Compare commits

..

1 Commits

Author SHA1 Message Date
Viktor Renkema 538aea26ac Check ancestorBlocks for tables before applying text alignment 2025-06-24 11:39:00 +02:00
1029 changed files with 20408 additions and 73489 deletions
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix UX issue about highlighting the search term in search result sections
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Assistant: you can now send follow-up questions while an answer is still being written. Each one appears as your own message with a "Queued" badge (hover for when it will send, × to cancel), and they're sent automatically one at a time as each answer completes.
+9
View File
@@ -0,0 +1,9 @@
---
"gitbook": patch
---
Fix three small visual issues
- Fix sidebar showing on `no-toc` pages in the gradient theme
- Fix variant selector truncating incorrectly in header when sections are present
- Fix page cover alignment on `lg` screens without TOC
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Respect fullWidth and defaultWidth for images
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Hide scrollbar on sections
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": minor
---
Add a carousel layout option to cards blocks, rendering them as a horizontally-scrolling, scroll-snapping row instead of a wrapping grid.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
Add docs.testgitbook.com to ADAPTIVE_CONTENT_HOSTS list
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
fix nested a tag causing hydration error
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
fix href being empty in TOC
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix navigation between sections/variants when previewing a site in v2
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Add support for inline icons.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix the docs embed `navigateToPage` API on multi-space sites. Deep-linking to a page in a different space/section (e.g. `navigateToPage('/help-center/integrations')`) previously 404'd because the section base was not placed before `~gitbook/embed/page`. The target is now resolved to its space server-side, so pages in any space resolve correctly. The input accepts the page path, an absolute path, or the full published URL.
@@ -1,6 +0,0 @@
---
"@gitbook/colors": patch
"gitbook": patch
---
A near-white tint color (e.g. a warm `#F5F3EF`) is now taken as the exact page background, mirroring the existing behavior for near-black tints. The tint's exact lightness, hue and chroma are preserved, and the color is anchored to whichever scale step the active theme renders as the background — so it matches exactly on `muted` (which uses the second step) as well as `clean`. This applies only to near-neutral tints that are light enough to read as a background; saturated or merely light-ish colors keep their normal accent scale. The `bold` theme is unaffected: it already uses the tint for the header and stays intentionally two-tone.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Add circular corners and depth styling
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix crash when integration script fails to render block.
+5
View File
@@ -0,0 +1,5 @@
---
'@gitbook/react-openapi': patch
---
Add authorization header for OAuth2
+6
View File
@@ -0,0 +1,6 @@
---
'@gitbook/react-openapi': patch
'gitbook': patch
---
Improve support for OAuth2 security type
+6
View File
@@ -0,0 +1,6 @@
---
"gitbook-v2": patch
"gitbook": patch
---
Adds Columns layout block to GBO
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Support dark-mode specific page cover image
+5
View File
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Update Models page styling
@@ -2,4 +2,4 @@
"gitbook": patch
---
a11y screen reader fixes
Show scrollbars
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
Optimize performances by using a smarter per-request cache arround data cached functions
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
add a force-revalidate api route to force bust the cache in case of errors
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Add support for icons in buttons.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Fix rendering of ogimage with SVG logos.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Best effort at preserving current variant when navigating between sections by matching the pathname against site spaces in the new section.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Add cover image background mode and masks
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Button blocks now respect the `size` option, so you can render small, medium, or large buttons.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix crash when integration is triggering invalid requests.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
Optimize the fetch of revision files by using only the getRevision cache.
+6
View File
@@ -0,0 +1,6 @@
---
"gitbook-v2": patch
"gitbook": patch
---
encode customization header
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Rework full-width layout, add support for full-width page option
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": minor
---
Add an `askQuestion` tool to the site MCP server. Alongside `searchDocumentation` and `getPage`, MCP clients can now ask a natural-language question and get a synthesized answer with links to the source pages, powered by the same AI search backend as the site's "ask a question" experience. The tool accepts an optional `goal` param so calling agents can attach the intent they're trying to accomplish, which tailors the answer and is tracked in analytics. The tool is only exposed on sites that have AI enabled.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix CodeBlock layout
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Scroll to active TOC when clicking a link
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
fix ISR on preview env
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Add support for text alignment for headings and paragraphs.
+6
View File
@@ -0,0 +1,6 @@
---
"gitbook-v2": patch
"gitbook": patch
---
Fix concurrent execution in Vercel causing pages to not be attached to the proper tags.
+5
View File
@@ -0,0 +1,5 @@
---
"@gitbook/react-contentkit": patch
---
Add basic error handling when transitioning between states.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
Generate a llms-full.txt version of the docs site
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Don't crash ogimage generation on RTL text, as a workaround until we can support it.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Add support for site customization option to change how external links open.
