Clippy ran in front of the test-binary archive inside Workspace Lint and Build, so every workspace test waited 13 to 17 minutes for a lint that shares no compiler output with the archive.
Move the unchanged Clippy step into its own workspace-clippy job with the same condition, needs, runner and cache key. Workspace Lint and Build keeps its ID and name as the archive producer. The aggregate and the scheduled alert depend on the new job, and the plan contract moves to 4 so a base planner that predates the job set falls back to the full matrix.
ci_gate.py now rejects a workflow where the lint is conditional, duplicated, outside the aggregate, scoped differently from the archive producer, or back on the archive consumers' dependency chain, and where the workflow's plan-contract marker differs from the planner's.
* fix(kms): read back SSE objects written through the AWS backend
The AWS backend returned the GenerateDataKey blob bare, so the read path took the unrecognized bytes for a locally wrapped key and asked for RUSTFS_SSE_S3_MASTER_KEY without ever calling AWS Decrypt. Every SSE-KMS and SSE-S3 object written through this backend was unreadable, and UploadPart failed the same way.
The backend now wraps the blob in the data-key envelope the other backends use. A stored key that is neither an envelope nor a local-master-key wrap is offered to the KMS when its backend reports that released versions persisted it bare, so objects written by 1.0.4 and 1.0.5 read back without being rewritten.
* fix(admin): percent-decode the key id in the KMS describe path
GET /rustfs/admin/v3/kms/keys/{key_id} read the path segment verbatim, so an AWS key ARN, which has to be escaped to fit in one segment, was looked up, authorized and audited under its escaped spelling and answered 404.
* fix(policy): match an AWS key ARN as its key id in KMS statements
A key-scoped statement was matched against the key identifier exactly as the request spelled it. A Deny on key/<id> therefore did not cover a request naming the same key by its AWS ARN, on the SSE-KMS write, on the read of an object stored under the ARN spelling, and on the per-key admin endpoints.
A key ARN is now reduced to its key id before matching. A request naming a key by alias, which only the backend can resolve, fails closed against key-scoped statements. The deletion impact report compares key references the same way.
Adds the AWS KMS backend guide in English and Chinese.
* fix(kms): read rio-v2 objects that carry a bare AWS data key
A rio-v2 build stores a sealed object key beside the data key, so an AWS-backed object written before the envelope carries the same shape as a MinIO object and was sent to the MinIO decoder, failing before AWS Decrypt was tried.
MinIO's sealing is authenticated, so opening the data key under the local master key is a proof: the bare blob reaches the KMS only once that has failed, or when no local master key exists. Without a backend that reads bare ciphertext the MinIO route is unchanged.
* docs(kms): describe pairing an AWS KMS site with a Vault site
Site replication synchronizes key names and never keys, and AWS assigns key ids, so in a mixed pair the Vault site has to name its keys after the AWS key ids.
fix(replication): replicate SSE-KMS objects under key enforcement
With RUSTFS_KMS_ENFORCE_SSE_KEY_POLICY=true the receiving site authorizes a replica PUT of an SSE-KMS object for kms:GenerateDataKey against the key it resolves to. The managed site-replicator account held no kms grant, so every SSE-KMS object stayed FAILED with AccessDenied.
Grant kms:GenerateDataKey on every key and treat a stored policy without it as outdated so the reconcile tick refreshes existing accounts. kms:Decrypt stays out: reads proxied to a peer run as this account.
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* refactor(auth): share authorization core with owned entry points
Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* refactor(admin): move remaining admin handlers to owned requests
Migrate the ten table-catalog commit and publication handlers to the
owned admin Operation trait, redeem object zip download tokens through
authorize_owned_request, and remove the s3s-typed router Operation
trait. S3Router now converts the s3s request into an AdminRequest and
the AdminResponse back at its edge, so no admin operation takes an s3s
type (rustfs/backlog#2788).
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* fix(auth): keep owned authorization in the app layer and fail closed
Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.
* test(auth): move owned parity tests to the app layer
Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.
* test(admin): convert the tagged table catalog request before installing identity
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* fix(admin): keep owned router entry points crate-visible
* test(auth): read storage-private parity facts through test accessors
The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.
* test(auth): owned and legacy entry points reach the same decisions
Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).
* fix(admin): drop the owned trait bound from S3Router's inherent impls
* test(auth): satisfy clippy on the parity test facade
* test(admin): cover zip download token redemption authorization
* test(auth): report every decision mismatch in the parity matrix
* refactor(admin): move the admin route table out of the s3s router
* test(auth): cover multipart staging in the owned/legacy decision matrix
* fix(admin): authorize warehouse locations with the owned commit request
* fix(admin): return the owned table catalog authorization result unchanged
* fix(table-catalog): restore owned request lines the main merge reverted
The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.
* fix(auth): make an absent caller secret unrepresentable as a key
RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.
* fix(auth): keep the test-only credentials rebuild out of the lib build
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
test(guards): let the split probe check sources that are already split
The end-to-end split probe simulated every split itself and stopped on a tree where bucket_usecase.rs is already split. It now decides per source (ecfs.rs, bucket_usecase.rs, multipart_usecase.rs) whether the tree is unsplit or split: unsplit sources are simulated as before, split sources get the same planted violations at the top of real split files plus a silence check over every other real split file, and a source in neither state fails with its name. Refs rustfs/backlog#2765.
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* test(guards): read file plus split directory in text guards
Text guards that read one file with include_str! or by path broke, or silently stopped seeing the code they guard, when that code moved to another file. They now read the file they read today, which stays required, plus the sibling directory a mechanical split will populate (storage/legacy_edge, app/bucket_usecase, app/multipart_usecase, app/lifecycle_transition_api_test). Counts are summed over the set and split markers must occur exactly once across it. Refs rustfs/backlog#2765.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* test(guards): avoid a typos false positive in a fixture
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* test(guards): address review of the split-safe text guards
Make the super:: import rules depth-aware for split files, cover ecfs_test.rs moving to legacy_edge/tests, read production text only in the Rust count and contains guards, bound method slices by their own closing line, keep the split arrays safe on bash 3.2, and add an end-to-end split probe for the architecture, layer and logging guards. Refs rustfs/backlog#2765.
* test(guards): plant the lifecycle split probe in its own file
P4 created lifecycle_transition_api_test/put.rs; the end-to-end split probe now plants its violations in split_probe.rs instead of overwriting it.
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* refactor(auth): share authorization core with owned entry points
Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* refactor(admin): move remaining admin handlers to owned requests
Migrate the ten table-catalog commit and publication handlers to the
owned admin Operation trait, redeem object zip download tokens through
authorize_owned_request, and remove the s3s-typed router Operation
trait. S3Router now converts the s3s request into an AdminRequest and
the AdminResponse back at its edge, so no admin operation takes an s3s
type (rustfs/backlog#2788).
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* fix(auth): keep owned authorization in the app layer and fail closed
Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.
* test(auth): move owned parity tests to the app layer
Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.
* test(admin): convert the tagged table catalog request before installing identity
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* fix(admin): keep owned router entry points crate-visible
* test(auth): read storage-private parity facts through test accessors
The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.
* test(auth): owned and legacy entry points reach the same decisions
Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).
* fix(admin): drop the owned trait bound from S3Router's inherent impls
* test(auth): satisfy clippy on the parity test facade
* test(admin): cover zip download token redemption authorization
* test(auth): report every decision mismatch in the parity matrix
* test(auth): cover multipart staging in the owned/legacy decision matrix
* fix(admin): authorize warehouse locations with the owned commit request
* fix(admin): return the owned table catalog authorization result unchanged
* fix(table-catalog): restore owned request lines the main merge reverted
The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.
* fix(auth): make an absent caller secret unrepresentable as a key
RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.
* fix(auth): keep the test-only credentials rebuild out of the lib build
* fix(app): drop the PutObjectInput re-export main now provides
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* test(e2e): allow a pinned release binary as differential reference side
RUSTFS_E2E_REFERENCE_BINARY makes side A of the dual-stack differential a released rustfs binary, started without RUSTFS_S3_STACK. A missing, non-file or non-executable path fails the run instead of falling back to the same-binary mode. The report records which side is the reference and each side's --version output.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* test(e2e): update smoke selection for reference-binary unit tests
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* ci(parity): run the dual-stack differential against the pinned reference
Adds a differential job to reference-parity.yml: side A is the pinned release, side B the candidate artifact built for the s3-tests comparison. The job prints reference_side, version_a and version_b from the report, fails when side A is not the reference or both versions are equal, and lists every difference in the job summary.
* ci(parity): print the first version line in the differential summary
* chore: restore main's Cargo and baseline files after merging main
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
ci(e2e): keep reference-selection unit tests out of e2e-full
The eight dual_stack_differential::reference tests added in #9285 entered the e2e-full selection and changed its digest. They are hermetic and already run in e2e-smoke on every pull request, so exclude them from e2e-full; the selection digest returns to the value recorded in .config/e2e-full-selection.txt.
AddUser reads the current secret only for a self-rotation, orphan-bucket recovery only to seal a /minio/admin compat response, and a missing secret key answers AccessDenied instead of InternalError in AddUser, bucket recovery and ChangeOwnPassword.
On the Vault KV2 and Vault Transit backends, an immediate deletion of a
key that was not already pending deletion only marked it PendingDeletion
and still reported success, so objects under the key stayed readable
after the caller was told the key was gone.
Key destruction is now two explicit steps on the Local, Vault KV2 and
Vault Transit backends: a deletion is scheduled first, and
`force_immediate` only destroys a key that is already PendingDeletion.
A request against an Enabled or Disabled key is refused with an invalid
state error and changes nothing. Vault Transit's "encryption key not
found" answer for a destroyed key now maps to KeyNotFound instead of a
backend error.
Document the feature in docs/operations/kms-key-destruction.md with a
Chinese translation.
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* build(deps): re-pin rustfs/gateway to 371d91b2
* fix(protocols): pass copy sources as CopySourceValue
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* test(protocols): raise rustfs test-count baseline for copy source tests
* fix(protocols): keep refusing listings without object ETags
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* build(deps): re-pin rustfs/gateway to f9aa6045
* build(deps): re-pin rustfs/gateway to aa1d1a29
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
The built-in notify and audit queue directories /opt/rustfs/events and
/opt/rustfs/audit are persisted cluster-wide as literal defaults. On
native Windows they have no drive prefix, so every target that kept the
default failed validation as a non-absolute path.
Treat those two literals as logical defaults and resolve them on each
node when a queue directory is validated or opened. A new
RUSTFS_TARGET_STORE_DIR relocates both default queues on any platform;
without it, Windows uses %ProgramData%\RustFS. Explicit operator paths,
the persisted configuration, and Linux/macOS behavior are unchanged, and
pending entries are not migrated when the root changes.
Expose the variable through the Helm chart as
config.rustfs.target_store_dir and document the resolution rules.
* fix(obs): bound the log directory with default settings
With the defaults the active log file had no size limit (size rolling was off), and the cleaner counted only rolled files older than the minimum file age against the byte budget, on a 30-minute interval. A log storm could therefore fill the disk for up to two hours without the budget applying.
The active file now rolls at 256 MiB when the single-file limit is unset; an explicit 0 still turns size rolling off, and the cleaner's per-file trim keeps its previous default. The appender wakes the cleaner after every roll, and once the rolled files exceed the byte budget the cleaner processes the oldest ones regardless of age. The README no longer calls the budget a hard cap on the directory and states the actual bound.
* fix(obs): trim only what the log byte budget needs
Lifting the minimum file age for an over-budget pass merged fresh files into the regular selection, so the keep_files ceiling and the per-file limit applied to them too: one byte over the budget could process every fresh file but keep_files of them. The override is now a byte trim on the files that would remain, oldest first, until the budget holds.
An unset single-file limit now rolls at a quarter of a small byte budget instead of 256 MiB, so a freshly rolled file is not larger than the whole budget. Both logging setups open the appender through one function that returns the roll signal the cleanup task listens on. The README states that a log directory must not be shared by processes whose file names match the same pattern.
* fix(ecstore): bound bitrot and remote disk failure logs
A failing drive logs one error per shard block of every read it serves, and an unreachable peer logs one warning per in-flight operation. Neither had a rate limit, so a degraded drive or peer could produce log volume at the speed of the failing I/O.
The three bitrot read failures (short shard, hash mismatch, read error) and the two remote disk failures (timeout, network-like error) now log at most once per five seconds and report how many events were suppressed. The remote disk throttles belong to each disk handle, so one noisy peer cannot hide another peer's first warning. Error results, health marking and the per-operation counters are unchanged.
