Compare commits

...

279 Commits

Author SHA1 Message Date
Peter White 3c4ff5527d Merge remote-tracking branch 'origin/main' into peter/remove-local-search 2026-11-12 14:42:24 +00:00
Peter White 238cf5c824 changeset 2026-11-12 14:42:18 +00:00
Peter White 575bfdfb2e Show only server results in site search 2026-11-12 14:42:18 +00:00
Nolann B. 0c3a51eca4 Stop card carousels from widening the page (#4768)
Co-authored-by: Claude <noreply@anthropic.com>
2026-11-12 15:31:58 +01:00
Tomek 7d1cd9f9df Remove ChatGPT-specific plain text Markdown responses (#4766) 2026-11-12 10:38:07 +00:00
Samy Pessé 6029a31c07 Version Packages (#4755)
Co-authored-by: github-actions[bot] <41898282+github-actions[bot]@users.noreply.github.com>
2026-11-12 10:34:04 +00:00
Nolann B. 4fb7e14436 Push the release PR with the PAT so its workflows run (#4738) 2026-11-12 10:18:08 +00:00
Steven H 31e88d16eb Relicense @gitbook/embed under Apache 2.0 (#4765)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-12 09:33:54 +00:00
Peter White 7ddd023d72 Fix search prewarming on public sites (#4762) 2026-11-12 10:24:29 +01:00
Peter White b53e73c0e7 Link suggested follow-up questions to the markdown ask route (#4757) 2026-11-12 08:57:20 +01:00
Taran Vohra 4a405475f3 Fix page outline not following the active section on long pages (#4754) 2026-11-11 19:29:25 +05:30
Samy Pessé aade3189ca Version Packages (#4711) 2026-11-10 18:25:28 +01:00
Brett Jephson 8689736e3a RND-13702: remove italic from annotation dfn (#4750) 2026-11-10 15:53:57 +00:00
Nolann B. 1b29a7051e Add a fetch option to parseOpenAPI (#4753) 2026-11-10 16:34:59 +01:00
Peter White 6c128729b2 Expand 3-digit hex colours correctly (#4748)
Co-authored-by: monem <119044801+pucedoteth@users.noreply.github.com>
2026-11-09 11:29:12 +00:00
Nolann B. 6344646974 Fix bash highlighting of the last letter before > (RND-13792) (#4747) 2026-11-09 10:47:47 +01:00
Nolann B. 192863526f Remove docs.cartographer3d.com from customer visual tests (#4749) 2026-11-09 10:28:06 +01:00
Greg Bergé 09a8310c9d Serve robots.txt without sign-in on authenticated access sites (RND-13789) (#4746)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-06 13:52:58 +01:00
Peter White a023a7131b Warn visitors not to share sensitive personal info in the Assistant (#4745) 2026-11-05 17:48:53 +00:00
conico974 198cafe978 Bump Next.js to 16.4.5 and OpenNext to 1.20.16 (#4743)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-04 11:22:58 +01:00
conico974 268fa83683 Fix formatting in README.md (#4741) 2026-11-03 19:29:19 +01:00
conico974 123454d2ac Dummy PR (#4739)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 12:58:05 +01:00
Nolann B. e6b8502036 Resolve .md page URLs in the MCP getPage tool (RND-13634) (#4735) 2026-11-02 12:59:34 +01:00
Peter White 3837c484a6 Redirect non-normalized proxied URLs to their public URL (RND-13627) (#4734) 2026-11-02 10:18:10 +01:00
Nolann B. 4dfe630a70 Bump @scalar/openapi-parser to 0.29 to fix false OpenAPI 3.2 errors (#4732) 2026-10-30 19:06:33 +01:00
Greg Bergé 26ec43e870 Don't cache failed searches (RND-13594) (#4731)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 13:21:53 +01:00
Peter White 063e6851e7 Resolve dark-mode image URLs in published Markdown (RND-13608) (#4728) 2026-10-30 10:57:33 +01:00
Taran Vohra 04f39f1472 Lazy webframes and lighter markup on large pages (#4726) 2026-10-30 14:27:21 +05:30
spastorelli 1383a798cb Stop prefetching the site login and logout links (#4727) 2026-10-29 19:19:54 +01:00
Greg Bergé 4a72ead12a Only apply a preview customization override to the site space it was made for (RND-13589) (#4725)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 16:44:09 +01:00
Peter White ea018507c7 Support a secondary brand colour on published sites (#4717) 2026-10-29 12:58:10 +00:00
Nolann B. 347a1cc006 Partition visitor cookies set inside an iframe (RND-12488) (#4721) 2026-10-29 11:07:45 +01:00
Steven H a512777351 Forward the visitor's user agent on ask and Assistant calls (#4714) 2026-10-29 09:27:00 +00:00
Peter White 508f1bc132 Load the inline expression runtime only for blocks that use it (RND-13530) (#4719) 2026-10-29 09:53:30 +01:00
Nolann B. 38f60f2633 Render soft line breaks in paragraphs with buttons (RND-12359) (#4724) 2026-10-29 08:56:09 +01:00
Nolann B. be658e1b32 Truncate long tab titles instead of hiding tabs in a menu (RND-11318) (#4723) 2026-10-29 08:30:52 +01:00
Nolann B. e745c88166 Add a search input to filter models on OpenAPI models pages (RND-12025) (#4718) 2026-10-28 22:59:52 +01:00
Nolann B. f61578f01f Remove duplicate preconnects and open the fonts one in CORS mode (RND-12526) (#4720) 2026-10-28 22:58:05 +01:00
Nolann B. a5d58bc210 Follow site redirects in MCP getPage (RND-13551) (#4715) 2026-10-28 18:46:59 +01:00
conico974 7e096d5131 Update dependencies for GitBook project (#4695)
Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-10-28 16:55:21 +01:00
Peter White bd431f1f8d Split llms-full.txt into parts by size so large sites don't fail (RND-13497) (#4712) 2026-10-28 14:25:00 +00:00
Peter White b7b8ae663b Keep list structure in Updates RSS feeds (RND-13414) (#4710) 2026-10-28 14:20:25 +00:00
Peter White 96c568393e Let analytics track outbound link clicks on published sites (RND-13494) (#4713) 2026-10-28 14:08:05 +00:00
Peter White 96f8ccc5cd Run Vercel functions in cle1 while Cloudflare IAD is degraded (#4716)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-28 14:48:52 +01:00
conico974 c00a7b3b88 Resolve the full URL in a single lookup and always send the visitor country (#4707)
Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-10-28 09:18:05 +01:00
Samy Pessé 3d83277b61 Version Packages (#4370)
Co-authored-by: github-actions[bot] <41898282+github-actions[bot]@users.noreply.github.com>
2026-10-27 18:43:15 +01:00
Nolann B. d053984d34 Keep the section group dropdown at the right width when switching groups quickly (RND-13149) (#4706) 2026-10-27 18:08:41 +01:00
spastorelli 02f4cbc779 Update gitbook/expr package (#4709)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 18:07:39 +01:00
Greg Bergé 9f22456eef Allow Ionic and Capacitor iOS apps to embed sites (RND-13442) (#4708)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 13:36:36 +01:00
Taran Vohra 3370103307 Lazy-load all embed iframes so YouTube thumbnails in tabs aren't blurry (RND-13501) (#4705) 2026-10-26 14:31:19 +05:30
Viktor Renkema b0cb03558d Mark blocks, pages and titles as comment targets (#4701)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-21 11:31:59 +02:00
Peter White fce8a6f2b6 Fix double slash in MCP example page URLs (#4703) 2026-10-21 11:29:29 +02:00
Tomek 5f38ae6f9f Adjust tab padding in dynamic tabs (#4696) 2026-10-20 14:42:39 +00:00
Tomek fc06bc694b Track Ask AI trigger clicks in insights (#4694)
Co-authored-by: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-20 16:03:15 +02:00
Viktor Renkema a17ed29e35 Fix admin toolbar magnification, tooltips and truncation (#4697)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 16:01:14 +02:00
conico974 bb47dadfbe Change x-robots-tag header for search/assistant deep links (#4693) 2026-10-20 15:41:35 +02:00
conico974 bfe45fede4 Fix e2e tests (#4698)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 15:03:45 +02:00
Peter White 9f940678b6 Update published-site Mermaid to 11.16.1 to match the editor (#4692) 2026-10-16 10:52:23 +00:00
Steven H 96626fea7c Point the admin toolbar insights button to /analytics (#4691)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 11:50:11 +01:00
Peter White d839d9dc57 Match site redirects whose source has non-ASCII characters (#4689) 2026-10-15 16:59:20 +02:00
Peter White 30fa152f0f Replace slapr with slack-pr-status (#4688) 2026-10-14 12:50:04 +02:00
Peter White 0540ebc1b9 Don't link page group breadcrumbs to their redirecting URL (#4686) 2026-10-14 10:31:26 +00:00
Peter White 0b515b0970 Fix 404 on Markdown pages when a theme is forced (#4685) 2026-10-14 11:46:58 +02:00
Peter White 65acba0b61 Fix Mermaid block diagrams and clipped labels on published sites (#4687) 2026-10-14 11:26:28 +02:00
Peter White f7dc7faa65 Reserve webframe size before hydration (#4683) 2026-10-14 08:25:57 +02:00
Peter White 03aa0f75f5 Render one shared Ask AI paragraph button (#4681) 2026-10-13 14:57:45 +02:00
Peter White a625112106 Skip the Ask AI paragraph button inside tables (#4680) 2026-10-13 13:40:20 +02:00
Brett Jephson 1bf3bd4294 Bump API version (#4679) 2026-10-13 10:55:32 +01:00
Peter White 9d62cb4bad Keep TOC scroll position when expanding a group (#4678) 2026-10-13 09:25:16 +02:00
Peter White 8bc381d852 Keep button labels readable inside colored hints (#4677) 2026-10-12 15:24:21 +02:00
Peter White a22923b56b Ask contributors to open issues instead of pull requests (#4676) 2026-10-12 12:06:51 +02:00
Peter White a73800e0ef Upgrade object-identity (#4675) 2026-10-12 11:22:25 +02:00
Steven H a0c1bdf58e Improve the Ask prompt for llms.txt (#4674) 2026-10-09 12:09:23 +01:00
Steven H d685660e1d Ensure we send the agent goal with the ask (#4673) 2026-10-08 20:51:24 +01:00
Peter White f1d5123c0b Support fr-ca, es-mx and es-419 site UI locales (RND-13260, RND-11280) (#4671) 2026-10-08 17:10:49 +02:00
conico974 679ea0706c Add support for visitor country hostnames via environment variable (#4668) 2026-10-08 11:35:18 +02:00
Peter White c366796756 Keep the embed open when switching section from the breadcrumbs (RND-12559) (#4670) 2026-10-08 11:26:04 +02:00
Peter White f35be52c80 Allow configuring the tab and page the Docs Embed opens on (RND-12456) (#4669) 2026-10-08 11:25:35 +02:00
conico974 848a39d1c8 Send visitor country in API requests for specific environments (#4667) 2026-10-07 18:08:57 +02:00
Peter White 9f447aab29 Open search in the current space from scoped search buttons (#4666) 2026-10-07 17:04:19 +02:00
Nolann B. 552538a0d9 Record proxied sites' markdown, llms.txt and RSS requests under their public URL (#4660) 2026-10-07 11:53:03 +02:00
Peter White 5c4a808ba8 Stop self-referencing nullable OpenAPI schemas from recursing when expanded (#4665) 2026-10-07 11:38:46 +02:00
Zeno Kapitein ad6262b6f9 Scope the site preview cookie to the preview route so customization/theme persists on navigation (RND-12191) (#4481)
Co-authored-by: Peter White <1788320+peterwhite@users.noreply.github.com>
2026-10-07 09:53:30 +02:00
Tomek 2137c2df7b Track Ask AI entry point in analytics (#4646) 2026-10-06 19:33:34 +02:00
Peter White 990e702035 Clarify not-found copy for login-protected pages (#4663) 2026-10-06 16:58:58 +02:00
Peter White 3ed448fed7 Keep ?ask out of the search field while integration assistants load (#4661) 2026-10-06 14:11:41 +02:00
conico974 4856a1f744 Add support for resolving missing page paths and redirecting to markdown versions (#4657) 2026-10-06 13:54:16 +02:00
Peter White ac843657ec Restore Next.js dev-mode OOM patch for 16.3.8 (#4662) 2026-10-06 13:33:50 +02:00
Brett Jephson b1102fcebe Prepare DocumentMarkColor to work with optional properties (#4659) 2026-10-05 17:55:22 +01:00
conico974 7996c362c1 Bump Next and OpenNext (#4658) 2026-10-05 15:48:35 +02:00
Steven H c7c1b79788 Improve the prompt asking agents for feedback on GitBook-powered docs (#4654) 2026-10-02 18:38:56 +01:00
Taran Vohra dff0c7903e Resolve cross-space repository page URLs when rendering sites (#4619)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 18:31:20 +05:30
Tomek ffebd1790e Extract page title utility and add SEO title support (#4647)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
Co-authored-by: Nolann Biron <biron.nolann@gmail.com>
Co-authored-by: Nolann B. <100787331+nolannbiron@users.noreply.github.com>
2026-10-02 14:07:15 +02:00
Tomek 0e0085e49a Fix sidebar group titles being clipped while scrolling (#4623)
Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-10-01 14:31:00 +02:00
Tomek 8e131693ea Auto-scroll TOC to active item when it's not visible (#4653) 2026-10-01 09:14:01 +00:00
Peter White 96325161be Lazy-load Loom embeds so pages with many of them don't stay blank (RND-13147) (#4652) 2026-09-30 14:18:29 +02:00
Surai 9f5290bccc Fix Ask AI submissions when search state is empty (#4651) 2026-09-30 09:50:39 +02:00
Peter White 61992424af Mark text over a background cover in the first frame after hydration (#4650) 2026-09-30 08:21:31 +02:00
Peter White 380af10236 Send previousUrl with site insights events (#4640) 2026-09-29 16:43:14 +00:00
Peter White 0911abc55c Fix page cover image jumping on load (#4648) 2026-09-29 18:11:03 +02:00
Tomek d8dc59b1a9 Improve dark theme contrast for Mermaid edge labels (#4645)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-29 14:02:07 +02:00
Surai d04f8bc05e Update trademark landing page (#4644) 2026-09-29 11:13:52 +02:00
conico974 576a781a8f Bump versions of @opennextjs/aws and @opennextjs/cloudflare (#4643) 2026-09-29 10:51:30 +02:00
Peter White df2841cf36 Don't leak the internal route into the site auth login link (#4642) 2026-09-28 17:43:23 +02:00
Tomek 70bfdda39c Restore Next.js 16.3.6 dev-mode OOM patch (#4641) 2026-09-28 11:40:41 +00:00
Peter White afbc57c3e0 Don't track 404 page views for internal ~gitbook routes (#4639) 2026-09-25 12:32:54 +02:00
Tomek e4638f1833 Fix webframes inside modals not receiving visitor claims (#4635) 2026-09-25 12:13:44 +02:00
Peter White d7f2addb03 Improve PR description context guidance (#4636) 2026-09-25 09:11:47 +02:00
Tomek 7f8ab7dcc7 Add support for ChatGPT Search (OAI-SearchBot) user agent (#4633) 2026-09-24 09:49:33 +02:00
Nolann B. 8dd9444596 Track Insights link clicks on the file block Download button (#4632) 2026-09-23 17:16:06 +02:00
Peter White bdc2497771 Return 404 instead of looping on missing non-ASCII page paths (#4631) 2026-09-23 14:20:50 +00:00
Peter White 581abe0bb7 Announce pagination at the top of each llms-full.txt part (#4630) 2026-09-23 09:05:44 +02:00
conico974 4503be2f19 Update Next.js dependency to 16.3.6 (#4629) 2026-09-22 21:00:10 +02:00
Peter White bdfc98b97e Add PR description skill and template (#4628) 2026-09-22 17:32:53 +02:00
Brett Jephson 0f0cfde6ba Filter table with client side selection (#4616)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-22 09:28:07 +01:00
Peter White 357af3f6d2 Fix RSS discovery for pages without updates (#4626) 2026-09-21 11:45:24 +02:00
Tomek b95add7b27 Apply release notes tag filters from URL via CSS before first paint (#4613)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-18 16:16:07 +02:00
conico974 99984ebbb3 Implement bypass for URL lookup alternatives (#4620) 2026-09-18 13:50:06 +02:00
Tomek a52daf8b15 align dropdown chevron buttons between group items and page items (#4622) 2026-09-18 11:17:41 +00:00
conico974 f80429e4e8 Update @opennextjs/aws dependency and refine e2e tests (#4587) 2026-09-18 12:18:47 +02:00
spastorelli 6b4c453497 Add server card for published sites MCPs (#4618) 2026-09-18 10:16:27 +02:00
Peter White c7d042a733 Add Slapr PR reactions in engineering (#4617) 2026-09-17 14:04:03 +02:00
Tomek e94a5085eb Fix search popover keyboard focus trap (#4615)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-17 11:21:17 +02:00
Tomek 3ae1524a88 Hide Intercom launcher when Assistant opens (#4614)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-17 11:20:20 +02:00
Nolann B. b967b248e7 Request insights and visitor endpoints relative to the served origin (#4603) 2026-09-16 20:54:20 +02:00
Nolann B. a9e6814744 Let the AI Assistant report documentation findings to the site's team (#4576) 2026-09-15 18:03:37 +02:00
Brett Jephson 5725da19e2 Honour an explicit select slug on a tab (#4601)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-15 13:37:03 +01:00
Peter White 05cff0a03b Hide anchor links on landing pages (#4609) 2026-09-15 09:20:38 +02:00
Nolann B. 1e8c34a426 Let ContentKit webframes dispatch modal and URL actions (#4611) 2026-09-14 15:19:05 +02:00
spastorelli cd881f9ac1 Fix set-cookie in RSC requests conflicting with logout requests (#4606) 2026-09-14 14:45:32 +02:00
Greg Bergé 39316fc205 Add agent actions to the prompt block (#4610)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-09-14 12:01:04 +02:00
Brett Jephson c08d05ade5 Fix select filters on table and cards blocks (#4608)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-11 10:33:02 +00:00
Peter White b9453a92f8 Fix preview auth redirects dropping content paths (#4602) 2026-09-11 08:42:28 +02:00
Peter White 2c4d40ad97 Expose the site MCP tools through WebMCP in published docs (#4604) 2026-09-11 08:30:36 +02:00
Tomek 688515efcf Support fit-content width sizing for ContentKit buttons (#4605)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-10 15:50:37 +02:00
Tomek 931cbe717e Restore Edit on Git page actions (#4597)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
Co-authored-by: Viktor Renkema <49148610+viktorrenkema@users.noreply.github.com>
Co-authored-by: conico974 <nicodorseuil@yahoo.fr>
2026-09-10 12:37:37 +02:00
Tomek 3ef1802e7e Add close button for modals in published sites (#4600)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-09 12:23:17 +02:00
Greg Bergé 8a0e0df84e Fix search section links not scrolling to the target section (#4598)
Co-authored-by: Claude Fable 5.1 <noreply@anthropic.com>
2026-09-09 11:40:58 +02:00
Peter White a9041a309a Fix fallback URL cleanup after successful page navigation (#4599) 2026-09-09 11:22:09 +02:00
conico974 625c108196 Add isRevalidationRequest function to handle specific requests (#4596) 2026-09-08 14:18:32 +02:00
Viktor Renkema 8e87856501 Fix page not found in preview links for sites with a custom homepage (#4594) 2026-09-08 11:27:07 +00:00
Tomek 9b822abbb6 Include page descriptions in markdown output (#4595)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-08 12:38:54 +02:00
Peter White 81dba6455b Resolve stable refs in HTML blocks of published markdown pages (#4592) 2026-09-08 09:45:14 +02:00
Johan Preynat 1faa57b812 Keep revision search results in preview (#4582) 2026-09-07 19:46:57 +02:00
Tomek 40150f0a6c Serve markdown with text/plain content-type for ChatGPT (#4591)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-07 17:13:19 +02:00
Brett Jephson bf29570bd5 RND-12706: measuring tabs fix (#4588)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-07 15:40:43 +01:00
Peter White e8e979b6c0 Serve permanent site redirects (#4586) 2026-09-07 16:07:40 +02:00
Tomek 1f250d1fa8 Add site structure e2e tests for external links (#4584) 2026-09-07 09:31:50 +02:00
Brett Jephson 46b3a18b25 Fix nested select css (#4583)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-04 16:20:52 +01:00
Nolann B. 2ff77e15b5 Attribute a markdown request from the page actions menu (#4581) 2026-09-04 12:17:00 +02:00
Tomek d7c867aa63 Fix MCP/Markdown copy confirmation closing dropdown instantly (#4579)
Co-authored-by: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-03 16:08:53 +02:00
Tomek bcd1c41aa1 Scroll to top when selecting current page in search (#4578)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-03 11:35:07 +02:00
Viktor Renkema 77058e3f17 Support merged cells (#4500)
Co-authored-by: OpenAI Codex <codex@openai.com>
2026-09-03 10:26:43 +02:00
Tomek 8ad7465801 Simplify carousel overflow with edge masks & fix carousel scroll (#4577)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-02 14:32:53 +00:00
arnau 1b7ac0e41b Open inline Ask AI questions in the configured assistant (#4574) 2026-09-02 12:05:37 +02:00
Tomek 5f88f4e680 Improve cross-space page breadcrumbs (#4571)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-02 11:43:35 +02:00
Peter White 7009bb9311 Drop the body-anchored cover gate from paragraph contrast text (#4573) 2026-09-02 11:24:54 +02:00
Johan Preynat e460ec381e Preserve linked page destinations in published search (#4566) 2026-09-01 15:06:26 +02:00
Johan Preynat 0a82628298 Trap keyboard focus within published search (#4567) 2026-09-01 13:12:01 +02:00
conico974 18ff11b68b Bump @opennextjs/aws and @opennextjs/cloudflare versions (#4570) 2026-09-01 12:14:55 +02:00
Peter White 3bf55cef10 Allow adding query params to the @webframe.navigate action (#4569) 2026-09-01 10:14:07 +02:00
Peter White e041e49f11 Wait for integrations to register before showing the cookie banner (#4568) 2026-09-01 09:09:15 +02:00
Johan Preynat c1b5be05eb Allow search to target any section (#4564) 2026-08-31 18:32:02 +02:00
Johan Preynat 7543eb83ad Prewarm Turbopuffer when published search opens (#4563) 2026-08-31 13:32:47 +00:00
Tomek 523b7cd4b6 Support external links (#4561)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-31 13:11:13 +02:00
spastorelli af698a49f5 Extend MCP tests (#4562) 2026-08-31 11:59:46 +02:00
conico974 db67585ee2 Remove MCP authentication path from internal paths registry (#4560) 2026-08-28 14:57:21 +02:00
Peter White a566153d98 Chunk oversized visitor authentication cookies (#4554) 2026-08-28 12:28:53 +02:00
conico974 530f98a9c4 Skip internal paths in URL lookup (#4557) 2026-08-28 12:24:29 +02:00
Tomek 39391259c8 Disable zoom for inline images (#4555) 2026-08-28 11:32:19 +02:00
Nolann B. 35be3835f3 Skip rendering work for off-screen OpenAPI blocks (#4502) 2026-08-27 18:41:33 +02:00
Tomek 4452fd793c Fix link title showing site section name (4542) (#4553)
Co-authored-by: Kai Kewley <kaikewley@gmail.com>
2026-08-27 09:57:32 +02:00
conico974 90566879d2 Improve image signature handling and resizing functionality (#4511) 2026-08-26 15:55:57 +02:00
Zeno Kapitein 40a879ad5f Keep section group dropdown columns readable when space is tight (#4549)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-26 15:05:28 +02:00
Johan Preynat cc441c99c6 Fix published search scope fusion (#4552) 2026-08-26 14:22:33 +02:00
conico974 64e143a15b Bump Next.js to version 16.3.3 (#4547) 2026-08-26 12:32:56 +02:00
Peter White 8c10d92f77 Keep the section group menu open over the collapsed sidebar rail (#4548) 2026-08-26 12:16:13 +02:00
Zeno Kapitein 0a22eb5340 Stop expecting a cookies dialog in the faq.wanttopay.net e2e test (#4550)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-26 11:54:31 +02:00
Zeno Kapitein d9fc4608e3 Stop suggesting previously asked questions in the GitBook Assistant (#4546)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 18:00:30 +02:00
Zeno Kapitein ded2f560e3 Show loose sections in a section group dropdown as secondary links unless the group starts with one (#4545)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 17:14:58 +02:00
Zeno Kapitein a9c5d1b546 Fix the gap between columns in large section group dropdowns (#4544)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:45:41 +02:00
Zeno Kapitein 0ff21b7ae2 Hide the section tabs scroll button when all tabs already fit (#4540)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:35:38 +02:00
Zeno Kapitein 94a496c561 Match the Docs Embed widget to the page it is embedded in (#4533)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:34:54 +02:00
Johan Preynat 148a43ac01 Preserve backend ranking across site sections (#4541) 2026-08-25 14:55:17 +02:00
Johan Preynat 5da854f09c Preserve backend ranking in published search (#4537) 2026-08-25 12:54:24 +02:00
spastorelli b772f74c2b Evaluate <if> blocks when serving markdown pages (#4538) 2026-08-25 12:18:53 +02:00
Zeno Kapitein e0bd04f641 Render headings with the site's heading font (#4531)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 12:08:03 +02:00
conico974 8d7c3edda8 Disable metadata fetching in revision-related API calls (#4459) 2026-08-24 13:55:50 +02:00
conico974 80951e9889 Remove CODEOWNERS file for API data cache functions (#4536) 2026-08-24 13:43:37 +02:00
Nolann B. 185dd8337e Defer tracking scripts until after load and idle (#4529) 2026-08-24 12:18:30 +02:00
Peter White da7fb13d83 Fail closed in /~gitbook/revalidate when GITBOOK_SECRET is unset (#4535) 2026-08-24 12:11:40 +02:00
conico974 49c993f181 Add API token expiration check (#4532) 2026-08-21 11:29:38 +02:00
Zeno Kapitein 90b54682e5 Redesign the site OAuth consent screen for published sites MCP (RND-12071) (#4530)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 22:45:46 +02:00
Zeno Kapitein 1dccf8f06c Fix table-of-contents page group's first item cut off after navigation (RND-11314) (#4391)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
Co-authored-by: copilot-swe-agent[bot] <198982749+Copilot@users.noreply.github.com>
Co-authored-by: zenoachtig <8304582+zenoachtig@users.noreply.github.com>
2026-08-20 15:28:02 +02:00
Nolann B. 810244e8a9 Stop preloading zoom-modal images at render time (#4528) 2026-08-20 15:02:00 +02:00
Tomek 0dd2f4fbcd Show containing section name when hovering direct space links (RND-12437) (#4525) 2026-08-20 14:06:10 +02:00
Nolann B. 8a700222e6 Only track embed view events once the frame is shown (RND-12362) (#4517) 2026-08-20 14:04:14 +02:00
Nolann B. b13fd91afc Compute the AI chat time greeting after mount to avoid a hydration mismatch (#4527) 2026-08-20 13:52:52 +02:00
Nolann B. 8a6baaba6a Load the admin toolbar and its CSS lazily (RND-12524) (#4526) 2026-08-20 13:47:49 +02:00
Zeno Kapitein 48fba7cb49 Fix: highlight a TOC link entry when on the page or section it points to (RND-11155) (#4476)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 12:48:45 +02:00
Zeno Kapitein 6928a9b00a Hide card fields that render no content (#4523)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 12:48:37 +02:00
Nolann B. 7bab574c63 Self-host default fonts and inline only the ones a site uses (RND-12524) (#4522) 2026-08-20 12:36:55 +02:00
conico974 75bdff3ff3 Add support for AI agent detection and robots directives in markdown (#4524) 2026-08-20 12:18:17 +02:00
Peter White 56c25587db Make keyboard shortcuts work on non-QWERTY layouts (#4516) 2026-08-19 15:03:34 +00:00
Zeno Kapitein cf4efc7213 Fix search input losing focus before hydration (RND-11849) (#4438)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-19 12:30:11 +02:00
Zeno Kapitein 1ef71609e7 Show the light/dark toggle on laptop-width screens (#4515)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-19 12:29:58 +02:00
Zeno Kapitein 195c9e6b84 Apply and remember the ?theme= light/dark override in the docs embed (#4380)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-08-19 11:07:23 +02:00
Zeno Kapitein 09f39f8300 Vertically center breadcrumb icons (#4513) 2026-08-19 08:52:10 +00:00
Peter White 9002f6598a Fix embed search suggested questions not opening the assistant (#4514) 2026-08-18 17:19:25 +02:00
Zeno Kapitein 01c9b059c6 Require Ctrl/Cmd to zoom Mermaid diagrams with the wheel (RND-12338) (#4465)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-18 16:37:49 +02:00
Zeno Kapitein 6d02b8ab72 Fix TS code block comment punctuation color in dark mode (RND-12204) (#4460)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-18 16:36:07 +02:00
Peter White 177ef8582a Fix Docs Embed host actions not reaching the assistant (#4512) 2026-08-18 16:33:03 +02:00
Zeno Kapitein 78c589ffba Align Previous/Next page navigation to opposite edges (RND-11235) (#4494)
Co-authored-by: Claude <noreply@anthropic.com>
2026-08-18 13:36:08 +02:00
Nolann B. e4b214e6bd Fix large OpenAPI payload section not being scrollable (RND-12291) (#4510) 2026-08-18 13:17:33 +02:00
Tomek 64ce9e180d Render site-space custom home page at root (#4475)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-18 12:20:52 +02:00
conico974 c64d3a50e8 Refactor CSS compatibility checks (#4504) 2026-08-18 10:30:43 +02:00
spastorelli fd070ce9ca Redirect to the upstream auth logout URL on ~gitbook/auth/logout (#4489) 2026-08-18 10:27:48 +02:00
Tomek 048c4e4c70 Fix tooltip data-popup-open state conflict and AI messages collapsible (#4509)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-18 10:22:47 +02:00
conico974 fb01dc9ecb Remove unused Cloudflare image resizing function (#4507) 2026-08-17 17:26:32 +02:00
Nolann B. d33e570bc7 Fix the spacebar being swallowed in the search bar (RND-12484) (#4508) 2026-08-17 13:21:21 +00:00
Tomek 87fd234d55 Fix dropdown icon rotation by reading dropdown open state (#4503)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-17 14:55:09 +02:00
Claire Chabas 0f32eb17d1 Fix toggle chevron alignment in ToC (#4505) 2026-08-17 14:41:44 +02:00
Tomek 3e29680792 Stabilize visual CI tests (#4506)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-17 13:14:47 +02:00
Nolann B. b3db1c58c8 Migrate headless UI primitives from Radix and react-aria to Base UI (#4499) 2026-08-15 21:05:32 +02:00
Nolann B. 0f994016f4 Update OpenAPI customer test URL (#4498) 2026-08-13 18:43:33 +02:00
Nolann B. 419094b79d Stop every DOM change from restyling the whole document (#4492) 2026-08-13 17:18:48 +02:00
Greg Bergé 95d23775ce Migrate repository to Oxlint and Oxfmt (#4497) 2026-08-13 13:18:42 +00:00
spastorelli aa98859560 Detect and pass visitor type for site resolution (#4490) 2026-08-13 14:33:10 +02:00
Tomek ea19801cfa feat: add greeting customization to AI chat (#4483) 2026-08-13 11:17:26 +00:00
Peter White 13059b843c Fix Docs Embed being stuck on the Search tab (RND-12435) (#4496) 2026-08-13 06:57:13 +00:00
Johan Preynat 3db14ad950 Fix search result links for page matches (RND-11916) (#4488) 2026-08-12 17:43:57 +02:00
Nolann B. 5fac9e37ee Move the OpenAPI package from react-aria to Base UI (#4473) 2026-08-12 14:53:09 +02:00
Nolann B. 1424c566a0 Load the OpenAPI renderer only on pages that use it (#4472) 2026-08-12 14:53:09 +02:00
conico974 65f99eafe5 Reduce bundle size on the server (#4464) 2026-08-12 13:22:51 +02:00
Tomek 7594a334d8 Show image thumbnails for file attachments (#4486)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-11 13:09:16 +02:00
conico974 827e4f9856 Fix variant switcher URL for non-default variants (#4487) 2026-08-11 13:09:14 +02:00
Peter White a9a1a609c5 Fix sticky search results when switching the search filter RND-12265 (#4485) 2026-08-11 10:15:36 +02:00
conico974 61405a3036 feat: add CSS browser compatibility check for pull requests (#4478) 2026-08-07 15:44:52 +02:00
conico974 634a24ff03 Fix text visibility issues on pages with background covers in Firefox and iOS Safari (#4477) 2026-08-07 12:46:26 +02:00
Nolann B. 2ccd43ee5e Lazy-load the Mermaid code block (#4468) 2026-08-06 08:59:03 +02:00
Nolann B. cd506e3f79 Split the Shiki highlighter from the plain token helpers (#4467) 2026-08-06 08:59:02 +02:00
Brett Jephson a6644074cb Fix: select no longer stored in url (#4466)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-05 11:59:56 +01:00
conico974 4be043d96e Add support for visitor token revalidation without redirection (#4463) 2026-08-05 09:50:26 +02:00
Brett Jephson 673f4b6076 RND-11832: button with select slug action (#4462) 2026-08-04 14:12:13 +01:00
Brett Jephson d0a63bab91 Tab - reinstate scroll hash (#4458)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-08-04 14:42:30 +02:00
conico974 ca9a1dd396 Block crawler from using ask endpoint (#4457) 2026-08-03 11:47:17 +02:00
claude[bot] 996d7ec021 Scroll to in-page heading even when the URL hash is unchanged (RND-12290) (#4454)
Co-authored-by: Claude <noreply@anthropic.com>
Co-authored-by: Tomek Gargula <tomasz@gitbook.com>
2026-07-31 10:36:37 +02:00
Brett Jephson f9ad9b5356 RND-11830: select store URL param (#4439)
Co-authored-by: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-30 16:05:36 +01:00
Nolann B. 332089eca9 Don't forward cookies through the OpenAPI Scalar proxy (#4451) 2026-07-30 10:06:17 +02:00
Zeno Kapitein 6ac4cf4b76 Align card and column breakpoints (#4449) 2026-07-29 12:13:25 +00:00
Zeno Kapitein 5c74eef602 Make the table search empty state more prominent (#4418)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-28 16:13:02 +02:00
Zeno Kapitein 1ee1853995 Add an assistant tool to rate its own previous response (#4425)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-28 16:10:41 +02:00
Tomek fa9c9b38b7 Force software rendering in Playwright for consistent images (#4444)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-27 14:01:55 +00:00
conico974 b4d9c6b95e Fix BUILD_VERSION assignment to ensure fallback to current timestamp (#4445) 2026-07-27 15:47:54 +02:00
Tomek 588964279e Remove search value from URL on unfocus (#4443)
Co-authored-by: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-27 10:46:02 +00:00
Nolann B. a80d41200a Run the OpenAPI Scalar proxy on GitBook's origin (#4440) 2026-07-24 18:36:27 +02:00
Nolann B. ccb9d7bda4 Submit sendFeedback MCP tool findings through submitSiteAgentFeedback (#4437) 2026-07-24 10:34:50 +02:00
Nolann B. 14562e9e5b Serve noindex on internal search/assistant URLs (?q= / ?ask=) (#4433) 2026-07-23 15:00:13 +02:00
spastorelli 580d186ddd Clean up old forward resume authorize to sites oauth server (#4436) 2026-07-23 14:08:56 +02:00
Tomek 038008c853 Fix heading anchor links on touch devices (#4435)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-23 11:56:21 +00:00
conico974 8c890522ed Patch next for dev, and fix issue in dev with inline icon (#4432) 2026-07-22 16:00:36 +02:00
conico974 e9558a6df7 Revert "Simplify search query handling to in-memory storage only (#4419)" (#4431) 2026-07-22 14:53:29 +02:00
Brett Jephson b5f3c1416a RND-11857: Prompt block with default expanded options (#4429) 2026-07-22 13:33:06 +01:00
conico974 b9d383bed3 Bump dependencies for @opennextjs/aws, @opennextjs/cloudflare, and next to latest versions (#4430) 2026-07-22 11:01:17 +02:00
spastorelli b6e7f2d2db Render the Site OAuth consent screen from the server's signed marker (#4428) 2026-07-22 09:59:30 +02:00
Tomek 94ef1769ec Simplify search query handling to in-memory storage only (#4419)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-22 07:54:50 +00:00
Zeno Kapitein ae9367dafe Only show the assistant activity heading when there's activity to reveal (#4424)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-21 14:47:58 +02:00
Zeno Kapitein cef18701be Add an assistant tool to submit page feedback (#4408)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-21 13:25:14 +02:00
Zeno Kapitein bf674a47d9 Add supporting context to AI tool confirmation dialogs (#4422)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-21 11:45:51 +02:00
conico974 1eb763f9c5 Implement API token cookie handling with chunking support (#4421) 2026-07-20 15:38:07 +02:00
Nolann B. db176ba0ea Add "On this page" on models page (#4417) 2026-07-20 13:17:02 +02:00
Nolann B. 03bbacf319 Add missing link reference to OpenAPI models (#4416) 2026-07-20 12:53:28 +02:00
Tomek 484cc11627 Fix ScrollContainer scroll buttons not reflecting overflow immediately (#4414)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-07-20 08:47:04 +00:00
spastorelli 0dee4155a2 Add consent flow env vars to next config (#4413) 2026-07-17 15:16:46 +00:00
spastorelli 4d7c01587e Add Sites OAuth consent screen (#4405) 2026-07-17 15:58:27 +02:00
Greg Bergé 6083a88845 Expose the current page context to integration block webframes (#4411)
Co-authored-by: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-17 12:06:38 +02:00
Nolann B. bf6a7af72b Defer search index loading until search is opened (#4407) 2026-07-16 21:53:24 +02:00
Utku Ufuk 703e654a37 Split the default-scope site search into two parallel API requests (#4395) 2026-07-16 15:23:30 +03:00
conico974 1b571aeaa9 Fix scroll behavior for navigation (#4406) 2026-07-16 14:21:01 +02:00
885 changed files with 33968 additions and 11578 deletions
@@ -0,0 +1,48 @@
---
name: write-pr-description
description: Write a concise, product-focused PR description from the changes and available discussion. Use when asked for a PR summary or description.