+5
View File
@@ -0,0 +1,5 @@
---
"@gitbook/fonts": minor
---
Initial version of the package
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix rendering of ogimage when logo or icon are AVIF images.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Add margin to adjacent buttons
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix ogimage generation failing with some JPEG images.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix page group not expanded by default
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
Don't cache unexpected API errors for more than a few minutes.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
Fix an issue where PDF export URLs were not keeping their query params.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Remove GBO's redundant re-selection of the best-scoring search section. The search API now returns a single highest-scoring section per page (and orders sections highest-score-first), so GBO no longer needs its own `getBestScoredResult` helper to pick the best section for the search and MCP previews. No user-visible change.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Sync the API reference responses selector with the "Responses" collapsibles, and keep the selected response in sync across every operation on the page (like the code sample language selector). Selecting a status code now expands the matching response section and applies to all operations at once.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix a light/dark flash on published sites configured to respect the system default (no theme toggle). Such sites forced the `system` theme, but `next-themes`' pre-paint script applies a forced value verbatim without resolving `prefers-color-scheme`, so the page painted light and only switched to dark after hydration. We now leave the theme unforced when the default is `system` (only concrete light/dark themes are forced), letting `next-themes`' existing pre-paint script resolve the system preference before first paint.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Add a `sendFeedback` MCP tool so AI agents can report documentation findings (outdated / incoherent / gap / other) as `agent_feedback` insights events. The tool only accepts finding categories, so it never records positive feedback.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Separate the prompt block actions into a primary "Open in" dropdown and a secondary "Copy prompt" button, instead of a single combined button group, and align the block's design with the expandable block (bordered frame, left disclosure chevron, and subtle elevation when expanded).
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix the docs embed widget shipping a stale script: declare the embed package's `standalone/` bundle as a Turbo build output. Because it wasn't declared, changes confined to the standalone widget (which compiles to `standalone/` but not `dist/`) didn't invalidate the downstream `generate` cache that copies it into the app, so the deployed widget could lag the source — e.g. the `clipboard-write` permission on the widget iframe never reached production, breaking the copy button in the Assistant embed.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
add a global error boundary
+5
View File
@@ -0,0 +1,5 @@
---
'@gitbook/react-openapi': patch
---
Indent JSON python code sample
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix missing title on button to close the announcement banner.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Make icons for page groups more contrasting
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Refine the per-paragraph AI ask button: shorten its tooltip to "Ask" (from "Ask <assistant> about this"), and hide it inside cards where it would otherwise be clipped by the card's overflow.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Ignore case while highlighting search results.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Consistently show variant selector in section bar if site has sections
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Make TOC height dynamic based on visible header and footer elements
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Clicking an active TOC item toggles its descendants
+6
View File
@@ -0,0 +1,6 @@
---
"gitbook": patch
"gitbook-v2": patch
---
Fix InlineLinkTooltip having a negative impact on performance, especially on larger pages.
+6
View File
@@ -0,0 +1,6 @@
---
'@gitbook/openapi-parser': patch
'@gitbook/react-openapi': patch
---
Optional label in OpenAPI x-codeSamples
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Keep the "On this page" and "Ask" buttons pinned below the header while scrolling on desktop API reference pages, so the page outline stays reachable throughout long operations.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Hide unfocusable unlabelled button from screen readers
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Only show the "Back to [space]" shortcut for cross-space links in the table of contents, not for in-content text links or other ways of reaching another space.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix bold header links hover color
+6
View File
@@ -0,0 +1,6 @@
---
"gitbook": patch
"gitbook-v2": patch
---
cache fonts and static image used in OGImage in memory
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix border being added to cards
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Add metadata for adding site to Apple devices home
+5
View File
@@ -0,0 +1,5 @@
---
'@gitbook/react-openapi': patch
---
Handle nested deprecated properties in generateSchemaExample
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix crash during rendering of ogimage for VA sites with default icon.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
Add `urlObject.hash` to `linker.toLinkForContent` to pass through URL fragment identifiers, used in search
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Allow to zoom images on mobile if relevant
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
apply customization for dynamic context
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Reverse order of feedback smileys
+5
View File
@@ -0,0 +1,5 @@
---
'@gitbook/react-openapi': patch
---
Deduplicate path parameters from OpenAPI spec
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix ogimage using incorrect Google Font depending on language.
-6
View File
@@ -1,6 +0,0 @@
---
"@gitbook/react-contentkit": patch
"gitbook": patch
---
Let integration block webframes navigate the reader to another page in the site by posting a `@webframe.navigate` action with a `path` (and optional `anchor`). Resolved client-side against the site base path, so navigation stays in-site and drives the standard navigation progress bar.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix an issue where certain keywords could cause an exception when rendering emojis
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook-v2": patch
---
remove trailing slash from linker
-12
View File
@@ -1,12 +0,0 @@
{
"version": "0.0.1",
"configurations": [
{
"name": "🚀 Dev server",
"runtimeExecutable": "sh",
"runtimeArgs": ["-c", "bun install && bun dev"],
"port": 3000,
"autoPort": false
}
]
}
+1 -1
View File
@@ -1,3 +1,3 @@
# Changes to the API data cache functions can invalidate all existing data cache
# causing a massive amount of revalidation, impacting our API.
packages/gitbook/src/lib/data/api.ts @SamyPesse
packages/gitbook-v2/src/lib/data/api.ts @SamyPesse
+5 -27
View File
@@ -53,39 +53,17 @@ After forking this repository, you'll want to [create a branch](https://docs.git
#### 3. Install dependencies and run the project locally
##### Prerequisites:
GitBook uses [Bun](https://bun.sh/) to run the project. Make sure you're using the specified version of `node` before running any of the development commands to ensure a smooth development experience.
