Compare commits

..

319 Commits

Author SHA1 Message Date
Nicolas Dorseuil 5c50ba2d5d Show Try it headers and query parameters as Scalar-style tables
Declared query parameters and headers appear prefilled in their own
tables, optional ones unchecked until the reader types or ticks them,
with a default Accept header and room to add rows. Booleans get a
true/false dropdown.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-25 23:05:35 +01:00
Nicolas Dorseuil 84ba78bd4d Scope saved Try it values by resolved server hosts
Raw server templates like {host}/v1 made unrelated APIs share a scope,
and so their saved tokens. Resolve variables first, and share nothing
when no server resolves to a concrete host.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-25 22:27:46 +01:00
Nicolas Dorseuil 5d60c2a7c7 Remember Try it values per API and allow extra headers and query parameters
Reopening Try it no longer starts over: values stay for the page's
lifetime, in memory only, scoped by the API's server origins so a token
is never sent to another API. Readers can also add headers and query
parameters the spec doesn't declare.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-25 22:26:00 +01:00
Nicolas Dorseuil bca0b711d8 changeset
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-25 21:54:20 +01:00
Nicolas Dorseuil ea375ecefc Replace the Scalar API client with a lightweight Try it panel
The Test it button loaded a 9 MB Vue runtime (6.3 MB over the wire) to
send one request. The new panel is ~7 KB gzipped, lazy-loaded, and
built from the operation GitBook already renders.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-25 21:54:20 +01:00
spastorelli fa7d4a94f6 Challenge MCP clients when the site rejects their bearer token (#4807) 2026-11-19 10:02:13 +01:00
Peter White a9535cdc0e Emit an escape event from the Docs Embed (#4809) 2026-11-19 09:06:29 +01:00
Peter White 506aa78375 Let browsers discover a published site's search via OpenSearch (#4810) 2026-11-19 09:06:25 +01:00
Peter White 6b2e806e9e Inherit site questions in the embedded Assistant (#4812) 2026-11-19 09:06:21 +01:00
Peter White 7ad3fff118 Open links in the tab their author chose (#4802) 2026-11-18 15:24:51 +01:00
Peter White 386a5c18eb Simplify search results and let hover select a result (#4806) 2026-11-18 15:12:09 +01:00
conico974 a3b5ce5b7e Render the llms.txt directive as the first element in <body> (#4801)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-18 13:19:09 +01:00
Nolann B. 818cbbeb38 Answer Assistant questions with medium reasoning (#4700) 2026-11-18 13:01:20 +01:00
Peter White 629916b96f Track GBO production releases in Linear (#4803) 2026-11-18 11:43:35 +01:00
Peter White be6e324327 Keep held-search tests on the search route when the site gives a search pass (#4804) 2026-11-18 11:20:29 +01:00
Peter White ae1e370c48 Stop the table of contents layout loop in older Chrome (#4800) 2026-11-18 09:03:01 +01:00
Peter White adbec4c832 Send each search once on sites without a top header (#4781) 2026-11-17 12:10:19 +00:00
Peter White 8f5175e69e Show result-shaped placeholders while search loads (#4779) 2026-11-17 12:10:19 +00:00
Peter White 7856e08c15 Show one server-ordered search list and open its top result on Enter (#4777) 2026-11-17 12:10:18 +00:00
Peter White e0b512e689 Ask for a comms decision before default-on live site changes (#4799) 2026-11-17 12:00:41 +00:00
Peter White 6cdbafcda6 [RND-8403] Respect a site's setting to turn off change request previews (#4797) 2026-11-17 11:12:01 +00:00
Peter White d55e8f90c2 Make the no-pass search test independent of the search pass flag (#4798) 2026-11-17 11:56:32 +01:00
Brett Jephson 960d7ec6e2 Fade collapsed code blocks on published sites (#4793)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-17 10:37:22 +00:00
Peter White cf8c3d52f3 Search the API directly from the browser with a search pass (#4784) 2026-11-17 10:35:54 +01:00
Peter White 4eb32b1534 Use absolute links in generated Markdown (#4795) 2026-11-17 10:11:23 +01:00
Peter White b5f7e55818 Render Small cards in published sites (#4796) 2026-11-17 09:34:22 +01:00
Nolann B. 262749a0b1 Copy the current spec's server in OpenAPI endpoint URLs (#4794) 2026-11-16 20:12:40 +01:00
Peter White b145bfcdff Stop caching site search results (#4782) 2026-11-16 16:43:30 +01:00
Peter White 1c718491bd Follow the API's cache lifetime for site data (#4790) 2026-11-16 14:10:44 +01:00
Viktor Renkema 8dd308bd90 Ignore categories when resolving tag assignments (#4736) 2026-11-16 10:49:18 +01:00
Peter White c09da2ec1a Show H3 headings in the page outline (#4787) 2026-11-16 10:47:57 +01:00
conico974 9fcde5f487 Reduce memory and CPU use of the OpenNext workers (#4788)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-16 10:17:23 +01:00
conico974 c85d84fc1d Store 'use cache' entries in R2 again (#4789)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-16 10:15:41 +01:00
Peter White c3df458378 Keep inline code readable over a background page cover (#4778) 2026-11-13 13:28:17 +01:00
conico974 ddccd3d4f0 Bump Next.js to 16.4.6 and OpenNext to 1.20.17 (#4776)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-13 13:28:03 +01:00
Peter White adfd921b3a Search one language in the MCP search tool (#4775) 2026-11-13 10:37:44 +01:00
Nolann B. 5997a66638 Remove duplicated declarations from the global stylesheet (#4764)
Co-authored-by: Claude <noreply@anthropic.com>
2026-11-12 18:23:37 +01:00
Nolann B. 65210b7d1d Respect reduced motion and forced colors, use dynamic viewport units (#4763)
Co-authored-by: Claude <noreply@anthropic.com>
2026-11-12 18:23:37 +01:00
Nolann B. 265ca4bd9d Improve keyboard and screen reader support (#4761)
Co-authored-by: Claude <noreply@anthropic.com>
2026-11-12 18:23:36 +01:00
Nolann B. 3e86382cdc Tighten the referrer policy and the embed channel handshake (#4759)
Co-authored-by: Claude <noreply@anthropic.com>
2026-11-12 18:23:36 +01:00
Nolann B. 19660edf91 Fix quick accessibility and input bugs, tune network priorities (#4758)
Co-authored-by: Claude <noreply@anthropic.com>
2026-11-12 18:23:35 +01:00
Nolann B. e3d22380fc Improve preview deployment workflow reliability (#4772)
Co-authored-by: Claude <noreply@anthropic.com>
2026-11-12 16:58:21 +00:00
Nolann B. 9b5b8c85ec Load the OpenAPI stylesheet only on pages with OpenAPI blocks (#4770) 2026-11-12 16:21:51 +01:00
Nolann B. 0c3a51eca4 Stop card carousels from widening the page (#4768)
Co-authored-by: Claude <noreply@anthropic.com>
2026-11-12 15:31:58 +01:00
Tomek 7d1cd9f9df Remove ChatGPT-specific plain text Markdown responses (#4766) 2026-11-12 10:38:07 +00:00
Samy Pessé 6029a31c07 Version Packages (#4755)
Co-authored-by: github-actions[bot] <41898282+github-actions[bot]@users.noreply.github.com>
2026-11-12 10:34:04 +00:00
Nolann B. 4fb7e14436 Push the release PR with the PAT so its workflows run (#4738) 2026-11-12 10:18:08 +00:00
Steven H 31e88d16eb Relicense @gitbook/embed under Apache 2.0 (#4765)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-12 09:33:54 +00:00
Peter White 7ddd023d72 Fix search prewarming on public sites (#4762) 2026-11-12 10:24:29 +01:00
Peter White b53e73c0e7 Link suggested follow-up questions to the markdown ask route (#4757) 2026-11-12 08:57:20 +01:00
Taran Vohra 4a405475f3 Fix page outline not following the active section on long pages (#4754) 2026-11-11 19:29:25 +05:30
Samy Pessé aade3189ca Version Packages (#4711) 2026-11-10 18:25:28 +01:00
Brett Jephson 8689736e3a RND-13702: remove italic from annotation dfn (#4750) 2026-11-10 15:53:57 +00:00
Nolann B. 1b29a7051e Add a fetch option to parseOpenAPI (#4753) 2026-11-10 16:34:59 +01:00
Peter White 6c128729b2 Expand 3-digit hex colours correctly (#4748)
Co-authored-by: monem <119044801+pucedoteth@users.noreply.github.com>
2026-11-09 11:29:12 +00:00
Nolann B. 6344646974 Fix bash highlighting of the last letter before > (RND-13792) (#4747) 2026-11-09 10:47:47 +01:00
Nolann B. 192863526f Remove docs.cartographer3d.com from customer visual tests (#4749) 2026-11-09 10:28:06 +01:00
Greg Bergé 09a8310c9d Serve robots.txt without sign-in on authenticated access sites (RND-13789) (#4746)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-06 13:52:58 +01:00
Peter White a023a7131b Warn visitors not to share sensitive personal info in the Assistant (#4745) 2026-11-05 17:48:53 +00:00
conico974 198cafe978 Bump Next.js to 16.4.5 and OpenNext to 1.20.16 (#4743)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-04 11:22:58 +01:00
conico974 268fa83683 Fix formatting in README.md (#4741) 2026-11-03 19:29:19 +01:00
conico974 123454d2ac Dummy PR (#4739)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 12:58:05 +01:00
Nolann B. e6b8502036 Resolve .md page URLs in the MCP getPage tool (RND-13634) (#4735) 2026-11-02 12:59:34 +01:00
Peter White 3837c484a6 Redirect non-normalized proxied URLs to their public URL (RND-13627) (#4734) 2026-11-02 10:18:10 +01:00
Nolann B. 4dfe630a70 Bump @scalar/openapi-parser to 0.29 to fix false OpenAPI 3.2 errors (#4732) 2026-10-30 19:06:33 +01:00
Greg Bergé 26ec43e870 Don't cache failed searches (RND-13594) (#4731)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 13:21:53 +01:00
Peter White 063e6851e7 Resolve dark-mode image URLs in published Markdown (RND-13608) (#4728) 2026-10-30 10:57:33 +01:00
Taran Vohra 04f39f1472 Lazy webframes and lighter markup on large pages (#4726) 2026-10-30 14:27:21 +05:30
spastorelli 1383a798cb Stop prefetching the site login and logout links (#4727) 2026-10-29 19:19:54 +01:00
Greg Bergé 4a72ead12a Only apply a preview customization override to the site space it was made for (RND-13589) (#4725)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 16:44:09 +01:00
Peter White ea018507c7 Support a secondary brand colour on published sites (#4717) 2026-10-29 12:58:10 +00:00
Nolann B. 347a1cc006 Partition visitor cookies set inside an iframe (RND-12488) (#4721) 2026-10-29 11:07:45 +01:00
Steven H a512777351 Forward the visitor's user agent on ask and Assistant calls (#4714) 2026-10-29 09:27:00 +00:00
Peter White 508f1bc132 Load the inline expression runtime only for blocks that use it (RND-13530) (#4719) 2026-10-29 09:53:30 +01:00
Nolann B. 38f60f2633 Render soft line breaks in paragraphs with buttons (RND-12359) (#4724) 2026-10-29 08:56:09 +01:00
Nolann B. be658e1b32 Truncate long tab titles instead of hiding tabs in a menu (RND-11318) (#4723) 2026-10-29 08:30:52 +01:00
Nolann B. e745c88166 Add a search input to filter models on OpenAPI models pages (RND-12025) (#4718) 2026-10-28 22:59:52 +01:00
Nolann B. f61578f01f Remove duplicate preconnects and open the fonts one in CORS mode (RND-12526) (#4720) 2026-10-28 22:58:05 +01:00
Nolann B. a5d58bc210 Follow site redirects in MCP getPage (RND-13551) (#4715) 2026-10-28 18:46:59 +01:00
conico974 7e096d5131 Update dependencies for GitBook project (#4695)
Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-10-28 16:55:21 +01:00
Peter White bd431f1f8d Split llms-full.txt into parts by size so large sites don't fail (RND-13497) (#4712) 2026-10-28 14:25:00 +00:00
Peter White b7b8ae663b Keep list structure in Updates RSS feeds (RND-13414) (#4710) 2026-10-28 14:20:25 +00:00
Peter White 96c568393e Let analytics track outbound link clicks on published sites (RND-13494) (#4713) 2026-10-28 14:08:05 +00:00
Peter White 96f8ccc5cd Run Vercel functions in cle1 while Cloudflare IAD is degraded (#4716)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-28 14:48:52 +01:00
conico974 c00a7b3b88 Resolve the full URL in a single lookup and always send the visitor country (#4707)
Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-10-28 09:18:05 +01:00
Samy Pessé 3d83277b61 Version Packages (#4370)
Co-authored-by: github-actions[bot] <41898282+github-actions[bot]@users.noreply.github.com>
2026-10-27 18:43:15 +01:00
Nolann B. d053984d34 Keep the section group dropdown at the right width when switching groups quickly (RND-13149) (#4706) 2026-10-27 18:08:41 +01:00
spastorelli 02f4cbc779 Update gitbook/expr package (#4709)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 18:07:39 +01:00
Greg Bergé 9f22456eef Allow Ionic and Capacitor iOS apps to embed sites (RND-13442) (#4708)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 13:36:36 +01:00
Taran Vohra 3370103307 Lazy-load all embed iframes so YouTube thumbnails in tabs aren't blurry (RND-13501) (#4705) 2026-10-26 14:31:19 +05:30
Viktor Renkema b0cb03558d Mark blocks, pages and titles as comment targets (#4701)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-21 11:31:59 +02:00
Peter White fce8a6f2b6 Fix double slash in MCP example page URLs (#4703) 2026-10-21 11:29:29 +02:00
Tomek 5f38ae6f9f Adjust tab padding in dynamic tabs (#4696) 2026-10-20 14:42:39 +00:00
Tomek fc06bc694b Track Ask AI trigger clicks in insights (#4694)
Co-authored-by: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-20 16:03:15 +02:00
Viktor Renkema a17ed29e35 Fix admin toolbar magnification, tooltips and truncation (#4697)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 16:01:14 +02:00
conico974 bb47dadfbe Change x-robots-tag header for search/assistant deep links (#4693) 2026-10-20 15:41:35 +02:00
conico974 bfe45fede4 Fix e2e tests (#4698)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 15:03:45 +02:00
Peter White 9f940678b6 Update published-site Mermaid to 11.16.1 to match the editor (#4692) 2026-10-16 10:52:23 +00:00
Steven H 96626fea7c Point the admin toolbar insights button to /analytics (#4691)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 11:50:11 +01:00
Peter White d839d9dc57 Match site redirects whose source has non-ASCII characters (#4689) 2026-10-15 16:59:20 +02:00
Peter White 30fa152f0f Replace slapr with slack-pr-status (#4688) 2026-10-14 12:50:04 +02:00
Peter White 0540ebc1b9 Don't link page group breadcrumbs to their redirecting URL (#4686) 2026-10-14 10:31:26 +00:00
Peter White 0b515b0970 Fix 404 on Markdown pages when a theme is forced (#4685) 2026-10-14 11:46:58 +02:00
Peter White 65acba0b61 Fix Mermaid block diagrams and clipped labels on published sites (#4687) 2026-10-14 11:26:28 +02:00
Peter White f7dc7faa65 Reserve webframe size before hydration (#4683) 2026-10-14 08:25:57 +02:00
Peter White 03aa0f75f5 Render one shared Ask AI paragraph button (#4681) 2026-10-13 14:57:45 +02:00
Peter White a625112106 Skip the Ask AI paragraph button inside tables (#4680) 2026-10-13 13:40:20 +02:00
Brett Jephson 1bf3bd4294 Bump API version (#4679) 2026-10-13 10:55:32 +01:00
Peter White 9d62cb4bad Keep TOC scroll position when expanding a group (#4678) 2026-10-13 09:25:16 +02:00
Peter White 8bc381d852 Keep button labels readable inside colored hints (#4677) 2026-10-12 15:24:21 +02:00
Peter White a22923b56b Ask contributors to open issues instead of pull requests (#4676) 2026-10-12 12:06:51 +02:00
Peter White a73800e0ef Upgrade object-identity (#4675) 2026-10-12 11:22:25 +02:00
Steven H a0c1bdf58e Improve the Ask prompt for llms.txt (#4674) 2026-10-09 12:09:23 +01:00
Steven H d685660e1d Ensure we send the agent goal with the ask (#4673) 2026-10-08 20:51:24 +01:00
Peter White f1d5123c0b Support fr-ca, es-mx and es-419 site UI locales (RND-13260, RND-11280) (#4671) 2026-10-08 17:10:49 +02:00
conico974 679ea0706c Add support for visitor country hostnames via environment variable (#4668) 2026-10-08 11:35:18 +02:00
Peter White c366796756 Keep the embed open when switching section from the breadcrumbs (RND-12559) (#4670) 2026-10-08 11:26:04 +02:00
Peter White f35be52c80 Allow configuring the tab and page the Docs Embed opens on (RND-12456) (#4669) 2026-10-08 11:25:35 +02:00
conico974 848a39d1c8 Send visitor country in API requests for specific environments (#4667) 2026-10-07 18:08:57 +02:00
Peter White 9f447aab29 Open search in the current space from scoped search buttons (#4666) 2026-10-07 17:04:19 +02:00
Nolann B. 552538a0d9 Record proxied sites' markdown, llms.txt and RSS requests under their public URL (#4660) 2026-10-07 11:53:03 +02:00
Peter White 5c4a808ba8 Stop self-referencing nullable OpenAPI schemas from recursing when expanded (#4665) 2026-10-07 11:38:46 +02:00
Zeno Kapitein ad6262b6f9 Scope the site preview cookie to the preview route so customization/theme persists on navigation (RND-12191) (#4481)
Co-authored-by: Peter White <1788320+peterwhite@users.noreply.github.com>
2026-10-07 09:53:30 +02:00
Tomek 2137c2df7b Track Ask AI entry point in analytics (#4646) 2026-10-06 19:33:34 +02:00
Peter White 990e702035 Clarify not-found copy for login-protected pages (#4663) 2026-10-06 16:58:58 +02:00
Peter White 3ed448fed7 Keep ?ask out of the search field while integration assistants load (#4661) 2026-10-06 14:11:41 +02:00
conico974 4856a1f744 Add support for resolving missing page paths and redirecting to markdown versions (#4657) 2026-10-06 13:54:16 +02:00
Peter White ac843657ec Restore Next.js dev-mode OOM patch for 16.3.8 (#4662) 2026-10-06 13:33:50 +02:00
Brett Jephson b1102fcebe Prepare DocumentMarkColor to work with optional properties (#4659) 2026-10-05 17:55:22 +01:00
conico974 7996c362c1 Bump Next and OpenNext (#4658) 2026-10-05 15:48:35 +02:00
Steven H c7c1b79788 Improve the prompt asking agents for feedback on GitBook-powered docs (#4654) 2026-10-02 18:38:56 +01:00
Taran Vohra dff0c7903e Resolve cross-space repository page URLs when rendering sites (#4619)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 18:31:20 +05:30
Tomek ffebd1790e Extract page title utility and add SEO title support (#4647)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
Co-authored-by: Nolann Biron <biron.nolann@gmail.com>
Co-authored-by: Nolann B. <100787331+nolannbiron@users.noreply.github.com>
2026-10-02 14:07:15 +02:00
Tomek 0e0085e49a Fix sidebar group titles being clipped while scrolling (#4623)
Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-10-01 14:31:00 +02:00
Tomek 8e131693ea Auto-scroll TOC to active item when it's not visible (#4653) 2026-10-01 09:14:01 +00:00
Peter White 96325161be Lazy-load Loom embeds so pages with many of them don't stay blank (RND-13147) (#4652) 2026-09-30 14:18:29 +02:00
Surai 9f5290bccc Fix Ask AI submissions when search state is empty (#4651) 2026-09-30 09:50:39 +02:00
Peter White 61992424af Mark text over a background cover in the first frame after hydration (#4650) 2026-09-30 08:21:31 +02:00