---
# Write a PR description
Read the full branch diff and commit history against the PR's base branch, not just the latest commit. Use the PR discussion and linked issues for context when available. The PR's changes are the source of truth for what ships if an issue describes something different.
Write for contributors and reviewers who may not know the area. Lead with what changes, prefer user or product impact when supported, and include implementation details only when they help review. Keep the proposed changes short, using bullets only when useful.
Include relevant validation and screenshots when available. Do not claim checks passed unless they ran. Use only information appropriate for a public repository; do not copy private issue details or customer information into the description.
## Template and changelog
Read `.github/pull_request_template.md` immediately before writing. Preserve its required section names and order. Include `Proposed changes` and `Changelog`; omit `Demo` when there is nothing to show. Add optional `Context` before `Changelog` only when it meets the rule below.
Write a short changelog entry describing what shipped. Use `[Feature]` for user-facing additions or improvements, `[Fix]` for user-facing bug fixes, and `[Chore]` for internal maintenance. For features and fixes, say what users can do or what no longer goes wrong in plain words. Keep chores useful to teammates without inventing user impact. Remove unused examples and placeholders. Usually one entry is enough; use more only for distinct changes. The PR changelog does not replace any changeset required by `AGENTS.md`.
## Optional context
Write `Proposed changes` and `Changelog` first. Add `Context` only when it tells someone unfamiliar with the area something material that the changelog does not. `Problem` names a concrete failure or limitation supported by the PR or discussion. `Outcome` names what this PR delivers at its actual scope. Omit the section if either field would repeat the changelog, describe only implementation, or guess at an impact.
```markdown
## Context
**Problem:** <concrete failure or limitation>
**Outcome:** <result delivered by this PR>
```
Keep each field to 1–2 short, non-technical sentences. Prefer user or product impact when supported. For infrastructure changes, explain the failure or limitation they caused. Do not invent an actor, customer segment, ownership, or impact, or force the change into a user story. Do not turn a preparatory change into a claim that the whole workflow is fixed. Keep the roles distinct: `Context` explains why this matters, `Changelog` says what shipped, and `Proposed changes` can explain implementation.
Examples:
- A dependency bump with no demonstrated user effect needs no `Context`.
- If creating the first change request leaves the user on an empty screen, say that it now opens after creation. Leave the animation-listener details in `Proposed changes`.
- If a PR indexes links for later checks, describe the indexing result. Do not claim every link has already been checked.
## Writing pass
- Use plain words and direct verbs: "use" instead of "leverage", "help" instead of "facilitate". Prefer active voice when the actor is known.
- Name the concrete behavior instead of saying "improves the experience" or "makes it more robust". Support performance claims with measurements.
- Cut filler, promotional language, and generic conclusions. If a sentence could fit almost any PR, make it specific or delete it.
- Keep one idea per sentence and use consistent names. Remove redundant hedging without hiding real uncertainty.
- Avoid "not just X, but Y", forced groups of three, em dashes, decorative emojis, and unnecessary bold text.
Return the description in a Markdown code block unless asked to update the PR. When asked to update it, apply the description with `gh pr edit` using a body file.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Assistant: you can now send follow-up questions while an answer is still being written. Each one appears as your own message with a "Queued" badge (hover for when it will send, × to cancel), and they're sent automatically one at a time as each answer completes.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": minor
---
Add a carousel layout option to cards blocks, rendering them as a horizontally-scrolling, scroll-snapping row instead of a wrapping grid.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix horizontal page scroll caused by card carousels bleeding past the viewport.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix the docs embed `navigateToPage` API on multi-space sites. Deep-linking to a page in a different space/section (e.g. `navigateToPage('/help-center/integrations')`) previously 404'd because the section base was not placed before `~gitbook/embed/page`. The target is now resolved to its space server-side, so pages in any space resolve correctly. The input accepts the page path, an absolute path, or the full published URL.
@@ -1,6 +0,0 @@
---
"@gitbook/colors": patch
"gitbook": patch
---
A near-white tint color (e.g. a warm `#F5F3EF`) is now taken as the exact page background, mirroring the existing behavior for near-black tints. The tint's exact lightness, hue and chroma are preserved, and the color is anchored to whichever scale step the active theme renders as the background — so it matches exactly on `muted` (which uses the second step) as well as `clean`. This applies only to near-neutral tints that are light enough to read as a background; saturated or merely light-ish colors keep their normal accent scale. The `bold` theme is unaffected: it already uses the tint for the header and stays intentionally two-tone.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Add cover image background mode and masks
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Button blocks now respect the `size` option, so you can render small, medium, or large buttons.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": minor
---
Add an `askQuestion` tool to the site MCP server. Alongside `searchDocumentation` and `getPage`, MCP clients can now ask a natural-language question and get a synthesized answer with links to the source pages, powered by the same AI search backend as the site's "ask a question" experience. The tool accepts an optional `goal` param so calling agents can attach the intent they're trying to accomplish, which tailors the answer and is tracked in analytics. The tool is only exposed on sites that have AI enabled.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Remove the ChatGPT-specific plain text response for Markdown and llms.txt routes; these now always serve `text/markdown`.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Remove GBO's redundant re-selection of the best-scoring search section. The search API now returns a single highest-scoring section per page (and orders sections highest-score-first), so GBO no longer needs its own `getBestScoredResult` helper to pick the best section for the search and MCP previews. No user-visible change.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Sync the API reference responses selector with the "Responses" collapsibles, and keep the selected response in sync across every operation on the page (like the code sample language selector). Selecting a status code now expands the matching response section and applies to all operations at once.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix a light/dark flash on published sites configured to respect the system default (no theme toggle). Such sites forced the `system` theme, but `next-themes`' pre-paint script applies a forced value verbatim without resolving `prefers-color-scheme`, so the page painted light and only switched to dark after hydration. We now leave the theme unforced when the default is `system` (only concrete light/dark themes are forced), letting `next-themes`' existing pre-paint script resolve the system preference before first paint.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Add a `sendFeedback` MCP tool so AI agents can report documentation findings (outdated / incoherent / gap / other) as `agent_feedback` insights events. The tool only accepts finding categories, so it never records positive feedback.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Separate the prompt block actions into a primary "Open in" dropdown and a secondary "Copy prompt" button, instead of a single combined button group, and align the block's design with the expandable block (bordered frame, left disclosure chevron, and subtle elevation when expanded).
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix the docs embed widget shipping a stale script: declare the embed package's `standalone/` bundle as a Turbo build output. Because it wasn't declared, changes confined to the standalone widget (which compiles to `standalone/` but not `dist/`) didn't invalidate the downstream `generate` cache that copies it into the app, so the deployed widget could lag the source — e.g. the `clipboard-write` permission on the widget iframe never reached production, breaking the copy button in the Assistant embed.
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Refine the per-paragraph AI ask button: shorten its tooltip to "Ask" (from "Ask <assistant> about this"), and hide it inside cards where it would otherwise be clipped by the card's overflow.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show only the server's results in site search, with a loading state until they arrive.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Keep the "On this page" and "Ask" buttons pinned below the header while scrolling on desktop API reference pages, so the page outline stays reachable throughout long operations.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Hide unfocusable unlabelled button from screen readers
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Only show the "Back to [space]" shortcut for cross-space links in the table of contents, not for in-content text links or other ways of reaching another space.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
a11y screen reader fixes
-6
View File
@@ -1,6 +0,0 @@
---
"@gitbook/react-contentkit": patch
"gitbook": patch
---
Let integration block webframes navigate the reader to another page in the site by posting a `@webframe.navigate` action with a `path` (and optional `anchor`). Resolved client-side against the site base path, so navigation stays in-site and drives the standard navigation progress bar.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Fix an issue where certain keywords could cause an exception when rendering emojis
+1
View File
@@ -0,0 +1 @@
../../.agents/skills/write-pr-description
+1
View File
@@ -0,0 +1 @@
../../.agents/skills/write-pr-description
+10
View File
@@ -0,0 +1,10 @@
# Stop editors from looking for .editorconfig files in parent directories.
root = true
[*]
charset = utf-8
end_of_line = lf
indent_style = space
indent_size = 4
insert_final_newline = true
max_line_length = 100
-3
View File
@@ -1,3 +0,0 @@
# Changes to the API data cache functions can invalidate all existing data cache
# causing a massive amount of revalidation, impacting our API.
packages/gitbook/src/lib/data/api.ts @SamyPesse
+47 -66
View File
@@ -1,110 +1,91 @@
# Welcome to GitBook's contributing guide!
# Contributing to GitBook
> _For help, support, feature requests, and product questions - head to our [GitHub Community](https://github.com/orgs/GitbookIO/discussions) 🤖_
> _For help, support and product questions, head to our [GitHub Community](https://github.com/orgs/GitbookIO/discussions)._
Thank you for investing your time in contributing to GitBook. Any contribution you make will be reviewed by our team. In this guide, you'll learn the different ways you can contribute.
Thanks for helping make GitBook better. This repository holds the open source renderer behind every published GitBook site, and the team reads everything that comes in here.
## Types of Contributions
## Ways to contribute
This repository contains code related to the rendering engine of GitBook's published content. Depending on what you'd like to contribute to, head to the section below to find the necessary steps.
- **Open an issue.** Report a bug, suggest a feature, or tell us when something feels off. This is the most useful thing you can do.
- **Join the conversation.** Share ideas and help others in [GitHub Community](https://github.com/orgs/GitbookIO/discussions).
- **Build with GitBook.** Publish your docs, try new features early, and tell us what works and what doesn't.
### Add a feature
## Issues instead of pull requests
Because this portion of GitBook is open source and available for you to use - if you think you can provide extra value through a new feature - you're welcome to add it! If you plan to distribute the code, keep the source code public to comply with GNU GPLv3. To clone in a private repository, you must first acquire a [commercial license](https://www.gitbook.com/pricing).
Pull requests are limited to the GitBook team. If you've found a bug or want something to change, please [open an issue](https://github.com/GitbookIO/gitbook/issues/new/choose) instead.
### Create a new issue
This isn't because we don't want your help. Every change here ships to every published GitBook site, so we need to own each one from start to finish. A clear issue often helps us more than a pull request: it tells us what's wrong and why, and lets us fix it in a way that fits the rest of the codebase.
If you spot a problem within a repository, [search if an issue already exists](https://docs.github.com/en/github/searching-for-information-on-github/searching-on-github/searching-issues-and-pull-requests#search-by-the-title-body-or-comments). If a related issue doesn't exist, you can open a new issue here!Please make sure any added issues are
A good issue includes:
- Descriptive
- Thoughtful
- Organized
- What you expected to happen, and what happened instead
- A link to a published GitBook site that shows the problem, if you have one
- Steps to reproduce it, plus screenshots or a recording for anything visual
- Your browser and OS, if it looks like it might matter
We recommend adding as many relevant links, minimal reproductions of the issue, and other materials that will help our team solve the issue fast.
Before opening one, [search existing issues](https://github.com/GitbookIO/gitbook/issues). If someone has already reported it, add a 👍 or any extra details you have.
### Solve an issue
Already fixed it in your fork? Link the branch or commit in your issue. We may open a pull request from it, and your commits keep your name.
If you're interested in solving an issue in our repository, start by scanning through it's exisiting issues to find one that you're interested in working on. If you find an issue to work on, you are welcome to open a PR with a fix. See the following sections below for more information on contributing for specific sections.
If you open a pull request anyway, we'll close it and point you here. Nothing personal, and we'd still love the issue.
### Documentation
## Reach out
The official documentation on GitBook open can be found directly in this Readme. Any updates or changes you would like to make, you can make directly to the README of this repository.
Not sure if it's a bug? Have a half-formed idea? Open an issue or start a [discussion](https://github.com/orgs/GitbookIO/discussions) anyway. We'd much rather hear from you than not, and no report is too small.
## Contributing
Spotted a wrong or missing translation? Open an issue with the string and the wording you'd suggest.
### Make changes locally
## Using AI
Any contribution you make can be made to the code located in this repository. In order to contribute, you'll need to start off of a local version of this repository.
You're welcome to use AI to help you write an issue. Please read and check what it produces before you post: reports that are long, vague or unverified take time away from fixing real problems, and we may close them without a reply.
#### 1. Fork the repository
## Running locally
##### Using GitHub Desktop:
You don't need a local setup to open an issue, but it can help you reproduce a problem or self-host the renderer.
- [Getting started with GitHub Desktop](https://docs.github.com/en/desktop/installing-and-configuring-github-desktop/getting-started-with-github-desktop) will guide you through setting up Desktop.
- Once Desktop is set up, you can use it to [fork the repo](https://docs.github.com/en/desktop/contributing-and-collaborating-using-github-desktop/cloning-and-forking-repositories-from-github-desktop)!
### Prerequisites
##### Using the command line:
- [Node.js](https://nodejs.org/en) (see "engines" in `package.json`)
- [Bun](https://bun.sh/) (see "packageManager" in `package.json`)
- [Fork the repo](https://docs.github.com/en/github/getting-started-with-github/fork-a-repo#fork-an-example-repository) so that you can make your changes without affecting the original project until you're ready to merge them.
### Setup
#### 2. Create a working branch and start with your changes
1. Use the project's version of Node:
After forking this repository, you'll want to [create a branch](https://docs.github.com/en/issues/tracking-your-work-with-issues/creating-a-branch-for-an-issue) to work off of.
#### 3. Install dependencies and run the project locally
##### Prerequisites:
- [Node.js](https://nodejs.org/en) (see "engines" in `package.json`)
- [Bun](https://bun.sh/) (see "packageManager" in `package.json`)
##### Setup steps:
1. Ensure you are using the project's version of Node:
```bash
nvm use
```
2. Install dependencies using Bun:
2. Install dependencies:
```bash
bun install
```
3. Start the development server:
```bash
bun dev
```
Additional development commands:
- `bun format`: Format the code using Biome
- `bun typecheck`: Run TypeScript type checking
- `bun unit`: Run unit tests
- `bun e2e`: Run end-to-end tests
Other commands:
#### 4. Preview your changes
- `bun lint`: Lint the code using Oxlint
- `bun lint:fix`: Automatically fix lint issues using Oxlint
- `bun format`: Format the code using Oxfmt
- `bun format:check`: Check formatting without changing files
- `bun typecheck`: Run TypeScript type checking
- `bun unit`: Run unit tests
- `bun e2e`: Run end-to-end tests
When running the development server, published GitBook sites can be rendered through your local version at `http://localhost:3000/url`.
### Preview a site
For example, our published docs can be viewed using the local version by visiting `http://localhost:3000/url/gitbook.com/docs` after running the development server.
With the development server running, any published GitBook site can be rendered through your local version at `http://localhost:3000/url/<published-url>`. For example, visit `http://localhost:3000/url/gitbook.com/docs` to see our own docs.
You can visit any published GitBook site behind your development server. Please make sure your site is [published publicly](https://gitbook.com/docs/published-documentation/publish-your-content-as-a-docs-site) to ensure you can view the site correctly in your development version.
The site must be [published publicly](https://gitbook.com/docs/published-documentation/publish-your-content-as-a-docs-site) to render locally.
### Commit your update
## License
[Commit your changes](https://github.com/git-guides/git-commit) once you are happy with them. See [Atom's contributing guide](https://github.com/atom/atom/blob/master/CONTRIBUTING.md#git-commit-messages) to know how to use emoji for commit messages!
The renderer is distributed under the [GNU GPLv3 License](https://github.com/GitbookIO/gitbook/blob/main/LICENSE). If you distribute the code, you must keep the source code public. To use it in a private repository, you need a [commercial license](https://www.gitbook.com/pricing).
Once your changes are ready, don't forget to self-review your code to double check that your chagnes are ready to be added.
### Pull Request
When you're finished with the changes, [create a pull request](https://docs.github.com/en/pull-requests/collaborating-with-pull-requests/proposing-changes-to-your-work-with-pull-requests/creating-a-pull-request), also known as a PR.
- Don't forget to [link PR to issue](https://docs.github.com/en/issues/tracking-your-work-with-issues/linking-a-pull-request-to-an-issue) if you are solving one.
- Enable the checkbox to [allow maintainer edits](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/allowing-changes-to-a-pull-request-branch-created-from-a-fork) so the branch can be updated for a merge. Once you submit your PR, a GitBook team member will review your proposal. We may ask questions or request for additional information.
- We may ask for changes to be made before a PR can be merged, either using [suggested changes](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/incorporating-feedback-in-your-pull-request) or pull request comments. You can apply suggested changes directly through the UI. You can make any other changes in your fork, then commit them to your branch.
- As you update your PR and apply changes, mark each conversation as [resolved](https://docs.github.com/en/github/collaborating-with-issues-and-pull-requests/commenting-on-a-pull-request#resolving-conversations).
- If you run into any merge issues, checkout this [git tutorial](https://lab.github.com/githubtraining/managing-merge-conflicts) to help you resolve merge conflicts and other issues.
### Your PR is merged
Congratulations 🎉 Thank you for your contribution! Once your PR is merged, your contributions will be publicly visible on the relevant repository.
The [`@gitbook/embed`](https://github.com/GitbookIO/gitbook/blob/main/packages/embed) package is distributed under the [Apache License 2.0](https://github.com/GitbookIO/gitbook/blob/main/packages/embed/LICENSE). Contributions to it are made under the same license.
@@ -1,83 +1,83 @@
name: Gradual Deploy to Cloudflare
description: Use gradual deployment to deploy to Cloudflare. This action will upload the middleware and server versions to Cloudflare and kept them bound together
inputs:
apiToken:
description: 'Cloudflare API token'
required: true
accountId:
description: 'Cloudflare account ID'
required: true
environment:
description: 'Cloudflare environment to deploy to (staging, production, preview)'
required: true
middlewareVersionId:
description: 'Middleware version ID to deploy'
required: true
serverVersionId:
description: 'Server version ID to deploy'
required: true
apiToken:
description: 'Cloudflare API token'
required: true
accountId:
description: 'Cloudflare account ID'
required: true
environment:
description: 'Cloudflare environment to deploy to (staging, production, preview)'
required: true
middlewareVersionId:
description: 'Middleware version ID to deploy'
required: true
serverVersionId:
description: 'Server version ID to deploy'
required: true
outputs:
deployment-url:
description: "Deployment URL"
value: ${{ steps.deploy_middleware.outputs.deployment-url }}
deployment-url:
description: 'Deployment URL'
value: ${{ steps.deploy_middleware.outputs.deployment-url }}
runs:
using: 'composite'
steps:
- id: wrangler_status
name: Check wrangler deployment status
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: deployments status --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
using: 'composite'
steps:
- id: wrangler_status
name: Check wrangler deployment status
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: deployments status --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
# This step is used to get the version ID that is currently deployed to Cloudflare.
- id: extract_current_version
name: Extract current version
shell: bash
run: |
version_id=$(echo "${{ steps.wrangler_status.outputs.command-output }}" | grep -A 3 "(100%)" | grep -oP '[0-9a-f]{8}-[0-9a-f]{4}-[0-9a-f]{4}-[0-9a-f]{4}-[0-9a-f]{12}')
echo "version_id=$version_id" >> $GITHUB_OUTPUT
# This step is used to get the version ID that is currently deployed to Cloudflare.
- id: extract_current_version
name: Extract current version
shell: bash
run: |
version_id=$(echo "${{ steps.wrangler_status.outputs.command-output }}" | grep -A 3 "(100%)" | grep -oP '[0-9a-f]{8}-[0-9a-f]{4}-[0-9a-f]{4}-[0-9a-f]{4}-[0-9a-f]{12}')
echo "version_id=$version_id" >> $GITHUB_OUTPUT
- id: deploy_server
name: Deploy server to Cloudflare at 0%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ steps.extract_current_version.outputs.version_id }}@100% ${{ inputs.serverVersionId }}@0% -y --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
- id: deploy_server
name: Deploy server to Cloudflare at 0%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ steps.extract_current_version.outputs.version_id }}@100% ${{ inputs.serverVersionId }}@0% -y --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
# Since we use version overrides headers, we can directly deploy the middleware to 100%.
- id: deploy_middleware
name: Deploy middleware to Cloudflare at 100%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ inputs.middlewareVersionId }}@100% -y --config ./packages/gitbook/openNext/customWorkers/middlewareWrangler.jsonc