- [Node.js](https://nodejs.org/en) (see "engines" in `package.json`)
- [Bun](https://bun.sh/) (see "packageManager" in `package.json`)
You can easily do this by running the command `nvm use`.
##### Setup steps:
1. Ensure you are using the project's version of Node:
```bash
nvm use
```
2. Install dependencies using Bun:
```bash
bun install
```
3. Start the development server:
```bash
bun dev
```
Additional development commands:
- `bun format`: Format the code using Biome
- `bun typecheck`: Run TypeScript type checking
- `bun unit`: Run unit tests
- `bun e2e`: Run end-to-end tests
To start your local version of GitBook, run the command `bun dev`.
#### 4. Preview your changes
When running the development server, published GitBook sites can be rendered through your local version at `http://localhost:3000/url`.
When running the development server, published GitBook sites can be rendered through your local version at `http://localhost:3000/`.
For example, our published docs can be viewed using the local version by visiting `http://localhost:3000/url/gitbook.com/docs` after running the development server.
For example, our published docs can be viewed using the local version by visiting `http://localhost:3000/gitbook.com/docs` after running the development server.
You can visit any published GitBook site behind your development server. Please make sure your site is [published publicly](https://gitbook.com/docs/published-documentation/publish-your-content-as-a-docs-site) to ensure you can view the site correctly in your development version.
@@ -30,9 +30,9 @@ runs:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
wranglerVersion: '4.10.0'
environment: ${{ inputs.environment }}
command: deployments status --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
command: deployments status --config ./packages/gitbook-v2/openNext/customWorkers/defaultWrangler.jsonc
# This step is used to get the version ID that is currently deployed to Cloudflare.
- id: extract_current_version
@@ -49,9 +49,9 @@ runs:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
wranglerVersion: '4.10.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ steps.extract_current_version.outputs.version_id }}@100% ${{ inputs.serverVersionId }}@0% -y --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
command: versions deploy ${{ steps.extract_current_version.outputs.version_id }}@100% ${{ inputs.serverVersionId }}@0% -y --config ./packages/gitbook-v2/openNext/customWorkers/defaultWrangler.jsonc
# Since we use version overrides headers, we can directly deploy the middleware to 100%.
- id: deploy_middleware
@@ -61,9 +61,9 @@ runs:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
wranglerVersion: '4.10.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ inputs.middlewareVersionId }}@100% -y --config ./packages/gitbook/openNext/customWorkers/middlewareWrangler.jsonc
command: versions deploy ${{ inputs.middlewareVersionId }}@100% -y --config ./packages/gitbook-v2/openNext/customWorkers/middlewareWrangler.jsonc
- name: Deploy server to Cloudflare at 100%
uses: cloudflare/wrangler-action@v3.14.0
@@ -71,9 +71,9 @@ runs:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
wranglerVersion: '4.10.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ inputs.serverVersionId }}@100% -y --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
command: versions deploy ${{ inputs.serverVersionId }}@100% -y --config ./packages/gitbook-v2/openNext/customWorkers/defaultWrangler.jsonc
- name: Outputs
shell: bash
@@ -0,0 +1,37 @@
name: 'Setup Playwright'
description: 'Install Playwright and dependencies'
runs:
using: 'composite'
steps:
# Run npm ci and get Playwright version
- name: 🏗 Prepare Playwright env
shell: bash
run: |
PLAYWRIGHT_VERSION=$(npm ls --json @playwright/test | jq --raw-output '.dependencies["gitbook"].dependencies["@playwright/test"].version')
echo "PLAYWRIGHT_VERSION=$PLAYWRIGHT_VERSION" >> $GITHUB_ENV
# Cache browser binaries, cache key is based on Playwright version and OS
- name: 🧰 Cache Playwright browser binaries
uses: actions/cache@v4
id: playwright-cache
with:
path: '~/.cache/ms-playwright'
key: '${{ runner.os }}-playwright-${{ env.PLAYWRIGHT_VERSION }}'
restore-keys: |
${{ runner.os }}-playwright-
# Install browser binaries & OS dependencies if cache missed
- name: 🏗 Install Playwright browser binaries & OS dependencies
if: steps.playwright-cache.outputs.cache-hit != 'true'
shell: bash
working-directory: packages/gitbook
run: |
bun x playwright install --with-deps chromium
# Install only the OS dependencies if cache hit
- name: 🏗 Install Playwright OS dependencies
