Compare commits

..

168 Commits

Author SHA1 Message Date
Nicolas Dorseuil 3bd9976524 Revert "super hacky solution to PPR cache body"
This reverts commit 4c36cf9abd.
2026-09-07 11:43:52 +02:00
Nicolas Dorseuil 4c36cf9abd super hacky solution to PPR cache body 2026-09-07 11:41:10 +02:00
Nicolas Dorseuil c1530706d0 Refactor PPR layout functions to use 'header' context and enhance type definitions for site context 2026-09-07 11:40:54 +02:00
Nicolas Dorseuil d4fa433d92 Split the PPR layout context between site and revision scopes
`SitePPRLayout` resolved a full site context, which fetches the published
site (site-scoped token) and the space with its revision. Only the site
part is needed to render the shell, and the shell is re-rendered on every
request.

Split `GitBookSiteContext` into a `GitBookSiteScopeContext` holding
everything derived from the published site, and the space context it is
merged with. The PPR layout now resolves only the site scope, under the
header scope so it shares its site fetch, and delegates the announcement,
header, table of contents, footer, admin toolbar and the page/tag icons to
cached components that resolve the revision under their own scope.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-07 11:40:54 +02:00
Nicolas Dorseuil a2170a352a Add PPR token exchange functionality: implement endpoint for exchanging revalidation tokens for scoped content API tokens, enhancing caching and claims management across components. 2026-09-07 11:39:51 +02:00
Nicolas Dorseuil e05abafddb Fix PPR test module mocks leaking into the rest of the suite
`mock.module` replaces a module for the whole bun test process, so mocking
`@/lib/context` and `jwt-decode` wholesale in the PPR route params test broke
every later test file that imported them. Spread the real context module and
sign a real JWT instead.

Also restore the `x-gitbook-route-site` debug header, commented out by mistake.
2026-09-07 11:39:51 +02:00
Nicolas Dorseuil 7e0e76e58a Implement GitBook-secret signature for PPR headers: enforce signature requirement and update related handling in middleware, tests, and proxy scripts. 2026-09-07 11:39:51 +02:00
Nicolas Dorseuil 42ab12a387 Enhance PPR route parameters: add basePath handling for variant consistency in getPPRHeaderRouteParams 2026-09-07 11:39:51 +02:00
Nicolas Dorseuil 2251b36673 Refactor getPPRDefaults function: streamline error handling and validation for decoded PPR defaults 2026-09-07 11:39:51 +02:00
Nicolas Dorseuil 8ef76487c2 Refactor PPR route parameter handling: simplify getPPRTableOfContentsRouteParams by removing unnecessary cache path variation 2026-09-07 11:39:51 +02:00
Nicolas Dorseuil e401c4d4c7 Apply oxfmt import ordering after rebase
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-07 11:39:51 +02:00
Nicolas Dorseuil fb971aefcc Refactor PPR cache handling: implement scoped cache tags for components to ensure independent revalidation and improve data fetching efficiency 2026-09-07 11:39:51 +02:00
Nicolas Dorseuil b6770d959a Prefix cache tags with ppr: for PPR route rendering to ensure cache entries are partitioned from static ones 2026-09-07 11:39:51 +02:00
Nicolas Dorseuil 8d881d88f6 Remove redundant cache tagging in PPRTableOfContents, PPRPageBody, and cachedGenerateSitePageMetadata functions 2026-09-07 11:39:51 +02:00
Nicolas Dorseuil 351c4ffa28 Fix proxy host header handling in forward function to prevent 404 errors 2026-09-07 11:39:51 +02:00
Nicolas Dorseuil bd608e6beb Add PPR development proxy and update documentation for local testing 2026-09-07 11:39:51 +02:00
Nicolas Dorseuil 825e245703 Refactor navigation components: implement client-side selection handling and improve context management 2026-09-07 11:39:50 +02:00
Nicolas Dorseuil 828ce66cd9 Refactor getPPRHeaderRouteParams and getPPRTableOfContentsRouteParams: enhance caching logic and add API token handling 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 8e1fdedf83 Remove NotFound component: delete unused page not found file 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 4a88202274 Refactor getPPRHeaderRouteParams: destructure revision from site URL data 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil d077e1a6b6 remove revalidationId from site data 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 7605d03d8c Refactor PPR components: remove unused files, add default site parameters, and enhance route handling 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 80026d2724 Refactor PPR components: remove deprecated files, enhance site context handling, and streamline API token management 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil b86ee531d4 Refactor PPR components: remove old