Peter White 380af10236 Send previousUrl with site insights events (#4640) 2026-09-29 16:43:14 +00:00
Peter White 0911abc55c Fix page cover image jumping on load (#4648) 2026-09-29 18:11:03 +02:00
Tomek d8dc59b1a9 Improve dark theme contrast for Mermaid edge labels (#4645)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-29 14:02:07 +02:00
Surai d04f8bc05e Update trademark landing page (#4644) 2026-09-29 11:13:52 +02:00
conico974 576a781a8f Bump versions of @opennextjs/aws and @opennextjs/cloudflare (#4643) 2026-09-29 10:51:30 +02:00
Peter White df2841cf36 Don't leak the internal route into the site auth login link (#4642) 2026-09-28 17:43:23 +02:00
Tomek 70bfdda39c Restore Next.js 16.3.6 dev-mode OOM patch (#4641) 2026-09-28 11:40:41 +00:00
Peter White afbc57c3e0 Don't track 404 page views for internal ~gitbook routes (#4639) 2026-09-25 12:32:54 +02:00
Tomek e4638f1833 Fix webframes inside modals not receiving visitor claims (#4635) 2026-09-25 12:13:44 +02:00
Peter White d7f2addb03 Improve PR description context guidance (#4636) 2026-09-25 09:11:47 +02:00
Tomek 7f8ab7dcc7 Add support for ChatGPT Search (OAI-SearchBot) user agent (#4633) 2026-09-24 09:49:33 +02:00
Nolann B. 8dd9444596 Track Insights link clicks on the file block Download button (#4632) 2026-09-23 17:16:06 +02:00
Peter White bdc2497771 Return 404 instead of looping on missing non-ASCII page paths (#4631) 2026-09-23 14:20:50 +00:00
Peter White 581abe0bb7 Announce pagination at the top of each llms-full.txt part (#4630) 2026-09-23 09:05:44 +02:00
conico974 4503be2f19 Update Next.js dependency to 16.3.6 (#4629) 2026-09-22 21:00:10 +02:00
Peter White bdfc98b97e Add PR description skill and template (#4628) 2026-09-22 17:32:53 +02:00
Brett Jephson 0f0cfde6ba Filter table with client side selection (#4616)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-22 09:28:07 +01:00
Peter White 357af3f6d2 Fix RSS discovery for pages without updates (#4626) 2026-09-21 11:45:24 +02:00
Tomek b95add7b27 Apply release notes tag filters from URL via CSS before first paint (#4613)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-18 16:16:07 +02:00
conico974 99984ebbb3 Implement bypass for URL lookup alternatives (#4620) 2026-09-18 13:50:06 +02:00
Tomek a52daf8b15 align dropdown chevron buttons between group items and page items (#4622) 2026-09-18 11:17:41 +00:00
conico974 f80429e4e8 Update @opennextjs/aws dependency and refine e2e tests (#4587) 2026-09-18 12:18:47 +02:00
spastorelli 6b4c453497 Add server card for published sites MCPs (#4618) 2026-09-18 10:16:27 +02:00
Peter White c7d042a733 Add Slapr PR reactions in engineering (#4617) 2026-09-17 14:04:03 +02:00
Tomek e94a5085eb Fix search popover keyboard focus trap (#4615)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-17 11:21:17 +02:00
Tomek 3ae1524a88 Hide Intercom launcher when Assistant opens (#4614)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-17 11:20:20 +02:00
Nolann B. b967b248e7 Request insights and visitor endpoints relative to the served origin (#4603) 2026-09-16 20:54:20 +02:00
Nolann B. a9e6814744 Let the AI Assistant report documentation findings to the site's team (#4576) 2026-09-15 18:03:37 +02:00
Brett Jephson 5725da19e2 Honour an explicit select slug on a tab (#4601)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-15 13:37:03 +01:00
Peter White 05cff0a03b Hide anchor links on landing pages (#4609) 2026-09-15 09:20:38 +02:00
Nolann B. 1e8c34a426 Let ContentKit webframes dispatch modal and URL actions (#4611) 2026-09-14 15:19:05 +02:00
spastorelli cd881f9ac1 Fix set-cookie in RSC requests conflicting with logout requests (#4606) 2026-09-14 14:45:32 +02:00
Greg Bergé 39316fc205 Add agent actions to the prompt block (#4610)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-09-14 12:01:04 +02:00
Brett Jephson c08d05ade5 Fix select filters on table and cards blocks (#4608)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-11 10:33:02 +00:00
Peter White b9453a92f8 Fix preview auth redirects dropping content paths (#4602) 2026-09-11 08:42:28 +02:00
Peter White 2c4d40ad97 Expose the site MCP tools through WebMCP in published docs (#4604) 2026-09-11 08:30:36 +02:00
Tomek 688515efcf Support fit-content width sizing for ContentKit buttons (#4605)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-10 15:50:37 +02:00
Tomek 931cbe717e Restore Edit on Git page actions (#4597)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
Co-authored-by: Viktor Renkema <49148610+viktorrenkema@users.noreply.github.com>
Co-authored-by: conico974 <nicodorseuil@yahoo.fr>
2026-09-10 12:37:37 +02:00
Tomek 3ef1802e7e Add close button for modals in published sites (#4600)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-09 12:23:17 +02:00
Greg Bergé 8a0e0df84e Fix search section links not scrolling to the target section (#4598)
Co-authored-by: Claude Fable 5.1 <noreply@anthropic.com>
2026-09-09 11:40:58 +02:00
Peter White a9041a309a Fix fallback URL cleanup after successful page navigation (#4599) 2026-09-09 11:22:09 +02:00
conico974 625c108196 Add isRevalidationRequest function to handle specific requests (#4596) 2026-09-08 14:18:32 +02:00
Viktor Renkema 8e87856501 Fix page not found in preview links for sites with a custom homepage (#4594) 2026-09-08 11:27:07 +00:00
Tomek 9b822abbb6 Include page descriptions in markdown output (#4595)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-08 12:38:54 +02:00
Peter White 81dba6455b Resolve stable refs in HTML blocks of published markdown pages (#4592) 2026-09-08 09:45:14 +02:00
Johan Preynat 1faa57b812 Keep revision search results in preview (#4582) 2026-09-07 19:46:57 +02:00
Tomek 40150f0a6c Serve markdown with text/plain content-type for ChatGPT (#4591)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-07 17:13:19 +02:00
Brett Jephson bf29570bd5 RND-12706: measuring tabs fix (#4588)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-07 15:40:43 +01:00
Peter White e8e979b6c0 Serve permanent site redirects (#4586) 2026-09-07 16:07:40 +02:00
Tomek 1f250d1fa8 Add site structure e2e tests for external links (#4584) 2026-09-07 09:31:50 +02:00
Brett Jephson 46b3a18b25 Fix nested select css (#4583)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-04 16:20:52 +01:00
Nolann B. 2ff77e15b5 Attribute a markdown request from the page actions menu (#4581) 2026-09-04 12:17:00 +02:00
Tomek d7c867aa63 Fix MCP/Markdown copy confirmation closing dropdown instantly (#4579)
Co-authored-by: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-03 16:08:53 +02:00
Tomek bcd1c41aa1 Scroll to top when selecting current page in search (#4578)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-03 11:35:07 +02:00
Viktor Renkema 77058e3f17 Support merged cells (#4500)
Co-authored-by: OpenAI Codex <codex@openai.com>
2026-09-03 10:26:43 +02:00
Tomek 8ad7465801 Simplify carousel overflow with edge masks & fix carousel scroll (#4577)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-02 14:32:53 +00:00
arnau 1b7ac0e41b Open inline Ask AI questions in the configured assistant (#4574) 2026-09-02 12:05:37 +02:00
Tomek 5f88f4e680 Improve cross-space page breadcrumbs (#4571)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-02 11:43:35 +02:00
Peter White 7009bb9311 Drop the body-anchored cover gate from paragraph contrast text (#4573) 2026-09-02 11:24:54 +02:00
Johan Preynat e460ec381e Preserve linked page destinations in published search (#4566) 2026-09-01 15:06:26 +02:00
Johan Preynat 0a82628298 Trap keyboard focus within published search (#4567) 2026-09-01 13:12:01 +02:00
conico974 18ff11b68b Bump @opennextjs/aws and @opennextjs/cloudflare versions (#4570) 2026-09-01 12:14:55 +02:00
Peter White 3bf55cef10 Allow adding query params to the @webframe.navigate action (#4569) 2026-09-01 10:14:07 +02:00
Peter White e041e49f11 Wait for integrations to register before showing the cookie banner (#4568) 2026-09-01 09:09:15 +02:00
Johan Preynat c1b5be05eb Allow search to target any section (#4564) 2026-08-31 18:32:02 +02:00
Johan Preynat 7543eb83ad Prewarm Turbopuffer when published search opens (#4563) 2026-08-31 13:32:47 +00:00
Tomek 523b7cd4b6 Support external links (#4561)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-31 13:11:13 +02:00
spastorelli af698a49f5 Extend MCP tests (#4562) 2026-08-31 11:59:46 +02:00
conico974 db67585ee2 Remove MCP authentication path from internal paths registry (#4560) 2026-08-28 14:57:21 +02:00
Peter White a566153d98 Chunk oversized visitor authentication cookies (#4554) 2026-08-28 12:28:53 +02:00
conico974 530f98a9c4 Skip internal paths in URL lookup (#4557) 2026-08-28 12:24:29 +02:00
Tomek 39391259c8 Disable zoom for inline images (#4555) 2026-08-28 11:32:19 +02:00
Nolann B. 35be3835f3 Skip rendering work for off-screen OpenAPI blocks (#4502) 2026-08-27 18:41:33 +02:00
Tomek 4452fd793c Fix link title showing site section name (4542) (#4553)
Co-authored-by: Kai Kewley <kaikewley@gmail.com>
2026-08-27 09:57:32 +02:00
conico974 90566879d2 Improve image signature handling and resizing functionality (#4511) 2026-08-26 15:55:57 +02:00
Zeno Kapitein 40a879ad5f Keep section group dropdown columns readable when space is tight (#4549)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-26 15:05:28 +02:00
Johan Preynat cc441c99c6 Fix published search scope fusion (#4552) 2026-08-26 14:22:33 +02:00
conico974 64e143a15b Bump Next.js to version 16.3.3 (#4547) 2026-08-26 12:32:56 +02:00
Peter White 8c10d92f77 Keep the section group menu open over the collapsed sidebar rail (#4548) 2026-08-26 12:16:13 +02:00
Zeno Kapitein 0a22eb5340 Stop expecting a cookies dialog in the faq.wanttopay.net e2e test (#4550)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-26 11:54:31 +02:00
Zeno Kapitein d9fc4608e3 Stop suggesting previously asked questions in the GitBook Assistant (#4546)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 18:00:30 +02:00
Zeno Kapitein ded2f560e3 Show loose sections in a section group dropdown as secondary links unless the group starts with one (#4545)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 17:14:58 +02:00
Zeno Kapitein a9c5d1b546 Fix the gap between columns in large section group dropdowns (#4544)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:45:41 +02:00
Zeno Kapitein 0ff21b7ae2 Hide the section tabs scroll button when all tabs already fit (#4540)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:35:38 +02:00
Zeno Kapitein 94a496c561 Match the Docs Embed widget to the page it is embedded in (#4533)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:34:54 +02:00
Johan Preynat 148a43ac01 Preserve backend ranking across site sections (#4541) 2026-08-25 14:55:17 +02:00
Johan Preynat 5da854f09c Preserve backend ranking in published search (#4537) 2026-08-25 12:54:24 +02:00
spastorelli b772f74c2b Evaluate <if> blocks when serving markdown pages (#4538) 2026-08-25 12:18:53 +02:00
Zeno Kapitein e0bd04f641 Render headings with the site's heading font (#4531)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 12:08:03 +02:00
conico974 8d7c3edda8 Disable metadata fetching in revision-related API calls (#4459) 2026-08-24 13:55:50 +02:00
conico974 80951e9889 Remove CODEOWNERS file for API data cache functions (#4536) 2026-08-24 13:43:37 +02:00
Nolann B. 185dd8337e Defer tracking scripts until after load and idle (#4529) 2026-08-24 12:18:30 +02:00
Peter White da7fb13d83 Fail closed in /~gitbook/revalidate when GITBOOK_SECRET is unset (#4535) 2026-08-24 12:11:40 +02:00
conico974 49c993f181 Add API token expiration check (#4532) 2026-08-21 11:29:38 +02:00
Zeno Kapitein 90b54682e5 Redesign the site OAuth consent screen for published sites MCP (RND-12071) (#4530)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 22:45:46 +02:00
Zeno Kapitein 1dccf8f06c Fix table-of-contents page group's first item cut off after navigation (RND-11314) (#4391)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
Co-authored-by: copilot-swe-agent[bot] <198982749+Copilot@users.noreply.github.com>
Co-authored-by: zenoachtig <8304582+zenoachtig@users.noreply.github.com>
2026-08-20 15:28:02 +02:00
Nolann B. 810244e8a9 Stop preloading zoom-modal images at render time (#4528) 2026-08-20 15:02:00 +02:00
Tomek 0dd2f4fbcd Show containing section name when hovering direct space links (RND-12437) (#4525) 2026-08-20 14:06:10 +02:00
Nolann B. 8a700222e6 Only track embed view events once the frame is shown (RND-12362) (#4517) 2026-08-20 14:04:14 +02:00
Nolann B. b13fd91afc Compute the AI chat time greeting after mount to avoid a hydration mismatch (#4527) 2026-08-20 13:52:52 +02:00
Nolann B. 8a6baaba6a Load the admin toolbar and its CSS lazily (RND-12524) (#4526) 2026-08-20 13:47:49 +02:00
Zeno Kapitein 48fba7cb49 Fix: highlight a TOC link entry when on the page or section it points to (RND-11155) (#4476)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 12:48:45 +02:00
Zeno Kapitein 6928a9b00a Hide card fields that render no content (#4523)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 12:48:37 +02:00
Nolann B. 7bab574c63 Self-host default fonts and inline only the ones a site uses (RND-12524) (#4522) 2026-08-20 12:36:55 +02:00
conico974 75bdff3ff3 Add support for AI agent detection and robots directives in markdown (#4524) 2026-08-20 12:18:17 +02:00
Peter White 56c25587db Make keyboard shortcuts work on non-QWERTY layouts (#4516) 2026-08-19 15:03:34 +00:00
Zeno Kapitein cf4efc7213 Fix search input losing focus before hydration (RND-11849) (#4438)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-19 12:30:11 +02:00
Zeno Kapitein 1ef71609e7 Show the light/dark toggle on laptop-width screens (#4515)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-19 12:29:58 +02:00
Zeno Kapitein 195c9e6b84 Apply and remember the ?theme= light/dark override in the docs embed (#4380)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-08-19 11:07:23 +02:00
Zeno Kapitein 09f39f8300 Vertically center breadcrumb icons (#4513) 2026-08-19 08:52:10 +00:00
Peter White 9002f6598a Fix embed search suggested questions not opening the assistant (#4514) 2026-08-18 17:19:25 +02:00
Zeno Kapitein 01c9b059c6 Require Ctrl/Cmd to zoom Mermaid diagrams with the wheel (RND-12338) (#4465)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-18 16:37:49 +02:00
Zeno Kapitein 6d02b8ab72 Fix TS code block comment punctuation color in dark mode (RND-12204) (#4460)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-18 16:36:07 +02:00
Peter White 177ef8582a Fix Docs Embed host actions not reaching the assistant (#4512) 2026-08-18 16:33:03 +02:00
Zeno Kapitein 78c589ffba Align Previous/Next page navigation to opposite edges (RND-11235) (#4494)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-18 13:36:08 +02:00
Nolann B. e4b214e6bd Fix large OpenAPI payload section not being scrollable (RND-12291) (#4510) 2026-08-18 13:17:33 +02:00
Tomek 64ce9e180d Render site-space custom home page at root (#4475)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-18 12:20:52 +02:00
conico974 c64d3a50e8 Refactor CSS compatibility checks (#4504) 2026-08-18 10:30:43 +02:00
spastorelli fd070ce9ca Redirect to the upstream auth logout URL on ~gitbook/auth/logout (#4489) 2026-08-18 10:27:48 +02:00
Tomek 048c4e4c70 Fix tooltip data-popup-open state conflict and AI messages collapsible (#4509)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-18 10:22:47 +02:00
conico974 fb01dc9ecb Remove unused Cloudflare image resizing function (#4507) 2026-08-17 17:26:32 +02:00
Nolann B. d33e570bc7 Fix the spacebar being swallowed in the search bar (RND-12484) (#4508) 2026-08-17 13:21:21 +00:00
Tomek 87fd234d55 Fix dropdown icon rotation by reading dropdown open state (#4503)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-17 14:55:09 +02:00
Claire Chabas 0f32eb17d1 Fix toggle chevron alignment in ToC (#4505) 2026-08-17 14:41:44 +02:00
Tomek 3e29680792 Stabilize visual CI tests (#4506)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-17 13:14:47 +02:00
Nolann B. b3db1c58c8 Migrate headless UI primitives from Radix and react-aria to Base UI (#4499) 2026-08-15 21:05:32 +02:00
Nolann B. 0f994016f4 Update OpenAPI customer test URL (#4498) 2026-08-13 18:43:33 +02:00
Nolann B. 419094b79d Stop every DOM change from restyling the whole document (#4492) 2026-08-13 17:18:48 +02:00
Greg Bergé 95d23775ce Migrate repository to Oxlint and Oxfmt (#4497) 2026-08-13 13:18:42 +00:00
spastorelli aa98859560 Detect and pass visitor type for site resolution (#4490) 2026-08-13 14:33:10 +02:00
Tomek ea19801cfa feat: add greeting customization to AI chat (#4483) 2026-08-13 11:17:26 +00:00
Peter White 13059b843c Fix Docs Embed being stuck on the Search tab (RND-12435) (#4496) 2026-08-13 06:57:13 +00:00
Johan Preynat 3db14ad950 Fix search result links for page matches (RND-11916) (#4488) 2026-08-12 17:43:57 +02:00
Nolann B. 5fac9e37ee Move the OpenAPI package from react-aria to Base UI (#4473) 2026-08-12 14:53:09 +02:00
Nolann B. 1424c566a0 Load the OpenAPI renderer only on pages that use it (#4472) 2026-08-12 14:53:09 +02:00
conico974 65f99eafe5 Reduce bundle size on the server (#4464) 2026-08-12 13:22:51 +02:00
Tomek 7594a334d8 Show image thumbnails for file attachments (#4486)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-11 13:09:16 +02:00
conico974 827e4f9856 Fix variant switcher URL for non-default variants (#4487) 2026-08-11 13:09:14 +02:00
Peter White a9a1a609c5 Fix sticky search results when switching the search filter RND-12265 (#4485) 2026-08-11 10:15:36 +02:00
conico974 61405a3036 feat: add CSS browser compatibility check for pull requests (#4478) 2026-08-07 15:44:52 +02:00
conico974 634a24ff03 Fix text visibility issues on pages with background covers in Firefox and iOS Safari (#4477) 2026-08-07 12:46:26 +02:00
Nolann B. 2ccd43ee5e Lazy-load the Mermaid code block (#4468) 2026-08-06 08:59:03 +02:00
Nolann B. cd506e3f79 Split the Shiki highlighter from the plain token helpers (#4467) 2026-08-06 08:59:02 +02:00
Brett Jephson a6644074cb Fix: select no longer stored in url (#4466)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-05 11:59:56 +01:00
conico974 4be043d96e Add support for visitor token revalidation without redirection (#4463) 2026-08-05 09:50:26 +02:00
