image.index.v1+json, application/vnd.docker.distribution.manifest.list.v2+json' \
"https://registry-1.docker.io/v2/rustfs/rustfs/manifests/$APP_VERSION" > /dev/null; then
echo "Release image is available: rustfs/rustfs:$APP_VERSION"
exit 0
fi
echo "Waiting for rustfs/rustfs:$APP_VERSION ($attempt/60)"
if (( attempt < 60 )); then
sleep 15
fi
done
echo "Release image is unavailable; refusing to publish Helm chart" >&2
exit 1
- name: Replace chart version and app version
env:
CHART_VERSION: ${{ steps.version.outputs.chart_version }}
APP_VERSION: ${{ steps.version.outputs.app_version }}
run: |
set -eux
sed -i -E "s/^version:.*/version: \"${CHART_VERSION}\"/" helm/rustfs/Chart.yaml
sed -i -E "s/^appVersion:.*/appVersion: \"${APP_VERSION}\"/" helm/rustfs/Chart.yaml
- name: Set up Helm
uses: azure/setup-helm@b9e51907a09c216f16ebe8536097933489208112 # v4.3.0
- name: Install yq
- uses: azure/setup-helm@b9e51907a09c216f16ebe8536097933489208112 # v4.3.0
- name: Install pinned yq
run: |
set -euo pipefail
yq_version="4.54.1"
@@ -238,66 +35,43 @@ jobs:
echo "$tools_dir" >> "$GITHUB_PATH"
"$tools_dir/yq" --version
- name: Test Helm Chart Templates
run: ./scripts/test_helm_templates.sh
- name: Package Helm Chart
run: |
set -eux
cp helm/README.md helm/rustfs/
helm package ./helm/rustfs \
--destination helm/rustfs/ \
--version "${{ steps.version.outputs.chart_version }}"
- name: Upload helm package as artifact
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: helm-package
path: |
helm/rustfs/*.tgz
helm/rustfs/README.md
retention-days: 1
publish-helm-package:
runs-on: ubuntu-latest
timeout-minutes: 30
needs: [ build-helm-package ]
if: needs.build-helm-package.result == 'success'
steps:
- name: Checkout helm package repo
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
# persist-credentials-exempt: this checkout's token IS the push credential —
# the job git-pushes to rustfs/helm below. Clearing it breaks chart publishing.
repository: rustfs/helm
token: ${{ secrets.RUSTFS_HELM_PACKAGE }}
- name: Download helm package
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
name: helm-package
path: ./
- name: Set up helm
uses: azure/setup-helm@b9e51907a09c216f16ebe8536097933489208112 # v4.3.0
- name: Generate index
run: helm repo index . --url https://charts.rustfs.com
# app_version is derived from the triggering tag name, and this job holds
# the cross-repository push token with rustfs/helm already checked out —
# the worst place in the repo to paste an attacker-influenced string into
# a shell line. Passed through env so bash treats it as data.
- name: Push helm package and index file
- name: Test and package the exact application version
id: chart
env:
GIT_USERNAME: ${{ secrets.USERNAME }}
GIT_EMAIL: ${{ secrets.EMAIL_ADDRESS }}
APP_VERSION: ${{ needs.build-helm-package.outputs.app_version }}
GH_TOKEN: ${{ github.token }}
CANDIDATE_MANIFEST: ${{ inputs.candidate_manifest }}
run: |
set -eux
git config --global user.name "${GIT_USERNAME}"
git config --global user.email "${GIT_EMAIL}"
git add .
git commit -m "Update rustfs helm package with ${APP_VERSION}." || echo "No changes to commit"
git push origin main
python3 - <<'PYCHART'
import sys, subprocess, shutil
from pathlib import Path
sys.path.insert(0, 'scripts/release')
import candidate as c, pipeline
inputs = pipeline.manifest_env()
current = pipeline.current_run('release-complete.yml')
if any(a['name'] == 'helm-package' for a in c.artifact_list(current['id'])):
c.download_artifact(current, 'helm-package', 'chart')
record = c.read_json('chart/chart.json')
c.require(record['inputs_sha256'] == c.digest(inputs), 'chart belongs to another candidate')
c.emit_output('reused', 'true')
else:
chart = Path('helm/rustfs/Chart.yaml')
import re
value = chart.read_text()
for key in ('version', 'appVersion'):
value, count = re.subn(rf'(?m)^{key}:.*$', f'{key}: "{inputs["version"]}"', value)
c.require(count == 1, 'ambiguous chart metadata')
chart.write_text(value)
subprocess.run(['bash', 'scripts/test_helm_templates.sh'], check=True)
shutil.copyfile('helm/README.md', 'helm/rustfs/README.md')
subprocess.run(['helm', 'package', 'helm/rustfs', '--destination', 'chart'], check=True)
path = Path('chart') / f"rustfs-{inputs['version']}.tgz"
c.write_json('chart/chart.json', {'version': inputs['version'], 'inputs_sha256': c.digest(inputs),
'name': path.name, 'sha256': c.file_digest(path), 'size': path.stat().st_size})
PYCHART
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
if: steps.chart.outputs.reused != 'true'
with:
name: helm-package
path: chart/*
if-no-files-found: error
retention-days: 30
+415
View File
@@ -0,0 +1,415 @@
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
# Manual packaging of the current origin/main tip. Workflow artifacts only.
# Dispatch uses this file from the selected branch. The build fetches
# refs/heads/main and checks out that commit, not the dispatch ref or a tag.
name: Manual main packages
on:
workflow_dispatch:
inputs:
architecture:
description: "Linux targets: x86 (x86_64 musl+gnu), arm (aarch64 musl+gnu), or all"
required: true
type: choice
options:
- x86
- arm
- all
default: all
version:
description: "Binary and package version: MAJOR.MINOR.PATCH, or MAJOR.MINOR.PATCH-(alpha|beta|rc).N. No leading v."
required: true
type: string
permissions:
contents: read
env:
CARGO_TERM_COLOR: always
RUST_BACKTRACE: 1
CARGO_INCREMENTAL: 0
jobs:
prepare:
name: Resolve main tip and version
if: github.repository == 'rustfs/rustfs'
runs-on: ubuntu-latest
timeout-minutes: 15
outputs:
source_sha: ${{ steps.pin.outputs.source_sha }}
version: ${{ steps.version.outputs.version }}
toolchain: ${{ steps.inputs.outputs.toolchain }}
console: ${{ steps.inputs.outputs.console }}
matrix: ${{ steps.matrix.outputs.matrix }}
steps:
- name: Checkout main
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: main
fetch-depth: 0
persist-credentials: false
- name: Pin the tip of origin/main
id: pin
shell: bash
run: |
set -euo pipefail
GIT_TERMINAL_PROMPT=0 git fetch --no-tags origin refs/heads/main
sha=$(git rev-parse FETCH_HEAD)
git checkout --detach "$sha"
test "$(git rev-parse HEAD)" = "$sha"
printf 'source_sha=%s\n' "$sha" >> "$GITHUB_OUTPUT"
printf 'Pinned origin/main %s\n' "$sha"
- name: Validate package version
id: version
shell: bash
env:
PACKAGE_VERSION: ${{ inputs.version }}
run: |
set -euo pipefail
bash scripts/release/package_manual_artifacts.sh validate \
--version "$PACKAGE_VERSION" \
--arch x86_64 \
--libc gnu | tee "$RUNNER_TEMP/package-version.txt"
printf 'version=%s\n' "$PACKAGE_VERSION" >> "$GITHUB_OUTPUT"
- name: Install stable Rust
uses: dtolnay/rust-toolchain@29eef336d9b2848a0b548edc03f92a220660cdb8 # stable
with:
toolchain: stable
- name: Resolve console assets and toolchain
id: inputs
shell: bash
env:
GH_TOKEN: ${{ github.token }}
run: |
set -euo pipefail
toolchain=$(rustc --version | awk '{print $2}')
[[ "$toolchain" =~ ^[0-9]+\.[0-9]+\.[0-9]+$ ]]
gh api repos/rustfs/console/releases/latest > console-release.json
TOOLCHAIN="$toolchain" python3 - <<'PY'
import json, os, sys
sys.path.insert(0, "scripts/release")
import candidate
console = candidate.console_asset(candidate.read_json("console-release.json"))
candidate.emit_output("console", json.dumps(console, separators=(",", ":")))
candidate.emit_output("toolchain", os.environ["TOOLCHAIN"])
print(f"toolchain={os.environ['TOOLCHAIN']}")
print(f"console={console['tag']} {console['name']}")
PY
- name: Select Linux targets
id: matrix
shell: bash
env:
ARCHITECTURE: ${{ inputs.architecture }}
run: |
set -euo pipefail
matrix=$(bash scripts/release/package_manual_artifacts.sh matrix "$ARCHITECTURE")
count=$(python3 -c 'import json,sys; print(len(json.loads(sys.argv[1])["include"]))' "$matrix")
[[ "$count" -gt 0 ]]
printf 'matrix=%s\n' "$matrix" >> "$GITHUB_OUTPUT"
printf 'Selected %s target(s) for %s\n' "$count" "$ARCHITECTURE"
package:
name: Package RustFS (${{ matrix.target_id }})
needs: prepare
if: github.repository == 'rustfs/rustfs'
# x86_64 uses sm-standard-4, the official release compile pool: the workspace
# release build needs that disk (placement rule: disk) and reads build.yml's
# cache without writing it. aarch64 uses ubicloud-standard-16-arm so the
# packaged binary and console smoke execute natively (placement rule: hardware).
runs-on: ${{ matrix.os }}
timeout-minutes: 210
env:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
RUSTUP_TOOLCHAIN: ${{ needs.prepare.outputs.toolchain }}
RUSTFLAGS: "${{ matrix.rustflags }}"
strategy:
fail-fast: false
matrix: ${{ fromJson(needs.prepare.outputs.matrix) }}
steps:
- name: Checkout the pinned origin/main commit
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: ${{ needs.prepare.outputs.source_sha }}
fetch-depth: 0
persist-credentials: false
- name: Confirm the checkout is that main commit
shell: bash
env:
SOURCE_SHA: ${{ needs.prepare.outputs.source_sha }}
run: |
set -euo pipefail
test "$(git rev-parse HEAD)" = "$SOURCE_SHA"
GIT_TERMINAL_PROMPT=0 git fetch --no-tags origin refs/heads/main
git merge-base --is-ancestor "$SOURCE_SHA" FETCH_HEAD
- name: Setup Rust environment
uses: ./.github/actions/setup
with:
rust-version: ${{ needs.prepare.outputs.toolchain }}
target: ${{ matrix.target }}
cache-shared-key: build-${{ matrix.target }}${{ matrix.glibc && format('-glibc-{0}', matrix.glibc) || '' }}${{ matrix.os == 'ubicloud-standard-16-arm' && '-ubicloud-arm' || '' }}
# build.yml owns this key. This job only restores it.
cache-save-if: 'false'
install-cross-tools: ${{ matrix.cross }}
install-build-packaging-tools: 'true'
install-test-tools: 'false'
- name: Download static console assets
shell: bash
env:
GH_TOKEN: ${{ github.token }}
CONSOLE_IDENTITY: ${{ needs.prepare.outputs.console }}
run: |
set -euo pipefail
python3 - <<'PYCONSOLE'
import json, os, pathlib, subprocess, zipfile
value = json.loads(os.environ["CONSOLE_IDENTITY"])
subprocess.run(["python3", ".github/actions/setup/download_release_asset.py",
"--repository", "rustfs/console", "--tag", value["tag"], "--asset", value["name"],
"--sha256", value["sha256"], "--output", "console.zip"], check=True)
destination = pathlib.Path("rustfs/static")
destination.mkdir(parents=True, exist_ok=True)
with zipfile.ZipFile("console.zip") as archive:
for member in archive.infolist():
path = pathlib.PurePosixPath(member.filename)
if path.is_absolute() or ".." in path.parts or "\\" in member.filename:
raise SystemExit("unsafe Console archive member")
archive.extractall(destination)
if not (destination / "index.html").is_file():
raise SystemExit("Console archive has no index.html")
PYCONSOLE
rm -f console.zip
- name: Build RustFS
shell: bash
env:
RUSTFS_BUILD_VERSION: ${{ needs.prepare.outputs.version }}
BUILD_TARGET: ${{ matrix.target }}
BUILD_OS: ${{ matrix.build_os }}
BUILD_FEATURES: ${{ matrix.features }}
BUILD_GLIBC: ${{ matrix.glibc }}
BUILD_CROSS: ${{ matrix.cross }}
run: |
set -euo pipefail
touch rustfs/build.rs
feature_args=()
if [[ -n "$BUILD_FEATURES" ]]; then
feature_args=(--features "$BUILD_FEATURES")
fi
# gnu targets pin glibc 2.31 through cargo-zigbuild (<target>.<glibc>).
target_arg="$BUILD_TARGET"
if [[ -n "$BUILD_GLIBC" ]]; then
target_arg="${target_arg}.${BUILD_GLIBC}"
fi
profile_args=()
if [[ "$BUILD_TARGET" == *-linux-gnu && "$BUILD_FEATURES" == pyroscope ]]; then
profile_args=(--config 'profile.release.strip="none"')
fi
case "$BUILD_CROSS" in
true)
cargo zigbuild --release --locked --target "$target_arg" "${feature_args[@]}" "${profile_args[@]}" -p rustfs --bin rustfs
;;
false)
cargo build --release --locked --target "$target_arg" "${feature_args[@]}" "${profile_args[@]}" -p rustfs --bin rustfs
;;
*)
printf 'unexpected cross flag: %q\n' "$BUILD_CROSS" >&2
exit 1
;;
esac
bin="target/${BUILD_TARGET}/release/rustfs"
version_output=$("$bin" --version)
first=${version_output%%$'\n'*}
if [[ "$first" != "rustfs ${RUSTFS_BUILD_VERSION}" ]]; then
printf 'binary version line is %q, expected %q\n' "$first" "rustfs ${RUSTFS_BUILD_VERSION}" >&2
printf '%s\n' "$version_output" >&2
exit 1
fi
if ! grep -Fxq "build target : ${BUILD_TARGET}" <<< "$version_output" || \
! grep -Fxq "build os : ${BUILD_OS}" <<< "$version_output" || \
! grep -Fxq "rust channel : stable-${BUILD_TARGET}" <<< "$version_output"; then
printf 'release binary reports an unexpected compile target\n' >&2
printf '%s\n' "$version_output" >&2
exit 1
fi
if [[ -n "$BUILD_GLIBC" ]]; then
python3 scripts/release/check_glibc.py "$BUILD_GLIBC" "$bin"
fi
- name: Generate the CPU symbol catalog
if: endsWith(matrix.target, '-linux-gnu') && matrix.features == 'pyroscope'
shell: bash
env:
BUILD_TARGET: ${{ matrix.target }}
run: |
set -euo pipefail
cargo metadata --locked --format-version 1 --filter-platform "$BUILD_TARGET" \
--features rustfs/pyroscope > "$RUNNER_TEMP/cpu-catalog-metadata.json"
features=$(jq -ce '
(.packages[] | select(.name == "rustfs") | .id) as $id |
.resolve.nodes[] | select(.id == $id) | .features | map(select(. != "default")) | sort
' "$RUNNER_TEMP/cpu-catalog-metadata.json")
release_dir="target/${BUILD_TARGET}/release"
rm -f "$release_dir/rustfs.cpu-symbol-catalog.json" "$release_dir/rustfs.cpu-symbol-catalog.sha256"
cargo run --locked -p rustfs-connect-symbol-catalog -- \
"$release_dir/rustfs" "$(git rev-parse HEAD)" "$BUILD_TARGET" "$features" \
"$release_dir/rustfs.cpu-symbol-catalog.json" > "$release_dir/rustfs.cpu-symbol-catalog.sha256"
- name: Install DEB and RPM tools
shell: bash
run: |
set -euo pipefail
sudo apt-get update
sudo apt-get install -y ruby ruby-dev build-essential rpm fakeroot cpio
sudo gem install fpm --version 1.17.0 --no-document
- name: Package zip, deb, and rpm
shell: bash
env:
PACKAGE_VERSION: ${{ needs.prepare.outputs.version }}
ARCH: ${{ matrix.arch }}
LIBC: ${{ matrix.libc }}
BUILD_TARGET: ${{ matrix.target }}
BUILD_FEATURES: ${{ matrix.features }}
SOURCE_SHA: ${{ needs.prepare.outputs.source_sha }}
run: |
set -euo pipefail
binary="target/${BUILD_TARGET}/release/rustfs"
extra=()
if [[ "$BUILD_TARGET" == *-linux-gnu && "$BUILD_FEATURES" == pyroscope ]]; then
extra=(
--zip-extra "target/${BUILD_TARGET}/release/rustfs.cpu-symbol-catalog.json"
--zip-extra "target/${BUILD_TARGET}/release/rustfs.cpu-symbol-catalog.sha256"
)
fi
bash scripts/release/package_manual_artifacts.sh package \
--version "$PACKAGE_VERSION" \
--arch "$ARCH" \
--libc "$LIBC" \
--binary "$binary" \
--output dist \
"${extra[@]}"
printf 'Packaged %s from origin/main %s\n' "$PACKAGE_VERSION" "$SOURCE_SHA"
- name: Verify the packaged binary
shell: bash
env:
PACKAGE_VERSION: ${{ needs.prepare.outputs.version }}
ARCH: ${{ matrix.arch }}
LIBC: ${{ matrix.libc }}
BUILD_TARGET: ${{ matrix.target }}
BUILD_OS: ${{ matrix.build_os }}
BUILD_FEATURES: ${{ matrix.features }}
run: |
set -euo pipefail
stem="rustfs-linux-${ARCH}-${LIBC}-v${PACKAGE_VERSION}"
package_file="dist/${stem}.zip"
[[ -f "$package_file" && -f "dist/${stem}.deb" && -f "dist/${stem}.rpm" ]]
[[ "$(find dist -maxdepth 1 -type f | wc -l)" -eq 3 ]]
archive_members=$(unzip -Z1 "$package_file" | sort)
if [[ "$BUILD_TARGET" == *-linux-gnu && "$BUILD_FEATURES" == pyroscope ]]; then
expected_members=$(printf '%s\n' rustfs rustfs.cpu-symbol-catalog.json rustfs.cpu-symbol-catalog.sha256 | sort)
else
expected_members=$(printf '%s\n' rustfs)
fi
if [[ "$archive_members" != "$expected_members" ]]; then
printf 'Linux package does not contain the expected files\n' >&2
printf '%s\n' "$archive_members" >&2
exit 1
fi
binary_dir=$(mktemp -d)
trap 'rm -rf "$binary_dir"' EXIT
unzip -q "$package_file" rustfs -d "$binary_dir"
version_output=$("$binary_dir/rustfs" --version)
first=${version_output%%$'\n'*}
if [[ "$first" != "rustfs ${PACKAGE_VERSION}" ]]; then
printf 'packaged binary version line is %q, expected %q\n' "$first" "rustfs ${PACKAGE_VERSION}" >&2
exit 1
fi
if ! grep -Fxq "build target : ${BUILD_TARGET}" <<< "$version_output" || \
! grep -Fxq "build os : ${BUILD_OS}" <<< "$version_output"; then
printf 'packaged binary reports an unexpected compile target\n' >&2
exit 1
fi
- name: Verify packaged console
if: matrix.target == 'x86_64-unknown-linux-gnu' || matrix.target == 'aarch64-unknown-linux-gnu'
shell: bash
env:
PACKAGE_VERSION: ${{ needs.prepare.outputs.version }}
ARCH: ${{ matrix.arch }}
LIBC: ${{ matrix.libc }}
run: |
set -euo pipefail
package_file="dist/rustfs-linux-${ARCH}-${LIBC}-v${PACKAGE_VERSION}.zip"
find_free_port() {
python3 - <<'PY'
import socket
with socket.socket() as sock:
sock.bind(("127.0.0.1", 0))
print(sock.getsockname()[1])
PY
}
package_dir=$(mktemp -d)
data_dir=$(mktemp -d)
log_file="${RUNNER_TEMP}/rustfs-console-smoke.log"
server_pid=""
trap '
if [[ -n "${server_pid:-}" ]]; then
kill "$server_pid" 2>/dev/null || true
wait "$server_pid" 2>/dev/null || true
fi
rm -rf "$package_dir" "$data_dir"
' EXIT
unzip -q "$package_file" -d "$package_dir"
api_port=$(find_free_port)
console_port=$(find_free_port)
console_url="http://127.0.0.1:${console_port}/rustfs/console/"
"$package_dir/rustfs" server \
--address "127.0.0.1:${api_port}" \
--console-enable \
--console-address "127.0.0.1:${console_port}" \
--access-key console-smoke \
--secret-key console-smoke-secret \
"$data_dir" >"$log_file" 2>&1 &
server_pid=$!
for _ in {1..40}; do
response=$(curl --silent --output /dev/null --write-out '%{http_code} %{content_type}' "$console_url" || true)
if [[ "$response" == 200\ text/html* ]]; then
exit 0
fi
sleep 0.25
done
printf 'Console endpoint did not return 200 text/html: %s\n' "$response" >&2
cat "$log_file"
exit 1
- name: Upload packages
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: packages-${{ matrix.target_id }}-v${{ needs.prepare.outputs.version }}
path: dist/*
if-no-files-found: error
compression-level: 0
retention-days: 30
+3 -1
View File
@@ -112,9 +112,11 @@ jobs:
# GitHub-hosted: reliably provides a running Docker daemon + buildx +
# python3. See the header note (ci-2) for why the self-hosted sm-standard-4
# label was abandoned (no docker.sock on the pod its only run landed on).
# sm-standard-2 has no docker.sock either (weekly runs failed at "Enable
# buildx" from 2026-09-27 to 2026-11-08), so keep this job on ubuntu-latest.
# TODO(ci-8): scheduled-failure alerting (auto-open issue on a red weekly
# run) is added by the ci-8 composite action; do not implement it here.
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 120
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
+279 -7
View File
@@ -87,18 +87,206 @@ jobs:
install-build-packaging-tools: 'false'
install-test-tools: 'false'
- name: Download static console assets
shell: bash
env:
GITHUB_TOKEN: ${{ github.token }}
run: |
# Packaging tools are off on this lane, so setup does not install unzip.
if ! command -v unzip >/dev/null 2>&1; then
sudo apt-get update -qq
sudo apt-get install -y -qq unzip
fi
if ! command -v unzip >/dev/null 2>&1; then
echo "unzip is required to extract console assets" >&2
exit 1
fi
mkdir -p ./rustfs/static
verify_sha256() {
local expected="$1"
local file="$2"
local actual=""
local actual_line=""
if command -v sha256sum >/dev/null 2>&1; then
actual_line=$(sha256sum -- "$file") || return 1
elif command -v shasum >/dev/null 2>&1; then
actual_line=$(shasum -a 256 -- "$file") || return 1
else
echo "No SHA-256 verification tool found" >&2
return 1
fi
actual="${actual_line%%[[:space:]]*}"
if [ "$actual" = "$expected" ]; then
echo "SHA256 verified OK: $actual"
return 0
else
echo "SHA256 mismatch: expected=$expected actual=$actual" >&2
return 1
fi
}
download_console_assets() {
local curl_bin="curl"
local python_bin="python3"
local console_api="https://api.github.com/repos/rustfs/console/releases/latest"
local console_json="console-release.json"
local console_url
local console_sha256
local curl_auth_args=()
console_tag=""
chmod +w ./rustfs/static/LICENSE || true
if ! command -v "$python_bin" >/dev/null 2>&1; then
python_bin="python"
fi
if ! command -v "$python_bin" >/dev/null 2>&1; then
echo "No Python interpreter found for release metadata parsing" >&2
return 1
fi
if [[ -n "${GITHUB_TOKEN:-}" ]]; then
curl_auth_args=(-H "Authorization: Bearer ${GITHUB_TOKEN}" -H "X-GitHub-Api-Version: 2022-11-28")
fi
"$curl_bin" "${curl_auth_args[@]}" --fail -L "$console_api" \
-o "$console_json" --retry 3 --retry-delay 5 --max-time 300 || return 1
read -r console_tag console_url console_sha256 < <("$python_bin" - "$console_json" <<'PY'
import json
import re
import sys
with open(sys.argv[1], encoding="utf-8") as handle:
release = json.load(handle)
tag = release.get("tag_name", "") or "unknown"
for asset in release.get("assets", []):
name = asset.get("name", "")
digest = asset.get("digest", "")
url = asset.get("browser_download_url", "")
if name.startswith("rustfs-console-") and name.endswith(".zip") and digest.startswith("sha256:") and url:
sha256 = digest.split(":", 1)[1]
if not re.fullmatch(r"[0-9a-fA-F]{64}", sha256):
raise SystemExit(f"console zip asset has invalid sha256 digest: {sha256}")
sys.stdout.buffer.write(f"{tag} {url} {sha256}\n".encode("utf-8"))
break
else:
raise SystemExit("no console zip asset with sha256 digest found")
PY
) || return 1
if [[ -z "$console_url" || -z "$console_sha256" ]]; then
echo "Console release metadata is missing URL or SHA-256 digest" >&2
return 1
fi
echo "Console release: ${console_tag}"
echo "Downloading console asset: ${console_url}"
"$curl_bin" --fail -L "$console_url" -o console.zip --retry 3 --retry-delay 5 --max-time 300 || return 1
verify_sha256 "$console_sha256" console.zip || return 2
unzip -o console.zip -d ./rustfs/static || return 2
}
if download_console_assets; then
rm -f console.zip console-release.json
else
status=$?
rm -f console.zip console-release.json
if [[ "$status" -eq 2 ]]; then
echo "Console asset integrity verification failed" >&2
fi
echo "Failed to download verified console assets" >&2
exit 1
fi
if [[ ! -s ./rustfs/static/index.html ]]; then
echo "Console asset archive is missing static/index.html" >&2
exit 1
fi
asset_count=$(find ./rustfs/static -type f | wc -l | tr -d '[:space:]')
echo "Console assets ready: version=${console_tag:-unknown}, ${asset_count} files extracted to ./rustfs/static"
- name: Build RustFS
# Pin the glibc baseline (`<target>.<glibc>` for cargo-zigbuild) so
# nightlies run on older distros such as RHEL/Rocky 9 (glibc 2.34); #8062.
run: cargo zigbuild --release --locked --target x86_64-unknown-linux-gnu.2.31 -p rustfs --bins
shell: bash
run: |
# Force rebuild by touching build.rs so a restored cache cannot
# reuse a rustfs artifact compiled before these console assets existed.
touch rustfs/build.rs
cargo zigbuild --release --locked --target x86_64-unknown-linux-gnu.2.31 -p rustfs --bin rustfs
- name: Verify glibc symbol baseline
run: |
python3 scripts/release/check_glibc.py 2.31 \
target/x86_64-unknown-linux-gnu/release/rustfs \
target/x86_64-unknown-linux-gnu/release/rustfs-cli
target/x86_64-unknown-linux-gnu/release/rustfs
target/x86_64-unknown-linux-gnu/release/rustfs --version | grep -Fx 'build target : x86_64-unknown-linux-gnu'
- name: Verify console
shell: bash
run: |
set -euo pipefail
find_free_port() {
python3 - <<'PY'
import socket
with socket.socket() as sock:
sock.bind(("127.0.0.1", 0))
print(sock.getsockname()[1])
PY
}
binary="target/x86_64-unknown-linux-gnu/release/rustfs"
data_dir="$(mktemp -d)"
log_file="${RUNNER_TEMP}/rustfs-console-smoke.log"
server_pid=""
trap '
if [[ -n "${server_pid:-}" ]]; then
kill "$server_pid" 2>/dev/null || true
wait "$server_pid" 2>/dev/null || true
fi
rm -rf "$data_dir"
' EXIT
if [[ ! -x "$binary" ]]; then
echo "rustfs binary not found: ${binary}" >&2
exit 1
fi
api_port="$(find_free_port)"
console_port="$(find_free_port)"
console_url="http://127.0.0.1:${console_port}/rustfs/console/"
"$binary" server \
--address "127.0.0.1:${api_port}" \
--console-enable \
--console-address "127.0.0.1:${console_port}" \
--access-key console-smoke \
--secret-key console-smoke-secret \
"$data_dir" >"$log_file" 2>&1 &
server_pid=$!
response=""
for _ in {1..40}; do
response="$(curl --silent --output /dev/null --write-out '%{http_code} %{content_type}' "$console_url" || true)"
if [[ "$response" == 200\ text/html* ]]; then
exit 0
fi
sleep 0.25
done
echo "Console endpoint did not return 200 text/html: $response" >&2
cat "$log_file"
exit 1
- name: Build DEB package
id: deb
shell: bash
@@ -346,12 +534,12 @@ jobs:
path: ${{ steps.publish.outputs.candidate_file }}
if-no-files-found: error
# Publish the deb/rpm pair to the auto-testing repo's `assets` branch so
# engineers can download and install the nightly directly. The branch is
# a single-commit orphan rewritten on every build, which keeps the repo
# small while the latest files stay reachable at stable raw URLs.
# Publish the deb/rpm pair as assets of the rolling `nightly` release on
# rustfs/auto-testing (see scripts/release/publish_nightly_assets.sh).
# The dispatch below runs only after this upload and the immutable R2
# candidate both succeed. It does not replace rustfs-functional-chain.yml,
# which still starts from this workflow's workflow_run completion.
# kms-vault-lane and kms-vault-ha-failover stay parallel with this job.
- name: Publish packages to auto-testing release assets
env:
ASSETS_TOKEN: ${{ secrets.PF_TESTING_GH_TOKEN }}
@@ -360,6 +548,90 @@ jobs:
DEB_DATE: ${{ steps.deb.outputs.deb_date }}
BUILD_REF: ${{ env.NIGHTLY_BUILD_REF }}
run: bash scripts/release/publish_nightly_assets.sh
# Cross-repo repository_dispatch cannot use GITHUB_TOKEN. The secret is a
# PAT or GitHub App token for rustfs/auto-testing: classic `repo` scope,
# or fine-grained Contents write (the permission GitHub checks for
# POST /repos/{owner}/{repo}/dispatches). A dispatch failure fails this
# step, and therefore this job, so the scheduled failure alert fires.
# GitHub allows at most 10 top-level client_payload properties, so the
# schema 2 candidate object is nested under `candidate` and the release
# fields sit beside it.
- name: Dispatch nightly candidate to auto-testing
if: ${{ steps.publish.outputs.candidate_file != '' }}
env:
DISPATCH_TOKEN: ${{ secrets.AUTO_TESTING_DISPATCH_TOKEN }}
CANDIDATE_FILE: ${{ steps.publish.outputs.candidate_file }}
DEB_DATE: ${{ steps.deb.outputs.deb_date }}
SOURCE_REPO: ${{ github.repository }}
shell: bash
run: |
set -euo pipefail
: "${DISPATCH_TOKEN:?AUTO_TESTING_DISPATCH_TOKEN is required to dispatch rustfs/auto-testing}"
: "${CANDIDATE_FILE:?nightly candidate manifest is required}"
: "${DEB_DATE:?DEB_DATE is required}"
[[ "${DEB_DATE}" =~ ^[0-9]{4}-[0-9]{2}-[0-9]{2}$ ]]
[[ "${SOURCE_REPO}" == "rustfs/rustfs" ]]
payload="${RUNNER_TEMP}/nightly-candidate-dispatch-${GITHUB_RUN_ID}-${GITHUB_RUN_ATTEMPT}.json"
jq -n --slurpfile candidate "${CANDIDATE_FILE}" \
--arg event_type "nightly-candidate-ready" \
--arg source_repo "${SOURCE_REPO}" \
--arg latest_alias_url "https://dl.rustfs.com/artifacts/rustfs/packages/nightly/rustfs-nightly-latest.deb" \
--arg auto_testing_release "https://github.com/rustfs/auto-testing/releases/tag/nightly" \
--arg channel "nightly" \
--arg deb_date "${DEB_DATE}" \
--arg nightly_workflow ".github/workflows/nightly-gnu.yml" \
'{
event_type: $event_type,
source_repo: $source_repo,
latest_alias_url: $latest_alias_url,
auto_testing_release: $auto_testing_release,
channel: $channel,
deb_date: $deb_date,
nightly_workflow: $nightly_workflow,
candidate: $candidate[0]
}' > "${payload}"
if ! jq -e '
.event_type == "nightly-candidate-ready"
and .source_repo == "rustfs/rustfs"
and .channel == "nightly"
and .deb_date == env.DEB_DATE
and .nightly_workflow == ".github/workflows/nightly-gnu.yml"
and .latest_alias_url == "https://dl.rustfs.com/artifacts/rustfs/packages/nightly/rustfs-nightly-latest.deb"
and .auto_testing_release == "https://github.com/rustfs/auto-testing/releases/tag/nightly"
and .candidate.schema == 2
and ((.candidate | keys | sort) == ["build_run_attempt","build_run_id","package_sha256","package_url","schema","source_ref","source_sha","workflow_sha"])
and ((keys | sort) == ["auto_testing_release","candidate","channel","deb_date","event_type","latest_alias_url","nightly_workflow","source_repo"])
' "${payload}" >/dev/null; then
echo "nightly dispatch payload does not match the nightly-candidate-ready contract" >&2
exit 1
fi
body="${RUNNER_TEMP}/nightly-candidate-dispatch-body-${GITHUB_RUN_ID}-${GITHUB_RUN_ATTEMPT}.json"
jq -n --slurpfile client_payload "${payload}" \
'{event_type: "nightly-candidate-ready", client_payload: $client_payload[0]}' > "${body}"
response="${RUNNER_TEMP}/nightly-candidate-dispatch-response-${GITHUB_RUN_ID}-${GITHUB_RUN_ATTEMPT}.txt"
status="$(curl -sS --retry 3 --connect-timeout 15 --max-time 60 \
-o "${response}" -w '%{http_code}' \
-X POST \
-H "Authorization: Bearer ${DISPATCH_TOKEN}" \
-H "Accept: application/vnd.github+json" \
-H "X-GitHub-Api-Version: 2022-11-28" \
-H "Content-Type: application/json" \
--data-binary @"${body}" \
https://api.github.com/repos/rustfs/auto-testing/dispatches)" || {
echo "repository_dispatch request to rustfs/auto-testing failed before an HTTP status" >&2
exit 1
}
if [[ "${status}" != "204" ]]; then
echo "repository_dispatch to rustfs/auto-testing failed: HTTP ${status}" >&2
if [[ -s "${response}" ]]; then
cat "${response}" >&2
fi
exit 1
fi
echo "dispatched nightly-candidate-ready to rustfs/auto-testing (deb_date=${DEB_DATE}, run=${GITHUB_RUN_ID}, attempt=${GITHUB_RUN_ATTEMPT})"
# Live-Vault lane for the rustfs-kms suite (rustfs/backlog#1774).
#
# RUSTFS_KMS_VAULT_TOKEN is the single switch that adds the Vault KV2 and
+2 -2
View File
@@ -47,8 +47,8 @@ permissions:
contents: read
concurrency:
group: oidc-keycloak-live-${{ github.ref }}
cancel-in-progress: true
group: oidc-keycloak-live-${{ github.event_name }}-${{ github.ref }}
cancel-in-progress: ${{ github.event_name != 'schedule' }}
jobs:
oidc-keycloak-live:
+38 -825
View File
@@ -1,840 +1,53 @@
# Copyright 2024 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
# Package Workflow - Build DEB/RPM packages
#
# This workflow builds DEB and RPM packages from pre-built Linux binaries
# and uploads them to Cloudflare R2 and the GitHub release.
#
# Trigger:
# - workflow_run: automatically package after "Build and Release" completes
# for a release tag (the mac/windows/linux binaries are already uploaded
# to the GitHub release before packaging starts)
# - workflow_dispatch: manual fallback with a release tag and/or exact build run ID
#
# Flow:
# 1. Resolve and validate the selected Build workflow run and source identity
# 2. Download Linux binaries (x86_64-gnu, aarch64-gnu, x86_64-musl,
# aarch64-musl) from build artifacts
# 3. Build DEB packages for amd64 and arm64, gnu and musl variants
# 4. Build RPM packages for x86_64 and aarch64, gnu and musl variants
# 5. Upload all packages to Cloudflare R2 and the GitHub release
name: Package DEB/RPM
permissions:
# contents: write is required to upload packages to the GitHub release
contents: write
actions: read
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Build candidate packages
on:
# Follows the same pattern as docker.yml: run after the release build
# workflow completes, so packaging is triggered only by release tags
# (e.g. 1.0.0-rc.2, 1.0.0-rc.3), never by development builds.
workflow_run:
workflows: [ "Build and Release" ]
types: [ completed ]
workflow_dispatch:
workflow_call:
inputs:
tag:
description: "Release tag to package (e.g. 1.0.0-beta.12). Leave empty for latest main build."