* fix(ecstore): bound reader retirement warnings in the decoder
A slow shard reader is retired once per stripe of every read it lags on, and a parity reader that cannot be aligned is retired with a warning each time. Both lines name only a shard index. They now log at most once per five seconds with the number suppressed; the retirement itself and the error recorded for the shard are unchanged.
* fix(windows): release rebuild source pins and align test fixtures
Release the multipart source directory pin as soon as the upload head is
decoded during online index rebuild. On Windows the pin denies delete
sharing, so keeping it while indexing made a concurrent abort fail with a
sharing violation.
Align three test fixtures with Windows path and handle semantics:
- heal bucket pass targets use the endpoint string form, matching
production disk endpoint identity;
- scanner erasure probe injection keys are normalized with path_join_buf
so they match the scanner's lookup keys;
- the targets queue budget test changes mtime through a writable handle,
which Windows requires.
* test(scanner): look up failed objects by the scanner's key form
The scanner records failed objects under keys built with path_join_buf,
which uses `/` separators on every platform. Three erasure probe tests
looked them up with a native `root.join(..)` path, so on Windows the
expected key never matched and the assertions failed. Build the expected
key the same way the scanner does; the assertions still require the exact
key to be present.
* test: bypass the disk independence check in path-only topology tests
These tests parse endpoints whose local paths are never created. Unix
leaves missing paths out of the physical-disk independence check, but
Windows resolves them to their volume, so every disk counted as one
shared device and the parsing assertions never ran. The check keeps its
own coverage in the dedicated shared-volume tests.
* fix(ecstore): name the target record when a migration write fails
The existence probe reports a blocked record with its path, but the
commit path returns bare disk errors. On Windows a regular file in the
record's place reads as missing, so migration only fails at the write,
and startup reported "File access denied" without naming the record.
* test: make app fixtures portable to native Windows
- Token- and cache-shaped keys use Windows-legal spellings at the same
sort position, so pagination still runs without relaxing key admission.
- The TLS root test falls back to a directory junction only when a
symlink needs a privilege the runner lacks, and asserts the root is a link.
- Snapshot timestamps step by 1 us, which Windows SystemTime can represent.
- The receiver disk URL uses a slash-led path instead of a raw drive path.
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* refactor(auth): share authorization core with owned entry points
Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* fix(auth): keep owned authorization in the app layer and fail closed
Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.
* test(auth): move owned parity tests to the app layer
Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* test(auth): read storage-private parity facts through test accessors
The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.
* test(auth): owned and legacy entry points reach the same decisions
Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).
* test(auth): satisfy clippy on the parity test facade
* test(auth): report every decision mismatch in the parity matrix
* test(auth): cover multipart staging in the owned/legacy decision matrix
* fix(table-catalog): restore owned request lines the main merge reverted
The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.
* fix(auth): make an absent caller secret unrepresentable as a key
RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.
* fix(auth): keep the test-only credentials rebuild out of the lib build
* fix(app): drop the PutObjectInput re-export main now provides
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* test(e2e): allow a pinned release binary as differential reference side
RUSTFS_E2E_REFERENCE_BINARY makes side A of the dual-stack differential a released rustfs binary, started without RUSTFS_S3_STACK. A missing, non-file or non-executable path fails the run instead of falling back to the same-binary mode. The report records which side is the reference and each side's --version output.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* test(e2e): update smoke selection for reference-binary unit tests
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* chore: restore main's Cargo and baseline files after merging main
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(gateway-adapter): add IAM-backed CredentialProvider
Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).
- Pin rustfs-gateway at the existing gateway rev with
default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
legacy empty secret); IAM not ready or not initialized -> Unavailable;
unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
NotFound; other IAM errors -> Backend; invalid or "off" principals
resolve disabled; STS credentials carry a SessionBinding, and an STS
credential without an expiry is a Backend fault rather than a
never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
error text is dropped after classification.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* feat(gateway-adapter): add IAM-backed PolicySource
Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.
- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
account's own secret for service accounts), and is_owner mirrors the
legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* feat(gateway-adapter): add Observer and AuthzAuditSink adapters
Map the gateway's answered-request event onto the labels of
rustfs_s3_http_requests_total, bounded as the legacy counter bounds them,
and write one audit record per authorization decision (allow, deny and
indeterminate) in the shape of the legacy authorization-denial entry,
with the gateway's verified caller as accessKey.
Both adapters stop at RustFS-side sink traits. The legacy metric and
audit field names, with the file:line that emits each and the owner
that supplies it under the gateway, are committed as
tests/fixtures/observability-contract.json and held to the code.
* fix(gateway-adapter): share live root and refuse short secrets
Address the security review of the T2.1 adapters (rustfs/backlog#2760).
- Add RootCredentials (validated: root secret and STS signing key at
least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
RootCell. IamAdapters::new is now the only constructor of
IamCredentials and IamPolicySource, so both read one live root source
per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
in the credential provider and DISABLED_PRINCIPAL in the policy
source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
accounts of root, the name live groups are read under, and another
session's token.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* fix(gateway-adapter): effective secret length and unsplittable pair
Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).
- One rule for every secret: its length after trailing NUL bytes are
removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
so trailing NULs add nothing; interior NULs count. Applied to the root
secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
together through the consuming install(builder, make_authenticator);
compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
binary reads its live root accessor directly; RootCell is now a
test-only helper.
* refactor(gateway-adapter): audit only refusals the gateway enforced
Drop the Observer adapter: request metrics stay with the outer tower
layer and the use-case code on both stacks, and the gateway already
logs every refusal it makes, so nothing is left for an observer to add.
Rework the AuthzAuditSink adapter to record only a Deny or
Indeterminate at an enforcing stage. An Allow and the GetObject
missing-object visibility probe produce no record. The audit switch
and the denial rate limiter are asked before a record is built, and
the record carries the legacy denial entry's fields only.
Remove the observability contract fixture and its tests.
* chore(gateway-adapter): drop the dependencies the observer needed
* docs(gateway-adapter): state what install guarantees about the provider handle
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* test(app): add per-operation test seams for oracle use-case calls
* chore(codemods): add lifecycle transition test split codemod
* test(app): split lifecycle transition tests by operation owner
* test: call oracle use-cases through test seams in cross-owner tests
* ci: guard cross-owner tests to call use-cases through test seams
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
* fix(ci): run the mint lane on ubuntu-latest, which has a Docker daemon
* fix(docker): let BuildKit populate TARGETARCH for the rc download
* fix(docker): derive the rc architecture when TARGETARCH is not set
* test(e2e): expect ServiceUnavailable for degraded ListParts after #9149
PR #9149 made ServiceUnavailable the default API code for storage
read-quorum failures and limited SlowDownRead to GET/HEAD object reads.
ListParts maps its storage error through ApiError::from, so a degraded
ListParts now answers 503 ServiceUnavailable. The two distributed
acceptance cases still expected the previous SlowDownRead code and have
failed every nightly e2e-distributed run since 2026-11-05.
The 503 status and the fail-closed (non-empty-list) assertions are
unchanged; only the error code tracks the intended contract.
* style(e2e): apply rustfmt to the ListParts error-code assertion
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(gateway-adapter): add IAM-backed CredentialProvider
Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).
- Pin rustfs-gateway at the existing gateway rev with
default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
legacy empty secret); IAM not ready or not initialized -> Unavailable;
unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
NotFound; other IAM errors -> Backend; invalid or "off" principals
resolve disabled; STS credentials carry a SessionBinding, and an STS
credential without an expiry is a Backend fault rather than a
never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
error text is dropped after classification.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* feat(gateway-adapter): add IAM-backed PolicySource
Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.
- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
account's own secret for service accounts), and is_owner mirrors the
legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* feat(gateway-adapter): add host, bucket-owner and request-id adapters
* fix(gateway-adapter): avoid ecstore path in doc comment
* fix(gateway-adapter): keep the s3s path pattern out of docs
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* test(gateway-adapter): make the test carrier Clone for Extensions::insert
* fix(gateway-adapter): share live root and refuse short secrets
Address the security review of the T2.1 adapters (rustfs/backlog#2760).
- Add RootCredentials (validated: root secret and STS signing key at
least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
RootCell. IamAdapters::new is now the only constructor of
IamCredentials and IamPolicySource, so both read one live root source
per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
in the credential provider and DISABLED_PRINCIPAL in the policy
source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
accounts of root, the name live groups are read under, and another
session's token.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* fix(gateway-adapter): effective secret length and unsplittable pair
Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).
- One rule for every secret: its length after trailing NUL bytes are
removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
so trailing NULs add nothing; interior NULs count. Applied to the root
secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
together through the consuming install(builder, make_authenticator);
compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
binary reads its live root accessor directly; RootCell is now a
test-only helper.
* test(gateway-adapter): use bucket names the rules accept in host tests
* refactor(gateway-adapter): never refuse on request id; owner is the reported constant
* docs(gateway-adapter): state what install guarantees about the provider handle
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
Dispatch-only workflow that compiles the current main commit with a
caller-supplied version and uploads zip, deb, and rpm artifacts.
Co-authored-by: hector <majinghe@users.noreply.github.com>
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)
* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.
Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.
Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.
Refs rustfs/backlog#2787, rustfs/backlog#2734
* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.
Refs rustfs/backlog#2742, rustfs/backlog#2734
* ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.
Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.
The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.
Refs rustfs/backlog#2744, rustfs/backlog#2734
* ci: raise the test-count baseline to the integration tree (#8426)
* ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only
The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.
Refs rustfs/backlog#2739, rustfs/backlog#2734
* ci: add the s3s edge allowlist mode to the footprint guard (#8405)
`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.
Refs rustfs/backlog#2741, rustfs/backlog#2734
* test(ecstore): reach the bucket-config codec through the test facade (#8428)
* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.
The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.
rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.
Refs rustfs/backlog#2747, rustfs/backlog#2734
* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader
Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.
* chore(scripts): add the s3s-to-rustfs-s3-types error codemod
Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.
* refactor(ecstore): take S3ErrorCode from rustfs-s3-types
Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
* ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).
The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
it imports the macro from rustfs_s3_types by name on a line starting
with the use item (or defines it with `macro_rules! s3_error`) and does
not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
tree naming it or a crate-root `*`, `use s3s::*`, or
`#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
crate-local re-export, a renamed or glob rustfs_s3_types import, a
commented-out import, a comment-only mention) counts.
Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.
`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.
differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.
Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.
Refs rustfs/backlog#2740
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor
* ci: classify the s3s edge adapters in storage/s3_compat as interface
* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.
The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.
Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.
Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.
Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.
$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0
$ cargo fmt --all --check
exit_code=0
$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0
$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0
$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0
$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0
$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0
$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0
$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0
$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0
$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0
$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0
$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0
$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0
$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s
OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok
----------------------------------------------------------------------
Ran 52 tests in 14.301s
OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s
OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s
OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok
----------------------------------------------------------------------
Ran 13 tests in 3.280s
OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
----------------------------------------------------------------------
Ran 10 tests in 0.051s
OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s
OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s
OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s
OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s
OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s
OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s
OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s
OK
PASS: cold stampede script self-test
exit_code=0
$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
----------------------------------------------------------------------
Ran 24 tests in 0.958s
OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0
$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0
$ ./scripts/check_no_planning_docs.sh
exit_code=0
$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0
Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0
Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
Starting 1 test across 1 binary (9 tests skipped)
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
assertion failed: (1..=1_000).contains(&data.duration_millis)
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
FAIL [ 0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
Starting 2 tests across 1 binary (8 tests skipped)
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
stdout ───
running 1 test
test production_cli_measures_and_signs_exact_binary_provenance ... FAILED
failures:
failures:
production_cli_measures_and_signs_exact_binary_provenance
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s
stderr ───
thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
assertion `left == right` failed
left: Number(1001)
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
stdout ───
running 1 test
test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED
failures:
failures:
real_local_write_read_is_measured_and_scratch_is_removed
test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s
stderr ───
thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
assertion `left == right` failed
left: 1001
right: 1000
note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace
────────────
Summary [ 13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
FAIL [ 13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
FAIL [ 0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100
Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.
$ git diff --check
exit_code=0
$ git diff --cached --check
exit_code=0
Independent orchestrator acceptance
Tested code tree: e67c72fb01
Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
|
= note: `#[warn(linker_messages)]` on by default
warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
Starting 10 tests across 1 binary
PASS [ 0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
PASS [ 0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
PASS [ 0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
PASS [ 0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
PASS [ 20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
PASS [ 5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
PASS [ 0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
PASS [ 0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
PASS [ 0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
PASS [ 0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
Summary [ 25.991s] 10 tests run: 10 passed, 0 skipped
exit_code=0
All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
* fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.
Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
--features rustfs-protocols/swift --no-fail-fast:
543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.
Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.
All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0
Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
Starting 543 tests across 8 binaries
Summary [ 6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0
The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
* fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.
Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.
Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.
Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45
All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.
cargo clippy -p rustfs --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.
The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.
cargo nextest run --profile ci -p rustfs --no-fail-fast
Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [ 2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.
cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
Summary [ 0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.
cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
Summary [ 0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.
Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
Summary [ 0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
Summary [ 5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
Summary [ 0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
Summary [ 5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.
cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
Summary [ 20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.
Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
* fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.
The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.
Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.
Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.
$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.
$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [ 0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.
54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.
Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608
Refs rustfs/backlog#2734.
* test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.
Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.
Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.
Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.
Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924
Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12
Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e
Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317
Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee
Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51
Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb
Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844
Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60
Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140
Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b
Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c
Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2
Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c
Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
Starting 1 test across 1 binary (5871 tests skipped)
SETUP PASS [ 0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
Summary [ 0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27
Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
Starting 3 tests across 1 binary (5869 tests skipped)
SETUP PASS [ 0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
PASS [ 0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
PASS [ 0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
PASS [ 0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
Summary [ 0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac
Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5
Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.
M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.
All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body
rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.
The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.
* refactor(rpc): serve internode rpc bodies with the owned Body
rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.
* fix(rpc): simplify wire test response builder type
Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.
Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.
No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.
* fix(ecstore): resume fenced Object Lock creation intents
* fix(ecstore): bound creation retry futures on the stack
* fix(ecstore): require native proof for creation retries
* fix(ecstore): bound bucket creation stack usage (#8466)
* fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.
Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.
Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed
Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
* fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.
The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
* test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.
Update the generated test-count baseline for the added macro arm.
Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
* refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family
* refactor(replication): move the replication config onto gateway types
The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.
* test: use S3 serializer for list response tests
* fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.
Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.
Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0
Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed
Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.
Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
* fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.
Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.
Validation (LANG=en_US.UTF-8, one build job):
cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [ 34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0
cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0
All 19 final Quick Checks completed with exit 0:
- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh
test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
* fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.
Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
* refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.
Linux test validation before the final import-path-only adjustment:
cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.
cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.
cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.
Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.
cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.
Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
* refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.
- rustfs/src/protocols/client.rs: the two webdav session methods now
return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
gets its own `use rustfs_s3_types::s3_error;` once its parent imports
that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
* refactor(admin): move error types to rustfs-s3-types (WIP, no build)
T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).
- codemod: --facade PATH treats a crate-local re-export of s3s's error
items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
(--facade crate::storage_api::site_replication::s3); 6 glob children
get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
conversion is derived from it.
* fix(admin): convert error types at the s3s boundary
Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:
- admin/auth.rs, admin/handlers/object_zip_download.rs,
admin/handlers/table_catalog/mod.rs: map the s3s result returned by
check_key_valid / authorize_request / authorize_internal_object_request
into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
rustfs code is converted with .into() when the struct is built, in
production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
s3s errors (S3Route impl); the expected rustfs code is converted with
.into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
&'static str so the Cow<'static, str> custom code borrows it; every
caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
that no longer have users (clippy -D warnings).
cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.
Refs rustfs/backlog#2743, rustfs/backlog#2734.
* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types
Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.
- ecstore: BucketConfigXml is implemented by the gateway codec for every
family; metadata, metadata_sys, versioning, object lock, replication and
lifecycle consumers take the persisted types. Region moves to
rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
persisted types in storage/storage_api.rs by writing one codec's XML and
reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.
The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.
* test(app): prepare the PutBucketEncryption config from the request
The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.
* style(app): format the PutBucketEncryption test
* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
* refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes
Part of T1.5 (rustfs/backlog#2746), batch 2.
* fix(s3select): keep the select request conversion in the app layer
The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
* fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts
* chore: update heal test count baseline
* test: reserve nextest capacity for progress probes (#8818)
* test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
* refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types
* test: update e2e test count baseline
* fix: preserve copy source keys and unknown lengths
* test: update protocols test count baseline
* fix(protocols): preserve typed SFTP backend errors
* test(protocols): use gateway list input in policy tests
* fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
* fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back
* test(ecstore): ratchet added restore finalization cases
* fix(ecstore): keep restore copyback compatible with older peers
* fix(ecstore): gate restore copyback on fleet compatibility
* fix(ecstore): retain transition identity during restore copyback
* fix(ecstore): route committed restore copyback locally
* fix restore copyback cleanup
* fix(ecstore): honor restore probe test fallback
* refactor(storage): migrate option errors to domain types (#8839)
* refactor(s3): migrate private multipart validation errors (#8844)
* refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts
* test(e2e): update smoke selection baseline
* test(e2e): update full selection baseline
* refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary
* refactor(admin): migrate prefix usage to owned request
* refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary
Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.
`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.
No handler behavior changes; the remaining migrations follow in batches.
* chore(admin): add the T1.12 admin handler codemod
The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.
* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)
Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.
The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.
Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): add owned forms of the shared admin response helpers
Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.
* refactor(admin): use the shared owned response helpers in batch 2 (#8954)
Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.
Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* fix(admin): preserve legacy body limit error responses
* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)
Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.
The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.
object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.
The s3s footprint baseline drops from 99 to 90 files.
* test(admin): anchor the replication diff body contract on the call
The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.
* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)
* fix(admin): preserve catalog body limit response bytes
* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests
Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.
profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.
The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.
KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.
Lower the s3s footprint baseline to the measured 68 files.
Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).
* refactor(admin): remove the legacy admin helpers batch 4 superseded
Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.
Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
* test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
* chore(gateway): raise test-count rows for tests merged from main
* test(s3select): use the owned JSON input types in merged planner tests
* fix(ecstore): scope the merged direct-writer test hook to test builds
* fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
* chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
* feat(gateway-adapter): add IAM-backed CredentialProvider
Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).
- Pin rustfs-gateway at the existing gateway rev with
default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
legacy empty secret); IAM not ready or not initialized -> Unavailable;
unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
NotFound; other IAM errors -> Backend; invalid or "off" principals
resolve disabled; STS credentials carry a SessionBinding, and an STS
credential without an expiry is a Backend fault rather than a
never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
error text is dropped after classification.
* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)
* feat(gateway-adapter): add IAM-backed PolicySource
Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.
- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
account's own secret for service accounts), and is_owner mirrors the
legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.
* ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline
Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
* chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main
main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
* fix(gateway-adapter): share live root and refuse short secrets
Address the security review of the T2.1 adapters (rustfs/backlog#2760).
- Add RootCredentials (validated: root secret and STS signing key at
least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
RootCell. IamAdapters::new is now the only constructor of
IamCredentials and IamPolicySource, so both read one live root source
per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
in the credential provider and DISABLED_PRINCIPAL in the policy
source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
accounts of root, the name live groups are read under, and another
session's token.
* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)
* fix(gateway-adapter): effective secret length and unsplittable pair
Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).
- One rule for every secret: its length after trailing NUL bytes are
removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
so trailing NULs add nothing; interior NULs count. Applied to the root
secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
together through the consuming install(builder, make_authenticator);
compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
binary reads its live root accessor directly; RootCell is now a
test-only helper.
* docs(gateway-adapter): state what install guarantees about the provider handle
---------
Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
A multipart index marker is recorded before its staging root is published, and a listing prunes markers whose root is gone. The window in between was covered by a five-minute age check, which cannot prove that the publisher's filesystem work has ended: a publisher stalled past it lost its marker, and the upload it then published stayed out of ListMultipartUploads on that drive until restart.
The publisher now holds an in-memory publication pin from before it records the marker until the filesystem work that publishes the root has returned. The pin travels with that work (the blocking closure or the lease owner chain), so it also covers work that outlives a cancelled caller. Pruning reads the pin first and the staging root second, under the marker lease. The age check and the per-write marker touch are removed.
Lands gateway/integration on main: the guard rails and the domain
decoupling for replacing s3s with rustfs/gateway (rustfs/backlog#2734,
Phase 0 and Phase 1). The S3 edge is still s3s and no wire behaviour
change is intended.
- Guard rails: lower-only s3s footprint baseline and edge allow-list,
per-crate test-count floor, 39 byte-level goldens for the persisted
bucket-config XML families, a two-server differential harness over
all 73 S3 operations, a JUnit differ, and a reference-parity lane
against the sha256-pinned 1.0.5 binary.
- Owned types: rustfs-s3-types (S3Error, S3ErrorCode, Body),
RequestEnvelope, AuthzFacts.
- Engine crates off s3s: ecstore, lifecycle, replication, scanner,
protocols, s3select, s3-client, rpc.
- Admin: error types moved; 300 of 314 Operation impls take the owned
AdminRequest.
- Server: the s3s-compat tower layers grouped under
server/legacy_compat; RUSTFS_S3_STACK=legacy|gateway selector, where
gateway refuses to start until the gateway edge exists.
Fixes made on the branch that change ecstore and heal behaviour are
listed in the pull request description. The per-commit history stays
on gateway/integration.
* fix(ecstore): let missing-key deletes complete on UUID-named folders
Deleting a key that does not exist probes the key's directory for
interrupted delete transactions. The probe was bounded at 4096 entries
per drive and charged every entry inside a UUID-named child, so a key
naming a folder of roughly 1,400 or more UUID-named child keys answered
503 SlowDown on every retry.
Inside a UUID-named child only journal files and data-directory markers
can be evidence, so every other name (a child key's own xl.meta, data
directories or children) is now skipped unread at 1/64 like plain
children of the folder. The per-call allowance of the bounded protocol
rises to 262,144 entries per drive; the resumable background step keeps
4096 and the request budget keeps its sizing, so the per-request total
is unchanged. The probe runs on the durable-mutation lane instead of
the one-worker foreground lane, and stops incomplete when its caller
goes away or after a third of the drive timeout (at most 10 s), so a
slow walk answers SlowDown instead of timing out the drive.
* test(ecstore): keep discovery fixtures meaningful under 1/64 charging
Part files inside a data directory are inert to object-scoped discovery
now, so reclaim_orphan_data_dirs_drains_empty_discovery_pages fills its
first step with the referenced data directories of many versions, which
still cost a full entry each. The charging test drives the walk directly
instead of through the wall-clock-limited disk entry point, so a loaded
machine cannot turn it into an incomplete probe.
Add unaligned-boundary SIMD vs scalar equivalence unit tests and on-demand (#[ignore]) utility-level throughput microbenchmarks across rustfs-utils, rustfs-rio, and rustfs-checksums:
- crates/utils/src/hash.rs: verify HighwayHasher SIMD (AVX2/SSE4.1/NEON) against highway::PortableHash scalar reference and contiguous hash_encode vs odd-chunked hash_encode_slices across unaligned tail boundaries; provide on-demand throughput microbenchmark.
- crates/rio/src/checksum.rs: verify SIMD-accelerated CRC32, CRC32C, and CRC64_NVME against bitwise scalar reference implementations across vector tail boundaries and measure utility-level throughput across all 10 BASE_CHECKSUM_TYPES.
- crates/checksums/src/lib.rs: verify streaming chunked update + finalize + headers() against one-shot digests across all 9 ChecksumAlgorithm variants for unaligned chunk and payload sizes, plus on-demand throughput microbenchmark.
The single-process usage overlay clears usage_snapshot_complete when it
holds counts it cannot reconcile with the persisted snapshot, for
example writes into a bucket that has no verified baseline. The admin
datausageinfo path then judged the overlaid document as structurally
incomplete and replaced it with an empty one, hiding every bucket the
scanner had measured. Because each write restarts that bucket's scanner
fence, a continuously written bucket kept the whole response empty
indefinitely.
Decide whether the persisted snapshot is usable before the overlay is
applied, and report overlay-induced incompleteness as a non-converged
snapshot instead, as is already done for buckets the scan never reached
(rustfs#5806).
Use the larger GitHub-hosted macOS runner for the macos-aarch64
release target. The target id, triple, and other platforms stay the same.
Co-authored-by: hector <majinghe@users.noreply.github.com>
description: Publish a RustFS version through Console, release-branch CI, preview acceptance, human confirmation, and final publication. Use only for an explicit release request.
description: Publish a RustFS version through frozen Linux candidate acceptance, desktop completion, manifest approval, byte-preserving publication and post-release follow-up. Use only for an explicit release request.