# Since we use version overrides headers, we can directly deploy the middleware to 100%.
- id: deploy_middleware
name: Deploy middleware to Cloudflare at 100%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ inputs.middlewareVersionId }}@100% -y --config ./packages/gitbook/openNext/customWorkers/middlewareWrangler.jsonc
- name: Deploy server to Cloudflare at 100%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ inputs.serverVersionId }}@100% -y --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
- name: Deploy server to Cloudflare at 100%
uses: cloudflare/wrangler-action@v3.14.0
with:
apiToken: ${{ inputs.apiToken }}
accountId: ${{ inputs.accountId }}
workingDirectory: ./
wranglerVersion: '4.43.0'
environment: ${{ inputs.environment }}
command: versions deploy ${{ inputs.serverVersionId }}@100% -y --config ./packages/gitbook/openNext/customWorkers/defaultWrangler.jsonc
- name: Outputs
shell: bash
env:
DEPLOYMENT_URL: ${{ steps.deploy_middleware.outputs.deployment-url }}
run: |
echo "URL: ${{ steps.deploy_middleware.outputs.deployment-url }}"
- name: Outputs
shell: bash
env:
DEPLOYMENT_URL: ${{ steps.deploy_middleware.outputs.deployment-url }}
run: |
echo "URL: ${{ steps.deploy_middleware.outputs.deployment-url }}"
+53 -52
View File
@@ -1,34 +1,34 @@
name: 'Deploy cloudflare'
description: 'Deploy GitBook to Cloudflare'
inputs:
opItem:
description: '1Password item to load secrets from'
required: true
opServiceAccount:
description: '1Password service account token'
required: true
apiToken:
description: 'Cloudflare API token'
required: true
accountId:
description: 'Cloudflare account ID'
required: true
environment:
description: 'Cloudflare environment to deploy to (staging, production, preview)'
required: true
deploy:
description: 'Deploy as main version for all traffic instead of uploading versions'
required: true
commitTag:
description: 'Commit branch to associate with the deployment'
required: true
commitMessage:
description: 'Commit message to associate with the deployment'
required: true
opItem:
description: '1Password item to load secrets from'
required: true
opServiceAccount:
description: '1Password service account token'
required: true
apiToken:
description: 'Cloudflare API token'
required: true
accountId:
description: 'Cloudflare account ID'
required: true
environment:
description: 'Cloudflare environment to deploy to (staging, production, preview)'
required: true
deploy:
description: 'Deploy as main version for all traffic instead of uploading versions'
required: true
commitTag:
description: 'Commit branch to associate with the deployment'
required: true
commitMessage:
description: 'Commit message to associate with the deployment'
required: true
outputs:
deployment-url:
description: "Deployment URL"
value: ${{ steps.upload_middleware.outputs.deployment-url }}
description: 'Deployment URL'
value: ${{ steps.upload_middleware.outputs.deployment-url }}
runs:
using: 'composite'
steps:
@@ -42,32 +42,34 @@ runs:
- name: Load secret
uses: 1password/load-secrets-action@v2
env:
OP_SERVICE_ACCOUNT_TOKEN: ${{ inputs.opServiceAccount }}
GITBOOK_URL: ${{ inputs.opItem }}/GITBOOK_URL
GITBOOK_ICONS_URL: ${{ inputs.opItem }}/GITBOOK_ICONS_URL
GITBOOK_ICONS_TOKEN: ${{ inputs.opItem }}/GITBOOK_ICONS_TOKEN
NEXT_SERVER_ACTIONS_ENCRYPTION_KEY: ${{ inputs.opItem }}/NEXT_SERVER_ACTIONS_ENCRYPTION_KEY
GITBOOK_SECRET: ${{ inputs.opItem }}/GITBOOK_SECRET
GITBOOK_APP_URL: ${{ inputs.opItem }}/GITBOOK_APP_URL
GITBOOK_API_URL: ${{ inputs.opItem }}/GITBOOK_API_URL
GITBOOK_API_PUBLIC_URL: ${{ inputs.opItem }}/GITBOOK_API_PUBLIC_URL
GITBOOK_API_TOKEN: ${{ inputs.opItem }}/GITBOOK_API_TOKEN
GITBOOK_OAUTH_SERVER_URL: ${{ inputs.opItem }}/GITBOOK_OAUTH_SERVER_URL
GITBOOK_PREVIEW_BASE_URL: ${{ inputs.opItem }}/GITBOOK_PREVIEW_BASE_URL
GITBOOK_INTEGRATIONS_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_HOST
GITBOOK_INTEGRATIONS_CONTENT_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_CONTENT_HOST
GITBOOK_IMAGE_RESIZE_SIGNING_KEY: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SIGNING_KEY
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL_2
GITBOOK_IMAGE_RESIZE_SALT: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SALT
GITBOOK_IMAGE_RESIZE_MODE: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_MODE
GITBOOK_ASSETS_PREFIX: ${{ inputs.opItem }}/GITBOOK_ASSETS_PREFIX
GITBOOK_FONTS_URL: ${{ inputs.opItem }}/GITBOOK_FONTS_URL
OP_SERVICE_ACCOUNT_TOKEN: ${{ inputs.opServiceAccount }}
GITBOOK_URL: ${{ inputs.opItem }}/GITBOOK_URL
GITBOOK_ICONS_URL: ${{ inputs.opItem }}/GITBOOK_ICONS_URL
GITBOOK_ICONS_TOKEN: ${{ inputs.opItem }}/GITBOOK_ICONS_TOKEN
NEXT_SERVER_ACTIONS_ENCRYPTION_KEY: ${{ inputs.opItem }}/NEXT_SERVER_ACTIONS_ENCRYPTION_KEY
GITBOOK_SECRET: ${{ inputs.opItem }}/GITBOOK_SECRET
GITBOOK_APP_URL: ${{ inputs.opItem }}/GITBOOK_APP_URL
GITBOOK_API_URL: ${{ inputs.opItem }}/GITBOOK_API_URL
GITBOOK_API_PUBLIC_URL: ${{ inputs.opItem }}/GITBOOK_API_PUBLIC_URL
GITBOOK_API_TOKEN: ${{ inputs.opItem }}/GITBOOK_API_TOKEN
GITBOOK_OAUTH_SERVER_URL: ${{ inputs.opItem }}/GITBOOK_OAUTH_SERVER_URL
GITBOOK_SITE_OAUTH_SIGNING_SECRET: ${{ inputs.opItem }}/GITBOOK_SITE_OAUTH_SIGNING_SECRET
GITBOOK_PREVIEW_BASE_URL: ${{ inputs.opItem }}/GITBOOK_PREVIEW_BASE_URL
GITBOOK_INTEGRATIONS_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_HOST
GITBOOK_INTEGRATIONS_CONTENT_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_CONTENT_HOST
GITBOOK_IMAGE_RESIZE_SIGNING_KEY: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SIGNING_KEY
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL_2
GITBOOK_IMAGE_RESIZE_SALT: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SALT
GITBOOK_IMAGE_RESIZE_MODE: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_MODE
GITBOOK_ASSETS_PREFIX: ${{ inputs.opItem }}/GITBOOK_ASSETS_PREFIX
GITBOOK_FONTS_URL: ${{ inputs.opItem }}/GITBOOK_FONTS_URL
- name: Build worker
run: bun run turbo build:cloudflare
env:
GITBOOK_RUNTIME: cloudflare
GITBOOK_BLOCK_SEARCH_INDEXATION: ${{ inputs.environment == 'preview' && 'true' || '' }}
GITBOOK_ALLOW_CUSTOMIZATION_OVERRIDE: ${{ inputs.environment == 'preview' && 'true' || '' }}
GITBOOK_RUNTIME: cloudflare
GITBOOK_BLOCK_SEARCH_INDEXATION: ${{ inputs.environment == 'preview' && 'true' || '' }}
GITBOOK_ALLOW_CUSTOMIZATION_OVERRIDE: ${{ inputs.environment == 'preview' && 'true' || '' }}
GITBOOK_DISABLE_INSIGHTS: ${{ inputs.environment == 'preview' && 'true' || '' }}
shell: bash
- name: Upload the DO worker
@@ -134,11 +136,10 @@ runs:
middlewareVersionId: ${{ steps.extract_middleware_version_id.outputs.version_id }}
deploy: ${{ inputs.deploy }}
- name: Outputs
shell: bash
env:
DEPLOYMENT_URL: ${{ steps.upload_middleware.outputs.deployment-url }}
DEPLOYMENT_URL: ${{ steps.upload_middleware.outputs.deployment-url }}
run: |
echo "URL: ${{ steps.upload_middleware.outputs.deployment-url }}"
echo "Output server: ${{ steps.upload_server.outputs.command-output }}"
echo "Output server: ${{ steps.upload_server.outputs.command-output }}"
+60 -59
View File
@@ -1,31 +1,31 @@
name: 'Deploy vercel'
description: 'Deploy GitBook to Vercel'
inputs:
vercelOrg:
description: 'Vercel organization'
required: true
vercelProject:
description: 'Vercel project'
required: true
vercelToken:
description: 'Vercel token'
required: true
opItem:
description: '1Password item to load secrets from'
required: true
opServiceAccount:
description: '1Password service account token'
required: true
environment:
description: 'Environment to deploy to'
required: true
headSha:
description: 'Git ref to deploy, used for the deploymentId'
required: false
vercelOrg:
description: 'Vercel organization'
required: true
vercelProject:
description: 'Vercel project'
required: true
vercelToken:
description: 'Vercel token'
required: true
opItem:
description: '1Password item to load secrets from'
required: true
opServiceAccount:
description: '1Password service account token'
required: true
environment:
description: 'Environment to deploy to'
required: true
headSha:
description: 'Git ref to deploy, used for the deploymentId'
required: false
outputs:
deployment-url:
description: "Deployment URL"
value: ${{ steps.deploy.outputs.deployment-url }}
description: 'Deployment URL'
value: ${{ steps.deploy.outputs.deployment-url }}
runs:
using: 'composite'
steps:
@@ -40,50 +40,52 @@ runs:
run: bun run vercel pull --yes --environment=${{ inputs.environment }} --token=${{ inputs.vercelToken }}
shell: bash
env:
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
- name: Load secret
uses: 1password/load-secrets-action@v2
env:
OP_SERVICE_ACCOUNT_TOKEN: ${{ inputs.opServiceAccount }}
GITBOOK_URL: ${{ inputs.opItem }}/GITBOOK_URL
GITBOOK_ICONS_URL: ${{ inputs.opItem }}/GITBOOK_ICONS_URL
GITBOOK_ICONS_TOKEN: ${{ inputs.opItem }}/GITBOOK_ICONS_TOKEN
GITBOOK_SECRET: ${{ inputs.opItem }}/GITBOOK_SECRET
GITBOOK_APP_URL: ${{ inputs.opItem }}/GITBOOK_APP_URL
GITBOOK_API_URL: ${{ inputs.opItem }}/GITBOOK_API_URL
GITBOOK_API_PUBLIC_URL: ${{ inputs.opItem }}/GITBOOK_API_PUBLIC_URL
GITBOOK_API_TOKEN: ${{ inputs.opItem }}/GITBOOK_API_TOKEN
GITBOOK_OAUTH_SERVER_URL: ${{ inputs.opItem }}/GITBOOK_OAUTH_SERVER_URL
GITBOOK_PREVIEW_BASE_URL: ${{ inputs.opItem }}/GITBOOK_PREVIEW_BASE_URL
GITBOOK_INTEGRATIONS_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_HOST
GITBOOK_INTEGRATIONS_CONTENT_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_CONTENT_HOST
GITBOOK_IMAGE_RESIZE_SIGNING_KEY: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SIGNING_KEY
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL_2
GITBOOK_IMAGE_RESIZE_SALT: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SALT
GITBOOK_IMAGE_RESIZE_MODE: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_MODE
GITBOOK_ASSETS_PREFIX: ${{ inputs.opItem }}/GITBOOK_ASSETS_PREFIX
GITBOOK_FONTS_URL: ${{ inputs.opItem }}/GITBOOK_FONTS_URL
OP_SERVICE_ACCOUNT_TOKEN: ${{ inputs.opServiceAccount }}
GITBOOK_URL: ${{ inputs.opItem }}/GITBOOK_URL
GITBOOK_ICONS_URL: ${{ inputs.opItem }}/GITBOOK_ICONS_URL
GITBOOK_ICONS_TOKEN: ${{ inputs.opItem }}/GITBOOK_ICONS_TOKEN
GITBOOK_SECRET: ${{ inputs.opItem }}/GITBOOK_SECRET
GITBOOK_APP_URL: ${{ inputs.opItem }}/GITBOOK_APP_URL
GITBOOK_API_URL: ${{ inputs.opItem }}/GITBOOK_API_URL
GITBOOK_API_PUBLIC_URL: ${{ inputs.opItem }}/GITBOOK_API_PUBLIC_URL
GITBOOK_API_TOKEN: ${{ inputs.opItem }}/GITBOOK_API_TOKEN
GITBOOK_OAUTH_SERVER_URL: ${{ inputs.opItem }}/GITBOOK_OAUTH_SERVER_URL
GITBOOK_SITE_OAUTH_SIGNING_SECRET: ${{ inputs.opItem }}/GITBOOK_SITE_OAUTH_SIGNING_SECRET
GITBOOK_PREVIEW_BASE_URL: ${{ inputs.opItem }}/GITBOOK_PREVIEW_BASE_URL
GITBOOK_INTEGRATIONS_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_HOST
GITBOOK_INTEGRATIONS_CONTENT_HOST: ${{ inputs.opItem }}/GITBOOK_INTEGRATIONS_CONTENT_HOST
GITBOOK_IMAGE_RESIZE_SIGNING_KEY: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SIGNING_KEY
GITBOOK_IMAGE_RESIZE_URL: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_URL_2
GITBOOK_IMAGE_RESIZE_SALT: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_SALT
GITBOOK_IMAGE_RESIZE_MODE: ${{ inputs.opItem }}/GITBOOK_IMAGE_RESIZE_MODE
GITBOOK_ASSETS_PREFIX: ${{ inputs.opItem }}/GITBOOK_ASSETS_PREFIX
GITBOOK_FONTS_URL: ${{ inputs.opItem }}/GITBOOK_FONTS_URL
- name: Inject build env vars
if: ${{ inputs.environment == 'preview' }}
shell: bash
run: |
HEAD_SHA=$(git rev-parse HEAD)
echo "resolved HEAD_SHA: $HEAD_SHA"
echo "GITBOOK_HEAD_SHA=$HEAD_SHA" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_RUNTIME=vercel" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_BLOCK_SEARCH_INDEXATION=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_ALLOW_CUSTOMIZATION_OVERRIDE=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "--- .vercel/.env.${{ inputs.environment }}.local after inject ---"
cat .vercel/.env.${{ inputs.environment }}.local
HEAD_SHA=$(git rev-parse HEAD)
echo "resolved HEAD_SHA: $HEAD_SHA"
echo "GITBOOK_HEAD_SHA=$HEAD_SHA" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_RUNTIME=vercel" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_BLOCK_SEARCH_INDEXATION=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_ALLOW_CUSTOMIZATION_OVERRIDE=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "GITBOOK_DISABLE_INSIGHTS=true" >> .vercel/.env.${{ inputs.environment }}.local
echo "--- .vercel/.env.${{ inputs.environment }}.local after inject ---"
cat .vercel/.env.${{ inputs.environment }}.local
- name: Build Project Artifacts
run: bun run vercel build --target=${{ inputs.environment }} --token=${{ inputs.vercelToken }}
shell: bash
env:
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
GITBOOK_RUNTIME: vercel
GITBOOK_HEAD_SHA: ${{ inputs.headSha }}
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
GITBOOK_RUNTIME: vercel
GITBOOK_HEAD_SHA: ${{ inputs.headSha }}
- name: Deploy Project Artifacts to Vercel
id: deploy
shell: bash
@@ -91,10 +93,9 @@ runs:
DEPLOYMENT_URL=$(bun run vercel deploy --prebuilt --target=${{ inputs.environment }} --token=${{ inputs.vercelToken }})
echo "deployment-url=$DEPLOYMENT_URL" >> "$GITHUB_OUTPUT"
env:
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
VERCEL_ORG_ID: ${{ inputs.vercelOrg }}
VERCEL_PROJECT_ID: ${{ inputs.vercelProject }}
- name: Outputs
shell: bash
run: |
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
+17
View File
@@ -0,0 +1,17 @@
## Proposed changes
<!-- Briefly describe what changed. Include relevant validation. -->
## Demo
<!-- Add screenshots or a recording when useful. Otherwise, remove this section. -->
<!-- Optional: add Context here only when it explains a concrete problem and result that the changelog does not. Remove this comment before submitting. -->
## Changelog
<!-- Keep the relevant entries and remove unused placeholders. Feature = user-facing addition or improvement; Fix = user-facing bug fix; Chore = internal maintenance. -->
- [Feature] ...
- [Fix] ...
- [Chore] ...
+22
View File
@@ -0,0 +1,22 @@
{
"display_information": {
"name": "PR Status",
"description": "Updates PR status reactions in engineering"
},
"features": {
"bot_user": {
"display_name": "PR Status",
"always_online": false
}
},
"oauth_config": {
"scopes": {
"bot": ["channels:history", "reactions:read", "reactions:write"]
}
},
"settings": {
"org_deploy_enabled": false,
"socket_mode_enabled": false,
"token_rotation_enabled": false
}
}
+15
View File
@@ -0,0 +1,15 @@
# Slack PR status
[GitbookIO/slack-pr-status](https://github.com/GitbookIO/slack-pr-status) adds review-status reactions to PR links posted in [#engineering](https://gitbook.slack.com/archives/C01NXGWJELS). It runs from `.github/workflows/slack-pr-status.yml` in `GitbookIO/gitbook`, `GitbookIO/gitbook-x` and `GitbookIO/integrations`. Emojis and statuses are configured in that workflow; see the action's README for the options.
Owner: Peter White.
| Configuration | Value |
| --- | --- |
| Slack app | **PR Status** (`A0C2AGLAD0T`), created from `.github/slack-pr-status-app-manifest.json` |
| Bot token | Repository Actions secret `SLAPR_SLACK_BOT_TOKEN` |
| GitHub token | The workflow's `GITHUB_TOKEN`, read-only |
Posts that link PRs from more than one repository are skipped, because each workflow's token can only read its own repository. PRs from forks get no reactions, because their workflows don't receive secrets.
To disable it in one repository, run `gh workflow disable slack-pr-status.yml --repo GitbookIO/<repository>`. To stop it everywhere, revoke the PR Status app's token.
+14
View File
@@ -20,6 +20,20 @@ jobs:
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- run: bun format:check
lint:
runs-on: ubuntu-latest
name: Lint
timeout-minutes: 6
steps:
- name: Checkout
uses: actions/checkout@v4
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- run: bun lint
test:
runs-on: ubuntu-latest
name: Test
@@ -0,0 +1,34 @@
name: CSS browser compatibility
on:
pull_request_target:
types: [opened, reopened, synchronize]
permissions:
contents: read
pull-requests: read
concurrency:
group: css-browser-compatibility-${{ github.event.pull_request.number }}
cancel-in-progress: true
jobs:
check:
name: Check newly added CSS declarations
runs-on: ubuntu-latest
timeout-minutes: 6
steps:
# pull_request_target checks out the trusted base branch by default. Never use the PR ref here.
- name: Checkout trusted checker
uses: actions/checkout@v4
- name: Setup Bun
uses: ./.github/composite/setup-bun
- name: Install dependencies
run: bun install --frozen-lockfile
env:
PUPPETEER_SKIP_DOWNLOAD: 1
- name: Check CSS browser compatibility
working-directory: packages/gitbook
run: bun run check:css-browser-compatibility
env:
GITHUB_TOKEN: ${{ github.token }}
+57 -9
View File
@@ -11,7 +11,7 @@ jobs:
runs-on: ubuntu-latest
if: ${{ github.event_name == 'pull_request_target' && github.event.pull_request.head.repo.fork }}
environment:
name: preview-approval
name: preview-approval
steps:
- name: Approval gate
run: echo "Preview deployment approved."
@@ -21,8 +21,8 @@ jobs:
needs: approval
if: ${{ always() && (needs.approval.result == 'success' || needs.approval.result == 'skipped') }}
environment:
name: 2v-preview
url: ${{ steps.deploy.outputs.deployment-url }}
name: 2v-preview
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
deployment-url: ${{ steps.deploy.outputs.deployment-url }}
steps:
@@ -47,8 +47,8 @@ jobs:
needs: approval
if: ${{ always() && (needs.approval.result == 'success' || needs.approval.result == 'skipped') }}
environment:
name: 2c-preview
url: ${{ steps.deploy.outputs.deployment-url }}
name: 2c-preview
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
deployment-url: ${{ steps.deploy.outputs.deployment-url || steps.extract-worker-id.outputs.worker-url }}
steps:
@@ -72,10 +72,10 @@ jobs:
id: extract-worker-id
if: ${{ !steps.deploy.outputs.deployment-url }}
run: |
if [[ "${{ steps.deploy.outputs.command-output }}" =~ Worker\ Version\ ID:\ ([0-9a-f]{8})-([0-9a-f-]+) ]]; then
WORKER_ID_FIRST_PART="${BASH_REMATCH[1]}"
echo "worker-url=https://${WORKER_ID_FIRST_PART}-gitbook-open-v2-preview.gitbook.workers.dev/" >> $GITHUB_OUTPUT
fi
if [[ "${{ steps.deploy.outputs.command-output }}" =~ Worker\ Version\ ID:\ ([0-9a-f]{8})-([0-9a-f-]+) ]]; then
WORKER_ID_FIRST_PART="${BASH_REMATCH[1]}"
echo "worker-url=https://${WORKER_ID_FIRST_PART}-gitbook-open-v2-preview.gitbook.workers.dev/" >> $GITHUB_OUTPUT
fi
- name: Outputs
run: |
echo "URL: ${{ steps.deploy.outputs.deployment-url || steps.extract-worker-id.outputs.worker-url }}"
@@ -187,6 +187,54 @@ jobs:
SITE_BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/
ARGOS_TOKEN: ${{ secrets.ARGOS_TOKEN }}
ARGOS_BUILD_NAME: customers-v2-vercel
# Style recalc depends on the client bundle, not the host, so this runs here only and
# not in the Cloudflare job. Kept out of `e2e-customers`, which is a visual suite.
- name: Run style invalidation tests
if: always()
working-directory: packages/gitbook
run: bun run e2e-style-perf
env:
BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}
SITE_BASE_URL: ${{ needs.deploy-v2-vercel.outputs.deployment-url }}/url/
# Runs on failure too: a blown style budget is exactly when the numbers are worth seeing.
- name: Build style invalidation report
if: always() && github.event_name != 'push'
id: style-perf
working-directory: packages/gitbook
run: |
rows=$(cat test-results/style-perf.md 2>/dev/null || true)
if [ -z "$rows" ]; then exit 0; fi
{
echo 'body<<STYLE_PERF_EOF'
echo '### Style invalidation on a large API reference'
echo
echo 'Elements restyled by opening one popup on [the Snyk API reference](https://docs.snyk.io/snyk-api/reference/apps). A share near or above 100% means the insertion restyles the whole document.'
echo
echo '| interaction | restyled | page | share | budget | |'
echo '| --- | ---: | ---: | ---: | ---: | :-: |'
echo "$rows"
echo 'STYLE_PERF_EOF'
} >> "$GITHUB_OUTPUT"
- name: Find style invalidation comment
if: always() && github.event_name != 'push' && steps.style-perf.outputs.body != ''
uses: peter-evans/find-comment@v3
id: fc-style-perf
with:
issue-number: ${{ github.event.pull_request.number }}
comment-author: 'github-actions[bot]'
body-includes: 'Style invalidation on a large API reference'
- name: Create or update style invalidation comment
if: always() && github.event_name != 'push' && steps.style-perf.outputs.body != ''
uses: peter-evans/create-or-update-comment@v4
with:
comment-id: ${{ steps.fc-style-perf.outputs.comment-id }}
issue-number: ${{ github.event.pull_request.number }}
body: ${{ steps.style-perf.outputs.body }}
edit-mode: replace
visual-testing-customers-v2-cloudflare:
runs-on: ubuntu-latest
name: Visual Testing Customers v2 (Cloudflare)
+9 -9
View File
@@ -7,7 +7,7 @@ jobs:
deploy-v2-vercel:
name: Deploy v2 to Vercel (production)
runs-on: ubuntu-latest
environment:
environment:
name: 2v-production
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
@@ -19,16 +19,16 @@ jobs:
id: deploy
uses: ./.github/composite/deploy-vercel
with:
environment: production
vercelOrg: ${{ secrets.VERCEL_ORG_ID }}
vercelProject: ${{ secrets.VERCEL_PROJECT_ID }}
vercelToken: ${{ secrets.VERCEL_TOKEN }}
opItem: op://gitbook-open/2v-production
opServiceAccount: ${{ secrets.OP_SERVICE_ACCOUNT_TOKEN }}
environment: production
vercelOrg: ${{ secrets.VERCEL_ORG_ID }}
vercelProject: ${{ secrets.VERCEL_PROJECT_ID }}
vercelToken: ${{ secrets.VERCEL_TOKEN }}
opItem: op://gitbook-open/2v-production
opServiceAccount: ${{ secrets.OP_SERVICE_ACCOUNT_TOKEN }}
deploy-v2-cloudflare:
name: Deploy v2 to Cloudflare Worker (production)
runs-on: ubuntu-latest
environment:
environment:
name: 2c-production
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
@@ -50,4 +50,4 @@ jobs:
commitMessage: ${{ github.sha }}
- name: Outputs
run: |
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
+9 -9
View File
@@ -7,7 +7,7 @@ jobs:
deploy-v2-vercel:
name: Deploy v2 to Vercel (staging)
runs-on: ubuntu-latest
environment:
environment:
name: 2v-staging
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
@@ -19,16 +19,16 @@ jobs:
id: deploy
uses: ./.github/composite/deploy-vercel
with:
environment: staging
vercelOrg: ${{ secrets.VERCEL_ORG_ID }}
vercelProject: ${{ secrets.VERCEL_PROJECT_ID }}
vercelToken: ${{ secrets.VERCEL_TOKEN }}
opItem: op://gitbook-open/2v-staging
opServiceAccount: ${{ secrets.OP_SERVICE_ACCOUNT_TOKEN }}
environment: staging
vercelOrg: ${{ secrets.VERCEL_ORG_ID }}
vercelProject: ${{ secrets.VERCEL_PROJECT_ID }}
vercelToken: ${{ secrets.VERCEL_TOKEN }}
opItem: op://gitbook-open/2v-staging
opServiceAccount: ${{ secrets.OP_SERVICE_ACCOUNT_TOKEN }}
deploy-v2-cloudflare:
name: Deploy v2 to Cloudflare Worker (staging)
runs-on: ubuntu-latest
environment:
environment:
name: 2c-staging
url: ${{ steps.deploy.outputs.deployment-url }}
outputs:
@@ -50,4 +50,4 @@ jobs:
commitMessage: ${{ github.sha }}
- name: Outputs
run: |
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
echo "URL: ${{ steps.deploy.outputs.deployment-url }}"
+3 -1
View File
@@ -4,7 +4,7 @@ on:
push:
branches:
- main
concurrency: ${{ github.workflow }}-${{ github.ref }}
jobs:
@@ -25,6 +25,8 @@ jobs:
with:
# This makes Actions fetch all Git history so that Changesets can generate changelogs with the correct commits
fetch-depth: 0
# Otherwise git pushes with GITHUB_TOKEN instead of the PAT, and the release PR never triggers Preview
persist-credentials: false
- name: Setup Node
uses: actions/setup-node@v4
with:
+33
View File
@@ -0,0 +1,33 @@
name: Slack PR status
on:
pull_request_review:
types: [submitted, dismissed]
pull_request:
types: [closed, reopened]
permissions:
contents: read
pull-requests: read
jobs:
slack-pr-status:
# Secrets aren't available to workflows triggered from forks.
if: github.event.pull_request.head.repo.full_name == github.repository
runs-on: ubuntu-latest
steps:
- uses: GitbookIO/slack-pr-status@main
with:
slack-token: ${{ secrets.SLAPR_SLACK_BOT_TOKEN }}
config: |
channels: [C01NXGWJELS]
approvalsRequired: 1
multiPr: aggregate
emojis:
commented: false
partiallyApproved: next_track_button
approved: pr-approved
changesRequested: construction
merged: merged
closed: no_entry_sign
partiallyReviewed: hourglass_flowing_sand
+3
View File
@@ -29,3 +29,6 @@ yarn-error.log*
# Bun pack artifacts
packages/*/*.tgz
# Playwright MCP artifacts
.playwright-mcp/
+70
View File
@@ -0,0 +1,70 @@
{
"$schema": "./node_modules/oxfmt/configuration_schema.json",
"printWidth": 100,
"tabWidth": 4,
"useTabs": false,
"semi": true,
"singleQuote": true,
"jsxSingleQuote": false,
"quoteProps": "as-needed",
"trailingComma": "es5",
"bracketSpacing": true,
"bracketSameLine": false,
"arrowParens": "always",
"endOfLine": "lf",
"sortImports": {
"customGroups": [
{
"groupName": "workspace",
"elementNamePattern": ["@gitbook/**"]
}
],
"groups": [
["value-builtin", "value-external", "type-builtin", "type-external"],
{ "newlinesBetween": true },
"workspace",
{ "newlinesBetween": true },
[
"value-internal",
"type-internal",
"value-parent",
"type-parent",
"value-sibling",
"type-sibling",
"value-index",
"type-index"
],
"type-import",
"unknown"
]
},
"sortPackageJson": false,
"sortTailwindcss": {
"config": "./packages/gitbook/tailwind.config.ts",
"attributes": ["class", "className", "style"],
"functions": ["clsx", "tw"]
},
"ignorePatterns": [
"**/node_modules/**",
"**/dist/**",
"**/build/**",
"**/public/**",
"**/.next/**",
"**/.open-next/**",
"**/.turbo/**",
"**/.vercel/**",
"**/.cache/**",
"**/.wrangler/**",
"**/*.log",
"**/*.MD",
"**/*.md",
"**/*.mdx",
"**/*.html",
"**/*.css",
"packages/embed/standalone/**",
"packages/openapi-parser/src/fixtures/**",
"packages/emoji-codepoints/index.ts",
"packages/icons/src/data/*.json",
"packages/gitbook/worker-configuration.d.ts"
]
}
+87
View File
@@ -0,0 +1,87 @@
{
"$schema": "./node_modules/oxlint/configuration_schema.json",
"categories": {
"correctness": "warn",
"suspicious": "warn",
"perf": "warn"
},
"plugins": ["eslint", "typescript", "unicorn", "oxc", "react", "jsx-a11y", "vitest"],
"env": {
"builtin": true,
"browser": true,
"node": true,
"shared-node-browser": true,
"worker": true
},
"globals": {
"Bun": "readonly",
"GitBookIntegrationEvent": "readonly",
"React": "readonly"
},
"rules": {
"eslint/no-console": [
"warn",
{
"allow": ["assert", "error", "warn"]
}
],
"eslint/no-control-regex": "warn",
"eslint/no-prototype-builtins": "warn",
"eslint/no-cond-assign": "warn",
"eslint/no-undef": "error",
"eslint/no-unused-vars": [
"error",
{
"argsIgnorePattern": "^_",
"caughtErrorsIgnorePattern": "^_",
"ignoreRestSiblings": true,
"varsIgnorePattern": "^_"
}
],
"react/button-has-type": "warn",
"react/exhaustive-deps": "warn",
"react/jsx-key": "warn",
"react/jsx-no-useless-fragment": "warn",
"react/no-array-index-key": "warn",
"react/void-dom-elements-no-children": "warn",
"react/rules-of-hooks": "error",
"jsx-a11y/alt-text": "warn",
"jsx-a11y/anchor-is-valid": "warn",
"jsx-a11y/click-events-have-key-events": "warn",
"jsx-a11y/iframe-has-title": "warn",
"jsx-a11y/interactive-supports-focus": "warn",
"jsx-a11y/label-has-associated-control": "warn",
"jsx-a11y/no-noninteractive-tabindex": "warn",
"jsx-a11y/role-has-required-aria-props": "warn",
"jsx-a11y/tabindex-no-positive": "warn",
"typescript/array-type": "error",
"typescript/no-explicit-any": "warn",
"typescript/no-non-null-assertion": "warn",
"typescript/no-confusing-void-expression": "warn",
"typescript/only-throw-error": "error",
"vitest/no-focused-tests": "error",
"no-delete-var": "warn",
"no-debugger": "error",
"no-throw-literal": "error",
"use-isnan": "error",
"valid-typeof": "error"
},
"ignorePatterns": [
"**/node_modules/**",
"**/dist/**",
"**/build/**",
"**/public/**",
"**/.next/**",
"**/.open-next/**",
"**/.turbo/**",
"**/.vercel/**",
"**/.cache/**",
"**/.wrangler/**",
"packages/embed/standalone/**",
"packages/openapi-parser/src/fixtures/**",
"packages/emoji-codepoints/index.ts",
"packages/icons/src/data/*.json",
"packages/gitbook/worker-configuration.d.ts",
"**/*.css"
]
}
+1 -1
View File
@@ -1,3 +1,3 @@
{
"recommendations": ["biomejs.biome"]
"recommendations": ["oxc.oxc-vscode"]
}
+3 -5
View File
@@ -8,14 +8,12 @@
["style \\=([^;]*);", "\\`([^\\`]*)\\`"]
],
"tailwindCSS.classAttributes": ["class", "className", "style", ".*Style"],
"prettier.enable": false,
"editor.formatOnSave": true,
"editor.defaultFormatter": "biomejs.biome",
"editor.defaultFormatter": "oxc.oxc-vscode",
"editor.codeActionsOnSave": {
"source.organizeImports.biome": "explicit",
"source.fixAll.biome": "explicit"
"source.fixAll.oxc": "always"
},
"[typescript]": {
"editor.defaultFormatter": "biomejs.biome"
"editor.defaultFormatter": "oxc.oxc-vscode"
}
}
+3 -2
View File
@@ -6,7 +6,8 @@
bun install # Install dependencies
bun dev # Start dev server (all packages)
bun run build # Build all packages
bun run format # Format with Biome (run after every change)
bun run lint # Lint with Oxlint
bun run format # Format with Oxfmt (run after every change)
bun run typecheck # Type-check all packages
bun run unit # Run unit tests
```
@@ -74,7 +75,7 @@ Save as `.changeset/<name>.md`, then commit it separately with message: `changes
## Formatting
Uses Biome (not ESLint/Prettier). Always run `bun run format` before committing.
Linting uses Oxlint and formatting uses Oxfmt. Always run `bun run format` before committing.
## Comments
+8 -6
View File
@@ -85,7 +85,7 @@ GitBook Open uses fontawesome. For self-hosting and local development, for licen
## Contributing
GitBook's rendering engine is fully open source and built on top of [Next.js](https://nextjs.org/). Head to our [contributing guide](https://github.com/GitbookIO/gitbook/blob/main/.github/CONTRIBUTING.md) to learn more about the workflow on adding your first Pull Request.
GitBook's rendering engine is fully open source and built on top of [Next.js](https://nextjs.org/). Head to our [contributing guide](https://github.com/GitbookIO/gitbook/blob/main/.github/CONTRIBUTING.md) to learn how to report bugs and suggest changes.
### Types of contributions
@@ -93,22 +93,22 @@ We encourage you to contribute to GitBook to help us build the best tool for doc
#### Translations
The GitBook UI is rendered using a set of translation files found in [`packages/gitbook/src/intl/translations`](/packages/gitbook/src/intl/translations/). We welcome all additional translations for the UI.
The GitBook UI is rendered using a set of translation files found in [`packages/gitbook/src/intl/translations`](/packages/gitbook/src/intl/translations/). Spotted a wrong or missing translation? Open an issue and let us know.
#### Bugs
Encounter a bug or find an issue you'd like to fix? Helping us fix issues related to GitBook greatly improves the experience for everyone. Head to the issues section of this repository to learn more about the types of bugs you can already help out with.
Encounter a bug? [Open an issue](https://github.com/GitbookIO/gitbook/issues/new/choose) with as much detail as you can. Clear reports help us fix things faster for everyone.
## Deployment
> [!WARNING]
> While it is possible to self-host this project, we do not recommend this unless you are certain this option fits your need.
>
> _Looking to add a specific feature in GitBook? Head to our [contributing guide](https://github.com/GitbookIO/gitbook/blob/main/.github/CONTRIBUTING.md) to get started._
> _Looking for a specific feature in GitBook? Head to our [contributing guide](https://github.com/GitbookIO/gitbook/blob/main/.github/CONTRIBUTING.md) to suggest it._
>
> Self-hosting this project puts the responsibility of maintaining and merging future updates on **you**. We cannot guarantee support, maintenance, or updates to forked and self-hosted instances of this project.
>
> We want to make it as easy as possible for our community to collaborate and push the future of GitBook, which is why we encourage you to contribute to our product directly instead of creating your own version.
> We want to make it as easy as possible for our community to collaborate and push the future of GitBook, which is why we encourage you to share your ideas with us instead of creating your own version.
This project allows you to self-host the rendering portion of your GitBook published content. Self-hosting has pros and cons.
@@ -124,6 +124,8 @@ If you plan to distribute the code, you must make the source code public to comp
See `LICENSE` for more information.
The [`@gitbook/embed`](packages/embed) package is an exception: it is distributed under the [Apache License 2.0](packages/embed/LICENSE), so it can be used in proprietary applications.
## Badges
<p align="left">
@@ -161,4 +163,4 @@ GitBook wouldn't be possible without these projects:
## Legacy GitBook (Deprecated)
Our previous version of GitBook and it's CLI tool are now deprecated. You can still view the old repository and it's commits on this [branch](https://github.com/GitbookIO/gitbook/tree/legacy).
Our previous version of GitBook and it's CLI tool are now deprecated. You can still view the old repository and it's commits on this [branch](https://github.com/GitbookIO/gitbook/tree/legacy).