required: false
candidate_manifest:
type: string
build_run_id:
description: "Build workflow run ID (when combined with tag, both must identify the same release commit)"
required: false
type: string
concurrency:
group: ${{ github.workflow }}-${{ github.event.workflow_run.head_branch || github.event.inputs.tag || github.run_id }}
cancel-in-progress: true
env:
HEAD_BRANCH: ${{ github.event.workflow_run.head_branch }}
WORKFLOW_RUN_ID: ${{ github.event.workflow_run.id }}
required: true
permissions:
contents: read
actions: read
jobs:
# Resolve which build run to use and extract version info
resolve:
name: Resolve Build
# Auto-trigger only from successful tag builds of "Build and Release".
# Tag pushes arrive as event == push with head_branch != main (a
# non-main push head_branch is the release tag name). Manual dispatch
# stays available as a fallback for backfills and re-runs.
if: >-
github.event_name == 'workflow_dispatch' ||
(github.event.workflow_run.conclusion == 'success' &&
github.event.workflow_run.event == 'push' &&
github.event.workflow_run.head_branch != 'main')
runs-on: ubuntu-latest # gh CLI required; the sm-standard-2 fleet does not ship it
timeout-minutes: 10
outputs:
version: ${{ steps.resolve.outputs.version }}
build_type: ${{ steps.resolve.outputs.build_type }}
build_run_id: ${{ steps.resolve.outputs.build_run_id }}
build_run_number: ${{ steps.resolve.outputs.build_run_number }}
head_sha: ${{ steps.resolve.outputs.head_sha }}
dev_sequence: ${{ steps.resolve.outputs.dev_sequence }}
tag: ${{ steps.resolve.outputs.tag }}
steps:
- name: Resolve build run
id: resolve
shell: bash
env:
GH_TOKEN: ${{ github.token }}
EVENT_NAME: ${{ github.event_name }}
REPOSITORY: ${{ github.repository }}
INPUT_TAG: ${{ github.event.inputs.tag }}
INPUT_RUN_ID: ${{ github.event.inputs.build_run_id }}
run: |
set -euo pipefail
fail() {
echo "❌ $1" >&2
exit 1
}
TAG=""
BUILD_RUN_ID=""
case "$EVENT_NAME" in
workflow_run)
TAG="$HEAD_BRANCH"
BUILD_RUN_ID="$WORKFLOW_RUN_ID"
;;
workflow_dispatch)
TAG="$INPUT_TAG"
BUILD_RUN_ID="$INPUT_RUN_ID"
;;
*) fail "unsupported event: $EVENT_NAME" ;;
esac
# Validate and classify tags before using them in API paths or logs.
semver_core='(0|[1-9][0-9]*)\.(0|[1-9][0-9]*)\.(0|[1-9][0-9]*)'
prerelease_id='(alpha|beta|rc)\.(0|[1-9][0-9]*)'
if [[ -n "$TAG" ]]; then
if [[ "$TAG" =~ ^${semver_core}(-${prerelease_id})?-preview\.(0|[1-9][0-9]*)$ ]]; then
BUILD_TYPE=preview
elif [[ "$TAG" =~ ^${semver_core}-${prerelease_id}$ ]]; then
BUILD_TYPE=prerelease
elif [[ "$TAG" =~ ^${semver_core}$ ]]; then
BUILD_TYPE=release
else
fail "tag is not a supported strict package version"
fi
else
BUILD_TYPE=development
fi
if [[ -n "$BUILD_RUN_ID" ]]; then
[[ "$BUILD_RUN_ID" =~ ^[1-9][0-9]*$ ]] || fail "build run ID must be a positive decimal integer"
echo "Using selected build run: $BUILD_RUN_ID"
elif [[ -n "$TAG" ]]; then
echo "Looking for build run for tag: $TAG"
BUILD_RUN_ID=$(gh api --method GET \
"repos/${REPOSITORY}/actions/workflows/build.yml/runs" \
-f branch="$TAG" -f status=success -F per_page=1 \
--jq '.workflow_runs[0].id // empty' 2>/dev/null || true)
if [[ -z "$BUILD_RUN_ID" ]]; then
BUILD_RUN_ID=$(gh api --method GET \
"repos/${REPOSITORY}/actions/workflows/build.yml/runs" \
-f event=push -f status=success -F per_page=100 2>/dev/null |
jq -r --arg tag "$TAG" \
'[.workflow_runs[] | select(.head_branch == $tag)][0].id // empty' || true)
fi
[[ "$BUILD_RUN_ID" =~ ^[1-9][0-9]*$ ]] || fail "no successful build run found for tag"
echo "Found build run: $BUILD_RUN_ID"
else
echo "No tag specified, looking for latest main build"
BUILD_RUN_ID=$(gh api --method GET \
"repos/${REPOSITORY}/actions/workflows/build.yml/runs" \
-f branch=main -f status=success -F per_page=1 \
--jq '.workflow_runs[0].id // empty' 2>/dev/null || true)
[[ "$BUILD_RUN_ID" =~ ^[1-9][0-9]*$ ]] || fail "no successful main build found"
echo "Latest main build: $BUILD_RUN_ID"
fi
# Fetch once and use the same immutable run metadata for identity,
# ordering, workflow provenance, and release-channel validation.
RUN_JSON=$(gh api "repos/${REPOSITORY}/actions/runs/${BUILD_RUN_ID}") ||
fail "cannot read selected build run"
RUN_ID=$(jq -r '.id // empty' <<<"$RUN_JSON")
RUN_NUMBER=$(jq -r '.run_number // empty' <<<"$RUN_JSON")
RUN_STATUS=$(jq -r '.status // empty' <<<"$RUN_JSON")
RUN_CONCLUSION=$(jq -r '.conclusion // empty' <<<"$RUN_JSON")
RUN_PATH=$(jq -r '.path // empty' <<<"$RUN_JSON")
HEAD_SHA=$(jq -r '.head_sha // empty' <<<"$RUN_JSON")
RUN_HEAD_BRANCH=$(jq -r '.head_branch // empty' <<<"$RUN_JSON")
[[ "$RUN_ID" == "$BUILD_RUN_ID" ]] || fail "run metadata ID mismatch"
[[ "$RUN_NUMBER" =~ ^[1-9][0-9]*$ ]] || fail "build run number must be a positive decimal integer"
[[ "$RUN_STATUS" == completed && "$RUN_CONCLUSION" == success ]] || fail "selected build run is not successful"
[[ "$RUN_PATH" == .github/workflows/build.yml ]] || fail "selected run is not Build and Release"
[[ "$HEAD_SHA" =~ ^[0-9a-f]{40}$ ]] || fail "selected build run has an invalid head SHA"
[[ "$RUN_HEAD_BRANCH" != *$'\n'* && -n "$RUN_HEAD_BRANCH" ]] || fail "selected build run has an invalid head branch"
if [[ -n "$TAG" ]]; then
[[ "$RUN_HEAD_BRANCH" == "$TAG" ]] || fail "tag and build run head branch do not match"
TAG_REF_JSON=$(gh api "repos/${REPOSITORY}/git/ref/tags/${TAG}") ||
fail "cannot resolve release tag ref"
TAG_OBJECT_TYPE=$(jq -r '.object.type // empty' <<<"$TAG_REF_JSON")
TAG_OBJECT_SHA=$(jq -r '.object.sha // empty' <<<"$TAG_REF_JSON")
depth=0
while [[ "$TAG_OBJECT_TYPE" == tag && $depth -lt 5 ]]; do
TAG_OBJECT_JSON=$(gh api "repos/${REPOSITORY}/git/tags/${TAG_OBJECT_SHA}") ||
fail "cannot peel annotated release tag"
TAG_OBJECT_TYPE=$(jq -r '.object.type // empty' <<<"$TAG_OBJECT_JSON")
TAG_OBJECT_SHA=$(jq -r '.object.sha // empty' <<<"$TAG_OBJECT_JSON")
depth=$((depth + 1))
done
[[ "$TAG_OBJECT_TYPE" == commit && "$TAG_OBJECT_SHA" =~ ^[0-9a-f]{40}$ ]] ||
fail "release tag does not resolve to a commit"
[[ "$TAG_OBJECT_SHA" == "$HEAD_SHA" ]] || fail "release tag commit and build run head SHA do not match"
VERSION="$TAG"
DEV_SEQUENCE=""
else
VERSION="dev-${HEAD_SHA}"
DEV_SEQUENCE="$RUN_NUMBER"
fi
{
echo "version=$VERSION"
echo "build_type=$BUILD_TYPE"
echo "build_run_id=$BUILD_RUN_ID"
echo "build_run_number=$RUN_NUMBER"
echo "head_sha=$HEAD_SHA"
echo "dev_sequence=$DEV_SEQUENCE"
echo "tag=${TAG}"
} >> "$GITHUB_OUTPUT"
echo "📊 Resolved:"
echo " Version: $VERSION"
echo " Build type: $BUILD_TYPE"
echo " Build run ID: $BUILD_RUN_ID"
echo " Build run number: $RUN_NUMBER"
# Consume the trusted release certification of the resolved build run and
# verify the certified input digests before any package is wrapped. A run
# without that certification fails closed here; packages built later must
# complete their own verification and cannot inherit an unverified
# conclusion.
release-certification:
name: Release Certification
needs: resolve
if: needs.resolve.result == 'success'
runs-on: ubuntu-latest # gh CLI required; the sm-standard-2 fleet does not ship it
timeout-minutes: 30
permissions:
contents: read
actions: read
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Download and verify release certification
env:
GH_TOKEN: ${{ secrets.RELEASE_VALIDATION_TOKEN || github.token }}
BUILD_RUN_ID: ${{ needs.resolve.outputs.build_run_id }}
BUILD_TYPE: ${{ needs.resolve.outputs.build_type }}
shell: bash
run: |
set -euo pipefail
mkdir -p certification
if [[ "$BUILD_TYPE" == "development" ]]; then
# Development artifacts are explicitly uncertified and never touch
# official or latest channels; only the staging/dev paths remain.
jq -n '{schema_version: 1, certified: false, reason: "development artifacts are explicitly uncertified"}' \
> certification/development-uncertified.json
exit 0
fi
if ! gh run download "$BUILD_RUN_ID" -n release-certification -D certification; then
echo "Build run ${BUILD_RUN_ID} published no release-certification artifact; failing closed" >&2
exit 1
fi
python3 scripts/release/release_gate.py verify-promotion \
--plan .config/release-validation-plan.json \
--candidate certification/candidate.json \
--summary certification/release-gate-output \
--artifact-sha256 "$(jq -r '.deliverables[0].sha256' certification/candidate.json)" \
--artifact-name "$(jq -r '.deliverables[0].name' certification/candidate.json)"
# Build DEB and RPM packages for each architecture and libc variant
package:
name: Package (${{ matrix.arch }}-${{ matrix.libc }})
needs: [ resolve, release-certification ]
runs-on: ubuntu-latest # gh CLI required; the sm-standard-2 fleet does not ship it
timeout-minutes: 30
runs-on: ubuntu-latest
timeout-minutes: 45
strategy:
fail-fast: false
max-parallel: 1
matrix:
include:
- arch: x86_64
libc: gnu
deb_arch: amd64
rpm_arch: x86_64
artifact_name: "rustfs-linux-x86_64-gnu"
# gnu binaries dynamically link glibc; musl binaries are static
# and run without a libc dependency.
deb_depends: "libc6 (>= 2.31)"
rpm_depends: "glibc >= 2.31"
- arch: aarch64
libc: gnu
deb_arch: arm64
rpm_arch: aarch64
artifact_name: "rustfs-linux-aarch64-gnu"
deb_depends: "libc6 (>= 2.31)"
rpm_depends: "glibc >= 2.31"
- arch: x86_64
libc: musl
deb_arch: amd64
rpm_arch: x86_64
artifact_name: "rustfs-linux-x86_64-musl"
deb_depends: ""
rpm_depends: ""
- arch: aarch64
libc: musl
deb_arch: arm64
rpm_arch: aarch64
artifact_name: "rustfs-linux-aarch64-musl"
deb_depends: ""
rpm_depends: ""
target: [linux-x86_64-musl, linux-aarch64-musl, linux-x86_64-gnu, linux-aarch64-gnu]
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: ${{ fromJson(inputs.candidate_manifest).source_sha }}
persist-credentials: false
- name: Normalize package metadata
id: versions
shell: bash
env:
BUILD_TYPE: ${{ needs.resolve.outputs.build_type }}
SOURCE_VERSION: ${{ needs.resolve.outputs.version }}
DEV_SEQUENCE: ${{ needs.resolve.outputs.dev_sequence }}
ARCH: ${{ matrix.rpm_arch }}
LIBC: ${{ matrix.libc }}
run: |
set -euo pipefail
normalized=$(./scripts/release/package_versions.sh \
"$BUILD_TYPE" "$SOURCE_VERSION" "$DEV_SEQUENCE" "$ARCH" "$LIBC")
printf '%s\n' "$normalized" >> "$GITHUB_OUTPUT"
- name: Download binary artifact from build run
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
pattern: ${{ matrix.artifact_name }}*
path: ./binary-artifact
run-id: ${{ needs.resolve.outputs.build_run_id }}
github-token: ${{ github.token }}
merge-multiple: true
- name: Extract binary
id: binary
shell: bash
run: |
set -euo pipefail
ZIP_FILE=$(find ./binary-artifact -name "*.zip" -type f | head -1)
if [[ -z "$ZIP_FILE" ]]; then
echo "❌ No binary artifact found"
find ./binary-artifact -mindepth 1 -maxdepth 1 -print 2>/dev/null || true
exit 1
fi
echo "Found artifact: $ZIP_FILE"
mkdir -p ./bin
unzip -o "$ZIP_FILE" -d ./bin
if [[ ! -f ./bin/rustfs ]]; then
echo "❌ rustfs binary not found in archive"
exit 1
fi
chmod +x ./bin/rustfs
stat --printf='%n %s bytes\n' ./bin/rustfs
echo "✅ Binary extracted"
- name: Build DEB package
id: deb
shell: bash
env:
DEB_VERSION: ${{ steps.versions.outputs.deb_version }}
DEB_ARCH: ${{ matrix.deb_arch }}
DEB_FILE: ${{ steps.versions.outputs.deb_file }}
DEB_DEPENDS: ${{ matrix.deb_depends }}
LIBC: ${{ matrix.libc }}
run: |
set -euo pipefail
PKG_DIR="${DEB_FILE%.deb}"
echo "Building DEB: ${DEB_FILE}"
mkdir -p "${PKG_DIR}/DEBIAN"
mkdir -p "${PKG_DIR}/usr/bin"
mkdir -p "${PKG_DIR}/etc/default"
mkdir -p "${PKG_DIR}/lib/systemd/system"
mkdir -p "${PKG_DIR}/usr/share/doc/rustfs"
cp ./bin/rustfs "${PKG_DIR}/usr/bin/"
chmod 755 "${PKG_DIR}/usr/bin/rustfs"
cp deploy/build/rustfs.service "${PKG_DIR}/lib/systemd/system/"
cat > "${PKG_DIR}/etc/default/rustfs" << 'ENVEOF'
# RustFS Environment Configuration
# See https://docs.rustfs.com for more information
# RUSTFS_ACCESS_KEY=<changeme>
# RUSTFS_SECRET_KEY=<changeme>
# RUSTFS_VOLUMES=""
# RUSTFS_ADDRESS=":9000"
# RUSTFS_CONSOLE_ADDRESS=":9001"
# RUSTFS_CONSOLE_ENABLE=true
# RUSTFS_OBS_LOGGER_LEVEL=error
# RUSTFS_OBS_LOG_DIRECTORY="/var/log/rustfs/"
ENVEOF
cat > "${PKG_DIR}/DEBIAN/control" << EOF
Package: rustfs
Version: ${DEB_VERSION}
Section: utils
Priority: optional
Architecture: ${DEB_ARCH}
EOF
# gnu binaries dynamically link glibc and must declare it; musl
# binaries are statically linked and need no libc dependency.
if [[ -n "$DEB_DEPENDS" ]]; then
echo "Depends: ${DEB_DEPENDS}" >> "${PKG_DIR}/DEBIAN/control"
fi
cat >> "${PKG_DIR}/DEBIAN/control" << EOF
Maintainer: RustFS Team <support@rustfs.com>
Description: High-performance distributed object storage (${LIBC} build)
RustFS is a high-performance distributed object storage software
built using Rust. It is compatible with MinIO and S3 API.
Homepage: https://rustfs.com
EOF
# Declare /etc/default/rustfs as a conffile so dpkg preserves user
# modifications on upgrade instead of silently overwriting them.
cat > "${PKG_DIR}/DEBIAN/conffiles" << 'CONFFILES'
/etc/default/rustfs
CONFFILES
./scripts/release/package_service_scripts.sh after-install > "${PKG_DIR}/DEBIAN/postinst"
chmod 755 "${PKG_DIR}/DEBIAN/postinst"
./scripts/release/package_service_scripts.sh before-remove > "${PKG_DIR}/DEBIAN/prerm"
chmod 755 "${PKG_DIR}/DEBIAN/prerm"
./scripts/release/package_service_scripts.sh after-remove > "${PKG_DIR}/DEBIAN/postrm"
chmod 755 "${PKG_DIR}/DEBIAN/postrm"
cp LICENSE "${PKG_DIR}/usr/share/doc/rustfs/"
cp README.md "${PKG_DIR}/usr/share/doc/rustfs/"
fakeroot dpkg-deb --build "${PKG_DIR}" "$DEB_FILE"
[[ $(dpkg-deb -f "$DEB_FILE" Package) == rustfs ]]
[[ $(dpkg-deb -f "$DEB_FILE" Version) == "$DEB_VERSION" ]]
[[ $(dpkg-deb -f "$DEB_FILE" Architecture) == "$DEB_ARCH" ]]
dpkg-deb --fsys-tarfile "$DEB_FILE" | tar -tf - | grep -Fx './usr/bin/rustfs' >/dev/null
stat --printf='%n %s bytes\n' "$DEB_FILE"
echo "deb_file=$DEB_FILE" >> "$GITHUB_OUTPUT"
echo "✅ DEB built: $DEB_FILE"
- name: Build RPM package
id: rpm
shell: bash
env:
RPM_VERSION: ${{ steps.versions.outputs.rpm_version }}
RPM_RELEASE: ${{ steps.versions.outputs.rpm_release }}
RPM_ARCH: ${{ matrix.rpm_arch }}
RPM_FILE: ${{ steps.versions.outputs.rpm_file }}
RPM_DEPENDS: ${{ matrix.rpm_depends }}
LIBC: ${{ matrix.libc }}
run: |
set -euo pipefail
echo "Building RPM for ${RPM_ARCH} (${LIBC})"
sudo apt-get update && sudo apt-get install -y ruby ruby-dev build-essential rpm
sudo gem install fpm
./scripts/test_package_versions.sh --require-package-managers
# gnu binaries dynamically link glibc and must declare it; musl
# binaries are statically linked and need no libc dependency.
depends_args=()
if [[ -n "$RPM_DEPENDS" ]]; then
depends_args+=(--depends "$RPM_DEPENDS")
fi
# Create config file for fpm (DEB build creates it in its package dir structure,
# but fpm needs the file to exist before packaging)
mkdir -p ./tmp-pkg/etc/default
cat > ./tmp-pkg/etc/default/rustfs << 'ENVEOF'
# RustFS Environment Configuration
# See https://docs.rustfs.com for more information
# RUSTFS_ACCESS_KEY=<changeme>
# RUSTFS_SECRET_KEY=<changeme>
# RUSTFS_VOLUMES=""
# RUSTFS_ADDRESS=":9000"
# RUSTFS_CONSOLE_ADDRESS=":9001"
# RUSTFS_CONSOLE_ENABLE=true
# RUSTFS_OBS_LOGGER_LEVEL=error
# RUSTFS_OBS_LOG_DIRECTORY="/var/log/rustfs/"
ENVEOF
fpm -s dir -t rpm \
--name rustfs \
--version "$RPM_VERSION" \
--iteration "$RPM_RELEASE" \
--architecture "$RPM_ARCH" \
--package "$RPM_FILE" \
"${depends_args[@]}" \
--description "High-performance distributed object storage (${LIBC} build)" \
--maintainer "RustFS Team <support@rustfs.com>" \
--url "https://rustfs.com" \
--license "Apache-2.0" \
--before-install <(./scripts/release/package_service_scripts.sh rpm-before-install) \
--before-upgrade <(./scripts/release/package_service_scripts.sh rpm-before-upgrade) \
--after-install <(./scripts/release/package_service_scripts.sh after-install) \
--after-upgrade <(./scripts/release/package_service_scripts.sh after-install) \
--before-remove <(./scripts/release/package_service_scripts.sh before-remove) \
--after-remove <(./scripts/release/package_service_scripts.sh after-remove) \
--rpm-posttrans <(./scripts/release/package_service_scripts.sh rpm-posttrans) \
--config-files /etc/default/rustfs \
./bin/rustfs=/usr/bin/rustfs \
./tmp-pkg/etc/default/rustfs=/etc/default/rustfs \
deploy/build/rustfs.service=/lib/systemd/system/rustfs.service \
LICENSE=/usr/share/doc/rustfs/LICENSE \
README.md=/usr/share/doc/rustfs/README.md
if [[ ! -f "$RPM_FILE" ]]; then
echo "❌ RPM build failed"
exit 1
fi
RPM_METADATA=$(rpm -qp --qf '%{NAME}\n%{VERSION}\n%{RELEASE}\n%{ARCH}\n' "$RPM_FILE")
EXPECTED_METADATA=$(printf 'rustfs\n%s\n%s\n%s' "$RPM_VERSION" "$RPM_RELEASE" "$RPM_ARCH")
[[ "$RPM_METADATA" == "$EXPECTED_METADATA" ]]
rpm -qpl "$RPM_FILE" | grep -Fx '/usr/bin/rustfs' >/dev/null
stat --printf='%n %s bytes\n' "$RPM_FILE"
echo "rpm_file=$RPM_FILE" >> "$GITHUB_OUTPUT"
echo "✅ RPM built: $RPM_FILE"
- name: Download certification evidence
if: needs.resolve.outputs.build_type != 'development'
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
name: release-certification
path: ./certification
# Later-built wrapper verification: the binary inside each package must
# match the certified binary digest for this platform before anything is
# uploaded, and the package itself stays on staging until promotion.
- name: Verify wrapped binary against certification
if: needs.resolve.outputs.build_type != 'development'
shell: bash
env:
DEB_FILE: ${{ steps.deb.outputs.deb_file }}
RPM_FILE: ${{ steps.rpm.outputs.rpm_file }}
ARTIFACT_NAME: ${{ matrix.artifact_name }}
run: |
set -euo pipefail
expected="$(jq -r --arg needle "$ARTIFACT_NAME" \
'[.deliverables[] | select(.name | contains($needle)) | .binary_sha256][0] // empty' \
certification/candidate.json)"
if [[ -z "$expected" ]]; then
echo "No certified binary digest recorded for ${ARTIFACT_NAME}" >&2
exit 1
fi
if ! command -v rpm2cpio >/dev/null 2>&1; then
sudo apt-get update && sudo apt-get install -y rpm2cpio
fi
if ! command -v cpio >/dev/null 2>&1; then
sudo apt-get update && sudo apt-get install -y cpio
fi
for package_file in "$DEB_FILE" "$RPM_FILE"; do
case "$package_file" in
*.deb)
dpkg-deb --fsys-tarfile "$package_file" | tar -xOf - ./usr/bin/rustfs > "$RUNNER_TEMP/wrapped-rustfs"
;;
*.rpm)
rpm2cpio "$package_file" | cpio -i --to-stdout ./usr/bin/rustfs > "$RUNNER_TEMP/wrapped-rustfs"
;;
esac
python3 scripts/release/release_gate.py verify-promotion \
--plan .config/release-validation-plan.json \
--candidate certification/candidate.json \
--summary certification/release-gate-output \
--artifact "$RUNNER_TEMP/wrapped-rustfs" \
--artifact-role binary
done
- name: Upload packages to artifacts
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: packages-${{ matrix.arch }}-${{ matrix.libc }}
path: |
*.deb
*.rpm
retention-days: 30
- name: Upload packages to Cloudflare R2
if: needs.resolve.outputs.build_type != 'preview' && env.R2_ACCESS_KEY_ID != ''
env:
R2_ACCESS_KEY_ID: ${{ secrets.R2_ACCESS_KEY_ID }}
R2_SECRET_ACCESS_KEY: ${{ secrets.R2_SECRET_ACCESS_KEY }}
R2_ENDPOINT: ${{ secrets.R2_ENDPOINT }}
R2_BUCKET: ${{ secrets.R2_BUCKET }}
AWS_EC2_METADATA_DISABLED: true
BUILD_TYPE: ${{ needs.resolve.outputs.build_type }}
DEB_FILE: ${{ steps.deb.outputs.deb_file }}
RPM_FILE: ${{ steps.rpm.outputs.rpm_file }}
shell: bash
run: |
set -euo pipefail
if [[ -z "$R2_ACCESS_KEY_ID" || -z "$R2_SECRET_ACCESS_KEY" || -z "$R2_ENDPOINT" || -z "$R2_BUCKET" ]]; then
echo "⚠️ R2 credentials missing, skipping upload"
exit 0
fi
if ! command -v aws >/dev/null 2>&1; then
sudo apt-get update && sudo apt-get install -y awscli
fi
export AWS_ACCESS_KEY_ID="$R2_ACCESS_KEY_ID"
export AWS_SECRET_ACCESS_KEY="$R2_SECRET_ACCESS_KEY"
export AWS_DEFAULT_REGION="auto"
# Build-phase writes stay on staging for release types: the official
# packages/release and packages/latest paths are written only by the
# certification-gated promote-packages job, from these same staged
# objects. Development packages keep the uncertified dev channel.
if [[ "$BUILD_TYPE" == "development" ]]; then
R2_PREFIX="artifacts/rustfs/packages/dev"
else
R2_PREFIX="artifacts/rustfs/packages/staging/${GITHUB_RUN_ID}/${GITHUB_RUN_ATTEMPT}"
fi
R2_PATH="s3://${R2_BUCKET}/${R2_PREFIX}/"
echo "📤 Uploading to $R2_PATH"
for f in "$DEB_FILE" "$RPM_FILE"; do
if [[ -n "$f" && -f "$f" ]]; then
echo "Uploading: $f"
aws s3 cp "$f" "$R2_PATH" --endpoint-url "$R2_ENDPOINT" --only-show-errors
fi
done
echo "✅ Upload complete"
- name: Upload packages to GitHub Release
if: needs.resolve.outputs.tag != ''
- name: Reuse completed package set
id: reuse
env:
GH_TOKEN: ${{ github.token }}
TAG: ${{ needs.resolve.outputs.tag }}
DEB_FILE: ${{ steps.deb.outputs.deb_file }}
RPM_FILE: ${{ steps.rpm.outputs.rpm_file }}
shell: bash
CANDIDATE_MANIFEST: ${{ inputs.candidate_manifest }}
TARGET: ${{ matrix.target }}
run: python3 scripts/release/deliver.py reuse --kind packages --target "$TARGET"
- name: Install packaging tools
if: steps.reuse.outputs.reused != 'true'
run: |
set -euo pipefail
# Upload the packages, then refresh the release checksums so the new
# assets are covered, matching the binary release flow.
for f in "$DEB_FILE" "$RPM_FILE"; do
if [[ -n "$f" && -f "$f" ]]; then
echo "📤 Uploading $(basename "$f") to GitHub release ${TAG}..."
gh release upload "$TAG" "$f" --clobber
fi
done
CHECKSUM_DIR="$(mktemp -d)"
gh release download "$TAG" -p 'SHA256SUMS' -p 'SHA512SUMS' \
-D "$CHECKSUM_DIR" --clobber
for spec in "SHA256SUMS:sha256sum" "SHA512SUMS:sha512sum"; do
asset="${spec%%:*}"
checksum_cmd="${spec##*:}"
checksum_file="${CHECKSUM_DIR}/${asset}"
for f in "$DEB_FILE" "$RPM_FILE"; do
if [[ -n "$f" && -f "$f" ]]; then
base="$(basename "$f")"
# GitHub stores release asset names with '~' normalized to '.'.
# Current package file names embed the raw tag and contain no
# '~', but older releases may still ship such assets, so the
# checksum entries must reference the name as stored on the
# release.
github_base="${base//\~/.}"
# Remove any stale entry (both naming variants), then append
grep -Fv -- "$base" "$checksum_file" > "${checksum_file}.tmp" || true
grep -Fv -- "$github_base" "${checksum_file}.tmp" > "${checksum_file}.tmp2" || true
mv "${checksum_file}.tmp2" "$checksum_file"
digest=$("$checksum_cmd" -- "$f" | awk '{print $1}')
printf '%s %s\n' "$digest" "$github_base" >> "$checksum_file"
fi
done
echo "📤 Updating ${asset} for release ${TAG}..."