---
# RustFS Release
Require the exact final SemVer target before version edits or publication. If unspecified, inspect current releases/tags and ask with concrete candidates; do not guess the channel or bump. A named bump type resolves to an exact version that still needs confirmation. Report the confirmed target verbatim; resolve any later mismatch before proceeding. Independent read-only preflight may continue.
Require the exact final SemVer target before version edits or publication. If unspecified, inspect releases/tags and ask with concrete candidates; do not guess the channel or bump. Reuse the user's confirmed target and authorized delivery scope. Independent read-only preflight may continue.
## Invariants
- Cargo stores `<target>`, never `-preview.N`. Before publication, installation defaults retain the previous available deliverable. Final and preview binaries embed their own tag names, so version/asset names differ despite identical source.
-Use annotated tags without `v`. Preview names are exactly `<target>-preview.<digits>`; choose the next unused iteration after fetching tags. Preview Releases are prereleases, never Latest; publish only versioned assets/exact Docker tags, never latest assets, R2, Helm, moving Docker channels, or installation/banner updates.
-`release/<target>`owns the candidate. Retain its history, backport only reviewed fixes, and never merge main wholesale or force-push it. Pin `PREVIEW_HASH` to its exact commit with complete passing CI. Preview and final tags both point there; never tag a later main/branch HEAD or insert another bump.
-Phase failures block dependents. Keep preview Releases until final publication and notes generation finish; CI removes Releases while retaining tags. Never move an existing preview or final tag.
- Cargo and every candidate executable contain the final product version. `<target>-preview.<run_number>` is an immutable candidate identifier, not a public tag or displayed binary version.
-Freeze the exact source, reviewed workflow recipe, toolchain, Console, CLI, dependency lock, previous stable version and validation plan. Newer unrelated main or Console releases do not change those inputs.
- Retain`release/<target>`history when a release branch is used; backport only reviewed fixes. Pin `CANDIDATE_SHA` to its exact CI-validated commit. Never force-push a release branch or move a public tag.
-Build Linux first. Complete field acceptance before macOS/Windows and packaging. Full certification and final acceptance are required before publication; a partial Linux PASS grants no release authority.
- Promote the accepted bytes. Final publication never recompiles binaries or rebuilds packages/images. Infrastructure retries reuse successful artifacts; changed source or inputs require a new candidate and affected acceptance.
- Phase failures block dependents. No latest/default-channel update before versioned delivery. Use the [pipeline runbook](../../../docs/operations/release-pipeline.md) for executable entry points, locks and recovery.
## Read by Phase
Read only the current phase's procedure; retain completed evidence across turns. Follow root verification, Git/PR, and authorization rules.
## Read by phase
| Phase | Procedure |
|---|---|
| 0 | Clean tree, fetch main/tags, verify GitHub access, then complete the mandatory [Console release gate](references/console-gate.md). A green Console build alone is insufficient. |
| 1–2 | [Prepare/reuse the release candidate and run exact-SHA branch CI](references/release-candidate.md). Source version changes use `rustfs-release-version-bump` with authorized delivery scope. |
| 3 | [Verify the preview build, assets, channels, and notes](references/preview-release.md). |
| 4–5 | [Run the downloaded binary, Console CRUD, and latest-rc matrix](references/preview-acceptance.md). Every check must pass. |
| Confirmation | Complete the gate below and end the turn. |
| 6 | After fresh confirmation, [publish and verify the final tag](references/final-release.md) at `PREVIEW_HASH`. |
| 7 | [Reconcile Security Advisories, milestones, installation references, and the website; reconcile main and remove the completed release branch](references/post-release-updates.md) only after complete publication. |
| 0 | Clean tree, fetch main/tags, verify access, then complete the mandatory [Console gate](references/console-gate.md). |
| 1–2 | [Prepare the exact source and run branch CI](references/release-candidate.md). Version edits use `rustfs-release-version-bump`. |
| 3 | [Build and verify the Linux candidate](references/preview-release.md). |
| 4–5 | [Run artifact, field, Console and rc acceptance](references/preview-acceptance.md), then complete desktop/package/image/chart validation. |
| Confirmation | Report the complete manifest and obtain the confirmation below. |
| 6 | [Publish the accepted manifest](references/final-release.md). |
After Phases 3–5 pass, recheck that the release branch still equals `PREVIEW_HASH` and that the current Console asset tag/digest match the preview's recorded build inputs. Report the target, branch, preview tag/hash, branch CI run, preview Release URL, accepted Console asset identity/result, and rc matrix. Explicitly ask whether to publish the final tag and end the turn without creating/pushing it.
After all acceptance passes, report the target, source SHA, source CI run, Linux and completion run URLs, final manifest SHA-256, accepted Console/CLI identities, compatibility/performance results and backlog report. Explicitly ask whether to publish this exact manifest and end the turn without dispatchingpublication.
Only a new affirmative user reply to that exact report authorizes Phase 6. The original release request, earlier confirmation, silence, or automated follow-up does not count. Confirmation binds the target, preview tag, hash, and accepted build inputs; a changed value or repeated/failed acceptance cycle invalidates it. Revalidate and obtain fresh confirmation before continuing.
Only a new affirmative reply to that exact report authorizes Phase 6. An earlier general release request, silence or automatic continuation does not count. Reuse confirmation for retries of that same manifest; do not ask again merely because a destination failed. A changed source, input, manifest or acceptance result invalidates it and requires renewed acceptance/confirmation.
## Recovery
## Recovery and reporting
- Before the final tag exists, land fixes on main, backport to the candidate, verify target versions, and restart branch CI/acceptance. Use a new preview iteration once a preview was tagged; main may advance independently.
- If only an external build input changed, record it, create a new preview iteration even when the source SHA is unchanged, and repeat the affected build and artifact acceptance before fresh confirmation. Reuse source checks whose inputs remain valid.
- Once the final tag exists, retry publication jobs for that exact tag. A source fix requires a newly confirmed target, not retagging or a newer preview. Phase 7 retries recheck artifact availability and superseding releases.
- If abandoned after the bump merged, report the unpublished version on main and record whether to revert or let the next release overwrite it. Deleting unpublished candidate branches or preview tags requires an explicit decision. Completed release branches follow Phase 7 cleanup; keep release tags.
Report completed phase results and incomplete work with evidence: Console previous/latest tags, release need, hash and run/Release URLs; target, branch CI/SHA, previews and hash, confirmation state; preview/final assets, latest-channel state, Console/rc results and cleanup; advisory reconciliation results and pending disclosure decisions; both milestone states, installation PR checks/merge state, and website text/link/PR/deployment state. Keep artifact publication separate from follow-up delivery; do not call an open PR a live update. Report deviations and their authorization.
Resume failed infrastructure jobs without rebuilding successful units. Fix product defects on main, backport when needed, and start a new candidate. After a final tag exists, retry the same bytes or use a new patch version; never move the tag. Do not conflate implemented, CI-passed, field-accepted, approved, published and post-release-complete states. Report incomplete work and deviations with evidence; a tag or green build alone is not a completed release.
@@ -4,7 +4,7 @@ Read during Phase 0, before changing RustFS version files or tags. Follow the pa
### Console release gate
Complete this gate before changing any RustFS version file or creating any RustFS tag. RustFS `build.yml` downloads the asset returned by `repos/rustfs/console/releases/latest`, so a successful Console build alone is insufficient.
Complete this gate before changing any RustFS version file or creating any RustFS tag. Candidate creation resolves `repos/rustfs/console/releases/latest` once and freezes the exact asset for every build, so a successful Console build alone is insufficient. After freezing, later Console releases do not silently change or invalidate the accepted inputs.
1. Read the latest published Console tag and compare it with Console `main`:
Read only after fresh user confirmation of the preview acceptance report. The [parent confirmation gate](../SKILL.md#human-confirmation) applies.
Read only after fresh confirmation of the complete candidate report. The [parent confirmation gate](../SKILL.md#human-confirmation) applies.
## Phase 6 — Publish the final tag on the validated commit
Dispatch `release-publish.yml` on main with the successful completion run ID and approved `release-manifest.json` SHA-256. Do not create the tag manually. The workflow revalidates source, bytes and trusted certification, then creates the annotated final tag at `CANDIDATE_SHA`. A recipe change fails closed and requires a new candidate; unrelated main changes do not require a rebuild.
No second source version bump. Before creating the final tag, recheck the remote `release/<target>` HEAD equals `PREVIEW_HASH` and the current Console release tag/asset digest still match the accepted preview inputs. If either changed after confirmation, the approval no longer applies; validate the changed inputs with a new preview and obtain fresh confirmation. The final tag goes on the exact commit the preview validated:
Require both versioned publication and channel publication jobs to succeed. Verify the final tag's commit and manifest identity; all six platform ZIPs and compatibility aliases; DEB/RPM, checksums, SBOM, provenance and evidence bundle; both multi-architecture image variants in Docker Hub, GHCR and Quay; and the accepted Helm chart in the chart repository. Download a host-compatible final artifact and confirm its digest is exactly the accepted candidate digest and its version/source output agrees.
```bash
git fetch origin --tags
git rev-parse "<preview-tag>^{commit}"# must equal PREVIEW_HASH — abort if not
git tag -a "<target>" -m "Release <target>""$PREVIEW_HASH"
git push origin "<target>"
```
For stable releases verify GitHub Latest, R2 download aliases and `latest.json` unless a newer stable release already owns those channels. Prereleases must remain GitHub prereleases and leave stable pointers unchanged. Verify generated release notes compare against the frozen previous stable release, excluding internal previews.
- CI rebuilds from the same source with a different tag name, so the binary self-reports `<target>`. Other inputs can change: `build.yml` reads Console `releases/latest` during each build. Compare the actual Console tag, URL, and verified digest in every final build job with the accepted preview record, and inspect available build provenance for other relevant changes. A pre-tag check cannot prevent a later input change. On a mismatch or missing evidence, repeat affected acceptance against the final artifacts and report the limitation; failed acceptance leaves release validation incomplete even if publication already succeeded. Never move the final tag to conceal a failure.
- Verify the final tag's complete publication path: all matrix and release jobs green; `gh release view "<target>"` shows the full versioned and `-latest` asset set plus checksums, SBOM, and provenance; Docker and Helm workflows succeed; `latest.json` points to `<target>`. A stable target must have `isPrerelease=false` and `isLatest=true`. An alpha/beta/rc target must have `isPrerelease=true`; GitHub does not permit prereleases to be Latest, but the project `latest.json` still advances to the final non-preview target.
- Verify the final Release body contains `## What's Changed` and a Full Changelog link. When `PREVIOUS_DELIVERABLE` exists, the link MUST be `https://github.com/rustfs/rustfs/compare/<PREVIOUS_DELIVERABLE>...<target>` and the baseline MUST equal the preview Release baseline; for example, both `1.0.0-beta.12-preview.1` and `1.0.0-beta.12` compare from `1.0.0-beta.11`.
- Verify the preview cleanup: `cleanup-preview-releases` must succeed and `gh release view "<preview-tag>"` must then report `release not found` for every preview iteration of this target. Each surviving preview tag must still resolve to its own recorded commit; the accepted preview resolves to `PREVIEW_HASH`. If the job failed, delete the leftover Releases manually with `gh release delete "<preview-tag>" --yes` and report it.
- Verify a host-compatible final artifact's checksum and `./rustfs --version`; it must report `<target>` and the expected source SHA. This identity check does not replace affected acceptance when build inputs changed.
On infrastructure failure retry the same workflow/seal; matching destinations are reused. Never clobber an asset, force a tag, rebuild the image or silently accept a changed digest. A source fix after the final tag requires a new patch version. Cross-registry writes are not atomic: report the unfinished destination rather than claiming publication complete.
Never pass `--cleanup-tag` when removing preview Releases. Remove them manually only if `cleanup-preview-releases` failed, after final publication and notes generation. Record deleted Releases and surviving tags.
New candidates create no preview Releases to clean up. For a legacy previewrelease, preserve its tag and remove its Release only after final delivery and notes are verified. Do not pass `--cleanup-tag`. Complete the [post-release follow-up](post-release-updates.md) separately.
@@ -24,7 +24,7 @@ Reconcile advisories after every completed final release, including Console-only
1. Re-read the published deliverable state before edits or a retry. If a newer release has superseded this target, do not downgrade installation references or the website announcement. Report the superseding release and leave those defaults intact.