-178
View File
@@ -1,178 +0,0 @@
{
"$schema": "https://biomejs.dev/schemas/1.9.4/schema.json",
"vcs": {
"enabled": false,
"clientKind": "git",
"useIgnoreFile": false
},
"files": {
"ignoreUnknown": false,
"ignore": [
"**/node_modules/**/*",
"**/dist/**/*",
"**/build/**/*",
"**/public/**/*",
"**/.next/**/*",
"**/.open-next/**/*",
"**/.turbo/**/*",
"**/.vercel/**/*",
"**/.cache/**/*",
"**/.wrangler/**/*",
"packages/embed/standalone/**/*",
"packages/openapi-parser/src/fixtures/**/*",
"packages/emoji-codepoints/index.ts",
"packages/icons/src/data/*.json",
"packages/gitbook/worker-configuration.d.ts",
"gitbook/tsconfig.json",
"**/*.css"
]
},
"formatter": {
"enabled": true,
"useEditorconfig": true,
"formatWithErrors": false,
"indentStyle": "space",
"indentWidth": 4,
"lineEnding": "lf",
"lineWidth": 100,
"attributePosition": "auto",
"bracketSpacing": true
},
"organizeImports": {
"enabled": true
},
"linter": {
"enabled": true,
"rules": {
"recommended": true,
"performance": {
"noDelete": "warn"
},
"security": {
"noDangerouslySetInnerHtml": "off"
},
"complexity": {
"noForEach": "off",
"noUselessFragments": "warn",
"noBannedTypes": "warn"
},
"correctness": {
"noUndeclaredVariables": "error",
"noUnusedVariables": "error",
"useArrayLiterals": "error",
"useHookAtTopLevel": "error",
"noUnusedImports": "error",
"noVoidElementsWithChildren": "warn",
"useJsxKeyInIterable": "warn",
"useExhaustiveDependencies": "warn",
"noUnknownFunction": "warn"
},
"style": {
"noNonNullAssertion": "warn",
"noParameterAssign": "off",
"useThrowOnlyError": "error"
},
"suspicious": {
"noConsole": {
"level": "warn",
"options": {
"allow": ["assert", "error", "warn"]
}
},
"noExplicitAny": "warn",
"noImplicitAnyLet": "warn",
"noConfusingVoidType": "warn",
"noControlCharactersInRegex": "warn",
"noPrototypeBuiltins": "warn",
"noAssignInExpressions": "warn",
"noArrayIndexKey": "warn"
},
"a11y": {
"useSemanticElements": "warn",
"useKeyWithClickEvents": "warn",
"noSvgWithoutTitle": "warn",
"useButtonType": "warn",
"useIframeTitle": "warn",
"useAltText": "warn",
"noPositiveTabindex": "warn",
"useFocusableInteractive": "warn",
"useAriaPropsForRole": "warn",
"useValidAnchor": "warn",
"noLabelWithoutControl": "warn",
"noNoninteractiveTabindex": "warn"
},
"nursery": {
"useSortedClasses": {
"level": "error",
"fix": "safe",
"options": {
"attributes": ["class", "className", "style"],
"functions": ["clsx", "tw"]
}
}
}
}
},
"javascript": {
"formatter": {
"jsxQuoteStyle": "double",
"quoteProperties": "asNeeded",
"trailingCommas": "es5",
"semicolons": "always",
"arrowParentheses": "always",
"bracketSameLine": false,
"quoteStyle": "single",
"attributePosition": "auto",
"bracketSpacing": true
}
},
"overrides": [
{
"include": [
"packages/gitbook/**/*",
"packages/react-openapi/**/*",
"packages/react-math/**/*",
"packages/react-contentkit/**/*",
"packages/icons/**/*"
],
"javascript": {
"globals": ["React"]
}
},
{
"include": ["packages/gitbook/**/*"],
"javascript": {
"globals": ["React", "GitBookIntegrationEvent"]
}
},
{
"include": ["*.css"],
"javascript": {
"globals": ["theme"]
}
},
{
"include": ["*.test.ts", "packages/gitbook/tests/**/*"],
"javascript": {
"globals": ["Bun"]
}
},
{
"include": [
"packages/cache-do/**/*",
"packages/gitbook/cf-env.d.ts",
"packages/gitbook/src/cloudflare-entrypoint.ts"
],
"javascript": {
"globals": [
"DurableObjectLocationHint",
"DurableObjectNamespace",
"DurableObjectStub",
"ContinentCode",
"Fetcher",
"ExportedHandler"
]
}
}
]
}
+518 -819
View File
File diff suppressed because it is too large Load Diff
+17 -10
View File
@@ -5,9 +5,10 @@
"node": "^22.3.0"
},
"devDependencies": {
"@biomejs/biome": "^1.9.4",
"@changesets/cli": "^2.31.0",
"turbo": "^2.10.3",
"@changesets/cli": "^2.31.1",
"oxfmt": "^0.62.0",
"oxlint": "^1.93.0",
"turbo": "^2.11.11",
"vercel": "50.37.3"
},
"packageManager": "bun@1.3.7",
@@ -18,8 +19,7 @@
"react": "catalog:",
"react-dom": "catalog:",
"esbuild": "0.27.3",
"axios": "1.8.4",
"@radix-ui/react-slot": "1.2.4"
"axios": "1.8.4"
},
"private": true,
"scripts": {
@@ -27,8 +27,10 @@
"build": "turbo run build",
"clean-deps": "rm -rf node_modules && rm -rf packages/*/node_modules",
"typecheck": "turbo run typecheck",
"format": "biome check --write ./",
"format:check": "biome check --diagnostic-level=error ./",
"lint": "oxlint --quiet",
"lint:fix": "oxlint --fix --quiet",
"format": "oxfmt",
"format:check": "oxfmt --check",
"unit": "turbo run unit",
"e2e": "turbo run e2e",
"e2e-customers": "turbo run e2e-customers",
@@ -39,11 +41,14 @@
"clean": "turbo run clean"
},
"workspaces": {
"packages": ["packages/*"],
"packages": [
"packages/*"
],
"catalog": {
"@tsconfig/strictest": "^2.0.6",
"@tsconfig/node20": "^20.1.6",
"@gitbook/api": "0.189.0",
"@base-ui/react": "^1.7.0",
"@gitbook/api": "0.208.0",
"@scalar/api-client-react": "^1.3.46",
"@types/react": "^19.0.0",
"@types/react-dom": "^19.0.0",
@@ -62,6 +67,8 @@
"patchedDependencies": {
"decode-named-character-reference@1.0.2": "patches/decode-named-character-reference@1.0.2.patch",
"@vercel/next@4.4.2": "patches/@vercel%2Fnext@4.4.2.patch",
"next@16.2.6": "patches/next@16.2.6.patch"
"mermaid@11.16.1": "patches/mermaid@11.16.1.patch",
"next@16.4.5": "patches/next@16.4.5.patch",
"@shikijs/langs@3.21.0": "patches/@shikijs%2Flangs@3.21.0.patch"
}
}
+6
View File
@@ -1,5 +1,11 @@
# @gitbook/browser-types
## 0.1.6
### Patch Changes
- bf674a4: Add an optional `context` property (string, up to 512 characters) to the `confirmation` of custom AI tools, shown above the confirmation dialog to help the user understand what they are approving or rejecting. The `confirmation` can now also be a function that receives the AI-provided input and returns the confirmation, so the context can be derived dynamically from the arguments the tool is about to run with. Available both to integrations (`GitBookIntegrationTool`) and to embed consumers (`GitBookToolDefinition`).
## 0.1.5
### Patch Changes
+6 -2
View File
@@ -9,7 +9,7 @@
}
},
"sideEffects": false,
"version": "0.1.5",
"version": "0.1.6",
"dependencies": {
"@gitbook/api": "catalog:",
"@gitbook/icons": "workspace:"
@@ -25,7 +25,11 @@
"dev": "bun run build -- --watch ./src",
"publish-to-npm": "../../scripts/publish-if-new.sh"
},
"files": ["dist", "README.md", "CHANGELOG.md"],
"files": [
"dist",
"README.md",
"CHANGELOG.md"
],
"publishConfig": {
"access": "public",
"registry": "https://registry.npmjs.org/"
+18 -4
View File
@@ -5,14 +5,28 @@ export type GitBookIntegrationEvent = 'load' | 'unload';
export type GitBookIntegrationEventCallback = (...args: any[]) => void;
export type GitBookIntegrationToolConfirmation = {
icon?: IconName;
label: string;
/**
* Supporting context displayed to the user above the confirmation dialog,
* to help them understand what they are approving or rejecting.
* Limited to 512 characters.
*/
context?: string;
};
export type GitBookIntegrationTool = AIToolDefinition & {
/**
* Confirmation action to be displayed to the user before executing the tool.
* Provide a static object, or a function that receives the input provided by
* the AI assistant and returns the confirmation — useful to display dynamic
* context based on the arguments the tool is about to be executed with.
*/
confirmation?: {
icon?: IconName;
label: string;
};
confirmation?:
| GitBookIntegrationToolConfirmation
| ((input: object) => GitBookIntegrationToolConfirmation);
/**
* Callback when the tool is executed.
+5 -1
View File
@@ -24,7 +24,11 @@
"dev": "bun run build -- --watch ./src",
"publish-to-npm": "../../scripts/publish-if-new.sh"
},
"files": ["dist", "README.md", "CHANGELOG.md"],
"files": [
"dist",
"README.md",
"CHANGELOG.md"
],
"publishConfig": {
"access": "public",
"registry": "https://registry.npmjs.org/"
+5 -4
View File
@@ -1,14 +1,15 @@
import type { ComputedContentSource } from '@gitbook/api';
import assertNever from 'assert-never';
import type { ComputedContentSource } from '@gitbook/api';
/**
* Get a stringified cache tag for a given object.
*/
export function getCacheTag(
spec: /**
* All data related to a user
* @deprecated - in v2, no tag as this is an immutable data
*/
* All data related to a user
* @deprecated - in v2, no tag as this is an immutable data
*/
| {
tag: 'user';
user: string;
+12
View File
@@ -1,5 +1,17 @@
# @gitbook/colors
## 0.4.5
### Patch Changes
- 6c12872: Expand 3-digit hex colors correctly in `hexToRgbArray`.
## 0.4.4
### Patch Changes
- a69a307: A near-white tint color (e.g. a warm `#F5F3EF`) is now taken as the exact page background, mirroring the existing behavior for near-black tints. The tint's exact lightness, hue and chroma are preserved, and the color is anchored to whichever scale step the active theme renders as the background — so it matches exactly on `muted` (which uses the second step) as well as `clean`. This applies only to near-neutral tints that are light enough to read as a background; saturated or merely light-ish colors keep their normal accent scale. The `bold` theme is unaffected: it already uses the tint for the header and stays intentionally two-tone.
## 0.4.3
### Patch Changes
+6 -2
View File
@@ -8,7 +8,7 @@
}
},
"sideEffects": false,
"version": "0.4.3",
"version": "0.4.5",
"devDependencies": {
"bun-types": "catalog:",
"tsdown": "catalog:",
@@ -21,7 +21,11 @@
"dev": "bun run build -- --watch ./src",
"publish-to-npm": "../../scripts/publish-if-new.sh"
},
"files": ["dist", "README.md", "CHANGELOG.md"],
"files": [
"dist",
"README.md",
"CHANGELOG.md"
],
"publishConfig": {
"access": "public",
"registry": "https://registry.npmjs.org/"
+13 -1
View File
@@ -1,6 +1,6 @@
import { describe, expect, it } from 'bun:test';
import { colorScale } from './transformations';
import { colorScale, hexToRgbArray } from './transformations';
describe('colorScale exact base', () => {
it('takes a very light tint as the exact background on step 1 (clean/bold)', () => {
@@ -67,3 +67,15 @@ describe('colorScale exact base', () => {
expect(scale[0]).not.toBe('#F5F3EF');
});
});
describe('hexToRgbArray', () => {
it('parses a 6-digit hex color', () => {
expect(hexToRgbArray('#1a2b3c')).toEqual([26, 43, 60]);
});
it('expands a 3-digit hex color', () => {
expect(hexToRgbArray('#abc')).toEqual([170, 187, 204]);
expect(hexToRgbArray('abc')).toEqual([170, 187, 204]);
expect(hexToRgbArray('#fff')).toEqual([255, 255, 255]);
});
});
+3 -1
View File
@@ -311,7 +311,9 @@ export function hexToRgbArray(hex: string): RGBColor {
const originalHex = hex;
let value = hex.replace('#', '');
if (hex.length === 3) value = value + value;
if (value.length === 3) {
value = [...value].map((digit) => digit + digit).join('');
}
const r = value.substring(0, 2);
const g = value.substring(2, 4);
+17
View File
@@ -1,5 +1,22 @@
# @gitbook/embed
## 0.7.0
### Minor Changes
- 31e88d1: Relicense under Apache 2.0 and drop the dependency on `@gitbook/icons`.
## 0.6.0
### Minor Changes
- f35be52: Add `defaultTab` and `defaultPage` options to the Docs Embed to choose where it opens. `defaultTab` opens the embed on the assistant, search or docs tab. `defaultPage` sets the page the docs tab opens on in place of the site's home page, and the embed opens on that page unless `defaultTab` says otherwise. Both work with the standalone script's `configure`, `frame.configure` and `<GitBookFrame>` props.
### Patch Changes
- 94a496c: Make the Docs Embed widget match the page it is embedded in rather than the visitor's OS: a widget on a light page stays light even when the visitor's system is in dark mode, and the widget's own chrome and the docs inside it always render in the same scheme. Sites published with a single theme impose it on the widget too, since they render in it regardless. The standalone script takes `?theme=light` on its URL, and calling `init` twice now updates the options instead of throwing.
- bf674a4: Add an optional `context` property (string, up to 512 characters) to the `confirmation` of custom AI tools, shown above the confirmation dialog to help the user understand what they are approving or rejecting. The `confirmation` can now also be a function that receives the AI-provided input and returns the confirmation, so the context can be derived dynamically from the arguments the tool is about to run with. Available both to integrations (`GitBookIntegrationTool`) and to embed consumers (`GitBookToolDefinition`).
## 0.5.1
### Patch Changes
+201
View File
@@ -0,0 +1,201 @@
Apache License
Version 2.0, January 2004
http://www.apache.org/licenses/
TERMS AND CONDITIONS FOR USE, REPRODUCTION, AND DISTRIBUTION
1. Definitions.
"License" shall mean the terms and conditions for use, reproduction,
and distribution as defined by Sections 1 through 9 of this document.
"Licensor" shall mean the copyright owner or entity authorized by
the copyright owner that is granting the License.
"Legal Entity" shall mean the union of the acting entity and all
other entities that control, are controlled by, or are under common
control with that entity. For the purposes of this definition,
"control" means (i) the power, direct or indirect, to cause the
direction or management of such entity, whether by contract or
otherwise, or (ii) ownership of fifty percent (50%) or more of the
outstanding shares, or (iii) beneficial ownership of such entity.
"You" (or "Your") shall mean an individual or Legal Entity
exercising permissions granted by this License.
"Source" form shall mean the preferred form for making modifications,
including but not limited to software source code, documentation
source, and configuration files.
"Object" form shall mean any form resulting from mechanical
transformation or translation of a Source form, including but
not limited to compiled object code, generated documentation,
and conversions to other media types.
"Work" shall mean the work of authorship, whether in Source or
Object form, made available under the License, as indicated by a
copyright notice that is included in or attached to the work
(an example is provided in the Appendix below).
"Derivative Works" shall mean any work, whether in Source or Object
form, that is based on (or derived from) the Work and for which the
editorial revisions, annotations, elaborations, or other modifications
represent, as a whole, an original work of authorship. For the purposes
of this License, Derivative Works shall not include works that remain
separable from, or merely link (or bind by name) to the interfaces of,
the Work and Derivative Works thereof.
"Contribution" shall mean any work of authorship, including
the original version of the Work and any modifications or additions
to that Work or Derivative Works thereof, that is intentionally
submitted to Licensor for inclusion in the Work by the copyright owner
or by an individual or Legal Entity authorized to submit on behalf of
the copyright owner. For the purposes of this definition, "submitted"
means any form of electronic, verbal, or written communication sent
to the Licensor or its representatives, including but not limited to
communication on electronic mailing lists, source code control systems,
and issue tracking systems that are managed by, or on behalf of, the
Licensor for the purpose of discussing and improving the Work, but
excluding communication that is conspicuously marked or otherwise
designated in writing by the copyright owner as "Not a Contribution."
"Contributor" shall mean Licensor and any individual or Legal Entity
on behalf of whom a Contribution has been received by Licensor and
subsequently incorporated within the Work.
2. Grant of Copyright License. Subject to the terms and conditions of
this License, each Contributor hereby grants to You a perpetual,
worldwide, non-exclusive, no-charge, royalty-free, irrevocable
copyright license to reproduce, prepare Derivative Works of,
publicly display, publicly perform, sublicense, and distribute the
Work and such Derivative Works in Source or Object form.
3. Grant of Patent License. Subject to the terms and conditions of
this License, each Contributor hereby grants to You a perpetual,
worldwide, non-exclusive, no-charge, royalty-free, irrevocable
(except as stated in this section) patent license to make, have made,
use, offer to sell, sell, import, and otherwise transfer the Work,
where such license applies only to those patent claims licensable
by such Contributor that are necessarily infringed by their
Contribution(s) alone or by combination of their Contribution(s)
with the Work to which such Contribution(s) was submitted. If You
institute patent litigation against any entity (including a
cross-claim or counterclaim in a lawsuit) alleging that the Work
or a Contribution incorporated within the Work constitutes direct
or contributory patent infringement, then any patent licenses
granted to You under this License for that Work shall terminate
as of the date such litigation is filed.
4. Redistribution. You may reproduce and distribute copies of the
Work or Derivative Works thereof in any medium, with or without
modifications, and in Source or Object form, provided that You
meet the following conditions:
(a) You must give any other recipients of the Work or
Derivative Works a copy of this License; and
(b) You must cause any modified files to carry prominent notices
stating that You changed the files; and
(c) You must retain, in the Source form of any Derivative Works
that You distribute, all copyright, patent, trademark, and
attribution notices from the Source form of the Work,
excluding those notices that do not pertain to any part of
the Derivative Works; and
(d) If the Work includes a "NOTICE" text file as part of its
distribution, then any Derivative Works that You distribute must
include a readable copy of the attribution notices contained
within such NOTICE file, excluding those notices that do not
pertain to any part of the Derivative Works, in at least one
of the following places: within a NOTICE text file distributed
as part of the Derivative Works; within the Source form or
documentation, if provided along with the Derivative Works; or,
within a display generated by the Derivative Works, if and
wherever such third-party notices normally appear. The contents
of the NOTICE file are for informational purposes only and
do not modify the License. You may add Your own attribution
notices within Derivative Works that You distribute, alongside
or as an addendum to the NOTICE text from the Work, provided
that such additional attribution notices cannot be construed
as modifying the License.
You may add Your own copyright statement to Your modifications and
may provide additional or different license terms and conditions
for use, reproduction, or distribution of Your modifications, or
for any such Derivative Works as a whole, provided Your use,
reproduction, and distribution of the Work otherwise complies with
the conditions stated in this License.
5. Submission of Contributions. Unless You explicitly state otherwise,
any Contribution intentionally submitted for inclusion in the Work
by You to the Licensor shall be under the terms and conditions of
this License, without any additional terms or conditions.
Notwithstanding the above, nothing herein shall supersede or modify
the terms of any separate license agreement you may have executed
with Licensor regarding such Contributions.
6. Trademarks. This License does not grant permission to use the trade
names, trademarks, service marks, or product names of the Licensor,
except as required for reasonable and customary use in describing the
origin of the Work and reproducing the content of the NOTICE file.
7. Disclaimer of Warranty. Unless required by applicable law or
agreed to in writing, Licensor provides the Work (and each
Contributor provides its Contributions) on an "AS IS" BASIS,
WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or
implied, including, without limitation, any warranties or conditions
of TITLE, NON-INFRINGEMENT, MERCHANTABILITY, or FITNESS FOR A
PARTICULAR PURPOSE. You are solely responsible for determining the
appropriateness of using or redistributing the Work and assume any
risks associated with Your exercise of permissions under this License.
8. Limitation of Liability. In no event and under no legal theory,
whether in tort (including negligence), contract, or otherwise,
unless required by applicable law (such as deliberate and grossly
negligent acts) or agreed to in writing, shall any Contributor be
liable to You for damages, including any direct, indirect, special,
incidental, or consequential damages of any character arising as a
result of this License or out of the use or inability to use the
Work (including but not limited to damages for loss of goodwill,
work stoppage, computer failure or malfunction, or any and all
other commercial damages or losses), even if such Contributor
has been advised of the possibility of such damages.
9. Accepting Warranty or Additional Liability. While redistributing
the Work or Derivative Works thereof, You may choose to offer,
and charge a fee for, acceptance of support, warranty, indemnity,
or other liability obligations and/or rights consistent with this
License. However, in accepting such obligations, You may act only
on Your own behalf and on Your sole responsibility, not on behalf
of any other Contributor, and only if You agree to indemnify,
defend, and hold each Contributor harmless for any liability
incurred by, or claims asserted against, such Contributor by reason
of your accepting any such warranty or additional liability.
END OF TERMS AND CONDITIONS
APPENDIX: How to apply the Apache License to your work.
To apply the Apache License to your work, attach the following
boilerplate notice, with the fields enclosed by brackets "[]"
replaced with your own identifying information. (Don't include
the brackets!) The text should be enclosed in the appropriate
comment syntax for the file format. We also recommend that a
file or class name and description of purpose be included on the
same "printed page" as the copyright notice for easier
identification within third-party archives.
Copyright [yyyy] [name of copyright owner]
Licensed under the Apache License, Version 2.0 (the "License");
you may not use this file except in compliance with the License.
You may obtain a copy of the License at
http://www.apache.org/licenses/LICENSE-2.0
Unless required by applicable law or agreed to in writing, software
distributed under the License is distributed on an "AS IS" BASIS,
WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
See the License for the specific language governing permissions and
limitations under the License.
+58 -7
View File
@@ -19,15 +19,27 @@ The script is served at `https://docs.company.com/~gitbook/embed/script.js`.
You can find the embed script from your docs site settings, or you can copy the following and replace `docs.company.com` with your docs site hostname.
```html
<script src="https://docs.company.com/~gitbook/embed/script.js"></script>
```
The script initializes the widget itself, so there is nothing to call. To pin the embed to one color
scheme, put it on the script URL — it has to be known before the widget renders:
```html
<script src="https://docs.company.com/~gitbook/embed/script.js?theme=light"></script>
```
To authenticate the visitor, call `init` with their token. Keep tokens out of the script URL: it is
publicly cacheable and ends up in server logs.
```html
<script src="https://docs.company.com/~gitbook/embed/script.js"></script>
<script>
// Initialize with Authenticated Access (optional)
window.GitBook('init',
window.GitBook('init',
{ siteURL: 'https://docs.company.com' },
{ visitor: { token: 'your-jwt-token' } }
);
window.GitBook('show');
</script>
```
@@ -42,6 +54,7 @@ GitBook('configure', {
icon: 'assistant' // 'assistant' | 'sparkle' | 'help' | 'book'
},
tabs: ['assistant', 'search', 'docs'],
defaultPage: '/getting-started',
actions: [
{
icon: 'circle-question',
@@ -95,6 +108,7 @@ frame.clearChat();
// Configure the embed (see Configuration section for all options)
frame.configure({
tabs: ['assistant', 'search', 'docs'],
defaultPage: '/getting-started',
actions: [
{
icon: 'circle-question',
@@ -130,6 +144,7 @@ import { GitBookProvider, GitBookFrame } from '@gitbook/embed/react';
unsignedClaims: { userId: '123' } // Optional: custom claims for dynamic expressions
}}
tabs={['assistant', 'search', 'docs']}
defaultPage="/getting-started"
greeting={{ title: 'Welcome!', subtitle: 'How can I help?' }}
assistantName="Support Assistant"
suggestions={['What is GitBook?', 'How do I get started?']}
@@ -237,6 +252,33 @@ Override which tabs are displayed. Defaults to your site's configuration.
tabs: ['assistant', 'search', 'docs']
```
### `defaultTab`
Available in: Standalone script, NPM package, React components
The tab the embed opens on. Without it, the embed opens on `defaultPage` if set, otherwise on the assistant (or the docs when the assistant isn't available). The tab must be one of the enabled `tabs`.
- **Type**: `'assistant' | 'search' | 'docs'`
```javascript
tabs: ['assistant', 'search', 'docs'],
defaultTab: 'search'
```
`defaultTab` and `defaultPage` apply when the embed first loads: the standalone widget keeps its place when it is closed and reopened. To move it later, use `navigateToPage` or `navigateToAssistant`.
### `defaultPage`
Available in: Standalone script, NPM package, React components
The page the docs tab opens on, in place of your site's home page. Accepts the same references as `navigateToPage`: the page's path within the site, an absolute path, or its full published URL. Unless `defaultTab` says otherwise, the embed opens on this page.
- **Type**: `string`
```javascript
defaultPage: '/getting-started/quickstart'
```
### `closeButton`
Available in: Standalone script, NPM package, React components
@@ -464,20 +506,25 @@ visitor: {
Available in: Standalone script (via `init`), NPM package (via `getFrameURL()`), React components (as prop)
Override the embed's color scheme. When omitted, the embed follows the iframe's CSS `color-scheme`, which lets it inherit the parent page or browser preference.
Override the embed's color scheme.
When omitted, the standalone widget follows the page it is embedded in — its `color-scheme`, falling back to the visitor's OS preference only when that page declares support for both. With the NPM package or the React components you own the iframe, so the embed follows the visitor's OS preference unless you pass this.
**Note**: This is not a configuration option but rather a parameter when initializing the frame or creating the frame URL.
**Standalone script**: Pass as the second argument to `GitBook('init', options, frameOptions)`
**Standalone script**: `?theme=light` on the script URL
**NPM package**: Pass to `getFrameURL({ colorScheme: 'dark' })`
**React components**: Pass as the `colorScheme` prop on `<GitBookFrame>`
- **Type**: `'light' | 'dark'`
```javascript
colorScheme: 'dark'
```html
<script src="https://docs.company.com/~gitbook/embed/script.js?theme=light"></script>
```
Sites published with a single theme always render in that theme, so `colorScheme` has no effect on
them — the widget follows the site instead, to keep its chrome and the docs inside it consistent.
### `button`
Available in: Standalone script only
@@ -495,3 +542,7 @@ button: {
icon: 'assistant'
}
```
## License
Distributed under the [Apache License 2.0](./LICENSE).
+8 -3
View File
@@ -13,10 +13,10 @@
}
},
"sideEffects": false,
"version": "0.5.1",
"version": "0.7.0",
"license": "Apache-2.0",
"dependencies": {
"@gitbook/api": "catalog:",
"@gitbook/icons": "workspace:",
"bidc": "catalog:"
},
"peerDependencies": {
@@ -39,7 +39,12 @@
"dev": "bun run build -- --watch ./src",
"publish-to-npm": "../../scripts/publish-if-new.sh"
},
"files": ["dist", "README.md", "CHANGELOG.md"],
"files": [
"dist",
"README.md",
"CHANGELOG.md",
"LICENSE"
],
"publishConfig": {
"access": "public",
"registry": "https://registry.npmjs.org/"
+3 -1
View File
@@ -10,7 +10,9 @@ export type CreateGitBookOptions = {
export type GetFrameURLOptions = {
/**
* Override the color scheme used by the embedded docs.
* When omitted, the embed follows the iframe's CSS `color-scheme`.
* When omitted, the standalone widget follows the page it is embedded in, and only falls back
* to the visitor's OS preference when that page supports both schemes. Building the iframe
* yourself, the embed follows the visitor's OS preference unless you pass this.
*/
colorScheme?: 'light' | 'dark';
@@ -1,4 +1,5 @@
import { createChannel } from 'bidc';
import type {
FrameToParentMessage,
GitBookEmbeddableConfiguration,
@@ -76,7 +77,7 @@ export function createGitBookFrame(iframe: HTMLIFrameElement): GitBookFrameClien
channel.send(message);
};
const events = new Map<string, Array<(...args: any[]) => void>>();
const events = new Map<string, ((...args: any[]) => void)[]>();
const configuration: GitBookEmbeddableConfiguration = {
tabs: ['assistant', 'search', 'docs'],
+31 -5
View File
@@ -1,5 +1,25 @@
import type { AIToolCallResult, AIToolDefinition } from '@gitbook/api';
import type { IconName } from '@gitbook/icons';
/**
* Name of a Font Awesome icon (e.g. `bolt`), or a GitBook custom icon.
*/
// Kept as a plain string so the package doesn't depend on @gitbook/icons and its licence.
type IconName = string;
/**
* Confirmation action to be displayed to the user before executing a tool.
*/
export type GitBookToolConfirmation = {
icon?: IconName;
label: string;
/**
* Supporting context displayed to the user above the confirmation dialog,
* to help them understand what they are approving or rejecting.
* Limited to 512 characters.
*/
context?: string;
};
/**
* Custom tool definition to be passed to the AI assistant.
@@ -7,11 +27,11 @@ import type { IconName } from '@gitbook/icons';
export type GitBookToolDefinition = AIToolDefinition & {
/**
* Confirmation action to be displayed to the user before executing the tool.
* Provide a static object, or a function that receives the input provided by
* the AI assistant and returns the confirmation — useful to display dynamic
* context based on the arguments the tool is about to be executed with.
*/
confirmation?: {
icon?: IconName;
label: string;
};
confirmation?: GitBookToolConfirmation | ((input: object) => GitBookToolConfirmation);
/**
* Callback when the tool is executed.
@@ -47,6 +67,12 @@ export type GitBookEmbeddableConfiguration = {
/** Tabs to display in the embed (if enabled on the site). */
tabs: ('assistant' | 'docs' | 'search')[];
/** Tab to open the embed on. */
defaultTab?: 'assistant' | 'docs' | 'search';
/** Page to open the docs tab on, instead of the site's home page. */
defaultPage?: string;
/** Additional buttons to be displayed in the header of the GitBook embed. */
actions: GitBookEmbeddableActionDefinition[];
+7 -1
View File
@@ -1,6 +1,7 @@
'use client';
import { useEffect, useMemo, useRef, useState } from 'react';
import type {
GetFrameURLOptions,
GitBookEmbeddableConfiguration,
@@ -26,6 +27,8 @@ export function GitBookFrame(props: GitBookFrameProps) {
suggestions = [],
tools = [],
tabs = ['assistant', 'search', 'docs'],
defaultTab,
defaultPage,
trademark = true,
closeButton = false,
assistantName,
@@ -49,6 +52,8 @@ export function GitBookFrame(props: GitBookFrameProps) {
useEffect(() => {
gitbookFrame?.configure({
tabs,
defaultTab,
defaultPage,
actions,
greeting,
suggestions,
@@ -64,6 +69,8 @@ export function GitBookFrame(props: GitBookFrameProps) {
suggestions,
tools,
tabs,
defaultTab,
defaultPage,
closeButton,
trademark,
assistantName,
@@ -78,7 +85,6 @@ export function GitBookFrame(props: GitBookFrameProps) {
height="100%"
allow="clipboard-write"
className={className}
style={colorScheme ? { colorScheme } : undefined}
/>
);
}
@@ -1,6 +1,7 @@
'use client';
import * as React from 'react';
import { type CreateGitBookOptions, createGitBook } from '../client';
import { GitBookContext } from './context';
+1
View File
@@ -1,6 +1,7 @@
'use client';
import * as React from 'react';
import type { GitBookClient } from '../client';
export const GitBookContext = React.createContext<GitBookClient | null>(null);
+88 -14
View File
@@ -55,6 +55,7 @@ let widgetIframe: HTMLIFrameElement | undefined;
let _client: GitBookClient | undefined;
let _frame: GitBookFrameClient | undefined;
let frameOptions: GetFrameURLOptions | undefined;
let frameConfigured = false;
let frameConfiguration: GitBookEmbeddableConfiguration & StandaloneConfiguration = {
button: {
label: 'Ask',
@@ -85,6 +86,47 @@ widgetWindow.classList.add('hidden');
document.body.appendChild(widgetButton);
document.body.appendChild(widgetWindow);
/**
* The one scheme everything follows: the widget's chrome, the frame's URL and the docs inside it.
* Either it was configured, or we match the page we are embedded in (RND-12558).
*/
function resolveColorScheme(): 'light' | 'dark' {
const configured = frameOptions?.colorScheme;
// Callers are plain JS, so anything else — a typo, a `system` — falls back to the page rather
// than reaching the CSS and the frame's URL, where the two would disagree.
return configured === 'light' || configured === 'dark' ? configured : hostColorScheme();
}
/**
* The scheme the embedding page renders in, which is not the visitor's OS preference: a page that
* never opted into dark stays light however the OS is set.
*
* Resolving a `light-dark()` is the only way to read it. A page's *used* color scheme isn't exposed
* anywhere — the CSSOM gives computed values, and a `<meta name="color-scheme">` (the common way to
* declare it) never even reaches those.
*/
function hostColorScheme(): 'light' | 'dark' {
const probe = document.createElement('div');
// The first `color` is the fallback where `light-dark()` is unsupported: without it the probe
// would inherit the page's own text colour and a white one would read as dark.
probe.style.cssText =
'display:none;color:rgb(0,0,0);color:light-dark(rgb(0,0,0), rgb(255,255,255))';
document.body.appendChild(probe);
const used = getComputedStyle(probe).color;
probe.remove();
return used === 'rgb(255, 255, 255)' ? 'dark' : 'light';
}
/** Mirror the resolved scheme onto the widget's own chrome, and hand it back for the frame's URL. */
function applyColorScheme(): 'light' | 'dark' {
const colorScheme = resolveColorScheme();
for (const element of [widgetButton, widgetWindow]) {
element.dataset.colorScheme = colorScheme;
}
return colorScheme;
}
function getClient() {
if (!_client) {
throw new Error(
@@ -102,12 +144,8 @@ function getIframe() {
widgetIframe = document.createElement('iframe');
widgetIframe.id = 'gitbook-widget-iframe';
widgetIframe.allow = 'clipboard-write';
if (frameOptions?.colorScheme) {
widgetIframe.style.colorScheme = frameOptions.colorScheme;
}
widgetIframe.src = client.getFrameURL({
...frameOptions,
});
// One read for both, so the docs can't come back in a different scheme than the panel.
widgetIframe.src = client.getFrameURL({ ...frameOptions, colorScheme: applyColorScheme() });
widgetWindow.appendChild(widgetIframe);
_frame = client.createFrame(widgetIframe);
@@ -115,25 +153,53 @@ function getIframe() {
widgetWindow.classList.add('hidden');
widgetButton.classList.remove('open');
});
// A new frame starts from the site's own defaults, so replay whatever the host configured.
if (frameConfigured) {
_frame.configure(frameConfiguration);
}
}
return { iframe: widgetIframe, frame: _frame };
}
const GitBook = (...args: StandaloneCalls) => {
switch (args[0]) {
case 'init':
if (_client) {
throw new Error(
'GitBook client already initialized. Call GitBook("unload") first.'
);
}
case 'init': {
// `~gitbook/embed/script.js` already calls `init`, so an integrator following the docs
// ends up calling it a second time. Take the new options instead of throwing: throwing
// here dropped every call queued behind it (RND-12558).
_client = createGitBook(args[1]);
frameOptions = args[2];
frameOptions = {
// Replace rather than merge: a call that leaves out `visitor` — a logout, another
// site — must not keep the token from the last one.