gh release upload "$TAG" "$checksum_file" --clobber
done
echo "✅ GitHub release assets updated"
# The only writer of the official packages/release and packages/latest R2
# paths. Promotion re-checks each package's wrapped binary against the
# passed certification list and copies the staged objects byte-for-byte:
# no rebuild-after-verify, no mutable latest resolution downstream.
promote-packages:
name: Promote Packages
needs: [ resolve, package, release-certification ]
# Target-channel lock for the official package paths.
concurrency:
group: release-channel-r2-packages
cancel-in-progress: false
if: needs.resolve.outputs.tag != '' && (needs.resolve.outputs.build_type == 'release' || needs.resolve.outputs.build_type == 'prerelease')
runs-on: ubuntu-latest # gh CLI required; the sm-standard-2 fleet does not ship it
timeout-minutes: 30
permissions:
contents: read
actions: read
env:
R2_ACCESS_KEY_ID: ${{ secrets.R2_ACCESS_KEY_ID }}
R2_SECRET_ACCESS_KEY: ${{ secrets.R2_SECRET_ACCESS_KEY }}
R2_ENDPOINT: ${{ secrets.R2_ENDPOINT }}
R2_BUCKET: ${{ secrets.R2_BUCKET }}
AWS_EC2_METADATA_DISABLED: true
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Download packages and certification
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
path: ./packages
pattern: packages-*
merge-multiple: true
- name: Download certification evidence
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
name: release-certification
path: ./certification
- name: Verify and promote staged packages
shell: bash
run: |
set -euo pipefail
if [[ -z "$R2_ACCESS_KEY_ID" || -z "$R2_SECRET_ACCESS_KEY" || -z "$R2_ENDPOINT" || -z "$R2_BUCKET" ]]; then
echo "❌ R2 credentials missing; refusing to promote to the official channel" >&2
exit 1
fi
STAGING_PREFIX="s3://${R2_BUCKET}/artifacts/rustfs/packages/staging/${GITHUB_RUN_ID}/${GITHUB_RUN_ATTEMPT}/"
RELEASE_PATH="s3://${R2_BUCKET}/artifacts/rustfs/packages/release/"
LATEST_PATH="s3://${R2_BUCKET}/artifacts/rustfs/packages/latest/"
if ! command -v aws >/dev/null 2>&1; then
sudo apt-get update && sudo apt-get install -y awscli
fi
export AWS_ACCESS_KEY_ID="$R2_ACCESS_KEY_ID"
export AWS_SECRET_ACCESS_KEY="$R2_SECRET_ACCESS_KEY"
export AWS_DEFAULT_REGION="auto"
if ! command -v rpm2cpio >/dev/null 2>&1; then
sudo apt-get install -y rpm2cpio
fi
if ! command -v cpio >/dev/null 2>&1; then
sudo apt-get install -y cpio
fi
promoted=0
for package_file in packages/*.deb packages/*.rpm; do
[[ -f "$package_file" ]] || continue
name="$(basename "$package_file")"
case "$package_file" in
*.deb)
dpkg-deb --fsys-tarfile "$package_file" | tar -xOf - ./usr/bin/rustfs > "$RUNNER_TEMP/wrapped-rustfs"
;;
*.rpm)
rpm2cpio "$package_file" | cpio -i --to-stdout ./usr/bin/rustfs > "$RUNNER_TEMP/wrapped-rustfs"
;;
esac
python3 scripts/release/release_gate.py verify-promotion \
--plan .config/release-validation-plan.json \
--candidate certification/candidate.json \
--summary certification/release-gate-output \
--artifact "$RUNNER_TEMP/wrapped-rustfs" \
--artifact-role binary
staged="$(mktemp)"
aws s3 cp "${STAGING_PREFIX}${name}" "$staged" --endpoint-url "$R2_ENDPOINT" --only-show-errors
staged_sha="$(sha256sum "$staged" | awk '{print $1}')"
built_sha="$(sha256sum "$package_file" | awk '{print $1}')"
if [[ "$staged_sha" != "$built_sha" ]]; then
echo "❌ Staged package ${name} does not match the verified bytes" >&2
exit 1
fi
aws s3 cp "$staged" "${RELEASE_PATH}${name}" --endpoint-url "$R2_ENDPOINT" --only-show-errors
aws s3 cp "$staged" "${LATEST_PATH}${name}" --endpoint-url "$R2_ENDPOINT" --only-show-errors
rm -f "$staged"
promoted=$((promoted + 1))
echo "✅ Promoted ${name} (${built_sha})"
done
if [[ "$promoted" -eq 0 ]]; then
echo "No staged packages found to promote" >&2
exit 1
fi
# Summary
summary:
name: Summary
needs: [ resolve, package ]
# Every completed Build and Release run triggers this workflow; when
# resolve declined it (not a release tag), there is nothing to summarise.
if: always() && needs.resolve.result != 'skipped'
runs-on: ubuntu-latest
timeout-minutes: 5
steps:
- name: Print summary
shell: bash
sudo apt-get update
sudo apt-get install -y ruby ruby-dev build-essential rpm fakeroot cpio
sudo gem install fpm --version 1.17.0 --no-document
- name: Package accepted executable and verify contents
if: steps.reuse.outputs.reused != 'true'
env:
SUMMARY_VERSION: ${{ needs.resolve.outputs.version }}
SUMMARY_BUILD_TYPE: ${{ needs.resolve.outputs.build_type }}
SUMMARY_BUILD_RUN_ID: ${{ needs.resolve.outputs.build_run_id }}
SUMMARY_PACKAGE_STATUS: ${{ needs.package.result }}
run: |
{
echo "## 📦 Package Summary"
echo ""
echo "| Item | Value |"
echo "|------|-------|"
echo "| Version | \`${SUMMARY_VERSION}\` |"
echo "| Build Type | ${SUMMARY_BUILD_TYPE} |"
echo "| Build Run | #${SUMMARY_BUILD_RUN_ID} |"
echo "| Package Status | ${SUMMARY_PACKAGE_STATUS} |"
} >> "$GITHUB_STEP_SUMMARY"
GH_TOKEN: ${{ github.token }}
CANDIDATE_MANIFEST: ${{ inputs.candidate_manifest }}
TARGET: ${{ matrix.target }}
run: python3 scripts/release/deliver.py package --target "$TARGET" --output delivery
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
if: steps.reuse.outputs.reused != 'true'
with:
name: packages-${{ matrix.target }}
path: delivery/*
if-no-files-found: error
compression-level: 0
retention-days: 30
+444
View File
@@ -0,0 +1,444 @@
# Copyright 2026 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
# s3-tests reference parity lane (rustfs/backlog#2773).
#
# Runs the ceph/s3-tests implemented list (scripts/s3-tests/implemented_tests.txt)
# against every target in .config/reference-parity-targets.toml and fails on
# any per-node-id difference between a candidate and the reference:
#
# - reference: the release pinned in .config/reference-binary.toml, downloaded
# and sha256-verified by .github/actions/reference-binary;
# - candidate targets: the debug binary built from this checkout exactly as
# ci.yml's build-rustfs-debug-binary job builds it for S3 Implemented Tests.
#
# Every target runs the same harness (scripts/s3-tests/run.sh from this
# checkout), test list and server configuration on its own hosted runner. A
# target's failures get one rerun against a fresh server; a case that passes it
# is flaky, not a difference. scripts/s3-tests/reference_parity.py judges the
# result and honours .config/reference-parity-tolerated.txt, whose entries must
# each match a real difference.
#
# The `differential` job adds the 73-operation dual-stack differential
# (crates/e2e_test/src/dual_stack_differential, rustfs/backlog#2740) against the
# same pinned reference: side A is the released binary (RUSTFS_E2E_REFERENCE_BINARY,
# started without RUSTFS_S3_STACK), side B is the candidate built above on its
# legacy stack. It reuses the candidate build artifact, never builds the candidate
# twice, and prints reference_side, version_a and version_b from the report the test
# wrote; it fails when side A was not the reference or both sides report the same
# version. Every (op, field, a, b) difference goes to the job summary. Report-only
# until the first result has been reviewed.
#
# Report-only: not part of the Test and Lint aggregate. Scheduled failures are
# owned by the scheduled-validation watchdog (.github/scheduled-validations.json).
name: Reference Parity
on:
pull_request:
paths:
- ".github/workflows/reference-parity.yml"
- ".github/actions/reference-binary/**"
- ".config/reference-binary.toml"
- ".config/reference-parity-targets.toml"
- ".config/reference-parity-tolerated.txt"
- "scripts/s3-tests/reference_parity.py"
- "scripts/junit_diff.py"
- "crates/e2e_test/src/dual_stack_differential/**"
schedule:
- cron: "37 1 * * *"
workflow_dispatch:
# Matches ci.yml: these variables are hashed into the rust-cache key, so the
# candidate build reads the same ci-dev cache as build-rustfs-debug-binary.
env:
CARGO_TERM_COLOR: always
RUST_BACKTRACE: 1
concurrency:
group: ${{ github.workflow }}-${{ github.ref }}
cancel-in-progress: true
permissions:
contents: read
defaults:
run:
shell: bash
jobs:
plan:
name: Plan parity targets
runs-on: ubuntu-latest
timeout-minutes: 5
outputs:
targets: ${{ steps.targets.outputs.targets }}
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Validate target list
id: targets
run: |
set -euo pipefail
targets="$(python3 scripts/s3-tests/reference_parity.py targets --config .config/reference-parity-targets.toml)"
echo "targets=${targets}" >> "$GITHUB_OUTPUT"
echo "Parity targets: ${targets}"
build-candidate:
name: Build candidate binary
# Critical-path CPU and cache ownership: the same debug build as ci.yml's
# build-rustfs-debug-binary, reading the ci-dev cache written on sm-standard-4.
runs-on: sm-standard-4
timeout-minutes: 60
env:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Setup Rust environment
uses: ./.github/actions/setup
with:
rust-version: stable
cache-shared-key: ci-dev
cache-save-if: 'false'
install-build-packaging-tools: 'false'
- name: Build debug binary
run: python3 scripts/e2e_binary.py build --bins --features e2e-test-hooks
- name: Upload candidate binary
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: reference-parity-candidate-binary
overwrite: true
path: |
target/debug/rustfs
target/debug/rustfs.e2e.json
if-no-files-found: error
retention-days: 1
s3tests:
name: s3-tests (${{ matrix.target.name }})
needs: [ plan, build-candidate ]
runs-on: ubuntu-latest
timeout-minutes: 75
strategy:
fail-fast: false
matrix:
target: ${{ fromJSON(needs.plan.outputs.targets) }}
env:
TARGET_NAME: ${{ matrix.target.name }}
TARGET_KIND: ${{ matrix.target.binary }}
# Above this many first-run failures the target is systemically broken;
# a rerun would only repeat it, so the first run is judged as is.
RERUN_CAP: "50"
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Fetch pinned reference binary
id: reference
if: matrix.target.binary == 'reference'
uses: ./.github/actions/reference-binary
- name: Download candidate binary
if: matrix.target.binary == 'candidate'
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
name: reference-parity-candidate-binary
path: target/debug
- name: Select target binary
env:
REFERENCE_PATH: ${{ steps.reference.outputs.path }}
run: |
set -euo pipefail
case "$TARGET_KIND" in
reference) binary="$REFERENCE_PATH" ;;
candidate) chmod +x target/debug/rustfs; binary="$PWD/target/debug/rustfs" ;;
*) echo "unknown target binary kind: $TARGET_KIND" >&2; exit 1 ;;
esac
test -x "$binary"
echo "TARGET_BINARY=$binary" >> "$GITHUB_ENV"
mkdir -p "parity/$TARGET_NAME"
{
echo "target=$TARGET_NAME"
echo "binary=$TARGET_KIND"
echo "sha256=$(sha256sum "$binary" | cut -d' ' -f1)"
echo "version=$("$binary" --version | tr '\n' ' ')"
} | tee "parity/$TARGET_NAME/target.txt"
- name: Apply target environment
env:
TARGET_JSON: ${{ toJSON(matrix.target) }}
run: |
set -euo pipefail
python3 scripts/s3-tests/reference_parity.py export-env --target-json "$TARGET_JSON" \
| tee -a "$GITHUB_ENV" "parity/$TARGET_NAME/target-env.txt"
- name: Run implemented s3-tests
run: |
set -uo pipefail
report="parity/$TARGET_NAME"
harness="artifacts/s3tests-single"
# Same invocation as ci.yml's S3 Implemented Tests, with a fresh data
# root and port per run. $1 optionally replaces the test list.
run_suite() {
local list="$1" label="$2" root port
root="${RUNNER_TEMP}/rustfs-s3tests-${label}"
rm -rf "$harness" "$root"
mkdir -p "$root"
port="$(python3 -c 'import socket; s=socket.socket(); s.bind(("127.0.0.1", 0)); print(s.getsockname()[1]); s.close()')"
env DEPLOY_MODE=binary \
RUSTFS_BINARY="$TARGET_BINARY" \
TEST_MODE=single \
MAXFAIL=0 \
XDIST=4 \
S3_PORT="$port" \
DATA_ROOT="$root" \
S3TESTS_CONF="$harness/s3tests.conf" \
${list:+IMPLEMENTED_TESTS_FILE="$list"} \
./scripts/s3-tests/run.sh
}
# A run is usable only if it produced a JUnit report; test failures
# are data for the comparison, a missing report is a lane failure.
keep() {
local prefix="$1"
for file in pytest.log compat-report.md; do
if [[ -f "$harness/$file" ]]; then cp "$harness/$file" "$report/${prefix}${file}"; fi
done
if [[ -f "$harness/rustfs-single/rustfs.log" ]]; then cp "$harness/rustfs-single/rustfs.log" "$report/${prefix}rustfs.log"; fi
test -s "$harness/junit.xml" || { echo "::error::$TARGET_NAME produced no JUnit report (${prefix:-first} run)"; return 1; }
cp "$harness/junit.xml" "$report/${prefix}junit.xml"
}
run_suite "" first
echo "first_run_exit=$?" >> "$report/target.txt"
keep "" || exit 1
cp "$harness/selected-nodeids.txt" "$report/selected-nodeids.txt" || exit 1
failures="$(python3 scripts/s3-tests/reference_parity.py failed --report "$report")" || exit 1
count="$(printf '%s' "$failures" | grep -c . || true)"
echo "first_run_failures=$count" >> "$report/target.txt"
if (( count == 0 )); then
exit 0
fi
if (( count > RERUN_CAP )); then
echo "::warning::$TARGET_NAME has $count failures (cap $RERUN_CAP); judging the first run without a rerun"
echo "rerun=skipped-over-cap" >> "$report/target.txt"
exit 0
fi
printf '%s\n' "$failures" > "$RUNNER_TEMP/rerun-tests.txt"
run_suite "$RUNNER_TEMP/rerun-tests.txt" rerun
echo "rerun_exit=$?" >> "$report/target.txt"
keep rerun- || exit 1
- name: Upload target report
if: always()
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: reference-parity-report-${{ matrix.target.name }}
overwrite: true
path: parity/${{ matrix.target.name }}/
if-no-files-found: error
retention-days: 14
differential:
name: Dual-stack differential (reference vs candidate)
needs: [ build-candidate ]
# Compiles the e2e_test harness against the ci-dev cache like the other
# sm-standard-4 jobs; the candidate server itself is the downloaded artifact.
runs-on: sm-standard-4
timeout-minutes: 90
env:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
NO_PROXY: 127.0.0.1,localhost,::1
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Setup Rust environment
uses: ./.github/actions/setup
with:
rust-version: stable
cache-shared-key: ci-dev
cache-save-if: 'false'
install-build-packaging-tools: 'false'
- name: Fetch pinned reference binary
id: reference
uses: ./.github/actions/reference-binary
- name: Download candidate binary
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
name: reference-parity-candidate-binary
path: target/debug
- name: Run dual-stack differential
id: differential
continue-on-error: true
env:
REFERENCE_PATH: ${{ steps.reference.outputs.path }}
RUSTFS_E2E_LOG_DIR: ${{ runner.temp }}/rustfs-differential-logs
run: |
set -euo pipefail
export no_proxy="$NO_PROXY"
chmod +x target/debug/rustfs
test -x "$REFERENCE_PATH"
mkdir -p "$RUSTFS_E2E_LOG_DIR"
# Side A: the released binary. Side B: the candidate on its legacy stack.
export RUSTFS_E2E_REFERENCE_BINARY="$REFERENCE_PATH"
test_name='dual_stack_differential::tests::both_stacks_answer_every_operation_identically'
python3 scripts/e2e_binary.py run --features e2e-test-hooks -- \
cargo test --locked -p e2e_test --lib "$test_name" -- --exact --nocapture \
2>&1 | tee "$RUNNER_TEMP/differential-test.log"
- name: Summarize report and verify the reference side
if: always()
run: |
set -euo pipefail
python3 - <<'PY'
import glob, json, os, sys
summary = os.environ["GITHUB_STEP_SUMMARY"]
reports = sorted(glob.glob("target/dual-stack/self-comparison-*.json"))
lines = ["## Dual-stack differential: reference vs candidate", ""]
failures = []
if len(reports) != 1:
failures.append(f"expected exactly one self-comparison report, found {len(reports)}: {reports}")
else:
report = json.load(open(reports[0]))
side = report.get("reference_side")
version_a = report.get("version_a")
version_b = report.get("version_b")
lines += [
f"- report: `{reports[0]}`",
f"- reference_side: `{side}`",
f"- version_a: `{(version_a or '').splitlines()[0] if version_a else version_a}`",
f"- version_b: `{(version_b or '').splitlines()[0] if version_b else version_b}`",
f"- stack_a: `{report.get('stack_a')}`, stack_b: `{report.get('stack_b')}`",
f"- compared_ops: {report.get('compared_ops')}, compared_cases: {report.get('compared_cases')}",
"",
]
print(f"reference_side={side}\nversion_a={version_a}\nversion_b={version_b}")
lines += ["```", "version_a:", version_a or "", "", "version_b:", version_b or "", "```", ""]
if side != "a":
failures.append(f"reference_side is {side!r}, expected 'a'")
if not version_a or not version_b:
failures.append("version_a or version_b is missing")
elif version_a == version_b:
failures.append("version_a equals version_b: the reference was replaced by the candidate")
diffs = report.get("differences") or []
lines.append(f"### Differences: {len(diffs)}")
by_op = {}
for d in diffs:
by_op.setdefault(d["op"], []).append(d)
for op in sorted(by_op):
lines += ["", f"#### {op}", "", "| case | field | a (reference) | b (candidate) |", "| --- | --- | --- | --- |"]
for d in by_op[op]:
cell = lambda v: "`" + str(v).replace("|", "\\|").replace("`", "'") + "`"
lines.append(f"| {d['case']} | {d['field']} | {cell(d['a'])} | {cell(d['b'])} |")
if failures:
lines += ["", "### Observation check failed", ""] + [f"- {f}" for f in failures]
open(summary, "a").write("\n".join(lines) + "\n")
print("\n".join(lines))
for f in failures:
print(f"::error::{f}")
sys.exit(1 if failures else 0)
PY
- name: Upload differential reports
if: always()
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: reference-differential-report
overwrite: true
path: |
target/dual-stack/*.json
${{ runner.temp }}/differential-test.log
if-no-files-found: warn
retention-days: 14
- name: Fail when the differential found differences
if: steps.differential.outcome == 'failure'
run: |
echo "::error::the dual-stack differential failed; see the job summary for every (op, field, a, b)"
exit 1
compare:
name: Compare targets
needs: [ plan, s3tests ]
if: always() && needs.plan.result == 'success'
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Download target reports
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
pattern: reference-parity-report-*
path: parity-download
- name: Compare per node id
env:
TARGETS: ${{ needs.plan.outputs.targets }}
S3TESTS_RESULT: ${{ needs.s3tests.result }}
run: |
set -uo pipefail
mkdir -p parity
for dir in parity-download/reference-parity-report-*; do
if [[ -d "$dir" ]]; then mv "$dir" "parity/${dir#parity-download/reference-parity-report-}"; fi
done
python3 scripts/s3-tests/reference_parity.py compare \
--targets-json "$TARGETS" \
--reports parity \
--tolerated .config/reference-parity-tolerated.txt \
--markdown "$GITHUB_STEP_SUMMARY" \
--json parity/diff.json > parity/diff.md
status=$?
cat parity/diff.md
if [[ "$S3TESTS_RESULT" != "success" ]]; then
echo "::error::s3-tests target jobs finished with '$S3TESTS_RESULT'"
status=1
fi
exit "$status"
- name: Upload parity diff
if: always()
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: reference-parity-diff
overwrite: true
path: |
parity/diff.md
parity/diff.json
if-no-files-found: warn
retention-days: 14
+133
View File
@@ -0,0 +1,133 @@
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Release candidate (Linux)
on:
workflow_dispatch:
inputs:
version:
description: Final product version (no preview suffix)
type: string
required: true
source_sha:
description: Full reviewed source commit
type: string
required: true
permissions:
contents: read
actions: read
concurrency:
group: release-candidate-${{ inputs.version }}
cancel-in-progress: false
jobs:
freeze:
if: github.repository == 'rustfs/rustfs' && github.ref == 'refs/heads/main'
runs-on: ubuntu-latest
timeout-minutes: 15
outputs:
manifest: ${{ steps.freeze.outputs.manifest }}
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
fetch-depth: 0
persist-credentials: false
- name: Freeze or recover original inputs
id: freeze
env:
GH_TOKEN: ${{ github.token }}
VERSION: ${{ inputs.version }}
SOURCE_SHA: ${{ inputs.source_sha }}
run: python3 scripts/release/pipeline.py prepare --version "$VERSION" --source "$SOURCE_SHA" --directory frozen
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
if: steps.freeze.outputs.reused != 'true'
with:
name: release-inputs
path: frozen/inputs.json
if-no-files-found: error
retention-days: 30
linux:
needs: freeze
uses: ./.github/workflows/build.yml
with:
candidate_manifest: ${{ needs.freeze.outputs.manifest }}
platforms: linux
upgrade:
needs: [freeze, linux]
runs-on: ubuntu-latest
timeout-minutes: 150
env:
RUSTUP_TOOLCHAIN: ${{ fromJson(needs.freeze.outputs.manifest).toolchain }}
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: ${{ fromJson(needs.freeze.outputs.manifest).workflow_sha }}
persist-credentials: false
- uses: ./.github/actions/setup
with:
rust-version: ${{ fromJson(needs.freeze.outputs.manifest).toolchain }}
cache-shared-key: release-upgrade-harness-hosted
cache-save-if: ${{ github.ref == 'refs/heads/main' }}
install-build-packaging-tools: "false"
install-test-tools: "false"
- name: Verify archived server against previous releases
env:
GH_TOKEN: ${{ github.token }}
CANDIDATE_MANIFEST: ${{ needs.freeze.outputs.manifest }}
run: |
python3 - <<'PYVERIFY'
import sys
from pathlib import Path
sys.path.insert(0, 'scripts/release')
import candidate as c, pipeline, verify
inputs = pipeline.manifest_env()
run = pipeline.current_run('release-candidate.yml')
if any(a['name'] == 'release-upgrade' for a in c.artifact_list(run['id'])):
c.download_artifact(run, 'release-upgrade', 'receipts')
pipeline.verify_evidence(inputs, Path('receipts'), {run['id']: run})
c.emit_output('reused', 'true')
else:
target = 'linux-x86_64-gnu'
c.download_artifact(run, f"candidate-{inputs['candidate_id']}-{target}", 'binary')
verify.upgrade(inputs, Path('binary') / f"rustfs-{target}-v{inputs['version']}.zip", Path('receipts'))
PYVERIFY
id: verify
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
if: steps.verify.outputs.reused != 'true'
with:
name: release-upgrade
path: receipts/*
if-no-files-found: error
retention-days: 30
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
if: failure()
with:
name: release-upgrade-failure-${{ github.run_attempt }}
path: receipts/*
retention-days: 7
seal-linux:
needs: [freeze, linux, upgrade]
runs-on: ubuntu-latest
timeout-minutes: 30
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Collect trusted receipts and seal Linux bytes
id: seal
env:
GH_TOKEN: ${{ github.token }}
run: |
python3 scripts/release/pipeline.py linux-seal --directory sealed
{
echo '## Linux acceptance'
echo 'Use this run ID and manifest SHA-256 when starting Release candidate (complete).'
sha256sum sealed/linux-manifest.json
echo 'Record cluster, performance, integrity and upgrade acceptance in backlog before continuing.'
} >> "$GITHUB_STEP_SUMMARY"
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
if: steps.seal.outputs.reused != 'true'
with:
name: release-linux
path: sealed/*
if-no-files-found: error
compression-level: 0
retention-days: 30
+97
View File
@@ -0,0 +1,97 @@
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Release candidate (complete)
on:
workflow_dispatch:
inputs:
candidate_run_id:
description: Successful Linux candidate run ID
type: string
required: true
linux_manifest_sha256:
description: Exact accepted Linux manifest SHA-256
type: string
required: true
acceptance_report:
description: Backlog report accepting cluster, performance, integrity and upgrade results
type: string
required: true
permissions:
contents: read
actions: read
concurrency:
group: release-complete-${{ inputs.candidate_run_id }}
cancel-in-progress: false
jobs:
acceptance:
if: github.repository == 'rustfs/rustfs' && github.ref == 'refs/heads/main'
runs-on: ubuntu-latest
timeout-minutes: 30
environment: release-linux-acceptance
outputs:
manifest: ${{ steps.accept.outputs.manifest }}
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
fetch-depth: 0
persist-credentials: false
- name: Bind acceptance to the exact Linux manifest
id: accept
env:
GH_TOKEN: ${{ github.token }}
CANDIDATE_RUN: ${{ inputs.candidate_run_id }}
MANIFEST_SHA: ${{ inputs.linux_manifest_sha256 }}
REPORT: ${{ inputs.acceptance_report }}
run: python3 scripts/release/pipeline.py complete-prepare --run-id "$CANDIDATE_RUN" --digest "$MANIFEST_SHA" --report "$REPORT" --directory linux
desktop:
needs: acceptance
uses: ./.github/workflows/build.yml
with:
candidate_manifest: ${{ needs.acceptance.outputs.manifest }}
platforms: desktop
packages:
needs: acceptance
uses: ./.github/workflows/package.yml
with:
candidate_manifest: ${{ needs.acceptance.outputs.manifest }}
images:
needs: acceptance
uses: ./.github/workflows/docker.yml
with:
candidate_manifest: ${{ needs.acceptance.outputs.manifest }}
chart:
needs: acceptance
uses: ./.github/workflows/helm-package.yml
with:
candidate_manifest: ${{ needs.acceptance.outputs.manifest }}
seal:
needs: [acceptance, desktop, packages, images, chart]
runs-on: ubuntu-latest
timeout-minutes: 45
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
fetch-depth: 0
persist-credentials: false
- name: Verify every deliverable and seal the candidate
id: seal
env:
GH_TOKEN: ${{ github.token }}
CANDIDATE_RUN: ${{ inputs.candidate_run_id }}
MANIFEST_SHA: ${{ inputs.linux_manifest_sha256 }}
REPORT: ${{ inputs.acceptance_report }}
run: |
python3 scripts/release/pipeline.py complete-seal --run-id "$CANDIDATE_RUN" --digest "$MANIFEST_SHA" --report "$REPORT" --directory sealed
{
echo '## Final publication approval'
echo 'Review this manifest, then explicitly dispatch Publish accepted release with its SHA-256.'
sha256sum sealed/release-manifest.json
} >> "$GITHUB_STEP_SUMMARY"
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
if: steps.seal.outputs.reused != 'true'
with:
name: release-seal
path: sealed/*
if-no-files-found: error
compression-level: 0
retention-days: 30
+193
View File
@@ -0,0 +1,193 @@
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Publish accepted release
on:
workflow_dispatch:
inputs:
complete_run_id:
description: Successful completed candidate run ID
type: string
required: true
manifest_sha256:
description: Exact approved final manifest SHA-256 (authorizes publication)
type: string
required: true
permissions:
contents: read
actions: read
concurrency:
group: release-publish-${{ inputs.complete_run_id }}
cancel-in-progress: false
jobs:
verify:
if: github.repository == 'rustfs/rustfs' && github.ref == 'refs/heads/main'
runs-on: ubuntu-latest
timeout-minutes: 45
outputs:
version: ${{ steps.verify.outputs.version }}
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
fetch-depth: 0
persist-credentials: false
- name: Recheck approved bytes and trusted certification
id: verify
env:
GH_TOKEN: ${{ github.token }}
COMPLETE_RUN: ${{ inputs.complete_run_id }}
MANIFEST_SHA: ${{ inputs.manifest_sha256 }}
run: python3 scripts/release/publish.py verify --run-id "$COMPLETE_RUN" --digest "$MANIFEST_SHA" --directory sealed
version:
needs: verify
runs-on: ubuntu-latest
timeout-minutes: 90
concurrency:
group: release-version-${{ needs.verify.outputs.version }}
cancel-in-progress: false
environment: release-publication
permissions:
contents: write
actions: read
packages: write
security-events: write
env:
GH_TOKEN: ${{ github.token }}
COMPLETE_RUN: ${{ inputs.complete_run_id }}
MANIFEST_SHA: ${{ inputs.manifest_sha256 }}
AWS_ACCESS_KEY_ID: ${{ secrets.R2_ACCESS_KEY_ID }}
AWS_SECRET_ACCESS_KEY: ${{ secrets.R2_SECRET_ACCESS_KEY }}
AWS_DEFAULT_REGION: auto
AWS_REQUEST_CHECKSUM_CALCULATION: when_required
AWS_RESPONSE_CHECKSUM_VALIDATION: when_required
AWS_EC2_METADATA_DISABLED: "true"
R2_ENDPOINT: ${{ secrets.R2_ENDPOINT }}
R2_BUCKET: ${{ secrets.R2_BUCKET }}
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
fetch-depth: 0
persist-credentials: false
- name: Install promotion tools
run: |
sudo apt-get update
sudo apt-get install -y skopeo
aws --version
- uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
username: rustfs
password: ${{ secrets.DOCKERHUB_TOKEN }}
- uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
registry: ghcr.io
username: ${{ secrets.GHCR_USERNAME }}
password: ${{ secrets.GHCR_PASSWORD }}
- uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
registry: quay.io
username: ${{ secrets.QUAY_USERNAME }}
password: ${{ secrets.QUAY_PASSWORD }}
- name: Share registry credentials with the OCI copier
run: |
install -m 600 "$HOME/.docker/config.json" "$RUNNER_TEMP/registry-auth.json"
echo "REGISTRY_AUTH_FILE=$RUNNER_TEMP/registry-auth.json" >> "$GITHUB_ENV"
- name: Promote verified version
run: python3 scripts/release/publish.py version --run-id "$COMPLETE_RUN" --digest "$MANIFEST_SHA" --directory sealed
- name: Publish accepted musl amd64 scan
uses: github/codeql-action/upload-sarif@99df26d4f13ea111d4ec1a7dddef6063f76b97e9 # v4
with:
sarif_file: sealed/scan-musl-amd64.sarif
category: container-image-musl-amd64
- name: Publish accepted musl arm64 scan
uses: github/codeql-action/upload-sarif@99df26d4f13ea111d4ec1a7dddef6063f76b97e9 # v4
with:
sarif_file: sealed/scan-musl-arm64.sarif
category: container-image-musl-arm64
- name: Publish accepted GNU amd64 scan
uses: github/codeql-action/upload-sarif@99df26d4f13ea111d4ec1a7dddef6063f76b97e9 # v4
with:
sarif_file: sealed/scan-gnu-amd64.sarif
category: container-image-gnu-amd64
- name: Publish accepted GNU arm64 scan
uses: github/codeql-action/upload-sarif@99df26d4f13ea111d4ec1a7dddef6063f76b97e9 # v4
with:
sarif_file: sealed/scan-gnu-arm64.sarif
category: container-image-gnu-arm64
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: release-version-receipt-${{ github.run_attempt }}
path: publication.json
if-no-files-found: error
retention-days: 90
channels:
needs: [verify, version]
runs-on: ubuntu-latest
timeout-minutes: 90
concurrency:
group: rustfs-release-channels
cancel-in-progress: false
permissions:
contents: write
actions: read
packages: write
env:
GH_TOKEN: ${{ github.token }}
COMPLETE_RUN: ${{ inputs.complete_run_id }}
MANIFEST_SHA: ${{ inputs.manifest_sha256 }}
AWS_ACCESS_KEY_ID: ${{ secrets.R2_ACCESS_KEY_ID }}
AWS_SECRET_ACCESS_KEY: ${{ secrets.R2_SECRET_ACCESS_KEY }}
AWS_DEFAULT_REGION: auto
AWS_REQUEST_CHECKSUM_CALCULATION: when_required
AWS_RESPONSE_CHECKSUM_VALIDATION: when_required
AWS_EC2_METADATA_DISABLED: "true"
R2_ENDPOINT: ${{ secrets.R2_ENDPOINT }}
R2_BUCKET: ${{ secrets.R2_BUCKET }}
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
fetch-depth: 0
persist-credentials: false
- name: Install promotion tools
run: |
sudo apt-get update
sudo apt-get install -y skopeo
aws --version
- uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
username: rustfs
password: ${{ secrets.DOCKERHUB_TOKEN }}
- uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
registry: ghcr.io
username: ${{ secrets.GHCR_USERNAME }}
password: ${{ secrets.GHCR_PASSWORD }}
- uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
registry: quay.io
username: ${{ secrets.QUAY_USERNAME }}
password: ${{ secrets.QUAY_PASSWORD }}
- name: Share registry credentials with the OCI copier
run: |
install -m 600 "$HOME/.docker/config.json" "$RUNNER_TEMP/registry-auth.json"
echo "REGISTRY_AUTH_FILE=$RUNNER_TEMP/registry-auth.json" >> "$GITHUB_ENV"
- uses: azure/setup-helm@b9e51907a09c216f16ebe8536097933489208112 # v4.3.0
- name: Install pinned OSS client
run: |
curl --fail --location --retry 3 --output "$RUNNER_TEMP/ossutil.zip" https://gosspublic.alicdn.com/ossutil/v2/2.1.1/ossutil-2.1.1-linux-amd64.zip
printf '%s %s\n' 60f3a808cbbdfd4b5269b8f967c6a66f564c9dacff52d93a5d21a588976ab5a2 "$RUNNER_TEMP/ossutil.zip" | sha256sum --check -
unzip -q "$RUNNER_TEMP/ossutil.zip" -d "$RUNNER_TEMP/ossutil-extract"
install -m 755 "$RUNNER_TEMP/ossutil-extract/ossutil-2.1.1-linux-amd64/ossutil" "$RUNNER_TEMP/ossutil"
echo "OSSUTIL_BIN=$RUNNER_TEMP/ossutil" >> "$GITHUB_ENV"
- name: Promote verified channels
env:
HELM_TOKEN: ${{ secrets.RUSTFS_HELM_PACKAGE }}
OSS_ACCESS_KEY_ID: ${{ secrets.ALICLOUDOSS_KEY_ID }}
OSS_ACCESS_KEY_SECRET: ${{ secrets.ALICLOUDOSS_KEY_SECRET }}
OSS_REGION: cn-beijing
OSS_ENDPOINT: https://oss-cn-beijing.aliyuncs.com
run: python3 scripts/release/publish.py channels --run-id "$COMPLETE_RUN" --digest "$MANIFEST_SHA" --directory sealed
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: release-channels-receipt-${{ github.run_attempt }}
path: publication.json
if-no-files-found: error
retention-days: 90
@@ -26,7 +26,13 @@ permissions:
jobs:
alert-on-incomplete-run:
name: Alert on incomplete scheduled run
if: github.repository == 'rustfs/rustfs'
# The registry still owns responsibility and cadence selection. Successful
# and PR runs can never produce an incomplete scheduled-run alert.
if: >-
github.repository == 'rustfs/rustfs' &&
github.event.workflow_run.conclusion != 'success' &&
(github.event.workflow_run.event == 'schedule' ||
github.event.workflow_run.event == 'workflow_run')
# Stay on GitHub-hosted runners: this monitor must keep running when the
# self-hosted sm-standard-* pool is down, which is exactly when the
# scheduled validations it watches stall.
+26
View File
@@ -107,6 +107,32 @@ jobs:
shell: pwsh
run: cargo test -p rustfs-ecstore --lib multipart_owned_record_parent_barriers_ -- --nocapture
# Native multipart completion publishes its payload from a different
# parent than its metadata, and abort renames under a precondition; both
# need their own Windows handle discipline.
- name: Test native multipart complete and abort publication
shell: pwsh
run: >-
cargo test -p rustfs-ecstore --lib --
native_abort_missing_state_with_actual_owned_records_never_becomes_legacy_or_missing
native_abort_pending_intent_is_not_a_delete_certificate_and_raw_cleanup_preserves_exact_evidence
--nocapture
# Owned-undo reclaim removes a directory it pinned, copy heal persists
# fault bytes through a handle, and metadata reads meet a directory.
- name: Test native multipart reclaim, copy heal, and directory reads
shell: pwsh
run: >-
cargo test -p rustfs-ecstore --lib --
native_multipart_owned_undo
native_multipart_copy_heal
orphan_multipart_cleanup_rejects_metadata_directory_on_one_disk
--nocapture
- name: Test directory removal fallback
shell: pwsh
run: "cargo test -p rustfs-ecstore --lib disk::fs::tests::test_remove -- --nocapture"
- name: Test Windows path conversion
shell: pwsh
run: "cargo test -p rustfs-utils --no-default-features --features path --lib dunce:: -- --nocapture"
+1 -1
View File
@@ -155,7 +155,7 @@ default build (lifecycle:
- ⚠️ PARTIALLY VIOLATED: serving-side `s3s` references remain in ecstore
(bucket metadata/replication/lifecycle DTOs and error mapping). The
count is ratcheted shrink-only by `scripts/check_s3s_footprint.sh`
(`S3S_ECSTORE_FILES_BASELINE`; the `object_lock` module was converted to
(the `ecstore_files` line of `.config/s3s-footprint-baseline.txt`; the `object_lock` module was converted to
storage-level types as the first ratchet step). Target state: the
baseline reaches zero and ecstore's `Cargo.toml` drops `s3s`.