files, add new layout and page components, and update utility functions for visitor tokens 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil d939d4c1fd Implement PPR route enhancements with revision and revalidation IDs, refactor headers handling, and add new layout and page components 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 0cc9a03add fix attempt 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 3805bac462 Fix invocation of cachedGenerateSitePageMetadata in generateMetadata function 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 23b438404c Refactor caching functions for site page metadata and viewport in PPR components 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 40d14b02d8 linting 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil ef0b6f020a Implement caching for site page metadata and viewport generation 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil d6c0d2dbcd comment 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 125872769f Refactor PPR tokens and enhance route parameter handling in utils 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil a04513f887 Implement PPR routing with token-based headers and restructure related components 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 7adbb5068f Enhance caching strategy in PPR components with remote cache and tagging 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil 2b146dbc6a Add dynamic export for force-static rendering in page component 2026-09-07 11:38:07 +02:00
Nicolas Dorseuil ea9420817f wip 2026-09-07 11:38:07 +02:00
Tomek 1f250d1fa8 Add site structure e2e tests for external links (#4584) 2026-09-07 09:31:50 +02:00
Brett Jephson 46b3a18b25 Fix nested select css (#4583)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-04 16:20:52 +01:00
Nolann B. 2ff77e15b5 Attribute a markdown request from the page actions menu (#4581) 2026-09-04 12:17:00 +02:00
Tomek d7c867aa63 Fix MCP/Markdown copy confirmation closing dropdown instantly (#4579)
Co-authored-by: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-03 16:08:53 +02:00
Tomek bcd1c41aa1 Scroll to top when selecting current page in search (#4578)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-03 11:35:07 +02:00
Viktor Renkema 77058e3f17 Support merged cells (#4500)
Co-authored-by: OpenAI Codex <codex@openai.com>
2026-09-03 10:26:43 +02:00
Tomek 8ad7465801 Simplify carousel overflow with edge masks & fix carousel scroll (#4577)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-02 14:32:53 +00:00
arnau 1b7ac0e41b Open inline Ask AI questions in the configured assistant (#4574) 2026-09-02 12:05:37 +02:00
Tomek 5f88f4e680 Improve cross-space page breadcrumbs (#4571)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-02 11:43:35 +02:00
Peter White 7009bb9311 Drop the body-anchored cover gate from paragraph contrast text (#4573) 2026-09-02 11:24:54 +02:00
Johan Preynat e460ec381e Preserve linked page destinations in published search (#4566) 2026-09-01 15:06:26 +02:00
Johan Preynat 0a82628298 Trap keyboard focus within published search (#4567) 2026-09-01 13:12:01 +02:00
conico974 18ff11b68b Bump @opennextjs/aws and @opennextjs/cloudflare versions (#4570) 2026-09-01 12:14:55 +02:00
Peter White 3bf55cef10 Allow adding query params to the @webframe.navigate action (#4569) 2026-09-01 10:14:07 +02:00
Peter White e041e49f11 Wait for integrations to register before showing the cookie banner (#4568) 2026-09-01 09:09:15 +02:00
Johan Preynat c1b5be05eb Allow search to target any section (#4564) 2026-08-31 18:32:02 +02:00
Johan Preynat 7543eb83ad Prewarm Turbopuffer when published search opens (#4563) 2026-08-31 13:32:47 +00:00
Tomek 523b7cd4b6 Support external links (#4561)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-31 13:11:13 +02:00
spastorelli af698a49f5 Extend MCP tests (#4562) 2026-08-31 11:59:46 +02:00
conico974 db67585ee2 Remove MCP authentication path from internal paths registry (#4560) 2026-08-28 14:57:21 +02:00
Peter White a566153d98 Chunk oversized visitor authentication cookies (#4554) 2026-08-28 12:28:53 +02:00
conico974 530f98a9c4 Skip internal paths in URL lookup (#4557) 2026-08-28 12:24:29 +02:00
Tomek 39391259c8 Disable zoom for inline images (#4555) 2026-08-28 11:32:19 +02:00
Nolann B. 35be3835f3 Skip rendering work for off-screen OpenAPI blocks (#4502) 2026-08-27 18:41:33 +02:00
Tomek 4452fd793c Fix link title showing site section name (4542) (#4553)
Co-authored-by: Kai Kewley <kaikewley@gmail.com>
2026-08-27 09:57:32 +02:00
conico974 90566879d2 Improve image signature handling and resizing functionality (#4511) 2026-08-26 15:55:57 +02:00