...args[2],
// Except the scheme, where the first one wins: `script.js` passes the site's own
// theme when it pins one, and that is not the integrator's to override.
colorScheme: frameOptions?.colorScheme ?? args[2]?.colorScheme,
};
const colorScheme = applyColorScheme();
// Rebuild the frame only if the new options change its URL — reloading it on the
// loader's `init` plus the integrator's would throw away a chat for nothing.
const frameURL = _client.getFrameURL({ ...frameOptions, colorScheme });
if (widgetIframe && widgetIframe.src !== frameURL) {
const wasOpen = !widgetWindow.classList.contains('hidden');
widgetIframe.remove();
widgetIframe = undefined;
_frame = undefined;
if (wasOpen) {
getIframe();
}
}
break;
}
case 'unload':
_client = undefined;
_frame = undefined;
widgetIframe?.remove();
widgetIframe = undefined;
frameOptions = undefined;
frameConfigured = false;
applyColorScheme();
widgetWindow.classList.add('hidden');
break;
case 'show':
@@ -192,6 +258,7 @@ const GitBook = (...args: StandaloneCalls) => {
}
}
frameConfigured = true;
getIframe().frame.configure({
...frameConfiguration,
});
@@ -214,4 +281,11 @@ const precalls = (window.GitBook as GitBookStandalone | undefined)?.q ?? [];
// @ts-expect-error - GitBook is not defined in the global scope
window.GitBook = GitBook;
precalls.forEach((call) => GitBook(...call));
// Replay each queued call on its own, so one that throws doesn't drop the rest.
precalls.forEach((call) => {
try {
GitBook(...call);
} catch (error) {
console.error('[gitbook:embed]', error);
}
});
+24 -8
View File
@@ -29,14 +29,30 @@
--gitbook-widget-easing-bounce: cubic-bezier(0.34, 1.56, 0.64, 1);
}
@media (prefers-color-scheme: dark) {
:root {
--gitbook-widget-text-color: #FFFFFF;
--gitbook-widget-border-color: #202020;
--gitbook-widget-background-translucent: rgba(15, 15, 15, 0.9);
--gitbook-widget-background-translucent-hover: rgba(20, 20, 20, 0.9);
--gitbook-widget-background-solid: #f0f0f0;
}
/* The widget owns the panel's surface, so it renders in the same scheme as the docs inside the
* iframe. `data-color-scheme` carries that one resolved scheme — see `resolveColorScheme()` — and
* is always set, so the declaration below only shows before the widget initializes (RND-12558).
* The colours are declared here rather than on `:root` because `light-dark()` resolves against the
* color-scheme of the element that declares them. The bundler lowers it to a variable toggle, so
* browsers without `light-dark()` still get both schemes. */
#gitbook-widget-button,
#gitbook-widget-window {
color-scheme: light;
--gitbook-widget-text-color: light-dark(#656973, #FFFFFF);
--gitbook-widget-border-color: light-dark(#e5e5e5, #202020);
--gitbook-widget-background-translucent: light-dark(rgba(255, 255, 255, 0.9), rgba(15, 15, 15, 0.9));
--gitbook-widget-background-translucent-hover: light-dark(rgba(250, 250, 250, 0.9), rgba(20, 20, 20, 0.9));
--gitbook-widget-background-solid: light-dark(#FFFFFF, #0f0f0f);
--gitbook-widget-background-solid-hover: light-dark(#FBFBFB, #141414);
}
#gitbook-widget-button[data-color-scheme="light"],
#gitbook-widget-window[data-color-scheme="light"] {
color-scheme: light;
}
#gitbook-widget-button[data-color-scheme="dark"],
#gitbook-widget-window[data-color-scheme="dark"] {
color-scheme: dark;
}
* {
+1 -1
View File
@@ -1,6 +1,6 @@
import emojisRaws from 'emoji-assets/emoji.json';
import fs from 'node:fs';
import path from 'node:path';
import emojisRaws from 'emoji-assets/emoji.json';
interface EmojiData {
code_points: {
+6
View File
@@ -1,5 +1,11 @@
# @gitbook/expr
## 1.4.0
### Minor Changes
- 02f4cbc: Restrict expressions to an allowlist of methods and syntax, and report unsupported expressions when parsing.
## 1.3.1
### Patch Changes
+7 -3
View File
@@ -1,7 +1,7 @@
{
"name": "@gitbook/expr",
"description": "Safely evaluate & parse user-defined GitBook expressions.",
"version": "1.3.1",
"version": "1.4.0",
"type": "module",
"exports": {
".": {
@@ -16,7 +16,7 @@
"acorn-walk": "^8.3.4",
"assert-never": "catalog:",
"escodegen": "^2.1.0",
"eval-estree-expression": "^3.0.1"
"eval-estree-expression": "^4.0.0"
},
"devDependencies": {
"@tsconfig/strictest": "catalog:",
@@ -36,7 +36,11 @@
"dev": "bun run build -- --watch ./src",
"publish-to-npm": "../../scripts/publish-if-new.sh"
},
"files": ["dist", "README.md", "CHANGELOG.md"],
"files": [
"dist",
"README.md",
"CHANGELOG.md"
],
"publishConfig": {
"access": "public",
"registry": "https://registry.npmjs.org/"
@@ -58,10 +58,10 @@ describe('autocomplete', () => {
}),
};
const context = new SymbolsTable(symbols);
const SCENARIOS: Array<{
const SCENARIOS: {
expressionWithCursor: string;
expectedSuggestions: AutocompleteSuggestions;
}> = [
}[] = [
{
expressionWithCursor: 'visit<cur>',
expectedSuggestions: [
+435 -6
View File
@@ -1,7 +1,15 @@
import { describe, expect, it } from 'bun:test';
import { parseExpressionAt } from 'acorn';
import { afterEach, beforeEach, describe, expect, it, mock } from 'bun:test';
import { ExpressionError } from '../errors';
import {
ALLOWED_METHODS,
MAX_CALLBACK_CALLS,
UnsafeExpressionError,
evaluateRestricted,
} from '../restricted';
import { ExpressionRuntime } from '../runtime';
import { SymbolArray, SymbolString } from '../symbols';
import type { Logger } from '../types';
const SILENT_LOGGER: Logger = {
@@ -10,6 +18,17 @@ const SILENT_LOGGER: Logger = {
error: () => {},
};
const getInputs = () => ({ user: { role: 'editor' }, tags: ['b', 'a'], count: 1 });
// Returns the thrown error instead of throwing, so that side effects can be asserted first.
const attempt = (fn: () => unknown) => {
try {
return fn();
} catch (error) {
return error;
}
};
describe('ExpressionRuntime', () => {
const runtime = new ExpressionRuntime(SILENT_LOGGER);
@@ -66,6 +85,51 @@ describe('ExpressionRuntime', () => {
inputs: { x: 2 },
expectedResult: [2, 4, 6],
},
{
scenario: 'array filter',
condition: 'reviews.filter(review => review.status === "approved").length >= 2',
inputs: {
reviews: [
{ status: 'approved' },
{ status: 'pending' },
{ status: 'approved' },
],
},
expectedResult: true,
},
{
scenario: 'array some',
condition: 'tags.some(tag => tag.startsWith("b") && tag.length === x)',
inputs: { tags: ['a', 'bb'], x: 2 },
expectedResult: true,
},
{
scenario: 'nested callbacks reading outer parameters',
condition: 'required.every(id => reviews.some(review => review.reviewer === id))',
inputs: {
required: ['u1', 'u2'],
reviews: [{ reviewer: 'u2' }, { reviewer: 'u1' }],
},
expectedResult: true,
},
{
scenario: 'callback parameter shadowing an input',
condition: 'tags.some(role => role === "b") && role === "admin"',
inputs: { tags: ['a', 'b'], role: 'admin' },
expectedResult: true,
},
{
scenario: 'array literal includes',
condition: '["admin", "editor"].includes(user.role)',
inputs: { user: { role: 'admin' } },
expectedResult: true,
},
{
scenario: 'array and string at',
condition: 'tags.at(-1).at(0)',
inputs: { tags: ['a', 'bc'] },
expectedResult: 'b',
},
{
scenario: 'string startsWith',
condition: 'user.role.startsWith("ad")',
@@ -102,6 +166,79 @@ describe('ExpressionRuntime', () => {
inputs: { user: { role: ' admin ' } },
expectedResult: true,
},
{
scenario: 'string length and index',
condition: 'user.role.length === 5 && user.role[0] === "a"',
inputs: { user: { role: 'admin' } },
expectedResult: true,
},
{
scenario: 'missing property',
condition: 'user.plan === undefined && missing === undefined',
inputs: { user: { role: 'admin' } },
expectedResult: true,
},
{
scenario: 'boolean claim',
condition: 'visitor.claims.flag === true',
inputs: { visitor: { claims: { flag: true } } },
expectedResult: true,
},
{
scenario: 'nested claims joined with ||',
condition: 'visitor.claims.group.a === true || visitor.claims.group.b === true',
inputs: { visitor: { claims: { group: { b: true } } } },
expectedResult: true,
},
{
scenario: 'negated guard',
condition: "!visitor.claims.unsigned || visitor.claims.unsigned.region !== 'eu'",
inputs: { visitor: { claims: { unsigned: { region: 'us' } } } },
expectedResult: true,
},
{
scenario: 'negated guard with a missing claim',
condition: "!visitor.claims.unsigned || visitor.claims.unsigned.region !== 'eu'",
inputs: { visitor: { claims: {} } },
expectedResult: true,
},
{
scenario: 'key with a colon',
condition: "visitor.claims['custom:tier'] !== 'gold'",
inputs: { visitor: { claims: { 'custom:tier': 'silver' } } },
expectedResult: true,
},
{
scenario: 'key with a colon and a missing claim',
condition: "visitor.claims['custom:tier'] !== 'gold'",
inputs: { visitor: { claims: {} } },
expectedResult: true,
},
{
scenario: 'URL-style key',
condition: "visitor.claims['https://example.com/flag'] === true",
inputs: { visitor: { claims: { 'https://example.com/flag': true } } },
expectedResult: true,
},
{
scenario: 'claim array includes',
condition: "visitor.claims.products.includes('a')",
inputs: { visitor: { claims: { products: ['a', 'b'] } } },
expectedResult: true,
},
{
scenario: 'array literal includes a claim',
condition: "['a', 'b'].includes(visitor.claims.org)",
inputs: { visitor: { claims: { org: 'a' } } },
expectedResult: true,
},
{
scenario: '&& guard with a dashed key',
condition:
"visitor.claims.unsigned && visitor.claims.unsigned['early-access'] === true",
inputs: { visitor: { claims: { unsigned: { 'early-access': true } } } },
expectedResult: true,
},
])(
'should properly evaluate/safeEvaluate a valid conditional expression: $scenario',
({ condition, inputs, expectedResult }) => {
@@ -126,11 +263,6 @@ describe('ExpressionRuntime', () => {
condition: 'while (1) {}',
inputs: {},
},
{
scenario: 'unsafe expression',
condition: '[1, 2, 3].map(() => { while (1) {}})',
inputs: {},
},
];
it.each(INVALID_EXPRESSSIONS)(
@@ -148,6 +280,303 @@ describe('ExpressionRuntime', () => {
expect(() => runtime.evaluate(condition, inputs)).toThrowError(ExpressionError);
}
);
it.each([
{ scenario: 'string method', condition: 'visitor.claims.plan.startsWith("p")' },
{ scenario: 'array method', condition: 'visitor.claims.products.includes("a")' },
{ scenario: 'callback method', condition: 'visitor.claims.products.some(p => p)' },
{ scenario: 'missing parent', condition: 'visitor.claims.org.name.toLowerCase()' },
])(
'should give undefined when calling a method on a missing claim: $scenario',
({ condition }) => {
const inputs = { visitor: { claims: {} } };
expect(runtime.evaluate(condition, inputs)).toBeUndefined();
expect(runtime.safeEvaluate(condition, inputs)).toEqual({ value: undefined });
expect(runtime.evaluateBoolean(condition, inputs)).toBe(false);
}
);
});
describe('unsafe expressions', () => {
// Each expression tries to call this function, which only an escape from the restrictions can reach.
const PAYLOAD = '__expressionPayload';
const CALL_PAYLOAD = `globalThis.${PAYLOAD}()`;
const payload = mock(() => true);
beforeEach(() => {
payload.mockClear();
Reflect.set(globalThis, PAYLOAD, payload);
});
afterEach(() => {
Reflect.deleteProperty(globalThis, PAYLOAD);
});
const UNSAFE_EXPRESSIONS = [
{
scenario: 'array key bypassing the constructor check',
condition: `({})[["constructor"]][["constructor"]]("${CALL_PAYLOAD}")()`,
},
{
scenario: 'array key on an input value',
condition: `user.role[["constructor"]][["constructor"]]("${CALL_PAYLOAD}")()`,
},
{
scenario: 'array key on a method',
condition: `"".includes[["constructor"]]("${CALL_PAYLOAD}")()`,
},
{
scenario: 'global access in a callback',
condition: `[1].some(() => ${CALL_PAYLOAD})`,
},
{
scenario: 'computed constructor key in a callback',
condition: `[1].some(x => x["constr" + "uctor"]["constr" + "uctor"]("${CALL_PAYLOAD}")())`,
},
{
scenario: 'computed constructor key in a map callback',
condition: `[1].map(x => x["constr" + "uctor"]["constr" + "uctor"]("${CALL_PAYLOAD}")())`,
},
{
scenario: 'arrow function called through implicit toString',
condition: `({ toString: () => ${CALL_PAYLOAD} }) + ""`,
},
{ scenario: 'inherited property', condition: 'user.constructor' },
{
scenario: 'inherited property with an array key',
condition: 'user[["constructor"]]',
},
{
scenario: 'inherited property of a string',
condition: 'user.role.toString',
runtimeOnly: true,
},
{ scenario: 'inherited property of a number', condition: 'count.constructor' },
{ scenario: 'prototype access', condition: 'user.__proto__' },
{ scenario: 'inherited variable', condition: 'toString', runtimeOnly: true },
{ scenario: 'arrow function outside a callback', condition: '[() => 1].length' },
{
scenario: 'block-bodied arrow function',
condition: '[1, 2, 3].some(() => { while (1) {} })',
},
{ scenario: 'function expression', condition: '[1].some(function () { return 1 })' },
{ scenario: 'async arrow callback', condition: 'tags.some(async t => t)' },
{
scenario: 'async function callback',
condition: 'tags.some(async function (t) { return t })',
},
{ scenario: 'immediately invoked async arrow', condition: '(async () => 1)()' },
{ scenario: 'object literal', condition: '({ role: "admin" }).role' },
{ scenario: 'constructor call', condition: 'new Date()' },
{ scenario: 'eval', condition: `eval("${CALL_PAYLOAD}")` },
{ scenario: 'eval as a method', condition: `globalThis.eval("${CALL_PAYLOAD}")` },
{ scenario: 'new Function', condition: `new Function("${CALL_PAYLOAD}")()` },
{ scenario: 'Function without new', condition: `Function("${CALL_PAYLOAD}")()` },
{
scenario: 'new on a function expression',
condition: `new function () { ${CALL_PAYLOAD} }()`,
},
{ scenario: 'method outside the standard library', condition: '"a".padStart(1e9)' },
{ scenario: 'string repeat', condition: 'user.role.repeat(1e9)' },
{ scenario: 'string repeat in a callback', condition: 'tags.map(t => t.repeat(1e9))' },
{ scenario: 'mutating array method', condition: 'tags.reverse()' },
{
scenario: 'callback for a method not taking one',
condition: 'tags.includes(t => t)',
},
{
scenario: 'inherited variable in a callback',
condition: 'tags.some(t => toString)',
runtimeOnly: true,
},
{
scenario: 'callback parameter named __proto__',
condition: 'tags.some(__proto__ => 1)',
},
{
scenario: 'callback parameter named constructor',
condition: 'tags.some(constructor => 1)',
},
{
scenario: 'expression deeper than the library limit',
condition: `${'!'.repeat(60)}true`,
runtimeOnly: true,
},
{
scenario: 'array literal longer than the library limit',
condition: `[${'1,'.repeat(10_001)}].length`,
runtimeOnly: true,
},
{
scenario: 'inherited property of a callback parameter',
condition: 'tags.some(t => t.constructor)',
},
{ scenario: 'non-arrow callback', condition: 'tags.map(Function)' },
{ scenario: 'callback with an extra argument', condition: 'tags.some(t => t, "a")' },
{ scenario: 'missing callback', condition: 'tags.some()' },
{
scenario: 'too many nested callback calls',
condition:
'[1, 2, 3, 4, 5, 6, 7, 8, 9, 10].map(a => [1, 2, 3, 4, 5, 6, 7, 8, 9, 10].map(b => [1, 2, 3, 4, 5, 6, 7, 8, 9, 10].map(c => [1, 2, 3, 4, 5, 6, 7, 8, 9, 10].map(d => d))))',
runtimeOnly: true,
},
{ scenario: 'method on a plain object', condition: 'user.hasOwnProperty("role")' },
{ scenario: 'method on a function', condition: '[1].some.call([1], n => n)' },
{
scenario: 'non-primitive argument',
condition: '[user].includes(user)',
runtimeOnly: true,
},
{ scenario: 'regex operator', condition: 'user.role =~ /^ed/' },
{ scenario: 'regex argument', condition: 'user.role.includes(/(a+)+b/)' },
{ scenario: 'BigInt literal', condition: '2n ** 64n' },
{
scenario: 'BigInt literal in a callback',
condition: '[1, 2, 3, 4].some((n) => 9n ** 9n ** 9n)',
},
{ scenario: 'BigInt literal in an array', condition: '[9n][0] ** 9n' },
{ scenario: 'BigInt literal in a template', condition: '`${9n ** 9n ** 9n}`' },
{ scenario: 'delete', condition: 'delete user.role' },
{ scenario: 'assignment', condition: 'user.role = "admin"' },
{ scenario: 'update', condition: 'count++' },
];
it.each(UNSAFE_EXPRESSIONS)(
'should throw with evaluate and return the error with safeEvaluate: $scenario',
({ condition }) => {
const evaluated = attempt(() => runtime.evaluate(condition, getInputs()));
const safeEvaluated = runtime.safeEvaluate(condition, getInputs());
expect(payload).not.toHaveBeenCalled();
expect(evaluated).toBeInstanceOf(ExpressionError);
expect(safeEvaluated.value).toBeUndefined();
expect(safeEvaluated.error).toBeInstanceOf(ExpressionError);
}
);
it.each(UNSAFE_EXPRESSIONS)(
'should evaluate to false with evaluateBoolean/evaluateBooleanAll: $scenario',
({ condition }) => {
const evaluated = runtime.evaluateBoolean(condition, getInputs());
const evaluatedAll = runtime.evaluateBooleanAll(['true', condition], getInputs());
expect(payload).not.toHaveBeenCalled();
expect(evaluated).toBe(false);
expect(evaluatedAll).toBe(false);
}
);
it.each(UNSAFE_EXPRESSIONS)(
'should throw without executing code with evaluateTemplate: $scenario',
({ condition }) => {
const evaluated = attempt(() =>
runtime.evaluateTemplate(`Hello {{ ${condition} }}`, getInputs())
);
expect(payload).not.toHaveBeenCalled();
expect(evaluated).toBeInstanceOf(ExpressionError);
}
);
it.each(UNSAFE_EXPRESSIONS)('should not mutate the inputs: $scenario', ({ condition }) => {
const inputs = getInputs();
attempt(() => runtime.evaluate(condition, inputs));
expect(inputs).toEqual(getInputs());
});
it.each(UNSAFE_EXPRESSIONS)(
'should report the error when parsing, for editors: $scenario',
({ condition, runtimeOnly }) => {
const parsed = attempt(() => runtime.parse(condition));
const { errors } = runtime.parseTemplate(`Hello {{ ${condition} }}`);
if (runtimeOnly) {
// Depends on the values, so only enforced when evaluating.
expect(parsed).not.toBeInstanceOf(Error);
expect(errors).toEqual([]);
} else {
expect(parsed).toBeInstanceOf(ExpressionError);
expect((parsed as ExpressionError).location).toBeDefined();
expect(errors).toHaveLength(1);
}
}
);
it.each(UNSAFE_EXPRESSIONS)(
'should not execute code when evaluating without validating first: $scenario',
({ condition }) => {
const expression = parseExpressionAt(condition, 0, { ecmaVersion: 'latest' });
const evaluated = attempt(() => evaluateRestricted(expression, getInputs()));
expect(payload).not.toHaveBeenCalled();
expect(
evaluated instanceof UnsafeExpressionError || evaluated instanceof RangeError
).toBe(true);
}
);
it('should point the parse error at the offending token', () => {
const condition = 'user.role.padStart(10)';
const error = attempt(() => runtime.parse(condition)) as ExpressionError;
expect(error.message).toBe('Method "padStart" is not supported');
expect(error.location).toEqual({ line: 1, column: 10 });
expect(condition.slice(error.token?.start, error.token?.end)).toBe('padStart');
});
it('should keep the location of the error when evaluating', () => {
const condition = 'user.role.padStart(10)';
const error = attempt(() => runtime.evaluate(condition, getInputs()));
expect(error).toBeInstanceOf(UnsafeExpressionError);
expect((error as ExpressionError).location).toEqual({ line: 1, column: 10 });
});
it('should explain why async callbacks are rejected', () => {
const error = attempt(() => runtime.parse('tags.some(async t => t)'));
expect((error as ExpressionError).message).toBe('Async functions are not supported');
});
it('should not validate when parsing loosely for autocomplete', () => {
expect(() => runtime.parse('user.constructor', { loose: true })).not.toThrow();
});
it.each(['constructor', '__proto__', 'prototype', '__defineGetter__', '__lookupGetter__'])(
'should not read an own "%s" key of the inputs',
(key) => {
// JSON.parse creates own properties, even for `__proto__`.
const inputs = JSON.parse(`{ "data": { "${key}": "value" }, "${key}": "value" }`);
expect(() => runtime.evaluate(`data["${key}"]`, inputs)).toThrow(ExpressionError);
expect(() => runtime.evaluate(key, inputs)).toThrow(ExpressionError);
expect(runtime.evaluateBoolean(`data["${key}"] === "value"`, inputs)).toBe(false);
}
);
it('should limit the number of callback calls per evaluation', () => {
const condition = 'items.map(item => item).length > 0';
const atLimit = { items: Array.from({ length: MAX_CALLBACK_CALLS }, (_, i) => i) };
const overLimit = { items: [...atLimit.items, MAX_CALLBACK_CALLS] };
expect(runtime.evaluate(condition, atLimit)).toBe(true);
// The budget is per evaluation, not shared across evaluations.
expect(runtime.evaluate(condition, atLimit)).toBe(true);
expect(() => runtime.evaluate(condition, overLimit)).toThrow(ExpressionError);
expect(runtime.evaluateBoolean(condition, overLimit)).toBe(false);
});
it('should only allow the standard library offered in the editor and reviewed additions', () => {
const stringMethods = SymbolString().methods.map((method) => method.name);
const arrayMethods = SymbolArray({ items: SymbolString() }).methods.map(
(method) => method.name
);
// Extend only after reviewing that a method is safe (see `ALLOWED_METHODS`).
expect(ALLOWED_METHODS.string).toEqual(new Set(stringMethods));
expect(ALLOWED_METHODS.array).toEqual(new Set([...arrayMethods, 'filter', 'map']));
});
});
describe('parse', () => {
+4 -5
View File
@@ -11,7 +11,6 @@ import type {
} from 'acorn';
import { isDummy } from 'acorn-loose';
import * as walk from 'acorn-walk';
import assertNever from 'assert-never';
import { type ExtractSymbolDef, SymbolType, SymbolsTable } from './symbols';
@@ -312,7 +311,7 @@ export class AutoComplete {
node: BinaryExpression,
cursorOffset: number,
context: SymbolsTable
): Array<AutocompleteLiteralValueSuggestion> {
): AutocompleteLiteralValueSuggestion[] {
const { left, right } = node;
if (left.type !== 'MemberExpression' && left.type !== 'Identifier') {
@@ -431,7 +430,7 @@ export class AutoComplete {
node: AnyNode,
cursorOffset: number,
context: SymbolsTable
): Array<AutocompleteOperatorSuggestion> {
): AutocompleteOperatorSuggestion[] {
if (node.type === 'Literal') {
const parent = findParentNode(node, ast);
@@ -496,7 +495,7 @@ export class AutoComplete {
*/
private getOperatorSuggestionsForSymbol(
symbol: ExtractSymbolDef<SymbolType>
): Array<AutocompleteOperatorSuggestion> {
): AutocompleteOperatorSuggestion[] {
switch (symbol.type) {
case SymbolType.Number:
case SymbolType.Boolean:
@@ -526,7 +525,7 @@ export class AutoComplete {
case SymbolType.Function:
return this.getOperatorSuggestionsForSymbol(symbol.returns);
case SymbolType.Union: {
return symbol.members.reduce<Array<AutocompleteOperatorSuggestion>>((prev, cur) => {
return symbol.members.reduce<AutocompleteOperatorSuggestion[]>((prev, cur) => {
prev.push(...this.getOperatorSuggestionsForSymbol(cur));
return prev;
}, []);
+1
View File
@@ -1,4 +1,5 @@
import type { JSONSchema7 } from 'json-schema';
import { filterOutNullable } from './utils';
type InputValuesType =
+236
View File
@@ -0,0 +1,236 @@
import type {
ArrowFunctionExpression,
CallExpression,
Expression,
Identifier,
Literal,
MemberExpression,
Node,
UnaryExpression,
} from 'acorn';
import evalESTreeExpr from 'eval-estree-expression';
import {
ALLOWED_METHODS,
CALLBACK_METHODS,
MAX_CALLBACK_CALLS,
UNSAFE_KEYS,
UnsafeExpressionError,
getCallbackParams,
} from './rules';
/**
* Evaluate a parsed expression with the restrictions, enforcing the rules that depend on values.
*/
export function evaluateRestricted(expression: Expression, inputs: object): unknown {
return evalESTreeExpr.evaluate.sync<Expression>(expression, inputs, {
// The library's own function support compiles code with `Function()`: calls and
// arrow functions are only handled by our visitors.
functions: false,
withMembers: true,
visitors: RESTRICTED_VISITORS,
});
}
/**
* Callback calls so far, per evaluator (the library creates one per evaluation).
*/
const callbackCalls = new WeakMap<object, number>();
type Visit = (node: Node, context: object, parent?: Node) => unknown;
type Evaluator = { visit: Visit };
/**
* Visitors overriding eval-estree-expression's defaults so that expressions can only read own
* properties of plain data and call the methods of the standard library.
*/
const RESTRICTED_VISITORS = {
Identifier(this: Evaluator, node: Identifier, context: object): unknown {
return readVariable(context, node.name);
},
MemberExpression(this: Evaluator, node: MemberExpression, context: object): unknown {
const object = this.visit(node.object, context, node);
const key = node.computed
? this.visit(node.property, context, node)
: (node.property as Identifier).name;
// Reject rather than coerce, so that keys like `["constructor"]` can't slip through.
if (typeof key !== 'string' && typeof key !== 'number') {
throw new UnsafeExpressionError('Property keys must be strings or numbers');
}
return readOwnProperty(object, String(key));
},
CallExpression(this: Evaluator, node: CallExpression, context: object): unknown {
const callee = node.callee;
if (callee.type !== 'MemberExpression' || callee.computed || callee.optional) {
throw new UnsafeExpressionError('Only method calls are supported');
}
const method = (callee.property as Identifier).name;
const receiver = this.visit(callee.object, context, callee);
// Like reading a property of a missing claim, calling a method on one gives `undefined`.
if (
(receiver === null || receiver === undefined) &&
(ALLOWED_METHODS.string.has(method) || ALLOWED_METHODS.array.has(method))
) {
return undefined;
}
const fn = getAllowedMethod(receiver, method);
if (!fn) {
throw new UnsafeExpressionError(`Method "${method}" is not supported`);
}
if (CALLBACK_METHODS.has(method)) {
const [callback] = node.arguments;
if (node.arguments.length !== 1 || callback?.type !== 'ArrowFunctionExpression') {
throw new UnsafeExpressionError(`"${method}" only accepts an arrow function`);
}
return Reflect.apply(fn, receiver, [createCallback(this, callback, context)]);
}
const args = node.arguments.map((arg) => {
if (arg.type === 'SpreadElement') {
throw new UnsafeExpressionError('Spread arguments are not supported');
}
const value = this.visit(arg, context, node);
if (!isPrimitive(value)) {
throw new UnsafeExpressionError('Only primitive values can be arguments');
}
return value;
});
return Reflect.apply(fn, receiver, args);
},
ArrowFunctionExpression(): never {
throw new UnsafeExpressionError('Arrow functions are only supported as callbacks');
},
FunctionExpression(): never {
throw new UnsafeExpressionError('Functions are not supported');
},
ObjectExpression(): never {
throw new UnsafeExpressionError('Object literals are not supported');
},
Literal(node: Literal): unknown {
// Regexes are only useful to the library's `=~` operator, and BigInt exponentiation can hang.
if (node.regex || typeof node.value === 'bigint') {
throw new UnsafeExpressionError('Regex and BigInt literals are not supported');
}
return node.value;
},
UnaryExpression(this: Evaluator, node: UnaryExpression, context: object): unknown {
// The library implements `delete` by mutating the inputs.
if (node.operator === 'delete') {
throw new UnsafeExpressionError('"delete" is not supported');
}
return Object.getPrototypeOf(this).UnaryExpression.call(this, node, context);
},
AssignmentExpression(): never {
throw new UnsafeExpressionError('Assignments are not supported');
},
UpdateExpression(): never {
throw new UnsafeExpressionError('Update expressions are not supported');
},
NewExpression(): never {
throw new UnsafeExpressionError('"new" is not supported');
},
TaggedTemplateExpression(): never {
throw new UnsafeExpressionError('Tagged templates are not supported');
},
ThisExpression(): never {
throw new UnsafeExpressionError('"this" is not supported');
},
};
/**
* Create a callback evaluating the arrow function's body with the evaluator, instead of compiling it.
*/
function createCallback(evaluator: Evaluator, node: ArrowFunctionExpression, context: object) {
const params = getCallbackParams(node);
return (...args: unknown[]) => {
const calls = (callbackCalls.get(evaluator) ?? 0) + 1;
if (calls > MAX_CALLBACK_CALLS) {
throw new UnsafeExpressionError('Too many callback calls');
}
callbackCalls.set(evaluator, calls);
const variables = new Map(params.map((name, index) => [name, args[index]]));
return evaluator.visit(node.body, new CallbackScope(variables, context), node);
};
}
/**
* Variables of a callback call, falling back to the enclosing scope.
* A Map avoids copying the inputs on each call.
*/
class CallbackScope {
constructor(
readonly variables: Map<string, unknown>,
readonly parent: object
) {}
}
function readVariable(scope: object, name: string): unknown {
if (UNSAFE_KEYS.has(name)) {
throw new UnsafeExpressionError(`"${name}" is not accessible`);
}
if (scope instanceof CallbackScope) {
return scope.variables.has(name)
? scope.variables.get(name)
: readVariable(scope.parent, name);
}
return readOwnProperty(scope, name);
}
/**
* Read an own property, treating any attempt to reach an inherited one (e.g. `constructor`) as unsafe.
*/
function readOwnProperty(object: unknown, key: string): unknown {
if (UNSAFE_KEYS.has(key)) {
throw new UnsafeExpressionError(`Property "${key}" is not accessible`);
}
if (object === null || object === undefined) {
return undefined;
}
if (typeof object === 'function') {
throw new UnsafeExpressionError('Functions are not accessible');
}
// Wrapping primitives exposes string indexes and `length` as own properties.
const target = Object(object);
if (Object.hasOwn(target, key)) {
return target[key];
}
if (key in target) {
throw new UnsafeExpressionError(`Property "${key}" is not accessible`);
}
return undefined;
}
function getAllowedMethod(receiver: unknown, method: string): Function | null {
if (typeof receiver === 'string' && ALLOWED_METHODS.string.has(method)) {
return Reflect.get(String.prototype, method);
}
if (Array.isArray(receiver) && ALLOWED_METHODS.array.has(method)) {
return Reflect.get(Array.prototype, method);
}
return null;
}
function isPrimitive(value: unknown): boolean {
return value === null || (typeof value !== 'object' && typeof value !== 'function');
}
+3
View File
@@ -0,0 +1,3 @@
export { evaluateRestricted } from './evaluate';
export { ALLOWED_METHODS, MAX_CALLBACK_CALLS, UnsafeExpressionError } from './rules';
export { validateExpression } from './validate';
+78
View File
@@ -0,0 +1,78 @@
import type { AnyNode, ArrowFunctionExpression } from 'acorn';
import { ExpressionError } from '../errors';
/**
* Methods that expressions are allowed to call, per receiver type.
* Must include the standard library offered in the editor (see `symbols.ts`). Only add methods
* after review: they must not mutate their receiver, and their output must stay bounded by their input.
*/
export const ALLOWED_METHODS = {
string: new Set([
'at',
'endsWith',
'includes',
'startsWith',
'toLowerCase',
'toUpperCase',
'trim',
]),
array: new Set(['at', 'every', 'filter', 'includes', 'map', 'some']),
};
/**
* Array methods taking a callback, the only place where arrow functions are allowed.
