Compare commits

...

623 Commits

Author SHA1 Message Date
overtrue fbd192242f ci: run workspace clippy beside the test binary build
Clippy ran in front of the test-binary archive inside Workspace Lint and Build, so every workspace test waited 13 to 17 minutes for a lint that shares no compiler output with the archive.

Move the unchanged Clippy step into its own workspace-clippy job with the same condition, needs, runner and cache key. Workspace Lint and Build keeps its ID and name as the archive producer. The aggregate and the scheduled alert depend on the new job, and the plan contract moves to 4 so a base planner that predates the job set falls back to the full matrix.

ci_gate.py now rejects a workflow where the lint is conditional, duplicated, outside the aggregate, scoped differently from the archive producer, or back on the archive consumers' dependency chain, and where the workflow's plan-contract marker differs from the planner's.
2026-11-12 07:24:51 +08:00
唐小鸭 e2bd880fa4 fix(kms): make AWS-backed SSE objects readable and key policies hold (#9334)
* fix(kms): read back SSE objects written through the AWS backend

The AWS backend returned the GenerateDataKey blob bare, so the read path took the unrecognized bytes for a locally wrapped key and asked for RUSTFS_SSE_S3_MASTER_KEY without ever calling AWS Decrypt. Every SSE-KMS and SSE-S3 object written through this backend was unreadable, and UploadPart failed the same way.

The backend now wraps the blob in the data-key envelope the other backends use. A stored key that is neither an envelope nor a local-master-key wrap is offered to the KMS when its backend reports that released versions persisted it bare, so objects written by 1.0.4 and 1.0.5 read back without being rewritten.

* fix(admin): percent-decode the key id in the KMS describe path

GET /rustfs/admin/v3/kms/keys/{key_id} read the path segment verbatim, so an AWS key ARN, which has to be escaped to fit in one segment, was looked up, authorized and audited under its escaped spelling and answered 404.

* fix(policy): match an AWS key ARN as its key id in KMS statements

A key-scoped statement was matched against the key identifier exactly as the request spelled it. A Deny on key/<id> therefore did not cover a request naming the same key by its AWS ARN, on the SSE-KMS write, on the read of an object stored under the ARN spelling, and on the per-key admin endpoints.

A key ARN is now reduced to its key id before matching. A request naming a key by alias, which only the backend can resolve, fails closed against key-scoped statements. The deletion impact report compares key references the same way.

Adds the AWS KMS backend guide in English and Chinese.

* fix(kms): read rio-v2 objects that carry a bare AWS data key

A rio-v2 build stores a sealed object key beside the data key, so an AWS-backed object written before the envelope carries the same shape as a MinIO object and was sent to the MinIO decoder, failing before AWS Decrypt was tried.

MinIO's sealing is authenticated, so opening the data key under the local master key is a proof: the bare blob reaches the KMS only once that has failed, or when no local master key exists. Without a backend that reads bare ciphertext the MinIO route is unchanged.

* docs(kms): describe pairing an AWS KMS site with a Vault site

Site replication synchronizes key names and never keys, and AWS assigns key ids, so in a mixed pair the Vault site has to name its keys after the AWS key ids.
2026-11-11 18:09:43 -05:00
唐小鸭 acf0d3ff72 fix(replication): replicate SSE-KMS objects under key-policy enforcement (#9340)
fix(replication): replicate SSE-KMS objects under key enforcement

With RUSTFS_KMS_ENFORCE_SSE_KEY_POLICY=true the receiving site authorizes a replica PUT of an SSE-KMS object for kms:GenerateDataKey against the key it resolves to. The managed site-replicator account held no kms grant, so every SSE-KMS object stayed FAILED with AccessDenied.