Zeno Kapitein 40a879ad5f Keep section group dropdown columns readable when space is tight (#4549)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-26 15:05:28 +02:00
Johan Preynat cc441c99c6 Fix published search scope fusion (#4552) 2026-08-26 14:22:33 +02:00
conico974 64e143a15b Bump Next.js to version 16.3.3 (#4547) 2026-08-26 12:32:56 +02:00
Peter White 8c10d92f77 Keep the section group menu open over the collapsed sidebar rail (#4548) 2026-08-26 12:16:13 +02:00
Zeno Kapitein 0a22eb5340 Stop expecting a cookies dialog in the faq.wanttopay.net e2e test (#4550)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-26 11:54:31 +02:00
Zeno Kapitein d9fc4608e3 Stop suggesting previously asked questions in the GitBook Assistant (#4546)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 18:00:30 +02:00
Zeno Kapitein ded2f560e3 Show loose sections in a section group dropdown as secondary links unless the group starts with one (#4545)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 17:14:58 +02:00
Zeno Kapitein a9c5d1b546 Fix the gap between columns in large section group dropdowns (#4544)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:45:41 +02:00
Zeno Kapitein 0ff21b7ae2 Hide the section tabs scroll button when all tabs already fit (#4540)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:35:38 +02:00
Zeno Kapitein 94a496c561 Match the Docs Embed widget to the page it is embedded in (#4533)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:34:54 +02:00
Johan Preynat 148a43ac01 Preserve backend ranking across site sections (#4541) 2026-08-25 14:55:17 +02:00
Johan Preynat 5da854f09c Preserve backend ranking in published search (#4537) 2026-08-25 12:54:24 +02:00
spastorelli b772f74c2b Evaluate <if> blocks when serving markdown pages (#4538) 2026-08-25 12:18:53 +02:00
Zeno Kapitein e0bd04f641 Render headings with the site's heading font (#4531)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 12:08:03 +02:00
conico974 8d7c3edda8 Disable metadata fetching in revision-related API calls (#4459) 2026-08-24 13:55:50 +02:00
conico974 80951e9889 Remove CODEOWNERS file for API data cache functions (#4536) 2026-08-24 13:43:37 +02:00
Nolann B. 185dd8337e Defer tracking scripts until after load and idle (#4529) 2026-08-24 12:18:30 +02:00
Peter White da7fb13d83 Fail closed in /~gitbook/revalidate when GITBOOK_SECRET is unset (#4535) 2026-08-24 12:11:40 +02:00
conico974 49c993f181 Add API token expiration check (#4532) 2026-08-21 11:29:38 +02:00
Zeno Kapitein 90b54682e5 Redesign the site OAuth consent screen for published sites MCP (RND-12071) (#4530)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 22:45:46 +02:00
Zeno Kapitein 1dccf8f06c Fix table-of-contents page group's first item cut off after navigation (RND-11314) (#4391)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
Co-authored-by: copilot-swe-agent[bot] <198982749+Copilot@users.noreply.github.com>
Co-authored-by: zenoachtig <8304582+zenoachtig@users.noreply.github.com>
2026-08-20 15:28:02 +02:00
Nolann B. 810244e8a9 Stop preloading zoom-modal images at render time (#4528) 2026-08-20 15:02:00 +02:00
Tomek 0dd2f4fbcd Show containing section name when hovering direct space links (RND-12437) (#4525) 2026-08-20 14:06:10 +02:00
Nolann B. 8a700222e6 Only track embed view events once the frame is shown (RND-12362) (#4517) 2026-08-20 14:04:14 +02:00
Nolann B. b13fd91afc Compute the AI chat time greeting after mount to avoid a hydration mismatch (#4527) 2026-08-20 13:52:52 +02:00
Nolann B. 8a6baaba6a Load the admin toolbar and its CSS lazily (RND-12524) (#4526) 2026-08-20 13:47:49 +02:00
Zeno Kapitein 48fba7cb49 Fix: highlight a TOC link entry when on the page or section it points to (RND-11155) (#4476)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 12:48:45 +02:00
Zeno Kapitein 6928a9b00a Hide card fields that render no content (#4523)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 12:48:37 +02:00
Nolann B. 7bab574c63 Self-host default fonts and inline only the ones a site uses (RND-12524) (#4522) 2026-08-20 12:36:55 +02:00
conico974 75bdff3ff3 Add support for AI agent detection and robots directives in markdown (#4524) 2026-08-20 12:18:17 +02:00
Peter White 56c25587db Make keyboard shortcuts work on non-QWERTY layouts (#4516) 2026-08-19 15:03:34 +00:00
Zeno Kapitein cf4efc7213 Fix search input losing focus before hydration (RND-11849) (#4438)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-19 12:30:11 +02:00
Zeno Kapitein 1ef71609e7 Show the light/dark toggle on laptop-width screens (#4515)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-19 12:29:58 +02:00
Zeno Kapitein 195c9e6b84 Apply and remember the ?theme= light/dark override in the docs embed (#4380)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-08-19 11:07:23 +02:00