if: steps.playwright-cache.outputs.cache-hit == 'true'
shell: bash
working-directory: packages/gitbook
run: |
bun x playwright install-deps
+11 -17
View File
@@ -26,7 +26,7 @@ inputs:
description: 'Commit message to associate with the deployment'
required: true
outputs:
deployment-url:
deployment-url:
description: "Deployment URL"
value: ${{ steps.upload_middleware.outputs.deployment-url }}
runs:
@@ -52,22 +52,16 @@ runs:
GITBOOK_API_URL: ${{ inputs.opItem }}/GITBOOK_API_URL
GITBOOK_API_PUBLIC_URL: ${{ inputs.opItem }}/GITBOOK_API_PUBLIC_URL
GITBOOK_API_TOKEN: ${{ inputs.opItem }}/GITBOOK_API_TOKEN
GITBOOK_OAUTH_SERVER_URL: ${{ inputs.opItem }}/GITBOOK_OAUTH_SERVER_URL
GITBOOK_PREVIEW_BASE_URL: ${{ inputs.opItem }}/GITBOOK_PREVIEW_BASE_URL
GITBOOK_INTEGRATIONS_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_HOST
GITBOOK_INTEGRATIONS_CONTENT_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_CONTENT_HOST
GITBOOK_IMAGE_RESIZE_SIGNING_KEY: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SIGNING_KEY
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL_2
GITBOOK_IMAGE_RESIZE_SALT: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SALT
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL
GITBOOK_IMAGE_RESIZE_MODE: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_MODE
GITBOOK_ASSETS_PREFIX: ${{ inputs.opItem }}/GITBOOK_ASSETS_PREFIX
GITBOOK_FONTS_URL: ${{ inputs.opItem }}/GITBOOK_FONTS_URL
- name: Build worker
run: bun run turbo build:cloudflare
run: bun run turbo build:v2:cloudflare
env:
GITBOOK_RUNTIME: cloudflare
GITBOOK_BLOCK_SEARCH_INDEXATION: ${{ inputs.environment == 'preview' && 'true' || '' }}
GITBOOK_ALLOW_CUSTOMIZATION_OVERRIDE: ${{ inputs.environment == 'preview' && 'true' || '' }}
shell: bash
- name: Upload the DO worker
@@ -76,9 +70,9 @@ runs:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
wranglerVersion: '4.10.0'
environment: ${{ inputs.environment }}
command: deploy --config ./packages/gitbook/openNext/customWorkers/doWrangler.jsonc
command: deploy --config ./packages/gitbook-v2/openNext/customWorkers/doWrangler.jsonc
- id: upload_server
name: Upload server to Cloudflare
@@ -87,9 +81,9 @@ runs:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
wranglerVersion: '4.10.0'
environment: ${{ inputs.environment }}
command: ${{ format('versions upload --tag {0} --message "{1}"', inputs.commitTag, inputs.commitMessage) }} --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
command: ${{ format('versions upload --tag {0} --message "{1}"', inputs.commitTag, inputs.commitMessage) }} --config ./packages/gitbook-v2/openNext/customWorkers/defaultWrangler.jsonc
- name: Extract server version worker ID
shell: bash
@@ -101,7 +95,7 @@ runs:
- name: Run updateWrangler scripts
shell: bash
run: |
bun run ./packages/gitbook/openNext/customWorkers/script/updateWrangler.ts ${{ steps.extract_server_version_id.outputs.version_id }}
bun run ./packages/gitbook-v2/openNext/customWorkers/script/updateWrangler.ts ${{ steps.extract_server_version_id.outputs.version_id }}
- id: upload_middleware
name: Upload middleware to Cloudflare
@@ -110,10 +104,10 @@ runs:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
wranglerVersion: '4.10.0'
environment: ${{ inputs.environment }}
command: ${{ format('versions upload --tag {0} --message "{1}"', inputs.commitTag, inputs.commitMessage) }} --config ./packages/gitbook/openNext/customWorkers/middlewareWrangler.jsonc
command: ${{ format('versions upload --tag {0} --message "{1}"', inputs.commitTag, inputs.commitMessage) }} --config ./packages/gitbook-v2/openNext/customWorkers/middlewareWrangler.jsonc
- name: Extract middleware version worker ID
shell: bash
id: extract_middleware_version_id
+2 -22
View File
@@ -19,11 +19,8 @@ inputs:
environment:
description: 'Environment to deploy to'
required: true
headSha:
description: 'Git ref to deploy, used for the deploymentId'
required: false
outputs:
deployment-url:
deployment-url:
description: "Deployment URL"
value: ${{ steps.deploy.outputs.deployment-url }}
runs:
@@ -54,28 +51,12 @@ runs:
GITBOOK_API_URL: ${{ inputs.opItem }}/GITBOOK_API_URL
GITBOOK_API_PUBLIC_URL: ${{ inputs.opItem }}/GITBOOK_API_PUBLIC_URL
GITBOOK_API_TOKEN: ${{ inputs.opItem }}/GITBOOK_API_TOKEN
GITBOOK_OAUTH_SERVER_URL: ${{ inputs.opItem }}/GITBOOK_OAUTH_SERVER_URL
GITBOOK_PREVIEW_BASE_URL: ${{ inputs.opItem }}/GITBOOK_PREVIEW_BASE_URL
GITBOOK_INTEGRATIONS_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_HOST
GITBOOK_INTEGRATIONS_CONTENT_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_CONTENT_HOST
GITBOOK_IMAGE_RESIZE_SIGNING_KEY: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SIGNING_KEY
