description: Write a concise, product-focused PR description from the changes and available discussion. Use when asked for a PR summary or description.
---
# Write a PR description
Read the full branch diff and commit history against the PR's base branch, not just the latest commit. Use the PR discussion and linked issues for context when available. The PR's changes are the source of truth for what ships if an issue describes something different.
Write for contributors and reviewers who may not know the area. Lead with what changes, prefer user or product impact when supported, and include implementation details only when they help review. Keep the proposed changes short, using bullets only when useful.
Include relevant validation and screenshots when available. Do not claim checks passed unless they ran. Use only information appropriate for a public repository; do not copy private issue details or customer information into the description.
## Template and changelog
Read `.github/pull_request_template.md` immediately before writing. Preserve its required section names and order. Include `Proposed changes` and `Changelog`; omit `Demo` when there is nothing to show. Add optional `Context` before `Changelog` only when it meets the rule below.
Write a short changelog entry describing what shipped. Use `[Feature]` for user-facing additions or improvements, `[Fix]` for user-facing bug fixes, and `[Chore]` for internal maintenance. For features and fixes, say what users can do or what no longer goes wrong in plain words. Keep chores useful to teammates without inventing user impact. Remove unused examples and placeholders. Usually one entry is enough; use more only for distinct changes. The PR changelog does not replace any changeset required by `AGENTS.md`.
## Optional context
Write `Proposed changes` and `Changelog` first. Add `Context` only when it tells someone unfamiliar with the area something material that the changelog does not. `Problem` names a concrete failure or limitation supported by the PR or discussion. `Outcome` names what this PR delivers at its actual scope. Omit the section if either field would repeat the changelog, describe only implementation, or guess at an impact.
```markdown
## Context
**Problem:** <concrete failure or limitation>
**Outcome:** <result delivered by this PR>
```
Keep each field to 1–2 short, non-technical sentences. Prefer user or product impact when supported. For infrastructure changes, explain the failure or limitation they caused. Do not invent an actor, customer segment, ownership, or impact, or force the change into a user story. Do not turn a preparatory change into a claim that the whole workflow is fixed. Keep the roles distinct: `Context` explains why this matters, `Changelog` says what shipped, and `Proposed changes` can explain implementation.
Examples:
- A dependency bump with no demonstrated user effect needs no `Context`.
- If creating the first change request leaves the user on an empty screen, say that it now opens after creation. Leave the animation-listener details in `Proposed changes`.
- If a PR indexes links for later checks, describe the indexing result. Do not claim every link has already been checked.
## Writing pass
- Use plain words and direct verbs: "use" instead of "leverage", "help" instead of "facilitate". Prefer active voice when the actor is known.
- Name the concrete behavior instead of saying "improves the experience" or "makes it more robust". Support performance claims with measurements.
- Cut filler, promotional language, and generic conclusions. If a sentence could fit almost any PR, make it specific or delete it.
- Keep one idea per sentence and use consistent names. Remove redundant hedging without hiding real uncertainty.
- Avoid "not just X, but Y", forced groups of three, em dashes, decorative emojis, and unnecessary bold text.
Return the description in a Markdown code block unless asked to update the PR. When asked to update it, apply the description with `gh pr edit` using a body file.
Assistant: you can now send follow-up questions while an answer is still being written. Each one appears as your own message with a "Queued" badge (hover for when it will send, × to cancel), and they're sent automatically one at a time as each answer completes.
Name a site's MCP server as docs, such as "Acme Docs MCP Server", in AI clients and in the install commands and links, so it is not confused with a product's own MCP server.
Fix the docs embed `navigateToPage` API on multi-space sites. Deep-linking to a page in a different space/section (e.g. `navigateToPage('/help-center/integrations')`) previously 404'd because the section base was not placed before `~gitbook/embed/page`. The target is now resolved to its space server-side, so pages in any space resolve correctly. The input accepts the page path, an absolute path, or the full published URL.
A near-white tint color (e.g. a warm `#F5F3EF`) is now taken as the exact page background, mirroring the existing behavior for near-black tints. The tint's exact lightness, hue and chroma are preserved, and the color is anchored to whichever scale step the active theme renders as the background — so it matches exactly on `muted` (which uses the second step) as well as `clean`. This applies only to near-neutral tints that are light enough to read as a background; saturated or merely light-ish colors keep their normal accent scale. The `bold` theme is unaffected: it already uses the tint for the header and stays intentionally two-tone.
Reduce memory and CPU use of the OpenNext workers: minify the middleware, resolve the site context once per request, cache parsed OpenAPI descriptions across a spec, drop the redis client and the unused force-revalidate route from the server bundle.