+13
View File
@@ -7,6 +7,10 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
## [Unreleased]
### Notifications and audit
- Notify and audit targets that keep the default `queue_dir` now work on native Windows: the defaults `/opt/rustfs/events` and `/opt/rustfs/audit` resolve per node, to `%ProgramData%\RustFS\events` and `%ProgramData%\RustFS\audit` on Windows, instead of failing validation as non-absolute paths. The new `RUSTFS_TARGET_STORE_DIR` (Helm `config.rustfs.target_store_dir`) relocates both default queues on any platform. Linux and macOS behavior is unchanged when it is unset, persisted configuration is unchanged, and pending entries are not migrated when the root changes. See `docs/operations/target-queue-storage.md`.
### Deployment
- Existing volumes created by older root-running container images must be writable by the non-root runtime identity before upgrading. The default container UID/GID is `10001:10001`; stop the affected instances, verify host mount paths, and for ordinary bind mounts run `sudo chown -R 10001:10001 /actual/data /actual/logs` on each RustFS data/log mount. Account for ACLs, NFS, Kubernetes, and rootless UID mappings. Image-build ownership changes do not migrate mounted data. See the Docker Quick Start in [README.md](README.md).
@@ -14,10 +18,13 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
### Security
- **Key-scoped KMS policy statements now hold for every spelling of an AWS key**: a statement such as `Deny kms:Decrypt` on `arn:aws:kms:::key/<key-id>` was matched against the key identifier exactly as the request spelled it, so naming the same key by its AWS ARN (`arn:aws:kms:<region>:<account>:key/<key-id>`) was evaluated as a different key and the `Deny` did not apply. With `RUSTFS_KMS_ENFORCE_SSE_KEY_POLICY=true` and the AWS KMS backend, an identity allowed on all keys but denied one could still write under that key, and read objects stored under its ARN spelling; the per-key admin endpoints were affected the same way. A key ARN is now evaluated as its key id, on the SSE-KMS data path and the admin endpoints alike. A request that names a key by alias, which only the backend can resolve, now fails closed against key-scoped statements: every key-scoped `Deny` applies and only an `Allow` on every key covers it. The KMS deletion impact report recognizes the default key and bucket default-encryption references across the id and ARN spellings as well. Deployments without key-scoped KMS statements, and the other KMS backends, whose key ids have a single spelling, are unaffected.
- **Header-signed SigV4 requests honour only signed headers** (GHSA-xm99-m3gq-83g8): a request authenticated with a SigV4 `Authorization` header that carries an `x-amz-*` request header not listed in its `SignedHeaders` is now rejected with `403 AccessDenied` ("There were headers present in the request which were not signed"), matching AWS S3 and the presigned rule from GHSA-g8w9-qw9q-fghr. Previously anyone holding one header-signed `PutObject` request could add an unsigned `x-amz-copy-source` and turn it into a `CopyObject` that ran with the signer's permissions, copying any object the signer could read into the target. An `Authorization` header whose algorithm token is not `AWS4-HMAC-SHA256` is now rejected instead of being verified as SigV4. The request-envelope headers `x-amz-content-sha256`, `x-amz-decoded-content-length`, `x-amz-trailer` and `x-amz-checksum-algorithm` (the same set the upstream `s3s` fix exempts) and `x-amz-cf-id` (CloudFront) remain tolerated unsigned; AWS SDKs and RustFS's own signers already sign every other `x-amz-*` header. SigV2, JWT and anonymous requests are unchanged.
### Replication
- Site replication now replicates SSE-KMS objects when the receiving site runs with `RUSTFS_KMS_ENFORCE_SSE_KEY_POLICY=true`. The receiving site authorizes each replica write against the KMS key it resolves to, and the managed `site-replicator-0` account held no `kms` grant, so every SSE-KMS object stayed `FAILED` with `AccessDenied` while SSE-S3 and SSE-C objects replicated. The account's embedded policy now grants `kms:GenerateDataKey` on every key; existing accounts are refreshed by the reconcile tick and the failed objects catch up afterwards. It is deliberately not granted `kms:Decrypt`, so reads proxied to a peer for an SSE-KMS object are still refused under enforcement. Bucket replication through a remote target needs the same grant on the identity whose credentials the target uses. Sites that do not enable enforcement are unaffected.
- Object Lock replication PUTs now carry a required integrity header, fixing target rejection introduced by the plain-payload default ([#7097](https://github.com/rustfs/rustfs/pull/7097)). This changes the default outbound request for locked objects but adds no persisted format.
- Multipart source objects stay on the multipart transport even when their checksum record is a whole-object checksum, so objects above the single-PUT limit remain replicable ([#7047](https://github.com/rustfs/rustfs/pull/7047)).
- Targets that mint their own version IDs now use a per-target version ledger for tag, retention, legal-hold, and permanent-delete mutations; ambiguous pre-ledger matches fail with backoff instead of guessing ([#7368](https://github.com/rustfs/rustfs/pull/7368)). This adds dual-prefixed internal metadata keys that older readers ignore.
@@ -26,12 +33,18 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
- IAM snapshot/deletion replay, target-assigned delete-marker purges, timestamp ordering, and best-effort peer broadcast now close the control-plane gaps found by the R6 review ([#7195](https://github.com/rustfs/rustfs/pull/7195)).
- A `set-remote-target?update=true&creds=true` request on a site-replication peer's bucket target is now rejected with `400 InvalidRequest`, naming the target and why it counts as peer-owned. It used to return success while keeping the stored endpoint, credentials, and TLS settings, so an endpoint edit from the Console's bucket replication form appeared to apply but did not. Change a peer's address with a site-replication edit instead; see "Changing a site's address" in `docs/operations/site-replication-operations.md`. The `sync`, `bandwidth`, `proxy`, and `path` update groups are unchanged.
- Site-replication edits that omit the site name, such as `mc admin replicate update --deployment-id <ID> --endpoint <URL>`, now keep the stored name on the editing site and on every receiver instead of renaming the site after the new endpoint host. No persisted format changes.
- The persisted replication MRF journal is now replayed every 5 minutes while the server runs, not only at startup. Delete-marker purges whose targets were unreachable, and replications that overflowed the worker queues, now converge within one replay interval after the target returns instead of waiting for a restart. A target that stays down is re-attempted once per retained entry per interval across the cluster: the start time of the last pass is shared through a small `config/replication/mrf.bin.replay` object, so nodes do not each replay once per interval. Older versions ignore that object; existing persisted formats are unchanged.
- Upgrade and rollback: upgrade every node in one site consecutively and verify reconciliation before moving to the next site; do not intentionally run a site mixed-version. Target-version ledger keys are harmless on rollback, although old code cannot use their routing. Before rolling back past [#7307](https://github.com/rustfs/rustfs/pull/7307), drain or repair every pending version purge: older code can free a retained version's data directory before its remote purge is acknowledged. See `docs/operations/site-replication-operations.md`.
### Security
- **Presigned URLs honour only signed headers** (GHSA-g8w9-qw9q-fghr): a SigV4 presigned request that carries an `x-amz-*` request header not listed in `X-Amz-SignedHeaders` is now rejected with `403 AccessDenied` ("There were headers present in the request which were not signed"), matching AWS S3. Previously the holder of a presigned `PutObject` URL could add unsigned `x-amz-tagging`, `x-amz-storage-class`, `x-amz-website-redirect-location`, ACL, metadata, Object Lock or SSE headers and have them applied. Presigners that intend a property must set it before signing so the SDK lists the header in `SignedHeaders`; `x-amz-cf-id` (CloudFront) remains tolerated unsigned. Header-signed SigV4 and SigV2 requests are unchanged.
### Fixed
- **KMS keys could not be described by ARN through the path route**: `GET /rustfs/admin/v3/kms/keys/{key_id}` read the path segment verbatim, so a key id that has to be percent-encoded to fit in one segment — an AWS key ARN, with its `:` and `/` — was looked up, authorized and audited under its encoded spelling and answered `404`. The segment is now percent-decoded first; a segment that is not valid UTF-8 after decoding is refused with `400 InvalidArgument`. The `describe-key?keyId=` form was unaffected.
- **SSE-KMS objects written through the AWS KMS backend could not be read**: `GetObject`, `CopyObject` and every other read of an `aws:kms` object failed with `400 InvalidRequest` ("SSE-S3 requires RUSTFS_SSE_S3_MASTER_KEY to be set ...") on a deployment using `RUSTFS_KMS_BACKEND=aws`, although the write and `HeadObject` succeeded. The AWS backend stored the `GenerateDataKey` blob as it came from AWS, the read path took those unrecognized bytes for a locally wrapped key, and AWS was never asked to decrypt. The backend now stores the blob inside the same data-key envelope the other backends use, and a blob stored without one is routed to AWS when the AWS backend is active. Objects written by 1.0.4 and 1.0.5 are intact and become readable after the upgrade, with no rewrite. Setting `RUSTFS_SSE_S3_MASTER_KEY` was never a workaround. An object written by this release is not readable by an older one; the same was already true of every object the older release wrote itself.
- **Immediate KMS key deletion no longer reports success without destroying the key** (behavior change): with `RUSTFS_KMS_ALLOW_IMMEDIATE_DELETION=true`, a `DELETE /rustfs/admin/v3/kms/keys/delete` request with `force_immediate` against an `Enabled` or `Disabled` key on the Vault KV2 or Vault Transit backend returned success but only moved the key to `PendingDeletion`; the key material stayed in Vault and objects encrypted under it remained readable, while the Local backend destroyed the key in that one request. Key destruction is now the same two explicit steps on every backend: schedule the deletion, then either let the waiting window elapse or send `force_immediate` to destroy the pending key early. `force_immediate` against a key that is not `PendingDeletion` is refused with `400` and changes nothing, so a success response always means the key is gone and no single request can destroy a key in use. Automation that destroyed Local keys with one `force_immediate` request must schedule the deletion first. On Vault Transit, a read under a key that no longer exists in Vault now fails with `KMS.NotFoundException` instead of `503 ServiceUnavailable`. No persisted format changes. See `docs/operations/kms-key-destruction.md`.
- **`mc admin info` and `mc admin replicate resync` work again**: since the cluster snapshot view (#3803), `GET /v3/info` and `GET /v3/storageinfo` returned the madmin `InfoMessage` / `StorageInfo` nested under an `info` key next to `admin_discovery` (and, for `/info`, `bitrotSelftest`). madmin decodes those bodies directly, so `mc admin info` printed empty values and `mc admin replicate resync start/status` rejected every alias with "alias provided is not part of cluster replication" because the local `deploymentID` read as empty. Requests on the MinIO-compatible `/minio/admin/v3` prefix now receive the bare madmin body again; `/rustfs/admin/v3`, which rc and the console use, keeps the envelope unchanged.
- **Replication status writebacks no longer invalidate scanner cycles**: every replication status writeback (`persist_replication_state_if_current` in `Update` mode, including the heals the scanner queues during its own walk) marked the bucket dirty on the namespace path, advanced the dirty-usage generation and woke the scanner, so a site-replication resync or any steadily replicated bucket ended every cycle `superseded`, the authoritative usage baseline was never certified, and the console reported usage freshness as stale for as long as replication ran (#8375). Those writebacks are now status class: they do not touch the dirty-usage generation, the activity snapshot, the dirty-usage wake or the durable dirty journal, and only the process-local producer coverage is recorded. They need no rescan queue, because a deployment with an active replication rule already walks every bucket on every cycle and that walk refreshes `replication_stats`. Tier-expiration cleanup, which removes data, stays on the namespace path. No persisted format, protocol, admin API or configuration changes. Design: `docs/architecture/scanner-per-bucket-convergence.md`.
- **A bucket written during a scanner walk no longer supersedes the whole cycle**: the post-walk cluster activity proof required the entire activity snapshot and the dirty-usage generation to be unchanged, so a single-node deployment with one bucket written every few seconds never reached a `Complete` cycle, `usage_snapshot_converged` never became true and the authoritative usage baseline was never certified (#8494). Dirty usage is now certified per bucket: a structurally complete walk that the guardrail did not veto is `Complete`, buckets whose dirty generation still matches the start snapshot are cleared, and buckets written during the walk stay dirty and are published as the pending set, so `usage_snapshot_converged` means "no bucket pending" and the next cycle is scoped to the pending buckets. Such a cycle writes the authoritative usage object; the observed object is now selected by an explicit observational mark that vetoed cycles carry. The guardrail itself vetoes only on the fields that change which namespace the walk described (peer set, process instance, protocol version, topology, maintenance generation, data movement, movement generation, publication blocked) and reports the field and host in the scanner log and in the new `usage_freshness` fields `guardrail_veto_total`, `last_guardrail_veto_unix_secs` and `last_guardrail_veto_reason`. In a distributed deployment a remote peer whose dirty usage moved during the walk still supersedes the cycle until scoped acknowledgements can name its buckets. `.usage.v2.json` gains the additive, default-when-absent fields `usage_snapshot_pending_buckets`, `usage_snapshot_pending_bucket_count` and `usage_snapshot_observational`; older readers ignore them and treat the snapshot as an authoritative but unconverged publication. Quota is unchanged: an uncertified bucket keeps its last usage value as the floor and live writes do not advance it. No protocol or configuration changes. Design: `docs/architecture/scanner-per-bucket-convergence.md`.
Generated
+582 -251
View File
File diff suppressed because it is too large Load Diff
+87 -64
View File
@@ -26,6 +26,7 @@ members = [
"crates/ecstore", # Erasure coding storage implementation
"crates/e2e_test", # End-to-end test suite
"crates/filemeta", # File metadata management
"crates/gateway-adapter", # RustFS implementations of the gateway extension traits
"crates/heal", # Erasure set and object healing
"crates/heal-contracts", # Heal request/response channel contracts
"crates/iam", # Identity and Access Management
@@ -48,7 +49,7 @@ members = [
"crates/replication", # Replication contracts and wire formats
"crates/concurrency", # Concurrency management for RustFS - timeout, locking, backpressure, and I/O scheduling
"crates/s3-client", # S3 client for engine-side consumption of remote S3 endpoints (tiering, transition targets)
"crates/s3-types", # S3 event type definitions
"crates/s3-types", # S3 event and error type definitions
"crates/s3-ops", # S3 operation definitions and mapping
"crates/s3select-api", # S3 Select API interface
"crates/s3select-query", # S3 Select query engine
@@ -75,7 +76,7 @@ edition = "2024"
license = "Apache-2.0"
repository = "https://github.com/rustfs/rustfs"
rust-version = "1.99.0"
version = "1.0.2"
version = "1.0.5"
homepage = "https://rustfs.com"
description = "RustFS is a high-performance distributed object storage software built using Rust, one of the most popular languages worldwide. "
keywords = ["RustFS", "Minio", "object-storage", "filesystem", "s3"]
@@ -92,64 +93,78 @@ redundant_clone = "warn"
[workspace.dependencies]
# RustFS Internal Crates
rustfs = { path = "./rustfs", version = "1.0.2" }
rustfs-heal = { path = "crates/heal", version = "1.0.2" }
rustfs-heal-contracts = { path = "crates/heal-contracts", version = "1.0.2" }
rustfs-scanner-metrics = { path = "crates/scanner-metrics", version = "1.0.2" }
rustfs-audit = { path = "crates/audit", version = "1.0.2" }
rustfs-checksums = { path = "crates/checksums", version = "1.0.2" }
rustfs-common = { path = "crates/common", version = "1.0.2" }
rustfs-data-usage = { path = "crates/data-usage", version = "1.0.2" }
rustfs-config = { path = "./crates/config", version = "1.0.2" }
rustfs-concurrency = { path = "./crates/concurrency", version = "1.0.2" }
rustfs-credentials = { path = "crates/credentials", version = "1.0.2" }
rustfs-crypto = { path = "crates/crypto", version = "1.0.2" }
rustfs-ecstore = { path = "crates/ecstore", version = "1.0.2" }
rustfs-filemeta = { path = "crates/filemeta", version = "1.0.2" }
rustfs-iam = { path = "crates/iam", version = "1.0.2" }
rustfs-keystone = { path = "crates/keystone", version = "1.0.2" }
rustfs-license = { path = "crates/license", version = "1.0.2" }
rustfs-lifecycle = { path = "crates/lifecycle", version = "1.0.2" }
rustfs-kms = { path = "crates/kms", version = "1.0.2" }
rustfs-lock = { path = "crates/lock", version = "1.0.2" }
rustfs-madmin = { path = "crates/madmin", version = "1.0.2" }
rustfs-notify = { path = "crates/notify", version = "1.0.2" }
rustfs-io-metrics = { path = "crates/io-metrics", version = "1.0.2" }
rustfs-io-core = { path = "crates/io-core", version = "1.0.2" }
rustfs-object-capacity = { path = "crates/object-capacity", version = "1.0.2" }
rustfs-object-data-cache = { path = "crates/object-data-cache", version = "1.0.2", default-features = false }
rustfs-log-analyzer = { path = "crates/log-analyzer", version = "1.0.2" }
rustfs-obs = { path = "crates/obs", version = "1.0.2" }
rustfs-policy = { path = "crates/policy", version = "1.0.2" }
rustfs-protos = { path = "crates/protos", version = "1.0.2" }
rustfs-protocols = { path = "crates/protocols", version = "1.0.2" }
rustfs-replication = { path = "crates/replication", version = "1.0.2" }
rustfs-rio = { path = "crates/rio", version = "1.0.2" }
rustfs-rio-v2 = { path = "crates/rio-v2", version = "1.0.2" }
rustfs-s3-client = { path = "crates/s3-client", version = "1.0.2" }
rustfs-s3-types = { path = "crates/s3-types", version = "1.0.2" }
rustfs-s3-ops = { path = "crates/s3-ops", version = "1.0.2" }
rustfs-s3select-api = { path = "crates/s3select-api", version = "1.0.2" }
rustfs-s3select-query = { path = "crates/s3select-query", version = "1.0.2" }
rustfs-scanner = { path = "crates/scanner", version = "1.0.2" }
rustfs-security-governance = { path = "crates/security-governance", version = "1.0.2" }
rustfs-extension-schema = { path = "crates/extension-schema", version = "1.0.2" }
rustfs-signer = { path = "crates/signer", version = "1.0.2" }
rustfs-storage-api = { path = "crates/storage-api", version = "1.0.2" }
rustfs-trusted-proxies = { path = "crates/trusted-proxies", version = "1.0.2" }
rustfs-targets = { path = "crates/targets", version = "1.0.2" }
rustfs-test-utils = { path = "crates/test-utils", version = "1.0.2" }
rustfs-tls-runtime = { path = "crates/tls-runtime", version = "1.0.2" }
rustfs-utils = { path = "crates/utils", version = "1.0.2" }
rustfs-zip = { path = "./crates/zip", version = "1.0.2" }
rustfs = { path = "./rustfs", version = "1.0.5" }
rustfs-gateway-adapter = { path = "crates/gateway-adapter", version = "1.0.5" }
rustfs-heal = { path = "crates/heal", version = "1.0.5" }
rustfs-heal-contracts = { path = "crates/heal-contracts", version = "1.0.5" }
rustfs-scanner-metrics = { path = "crates/scanner-metrics", version = "1.0.5" }
rustfs-audit = { path = "crates/audit", version = "1.0.5" }
rustfs-checksums = { path = "crates/checksums", version = "1.0.5" }
rustfs-common = { path = "crates/common", version = "1.0.5" }
rustfs-data-usage = { path = "crates/data-usage", version = "1.0.5" }
rustfs-config = { path = "./crates/config", version = "1.0.5" }
rustfs-concurrency = { path = "./crates/concurrency", version = "1.0.5" }
rustfs-credentials = { path = "crates/credentials", version = "1.0.5" }
rustfs-crypto = { path = "crates/crypto", version = "1.0.5" }
rustfs-ecstore = { path = "crates/ecstore", version = "1.0.5" }
rustfs-filemeta = { path = "crates/filemeta", version = "1.0.5" }
rustfs-iam = { path = "crates/iam", version = "1.0.5" }
rustfs-keystone = { path = "crates/keystone", version = "1.0.5" }
rustfs-license = { path = "crates/license", version = "1.0.5" }
rustfs-lifecycle = { path = "crates/lifecycle", version = "1.0.5" }
rustfs-kms = { path = "crates/kms", version = "1.0.5" }
rustfs-lock = { path = "crates/lock", version = "1.0.5" }
rustfs-madmin = { path = "crates/madmin", version = "1.0.5" }
rustfs-notify = { path = "crates/notify", version = "1.0.5" }
rustfs-io-metrics = { path = "crates/io-metrics", version = "1.0.5" }
rustfs-io-core = { path = "crates/io-core", version = "1.0.5" }
rustfs-object-capacity = { path = "crates/object-capacity", version = "1.0.5" }
rustfs-object-data-cache = { path = "crates/object-data-cache", version = "1.0.5", default-features = false }
rustfs-log-analyzer = { path = "crates/log-analyzer", version = "1.0.5" }
rustfs-obs = { path = "crates/obs", version = "1.0.5" }
rustfs-policy = { path = "crates/policy", version = "1.0.5" }
rustfs-protos = { path = "crates/protos", version = "1.0.5" }
rustfs-protocols = { path = "crates/protocols", version = "1.0.5" }
rustfs-replication = { path = "crates/replication", version = "1.0.5" }
rustfs-rio = { path = "crates/rio", version = "1.0.5" }
rustfs-rio-v2 = { path = "crates/rio-v2", version = "1.0.5" }
rustfs-s3-client = { path = "crates/s3-client", version = "1.0.5" }
rustfs-s3-types = { path = "crates/s3-types", version = "1.0.5" }
rustfs-s3-ops = { path = "crates/s3-ops", version = "1.0.5" }
rustfs-s3select-api = { path = "crates/s3select-api", version = "1.0.5" }
rustfs-s3select-query = { path = "crates/s3select-query", version = "1.0.5" }
rustfs-scanner = { path = "crates/scanner", version = "1.0.5" }
rustfs-security-governance = { path = "crates/security-governance", version = "1.0.5" }
rustfs-extension-schema = { path = "crates/extension-schema", version = "1.0.5" }
rustfs-signer = { path = "crates/signer", version = "1.0.5" }
rustfs-storage-api = { path = "crates/storage-api", version = "1.0.5" }
rustfs-trusted-proxies = { path = "crates/trusted-proxies", version = "1.0.5" }
rustfs-targets = { path = "crates/targets", version = "1.0.5" }
rustfs-test-utils = { path = "crates/test-utils", version = "1.0.5" }
rustfs-tls-runtime = { path = "crates/tls-runtime", version = "1.0.5" }
rustfs-utils = { path = "crates/utils", version = "1.0.5" }
rustfs-zip = { path = "./crates/zip", version = "1.0.5" }
# The gateway's S3 types: the DTOs and persisted bucket-configuration codecs the
# engine crates move onto from s3s (rustfs/backlog#2745). The one pin of the
# gateway in this workspace; no crate may enable a `compat-s3s*` feature except
# the s3s-facing edge of the rustfs binary.
rustfs-gateway-types = { git = "https://github.com/rustfs/gateway.git", rev = "7915d06950f88611d883f6ab3d95efc90c65dec0", version = "0.40.0", default-features = false }
rustfs-gateway-stream = { git = "https://github.com/rustfs/gateway.git", rev = "7915d06950f88611d883f6ab3d95efc90c65dec0", version = "0.2.0", default-features = false }
# The gateway framework itself, consumed for its extension traits by the ring-2
# adapter. `default-features = false` keeps the `server` feature, and with it the
# server crate, out of the build.
rustfs-gateway = { git = "https://github.com/rustfs/gateway.git", rev = "7915d06950f88611d883f6ab3d95efc90c65dec0", version = "0.62.0", default-features = false }
# Test-only: builds the `EffectiveHost` a host-resolution test queries with.
rustfs-gateway-http = { git = "https://github.com/rustfs/gateway.git", rev = "7915d06950f88611d883f6ab3d95efc90c65dec0", default-features = false }
# Async Runtime and Networking
async-channel = "2.5.0"
async_zip = { default-features = false, version = "0.0.19" }
mysql_async = { default-features = false, version = "0.37.1" }
async-compression = { version = "0.4.51" }
async-compression = { version = "0.4.52" }
async-trait = "0.1.92"
async-nats = { version = "0.51.0", default-features = false }
async-nats = { version = "0.52.0", default-features = false }
axum = "0.8.9"
futures = "0.3.34"
futures-core = "0.3.34"
@@ -168,7 +183,7 @@ http-body-util = "0.1.5"
memchr = "2.8.3"
minlz = "1.2.3"
reqwest = "0.13.5"
rustfs-kafka-async = { version = "1.4.0" }
rustfs-kafka-async = { version = "1.4.1" }
socket2 = { version = "0.6.5" }
tokio = { version = "1.54.1" }
tokio-rustls = { default-features = false, version = "0.26.6" }
@@ -191,6 +206,7 @@ quinn = { version = "0.11.12", default-features = false, features = [
# Serialization and Data Formats
apache-avro = { version = "0.22.0", features = ["snappy", "zstandard"] }
bytes = { version = "1.12.1" }
csv-core = "0.1.13"
bytesize = "2.7.0"
byteorder = "1.5.0"
flatbuffers = "25.12.19"
@@ -212,6 +228,7 @@ serde_urlencoded = "0.7.1"
# releases.
aes-gcm = { version = "0.11.1" }
argon2 = { version = "0.6.0" }
aws-lc-rs = { version = "1.19.0", default-features = false }
blake2 = "0.11.0"
chacha20poly1305 = { version = "0.11.0" }
crc-fast = "1.10.0"
@@ -234,7 +251,7 @@ proptest = "1"
# Time and Date
chrono = { version = "0.4.45" }
humantime = "2.4.0"
jiff = { version = "0.2.38" }
jiff = { version = "0.2.39" }
time = { version = "0.3.55" }
# Database
@@ -247,8 +264,8 @@ anyhow = "1.0.104"
arc-swap = "1.9.3"
rustfs-tokio-tar = { version = "0.7.1" }
# Candidate Snowball parser versions exercised by rustfs-zip compatibility fixtures.
tar-codec = "0.0.15"
tar-framing = "0.0.15"
tar-codec = "0.0.16"
tar-framing = "0.0.16"
atoi = "3.1.1"
atomic_enum = "0.3.0"
aws-config = { version = "1.13.0" }
@@ -294,6 +311,7 @@ local-ip-address = "0.6.13"
log = "0.4"
memmap2 = "0.9.12"
lz4 = "1.28.1"
lz4_flex = { version = "=0.14.0", default-features = false, features = ["std", "frame"] }
matchit = "0.9.2"
md-5 = "0.11.0"
mime_guess = "2.0.5"
@@ -326,6 +344,10 @@ rust-embed = { version = "8.13.0" }
rustc-hash = { version = "2.1.3" }
s3s = { git = "https://github.com/s3s-project/s3s", rev = "5761ddfe4c509fcac87e3b99fd5bd9e176b442c0", features = ["minio"] }
s3s-sigv4 = { git = "https://github.com/s3s-project/s3s", rev = "5761ddfe4c509fcac87e3b99fd5bd9e176b442c0" }
# The same s3s pin under the name the legacy edge of the gateway migration uses
# (crates/s3-types, feature `compat-s3s`). Keep `rev` identical to `s3s` above.
# DELETE BY T4.2 (rustfs/backlog#2784).
legacy-s3s = { package = "s3s", git = "https://github.com/s3s-project/s3s", rev = "5761ddfe4c509fcac87e3b99fd5bd9e176b442c0", features = ["minio"] }
serial_test = "4.0.1"
shadow-rs = { default-features = false, version = "2.0.0" }
siphasher = "1.0.4"
@@ -334,10 +356,11 @@ compact_str = "0.10.0"
snap = "1.1.2"
starshard = { version = "2.4.0" }
strum = { version = "0.28.0" }
sync_wrapper = "1.0.2"
sysinfo = "0.40.1"
temp-env = "0.3.6"
tempfile = "3.27.0"
test-case = "3.4.0"
test-case = "3.4.1"
thiserror = "2.0.21"
tracing = { version = "0.1.44" }
tracing-appender = "0.2.5"
@@ -356,13 +379,13 @@ winapi-util = "0.1.11"
windows = { version = "0.62.2" }
windows-sys = "0.61.2"
xxhash-rust = { version = "0.8.19" }
zip = "9.2.1"
zip = "9.3.0"
zstd = "0.14.3"
# Observability and Metrics
metrics = "0.24.6"
metrics-util = "0.20"
dial9 = { version = "0.5.6", default-features = false }
dial9 = { version = "0.5.7", default-features = false }
opentelemetry = { version = "0.33.1" }
opentelemetry-appender-tracing = { version = "0.33.1" }
opentelemetry-otlp = { version = "0.33.1" }
@@ -377,16 +400,16 @@ libunftp = { version = "0.24.0" }
unftp-core = "0.1.0"
suppaftp = { version = "12.2.1" }
rcgen = { version = "0.14.10", default-features = false, features = ["aws_lc_rs", "crypto", "pem"] }
russh = { version = "0.65.0" }
russh = { version = "0.65.1" }
russh-sftp = "3.0.1"
# WebDAV
dav-server = "0.11.0"
# Performance Analysis and Memory Profiling
rustfs-mimalloc = { version = "0.7.2" }
rustfs-mimalloc = { version = "0.7.3" }
# Preserve Unicode focus filters until rustfs/backlog#2302 is resolved.
hotpath = { version = "0.30.3", default-features = false }
hotpath = { version = "0.31.1", default-features = false }
# Snapshot testing for output format regression detection
insta = { version = "1.49" }
+22 -5
View File
@@ -12,10 +12,13 @@
# See the License for the specific language governing permissions and
# limitations under the License.
FROM alpine:3.24.2 AS build
ARG BINARY_SOURCE=download
FROM alpine:3.24.2 AS download
ARG TARGETARCH
ARG RELEASE=latest
ARG RC_RELEASE=latest
RUN apk add --no-cache ca-certificates curl jq unzip
WORKDIR /build
@@ -69,6 +72,17 @@ RUN set -eux; \
chmod +x /build/rustfs; \
rm -rf rustfs.zip /build/.tmp || true
COPY scripts/download_rc.sh /usr/local/bin/download_rc.sh
RUN sh /usr/local/bin/download_rc.sh "$TARGETARCH" musl "$RC_RELEASE" /build/rc
# Candidate packaging supplies the accepted executables from verified archives.
# The default download stage remains available for local image builds.
FROM scratch AS supplied
ARG TARGETARCH
COPY .release-inputs/${TARGETARCH}/ /build/
FROM ${BINARY_SOURCE} AS build
FROM alpine:3.24.2
@@ -95,14 +109,17 @@ RUN apk upgrade --no-cache && \
ca-certificates \
coreutils \
curl \
jq \
tzdata \
&& test "$(TZ=Asia/Kolkata date +%z)" = "+0530"
COPY --from=build /etc/ssl/certs/ca-certificates.crt /etc/ssl/certs/
COPY --from=build /build/rustfs /usr/bin/rustfs
COPY entrypoint.sh /entrypoint.sh
COPY --from=build /build/rc /usr/bin/rc
COPY entrypoint.sh /etc/rustfs/entrypoint.sh
COPY bootstrap/ /etc/rustfs/bootstrap/
RUN chmod +x /usr/bin/rustfs /entrypoint.sh
RUN chmod +x /usr/bin/rustfs /usr/bin/rc /etc/rustfs/entrypoint.sh && \
ln -s /etc/rustfs/entrypoint.sh /entrypoint.sh
RUN addgroup -g 10001 -S rustfs && \
adduser -u 10001 -G rustfs -S rustfs -D && \
@@ -124,6 +141,6 @@ VOLUME ["/data"]
USER rustfs
ENTRYPOINT ["/entrypoint.sh"]
ENTRYPOINT ["/etc/rustfs/entrypoint.sh"]
CMD ["rustfs"]
+13 -4
View File
@@ -12,7 +12,10 @@
# See the License for the specific language governing permissions and
# limitations under the License.
FROM rust:1.97.1-trixie
FROM rust:1.99.1-trixie
ARG TARGETARCH
ARG RC_RELEASE=latest
RUN set -eux; \
export DEBIAN_FRONTEND=noninteractive; \
@@ -21,6 +24,7 @@ RUN set -eux; \
build-essential \
ca-certificates \
curl \
jq \
git \
pkg-config \
libssl-dev \
@@ -36,6 +40,7 @@ COPY . .