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL_2
GITBOOK_IMAGE_RESIZE_SALT: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SALT
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL
GITBOOK_IMAGE_RESIZE_MODE: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_MODE
GITBOOK_ASSETS_PREFIX: ${{ inputs.opItem }}/GITBOOK_ASSETS_PREFIX
GITBOOK_FONTS_URL: ${{ inputs.opItem }}/GITBOOK_FONTS_URL
- name: Inject build env vars
if: ${{ inputs.environment == 'preview' }}
shell: bash
run: |
HEAD_SHA=$(git rev-parse HEAD)
echo "resolved HEAD_SHA: $HEAD_SHA"
echo "GITBOOK_HEAD_SHA=$HEAD_SHA" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_RUNTIME=vercel" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_BLOCK_SEARCH_INDEXATION=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_ALLOW_CUSTOMIZATION_OVERRIDE=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "--- .vercel/.env.${{ inputs.environment }}.local after inject ---"
cat .vercel/.env.${{ inputs.environment }}.local
- name: Build Project Artifacts
run: bun run vercel build --target=${{ inputs.environment }} --token=${{ inputs.vercelToken }}
shell: bash
@@ -83,7 +64,6 @@ runs:
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
GITBOOK_RUNTIME: vercel
GITBOOK_HEAD_SHA: ${{ inputs.headSha }}
- name: Deploy Project Artifacts to Vercel
id: deploy
shell: bash
+7 -3
View File
@@ -4,7 +4,8 @@ on:
push:
branches:
- main
- changeset-release/main
env:
NPM_TOKEN_READONLY: ${{ secrets.NPM_TOKEN_READONLY }}
jobs:
format:
runs-on: ubuntu-latest
@@ -34,10 +35,13 @@ jobs:
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- run: bun unit
build:
build-oss:
# CI to check that the repository builds correctly on a machine without the credentials
runs-on: ubuntu-latest
name: Build
name: Build (Open Source)
timeout-minutes: 6
env:
NPM_TOKEN_READONLY: ''
steps:
- name: Checkout
uses: actions/checkout@v4
+128 -82
View File
@@ -1,25 +1,62 @@
name: Preview
on:
pull_request_target:
pull_request:
push:
branches:
- main
branches:
- main
env:
NPM_TOKEN_READONLY: ${{ secrets.NPM_TOKEN_READONLY }}
jobs:
approval:
# Ensure that external contributors' PRs are manually approved before deployment
name: Approve Preview Deployment
deploy-v1-cloudflare:
name: Deploy v1 to Cloudflare Pages
runs-on: ubuntu-latest
if: ${{ github.event_name == 'pull_request_target' && github.event.pull_request.head.repo.fork }}
environment:
name: preview-approval
name: ${{ github.ref == 'refs/heads/main' && '1c-production' || '1c-preview' }}
url: ${{ steps.deploy.outputs.deployment-url }}
permissions:
contents: read
deployments: write
issues: write
pull-requests: write
checks: write
statuses: write
outputs:
deployment-url: ${{ steps.deploy.outputs.deployment-url }}
deployment-alias-url: ${{ steps.deploy.outputs.deployment-alias-url }}
steps:
- name: Approval gate
run: echo "Preview deployment approved."
- name: Checkout
uses: actions/checkout@v4
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- name: Sets env vars for production
if: github.ref == 'refs/heads/main'
run: |
echo "GITBOOK_ASSETS_PREFIX=https://static.gitbook.com" >> $GITHUB_ENV
- name: Build Next.js with next-on-pages
run: bun run turbo gitbook#build:cloudflare
env:
NEXT_SERVER_ACTIONS_ENCRYPTION_KEY: ${{ secrets.NEXT_SERVER_ACTIONS_ENCRYPTION_KEY }}
GITBOOK_RUNTIME: cloudflare
- id: deploy
name: Deploy to Cloudflare
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ secrets.CLOUDFLARE_API_TOKEN }}
accountId: ${{ secrets.CLOUDFLARE_ACCOUNT_ID }}
workingDirectory: ./
wranglerVersion: '3.112.0'
command: pages deploy ./packages/gitbook/.vercel/output/static --project-name=${{ vars.CLOUDFLARE_PROJECT_NAME }} --branch=${{ github.ref == 'refs/heads/main' && 'main' || format('pr{0}', github.event.pull_request.number) }}
- name: Outputs
run: |
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
echo "Alias URL: ${{ steps.deploy.outputs.deployment-alias-url }}"
deploy-v2-vercel:
name: Deploy v2 to Vercel (preview)
runs-on: ubuntu-latest
needs: approval
if: ${{ always() && (needs.approval.result == 'success' || needs.approval.result == 'skipped') }}
environment:
name: 2v-preview
url: ${{ steps.deploy.outputs.deployment-url }}
@@ -28,8 +65,6 @@ jobs:
steps:
- name: Checkout
uses: actions/checkout@v4
with:
ref: ${{ github.event.pull_request.head.sha || github.sha }}
- name: Deploy to Vercel
id: deploy
uses: ./.github/composite/deploy-vercel
@@ -40,12 +75,9 @@ jobs:
vercelToken: ${{ secrets.VERCEL_TOKEN }}
opItem: op://gitbook-open/2v-preview
opServiceAccount: ${{ secrets.OP_SERVICE_ACCOUNT_TOKEN }}
headSha: ${{ github.event.pull_request.head.sha || github.sha }}
deploy-v2-cloudflare:
name: Deploy v2 to Cloudflare Worker (preview)
runs-on: ubuntu-latest
needs: approval
if: ${{ always() && (needs.approval.result == 'success' || needs.approval.result == 'skipped') }}
environment:
name: 2c-preview
url: ${{ steps.deploy.outputs.deployment-url }}
@@ -54,8 +86,6 @@ jobs:
steps:
- name: Checkout
uses: actions/checkout@v4
with:
ref: ${{ github.event.pull_request.head.sha || github.sha }}
- name: Deploy to Cloudflare
id: deploy
uses: ./.github/composite/deploy-cloudflare
@@ -82,8 +112,9 @@ jobs:
comment-deployments:
runs-on: ubuntu-latest
name: Comment Deployments (preview)
if: always() && github.event_name != 'push'
if: always() && !startsWith(github.ref, 'refs/heads/main')
needs:
- deploy-v1-cloudflare
- deploy-v2-vercel
- deploy-v2-cloudflare
steps:
@@ -103,6 +134,15 @@ jobs:
body: |
Summary of the deployments:
### Version 1
| Version | URL | Status |
| --- | --- | --- |
| Latest commit | [${{ needs.deploy-v1-cloudflare.outputs.deployment-url }}](${{ needs.deploy-v1-cloudflare.outputs.deployment-url }}) | ${{ needs.deploy-v1-cloudflare.result == 'success' && '✅' || '❌' }} |
| PR | [${{ needs.deploy-v1-cloudflare.outputs.deployment-alias-url }}](${{ needs.deploy-v1-cloudflare.outputs.deployment-alias-url }}) | ${{ needs.deploy-v1-cloudflare.result == 'success' && '✅' || '❌' }} |
### Version 2
| Version | URL | Status |
| --- | --- | --- |
| Vercel | [${{ needs.deploy-v2-vercel.outputs.deployment-url }}](${{ needs.deploy-v2-vercel.outputs.deployment-url }}) | ${{ needs.deploy-v2-vercel.result == 'success' && '✅' || '❌' }} |
@@ -110,143 +150,149 @@ jobs:
### Test content
| Site | `2v` | `2c` |
| --- | --- | --- |
| GitBook | [${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.com/docs](${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.com/docs) | [${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.com/docs](${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.com/docs) |
| E2E | [${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open](${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open) | [${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open](${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open) |
| Site | `v1` | `2v` | `2c` |
| --- | --- | --- | --- |
| GitBook | [${{ needs.deploy-v1-cloudflare.outputs.deployment-url }}/gitbook.com/docs](${{ needs.deploy-v1-cloudflare.outputs.deployment-url }}/gitbook.com/docs) | [${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.com/docs](${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.com/docs) | [${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.com/docs](${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.com/docs) |
| E2E | [${{ needs.deploy-v1-cloudflare.outputs.deployment-url }}/gitbook.gitbook.io/test-gitbook-open](${{ needs.deploy-v1-cloudflare.outputs.deployment-url }}/gitbook.gitbook.io/test-gitbook-open) | [${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open](${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open) | [${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open](${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/gitbook.gitbook.io/test-gitbook-open) |
edit-mode: replace
visual-testing-v1:
runs-on: ubuntu-latest
name: Visual Testing v1
needs: deploy-v1-cloudflare
timeout-minutes: 10
steps:
- name: Checkout
uses: actions/checkout@v4
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
- name: Setup Playwright
uses: ./.github/actions/setup-playwright
- name: Run Playwright tests
run: bun e2e
env:
BASE_URL: ${{ needs.deploy-v1-cloudflare.outputs.deployment-url }}
ARGOS_TOKEN: ${{ secrets.ARGOS_TOKEN }}
visual-testing-v2-vercel:
runs-on: ubuntu-latest
name: Visual Testing v2
needs: deploy-v2-vercel
if: ${{ always() && needs.deploy-v2-vercel.result == 'success' }}
timeout-minutes: 15
timeout-minutes: 10
steps:
- name: Checkout
uses: actions/checkout@v4
with:
ref: ${{ github.event.pull_request.head.sha || github.sha }}
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- name: Setup Playwright
uses: ./.github/actions/setup-playwright
- name: Run Playwright tests
run: bun e2e
env:
BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}
SITE_BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/
ARGOS_TOKEN: ${{ secrets.ARGOS_TOKEN }}
ARGOS_BUILD_NAME: v2-vercel
ARGOS_BUILD_NAME: 'v2-vercel'
visual-testing-v2-cloudflare:
runs-on: ubuntu-latest
name: Visual Testing v2 (Cloudflare)
needs: deploy-v2-cloudflare
if: ${{ always() && needs.deploy-v2-cloudflare.result == 'success' }}
timeout-minutes: 15
timeout-minutes: 10
steps:
- name: Checkout
uses: actions/checkout@v4
with:
ref: ${{ github.event.pull_request.head.sha || github.sha }}