Zeno Kapitein 09f39f8300 Vertically center breadcrumb icons (#4513) 2026-08-19 08:52:10 +00:00
Peter White 9002f6598a Fix embed search suggested questions not opening the assistant (#4514) 2026-08-18 17:19:25 +02:00
Zeno Kapitein 01c9b059c6 Require Ctrl/Cmd to zoom Mermaid diagrams with the wheel (RND-12338) (#4465)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-18 16:37:49 +02:00
Zeno Kapitein 6d02b8ab72 Fix TS code block comment punctuation color in dark mode (RND-12204) (#4460)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-18 16:36:07 +02:00
Peter White 177ef8582a Fix Docs Embed host actions not reaching the assistant (#4512) 2026-08-18 16:33:03 +02:00
Zeno Kapitein 78c589ffba Align Previous/Next page navigation to opposite edges (RND-11235) (#4494)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-18 13:36:08 +02:00
Nolann B. e4b214e6bd Fix large OpenAPI payload section not being scrollable (RND-12291) (#4510) 2026-08-18 13:17:33 +02:00
Tomek 64ce9e180d Render site-space custom home page at root (#4475)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-18 12:20:52 +02:00
conico974 c64d3a50e8 Refactor CSS compatibility checks (#4504) 2026-08-18 10:30:43 +02:00
spastorelli fd070ce9ca Redirect to the upstream auth logout URL on ~gitbook/auth/logout (#4489) 2026-08-18 10:27:48 +02:00
Tomek 048c4e4c70 Fix tooltip data-popup-open state conflict and AI messages collapsible (#4509)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-18 10:22:47 +02:00
conico974 fb01dc9ecb Remove unused Cloudflare image resizing function (#4507) 2026-08-17 17:26:32 +02:00
Nolann B. d33e570bc7 Fix the spacebar being swallowed in the search bar (RND-12484) (#4508) 2026-08-17 13:21:21 +00:00
Tomek 87fd234d55 Fix dropdown icon rotation by reading dropdown open state (#4503)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-17 14:55:09 +02:00
Claire Chabas 0f32eb17d1 Fix toggle chevron alignment in ToC (#4505) 2026-08-17 14:41:44 +02:00
Tomek 3e29680792 Stabilize visual CI tests (#4506)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-17 13:14:47 +02:00
Nolann B. b3db1c58c8 Migrate headless UI primitives from Radix and react-aria to Base UI (#4499) 2026-08-15 21:05:32 +02:00
Nolann B. 0f994016f4 Update OpenAPI customer test URL (#4498) 2026-08-13 18:43:33 +02:00
Nolann B. 419094b79d Stop every DOM change from restyling the whole document (#4492) 2026-08-13 17:18:48 +02:00
Greg Bergé 95d23775ce Migrate repository to Oxlint and Oxfmt (#4497) 2026-08-13 13:18:42 +00:00
spastorelli aa98859560 Detect and pass visitor type for site resolution (#4490) 2026-08-13 14:33:10 +02:00
Tomek ea19801cfa feat: add greeting customization to AI chat (#4483) 2026-08-13 11:17:26 +00:00
Peter White 13059b843c Fix Docs Embed being stuck on the Search tab (RND-12435) (#4496) 2026-08-13 06:57:13 +00:00
Johan Preynat 3db14ad950 Fix search result links for page matches (RND-11916) (#4488) 2026-08-12 17:43:57 +02:00
Nolann B. 5fac9e37ee Move the OpenAPI package from react-aria to Base UI (#4473) 2026-08-12 14:53:09 +02:00
Nolann B. 1424c566a0 Load the OpenAPI renderer only on pages that use it (#4472) 2026-08-12 14:53:09 +02:00
conico974 65f99eafe5 Reduce bundle size on the server (#4464) 2026-08-12 13:22:51 +02:00
Tomek 7594a334d8 Show image thumbnails for file attachments (#4486)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-11 13:09:16 +02:00
conico974 827e4f9856 Fix variant switcher URL for non-default variants (#4487) 2026-08-11 13:09:14 +02:00
Peter White a9a1a609c5 Fix sticky search results when switching the search filter RND-12265 (#4485) 2026-08-11 10:15:36 +02:00
conico974 61405a3036 feat: add CSS browser compatibility check for pull requests (#4478) 2026-08-07 15:44:52 +02:00
conico974 634a24ff03 Fix text visibility issues on pages with background covers in Firefox and iOS Safari (#4477) 2026-08-07 12:46:26 +02:00
Nolann B. 2ccd43ee5e Lazy-load the Mermaid code block (#4468) 2026-08-06 08:59:03 +02:00
Nolann B. cd506e3f79 Split the Shiki highlighter from the plain token helpers (#4467) 2026-08-06 08:59:02 +02:00
Brett Jephson a6644074cb Fix: select no longer stored in url (#4466)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-05 11:59:56 +01:00
conico974 4be043d96e Add support for visitor token revalidation without redirection (#4463) 2026-08-05 09:50:26 +02:00
Brett Jephson 673f4b6076 RND-11832: button with select slug action (#4462) 2026-08-04 14:12:13 +01:00
Brett Jephson d0a63bab91 Tab - reinstate scroll hash (#4458)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-04 14:42:30 +02:00
conico974 ca9a1dd396 Block crawler from using ask endpoint (#4457) 2026-08-03 11:47:17 +02:00
