* Fix redirect for uppercased pathnames
* Try fixing it
* Try without metadataBase
* New try
* Fix it
* Try to fix og:image
* Generate canonical URL meta tag
* Cache getPublishedContentByUrl by tags
* Reduce amount of cases returned by getURLLookupAlternatives
* Optimize lookup even more for revisions / change-requests
* Fix basePath for revisions / crs
* Fix for RND-3192: images expanding card content beyond their width
* Wrap Image in a size-restricting container
---------
Co-authored-by: Viktor Renkema <vrenkema@gmail.com>
* Prevent scroll flickering when switching between page with scroll and no scroll
* Oups
* Remove id
* Apply only on large device and use variable
* Fix default
* Start
* Use MathJax v3
* Format
* Improve font-size
* Lint
* Better handle loading
* Copy MathJax assets to public folder
* Attempt at using local assets for MathJax
* Use bun 1.0.31
* Try with bun 1.0.33
* Try fixing headers
* Simplify
* Simplify and not use suspense module
* Cleanup more
* Add test for Math
* Make math block scroll if needed
* Update packages/react-math/src/KaTeX.tsx
Co-authored-by: Greg Bergé <berge.greg@gmail.com>
* Use React.use
* Format
* Use exports
* Lint
* Disable cache in CI for lint
* Format
---------
Co-authored-by: Greg Bergé <berge.greg@gmail.com>
* Resolve anchor content reference to the block text for mentions
* Only apply it for mentions/etc, where text is needed
* Handle tabs/expandable
* Rename to resolveAnchorText
* Fix an issue where clicking links to other spaces would not update ToC/header
* Fix
* Remove dev text
* Use URL.CanParse for testing the external url
---------
Co-authored-by: Samy Pessé <samypesse@gmail.com>
* Redirect to lowercase pathname when page path has uppercase
* Also redirect in generateMetadata
* Rollback changes in middleware normalizeURL
* Improve argument type
* Only redirect in page component
* improve top link vis queries & footer style fixes
* add ellipsis to menu items
* Add spacing to menu items
* Remove weird shadow
* Format
---------
Co-authored-by: Samy Pessé <samypesse@gmail.com>
* Optimize read of revisions with metadata=false when possible
* Format
* Fix
* Update src/components/AdminToolbar/AdminToolbar.tsx
Co-authored-by: Steven H <shne24@gmail.com>
---------
Co-authored-by: Steven H <shne24@gmail.com>
* Better handle immutable cache entries in memory/cf-cache
* Format
* Update src/lib/cache/utils.ts
Co-authored-by: Steven H <shne24@gmail.com>
---------
Co-authored-by: Steven H <shne24@gmail.com>
* Store setAt on cache meta and output stats on revalidation
* Delete from KV cache
* test more
* Improve
* Format
* Store the key in metadata
* Avoid storing too much in KV
* Don't put tag on resolve of url
* Try different approach
* Revalidate before cache expires
* TS
* Only replicate to local backends
* Ensure revalidate is done only once for the same key
* Improve perf of getCacheKey
* Simplify type
* Use better method and comment
* Use it 7 days only
* Simplify redis cache and remove hits count
* Fix naming
* Update src/lib/tracing.ts
Co-authored-by: Steven H <shne24@gmail.com>
---------
Co-authored-by: Steven H <shne24@gmail.com>
* Add unit tests for "race"
* Reduce to 80s
* Implement a Cloudflare KV cache
* Format
* Lint
* Fix tagging of entries in KV
* No longer use HTTP cache tags
* Simplify tags to only keep 2
* Implement a blockFallback logic
* Improve the block fallback logic
* More tests
* Start introducing a always optional signal on all cache ops
* Correctly pass signal end to end
* Fix one more case and add tests
* Fix it
* Add test for error
* Fix error handling
* Simplify even more
* Improve logs
* Improve logs / measurements
* Fix timing
* Fix read cache duration and add minor tests
* Log redis time
* Change replication logic
* Fix redis errors
* Log more
* More logs and test memory first
* Improve tracing for cache backends
* Ignore all dependencies
* Log the key in the cache low level traces
* Fix integrations blocks and text being too long
* Fix size of code blocks
* Open expandable by default on print mode
* Render tabs one after the other
* Adjust colors
* Open all in openapi when printing
* Fix title
* Format
* Fix TS
* Commit
* make light base lighter, improve table legiblity
* improve hover leg on toc
* improve tabs leg
* improve tab design
* improve expandable leg
* slight global color tweak
* hide debugger
* first pass at nested ordered list symbols
* remove margin inside lists
* V1 of nested bullets & fix header hash pos
* clean up
* convert listItem render to switch
* Improve lists
* improve heading hash
* fix list todos to match heading size too
* no need for inline-grid
---------
Co-authored-by: Samy Pessé <samypesse@gmail.com>
* Disable browser caching
* Improve cache read
* Fix
* Try using it for lookup
* Read before increment in redis
* Don't use multi
* Limit cache to 2min in cloudflare
* Cache in cloudflare but not in the browser
* Add classname
* Start applying it
* reset existing style changes in favor of global setup
* setup v1 plain mode
* fix name clash
* move light/dark bases as vars
* side image render fix
* customize individual light tiers for light mode
* Add comment about primary and base
* remove style prop from image
* w-unset not needed on image
---------
Co-authored-by: sebastiangraz <graz@live.se>
* Stream AI answers to questions
* Use a different polyfill
* Revert "Use a different polyfill"
This reverts commit b8474c56301faf3180eebf81f697703c31447500.
* Update api
* Patch event-source-polyfill to support Cloudflare
* Patch the min version
* Update api client and remove eventsource polyfill
* Cleanup
* fix tab multiline
* OpenAPI improvements (#127)
* Fix display of authentication infos
* Fix property names
* Fix body / request starting with oneOf
* CSS fixes
* Show description
* Format
* Fix code samples
* Convert swagger 2.0 to OpenAPI v3 (#128)
* Convert swagger 2.0 to OpenAPI 3
* Format
* Fix page with one api block shown as empty (#129)
* Fix page with one api block shown as empty
* Format
* Style sprint (#126)
* V1 code blocks fix
* equalize modal text label + fix safari bug with fixed position stroke
* code block adjustments
* fix search result spacing
* remove metal + adjust light and dark mode
* remove metal from tw config
* Add colordebugger + remove unused global colors
* correct opacities on all colors
* first part of cleaning up colors
* fix tab colors
* search modal color changes
* adjust global colors
* expandable + code color changes
* add delay to loading panes
* adjust globals
* improve select table type
* improve light mode checkbox
* fix delay
* content
* uncomment debug
* expandable fixes
* OpenAPI improvements (#127)
* Fix display of authentication infos
* Fix property names
* Fix body / request starting with oneOf
* CSS fixes
* Show description
* Format
* Fix code samples
* Fix empty API responses not being displayed (#130)
* Fix response not being displayed when contains no body
* Fix padding
* Resolve any JSON/YAML OpenAPI file and resolve common parameters (#132)
* Fix parsing of OpenAPI when content-type is unknown
* Resolve common parameters
* Format
* Add support for straight corners (#131)
* Add class to body and tailwind variant
* Use it on the search button
* Use it for buttons and cookies banner
* Use it for cards
* Use it in more places
* Lint
* More
* page feedback
* theme toggler
* Rename Authentication to Authorization (#133)
* remove unused color light-5
* fix dupe css
---------
Co-authored-by: Samy Pessé <samypesse@gmail.com>
* Add class to body and tailwind variant
* Use it on the search button
* Use it for buttons and cookies banner
* Use it for cards
* Use it in more places
* Lint
* More
* page feedback
* theme toggler
* Start methods to resolve refs
* bun
* Start package
* Add code to resolve ref
* Continue
* Deref
* Start monorepo
* Continue
* Fix ref resolver
* Style a bit more
* Start toggling section
* Continue
* Start displaying query/path/headers params
* Hide respo se if empty
* Fix recursive refs
* Simplify interactive and styling
* Display enums
* Format
* Improve type name being displayed
* Improve naming
* Render oneOf/anyOf/allOf
* Handle circular references
* Start variable in server url
* Use client component for the spec part
* Improve CSS sizing
* Display open api blocks in aside
* Make aside an overlay
* Improve stickiness of openapi
* Align document on the left when api page
* Improve general layout
* Better align
* Fix padding in aside
* Use syntax highlighting
* Show sample of response
* Improve code generation
* Improve code generated
* Format
* Format
* Rename to OpenAPI
* Skip deprecated properties and handle additionalProperties
* Use discriminator for naming
* Better name enum
* Make entire header toggeable
* Format and lint
* Add curl example
* Improve curl
* style pass
* Start securities
* Bun
* Fix TS
* Improve label
* Start markdown
* Improve code samples
* Test
* Use custom skeleton for api block
* Format
* Add support for redocly code samples
* Fix api blocks in aside
* Use typography for markdown
* Format
* Fix spacing in markdown
* Render headers
* Format
* Format
---------
Co-authored-by: Sebastian Graz <graz@live.se>
* Use input url instead of request url
* Improve cache purging
* Lint
* Fix TS
* Add method to delete from cloudflare
* Clear on all backends
* Fix
* Add global cloudflare tag
* First try
* Lint and format
* Use edge runtime
* Use envs for sentry
* Fix type
* Fix upload of sourcemaps
* Try fixing monitoring calls
* Fix gitbook/monitoring in middleware
* test error in middleware
* Define context on sentry data
* Set SENTRY_ENVIRONMENT to preview or production
* Format