*/
export const CALLBACK_METHODS = new Set(['every', 'filter', 'map', 'some']);
/**
* Maximum number of callback calls in a single evaluation, as nested callbacks multiply and
* visitors control the size of unsigned claims. Enough for a pass over an identity provider's
* group claim (capped around 200 entries), or a small nested pair of arrays.
*/
export const MAX_CALLBACK_CALLS = 250;
/**
* Names never readable as variables or properties, even as own properties of the inputs.
* Replaces (and extends) the library's own denylist, as our visitors override the ones applying it.
*/
export const UNSAFE_KEYS = new Set([
'__defineGetter__',
'__defineSetter__',
'__lookupGetter__',
'__lookupSetter__',
'__proto__',
'constructor',
'prototype',
]);
/**
* Thrown when an expression uses something the restrictions don't allow.
*/
export class UnsafeExpressionError extends ExpressionError {}
/**
* Create an error pointing at the node, so that editors can highlight it.
*/
export function unsupported(node: AnyNode, message: string): UnsafeExpressionError {
return new UnsafeExpressionError(message, node.loc?.start);
}
/**
* Parameter names of an arrow function, if it has the shape allowed for callbacks.
*/
export function getCallbackParams(node: ArrowFunctionExpression): string[] {
if (node.async) {
throw unsupported(node, 'Async functions are not supported');
}
if (!node.expression) {
throw unsupported(node, 'Only single-expression arrow functions are supported');
}
return node.params.map((param) => {
if (param.type !== 'Identifier' || UNSAFE_KEYS.has(param.name)) {
throw unsupported(param, 'Only simple arrow function parameters are supported');
}
return param.name;
});
}
+137
View File
@@ -0,0 +1,137 @@
import type { AnyNode, CallExpression, Identifier } from 'acorn';
import {
ALLOWED_METHODS,
CALLBACK_METHODS,
UNSAFE_KEYS,
getCallbackParams,
unsupported,
} from './rules';
/**
* Check an expression against the restrictions without evaluating it, so that editors can report
* violations. Rules depending on values (receiver types, inherited properties, limits) are only
* enforced by `evaluateRestricted`.
*/
export function validateExpression(node: AnyNode): void {
switch (node.type) {
case 'Literal':
if (node.regex || typeof node.value === 'bigint') {
throw unsupported(
node,
'Regular expressions and BigInt literals are not supported'
);
}
return;
case 'Identifier':
return assertSafeKey(node.name, node);
case 'TemplateLiteral':
return node.expressions.forEach(validateExpression);
case 'ArrayExpression':
for (const element of node.elements) {
if (element) {
validateExpression(
element.type === 'SpreadElement' ? element.argument : element
);
}
}
return;
case 'UnaryExpression':
if (node.operator === 'delete') {
throw unsupported(node, '"delete" is not supported');
}
return validateExpression(node.argument);
case 'BinaryExpression':
case 'LogicalExpression':
validateExpression(node.left);
return validateExpression(node.right);
case 'ConditionalExpression':
validateExpression(node.test);
validateExpression(node.consequent);
return validateExpression(node.alternate);
case 'SequenceExpression':
return node.expressions.forEach(validateExpression);
case 'MemberExpression':
validateExpression(node.object);
if (!node.computed) {
return assertSafeKey((node.property as Identifier).name, node.property);
}
if (node.property.type === 'Literal') {
return assertSafeKey(String(node.property.value), node.property);
}
if (node.property.type === 'ArrayExpression') {
throw unsupported(node.property, 'Property keys must be strings or numbers');
}
return validateExpression(node.property);
case 'CallExpression':
return validateCall(node);
case 'ArrowFunctionExpression':
throw unsupported(node, 'Arrow functions are only supported as callbacks');
case 'ObjectExpression':
throw unsupported(node, 'Object literals are not supported');
case 'AssignmentExpression':
// `a =~ /regex/` parses as an assignment of `~/regex/`.
throw unsupported(
node,
node.right.type === 'UnaryExpression' && node.right.operator === '~'
? 'The "=~" regex operator is not supported'
: 'Assignments are not supported'
);
default:
throw unsupported(
node,
UNSUPPORTED_SYNTAX[node.type] ?? `${node.type} is not supported`
);
}
}
/**
* Errors shown to authors for rejected syntax.
*/
const UNSUPPORTED_SYNTAX: Partial<Record<AnyNode['type'], string>> = {
AwaitExpression: '"await" is not supported',
ChainExpression: 'Optional chaining ("?.") is not supported',
ClassExpression: 'Classes are not supported',
FunctionExpression: 'Functions are not supported',
ImportExpression: '"import" is not supported',
NewExpression: '"new" is not supported',
TaggedTemplateExpression: 'Tagged templates are not supported',
ThisExpression: '"this" is not supported',
UpdateExpression: '"++" and "--" are not supported',
YieldExpression: '"yield" is not supported',
};
function validateCall(node: CallExpression): void {
const callee = node.callee;
if (callee.type !== 'MemberExpression' || callee.computed || node.optional) {
throw unsupported(node, 'Only method calls are supported');
}
validateExpression(callee.object);
const method = (callee.property as Identifier).name;
if (!ALLOWED_METHODS.string.has(method) && !ALLOWED_METHODS.array.has(method)) {
throw unsupported(callee.property, `Method "${method}" is not supported`);
}
if (CALLBACK_METHODS.has(method)) {
const [callback] = node.arguments;
if (node.arguments.length !== 1 || callback?.type !== 'ArrowFunctionExpression') {
throw unsupported(node, `"${method}" only accepts an arrow function`);
}
getCallbackParams(callback);
return validateExpression(callback.body);
}
for (const arg of node.arguments) {
if (arg.type === 'SpreadElement') {
throw unsupported(arg, 'Spread arguments are not supported');
}
validateExpression(arg);
}
}
function assertSafeKey(key: string, node: AnyNode): void {
if (UNSAFE_KEYS.has(key)) {
throw unsupported(node, `"${key}" is not accessible`);
}
}
+32 -6
View File
@@ -11,10 +11,11 @@ import {
import { parse as parseLoose } from 'acorn-loose';
import escodegen from 'escodegen';
import evalESTreeExpr from 'eval-estree-expression';
const { evaluate, variables } = evalESTreeExpr;
const { variables } = evalESTreeExpr;
import { AutoComplete } from './autocomplete';
import { ExpressionError } from './errors';
import { UnsafeExpressionError, evaluateRestricted, validateExpression } from './restricted';
import type { SymbolsTable } from './symbols';
import type { TemplatePart } from './template';
import { parseTemplate as parseTemplateParts } from './template';
@@ -39,6 +40,7 @@ export class ExpressionRuntime {
/**
* Evaluates an expression based on the given inputs/context.
* Throws an `ExpressionError` for invalid expressions, including those the restrictions don't allow.
*/
public evaluate(expr: string, inputs: object): unknown {
try {
@@ -48,12 +50,12 @@ export class ExpressionRuntime {
throw new ExpressionError('Invalid nodes found when parsing');
}
return evaluate.sync<Expression>(parsed.result, inputs, {
functions: true,
withMembers: true,
generate: escodegen.generate,
});
return evaluateRestricted(parsed.result, inputs);
} catch (error) {
// Keep the location, so that editors can point at the offending token.
if (error instanceof UnsafeExpressionError) {
throw error;
}
throw error instanceof Error
? new ExpressionError(error.message)
: new ExpressionError('Unexpected error');
@@ -213,6 +215,11 @@ export class ExpressionRuntime {
// Return information on the other nodes as invalid nodes
const invalidNodes = ast.body.filter(filterOutModuleDeclarationStatement);
// Loose parsing serves autocomplete on partial expressions, which are expected to be incomplete.
if (!options.loose) {
validateRestrictedExpression(expr, statement.expression);
}
return {
result: statement.expression,
invalidNodes,
@@ -265,6 +272,25 @@ function createExpressionErrorFromSyntaxError(
return new ExpressionError(errorMessage, loc, token);
}
/**
* Validate an expression against the restrictions, pointing the error at the offending token for editors.
*/
function validateRestrictedExpression(code: string, expression: Expression): void {
try {
validateExpression(expression);
} catch (error) {
if (error instanceof UnsafeExpressionError && error.location) {
throw new UnsafeExpressionError(
error.message,
error.location,
getTokenAtLoc(code, error.location)
);
}
throw error;
}
}
function getTokenAtLoc(code: string, errorLoc: Position): Token | undefined {
const tokens = tokenizer(code, {
ecmaVersion: 'latest',
+3 -3
View File
@@ -20,7 +20,7 @@ export interface ExpressionParserResult {
/**
* The information of the invalid (non-expression) nodes found from the other portions of the parsed expression.
*/
invalidNodes: Array<ExpressionStatement>;
invalidNodes: ExpressionStatement[];
}
export interface ExpressionAutocompleteResults {
@@ -158,11 +158,11 @@ export interface AutocompleteSymbolSuggestion {
symbol: SymbolInfo;
}
export type AutocompleteSuggestions = Array<
export type AutocompleteSuggestions = (
| AutocompleteSymbolSuggestion
| AutocompleteLiteralValueSuggestion
| AutocompleteOperatorSuggestion
>;
)[];
type LoggerFn = (message: string, ...args: any[]) => void;
+4
View File
@@ -27,6 +27,10 @@ declare module 'eval-estree-expression' {
* Used with the variables method to return nested variables (e.g., variables with dot notation, like foo.bar.baz). Default: undefined
*/
withMembers?: boolean;
/**
* Custom visitors by node type, taking precedence over the built-in ones. Called with the evaluator as `this`.
*/
visitors?: Record<string, Function>;
}
/**
+1 -2
View File
@@ -1,8 +1,7 @@
import { APIv2 } from 'google-font-metadata';
import fs from 'node:fs/promises';
import path from 'node:path';
import { APIv2 } from 'google-font-metadata';
import { CustomizationDefaultFont } from '@gitbook/api';
import type { FontDefinitions } from '../src/types';
+6 -1
View File
@@ -27,7 +27,12 @@
"unit": "bun test",
"publish-to-npm": "../../scripts/publish-if-new.sh"
},
"files": ["dist", "bin", "README.md", "CHANGELOG.md"],
"files": [
"dist",
"bin",
"README.md",
"CHANGELOG.md"
],
"engines": {
"node": ">=20.0.0"
},
+1 -2
View File
@@ -1,5 +1,4 @@
import rawFonts from './data/fonts.json' with { type: 'json' };
import type { FontDefinitions } from './types';
import rawFonts from './data/fonts.json' with { type: 'json' };
export const fonts: FontDefinitions = rawFonts;
@@ -1,5 +1,7 @@
import { describe, expect, it } from 'bun:test';
import { CustomizationDefaultFont } from '@gitbook/api';
import { getDefaultFont } from './getDefaultFont';
describe('getDefaultFont', () => {
+2 -1
View File
@@ -1,4 +1,5 @@
import type { CustomizationDefaultFont } from '@gitbook/api';
import { fonts } from './fonts';
import type { FontWeight } from './types';
@@ -86,7 +87,7 @@ function getBestUnicodeRange(text: string, ranges: Record<string, string>): stri
// ---------- tally code-point hits ----------
const hits: Record<string, number> = Object.fromEntries(Object.keys(parsed).map((k) => [k, 0]));
for (let i = 0; i < text.length; ) {
for (let i = 0; i < text.length;) {
const cp = text.codePointAt(i)!;
i += cp > 0xffff ? 2 : 1; // advance by 1 UTF-16 code-unit (or 2 for surrogates)
+290
View File
@@ -1,5 +1,295 @@
# gitbook
## 0.28.2
### Patch Changes
- b53e73c: Link suggested follow-up questions in markdown AI answers to the `.md` ask route so agents get markdown back.
- 4a40547: Fix the page outline not scrolling to keep the active section visible on long pages.
- 7ddd023: Fix search prewarming on public sites.
- Updated dependencies [31e88d1]
- @gitbook/embed@0.7.0
## 0.28.1
### Patch Changes
- a023a71: Warn visitors not to share sensitive personal info in the Assistant context popover.
- 6344646: Fix bash code blocks colouring the last letter of a word before `>` differently, as in `<name>`.
- 7e096d5: Bump Next.js to 16.4.3, keeping the dev-mode OOM patch.
- 198cafe: Bump Next.js to 16.4.5 and OpenNext (Cloudflare 1.20.16, AWS 4.1.15), keeping the dev-mode OOM patch.
- f61578f: Preconnect each asset origin once, skip same-origin icon URLs, and open the fonts preconnect in CORS mode so font requests can reuse it.
- 26ec43e: Stop caching failed searches, so a rate-limited or failing search is retried on the next query instead of being served from cache for 15 minutes.
- 8689736: Remove italic from dfn styling
- 04f39f1: Declare the Tailwind layer order in each component stylesheet, so a route whose first stylesheet is one of them still puts `base` before `components` and preflight does not strip their padding and borders.
- a512777: Forward the visitor's user agent on ask and Assistant calls so questions are classified by who asked.
- 508f1bc: Load the inline expression runtime only on pages whose code blocks or text use expressions, so other pages ship less JavaScript.
- 04f39f1: Pack the class lists that every block, heading anchor and table cell repeats into shared CSS classes, and carry a table cell's width once as a custom property instead of spelling it out as both width and min-width, so a large page carries far less markup.
- bd431f1: Split llms-full.txt into parts by size so large sites no longer fail with "content too large"
- a5d58bc: Follow site and space redirects when the MCP getPage tool resolves a page URL.
- e6b8502: Fix the MCP `getPage` tool returning "Page not found" for the Markdown URL of a page (`<page>.md`).
- e745c88: Add a search input to filter models by name on OpenAPI models pages.
- 96c5683: Let analytics tools like GA4 track outbound link clicks by using native link navigation.
- 347a1cc: Set `Partitioned` on visitor cookies set inside an iframe so authenticated embeds work cross-site.
- 3837c48: Fix encoded or non-normalized links on proxied sites redirecting to the internal proxy path instead of the public URL.
- ea01850: Support a secondary brand colour for secondary buttons and `$secondary` text, background, icon and tag colours. Sites without one render as before.
- c00a7b3: Resolve the published content with the full URL in a single lookup and always send the visitor country.
- 063e685: Resolve dark-mode image URLs in published Markdown.
- 09a8310: Serve a disallow-all robots.txt instead of redirecting to sign-in on authenticated access sites.
- b7b8ae6: Keep lists, paragraphs and code blocks as HTML in Updates RSS feeds, instead of running all the text together
- 4a72ead: Only apply a site preview customization override to the section or variant it was made for.
- 38f60f2: Render soft line breaks in paragraphs that contain buttons.
- 1383a79: Fix visitors being logged out right after signing in on sites with a logout link in the header.
- be658e1: Truncate long tab titles one by one and show the selected tab's full title, instead of hiding tabs behind a "…" menu
- Updated dependencies [6c12872]
- Updated dependencies [04f39f1]
- Updated dependencies [1b29a70]
- Updated dependencies [4dfe630]
- @gitbook/colors@0.4.5
- @gitbook/react-contentkit@0.7.18
- @gitbook/openapi-parser@3.1.0
- @gitbook/react-openapi@2.0.1
## 0.28.0
### Minor Changes
- 3d37684: Add a carousel layout option to cards blocks, rendering them as a horizontally-scrolling, scroll-snapping row instead of a wrapping grid.
- 523b7cd: Support external links in published site navigation.
- 89c4a0f: Add an `askQuestion` tool to the site MCP server. Alongside `searchDocumentation` and `getPage`, MCP clients can now ask a natural-language question and get a synthesized answer with links to the source pages, powered by the same AI search backend as the site's "ask a question" experience. The tool accepts an optional `goal` param so calling agents can attach the intent they're trying to accomplish, which tailors the answer and is tracked in analytics. The tool is only exposed on sites that have AI enabled.
### Patch Changes
- a17ed29: Fix admin toolbar magnification, tooltip placement, title truncation and logo colour.
- 048c4e4: Fix "View activity" disclosure in AI Chat not opening after the Base UI migration.
- 996d7ec: Scroll to an in-page heading even when the URL hash is unchanged (e.g. clicking the same anchor again).
- fa9c9b3: Force software rendering (SwiftShader) in Playwright Chromium to eliminate image downscaling drift between GPU-equipped local runs and headless CI runs in Argos screenshots.
- 3ed448f: Stop the `?ask` query briefly appearing in the search field before an integration assistant opens.
- 2137c2d: Track which Ask AI entry point opened the chat in ask view analytics.
- a9e6814: Add `leaveAgentFeedback` and `leaveUserFeedback` assistant tools, reporting documentation findings to the site's team through the same path as the MCP `sendFeedback` tool, and record an `agent_feedback` insights event on both surfaces.
- d9fc460: Stop showing previously asked questions as suggestions in the GitBook Assistant
- 1ee1853: Add an assistant tool to rate its own previous response when the user reacts to it.
- cef1870: Add an assistant tool to submit feedback about the current page on behalf of the user.
- 49d35aa: Assistant: you can now send follow-up questions while an answer is still being written. Each one appears as your own message with a "Queued" badge (hover for when it will send, × to cancel), and they're sent automatically one at a time as each answer completes.
- 8ad7465: Simplify carousel overflow with symmetric edge masks and visible-item paging. Replaces complex negative-margin bleed logic with transparent edge fades and page-by-visible-item scrolling.
- 6199242: Recolor text over a background page cover in the first frame after hydration.
- b3db1c5: Keep the breadcrumbs from covering the page actions' hit area.
- 1bf3bd4: Update API
- 9b822ab: Include published page descriptions in the page's Markdown output.
- 64e143a: Bump Next.js to 16.3.3.
- 9d62cb4: Fix table of contents scrolling back to the current page when expanding another group.
- c08d05a: Fix select filters not working on table and cards blocks.
- a566153: Chunk oversized visitor auth cookies to fix an infinite redirect loop when the visitor token exceeds the browser cookie size limit.
- 1b7ac0e: Fix inline Ask AI buttons opening a configured custom assistant.
- ae9367d: Assistant: the "Explored briefly" activity heading no longer appears when there's nothing to show. It now renders only when the answer is preceded by a real preamble or one or more tool calls, so a simple answer with an empty reasoning step no longer surfaces an empty collapsible.
- b0cb035: Mark blocks, pages and titles so comments can target them on change request previews.
- 688515e: Fix ContentKit buttons to size to their content instead of stretching to the full container width.
- e041e49: Stop the built-in cookie banner from flashing on sites using a consent integration such as Osano or OneTrust.
- 5f88f4e: Fix breadcrumbs for cross-space page links in grouped sites.
- dff0c79: Automatically resolve GitHub and GitLab page links to matching pages in the same published site, including cross-space links imported before their target page was available.
- 1ef7160: Show the theme toggle in the footer whenever the outline column that hosts the other toggle isn't pinned open, so it stays reachable on laptop-sized screens in wide layouts and while the AI chat is open.
- 3939125: Disable click-to-zoom for inline line sized images.
- 39316fc: Give the prompt block a default "Copy prompt" action alongside "Open in Claude", "Open in Codex" and "Open in Cursor", and remember the visitor's last pick across every prompt block.
- c366796: Keep the docs embed open when switching section, variant or language.
- f35be52: Add `defaultTab` and `defaultPage` options to the Docs Embed to choose where it opens. `defaultTab` opens the embed on the assistant, search or docs tab. `defaultPage` sets the page the docs tab opens on in place of the site's home page, and the embed opens on that page unless `defaultTab` says otherwise. Both work with the standalone script's `configure`, `frame.configure` and `<GitBookFrame>` props.
- 177ef85: Fix host action buttons in the Docs Embed not reaching the assistant.
- 4e9071d: Fix the docs embed `navigateToPage` API on multi-space sites. Deep-linking to a page in a different space/section (e.g. `navigateToPage('/help-center/integrations')`) previously 404'd because the section base was not placed before `~gitbook/embed/page`. The target is now resolved to its space server-side, so pages in any space resolve correctly. The input accepts the page path, an absolute path, or the full published URL.
- 94a496c: Fix the Docs Embed widget rendering with a dark surface when the visitor's OS is in dark mode, even on a light page or a site published with a light theme. The embed script now accepts `?theme=light|dark` to force a scheme.
- 9002f65: Fix suggested question clicks in the embed search not opening the assistant.
- 13059b8: Fix switching from the Search tab to the Docs or Assistant tab in the embed doing nothing.
- b5f3c14: Add configurable default visibility to Prompt block
- a69a307: A near-white tint color (e.g. a warm `#F5F3EF`) is now taken as the exact page background, mirroring the existing behavior for near-black tints. The tint's exact lightness, hue and chroma are preserved, and the color is anchored to whichever scale step the active theme renders as the background — so it matches exactly on `muted` (which uses the second step) as well as `clean`. This applies only to near-neutral tints that are light enough to read as a background; saturated or merely light-ish colors keep their normal accent scale. The `bold` theme is unaffected: it already uses the tint for the header and stays intentionally two-tone.
- 02f4cbc: Restrict expressions to an allowlist of methods and syntax, and report unsupported expressions when parsing.
- f9ad9b5: Introduce client-side content selection (`select`): a site-wide, recency-ordered list of selected slugs, persisted in localStorage and shareable via `?select=`, applied to `<html>` before first paint so the right variant renders with no flash. All variants stay server-rendered, so pages are byte-identical for every visitor (no cache impact).
Tabs now use it: switching a tab activates its slug, and every tab group offering that slug follows, across pages. Tabs no longer write to the URL fragment (`#` returns to anchors only); deep-links into a tab still activate and scroll to it.
- 03bbacf: Add missing link reference to OpenAPI models
- 530f98a: Skip internal paths (`~gitbook/*`, `.well-known/oauth-protected-resource`, `llms.txt`, `robots.txt`, `sitemap.xml`, `rss.xml`) when building URL lookup alternatives, to avoid resolving URLs that can never match content.
- cc441c9: Keep published search results within the selected site-space scope during local and remote result fusion.
- 0911abc: Fix page cover image jumping on load
- fce8a6f: Fix the double slash in the example page URLs of the MCP server's getPage and sendFeedback tools.
- 357af3f: Only advertise RSS feeds on pages with Updates blocks.
- 4452fd7: Fix page link titles showing the site section name instead of the target space title.
- b1102fc: Use the DocumentTextColor type defined in API schema.
- 9f22456: Allow sites and the embedded Assistant to load inside Ionic and Capacitor iOS apps by permitting the `ionic:` and `capacitor:` schemes in `frame-ancestors`.
- 7f8ab7d: Serve Markdown responses as plain text to OpenAI's ChatGPT Search crawler.
- d0a63ba: Update the URL hash when a tab is selected, so a copied link scrolls back to that tab
- 7bab574: Self-host default Google fonts and inline only the @font-face rules of the fonts a site uses, instead of shipping render-blocking stylesheets covering all 23 families on every page.
- 05cff0a: Hide heading and expandable anchor links on pages whose layout disables anchors (landing pages).
- 6928a9b: Hide card fields that render no content, along with their title
- 3ae1524: Hide the Intercom launcher while the Assistant panel is open, so it no longer overlaps the message box.
- 8bc381d: Fix low-contrast button labels inside success, warning and danger hints.
- c41cf9c: Add cover image background mode and masks
- 56c2558: Upgrade react-hotkeys-hook to v5 and use its native `useKey` option so keyboard shortcuts match the produced key on non-QWERTY layouts.
- d685660: Agents can now send a goal with any question they ask on the Markdown version of a page.
- 9f5290b: Fix inline Ask AI inputs and buttons doing nothing before search is opened.
- 39156ee: Button blocks now respect the `size` option, so you can render small, medium, or large buttons.
- 552538a: Track server-side Insights events (markdown, llms.txt, RSS, ask) with the site's public URL instead of the proxy URL.
- 380af10: Send the previous page's URL with site insights events so broken links can be traced to the page linking to them.
- bf674a4: Add an optional `context` property (string, up to 512 characters) to the `confirmation` of custom AI tools, shown above the confirmation dialog to help the user understand what they are approving or rejecting. The `confirmation` can now also be a function that receives the AI-provided input and returns the confirmation, so the context can be derived dynamically from the arguments the tool is about to run with. Available both to integrations (`GitBookIntegrationTool`) and to embed consumers (`GitBookToolDefinition`).
- c1b5be0: Keep embed demos and frames on the deployment that served them.
- b13fd91: Fix a hydration mismatch on every page load caused by the AI chat time-based greeting being computed in the server timezone.
- 3370103: Fix blurry YouTube thumbnails in tabs by lazy-loading all embeds until they are visible.
- 9632516: Fix Loom videos staying blank on pages with many Loom embeds by lazy-loading them.
- 2ccd43e: Lazy-load the Mermaid code block so pages that have code blocks but no diagram no longer ship its rendering dependencies.
- 65f99ea: Lazy load the Scalar API client modal and stop preloading the Scalar runtime. The modal is now code-split into its own chunk, fetched in parallel with the runtime only when a reader clicks "Test it", and a spinner is shown on the button until the client opens.
Breaking: the package no longer ships the modal in its main entry — consumers must serve the emitted `ScalarApiModal` chunk and use a bundler that supports dynamic `import()`, and the Scalar runtime is no longer preloaded on page load. The internal `preloadScalarRuntime` helper is removed.
- 810244e: Stop preloading the zoom-modal variant of every zoomable image at render time; it downloaded each image twice during the initial page load. The modal image still loads on hover or click.
- 581abe0: Announce pagination at the top of every part of a multi-part llms-full.txt, with absolute links to the previous and next parts.
- 75bdff3: Serve an indexable `X-Robots-Tag` on markdown pages requested by AI agents
- 2ff77e1: Bump `@gitbook/api` to 0.199.0, and record a markdown request made from the page actions menu as a page action rather than an agent request.
- d7c867a: Fix the page-actions dropdown closing before the "Copied" confirmation could be shown when copying the MCP server URL, an MCP install command, or the page as Markdown.
- ccb9d7b: Submit `sendFeedback` MCP tool findings through the dedicated `submitSiteAgentFeedback` API endpoint. The `pageUrl` is now required and an optional `goal` can be provided.
- 9f94067: Update Mermaid to 11.16.1 to match the editor, adding support for doughnut charts.
- 65acba0: Fix Mermaid block diagrams falling back to a code block on published sites.
- 65acba0: Fix long Mermaid labels being clipped instead of wrapping at some browser zoom levels.
- d8dc59b: Improve dark theme contrast for Mermaid edge labels.
- 01c9b05: Mermaid diagrams no longer hijack page scrolling: zooming with the wheel now requires holding Ctrl/Cmd inline, while the fullscreen view keeps free wheel zoom.
- b3db1c5: Migrate the headless UI primitives from Radix and react-aria to Base UI.
- a664407: Persist content selection (tabs and other `select` blocks) in localStorage only, dropping the `?select=` query parameter from the URL. A tab click still writes the tab's hash, so a copied URL lands on that tab and reactivates it on load.
- c7c1b79: Improve the prompt for agents to ask questions.
- 14562e9: Serve `X-Robots-Tag: noindex` on internal search/assistant URLs (`?q=` / `?ask=`) and stop disallowing them in robots.txt, so Google can crawl the directive and drop them from the index instead of reporting "Indexed, though blocked by robots.txt".
- bdc2497: Missing pages with accented or non-Latin characters in the URL now return 404 instead of an endless redirect.
- 90b5468: Redesign the site OAuth consent screen for published sites MCP and translate its strings
- 40a879a: Drop a column instead of shrinking them all when a section group dropdown runs out of room
- a9c5d1b: Let a section group dropdown scroll when it is taller than the screen
- 827e4f9: Fix the variant switcher linking to the wrong URL for non-default variants of the default section
- 35be383: Skip the rendering work for off-screen OpenAPI blocks, so pages with many operations stay smooth to scroll.
- db176ba: Add an "On this page" table of contents on OpenAPI models pages. Each model in a grouped/multi-model "Models" section is now listed as its own section, matching operations and webhooks.
- 5c4a808: Fix OpenAPI schemas that reference themselves through a nullable union rendering forever when expanded, which crashed PDF exports.
- 332089e: Improve cookie handling in the OpenAPI "Test it" request proxy.
- a80d412: Serve the OpenAPI "Test it" request proxy from GitBook's own domain.
- 1424c56: Keep the OpenAPI renderer out of the initial bundle of pages that have no OpenAPI block, by building its context on the client behind a dynamic boundary.
- e4b214e: Fix OpenAPI webhook payload and schema example panels being clipped instead of scrollable.
- ffebd17: Use the page's tag title, when set, for the HTML `<title>` of published pages.
- 7009bb9: Move paragraph block styles behind a single `paragraph` class and drop the `page-cover-background:` gate from the cover-contrast text. The gate combined with the per-paragraph `:not(:has(...))` made every DOM insertion re-style all paragraphs, which froze very long pages.
- 40150f0: Serve Markdown responses to ChatGPT with a `text/plain` Content-Type for compatibility.
- e460ec3: Preserve external page destinations returned by published search.
- 148a43a: Use one canonical backend-ranked result set for published searches across site sections.
- 5da854f: Preserve canonical backend ranking and present page or section context that matches each published search destination.
- 78c589f: Align the Previous page navigation button to the left edge and the Next button to the right edge, including when only one of them is present.
- b9453a9: Preserve the full site preview path and query parameters when redirecting users to log in.
- ad6262b: Fix previewed customization and theme overrides being lost when navigating between pages inside the site preview. The preview cookie was scoped to the site's canonical base path instead of the preview route it is actually served under, so the browser dropped it on the next in-preview navigation.
- 8e87856: Fix pages resolving to "not found" when a root URL lookup resolves to a custom homepage, by no longer using the homepage pathname as a prefix for the requested page path.
- 1faa57b: Keep current-space search results inside revision previews.
- 7543eb8: Prewarm published search caches when readers open the search interface.
- 990e702: Clarify the not-found page on sites with login-protected content: prompt anonymous visitors to log in, and tell logged-in visitors they may not have access.
- 185dd83: Inject site tracking scripts (analytics integrations) after `load` + idle instead of preloading them and executing them during the critical loading window.
- 77058e3: Render horizontal and vertical merged table cells on published pages.
- e4638f1: Pass page context to webframes opened from integration modals.
- 0540ebc: Stop page group breadcrumbs from linking to a URL that redirects to the group's first page.
- 634a24f: Fix text disappearing in Firefox and iOS Safari on pages with a background cover
- 64ce9e1: Render a site-space custom home page at its placement root while preserving the full space and normal page URLs.
- b95add7: Apply release notes tag filters from the URL via CSS before first paint, so the filtered entries, the "page contents" section list, and the tag chip highlighting all show correctly from the start on cached pages, with no flash of unfiltered content. Also stop the "page contents" scroll highlight from defaulting to an entry hidden by the filter.
- 8e13169: Scroll the table of contents to the active page after client-side navigation.
- d839d9d: Site redirects whose source path has accented or non-Latin characters now redirect visitors instead of returning 404.
- f1d5123: Show site UI in French or Spanish for spaces set to Canadian French, Mexican Spanish or Latin American Spanish.
- b967b24: Fix analytics and adaptive content silently breaking on sites served from a different host than the one configured (apex vs www, domain alias, CDN). The insights and visitor-claims endpoints are now requested relative to the page's own origin instead of the configured host, which a prerendered page cannot know.
Keep the traffic of GitBook's own preview deployments out of the sites' analytics, now that those requests reach the events endpoint.
- 81dba64: Resolve stable page, space and file refs in images, definitions and HTML blocks of published markdown pages, instead of leaking internal `/pages/{id}`, `/spaces/{id}` and `/files/{id}` URLs.
- ac84365: Restore the Next.js dev-mode OOM patch that was silently dropped by the 16.3.8 upgrade.
- 70bfdda: Restore the Next.js dev-mode OOM patch that was silently dropped by the 16.3.6 upgrade (root `package.json`'s `patchedDependencies` still pinned it to the old `16.3.3` patch file, so Bun stopped applying it).
- da7fb13: Fail closed in `/~gitbook/revalidate` when `GITBOOK_SECRET` is not configured, returning `403 Revalidation is disabled` instead of skipping the signature check, consistent with `force-revalidate`.
- a9a52fe: Remove GBO's redundant re-selection of the best-scoring search section. The search API now returns a single highest-scoring section per page (and orders sections highest-score-first), so GBO no longer needs its own `getBestScoredResult` helper to pick the best section for the search and MCP previews. No user-visible change.
- 195c9e6: Fix the docs embed not applying `?theme=light`/`?theme=dark`. The theme was dropped when the embed redirected to its default tab, and the embed tabs couldn't read it because they render statically (their request headers are empty). The middleware now threads a forced embed theme through the embed route context (scoped to the embed, not the main site), so the embed tabs honor it while staying statically rendered, and the redirect forwards it to the default tab. The forced theme is also persisted to the embed's own theme storage so it is remembered across tab navigation instead of only applying while the query string is present.
- 597fe34: Sync the API reference responses selector with the "Responses" collapsibles, and keep the selected response in sync across every operation on the page (like the code sample language selector). Selecting a status code now expands the matching response section and applies to all operations at once.