Brett Jephson 673f4b6076 RND-11832: button with select slug action (#4462) 2026-08-04 14:12:13 +01:00
Brett Jephson d0a63bab91 Tab - reinstate scroll hash (#4458)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-04 14:42:30 +02:00
conico974 ca9a1dd396 Block crawler from using ask endpoint (#4457) 2026-08-03 11:47:17 +02:00
claude[bot] 996d7ec021 Scroll to in-page heading even when the URL hash is unchanged (RND-12290) (#4454)
Co-authored-by: Claude <noreply@anthropic.com>
Co-authored-by: Tomek Gargula <tomasz@gitbook.com>
2026-07-31 10:36:37 +02:00
Brett Jephson f9ad9b5356 RND-11830: select store URL param (#4439)
Co-authored-by: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-30 16:05:36 +01:00
Nolann B. 332089eca9 Don't forward cookies through the OpenAPI Scalar proxy (#4451) 2026-07-30 10:06:17 +02:00
Zeno Kapitein 6ac4cf4b76 Align card and column breakpoints (#4449) 2026-07-29 12:13:25 +00:00
Zeno Kapitein 5c74eef602 Make the table search empty state more prominent (#4418)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-28 16:13:02 +02:00
Zeno Kapitein 1ee1853995 Add an assistant tool to rate its own previous response (#4425)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-28 16:10:41 +02:00
Tomek fa9c9b38b7 Force software rendering in Playwright for consistent images (#4444)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-27 14:01:55 +00:00
conico974 b4d9c6b95e Fix BUILD_VERSION assignment to ensure fallback to current timestamp (#4445) 2026-07-27 15:47:54 +02:00
Tomek 588964279e Remove search value from URL on unfocus (#4443)
Co-authored-by: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-27 10:46:02 +00:00
Nolann B. a80d41200a Run the OpenAPI Scalar proxy on GitBook's origin (#4440) 2026-07-24 18:36:27 +02:00
Nolann B. ccb9d7bda4 Submit sendFeedback MCP tool findings through submitSiteAgentFeedback (#4437) 2026-07-24 10:34:50 +02:00
Nolann B. 14562e9e5b Serve noindex on internal search/assistant URLs (?q= / ?ask=) (#4433) 2026-07-23 15:00:13 +02:00
spastorelli 580d186ddd Clean up old forward resume authorize to sites oauth server (#4436) 2026-07-23 14:08:56 +02:00
Tomek 038008c853 Fix heading anchor links on touch devices (#4435)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-23 11:56:21 +00:00
conico974 8c890522ed Patch next for dev, and fix issue in dev with inline icon (#4432) 2026-07-22 16:00:36 +02:00
conico974 e9558a6df7 Revert "Simplify search query handling to in-memory storage only (#4419)" (#4431) 2026-07-22 14:53:29 +02:00
Brett Jephson b5f3c1416a RND-11857: Prompt block with default expanded options (#4429) 2026-07-22 13:33:06 +01:00
conico974 b9d383bed3 Bump dependencies for @opennextjs/aws, @opennextjs/cloudflare, and next to latest versions (#4430) 2026-07-22 11:01:17 +02:00
spastorelli b6e7f2d2db Render the Site OAuth consent screen from the server's signed marker (#4428) 2026-07-22 09:59:30 +02:00
Tomek 94ef1769ec Simplify search query handling to in-memory storage only (#4419)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-22 07:54:50 +00:00
Zeno Kapitein ae9367dafe Only show the assistant activity heading when there's activity to reveal (#4424)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-21 14:47:58 +02:00
Zeno Kapitein cef18701be Add an assistant tool to submit page feedback (#4408)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-21 13:25:14 +02:00
Zeno Kapitein bf674a47d9 Add supporting context to AI tool confirmation dialogs (#4422)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-21 11:45:51 +02:00
conico974 1eb763f9c5 Implement API token cookie handling with chunking support (#4421) 2026-07-20 15:38:07 +02:00
Nolann B. db176ba0ea Add "On this page" on models page (#4417) 2026-07-20 13:17:02 +02:00
Nolann B. 03bbacf319 Add missing link reference to OpenAPI models (#4416) 2026-07-20 12:53:28 +02:00
Tomek 484cc11627 Fix ScrollContainer scroll buttons not reflecting overflow immediately (#4414)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-20 08:47:04 +00:00
spastorelli 0dee4155a2 Add consent flow env vars to next config (#4413) 2026-07-17 15:16:46 +00:00
spastorelli 4d7c01587e Add Sites OAuth consent screen (#4405) 2026-07-17 15:58:27 +02:00
Greg Bergé 6083a88845 Expose the current page context to integration block webframes (#4411)
Co-authored-by: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-17 12:06:38 +02:00
Nolann B. bf6a7af72b Defer search index loading until search is opened (#4407) 2026-07-16 21:53:24 +02:00
Utku Ufuk 703e654a37 Split the default-scope site search into two parallel API requests (#4395) 2026-07-16 15:23:30 +03:00
conico974 1b571aeaa9 Fix scroll behavior for navigation (#4406) 2026-07-16 14:21:01 +02:00
952 changed files with 40776 additions and 13387 deletions
@@ -0,0 +1,48 @@
---
name: write-pr-description
description: Write a concise, product-focused PR description from the changes and available discussion. Use when asked for a PR summary or description.
---
# Write a PR description
Read the full branch diff and commit history against the PR's base branch, not just the latest commit. Use the PR discussion and linked issues for context when available. The PR's changes are the source of truth for what ships if an issue describes something different.
Write for contributors and reviewers who may not know the area. Lead with what changes, prefer user or product impact when supported, and include implementation details only when they help review. Keep the proposed changes short, using bullets only when useful.
Include relevant validation and screenshots when available. Do not claim checks passed unless they ran. Use only information appropriate for a public repository; do not copy private issue details or customer information into the description.
## Template and changelog
Read `.github/pull_request_template.md` immediately before writing. Preserve its required section names and order. Include `Proposed changes` and `Changelog`; omit `Demo` when there is nothing to show. Add optional `Context` before `Changelog` only when it meets the rule below.
Write a short changelog entry describing what shipped. Use `[Feature]` for user-facing additions or improvements, `[Fix]` for user-facing bug fixes, and `[Chore]` for internal maintenance. For features and fixes, say what users can do or what no longer goes wrong in plain words. Keep chores useful to teammates without inventing user impact. Remove unused examples and placeholders. Usually one entry is enough; use more only for distinct changes. The PR changelog does not replace any changeset required by `AGENTS.md`.
## Optional context
Write `Proposed changes` and `Changelog` first. Add `Context` only when it tells someone unfamiliar with the area something material that the changelog does not. `Problem` names a concrete failure or limitation supported by the PR or discussion. `Outcome` names what this PR delivers at its actual scope. Omit the section if either field would repeat the changelog, describe only implementation, or guess at an impact.
```markdown
## Context
**Problem:** <concrete failure or limitation>
**Outcome:** <result delivered by this PR>
```
Keep each field to 1–2 short, non-technical sentences. Prefer user or product impact when supported. For infrastructure changes, explain the failure or limitation they caused. Do not invent an actor, customer segment, ownership, or impact, or force the change into a user story. Do not turn a preparatory change into a claim that the whole workflow is fixed. Keep the roles distinct: `Context` explains why this matters, `Changelog` says what shipped, and `Proposed changes` can explain implementation.
Examples:
- A dependency bump with no demonstrated user effect needs no `Context`.
- If creating the first change request leaves the user on an empty screen, say that it now opens after creation. Leave the animation-listener details in `Proposed changes`.
- If a PR indexes links for later checks, describe the indexing result. Do not claim every link has already been checked.
## Writing pass
- Use plain words and direct verbs: "use" instead of "leverage", "help" instead of "facilitate". Prefer active voice when the actor is known.
- Name the concrete behavior instead of saying "improves the experience" or "makes it more robust". Support performance claims with measurements.
- Cut filler, promotional language, and generic conclusions. If a sentence could fit almost any PR, make it specific or delete it.
- Keep one idea per sentence and use consistent names. Remove redundant hedging without hiding real uncertainty.
- Avoid "not just X, but Y", forced groups of three, em dashes, decorative emojis, and unnecessary bold text.
Return the description in a Markdown code block unless asked to update the PR. When asked to update it, apply the description with `gh pr edit` using a body file.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep links in generated Markdown usable outside the source page.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fade the bottom of collapsed code blocks so readers can tell there is more code, matching the editor.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Answer Assistant questions with medium reasoning instead of low, matching AI search.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Assistant: you can now send follow-up questions while an answer is still being written. Each one appears as your own message with a "Queued" badge (hover for when it will send, × to cancel), and they're sent automatically one at a time as each answer completes.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Bump Next.js to 16.4.6 and OpenNext (Cloudflare 1.20.17, AWS 4.1.16), keeping the dev-mode OOM patch.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": minor
---
Add a carousel layout option to cards blocks, rendering them as a horizontally-scrolling, scroll-snapping row instead of a wrapping grid.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix horizontal page scroll caused by card carousels bleeding past the viewport.
+6
View File
@@ -0,0 +1,6 @@
---
"@gitbook/embed": minor
"gitbook": patch
---
Emit an `escape` event from the Docs Embed when Escape is pressed inside it and nothing in the embed used it, so the host can close its own panel.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix the docs embed `navigateToPage` API on multi-space sites. Deep-linking to a page in a different space/section (e.g. `navigateToPage('/help-center/integrations')`) previously 404'd because the section base was not placed before `~gitbook/embed/page`. The target is now resolved to its space server-side, so pages in any space resolve correctly. The input accepts the page path, an absolute path, or the full published URL.
@@ -0,0 +1,6 @@
---
"@gitbook/embed": minor
"gitbook": patch
---
Use the site's suggested questions when the embedded Assistant receives an empty or omitted list, including from older SDKs.
@@ -1,6 +0,0 @@
---
"@gitbook/colors": patch
"gitbook": patch
---
A near-white tint color (e.g. a warm `#F5F3EF`) is now taken as the exact page background, mirroring the existing behavior for near-black tints. The tint's exact lightness, hue and chroma are preserved, and the color is anchored to whichever scale step the active theme renders as the background — so it matches exactly on `muted` (which uses the second step) as well as `clean`. This applies only to near-neutral tints that are light enough to read as a background; saturated or merely light-ish colors keep their normal accent scale. The `bold` theme is unaffected: it already uses the tint for the header and stays intentionally two-tone.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the table of contents keeping published pages busy in older Chrome versions such as Chrome 130.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix `'use cache'` entries never being stored in or read from R2 and the regional cache on Cloudflare.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Remove duplicated declarations from the global stylesheet.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Add cover image background mode and masks
@@ -0,0 +1,5 @@
---
"@gitbook/icons": minor
---
Add a `@gitbook/icons/validateIconName` entry that validates icon names without loading the icon labels and search terms.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Button blocks now respect the `size` option, so you can render small, medium, or large buttons.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep inline code and highlighted text readable when a paragraph crosses the bottom edge of a background page cover.
@@ -0,0 +1,6 @@
---
"gitbook": patch
"@gitbook/icons": patch
---
Add a skip link, keyboard navigation between content tabs, focusable table of contents toggles, and hide decorative icons from assistive technologies.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Reduce memory and CPU use of the OpenNext workers: minify the middleware, resolve the site context once per request, cache parsed OpenAPI descriptions across a spec, drop the redis client and the unused force-revalidate route from the server bundle.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Load the OpenAPI stylesheet only on pages with OpenAPI blocks.
+6
View File
@@ -0,0 +1,6 @@
---
"gitbook": minor
"@gitbook/react-openapi": minor
---
Replace the Scalar API client behind "Test it" with a lightweight Try it panel.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Render the llms.txt directive as the first element in the page body so agents find it before the navigation.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": minor
---
Add an `askQuestion` tool to the site MCP server. Alongside `searchDocumentation` and `getPage`, MCP clients can now ask a natural-language question and get a synthesized answer with links to the source pages, powered by the same AI search backend as the site's "ask a question" experience. The tool accepts an optional `goal` param so calling agents can attach the intent they're trying to accomplish, which tailors the answer and is tracked in analytics. The tool is only exposed on sites that have AI enabled.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Challenge MCP clients to authorize again when a visitor-auth site rejects their bearer token.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Limit the MCP `searchDocumentation` tool to one language: the one the client passes in the new optional `language` argument, or else the language of the site variant the MCP endpoint is served from.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Flush insights events when the page is hidden, preload the search index at low priority and prioritize the dark page cover on dark-default sites.
@@ -0,0 +1,5 @@
---
"@gitbook/react-openapi": patch
---
Copy the current spec's server in OpenAPI endpoint URLs instead of a server kept from a previously visited page.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Publish an OpenSearch description on every site so browsers can offer its search from the address bar.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show H3 headings in the page outline.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Open a link in the same or a new tab when its author chose one, instead of the site-wide external links setting.
+5
View File
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Respect disabled change request previews on published sites.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the search button accessible name, hoverable link previews, IME-safe Enter on Safari, cookie banner semantics, active outline item announcement and textarea shrinking.
@@ -0,0 +1,6 @@
---
"gitbook": patch
"@gitbook/embed": patch
---
Respect reduced motion for enter and exit animations, keep the header separator and input focus visible in forced colors mode, and size mobile surfaces with dynamic viewport units.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Send only the site origin as referrer to third parties, and only let the embedding page open the embed messaging channel.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Remove the ChatGPT-specific plain text response for Markdown and llms.txt routes; these now always serve `text/markdown`.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Remove GBO's redundant re-selection of the best-scoring search section. The search API now returns a single highest-scoring section per page (and orders sections highest-score-first), so GBO no longer needs its own `getBestScoredResult` helper to pick the best section for the search and MCP previews. No user-visible change.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Sync the API reference responses selector with the "Responses" collapsibles, and keep the selected response in sync across every operation on the page (like the code sample language selector). Selecting a status code now expands the matching response section and applies to all operations at once.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix a light/dark flash on published sites configured to respect the system default (no theme toggle). Such sites forced the `system` theme, but `next-themes`' pre-paint script applies a forced value verbatim without resolving `prefers-color-scheme`, so the page painted light and only switched to dark after hydration. We now leave the theme unforced when the default is `system` (only concrete light/dark themes are forced), letting `next-themes`' existing pre-paint script resolve the system preference before first paint.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Add a `sendFeedback` MCP tool so AI agents can report documentation findings (outdated / incoherent / gap / other) as `agent_feedback` insights events. The tool only accepts finding categories, so it never records positive feedback.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Separate the prompt block actions into a primary "Open in" dropdown and a secondary "Copy prompt" button, instead of a single combined button group, and align the block's design with the expandable block (bordered frame, left disclosure chevron, and subtle elevation when expanded).