* Pass url and userAgent
* Remove test cases
* Disable debug
* Remove ignoreBuildErrors
* Add tests for getURLLookupAlternatives
* Match correctly revisions and changes URLs
* Use revision and changerequets ID passed from lookup
* Prevent indexing these urls
* Start
* Start rendering toolbar
* Update api client
* Format
* Format
* Mock resolve of snippet
* Add test for revision
* Suspense boundary and progressive loading on blocks
* Start refactoring to better leverage app router
* Use skeleton for page layout
* Improve dynamic toc
* Switch page full width to be client side only
* Format
* Remove old PageLoading
* Fix first page not marked as active
* Close search when clicking search link
* Fix handling urls with direct space ID
* Preserve all search params when navigating in the PDF UI
* Show a trademark on the pdf page
* Generate proper trademark url
* Format
* Cleanup
* Add buttons to pdf page
* Present as page
* Fix break
* Show active page
* Add description
* Make buttons work
* Handle back link
* Show alert when reaching maximum
* Format
* Start
* Improve generation
* Improve style
* Lint
* Use tilde instead of dot in the url
* Improve style
* Fix page group
* Format
* Add visual tests for PDF
* Use caching for search/ask
* Refactor DocumentView to be ready to be used for other stuff
* Start logic to use document
* Fix comment
* Remove log
* Format and typecheck
* Add aria-label to cookies modal
* Test lighthouse
* Remove lighthouse as it doesn't work in bun
https://github.com/oven-sh/bun/issues/4958
* Translate everything in search
* Add cloudflare job to publish pages
* Try like this
* Fix build path
* Try end to end
* Fix installation
* Use var instead of secret for CLOUDFLARE_PROJECT_NAME
* Use new puppeteer mode
* Add more tests
* Run in parallel
* Go back to no-concurrency
* Test pagespeed
* Print output
* Fix thresholds
* Accept an option to purge without refreshing
* Store hits on the redis cache entry
* Revalidate first the entries with the most hits
* Format
* bun
* Ignore error from JSON.NUMINCRBY
* add search spinner
* better dark/light settings
* text color use textarea for input to get multiline
* fix fonts
* fix margins on result
* fix local ascent override, primary spinner color
* fix overflow
* fix overflow not scrolling all the way up
* testing hiding sidescroller on hover
* add better hover
* no-answer fix
* Store arguments and tags in redis cache
* Refactor cache to support revalidation
* Format
* Fix redis cache
* Try with both GT and NX
* Fix get from redis
* Fix json syntax
* New attempt
* Fix log
* Skip case where there is no key for tags
* New try
* Ignore when no tags is passed
* Optimize images using Cloudflare Images
* Try skipping middleware
* Make it work with base path
* Fetch image size
* Use a target instead of the cf fetch options
* Fix resizing
* Start optimizing images
* Preload images
* Use it for page cover
* Format and adapt cover
* Fix image resizing serving jpeg
* Lazy load dark mode images
* Timeout at 2s
* Fix iframe CSP
* Implement logic to lazy load images that should be offscreen
* Also lazy load cover images
* Low priority in preloading
* Fix csp
* Set colorSchema metadata
* Try CSP
* Move colorScheme to generateViewport
* Bun install
* Use wildcard for img-src and connect-src
* Allow all unsafe-inline for now for style
* Remove nonce for style
* Remove nonce for style
* Optimize data fetching with parallel requests
* Try to reuse memory cache between middleware and rendering in CF
* Comment
* Fetch document in parallel of collections
* Cleanup
* Log if redis is enabled for caching
* Fix memory cache before redis one
* Optimize alternatives being tested
* Implement a tagging logic for cache value
* Extract cache-tags from HTTP requests
* Auto-tag API cache entry
* Implement route
* Output cache-control and cache-tag
* Make the revalidate route a edge one
* Fallback to plain code block if syntax is not found
* Try with shikiji instead
* Fix css variables
* Try calling loadWasm
* Support highlighting for all languages of shikiji
* Remove shiki
* Install vscode-oniguruma
* Run bun
- Fix headings always showing hashtag
- replace slate-color with Gitbook brand everywhere
- add gitbook logo to TOC
- Style inline code blocks like `these`
- made TOC headings sticky to top on scroll
- Redesign the blockref component
- Nicer use of `ring` instead of `border` for layout separation
- hints remove blend mode on depth > 1
- hints icons animated
- Fix color theming on dropdown menu sub items
- figure out custom shadows for 1px stroke outside paragdim
- tab blocks add spacing between items
- set default accent/primary color if not set
* Hide title/description based on layout
* Hide aside based on page.layout.outline
* Hide pagination based on layout
* Hide table of contents based on layout
* add maxwidth limit for very large screens
* testing animation on hints
* page aside style on darkmode
* fix icon TOC
* Make scrollbars stable when overflowing
* fix scrollbar on search
* search compact header
* search style
* test without bg toc
* Commit
* setup before mobile TOC
* test if style{} clashes
* fix TOC hover
* add prevent default on search shortcut
* add deps
* Add header mobile menu setup
* work on fallback logo
* style search modal position
* style hamburger button
* padding
* add rudimental toggle
* comment
* gap value responsive
* remove slate
* fix z index
* undo test
* Install and format
---------
Co-authored-by: Samy Pessé <samypesse@gmail.com>
* Remove added line
* Improve gutter and prepare wrap
* Style layout of code blocks
* Start rendering annotation
* Test serverComponentsExternalPackages
* Directly import theme
* Use Tailwind with shiki
* Prepare idea on how to lazy load languages
* Start better matching with inlines
* Make test work
* Start loading more languages
* Start annotations
* Format
* Fix multiple lines
* bun install
* Move back to use the middleware as the main logic
* Fix link
* Improve lookup to support docs.gitbook.com.localhost:3000
* Make it work with dev url in prod for now
* Start lookup with API
* Continue
* Prepare for cloudflare build
* Dummy commit
* Try to abort requests
* Support x-forwarded-host
* Test multiple modes
* Add logs
* Add logs
* Update next
* Default to multi-path
* Switch back to nodejs runtime
* Adapt to staging API
* Make sure to return an absolute url for a redirect
* Update api client and try single request
* Try again with concurrent lookup
* Start fetching search using a server actions
* Format
* Keyboard navigation in search
* Highlight query in results
* Add translation to input placeholder
* Add placeholder when no results
Assistant: you can now send follow-up questions while an answer is still being written. Each one appears as your own message with a "Queued" badge (hover for when it will send, × to cancel), and they're sent automatically one at a time as each answer completes.
Fix the docs embed `navigateToPage` API on multi-space sites. Deep-linking to a page in a different space/section (e.g. `navigateToPage('/help-center/integrations')`) previously 404'd because the section base was not placed before `~gitbook/embed/page`. The target is now resolved to its space server-side, so pages in any space resolve correctly. The input accepts the page path, an absolute path, or the full published URL.
A near-white tint color (e.g. a warm `#F5F3EF`) is now taken as the exact page background, mirroring the existing behavior for near-black tints. The tint's exact lightness, hue and chroma are preserved, and the color is anchored to whichever scale step the active theme renders as the background — so it matches exactly on `muted` (which uses the second step) as well as `clean`. This applies only to near-neutral tints that are light enough to read as a background; saturated or merely light-ish colors keep their normal accent scale. The `bold` theme is unaffected: it already uses the tint for the header and stays intentionally two-tone.
Add an `askQuestion` tool to the site MCP server. Alongside `searchDocumentation` and `getPage`, MCP clients can now ask a natural-language question and get a synthesized answer with links to the source pages, powered by the same AI search backend as the site's "ask a question" experience. The tool accepts an optional `goal` param so calling agents can attach the intent they're trying to accomplish, which tailors the answer and is tracked in analytics. The tool is only exposed on sites that have AI enabled.
Remove GBO's redundant re-selection of the best-scoring search section. The search API now returns a single highest-scoring section per page (and orders sections highest-score-first), so GBO no longer needs its own `getBestScoredResult` helper to pick the best section for the search and MCP previews. No user-visible change.
Sync the API reference responses selector with the "Responses" collapsibles, and keep the selected response in sync across every operation on the page (like the code sample language selector). Selecting a status code now expands the matching response section and applies to all operations at once.
Fix a light/dark flash on published sites configured to respect the system default (no theme toggle). Such sites forced the `system` theme, but `next-themes`' pre-paint script applies a forced value verbatim without resolving `prefers-color-scheme`, so the page painted light and only switched to dark after hydration. We now leave the theme unforced when the default is `system` (only concrete light/dark themes are forced), letting `next-themes`' existing pre-paint script resolve the system preference before first paint.