Add an `askQuestion` tool to the site MCP server. Alongside `searchDocumentation` and `getPage`, MCP clients can now ask a natural-language question and get a synthesized answer with links to the source pages, powered by the same AI search backend as the site's "ask a question" experience. The tool accepts an optional `goal` param so calling agents can attach the intent they're trying to accomplish, which tailors the answer and is tracked in analytics. The tool is only exposed on sites that have AI enabled.
Limit the MCP `searchDocumentation` tool to one language: the one the client passes in the new optional `language` argument, or else the language of the site variant the MCP endpoint is served from.
Fix the search button accessible name, hoverable link previews, IME-safe Enter on Safari, cookie banner semantics, active outline item announcement and textarea shrinking.
Respect reduced motion for enter and exit animations, keep the header separator and input focus visible in forced colors mode, and size mobile surfaces with dynamic viewport units.
Remove GBO's redundant re-selection of the best-scoring search section. The search API now returns a single highest-scoring section per page (and orders sections highest-score-first), so GBO no longer needs its own `getBestScoredResult` helper to pick the best section for the search and MCP previews. No user-visible change.
Sync the API reference responses selector with the "Responses" collapsibles, and keep the selected response in sync across every operation on the page (like the code sample language selector). Selecting a status code now expands the matching response section and applies to all operations at once.
Fix a light/dark flash on published sites configured to respect the system default (no theme toggle). Such sites forced the `system` theme, but `next-themes`' pre-paint script applies a forced value verbatim without resolving `prefers-color-scheme`, so the page painted light and only switched to dark after hydration. We now leave the theme unforced when the default is `system` (only concrete light/dark themes are forced), letting `next-themes`' existing pre-paint script resolve the system preference before first paint.
Add a `sendFeedback` MCP tool so AI agents can report documentation findings (outdated / incoherent / gap / other) as `agent_feedback` insights events. The tool only accepts finding categories, so it never records positive feedback.
Separate the prompt block actions into a primary "Open in" dropdown and a secondary "Copy prompt" button, instead of a single combined button group, and align the block's design with the expandable block (bordered frame, left disclosure chevron, and subtle elevation when expanded).
Fix the docs embed widget shipping a stale script: declare the embed package's `standalone/` bundle as a Turbo build output. Because it wasn't declared, changes confined to the standalone widget (which compiles to `standalone/` but not `dist/`) didn't invalidate the downstream `generate` cache that copies it into the app, so the deployed widget could lag the source — e.g. the `clipboard-write` permission on the widget iframe never reached production, breaking the copy button in the Assistant embed.
Send site searches straight to the search API when the site hands out a search pass, and use the site's search route when it does not or when the API refuses a search.
Refine the per-paragraph AI ask button: shorten its tooltip to "Ask" (from "Ask <assistant> about this"), and hide it inside cards where it would otherwise be clipped by the card's overflow.
Keep the "On this page" and "Ask" buttons pinned below the header while scrolling on desktop API reference pages, so the page outline stays reachable throughout long operations.
Only show the "Back to [space]" shortcut for cross-space links in the table of contents, not for in-content text links or other ways of reaching another space.
Let integration block webframes navigate the reader to another page in the site by posting a `@webframe.navigate` action with a `path` (and optional `anchor`). Resolved client-side against the site base path, so navigation stays in-site and drives the standard navigation progress bar.
> _For help, support, feature requests, and product questions - head to our [GitHub Community](https://github.com/orgs/GitbookIO/discussions) 🤖_
> _For help, support and product questions, head to our [GitHub Community](https://github.com/orgs/GitbookIO/discussions)._
Thank you for investing your time in contributing to GitBook. Any contribution you make will be reviewed by our team. In this guide, you'll learn the different ways you can contribute.
Thanks for helping make GitBook better. This repository holds the open source renderer behind every published GitBook site, and the team reads everything that comes in here.
## Types of Contributions
## Ways to contribute
This repository contains code related to the rendering engine of GitBook's published content. Depending on what you'd like to contribute to, head to the section below to find the necessary steps.
-**Open an issue.** Report a bug, suggest a feature, or tell us when something feels off. This is the most useful thing you can do.
-**Join the conversation.** Share ideas and help others in [GitHub Community](https://github.com/orgs/GitbookIO/discussions).
-**Build with GitBook.** Publish your docs, try new features early, and tell us what works and what doesn't.
### Add a feature
## Issues instead of pull requests
Because this portion of GitBook is open source and available for you to use - if you think you can provide extra value through a new feature - you're welcome to add it! If you plan to distribute the code, keep the source code public to comply with GNU GPLv3. To clone in a private repository, you must first acquire a [commercial license](https://www.gitbook.com/pricing).
Pull requests are limited to the GitBook team. If you've found a bug or want something to change, please [open an issue](https://github.com/GitbookIO/gitbook/issues/new/choose) instead.
### Create a new issue
This isn't because we don't want your help. Every change here ships to every published GitBook site, so we need to own each one from start to finish. A clear issue often helps us more than a pull request: it tells us what's wrong and why, and lets us fix it in a way that fits the rest of the codebase.