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- name: Setup Playwright
uses: ./.github/actions/setup-playwright
- name: Run Playwright tests
run: bun e2e
env:
BASE_URL: ${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}
SITE_BASE_URL: ${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/
ARGOS_TOKEN: ${{ secrets.ARGOS_TOKEN }}
ARGOS_BUILD_NAME: v2-cloudflare
visual-testing-customers-v2:
ARGOS_BUILD_NAME: 'v2-cloudflare'
visual-testing-customers-v1:
runs-on: ubuntu-latest
name: Visual Testing Customers v2
needs: deploy-v2-vercel
if: ${{ always() && needs.deploy-v2-vercel.result == 'success' }}
timeout-minutes: 30
name: Visual Testing Customers v1
needs: deploy-v1-cloudflare
timeout-minutes: 10
steps:
- name: Checkout
uses: actions/checkout@v4
with:
ref: ${{ github.event.pull_request.head.sha || github.sha }}
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
- name: Setup Playwright
uses: ./.github/actions/setup-playwright
- name: Run Playwright tests
run: bun e2e-customers
env:
PUPPETEER_SKIP_DOWNLOAD: 1
BASE_URL: ${{ needs.deploy-v1-cloudflare.outputs.deployment-url }}
ARGOS_TOKEN: ${{ secrets.ARGOS_TOKEN }}
ARGOS_BUILD_NAME: 'customers-v1'
visual-testing-customers-v2:
runs-on: ubuntu-latest
name: Visual Testing Customers v2
needs: deploy-v2-vercel
timeout-minutes: 10
steps:
- name: Checkout
uses: actions/checkout@v4
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
- name: Setup Playwright
uses: ./.github/actions/setup-playwright
- name: Run Playwright tests
run: bun e2e-customers
env:
BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}
SITE_BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/
ARGOS_TOKEN: ${{ secrets.ARGOS_TOKEN }}
ARGOS_BUILD_NAME: customers-v2-vercel
ARGOS_BUILD_NAME: 'customers-v2'
visual-testing-customers-v2-cloudflare:
runs-on: ubuntu-latest
name: Visual Testing Customers v2 (Cloudflare)
needs: deploy-v2-cloudflare
if: ${{ always() && needs.deploy-v2-cloudflare.result == 'success' }}
timeout-minutes: 30
timeout-minutes: 10
steps:
- name: Checkout
uses: actions/checkout@v4
with:
ref: ${{ github.event.pull_request.head.sha || github.sha }}
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- name: Setup Playwright
uses: ./.github/actions/setup-playwright
- name: Run Playwright tests
run: bun e2e-customers
env:
BASE_URL: ${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}
SITE_BASE_URL: ${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/
ARGOS_TOKEN: ${{ secrets.ARGOS_TOKEN }}
ARGOS_BUILD_NAME: customers-v2-cloudflare
browserless-testing-v2-vercel:
ARGOS_BUILD_NAME: 'customers-v2'
pagespeed-testing-v1:
runs-on: ubuntu-latest
name: Browserless Testing v2 (Vercel)
needs: deploy-v2-vercel
if: ${{ always() && needs.deploy-v2-vercel.result == 'success' }}
name: PageSpeed Testing v1
needs: deploy-v1-cloudflare
steps:
- name: Checkout
uses: actions/checkout@v4
with:
ref: ${{ github.event.pull_request.head.sha || github.sha }}
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- name: Run tests
run: cd ./packages/gitbook && bun e2e-browserless
- name: Run pagespeed tests
run: bun ./packages/gitbook/tests/pagespeed-testing.ts
env:
BASE_URL: ${{needs.deploy-v2-vercel.outputs.deployment-url}}
SITE_BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/
# browserless-testing-v2-cloudflare:
# runs-on: ubuntu-latest
# name: Browserless Testing v2 (Cloudflare)
# needs: deploy-v2-cloudflare
# steps:
# - name: Checkout
# uses: actions/checkout@v4
# - name: Setup Bun
# uses: ./.github/composite/setup-bun
# - name: Install dependencies
# run: bun install --frozen-lockfile
# env:
# PUPPETEER_SKIP_DOWNLOAD: 1
# - name: Run tests
# run: cd ./packages/gitbook && bun e2e-browserless
# env:
# BASE_URL: ${{needs.deploy-v2-cloudflare.outputs.deployment-url}}
# SITE_BASE_URL: ${{ needs.deploy-v2-cloudflare.outputs.deployment-url }}/url/
BASE_URL: ${{needs.deploy-v1-cloudflare.outputs.deployment-url}}
PAGESPEED_API_KEY: ${{ secrets.PAGESPEED_API_KEY }}
+2
View File
@@ -3,6 +3,8 @@ on:
push:
branches:
- main
env:
NPM_TOKEN_READONLY: ${{ secrets.NPM_TOKEN_READONLY }}
jobs:
deploy-v2-vercel:
name: Deploy v2 to Vercel (production)
+2
View File
@@ -3,6 +3,8 @@ on:
push:
branches:
- main
env:
NPM_TOKEN_READONLY: ${{ secrets.NPM_TOKEN_READONLY }}
jobs:
deploy-v2-vercel:
name: Deploy v2 to Vercel (staging)
+28 -20
View File
@@ -4,6 +4,9 @@ on:
push:
branches:
- main
env:
NPM_TOKEN_READONLY: ${{ secrets.NPM_TOKEN_READONLY }}
concurrency: ${{ github.workflow }}-${{ github.ref }}
@@ -11,42 +14,47 @@ jobs:
publish:
name: Publish
runs-on: ubuntu-latest
permissions:
id-token: write
pull-requests: write
contents: write
env:
# The repo is managed by Bun, but publishing uses npm for provenance.
# Keep Corepack from rejecting packageManager: bun@... when npm runs.
COREPACK_ENABLE_PROJECT_SPEC: 0
steps:
- name: Checkout Repo
uses: actions/checkout@v3
with:
# This makes Actions fetch all Git history so that Changesets can generate changelogs with the correct commits
fetch-depth: 0
- name: Setup Node
uses: actions/setup-node@v4
with:
node-version: 22
registry-url: 'https://registry.npmjs.org'
- name: Update npm
run: |
corepack enable npm
corepack install -g npm@latest
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- name: Create Release Pull Request
- name: Create Release Pull Request or Publish to npm
id: changesets
uses: changesets/action@v1
with:
publish: bun run publish-all-packages
version: bun run changeset-version
publish: npm run release
version: npm run changeset-version
env:
# Using a PAT instead of GITHUB_TOKEN because we need to run workflows when releases are created
# https://github.com/orgs/community/discussions/26875#discussioncomment-3253761
GITHUB_TOKEN: ${{ secrets.GH_PERSONAL_TOKEN }}
NPM_TOKEN: ${{ secrets.NPM_TOKEN }}
CLOUDFLARE_ACCOUNT_ID: ${{ secrets.CLOUDFLARE_ACCOUNT_ID }}
CLOUDFLARE_API_TOKEN: ${{ secrets.CLOUDFLARE_API_TOKEN }}
release-preview:
# For now it releases the cache-do to both preview and production
# Once we changed to deploy the app only on release, we should change `release:preview` in `cache-do`
name: Release Preview
runs-on: ubuntu-latest
steps:
- name: Checkout Repo
uses: actions/checkout@v3
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- name: Release preview packages
run: bun run release:preview
env:
CLOUDFLARE_ACCOUNT_ID: ${{ secrets.CLOUDFLARE_ACCOUNT_ID }}
CLOUDFLARE_API_TOKEN: ${{ secrets.CLOUDFLARE_API_TOKEN }}
-4
View File
@@ -25,7 +25,3 @@ yarn-error.log*
# TypeScript
*.tsbuildinfo
.npmrc
# Bun pack artifacts
packages/*/*.tgz
+1 -1
View File
@@ -1 +1 @@
v22.3
v20.6
-81
View File
@@ -1,81 +0,0 @@
# AGENTS Instructions
## Commands
```bash
bun install # Install dependencies
bun dev # Start dev server (all packages)
bun run build # Build all packages
bun run format # Format with Biome (run after every change)
bun run typecheck # Type-check all packages
bun run unit # Run unit tests
```
## Development
The dev server proxies published GitBook sites locally. After `bun dev`, access any published site at:
```
http://localhost:3000/url/<published-gitbook-url>
```
Examples:
- `http://localhost:3000/url/gitbook.com/docs`
- `http://localhost:3000/url/open-source.gitbook.io/midjourney`
## Architecture
```
packages/
gitbook/ # Main Next.js app
src/
app/ # Next.js App Router (sites/)
components/ # React components
lib/ # Server utilities, data fetching
intl/ # Internationalization (translations/)
openapi-parser/ # OpenAPI 3.0/3.1/Swagger parser
react-openapi/ # OpenAPI rendering components
react-contentkit/ # ContentKit component rendering
embed/ # Embeddable GitBook components
shared/ # Shared utilities
icons/ # Icon assets
fonts/ # Font assets
colors/ # Color tokens
expr/ # GitBook expression evaluator
cache-do/ # Cloudflare DO cache
cache-tags/ # Cache tag utilities
```
## Testing
```bash
bun run unit # Unit tests via bun test (not vitest)
bun run e2e # Playwright e2e tests (requires built app)
```
Run a specific test file:
```bash
cd packages/gitbook && bun test src/lib/cache.test.ts
```
## Changesets
After committing code changes, create a changeset for the affected package:
```md
---
"gitbook": patch
---
Provide a short description of the change.
```
Save as `.changeset/<name>.md`, then commit it separately with message: `changeset`
## Formatting
Uses Biome (not ESLint/Prettier). Always run `bun run format` before committing.
## Comments
Comment to explain *why*, not *what* — the code already shows what it does. Keep comments short, ideally a single line. Avoid multi-line block comments that narrate mechanics a reader can follow from the code; they add noise and go stale. Reserve longer comments for genuinely non-obvious rationale: a subtle invariant, or a workaround and the reason it exists.
-1
View File
@@ -1 +0,0 @@
@AGENTS.md

Some files were not shown because too many files have changed in this diff Show More