Add a `sendFeedback` MCP tool so AI agents can report documentation findings (outdated / incoherent / gap / other) as `agent_feedback` insights events. The tool only accepts finding categories, so it never records positive feedback.
Separate the prompt block actions into a primary "Open in" dropdown and a secondary "Copy prompt" button, instead of a single combined button group, and align the block's design with the expandable block (bordered frame, left disclosure chevron, and subtle elevation when expanded).
Fix the docs embed widget shipping a stale script: declare the embed package's `standalone/` bundle as a Turbo build output. Because it wasn't declared, changes confined to the standalone widget (which compiles to `standalone/` but not `dist/`) didn't invalidate the downstream `generate` cache that copies it into the app, so the deployed widget could lag the source — e.g. the `clipboard-write` permission on the widget iframe never reached production, breaking the copy button in the Assistant embed.
Refine the per-paragraph AI ask button: shorten its tooltip to "Ask" (from "Ask <assistant> about this"), and hide it inside cards where it would otherwise be clipped by the card's overflow.
Keep the "On this page" and "Ask" buttons pinned below the header while scrolling on desktop API reference pages, so the page outline stays reachable throughout long operations.
Only show the "Back to [space]" shortcut for cross-space links in the table of contents, not for in-content text links or other ways of reaching another space.
Let integration block webframes navigate the reader to another page in the site by posting a `@webframe.navigate` action with a `path` (and optional `anchor`). Resolved client-side against the site base path, so navigation stays in-site and drives the standard navigation progress bar.
> _For help, support, feature requests, and product questions - head to our [GitHub Community](https://github.com/orgs/GitbookIO/discussions) 🤖_
Thank you for investing your time in contributing to GitBook. Any contribution you make will be reviewed by our team. In this guide, you'll learn the different ways you can contribute.
## Types of Contributions
This repository contains code related to the rendering engine of GitBook's published content. Depending on what you'd like to contribute to, head to the section below to find the necessary steps.
### Add a feature
Because this portion of GitBook is open source and available for you to use - if you think you can provide extra value through a new feature - you're welcome to add it! If you plan to distribute the code, keep the source code public to comply with GNU GPLv3. To clone in a private repository, you must first acquire a [commercial license](https://www.gitbook.com/pricing).
### Create a new issue
If you spot a problem within a repository, [search if an issue already exists](https://docs.github.com/en/github/searching-for-information-on-github/searching-on-github/searching-issues-and-pull-requests#search-by-the-title-body-or-comments). If a related issue doesn't exist, you can open a new issue here!Please make sure any added issues are
- Descriptive
- Thoughtful
- Organized
We recommend adding as many relevant links, minimal reproductions of the issue, and other materials that will help our team solve the issue fast.
### Solve an issue
If you're interested in solving an issue in our repository, start by scanning through it's exisiting issues to find one that you're interested in working on. If you find an issue to work on, you are welcome to open a PR with a fix. See the following sections below for more information on contributing for specific sections.
### Documentation
The official documentation on GitBook open can be found directly in this Readme. Any updates or changes you would like to make, you can make directly to the README of this repository.
## Contributing
### Make changes locally
Any contribution you make can be made to the code located in this repository. In order to contribute, you'll need to start off of a local version of this repository.
#### 1. Fork the repository
##### Using GitHub Desktop:
- [Getting started with GitHub Desktop](https://docs.github.com/en/desktop/installing-and-configuring-github-desktop/getting-started-with-github-desktop) will guide you through setting up Desktop.
- Once Desktop is set up, you can use it to [fork the repo](https://docs.github.com/en/desktop/contributing-and-collaborating-using-github-desktop/cloning-and-forking-repositories-from-github-desktop)!
##### Using the command line:
- [Fork the repo](https://docs.github.com/en/github/getting-started-with-github/fork-a-repo#fork-an-example-repository) so that you can make your changes without affecting the original project until you're ready to merge them.
#### 2. Create a working branch and start with your changes
After forking this repository, you'll want to [create a branch](https://docs.github.com/en/issues/tracking-your-work-with-issues/creating-a-branch-for-an-issue) to work off of.
#### 3. Install dependencies and run the project locally
##### Prerequisites:
- [Node.js](https://nodejs.org/en) (see "engines" in `package.json`)
- [Bun](https://bun.sh/) (see "packageManager" in `package.json`)
##### Setup steps:
1. Ensure you are using the project's version of Node:
```bash
nvm use
```
2. Install dependencies using Bun:
```bash
bun install
```
3. Start the development server:
```bash
bun dev
```
Additional development commands:
-`bun format`: Format the code using Biome
-`bun typecheck`: Run TypeScript type checking
-`bun unit`: Run unit tests
-`bun e2e`: Run end-to-end tests
#### 4. Preview your changes
When running the development server, published GitBook sites can be rendered through your local version at `http://localhost:3000/url`.
For example, our published docs can be viewed using the local version by visiting `http://localhost:3000/url/gitbook.com/docs` after running the development server.
You can visit any published GitBook site behind your development server. Please make sure your site is [published publicly](https://gitbook.com/docs/published-documentation/publish-your-content-as-a-docs-site) to ensure you can view the site correctly in your development version.
### Commit your update
[Commit your changes](https://github.com/git-guides/git-commit) once you are happy with them. See [Atom's contributing guide](https://github.com/atom/atom/blob/master/CONTRIBUTING.md#git-commit-messages) to know how to use emoji for commit messages!
Once your changes are ready, don't forget to self-review your code to double check that your chagnes are ready to be added.
### Pull Request
When you're finished with the changes, [create a pull request](https://docs.github.com/en/pull-requests/collaborating-with-pull-requests/proposing-changes-to-your-work-with-pull-requests/creating-a-pull-request), also known as a PR.
- Don't forget to [link PR to issue](https://docs.github.com/en/issues/tracking-your-work-with-issues/linking-a-pull-request-to-an-issue) if you are solving one.
- Enable the checkbox to [allow maintainer edits](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/allowing-changes-to-a-pull-request-branch-created-from-a-fork) so the branch can be updated for a merge. Once you submit your PR, a GitBook team member will review your proposal. We may ask questions or request for additional information.
- We may ask for changes to be made before a PR can be merged, either using [suggested changes](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/incorporating-feedback-in-your-pull-request) or pull request comments. You can apply suggested changes directly through the UI. You can make any other changes in your fork, then commit them to your branch.
- As you update your PR and apply changes, mark each conversation as [resolved](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/commenting-on-a-pull-request#resolving-conversations).
- If you run into any merge issues, checkout this [git tutorial](https://lab.github.com/githubtraining/managing-merge-conflicts) to help you resolve merge conflicts and other issues.
### Your PR is merged
Congratulations 🎉 Thank you for your contribution! Once your PR is merged, your contributions will be publicly visible on the relevant repository.
description:Use gradual deployment to deploy to Cloudflare. This action will upload the middleware and server versions to Cloudflare and kept them bound together
inputs:
apiToken:
description:'Cloudflare API token'
required:true
accountId:
description:'Cloudflare account ID'
required:true
environment:
description:'Cloudflare environment to deploy to (staging, production, preview)'
bun run unit # Unit tests via bun test (not vitest)
bun run e2e # Playwright e2e tests (requires built app)
```
Run a specific test file:
```bash
cd packages/gitbook && bun test src/lib/cache.test.ts
```
## Changesets
After committing code changes, create a changeset for the affected package:
```md
---
"gitbook": patch
---
Provide a short description of the change.
```
Save as `.changeset/<name>.md`, then commit it separately with message: `changeset`
## Formatting
Uses Biome (not ESLint/Prettier). Always run `bun run format` before committing.
## Comments
Comment to explain *why*, not *what* — the code already shows what it does. Keep comments short, ideally a single line. Avoid multi-line block comments that narrate mechanics a reader can follow from the code; they add noise and go stale. Reserve longer comments for genuinely non-obvious rationale: a subtle invariant, or a workaround and the reason it exists.
All notable changes to this project will be documented in this file.
This project adheres to [Semantic Versioning](http://semver.org/).