2. Invoke `rustfs-release-version-bump` with stage `post-release`, the exact target, and the authorized delivery scope. Prepare the follow-up on current main; do not edit or move either validated release tag. Cargo versions may already be preparing the next target and must remain untouched.
3. Verify the exact Docker image manifest, Release download links, RPM source archive, and Helm repository entry before publishing the installation PR. The chart workflow overrides chart/app versions from the final tag, pins the source checkout to that release, and waits for its default Docker image before packaging.
3. Verify the exact Docker image manifest, Release download links, RPM source archive, and Helm repository entry before publishing the installation PR. The chart is packaged and tested before sealing; publication uploads those same bytes only after versioned Docker images are available.
4. Report the installation PR and its merge state separately from the completed release. Reuse existing merge authorization and repository checks; do not infer new merge authority from this reference.
## rustfs.com top banner
@@ -54,4 +54,4 @@ Use the existing announcement configuration from [website PR #112](https://githu
1. Compare the exact published tag with current main. Audit every release-side commit since their merge base, including inherited backports. An ahead count is a history difference, not proof of missing changes. Use ancestry and patch equivalence, then inspect current code and regression evidence for squashed, adapted, superseded, or reverted changes. Record each commit as present, superseded, release-only, or missing; a positive `git cherry` result alone does not prove a missing fix.
2. Bring missing shared changes to main through a reviewed PR and the required checks before closing the follow-up. Preserve main's later changes; decide version bumps and pinned Console configuration separately. If a history merge is needed, use a merge commit and verify the release commit is an ancestor of main; squash does not establish that ancestry. Do not merge main into the published release branch or move its tags. Report unresolved changes instead of claiming reconciliation is complete.
3. After publication and authorized follow-ups are complete, delete the remote `release/<target>` branch. Immediately before deletion, verify its HEAD still equals the published tag's commit and no open PR targets or originates from it. Preserve a branch with newer work or open PRs and report the blocker. Use a deletion with an expected-old-SHA check to avoid removing a concurrently advanced branch.
4. Verify the remote branch is absent and the final and preview tags still resolve to their recorded commits. Remove a local release branch only if it is task-owned, unchecked out, and has no unpreserved work. Record cleanup separately from artifact publication; an explicitly authorized deletion before reconciliation does not make unresolved main changes complete.
4. Verify the remote branch is absent and the final tag and any legacy preview tags still resolve to their recorded commits. Remove a local release branch only if it is task-owned, unchecked out, and has no unpreserved work. Record cleanup separately from artifact publication; an explicitly authorized deletion before reconciliation does not make unresolved main changes complete.
Read after Phase 3 succeeds. Complete every check below before the parent skill's manual confirmation gate. These checks cover the downloaded artifact, embedded Console, and latest rc client.
Read after Phase 3 succeeds. Complete every check below before the parent skill's manual confirmation gate. These checks cover the downloaded artifact, embedded Console, and the rc release frozen in the candidate inputs.
## Phase 4 — Run the artifact locally, verify the console
Use a unique task-owned scratch directory. Select the versioned archive matching the host OS, architecture, and runtime, download its checksum file, and verify the archive before extraction. Do not substitute a different build when a matching artifact is unavailable; report that acceptance gap. The shell example below assumes the verified executable is at `RUSTFS_BINARY` (`rustfs.exe` on Windows), `SCRATCH` is the task directory, and `S3_PORT` and `CONSOLE_PORT` are distinct available ports. Use equivalent native commands when the shell differs.
Use a unique task-owned scratch directory. Select the versioned archive matching the acceptance host, and verify it against the sealed manifest before extraction. Before desktop completion, use the Linux acceptance environment rather than rebuilding for the local desktop. Do not substitute a different build when a matching artifact is unavailable; report that acceptance gap. The shell example below assumes the verified executable is at `RUSTFS_BINARY` (`rustfs.exe` on Windows), `SCRATCH` is the task directory, and `S3_PORT` and `CONSOLE_PORT` are distinct available ports. Use equivalent native commands when the shell differs.
Bind both listeners to loopback. Choose task-only credentials, set loopback proxy exclusions for the server/client processes, and record the server PID. A port probe does not reserve a port; retry startup with fresh ports on a bind conflict rather than connecting to an existing service.
@@ -24,16 +24,16 @@ PREVIEW_SERVER_PID=$!
Checks (all must pass):
-`"$RUSTFS_BINARY" --version` reports the preview tag name and the short SHA of `PREVIEW_HASH`. Reporting `<target>` without the `-preview.N` suffix means the build did not embed the tag — treat as FAIL and investigate before proceeding.
-`"$RUSTFS_BINARY" --version` reports the exact final `<target>` and full `CANDIDATE_SHA`. A preview suffix, another version or another source is a failure.
- Wait with a bounded readiness deadline while checking the recorded server process remains alive; `curl --noproxy '*' -fsS "$S3_ENDPOINT/health/ready"` must return ready from this process's listener.
- Startup log shows the embedded console being served (this was the regression that `fix(release): require embedded console assets` guards).
- Open `CONSOLE_ENDPOINT` in the browser and log in with the task credentials. The dashboard must render without JS console errors; create a bucket, upload a file, download it back (byte-identical), and delete the object and bucket. Keep the server running for Phase 5.
## Phase 5 — Validate with the latest rc client
## Phase 5 — Validate with the pinned rc client
`rc` is the RustFS CLI client from <https://github.com/rustfs/cli>.
- Resolve the latest release with `gh api repos/rustfs/cli/releases/latest --jq .tag_name`; verify the local client's version or download and verify a host-compatible client into the task directory. Set `RC_BIN` to that executable and record its version/digest. Avoid changing the user's installed client for this check.
- Read the CLI release and asset digests from `inputs.json`; verify the local client's version or download a host-compatible asset from that exact release into the task directory. If the host is a desktop, resolve its asset within the same pinned CLI release and record the digest; do not independently follow `latest`. Set `RC_BIN` to that executable and record its version/digest. Avoid changing the user's installed client for this check.
- Inspect the client's current help for an isolated configuration option and use it when supported. Otherwise choose a unique `PREVIEW_ALIAS` and confirm it is absent before creating it; never overwrite an existing alias. Use task-owned bucket/user names and input/output files. The names below are safe only inside the newly started isolated server.
- Point the client at `S3_ENDPOINT` with loopback proxy exclusions and run the command matrix, recording PASS/FAIL per command:
@@ -60,3 +60,9 @@ cmp <local-file> "$SCRATCH/out"
```
- Any FAIL blocks acceptance. On success or failure, stop only the recorded task process and remove only task-created aliases/data after retaining the needed failure evidence. Do not erase an existing client configuration or unrelated server data.
## Field acceptance and desktop completion
Before accepting the Linux manifest, record Scanner/Heal, multi-pool, memory, major features, high-concurrency 503, performance and previous-version integrity/upgrade results in backlog. Preserve the release-specific agreed limits and baseline; a PASS label without artifact identities or test results does not satisfy acceptance.
Dispatch `release-complete.yml` only after that report passes, using the exact Linux manifest digest and backlog URL. Require native macOS/Windows checks, package extraction, image startup/scans, chart tests and complete certification to pass. Complete any desktop Console/client checks applicable to the release against these same archives. Record the completion run and final manifest SHA-256 before entering the parent confirmation gate. Partial Linux acceptance does not authorize final publication.
Read for Phase 3 after the candidate passed exact-SHA CI. The [parent release invariants](../SKILL.md) apply.
Read for Phase 3 after the source passed exact-SHA CI. The [parent invariants](../SKILL.md) apply; commands and recovery live in the [pipeline runbook](../../../../docs/operations/release-pipeline.md).
## Preview channels
Dispatch `release-candidate.yml` on main with the confirmed final version and `CANDIDATE_SHA`. Record the run ID, frozen `inputs.json`, every Linux archive digest and `linux-manifest.json` SHA-256. Require the four Linux builds, native startup/S3 checks, previous-release upgrade matrix and Linux seal to succeed. Missing, skipped, cancelled or failed required work is incomplete acceptance.
- Use `<target>-preview.N` for every target, e.g. `1.0.0-beta.10-preview.3` or `1.1.0-preview.1`.
- The canonical suffix is exactly `-preview.<digits>`. `build.yml` recognizes it before alpha/beta/rc classification and routes it to the preview-only path; any other tag containing `-preview` fails closed instead of being treated as a release.
- A preview Release MUST be published with `isPrerelease=true` and `isLatest=false`. Any `*-latest` preview asset or preview-triggered `latest.json`, R2, Helm, or moving Docker channel tag is a pipeline failure. Docker images may use the exact preview version tag, including its existing variant suffixes.
- Preview Releases are cleaned up by the `cleanup-preview-releases` job after `publish-release` succeeds for the deliverable tag. It deletes every Release whose tag is exactly `<target>-preview.<digits>` and never passes `--cleanup-tag`, so the tags survive.
Verify the frozen Console identity equals the one accepted in Phase 0. Every matrix job consumes that same digest and exact toolchain. The binary must report the final product version and source commit; its candidate ID is separate. No public tag, Release, registry tag, R2 release path, Helm repository or latest pointer should change during this stage.
## Phase 3 — CI and preview Release verification
- Find and watch the tag build: `gh run list --workflow build.yml --branch "<preview-tag>" --limit 1` then `gh run watch <run-id>`. Every build matrix target must succeed (linux x86_64/aarch64 × musl/gnu, macos-aarch64, windows-x86_64).
- Confirm the preview tag resolves to the Phase 2 CI-validated `PREVIEW_HASH`. If the release branch advances during acceptance, repeat Phases 2–5 with a new preview tag.
- Confirm the Release publication jobs (`create-release`, `upload-release-assets`, and `publish-release`) succeed while `update-latest-version` is skipped.
- Record the inputs actually consumed by each build job: source SHA and the embedded Console release tag, asset URL, and verified SHA256 from the download logs. The workflow reads Console `releases/latest` separately for each build; confirm the matrix used the Console asset accepted in Phase 0. A missing identity or differing asset blocks acceptance until resolved. Retain available toolchain and build provenance with the artifact checksums; the same source SHA alone does not establish equivalent builds.
- Verify `gh release view "<preview-tag>" --json isPrerelease,assets,url`: `isPrerelease` must be `true`, and the Release must contain all 6 versioned platform zips, checksums, SBOM, and provenance with no `-latest` assets. Confirm `gh api repos/{owner}/{repo}/releases/latest --jq .tag_name` does not return `<preview-tag>`.
- Record `PREVIOUS_DELIVERABLE`, selected from published Releases by `publishedAt` after excluding the current tag and every `-preview.N` tag. Verify `gh release view "<preview-tag>" --json body --jq .body` contains `## What's Changed` and, when `PREVIOUS_DELIVERABLE` exists, `**Full Changelog**: https://github.com/rustfs/rustfs/compare/<PREVIOUS_DELIVERABLE>...<preview-tag>`. For a repository with no previous deliverable, verify a Full Changelog link exists and record the GitHub baseline fallback.
- Confirm Helm is skipped. If preview Docker images are published, confirm they use only exact preview tags (and variant suffixes), with no `latest`, `alpha`, `beta`, or `rc` channel updates. Preview validation covers the built RustFS binaries, embedded console, and rc compatibility; it does not authorize advancing any installation default.
## Release notes
- When a previous deliverable exists, GitHub Release notes for the preview and final tags MUST use it as their shared comparison baseline: the most recently published non-preview Release before the target. Internal `-preview.N` Releases are explicitly excluded from that selection, even when they point at the same commit as the final tag — cleanup runs after the notes are generated, so the preview Release is still present and would otherwise be picked as the baseline. If no previous deliverable exists, omit `previous_tag_name` and record that GitHub's default baseline fallback was used.
- Generated Release notes carry a workflow-management marker so retries can repair them. Before manually curating a generated body, remove that marker; unmarked non-placeholder notes are preserved by later workflow runs.
A green Linux run is ready for field acceptance, not publication. The partial certification must have `publish_allowed: false`. Retain the exact Linux manifest for the next stage; a new source/build-input candidate must not inherit the old approval. A newer unrelated main commit does not invalidate this evidence.
@@ -16,22 +16,13 @@ Read for Phases 1–2. The [parent release invariants](../SKILL.md) and Console
- Only when neither the release branch, an unfinished preview tag, nor current main already has `<target>`: if main is at a later version, select and verify a historical commit containing `<target>` rather than downgrading main; block if none exists. Otherwise invoke the `rustfs-release-version-bump` skill with stage `prepare`, the final `<target>` (NOT a preview version), and full GitHub flow (commit/push/PR).