- e14609c: Fix a light/dark flash on published sites configured to respect the system default (no theme toggle). Such sites forced the `system` theme, but `next-themes`' pre-paint script applies a forced value verbatim without resolving `prefers-color-scheme`, so the page painted light and only switched to dark after hydration. We now leave the theme unforced when the default is `system` (only concrete light/dark themes are forced), letting `next-themes`' existing pre-paint script resolve the system preference before first paint.
- 98b2df4: Add a `sendFeedback` MCP tool so AI agents can report documentation findings (outdated / incoherent / gap / other) as `agent_feedback` insights events. The tool only accepts finding categories, so it never records positive feedback.
- 8e9a49d: Separate the prompt block actions into a primary "Open in" dropdown and a secondary "Copy prompt" button, instead of a single combined button group, and align the block's design with the expandable block (bordered frame, left disclosure chevron, and subtle elevation when expanded).
- cf4efc7: Fix the search field losing focus if it was focused just before the page finished hydrating.
- e73b182: Fix the docs embed widget shipping a stale script: declare the embed package's `standalone/` bundle as a Turbo build output. Because it wasn't declared, changes confined to the standalone widget (which compiles to `standalone/` but not `dist/`) didn't invalidate the downstream `generate` cache that copies it into the app, so the deployed widget could lag the source — e.g. the `clipboard-write` permission on the widget iframe never reached production, breaking the copy button in the Assistant embed.
- 6d02b8a: Fix code block syntax highlighting so comment delimiters (e.g. `//`, `/*`) use the same color as the rest of the comment. Previously the delimiter fell through to the generic punctuation scope, making it a different color from the comment body (most visible in dark mode).
- bcd1c41: Scroll to the top when selecting a search result for the page already being viewed.
- 1f250d1: Add end-to-end coverage for root and nested external links in site section navigation.
- 8a0e0df: Fix section links in search results opening the page without scrolling to the section.
- 484cc11: Fix ScrollContainer scroll buttons not reflecting content overflow immediately or after dynamic content changes (e.g. search results).
- c1b5be0: Allow published search to be scoped to any visible site section.
- 9f447aa: Let search buttons open search limited to the current space.
- d33e570: Fix the spacebar being ignored in the search bar, which made multi-word queries impossible.
- 0a82628: Keep keyboard focus within search while the results are open.
- 5889642: Keep the last search query visible after closing search, and restore it when reopening, without breaking navigation when clicking a search result.
- 3db14ad: Link page-level search matches to the top of the page while preserving section anchors for section matches.
- e94a508: Fix keyboard focus getting trapped inside the header search popover, allowing Tab/Shift+Tab to exit it as expected.
- d053984: Fix the section group dropdown keeping the wrong width when moving quickly between groups.
- 0dd2f4f: Show the containing section name when hovering a direct link to a space.
- 8c10d92: Fix the section group menu dismissing while the mouse is still inside it, when the collapsed sidebar rail overlaps the menu on no-sidebar pages.
- ded2f56: Show loose sections in a section group dropdown as secondary links unless the group starts with one
- 0ff21b7: Stop the section tabs in the header from showing a scroll button and faded edge when all tabs already fit.
- 848a39d: Send the visitor country to resolvePublishedContentByUrl on dev, preview, staging and selected sites, using the forwarded `x-gitbook-country` header on revalidation requests.
- 03aa0f7: Render a single Ask AI paragraph button that moves to the hovered paragraph, instead of one hidden button per paragraph.
- cd506e3: Keep Shiki out of the initial page bundle by splitting the highlighter from the plain-text token helpers, so client code no longer pulls the engine and language bundles in through a shared import.
- ad3399b: Refine the per-paragraph AI ask button: shorten its tooltip to "Ask" (from "Ask <assistant> about this"), and hide it inside cards where it would otherwise be clipped by the card's overflow.
- 0e0085e: Fix the first item of a sidebar page group sometimes appearing cut off after navigating.
- 931cbe7: Use cached Git metadata (via @gitbook/api 0.201.0's `cachedMetadata` param) when rendering Edit on Git actions.
- df2841c: Fix the site auth login link sometimes redirecting back to an internal URL after login.
- e0bd04f: Render headings with the site's heading font when one is configured, falling back to the main font otherwise.
- a625112: Skip rendering the Ask AI paragraph button inside table cells, where it is hidden, to keep pages with large tables within memory limits.
- afbc57c: Don't track a page view for 404s on internal `~gitbook` routes, so they no longer appear as broken URLs.
- 0f0cfde: Narrow a table or card grid to the reader's content selection: choosing an option in a tab or a select button now filters any select column that offers it. The table says what it has been narrowed to, and offers a Clear that drops the selection.
- bf29570: Fix the tabs "more" dropdown showing when no tab is overflowing, and stop a tab click re-rendering every tab group on the page.
- 703e654: Split the default-scope site search into two parallel API requests — one restricted to the current site space and one for the other site spaces — rendering each result set as soon as its response arrives. All results are ranked together by score, with the current site space scores boosted.
- 0b515b0: Fix 404 on Markdown pages (View as Markdown) in site previews and when a theme is forced with `?theme=`.
- 57f3077: Keep the "On this page" and "Ask" buttons pinned below the header while scrolling on desktop API reference pages, so the page outline stays reachable throughout long operations.
- 8676ad1: Hide unfocusable unlabelled button from screen readers
- 6cf4278: Only show the "Back to [space]" shortcut for cross-space links in the table of contents, not for in-content text links or other ways of reaching another space.
- 7594a33: Show image thumbnails, including SVG previews, for file attachments on published sites.
- 5725da1: Let a tab keep its content selection across a rename, by honouring an explicit slug set on the tab instead of always deriving one from its title.
- 5c74eef: Make the table search "no results" empty state more prominent with vertical spacing so it no longer blends into the content below.
- 5f38ae6: Adjust tab panel and tab button padding so tabbed content has more breathing room.
- 038008c: Fix heading anchor links being unreachable on touch devices by adding a tap-to-reveal state. The anchor icon now appears after the heading text without wrapping onto an orphan line while retaining its existing desktop placement. Use `pointerup` for the dismiss listener to fix unreliable dismissal on iOS Safari, and enlarge the anchor's touch tap target to a square 24px area (meeting the WCAG 2.5.8 minimum) so the icon stays centered instead of overflowing shorter headings' line height.
- a9a1a60: Fix search results from a previous scope staying stuck on top of the new results when switching the search filter.
- 46b3a18: Fix tabs nested inside another tab group rendering an empty body once a tab in the outer group was selected.
- 8a6baab: Load the admin toolbar and its CSS lazily so published pages no longer ship a render-blocking stylesheet for admin-only UI.
- a9c5d1b: Remove the gap between the columns of a section group dropdown holding a large group
- a9041a3: Remove the fallback query parameter after successful page navigation without adding a browser history entry.
- 931cbe7: Restore Edit on Git page actions for Git-synced pages.
- ea19801: Support localized custom AI Assistant greeting subtitles.
- 1dccf8f: Fix the first item of a table-of-contents page group appearing cut off (faded under the group header) after client-side navigation.
- 48fba7c: Highlight a table-of-contents link entry as active when it points to the page — or the section of a page — you are currently viewing.
- 96626fe: Fix the admin toolbar insights button to link to the site's analytics page.
- 048c4e4: Fix chevrons and open-state styling incorrectly reacting to a tooltip opening on the same trigger, by switching from the shared Base UI `data-popup-open` attribute to `aria-expanded`.
- fc06bc6: Track `ask_trigger_click` insights event when an Ask entry point is clicked.
- 8dd9444: Track Insights link clicks on the Download button of file blocks.
- d04f8bc: Point the "Powered by GitBook" trademark link to gitbook.com/powered-by.
- a73800e: Upgrade object-identity to preserve value types when caching object arguments.
- 679ea07: Read the production hostnames that receive the visitor country from the `GITBOOK_VISITOR_COUNTRY_HOSTNAMES` build-time env variable.
- f3408ed: a11y screen reader fixes
- 3bf55ce: Support query params in the `@webframe.navigate` action.
- cb92754: Let integration block webframes navigate the reader to another page in the site by posting a `@webframe.navigate` action with a `path` (and optional `anchor`). Resolved client-side against the site base path, so navigation stays in-site and drives the standard navigation progress bar.
- 6083a88: Expose the current page (`id`, `path`, `title`) to integration block webframes through the client-only webframe `state.page`, alongside adaptive visitor claims.
- f7dc7fa: Reserve the webframe's size in the server-rendered layout so anchor links to content below integration blocks no longer land too high.
- 2c4d40a: Expose the site's MCP tools to browser agents through WebMCP when the MCP page action is enabled.
- 8a70022: Only track embed view events once the frame is actually shown to the reader
- cf94386: Fix an issue where certain keywords could cause an exception when rendering emojis
- 673f4b6: Add the `select` action to InlineButton. Clicking the button activates its slug, so any block containing that slug switches to it.
- Updated dependencies [f35be52]
- Updated dependencies [94a496c]
- Updated dependencies [a69a307]
- Updated dependencies [02f4cbc]
- Updated dependencies [03bbacf]
- Updated dependencies [bf674a4]
- Updated dependencies [65f99ea]
- Updated dependencies [5c4a808]
- Updated dependencies [1424c56]
- Updated dependencies [3ef1802]
- Updated dependencies [1e8c34a]
- Updated dependencies [3bf55ce]
- Updated dependencies [cb92754]
- Updated dependencies [6083a88]
- Updated dependencies [f7dc7fa]
- @gitbook/embed@0.6.0
- @gitbook/colors@0.4.4
- @gitbook/expr@1.4.0
- @gitbook/react-openapi@2.0.0
- @gitbook/openapi-parser@3.0.13
- @gitbook/browser-types@0.1.6
- @gitbook/react-contentkit@0.7.17
## 0.27.2
### Patch Changes
+7 -29
View File
@@ -215,7 +215,8 @@ const testCases: TestsCase[] = [
{
name: 'docs.n8n.io',
contentBaseURL: 'https://docs.n8n.io',
tests: [{ name: 'Home', url: '/', run: waitForCookiesDialog }],
// The site registers its own cookie banner, so the built-in one never shows.
tests: [{ name: 'Home', url: '/' }],
},
{
name: 'docs.cherryai.com.cn',
@@ -282,16 +283,6 @@ const testCases: TestsCase[] = [
contentBaseURL: 'https://vimeo.com',
tests: [{ name: 'Home', url: '/legal' }],
},
{
name: 'help.platipomiru.com',
contentBaseURL: 'https://help.platipomiru.com',
tests: [{ name: 'Home', url: '/' }],
},
{
name: 'help.aikido.dev',
contentBaseURL: 'https://help.aikido.dev',
tests: [{ name: 'Home', url: '/', run: waitForCookiesDialog }],
},
{
name: 'doc.demarche.numerique.gouv.fr',
contentBaseURL: 'https://doc.demarche.numerique.gouv.fr',
@@ -312,11 +303,6 @@ const testCases: TestsCase[] = [
contentBaseURL: 'https://docs.triumpharcade.com',
tests: [{ name: 'Home', url: '/', run: waitForCookiesDialog }],
},
{
name: 'docs.nats.io',
contentBaseURL: 'https://docs.nats.io',
tests: [{ name: 'Home', url: '/', run: waitForCookiesDialog }],
},
{
name: 'help.glpi-project.org',
contentBaseURL: 'https://help.glpi-project.org',
@@ -365,7 +351,9 @@ const testCases: TestsCase[] = [
{
name: 'docs.verifone.com',
contentBaseURL: 'https://docs.verifone.com',
tests: [{ name: 'Home', url: '/', run: waitForCookiesDialog }],
// Verifone's custom Cookiebot integration races with and suppresses GitBook's built-in
// banner, so waitForCookiesDialog is not a stable invariant here.
tests: [{ name: 'Home', url: '/' }],
},
// Deactivate it because of a custom Ask AI that causes flakiness.
// {
@@ -390,7 +378,7 @@ const testCases: TestsCase[] = [
{ name: 'Home', url: '/docs', run: waitForCookiesDialog },
{
name: 'OpenAPI',
url: '/docs/developers/gitbook-api/api-reference/docs-sites/site-ai-ask',
url: '/docs/developers/gitbook-api/api-reference/docs-sites/site-ai-ask/ask-a-question-in-a-site',
run: waitForCookiesDialog,
},
],
@@ -403,7 +391,7 @@ const testCases: TestsCase[] = [
{
name: 'faq.wanttopay.net/wanttopay-app',
contentBaseURL: 'https://faq.wanttopay.net',
tests: [{ name: 'Home', url: '/wanttopay-app', run: waitForCookiesDialog }],
tests: [{ name: 'Home', url: '/wanttopay-app' }],
},
{
name: 'guide.prismlive.com',
@@ -480,11 +468,6 @@ const testCases: TestsCase[] = [
contentBaseURL: 'https://manual.edgetx.org',
tests: [{ name: 'Home', url: '/' }],
},
{
name: 'docs.cortex.io',
contentBaseURL: 'https://docs.cortex.io',
tests: [{ name: 'Home', url: '/', run: waitForCookiesDialog }],
},
// Flaky because of the GIF
// {
// name: 'docs.mufy.ai',
@@ -601,11 +584,6 @@ const testCases: TestsCase[] = [
contentBaseURL: 'https://help.blotato.com',
tests: [{ name: 'Home', url: '/', run: waitForCookiesDialog }],
},
{
name: 'docs.cartographer3d.com',
contentBaseURL: 'https://docs.cartographer3d.com',
tests: [{ name: 'Home', url: '/' }],
},
{
name: 'docs.acestudio.ai',
contentBaseURL: 'https://docs.acestudio.ai',
+452 -25
View File
@@ -1,3 +1,6 @@
import { type Page, expect } from '@playwright/test';
import jwt from 'jsonwebtoken';
import {
CustomizationAIMode,
CustomizationBackground,
@@ -7,14 +10,11 @@ import {
CustomizationDepth,
CustomizationHeaderPreset,
CustomizationIconsStyle,
CustomizationPageActionType,
CustomizationSidebarListStyle,
SiteSocialAccountPlatform,
} from '@gitbook/api';
import type { GitBookStandalone } from '@gitbook/embed';
import { expect } from '@playwright/test';
import jwt from 'jsonwebtoken';
import { VISITOR_TOKEN_COOKIE } from '@/lib/visitors';
import { getGitBookPreviewURL, getSiteAPIToken } from '../tests/utils';
import {
@@ -35,8 +35,10 @@ import {
waitForAdminToolbar,
waitForCookiesDialog,
waitForCoverImages,
waitForHydration,
waitForNotFound,
} from './util';
import { VISITOR_TOKEN_COOKIE } from '@/lib/visitors';
// Kept as deterministic as possible to reduce visual flakiness: no preamble, a
// single fixed search, a concise answer, and a fixed number of follow-ups. The
@@ -51,6 +53,27 @@ const AI_PROMPT = [
'4. Always end by proposing exactly 3 follow-up suggestions.',
].join('\n');
// `InsightsProvider` debounces its flushes by 1.5s.
const INSIGHTS_FLUSH_TIMEOUT = 3000;
/**
* Collect the insights events of a given type sent by the page and its frames.
*/
function trackInsightsEvents(page: Page, type: string) {
const collected: { type: string }[] = [];
page.on('request', (request) => {
if (request.method() !== 'POST' || !request.url().includes('/~gitbook/__evt')) {
return;
}
const body = request.postDataJSON() as { events?: { type: string }[] } | null;
collected.push(...(body?.events ?? []).filter((event) => event.type === type));
});
return collected;
}
const overrideAIInitialState = () => {
const greeting = document.querySelector('[data-testid="ai-chat-greeting-title"]');
if (greeting) {
@@ -135,6 +158,57 @@ const searchTestCases: Test[] = [
await expect(page.getByTestId('search-input')).toBeFocused();
},
},
{
name: 'Search - Keyboard focus exits to the next page control',
url: getCustomizationURL({
ai: {
mode: CustomizationAIMode.Search,
},
}),
screenshot: false,
run: async (page) => {
await waitForCookiesDialog(page);
const searchInput = page.getByTestId('search-input');
await searchInput.focus();
await searchInput.fill('gitbook');
const searchPopup = page.getByTestId('search-popover');
await expect(searchPopup).toBeVisible({ timeout: 10_000 });
const finalPopupControl = searchPopup
.locator(
'a[href], button:not([disabled]), input:not([disabled]), [tabindex]:not([tabindex="-1"])'
)
.filter({ visible: true })
.last();
const nextPageControl = page.getByTestId('table-of-contents').getByRole('link').first();
await expect(finalPopupControl).toBeVisible();
await expect(nextPageControl).toBeVisible();
await finalPopupControl.focus();
await page.keyboard.press('Tab');
await expect(searchPopup).toBeHidden();
await expect(nextPageControl).toBeFocused();
await page.keyboard.press('Shift+Tab');
await expect(searchInput).toBeFocused();
},
},
{
// `fill()` bypasses key events, so it can't catch a swallowed key. RND-12484.
name: 'Search - AI Mode: None - Typing multi-word queries',
url: getCustomizationURL({
ai: {
mode: CustomizationAIMode.None,
},
}),
screenshot: false,
run: async (page) => {
await waitForCookiesDialog(page);
const searchInput = page.getByTestId('search-input');
await searchInput.focus();
await searchInput.pressSequentially('getting started');
await expect(searchInput).toHaveValue('getting started');
},
},
{
name: 'Search - AI Mode: None - URL query (Initial)',
url: `${getCustomizationURL({
@@ -175,6 +249,43 @@ const searchTestCases: Test[] = [
await expect(page.getByTestId('search-results')).toBeVisible();
},
},
{
// RND-12844: the popover's focus manager re-focused the closing popup and
// scrolled the page back to the top right after landing on the section.
name: 'Search - Section result scrolls to the section',
url: getCustomizationURL({
ai: {
mode: CustomizationAIMode.None,
},
}),
screenshot: false,
run: async (page) => {
await waitForCookiesDialog(page);
const searchInput = page.getByTestId('search-input');
await searchInput.focus();
// Type like a visitor: `fill()` doesn't trigger the remote search.
await searchInput.pressSequentially('tasks');
const sectionResult = page.locator(
'[data-testid="search-page-result"][href$="/blocks/lists#tasks"]'
);
// Section results come from the remote index, which can be slow to answer.
await expect(sectionResult).toBeVisible({ timeout: 30_000 });
await sectionResult.click();
await page.waitForURL(/\/blocks\/lists#tasks$/);
// The regression scrolled back to the top shortly after landing, so let
// that happen before asserting.
await page.waitForTimeout(1000);
// The heading is parked under the header, within its scroll margin.
const top = await page
.locator('#tasks')
.evaluate((heading) => heading.getBoundingClientRect().top);
expect(top).toBeGreaterThanOrEqual(0);
expect(top).toBeLessThanOrEqual(150);
},
},
{
name: 'Ask - AI Mode: Assistant - Complete flow',
url: getCustomizationURL({
@@ -381,6 +492,7 @@ const testCases: TestsCase[] = [
name: 'Customized variant titles are displayed',
url: '',
run: async (page) => {
await waitForHydration(page);
const spaceDropdown = page
.locator('[data-testid="space-dropdown-button"]')
.locator('visible=true');
@@ -408,6 +520,7 @@ const testCases: TestsCase[] = [
name: 'Switch variant with alternate link in metadata',
url: 'rfcs',
run: async (page) => {
await waitForHydration(page);
const spaceDropdown = page
.locator('[data-testid="space-dropdown-button"]')
.locator('visible=true');
@@ -441,11 +554,30 @@ const testCases: TestsCase[] = [
name: 'GitBook Site (Navigation when switching variant)',
contentBaseURL: 'https://gitbook-open-e2e-sites.gitbook.io/',
tests: [
{
name: 'Strip fallback after loading a page without adding history',
url: 'api-multi-versions/reference/api-reference/pets',
screenshot: false,
run: async (page) => {
await waitForHydration(page);
const previousURL = page.url();
const targetURL = new URL(previousURL);
targetURL.searchParams.set('fallback', 'true');
targetURL.searchParams.set('ref', 'variant');
targetURL.hash = 'pets';
await page.goto(targetURL.toString());
targetURL.searchParams.delete('fallback');
await expect(page).toHaveURL(targetURL.toString());
await page.goBack();
await expect(page).toHaveURL(previousURL);
},
},
{
name: 'Keep navigation path/route when switching variant (Public)',
url: 'api-multi-versions/reference/api-reference/pets',
screenshot: false,
run: async (page) => {
await waitForHydration(page);
const spaceDropdown = await page
.locator('[data-testid="space-dropdown-button"]')
.locator('visible=true');
@@ -462,8 +594,11 @@ const testCases: TestsCase[] = [
.click();
// It should keep the current page path, i.e "reference/api-reference/pets" when navigating to the new variant
await page.waitForURL((url) =>
url.pathname.includes('api-multi-versions/2.0/reference/api-reference/pets')
await page.waitForURL(
(url) =>
url.pathname.includes(
'api-multi-versions/2.0/reference/api-reference/pets'
) && !url.searchParams.has('fallback')
);
},
},
@@ -472,6 +607,7 @@ const testCases: TestsCase[] = [
url: 'api-multi-versions-share-links/8tNo6MeXg7CkFMzSSz81/reference/api-reference/pets',
screenshot: false,
run: async (page) => {
await waitForHydration(page);
const spaceDropdown = await page
.locator('[data-testid="space-dropdown-button"]')
.locator('visible=true');
@@ -513,6 +649,7 @@ const testCases: TestsCase[] = [
return `api-multi-versions-va/reference/api-reference/pets?jwt_token=${token}`;
},
run: async (page) => {
await waitForHydration(page);
const spaceDropdown = await page
.locator('[data-testid="space-dropdown-button"]')
.locator('visible=true');
@@ -548,6 +685,7 @@ const testCases: TestsCase[] = [
url: 'ecosystem/connection-provider',
screenshot: false,
run: async (page) => {
await waitForHydration(page);
const spaceDropdown = page
.locator('[data-testid="space-dropdown-button"]')
.locator('visible=true');
@@ -578,6 +716,7 @@ const testCases: TestsCase[] = [
url: 'nl/ecosysteem/connection-provider',
screenshot: false,
run: async (page) => {
await waitForHydration(page);
const spaceDropdown = page
.locator('[data-testid="space-dropdown-button"]')
.locator('visible=true');
@@ -618,18 +757,128 @@ const testCases: TestsCase[] = [
url: '',
screenshot: false,
run: async (page) => {
const trigger = page.getByRole('button', { name: 'Test Section Group 1' });
// Radix NavigationMenu opens the dropdown on a `pointermove`. A single
// synthetic hover can land before hydration and be lost, so re-hover
// until the dropdown content actually appears.
await expect(async () => {
await trigger.hover();
await expect(page.getByText('Section B')).toBeVisible({ timeout: 1000 });
}).toPass({ timeout: 15000 });
// The menu only opens on `mouseenter`, which cannot fire again once the pointer
// is inside: a hover landing before hydration is lost for good.
await waitForHydration(page);
const trigger = page
.locator('[data-gb-sections]')
.getByRole('button', { name: 'Test Section Group 1' });
await trigger.hover();
await expect(page.getByText('Section B')).toBeVisible();
await page.getByText('Section B').click();
await page.waitForURL((url) => url.pathname.includes('/sections/sections-4'));
},
},
{
name: 'Root external link renders in the configured position',
url: '',
screenshot: false,
run: async (page) => {
await waitForHydration(page);
const rootSections = page.locator('[data-gb-sections]');
const rootItems = rootSections.locator(':scope > li');
await expect(rootItems).toHaveCount(4);
await expect(rootItems.nth(0)).toContainText('Home');
await expect(rootItems.nth(1)).toContainText('Test Section Group 1');
await expect(rootItems.nth(2)).toContainText('Test Section Group 2');
await expect(rootItems.last()).toContainText('Gitbook Docs');
await expect(
rootSections.getByRole('link', { name: 'Gitbook Docs' })
).toBeVisible();
},
},
{
name: 'Root external link has the configured contract',
url: '',
screenshot: false,
run: async (page) => {
await waitForHydration(page);
const rootLink = page
.locator('[data-gb-sections]')
.getByRole('link', { name: 'Gitbook Docs' });
await expect(rootLink).toBeVisible();
await expect(rootLink).toHaveAttribute('href', 'https://gitbook.com/docs');
await expect(rootLink).not.toHaveAttribute('target');
await expect(rootLink).not.toHaveAttribute('rel');
await expect(rootLink).toHaveAttribute('data-active', 'false');
await expect(rootLink).not.toHaveAttribute('aria-current');
},
},
{
name: 'Nested external link renders in the configured position',
url: '',
screenshot: false,
run: async (page) => {
await waitForHydration(page);
await page
.locator('[data-gb-sections]')
.getByRole('button', { name: 'Test Section Group 2' })
.hover();
const nestedLink = page.getByRole('link', { name: 'Gitbook Site' });
await expect(nestedLink).toBeVisible();
const nestedItems = nestedLink
.locator('xpath=ancestor::ul[1]')
.locator(':scope > li');
await expect(nestedItems).toHaveCount(3);
await expect(nestedItems.nth(0)).toContainText('Section C');
await expect(nestedItems.nth(1)).toContainText('Section with longer title');
await expect(nestedItems.last()).toContainText('Gitbook Site');
},
},
{
name: 'Nested external link has the configured contract',
url: '',
screenshot: false,
run: async (page) => {
await waitForHydration(page);
await page
.locator('[data-gb-sections]')
.getByRole('button', { name: 'Test Section Group 2' })
.hover();
const nestedLink = page.getByRole('link', { name: 'Gitbook Site' });
await expect(nestedLink).toBeVisible();
await expect(nestedLink).toHaveAttribute('href', 'https://gitbook.com');
await expect(nestedLink).not.toHaveAttribute('target');
await expect(nestedLink).not.toHaveAttribute('rel');
await expect(nestedLink).not.toHaveAttribute('aria-current');
},
},
{
name: 'External links navigate natively in the current tab',
url: '',
screenshot: false,
run: async (page) => {
await waitForHydration(page);
await page.route('https://gitbook.com/**', (route) =>
route.fulfill({ status: 200, contentType: 'text/html', body: '' })
);
const popups: string[] = [];
page.on('popup', (popup) => popups.push(popup.url()));
await page
.locator('[data-gb-sections]')
.getByRole('link', { name: 'Gitbook Docs' })
.click();
await expect(page).toHaveURL('https://gitbook.com/docs');
await page.goBack();
await waitForHydration(page);
await page
.locator('[data-gb-sections]')
.getByRole('button', { name: 'Test Section Group 2' })
.hover();
await page.getByRole('link', { name: 'Gitbook Site' }).click();
await expect(page).toHaveURL('https://gitbook.com/');
expect(popups).toEqual([]);
},
},
],
},
{
@@ -842,6 +1091,30 @@ const testCases: TestsCase[] = [
).toBeVisible();
},
},
{
name: 'Markdown page with theme cookie',
url: async () => {
const data = await getSiteAPIToken(
'https://gitbook.gitbook.io/test-gitbook-open/'
);
const searchParams = new URLSearchParams();
searchParams.set('token', data.apiToken);
searchParams.set('theme', 'dark');
return `url/${getGitBookPreviewURL(`${data.site}/blocks?${searchParams.toString()}`)}`;
},
screenshot: false,
run: async (page) => {
// The app opens previews with `?theme=`, which the middleware persists in a cookie.
const markdownURL = new URL(page.url());
markdownURL.pathname = `${markdownURL.pathname.replace(/\/$/, '')}.md`;
markdownURL.search = '';
const response = await page.request.get(markdownURL.toString());
expect(response.status()).toBe(200);
expect(response.headers()['content-type']).toContain('text/markdown');
},
},
{
name: 'Redirect to app for authentication when missing token',
url: async () => {
@@ -1241,8 +1514,8 @@ const testCases: TestsCase[] = [
},
// New site themes
...allThemes.flatMap((theme) => [
...allTintColors.flatMap((tint) => [
...allSidebarBackgroundStyles.flatMap((sidebarStyle) => ({
...allTintColors.flatMap((tint) =>
allSidebarBackgroundStyles.flatMap((sidebarStyle) => ({
name: `Theme ${theme} - Tint ${tint.label} - Sidebar ${sidebarStyle} - Mode ${themeMode}`,
url: getCustomizationURL({
styling: {
@@ -1262,8 +1535,8 @@ const testCases: TestsCase[] = [
},
}),
run: waitForCookiesDialog,
})),
]),
}))
),
...allSearchStyles.flatMap((searchStyle) => ({
name: `Theme ${theme} – Search ${searchStyle} – Mode ${themeMode}`,
url: getCustomizationURL({
@@ -1283,8 +1556,8 @@ const testCases: TestsCase[] = [
})),
]),
// Deprecated header themes
...allDeprecatedThemePresets.flatMap((preset) => [
...allSidebarBackgroundStyles.flatMap((sidebarStyle) => ({
...allDeprecatedThemePresets.flatMap((preset) =>
allSidebarBackgroundStyles.flatMap((sidebarStyle) => ({
name: `With tint - Legacy header preset ${preset} - Sidebar ${sidebarStyle} - Theme mode ${themeMode}`,
url: getCustomizationURL({
styling: {
@@ -1310,8 +1583,8 @@ const testCases: TestsCase[] = [
},
}),
run: waitForCookiesDialog,
})),
]),
}))
),
{
name: `With tint - Legacy background match - Theme mode ${themeMode}`,
url: getCustomizationURL({
@@ -1351,6 +1624,70 @@ const testCases: TestsCase[] = [
},
],
},
{
name: 'Edit on Git page actions',
contentBaseURL: 'https://gitbook-open-e2e-sites.gitbook.io/yjs/',
tests: [
{
name: 'With Edit on Git as the default action',
url: getCustomizationURL({
pageActions: {
items: [CustomizationPageActionType.Git],
},
}),
run: async (page) => {
await waitForHydration(page);
await expect(
page.getByRole('link', { name: 'Edit', exact: true })
).toHaveAttribute(
'href',
'https://github.com/taranvohra/yjs-docs/tree/main/README.md'
);
},
screenshot: false,
},
{
name: 'With Edit on Git in the dropdown',
url: getCustomizationURL({
pageActions: {
items: [
CustomizationPageActionType.Markdown,
CustomizationPageActionType.Git,
],
},
}),
run: async (page) => {
await waitForHydration(page);
await page.getByRole('button', { name: 'More' }).click();
await expect(page.getByRole('menu')).toBeVisible();
await expect(
page.getByRole('menuitem', { name: 'Edit on GitHub' })
).toHaveAttribute(
'href',
'https://github.com/taranvohra/yjs-docs/tree/main/README.md'
);
},
screenshot: false,
},
{
name: 'Without Edit on Git',
url: getCustomizationURL({
pageActions: {
items: [CustomizationPageActionType.Markdown],
},
}),
run: async (page) => {
await waitForHydration(page);
await page.getByRole('button', { name: 'More' }).click();
await expect(page.getByRole('menu')).toBeVisible();
await expect(
page.getByRole('menuitem', { name: 'Edit on GitHub' })
).toHaveCount(0);
},
screenshot: false,
},
],
},
{
name: 'Page actions',
contentBaseURL: 'https://gitbook.gitbook.io/test-gitbook-open/',
@@ -1403,7 +1740,6 @@ const testCases: TestsCase[] = [
{
name: 'Without previewed ads',
url: 'text-page?ads_preview=1',
run: waitForCookiesDialog,
},
],
},
@@ -1609,6 +1945,70 @@ const testCases: TestsCase[] = [
},
],
},
{
name: 'Visitor Auth - Space (oversized token)',
contentBaseURL: 'https://gitbook.gitbook.io/gbo-va-space/',
tests: [
{
name: 'Oversized token is chunked into cookies and survives navigation',
url: () => {
const privateKey = '70b844d0-c519-4532-8586-5970ce48c537';
const token = jwt.sign(
{
name: 'gitbook-open-tests',
// Inflate the token above the ~4KB browser cookie limit,
// like an IdP issuing many group claims would.
groups: Array.from(
{ length: 60 },
(_, index) => `group-${index}-${'x'.repeat(80)}`
),
},
privateKey,
{
expiresIn: '24h',
}
);
return `first?jwt_token=${token}`;
},
run: async (page) => {
await expect(
page.getByRole('heading', { level: 1, name: 'first' })
).toBeVisible();
// The token must be persisted as a chunk-count marker plus chunk cookies.
const cookies = await page.context().cookies();
// Next.js percent-encodes cookie values, so the raw value is `chunks%3A2`.
const marker = cookies.find(
(cookie) =>
cookie.name.startsWith(VISITOR_TOKEN_COOKIE) &&
/^chunks(:|%3A)\d+$/.test(cookie.value)
);
expect(marker).toBeDefined();
const chunks = cookies.filter((cookie) =>
cookie.name.startsWith(`${marker?.name}-`)
);
expect(chunks.length).toBeGreaterThanOrEqual(2);
// Navigating without the token must authenticate from the chunked cookie.