claude[bot] 996d7ec021 Scroll to in-page heading even when the URL hash is unchanged (RND-12290) (#4454)
Co-authored-by: Claude <noreply@anthropic.com>
Co-authored-by: Tomek Gargula <tomasz@gitbook.com>
2026-07-31 10:36:37 +02:00
Brett Jephson f9ad9b5356 RND-11830: select store URL param (#4439)
Co-authored-by: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-30 16:05:36 +01:00
Nolann B. 332089eca9 Don't forward cookies through the OpenAPI Scalar proxy (#4451) 2026-07-30 10:06:17 +02:00
Zeno Kapitein 6ac4cf4b76 Align card and column breakpoints (#4449) 2026-07-29 12:13:25 +00:00
Zeno Kapitein 5c74eef602 Make the table search empty state more prominent (#4418)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-28 16:13:02 +02:00
Zeno Kapitein 1ee1853995 Add an assistant tool to rate its own previous response (#4425)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-28 16:10:41 +02:00
Tomek fa9c9b38b7 Force software rendering in Playwright for consistent images (#4444)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-27 14:01:55 +00:00
conico974 b4d9c6b95e Fix BUILD_VERSION assignment to ensure fallback to current timestamp (#4445) 2026-07-27 15:47:54 +02:00
Tomek 588964279e Remove search value from URL on unfocus (#4443)
Co-authored-by: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-27 10:46:02 +00:00
Nolann B. a80d41200a Run the OpenAPI Scalar proxy on GitBook's origin (#4440) 2026-07-24 18:36:27 +02:00
Nolann B. ccb9d7bda4 Submit sendFeedback MCP tool findings through submitSiteAgentFeedback (#4437) 2026-07-24 10:34:50 +02:00
Nolann B. 14562e9e5b Serve noindex on internal search/assistant URLs (?q= / ?ask=) (#4433) 2026-07-23 15:00:13 +02:00
spastorelli 580d186ddd Clean up old forward resume authorize to sites oauth server (#4436) 2026-07-23 14:08:56 +02:00
Tomek 038008c853 Fix heading anchor links on touch devices (#4435)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-23 11:56:21 +00:00
conico974 8c890522ed Patch next for dev, and fix issue in dev with inline icon (#4432) 2026-07-22 16:00:36 +02:00
conico974 e9558a6df7 Revert "Simplify search query handling to in-memory storage only (#4419)" (#4431) 2026-07-22 14:53:29 +02:00
Brett Jephson b5f3c1416a RND-11857: Prompt block with default expanded options (#4429) 2026-07-22 13:33:06 +01:00
conico974 b9d383bed3 Bump dependencies for @opennextjs/aws, @opennextjs/cloudflare, and next to latest versions (#4430) 2026-07-22 11:01:17 +02:00
spastorelli b6e7f2d2db Render the Site OAuth consent screen from the server's signed marker (#4428) 2026-07-22 09:59:30 +02:00
Tomek 94ef1769ec Simplify search query handling to in-memory storage only (#4419)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-22 07:54:50 +00:00
Zeno Kapitein ae9367dafe Only show the assistant activity heading when there's activity to reveal (#4424)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-21 14:47:58 +02:00
Zeno Kapitein cef18701be Add an assistant tool to submit page feedback (#4408)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-21 13:25:14 +02:00
Zeno Kapitein bf674a47d9 Add supporting context to AI tool confirmation dialogs (#4422)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-21 11:45:51 +02:00
conico974 1eb763f9c5 Implement API token cookie handling with chunking support (#4421) 2026-07-20 15:38:07 +02:00
Nolann B. db176ba0ea Add "On this page" on models page (#4417) 2026-07-20 13:17:02 +02:00
Nolann B. 03bbacf319 Add missing link reference to OpenAPI models (#4416) 2026-07-20 12:53:28 +02:00
Tomek 484cc11627 Fix ScrollContainer scroll buttons not reflecting overflow immediately (#4414)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-20 08:47:04 +00:00
spastorelli 0dee4155a2 Add consent flow env vars to next config (#4413) 2026-07-17 15:16:46 +00:00
spastorelli 4d7c01587e Add Sites OAuth consent screen (#4405) 2026-07-17 15:58:27 +02:00
Greg Bergé 6083a88845 Expose the current page context to integration block webframes (#4411)
Co-authored-by: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-17 12:06:38 +02:00
Nolann B. bf6a7af72b Defer search index loading until search is opened (#4407) 2026-07-16 21:53:24 +02:00
Utku Ufuk 703e654a37 Split the default-scope site search into two parallel API requests (#4395) 2026-07-16 15:23:30 +03:00
conico974 1b571aeaa9 Fix scroll behavior for navigation (#4406) 2026-07-16 14:21:01 +02:00
864 changed files with 25476 additions and 7687 deletions
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix "View activity" disclosure in AI Chat not opening after the Base UI migration.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Scroll to an in-page heading even when the URL hash is unchanged (e.g. clicking the same anchor again).