- If a bump PR was needed, get it merged into main and record its merge commit. For a new release branch when main already has `<target>`, identify the main commit that introduced those versions. Phase 2 chooses a release candidate containing that commit; an existing release branch keeps its own history and a newer main HEAD is not required.
Do not wait for the moving latest main HEAD to become green. The release-branch CI in Phase 2 validates the chosen commit before a preview tag is created.
Do not wait for the moving latest main HEAD to become green. The release-branch CI in Phase 2 validates the chosen commit before a candidate build is dispatched.
## Phase 2 — Pin and validate the release candidate, then publish the preview tag
## Phase 2 — Pin and validate the release source
- Use `release/<target>`. On the first attempt, create it from a selected main commit containing the version bump and intended changes; it need not be the latest main HEAD. On a restart, retain the existing branch and backport only reviewed fixes from main. Verify the branch's Cargo versions still equal `<target>`. If adopting an existing preview, run this branch CI before continuing its acceptance; reuse the tag only when it points to the validated SHA.
- The current `ci.yml` runs automatically on main pushes, not release-branch pushes. Dispatch it explicitly with `gh workflow run ci.yml --ref "release/<target>"`. Locate that dispatch run, verify its `head_sha` equals the release branch's remote HEAD, and require the full expected CI job set to pass, including `Quick Checks`, `Test and Lint`, and `End-to-End Tests (full merge gate)`. Treat a missing or skipped required lane as incomplete. A successful PR check or CI run for a different SHA does not qualify. If the branch advances or a run is cancelled, validate the new SHA again. Do not tag a candidate with failing or incomplete CI.
- Use `release/<target>`. On the first attempt, create it from a selected main commit containing the version bump and intended changes; it need not be the latest main HEAD. On a restart, retain the existing branch and backport only reviewed fixes from main. Verify the branch's Cargo versions still equal `<target>`. A legacy preview can anchor source selection, but its tag and old artifacts do not constitute a candidate in the new protocol; freeze and verify a new candidate after the release recipe is aligned.
- The current `ci.yml` runs automatically on main pushes, not release-branch pushes. Dispatch it explicitly with `gh workflow run ci.yml --ref "release/<target>"`. Locate that dispatch run, verify its `head_sha` equals the release branch's remote HEAD, and require the full expected CI job set to pass, including `Quick Checks`, `Test and Lint`, and `End-to-End Tests (full merge gate)`. Treat a missing or skipped required lane as incomplete. A successful PR check or CI run for a different SHA does not qualify. If the branch advances or a run is cancelled, validate the new SHA again. Do not dispatch a candidate with failing or incomplete CI.
- Prefer protecting `release/*` against force pushes and deletion and requiring reviewed backport PRs. Check live rulesets rather than assuming the main ruleset covers release branches; report a missing release-branch rule as a gap.
- Set `PREVIEW_HASH` to the CI-validated release-branch commit and recheck the remote branch HEAD immediately before tagging. Report the branch, commit, and CI run URL; do not derive `PREVIEW_HASH` from a later `origin/main` fetch. When adopting an existing preview tag at this SHA, skip tag creation and continue Phase 3.
```bash
git tag -a "<preview-tag>" -m "Release <preview-tag>""$PREVIEW_HASH"
git push origin "<preview-tag>"
```
Pushing the tag triggers `.github/workflows/build.yml` ("Build and Release"); `docker.yml` chains off it via `workflow_run`.
The preview run builds versioned artifacts and publishes them in a GitHub prerelease. Docker may publish exact preview image tags. Latest-channel, R2, and Helm publication must be skipped; installation references and the website announcement stay unchanged.
On a restart after a backport, re-run release-branch CI before setting the new `PREVIEW_HASH`. Use the next unused preview iteration when the validated commit differs from an existing preview tag; never move an existing tag.
- Set `CANDIDATE_SHA` to the CI-validated release-branch commit. Record the branch, exact commit and CI run URL. The new candidate protocol starts from a commit whose release recipe matches the reviewed main dispatcher; backport the recipe before freezing an older release branch if needed.
- Dispatch the Linux candidate as described in [candidate verification](preview-release.md). Do not create a preview or final tag here. The final executable already contains `<target>`; publication later promotes those same bytes.
- After a source or build-input change, run the affected source checks and create a new candidate. Reuse the frozen candidate after an infrastructure failure. Do not restart acceptance for unrelated main advances.
@@ -4,18 +4,18 @@ description: Prepare an exact RustFS Cargo version or align installation referen
---
# Release Version Files
Require an exact target; ask if missing or ambiguous. Reject targets containing `-preview`: those are tag-only. Infer `post-release` only from an explicit request or parent workflow; otherwise use `prepare`. Delivery defaults to local edit/verify; commit, push, PR, and merge follow existing authorization and [Git rules](../../references/pull-requests.md).
Require an exact target; ask if missing or ambiguous. Reject targets containing `-preview`: those identify candidates, not product versions or new public tags. Infer `post-release` only from an explicit request or parent workflow; otherwise use `prepare`. Delivery defaults to local edit/verify; commit, push, PR, and merge follow existing authorization and [Git rules](../../references/pull-requests.md).
| Stage | Files and constraints |
|---|---|
| `prepare` | Only `Cargo.toml` and `Cargo.lock`: workspace package, internal dependency, and workspace member versions become `<target>`. External dependencies stay unchanged. |
| `post-release` | Only `README.md`, `README_ZH.md`, `flake.nix`, `helm/rustfs/Chart.yaml`, and `rustfs.spec`. Cargo may already target the next release; leave it untouched. |
Before installation edits, verify the exact non-preview Release, downloadable assets/source archive, pullable `rustfs/rustfs:<target>` image manifest, and published Helm chart. Block on missing artifacts. Do not downgrade defaults if a newer deliverable superseded the target. Preview preparation retains the previous published installation references; follow-up commits never replace either validated tag.
Before installation edits, verify the exact non-preview Release, downloadable assets/source archive, pullable `rustfs/rustfs:<target>` image manifest, and published Helm chart. Block on missing artifacts. Do not downgrade defaults if a newer deliverable superseded the target. Candidate preparation retains the previous published installation references; follow-up commits never replace validated tags or sealed artifacts.
Packaging policy:
- Docker image tags have no `v` prefix. Derive chart/app versions with `scripts/helm_chart_version.sh <target>` (`beta.N -> 0.N.0`; other versions unchanged). Helm CI derives versions from the final tag, so no early chart bump is required.
- Docker image tags have no `v` prefix. Derive chart/app versions with `scripts/helm_chart_version.sh <target>`; both equal the final product SemVer, including prerelease suffixes. Helm CI uses the frozen candidate version before sealing, so no early installation chart bump is required. Previously published chart versions remain unchanged.
- RPM `Version` is numeric; `Release` is the prerelease suffix or `1` for stable. Expanded `Source0` and the unpack directory must resolve to the exact target including its suffix. Add the changelog entry using current git identity, date, and target; never copy an example identity/date.
- Changing these mappings requires explicit confirmation.
@@ -20,11 +20,11 @@ planning-docs-check: ## Check that no planning-type documents are committed
./scripts/check_no_planning_docs.sh
.PHONY:pre-commit
pre-commit:fmt-checkunsafe-code-checkarchitecture-migration-checklogging-guardrails-checkerror-other-ratchet-checktokio-io-uring-checkextension-schema-checkbody-cache-whitelist-checks3s-footprint-checkfips-wording-checkembedded-secrets-checktest-wiring-checkdoc-paths-checkplanning-docs-checkquick-check## Run fast pre-commit checks without clippy/full tests
pre-commit:fmt-checkunsafe-code-checkarchitecture-migration-checklogging-guardrails-checkerror-other-ratchet-checktokio-io-uring-checkextension-schema-checkbody-cache-whitelist-checks3s-footprint-checktest-count-ratchet-checktest-seams-checkfips-wording-checkembedded-secrets-checktest-wiring-checkdoc-paths-checkplanning-docs-checkquick-check## Run fast pre-commit checks without clippy/full tests
@echo "✅ All pre-commit checks passed!"
.PHONY:pre-pr
pre-pr:fmt-checkunsafe-code-checkarchitecture-migration-checklogging-guardrails-checkerror-other-ratchet-checktokio-io-uring-checkextension-schema-checkbody-cache-whitelist-checks3s-footprint-checkfips-wording-checkembedded-secrets-checktest-wiring-checkdoc-paths-checkplanning-docs-checklog-analyzer-rules-checkoffline-enrollment-e2e-checkclippy-checktest## Run full pre-PR checks with clippy and tests
pre-pr:fmt-checkunsafe-code-checkarchitecture-migration-checklogging-guardrails-checkerror-other-ratchet-checktokio-io-uring-checkextension-schema-checkbody-cache-whitelist-checks3s-footprint-checktest-count-ratchet-checktest-seams-checkfips-wording-checkembedded-secrets-checktest-wiring-checkdoc-paths-checkplanning-docs-checklog-analyzer-rules-checkoffline-enrollment-e2e-checkclippy-checktest## Run full pre-PR checks with clippy and tests
"description":"Certification for immutable candidates. All shipped platforms require native identity and startup; stable and prerelease require the pinned upgrade matrix. Linux-only acceptance never authorizes publication.",
"release_types":[
"preview",
"prerelease",
"stable"
],
"targets":[
{
"os":"linux",
"arch":"x86_64",
"abi":"musl"
},
{
"os":"linux",
"arch":"aarch64",
"abi":"musl"
},
{
"os":"linux",
"arch":"x86_64",
"abi":"gnu"
},
{
"os":"linux",
"arch":"aarch64",
"abi":"gnu"
},
{
"os":"macos",
"arch":"aarch64",
"abi":"none"
},
{
"os":"windows",
"arch":"x86_64",
"abi":"msvc"
}
],
"targets_basis":"Platform matrix of .github/workflows/build.yml (prepare-platform-matrix). gnu and macOS targets build with the pyroscope feature; musl and Windows targets build with no extra features.",
"features":[
"pyroscope"
],
"trusted_workflows":[
{
"repository":"rustfs/rustfs",
"workflow_id":"release-candidate.yml"
},
{
"repository":"rustfs/rustfs",
"workflow_id":"release-complete.yml"
}
],
"trusted_workflows_basis":"Receipts are produced by the reviewed main workflows and fetched by exact run ID with GitHub artifact digest verification. Candidate inputs freeze the harness commit separately from product source.",
"lanes":[
{
"lane":"identity",
"harness_repository":"rustfs/rustfs",
"harness_sha":"candidate.workflow_sha",
"harness_basis":"The exact workflow commit is frozen in candidate inputs; no mutable branch is accepted as a harness identity.",
"timeout_seconds":1800,
"environment_capabilities":[
"process-exec"
],
"cases":[
"artifact-identity",
"startup"
],
"applies_to":{
"release_types":[
"preview",
"prerelease",
"stable"
],
"platforms":"all"
},
"applies_basis":"Artifact identity and startup checks are mandatory for every release type, preview included, on every shipped target (rustfs/backlog#2662 frozen design item 5)."
},
{
"lane":"upgrade",
"harness_repository":"rustfs/rustfs",
"harness_sha":"candidate.workflow_sha",
"harness_basis":"The exact workflow commit is frozen in candidate inputs; no mutable branch is accepted as a harness identity.",
"timeout_seconds":5400,
"environment_capabilities":[
"process-exec",
"previous-release-artifact"
],
"cases":[
"direct-upgrade",
"mixed-version-upgrade",
"bucket-config-upgrade",
"bucket-config-rollback",
"multipart-layout-upgrade",
"multipart-layout-baseline"
],
"cases_basis":"Case IDs of the pinned previous-release matrix in .github/workflows/e2e-upgrade.yml (source.version/asset/sha256 and the case list mapped there).",
"applies_to":{
"release_types":[
"prerelease",
"stable"
],
"platforms":[
{
"os":"linux",
"arch":"x86_64",
"abi":"gnu"
}
]
},
"applies_basis":"preview releases use the pre-declared smaller set (identity lane only). The upgrade lane is only exercised on linux-x86_64-gnu, the platform of the pinned source assets."
}
],
"upgrade_sources":{
"basis":"Exactly the two previous-release sources pinned in .github/workflows/e2e-upgrade.yml are exercised today (source.version / source.asset / source.sha256). No other N-1/N-2 compatibility is claimed, and these digests are not inferred from tags.",
"rollback_basis":"Only the bucket-config-rollback case (rollback_to_previous_release_reads_current_bucket_metadata) is exercised. Full data-plane rollback is not certified and is never a default claim."