RUN ./scripts/static.sh
RUN cargo run --bin gproto
RUN cargo build --release --locked --bin rustfs
RUN sh /usr/src/rustfs/scripts/download_rc.sh "$TARGETARCH" musl "$RC_RELEASE" /usr/local/bin/rc
RUN set -eux; \
groupadd -g 10001 rustfs; \
@@ -50,8 +55,12 @@ RUN set -eux; \
chown -R rustfs:rustfs /data /logs /app; \
chmod 0750 /data /logs
COPY entrypoint.sh /entrypoint.sh
RUN install -m 0755 /usr/src/rustfs/target/release/rustfs /usr/bin/rustfs && chmod +x /entrypoint.sh
COPY entrypoint.sh /etc/rustfs/entrypoint.sh
COPY bootstrap/ /etc/rustfs/bootstrap/
RUN install -m 0755 /usr/src/rustfs/target/release/rustfs /usr/bin/rustfs && \
install -m 0755 /usr/local/bin/rc /usr/bin/rc && \
chmod +x /etc/rustfs/entrypoint.sh && \
ln -s /etc/rustfs/entrypoint.sh /entrypoint.sh
ENV RUSTFS_VOLUMES="/data" \
RUST_LOG="warn" \
@@ -63,5 +72,5 @@ ENV RUSTFS_VOLUMES="/data" \
EXPOSE 9000 9001
ENTRYPOINT ["/entrypoint.sh"]
ENTRYPOINT ["/etc/rustfs/entrypoint.sh"]
CMD ["/usr/bin/rustfs"]
+22 -4
View File
@@ -12,10 +12,13 @@
# See the License for the specific language governing permissions and
# limitations under the License.
FROM ubuntu:26.04 AS build
ARG BINARY_SOURCE=download
FROM ubuntu:26.04 AS download
ARG TARGETARCH
ARG RELEASE=latest
ARG RC_RELEASE=latest
RUN apt-get update && apt-get install -y --no-install-recommends \
ca-certificates \
@@ -76,6 +79,17 @@ RUN set -eux; \
chmod +x /build/rustfs; \
rm -rf rustfs.zip /build/.tmp || true
COPY scripts/download_rc.sh /usr/local/bin/download_rc.sh
RUN sh /usr/local/bin/download_rc.sh "$TARGETARCH" gnu "$RC_RELEASE" /build/rc
# Candidate packaging supplies the accepted executables from verified archives.
# The default download stage remains available for local image builds.
FROM scratch AS supplied
ARG TARGETARCH
COPY .release-inputs/${TARGETARCH}/ /build/
FROM ${BINARY_SOURCE} AS build
FROM ubuntu:26.04
ARG RELEASE=latest
@@ -99,14 +113,18 @@ RUN apt-get update && apt-get upgrade -y \
&& DEBIAN_FRONTEND=noninteractive apt-get install -y --no-install-recommends \
ca-certificates \
curl \
jq \
tzdata \
&& test "$(TZ=Asia/Kolkata date +%z)" = "+0530" \
&& rm -rf /var/lib/apt/lists/*
COPY --from=build /build/rustfs /usr/bin/rustfs
COPY entrypoint.sh /entrypoint.sh
COPY --from=build /build/rc /usr/bin/rc
COPY entrypoint.sh /etc/rustfs/entrypoint.sh
COPY bootstrap/ /etc/rustfs/bootstrap/
RUN chmod +x /usr/bin/rustfs /entrypoint.sh
RUN chmod +x /usr/bin/rustfs /usr/bin/rc /etc/rustfs/entrypoint.sh && \
ln -s /etc/rustfs/entrypoint.sh /entrypoint.sh
RUN groupadd -g 10001 rustfs && \
useradd -u 10001 -g rustfs -m -s /sbin/nologin rustfs && \
@@ -131,6 +149,6 @@ VOLUME ["/data"]
USER rustfs
ENTRYPOINT ["/entrypoint.sh"]
ENTRYPOINT ["/etc/rustfs/entrypoint.sh"]
CMD ["rustfs"]
+40 -10
View File
@@ -24,21 +24,24 @@
#
# Supports cross-compilation for amd64 and arm64 via TARGETPLATFORM.
ARG TARGETPLATFORM
ARG BUILDPLATFORM
ARG TARGETARCH
# Do not declare TARGETPLATFORM, BUILDPLATFORM or TARGETARCH here: a global
# declaration without a value shadows BuildKit's automatic values, so the
# stage-level re-declarations below see empty strings. They are only
# declared inside the stage that uses them.
ARG RUSTFS_BUILD_FEATURES=""
ARG RC_RELEASE=latest
# -----------------------------
# Build stage
# -----------------------------
FROM rust:1.97.1-trixie AS builder
FROM rust:1.99.1-trixie AS builder
# Re-declare args after FROM
ARG TARGETPLATFORM
ARG BUILDPLATFORM
ARG TARGETARCH
ARG RUSTFS_BUILD_FEATURES
ARG RC_RELEASE
# Debug: print platforms
RUN echo "Build info -> BUILDPLATFORM=${BUILDPLATFORM}, TARGETPLATFORM=${TARGETPLATFORM}"
@@ -52,6 +55,7 @@ RUN set -eux; \
build-essential \
ca-certificates \
curl \
jq \
git \
pkg-config \
libssl-dev \
@@ -166,6 +170,25 @@ RUN --mount=type=cache,target=/usr/local/cargo/registry \
;; \
esac
# TARGETARCH is only provided by BuildKit. Fall back to TARGETPLATFORM (for
# example set by docker-compose) and then to the build host, like the cargo
# step above, so every path that builds this file passes a real architecture.
RUN set -eu; \
rc_arch="${TARGETARCH:-}"; \
if [ -z "${rc_arch}" ]; then \
case "${TARGETPLATFORM:-}" in \
linux/amd64) rc_arch=amd64 ;; \
linux/arm64) rc_arch=arm64 ;; \
*) \
case "$(uname -m)" in \
x86_64) rc_arch=amd64 ;; \
aarch64|arm64) rc_arch=arm64 ;; \
*) echo "TARGETARCH is empty and TARGETPLATFORM='${TARGETPLATFORM:-}' is not linux/amd64 or linux/arm64; cannot choose an rc architecture on $(uname -m)" >&2; exit 1 ;; \
esac ;; \
esac; \
fi; \
sh /usr/src/rustfs/scripts/download_rc.sh "${rc_arch}" musl "${RC_RELEASE}" /usr/local/bin/rc
# -----------------------------
# Development stage (keeps toolchain)
# -----------------------------
@@ -199,10 +222,13 @@ ENV RUSTFS_VOLUMES="/data" \
# We rely on cargo run to build and run
EXPOSE 9000 9001
COPY entrypoint.sh /entrypoint.sh
RUN chmod +x /entrypoint.sh
COPY entrypoint.sh /etc/rustfs/entrypoint.sh
COPY bootstrap/ /etc/rustfs/bootstrap/
RUN install -m 0755 /usr/local/bin/rc /usr/bin/rc && \
chmod +x /etc/rustfs/entrypoint.sh && \
ln -s /etc/rustfs/entrypoint.sh /entrypoint.sh
ENTRYPOINT ["/entrypoint.sh"]
ENTRYPOINT ["/etc/rustfs/entrypoint.sh"]
CMD ["cargo", "run", "--bin", "rustfs", "--"]
# -----------------------------
@@ -227,6 +253,7 @@ RUN set -eux; \
apt-get install -y --no-install-recommends \
ca-certificates \
curl \
jq \
tzdata \
coreutils; \
rm -rf /var/lib/apt/lists/*
@@ -248,8 +275,11 @@ RUN set -eux; \
# Copy the freshly built binary and the entrypoint
COPY --from=builder /usr/local/bin/rustfs /usr/bin/rustfs
COPY entrypoint.sh /entrypoint.sh
RUN chmod +x /usr/bin/rustfs /entrypoint.sh
COPY --from=builder /usr/local/bin/rc /usr/bin/rc
COPY entrypoint.sh /etc/rustfs/entrypoint.sh
COPY bootstrap/ /etc/rustfs/bootstrap/
RUN chmod +x /usr/bin/rustfs /usr/bin/rc /etc/rustfs/entrypoint.sh && \
ln -s /etc/rustfs/entrypoint.sh /entrypoint.sh
# Default environment (override in docker run/compose as needed)
ENV RUSTFS_VOLUMES="/data" \
@@ -263,5 +293,5 @@ EXPOSE 9000
VOLUME ["/data"]
# Keep root here; entrypoint will drop privileges using chroot --userspec
ENTRYPOINT ["/entrypoint.sh"]
ENTRYPOINT ["/etc/rustfs/entrypoint.sh"]
CMD ["/usr/bin/rustfs"]
+4 -4
View File
@@ -145,7 +145,7 @@ chown -R 10001:10001 data logs
docker run -d -p 9000:9000 -p 9001:9001 -v $(pwd)/data:/data -v $(pwd)/logs:/logs rustfs/rustfs:latest
# Using specific version
docker run -d -p 9000:9000 -p 9001:9001 -v $(pwd)/data:/data -v $(pwd)/logs:/logs rustfs/rustfs:1.0.4
docker run -d -p 9000:9000 -p 9001:9001 -v $(pwd)/data:/data -v $(pwd)/logs:/logs rustfs/rustfs:1.0.5
```
If you use [podman](https://github.com/containers/podman) instead of docker, you can install the RustFS with the below command
@@ -199,7 +199,7 @@ docker run -d --name rustfs -p 9000:9000 \
Notes:
- `RUSTFS_NOTIFY_ENABLE=true` enables the global notify module switch.
- For ARN `arn:rustfs:sqs::primary:webhook`, use instance-scoped env vars with `_PRIMARY`.
- If queue dir is omitted, the official image maps `/opt/rustfs/events` into the persistent `/data` volume so it is writable by the runtime user and pending events survive container recreation. Override `queue_dir` when using another deployment layout.
- If queue dir is omitted, the official image maps `/opt/rustfs/events` into the persistent `/data` volume so it is writable by the runtime user and pending events survive container recreation. Override `queue_dir` when using another deployment layout, or set `RUSTFS_TARGET_STORE_DIR` to move every default queue; native Windows defaults to `%ProgramData%\RustFS`. See [Target queue storage](docs/operations/target-queue-storage.md).
- `RUSTFS_NOTIFY_WEBHOOK_SKIP_TLS_VERIFY_PRIMARY` defaults to `false`; enabling it skips webhook TLS certificate verification, allows MITM attacks, and emits a startup warning. Prefer `RUSTFS_NOTIFY_WEBHOOK_CLIENT_CA_PRIMARY` for private CAs.
- Since `1.0.0-beta.11`, webhook endpoints on private or container networks
(`Docker Compose service names`, `host.docker.internal`, RFC 1918 addresses) are
@@ -224,7 +224,7 @@ For developers who want to build RustFS Docker images from source with multi-arc
./docker-buildx.sh --push
# Build specific version
./docker-buildx.sh --release 1.0.4 --push
./docker-buildx.sh --release 1.0.5 --push
# Build for custom registry
./docker-buildx.sh --registry your-registry.com --namespace yourname --push
@@ -242,7 +242,7 @@ You can also use Make targets for convenience:
```bash
make docker-buildx # Build locally
make docker-buildx-push # Build and push
make docker-buildx-version VERSION=1.0.4 # Build specific version
make docker-buildx-version VERSION=1.0.5 # Build specific version
make help-docker # Show all Docker-related commands
```
+3 -3
View File
@@ -138,7 +138,7 @@ chown -R 10001:10001 data logs
docker run -d -p 9000:9000 -p 9001:9001 -v $(pwd)/data:/data -v $(pwd)/logs:/logs rustfs/rustfs:latest
# 使用指定版本运行
docker run -d -p 9000:9000 -p 9001:9001 -v $(pwd)/data:/data -v $(pwd)/logs:/logs rustfs/rustfs:1.0.4
docker run -d -p 9000:9000 -p 9001:9001 -v $(pwd)/data:/data -v $(pwd)/logs:/logs rustfs/rustfs:1.0.5
```
如果您通过绑定挂载启用 TLS 证书目录,也请用同样方式准备该目录:
@@ -176,7 +176,7 @@ docker compose -f docker-compose-simple.yml up -d
./docker-buildx.sh --push
# 构建指定版本
./docker-buildx.sh --release 1.0.4 --push
./docker-buildx.sh --release 1.0.5 --push
# 构建并推送到自定义仓库
./docker-buildx.sh --registry your-registry.com --namespace yourname --push
@@ -193,7 +193,7 @@ docker compose -f docker-compose-simple.yml up -d
```bash
make docker-buildx # 本地构建
make docker-buildx-push # 构建并推送
make docker-buildx-version VERSION=1.0.4 # 构建指定版本
make docker-buildx-version VERSION=1.0.5 # 构建指定版本
make help-docker # 显示所有 Docker 相关命令
```
+21
View File
@@ -0,0 +1,21 @@
# RustFS image bootstrap
The official image bundles this directory at `/etc/rustfs/bootstrap`. The default `buckets.json` is an empty JSON array, so the image starts RustFS directly and does not require a bootstrap endpoint or bootstrap credentials.
To create buckets, replace `buckets.json` in a derived image with a JSON array of bucket names. The entrypoint creates each bucket if it does not exist and applies `public-access-block.json`, whose default blocks all four public access paths. Edit that file in the derived image only when public access is an explicit requirement.
Optional per-bucket files use the bucket name as the filename without an extension:
| Directory | File format | Applied operation |
| --- | --- | --- |
| `policies/` | S3 bucket policy JSON | `rc bucket anonymous set-json` |
| `versioning/` | JSON boolean (`true` or `false`) | Enable or suspend bucket versioning |
| `lifecycle/` | `rc bucket lifecycle rule import` JSON | Replace lifecycle rules |
| `cors/` | JSON or XML accepted by `rc bucket cors set` | Replace CORS rules |
| `notifications/` | JSON array of `{ "arn": "...", "events": ["..."] }` | Add or replace event rules by ARN (prefix/suffix filters are not currently accepted) |
Every per-bucket file must correspond to a bucket listed in `buckets.json`. Applying these files is repeatable: bucket creation ignores existing buckets, while each configuration operation replaces or reconciles that bucket's requested state.
When `buckets.json` is non-empty, set `RUSTFS_BOOTSTRAP_ENDPOINT` to the RustFS S3 endpoint reachable from the container, for example `http://rustfs:9000` for a Compose service or the internal service DNS name in Kubernetes. The entrypoint waits on that endpoint's `/health/ready`; it never assumes `localhost`. `RUSTFS_BOOTSTRAP_TIMEOUT` controls the readiness wait in seconds (default `120`, maximum `3600`). `RUSTFS_BOOTSTRAP_DIR` can point to a different in-image configuration directory; it defaults to `/etc/rustfs/bootstrap`. Set `RUSTFS_ACCESS_KEY` and `RUSTFS_SECRET_KEY`, or their `_FILE` variants, for bootstrap authentication. The endpoint and credentials are read at runtime and are not baked into the image.
RustFS built-in IAM policies remain unchanged; the default bootstrap installs no custom bucket policies, lifecycle rules, versioning, CORS rules, or notification rules. The bundled RustFS CLI is resolved from a published release and its release checksum is verified. Set the Docker build argument `RC_RELEASE` to a version to pin it. Build the RustFS image after a CLI release containing the `bucket public-access-block` commands is available. For Kubernetes, the configured service must route traffic to the starting pod before its readiness probe succeeds (for example, with `publishNotReadyAddresses: true`); otherwise the service endpoint cannot reach the pod while the entrypoint waits for readiness.
+1
View File
@@ -0,0 +1 @@
[]
+1
View File
@@ -0,0 +1 @@
+1
View File
@@ -0,0 +1 @@
+1
View File
@@ -0,0 +1 @@
+1
View File
@@ -0,0 +1 @@
+6
View File
@@ -0,0 +1,6 @@
{
"block_public_acls": true,
"ignore_public_acls": true,
"block_public_policy": true,
"restrict_public_buckets": true
}
+1
View File
@@ -0,0 +1 @@
+100
View File
@@ -902,4 +902,104 @@ mod tests {
assert_eq!(raw.len(), 8);
assert_eq!(&raw[..], reference.digest().to_be_bytes().as_slice());
}
#[test]
fn checksums_streaming_chunks_and_header_encoding_match_oneshot_across_unaligned_boundaries() {
use crate::http::HttpChecksum;
let all = [
ChecksumAlgorithm::Crc32,
ChecksumAlgorithm::Crc32c,
ChecksumAlgorithm::Crc64Nvme,
ChecksumAlgorithm::Sha1,
ChecksumAlgorithm::Sha256,
ChecksumAlgorithm::Sha512,
ChecksumAlgorithm::Xxhash3,
ChecksumAlgorithm::Xxhash64,
ChecksumAlgorithm::Xxhash128,
];
for &payload_len in &[0usize, 1, 31, 33, 1024, 4096 + 37, 64 * 1024 + 19] {
let payload: Vec<u8> = (0..payload_len).map(|i| ((i * 19 + 5) % 253) as u8).collect();
for algorithm in all {
let mut one_shot = algorithm.into_impl();
one_shot.update(&payload);
let expected_raw = one_shot.finalize();
assert_eq!(expected_raw.len(), algorithm.raw_len());
let mut one_shot_hdr = algorithm.into_impl();
one_shot_hdr.update(&payload);
let expected_headers = one_shot_hdr.headers();
for &chunk_size in &[1usize, 31, 1021, 4096] {
if payload_len > 4096 && chunk_size == 1 {
continue;
}
let mut streaming: Box<dyn HttpChecksum> = algorithm.into_impl();
for chunk in payload.chunks(chunk_size) {
streaming.update(chunk);
}
let actual_headers = streaming.headers();
assert_eq!(
actual_headers.get(algorithm.http_header_name()),
expected_headers.get(algorithm.http_header_name()),
"{algorithm:?} streaming mismatch at payload_len={payload_len}, chunk_size={chunk_size}"
);
}
}
}
}
#[test]
#[ignore = "utility throughput microbenchmark; run via cargo test -p rustfs-checksums --lib --release -- --ignored --nocapture"]
fn microbench_checksums_streaming_chunks_and_header_encoding() {
use crate::http::HttpChecksum;
use std::hint::black_box;
use std::time::Instant;
let all = [
ChecksumAlgorithm::Crc32,
ChecksumAlgorithm::Crc32c,
ChecksumAlgorithm::Crc64Nvme,
ChecksumAlgorithm::Sha1,
ChecksumAlgorithm::Sha256,
ChecksumAlgorithm::Sha512,
ChecksumAlgorithm::Xxhash3,
ChecksumAlgorithm::Xxhash64,
ChecksumAlgorithm::Xxhash128,
];
let payload: Vec<u8> = (0..(256 * 1024)).map(|i| ((i * 19 + 5) % 253) as u8).collect();
for &chunk_size in &[4 * 1024usize, 64 * 1024, 256 * 1024] {
for algorithm in all {
let mut one_shot = algorithm.into_impl();
one_shot.update(&payload);
let expected_headers = one_shot.headers();
let iters = 8usize;
let t0 = Instant::now();
let mut last_headers = http::HeaderMap::new();
for _ in 0..iters {
let mut streaming: Box<dyn HttpChecksum> = algorithm.into_impl();
for chunk in payload.chunks(chunk_size) {
streaming.update(black_box(chunk));
}
last_headers = streaming.headers();
black_box(&last_headers);
}
let elapsed = t0.elapsed();
assert_eq!(
last_headers.get(algorithm.http_header_name()),
expected_headers.get(algorithm.http_header_name()),
"{algorithm:?} streaming chunk_size={chunk_size} header mismatch"
);
let total_mib = (payload.len() * iters) as f64 / (1024.0 * 1024.0);
let mibs = total_mib / elapsed.as_secs_f64().max(1e-9);
println!(
"[microbench][checksums] algo={algorithm:?} chunk_size={chunk_size}B throughput={mibs:.1} MiB/s (size={}B)",
algorithm.raw_len()
);
}
}
}
}
+7
View File
@@ -276,6 +276,13 @@ Drive timeout profile preset:
- values must be positive; `0` or an invalid value falls back to the default, and values above `60` are clamped to `60`.
- the setting is read by the aggregating node only; it does not change the internode RPC wire contract. Any retry shares one round deadline rather than receiving a fresh timeout.
## Target queue directory
- `RUSTFS_TARGET_STORE_DIR`
- absolute root for notify and audit target queues whose `queue_dir` is the default `/opt/rustfs/events` or `/opt/rustfs/audit`; they open `<root>/events` and `<root>/audit` on this node.
- unset keeps those paths on Linux and macOS; native Windows uses `%ProgramData%\RustFS\events` and `%ProgramData%\RustFS\audit`.
- explicit `queue_dir` values are never relocated, and the persisted target configuration is unchanged. Changing the root does not migrate pending entries. See `docs/operations/target-queue-storage.md`.
## Startup filesystem boundary policy
- `RUSTFS_UNSUPPORTED_FS_POLICY` controls startup behavior when RustFS detects local endpoint filesystems that are outside the supported production boundary.
+21 -9
View File
@@ -184,15 +184,27 @@ const _: () = assert!(!DEFAULT_INTERNODE_RPC_REPLAY_SCOPE_STRICT);
/// Capacity (distinct nonces) of the process-local internode RPC replay cache that enforces
/// one-time consumption of authenticated RPC signatures.
///
/// The cache retains each nonce for the ~10-minute signature freshness envelope. Once peers use
/// replay-scoped v3 authentication, every authenticated RPC consumes one entry, so the steady
/// state holds roughly `authenticated RPC RPS x 601s` entries. This default is the minimum floor:
/// explicit operator values and resource-aware auto sizing both clamp upward to at least this
/// value. Overflow fails closed — legitimate signed traffic is the only thing that can fill the
/// cache (replays are rejected before insertion, and an attacker cannot mint valid nonces without
/// the shared secret) — and increments
/// `rustfs_system_network_internode_replay_cache_overflow_total`, so a sustained non-zero overflow
/// counter means this capacity is undersized for the node's peak authenticated RPC rate.
/// Nonces remain protected until their signed timestamp is outside the observed wall-clock
/// validity window, including after clock rollback. Current-time signatures live about five
/// minutes; the maximum accepted forward clock skew can extend that to ten minutes. A body-bound
/// v3 request consumes both its v3 and compatibility-v2 nonces, so size for receiver nonce intake,
/// not S3 request rate or CPU count.
///
/// Automatic admission budgets 13% of effective process memory for signed-time
/// hash tables, allocator overhead and simultaneous old/new tables during growth.
/// The reported count is an absolute UUID payload ceiling, not guaranteed throughput:
/// actual byte admission can reject earlier depending on timestamp distribution.
/// Tables grow with demand and are released together when their signed time expires.
/// CPU count, a historical minimum, and a fixed 32M ceiling do not constrain this budget.
/// If memory detection fails, the historical default remains a bounded count fallback.
///
/// Explicit values remain count ceilings with the historical minimum of 1,048,576
/// for configuration compatibility, and bypass automatic byte admission. That
/// compatibility floor does not apply to the automatically detected memory budget.
/// Zero never disables replay protection.
/// Overflow rejects the request without evicting a still-valid identity, increments
/// `rustfs_system_network_internode_replay_cache_overflow_total`, and returns resource
/// exhaustion rather than invalid credentials. Measure headroom before overriding.
pub const ENV_INTERNODE_RPC_REPLAY_CACHE_CAPACITY: &str = "RUSTFS_INTERNODE_RPC_REPLAY_CACHE_CAPACITY";
pub const DEFAULT_INTERNODE_RPC_REPLAY_CACHE_CAPACITY: usize = 1_048_576;
+3 -2
View File
@@ -32,8 +32,9 @@ pub const ENV_OBJECT_MEDIUM_CONCURRENCY_THRESHOLD: &str = "RUSTFS_OBJECT_MEDIUM_
/// Environment variable name for maximum concurrent disk reads for object operations.
/// - Purpose: Limit the number of concurrent disk read operations for object reads to prevent I/O saturation.
/// - Unit: request count (usize).
/// - Semantics: Throttling disk reads helps maintain overall system responsiveness under load.
/// - Unit: request count (usize) for GET; estimated drive fanout for native LIST.
/// - Semantics: GET bodies and native LIST walks use separate per-instance budgets of this size.
/// A LIST consumes up to one budget, including its disk-producer cleanup. `0` disables both caps.
/// - Example: `export RUSTFS_OBJECT_MAX_CONCURRENT_DISK_READS=16`
/// - Note: This setting may interact with OS-level I/O scheduling and should be tuned based on hardware capabilities.
pub const ENV_OBJECT_MAX_CONCURRENT_DISK_READS: &str = "RUSTFS_OBJECT_MAX_CONCURRENT_DISK_READS";
+3 -3
View File
@@ -30,10 +30,10 @@ pub const ENV_TRUSTED_PROXY_VALIDATION_MODE: &str = "RUSTFS_TRUSTED_PROXY_VALIDA
/// Default validation mode is "hop_by_hop".
pub const DEFAULT_TRUSTED_PROXY_VALIDATION_MODE: &str = "hop_by_hop";
/// Environment variable to enable RFC 7239 "Forwarded" header support.
/// Select RFC 7239 "Forwarded" instead of "X-Forwarded-For" in legacy mode.
pub const ENV_TRUSTED_PROXY_ENABLE_RFC7239: &str = "RUSTFS_TRUSTED_PROXY_ENABLE_RFC7239";
/// RFC 7239 support is enabled by default.
pub const DEFAULT_TRUSTED_PROXY_ENABLE_RFC7239: bool = true;
/// Legacy mode uses X-Forwarded-For unless RFC 7239 is explicitly selected.
pub const DEFAULT_TRUSTED_PROXY_ENABLE_RFC7239: bool = false;
/// Environment variable for the maximum allowed proxy hops.
pub const ENV_TRUSTED_PROXY_MAX_HOPS: &str = "RUSTFS_TRUSTED_PROXY_MAX_HOPS";
+12
View File
@@ -144,5 +144,17 @@ pub const POSTGRES_QUEUE_LIMIT: &str = "queue_limit";
/// Applies to both notify and audit target queue stores.
pub const ENV_TARGET_STORE_COMPRESS: &str = "RUSTFS_TARGET_STORE_COMPRESS";
/// Environment variable that relocates the root of the default notify and audit queue directories.
///
/// It applies only to targets whose `queue_dir` is the logical default (`EVENT_DEFAULT_DIR` or
/// `AUDIT_DEFAULT_DIR`); their queues move to `<root>/events` and `<root>/audit` on this node.
pub const ENV_TARGET_STORE_DIR: &str = "RUSTFS_TARGET_STORE_DIR";
/// Queue-store compression is enabled by default to reduce disk footprint.
pub const DEFAULT_TARGET_STORE_COMPRESS: bool = true;
/// Maximum on-disk bytes in each target queue, including failed entries and pending writes.
pub const ENV_TARGET_STORE_MAX_BYTES: &str = "RUSTFS_TARGET_STORE_MAX_BYTES";
/// Queue writes fail at one GiB unless the operator sets another positive byte budget.
pub const DEFAULT_TARGET_STORE_MAX_BYTES: u64 = 1024 * 1024 * 1024;
+6 -1
View File
@@ -175,12 +175,17 @@ pub const ENV_HTTP_SOCKET_RECV_BUFFER_BYTES: &str = "RUSTFS_HTTP_SOCKET_RECV_BUF
pub const DEFAULT_HTTP_SOCKET_RECV_BUFFER_BYTES: usize = 0;
/// Environment variable for the S3 request-body inter-chunk read timeout
/// (seconds). Default: 300. Set to 0 to disable.
/// (seconds). Default: 300. Set to 0 to disable the inactivity timeout.
///
/// This bounds how long a `PutObject`/upload may wait for the *next* body chunk
/// while more bytes are still expected. It resets on every chunk, so it does not
/// penalize slow-but-progressing uploads — it only fires when a peer sends a
/// partial body and then goes silent *without* closing the connection (no EOF).
/// Independently of this knob, `PutObject` and `UploadPart` require at least
/// 64 KiB of body progress per 60 seconds of server wait (the minimum-progress
/// floor, logged as `upload_body_progress_stalled`); it bounds trickle uploads
/// that would otherwise pin upload admission indefinitely, and it stays in
/// force when this timeout is set to 0.
/// A reverse proxy or CDN that forwards a truncated body this way would
/// otherwise make RustFS wait forever for bytes that never arrive; with this
/// timeout the stalled read is aborted and logged with the received/expected
+6 -1
View File
@@ -91,7 +91,12 @@ pub const ENV_OBS_LOG_MATCH_MODE: &str = "RUSTFS_OBS_LOG_MATCH_MODE";
/// Default values for log cleanup
pub const DEFAULT_OBS_LOG_MAX_TOTAL_SIZE_BYTES: u64 = 2 * 1024 * 1024 * 1024; // 2 GiB
pub const DEFAULT_OBS_LOG_MAX_SINGLE_FILE_SIZE_BYTES: u64 = 0; // No single file limit
pub const DEFAULT_OBS_LOG_MAX_SINGLE_FILE_SIZE_BYTES: u64 = 0; // No per-file trim by the cleaner
/// Size at which the active log file is rolled when
/// `RUSTFS_OBS_LOG_MAX_SINGLE_FILE_SIZE_BYTES` is unset. Without a size roll
/// the active file is bounded only by the rotation period, and the cleaner
/// never touches the active file. An explicit `0` keeps size rolling off.
pub const DEFAULT_OBS_LOG_ACTIVE_FILE_ROLL_SIZE_BYTES: u64 = 256 * 1024 * 1024; // 256 MiB
pub const DEFAULT_OBS_LOG_COMPRESS_OLD_FILES: bool = true;
pub const DEFAULT_OBS_LOG_GZIP_COMPRESSION_LEVEL: u32 = 6;
pub const DEFAULT_OBS_LOG_COMPRESSION_ALGORITHM_GZIP: &str = "gzip";
+55 -2
View File
@@ -675,6 +675,10 @@ impl DataUsageInfo {
/// cycle. The timestamp fallback preserves ordering for legacy snapshots that
/// predate those fields.
pub fn data_usage_snapshot_is_newer(candidate: &DataUsageInfo, baseline: &DataUsageInfo) -> bool {
data_usage_identity_is_newer(candidate.snapshot_identity(), baseline.snapshot_identity())
}
fn data_usage_identity_is_newer(candidate: DataUsageSnapshotIdentity, baseline: DataUsageSnapshotIdentity) -> bool {
match (
candidate.scanner_epoch.zip(candidate.scanner_cycle),
baseline.scanner_epoch.zip(baseline.scanner_cycle),
@@ -697,10 +701,18 @@ pub fn data_usage_snapshot_is_newer(candidate: &DataUsageInfo, baseline: &DataUs
/// already advance the authoritative timestamp when deleting a bucket, so a
/// rollback delete/recreate fences the previous bucket incarnation too.
pub fn observed_data_usage_is_newer(observed: &DataUsageInfo, authoritative: &DataUsageInfo) -> bool {
observed_data_usage_is_newer_than_identity(observed, authoritative.snapshot_identity())
}
/// Return whether a nonconverged observation may supersede `authoritative`.
///
/// This applies the structural, exact-baseline, and generation checks of
/// [`observed_data_usage_is_newer`] without retaining the baseline's bucket maps.
pub fn observed_data_usage_is_newer_than_identity(observed: &DataUsageInfo, authoritative: DataUsageSnapshotIdentity) -> bool {
observed.usage_snapshot_converged == Some(false)
&& (observed.is_complete_bucket_usage_snapshot() || observed.is_valid_partial_snapshot())
&& observed.usage_snapshot_authoritative_baseline.as_ref() == Some(&authoritative.snapshot_identity())
&& data_usage_snapshot_is_newer(observed, authoritative)
&& observed.usage_snapshot_authoritative_baseline == Some(authoritative)
&& data_usage_identity_is_newer(observed.snapshot_identity(), authoritative)
}
/// Metadata describing the status of a disk-level data usage snapshot.