If you spot a problem within a repository, [search if an issue already exists](https://docs.github.com/en/github/searching-for-information-on-github/searching-on-github/searching-issues-and-pull-requests#search-by-the-title-body-or-comments). If a related issue doesn't exist, you can open a new issue here!Please make sure any added issues are
A good issue includes:
-Descriptive
-Thoughtful
-Organized
-What you expected to happen, and what happened instead
-A link to a published GitBook site that shows the problem, if you have one
-Steps to reproduce it, plus screenshots or a recording for anything visual
- Your browser and OS, if it looks like it might matter
We recommend adding as many relevant links, minimal reproductions of the issue, and other materials that will help our team solve the issue fast.
Before opening one, [search existing issues](https://github.com/GitbookIO/gitbook/issues). If someone has already reported it, add a 👍 or any extra details you have.
### Solve an issue
Already fixed it in your fork? Link the branch or commit in your issue. We may open a pull request from it, and your commits keep your name.
If you're interested in solving an issue in our repository, start by scanning through it's exisiting issues to find one that you're interested in working on. If you find an issue to work on, you are welcome to open a PR with a fix. See the following sections below for more information on contributing for specific sections.
If you open a pull request anyway, we'll close it and point you here. Nothing personal, and we'd still love the issue.
### Documentation
## Reach out
The official documentation on GitBook open can be found directly in this Readme. Any updates or changes you would like to make, you can make directly to the README of this repository.
Not sure if it's a bug? Have a half-formed idea? Open an issue or start a [discussion](https://github.com/orgs/GitbookIO/discussions) anyway. We'd much rather hear from you than not, and no report is too small.
## Contributing
Spotted a wrong or missing translation? Open an issue with the string and the wording you'd suggest.
### Make changes locally
## Using AI
Any contribution you make can be made to the code located in this repository. In order to contribute, you'll need to start off of a local version of this repository.
You're welcome to use AI to help you write an issue. Please read and check what it produces before you post: reports that are long, vague or unverified take time away from fixing real problems, and we may close them without a reply.
#### 1. Fork the repository
## Running locally
##### Using GitHub Desktop:
You don't need a local setup to open an issue, but it can help you reproduce a problem or self-host the renderer.
- [Getting started with GitHub Desktop](https://docs.github.com/en/desktop/installing-and-configuring-github-desktop/getting-started-with-github-desktop) will guide you through setting up Desktop.
- Once Desktop is set up, you can use it to [fork the repo](https://docs.github.com/en/desktop/contributing-and-collaborating-using-github-desktop/cloning-and-forking-repositories-from-github-desktop)!
### Prerequisites
##### Using the command line:
- [Node.js](https://nodejs.org/en) (see "engines" in `package.json`)
- [Bun](https://bun.sh/) (see "packageManager" in `package.json`)
- [Fork the repo](https://docs.github.com/en/github/getting-started-with-github/fork-a-repo#fork-an-example-repository) so that you can make your changes without affecting the original project until you're ready to merge them.
### Setup
#### 2. Create a working branch and start with your changes
1. Use the project's version of Node:
After forking this repository, you'll want to [create a branch](https://docs.github.com/en/issues/tracking-your-work-with-issues/creating-a-branch-for-an-issue) to work off of.
#### 3. Install dependencies and run the project locally
##### Prerequisites:
- [Node.js](https://nodejs.org/en) (see "engines" in `package.json`)
- [Bun](https://bun.sh/) (see "packageManager" in `package.json`)
##### Setup steps:
1. Ensure you are using the project's version of Node:
```bash
nvm use
```
2. Install dependencies using Bun:
2. Install dependencies:
```bash
bun install
```
3. Start the development server:
```bash
bun dev
```
Additional development commands:
-`bun format`: Format the code using Biome
-`bun typecheck`: Run TypeScript type checking
-`bun unit`: Run unit tests
-`bun e2e`: Run end-to-end tests
Other commands:
#### 4. Preview your changes
-`bun lint`: Lint the code using Oxlint
-`bun lint:fix`: Automatically fix lint issues using Oxlint
-`bun format`: Format the code using Oxfmt
-`bun format:check`: Check formatting without changing files
-`bun typecheck`: Run TypeScript type checking
-`bun unit`: Run unit tests
-`bun e2e`: Run end-to-end tests
When running the development server, published GitBook sites can be rendered through your local version at `http://localhost:3000/url`.
### Preview a site
For example, our published docs can be viewed using the local version by visiting`http://localhost:3000/url/gitbook.com/docs`after running the development server.
With the development server running, any published GitBook site can be rendered through your local version at `http://localhost:3000/url/<published-url>`. For example, visit `http://localhost:3000/url/gitbook.com/docs`to see our own docs.