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
name:"Reference RustFS binary"
description:"Download the pinned reference RustFS release, verify its sha256 and expose the executable path. A missing pin, missing asset or digest mismatch fails the step."
inputs:
pin-file:
description:"Pin file naming the reference release (repository-relative)"
required:false
default:".config/reference-binary.toml"
platform:
description:"Platform table in the pin file"
required:false
default:"linux-x86_64-gnu"
destination:
description:"Directory that receives the executable; defaults to $RUNNER_TEMP/reference-binary"
required:false
default:""
outputs:
path:
description:"Absolute path of the verified executable"
This repository is public. For a public repository, GitHub's standard hosted runners (`ubuntu-latest`, `windows-latest`, `macos-latest`) cost nothing and have no minute cap, whatever plan the organisation is on. GitHub bills only two things: larger hosted runners, which have custom labels and are not used here, and standard runners in private repositories.
This repository is public. For a public repository, GitHub's standard hosted runners (`ubuntu-latest`, `windows-latest`, `macos-latest`) cost nothing and have no minute cap, whatever plan the organisation is on. GitHub bills only two things: larger hosted runners, including the `macos-latest-xlarge` release lane used here, and standard runners in private repositories.
Every other label in this repository is capacity RustFS pays for. ARC pods and lab machines accrue cost while the machine exists. A Ubicloud label is metered for the minutes a job holds its VM:
@@ -13,6 +13,7 @@ Every other label in this repository is capacity RustFS pays for. ARC pods and l
|---|---|---|---|
| `ubuntu-latest` | nobody | GitHub-hosted, Ubuntu 24.04, 4 vCPU, 16 GB RAM, about 14 GB of free disk. Ships a C toolchain, `docker`, `gh`, `curl`, `wget`, `jq`, Python. Can `mount` tmpfs and loop devices; io_uring works | the default for every job |
| `windows-latest`, `macos-latest` | nobody | GitHub-hosted standard runners | Windows and macOS targets |
| `macos-latest-xlarge` | RustFS | GitHub-hosted larger Apple Silicon runner | macOS release builds, deferred until Linux acceptance for candidates |
| `sm-standard-2` | RustFS | ARC pod, Ubuntu 24.04, minimal image: no `gh`, no C toolchain; Docker only on the `dind-` label | only a job that a hosted runner cannot run (see the placement rule) |
| `sm-standard-4` | RustFS | ARC pod, Ubuntu 24.04, 14 CPUs and 28 GB (the label is not the core count), large disk | workspace-scale Cargo builds |
| `ubicloud-standard-16-arm` | RustFS | Ubicloud VM, alias of `ubicloud-standard-16-arm-ubuntu-2404`: Ubuntu 24.04 arm64, 16 vCPU, 48 GB, 300 GB disk. Reached through the `build.yml` matrix, so `actionlint.yaml` does not list it | native aarch64 release builds (`linux-aarch64-musl`, `linux-aarch64-gnu`) |
@@ -32,7 +33,7 @@ A job runs on `ubuntu-latest` unless it has one of these reasons, and the reason
Jobs that do only the following have no reason to be self-hosted: shell or Python scripts, `cargo fmt`, `cargo deny`, typos, actionlint, API calls (`gh`, dependency review, issue and stale bots, CLA checks), downloading an artifact and running a prebuilt binary, or a `cargo build -p rustfs` with its own cache key. `e2e-distributed.yml` and `e2e-upgrade.yml` build the server and the `e2e_test` harness on `ubuntu-latest` inside their budgets, so "it compiles something" alone is not a reason.
The functional chain's `prepare` and `complete-chain` jobs, the performance runner availability check, and runner hygiene use `ubuntu-latest`: they inspect APIs or artifacts, not the lab hosts. The actual functional and performance suites remain on their lab runners. Functional-chain health collection uses `ubuntu-latest` so a lab outage cannot also stop its independent monitor. Docker image packaging also uses `ubuntu-latest` for both musl and glibc variants; it downloads release binaries rather than compiling the workspace, and still sets up QEMU and Buildx explicitly.
The functional chain's `prepare` and `complete-chain` jobs, the performance runner availability check, and runner hygiene use `ubuntu-latest`: they inspect APIs or artifacts, not the lab hosts. The actual functional and performance suites remain on their lab runners. Functional-chain health collection uses `ubuntu-latest` so a lab outage cannot also stop its independent monitor. Docker image packaging also uses `ubuntu-latest` for both musl and glibc variants; it wraps verified candidate binaries rather than compiling the workspace, and still sets up QEMU and Buildx explicitly.
Moving these jobs off AKS reduces capacity demand, not necessarily the Azure bill immediately. VM costs fall only when nodes scale down or smaller capacity replaces them.
@@ -52,7 +53,7 @@ A hosted runner is also the only choice for a few things the pods cannot do: `mo
These are the patterns that have cost real money here without validating anything more:
- An `if: always()` summary or alert job on a self-hosted label inside a `workflow_run`-triggered workflow. The upstream workflow completes many times a day, the real jobs skip, and the summary still starts a pod each time. Gate it on the upstream job having run, and keep it on `ubuntu-latest`.
- Per-push workflows on `main`. A merge triggers the full`ci.yml` matrix, `cache-warm.yml` and the`build.yml` development build; with tens of merges a day that is as much self-hosted time as all pull requests together. Anything that does not verify the merged tree itself belongs on a schedule or behind a `paths` filter.
- Per-push workflows on `main`. A merge triggers the applicable`ci.yml` matrix and cachewarming;`build.yml` development builds are scheduled or manual; with tens of merges a day that is as much self-hosted time as all pull requests together. Anything that does not verify the merged tree itself belongs on a schedule or behind a `paths` filter.
-`apt-get install` of tools the hosted image already ships. It is only needed on the minimal pod images.
- A throttled `CARGO_BUILD_JOBS` on a 14-CPU pod. The limit exists for link-storm reasons documented in `ci.yml`; measure before raising it, and measure before lowering it further.
- Tiny jobs on ARC pods. Each one pays roughly a minute of pod start-up before its first step; a compile-free job that takes ten seconds costs more to schedule than to run.
@@ -66,7 +67,7 @@ gh api "repos/rustfs/rustfs/actions/runs/<run_id>/jobs?per_page=100" \
Only rows whose label starts with `sm-`, `dind-`, `ubicloud-`, `smoke-` or `pf-`cost anything. At the October 2026 review, a full pull-request run of `ci.yml` spent about 150 self-hosted minutes, a third of it in jobs that never compiled; treat that as the scale of what a placement mistake costs, not as a current figure.
Rows using `macos-latest-xlarge` or a label starting with `sm-`, `dind-`, `ubicloud-`, `smoke-` or `pf-`use paid capacity. At the October 2026 review, a full pull-request run of `ci.yml` spent about 150 self-hosted minutes, a third of it in jobs that never compiled; treat that as the scale of what a placement mistake costs, not as a current figure.
## Checklist for a new or moved job
@@ -76,3 +77,9 @@ Only rows whose label starts with `sm-`, `dind-`, `ubicloud-`, `smoke-` or `pf-`
- A self-hosted `runs-on` carries a comment naming its reason from the placement rule.
- Every `./.github/actions/setup` call states `cache-save-if`, and a key read from one pool is not written from the other.
- Moving a job does not change its check name, so the `main` ruleset and `docs/testing/ci-gates.md` stay as they are; renaming it does, and then that document's change checklist applies.
## Release stages
The [candidate release pipeline](../../docs/operations/release-pipeline.md) builds Linux first and defers paid desktop capacity until acceptance. Daily development builds also select Linux; use manual platform selection for desktop development artifacts. All six platforms remain required before publication. The pipeline records and promotes the exact tested bytes. Builder workflows have no public-release credentials. Keep periodic development builds, PR verification and field-test chains separate when their contracts differ; do not re-enable disabled workflows as part of a source-file migration.
Larger runners remain billed for public repositories; see [GitHub runner billing](https://docs.github.com/en/actions/concepts/runners/larger-runners#billing). Actual spending comes from organization billing, not runner labels or an estimated build duration.
@@ -7,6 +7,10 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
## [Unreleased]
### Notifications and audit
- Notify and audit targets that keep the default `queue_dir` now work on native Windows: the defaults `/opt/rustfs/events` and `/opt/rustfs/audit` resolve per node, to `%ProgramData%\RustFS\events` and `%ProgramData%\RustFS\audit` on Windows, instead of failing validation as non-absolute paths. The new `RUSTFS_TARGET_STORE_DIR` (Helm `config.rustfs.target_store_dir`) relocates both default queues on any platform. Linux and macOS behavior is unchanged when it is unset, persisted configuration is unchanged, and pending entries are not migrated when the root changes. See `docs/operations/target-queue-storage.md`.
### Deployment
- Existing volumes created by older root-running container images must be writable by the non-root runtime identity before upgrading. The default container UID/GID is `10001:10001`; stop the affected instances, verify host mount paths, and for ordinary bind mounts run `sudo chown -R 10001:10001 /actual/data /actual/logs` on each RustFS data/log mount. Account for ACLs, NFS, Kubernetes, and rootless UID mappings. Image-build ownership changes do not migrate mounted data. See the Docker Quick Start in [README.md](README.md).
@@ -14,10 +18,13 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
### Security
- **Key-scoped KMS policy statements now hold for every spelling of an AWS key**: a statement such as `Deny kms:Decrypt` on `arn:aws:kms:::key/<key-id>` was matched against the key identifier exactly as the request spelled it, so naming the same key by its AWS ARN (`arn:aws:kms:<region>:<account>:key/<key-id>`) was evaluated as a different key and the `Deny` did not apply. With `RUSTFS_KMS_ENFORCE_SSE_KEY_POLICY=true` and the AWS KMS backend, an identity allowed on all keys but denied one could still write under that key, and read objects stored under its ARN spelling; the per-key admin endpoints were affected the same way. A key ARN is now evaluated as its key id, on the SSE-KMS data path and the admin endpoints alike. A request that names a key by alias, which only the backend can resolve, now fails closed against key-scoped statements: every key-scoped `Deny` applies and only an `Allow` on every key covers it. The KMS deletion impact report recognizes the default key and bucket default-encryption references across the id and ARN spellings as well. Deployments without key-scoped KMS statements, and the other KMS backends, whose key ids have a single spelling, are unaffected.
- **Header-signed SigV4 requests honour only signed headers** (GHSA-xm99-m3gq-83g8): a request authenticated with a SigV4 `Authorization` header that carries an `x-amz-*` request header not listed in its `SignedHeaders` is now rejected with `403 AccessDenied` ("There were headers present in the request which were not signed"), matching AWS S3 and the presigned rule from GHSA-g8w9-qw9q-fghr. Previously anyone holding one header-signed `PutObject` request could add an unsigned `x-amz-copy-source` and turn it into a `CopyObject` that ran with the signer's permissions, copying any object the signer could read into the target. An `Authorization` header whose algorithm token is not `AWS4-HMAC-SHA256` is now rejected instead of being verified as SigV4. The request-envelope headers `x-amz-content-sha256`, `x-amz-decoded-content-length`, `x-amz-trailer` and `x-amz-checksum-algorithm` (the same set the upstream `s3s` fix exempts) and `x-amz-cf-id` (CloudFront) remain tolerated unsigned; AWS SDKs and RustFS's own signers already sign every other `x-amz-*` header. SigV2, JWT and anonymous requests are unchanged.
### Replication
- Site replication now replicates SSE-KMS objects when the receiving site runs with `RUSTFS_KMS_ENFORCE_SSE_KEY_POLICY=true`. The receiving site authorizes each replica write against the KMS key it resolves to, and the managed `site-replicator-0` account held no `kms` grant, so every SSE-KMS object stayed `FAILED` with `AccessDenied` while SSE-S3 and SSE-C objects replicated. The account's embedded policy now grants `kms:GenerateDataKey` on every key; existing accounts are refreshed by the reconcile tick and the failed objects catch up afterwards. It is deliberately not granted `kms:Decrypt`, so reads proxied to a peer for an SSE-KMS object are still refused under enforcement. Bucket replication through a remote target needs the same grant on the identity whose credentials the target uses. Sites that do not enable enforcement are unaffected.
- Object Lock replication PUTs now carry a required integrity header, fixing target rejection introduced by the plain-payload default ([#7097](https://github.com/rustfs/rustfs/pull/7097)). This changes the default outbound request for locked objects but adds no persisted format.