@@ -3140,12 +3152,17 @@ mod tests {
};
assert!(observed_data_usage_is_newer(&observed, &authoritative));
assert!(observed_data_usage_is_newer_than_identity(&observed, authoritative.snapshot_identity()));
authoritative.last_update = Some(SystemTime::UNIX_EPOCH + Duration::from_secs(601));
assert!(
!observed_data_usage_is_newer(&observed, &authoritative),
"an old-binary namespace mutation must fence the prior bucket incarnation regardless of clock skew"
);
assert!(
!observed_data_usage_is_newer_than_identity(&observed, authoritative.snapshot_identity()),
"a captured identity must preserve the exact namespace fence"
);
}
#[test]
@@ -3172,6 +3189,18 @@ mod tests {
assert!(!observed_data_usage_is_newer(&candidate(2, 9, Some(false), true), &authoritative));
assert!(!observed_data_usage_is_newer(&candidate(2, 11, Some(true), true), &authoritative));
assert!(!observed_data_usage_is_newer(&candidate(2, 11, Some(false), false), &authoritative));
for (observed, expected) in [
(candidate(2, 11, Some(false), true), true),
(candidate(2, 9, Some(false), true), false),
(candidate(2, 11, Some(true), true), false),
(candidate(2, 11, Some(false), false), false),
] {
assert_eq!(
observed_data_usage_is_newer_than_identity(&observed, authoritative.snapshot_identity()),
expected,
"observation identity selection must preserve convergence, completeness, and generation gates"
);
}
let mut partial = candidate(2, 11, Some(false), false);
partial.usage_snapshot_partial = true;
@@ -3186,6 +3215,30 @@ mod tests {
segment_invalidation_proof: None,
}];
assert!(observed_data_usage_is_newer(&partial, &authoritative));
assert!(observed_data_usage_is_newer_than_identity(&partial, authoritative.snapshot_identity()));
}
#[test]
fn observation_identity_selection_keeps_legacy_timestamp_ordering() {
let baseline = DataUsageSnapshotIdentity {
last_update: Some(SystemTime::UNIX_EPOCH + Duration::from_secs(10)),
// An epoch without a cycle is not a coordinated position.
scanner_epoch: Some(2),
scanner_cycle: None,
};
let mut observed = DataUsageInfo {
last_update: Some(SystemTime::UNIX_EPOCH + Duration::from_secs(11)),
scanner_epoch: Some(1),
usage_snapshot_complete: true,
usage_snapshot_converged: Some(false),
usage_snapshot_authoritative_baseline: Some(baseline),
..Default::default()
};
assert!(observed_data_usage_is_newer_than_identity(&observed, baseline));
observed.last_update = baseline.last_update;
assert!(!observed_data_usage_is_newer_than_identity(&observed, baseline));
observed.last_update = None;
assert!(!observed_data_usage_is_newer_than_identity(&observed, baseline));
}
#[test]
+4 -3
View File
@@ -26,9 +26,10 @@ Registered in [`src/lib.rs`](src/lib.rs). Grouped by concern:
| **protocols** | [`src/protocols/`](src/protocols) | FTPS, WebDAV, SFTP compliance. Fixed ports, own guide: [`src/protocols/README.md`](src/protocols/README.md) |
| **reliant** | [`src/reliant/`](src/reliant) | Tests that reuse an **externally started** server (SQL/select, conditional writes, lifecycle, deleted-object reads, node-interact). Run via [`scripts/run_e2e_tests.sh`](../../scripts/run_e2e_tests.sh); see [`src/reliant/README.md`](src/reliant/README.md) |
| **cluster** | `cluster_concurrency_test`, `stale_multipart_cleanup_cluster_test`, `namespace_lock_quorum_test`, `admin_timeout_regression_test`, `object_lambda_test`, `replication_extension_test`, `tier_stats_cluster_test` | Multi-node scenarios via `RustFSTestClusterEnvironment` |
| **distributed 4×4** | [`src/distributed/`](src/distributed) | Storage-sensitive PR and nightly `e2e-distributed` lane: S3, object lock/WORM, versioning, bucket/site replication, quota, expand/decommission/rebalance, concurrency, chaos, 4-node upgrade of historical data and IAM AK/SK. Map: [`docs/testing/distributed-e2e.md`](../../docs/testing/distributed-e2e.md) |
| **distributed 4×4** | [`src/distributed/`](src/distributed) | Nightly `e2e-distributed` lane: S3, object lock/WORM, versioning, bucket/site replication, quota, expand/decommission/rebalance, concurrency, chaos, 4-node upgrade of historical data and IAM AK/SK. Map: [`docs/testing/distributed-e2e.md`](../../docs/testing/distributed-e2e.md) |
| **chaos / reliability** | [`src/chaos.rs`](src/chaos.rs), `reliability_disk_fault_test`, `heal_erasure_disk_rebuild_test`, `server_startup_failfast_test` | Disk offline/replace/corrupt, EC rebuild, heal, fail-fast startup |
| **upgrade compatibility** | `upgrade_compatibility_test` | Pinned previous-release writes followed by current-build reads on the same data directory |
| **dual-stack differential** | `dual_stack_differential` | Two single-node servers answer one SDK script for all 73 S3 operations and every differing `(op, field, a, b)` is reported. Side A is the binary under test on `RUSTFS_S3_STACK=legacy`; side B runs `RUSTFS_E2E_STACK_B`. Set `RUSTFS_E2E_REFERENCE_BINARY` to a released `rustfs` binary to make side A that binary instead (started without `RUSTFS_S3_STACK`, which older releases do not know). A missing, non-file or non-executable path fails the run; it never skips or falls back to the same-binary mode. The report in `<target>/dual-stack/<run>.json` records `reference_side` and each side's `--version` output |
The external-tool `storage_metric_ownership_test` validates the OTLP/Collector/Prometheus path, including a rolling upgrade and node failures. See the [storage metrics guide](../../docs/operations/storage-metrics.md) for its required binaries and focused command.
@@ -194,9 +195,9 @@ the same profile for membership and execution with one nightly worker.
| `s3s-e2e` black-box | `e2e-tests` + `e2e-tests-rio-v2` jobs | **Active** (external conformance tool) |
| ILM / lifecycle (ignored) | `test-ilm-integration-serial` lane, `-j1` | **Active** (backlog#1148 ilm-1) |
| KMS suite | `e2e-full` job, merge queue + main | **Active** |
| Direct and mixed-version rolling upgrades from pinned previous release | `e2e-upgrade.yml`, storage-sensitive PRs + release tags + weekly | **Active** |
| Direct and mixed-version rolling upgrades from pinned previous release | `e2e-upgrade.yml`, release tags + weekly schedule + manual dispatch | **Active** |
| Cluster faults (`e2e-nightly` profile) | consolidated nightly workflow | **Active** (backlog#1149 ci-7) |
| Distributed 4-node 4-disk (`e2e-distributed` profile) | `.github/workflows/e2e-distributed.yml` | **Active** (storage-sensitive PR / nightly / dispatch) |
| Distributed 4-node 4-disk (`e2e-distributed` profile) | `.github/workflows/e2e-distributed.yml` | **Active** (nightly / dispatch) |
| Protocols (FTPS/WebDAV/SFTP) | consolidated nightly workflow, serial | **Active** (backlog#1149 ci-7) |
| Replication (fast subset) | `e2e-smoke` profile, `e2e-tests` job, every PR | **Active** (backlog#1147 repl-1) |
| Replication (slow + multi-node) | `e2e-repl-nightly` profile, consolidated nightly workflow | **Active** (backlog#1147 repl-1) |
+106 -1
View File
@@ -17,7 +17,8 @@
//! when PublicAccessBlock configuration is missing or explicitly set.
use crate::common::{RustFSTestEnvironment, init_logging, local_http_client};
use aws_sdk_s3::types::PublicAccessBlockConfiguration;
use crate::sts_query_compat_test::{OPA_AUTH_TOKEN, OpaMock};
use aws_sdk_s3::types::{PublicAccessBlockConfiguration, Tag, Tagging};
use tracing::info;
async fn setup_public_bucket(
@@ -69,6 +70,110 @@ async fn anonymous_get_object(
local_http_client().get(&url).send().await
}
#[tokio::test]
async fn test_plain_http_matches_secure_transport_false_bucket_policy() -> Result<(), Box<dyn std::error::Error + Send + Sync>> {
init_logging();
let mut env = RustFSTestEnvironment::new().await?;
env.start_rustfs_server(vec![]).await?;
assert!(env.url.starts_with("http://"), "fixture must exercise plaintext HTTP: {}", env.url);
let bucket = "secure-transport-policy";
let key = "plain-http.txt";
let admin = env.create_s3_client();
admin.create_bucket().bucket(bucket).send().await?;
admin
.put_object()
.bucket(bucket)
.key(key)
.body(aws_sdk_s3::primitives::ByteStream::from_static(b"plain http"))
.send()
.await?;
admin
.put_bucket_policy()
.bucket(bucket)
.policy(
serde_json::json!({
"Version": "2012-10-17",
"Statement": [{
"Effect": "Allow",
"Principal": "*",
"Action": "s3:GetObject",
"Resource": format!("arn:aws:s3:::{bucket}/*"),
"Condition": {"Bool": {"aws:SecureTransport": "false"}}
}]
})
.to_string(),
)
.send()
.await?;
let response = anonymous_get_object(&env, bucket, key).await?;
assert_eq!(response.status().as_u16(), 200);
assert_eq!(response.bytes().await?.as_ref(), b"plain http");
Ok(())
}
/// Root credentials have no attached IAM policy, so these requests depend on
/// the owner flag reaching policy evaluation unchanged.
#[tokio::test]
async fn test_root_requests_keep_policy_owner_flag() -> Result<(), Box<dyn std::error::Error + Send + Sync>> {
init_logging();
let opa = OpaMock::start().await?;
let mut env = RustFSTestEnvironment::new().await?;
env.start_rustfs_server_with_env(
vec![],
&[
("RUSTFS_POLICY_PLUGIN_URL", opa.url.as_str()),
("RUSTFS_POLICY_PLUGIN_AUTH_TOKEN", OPA_AUTH_TOKEN),
],
)
.await?;
let bucket = "root-owner-flag";
let key = "owner.txt";
let client = env.create_s3_client();
client.create_bucket().bucket(bucket).send().await?;
client
.put_object()
.bucket(bucket)
.key(key)
.body(aws_sdk_s3::primitives::ByteStream::from_static(b"owner access"))
.send()
.await?;
// Duplicate tag keys are ambiguous, so PutBucketTagging rejects them
// before they can reach stored metadata or the OPA tag-loading path.
let duplicate = client
.put_bucket_tagging()
.bucket(bucket)
.tagging(
Tagging::builder()
.tag_set(Tag::builder().key("department").value("finance").build()?)
.tag_set(Tag::builder().key("department").value("engineering").build()?)
.build()?,
)
.send()
.await
.expect_err("duplicate bucket tag keys must be rejected");
assert_eq!(duplicate.into_service_error().meta().code(), Some("InvalidTag"));
client
.put_bucket_tagging()
.bucket(bucket)
.tagging(
Tagging::builder()
.tag_set(Tag::builder().key("department").value("finance").build()?)
.build()?,
)
.send()
.await?;
let object = client.get_object().bucket(bucket).key(key).send().await?;
assert_eq!(object.body.collect().await?.into_bytes().as_ref(), b"owner access");
Ok(())
}
/// Issue #2036: Anonymous GetObject should succeed when bucket policy allows it
/// and no PublicAccessBlock configuration exists (ConfigNotFound).
#[tokio::test]
+12
View File
@@ -774,6 +774,18 @@ impl RustFSTestEnvironment {
.await
}
/// Like [`Self::start_rustfs_server_from_binary`], but leaves other running RustFS processes
/// alone, so that two servers of different binaries can be alive at once.
pub async fn start_rustfs_server_from_binary_without_cleanup(
&mut self,
binary_path: &Path,
extra_args: Vec<&str>,
extra_env: &[(&str, &str)],
) -> Result<(), Box<dyn std::error::Error + Send + Sync>> {
self.start_rustfs_server_inner_with_binary(binary_path, extra_args, extra_env, false)
.await
}
/// Start RustFS server with basic configuration
pub async fn start_rustfs_server(&mut self, extra_args: Vec<&str>) -> Result<(), Box<dyn std::error::Error + Send + Sync>> {
self.start_rustfs_server_inner(extra_args, &[], true).await
@@ -260,7 +260,7 @@ async fn iam_policy_requires_if_match(env: &RustFSTestEnvironment, admin: &Clien
let key = "guarded.txt";
admin_create_user(env, &user, user_secret).await?;
let policy = serde_json::json!({
let mut policy = serde_json::json!({
"Version": "2012-10-17",
"Statement": [{
"Effect": "Allow",
@@ -268,9 +268,8 @@ async fn iam_policy_requires_if_match(env: &RustFSTestEnvironment, admin: &Clien
"Resource": [format!("arn:aws:s3:::{bucket}/*")],
"Condition": { "Null": { "s3:if-match": "false" } }
}]
})
.to_string();
admin_add_and_attach_policy(env, &policy_name, &policy, &user).await?;
});
admin_add_and_attach_policy(env, &policy_name, &policy.to_string(), &user).await?;
admin.create_bucket().bucket(&bucket).send().await?;
let original = admin
@@ -293,6 +292,46 @@ async fn iam_policy_requires_if_match(env: &RustFSTestEnvironment, admin: &Clien
.expect_err("PutObject without If-Match must be denied");
assert_error(&denied, "AccessDenied", 403, "unconditional PutObject");
let denied = client
.put_object()
.bucket(&bucket)
.key(key)
.if_match(&etag)
.body(ByteStream::from_static(b"missing-read-permission"))
.send()
.await
.expect_err("If-Match without GetObject must be denied");
assert_error(&denied, "AccessDenied", 403, "conditional PutObject without GetObject");
// S3 requires GetObject as well as PutObject for an ETag-based write.
policy["Statement"]
.as_array_mut()
.expect("policy statements")
.push(serde_json::json!({
"Effect": "Allow",
"Action": ["s3:GetObject"],
"Resource": [format!("arn:aws:s3:::{bucket}/{key}")]
}));
admin_add_canned_policy_via(
AdminTransport::Signed,
&env.url,
&env.access_key,
&env.secret_key,
&policy_name,
&policy.to_string(),
)
.await?;
let denied = client
.put_object()
.bucket(&bucket)
.key(key)
.body(ByteStream::from_static(b"blind-overwrite"))
.send()
.await
.expect_err("GetObject permission must not allow an unconditional PutObject");
assert_error(&denied, "AccessDenied", 403, "unconditional PutObject with GetObject");
client
.put_object()
.bucket(&bucket)
@@ -301,6 +340,8 @@ async fn iam_policy_requires_if_match(env: &RustFSTestEnvironment, admin: &Clien
.body(ByteStream::from_static(b"v2"))
.send()
.await?;
let written = client.get_object().bucket(&bucket).key(key).send().await?;
assert_eq!(written.body.collect().await?.into_bytes().as_ref(), b"v2");
let _ = admin.delete_object().bucket(&bucket).key(key).send().await;
let _ = admin.delete_bucket().bucket(&bucket).send().await;
@@ -502,10 +502,163 @@ mod tests {
assert!(response.contains(if expected == reqwest::StatusCode::FORBIDDEN {
"<Code>AccessDenied</Code>"
} else {
"<Code>BucketAlreadyExists</Code>"
"<Code>BucketAlreadyOwnedByYou</Code>"
}));
}
}
Ok(())
}
/// A deployment owns a single bucket namespace, so an IAM user that recreates
/// an existing bucket is the owner, not another account. In the default region
/// every such request returns the legacy idempotent `200 OK` (AWS CreateBucket
/// semantics), including buckets created by root and by another IAM user.
#[tokio::test]
async fn test_create_bucket_duplicate_in_default_region_is_idempotent_for_iam_user()
-> Result<(), Box<dyn Error + Send + Sync>> {
init_logging();
let mut env = RustFSTestEnvironment::new().await?;
env.start_rustfs_server(vec!["--region", "us-east-1"]).await?;
let root = env.create_s3_client();
admin_create_user(&env, "duplicate-iam", "duplicate-iam-secret").await?;
admin_attach_user_policy_via(
AdminTransport::Signed,
&env.url,
&env.access_key,
&env.secret_key,
"readwrite",
"duplicate-iam",
)
.await?;
let iam = Client::from_conf(build_test_s3_config(
&env.url,
"duplicate-iam",
"duplicate-iam-secret",
None,
"duplicate-create",
));
root.create_bucket()
.bucket("duplicate-root-owned")
.send()
.await
.expect("root creates the first bucket");
iam.create_bucket()
.bucket("duplicate-root-owned")
.send()
.await
.expect("an IAM user recreating a root-owned bucket in us-east-1 gets 200 OK");
iam.create_bucket()
.bucket("duplicate-iam-owned")
.send()
.await
.expect("the IAM user creates its own bucket");
iam.create_bucket()
.bucket("duplicate-iam-owned")
.send()
.await
.expect("the same IAM user recreating its bucket gets 200 OK");
root.create_bucket()
.bucket("duplicate-iam-owned")
.send()
.await
.expect("root recreating an IAM-created bucket gets 200 OK");
Ok(())
}
/// Outside the default region the same ownership answer becomes
/// `409 BucketAlreadyOwnedByYou` for every authorized requester. Requests that
/// lack `s3:CreateBucket` still fail authorization before the duplicate check.
#[tokio::test]
async fn test_create_bucket_duplicate_outside_default_region_reports_owned_by_you() -> Result<(), Box<dyn Error + Send + Sync>>
{
init_logging();
let mut env = RustFSTestEnvironment::new().await?;
env.start_rustfs_server(vec!["--region", "eu-west-1"]).await?;
let region = "eu-west-1";
let root = Client::from_conf(
env.create_s3_client()
.config()
.to_builder()
.region(Region::new(region))
.build(),
);
admin_create_user(&env, "duplicate-eu-iam", "duplicate-eu-iam-secret").await?;
admin_attach_user_policy_via(
AdminTransport::Signed,
&env.url,
&env.access_key,
&env.secret_key,
"readwrite",
"duplicate-eu-iam",
)
.await?;
let iam = Client::from_conf(
build_test_s3_config(&env.url, "duplicate-eu-iam", "duplicate-eu-iam-secret", None, "duplicate-create")
.to_builder()
.region(Region::new(region))
.build(),
);
admin_create_user(&env, "duplicate-eu-readonly", "duplicate-eu-readonly-secret").await?;
admin_attach_user_policy_via(
AdminTransport::Signed,
&env.url,
&env.access_key,
&env.secret_key,
"readonly",
"duplicate-eu-readonly",
)
.await?;
let readonly = Client::from_conf(
build_test_s3_config(
&env.url,
"duplicate-eu-readonly",
"duplicate-eu-readonly-secret",
None,
"duplicate-create",
)
.to_builder()
.region(Region::new(region))
.build(),
);
for (client, bucket) in [(&root, "duplicate-eu-root"), (&iam, "duplicate-eu-iam")] {
client
.create_bucket()
.bucket(bucket)
.send()
.await
.unwrap_or_else(|error| panic!("{bucket} must be created: {error:?}"));
// Both the creator and the other authenticated identity own the namespace.
for creator in [&root, &iam] {
let error = creator
.create_bucket()
.bucket(bucket)
.send()
.await
.expect_err("a duplicate create outside us-east-1 must report ownership");
assert_eq!(
error.as_service_error().and_then(ProvideErrorMetadata::code),
Some("BucketAlreadyOwnedByYou"),
"{bucket}"
);
assert_eq!(error.raw_response().map(|response| response.status().as_u16()), Some(409), "{bucket}");
}
}
let denied = readonly
.create_bucket()
.bucket("duplicate-eu-root")
.send()
.await
.expect_err("a requester without s3:CreateBucket must be denied before the duplicate check");
assert_eq!(denied.as_service_error().and_then(ProvideErrorMetadata::code), Some("AccessDenied"));
Ok(())
}
}
@@ -12,11 +12,249 @@
// See the License for the specific language governing permissions and
// limitations under the License.
use super::harness::{DistCluster, DistLayout, TestResult, assert_object_bytes, payload_for, put_object, unique_bucket};
use super::harness::{DistCluster, DistLayout, TestResult, payload_for, s3_probe_client, sha256_hex, unique_bucket};
use crate::common::init_logging;
use aws_sdk_s3::{
Client,
error::{ProvideErrorMetadata, SdkError},
primitives::ByteStream,
};
use std::any::TypeId;
use std::collections::BTreeSet;
use std::fmt::Debug;
use std::future::Future;
use std::sync::Arc;
use std::time::Duration;
use tokio::sync::Barrier;
use tokio::time::Instant;
const LOCK_ADMISSION_BUDGET: Duration = Duration::from_secs(45);
async fn after_lock_contention<T, E, F, Fut>(operation: &str, mut call: F) -> TestResult<Result<T, SdkError<E>>>
where
E: Debug + ProvideErrorMetadata + 'static,
F: FnMut() -> Fut,
Fut: Future<Output = Result<T, SdkError<E>>>,
{
let started = Instant::now();
let mut attempts = 0;
// The workload uses unique unversioned keys. Repeat only explicitly
// advertised lock backpressure; every step still needs its real result.
let outcome = tokio::time::timeout(LOCK_ADMISSION_BUDGET, async {
loop {
attempts += 1;
let result = call().await;
let retry = result.as_ref().err().is_some_and(|error| {
let Some(response) = error.raw_response() else {
return false;
};
let Some(service_error) = error.as_service_error() else {
return false;
};
// HEAD has no XML error body, so its SDK service error can
// lack a code even when the server supplies retry headers.
let namespace_code = service_error.code() == Some("ServiceUnavailable")
|| (service_error.code().is_none()
&& TypeId::of::<E>() == TypeId::of::<aws_sdk_s3::operation::head_object::HeadObjectError>());
response.status().as_u16() == 503
&& namespace_code
&& response.headers().get("x-rustfs-error-cause") == Some("namespace_lock_timeout")
&& response.headers().get("retry-after") == Some("1")
});
if !retry {
return result;
}
tokio::time::sleep(Duration::from_secs(1)).await;
}
})
.await;
if attempts > 1 || !matches!(&outcome, Ok(Ok(_))) {
eprintln!(
"mixed workload request: operation={operation}, attempts={attempts}, elapsed={:?}",
started.elapsed()
);
}
outcome.map_err(|_| {
format!("{operation} exceeded its {LOCK_ADMISSION_BUDGET:?} request budget after {attempts} attempts").into()
})
}
async fn assert_workload_bytes(client: &Client, bucket: &str, key: &str, expected: &[u8]) -> TestResult {
let output = after_lock_contention(&format!("GET {key}"), || client.get_object().bucket(bucket).key(key).send()).await??;
let actual = output.body.collect().await?.into_bytes();
if actual.as_ref() != expected {
return Err(format!(
"object {key} bytes mismatch: expected {} bytes sha256={} got {} bytes sha256={}",
expected.len(),
sha256_hex(expected),
actual.len(),
sha256_hex(&actual)
)
.into());
}
Ok(())
}
#[cfg(test)]
mod tests {
use super::*;
use aws_smithy_http_client::test_util::infallible_client_fn;
use aws_smithy_types::body::SdkBody;
use std::sync::atomic::{AtomicUsize, Ordering};
type Reply = (u16, &'static str, Option<&'static str>, Option<&'static str>, &'static str);
fn client(respond: impl Fn(usize) -> Reply + Send + Sync + 'static) -> (Client, Arc<AtomicUsize>) {
let requests = Arc::new(AtomicUsize::new(0));
let seen = Arc::clone(&requests);
let transport = infallible_client_fn(move |_| {
let (status, code, cause, retry_after, body) = respond(seen.fetch_add(1, Ordering::SeqCst));
let body = if code.is_empty() {
body.to_string()
} else {
format!("<Error><Code>{code}</Code></Error>")
};
let mut response = http::Response::builder()
.status(status)
.header("content-type", "application/xml")
.header("content-length", body.len());
if let Some(cause) = cause {
response = response.header("x-rustfs-error-cause", cause);
}
if let Some(retry_after) = retry_after {
response = response.header("retry-after", retry_after);
}
response.body(SdkBody::from(body)).expect("scripted S3 response")
});
let config = crate::common::build_test_s3_config(
"http://contention.example.invalid",
"synthetic-access",
"synthetic-secret",
None,
"contention-test",
);
let client = Client::from_conf(config.to_builder().http_client(transport).build());
(s3_probe_client(&client), requests)
}
fn contention() -> Reply {
(503, "ServiceUnavailable", Some("namespace_lock_timeout"), Some("1"), "")
}
#[tokio::test(start_paused = true)]
async fn advertised_contention_recovers_after_standard_sdk_attempts_are_exhausted() -> TestResult {
let (client, requests) = client(|attempt| {
if attempt < 3 {
contention()
} else {
(200, "", None, None, "")
}
});
let standard = Client::from_conf(
client
.config()
.to_builder()
.retry_config(aws_sdk_s3::config::retry::RetryConfig::standard().with_max_attempts(3))
.build(),
);
standard
.put_object()
.bucket("bucket")
.key("key")
.body(ByteStream::from_static(b"body"))
.send()
.await
.expect_err("three advertised lock responses exhaust the standard SDK policy");
assert_eq!(requests.load(Ordering::SeqCst), 3);
requests.store(0, Ordering::SeqCst);
let started = Instant::now();
after_lock_contention("PUT recovery", || {
client
.put_object()
.bucket("bucket")
.key("key")
.body(ByteStream::from_static(b"body"))
.send()
})
.await??;
assert_eq!(requests.load(Ordering::SeqCst), 4);
assert!(started.elapsed() >= Duration::from_secs(3), "honor each Retry-After response");
Ok(())
}
#[tokio::test(start_paused = true)]
async fn bodyless_head_contention_uses_explicit_retry_headers() -> TestResult {
let (client, requests) = client(|attempt| {
if attempt == 0 {
(503, "", Some("namespace_lock_timeout"), Some("1"), "")
} else {
(200, "", None, None, "")
}
});
after_lock_contention("HEAD recovery", || client.head_object().bucket("bucket").key("key").send()).await??;
assert_eq!(requests.load(Ordering::SeqCst), 2);
Ok(())
}
#[tokio::test(start_paused = true)]
async fn unrelated_or_malformed_responses_are_not_retried() -> TestResult {
for reply in [
(500, "InternalError", Some("namespace_lock_timeout"), Some("1"), ""),
(403, "AccessDenied", None, None, ""),
(404, "NoSuchKey", None, None, ""),
(503, "ServiceUnavailable", Some("storage_write_quorum"), None, ""),
(503, "ServiceUnavailable", Some("namespace_lock_unavailable"), Some("1"), ""),
(503, "InternalError", Some("namespace_lock_timeout"), Some("1"), ""),
(503, "", Some("namespace_lock_timeout"), Some("1"), ""),
(503, "ServiceUnavailable", None, Some("1"), ""),
(503, "ServiceUnavailable", Some("namespace_lock_timeout"), None, ""),
(503, "ServiceUnavailable", Some("namespace_lock_timeout"), Some("2"), ""),
] {
let (client, requests) = client(move |_| reply);
let result = after_lock_contention("PUT fatal response", || {
client
.put_object()
.bucket("bucket")
.key("key")
.body(ByteStream::from_static(b"body"))
.send()
})
.await?;
assert!(result.is_err(), "fatal response cannot become success: {reply:?}");
assert_eq!(requests.load(Ordering::SeqCst), 1, "fatal response must remain visible: {reply:?}");
}
Ok(())
}
#[tokio::test(start_paused = true)]
async fn persistent_lock_contention_exhausts_the_request_budget() {
let (client, requests) = client(|_| contention());
let started = Instant::now();
let result = after_lock_contention("PUT unavailable", || {
client
.put_object()
.bucket("bucket")
.key("key")
.body(ByteStream::from_static(b"body"))
.send()
})
.await;
assert!(result.is_err(), "persistent contention cannot acknowledge an operation");
assert!(started.elapsed() >= LOCK_ADMISSION_BUDGET);
assert!(requests.load(Ordering::SeqCst) > 1);
assert!(requests.load(Ordering::SeqCst) <= LOCK_ADMISSION_BUDGET.as_secs() as usize + 1);
}
#[tokio::test(start_paused = true)]
async fn acknowledged_wrong_bytes_fail_without_retry() {
let (client, requests) = client(|_| (200, "", None, None, "wrong bytes"));
let error = assert_workload_bytes(&client, "bucket", "key", b"expected bytes")
.await
.expect_err("a successful but incorrect read is a consistency failure");
assert!(error.to_string().contains("bytes mismatch"));
assert_eq!(requests.load(Ordering::SeqCst), 1);
}
}
#[tokio::test]
async fn four_node_high_concurrency_mixed_workload_is_consistent_on_every_node() -> TestResult {
@@ -24,7 +262,9 @@ async fn four_node_high_concurrency_mixed_workload_is_consistent_on_every_node()
let dist = DistCluster::start(DistLayout::FourByFour).await?;
let bucket = unique_bucket("conc");
dist.create_bucket(&bucket).await?;
let clients = Arc::new(dist.clients()?);
// This consistency probe owns its admission policy; unrelated responses
// must not be hidden by the SDK's general-purpose retries.
let clients = Arc::new(dist.clients()?.iter().map(s3_probe_client).collect::<Vec<_>>());
let worker_count = 24;
let rounds = 4;
let barrier = Arc::new(Barrier::new(worker_count));
@@ -44,31 +284,46 @@ async fn four_node_high_concurrency_mixed_workload_is_consistent_on_every_node()
let key = format!("source/worker-{idx:02}-round-{round}.bin");
let copy_key = format!("retained/worker-{idx:02}-round-{round}.bin");
let body = payload_for(&key, 64 * 1024);
put_object(writer, &bucket, &key, body.clone()).await?;
let context = format!("worker={idx} round={round}");
after_lock_contention(&format!("{context} PUT source"), || {
writer
.put_object()
.bucket(&bucket)
.key(&key)
.body(ByteStream::from(body.clone()))
.send()
})
.await??;
let head = reader.head_object().bucket(&bucket).key(&key).send().await?;
let head = after_lock_contention(&format!("{context} HEAD source"), || {
reader.head_object().bucket(&bucket).key(&key).send()
})
.await??;
if head.content_length() != Some(body.len() as i64) {
return Err(format!("HEAD returned the wrong size for {key}: {head:?}").into());
}
assert_object_bytes(reader, &bucket, &key, &body).await?;
assert_workload_bytes(reader, &bucket, &key, &body).await?;
copier
.copy_object()
.bucket(&bucket)
.key(&copy_key)
.copy_source(format!("{bucket}/{key}"))
.send()
.await?;
assert_object_bytes(writer, &bucket, &copy_key, &body).await?;
after_lock_contention(&format!("{context} COPY retained"), || {
copier
.copy_object()
.bucket(&bucket)
.key(&copy_key)
.copy_source(format!("{bucket}/{key}"))
.send()
})
.await??;
assert_workload_bytes(writer, &bucket, &copy_key, &body).await?;
writer.delete_object().bucket(&bucket).key(&key).send().await?;
let missing = reader
.head_object()
.bucket(&bucket)
.key(&key)
.send()
.await
.expect_err("deleted source key must not remain visible");
after_lock_contention(&format!("{context} DELETE source"), || {
writer.delete_object().bucket(&bucket).key(&key).send()
})
.await??;
let missing = after_lock_contention(&format!("{context} HEAD deleted source"), || {
reader.head_object().bucket(&bucket).key(&key).send()
})
.await?