You can visit any published GitBook site behind your development server. Please make sure your site is [published publicly](https://gitbook.com/docs/published-documentation/publish-your-content-as-a-docs-site) to ensure you can view the site correctly in your development version.
The site must be [published publicly](https://gitbook.com/docs/published-documentation/publish-your-content-as-a-docs-site) to render locally.
### Commit your update
## License
[Commit your changes](https://github.com/git-guides/git-commit) once you are happy with them. See [Atom's contributing guide](https://github.com/atom/atom/blob/master/CONTRIBUTING.md#git-commit-messages) to know how to use emoji for commit messages!
The renderer is distributed under the [GNU GPLv3 License](https://github.com/GitbookIO/gitbook/blob/main/LICENSE). If you distribute the code, you must keep the source code public. To use it in a private repository, you need a [commercial license](https://www.gitbook.com/pricing).
Once your changes are ready, don't forget to self-review your code to double check that your chagnes are ready to be added.
### Pull Request
When you're finished with the changes, [create a pull request](https://docs.github.com/en/pull-requests/collaborating-with-pull-requests/proposing-changes-to-your-work-with-pull-requests/creating-a-pull-request), also known as a PR.
- Don't forget to [link PR to issue](https://docs.github.com/en/issues/tracking-your-work-with-issues/linking-a-pull-request-to-an-issue) if you are solving one.
- Enable the checkbox to [allow maintainer edits](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/allowing-changes-to-a-pull-request-branch-created-from-a-fork) so the branch can be updated for a merge. Once you submit your PR, a GitBook team member will review your proposal. We may ask questions or request for additional information.
- We may ask for changes to be made before a PR can be merged, either using [suggested changes](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/incorporating-feedback-in-your-pull-request) or pull request comments. You can apply suggested changes directly through the UI. You can make any other changes in your fork, then commit them to your branch.
- As you update your PR and apply changes, mark each conversation as [resolved](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/commenting-on-a-pull-request#resolving-conversations).
- If you run into any merge issues, checkout this [git tutorial](https://lab.github.com/githubtraining/managing-merge-conflicts) to help you resolve merge conflicts and other issues.
### Your PR is merged
Congratulations 🎉 Thank you for your contribution! Once your PR is merged, your contributions will be publicly visible on the relevant repository.
The [`@gitbook/embed`](https://github.com/GitbookIO/gitbook/blob/main/packages/embed) package is distributed under the [Apache License 2.0](https://github.com/GitbookIO/gitbook/blob/main/packages/embed/LICENSE). Contributions to it are made under the same license.
description:Use gradual deployment to deploy to Cloudflare. This action will upload the middleware and server versions to Cloudflare and kept them bound together
inputs:
apiToken:
description:'Cloudflare API token'
required:true
accountId:
description:'Cloudflare account ID'
required:true
environment:
description:'Cloudflare environment to deploy to (staging, production, preview)'
required:true
middlewareVersionId:
description:'Middleware version ID to deploy'
required:true
serverVersionId:
description:'Server version ID to deploy'
required:true
apiToken:
description:'Cloudflare API token'
required:true
accountId:
description:'Cloudflare account ID'
required:true
environment:
description:'Cloudflare environment to deploy to (staging, production, preview)'
<!-- Briefly describe what changed. Include relevant validation. -->
## Demo
<!-- Add screenshots or a recording when useful. Otherwise, remove this section. -->
<!-- Optional: add Context here only when it explains a concrete problem and result that the changelog does not. Remove this comment before submitting. -->
## Changelog
<!-- Keep the relevant entries and remove unused placeholders. Feature = user-facing addition or improvement; Fix = user-facing bug fix; Chore = internal maintenance. -->
[GitbookIO/slack-pr-status](https://github.com/GitbookIO/slack-pr-status) adds review-status reactions to PR links posted in [#engineering](https://gitbook.slack.com/archives/C01NXGWJELS). It runs from `.github/workflows/slack-pr-status.yml` in `GitbookIO/gitbook`, `GitbookIO/gitbook-x` and `GitbookIO/integrations`. Emojis and statuses are configured in that workflow; see the action's README for the options.
Owner: Peter White.
| Configuration | Value |
| --- | --- |
| Slack app | **PR Status** (`A0C2AGLAD0T`), created from `.github/slack-pr-status-app-manifest.json` |
| GitHub token | The workflow's `GITHUB_TOKEN`, read-only |
Posts that link PRs from more than one repository are skipped, because each workflow's token can only read its own repository. PRs from forks get no reactions, because their workflows don't receive secrets.
To disable it in one repository, run `gh workflow disable slack-pr-status.yml --repo GitbookIO/<repository>`. To stop it everywhere, revoke the PR Status app's token.
Some files were not shown because too many files have changed in this diff
Show More
Reference in New Issue
Block a user
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.