## 3.0.0 (pre)
- Summary can contain external links and anchors (Fix [#776](https://github.com/GitbookIO/gitbook/issues/776))
- Summary can contain differents entitled sections
- Glossary is generated as a normal page
- Headings are no longer annotated with glossary terms
- Themes are now published as a plugin, with ability to extend it from the book source
-`links.sidebar` configuration is no longer supported, use summary sections instead
-`pdf.headerTemplate` and `pdf.footerTemplate` have been replaced by a template in theme/book: `_layout/ebook/pdf_header.html` and `_layout/ebook/pdf_footer.html`
- Markdown parser is now using CommonMark
- Root folder for the book can be specified in a `.gitbook` file
- Multi-lingual books share assets folder
- YAML front matter is parsed and can extend page's properties
- Fix `uk` translation
- Fix heading ID including dashes
- Fix error in code highlighting for unknown languages
- Accept SSH url as plugin version
- Add templating blocks `markdown`, `asciidoc` and `markup`
## 2.6.7
- Fix bug with filenames including spaces
- Add Turkish and Catalan translations
## 2.6.6
- Fix custom CSS that are generated by plugins for PDF output
## 2.6.5
- Fix support for plugins generating custom stylesheets (`styles-less` and `styles-sass`)
- Fix glossary terms being replaced in script (ex: math)
## 2.6.4
- Fix regression introduced by `2.6.3` of single HTML tags in markdown
## 2.6.3
- Fix parsing bug with inline HTML in Markdown
## 2.6.2
- Fix `gitbook.state.bookRoot`, `gitbook.state.root` now has a trailing slash
- Update nunjucks to 2.2.0
## 2.6.1
- Use CamelCase for `gitbook.state.innerLanguage`
## 2.6.0
- Close sidebar after clicking a link on mobile
- Add root for multilingual books: `gitbook.state.bookRoot`
- Fix calcul of `gitbook.state.root` when serving HTML index as `/`
## 2.5.0
- Font settings, sharing and search are externalized as default plugins
- Plugins can define a configuration schema in the manifest, this schema will be used to validate configuration during build
- New Node.js API for plugin: `book.formatString(type, content)`
- New client side API for website plugins: `gitbook.toolbar.createButton(opts)`
- Better header/footer for PDF, CSS wil be inlined to easily style the header/footer
- Cleaner table of contents for ebooks
- Support for RTL in ebook's table of contents
- Better colors for mobi (links and code blocks)
- Fix installation of plugins when using a pre-release
- Fix support for pre-releases
- Update asciidoc parser to remove git dependency
- Fix templating in imported content
- Fix querystring in image urls
- Normalize heading IDs like GitHub
- Use Arial as default font for PDFs
- Add `root`, `chapterTitle` and `filepath` to `gitbook.state` JS API
## 2.4.3
- Add ukrainian translation (`uk`)
- Add `book.json` configuration for maximum size of search index
- Improve reliability of summary parser
## 2.4.2
- Default plugins should not be installed by `gitbook install`
- Limit search index size to avoid crash during generation
- Fix code highlighting for html without language specified
- Fix warning message for gitbook version when building a multilingual book
## 2.4.1
- Fix disabling of default plugins, ex: `-highlight`
## 2.4.0
- Fix page being updated when user wants to open a link in a new tab
- Plugins can now replaced default code highlighter
- Add semantic information for screen readers (web version)
- Content references accept absolute paths, resolved to book folder
- Improve overall reliability
## 2.3.3
- Fix bug in SUMMARY parsing preventing multiple entries without filenames
## 2.3.2
- Fix blocks (like maths) in Asciidoc
- Fix error when checking gitbook version
## 2.3.1
- Fix black font color for ebooks (mobi, pdf and epub)
- Fix ISO code for korean language
- Fix korean translation
- Fix syntax highlighting for asciidoc
- Fix inline html escaping in markdown
- Add warning for file outside SUMMARY
- Force SUMMARY entries to be unique by filename
## 2.3.0
- Fix nunjucks issue with multiple `{% raw %}` blocks
- Fix crash when git conref failed
- Fix crash when failed to download remote image (better error message)
- Fix flicking effect when changing page (big UX improvement)
- Add Hebrew translation (`he`)
- Add utility method `book.config.get` for plugins
- Hooks `page:before` and `page` are no longer deprecated
- Remove webfonts to make website lighter
- Make glossary's order case insensitive
## 2.2.0
- Fix direction in code blocks (always LTR)
- Add options `chapterMark` and `pageBreaksBefore` for PDF
- Update code highlighting library
-`book.json` accessible as `config` in templating syntax
- Add Vietnamese translation (`vi`)
## 2.1.0
- Fix error in calcul of `levels` in table of contents, error introduced a few versions ago
- Add optional `styles/print.css` to replace `print.css` used in ebook
## 2.0.4
- Fix `{% raw %}`, got confused with "fake" variable declarations
- Fix title of language chooser
- Fix the X-UA-Compatible meta tag
- Move style sheets to the <head> section
## 2.0.3
- Fix `gitbook init` for SUMMARY with empty entries
- Fix escaping of code blocks in markdown
## 2.0.2
- Fix relative links in windows
- Improve watcher in serve command (switch to chokidar)
- Add Romanian translation (`ro`)
- Add Finish translation (`fi`)
- Add Japanese translation (`jp`)
- Add Korean translation (`kr`)
## 2.0.1
- Improve error logging (display file, line and column)
- Add back support for `options.originalInput`
- Don't process math in markdown parser (delegated to `mathjax` plugin)
- Fix some cases of code blocks escaping
- Fix i18n for introduction title in json format
- Fix reload when book configuration is updated
- Fix backslashes in url when building on windows
## 2.0.0
- Fix page title of introduction
- Ignore codeblocks when replacing glossary terms
- Improve Unit Tests
- Fix scrolling position in website when preparing page
## 2.0.0-beta.5
- Fix progress order in json format
## 2.0.0-beta.4
- Fix default generator for use programmatically
- Add option "author" for html meta tags
- Fix links normalization (content and hash)
## 2.0.0-beta.3
- Fix odd cases with code blocks escaping
## 2.0.0-beta.2
- Fix definition of entry point title using SUMMARY.md
## 2.0.0-beta.1
- Fix windows incompatibility
- Add support for rtl (enabled by default for `ar` and `fa`)
- Escape code blocks in markdown parser
- Add Persian/Farsi translation (`fa`)
- Add Arabic translation (`ar`)
- Add Bengali translation (`bn`)
- Provide generator name in template context
## 2.0.0-alpha.9
- Fix links in sidebar
- Fix normalization of html link (README to index)
- Fix html snippets escaping
## 2.0.0-alpha.8
- Improve locale detection for i18n
- Fix chapter name for Glossary in pdf
- Don't escape html in glossary items
- Fix generation of multilingual book as ebook
- Add "post" block attribute to post-process
## 2.0.0-alpha.7
- Fix display of glossary in ebook formats
- Add default footer and header to pdf
- Fix generation of json format compatible with 1.x.x
- Add Simplifiled Chinese and Traditional Chinese translations
## 2.0.0-alpha.6
- Add es and pt translations
- Fix replacement of glossary terms
## 2.0.0-alpha.5
- Fix copy of files/covers
- Add back `finish:before` hook
## 2.0.0-alpha.4
- Fix copy of cover for multilingal books
## 2.0.0-alpha.3
- Norwegian translation
- Load plugins from book in priority
## 2.0.0-alpha.3
- Fix init command
- Update parsers to fix spaces in summary (`gitbook-parsers@0.3.1`)
## 2.0.0-alpha.1
- Externalize parsing into `gitbook-parsers` module
- Supports AsciiDoc and reStructuredText
- Hooks for page (`page:*`) are now deprecated, plugins should extend filters and blocks instead
- Hooks `summary` and `glossary` (after and before) have been removed
- Exercises and Quizzes are no longer parsed in the markdown parser
- Support for more markdown extensions: `.markdown`, `.mdown`
- Templates are rendered with nunjucks instead of swig, syntax is almost compatible, there is some changes with contexts and filters. `{{ super() }}` should be use instead of `{% parent %}`
- Clean output folder on build without removing `.git` and `.svn`
- MathJAX is no longer a default plugin
- SVG images are converted to PNG during generation of ebooks
- i18n in website and ebook (ru, it, de, fr)
- New templating syntax
- Content references (both internal and external)
- Glossary terms are handled during generation (also in ebook format)
## 1.5.0
- Fix `serve` command, broken by `1.4.2`
- Add nicer `dark` theme :)
## 1.4.2
- Force `process.exit` after builds, to prevent (possibly) lingering plugins
## 1.4.1
- Fix command 'install' without arguments
## 1.4.0
- Add command `gitbook install` to install plugins from book.json
-`package.json` is no longer necessary
## 1.3.4
- Add glossary to ebooks
- Fix autocover with new hook "finish:before"
- Add X-UA-Compatible meta tag for IE
## 1.3.3
- Fix parsing of lexed content using the client library
## 1.3.2
- ePub files are now passing validation from epubcheck
- Fix replacement of multiple glossary terms in a single sentence
- Fix on windows deep relative links
- Fix search indexer
## 1.3.1
- Fix error with links in markdown
## 1.3.0
- Bundle gitbook parsing library as a client side library in `gitbook.js` and `gitbook.min.js`
## 1.2.0
- Improvements on ebook generation
- Fix incorrect follow of links in ebook generation
- Move Table of Contents at the beginning of the ebook
- Update to last highlight.js (includes Swift)
- Includes of templates and variables (from book.json)
## 1.1.1
- Rewrite quiz logic to be more robust
- Improve integration of glossary
- Improve generation of ebook by using a multiple HTML pages input source
- Fix incorrect page breaks after h1 and h2 divs
- New options to set header and footer in PDF generation
## 1.1.0
- Plugins can now extend the ebook generation (pdf, epub, mobi)
- Update `kramed` to version 0.4.3
## 1.0.3
- Update `mathjax` plugin and MathJAx to version 2.4
- Update `highlight.js` to 8.2.0
## 1.0.2
- Update `mathjax` plugin, fixes issues with inline math rendering (no longer wanted)
## 1.0.1
- New inline math convention (kramdown's), using `$$` rather than `$` as delimiters
- Fix instapaper sharing
- The `exercises` & `quizzes` plugins are now by default
## 1.0.0
- New design
- Support for glossary
- Support for sharing to instapaper
- Support for footnotes
## 0.7.1
- Update `fs-extra` to `0.10.0` (fixes potential race conditions)
## 0.7.0
- Add page break in ebook (pdf, epub, mobi) between chapters/articles
- Start using kramed instead of marked
- Fix display of inline math
- Switch to graceful-fs to fix EMFILE errors
- Add sharing to weibo.com
## 0.6.2
- Support generating a plugin's book info dynamically
- Improve navigation on dark theme
- Improve path normalization when parsing SUMMARY.md
GitBook is a command line tool (and Node.js library) for building beautiful books using GitHub/Git and Markdown (or AsciiDoc). Here is an example: [Learn Javascript](https://www.gitbook.com/book/GitBookIO/javascript).