.expect_err("deleted source key must not remain visible");
if missing.raw_response().map(|response| response.status().as_u16()) != Some(404) {
return Err(format!("deleted source {key} returned an unexpected result: {missing:?}").into());
}
@@ -82,14 +337,22 @@ async fn four_node_high_concurrency_mixed_workload_is_consistent_on_every_node()
for handle in handles {
inventory.extend(handle.await??);
}
assert_eq!(
inventory.len(),
worker_count * rounds,
"every worker round must retain its acknowledged copy"
);
let expected_keys: BTreeSet<_> = inventory.iter().map(|(key, _)| key.as_str()).collect();
for (node_idx, client) in clients.iter().enumerate() {
let listed = client.list_objects_v2().bucket(&bucket).prefix("retained/").send().await?;
let listed = after_lock_contention(&format!("node={node_idx} LIST retained"), || {
client.list_objects_v2().bucket(&bucket).prefix("retained/").send()
})
.await??;
let listed_keys: BTreeSet<_> = listed.contents().iter().filter_map(|object| object.key()).collect();
assert_eq!(listed_keys, expected_keys, "node {node_idx} returned a divergent retained-key listing");
for (key, body) in &inventory {
assert_object_bytes(client, &bucket, key, body)
assert_workload_bytes(client, &bucket, key, body)
.await
.map_err(|error| format!("node {node_idx} failed to read {key}: {error}"))?;
}
@@ -1285,7 +1285,9 @@ async fn list_parts_disk_loss_after_metadata_read(
let error = result.expect_err("one missing directory and three unavailable participants cannot prove an empty upload");
let response = error.raw_response().expect("ListParts must return an S3 service response");
assert_eq!(response.status().as_u16(), 503);
assert_eq!(error.as_service_error().and_then(|err| err.meta().code()), Some("SlowDownRead"));
// Since #9149, SlowDownRead is reserved for GET/HEAD object reads; a
// ListParts read-quorum failure is reported as ServiceUnavailable.
assert_eq!(error.as_service_error().and_then(|err| err.meta().code()), Some("ServiceUnavailable"));
assert!(response.headers().get("x-rustfs-error-cause").is_none());
assert!(response.headers().get("retry-after").is_none());
assert!(
@@ -25,7 +25,8 @@
use super::harness::{
DistCluster, DistLayout, TestResult, cluster_admin, cluster_admin_ok, decommission_status_json, get_object_bytes,
payload_for, put_object, s3_probe_client, s3_probe_error_code, sha256_hex, unique_bucket, wait_until,
payload_for, put_object, rebalance_complete, rebalance_status_json, s3_probe_client, s3_probe_error_code, sha256_hex,
unique_bucket, wait_until,
};
use crate::chaos::{VersionShardCensus, census_object_version_on_disk};
use crate::common::{FAST_DATA_USAGE_SCANNER_ENV, RustFSTestClusterEnvironment};
@@ -47,6 +48,7 @@ use tokio::time::{Instant, sleep};
use uuid::Uuid;
pub(crate) const MOVEMENT_BARRIER_DIR_ENV: &str = "RUSTFS_E2E_DATA_MOVEMENT_BARRIER_DIR";
pub(crate) const STAGE_AFTER_ENTRY_ADMISSION: &str = "after_entry_admission";
pub(crate) const STAGE_BEFORE_TARGET_COMMIT: &str = "before_target_commit";
pub(crate) const STAGE_BEFORE_SOURCE_CLEANUP: &str = "before_source_cleanup";
pub(crate) const STAGE_AFTER_RESPONSIBILITY_PERSISTED: &str = "after_responsibility_persisted";
@@ -1166,8 +1168,21 @@ pub(crate) async fn clear_decommission(cluster: &RustFSTestClusterEnvironment, p
.await
}
pub(crate) async fn stop_rebalance(cluster: &RustFSTestClusterEnvironment) -> TestResult<String> {
cluster_admin_ok(cluster, Method::POST, "/rustfs/admin/v3/rebalance/stop", None).await
pub(crate) async fn stop_rebalance(cluster: &RustFSTestClusterEnvironment, expected_id: &str) -> TestResult<String> {
let path = "/rustfs/admin/v3/rebalance/stop";
let (status, response) = cluster_admin(cluster, Method::POST, path, None).await?;
if status.is_success() {
return Ok(response);
}
// The run can finish between the active observation and the stop request.
// Only completion of that same run makes a not-started response acceptable.
if status == StatusCode::NOT_FOUND
&& response.contains("<Code>NoSuchResource</Code>")
&& rebalance_complete(&rebalance_status_json(cluster).await?, expected_id)?
{
return Ok(response);
}
Err(format!("POST {path} failed: {status} {response}").into())
}
pub(crate) fn decommission_pool_entry(status: &Value, pool_id: usize) -> TestResult<Value> {
@@ -1585,6 +1600,129 @@ pub(crate) async fn assert_every_node_serves(dist: &DistCluster, bucket: &str, l
mod tests {
use super::*;
const REBALANCE_NOT_STARTED: &str =
"<Error><Code>NoSuchResource</Code><Message>pool rebalance is not started</Message></Error>";
async fn mock_rebalance_stop(
stop_status: StatusCode,
stop_body: &str,
run_status: Value,
) -> TestResult<(TestResult<String>, Vec<String>)> {
use bytes::Bytes;
use http_body_util::Full;
use hyper::service::service_fn;
use hyper_util::rt::TokioIo;
use tokio::net::TcpListener;
use tokio::sync::mpsc;
use tokio::task::JoinSet;
let listener = TcpListener::bind("127.0.0.1:0").await?;
let mut cluster = RustFSTestClusterEnvironment::new(1).await?;
cluster.nodes[0].url = format!("http://{}", listener.local_addr()?);
let stop_body = stop_body.to_string();
let (requests_tx, mut requests_rx) = mpsc::unbounded_channel();
let mut server = JoinSet::new();
server.spawn(async move {
loop {
let (stream, _) = match listener.accept().await {
Ok(connection) => connection,
Err(error) => return Err::<(), Box<dyn std::error::Error + Send + Sync>>(error.into()),
};
let stop_body = stop_body.clone();
let run_status = run_status.clone();
let requests_tx = requests_tx.clone();
let handler = service_fn(move |request: hyper::Request<hyper::body::Incoming>| {
let route = format!("{} {}", request.method(), request.uri().path());
requests_tx.send(route.clone()).expect("record mock admin request");
let (status, body) = match route.as_str() {
"POST /rustfs/admin/v3/rebalance/stop" => (stop_status, stop_body.clone()),
"GET /rustfs/admin/v3/rebalance/status" => (StatusCode::OK, run_status.to_string()),
_ => (StatusCode::BAD_REQUEST, "unexpected admin request".to_string()),
};
async move { http::Response::builder().status(status).body(Full::new(Bytes::from(body))) }
});
hyper::server::conn::http1::Builder::new()
.keep_alive(false)
.serve_connection(TokioIo::new(stream), handler)
.await?;
}
});
let outcome = tokio::time::timeout(Duration::from_secs(5), stop_rebalance(&cluster, "run-1")).await?;
server.abort_all();
let requests = std::iter::from_fn(|| requests_rx.try_recv().ok()).collect();
Ok((outcome, requests))
}
fn completed_rebalance() -> Value {
serde_json::json!({
"id": "run-1",
"pools": [
{ "id": 0, "status": "Completed", "progress": { "versions": 113 } },
{ "id": 1, "status": "None" }
]
})
}
#[tokio::test]
async fn rebalance_stop_success_does_not_query_completion() -> TestResult {
let (outcome, requests) = mock_rebalance_stop(StatusCode::OK, "", Value::Null).await?;
assert_eq!(outcome?, "");
assert_eq!(requests, ["POST /rustfs/admin/v3/rebalance/stop"]);
Ok(())
}
#[tokio::test]
async fn rebalance_stop_accepts_completed_run_after_not_started_response() -> TestResult {
let (outcome, requests) =
mock_rebalance_stop(StatusCode::NOT_FOUND, REBALANCE_NOT_STARTED, completed_rebalance()).await?;
outcome?;
assert_eq!(
requests,
[
"POST /rustfs/admin/v3/rebalance/stop",
"GET /rustfs/admin/v3/rebalance/status"
]
);
Ok(())
}
#[tokio::test]
async fn rebalance_stop_rejects_unproven_completion_and_other_errors() -> TestResult {
let complete = completed_rebalance();
let mut invalid = vec![Value::Null];
for (pointer, value) in [
("/id", serde_json::json!("run-2")),
("/pools/0/status", serde_json::json!("Started")),
("/pools/0/status", serde_json::json!("Failed")),
("/pools/0/status", serde_json::json!("Stopped")),
("/pools/0/progress/versions", serde_json::json!(0)),
] {
let mut status = complete.clone();
*status.pointer_mut(pointer).expect("completion fixture field") = value;
invalid.push(status);
}
let mut pending = complete.clone();
pending["stopPropagation"] = serde_json::json!({ "pendingTerminalReload": true });
invalid.push(pending);
let mut failed = complete.clone();
failed["pools"][0]["lastError"] = serde_json::json!("migration failed");
invalid.push(failed);
for status in invalid {
let (outcome, _) = mock_rebalance_stop(StatusCode::NOT_FOUND, REBALANCE_NOT_STARTED, status.clone()).await?;
assert!(outcome.is_err(), "unproven completion accepted: {status}");
}
for (code, body) in [
(StatusCode::FORBIDDEN, REBALANCE_NOT_STARTED),
(StatusCode::INTERNAL_SERVER_ERROR, REBALANCE_NOT_STARTED),
(StatusCode::NOT_FOUND, "<Error><Code>NoSuchBucket</Code></Error>"),
] {
let (outcome, requests) = mock_rebalance_stop(code, body, complete.clone()).await?;
assert!(outcome.is_err(), "unrelated error accepted: {code} {body}");
assert_eq!(requests, ["POST /rustfs/admin/v3/rebalance/stop"]);
}
Ok(())
}
#[test]
fn version_ids_normalize_null_spellings() {
for spelling in [None, Some(""), Some("null"), Some("00000000-0000-0000-0000-000000000000")] {
@@ -28,7 +28,7 @@ use super::harness::{
wait_for_rebalance_active, wait_for_rebalance_complete,
};
use super::scanner_heal_topology_fixture::{
LiveWorkload, MOVEMENT_ACTIVE_TIMEOUT, MOVEMENT_COMPLETE_TIMEOUT, MovementOperation, SEED_POOL,
LiveWorkload, MOVEMENT_ACTIVE_TIMEOUT, MOVEMENT_COMPLETE_TIMEOUT, MovementOperation, SEED_POOL, STAGE_AFTER_ENTRY_ADMISSION,
STAGE_AFTER_RESPONSIBILITY_PERSISTED, STAGE_BEFORE_SOURCE_CLEANUP, STAGE_BEFORE_TARGET_COMMIT, TopologyManifest, TopologyRun,
assert_bucket_durability_strict, assert_every_node_serves, assert_probe_objects, assert_process_durability_strict,
assert_seed_pool_census_unchanged, assert_single_pool_placement, cancel_decommission, capture_seed_pool_census,
@@ -274,6 +274,7 @@ async fn wait_for_rebalance_stopped_or_completed(run: &TopologyRun, rebalance_id
#[tokio::test]
async fn scanner_heal_topology_rebalance_survives_live_writes_stop_and_restart() -> TestResult {
init_logging();
require_test_hooks();
let mut run = TopologyRun::start("rebalance").await?;
let manifest = seed_manifest(&run).await?;
assert_bucket_durability_strict(&run.dist.cluster, &manifest.buckets()).await?;
@@ -288,23 +289,52 @@ async fn scanner_heal_topology_rebalance_survives_live_writes_stop_and_restart()
.map(|entry| (entry.key.clone(), entry.sha256.clone()))
.collect();
let first_id = start_rebalance(&run.dist.cluster).await?;
wait_for_rebalance_active(&run.dist.cluster, &first_id, MOVEMENT_ACTIVE_TIMEOUT).await?;
let during_rebalance = put_probe_objects(&run.dist, &scratch, "during-rebalance", 4).await?;
let workload = tokio::spawn(run_live_workload(LiveWorkload {
clients: run.dist.clients()?,
bucket: scratch.clone(),
prefix: "live".to_string(),
writers: LIVE_WRITERS,
rounds: LIVE_ROUNDS,
baseline_bucket: manifest.plain_bucket.clone(),
baseline: baseline.clone(),
pause: Duration::from_millis(100),
}));
sleep(Duration::from_secs(2)).await;
stop_rebalance(&run.dist.cluster).await?;
let (first_outcome, first_status) = wait_for_rebalance_stopped_or_completed(&run, &first_id).await?;
let ops = workload.await??;
// Keep an admitted entry on the source until stop cancels admission. Start
// propagation may await that entry, so observe and stop before awaiting ACK.
let first_key = manifest.plain_key("external", 0)?;
run.movement_barrier
.arm_movement("rebalance", &manifest.plain_bucket, &first_key, STAGE_AFTER_ENTRY_ADMISSION)?;
let observe_first = async {
let (observed_id, reached) = tokio::time::timeout(MOVEMENT_ACTIVE_TIMEOUT, async {
let reached = run.movement_barrier.wait_reached(MOVEMENT_ACTIVE_TIMEOUT).await?;
let status = rebalance_status_json(&run.dist.cluster).await?;
let observed_id = status
.get("id")
.and_then(Value::as_str)
.ok_or("rebalance status omitted id")?;
wait_for_rebalance_active(&run.dist.cluster, observed_id, MOVEMENT_ACTIVE_TIMEOUT).await?;
Ok::<_, Box<dyn std::error::Error + Send + Sync>>((observed_id.to_string(), reached))
})
.await??;
let probes = put_probe_objects(&run.dist, &scratch, "during-rebalance", 4).await?;
let workload = run_live_workload(LiveWorkload {
clients: run.dist.clients()?,
bucket: scratch.clone(),
prefix: "live".to_string(),
writers: LIVE_WRITERS,
rounds: LIVE_ROUNDS,
baseline_bucket: manifest.plain_bucket.clone(),
baseline: baseline.clone(),
pause: Duration::from_millis(100),
});
let stop = async {
sleep(Duration::from_secs(2)).await;
stop_rebalance(&run.dist.cluster, &observed_id).await?;
let (outcome, status) = wait_for_rebalance_stopped_or_completed(&run, &observed_id).await?;
if outcome != "stopped" {
return Err("rebalance completed before stop; mid-run stop was not exercised".into());
}
Ok::<_, Box<dyn std::error::Error + Send + Sync>>((outcome, status))
};
let (ops, (outcome, status)) = tokio::try_join!(workload, stop)?;
Ok::<_, Box<dyn std::error::Error + Send + Sync>>((observed_id, reached, probes, ops, outcome, status))
};
let (first_id, (observed_id, first_reached, during_rebalance, ops, first_outcome, first_status)) =
tokio::try_join!(start_rebalance(&run.dist.cluster), observe_first)?;
if first_id != observed_id {
return Err(format!("rebalance start acknowledged {first_id}, but the stopped run was {observed_id}").into());
}
run.movement_barrier.disarm()?;
let live_state = expected_live_state(&ops);
for node_idx in 0..run.dist.cluster.nodes.len() {
@@ -333,8 +363,40 @@ async fn scanner_heal_topology_rebalance_survives_live_writes_stop_and_restart()
verify_from_every_node(&run.dist, &manifest, "after restart following the stop").await?;
verify_live_state(&run.dist.client(0)?, &scratch, &live_state, "after restart following the stop").await?;
let second_id = start_rebalance(&run.dist.cluster).await?;
wait_for_rebalance_active(&run.dist.cluster, &second_id, MOVEMENT_ACTIVE_TIMEOUT).await?;
// A short second run can finish before the start response reaches us.
// Hold one remaining source entry until its active state is observed.
let mut second_key = None;
for entry in manifest.plain_entries() {
if pools_holding(&run.dist, &manifest.plain_bucket, &entry.key, None)?.contains(&SEED_POOL) {
second_key = Some(entry.key.clone());
break;
}
}
let second_key = second_key.ok_or("no seed-pool object remains for the second rebalance")?;
let second_barrier = run.movement_barrier.next_phase();
second_barrier.arm_movement("rebalance", &manifest.plain_bucket, &second_key, STAGE_BEFORE_SOURCE_CLEANUP)?;
let observe_second = async {
let reached = second_barrier.wait_reached(MOVEMENT_ACTIVE_TIMEOUT).await?;
let status = rebalance_status_json(&run.dist.cluster).await?;
let observed_id = status
.get("id")
.and_then(Value::as_str)
.ok_or("rebalance status omitted id")?;
if observed_id == first_id {
return Err("the second rebalance reused the stopped run id".into());
}
wait_for_rebalance_active(&run.dist.cluster, observed_id, MOVEMENT_ACTIVE_TIMEOUT).await?;
second_barrier.disarm()?;
second_barrier.release_movement()?;
Ok::<_, Box<dyn std::error::Error + Send + Sync>>((observed_id.to_string(), reached))
};
// Worker propagation can hold the start response until movement drains.
let (second_id, (observed_id, second_reached)) = tokio::try_join!(start_rebalance(&run.dist.cluster), async {
tokio::time::timeout(MOVEMENT_ACTIVE_TIMEOUT, observe_second).await?
})?;
if second_id != observed_id {
return Err(format!("rebalance start acknowledged {second_id}, but the active run was {observed_id}").into());
}
wait_for_rebalance_complete(&run.dist.cluster, &second_id, MOVEMENT_COMPLETE_TIMEOUT).await?;
verify_from_every_node(&run.dist, &manifest, "after the second rebalance completed").await?;
verify_live_state(&run.dist.client(3)?, &scratch, &live_state, "after the second rebalance completed").await?;
@@ -351,8 +413,8 @@ async fn scanner_heal_topology_rebalance_survives_live_writes_stop_and_restart()
&json!({
"gate": "G-REB",
"manifest": manifest_summary(&manifest),
"first_run": { "id": first_id, "outcome": first_outcome, "status": first_status, "versions_held_by_two_pools_after_stop": retained_after_stop },
"second_run": { "id": second_id, "versions_off_seed_pool": moved },
"first_run": { "id": first_id, "outcome": first_outcome, "status": first_status, "versions_held_by_two_pools_after_stop": retained_after_stop, "barrier_object": first_key, "barrier": first_reached },
"second_run": { "id": second_id, "versions_off_seed_pool": moved, "barrier_object": second_key, "barrier": second_reached },
"live_ops": ops,
"probe_placement_during_rebalance": during_placement,
"process_durability_strict_nodes": strict_nodes,
@@ -493,7 +493,12 @@ async fn compare_degraded_legacy_list_parts(dist: &mut DistCluster, seed: &Upgra
assert!(legacy.parts().is_empty());
let current = current.expect_err("current coordinator must not infer empty from missing directories and offline disks");
assert_eq!(current.raw_response().expect("current S3 response").status().as_u16(), 503);
assert_eq!(current.as_service_error().and_then(|error| error.meta().code()), Some("SlowDownRead"));
// Since #9149, SlowDownRead is reserved for GET/HEAD object reads; a
// ListParts read-quorum failure is reported as ServiceUnavailable.
assert_eq!(
current.as_service_error().and_then(|error| error.meta().code()),
Some("ServiceUnavailable")
);
dist.cluster.start_node_from_binary(3, previous).await?;
wait_for_upgrade_write_readiness(&clients, &seed.history_bucket, "mixed-list-restored", CREDENTIAL_TIMEOUT).await?;
for (path, before) in original_files {
@@ -0,0 +1,524 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! What one stack answered, and how two answers are compared.
//!
//! An [`Observation`] keeps only what a client acts on: the HTTP status, the S3 error code, the
//! allowlisted response headers and a few typed fields decoded from the response. The error
//! message is kept for diagnostics and never compared: message wording is judged by the wire
//! corpus, not here. The comparator is pure so it can be tested without a server.
use serde::Serialize;
use std::collections::{BTreeMap, BTreeSet};
use std::path::{Path, PathBuf};
/// Response headers compared exactly (after [`normalized_header_value`]).
const HEADER_ALLOWLIST: [&str; 7] = [
"content-type",
"x-amz-version-id",
"etag",
"x-amz-delete-marker",
"content-range",
"accept-ranges",
"x-amz-request-charged",
];
/// Every response header with this prefix is compared as well.
const HEADER_ALLOWLIST_PREFIX: &str = "x-amz-server-side-encryption";
/// Placeholder for a field one side did not send.
const ABSENT: &str = "<absent>";
/// The lowercase header name if the comparator looks at this header.
pub(crate) fn compared_header(name: &str) -> Option<String> {
let name = name.to_ascii_lowercase();
(HEADER_ALLOWLIST.contains(&name.as_str()) || name.starts_with(HEADER_ALLOWLIST_PREFIX)).then_some(name)
}
/// A version ID is minted per process, so its value never matches across two servers; only
/// whether it is the literal `null` (an unversioned write) carries meaning.
fn normalized_header_value(name: &str, value: &str) -> String {
if name == "x-amz-version-id" && value != "null" {
"<version-id>".to_owned()
} else {
value.to_owned()
}
}
/// One request's outcome as a client sees it.
#[derive(Clone, Debug, Serialize)]
pub(crate) struct Observation {
/// The S3 operation, named as in the `s3s::S3` trait (`GetObject`).
pub op: &'static str,
/// Which request of the script this was (`normal`, `negative`, or a setup label).
pub case: &'static str,
/// HTTP status; 0 when no response arrived.
pub status: u16,
/// The S3 error code, or the SDK's error kind when there was no service error.
pub error_code: Option<String>,
/// Allowlisted headers only, lowercase names, normalized values.
pub headers: BTreeMap<String, String>,
/// Typed values decoded from the response body, never free text.
pub fields: BTreeMap<String, String>,
/// Diagnostic only; never compared.
#[serde(skip)]
pub message: Option<String>,
}
impl Observation {
/// Builds an observation, keeping only the allowlisted headers.
pub(crate) fn new<'h>(
op: &'static str,
case: &'static str,
status: u16,
error_code: Option<String>,
headers: impl IntoIterator<Item = (&'h str, &'h str)>,
) -> Self {
let headers = headers
.into_iter()
.filter_map(|(name, value)| compared_header(name).map(|name| (name, value)))
.map(|(name, value)| {
let value = normalized_header_value(&name, value);
(name, value)
})
.collect();
Self {
op,
case,
status,
error_code,
headers,
fields: BTreeMap::new(),
message: None,
}
}
pub(crate) fn with_field(mut self, name: &str, value: impl Into<String>) -> Self {
self.fields.insert(name.to_owned(), value.into());
self
}
pub(crate) fn is_success(&self) -> bool {
(200..300).contains(&self.status)
}
}
/// One field on which the two stacks answered differently.
#[derive(Clone, Debug, PartialEq, Eq, Serialize)]
pub(crate) struct Difference {
pub op: String,
pub case: String,
pub field: String,
pub a: String,
pub b: String,
}
/// Every difference between two transcripts of the same script, matched by `(op, case)`.
pub(crate) fn compare(a: &[Observation], b: &[Observation]) -> Vec<Difference> {
let mut differences = Vec::new();
let (index_a, duplicates_a) = index(a);
let (index_b, duplicates_b) = index(b);
for (op, case) in duplicates_a.union(&duplicates_b) {
let count = |side: &[Observation]| {
side.iter()
.filter(|observation| (observation.op, observation.case) == (*op, *case))
.count()
.to_string()
};
differences.push(difference(op, case, "duplicate_case", count(a), count(b)));
}
let keys: BTreeSet<_> = index_a.keys().chain(index_b.keys()).copied().collect();
for key @ (op, case) in keys {
match (index_a.get(&key), index_b.get(&key)) {
(Some(a), Some(b)) => compare_one(a, b, &mut differences),
(a, b) => {
let presence = |side: Option<&&Observation>| if side.is_some() { "present" } else { ABSENT }.to_owned();
differences.push(difference(op, case, "observation", presence(a), presence(b)));
}
}
}
differences
}
type Key = (&'static str, &'static str);
fn index(side: &[Observation]) -> (BTreeMap<Key, &Observation>, BTreeSet<Key>) {
let mut index = BTreeMap::new();
let mut duplicates = BTreeSet::new();
for observation in side {
let key = (observation.op, observation.case);
if index.insert(key, observation).is_some() {
duplicates.insert(key);
}
}
(index, duplicates)
}
fn difference(op: &str, case: &str, field: &str, a: String, b: String) -> Difference {
Difference {
op: op.to_owned(),
case: case.to_owned(),
field: field.to_owned(),
a,
b,
}
}
fn compare_one(a: &Observation, b: &Observation, differences: &mut Vec<Difference>) {
let mut field = |name: String, value_a: Option<&str>, value_b: Option<&str>| {
if value_a != value_b {
let show = |value: Option<&str>| value.unwrap_or(ABSENT).to_owned();
differences.push(difference(a.op, a.case, &name, show(value_a), show(value_b)));
}
};
field(
"status".to_owned(),
Some(a.status.to_string().as_str()),
Some(b.status.to_string().as_str()),
);
field("error_code".to_owned(), a.error_code.as_deref(), b.error_code.as_deref());
let headers: BTreeSet<_> = a.headers.keys().chain(b.headers.keys()).collect();
for name in headers {
field(
format!("header.{name}"),
a.headers.get(name).map(String::as_str),
b.headers.get(name).map(String::as_str),
);
}
let fields: BTreeSet<_> = a.fields.keys().chain(b.fields.keys()).collect();
for name in fields {
field(
format!("body.{name}"),
a.fields.get(name).map(String::as_str),
b.fields.get(name).map(String::as_str),
);
}
}
/// Operations observed on both sides.
pub(crate) fn compared_ops(a: &[Observation], b: &[Observation]) -> BTreeSet<&'static str> {
let ops_b: BTreeSet<_> = b.iter().map(|observation| observation.op).collect();
a.iter()
.map(|observation| observation.op)
.filter(|op| ops_b.contains(op))
.collect()
}
/// `(op, case)` pairs observed on both sides.
pub(crate) fn compared_cases(a: &[Observation], b: &[Observation]) -> usize {
let cases_b: BTreeSet<_> = b.iter().map(|observation| (observation.op, observation.case)).collect();
a.iter()
.map(|observation| (observation.op, observation.case))
.collect::<BTreeSet<_>>()
.intersection(&cases_b)
.count()
}
/// The JSON report written for every run.
#[derive(Debug, Serialize)]
pub(crate) struct Report {
pub schema: u32,
pub run: String,
pub stack_a: String,
pub stack_b: String,
/// Which side is the pinned release binary: `"a"`, or `None` when both sides are the binary
/// under test.
pub reference_side: Option<&'static str>,
/// `--version` output of the binary each side actually ran.
pub version_a: String,
pub version_b: String,
pub region_a: Option<String>,
pub region_b: Option<String>,
pub compared_ops: usize,
pub compared_cases: usize,
pub differences: Vec<Difference>,
}
impl Report {
/// Writes the report as `<directory>/<run>.json` and returns its path.
pub(crate) fn write_to(&self, directory: &Path) -> std::io::Result<PathBuf> {
std::fs::create_dir_all(directory)?;
let path = directory.join(format!("{}.json", self.run));
let json = serde_json::to_vec_pretty(self).map_err(std::io::Error::other)?;
std::fs::write(&path, json)?;
Ok(path)
}
}
/// One line per difference, for a failing assertion.
pub(crate) fn render(differences: &[Difference]) -> String {
differences
.iter()
.map(|d| format!("({}, {}, {}, a={:?}, b={:?})", d.op, d.case, d.field, d.a, d.b))
.collect::<Vec<_>>()
.join("\n")
}
#[cfg(test)]
mod tests {
use super::*;
fn ok(op: &'static str) -> Observation {
Observation::new(op, "normal", 200, None, [("content-type", "application/xml")])
}
fn fields(differences: &[Difference]) -> Vec<&str> {
differences.iter().map(|d| d.field.as_str()).collect()
}
#[test]
fn identical_transcripts_have_no_difference() {
let a = vec![
ok("HeadBucket"),
ok("GetBucketLocation").with_field("location_constraint", "us-east-1"),
];
let b = a.clone();
assert_eq!(compare(&a, &b), Vec::new());
assert_eq!(compared_ops(&a, &b).len(), 2);
}
#[test]
fn a_status_difference_is_reported() {
let a = vec![ok("PutBucketAcl")];
let b = vec![Observation::new(
"PutBucketAcl",
"normal",
403,
None,
[("content-type", "application/xml")],
)];
assert_eq!(
compare(&a, &b),
vec![Difference {
op: "PutBucketAcl".into(),
case: "normal".into(),
field: "status".into(),
a: "200".into(),
b: "403".into(),
}]
);
}
#[test]
fn an_error_code_difference_is_reported() {
let a = vec![Observation::new("GetObject", "negative", 404, Some("NoSuchKey".into()), [])];
let b = vec![Observation::new(
"GetObject",
"negative",
404,
Some("NoSuchBucket".into()),
[],
)];
let differences = compare(&a, &b);
assert_eq!(fields(&differences), ["error_code"]);
assert_eq!((differences[0].a.as_str(), differences[0].b.as_str()), ("NoSuchKey", "NoSuchBucket"));
}
#[test]
fn an_error_code_on_one_side_only_is_reported() {
let a = vec![Observation::new("HeadBucket", "negative", 404, Some("NotFound".into()), [])];
let b = vec![Observation::new("HeadBucket", "negative", 404, None, [])];
let differences = compare(&a, &b);
assert_eq!(fields(&differences), ["error_code"]);
assert_eq!(differences[0].b, ABSENT);
}
#[test]
fn an_allowlisted_header_difference_is_reported() {
let a = vec![Observation::new("HeadObject", "normal", 200, None, [("ETag", "\"aa\"")])];
let b = vec![Observation::new("HeadObject", "normal", 200, None, [("etag", "\"bb\"")])];
assert_eq!(fields(&compare(&a, &b)), ["header.etag"]);
}
#[test]
fn a_header_sent_by_one_side_only_is_reported() {
let a = vec![Observation::new(
"DeleteObject",
"normal",
204,
None,
[("x-amz-delete-marker", "true")],
)];
let b = vec![Observation::new("DeleteObject", "normal", 204, None, [])];
let differences = compare(&a, &b);
assert_eq!(fields(&differences), ["header.x-amz-delete-marker"]);
assert_eq!((differences[0].a.as_str(), differences[0].b.as_str()), ("true", ABSENT));
}
#[test]
fn every_server_side_encryption_header_is_compared() {
let header = "x-amz-server-side-encryption-customer-key-md5";
let a = vec![Observation::new("PutObject", "sse-c", 200, None, [(header, "one")])];
let b = vec![Observation::new("PutObject", "sse-c", 200, None, [(header, "two")])];
assert_eq!(fields(&compare(&a, &b)), [format!("header.{header}")]);
}
#[test]
fn headers_outside_the_allowlist_are_not_compared() {
let a = vec![Observation::new(
"ListBuckets",
"normal",
200,
None,
[
("date", "Mon"),
("x-amz-request-id", "1"),
("server", "a"),
("content-length", "10"),
],
)];
let b = vec![Observation::new(
"ListBuckets",
"normal",
200,
None,
[
("date", "Tue"),
("x-amz-request-id", "2"),
("server", "b"),
("content-length", "11"),
],
)];
assert_eq!(compare(&a, &b), Vec::new());
assert!(a[0].headers.is_empty(), "non-allowlisted headers were kept: {:?}", a[0].headers);
}
#[test]
fn distinct_version_ids_are_not_a_difference() {
let a = vec![Observation::new(
"PutObject",
"normal",
200,
None,
[("x-amz-version-id", "0b1c")],
)];
let b = vec![Observation::new(
"PutObject",
"normal",
200,
None,
[("x-amz-version-id", "9f8e")],
)];
assert_eq!(compare(&a, &b), Vec::new());
}
#[test]
fn a_null_version_id_against_a_real_one_is_reported() {
let a = vec![Observation::new(
"PutObject",
"normal",
200,
None,
[("x-amz-version-id", "null")],
)];
let b = vec![Observation::new(
"PutObject",
"normal",
200,
None,
[("x-amz-version-id", "9f8e")],
)];
assert_eq!(fields(&compare(&a, &b)), ["header.x-amz-version-id"]);
}
#[test]
fn a_body_field_difference_is_reported() {
let a = vec![ok("GetBucketLocation").with_field("location_constraint", "us-east-1")];
let b = vec![ok("GetBucketLocation").with_field("location_constraint", "eu-west-1")];
let differences = compare(&a, &b);
assert_eq!(fields(&differences), ["body.location_constraint"]);
assert_eq!((differences[0].a.as_str(), differences[0].b.as_str()), ("us-east-1", "eu-west-1"));
}
#[test]
fn a_body_field_on_one_side_only_is_reported() {
let a = vec![ok("ListObjectsV2").with_field("keys", "[]")];
let b = vec![ok("ListObjectsV2")];
assert_eq!(fields(&compare(&a, &b)), ["body.keys"]);
}
#[test]
fn error_messages_are_never_compared() {
let mut a = Observation::new("GetObject", "negative", 404, Some("NoSuchKey".into()), []);
let mut b = a.clone();
a.message = Some("The specified key does not exist.".into());
b.message = Some("Object not found".into());
assert_eq!(compare(&[a], &[b]), Vec::new());
}
#[test]
fn a_case_observed_on_one_side_only_is_reported() {
let a = vec![ok("HeadBucket"), ok("ListBuckets")];
let b = vec![ok("HeadBucket")];
let differences = compare(&a, &b);
assert_eq!(fields(&differences), ["observation"]);
assert_eq!(differences[0].op, "ListBuckets");
assert_eq!(compared_ops(&a, &b).into_iter().collect::<Vec<_>>(), ["HeadBucket"]);
}
#[test]
fn a_case_recorded_twice_is_reported() {
let a = vec![ok("HeadBucket"), ok("HeadBucket")];
let b = vec![ok("HeadBucket")];
assert_eq!(fields(&compare(&a, &b)), ["duplicate_case"]);
}
#[test]
fn compared_ops_counts_operations_not_cases() {
let negative = Observation::new("HeadBucket", "negative", 404, Some("NotFound".into()), []);
let a = vec![ok("HeadBucket"), negative, ok("ListBuckets")];
let b = a.clone();
assert_eq!(compared_ops(&a, &b).len(), 2);
}
#[test]
fn the_report_lists_each_difference_as_op_field_a_b() {
let directory = std::env::temp_dir().join(format!("dual-stack-report-{}", uuid::Uuid::new_v4()));
let report = Report {
schema: 2,
run: "unit".into(),
stack_a: "legacy".into(),
stack_b: "legacy".into(),
reference_side: Some("a"),
version_a: "rustfs 1.0.4".into(),
version_b: "rustfs 1.1.0".into(),
region_a: None,
region_b: Some("eu-west-1".into()),
compared_ops: 1,
compared_cases: 1,
differences: compare(
&[ok("GetBucketLocation").with_field("location_constraint", "us-east-1")],
&[ok("GetBucketLocation").with_field("location_constraint", "eu-west-1")],
),
};
let path = report.write_to(&directory).expect("write the report");
let json: serde_json::Value = serde_json::from_slice(&std::fs::read(&path).expect("read the report")).expect("parse");
let _ = std::fs::remove_dir_all(&directory);
assert_eq!(path.file_name().and_then(|name| name.to_str()), Some("unit.json"));
assert_eq!(json["compared_ops"], 1);
assert_eq!(json["reference_side"], "a");
assert_eq!(json["version_a"], "rustfs 1.0.4");
assert_eq!(json["version_b"], "rustfs 1.1.0");
assert_eq!(
json["differences"],
serde_json::json!([{
"op": "GetBucketLocation",
"case": "normal",
"field": "body.location_constraint",
"a": "us-east-1",
"b": "eu-west-1",
}])
);
}
}
@@ -0,0 +1,257 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! Dual-stack differential: one `rustfs` binary, two processes, one SDK script (rustfs/backlog#2740).