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Force software rendering (SwiftShader) in Playwright Chromium to eliminate image downscaling drift between GPU-equipped local runs and headless CI runs in Argos screenshots.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Stop showing previously asked questions as suggestions in the GitBook Assistant
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Add an assistant tool to rate its own previous response when the user reacts to it.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Add an assistant tool to submit feedback about the current page on behalf of the user.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Simplify carousel overflow with symmetric edge masks and visible-item paging. Replaces complex negative-margin bleed logic with transparent edge fades and page-by-visible-item scrolling.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep the breadcrumbs from covering the page actions' hit area.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Bump Next.js to 16.3.3.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Chunk oversized visitor auth cookies to fix an infinite redirect loop when the visitor token exceeds the browser cookie size limit.
+5
View File
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Fix inline Ask AI buttons opening a configured custom assistant.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Assistant: the "Explored briefly" activity heading no longer appears when there's nothing to show. It now renders only when the answer is preceded by a real preamble or one or more tool calls, so a simple answer with an empty reasoning step no longer surfaces an empty collapsible.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Stop the built-in cookie banner from flashing on sites using a consent integration such as Osano or OneTrust.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix breadcrumbs for cross-space page links in grouped sites.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show the theme toggle in the footer whenever the outline column that hosts the other toggle isn't pinned open, so it stays reachable on laptop-sized screens in wide layouts and while the AI chat is open.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Disable click-to-zoom for inline line sized images.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix host action buttons in the Docs Embed not reaching the assistant.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the Docs Embed widget rendering with a dark surface when the visitor's OS is in dark mode, even on a light page or a site published with a light theme. The embed script now accepts `?theme=light|dark` to force a scheme.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix suggested question clicks in the embed search not opening the assistant.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix switching from the Search tab to the Docs or Assistant tab in the embed doing nothing.
+5
View File
@@ -0,0 +1,5 @@
---
"@gitbook/embed": patch
---
Make the Docs Embed widget match the page it is embedded in rather than the visitor's OS: a widget on a light page stays light even when the visitor's system is in dark mode, and the widget's own chrome and the docs inside it always render in the same scheme. Sites published with a single theme impose it on the widget too, since they render in it regardless. The standalone script takes `?theme=light` on its URL, and calling `init` twice now updates the options instead of throwing.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Add configurable default visibility to Prompt block
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Support external links in published site navigation.
+7
View File
@@ -0,0 +1,7 @@
---
"gitbook": patch
---
Introduce client-side content selection (`select`): a site-wide, recency-ordered list of selected slugs, persisted in localStorage and shareable via `?select=`, applied to `<html>` before first paint so the right variant renders with no flash. All variants stay server-rendered, so pages are byte-identical for every visitor (no cache impact).
Tabs now use it: switching a tab activates its slug, and every tab group offering that slug follows, across pages. Tabs no longer write to the URL fragment (`#` returns to anchors only); deep-links into a tab still activate and scroll to it.
+7
View File
@@ -0,0 +1,7 @@
---
"@gitbook/openapi-parser": patch
"@gitbook/react-openapi": patch
"gitbook": patch
---
Add missing link reference to OpenAPI models
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Skip internal paths (`~gitbook/*`, `.well-known/oauth-protected-resource`, `llms.txt`, `robots.txt`, `sitemap.xml`, `rss.xml`) when building URL lookup alternatives, to avoid resolving URLs that can never match content.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep published search results within the selected site-space scope during local and remote result fusion.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix page link titles showing the site section name instead of the target space title.