You can publish and host books easily online using [gitbook.com](https://www.gitbook.com). A desktop editor is [also available](https://www.gitbook.com/editor).
Check out the [GitBook Community Slack Channel](https://slack.gitbook.com), Stay updated by following [@GitBookIO](https://twitter.com/GitBookIO) on Twitter or [GitBook](https://www.facebook.com/gitbookcom) on Facebook.
<p align="center">Welcome to GitBook, the platform for managing technical knowledge for teams.</p>
Complete documentation is available at [toolchain.gitbook.com](http://toolchain.gitbook.com/).
<p align="center">This repository contains the open source code used to render GitBook's published content.</p>
<img alt="GitBook Open Published Site" src="./assets/published-site.png">
</p>
## Getting started
## Table of Contents
GitBook can be used either on your computer for building local books or on GitBook.com for hosting them. To get started, check out [the installation instructions in the documentation](docs/setup.md).
- [Getting Started](#getting-started)
- [Contributing](#contributing)
- [Types of contributions](#types-of-contributions)
- [Licensing](#license)
- [Acknowledgements](#acknowledgements)
- [Legacy GitBook](#legacy-gitbook-deprecated)
## Usage examples
## Getting Started
GitBook can be used to create book, public documentation, enterprise manual, thesis, research papers, etc.
To run a local version of this project, please follow these simple steps.
You can find a [list of real-world examples](docs/examples.md) in the documentation.
### Prerequisites
## Help and Support
- Node.js (Version: >= 22.3)
- Use nvm for easy Node management
- [Bun](https://bun.sh/) (Version: >=1.2.15)
- We use a text-based lockfile which isn't supported below 1.2.15
We're always happy to help out with your books or any other questions you might have. You can ask a question on the following contact form at [gitbook.com/contact](https://www.gitbook.com/contact) or signal an issue on [GitHub](https://github.com/GitbookIO/gitbook).
### Set up
## Features
1. Clone the repo into a **public** GitHub repository. If you plan to distribute the code, keep the source code public to comply with GNU GPLv3. To clone in a private repository, acquire a [commercial license](https://www.gitbook.com/pricing).
* Write using [Markdown](http://toolchain.gitbook.com/syntax/markdown.html) or [AsciiDoc](http://toolchain.gitbook.com/syntax/asciidoc.html)
* Output as a website or [ebook (pdf, epub, mobi)](http://toolchain.gitbook.com/ebook.html)
2. Ensure you are using the project's version of `node`. Running `nvm use` will change your local version to the correct one.
The platform [GitBook.com](https://www.gitbook.com/) is like an "Heroku for books": you can create a book on it (public, or private) and update it using **git push**.
3. Install the project's dependencies through Bun.
## Licensing
```
bun install
```
GitBook is licensed under the Apache License, Version 2.0. See [LICENSE](LICENSE) for the full license text.
4. Start your local development server.
```
bun dev
```
6. Open a published GitBook space in your web browser, prefixing it with `http://localhost:3000/url`.
Any published GitBook site can be accessed through your local development instance, and any updates you make to the codebase will be reflected in your browser.
### CI and testing
All pull-requests will be tested against both visual and performances testing to prevent regressions.
## Fonts and Icons
GitBook Open uses fontawesome. For self-hosting and local development, for licensing reasons, only the icons from the free version should be used.
## Contributing
GitBook's rendering engine is fully open source and built on top of [Next.js](https://nextjs.org/). Head to our [contributing guide](https://github.com/GitbookIO/gitbook/blob/main/.github/CONTRIBUTING.md) to learn more about the workflow on adding your first Pull Request.
### Types of contributions
We encourage you to contribute to GitBook to help us build the best tool for documenting technical knowledge. If you're looking for some quick ways to contribute, continue reading to learn more about popular contributions.
#### Translations
The GitBook UI is rendered using a set of translation files found in [`packages/gitbook/src/intl/translations`](/packages/gitbook/src/intl/translations/). We welcome all additional translations for the UI.
#### Bugs
Encounter a bug or find an issue you'd like to fix? Helping us fix issues related to GitBook greatly improves the experience for everyone. Head to the issues section of this repository to learn more about the types of bugs you can already help out with.
## Deployment
> [!WARNING]
> While it is possible to self-host this project, we do not recommend this unless you are certain this option fits your need.
>
> _Looking to add a specific feature in GitBook? Head to our [contributing guide](https://github.com/GitbookIO/gitbook/blob/main/.github/CONTRIBUTING.md) to get started._
>
> Self-hosting this project puts the responsibility of maintaining and merging future updates on **you**. We cannot guarantee support, maintenance, or updates to forked and self-hosted instances of this project.
>
> We want to make it as easy as possible for our community to collaborate and push the future of GitBook, which is why we encourage you to contribute to our product directly instead of creating your own version.
This project allows you to self-host the rendering portion of your GitBook published content. Self-hosting has pros and cons.
On the pro side, you can customize the look and feel of your content, and better embed your documentation in your application.
On the con side, you become responsible for the reliability of your published site, and keeping the renderer up-to-date with the changes made to the GitBook platform.
## License
Distributed under the [GNU GPLv3 License](https://github.com/GitBookIO/gitbook/blob/main/LICENSE).
If you plan to distribute the code, you must make the source code public to comply with the GNU GPLv3. To clone in a private repository, acquire a [commercial license](https://www.gitbook.com/pricing).
Our previous version of GitBook and it's CLI tool are now deprecated. You can still view the old repository and it's commits on this [branch](https://github.com/GitbookIO/gitbook/tree/legacy).
This document aims to be a comprehensive guide to GitBook. It contains the full documentation for version **{{ book.version }}**. Help for GitBook.com specific questions can be found at [help.gitbook.com](https://help.gitbook.com).
### What is GitBook?
GitBook is a command line tool (and Node.js library) for building beautiful books using GitHub/Git and Markdown (or AsciiDoc). . This documentation has been generated using GitBook.
GitBook can output your content as a website ([customizable](themes/README.md) and [extensibles](plugins/README.md)) or as an ebook (PDF, ePub or Mobi).
[GitBook.com](https://www.gitbook.com) is the online platform to create and host books built using the GitBook format. It offers hosting, collaboration features and an [easy-to-use editor](https://www.gitbook.com/editor).
### Help and Support
We're always happy to help out with your books or any other questions you might have. You can ask a question on the following contact form at [gitbook.com/contact](https://www.gitbook.com/contact) or signal an issue on [GitHub](https://github.com/GitbookIO/gitbook).
Check out the [GitBook Community Slack Channel](https://slack.gitbook.com), Stay updated by following [@GitBookIO](https://twitter.com/GitBookIO) on Twitter or [GitBook](https://www.facebook.com/gitbookcom) on Facebook.
### FAQ
Some questions are frequently asked. If you have a problem you should [check this out](faq.md) first.
### Contribute to this documentation
You can contribute to improve this documentation on [GitHub](https://github.com/GitbookIO/gitbook) by signaling issues or proposing changes.
GitBook allows you to customize your book using a flexible configuration. These options are specified in a `book.json` file. For authors unfamiliar with the JSON syntax, you can validate the syntax using tools such as [JSONlint](http://jsonlint.com).