//!
//! Stack A runs `RUSTFS_S3_STACK=legacy` of the binary under test, unless `RUSTFS_E2E_REFERENCE_BINARY`
//! names a released binary: then A is that binary, started without `RUSTFS_S3_STACK` (older
//! releases do not know it), and a bad path fails the run instead of falling back (see
//! `reference`). The report names which side is the reference and the `--version` each side ran. Stack B runs the value of `RUSTFS_E2E_STACK_B`
//! (default `legacy` until the gateway stack is assembled), and `RUSTFS_E2E_STACK_B_REGION`, when
//! set, starts B in another region so that a difference can be injected by hand. Both servers
//! answer the script in `scenarios`, which covers every operation of `impl S3 for FS`; `compare`
//! reports each `(op, field, a, b)` on which the answers differ, and every run writes its report
//! to `<target>/dual-stack/<run>.json`. Two processes, not two embedded servers: bucket metadata
//! is process-global, so two stacks in one process would read each other's buckets.
mod compare;
mod reference;
mod scenarios;
use crate::common::{RustFSTestEnvironment, init_logging, rustfs_binary_path, workspace_root};
use compare::{Difference, Observation, Report, compare, compared_cases, compared_ops, render};
use reference::{SideA, binary_version};
use std::path::{Path, PathBuf};
use std::time::{SystemTime, UNIX_EPOCH};
type BoxError = Box<dyn std::error::Error + Send + Sync>;
const STACK_A: &str = "legacy";
/// Label of side A in the report when it is the released reference binary.
const STACK_A_REFERENCE: &str = "reference";
const ENV_STACK_B: &str = "RUSTFS_E2E_STACK_B";
const ENV_STACK_B_REGION: &str = "RUSTFS_E2E_STACK_B_REGION";
/// Becomes `gateway` once rustfs/backlog#2734 T2.5 assembles the gateway stack.
const DEFAULT_STACK_B: &str = "legacy";
/// The region the negative control gives stack A explicitly, so an inherited `RUSTFS_REGION`
/// cannot erase the injected difference. Not `us-east-1`: that region answers GetBucketLocation
/// with an empty LocationConstraint and re-creating an owned bucket with 200, so it would not
/// report its own name and would add CreateBucket differences to the control.
const CONTROL_REGION_A: &str = "us-west-2";
const CONTROL_REGION_B: &str = "eu-west-1";
/// `normal` cases the legacy stack must answer with a 2xx. The comparison alone cannot tell a
/// script that exercises real behavior from one in which both stacks fail the same way. Five of
/// the 73 fail on legacy by design of this script: PutBucketReplication (no registered remote
/// target), GetBucketReplication (so no configuration), PutBucketNotificationConfiguration (no
/// notification target configured), RestoreObject (the object is not archived) and
/// GetObjectTorrent (legacy answers `NoSuchKey`).
const MIN_NORMAL_SUCCESSES: usize = 68;
struct PairConfig {
side_a: SideA,
stack_b: String,
region_a: Option<String>,
region_b: Option<String>,
}
impl PairConfig {
fn from_env() -> Result<Self, BoxError> {
Ok(Self {
side_a: SideA::from_env()?,
stack_b: std::env::var(ENV_STACK_B).unwrap_or_else(|_| DEFAULT_STACK_B.to_owned()),
region_a: None,
region_b: std::env::var(ENV_STACK_B_REGION).ok(),
})
}
fn stack_a_label(&self) -> &'static str {
match self.side_a {
SideA::SameBinary => STACK_A,
SideA::Reference(_) => STACK_A_REFERENCE,
}
}
}
/// Starts one server of the binary under test on `stack`, overriding its region only when asked.
async fn start_stack(stack: &str, region: Option<&str>) -> Result<RustFSTestEnvironment, BoxError> {
let mut env = RustFSTestEnvironment::new().await?;
let mut vars = vec![("RUSTFS_S3_STACK", stack)];
if let Some(region) = region {
vars.push(("RUSTFS_REGION", region));
}
env.start_rustfs_server_without_cleanup_with_env(&vars).await?;
Ok(env)
}
/// Starts one server of a released binary. `RUSTFS_S3_STACK` is not passed: older releases do not
/// know it and have exactly one stack.
async fn start_reference(binary: &Path, region: Option<&str>) -> Result<RustFSTestEnvironment, BoxError> {
let mut env = RustFSTestEnvironment::new().await?;
let mut vars = Vec::new();
if let Some(region) = region {
vars.push(("RUSTFS_REGION", region));
}
env.start_rustfs_server_from_binary_without_cleanup(binary, vec![], &vars)
.await?;
Ok(env)
}
/// Starts stack A and stack B side by side, each with its own port and data directory.
async fn spawn_pair(config: &PairConfig) -> Result<(RustFSTestEnvironment, RustFSTestEnvironment), BoxError> {
let side_a = async {
match &config.side_a {
SideA::SameBinary => start_stack(STACK_A, config.region_a.as_deref()).await,
SideA::Reference(binary) => start_reference(binary, config.region_a.as_deref()).await,
}
};
tokio::try_join!(side_a, start_stack(&config.stack_b, config.region_b.as_deref()))
}
fn report_directory() -> PathBuf {
let target = std::env::var_os("CARGO_TARGET_DIR").map_or_else(|| PathBuf::from("target"), PathBuf::from);
let target = if target.is_absolute() {
target
} else {
workspace_root().join(target)
};
target.join("dual-stack")
}
struct Run {
report: Report,
path: PathBuf,
a: Vec<Observation>,
}
/// Runs the script against both stacks concurrently and writes the report.
async fn run_differential(label: &str, config: &PairConfig) -> Run {
let binary_under_test = rustfs_binary_path();
let (version_a, version_b) = match &config.side_a {
SideA::SameBinary => {
let version = binary_version(&binary_under_test)
.await
.expect("capture the binary under test version");
(version.clone(), version)
}
SideA::Reference(binary) => (
binary_version(binary).await.expect("capture the reference binary version"),
binary_version(&binary_under_test)
.await
.expect("capture the binary under test version"),
),
};
let (server_a, server_b) = spawn_pair(config).await.expect("start stack A and stack B");
let (a, b) = tokio::join!(Box::pin(scenarios::run(&server_a)), Box::pin(scenarios::run(&server_b)));
let millis = SystemTime::now()
.duration_since(UNIX_EPOCH)
.map_or(0, |elapsed| elapsed.as_millis());
let report = Report {
schema: 2,
run: format!("{label}-{millis}-{}", std::process::id()),
stack_a: config.stack_a_label().to_owned(),
stack_b: config.stack_b.clone(),
reference_side: matches!(config.side_a, SideA::Reference(_)).then_some("a"),
version_a,
version_b,
region_a: config.region_a.clone(),
region_b: config.region_b.clone(),
compared_ops: compared_ops(&a, &b).len(),
compared_cases: compared_cases(&a, &b),
differences: compare(&a, &b),
};
let path = report.write_to(&report_directory()).expect("write the dual-stack report");
Run { report, path, a }
}
#[cfg(test)]
mod tests {
use super::*;
#[tokio::test]
async fn both_stacks_answer_every_operation_identically() {
init_logging();
let config = PairConfig::from_env().expect("RUSTFS_E2E_REFERENCE_BINARY must be valid when set");
let run = run_differential("self-comparison", &config).await;
let report = &run.report;
let mut observed: Vec<_> = run.a.iter().map(|observation| observation.op).collect();
observed.sort_unstable();
observed.dedup();
assert_eq!(
observed,
scenarios::OPERATIONS,
"the script must drive exactly the operations of impl S3 for FS"
);
assert_eq!(report.compared_ops, scenarios::OPERATIONS.len(), "report: {}", run.path.display());
assert!(
report.differences.is_empty(),
"stack {} ({}) and stack {} ({}) differ on {} of {} cases (report: {}):\n{}",
report.stack_a,
report.version_a,
report.stack_b,
report.version_b,
report.differences.len(),
report.compared_cases,
run.path.display(),
render(&report.differences)
);
let not_4xx: Vec<_> = run
.a
.iter()
.filter(|observation| observation.case == "negative" && !(400..500).contains(&observation.status))
.collect();
assert!(
not_4xx.is_empty(),
"negative cases must fail with a 4xx on side A ({}): {not_4xx:#?}",
report.version_a
);
let successes = run
.a
.iter()
.filter(|observation| observation.case == "normal" && observation.is_success())
.count();
assert!(
successes >= MIN_NORMAL_SUCCESSES,
"only {successes} normal cases succeeded on side A ({}): {:#?}",
report.version_a,
run.a
);
}
#[tokio::test]
async fn differential_detects_an_injected_difference() {
init_logging();
let config = PairConfig {
side_a: SideA::SameBinary,
stack_b: STACK_A.to_owned(),
region_a: Some(CONTROL_REGION_A.to_owned()),
region_b: Some(CONTROL_REGION_B.to_owned()),
};
let run = run_differential("injected-region", &config).await;
let expected = Difference {
op: "GetBucketLocation".to_owned(),
case: "normal".to_owned(),
field: "body.location_constraint".to_owned(),
a: CONTROL_REGION_A.to_owned(),
b: CONTROL_REGION_B.to_owned(),
};
assert!(
run.report.differences.contains(&expected),
"B started in {CONTROL_REGION_B} but GetBucketLocation was not reported (report: {}):\n{}",
run.path.display(),
render(&run.report.differences)
);
}
}
@@ -0,0 +1,163 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! Which binary side A of the differential runs, and what it reports about itself.
//!
//! `RUSTFS_E2E_REFERENCE_BINARY` names a released `rustfs` binary to use as the reference. Unset,
//! side A is the binary under test on `RUSTFS_S3_STACK=legacy`. Set, it must resolve to an
//! executable file or the run fails: a reference that was asked for and silently replaced by the
//! binary under test would report an agreement with itself as agreement with the release.
use std::ffi::OsString;
use std::path::{Path, PathBuf};
type BoxError = Box<dyn std::error::Error + Send + Sync>;
pub(super) const ENV_REFERENCE_BINARY: &str = "RUSTFS_E2E_REFERENCE_BINARY";
#[derive(Clone, Debug, PartialEq, Eq)]
pub(super) enum SideA {
/// Both sides are the binary under test; A runs `RUSTFS_S3_STACK=legacy`.
SameBinary,
/// A is this released binary, started without `RUSTFS_S3_STACK`.
Reference(PathBuf),
}
impl SideA {
pub(super) fn from_env() -> Result<Self, BoxError> {
Self::resolve(std::env::var_os(ENV_REFERENCE_BINARY))
}
/// `None` is the only value that selects same-binary mode; every other value must validate.
pub(super) fn resolve(value: Option<OsString>) -> Result<Self, BoxError> {
let Some(value) = value else {
return Ok(Self::SameBinary);
};
let path = PathBuf::from(value);
validate_executable(&path)?;
Ok(Self::Reference(path))
}
}
fn validate_executable(path: &Path) -> Result<(), BoxError> {
if path.as_os_str().is_empty() {
return Err(format!("{ENV_REFERENCE_BINARY} is set but empty").into());
}
let metadata = std::fs::metadata(path)
.map_err(|error| format!("{ENV_REFERENCE_BINARY} points to {}, which cannot be read: {error}", path.display()))?;
if !metadata.is_file() {
return Err(format!("{ENV_REFERENCE_BINARY} points to {}, which is not a file", path.display()).into());
}
if !is_executable(&metadata) {
return Err(format!("{ENV_REFERENCE_BINARY} points to {}, which is not executable", path.display()).into());
}
Ok(())
}
#[cfg(unix)]
fn is_executable(metadata: &std::fs::Metadata) -> bool {
use std::os::unix::fs::PermissionsExt;
metadata.permissions().mode() & 0o111 != 0
}
#[cfg(not(unix))]
fn is_executable(_metadata: &std::fs::Metadata) -> bool {
true
}
/// What `<binary> --version` printed, trimmed. Fails when the binary does not run, exits
/// non-zero, or prints nothing, because an empty version would report nothing as observed.
pub(super) async fn binary_version(binary: &Path) -> Result<String, BoxError> {
let output = tokio::process::Command::new(binary).arg("--version").output().await?;
if !output.status.success() {
return Err(format!("{} --version failed with {}", binary.display(), output.status).into());
}
let version = String::from_utf8_lossy(&output.stdout).trim().to_owned();
if version.is_empty() {
return Err(format!("{} --version printed nothing", binary.display()).into());
}
Ok(version)
}
#[cfg(all(test, unix))]
mod tests {
use super::*;
use std::os::unix::fs::PermissionsExt;
fn script(dir: &Path, name: &str, body: &str, mode: u32) -> PathBuf {
let path = dir.join(name);
std::fs::write(&path, body).expect("write the stand-in");
std::fs::set_permissions(&path, std::fs::Permissions::from_mode(mode)).expect("chmod");
path
}
#[test]
fn missing_path_is_an_error_not_a_fallback() {
let dir = tempfile::tempdir().expect("tempdir");
let error = SideA::resolve(Some(dir.path().join("absent").into_os_string())).expect_err("must fail closed");
assert!(error.to_string().contains("cannot be read"), "{error}");
}
#[test]
fn non_executable_file_is_an_error() {
let dir = tempfile::tempdir().expect("tempdir");
let path = script(dir.path(), "rustfs", "#!/bin/sh\necho v\n", 0o644);
let error = SideA::resolve(Some(path.into_os_string())).expect_err("must fail closed");
assert!(error.to_string().contains("not executable"), "{error}");
}
#[test]
fn directory_is_an_error() {
let dir = tempfile::tempdir().expect("tempdir");
let error = SideA::resolve(Some(dir.path().as_os_str().to_owned())).expect_err("must fail closed");
assert!(error.to_string().contains("not a file"), "{error}");
}
#[test]
fn empty_value_is_an_error() {
let error = SideA::resolve(Some(OsString::new())).expect_err("must fail closed");
assert!(error.to_string().contains("empty"), "{error}");
}
#[test]
fn unset_selects_same_binary_mode() {
assert_eq!(SideA::resolve(None).expect("unset is valid"), SideA::SameBinary);
}
#[test]
fn executable_file_selects_reference_mode() {
let dir = tempfile::tempdir().expect("tempdir");
let path = script(dir.path(), "rustfs", "#!/bin/sh\necho v\n", 0o755);
assert_eq!(
SideA::resolve(Some(path.clone().into_os_string())).expect("valid"),
SideA::Reference(path)
);
}
#[tokio::test]
async fn version_output_is_captured_from_the_binary() {
let dir = tempfile::tempdir().expect("tempdir");
let path = script(dir.path(), "rustfs", "#!/bin/sh\necho 'rustfs 1.0.4 (abc123)'\n", 0o755);
assert_eq!(binary_version(&path).await.expect("version"), "rustfs 1.0.4 (abc123)");
}
#[tokio::test]
async fn failing_or_silent_version_is_an_error() {
let dir = tempfile::tempdir().expect("tempdir");
let failing = script(dir.path(), "failing", "#!/bin/sh\nexit 3\n", 0o755);
assert!(binary_version(&failing).await.is_err());
let silent = script(dir.path(), "silent", "#!/bin/sh\nexit 0\n", 0o755);
assert!(binary_version(&silent).await.is_err());
}
}
File diff suppressed because it is too large Load Diff
@@ -33,7 +33,7 @@ mod tests {
use sha2::{Digest, Sha256};
use std::collections::HashSet;
use std::error::Error;
use std::io::{Read, Write};
use std::io::{Read, Seek, SeekFrom, Write};
use std::net::SocketAddr;
use std::path::{Path, PathBuf};
use std::process::Command;
@@ -1654,6 +1654,89 @@ mod tests {
TargetEndpointBlackhole,
}
async fn release_heal_commit_barrier_after_shutdown(
log: &Path,
log_offset: u64,
barrier: &Path,
) -> Result<serde_json::Value, Box<dyn Error + Send + Sync>> {
// Observe within the existing graceful process-stop budget.
timeout(Duration::from_secs(45), async {
loop {
let mut file = std::fs::File::open(log)?;
file.seek(SeekFrom::Start(log_offset))?;
let mut tail = String::new();
file.read_to_string(&mut tail)?;
if let Some(event) = tail
.lines()
.filter_map(|line| serde_json::from_str::<serde_json::Value>(line).ok())
.find(|event| {
event["event"] == "server_shutdown_state"
&& event["component"] == "main"
&& event["subsystem"] == "startup"
&& event["state"] == "stopping"
})
{
// Local heal has stopped and HTTP shutdown has been signalled.
// Let admitted peer RPCs finish; keeping this synthetic barrier
// until process exit would make the fixture block its own drain.
std::fs::remove_file(barrier)?;
return Ok(event);
}
sleep(Duration::from_millis(10)).await;
}
})
.await?
}
#[tokio::test(start_paused = true)]
async fn heal_commit_barrier_waits_for_new_shutdown_event() -> Result<(), Box<dyn Error + Send + Sync>> {
let directory = tempfile::tempdir()?;
let log = directory.path().join("server.log");
let barrier = directory.path().join("barrier");
let event = serde_json::json!({
"event": "server_shutdown_state", "component": "main", "subsystem": "startup", "state": "stopping"
});
std::fs::write(&log, format!("{event}\n"))?;
std::fs::write(&barrier, "bucket/prefix/")?;
let log_offset = log.metadata()?.len();
let mut writer = std::fs::OpenOptions::new().append(true).open(&log)?;
writeln!(writer, "{}", serde_json::json!({"event": "shutdown_signal_received"}))?;
writeln!(writer, "{}", serde_json::json!({"event": "server_shutdown_state", "state": "stopping"}))?;
let release = release_heal_commit_barrier_after_shutdown(&log, log_offset, &barrier);
tokio::pin!(release);
assert!(
futures::poll!(release.as_mut()).is_pending(),
"old or unrelated events must not release the barrier"
);
assert!(barrier.is_file(), "the partial-rebuild barrier must remain armed before shutdown");
tokio::time::advance(Duration::from_secs(6)).await;
assert!(
futures::poll!(release.as_mut()).is_pending(),
"background shutdown may take longer than five seconds within the process-stop budget"
);
writeln!(writer, "{event}")?;
tokio::time::advance(Duration::from_millis(10)).await;
assert_eq!(release.await?, event, "retain the actual new shutdown witness");
assert!(!barrier.exists(), "shutdown must release the synthetic hold");
Ok(())
}
#[tokio::test(start_paused = true)]
async fn heal_commit_barrier_missing_shutdown_fails_without_releasing() -> Result<(), Box<dyn Error + Send + Sync>> {
let directory = tempfile::tempdir()?;
let log = directory.path().join("server.log");
let barrier = directory.path().join("barrier");
std::fs::write(&log, "")?;
std::fs::write(&barrier, "bucket/prefix/")?;
let error = release_heal_commit_barrier_after_shutdown(&log, 0, &barrier)
.await
.expect_err("missing shutdown evidence must fail the fixture");
assert!(error.is::<tokio::time::error::Elapsed>());
assert!(barrier.is_file(), "a missing shutdown witness must not release repairs");
Ok(())
}
async fn run_cluster_root_heal_interruption(scenario: InterruptionScenario) -> Result<(), Box<dyn Error + Send + Sync>> {
let server_binary = rustfs_binary_path();
let evidence_case = match scenario {
@@ -1791,6 +1874,7 @@ mod tests {
let mut created_online_objects = Vec::with_capacity(online_object_count);
let mut expected_manifests = Vec::with_capacity(online_object_count);
let mut unclean_shutdown_marker_observed = None;
let mut shutdown_barrier_release = None;
let mut attempt_count = 0usize;
let max_online_attempts = online_object_count.saturating_mul(topology.total_drives().max(1));
while expected_manifests.len() < online_object_count {
@@ -2373,7 +2457,21 @@ mod tests {
| InterruptionScenario::BackgroundTargetRestartEc84MultiSet
| InterruptionScenario::BackgroundCoordinatorRestart
) {
cluster.stop_node_gracefully(interruption_node).await?;
if interruption_node == 1
&& let Some(barrier) = &commit_barrier
{
let target_log = PathBuf::from(format!("{log_dir}/node1.log"));
let log_offset = target_log.metadata()?.len();
let (stopped, released) = tokio::join!(
cluster.stop_node_gracefully(interruption_node),
release_heal_commit_barrier_after_shutdown(&target_log, log_offset, barrier),
);
// Await both branches even on error so the child is reaped.
stopped?;
shutdown_barrier_release = Some(released?);
} else {
cluster.stop_node_gracefully(interruption_node).await?;
}
} else {
cluster.stop_node(interruption_node)?;
}
@@ -2415,7 +2513,9 @@ mod tests {
}
}
}
if let Some(barrier) = &commit_barrier {
if shutdown_barrier_release.is_none()
&& let Some(barrier) = &commit_barrier
{
std::fs::remove_file(barrier)?;
}
cluster.start_node_from_binary(interruption_node, &server_binary).await?;
@@ -2746,6 +2846,7 @@ mod tests {
"all_peers_bound_to_generation_window": true,
"pid_before": target_pid, "pid_after": restarted_pid,
"unclean_shutdown_marker": unclean_shutdown_marker_observed.unwrap_or(false),
"graceful_barrier_release": shutdown_barrier_release,
"objects": evidence_objects, "node_listings": node_listings,
});
if let Some(outage_write) = outage_write_diagnostic {
@@ -586,7 +586,18 @@ async fn test_reads_under_a_deleted_kms_key_report_key_not_found() -> Result<(),
.await?;
assert_eq!(put.ssekms_key_id(), Some(doomed_key_id.as_str()));
info!("🗑️ deleting {doomed_key_id} immediately");
// Destruction is two requests: schedule the deletion, then destroy the
// pending key without waiting out its window.
info!("🗑️ scheduling {doomed_key_id} for deletion, then destroying it");
kms_admin_request(
&base.url,
http::Method::DELETE,
"/rustfs/admin/v3/kms/keys/delete",
Some(&serde_json::json!({ "key_id": doomed_key_id }).to_string()),
&base.access_key,
&base.secret_key,
)
.await?;
kms_admin_request(
&base.url,
http::Method::DELETE,
+255 -2
View File
@@ -21,12 +21,15 @@
#[cfg(test)]
mod tests {
use crate::common::{RustFSTestEnvironment, init_logging};
use crate::common::{RustFSTestEnvironment, admin_create_user, init_logging};
use aws_sdk_s3::Client;
use aws_sdk_s3::primitives::ByteStream;
use aws_sdk_s3::types::{BucketVersioningStatus, Delete, ObjectIdentifier, VersioningConfiguration};
use std::error::Error;
use tracing::info;
type TestResult = Result<(), Box<dyn Error + Send + Sync>>;
async fn create_bucket(client: &Client, bucket: &str) -> Result<(), Box<dyn Error + Send + Sync>> {
client.create_bucket().bucket(bucket).send().await?;
Ok(())
@@ -90,7 +93,7 @@ mod tests {
Ok(())
}
/// Duplicate and repeated slashes after a leading slash collapse MinIO-style.
/// Duplicate and repeated slashes after a leading slash collapse MinIO-style across single and bulk operations.
#[tokio::test]
async fn test_put_object_with_duplicate_slashes_normalized() -> Result<(), Box<dyn Error + Send + Sync>> {
init_logging();
@@ -144,8 +147,258 @@ mod tests {
"GET after DELETE with raw key must return HTTP 404, got {error:?}"
);
assert_bulk_delete_normalizes_keys(&client).await?;
assert_bulk_delete_authorizes_normalized_keys(&env, &client).await?;
assert_bulk_delete_preserves_version_identity(&client).await?;
env.stop_server();
info!("Test completed successfully");
Ok(())
}
async fn assert_bulk_delete_normalizes_keys(client: &Client) -> TestResult {
let bucket = "test-bulk-leading-slash";
create_bucket(client, bucket).await?;
let cases = [
("/foo/bar", "foo/bar"),
("//keyname", "keyname"),
("/dir///sub//file", "dir/sub/file"),
("/folder///", "folder/"),
("/literal%2F+名", "literal%2F+名"),
("plain", "plain"),
];
let invalid = ["///", "/dir/../keep", "dir//keep"];
client
.put_object()
.bucket(bucket)
.key("keep")
.body(ByteStream::from_static(b"keep"))
.send()
.await?;
client
.put_object()
.bucket(bucket)
.key("dir/keep")
.body(ByteStream::from_static(b"keep"))
.send()
.await?;
for quiet in [false, true] {
for (raw, _) in cases {
client
.put_object()
.bucket(bucket)
.key(raw)
.body(ByteStream::from_static(b""))
.send()
.await?;
}
let listing = client.list_objects_v2().bucket(bucket).send().await?;
let stored: Vec<_> = listing.contents().iter().filter_map(|object| object.key()).collect();
let mut expected: Vec<_> = cases
.iter()
.map(|(_, normalized)| *normalized)
.chain(["dir/keep", "keep"])
.collect();
expected.sort_unstable();
assert_eq!(stored, expected, "PUT must store the exact normalized targets before bulk deletion");
let objects = cases
.iter()
.map(|(raw, _)| *raw)
.chain(invalid)
.map(|key| ObjectIdentifier::builder().key(key).build())
.collect::<Result<Vec<_>, _>>()?;
let delete = Delete::builder().set_objects(Some(objects)).quiet(quiet).build()?;
// A second identical batch also pins idempotent deletion of absent normalized keys.
for _ in 0..2 {
let output = client.delete_objects().bucket(bucket).delete(delete.clone()).send().await?;
let errors: Vec<_> = output.errors().iter().map(|error| (error.key(), error.code())).collect();
assert_eq!(
errors,
invalid.map(|key| (Some(key), Some("InvalidArgument"))),
"unexpected per-key errors: {output:?}"
);
let deleted: Vec<_> = output.deleted().iter().filter_map(|object| object.key()).collect();
let expected = if quiet {
vec![]
} else {
cases.iter().map(|(raw, _)| *raw).collect()
};
assert_eq!(deleted, expected, "responses must retain request keys, including directory slashes");
}
let listing = client.list_objects_v2().bucket(bucket).send().await?;
let remaining: Vec<_> = listing.contents().iter().filter_map(|object| object.key()).collect();
assert_eq!(
remaining,
["dir/keep", "keep"],
"bulk delete must remove normalized objects without resolving dot segments"
);
}
Ok(())
}
async fn assert_bulk_delete_authorizes_normalized_keys(env: &RustFSTestEnvironment, admin: &Client) -> TestResult {
let bucket = "test-bulk-slash-policy";
let user = "bulk-slash-user";
admin_create_user(env, user, "bulkSlashTestSecret123!").await?;
create_bucket(admin, bucket).await?;
for key in ["allowed/item", "protected/item"] {
admin
.put_object()
.bucket(bucket)
.key(key)
.body(ByteStream::from_static(b"keep"))
.send()
.await?;
}
let policy = serde_json::json!({
"Version": "2012-10-17",
"Statement": [
{"Effect": "Allow", "Principal": {"AWS": [user]}, "Action": ["s3:DeleteObject"],
"Resource": [format!("arn:aws:s3:::{bucket}/*")]},
{"Effect": "Deny", "Principal": {"AWS": [user]}, "Action": ["s3:DeleteObject"],
"Resource": [format!("arn:aws:s3:::{bucket}/protected/*")]}
]
});
admin
.put_bucket_policy()
.bucket(bucket)
.policy(policy.to_string())
.send()
.await?;
let client = env.create_s3_client_with_credentials(user, "bulkSlashTestSecret123!");
let output = client
.delete_objects()
.bucket(bucket)
.delete(
Delete::builder()
.objects(ObjectIdentifier::builder().key("/allowed///item").build()?)
.objects(ObjectIdentifier::builder().key("/protected///item").build()?)
.build()?,
)
.send()
.await?;
assert_eq!(output.deleted().len(), 1, "allowed normalized key must be deleted: {output:?}");
assert_eq!(output.deleted()[0].key(), Some("/allowed///item"));
assert_eq!(output.errors().len(), 1, "normalized resource denial must apply: {output:?}");
assert_eq!(output.errors()[0].key(), Some("/protected///item"));
assert_eq!(output.errors()[0].code(), Some("AccessDenied"));
let listing = admin.list_objects_v2().bucket(bucket).send().await?;
let remaining: Vec<_> = listing.contents().iter().filter_map(|object| object.key()).collect();
assert_eq!(remaining, ["protected/item"], "only the authorized object may be removed");
let protected = admin.get_object().bucket(bucket).key("protected/item").send().await?;
assert_eq!(protected.body.collect().await?.into_bytes().as_ref(), b"keep");
Ok(())
}
async fn assert_bulk_delete_preserves_version_identity(client: &Client) -> TestResult {
let bucket = "test-bulk-slash-versions";
let raw = "/history///file";
let normalized = "history/file";
create_bucket(client, bucket).await?;
client
.put_bucket_versioning()
.bucket(bucket)
.versioning_configuration(
VersioningConfiguration::builder()
.status(BucketVersioningStatus::Enabled)
.build(),
)
.send()
.await?;
let first = client
.put_object()
.bucket(bucket)
.key(raw)
.body(ByteStream::from_static(b"old"))
.send()
.await?;
let first_id = first.version_id().ok_or("first PUT omitted version ID")?;
let latest = client
.put_object()
.bucket(bucket)
.key(raw)
.body(ByteStream::from_static(b"latest"))
.send()
.await?;
let latest_id = latest.version_id().ok_or("latest PUT omitted version ID")?;
let invalid = client
.delete_objects()
.bucket(bucket)
.delete(
Delete::builder()
.objects(ObjectIdentifier::builder().key("///").build()?)
.build()?,
)
.send()
.await?;
assert!(invalid.deleted().is_empty(), "slash-only keys must not delete a versioned object");
assert_eq!(
invalid.errors().len(),
1,
"slash-only keys must remain invalid in versioned buckets: {invalid:?}"
);
assert_eq!(invalid.errors()[0].key(), Some("///"));
assert_eq!(invalid.errors()[0].code(), Some("InvalidArgument"));
let deleted = client
.delete_objects()
.bucket(bucket)
.delete(
Delete::builder()
.objects(ObjectIdentifier::builder().key(raw).version_id(first_id).build()?)
.build()?,
)
.send()
.await?;
assert!(deleted.errors().is_empty(), "historical delete failed: {deleted:?}");
assert_eq!(deleted.deleted().len(), 1);
assert_eq!(deleted.deleted()[0].key(), Some(raw));
assert_eq!(deleted.deleted()[0].version_id(), Some(first_id));
let listing = client.list_object_versions().bucket(bucket).send().await?;
assert_eq!(listing.versions().len(), 1, "only the latest data version should remain: {listing:?}");
assert_eq!(listing.versions()[0].version_id(), Some(latest_id));
let deleted = client
.delete_objects()
.bucket(bucket)
.delete(
Delete::builder()
.objects(ObjectIdentifier::builder().key(raw).build()?)
.build()?,
)
.send()
.await?;
assert!(deleted.errors().is_empty(), "delete marker creation failed: {deleted:?}");
assert_eq!(deleted.deleted().len(), 1);
assert_eq!(deleted.deleted()[0].key(), Some(raw));
assert_eq!(deleted.deleted()[0].delete_marker(), Some(true));
let marker = deleted.deleted()[0]
.delete_marker_version_id()
.ok_or("missing delete marker ID")?;
let listing = client.list_object_versions().bucket(bucket).send().await?;
assert_eq!(listing.delete_markers().len(), 1);
assert_eq!(listing.delete_markers()[0].key(), Some(normalized));
assert_eq!(listing.delete_markers()[0].version_id(), Some(marker));
let deleted = client
.delete_objects()
.bucket(bucket)
.delete(
Delete::builder()
.objects(ObjectIdentifier::builder().key(raw).version_id(marker).build()?)
.build()?,
)
.send()
.await?;
assert!(deleted.errors().is_empty(), "explicit marker removal failed: {deleted:?}");
assert_eq!(deleted.deleted().len(), 1);
assert_eq!(deleted.deleted()[0].key(), Some(raw));
assert_eq!(deleted.deleted()[0].version_id(), Some(marker));
let listing = client.list_object_versions().bucket(bucket).send().await?;
assert!(listing.delete_markers().is_empty());
let restored = client.get_object().bucket(bucket).key(normalized).send().await?;
assert_eq!(restored.version_id(), Some(latest_id));
assert_eq!(restored.body.collect().await?.into_bytes().as_ref(), b"latest");
Ok(())
}
}
+9
View File
@@ -31,6 +31,12 @@ pub mod chaos;
#[cfg(test)]
pub mod fake_s3_target;
// Dual-stack differential (rustfs/backlog#2740): one binary, two processes on
// different RUSTFS_S3_STACK values, the same SDK script for every S3 operation,
// compared on status, error code, allowlisted headers and typed body fields.
#[cfg(test)]
mod dual_stack_differential;
// On-demand migration (backlog#2147): shared two-server environment, admin
// wrappers, and the harness self-test (backlog#2151). Behavior scenarios are
// added by later ODM tasks.
@@ -283,6 +289,9 @@ mod ssec_copy_test;
#[cfg(test)]
mod multipart_storage_class_test;
#[cfg(test)]
mod multipart_upload_id_test;
#[cfg(test)]
mod storage_class_capability_test;

Some files were not shown because too many files have changed in this diff Show More