+5
View File
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Update the URL hash when a tab is selected, so a copied link scrolls back to that tab
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Self-host default Google fonts and inline only the @font-face rules of the fonts a site uses, instead of shipping render-blocking stylesheets covering all 23 families on every page.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Hide card fields that render no content, along with their title
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Upgrade react-hotkeys-hook to v5 and use its native `useKey` option so keyboard shortcuts match the produced key on non-QWERTY layouts.
+7
View File
@@ -0,0 +1,7 @@
---
"@gitbook/browser-types": patch
"@gitbook/embed": patch
"gitbook": patch
---
Add an optional `context` property (string, up to 512 characters) to the `confirmation` of custom AI tools, shown above the confirmation dialog to help the user understand what they are approving or rejecting. The `confirmation` can now also be a function that receives the AI-provided input and returns the confirmation, so the context can be derived dynamically from the arguments the tool is about to run with. Available both to integrations (`GitBookIntegrationTool`) and to embed consumers (`GitBookToolDefinition`).
+5
View File
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Keep embed demos and frames on the deployment that served them.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix a hydration mismatch on every page load caused by the AI chat time-based greeting being computed in the server timezone.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Lazy-load the Mermaid code block so pages that have code blocks but no diagram no longer ship its rendering dependencies.
+8
View File
@@ -0,0 +1,8 @@
---
"@gitbook/react-openapi": major
"gitbook": patch
---
Lazy load the Scalar API client modal and stop preloading the Scalar runtime. The modal is now code-split into its own chunk, fetched in parallel with the runtime only when a reader clicks "Test it", and a spinner is shown on the button until the client opens.
Breaking: the package no longer ships the modal in its main entry — consumers must serve the emitted `ScalarApiModal` chunk and use a bundler that supports dynamic `import()`, and the Scalar runtime is no longer preloaded on page load. The internal `preloadScalarRuntime` helper is removed.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Stop preloading the zoom-modal variant of every zoomable image at render time; it downloaded each image twice during the initial page load. The modal image still loads on hover or click.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Serve an indexable `X-Robots-Tag` on markdown pages requested by AI agents
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Bump `@gitbook/api` to 0.199.0, and record a markdown request made from the page actions menu as a page action rather than an agent request.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the page-actions dropdown closing before the "Copied" confirmation could be shown when copying the MCP server URL, an MCP install command, or the page as Markdown.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Submit `sendFeedback` MCP tool findings through the dedicated `submitSiteAgentFeedback` API endpoint. The `pageUrl` is now required and an optional `goal` can be provided.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Mermaid diagrams no longer hijack page scrolling: zooming with the wheel now requires holding Ctrl/Cmd inline, while the fullscreen view keeps free wheel zoom.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Migrate the headless UI primitives from Radix and react-aria to Base UI.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Persist content selection (tabs and other `select` blocks) in localStorage only, dropping the `?select=` query parameter from the URL. A tab click still writes the tab's hash, so a copied URL lands on that tab and reactivates it on load.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Serve `X-Robots-Tag: noindex` on internal search/assistant URLs (`?q=` / `?ask=`) and stop disallowing them in robots.txt, so Google can crawl the directive and drop them from the index instead of reporting "Indexed, though blocked by robots.txt".
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Redesign the site OAuth consent screen for published sites MCP and translate its strings
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Drop a column instead of shrinking them all when a section group dropdown runs out of room
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Let a section group dropdown scroll when it is taller than the screen
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the variant switcher linking to the wrong URL for non-default variants of the default section
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Skip the rendering work for off-screen OpenAPI blocks, so pages with many operations stay smooth to scroll.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Add an "On this page" table of contents on OpenAPI models pages. Each model in a grouped/multi-model "Models" section is now listed as its own section, matching operations and webhooks.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Improve cookie handling in the OpenAPI "Test it" request proxy.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Serve the OpenAPI "Test it" request proxy from GitBook's own domain.