### General Settings
| Variable | Description |
| -------- | ----------- |
| `root` | Path to the root folder containing all the book's files, except `book.json`|
| `title` | Title of your book, default value is extracted from the README. On GitBook.com this field is pre-filled. |
| `description` | Description of your book, default value is extracted from the README. On GitBook.com this field is pre-filled. |
| `author` | Name of the author. On GitBook.com this field is pre-filled. |
| `isbn` | ISBN of the book |
| `language` | [ISO code](https://en.wikipedia.org/wiki/List_of_ISO_639-1_codes) of the book's language, default value is `en` |
| `direction` | Text's direction. Can be `rtl` or `ltr`, the default value depends on the value of `language` |
| `gitbook` | Version of GitBook that should be used. Uses the [SemVer](http://semver.org) specification and accepts conditions like `">= 3.0.0"` |
### Plugins
Plugins and their configurations are specified in the `book.json`. See [the plugins section](plugins/README.md) for more details.
| Variable | Description |
| -------- | ----------- |
| `plugins` | List of plugins to load |
| `pluginsConfig` |Configuration for plugins |
### Theme
Since version 3.0.0, GitBook can use themes. See [the theming section](themes/README.md) for more details.
| Variable | Description |
| -------- | ----------- |
| `theme` | The theme to use for the book |
### PDF Options
PDF Output can be customized using a set of options in the `book.json`:
| Variable | Description |
| -------- | ----------- |
| `pdf.pageNumbers` | Add page numbers to the bottom of every page (default is `true`) |
| `pdf.fontSize` | Base font size (default is `12`) |
| `pdf.fontFamily` | Base font family (default is `Arial`) |
| `pdf.paperSize` | Paper size, options are `'a0', 'a1', 'a2', 'a3', 'a4', 'a5', 'a6', 'b0', 'b1', 'b2', 'b3', 'b4', 'b5', 'b6', 'legal', 'letter'` (default is `a4`) |
| `pdf.margin.top` | Top margin (default is `56`) |
| `pdf.margin.bottom` | Bottom margin (default is `56`) |
| `pdf.margin.right` | Right margin (default is `62`) |
| `pdf.margin.left` | Left margin (default is `62`) |
GitBook can generates a website, but can also output content as ebook (ePub, Mobi, PDF).
### Installing ebook-convert
`ebook-convert` is required to generate ebooks (epub, mobi, pdf).
##### OS X
Download the [Calibre application](https://calibre-ebook.com/download). After moving the `calibre.app` to your Applications folder create a symbolic link to the ebook-convert tool:
description: Real world examples of content published using GitBook.
---
# Examples
More than 50,000 books have been published on [GitBook.com](https://www.gitbook.com/explore).
### Books
- [Front-end Handbook](https://www.gitbook.com/book/frontendmasters/front-end-handbook/details) by [Cody Lindley](http://codylindley.com)
- [How to make an Operating System](https://www.gitbook.com/book/samypesse/how-to-create-an-operating-system/details) by [@SamyPesse](https://github.com/SamyPesse)
- [Building Web Apps with Go](https://www.gitbook.com/book/codegangsta/building-web-apps-with-go/details) by [@codegangsta](https://github.com/codegangsta)
- [Django Girls Tutorial](http://tutorial.djangogirls.org/en/index.html) by [Django Girls](https://djangogirls.org)
- [Linux Inside](https://www.gitbook.com/book/0xax/linux-insides/details) by [0xAX](https://twitter.com/0xAX)
- [Learn Javascript](https://www.gitbook.com/book/gitbookio/javascript/details) by [GitBook](https://twitter.com/GitbookIO)
### Research Papers
- [TowCenter Collection](https://www.gitbook.com/@towcenter) by [Columbia Journalism School](http://www.journalism.columbia.edu/)
- [Block Relaxation Algorithms in Statistics](https://www.gitbook.com/@jandeleeuw) by Jan de Leeuw
### Documentation
- [DuckDuckHack Documentation](http://docs.duckduckhack.com) by [DuckDuckGo](https://duckduckgo.com/about)
This page gathers common questions and answers concerning the GitBook format and toolchain.
Questions about GitBook.com and the Editor are gather into the [help.gitbook.com's FAQ](http://help.gitbook.com/faq.html).
#### How can I host/publish my book?
Books can easily be published and hosted on [GitBook.com](https://www.gitbook.com). But GitBook output can be hosted on any static file hosting solution.
#### What can I use to edit my content?
Any text editor should work! But we advise using the [GitBook Editor](https://www.gitbook.com/editor). [GitBook.com](https://www.gitbook.com) also provides a web version of this editor.
---
#### Does GitBook supports RTL/bi-directional text ?
The GitBook format supports right to left, and bi-directional writing. To enable it, you either need to specify a language (ex: `ar`), or force GitBook to use RTL in your `book.json`:
``` json
{
"language": "ar",
"direction": "rtl"
}
```
With version 3.0 of GitBook, it's automatically detected according to the content.
_Note that, while the output book will indeed respect RTL, the Editor doesn't support RTL writing yet_.
#### Should I use an `.html` or `.md` extensions in my links?
You should always use paths and the `.md` extensions when linking to your files, GitBook will automatically replace these paths by the appropriate link when the pointing file is referenced in the Table of Contents.
#### Can I create a GitBook in a sub-directory of my repository?
Yes, GitBooks can be created in [sub-directories](structure.md#subdirectory). GitBook.com and the CLI also looks by default in a serie of [folders](structure.md).
#### Does GitBook supports RTL languages?
Yes, GitBook automatically detect the direction in your pages (`rtl` or `ltr`) and adjust the layout accordingly. The direction can also be specified globally in the [book.json](config.md).
---
#### Does GitBook support Math equations?
GitBook supports math equations and TeX thanks to plugins. There are currently 2 official plugins to display math: [mathjax](https://plugins.gitbook.com/plugin/mathjax) and [katex](https://plugins.gitbook.com/plugin/katex).
#### Can I customize/theme the output?
Yes, both the website and ebook outputs can be customized using [themes](themes/README.md).
#### Can I add interactive content (videos, etc)?
GitBook is very [extensible](plugins/README.md). You can use [existing plugins](https://plugins.gitbook.com) or create your own!
GitBook supports building books written in multiple languages. Each language should be a sub-directory following the normal GitBook format, and a file named `LANGS.md` should be present at the root of the repository with the following format:
```markdown
# Languages
* [English](en/)
* [French](fr/)
* [Español](es/)
```
### Configuration for each language
When a language book (ex: `en`) has a `book.json`, its configuration will extend the main configuration.
The only exception is plugins, plugins are specified globally, and language specific plugins cannot be specified.
Allows you to specify terms and their respective definitions to be displayed as annotations. Based on those terms, GitBook will automatically build an index and highlight those terms in pages.
GitBook uses a `SUMMARY.md` file to define the structure of chapters and subchapters of the book. The `SUMMARY.md` file is used to generate the book's table of contents.
The format of `SUMMARY.md` is just a list of links. The link's title is used as the chapter's title, and the link's target is a path to that chapter's file.
Adding a nested list to a parent chapter will create subchapters.
##### Simple example
```markdown
# Summary
* [Part I](part1/README.md)
* [Writing is nice](part1/writing.md)
* [GitBook is nice](part1/gitbook.md)
* [Part II](part2/README.md)
* [We love feedback](part2/feedback_please.md)
* [Better tools for authors](part2/better_tools.md)
```
Each chapter has a dedicated page (`part#/README.md`) and is split into subchapters.
##### Anchors
Chapters in the Table of Contents can be pointing to specific part of a file using anchor.
```markdown
# Summary
### Part I
* [Part I](part1/README.md)
* [Writing is nice](part1/README.md#writing)
* [GitBook is nice](part1/README.md#gitbook)
* [Part II](part2/README.md)
* [We love feedback](part2/README.md#feedback)
* [Better tools for authors](part2/README.md#tools)
```
##### Parts
The Table of Contents can be divided into parts separated by headings or horizontal lines:
```markdown
# Summary
### Part I
* [Writing is nice](part1/writing.md)
* [GitBook is nice](part1/gitbook.md)
### Part II
* [We love feedback](part2/feedback_please.md)
* [Better tools for authors](part2/better_tools.md)
----
* [Last part without title](part3/title.md)
```
Parts are just groups of chapters and do not have dedicated pages, but according to the theme, it will show in the navigation.
### Pages
#### Markdown syntax
Most of the files for GitBook use the Markdown syntax by default. GitBook infers your pages's structure from it. The syntax used is similar to the [GitHub Flavored Markdown syntax](https://guides.github.com/features/mastering-markdown/). One can also opt for the [AsciiDoc syntax](asciidoc.md).
##### Example of a chapter file
``` markdown
# Title of the chapter
This is a great introduction.
## Section 1
Markdown will dictates _most_ of your **book's structure**
## Section 2
...
```
#### Front Matter
Pages can contain an optional front matter. It can be used to define the page's description. The front matter must be the first thing in the file and must take the form of valid YAML set between triple-dashed lines. Here is a basic example:
```yaml
---
description: This is a short description of my page
---
# The content of my page
...
```
The front matter can define variables of your own, they will be added to the [page variable](templating/variables.md) so you can use them in your templating.
Plugins are the best way to extend GitBook functionalities (ebook and website). There exist plugins to do a lot of things: bring math formulas display support, track visits using Google Analytic, etc.
### How to find plugins?
Plugins can be easily searched on [plugins.gitbook.com](https://plugins.gitbook.com).
### How to install a plugin?
Once you find a plugin that you want to install, you need to add it to your `book.json`:
```
{
"plugins": ["myPlugin", "anotherPlugin"]
}
```
You can also specify a specific version using: `"myPlugin@0.3.1"`. By default GitBook will resolve the latest version of the plugin compatbile with the current GitBook version.
### GitBook.com
Plugins are automatically installed on [GitBook.com](https://www.gitbook.com). Locally, run `gitbook install` to install and prepare all plugins for your books.
### Configuring plugins
Plugins specific configurations are stored in `pluginsConfig`. You have to refer to the documentation of the plugin itself for details about the available options.