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix the docs embed widget shipping a stale script: declare the embed package's `standalone/` bundle as a Turbo build output. Because it wasn't declared, changes confined to the standalone widget (which compiles to `standalone/` but not `dist/`) didn't invalidate the downstream `generate` cache that copies it into the app, so the deployed widget could lag the source — e.g. the `clipboard-write` permission on the widget iframe never reached production, breaking the copy button in the Assistant embed.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Send site searches straight to the search API when the site hands out a search pass, and use the site's search route when it does not or when the API refuses a search.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Send each search once on sites without a top header, and make search work between 768 and 1023 px wide.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show loading rows shaped like search results while search waits for the server.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show search results with one-line breadcrumbs and no icons or shortcut hints, and select the result under the mouse.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Stop caching site search results in the framework cache, so every search reaches the API.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show one server-ordered search list and open its top result on Enter.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Follow the API's cache lifetime for site data, so a site preview shows layout changes soon after they are saved.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Refine the per-paragraph AI ask button: shorten its tooltip to "Ask" (from "Ask <assistant> about this"), and hide it inside cards where it would otherwise be clipped by the card's overflow.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Render small cards in a responsive four-column grid and carousel.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Keep the "On this page" and "Ask" buttons pinned below the header while scrolling on desktop API reference pages, so the page outline stays reachable throughout long operations.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Hide unfocusable unlabelled button from screen readers
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Only show the "Back to [space]" shortcut for cross-space links in the table of contents, not for in-content text links or other ways of reaching another space.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Ignore tag category references when displaying assigned tags and update filters.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
a11y screen reader fixes
-6
View File
@@ -1,6 +0,0 @@
---
"@gitbook/react-contentkit": patch
"gitbook": patch
---
Let integration block webframes navigate the reader to another page in the site by posting a `@webframe.navigate` action with a `path` (and optional `anchor`). Resolved client-side against the site base path, so navigation stays in-site and drives the standard navigation progress bar.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix an issue where certain keywords could cause an exception when rendering emojis
+1
View File
@@ -0,0 +1 @@
../../.agents/skills/write-pr-description
+1
View File
@@ -0,0 +1 @@
../../.agents/skills/write-pr-description
+10
View File
@@ -0,0 +1,10 @@
# Stop editors from looking for .editorconfig files in parent directories.
root = true
[*]
charset = utf-8
end_of_line = lf
indent_style = space
indent_size = 4
insert_final_newline = true
max_line_length = 100
-3
View File
@@ -1,3 +0,0 @@
# Changes to the API data cache functions can invalidate all existing data cache
# causing a massive amount of revalidation, impacting our API.
packages/gitbook/src/lib/data/api.ts @SamyPesse
+47 -66
View File
@@ -1,110 +1,91 @@
# Welcome to GitBook's contributing guide!
# Contributing to GitBook
> _For help, support, feature requests, and product questions - head to our [GitHub Community](https://github.com/orgs/GitbookIO/discussions) 🤖_
> _For help, support and product questions, head to our [GitHub Community](https://github.com/orgs/GitbookIO/discussions)._
Thank you for investing your time in contributing to GitBook. Any contribution you make will be reviewed by our team. In this guide, you'll learn the different ways you can contribute.
Thanks for helping make GitBook better. This repository holds the open source renderer behind every published GitBook site, and the team reads everything that comes in here.
## Types of Contributions
## Ways to contribute
This repository contains code related to the rendering engine of GitBook's published content. Depending on what you'd like to contribute to, head to the section below to find the necessary steps.
- **Open an issue.** Report a bug, suggest a feature, or tell us when something feels off. This is the most useful thing you can do.
- **Join the conversation.** Share ideas and help others in [GitHub Community](https://github.com/orgs/GitbookIO/discussions).
- **Build with GitBook.** Publish your docs, try new features early, and tell us what works and what doesn't.
### Add a feature
## Issues instead of pull requests
Because this portion of GitBook is open source and available for you to use - if you think you can provide extra value through a new feature - you're welcome to add it! If you plan to distribute the code, keep the source code public to comply with GNU GPLv3. To clone in a private repository, you must first acquire a [commercial license](https://www.gitbook.com/pricing).
Pull requests are limited to the GitBook team. If you've found a bug or want something to change, please [open an issue](https://github.com/GitbookIO/gitbook/issues/new/choose) instead.
### Create a new issue
This isn't because we don't want your help. Every change here ships to every published GitBook site, so we need to own each one from start to finish. A clear issue often helps us more than a pull request: it tells us what's wrong and why, and lets us fix it in a way that fits the rest of the codebase.
If you spot a problem within a repository, [search if an issue already exists](https://docs.github.com/en/github/searching-for-information-on-github/searching-on-github/searching-issues-and-pull-requests#search-by-the-title-body-or-comments). If a related issue doesn't exist, you can open a new issue here!Please make sure any added issues are
A good issue includes:
- Descriptive
- Thoughtful
- Organized
- What you expected to happen, and what happened instead
- A link to a published GitBook site that shows the problem, if you have one
- Steps to reproduce it, plus screenshots or a recording for anything visual
- Your browser and OS, if it looks like it might matter
We recommend adding as many relevant links, minimal reproductions of the issue, and other materials that will help our team solve the issue fast.
Before opening one, [search existing issues](https://github.com/GitbookIO/gitbook/issues). If someone has already reported it, add a 👍 or any extra details you have.
### Solve an issue
Already fixed it in your fork? Link the branch or commit in your issue. We may open a pull request from it, and your commits keep your name.
If you're interested in solving an issue in our repository, start by scanning through it's exisiting issues to find one that you're interested in working on. If you find an issue to work on, you are welcome to open a PR with a fix. See the following sections below for more information on contributing for specific sections.
If you open a pull request anyway, we'll close it and point you here. Nothing personal, and we'd still love the issue.
### Documentation
## Reach out
The official documentation on GitBook open can be found directly in this Readme. Any updates or changes you would like to make, you can make directly to the README of this repository.
Not sure if it's a bug? Have a half-formed idea? Open an issue or start a [discussion](https://github.com/orgs/GitbookIO/discussions) anyway. We'd much rather hear from you than not, and no report is too small.
## Contributing
Spotted a wrong or missing translation? Open an issue with the string and the wording you'd suggest.
### Make changes locally
## Using AI
Any contribution you make can be made to the code located in this repository. In order to contribute, you'll need to start off of a local version of this repository.
You're welcome to use AI to help you write an issue. Please read and check what it produces before you post: reports that are long, vague or unverified take time away from fixing real problems, and we may close them without a reply.
#### 1. Fork the repository
## Running locally
##### Using GitHub Desktop:
You don't need a local setup to open an issue, but it can help you reproduce a problem or self-host the renderer.
- [Getting started with GitHub Desktop](https://docs.github.com/en/desktop/installing-and-configuring-github-desktop/getting-started-with-github-desktop) will guide you through setting up Desktop.
- Once Desktop is set up, you can use it to [fork the repo](https://docs.github.com/en/desktop/contributing-and-collaborating-using-github-desktop/cloning-and-forking-repositories-from-github-desktop)!
### Prerequisites
##### Using the command line:
- [Node.js](https://nodejs.org/en) (see "engines" in `package.json`)
- [Bun](https://bun.sh/) (see "packageManager" in `package.json`)
- [Fork the repo](https://docs.github.com/en/github/getting-started-with-github/fork-a-repo#fork-an-example-repository) so that you can make your changes without affecting the original project until you're ready to merge them.
### Setup
#### 2. Create a working branch and start with your changes
1. Use the project's version of Node:
After forking this repository, you'll want to [create a branch](https://docs.github.com/en/issues/tracking-your-work-with-issues/creating-a-branch-for-an-issue) to work off of.
#### 3. Install dependencies and run the project locally
##### Prerequisites:
- [Node.js](https://nodejs.org/en) (see "engines" in `package.json`)
- [Bun](https://bun.sh/) (see "packageManager" in `package.json`)
##### Setup steps:
1. Ensure you are using the project's version of Node:
```bash
nvm use
```
2. Install dependencies using Bun:
2. Install dependencies:
```bash
bun install
```
3. Start the development server:
```bash
bun dev
```
Additional development commands:
- `bun format`: Format the code using Biome
- `bun typecheck`: Run TypeScript type checking
- `bun unit`: Run unit tests
- `bun e2e`: Run end-to-end tests
Other commands:
#### 4. Preview your changes
- `bun lint`: Lint the code using Oxlint
- `bun lint:fix`: Automatically fix lint issues using Oxlint
- `bun format`: Format the code using Oxfmt
- `bun format:check`: Check formatting without changing files
- `bun typecheck`: Run TypeScript type checking
- `bun unit`: Run unit tests
- `bun e2e`: Run end-to-end tests
When running the development server, published GitBook sites can be rendered through your local version at `http://localhost:3000/url`.
### Preview a site
For example, our published docs can be viewed using the local version by visiting `http://localhost:3000/url/gitbook.com/docs` after running the development server.
With the development server running, any published GitBook site can be rendered through your local version at `http://localhost:3000/url/<published-url>`. For example, visit `http://localhost:3000/url/gitbook.com/docs` to see our own docs.
You can visit any published GitBook site behind your development server. Please make sure your site is [published publicly](https://gitbook.com/docs/published-documentation/publish-your-content-as-a-docs-site) to ensure you can view the site correctly in your development version.
The site must be [published publicly](https://gitbook.com/docs/published-documentation/publish-your-content-as-a-docs-site) to render locally.
### Commit your update
## License
[Commit your changes](https://github.com/git-guides/git-commit) once you are happy with them. See [Atom's contributing guide](https://github.com/atom/atom/blob/master/CONTRIBUTING.md#git-commit-messages) to know how to use emoji for commit messages!
The renderer is distributed under the [GNU GPLv3 License](https://github.com/GitbookIO/gitbook/blob/main/LICENSE). If you distribute the code, you must keep the source code public. To use it in a private repository, you need a [commercial license](https://www.gitbook.com/pricing).
Once your changes are ready, don't forget to self-review your code to double check that your chagnes are ready to be added.
### Pull Request
When you're finished with the changes, [create a pull request](https://docs.github.com/en/pull-requests/collaborating-with-pull-requests/proposing-changes-to-your-work-with-pull-requests/creating-a-pull-request), also known as a PR.
- Don't forget to [link PR to issue](https://docs.github.com/en/issues/tracking-your-work-with-issues/linking-a-pull-request-to-an-issue) if you are solving one.
- Enable the checkbox to [allow maintainer edits](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/allowing-changes-to-a-pull-request-branch-created-from-a-fork) so the branch can be updated for a merge. Once you submit your PR, a GitBook team member will review your proposal. We may ask questions or request for additional information.
- We may ask for changes to be made before a PR can be merged, either using [suggested changes](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/incorporating-feedback-in-your-pull-request) or pull request comments. You can apply suggested changes directly through the UI. You can make any other changes in your fork, then commit them to your branch.
- As you update your PR and apply changes, mark each conversation as [resolved](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/commenting-on-a-pull-request#resolving-conversations).
- If you run into any merge issues, checkout this [git tutorial](https://lab.github.com/githubtraining/managing-merge-conflicts) to help you resolve merge conflicts and other issues.
### Your PR is merged
Congratulations 🎉 Thank you for your contribution! Once your PR is merged, your contributions will be publicly visible on the relevant repository.
The [`@gitbook/embed`](https://github.com/GitbookIO/gitbook/blob/main/packages/embed) package is distributed under the [Apache License 2.0](https://github.com/GitbookIO/gitbook/blob/main/packages/embed/LICENSE). Contributions to it are made under the same license.
@@ -1,83 +1,83 @@
name: Gradual Deploy to Cloudflare
description: Use gradual deployment to deploy to Cloudflare. This action will upload the middleware and server versions to Cloudflare and kept them bound together
inputs:
apiToken:
description: 'Cloudflare API token'
required: true
accountId:
description: 'Cloudflare account ID'
required: true
environment:
description: 'Cloudflare environment to deploy to (staging, production, preview)'
required: true
middlewareVersionId:
description: 'Middleware version ID to deploy'
required: true
serverVersionId:
description: 'Server version ID to deploy'
required: true
apiToken:
description: 'Cloudflare API token'
required: true
accountId:
description: 'Cloudflare account ID'
required: true
environment:
description: 'Cloudflare environment to deploy to (staging, production, preview)'
required: true
middlewareVersionId:
description: 'Middleware version ID to deploy'
required: true
serverVersionId:
description: 'Server version ID to deploy'
required: true
outputs:
deployment-url:
description: "Deployment URL"
value: ${{ steps.deploy_middleware.outputs.deployment-url }}
deployment-url:
description: 'Deployment URL'
value: ${{ steps.deploy_middleware.outputs.deployment-url }}
runs:
using: 'composite'
steps:
- id: wrangler_status
name: Check wrangler deployment status
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: deployments status --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
using: 'composite'
steps:
- id: wrangler_status
name: Check wrangler deployment status
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: deployments status --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
# This step is used to get the version ID that is currently deployed to Cloudflare.
- id: extract_current_version
name: Extract current version
shell: bash
run: |
version_id=$(echo "${{ steps.wrangler_status.outputs.command-output }}" | grep -A 3 "(100%)" | grep -oP '[0-9a-f]{8}-[0-9a-f]{4}-[0-9a-f]{4}-[0-9a-f]{4}-[0-9a-f]{12}')
echo "version_id=$version_id" >> $GITHUB_OUTPUT
# This step is used to get the version ID that is currently deployed to Cloudflare.
- id: extract_current_version
name: Extract current version
shell: bash
run: |
version_id=$(echo "${{ steps.wrangler_status.outputs.command-output }}" | grep -A 3 "(100%)" | grep -oP '[0-9a-f]{8}-[0-9a-f]{4}-[0-9a-f]{4}-[0-9a-f]{4}-[0-9a-f]{12}')
echo "version_id=$version_id" >> $GITHUB_OUTPUT
- id: deploy_server
name: Deploy server to Cloudflare at 0%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ steps.extract_current_version.outputs.version_id }}@100% ${{ inputs.serverVersionId }}@0% -y --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
- id: deploy_server
name: Deploy server to Cloudflare at 0%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ steps.extract_current_version.outputs.version_id }}@100% ${{ inputs.serverVersionId }}@0% -y --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
# Since we use version overrides headers, we can directly deploy the middleware to 100%.
- id: deploy_middleware
name: Deploy middleware to Cloudflare at 100%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ inputs.middlewareVersionId }}@100% -y --config ./packages/gitbook/openNext/customWorkers/middlewareWrangler.jsonc