- Multipart source objects stay on the multipart transport even when their checksum record is a whole-object checksum, so objects above the single-PUT limit remain replicable ([#7047](https://github.com/rustfs/rustfs/pull/7047)).
- Targets that mint their own version IDs now use a per-target version ledger for tag, retention, legal-hold, and permanent-delete mutations; ambiguous pre-ledger matches fail with backoff instead of guessing ([#7368](https://github.com/rustfs/rustfs/pull/7368)). This adds dual-prefixed internal metadata keys that older readers ignore.
@@ -33,6 +40,11 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
- **Presigned URLs honour only signed headers** (GHSA-g8w9-qw9q-fghr): a SigV4 presigned request that carries an `x-amz-*` request header not listed in `X-Amz-SignedHeaders` is now rejected with `403 AccessDenied` ("There were headers present in the request which were not signed"), matching AWS S3. Previously the holder of a presigned `PutObject` URL could add unsigned `x-amz-tagging`, `x-amz-storage-class`, `x-amz-website-redirect-location`, ACL, metadata, Object Lock or SSE headers and have them applied. Presigners that intend a property must set it before signing so the SDK lists the header in `SignedHeaders`; `x-amz-cf-id` (CloudFront) remains tolerated unsigned. Header-signed SigV4 and SigV2 requests are unchanged.
### Fixed
- **KMS keys could not be described by ARN through the path route**: `GET /rustfs/admin/v3/kms/keys/{key_id}` read the path segment verbatim, so a key id that has to be percent-encoded to fit in one segment — an AWS key ARN, with its `:` and `/` — was looked up, authorized and audited under its encoded spelling and answered `404`. The segment is now percent-decoded first; a segment that is not valid UTF-8 after decoding is refused with `400 InvalidArgument`. The `describe-key?keyId=` form was unaffected.
- **SSE-KMS objects written through the AWS KMS backend could not be read**: `GetObject`, `CopyObject` and every other read of an `aws:kms` object failed with `400 InvalidRequest` ("SSE-S3 requires RUSTFS_SSE_S3_MASTER_KEY to be set ...") on a deployment using `RUSTFS_KMS_BACKEND=aws`, although the write and `HeadObject` succeeded. The AWS backend stored the `GenerateDataKey` blob as it came from AWS, the read path took those unrecognized bytes for a locally wrapped key, and AWS was never asked to decrypt. The backend now stores the blob inside the same data-key envelope the other backends use, and a blob stored without one is routed to AWS when the AWS backend is active. Objects written by 1.0.4 and 1.0.5 are intact and become readable after the upgrade, with no rewrite. Setting `RUSTFS_SSE_S3_MASTER_KEY` was never a workaround. An object written by this release is not readable by an older one; the same was already true of every object the older release wrote itself.
- **Immediate KMS key deletion no longer reports success without destroying the key** (behavior change): with `RUSTFS_KMS_ALLOW_IMMEDIATE_DELETION=true`, a `DELETE /rustfs/admin/v3/kms/keys/delete` request with `force_immediate` against an `Enabled` or `Disabled` key on the Vault KV2 or Vault Transit backend returned success but only moved the key to `PendingDeletion`; the key material stayed in Vault and objects encrypted under it remained readable, while the Local backend destroyed the key in that one request. Key destruction is now the same two explicit steps on every backend: schedule the deletion, then either let the waiting window elapse or send `force_immediate` to destroy the pending key early. `force_immediate` against a key that is not `PendingDeletion` is refused with `400` and changes nothing, so a success response always means the key is gone and no single request can destroy a key in use. Automation that destroyed Local keys with one `force_immediate` request must schedule the deletion first. On Vault Transit, a read under a key that no longer exists in Vault now fails with `KMS.NotFoundException` instead of `503 ServiceUnavailable`. No persisted format changes. See `docs/operations/kms-key-destruction.md`.
- **`mc admin info` and `mc admin replicate resync` work again**: since the cluster snapshot view (#3803), `GET /v3/info` and `GET /v3/storageinfo` returned the madmin `InfoMessage` / `StorageInfo` nested under an `info` key next to `admin_discovery` (and, for `/info`, `bitrotSelftest`). madmin decodes those bodies directly, so `mc admin info` printed empty values and `mc admin replicate resync start/status` rejected every alias with "alias provided is not part of cluster replication" because the local `deploymentID` read as empty. Requests on the MinIO-compatible `/minio/admin/v3` prefix now receive the bare madmin body again; `/rustfs/admin/v3`, which rc and the console use, keeps the envelope unchanged.
- **Replication status writebacks no longer invalidate scanner cycles**: every replication status writeback (`persist_replication_state_if_current` in `Update` mode, including the heals the scanner queues during its own walk) marked the bucket dirty on the namespace path, advanced the dirty-usage generation and woke the scanner, so a site-replication resync or any steadily replicated bucket ended every cycle `superseded`, the authoritative usage baseline was never certified, and the console reported usage freshness as stale for as long as replication ran (#8375). Those writebacks are now status class: they do not touch the dirty-usage generation, the activity snapshot, the dirty-usage wake or the durable dirty journal, and only the process-local producer coverage is recorded. They need no rescan queue, because a deployment with an active replication rule already walks every bucket on every cycle and that walk refreshes `replication_stats`. Tier-expiration cleanup, which removes data, stays on the namespace path. No persisted format, protocol, admin API or configuration changes. Design: `docs/architecture/scanner-per-bucket-convergence.md`.
- **A bucket written during a scanner walk no longer supersedes the whole cycle**: the post-walk cluster activity proof required the entire activity snapshot and the dirty-usage generation to be unchanged, so a single-node deployment with one bucket written every few seconds never reached a `Complete` cycle, `usage_snapshot_converged` never became true and the authoritative usage baseline was never certified (#8494). Dirty usage is now certified per bucket: a structurally complete walk that the guardrail did not veto is `Complete`, buckets whose dirty generation still matches the start snapshot are cleared, and buckets written during the walk stay dirty and are published as the pending set, so `usage_snapshot_converged` means "no bucket pending" and the next cycle is scoped to the pending buckets. Such a cycle writes the authoritative usage object; the observed object is now selected by an explicit observational mark that vetoed cycles carry. The guardrail itself vetoes only on the fields that change which namespace the walk described (peer set, process instance, protocol version, topology, maintenance generation, data movement, movement generation, publication blocked) and reports the field and host in the scanner log and in the new `usage_freshness` fields `guardrail_veto_total`, `last_guardrail_veto_unix_secs` and `last_guardrail_veto_reason`. In a distributed deployment a remote peer whose dirty usage moved during the walk still supersedes the cycle until scoped acknowledgements can name its buckets. `.usage.v2.json` gains the additive, default-when-absent fields `usage_snapshot_pending_buckets`, `usage_snapshot_pending_bucket_count` and `usage_snapshot_observational`; older readers ignore them and treat the snapshot as an authoritative but unconverged publication. Quota is unchanged: an uncertified bucket keeps its last usage value as the floor and live writes do not advance it. No protocol or configuration changes. Design: `docs/architecture/scanner-per-bucket-convergence.md`.
# Supports cross-compilation for amd64 and arm64 via TARGETPLATFORM.
ARG TARGETPLATFORM
ARG BUILDPLATFORM
ARG TARGETARCH
# Do not declare TARGETPLATFORM, BUILDPLATFORM or TARGETARCH here: a global
# declaration without a value shadows BuildKit's automatic values, so the
# stage-level re-declarations below see empty strings. They are only
# declared inside the stage that uses them.
ARGRUSTFS_BUILD_FEATURES=""
ARGRC_RELEASE=latest
@@ -169,7 +170,24 @@ RUN --mount=type=cache,target=/usr/local/cargo/registry \
;;\
esac
RUN sh /usr/src/rustfs/scripts/download_rc.sh "$TARGETARCH" musl "$RC_RELEASE" /usr/local/bin/rc
# TARGETARCH is only provided by BuildKit. Fall back to TARGETPLATFORM (for
# example set by docker-compose) and then to the build host, like the cargo
# step above, so every path that builds this file passes a real architecture.
RUNset -eu;\
rc_arch="${TARGETARCH:-}";\
if[ -z "${rc_arch}"];then\
case"${TARGETPLATFORM:-}" in \
linux/amd64)rc_arch=amd64 ;;\
linux/arm64)rc_arch=arm64 ;;\
*)\
case"$(uname -m)" in \
x86_64)rc_arch=amd64 ;;\
aarch64|arm64)rc_arch=arm64 ;;\
*)echo"TARGETARCH is empty and TARGETPLATFORM='${TARGETPLATFORM:-}' is not linux/amd64 or linux/arm64; cannot choose an rc architecture on $(uname -m)" >&2;exit1;;\
esac;;\
esac;\
fi;\
sh /usr/src/rustfs/scripts/download_rc.sh "${rc_arch}" musl "${RC_RELEASE}" /usr/local/bin/rc
- `RUSTFS_NOTIFY_ENABLE=true` enables the global notify module switch.
- For ARN `arn:rustfs:sqs::primary:webhook`, use instance-scoped env vars with `_PRIMARY`.
- If queue dir is omitted, the official image maps `/opt/rustfs/events` into the persistent `/data` volume so it is writable by the runtime user and pending events survive container recreation. Override `queue_dir` when using another deployment layout.
- If queue dir is omitted, the official image maps `/opt/rustfs/events` into the persistent `/data` volume so it is writable by the runtime user and pending events survive container recreation. Override `queue_dir` when using another deployment layout, or set `RUSTFS_TARGET_STORE_DIR` to move every default queue; native Windows defaults to `%ProgramData%\RustFS`. See [Target queue storage](docs/operations/target-queue-storage.md).
- `RUSTFS_NOTIFY_WEBHOOK_SKIP_TLS_VERIFY_PRIMARY` defaults to `false`; enabling it skips webhook TLS certificate verification, allows MITM attacks, and emits a startup warning. Prefer `RUSTFS_NOTIFY_WEBHOOK_CLIENT_CA_PRIMARY` for private CAs.
- Since `1.0.0-beta.11`, webhook endpoints on private or container networks
(`Docker Compose service names`, `host.docker.internal`, RFC 1918 addresses) are
@@ -224,7 +224,7 @@ For developers who want to build RustFS Docker images from source with multi-arc
- values must be positive; `0` or an invalid value falls back to the default, and values above `60` are clamped to `60`.
- the setting is read by the aggregating node only; it does not change the internode RPC wire contract. Any retry shares one round deadline rather than receiving a fresh timeout.
## Target queue directory
- `RUSTFS_TARGET_STORE_DIR`
- absolute root for notify and audit target queues whose `queue_dir` is the default `/opt/rustfs/events` or `/opt/rustfs/audit`; they open `<root>/events` and `<root>/audit` on this node.
- unset keeps those paths on Linux and macOS; native Windows uses `%ProgramData%\RustFS\events` and `%ProgramData%\RustFS\audit`.
- explicit `queue_dir` values are never relocated, and the persisted target configuration is unchanged. Changing the root does not migrate pending entries. See `docs/operations/target-queue-storage.md`.
## Startup filesystem boundary policy
- `RUSTFS_UNSUPPORTED_FS_POLICY` controls startup behavior when RustFS detects local endpoint filesystems that are outside the supported production boundary.
| **upgrade compatibility** | `upgrade_compatibility_test` | Pinned previous-release writes followed by current-build reads on the same data directory |
| **dual-stack differential** | `dual_stack_differential` | Two single-node servers answer one SDK script for all 73 S3 operations and every differing `(op, field, a, b)` is reported. Side A is the binary under test on `RUSTFS_S3_STACK=legacy`; side B runs `RUSTFS_E2E_STACK_B`. Set `RUSTFS_E2E_REFERENCE_BINARY` to a released `rustfs` binary to make side A that binary instead (started without `RUSTFS_S3_STACK`, which older releases do not know). A missing, non-file or non-executable path fails the run; it never skips or falls back to the same-binary mode. The report in `<target>/dual-stack/<run>.json` records `reference_side` and each side's `--version` output |
The external-tool `storage_metric_ownership_test` validates the OTLP/Collector/Prometheus path, including a rolling upgrade and node failures. See the [storage metrics guide](../../docs/operations/storage-metrics.md) for its required binaries and focused command.
// RUSTFS_COMPAT_TODO(s3gate-metadata-xml): the s3s codec reads persisted XML during migration. Remove after every supported writer uses the gateway codec and every retained metadata object and backup archive is verified or rewritten.
Some files were not shown because too many files have changed in this diff
Show More
Reference in New Issue
Block a user
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.