GitBooks provides different APIs and contexts to plugins. These APIs can vary according to the GitBook version being used, your plugin should specify the `engines.gitbook` field in `package.json` accordingly.
#### Book instance
The `Book` class is the central point of GitBook, it centralize all access read methods. This class is defined in [book.js](https://github.com/GitbookIO/gitbook/blob/master/lib/book.js).
Extending templating blocks is the best way to provide extra functionalities to authors.
The most common usage is to process the content within some tags at runtime. It's like [filters](./filters.md), but on steroids because you aren't confined to a single expression.
### Defining a new block
Blocks are defined by the plugin, blocks is a map of name associated with a block descriptor. The block descriptor needs to contain at least a `process` method.
```js
module.exports={
blocks:{
tag1:{
process:function(block){
return"Hello "+block.body+", How are you?";
}
}
}
};
```
The `process` should return the html content that will replace the tag. Refer to [Context and APIs](./api.md) to learn more about `this` and GitBook API.
A GitBook plugin is a node package published on NPM that follow a defined convention.
## Structure
#### package.json
The `package.json` is a manifest format for describing **Node.js modules**. GitBook plugins are built on top of Node modules. It declares dependencies, version, ownership, and other information required to run a plugin in GitBook. This document describes the schema in detail.
A plugin manifest `package.json` can also contain details about the required configuration. The configuration schema is defined in the `gitbook` field of the `package.json` (This field follow the [JSON-Schema](http://json-schema.org) guidelines):
```js
{
"name":"gitbook-plugin-mytest",
"version":"0.0.1",
"description":"This is my first GitBook plugin",
"engines":{
"gitbook":">1.x.x"
},
"gitbook":{
"properties":{
"myConfigKey":{
"type":"string",
"default":"it's the default value",
"description":"It defines my awesome config!"
}
}
}
}
```
You can learn more about `package.json` from the [NPM documentation](https://docs.npmjs.com/files/package.json).
The **package name** must begin with `gitbook-plugin-` and the **package engines** should contains `gitbook`.
#### index.js
The `index.js` is main entry point of your plugin runtime:
```js
module.exports={
// Map of hooks
hooks:{},
// Map of new blocks
blocks:{},
// Map of new filters
filters:{}
};
```
## Publish your plugin
GitBook plugins can be published on [NPM](https://www.npmjs.com).
To publish a new plugin, you need to create an account on [npmjs.com](https://www.npmjs.com) then publish it from the command line:
```
$ npm publish
```
## Private plugins
Private plugins can be hosted on GitHub and included using `git` urls:
Testing your plugin on your book before plushing it is possible using [npm link](https://docs.npmjs.com/cli/link).
In the plugin's folder, run:
```
$ npm link
```
The nin your book's folder:
```
$ npm link gitbook-plugin-<plugin's name>
```
### Unit testing on Travis
[gitbook-tester](https://github.com/todvora/gitbook-tester) makes it easy to write **Node.js/Mocha** unit tests for your plugins. Using [Travis.org](https://travis.org), tests can be run on each commits/tags.
Getting GitBook installed and ready-to-go should only take a few minutes.
### GitBook.com
[GitBook.com](https://www.gitbook.com) is an easy to use solution to write, publish and host books. It is the easiest solution for publishing your content and collaborating on it.
It integrates well with the [GitBook Editor](https://www.gitbook.com/editor).
### Local Installation
##### Requirements
Installing GitBook is easy and straightforward. Your system just needs to meet these two requirements:
* NodeJS (v4.0.0 and above are adviced)
* Windows, Linux, Unix, or Mac OS X
##### Install with NPM
The best way to install GitBook is via **NPM**. At the terminal prompt, simply run the following command to install GitBook:
```
$ npm install gitbook-cli -g
```
`gitbook-cli` is an utility to install and use multiple versions of GitBook on the same system. It will automatically install the required version of GitBook to build a book.
##### Create a book
GitBook can setup a boilerplate book:
```
$ gitbook init
```
If you wish to create the book into a new directory, you can do so by running `gitbook init ./directory`
Preview and serve your book using:
```
$ gitbook serve
```
Or build the static website using:
```
$ gitbook build
```
##### Install pre-releases
`gitbook-cli` makes it easy to download and install other versions of GitBook to test with your book:
```
$ gitbook fetch beta
```
Use `gitbook ls-remote` to list remote versions available for install.
##### Debugging
You can use the options `--log=debug` and `--debug` to get better error messages (with stack trace). For example:
GitBook uses a simple directory structure. All Markdown/Asciidoc files listed in the [SUMMARY](pages.md) will be transformed as HTML. Multi-Lingual books have a slightly [different structure](languages.md).
A basic GitBook usually looks something like this:
```
.
├── book.json
├── README.md
├── SUMMARY.md
├── chapter-1/
| ├── README.md
| └── something.md
└── chapter-2/
├── README.md
└── something.md
```
An overview of what each of these does:
| File | Description |
| -------- | ----------- |
| `book.json` | Stores [configuration](config.md) data (__optional__) |
| `README.md` | Preface / Introduction for your book (**required**) |
| `SUMMARY.md` | Table of Contents (See [Pages](pages.md)) (__optional__) |
| `GLOSSARY.md` | Lexicon / List of terms to annotate (See [Glossary](lexicon.md)) (__optional__) |
### Static files and Images
A static file is a file that is not listed in the `SUMMARY.md`. All static files, unless [ignored](#ignore), are copied to the output.
### Ignoring files & folders {#ignore}
GitBook will read the `.gitignore`, `.bookignore` and `.ignore` files to get a list of files and folders to skip.
The format inside those files, follows the same convention as `.gitignore`:
```
# This is a comment
# Ignore the file test.md
test.md
# Ignore everything in the directory "bin"
bin/*
```
### Project integration with subdirectory {#subdirectory}
For software projects, you can use a subdirectory (like `docs/`) to store the book for the project's documentation. You can configure the [`root` option](config.md) to indicate the folder where GitBook can find the book's files:
Since version `2.0.0`, GitBook can also accept AsciiDoc as an input format.
Please refer to the [AsciiDoc Syntax Quick Reference](http://asciidoctor.org/docs/asciidoc-syntax-quick-reference/) for more informations about the format.
Just like for markdown, GitBook is using some special files to extract structures: `README.adoc`, `SUMMARY.adoc`, `LANGS.adoc` and `GLOSSARY.adoc`.
### README.adoc
This is the main entry of your book: the introduction. This file is **required**.
### SUMMARY.adoc
This file defines the list of chapters and subchapters. Just like in Markdown, the `SUMMARY.adoc`'s format is simply a list of links, the name of the link is used as the chapter's name, and the target is a path to that chapter's file.
Subchapters are defined simply by adding a nested list to a parent chapter.
Most of the examples from this documentation are in Markdown. Markdown is default parser for GitBook, but one can also opt for the [AsciiDoc syntax](asciidoc.md).
Here’s an overview of Markdown syntax that you can use with GitBook (same as GitHub with some additions).
### Headings
To create a heading, add one to six `#` symbols before your heading text. The number of # you use will determine the size of the heading.
```markdown
# This is an <h1> tag
## This is an <h2> tag
###### This is an <h6> tag
```
GitBook supports a nice way for explicitly setting the header ID. If you follow the header text with an opening curly bracket (separated from the text with a least one space), a hash, the ID and a closing curly bracket, the ID is set on the header. If you use the trailing hash feature of atx style headers, the header ID has to go after the trailing hashes. For example:
```markdown
Hello {#id}
-----
# Hello {#id}
# Hello # {#id}
```
### Paragraphs and Line Breaks {#paragraphs}
A paragraph is simply one or more consecutive lines of text, separated by one or more blank lines. (A blank line is any line that looks like a blank line — a line containing nothing but spaces or tabs is considered blank.) Normal paragraphs should not be indented with spaces or tabs.
```
Here's a line for us to start with.
This line is separated from the one above by two newlines, so it will be a *separate paragraph*.
```
### Emphasis {#emphasis}
```markdown
*This text will be italic*
_This will also be italic_
**This text will be bold**
__This will also be bold__
~~This text will be crossed out.~~
_You **can** combine them_
```
### Lists {#lists}
Markdown supports ordered (numbered) and unordered (bulleted) lists.
##### Unordered
Unordered lists use asterisks, pluses, and hyphens — interchangably — as list markers:
```markdown
* Item 1
* Item 2
* Item 2a
* Item 2b
```
##### Ordered
Ordered lists use numbers followed by periods:
```markdown
1. Item 1
2. Item 2
3. Item 3
* Item 3a
* Item 3b
```
### Links {#links}
Markdown supports two style of links: inline and reference.
A simple link can be created by surrounding the text with square brackets and the link URL with parentheses:
```markdown
This is [an example](http://example.com/ "Title") inline link with a title.
[This link](http://example.net/) has no title attribute.
```
Links can point to relative paths, anchors or absolute urls.
### References
There is another way to create links which does not interrupt the text flow. The URL and title are defined using a reference name and this reference name is then used in square brackets instead of the link URL:
```markdown
This is [an example][id] reference-style link.