# Since we use version overrides headers, we can directly deploy the middleware to 100%.
- id: deploy_middleware
name: Deploy middleware to Cloudflare at 100%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ inputs.middlewareVersionId }}@100% -y --config ./packages/gitbook/openNext/customWorkers/middlewareWrangler.jsonc
- name: Deploy server to Cloudflare at 100%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ inputs.serverVersionId }}@100% -y --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
- name: Deploy server to Cloudflare at 100%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ inputs.serverVersionId }}@100% -y --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
- name: Outputs
shell: bash
env:
DEPLOYMENT_URL: ${{ steps.deploy_middleware.outputs.deployment-url }}
run: |
echo "URL: ${{ steps.deploy_middleware.outputs.deployment-url }}"
- name: Outputs
shell: bash
env:
DEPLOYMENT_URL: ${{ steps.deploy_middleware.outputs.deployment-url }}
run: |
echo "URL: ${{ steps.deploy_middleware.outputs.deployment-url }}"
+53 -52
View File
@@ -1,34 +1,34 @@
name: 'Deploy cloudflare'
description: 'Deploy GitBook to Cloudflare'
inputs:
opItem:
description: '1Password item to load secrets from'
required: true
opServiceAccount:
description: '1Password service account token'
required: true
apiToken:
description: 'Cloudflare API token'
required: true
accountId:
description: 'Cloudflare account ID'
required: true
environment:
description: 'Cloudflare environment to deploy to (staging, production, preview)'
required: true
deploy:
description: 'Deploy as main version for all traffic instead of uploading versions'
required: true
commitTag:
description: 'Commit branch to associate with the deployment'
required: true
commitMessage:
description: 'Commit message to associate with the deployment'
required: true
opItem:
description: '1Password item to load secrets from'
required: true
opServiceAccount:
description: '1Password service account token'
required: true
apiToken:
description: 'Cloudflare API token'
required: true
accountId:
description: 'Cloudflare account ID'
required: true
environment:
description: 'Cloudflare environment to deploy to (staging, production, preview)'
required: true
deploy:
description: 'Deploy as main version for all traffic instead of uploading versions'
required: true
commitTag:
description: 'Commit branch to associate with the deployment'
required: true
commitMessage:
description: 'Commit message to associate with the deployment'
required: true
outputs:
deployment-url:
description: "Deployment URL"
value: ${{ steps.upload_middleware.outputs.deployment-url }}
description: 'Deployment URL'
value: ${{ steps.upload_middleware.outputs.deployment-url }}
runs:
using: 'composite'
steps:
@@ -42,32 +42,34 @@ runs:
- name: Load secret
uses: 1password/load-secrets-action@v2
env:
OP_SERVICE_ACCOUNT_TOKEN: ${{ inputs.opServiceAccount }}
GITBOOK_URL: ${{ inputs.opItem }}/GITBOOK_URL
GITBOOK_ICONS_URL: ${{ inputs.opItem }}/GITBOOK_ICONS_URL
GITBOOK_ICONS_TOKEN: ${{ inputs.opItem }}/GITBOOK_ICONS_TOKEN
NEXT_SERVER_ACTIONS_ENCRYPTION_KEY: ${{ inputs.opItem }}/NEXT_SERVER_ACTIONS_ENCRYPTION_KEY
GITBOOK_SECRET: ${{ inputs.opItem }}/GITBOOK_SECRET
GITBOOK_APP_URL: ${{ inputs.opItem }}/GITBOOK_APP_URL
GITBOOK_API_URL: ${{ inputs.opItem }}/GITBOOK_API_URL
GITBOOK_API_PUBLIC_URL: ${{ inputs.opItem }}/GITBOOK_API_PUBLIC_URL
GITBOOK_API_TOKEN: ${{ inputs.opItem }}/GITBOOK_API_TOKEN
GITBOOK_OAUTH_SERVER_URL: ${{ inputs.opItem }}/GITBOOK_OAUTH_SERVER_URL
GITBOOK_PREVIEW_BASE_URL: ${{ inputs.opItem }}/GITBOOK_PREVIEW_BASE_URL
GITBOOK_INTEGRATIONS_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_HOST
GITBOOK_INTEGRATIONS_CONTENT_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_CONTENT_HOST
GITBOOK_IMAGE_RESIZE_SIGNING_KEY: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SIGNING_KEY
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL_2
GITBOOK_IMAGE_RESIZE_SALT: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SALT
GITBOOK_IMAGE_RESIZE_MODE: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_MODE
GITBOOK_ASSETS_PREFIX: ${{ inputs.opItem }}/GITBOOK_ASSETS_PREFIX
GITBOOK_FONTS_URL: ${{ inputs.opItem }}/GITBOOK_FONTS_URL
OP_SERVICE_ACCOUNT_TOKEN: ${{ inputs.opServiceAccount }}
GITBOOK_URL: ${{ inputs.opItem }}/GITBOOK_URL
GITBOOK_ICONS_URL: ${{ inputs.opItem }}/GITBOOK_ICONS_URL
GITBOOK_ICONS_TOKEN: ${{ inputs.opItem }}/GITBOOK_ICONS_TOKEN
NEXT_SERVER_ACTIONS_ENCRYPTION_KEY: ${{ inputs.opItem }}/NEXT_SERVER_ACTIONS_ENCRYPTION_KEY
GITBOOK_SECRET: ${{ inputs.opItem }}/GITBOOK_SECRET
GITBOOK_APP_URL: ${{ inputs.opItem }}/GITBOOK_APP_URL
GITBOOK_API_URL: ${{ inputs.opItem }}/GITBOOK_API_URL
GITBOOK_API_PUBLIC_URL: ${{ inputs.opItem }}/GITBOOK_API_PUBLIC_URL
GITBOOK_API_TOKEN: ${{ inputs.opItem }}/GITBOOK_API_TOKEN
GITBOOK_OAUTH_SERVER_URL: ${{ inputs.opItem }}/GITBOOK_OAUTH_SERVER_URL
GITBOOK_SITE_OAUTH_SIGNING_SECRET: ${{ inputs.opItem }}/GITBOOK_SITE_OAUTH_SIGNING_SECRET
GITBOOK_PREVIEW_BASE_URL: ${{ inputs.opItem }}/GITBOOK_PREVIEW_BASE_URL
GITBOOK_INTEGRATIONS_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_HOST
GITBOOK_INTEGRATIONS_CONTENT_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_CONTENT_HOST
GITBOOK_IMAGE_RESIZE_SIGNING_KEY: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SIGNING_KEY
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL_2
GITBOOK_IMAGE_RESIZE_SALT: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SALT
GITBOOK_IMAGE_RESIZE_MODE: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_MODE
GITBOOK_ASSETS_PREFIX: ${{ inputs.opItem }}/GITBOOK_ASSETS_PREFIX
GITBOOK_FONTS_URL: ${{ inputs.opItem }}/GITBOOK_FONTS_URL
- name: Build worker
run: bun run turbo build:cloudflare
env:
GITBOOK_RUNTIME: cloudflare
GITBOOK_BLOCK_SEARCH_INDEXATION: ${{ inputs.environment == 'preview' && 'true' || '' }}
GITBOOK_ALLOW_CUSTOMIZATION_OVERRIDE: ${{ inputs.environment == 'preview' && 'true' || '' }}
GITBOOK_RUNTIME: cloudflare
GITBOOK_BLOCK_SEARCH_INDEXATION: ${{ inputs.environment == 'preview' && 'true' || '' }}
GITBOOK_ALLOW_CUSTOMIZATION_OVERRIDE: ${{ inputs.environment == 'preview' && 'true' || '' }}
GITBOOK_DISABLE_INSIGHTS: ${{ inputs.environment == 'preview' && 'true' || '' }}
shell: bash
- name: Upload the DO worker
@@ -134,11 +136,10 @@ runs:
middlewareVersionId: ${{ steps.extract_middleware_version_id.outputs.version_id }}
deploy: ${{ inputs.deploy }}
- name: Outputs
shell: bash
env:
DEPLOYMENT_URL: ${{ steps.upload_middleware.outputs.deployment-url }}
DEPLOYMENT_URL: ${{ steps.upload_middleware.outputs.deployment-url }}
run: |
echo "URL: ${{ steps.upload_middleware.outputs.deployment-url }}"
echo "Output server: ${{ steps.upload_server.outputs.command-output }}"
echo "Output server: ${{ steps.upload_server.outputs.command-output }}"
+60 -59
View File
@@ -1,31 +1,31 @@
name: 'Deploy vercel'
description: 'Deploy GitBook to Vercel'
inputs:
vercelOrg:
description: 'Vercel organization'
required: true
vercelProject:
description: 'Vercel project'
required: true
vercelToken:
description: 'Vercel token'
required: true
opItem:
description: '1Password item to load secrets from'
required: true
opServiceAccount:
description: '1Password service account token'
required: true
environment:
description: 'Environment to deploy to'
required: true
headSha:
description: 'Git ref to deploy, used for the deploymentId'
required: false
vercelOrg:
description: 'Vercel organization'
required: true
vercelProject:
description: 'Vercel project'
required: true
vercelToken:
description: 'Vercel token'
required: true
opItem:
description: '1Password item to load secrets from'
required: true
opServiceAccount:
description: '1Password service account token'
required: true
environment:
description: 'Environment to deploy to'
required: true
headSha:
description: 'Git ref to deploy, used for the deploymentId'
required: false
outputs:
deployment-url:
description: "Deployment URL"
value: ${{ steps.deploy.outputs.deployment-url }}
description: 'Deployment URL'
value: ${{ steps.deploy.outputs.deployment-url }}
runs:
using: 'composite'
steps:
@@ -40,50 +40,52 @@ runs:
run: bun run vercel pull --yes --environment=${{ inputs.environment }} --token=${{ inputs.vercelToken }}
shell: bash
env:
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
- name: Load secret
uses: 1password/load-secrets-action@v2
env:
OP_SERVICE_ACCOUNT_TOKEN: ${{ inputs.opServiceAccount }}
GITBOOK_URL: ${{ inputs.opItem }}/GITBOOK_URL
GITBOOK_ICONS_URL: ${{ inputs.opItem }}/GITBOOK_ICONS_URL
GITBOOK_ICONS_TOKEN: ${{ inputs.opItem }}/GITBOOK_ICONS_TOKEN
GITBOOK_SECRET: ${{ inputs.opItem }}/GITBOOK_SECRET
GITBOOK_APP_URL: ${{ inputs.opItem }}/GITBOOK_APP_URL
GITBOOK_API_URL: ${{ inputs.opItem }}/GITBOOK_API_URL
GITBOOK_API_PUBLIC_URL: ${{ inputs.opItem }}/GITBOOK_API_PUBLIC_URL
GITBOOK_API_TOKEN: ${{ inputs.opItem }}/GITBOOK_API_TOKEN
GITBOOK_OAUTH_SERVER_URL: ${{ inputs.opItem }}/GITBOOK_OAUTH_SERVER_URL
GITBOOK_PREVIEW_BASE_URL: ${{ inputs.opItem }}/GITBOOK_PREVIEW_BASE_URL
GITBOOK_INTEGRATIONS_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_HOST
GITBOOK_INTEGRATIONS_CONTENT_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_CONTENT_HOST
GITBOOK_IMAGE_RESIZE_SIGNING_KEY: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SIGNING_KEY
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL_2
GITBOOK_IMAGE_RESIZE_SALT: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SALT
GITBOOK_IMAGE_RESIZE_MODE: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_MODE
GITBOOK_ASSETS_PREFIX: ${{ inputs.opItem }}/GITBOOK_ASSETS_PREFIX
GITBOOK_FONTS_URL: ${{ inputs.opItem }}/GITBOOK_FONTS_URL
OP_SERVICE_ACCOUNT_TOKEN: ${{ inputs.opServiceAccount }}
GITBOOK_URL: ${{ inputs.opItem }}/GITBOOK_URL
GITBOOK_ICONS_URL: ${{ inputs.opItem }}/GITBOOK_ICONS_URL
GITBOOK_ICONS_TOKEN: ${{ inputs.opItem }}/GITBOOK_ICONS_TOKEN
GITBOOK_SECRET: ${{ inputs.opItem }}/GITBOOK_SECRET
GITBOOK_APP_URL: ${{ inputs.opItem }}/GITBOOK_APP_URL
GITBOOK_API_URL: ${{ inputs.opItem }}/GITBOOK_API_URL
GITBOOK_API_PUBLIC_URL: ${{ inputs.opItem }}/GITBOOK_API_PUBLIC_URL
GITBOOK_API_TOKEN: ${{ inputs.opItem }}/GITBOOK_API_TOKEN
GITBOOK_OAUTH_SERVER_URL: ${{ inputs.opItem }}/GITBOOK_OAUTH_SERVER_URL
GITBOOK_SITE_OAUTH_SIGNING_SECRET: ${{ inputs.opItem }}/GITBOOK_SITE_OAUTH_SIGNING_SECRET
GITBOOK_PREVIEW_BASE_URL: ${{ inputs.opItem }}/GITBOOK_PREVIEW_BASE_URL
GITBOOK_INTEGRATIONS_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_HOST
GITBOOK_INTEGRATIONS_CONTENT_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_CONTENT_HOST
GITBOOK_IMAGE_RESIZE_SIGNING_KEY: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SIGNING_KEY
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL_2
GITBOOK_IMAGE_RESIZE_SALT: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SALT
GITBOOK_IMAGE_RESIZE_MODE: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_MODE
GITBOOK_ASSETS_PREFIX: ${{ inputs.opItem }}/GITBOOK_ASSETS_PREFIX
GITBOOK_FONTS_URL: ${{ inputs.opItem }}/GITBOOK_FONTS_URL
- name: Inject build env vars
if: ${{ inputs.environment == 'preview' }}
shell: bash
run: |
HEAD_SHA=$(git rev-parse HEAD)
echo "resolved HEAD_SHA: $HEAD_SHA"
echo "GITBOOK_HEAD_SHA=$HEAD_SHA" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_RUNTIME=vercel" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_BLOCK_SEARCH_INDEXATION=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_ALLOW_CUSTOMIZATION_OVERRIDE=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "--- .vercel/.env.${{ inputs.environment }}.local after inject ---"
cat .vercel/.env.${{ inputs.environment }}.local
HEAD_SHA=$(git rev-parse HEAD)
echo "resolved HEAD_SHA: $HEAD_SHA"
echo "GITBOOK_HEAD_SHA=$HEAD_SHA" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_RUNTIME=vercel" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_BLOCK_SEARCH_INDEXATION=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_ALLOW_CUSTOMIZATION_OVERRIDE=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_DISABLE_INSIGHTS=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "--- .vercel/.env.${{ inputs.environment }}.local after inject ---"
cat .vercel/.env.${{ inputs.environment }}.local
- name: Build Project Artifacts
run: bun run vercel build --target=${{ inputs.environment }} --token=${{ inputs.vercelToken }}
shell: bash
env:
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
GITBOOK_RUNTIME: vercel
GITBOOK_HEAD_SHA: ${{ inputs.headSha }}
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
GITBOOK_RUNTIME: vercel
GITBOOK_HEAD_SHA: ${{ inputs.headSha }}
- name: Deploy Project Artifacts to Vercel
id: deploy
shell: bash
@@ -91,10 +93,9 @@ runs:
DEPLOYMENT_URL=$(bun run vercel deploy --prebuilt --target=${{ inputs.environment }} --token=${{ inputs.vercelToken }})
echo "deployment-url=$DEPLOYMENT_URL" >> "$GITHUB_OUTPUT"
env:
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
- name: Outputs
shell: bash
run: |
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
+17
View File
@@ -0,0 +1,17 @@
## Proposed changes
<!-- Briefly describe what changed. Include relevant validation. -->
## Demo
<!-- Add screenshots or a recording when useful. Otherwise, remove this section. -->
<!-- Optional: add Context here only when it explains a concrete problem and result that the changelog does not. Remove this comment before submitting. -->
## Changelog
<!-- Keep the relevant entries and remove unused placeholders. Feature = user-facing addition or improvement; Fix = user-facing bug fix; Chore = internal maintenance. -->
- [Feature] ...
- [Fix] ...
- [Chore] ...
+22
View File
@@ -0,0 +1,22 @@
{
"display_information": {
"name": "PR Status",
"description": "Updates PR status reactions in engineering"
},
"features": {
"bot_user": {
"display_name": "PR Status",
"always_online": false
}
},
"oauth_config": {
"scopes": {
"bot": ["channels:history", "reactions:read", "reactions:write"]
}
},
"settings": {
"org_deploy_enabled": false,
"socket_mode_enabled": false,
"token_rotation_enabled": false
}
}
+15
View File
@@ -0,0 +1,15 @@
# Slack PR status
[GitbookIO/slack-pr-status](https://github.com/GitbookIO/slack-pr-status) adds review-status reactions to PR links posted in [#engineering](https://gitbook.slack.com/archives/C01NXGWJELS). It runs from `.github/workflows/slack-pr-status.yml` in `GitbookIO/gitbook`, `GitbookIO/gitbook-x` and `GitbookIO/integrations`. Emojis and statuses are configured in that workflow; see the action's README for the options.
Owner: Peter White.
| Configuration | Value |
| --- | --- |
| Slack app | **PR Status** (`A0C2AGLAD0T`), created from `.github/slack-pr-status-app-manifest.json` |
| Bot token | Repository Actions secret `SLAPR_SLACK_BOT_TOKEN` |
| GitHub token | The workflow's `GITHUB_TOKEN`, read-only |
Posts that link PRs from more than one repository are skipped, because each workflow's token can only read its own repository. PRs from forks get no reactions, because their workflows don't receive secrets.
To disable it in one repository, run `gh workflow disable slack-pr-status.yml --repo GitbookIO/<repository>`. To stop it everywhere, revoke the PR Status app's token.
+14
View File
@@ -20,6 +20,20 @@ jobs:
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- run: bun format:check
lint:
runs-on: ubuntu-latest
name: Lint
timeout-minutes: 6
steps:
- name: Checkout
uses: actions/checkout@v4
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- run: bun lint
test:
runs-on: ubuntu-latest
name: Test
@@ -0,0 +1,34 @@
name: CSS browser compatibility
on:
pull_request_target:
types: [opened, reopened, synchronize]
permissions:
contents: read
pull-requests: read
concurrency:
group: css-browser-compatibility-${{ github.event.pull_request.number }}
cancel-in-progress: true
jobs:
check:
name: Check newly added CSS declarations
runs-on: ubuntu-latest
timeout-minutes: 6
steps:
# pull_request_target checks out the trusted base branch by default. Never use the PR ref here.
- name: Checkout trusted checker
uses: actions/checkout@v4
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- name: Check CSS browser compatibility
working-directory: packages/gitbook
run: bun run check:css-browser-compatibility
env:
GITHUB_TOKEN: ${{ github.token }}
+95 -21
View File
@@ -4,6 +4,11 @@ on:
push:
branches:
- main
# A newer run for the same PR supersedes the previous one. Each push to main gets a group of its
# own, so main runs are never queued behind or cancelled by another run.
concurrency:
group: ${{ github.event_name == 'pull_request_target' && format('preview-pr-{0}', github.event.pull_request.number) || format('preview-run-{0}', github.run_id) }}
cancel-in-progress: ${{ github.event_name == 'pull_request_target' }}
jobs:
approval:
# Ensure that external contributors' PRs are manually approved before deployment
@@ -11,18 +16,19 @@ jobs:
runs-on: ubuntu-latest
if: ${{ github.event_name == 'pull_request_target' && github.event.pull_request.head.repo.fork }}
environment:
name: preview-approval
name: preview-approval
steps:
- name: Approval gate
run: echo "Preview deployment approved."