@@ -0,0 +1,6 @@
---
"gitbook": patch
"@gitbook/react-openapi": minor
---
Keep the OpenAPI renderer out of the initial bundle of pages that have no OpenAPI block, by building its context on the client behind a dynamic boundary.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix OpenAPI webhook payload and schema example panels being clipped instead of scrollable.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Move paragraph block styles behind a single `paragraph` class and drop the `page-cover-background:` gate from the cover-contrast text. The gate combined with the per-paragraph `:not(:has(...))` made every DOM insertion re-style all paragraphs, which froze very long pages.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Prefix all cache tags with `ppr:` when rendering under the PPR route, so PPR cache entries are partitioned from the static ones.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Require a GitBook-secret signature on the `x-gbo-*` PPR headers, so a client can't opt itself into the PPR route.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Exchange the PPR revalidation token for a content API token scoped to each PPR component, so the API receives claims it understands and the header and table of contents can be cached across pages.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Preserve external page destinations returned by published search.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Use one canonical backend-ranked result set for published searches across site sections.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Preserve canonical backend ranking and present page or section context that matches each published search destination.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Align the Previous page navigation button to the left edge and the Next button to the right edge, including when only one of them is present.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Prewarm published search caches when readers open the search interface.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Inject site tracking scripts (analytics integrations) after `load` + idle instead of preloading them and executing them during the critical loading window.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Render horizontal and vertical merged table cells on published pages.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix text disappearing in Firefox and iOS Safari on pages with a background cover
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Render a site-space custom home page at its placement root while preserving the full space and normal page URLs.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fail closed in `/~gitbook/revalidate` when `GITBOOK_SECRET` is not configured, returning `403 Revalidation is disabled` instead of skipping the signature check, consistent with `force-revalidate`.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the docs embed not applying `?theme=light`/`?theme=dark`. The theme was dropped when the embed redirected to its default tab, and the embed tabs couldn't read it because they render statically (their request headers are empty). The middleware now threads a forced embed theme through the embed route context (scoped to the embed, not the main site), so the embed tabs honor it while staying statically rendered, and the redirect forwards it to the default tab. The forced theme is also persisted to the embed's own theme storage so it is remembered across tab navigation instead of only applying while the query string is present.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the search field losing focus if it was focused just before the page finished hydrating.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix code block syntax highlighting so comment delimiters (e.g. `//`, `/*`) use the same color as the rest of the comment. Previously the delimiter fell through to the generic punctuation scope, making it a different color from the comment body (most visible in dark mode).
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Scroll to the top when selecting a search result for the page already being viewed.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Add end-to-end coverage for root and nested external links in site section navigation.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix ScrollContainer scroll buttons not reflecting content overflow immediately or after dynamic content changes (e.g. search results).
+5
View File
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Allow published search to be scoped to any visible site section.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the spacebar being ignored in the search bar, which made multi-word queries impossible.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep keyboard focus within search while the results are open.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep the last search query visible after closing search, and restore it when reopening, without breaking navigation when clicking a search result.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Link page-level search matches to the top of the page while preserving section anchors for section matches.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show the containing section name when hovering a direct link to a space.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the section group menu dismissing while the mouse is still inside it, when the collapsed sidebar rail overlaps the menu on no-sidebar pages.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show loose sections in a section group dropdown as secondary links unless the group starts with one
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Stop the section tabs in the header from showing a scroll button and faded edge when all tabs already fit.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep Shiki out of the initial page bundle by splitting the highlighter from the plain-text token helpers, so client code no longer pulls the engine and language bundles in through a shared import.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Render headings with the site's heading font when one is configured, falling back to the main font otherwise.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Split the default-scope site search into two parallel API requests — one restricted to the current site space and one for the other site spaces — rendering each result set as soon as its response arrives. All results are ranked together by score, with the current site space scores boosted.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show image thumbnails, including SVG previews, for file attachments on published sites.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Make the table search "no results" empty state more prominent with vertical spacing so it no longer blends into the content below.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix heading anchor links being unreachable on touch devices by adding a tap-to-reveal state. The anchor icon now appears after the heading text without wrapping onto an orphan line while retaining its existing desktop placement. Use `pointerup` for the dismiss listener to fix unreliable dismissal on iOS Safari, and enlarge the anchor's touch tap target to a square 24px area (meeting the WCAG 2.5.8 minimum) so the icon stays centered instead of overflowing shorter headings' line height.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix search results from a previous scope staying stuck on top of the new results when switching the search filter.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix tabs nested inside another tab group rendering an empty body once a tab in the outer group was selected.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Load the admin toolbar and its CSS lazily so published pages no longer ship a render-blocking stylesheet for admin-only UI.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Remove the gap between the columns of a section group dropdown holding a large group
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Support localized custom AI Assistant greeting subtitles.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the first item of a table-of-contents page group appearing cut off (faded under the group header) after client-side navigation.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Highlight a table-of-contents link entry as active when it points to the page — or the section of a page — you are currently viewing.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix chevrons and open-state styling incorrectly reacting to a tooltip opening on the same trigger, by switching from the shared Base UI `data-popup-open` attribute to `aria-expanded`.
+6
View File
@@ -0,0 +1,6 @@
---
"gitbook": patch
"@gitbook/react-contentkit": patch
---
Support query params in the `@webframe.navigate` action.

Some files were not shown because too many files have changed in this diff Show More