```
Then, anywhere in the document, you define your link label like this, on a line by itself:
```markdown
[id]: http://example.com/ "Optional Title Here"
```
### Images {#images}
Images can be created in a similar way than links: just use an exclamation mark before the square brackets. The link text will become the alternative text of the image and the link URL specifies the image source:
```markdown
An image: 
```
### Blockquotes {#blockquotes}
A blockquote is started using the `>` marker followed by an optional space; all following lines that are also started with the blockquote marker belong to the blockquote. You can use any block-level elements inside a blockquote:
```markdown
As Kanye West said:
> We're living the future so
> the present is our past.
```
### Tables {#tables}
You can create tables by assembling a list of words and dividing them with hyphens `-` (for the first row), and then separating each column with a pipe `|`:
```markdown
| First Header | Second Header |
| ------------- | ------------- |
| Content Cell | Content Cell |
| Content Cell | Content Cell |
```
The pipes on either end of the table are optional. Cells can vary in width and do not need to be perfectly aligned within columns. There must be at least three hyphens in each column of the header row.
### Code {#code}
Markdown supports two different code block styles. One uses lines indented with either four spaces or one tab whereas the other uses lines with tilde characters as delimiters – therefore the content does not need to be indented:
```markdown
This is a sample code block.
Continued here.
```
##### Fenced code blocks
You can create fenced code blocks by placing triple backticks ` ``` ` before and after the code block. We recommend placing a blank line before and after code blocks to make the raw formatting easier to read.
```
function test() {
console.log("notice the blank line before this function?");
}
```
##### Syntax highlighting
You can add an optional language identifier to enable syntax highlighting in your fenced code block.
For example, to syntax highlight Ruby code:
```ruby
require 'redcarpet'
markdown = Redcarpet.new("Hello World!")
puts markdown.to_html
```
##### Inline code
Text phrases can be marked up as code by surrounding them with backticks:
Use `gitbook` to convert the `text` in markdown
syntax to HTML.
### Footnotes
GitBook supports a simple syntax for such footnotes. Footnotes are relative to each pages.
```markdown
Text prior to footnote reference.[^2]
[^2]: Comment to include in footnote.
```
### HTML
GitBook supports use of raw HTML in your text, Markdown syntax in HTML is not processed:
```
<div>
Markdown here will not be **parsed**
</div>
```
### Horizontal Rule
Horizontal Rules can be inserted using three or more asterisks, dashes or underscores, optionally separated by spaces or tabs, on an otherwise blank line:
```markdown
Three or more...
---
Hyphens
***
Asterisks
```
### Ignoring Markdown formatting
You can tell GitBook to ignore (or escape) Markdown formatting by using `\` before the Markdown character.
```
Let's rename \*our-new-project\* to \*our-old-project\*.
GitBook uses the [Nunjucks templating language](https://mozilla.github.io/nunjucks/) to process pages and theme's templates.
The Nunjucks syntax is very similar to **Jinja2** or **Liquid**. Its syntax uses surrounding braces `{ }` to mark content that needs to be processed.
### Variables
A variable looks up a value from the template context. If you wanted to simply display a variable, you would use the `{{ variable }}` syntax. For example :
```twig
My name is {{name}}, nice to meet you
```
This looks up username from the context and displays it. Variable names can have dots in them which lookup properties, just like JavaScript. You can also use the square bracket syntax.
```twig
{{foo.bar}}
{{foo["bar"]}}
```
If a value is undefined, nothing is displayed. The following all output nothing if foo is undefined: `{{ foo }}`, `{{ foo.bar }}`, `{{ foo.bar.baz }}`.
GitBook provides a set of [predefined variables](variables.md) from the context.
### Filters
Filters are essentially functions that can be applied to variables. They are called with a pipe operator (`|`) and can take arguments.
```twig
{{foo|title}}
{{foo|join(",")}}
{{foo|replace("foo","bar")|capitalize}}
```
The third example shows how you can chain filters. It would display "Bar", by first replacing "foo" with "bar" and then capitalizing it.
### Tags
##### if
`if` tests a condition and lets you selectively display content. It behaves exactly as JavaScript's `if` behaves.
```twig
{%ifvariable%}
It is true
{%endif%}
```
If variable is defined and evaluates to true, "It is true" will be displayed. Otherwise, nothing will be.
You can specify alternate conditions with `elif` and `else`:
GitBook provides a serie of builtin filters and blocks to help you write templates.
### Filters
`value|default(default, [boolean])`If value is strictly undefined, return default, otherwise value. If boolean is true, any JavaScript falsy value will return default (false, "", etc)
`arr|sort(reverse, caseSens, attr)`
Sort arr with JavaScript's arr.sort function. If reverse is true, result will be reversed. Sort is case-insensitive by default, but setting caseSens to true makes it case-sensitive. If attr is passed, will compare attr from each item.
The real git url part should finish with `.git`, the filename to import is extracted after the `.git` till the fragment of the url.
The `commit-ish` can be any tag, sha, or branch which can be supplied as an argument to `git checkout`. The default is `master`.
### Inheritance
Template inheritance is a way to make it easy to reuse templates. When writing a template, you can define "blocks" that child templates can override. The inheritance chain can be as long as you like.
`block` defines a section on the template and identifies it with a name. Base templates can specify blocks and child templates can override them with new content.
```
{% extends "./mypage.md" %}
{% block pageContent %}
# This is my page content
{% endblock %}
```
In the file `mypage.md`, you should specify the blocks that can be extended:
The following is a reference of the available data during book's parsing and theme generation.
### Global Variables
| Variable | Description |
| -------- | ----------- |
| `book` | Book-wide information + configuration settings from `book.json`. See below for details. |
| `gitbook` | GitBook specific information |
| `page` | Current page specific information |
| `file` | File associated with the current page specific information |
| `summary` | Information about the table of contents |
| `languages` | List of languages for multi-lingual books |
| `output` | Information about the output generator |
| `config` | Dump of the `book.json` |
### Book Variables
| Variable | Description |
| -------- | ----------- |
| `book.[CONFIGURATION_DATA]` | All the `variables` set via the `book.json` are available through the book variable. |
| `book.language` | Current language for a multilingual book |
### GitBook Variables
| Variable | Description |
| -------- | ----------- |
| `gitbook.time` | The current time (when you run the `gitbook` command) . |
| `gitbook.version` | Version of GitBook used to generate the book |
### File Variables
| Variable | Description |
| -------- | ----------- |
| `file.path` | The path to the raw page |
| `file.mtime` | Modified Time. Last time the file was modified |
| `file.type` | The name of the parser used to compile this file (ex: `markdown`, `asciidoc`, etc) |
#### Page Variables
| Variable | Description |
| -------- | ----------- |
| `page.title` | Title of the page |
| `page.previous` | Previous page in the Table of Contents (can be `null`) |
| `page.next` | Next page in the Table of Contents (can be `null`) |
| `page.dir` | Text direction, based on configuration or detected from content (`rtl` or `ltr`) |
#### Table of Contents Variables
| Variable | Description |
| -------- | ----------- |
| `summary.parts` | List of sections in the Table of Contents |
The whole table of contents (`SUMMARY.md`) can be accessed:
`summary.parts[0].articles[0].title` will return the title of the first article.
#### Multi-lingual book Variable
| Variable | Description |
| -------- | ----------- |
| `languages.list` | List of languages for this book |
Languages are defined by `{ id: 'en', title: 'English' }`.
### Output Variables
| Variable | Description |
| -------- | ----------- |
| `output.name` | Name of the output generator, possible values are `website`, `json`, `ebook` |
| `output.format` | When `output.name == "ebook"`, `format` defines the ebook format that will be generated, possible values are `pdf`, `epub` or `mobi` |
Since version 3.0.0, GitBook can be easily themed. Books use the [theme-default](https://github.com/GitbookIO/theme-default) theme by default.
> **Caution**: Custom theming can block some plugins from working correctly.
### Structure of a theme
A theme is a plugin containing templates and assets. Overriding any individual template is optional, since themes always extend the default theme.
| Folder | Description |
| -------- | ----------- |
| `_layouts` | Main folder containing all the templates |
| `_layouts/website/page.html` | Template for a normal page |
| `_layouts/ebook/page.html` | Template for a normal page during ebook generation (PDF< ePub, Mobi) |
### Extend/Customize theme in a book
Authors can extend the templates of a theme directly from their book's source (without creating an external theme). Templates will be resolved in the `_layouts` folder of the book first, then in
### Publish a theme
Themes are published as plugins ([see related docs](../plugins/README.md)) with a `theme-` prefix. For example the theme `awesome` will be loaded from the `theme-awesome` plugin, and then from the `gitbook-plugin-theme-awesome` NPM package.
that.log.warn.ln('gitbook version specified in your book.json might be too strict for future patches, \'>='+(_.first(gitbook.version.split('.'))+'.x.x')+'\' is more adequate');
// Return templating/json context for gitbook itself
functiongetContext(){
return{
gitbook:{
version:pkg.version,
time:START_TIME
}
};
}
module.exports={
version:pkg.version,
satisfies:satisfies,
getContext:getContext
};
Some files were not shown because too many files have changed in this diff
Show More
Reference in New Issue
Block a user
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.