deploy-v2-vercel:
name: Deploy v2 to Vercel (preview)
runs-on: ubuntu-latest
timeout-minutes: 20
needs: approval
if: ${{ always() && (needs.approval.result == 'success' || needs.approval.result == 'skipped') }}
if: ${{ !cancelled() && (needs.approval.result == 'success' || needs.approval.result == 'skipped') }}
environment:
name: 2v-preview
url: ${{ steps.deploy.outputs.deployment-url }}
name: 2v-preview
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
deployment-url: ${{ steps.deploy.outputs.deployment-url }}
steps:
@@ -44,11 +50,12 @@ jobs:
deploy-v2-cloudflare:
name: Deploy v2 to Cloudflare Worker (preview)
runs-on: ubuntu-latest
timeout-minutes: 20
needs: approval
if: ${{ always() && (needs.approval.result == 'success' || needs.approval.result == 'skipped') }}
if: ${{ !cancelled() && (needs.approval.result == 'success' || needs.approval.result == 'skipped') }}
environment:
name: 2c-preview
url: ${{ steps.deploy.outputs.deployment-url }}
name: 2c-preview
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
deployment-url: ${{ steps.deploy.outputs.deployment-url || steps.extract-worker-id.outputs.worker-url }}
steps:
@@ -72,17 +79,17 @@ jobs:
id: extract-worker-id
if: ${{ !steps.deploy.outputs.deployment-url }}
run: |
if [[ "${{ steps.deploy.outputs.command-output }}" =~ Worker\ Version\ ID:\ ([0-9a-f]{8})-([0-9a-f-]+) ]]; then
WORKER_ID_FIRST_PART="${BASH_REMATCH[1]}"
echo "worker-url=https://${WORKER_ID_FIRST_PART}-gitbook-open-v2-preview.gitbook.workers.dev/" >> $GITHUB_OUTPUT
fi
if [[ "${{ steps.deploy.outputs.command-output }}" =~ Worker\ Version\ ID:\ ([0-9a-f]{8})-([0-9a-f-]+) ]]; then
WORKER_ID_FIRST_PART="${BASH_REMATCH[1]}"
echo "worker-url=https://${WORKER_ID_FIRST_PART}-gitbook-open-v2-preview.gitbook.workers.dev/" >> $GITHUB_OUTPUT
fi
- name: Outputs
run: |
echo "URL: ${{ steps.deploy.outputs.deployment-url || steps.extract-worker-id.outputs.worker-url }}"
comment-deployments:
runs-on: ubuntu-latest
name: Comment Deployments (preview)
if: always() && github.event_name != 'push'
if: ${{ !cancelled() && github.event_name != 'push' }}
needs:
- deploy-v2-vercel
- deploy-v2-cloudflare
@@ -95,6 +102,25 @@ jobs:
comment-author: 'github-actions[bot]'
body-includes: 'Summary of the deployments'
# A deploy that didn't succeed has no URL (e.g. a re-run hitting Vercel's "deploymentId
# already exists"), so keep the URL the comment already shows instead of blanking it.
- name: Resolve deployment URLs
id: urls
env:
PREVIOUS_COMMENT: ${{ steps.fc.outputs.comment-body }}
VERCEL_RESULT: ${{ needs.deploy-v2-vercel.result }}
VERCEL_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}
CLOUDFLARE_RESULT: ${{ needs.deploy-v2-cloudflare.result }}
CLOUDFLARE_URL: ${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}
run: |
previous_url() {
sed -n "s/^| $1 | \[\([^]]*\)\].*/\1/p" <<<"$PREVIOUS_COMMENT" | head -n 1
}
if [ "$VERCEL_RESULT" != success ]; then VERCEL_URL=$(previous_url Vercel); fi
if [ "$CLOUDFLARE_RESULT" != success ]; then CLOUDFLARE_URL=$(previous_url Cloudflare); fi
echo "vercel=$VERCEL_URL" >> "$GITHUB_OUTPUT"
echo "cloudflare=$CLOUDFLARE_URL" >> "$GITHUB_OUTPUT"
- name: Create or update GitHub comment
uses: peter-evans/create-or-update-comment@v4
with:
@@ -105,21 +131,21 @@ jobs:
| Version | URL | Status |
| --- | --- | --- |
| Vercel | [${{ needs.deploy-v2-vercel.outputs.deployment-url }}](${{ needs.deploy-v2-vercel.outputs.deployment-url }}) | ${{ needs.deploy-v2-vercel.result == 'success' && '✅' || '❌' }} |
| Cloudflare | [${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}](${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}) | ${{ needs.deploy-v2-cloudflare.result == 'success' && '✅' || '❌' }} |
| Vercel | [${{ steps.urls.outputs.vercel }}](${{ steps.urls.outputs.vercel }}) | ${{ needs.deploy-v2-vercel.result == 'success' && '✅' || '❌' }} |
| Cloudflare | [${{ steps.urls.outputs.cloudflare }}](${{ steps.urls.outputs.cloudflare }}) | ${{ needs.deploy-v2-cloudflare.result == 'success' && '✅' || '❌' }} |
### Test content
| Site | `2v` | `2c` |
| --- | --- | --- |
| GitBook | [${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.com/docs](${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.com/docs) | [${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.com/docs](${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.com/docs) |
| E2E | [${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open](${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open) | [${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open](${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open) |
| GitBook | [${{ steps.urls.outputs.vercel }}/url/gitbook.com/docs](${{ steps.urls.outputs.vercel }}/url/gitbook.com/docs) | [${{ steps.urls.outputs.cloudflare }}/url/gitbook.com/docs](${{ steps.urls.outputs.cloudflare }}/url/gitbook.com/docs) |
| E2E | [${{ steps.urls.outputs.vercel }}/url/gitbook.gitbook.io/test-gitbook-open](${{ steps.urls.outputs.vercel }}/url/gitbook.gitbook.io/test-gitbook-open) | [${{ steps.urls.outputs.cloudflare }}/url/gitbook.gitbook.io/test-gitbook-open](${{ steps.urls.outputs.cloudflare }}/url/gitbook.gitbook.io/test-gitbook-open) |
edit-mode: replace
visual-testing-v2-vercel:
runs-on: ubuntu-latest
name: Visual Testing v2
needs: deploy-v2-vercel
if: ${{ always() && needs.deploy-v2-vercel.result == 'success' }}
if: ${{ !cancelled() && needs.deploy-v2-vercel.result == 'success' }}
timeout-minutes: 15
steps:
- name: Checkout
@@ -143,7 +169,7 @@ jobs:
runs-on: ubuntu-latest
name: Visual Testing v2 (Cloudflare)
needs: deploy-v2-cloudflare
if: ${{ always() && needs.deploy-v2-cloudflare.result == 'success' }}
if: ${{ !cancelled() && needs.deploy-v2-cloudflare.result == 'success' }}
timeout-minutes: 15
steps:
- name: Checkout
@@ -167,7 +193,7 @@ jobs:
runs-on: ubuntu-latest
name: Visual Testing Customers v2
needs: deploy-v2-vercel
if: ${{ always() && needs.deploy-v2-vercel.result == 'success' }}
if: ${{ !cancelled() && needs.deploy-v2-vercel.result == 'success' }}
timeout-minutes: 30
steps:
- name: Checkout
@@ -187,11 +213,59 @@ jobs:
SITE_BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/
ARGOS_TOKEN: ${{ secrets.ARGOS_TOKEN }}
ARGOS_BUILD_NAME: customers-v2-vercel
# Style recalc depends on the client bundle, not the host, so this runs here only and
# not in the Cloudflare job. Kept out of `e2e-customers`, which is a visual suite.
- name: Run style invalidation tests
if: ${{ !cancelled() }}
working-directory: packages/gitbook
run: bun run e2e-style-perf
env:
BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}
SITE_BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/
# Runs on failure too: a blown style budget is exactly when the numbers are worth seeing.
- name: Build style invalidation report
if: ${{ !cancelled() && github.event_name != 'push' }}
id: style-perf
working-directory: packages/gitbook
run: |
rows=$(cat test-results/style-perf.md 2>/dev/null || true)
if [ -z "$rows" ]; then exit 0; fi
{
echo 'body<<STYLE_PERF_EOF'
echo '### Style invalidation on a large API reference'
echo
echo 'Elements restyled by opening one popup on [the Snyk API reference](https://docs.snyk.io/snyk-api/reference/apps). A share near or above 100% means the insertion restyles the whole document.'
echo
echo '| interaction | restyled | page | share | budget | |'
echo '| --- | ---: | ---: | ---: | ---: | :-: |'
echo "$rows"
echo 'STYLE_PERF_EOF'
} >> "$GITHUB_OUTPUT"
- name: Find style invalidation comment
if: ${{ !cancelled() && github.event_name != 'push' && steps.style-perf.outputs.body != '' }}
uses: peter-evans/find-comment@v3
id: fc-style-perf
with:
issue-number: ${{ github.event.pull_request.number }}
comment-author: 'github-actions[bot]'
body-includes: 'Style invalidation on a large API reference'
- name: Create or update style invalidation comment
if: ${{ !cancelled() && github.event_name != 'push' && steps.style-perf.outputs.body != '' }}
uses: peter-evans/create-or-update-comment@v4
with:
comment-id: ${{ steps.fc-style-perf.outputs.comment-id }}
issue-number: ${{ github.event.pull_request.number }}
body: ${{ steps.style-perf.outputs.body }}
edit-mode: replace
visual-testing-customers-v2-cloudflare:
runs-on: ubuntu-latest
name: Visual Testing Customers v2 (Cloudflare)
needs: deploy-v2-cloudflare
if: ${{ always() && needs.deploy-v2-cloudflare.result == 'success' }}
if: ${{ !cancelled() && needs.deploy-v2-cloudflare.result == 'success' }}
timeout-minutes: 30
steps:
- name: Checkout
@@ -215,7 +289,7 @@ jobs:
runs-on: ubuntu-latest
name: Browserless Testing v2 (Vercel)
needs: deploy-v2-vercel
if: ${{ always() && needs.deploy-v2-vercel.result == 'success' }}
if: ${{ !cancelled() && needs.deploy-v2-vercel.result == 'success' }}
steps:
- name: Checkout
uses: actions/checkout@v4
+37 -9
View File
@@ -7,7 +7,7 @@ jobs:
deploy-v2-vercel:
name: Deploy v2 to Vercel (production)
runs-on: ubuntu-latest
environment:
environment:
name: 2v-production
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
@@ -19,16 +19,16 @@ jobs:
id: deploy
uses: ./.github/composite/deploy-vercel
with:
environment: production
vercelOrg: ${{ secrets.VERCEL_ORG_ID }}
vercelProject: ${{ secrets.VERCEL_PROJECT_ID }}
vercelToken: ${{ secrets.VERCEL_TOKEN }}
opItem: op://gitbook-open/2v-production
opServiceAccount: ${{ secrets.OP_SERVICE_ACCOUNT_TOKEN }}
environment: production
vercelOrg: ${{ secrets.VERCEL_ORG_ID }}
vercelProject: ${{ secrets.VERCEL_PROJECT_ID }}
vercelToken: ${{ secrets.VERCEL_TOKEN }}
opItem: op://gitbook-open/2v-production
opServiceAccount: ${{ secrets.OP_SERVICE_ACCOUNT_TOKEN }}
deploy-v2-cloudflare:
name: Deploy v2 to Cloudflare Worker (production)
runs-on: ubuntu-latest
environment:
environment:
name: 2c-production
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
@@ -50,4 +50,32 @@ jobs:
commitMessage: ${{ github.sha }}
- name: Outputs
run: |
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
linear-release:
name: Track the production release in Linear
needs: [deploy-v2-vercel, deploy-v2-cloudflare]
runs-on: ubuntu-latest
timeout-minutes: 10
# Release tracking must never fail a deployment that already succeeded.
continue-on-error: true
permissions:
contents: read
env:
LINEAR_ACCESS_KEY: ${{ secrets.PRODUCTION_LINEAR_RELEASE_ACCESS_KEY }}
steps:
- name: Skip release tracking without an access key
if: env.LINEAR_ACCESS_KEY == ''
run: echo "::warning::No Linear pipeline access key is configured, skipped tracking the release."
- name: Checkout
if: env.LINEAR_ACCESS_KEY != ''
uses: actions/checkout@v4
with:
# The Linear CLI scans commit metadata since the last release, so it needs history but no blobs.
fetch-depth: 0
filter: blob:none
persist-credentials: false
- name: Sync the release to Linear
if: env.LINEAR_ACCESS_KEY != ''
uses: linear/linear-release-action@dd4fc407f860b9460d2cf0b3fb1edd8985cf443f # v0.18.2
with:
access_key: ${{ env.LINEAR_ACCESS_KEY }}
+9 -9
View File
@@ -7,7 +7,7 @@ jobs:
deploy-v2-vercel:
name: Deploy v2 to Vercel (staging)
runs-on: ubuntu-latest
environment:
environment:
name: 2v-staging
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
@@ -19,16 +19,16 @@ jobs:
id: deploy
uses: ./.github/composite/deploy-vercel
with:
environment: staging
vercelOrg: ${{ secrets.VERCEL_ORG_ID }}
vercelProject: ${{ secrets.VERCEL_PROJECT_ID }}
vercelToken: ${{ secrets.VERCEL_TOKEN }}
opItem: op://gitbook-open/2v-staging
opServiceAccount: ${{ secrets.OP_SERVICE_ACCOUNT_TOKEN }}
environment: staging
vercelOrg: ${{ secrets.VERCEL_ORG_ID }}
vercelProject: ${{ secrets.VERCEL_PROJECT_ID }}
vercelToken: ${{ secrets.VERCEL_TOKEN }}
opItem: op://gitbook-open/2v-staging
opServiceAccount: ${{ secrets.OP_SERVICE_ACCOUNT_TOKEN }}
deploy-v2-cloudflare:
name: Deploy v2 to Cloudflare Worker (staging)
runs-on: ubuntu-latest
environment:
environment:
name: 2c-staging
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
@@ -50,4 +50,4 @@ jobs:
commitMessage: ${{ github.sha }}
- name: Outputs
run: |
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
+3 -1
View File
@@ -4,7 +4,7 @@ on:
push:
branches:
- main
concurrency: ${{ github.workflow }}-${{ github.ref }}
jobs:
@@ -25,6 +25,8 @@ jobs:
with:
# This makes Actions fetch all Git history so that Changesets can generate changelogs with the correct commits
fetch-depth: 0
# Otherwise git pushes with GITHUB_TOKEN instead of the PAT, and the release PR never triggers Preview
persist-credentials: false
- name: Setup Node
uses: actions/setup-node@v4
with:
+33
View File
@@ -0,0 +1,33 @@
name: Slack PR status
on:
pull_request_review:
types: [submitted, dismissed]
pull_request:
types: [closed, reopened]
permissions:
contents: read
pull-requests: read
jobs:
slack-pr-status:
# Secrets aren't available to workflows triggered from forks.
if: github.event.pull_request.head.repo.full_name == github.repository
runs-on: ubuntu-latest
steps:
- uses: GitbookIO/slack-pr-status@main
with:
slack-token: ${{ secrets.SLAPR_SLACK_BOT_TOKEN }}
config: |
channels: [C01NXGWJELS]
approvalsRequired: 1
multiPr: aggregate
emojis:
commented: false
partiallyApproved: next_track_button
approved: pr-approved
changesRequested: construction
merged: merged
closed: no_entry_sign
partiallyReviewed: hourglass_flowing_sand
+3
View File
@@ -29,3 +29,6 @@ yarn-error.log*
# Bun pack artifacts
packages/*/*.tgz
# Playwright MCP artifacts
.playwright-mcp/
+70
View File
@@ -0,0 +1,70 @@
{
"$schema": "./node_modules/oxfmt/configuration_schema.json",
"printWidth": 100,
"tabWidth": 4,
"useTabs": false,
"semi": true,
"singleQuote": true,
"jsxSingleQuote": false,
"quoteProps": "as-needed",
"trailingComma": "es5",
"bracketSpacing": true,
"bracketSameLine": false,
"arrowParens": "always",
"endOfLine": "lf",
"sortImports": {
"customGroups": [
{
"groupName": "workspace",
"elementNamePattern": ["@gitbook/**"]
}
],
"groups": [
["value-builtin", "value-external", "type-builtin", "type-external"],
{ "newlinesBetween": true },
"workspace",
{ "newlinesBetween": true },
[
"value-internal",
"type-internal",
"value-parent",
"type-parent",
"value-sibling",
"type-sibling",
"value-index",
"type-index"
],
"type-import",
"unknown"
]
},
"sortPackageJson": false,
"sortTailwindcss": {
"config": "./packages/gitbook/tailwind.config.ts",
"attributes": ["class", "className", "style"],
"functions": ["clsx", "tw"]
},
"ignorePatterns": [
"**/node_modules/**",
"**/dist/**",
"**/build/**",
"**/public/**",
"**/.next/**",
"**/.open-next/**",
"**/.turbo/**",
"**/.vercel/**",
"**/.cache/**",
"**/.wrangler/**",
"**/*.log",
"**/*.MD",
"**/*.md",
"**/*.mdx",
"**/*.html",
"**/*.css",
"packages/embed/standalone/**",
"packages/openapi-parser/src/fixtures/**",
"packages/emoji-codepoints/index.ts",
"packages/icons/src/data/*.json",
"packages/gitbook/worker-configuration.d.ts"
]
}
+87
View File
@@ -0,0 +1,87 @@
{
"$schema": "./node_modules/oxlint/configuration_schema.json",
"categories": {
"correctness": "warn",
"suspicious": "warn",
"perf": "warn"
},
"plugins": ["eslint", "typescript", "unicorn", "oxc", "react", "jsx-a11y", "vitest"],
"env": {
"builtin": true,
"browser": true,
"node": true,
"shared-node-browser": true,
"worker": true
},
"globals": {
"Bun": "readonly",
"GitBookIntegrationEvent": "readonly",
"React": "readonly"
},
"rules": {
"eslint/no-console": [
"warn",
{
"allow": ["assert", "error", "warn"]
}
],
"eslint/no-control-regex": "warn",
"eslint/no-prototype-builtins": "warn",
"eslint/no-cond-assign": "warn",
"eslint/no-undef": "error",
"eslint/no-unused-vars": [
"error",
{
"argsIgnorePattern": "^_",
"caughtErrorsIgnorePattern": "^_",
"ignoreRestSiblings": true,
"varsIgnorePattern": "^_"
}
],
"react/button-has-type": "warn",
"react/exhaustive-deps": "warn",
"react/jsx-key": "warn",
"react/jsx-no-useless-fragment": "warn",
"react/no-array-index-key": "warn",
"react/void-dom-elements-no-children": "warn",
"react/rules-of-hooks": "error",
"jsx-a11y/alt-text": "warn",
"jsx-a11y/anchor-is-valid": "warn",
"jsx-a11y/click-events-have-key-events": "warn",
"jsx-a11y/iframe-has-title": "warn",
"jsx-a11y/interactive-supports-focus": "warn",
"jsx-a11y/label-has-associated-control": "warn",
"jsx-a11y/no-noninteractive-tabindex": "warn",
"jsx-a11y/role-has-required-aria-props": "warn",
"jsx-a11y/tabindex-no-positive": "warn",
"typescript/array-type": "error",
"typescript/no-explicit-any": "warn",
"typescript/no-non-null-assertion": "warn",
"typescript/no-confusing-void-expression": "warn",
"typescript/only-throw-error": "error",
"vitest/no-focused-tests": "error",
"no-delete-var": "warn",
"no-debugger": "error",
"no-throw-literal": "error",
"use-isnan": "error",
"valid-typeof": "error"
},
"ignorePatterns": [
"**/node_modules/**",
"**/dist/**",
"**/build/**",
"**/public/**",
"**/.next/**",
"**/.open-next/**",
"**/.turbo/**",
"**/.vercel/**",
"**/.cache/**",
"**/.wrangler/**",
"packages/embed/standalone/**",
"packages/openapi-parser/src/fixtures/**",
"packages/emoji-codepoints/index.ts",
"packages/icons/src/data/*.json",
"packages/gitbook/worker-configuration.d.ts",
"**/*.css"
]
}
+1 -1
View File
@@ -1,3 +1,3 @@
{
"recommendations": ["biomejs.biome"]
"recommendations": ["oxc.oxc-vscode"]
}
+3 -5
View File
@@ -8,14 +8,12 @@
["style \\=([^;]*);", "\\`([^\\`]*)\\`"]
],
"tailwindCSS.classAttributes": ["class", "className", "style", ".*Style"],
"prettier.enable": false,
"editor.formatOnSave": true,
"editor.defaultFormatter": "biomejs.biome",
"editor.defaultFormatter": "oxc.oxc-vscode",
"editor.codeActionsOnSave": {
"source.organizeImports.biome": "explicit",
"source.fixAll.biome": "explicit"
"source.fixAll.oxc": "always"
},
"[typescript]": {
"editor.defaultFormatter": "biomejs.biome"
"editor.defaultFormatter": "oxc.oxc-vscode"
}
}
+33 -2
View File
@@ -6,7 +6,8 @@
bun install # Install dependencies
bun dev # Start dev server (all packages)
bun run build # Build all packages
bun run format # Format with Biome (run after every change)
bun run lint # Lint with Oxlint
bun run format # Format with Oxfmt (run after every change)
bun run typecheck # Type-check all packages
bun run unit # Run unit tests
```
@@ -58,6 +59,36 @@ Run a specific test file:
cd packages/gitbook && bun test src/lib/cache.test.ts
```
## Changes customers see on their live site
Published sites are our customers' product. If a change alters how their content looks or behaves without them changing anything, it needs a comms decision before it merges.