// `first` is the space's default page, so the post-sign-in redirect
// canonicalizes to the space root: derive `second` from that base.
const secondURL = new URL(page.url());
const basePathname = secondURL.pathname
.replace(/\/first\/?$/, '')
.replace(/\/$/, '');
secondURL.pathname = `${basePathname}/second`;
secondURL.search = '';
// Same reason as the harness navigation: third-party subresources on
// this site can hang and never fire `load`.
await page.goto(secondURL.toString(), { waitUntil: 'domcontentloaded' });
await expect(
page.getByRole('heading', { level: 1, name: 'second' })
).toBeVisible();
},
screenshot: false,
},
],
},
{
name: 'Visitor Auth - Collection',
contentBaseURL: 'https://gitbook.gitbook.io/gbo-va-collection/',
@@ -2236,6 +2636,33 @@ const testCases: TestsCase[] = [
);
},
},
{
name: 'Only tracks ask_view once the widget is opened',
// `trigger=custom` loads the frame but leaves the window closed.
url: '?trigger=custom',
screenshot: false,
run: async (page) => {
const askViews = trackInsightsEvents(page, 'ask_view');
const chat = page.frameLocator('#gitbook-widget-iframe').getByTestId('ai-chat');
// The assistant renders inside the hidden frame, but nobody has seen it.
await expect(chat).toBeAttached({ timeout: 20000 });
await page.waitForTimeout(INSIGHTS_FLUSH_TIMEOUT);
expect(askViews).toHaveLength(0);
await page.getByRole('button', { name: 'Open' }).click();
await expect(chat).toBeVisible();
await expect.poll(() => askViews.length, { timeout: 20000 }).toBe(1);
// Hiding and showing the same frame again is not a second view.
await page.getByRole('button', { name: 'Close' }).click();
await expect(chat).toBeHidden();
await page.getByRole('button', { name: 'Open' }).click();
await expect(chat).toBeVisible();
await page.waitForTimeout(INSIGHTS_FLUSH_TIMEOUT);
expect(askViews).toHaveLength(1);
},
},
],
},
{
@@ -2405,7 +2832,7 @@ const testCases: TestsCase[] = [
actions.nth(1).click(),
]);
// Verify the new page would have opened with the expected URL
expect(newPage.url()).toContain('gitbook.com');
await expect(newPage).toHaveURL(/gitbook\.com/);
// Close it immediately to avoid navigation
await newPage.close();
@@ -2553,7 +2980,7 @@ const testCases: TestsCase[] = [
openInNewTabButton.click(),
]);
// Verify the new page would have opened with the expected URL
expect(newPage.url()).toContain('gitbook.gitbook.io');
await expect(newPage).toHaveURL(/gitbook\.gitbook\.io/);
// Close it immediately to avoid navigation
await newPage.close();
},
+1
View File
@@ -1,5 +1,6 @@
import { argosScreenshot } from '@argos-ci/playwright';
import { expect, test } from '@playwright/test';
import { getContentTestURL } from '../tests/utils';
import { waitForIcons } from './util';
+334
View File
@@ -0,0 +1,334 @@
import { type Page, expect, test } from '@playwright/test';
// Import the specific modules (not the package barrel) so this stays free of the `@/` path alias
// that the store pulls in — Playwright's loader doesn't resolve it.
import { SELECT_LIST_CAP, selectRankAttribute } from '../src/lib/select/constants';
import { generateSelectCSS, selectSetClassName } from '../src/lib/select/generateSelectCSS';
/**
* Behaviour tests for the `select` CSS: given a recency-ordered selection applied to `<html>`, a
* group must show exactly the most-recently-activated of its options (its "first ranking"
* selection), falling back to its default when none are active. These run in a real browser against
* the actual generated CSS, so they assert observable visibility — not how the selectors are built.
*/
/** Render a single group of option panes with the generated stylesheet. First slug = default. */
async function renderGroup(page: Page, slugs: string[]) {
const css = generateSelectCSS(slugs);
const scope = selectSetClassName(slugs);
const panes = slugs
.map(
(slug, index) =>
`<div data-testid="pane-${slug}" data-select-option="${slug}"${index === 0 ? ' data-select-default' : ''}>${slug}</div>`
)
.join('');
await page.setContent(
`<!doctype html><html><head><style>${css}</style></head><body><div class="${scope}" data-select-group>${panes}</div></body></html>`
);
}
/**
* Apply the recency list to `<html>` as `data-sel-*` attributes (most-recent first), via the shared
* attribute-name helper — mirroring what the pre-paint script / store do at runtime.
*/
async function applySelection(page: Page, active: string[]) {
for (const [rank, value] of active.entries()) {
await page.evaluate(
({ attr, value }) => document.documentElement.setAttribute(attr, value),
{ attr: selectRankAttribute(rank), value }
);
}
}
/** Assert exactly one pane is visible, and it is the expected slug. */
async function expectOnlyVisible(page: Page, slugs: string[], expectedSlug: string) {
for (const slug of slugs) {
const pane = page.getByTestId(`pane-${slug}`);
if (slug === expectedSlug) {
await expect(pane).toBeVisible();
} else {
await expect(pane).toBeHidden();
}
}
}
async function setup(page: Page, slugs: string[], active: string[]) {
await renderGroup(page, slugs);
await applySelection(page, active);
}
test.describe('select CSS visibility', () => {
const slugs = ['python', 'go', 'java'];
test('shows the default when nothing is selected', async ({ page }) => {
await setup(page, slugs, []);
await expectOnlyVisible(page, slugs, 'python'); // first pane is the default
});
test('shows the selected option and hides the rest', async ({ page }) => {
await setup(page, slugs, ['go']);
await expectOnlyVisible(page, slugs, 'go');
});
test('shows the most-recently-activated option of the group', async ({ page }) => {
// Recency list is most-recent-first: `go` is more recent than `python`.
await setup(page, slugs, ['go', 'python']);
await expectOnlyVisible(page, slugs, 'go');
await setup(page, slugs, ['python', 'go']);
await expectOnlyVisible(page, slugs, 'python');
});
test('ignores more-recent selections that are not in the group', async ({ page }) => {
// `dark` is more recent but not one of this group's options, so `go` still wins.
await setup(page, slugs, ['dark', 'go', 'python']);
await expectOnlyVisible(page, slugs, 'go');
});
test('falls back to the default when no active slug is in the group', async ({ page }) => {
await setup(page, slugs, ['dark', 'light']);
await expectOnlyVisible(page, slugs, 'python');
});
test('keeps symbol-bearing slugs (c / c++ / c#) distinct through the CSS selectors', async ({
page,
}) => {
// Slugs can contain `+` and `#` (see slugifySelectValue); they must survive quoted attribute
// selectors without collapsing together.
const symbols = ['c', 'c++', 'c#'];
await setup(page, symbols, ['c++']);
await expectOnlyVisible(page, symbols, 'c++');
});
test('shows only the first pane when a group repeats a slug (duplicate tab names)', async ({
page,
}) => {
// Two panes share the slug `js`; activating it must reveal only the first, never both.
const scope = selectSetClassName(['js', 'ts']);
await page.setContent(
`<!doctype html><html><head><style>${generateSelectCSS(['js', 'ts'])}</style></head><body><div class="${scope}" data-select-group><div data-testid="js-first" data-select-option="js" data-select-default>js 1</div><div data-testid="js-second" data-select-option="js">js 2</div><div data-testid="ts" data-select-option="ts">ts</div></div></body></html>`
);
await applySelection(page, ['js']);
await expect(page.getByTestId('js-first')).toBeVisible();
await expect(page.getByTestId('js-second')).toBeHidden();
await expect(page.getByTestId('ts')).toBeHidden();
});
test('a pinned pane overrides first-match (the duplicate the visitor clicked)', async ({
page,
}) => {
// The client marks the clicked pane data-select-pinned and its same-slug sibling unpinned;
// the pinned one must win over the first-match default.
const scope = selectSetClassName(['js', 'ts']);
await page.setContent(
`<!doctype html><html><head><style>${generateSelectCSS(['js', 'ts'])}</style></head><body><div class="${scope}" data-select-group><div data-testid="js-first" data-select-option="js" data-select-default data-select-unpinned>js 1</div><div data-testid="js-second" data-select-option="js" data-select-pinned>js 2</div></div></body></html>`
);
await applySelection(page, ['js']);
await expect(page.getByTestId('js-second')).toBeVisible();
await expect(page.getByTestId('js-first')).toBeHidden();
});
});
interface GroupSpec {
id: string;
slugs: string[];
}
/**
* Render several tab groups, each with clickable tab buttons wired to `__select` — an in-page
* stand-in for the store's `activate()`/`mirrorToHtml()` (whose recency/dedupe/cap logic is unit
* tested in store.test.ts). It prepends the clicked slug onto the `data-sel-*` recency list on
* `<html>`, most-recent first. This keeps the test focused on the observable behaviour a visitor
* sees — a real click switching every group that offers that option — driven by real browser CSS.
*/
async function renderGroups(page: Page, groups: GroupSpec[]) {
const styles = [
...new Map(
groups.map((group) => [selectSetClassName(group.slugs), generateSelectCSS(group.slugs)])
).values(),
]
.map((css) => `<style>${css}</style>`)
.join('');
const markup = groups
.map((group) => {
const scope = selectSetClassName(group.slugs);
const buttons = group.slugs
.map(
(slug) =>
`<button data-testid="${group.id}-btn-${slug}" onclick="__select('${slug}')">${slug}</button>`
)
.join('');
const panes = group.slugs
.map(
(slug, index) =>
`<div data-testid="${group.id}-pane-${slug}" data-select-option="${slug}"${index === 0 ? ' data-select-default' : ''}>${slug}</div>`
)
.join('');
return `<div class="${scope}" data-select-group><div role="tablist">${buttons}</div>${panes}</div>`;
})
.join('');
const selectScript = `window.__select=function(slug){var el=document.documentElement,cur=[],i,v;for(i=0;i<${SELECT_LIST_CAP};i++){v=el.getAttribute('data-sel-'+i);if(v)cur.push(v);}var next=[slug];for(i=0;i<cur.length;i++){if(cur[i]!==slug)next.push(cur[i]);}next=next.slice(0,${SELECT_LIST_CAP});for(i=0;i<${SELECT_LIST_CAP};i++){if(next[i])el.setAttribute('data-sel-'+i,next[i]);else el.removeAttribute('data-sel-'+i);}};`;
await page.setContent(
`<!doctype html><html><head>${styles}<script>${selectScript}</script></head><body>${markup}</body></html>`
);
}
/** Assert a specific group shows exactly `expectedSlug` and hides its other options. */
async function expectGroupShows(
page: Page,
groupId: string,
slugs: string[],
expectedSlug: string
) {
for (const slug of slugs) {
const pane = page.getByTestId(`${groupId}-pane-${slug}`);
if (slug === expectedSlug) {
await expect(pane).toBeVisible();
} else {
await expect(pane).toBeHidden();
}
}
}
test.describe('select syncing across groups (click-driven)', () => {
test('clicking a tab syncs every group offering that option', async ({ page }) => {
const slugs = ['python', 'go'];
await renderGroups(page, [
{ id: 'a', slugs },
{ id: 'b', slugs },
]);
// Both groups start on their default (first) pane.
await expectGroupShows(page, 'a', slugs, 'python');
await expectGroupShows(page, 'b', slugs, 'python');
// Clicking a tab in group A switches group B too.
await page.getByTestId('a-btn-go').click();
await expectGroupShows(page, 'a', slugs, 'go');
await expectGroupShows(page, 'b', slugs, 'go');
// And the sync works from either group.
await page.getByTestId('b-btn-python').click();
await expectGroupShows(page, 'a', slugs, 'python');
await expectGroupShows(page, 'b', slugs, 'python');
});
test('only groups that share the clicked option follow along', async ({ page }) => {
const shared = ['python', 'go'];
const other = ['go', 'rust'];
await renderGroups(page, [
{ id: 'a', slugs: shared },
{ id: 'b', slugs: other },
]);
// `rust` exists only in group B, so clicking it leaves group A on its default.
await page.getByTestId('b-btn-rust').click();
await expectGroupShows(page, 'b', other, 'rust');
await expectGroupShows(page, 'a', shared, 'python');
// `go` is shared, so clicking it in A moves both groups.
await page.getByTestId('a-btn-go').click();
await expectGroupShows(page, 'a', shared, 'go');
await expectGroupShows(page, 'b', other, 'go');
});
});
interface NestedSpec {
outer: string[];
inner: string[];
/** Which of the outer options hosts the nested group. */
host: string;
/**
* Emit the nested group's stylesheet before the outer one, as happens when a group with the
* same option set appears earlier on the page and its deduped sheet lands in `<head>` first.
*/
innerStyleFirst?: boolean;
}
/**
* Render a group nested inside one of another group's panes, mirroring the DOM `DynamicTabs`
* produces: panes are direct children of the element carrying the set class, and a pane's body is
* wrapped in a padding div before the nested group.
*/
async function renderNestedGroups(page: Page, spec: NestedSpec) {
const { outer, inner, host, innerStyleFirst = false } = spec;
const outerScope = selectSetClassName(outer);
const innerScope = selectSetClassName(inner);
const innerPanes = inner
.map(
(slug, index) =>
`<div data-testid="inner-pane-${slug}" data-select-option="${slug}"${index === 0 ? ' data-select-default' : ''}>${slug}</div>`
)
.join('');
const innerGroup = `<div class="${innerScope}" data-select-group>${innerPanes}</div>`;
const outerPanes = outer
.map(
(slug, index) =>
`<div data-testid="outer-pane-${slug}" data-select-option="${slug}"${index === 0 ? ' data-select-default' : ''}><div>${slug}${slug === host ? innerGroup : ''}</div></div>`
)
.join('');
const styles = [generateSelectCSS(outer), generateSelectCSS(inner)];
if (innerStyleFirst) {
styles.reverse();
}
await page.setContent(
`<!doctype html><html><head>${styles.map((css) => `<style>${css}</style>`).join('')}</head><body><div class="${outerScope}" data-select-group>${outerPanes}</div></body></html>`
);
}
/**
* A group's stylesheet must resolve only its own panes. Because every pane of a nested group is also
* a descendant of the outer group, a sheet that reached descendants instead of children would hide
* the nested panes whenever an outer option was active, leaving the nested tab bar with an empty body.
*/
test.describe('select CSS visibility in nested groups', () => {
const outer = ['macos', 'windows'];
const inner = ['npm', 'yarn'];
test('shows both defaults when nothing is selected', async ({ page }) => {
await renderNestedGroups(page, { outer, inner, host: 'macos' });
await expect(page.getByTestId('outer-pane-macos')).toBeVisible();
await expect(page.getByTestId('inner-pane-npm')).toBeVisible();
await expect(page.getByTestId('inner-pane-yarn')).toBeHidden();
});
test('keeps the nested group resolved when an outer option is activated', async ({ page }) => {
await renderNestedGroups(page, { outer, inner, host: 'macos' });
await applySelection(page, ['macos']);
await expect(page.getByTestId('outer-pane-macos')).toBeVisible();
await expect(page.getByTestId('inner-pane-npm')).toBeVisible();
await expect(page.getByTestId('inner-pane-yarn')).toBeHidden();
});
test('resolves a nested group hosted by a non-default outer option', async ({ page }) => {
await renderNestedGroups(page, { outer, inner, host: 'windows' });
await applySelection(page, ['windows']);
await expect(page.getByTestId('outer-pane-windows')).toBeVisible();
await expect(page.getByTestId('inner-pane-npm')).toBeVisible();
await expect(page.getByTestId('inner-pane-yarn')).toBeHidden();
});
test('resolves each group against its own options', async ({ page }) => {
await renderNestedGroups(page, { outer, inner, host: 'macos' });
await applySelection(page, ['yarn', 'macos']);
await expect(page.getByTestId('outer-pane-macos')).toBeVisible();
await expect(page.getByTestId('inner-pane-yarn')).toBeVisible();
await expect(page.getByTestId('inner-pane-npm')).toBeHidden();
});
test('resolves the same way whichever stylesheet comes first', async ({ page }) => {
await renderNestedGroups(page, { outer, inner, host: 'macos', innerStyleFirst: true });
await applySelection(page, ['yarn', 'macos']);
await expect(page.getByTestId('outer-pane-macos')).toBeVisible();
await expect(page.getByTestId('inner-pane-yarn')).toBeVisible();
await expect(page.getByTestId('inner-pane-npm')).toBeHidden();
});
});
+234
View File
@@ -0,0 +1,234 @@
import { type CDPSession, type Locator, type Page, expect, test } from '@playwright/test';
import { mkdirSync, writeFileSync } from 'node:fs';
import { dirname } from 'node:path';
import { getContentTestURL } from '../tests/utils';
import { waitForCookiesDialog } from './util';
/** Already covered by `customers.spec.ts`, and among the largest pages we render. */
const LARGE_PAGE_URL = 'https://docs.snyk.io/snyk-api/reference/apps';
/** Table rows the preview workflow pastes into a PR comment. Relative to the package, gitignored. */
const REPORT_FILE = 'test-results/style-perf.md';
// Share of the page one popup may restyle: a ratio so it survives the page growing, a count rather
// than a duration so it does not move with CI machine speed. `search` is above 1 because it still
// restyles the whole document — a ratchet against today's state, to lower as families get fixed.
const RESTYLE_BUDGET_RATIO = {
'openapi-select': 0.25,
search: 1.25,
};
type TraceEvent = { name: string; args?: { elementCount?: number } };
/** Elements Blink restyled while `action` ran — DevTools reports this as "Elements affected". */
async function countRestyledElements(
page: Page,
client: CDPSession,
action: () => Promise<void>
): Promise<number> {
// Style is computed lazily, so settle queued recalcs or earlier work lands in the trace.
await page.evaluate(() => void document.body.offsetHeight);
await client.send('Tracing.start', {
categories: 'disabled-by-default-devtools.timeline',
transferMode: 'ReturnAsStream',
});
await action();
await page.evaluate(() => void document.body.offsetHeight);
const handle = await new Promise<string>((resolve) => {
client.once('Tracing.tracingComplete', (event) => resolve(event.stream as string));
void client.send('Tracing.end');
});
let raw = '';
for (let eof = false; !eof;) {
const chunk = await client.send('IO.read', { handle });
raw += chunk.data;
eof = chunk.eof;
}
await client.send('IO.close', { handle });
const parsed = JSON.parse(raw);
const events: TraceEvent[] = Array.isArray(parsed) ? parsed : parsed.traceEvents;
return events
.filter((event) => event.name === 'UpdateLayoutTree')
.reduce((total, event) => total + (event.args?.elementCount ?? 0), 0);
}
/**
* Measure a *re*open: the first open also pays for mounting the popup, and waiting on anything
* looser than the popup being hidden again undercounts the reopen by ~10x.
*/
async function measureReopen(
page: Page,
client: CDPSession,
open: () => Promise<void>,
popup: Locator
): Promise<number> {
await open();
await expect(popup).toBeVisible();
await page.keyboard.press('Escape');
await expect(popup).toBeHidden();
const restyled = await countRestyledElements(page, client, open);
await expect(popup, 'the measurement is meaningless if the popup did not open').toBeVisible();
// Leave the page as we found it, so the next measurement is not measuring this popup's teardown.
await page.keyboard.press('Escape');
await expect(popup).toBeHidden();
return restyled;
}
type Measurement = { name: keyof typeof RESTYLE_BUDGET_RATIO; restyled: number };
function expectWithinBudgets(measurements: Measurement[], total: number) {
const count = (value: number) => value.toLocaleString('en-US');
// Reported before asserting, so a blown budget still reaches the PR comment.
mkdirSync(dirname(REPORT_FILE), { recursive: true });
writeFileSync(
REPORT_FILE,
measurements
.map(({ name, restyled }) => {
const ratio = restyled / total;
const budget = RESTYLE_BUDGET_RATIO[name];
const status = ratio < budget ? '✅' : '❌';
return `| \`${name}\` | ${count(restyled)} | ${count(total)} | ${(ratio * 100).toFixed(1)}% | ${(budget * 100).toFixed(0)}% | ${status} |\n`;
})
.join('')
);
// Soft, so one breach still reports the other interaction rather than masking it.
for (const { name, restyled } of measurements) {
expect
.soft(restyled / total, `${name} restyled ${restyled} of ${total} elements`)
.toBeLessThan(RESTYLE_BUDGET_RATIO[name]);
}
}
const countElements = (page: Page) =>
page.evaluate(() => document.getElementsByTagName('*').length);
// Not `networkidle`: third-party subresources on this customer site can hang, so it never settles.
async function waitForStableElementCount(page: Page): Promise<number> {
let previous = await countElements(page);
await expect
.poll(
async () => {
const current = await countElements(page);
const stable = current === previous;
previous = current;
return stable;
},
{ message: 'the tree never stopped changing', timeout: 15_000 }
)
.toBe(true);
return previous;
}
async function openLargePage(page: Page) {
await page.goto(getContentTestURL(LARGE_PAGE_URL));
await waitForCookiesDialog(page);
// Measure a settled page: before hydration the tree is smaller and no popup can open at all.
await page.locator('html.hydrated').waitFor();
await expect(page.getByLabel('OpenAPI Select').first()).toBeAttached();
const totalElements = await waitForStableElementCount(page);
const client = await page.context().newCDPSession(page);
return { client, totalElements };
}
// Guards the harness: if an idle window is busy, background work is leaking into the measurements
// and they mean nothing. Closing a popup leaves a few elements of teardown, so this is not zero —
// it only has to sit far below a real measurement (hundreds) and a whole-document restyle (~11k).
const IDLE_RESTYLE_TOLERANCE = 100;
async function expectIdle(page: Page, client: CDPSession) {
const restyled = await countRestyledElements(page, client, async () => {});
expect(restyled, 'an idle page should barely restyle').toBeLessThan(IDLE_RESTYLE_TOLERANCE);
}
// Both checks below probe a block's children, never the block itself: `content-visibility: auto`
// skips an element's *contents*, so the element carrying it keeps reporting visible and every block
// would look rendered. Same reason `toBeVisible()` is no use here — a skipped child still has a box.
function countRenderedBlocks(page: Page): Promise<number> {
return page.evaluate(
() =>
[...document.querySelectorAll('.openapi-block')].filter((block) =>
[...block.children].some((child) =>
child.checkVisibility({ contentVisibilityAuto: true })
)
).length
);
}
test('off-screen OpenAPI blocks skip their rendering work', async ({ page }) => {
await openLargePage(page);
const blocks = page.locator('.openapi-block');
const total = await blocks.count();
expect(total, 'the fixture needs enough blocks for some to sit off-screen').toBeGreaterThan(4);
await page.evaluate(() => window.scrollTo(0, 0));
const rendered = await countRenderedBlocks(page);
expect(
rendered,
`${rendered} of ${total} blocks rendered from the top of the page`
).toBeLessThan(total / 2);
// Un-skipping on approach is what keeps #anchors and find-in-page working.
const last = blocks.last();
await last.scrollIntoViewIfNeeded();
await expect
.poll(
() =>
last.evaluate((block) =>
[...block.children].some((child) =>
child.checkVisibility({ contentVisibilityAuto: true })
)
),
{ message: 'the last block never rendered after being scrolled to' }
)
.toBe(true);
});
test('opening a popup restyles a bounded part of a large API reference', async ({ page }) => {
const { client, totalElements } = await openLargePage(page);
await expectIdle(page, client);
const trigger = page.getByLabel('OpenAPI Select').first();
await trigger.scrollIntoViewIfNeeded();
const select = await measureReopen(
page,
client,
() => trigger.click(),
page.locator('.openapi-select-popover')
);
await expectIdle(page, client);
const searchInput = page.getByTestId('search-input');
const search = await measureReopen(
page,
client,
() => searchInput.focus(),
page.getByTestId('search-results')
);
expectWithinBudgets(
[
{ name: 'openapi-select', restyled: select },
{ name: 'search', restyled: search },
],
totalElements
);
});
+178
View File
@@ -0,0 +1,178 @@
import { type Page, expect, test } from '@playwright/test';
// Import the specific module (not the package barrel) so this stays free of the `@/` path alias,
// which Playwright's loader doesn't resolve — same reason as `select.spec.ts`.
import { resolveOverflowingItems } from '../src/components/hooks/listOverflow';
/**
* Behaviour tests for the tab bar's overflow rule (`useListOverflow`), which decides which tabs move
* into the "more" dropdown. Rects are measured in a real browser so the geometry is genuine — the
* layout below mirrors the tab bar in `DynamicTabs`: a non-wrapping flex row of `shrink-0` items,
* clipped by `overflow: hidden`, measured with the dropdown rendered ahead of the tabs.
*
* The regression these guard is a dropdown appearing when nothing actually overflowed: measuring
* with the dropdown present consumes `MENU` pixels, so a bar whose tabs total just under the
* container would hand its last tab to a menu it never needed.
*/
/** Width of the ellipsis button, matching the `px-3.5` + `size-4` icon of the real one. */
const MENU = 44;
interface Row {
/** Container width in px. */
container: number;
/** Tab widths in px, in order. */
tabs: number[];
/** Whether the dropdown is reserving space ahead of the tabs, as during a measure pass. */
withMenu?: boolean;
/** Hide an ancestor, so the row measures with no box at all. */
hidden?: boolean;
}
/**
* Lay the row out in the browser and run the real rule over the rects it produces.
* Returns the ids reported as overflowing, or `null` when the measurement carried no information.
*/
async function measure(page: Page, row: Row): Promise<string[] | null> {
const { container, tabs, withMenu = true, hidden = false } = row;
const items = tabs
.map((w, i) => `<div class="item" id="tab-${i}" style="width:${w}px">${i}</div>`)
.join('');
const menu = withMenu ? `<div class="item" style="width:${MENU}px">…</div>` : '';
await page.setContent(
`<!doctype html><html><head><style>
* { box-sizing: border-box; }
body { margin: 0; }
.pane { ${hidden ? 'display: none;' : ''} }
.bar {
width: ${container}px;
display: inline-flex;
overflow: hidden;
}
.bar::after { content: ""; flex: 1; }
.item { flex-shrink: 0; max-width: 100%; }
</style></head><body>
<div class="pane"><div class="bar" id="bar">${menu}${items}</div></div>
</body></html>`
);
const measured = await page.evaluate(() => {
const bar = document.getElementById('bar');
if (!bar) {
throw new Error('missing bar');
}
const rect = bar.getBoundingClientRect();
return {
container: { left: rect.left, right: rect.right, width: rect.width },
items: [...bar.querySelectorAll<HTMLElement>('.item[id]')].map((el) => {
const r = el.getBoundingClientRect();
return { id: el.id, rect: { left: r.left, right: r.right } };
}),
};
});
const result = resolveOverflowingItems(measured.container, measured.items);
return result ? [...result].sort() : null;
}
test.describe('tab overflow rule', () => {
test('reports nothing when every tab fits with room to spare', async ({ page }) => {
// 3 x 100 = 300 of 600, so even with the menu reserved there is slack.
expect(await measure(page, { container: 600, tabs: [100, 100, 100] })).toEqual([]);
});
test('reports nothing when the tabs fit exactly', async ({ page }) => {
expect(await measure(page, { container: 300, tabs: [100, 100, 100] })).toEqual([]);
});
test('reports nothing when only the reserved menu made the row overflow', async ({ page }) => {
// The regression: tabs total 300 and the container is 320, so they fit — but measuring
// reserves 44 for the menu, which used to push the last tab out and show a needless
// dropdown. Every width in `container - MENU < 300 <= container` must stay empty.
for (const container of [300, 305, 320, 330, 343]) {
expect(
await measure(page, { container, tabs: [100, 100, 100] }),
`container ${container}px`
).toEqual([]);
}
});
test('reports the tabs that genuinely do not fit alongside the menu', async ({ page }) => {
// 300 of tabs into 290: the row really does overflow, so the menu is warranted and the
// remaining tabs must fit beside it (100 + 100 + 44 = 244 <= 290).
expect(await measure(page, { container: 290, tabs: [100, 100, 100] })).toEqual(['tab-2']);
});
test('gives up as many tabs as the width demands', async ({ page }) => {
expect(await measure(page, { container: 190, tabs: [100, 100, 100] })).toEqual([
'tab-1',
'tab-2',
]);
expect(await measure(page, { container: 150, tabs: [100, 100, 100] })).toEqual([
'tab-1',
'tab-2',
]);
});
test('moves every tab into the menu once not even the first fits beside it', async ({
page,
}) => {
// 100 + 44 > 120, so no tab can share the row with the menu. Everything goes in, leaving a
// bar that is only the menu — deliberately, since the menu is then the sole route to any
// tab. Forcing the first tab to stay would push the menu past the clipped edge and strand
// the rest.
expect(await measure(page, { container: 120, tabs: [100, 100, 100] })).toEqual([
'tab-0',
'tab-1',
'tab-2',
]);
});
test('keeps a single tab that fills the bar rather than hiding it behind a menu', async ({
page,
}) => {
// `max-width: 100%` truncates it to the container, so it fits — a lone tab should never be
// the only thing in the dropdown.
expect(await measure(page, { container: 200, tabs: [400] })).toEqual([]);
});
test('cuts a nested bar earlier, since its pane padding narrows it', async ({ page }) => {
// A nested tab bar sits inside a `p-4` pane, so it has 32px less to work with. At 330 the
// outer bar keeps all three tabs; the nested one at 330 - 32 cannot.
expect(await measure(page, { container: 330, tabs: [100, 100, 100] })).toEqual([]);
expect(await measure(page, { container: 330 - 32, tabs: [100, 100, 100] })).toEqual([
'tab-2',
]);
});
test('progressively fills the menu as a long list is squeezed', async ({ page }) => {
const tabs = Array.from({ length: 12 }, () => 100);
let previous = -1;
for (const container of [1300, 1200, 1000, 800, 600, 400, 200]) {
const overflowing = await measure(page, { container, tabs });
expect(overflowing, `container ${container}px`).not.toBeNull();
const hidden = overflowing?.length ?? 0;
// Never loses a tab, and never un-hides one as the space shrinks.
expect(hidden, `container ${container}px`).toBeGreaterThanOrEqual(previous);
expect(hidden, `container ${container}px`).toBeLessThanOrEqual(tabs.length);
previous = hidden;
}
// Widest fits everything; at 200 only the first tab still fits beside the menu.
expect(await measure(page, { container: 1300, tabs })).toEqual([]);
expect((await measure(page, { container: 200, tabs }))?.length).toBe(11);
});
test('reports nothing measurable while an ancestor is hidden', async ({ page }) => {
// A bar behind an inactive tab has no box, so every rect is zero. That says nothing about
// what fits, and must not be mistaken for "everything overflows".
expect(
await measure(page, { container: 200, tabs: [100, 100, 100], hidden: true })
).toBeNull();
});
test('reports nothing measurable for an empty list', async ({ page }) => {
expect(await measure(page, { container: 600, tabs: [] })).toBeNull();
});
});
+24 -15
View File
@@ -1,4 +1,16 @@
import { argosScreenshot } from '@argos-ci/playwright';
import {
type BrowserContext,
type FrameLocator,
type Page,
type Response,
expect,
test,
} from '@playwright/test';
import deepMerge from 'deepmerge';
import rison from 'rison';
import type { DeepPartial } from 'ts-essentials';
import {
CustomizationAIMode,
CustomizationBackground,
@@ -22,17 +34,6 @@ import {
type SiteCustomizationSettings,
SiteExternalLinksTarget,
} from '@gitbook/api';
import {
type BrowserContext,
type FrameLocator,
type Page,
type Response,
expect,
test,
} from '@playwright/test';
import deepMerge from 'deepmerge';
import rison from 'rison';
import type { DeepPartial } from 'ts-essentials';
import { getContentTestURL, getTestURL } from '../tests/utils';
@@ -91,7 +92,7 @@ export interface Test {
export type TestsCase = {
name: string;
skip?: boolean;
tests: Array<Test>;
tests: Test[];
contentBaseURL?: string;
/**
* Whether screenshots in this test case should capture the full scrollable page by default.
@@ -111,10 +112,10 @@ export const allThemeModes: CustomizationDefaultThemeMode[] = [
CustomizationDefaultThemeMode.Dark,
];
export const allTintColors: Array<{
export const allTintColors: {
label: string;
value: CustomizationThemedColor | undefined;
}> = [
}[] = [
{
label: 'Off',
value: undefined,
@@ -172,6 +173,10 @@ export async function waitForCookiesDialog(page: Page) {
});
}
export async function waitForHydration(page: Page) {
await page.locator('html.hydrated').waitFor();
}
/**
* Wait for the GitBook admin toolbar to be present.
*
@@ -460,7 +465,11 @@ export function getCustomizationURL(partial: DeepPartial<SiteCustomizationSettin
socialAccounts: [],
};
const encoded = rison.encode_object(deepMerge(DEFAULT_CUSTOMIZATION, partial));
const encoded = rison.encode_object(
deepMerge(DEFAULT_CUSTOMIZATION, partial, {
arrayMerge: (_target, source) => source,
})
);
const searchParams = new URLSearchParams();
searchParams.set('customization', encoded);

Some files were not shown because too many files have changed in this diff Show More