It counts if it ships on by default and any of these are true:
- It changes structure or navigation: outline/"On this page", sidebar, TOC, headings, breadcrumbs, pagination, header or footer.
- Something new appears on every page (or every page of a type), or something existing disappears or moves.
- Layout or typography shifts enough that a customer would notice in a screenshot.
- URLs, anchors, redirects, SEO/meta tags or search/Ask behaviour change.
- A default changes for existing sites.
It does not count when:
- It's behind a flag, a site setting or opt-in that stays off for existing sites until comms go out.
- It's a bug fix that restores the intended behaviour.
- It only affects the editor/app, not published content.
When it counts:
1. Warn the engineer before the PR is opened: "This changes customers' live sites. Have the support and sales leads agreed the rollout and announcement?"
2. Suggest a flag or staged rollout if there isn't one, so it can ship dark and be turned on after the notice goes out.
## Bumping Next.js or OpenNext
Type checks and unit tests miss runtime regressions: OpenNext 4.1.15 changed the composable cache key format, and every `'use cache'` call silently missed for days. Before committing a bump of `next`, `@opennextjs/aws` or `@opennextjs/cloudflare`, run both runtimes locally from `packages/gitbook`:
1. **Next**: `bun run build:local && bun run start`, then load several distinct pages under `http://localhost:3000/url/gitbook.com/docs`.
2. **OpenNext**: `bun run build:cloudflare`, delete `openNext/customWorkers/.wrangler` (stale cache hits otherwise skip the server), then run `bun run dev:cf:server` and `bun run dev:cf:middleware` and load several distinct pages under `http://127.0.0.1:8771/url/gitbook.com/docs`.
3. Diff the changed OpenNext versions' adapters that call our overrides in `openNext/` (incremental, composable and tag cache, queue), e.g. with `npm pack` of the old and new versions.
The bump is safe when every page returns 200 on both runtimes and the server logs show no cache errors (grep `Failed to` and `regional cache`). Report the pages checked and the log result in the PR.
## Changesets
After committing code changes, create a changeset for the affected package:
@@ -74,7 +105,7 @@ Save as `.changeset/<name>.md`, then commit it separately with message: `changes
## Formatting
Uses Biome (not ESLint/Prettier). Always run `bun run format` before committing.
Linting uses Oxlint and formatting uses Oxfmt. Always run `bun run format` before committing.
## Comments
+8 -6
View File
@@ -85,7 +85,7 @@ GitBook Open uses fontawesome. For self-hosting and local development, for licen
## Contributing
GitBook's rendering engine is fully open source and built on top of [Next.js](https://nextjs.org/). Head to our [contributing guide](https://github.com/GitbookIO/gitbook/blob/main/.github/CONTRIBUTING.md) to learn more about the workflow on adding your first Pull Request.
GitBook's rendering engine is fully open source and built on top of [Next.js](https://nextjs.org/). Head to our [contributing guide](https://github.com/GitbookIO/gitbook/blob/main/.github/CONTRIBUTING.md) to learn how to report bugs and suggest changes.
### Types of contributions
@@ -93,22 +93,22 @@ We encourage you to contribute to GitBook to help us build the best tool for doc
#### Translations
The GitBook UI is rendered using a set of translation files found in [`packages/gitbook/src/intl/translations`](/packages/gitbook/src/intl/translations/). We welcome all additional translations for the UI.
The GitBook UI is rendered using a set of translation files found in [`packages/gitbook/src/intl/translations`](/packages/gitbook/src/intl/translations/). Spotted a wrong or missing translation? Open an issue and let us know.
#### Bugs
Encounter a bug or find an issue you'd like to fix? Helping us fix issues related to GitBook greatly improves the experience for everyone. Head to the issues section of this repository to learn more about the types of bugs you can already help out with.
Encounter a bug? [Open an issue](https://github.com/GitbookIO/gitbook/issues/new/choose) with as much detail as you can. Clear reports help us fix things faster for everyone.
## Deployment
> [!WARNING]
> While it is possible to self-host this project, we do not recommend this unless you are certain this option fits your need.
>
> _Looking to add a specific feature in GitBook? Head to our [contributing guide](https://github.com/GitbookIO/gitbook/blob/main/.github/CONTRIBUTING.md) to get started._
> _Looking for a specific feature in GitBook? Head to our [contributing guide](https://github.com/GitbookIO/gitbook/blob/main/.github/CONTRIBUTING.md) to suggest it._
>
> Self-hosting this project puts the responsibility of maintaining and merging future updates on **you**. We cannot guarantee support, maintenance, or updates to forked and self-hosted instances of this project.
>
> We want to make it as easy as possible for our community to collaborate and push the future of GitBook, which is why we encourage you to contribute to our product directly instead of creating your own version.
> We want to make it as easy as possible for our community to collaborate and push the future of GitBook, which is why we encourage you to share your ideas with us instead of creating your own version.
This project allows you to self-host the rendering portion of your GitBook published content. Self-hosting has pros and cons.
@@ -124,6 +124,8 @@ If you plan to distribute the code, you must make the source code public to comp
See `LICENSE` for more information.
The [`@gitbook/embed`](packages/embed) package is an exception: it is distributed under the [Apache License 2.0](packages/embed/LICENSE), so it can be used in proprietary applications.
## Badges
<p align="left">
@@ -161,4 +163,4 @@ GitBook wouldn't be possible without these projects:
## Legacy GitBook (Deprecated)
Our previous version of GitBook and it's CLI tool are now deprecated. You can still view the old repository and it's commits on this [branch](https://github.com/GitbookIO/gitbook/tree/legacy).
Our previous version of GitBook and it's CLI tool are now deprecated. You can still view the old repository and it's commits on this [branch](https://github.com/GitbookIO/gitbook/tree/legacy).
-178
View File
@@ -1,178 +0,0 @@
{
"$schema": "https://biomejs.dev/schemas/1.9.4/schema.json",
"vcs": {
"enabled": false,
"clientKind": "git",
"useIgnoreFile": false
},
"files": {
"ignoreUnknown": false,
"ignore": [
"**/node_modules/**/*",
"**/dist/**/*",
"**/build/**/*",
"**/public/**/*",
"**/.next/**/*",
"**/.open-next/**/*",
"**/.turbo/**/*",
"**/.vercel/**/*",
"**/.cache/**/*",
"**/.wrangler/**/*",
"packages/embed/standalone/**/*",
"packages/openapi-parser/src/fixtures/**/*",
"packages/emoji-codepoints/index.ts",
"packages/icons/src/data/*.json",
"packages/gitbook/worker-configuration.d.ts",
"gitbook/tsconfig.json",
"**/*.css"
]
},
"formatter": {
"enabled": true,
"useEditorconfig": true,
"formatWithErrors": false,
"indentStyle": "space",
"indentWidth": 4,
"lineEnding": "lf",
"lineWidth": 100,
"attributePosition": "auto",
"bracketSpacing": true
},
"organizeImports": {
"enabled": true
},
"linter": {
"enabled": true,
"rules": {
"recommended": true,
"performance": {
"noDelete": "warn"
},
"security": {
"noDangerouslySetInnerHtml": "off"
},
"complexity": {
"noForEach": "off",
"noUselessFragments": "warn",
"noBannedTypes": "warn"
},
"correctness": {
"noUndeclaredVariables": "error",
"noUnusedVariables": "error",
"useArrayLiterals": "error",
"useHookAtTopLevel": "error",
"noUnusedImports": "error",
"noVoidElementsWithChildren": "warn",
"useJsxKeyInIterable": "warn",
"useExhaustiveDependencies": "warn",
"noUnknownFunction": "warn"
},
"style": {
"noNonNullAssertion": "warn",
"noParameterAssign": "off",
"useThrowOnlyError": "error"
},
"suspicious": {
"noConsole": {
"level": "warn",
"options": {
"allow": ["assert", "error", "warn"]
}
},
"noExplicitAny": "warn",
"noImplicitAnyLet": "warn",
"noConfusingVoidType": "warn",
"noControlCharactersInRegex": "warn",
"noPrototypeBuiltins": "warn",
"noAssignInExpressions": "warn",
"noArrayIndexKey": "warn"
},
"a11y": {
"useSemanticElements": "warn",
"useKeyWithClickEvents": "warn",
"noSvgWithoutTitle": "warn",
"useButtonType": "warn",
"useIframeTitle": "warn",
"useAltText": "warn",
"noPositiveTabindex": "warn",
"useFocusableInteractive": "warn",
"useAriaPropsForRole": "warn",
"useValidAnchor": "warn",
"noLabelWithoutControl": "warn",
"noNoninteractiveTabindex": "warn"
},
"nursery": {
"useSortedClasses": {
"level": "error",
"fix": "safe",
"options": {
"attributes": ["class", "className", "style"],
"functions": ["clsx", "tw"]
}
}
}
}
},
"javascript": {
"formatter": {
"jsxQuoteStyle": "double",
"quoteProperties": "asNeeded",
"trailingCommas": "es5",
"semicolons": "always",
"arrowParentheses": "always",
"bracketSameLine": false,
"quoteStyle": "single",
"attributePosition": "auto",
"bracketSpacing": true
}
},
"overrides": [
{
"include": [
"packages/gitbook/**/*",
"packages/react-openapi/**/*",
"packages/react-math/**/*",
"packages/react-contentkit/**/*",
"packages/icons/**/*"
],
"javascript": {
"globals": ["React"]
}
},
{
"include": ["packages/gitbook/**/*"],
"javascript": {
"globals": ["React", "GitBookIntegrationEvent"]
}
},
{
"include": ["*.css"],
"javascript": {
"globals": ["theme"]
}
},
{
"include": ["*.test.ts", "packages/gitbook/tests/**/*"],
"javascript": {
"globals": ["Bun"]
}
},
{
"include": [
"packages/cache-do/**/*",
"packages/gitbook/cf-env.d.ts",
"packages/gitbook/src/cloudflare-entrypoint.ts"
],
"javascript": {
"globals": [
"DurableObjectLocationHint",
"DurableObjectNamespace",
"DurableObjectStub",
"ContinentCode",
"Fetcher",
"ExportedHandler"
]
}
}
]
}
+462 -1368
View File
File diff suppressed because it is too large Load Diff
+17 -11
View File
@@ -5,9 +5,10 @@
"node": "^22.3.0"
},
"devDependencies": {
"@biomejs/biome": "^1.9.4",
"@changesets/cli": "^2.31.0",
"turbo": "^2.10.3",
"@changesets/cli": "^2.31.1",
"oxfmt": "^0.62.0",
"oxlint": "^1.93.0",
"turbo": "^2.11.11",
"vercel": "50.37.3"
},
"packageManager": "bun@1.3.7",
@@ -18,8 +19,7 @@
"react": "catalog:",
"react-dom": "catalog:",
"esbuild": "0.27.3",
"axios": "1.8.4",
"@radix-ui/react-slot": "1.2.4"
"axios": "1.8.4"
},
"private": true,
"scripts": {
@@ -27,8 +27,10 @@
"build": "turbo run build",
"clean-deps": "rm -rf node_modules && rm -rf packages/*/node_modules",
"typecheck": "turbo run typecheck",
"format": "biome check --write ./",
"format:check": "biome check --diagnostic-level=error ./",
"lint": "oxlint --quiet",
"lint:fix": "oxlint --fix --quiet",
"format": "oxfmt",
"format:check": "oxfmt --check",
"unit": "turbo run unit",
"e2e": "turbo run e2e",
"e2e-customers": "turbo run e2e-customers",
@@ -39,12 +41,14 @@
"clean": "turbo run clean"
},
"workspaces": {
"packages": ["packages/*"],
"packages": [
"packages/*"
],
"catalog": {
"@tsconfig/strictest": "^2.0.6",
"@tsconfig/node20": "^20.1.6",
"@gitbook/api": "0.189.0",
"@scalar/api-client-react": "^1.3.46",
"@base-ui/react": "^1.7.0",
"@gitbook/api": "0.210.0",
"@types/react": "^19.0.0",
"@types/react-dom": "^19.0.0",
"assert-never": "^1.4.0",
@@ -62,6 +66,8 @@
"patchedDependencies": {
"decode-named-character-reference@1.0.2": "patches/decode-named-character-reference@1.0.2.patch",
"@vercel/next@4.4.2": "patches/@vercel%2Fnext@4.4.2.patch",
"next@16.2.6": "patches/next@16.2.6.patch"
"mermaid@11.16.1": "patches/mermaid@11.16.1.patch",
"next@16.4.6": "patches/next@16.4.6.patch",
"@shikijs/langs@3.21.0": "patches/@shikijs%2Flangs@3.21.0.patch"
}
}
+6
View File
@@ -1,5 +1,11 @@
# @gitbook/browser-types
## 0.1.6
### Patch Changes
- bf674a4: Add an optional `context` property (string, up to 512 characters) to the `confirmation` of custom AI tools, shown above the confirmation dialog to help the user understand what they are approving or rejecting. The `confirmation` can now also be a function that receives the AI-provided input and returns the confirmation, so the context can be derived dynamically from the arguments the tool is about to run with. Available both to integrations (`GitBookIntegrationTool`) and to embed consumers (`GitBookToolDefinition`).
## 0.1.5
### Patch Changes
+6 -2
View File
@@ -9,7 +9,7 @@
}
},
"sideEffects": false,
"version": "0.1.5",
"version": "0.1.6",
"dependencies": {
"@gitbook/api": "catalog:",
"@gitbook/icons": "workspace:"
@@ -25,7 +25,11 @@
"dev": "bun run build -- --watch ./src",
"publish-to-npm": "../../scripts/publish-if-new.sh"
},
"files": ["dist", "README.md", "CHANGELOG.md"],
"files": [
"dist",
"README.md",
"CHANGELOG.md"
],
"publishConfig": {
"access": "public",
"registry": "https://registry.npmjs.org/"
+18 -4
View File
@@ -5,14 +5,28 @@ export type GitBookIntegrationEvent = 'load' | 'unload';
export type GitBookIntegrationEventCallback = (...args: any[]) => void;
export type GitBookIntegrationToolConfirmation = {
icon?: IconName;
label: string;
/**
* Supporting context displayed to the user above the confirmation dialog,
* to help them understand what they are approving or rejecting.
* Limited to 512 characters.
*/
context?: string;
};
export type GitBookIntegrationTool = AIToolDefinition & {
/**
* Confirmation action to be displayed to the user before executing the tool.
* Provide a static object, or a function that receives the input provided by
* the AI assistant and returns the confirmation — useful to display dynamic
* context based on the arguments the tool is about to be executed with.
*/
confirmation?: {
icon?: IconName;
label: string;
};
confirmation?:
| GitBookIntegrationToolConfirmation
| ((input: object) => GitBookIntegrationToolConfirmation);
/**
* Callback when the tool is executed.
+5 -1
View File
@@ -24,7 +24,11 @@
"dev": "bun run build -- --watch ./src",
"publish-to-npm": "../../scripts/publish-if-new.sh"
},
"files": ["dist", "README.md", "CHANGELOG.md"],
"files": [
"dist",
"README.md",
"CHANGELOG.md"
],
"publishConfig": {
"access": "public",
"registry": "https://registry.npmjs.org/"
+5 -4
View File
@@ -1,14 +1,15 @@
import type { ComputedContentSource } from '@gitbook/api';
import assertNever from 'assert-never';
import type { ComputedContentSource } from '@gitbook/api';
/**
* Get a stringified cache tag for a given object.
*/
export function getCacheTag(
spec: /**
* All data related to a user
* @deprecated - in v2, no tag as this is an immutable data
*/
* All data related to a user
* @deprecated - in v2, no tag as this is an immutable data
*/
| {
tag: 'user';
user: string;
+12
View File
@@ -1,5 +1,17 @@
# @gitbook/colors
## 0.4.5
### Patch Changes
- 6c12872: Expand 3-digit hex colors correctly in `hexToRgbArray`.
## 0.4.4
### Patch Changes
- a69a307: A near-white tint color (e.g. a warm `#F5F3EF`) is now taken as the exact page background, mirroring the existing behavior for near-black tints. The tint's exact lightness, hue and chroma are preserved, and the color is anchored to whichever scale step the active theme renders as the background — so it matches exactly on `muted` (which uses the second step) as well as `clean`. This applies only to near-neutral tints that are light enough to read as a background; saturated or merely light-ish colors keep their normal accent scale. The `bold` theme is unaffected: it already uses the tint for the header and stays intentionally two-tone.
## 0.4.3
### Patch Changes
+6 -2
View File
@@ -8,7 +8,7 @@
}
},
"sideEffects": false,
"version": "0.4.3",
"version": "0.4.5",
"devDependencies": {
"bun-types": "catalog:",
"tsdown": "catalog:",
@@ -21,7 +21,11 @@
"dev": "bun run build -- --watch ./src",
"publish-to-npm": "../../scripts/publish-if-new.sh"
},
"files": ["dist", "README.md", "CHANGELOG.md"],
"files": [
"dist",
"README.md",
"CHANGELOG.md"
],
"publishConfig": {
"access": "public",
"registry": "https://registry.npmjs.org/"
+13 -1
View File
@@ -1,6 +1,6 @@
import { describe, expect, it } from 'bun:test';
import { colorScale } from './transformations';
import { colorScale, hexToRgbArray } from './transformations';
describe('colorScale exact base', () => {
it('takes a very light tint as the exact background on step 1 (clean/bold)', () => {
@@ -67,3 +67,15 @@ describe('colorScale exact base', () => {
expect(scale[0]).not.toBe('#F5F3EF');
});
});
describe('hexToRgbArray', () => {
it('parses a 6-digit hex color', () => {
expect(hexToRgbArray('#1a2b3c')).toEqual([26, 43, 60]);
});
it('expands a 3-digit hex color', () => {
expect(hexToRgbArray('#abc')).toEqual([170, 187, 204]);
expect(hexToRgbArray('abc')).toEqual([170, 187, 204]);
expect(hexToRgbArray('#fff')).toEqual([255, 255, 255]);
});
});
+3 -1
View File
@@ -311,7 +311,9 @@ export function hexToRgbArray(hex: string): RGBColor {
const originalHex = hex;
let value = hex.replace('#', '');
if (hex.length === 3) value = value + value;
if (value.length === 3) {
value = [...value].map((digit) => digit + digit).join('');
}
const r = value.substring(0, 2);
const g = value.substring(2, 4);
+17
View File
@@ -1,5 +1,22 @@
# @gitbook/embed
## 0.7.0
### Minor Changes
- 31e88d1: Relicense under Apache 2.0 and drop the dependency on `@gitbook/icons`.
## 0.6.0
### Minor Changes
- f35be52: Add `defaultTab` and `defaultPage` options to the Docs Embed to choose where it opens. `defaultTab` opens the embed on the assistant, search or docs tab. `defaultPage` sets the page the docs tab opens on in place of the site's home page, and the embed opens on that page unless `defaultTab` says otherwise. Both work with the standalone script's `configure`, `frame.configure` and `<GitBookFrame>` props.
### Patch Changes
- 94a496c: Make the Docs Embed widget match the page it is embedded in rather than the visitor's OS: a widget on a light page stays light even when the visitor's system is in dark mode, and the widget's own chrome and the docs inside it always render in the same scheme. Sites published with a single theme impose it on the widget too, since they render in it regardless. The standalone script takes `?theme=light` on its URL, and calling `init` twice now updates the options instead of throwing.
- bf674a4: Add an optional `context` property (string, up to 512 characters) to the `confirmation` of custom AI tools, shown above the confirmation dialog to help the user understand what they are approving or rejecting. The `confirmation` can now also be a function that receives the AI-provided input and returns the confirmation, so the context can be derived dynamically from the arguments the tool is about to run with. Available both to integrations (`GitBookIntegrationTool`) and to embed consumers (`GitBookToolDefinition`).
## 0.5.1
### Patch Changes
+201
View File
@@ -0,0 +1,201 @@
Apache License
Version 2.0, January 2004
http://www.apache.org/licenses/
TERMS AND CONDITIONS FOR USE, REPRODUCTION, AND DISTRIBUTION
1. Definitions.
"License" shall mean the terms and conditions for use, reproduction,
and distribution as defined by Sections 1 through 9 of this document.
"Licensor" shall mean the copyright owner or entity authorized by
the copyright owner that is granting the License.
"Legal Entity" shall mean the union of the acting entity and all
other entities that control, are controlled by, or are under common
control with that entity. For the purposes of this definition,
"control" means (i) the power, direct or indirect, to cause the
direction or management of such entity, whether by contract or
otherwise, or (ii) ownership of fifty percent (50%) or more of the
outstanding shares, or (iii) beneficial ownership of such entity.
"You" (or "Your") shall mean an individual or Legal Entity
exercising permissions granted by this License.
"Source" form shall mean the preferred form for making modifications,
including but not limited to software source code, documentation
source, and configuration files.
"Object" form shall mean any form resulting from mechanical
transformation or translation of a Source form, including but
not limited to compiled object code, generated documentation,
and conversions to other media types.
"Work" shall mean the work of authorship, whether in Source or
Object form, made available under the License, as indicated by a
copyright notice that is included in or attached to the work
(an example is provided in the Appendix below).
"Derivative Works" shall mean any work, whether in Source or Object
form, that is based on (or derived from) the Work and for which the
editorial revisions, annotations, elaborations, or other modifications
represent, as a whole, an original work of authorship. For the purposes
of this License, Derivative Works shall not include works that remain
separable from, or merely link (or bind by name) to the interfaces of,
the Work and Derivative Works thereof.
"Contribution" shall mean any work of authorship, including
the original version of the Work and any modifications or additions
to that Work or Derivative Works thereof, that is intentionally
submitted to Licensor for inclusion in the Work by the copyright owner
or by an individual or Legal Entity authorized to submit on behalf of
the copyright owner. For the purposes of this definition, "submitted"
means any form of electronic, verbal, or written communication sent
to the Licensor or its representatives, including but not limited to
communication on electronic mailing lists, source code control systems,
and issue tracking systems that are managed by, or on behalf of, the
Licensor for the purpose of discussing and improving the Work, but
excluding communication that is conspicuously marked or otherwise
designated in writing by the copyright owner as "Not a Contribution."
"Contributor" shall mean Licensor and any individual or Legal Entity
on behalf of whom a Contribution has been received by Licensor and
subsequently incorporated within the Work.
2. Grant of Copyright License. Subject to the terms and conditions of
this License, each Contributor hereby grants to You a perpetual,
worldwide, non-exclusive, no-charge, royalty-free, irrevocable
copyright license to reproduce, prepare Derivative Works of,
publicly display, publicly perform, sublicense, and distribute the
Work and such Derivative Works in Source or Object form.
3. Grant of Patent License. Subject to the terms and conditions of
this License, each Contributor hereby grants to You a perpetual,
worldwide, non-exclusive, no-charge, royalty-free, irrevocable
(except as stated in this section) patent license to make, have made,
use, offer to sell, sell, import, and otherwise transfer the Work,
where such license applies only to those patent claims licensable
by such Contributor that are necessarily infringed by their
Contribution(s) alone or by combination of their Contribution(s)
with the Work to which such Contribution(s) was submitted. If You
institute patent litigation against any entity (including a
cross-claim or counterclaim in a lawsuit) alleging that the Work
or a Contribution incorporated within the Work constitutes direct
or contributory patent infringement, then any patent licenses
granted to You under this License for that Work shall terminate
as of the date such litigation is filed.
4. Redistribution. You may reproduce and distribute copies of the
Work or Derivative Works thereof in any medium, with or without
modifications, and in Source or Object form, provided that You
meet the following conditions:
(a) You must give any other recipients of the Work or
Derivative Works a copy of this License; and
(b) You must cause any modified files to carry prominent notices
stating that You changed the files; and
(c) You must retain, in the Source form of any Derivative Works
that You distribute, all copyright, patent, trademark, and
attribution notices from the Source form of the Work,
excluding those notices that do not pertain to any part of
the Derivative Works; and
(d) If the Work includes a "NOTICE" text file as part of its
distribution, then any Derivative Works that You distribute must
include a readable copy of the attribution notices contained
within such NOTICE file, excluding those notices that do not
pertain to any part of the Derivative Works, in at least one
of the following places: within a NOTICE text file distributed
as part of the Derivative Works; within the Source form or
documentation, if provided along with the Derivative Works; or,
within a display generated by the Derivative Works, if and
wherever such third-party notices normally appear. The contents
of the NOTICE file are for informational purposes only and
do not modify the License. You may add Your own attribution
notices within Derivative Works that You distribute, alongside
or as an addendum to the NOTICE text from the Work, provided
that such additional attribution notices cannot be construed
as modifying the License.
You may add Your own copyright statement to Your modifications and
may provide additional or different license terms and conditions
for use, reproduction, or distribution of Your modifications, or
for any such Derivative Works as a whole, provided Your use,
reproduction, and distribution of the Work otherwise complies with
the conditions stated in this License.
5. Submission of Contributions. Unless You explicitly state otherwise,
any Contribution intentionally submitted for inclusion in the Work
by You to the Licensor shall be under the terms and conditions of
this License, without any additional terms or conditions.
Notwithstanding the above, nothing herein shall supersede or modify
the terms of any separate license agreement you may have executed
with Licensor regarding such Contributions.
6. Trademarks. This License does not grant permission to use the trade
names, trademarks, service marks, or product names of the Licensor,
except as required for reasonable and customary use in describing the
origin of the Work and reproducing the content of the NOTICE file.
7. Disclaimer of Warranty. Unless required by applicable law or
agreed to in writing, Licensor provides the Work (and each
Contributor provides its Contributions) on an "AS IS" BASIS,
WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or
implied, including, without limitation, any warranties or conditions
of TITLE, NON-INFRINGEMENT, MERCHANTABILITY, or FITNESS FOR A
PARTICULAR PURPOSE. You are solely responsible for determining the
appropriateness of using or redistributing the Work and assume any
risks associated with Your exercise of permissions under this License.
8. Limitation of Liability. In no event and under no legal theory,
whether in tort (including negligence), contract, or otherwise,
unless required by applicable law (such as deliberate and grossly
negligent acts) or agreed to in writing, shall any Contributor be
liable to You for damages, including any direct, indirect, special,
incidental, or consequential damages of any character arising as a
result of this License or out of the use or inability to use the
Work (including but not limited to damages for loss of goodwill,
work stoppage, computer failure or malfunction, or any and all
other commercial damages or losses), even if such Contributor
has been advised of the possibility of such damages.
9. Accepting Warranty or Additional Liability. While redistributing
the Work or Derivative Works thereof, You may choose to offer,
and charge a fee for, acceptance of support, warranty, indemnity,
or other liability obligations and/or rights consistent with this
License. However, in accepting such obligations, You may act only
on Your own behalf and on Your sole responsibility, not on behalf
of any other Contributor, and only if You agree to indemnify,
defend, and hold each Contributor harmless for any liability
incurred by, or claims asserted against, such Contributor by reason
of your accepting any such warranty or additional liability.
END OF TERMS AND CONDITIONS
APPENDIX: How to apply the Apache License to your work.
To apply the Apache License to your work, attach the following
boilerplate notice, with the fields enclosed by brackets "[]"
replaced with your own identifying information. (Don't include
the brackets!) The text should be enclosed in the appropriate
comment syntax for the file format. We also recommend that a
file or class name and description of purpose be included on the
same "printed page" as the copyright notice for easier
identification within third-party archives.
Copyright [yyyy] [name of copyright owner]
Licensed under the Apache License, Version 2.0 (the "License");
you may not use this file except in compliance with the License.
You may obtain a copy of the License at
http://www.apache.org/licenses/LICENSE-2.0
Unless required by applicable law or agreed to in writing, software
distributed under the License is distributed on an "AS IS" BASIS,
WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
See the License for the specific language governing permissions and
limitations under the License.
+66 -8
View File
@@ -19,15 +19,27 @@ The script is served at `https://docs.company.com/~gitbook/embed/script.js`.
You can find the embed script from your docs site settings, or you can copy the following and replace `docs.company.com` with your docs site hostname.
```html
<script src="https://docs.company.com/~gitbook/embed/script.js"></script>
```
The script initializes the widget itself, so there is nothing to call. To pin the embed to one color
scheme, put it on the script URL — it has to be known before the widget renders:
```html
<script src="https://docs.company.com/~gitbook/embed/script.js?theme=light"></script>
```
To authenticate the visitor, call `init` with their token. Keep tokens out of the script URL: it is
publicly cacheable and ends up in server logs.
```html
<script src="https://docs.company.com/~gitbook/embed/script.js"></script>
<script>
// Initialize with Authenticated Access (optional)
window.GitBook('init',
window.GitBook('init',
{ siteURL: 'https://docs.company.com' },
{ visitor: { token: 'your-jwt-token' } }
);
window.GitBook('show');
</script>
```
@@ -42,6 +54,7 @@ GitBook('configure', {
icon: 'assistant' // 'assistant' | 'sparkle' | 'help' | 'book'
},
tabs: ['assistant', 'search', 'docs'],
defaultPage: '/getting-started',
actions: [
{
icon: 'circle-question',
@@ -95,6 +108,7 @@ frame.clearChat();
// Configure the embed (see Configuration section for all options)
frame.configure({
tabs: ['assistant', 'search', 'docs'],
defaultPage: '/getting-started',
actions: [
{
icon: 'circle-question',
@@ -113,6 +127,11 @@ frame.configure({
frame.on('close', () => {
console.log('Frame closed');
});
// Escape was pressed inside the frame and nothing in it (a menu, a dialog) used it
frame.on('escape', () => {
closeHelpPanel();
});
```
## As React components
@@ -130,6 +149,7 @@ import { GitBookProvider, GitBookFrame } from '@gitbook/embed/react';
unsignedClaims: { userId: '123' } // Optional: custom claims for dynamic expressions
}}
tabs={['assistant', 'search', 'docs']}
defaultPage="/getting-started"
greeting={{ title: 'Welcome!', subtitle: 'How can I help?' }}
assistantName="Support Assistant"
suggestions={['What is GitBook?', 'How do I get started?']}
@@ -207,7 +227,7 @@ function MyComponent() {
- `frame.postUserMessage(message: string)` → `void`
- `frame.clearChat()` → `void`
- `frame.configure(settings: Partial<GitBookEmbeddableConfiguration>)` → `void`
- `frame.on(event: string, listener: Function)` → `() => void` (unsubscribe)
- `frame.on(event: string, listener: Function)` → `() => void` (unsubscribe). Events: `close`, `escape`
### React Components
@@ -237,6 +257,33 @@ Override which tabs are displayed. Defaults to your site's configuration.
tabs: ['assistant', 'search', 'docs']
```
### `defaultTab`
Available in: Standalone script, NPM package, React components
The tab the embed opens on. Without it, the embed opens on `defaultPage` if set, otherwise on the assistant (or the docs when the assistant isn't available). The tab must be one of the enabled `tabs`.
- **Type**: `'assistant' | 'search' | 'docs'`
```javascript
tabs: ['assistant', 'search', 'docs'],
defaultTab: 'search'
```
`defaultTab` and `defaultPage` apply when the embed first loads: the standalone widget keeps its place when it is closed and reopened. To move it later, use `navigateToPage` or `navigateToAssistant`.
### `defaultPage`
Available in: Standalone script, NPM package, React components
The page the docs tab opens on, in place of your site's home page. Accepts the same references as `navigateToPage`: the page's path within the site, an absolute path, or its full published URL. Unless `defaultTab` says otherwise, the embed opens on this page.
- **Type**: `string`
```javascript
defaultPage: '/getting-started/quickstart'
```
### `closeButton`
Available in: Standalone script, NPM package, React components
@@ -352,6 +399,8 @@ Available in: Standalone script, NPM package, React components
Suggested questions displayed in the [Assistant](https://gitbook.com/docs/publishing-documentation/gitbook-ai-assistant) welcome screen.
Omit `suggestions` when creating the embed or pass an empty array to use the site's suggested questions. If the site has no suggested questions, the Assistant shows generic questions. Later `configure` calls keep the current setting unless you pass `suggestions`. To restore the site's questions, remove the React prop or pass `{ suggestions: [] }` or `{ suggestions: undefined }` to `configure`.
- **Type**: `string[]`
```javascript
@@ -464,20 +513,25 @@ visitor: {
Available in: Standalone script (via `init`), NPM package (via `getFrameURL()`), React components (as prop)
Override the embed's color scheme. When omitted, the embed follows the iframe's CSS `color-scheme`, which lets it inherit the parent page or browser preference.
Override the embed's color scheme.
When omitted, the standalone widget follows the page it is embedded in — its `color-scheme`, falling back to the visitor's OS preference only when that page declares support for both. With the NPM package or the React components you own the iframe, so the embed follows the visitor's OS preference unless you pass this.
**Note**: This is not a configuration option but rather a parameter when initializing the frame or creating the frame URL.
**Standalone script**: Pass as the second argument to `GitBook('init', options, frameOptions)`
**Standalone script**: `?theme=light` on the script URL
**NPM package**: Pass to `getFrameURL({ colorScheme: 'dark' })`
**React components**: Pass as the `colorScheme` prop on `<GitBookFrame>`
- **Type**: `'light' | 'dark'`
```javascript
colorScheme: 'dark'
```html
<script src="https://docs.company.com/~gitbook/embed/script.js?theme=light"></script>
```
Sites published with a single theme always render in that theme, so `colorScheme` has no effect on
them — the widget follows the site instead, to keep its chrome and the docs inside it consistent.
### `button`
Available in: Standalone script only
@@ -495,3 +549,7 @@ button: {
icon: 'assistant'
}
```
## License
Distributed under the [Apache License 2.0](./LICENSE).
+8 -3
View File
@@ -13,10 +13,10 @@
}
},
"sideEffects": false,
"version": "0.5.1",
"version": "0.7.0",
"license": "Apache-2.0",
"dependencies": {
"@gitbook/api": "catalog:",
"@gitbook/icons": "workspace:",
"bidc": "catalog:"
},
"peerDependencies": {
@@ -39,7 +39,12 @@
"dev": "bun run build -- --watch ./src",
"publish-to-npm": "../../scripts/publish-if-new.sh"
},
"files": ["dist", "README.md", "CHANGELOG.md"],
"files": [
"dist",
"README.md",
"CHANGELOG.md",
"LICENSE"
],
"publishConfig": {
"access": "public",
"registry": "https://registry.npmjs.org/"

Some files were not shown because too many files have changed in this diff Show More