Grant kms:GenerateDataKey on every key and treat a stored policy without it as outdated so the reconcile tick refreshes existing accounts. kms:Decrypt stays out: reads proxied to a peer run as this account.
2026-11-11 18:09:25 -05:00
Chris An 013a4ae3b3 refactor(admin): move the admin route table out of the s3s router (#9320)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* refactor(auth): share authorization core with owned entry points

Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* refactor(admin): move remaining admin handlers to owned requests

Migrate the ten table-catalog commit and publication handlers to the
owned admin Operation trait, redeem object zip download tokens through
authorize_owned_request, and remove the s3s-typed router Operation
trait. S3Router now converts the s3s request into an AdminRequest and
the AdminResponse back at its edge, so no admin operation takes an s3s
type (rustfs/backlog#2788).

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* fix(auth): keep owned authorization in the app layer and fail closed

Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.

* test(auth): move owned parity tests to the app layer

Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.

* test(admin): convert the tagged table catalog request before installing identity

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* fix(admin): keep owned router entry points crate-visible

* test(auth): read storage-private parity facts through test accessors

The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.

* test(auth): owned and legacy entry points reach the same decisions

Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).

* fix(admin): drop the owned trait bound from S3Router's inherent impls

* test(auth): satisfy clippy on the parity test facade

* test(admin): cover zip download token redemption authorization

* test(auth): report every decision mismatch in the parity matrix

* refactor(admin): move the admin route table out of the s3s router

* test(auth): cover multipart staging in the owned/legacy decision matrix

* fix(admin): authorize warehouse locations with the owned commit request

* fix(admin): return the owned table catalog authorization result unchanged

* fix(table-catalog): restore owned request lines the main merge reverted

The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.

* fix(auth): make an absent caller secret unrepresentable as a key

RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.

* fix(auth): keep the test-only credentials rebuild out of the lib build

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 18:08:28 -05:00
Chris An 6e82e08f8e test(guards): let the split probe check already-split sources (#9343)
test(guards): let the split probe check sources that are already split

The end-to-end split probe simulated every split itself and stopped on a tree where bucket_usecase.rs is already split. It now decides per source (ecfs.rs, bucket_usecase.rs, multipart_usecase.rs) whether the tree is unsplit or split: unsplit sources are simulated as before, split sources get the same planted violations at the top of real split files plus a silence check over every other real split file, and a source in neither state fails with its name. Refs rustfs/backlog#2765.
2026-11-11 17:39:16 -05:00
Chris An e98b9132ca test(guards): read file plus split directory in text guards (#9292)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* test(guards): read file plus split directory in text guards

Text guards that read one file with include_str! or by path broke, or silently stopped seeing the code they guard, when that code moved to another file. They now read the file they read today, which stays required, plus the sibling directory a mechanical split will populate (storage/legacy_edge, app/bucket_usecase, app/multipart_usecase, app/lifecycle_transition_api_test). Counts are summed over the set and split markers must occur exactly once across it. Refs rustfs/backlog#2765.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* test(guards): avoid a typos false positive in a fixture

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* test(guards): address review of the split-safe text guards

Make the super:: import rules depth-aware for split files, cover ecfs_test.rs moving to legacy_edge/tests, read production text only in the Rust count and contains guards, bound method slices by their own closing line, keep the split arrays safe on bash 3.2, and add an end-to-end split probe for the architecture, layer and logging guards. Refs rustfs/backlog#2765.

* test(guards): plant the lifecycle split probe in its own file

P4 created lifecycle_transition_api_test/put.rs; the end-to-end split probe now plants its violations in split_probe.rs instead of overwriting it.

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 17:09:38 -05:00
Chris An 0e69351973 refactor(admin): move remaining admin handlers to owned requests (#9287)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* refactor(auth): share authorization core with owned entry points

Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* refactor(admin): move remaining admin handlers to owned requests

Migrate the ten table-catalog commit and publication handlers to the
owned admin Operation trait, redeem object zip download tokens through
authorize_owned_request, and remove the s3s-typed router Operation
trait. S3Router now converts the s3s request into an AdminRequest and
the AdminResponse back at its edge, so no admin operation takes an s3s
type (rustfs/backlog#2788).

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* fix(auth): keep owned authorization in the app layer and fail closed

Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.

* test(auth): move owned parity tests to the app layer

Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.

* test(admin): convert the tagged table catalog request before installing identity

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* fix(admin): keep owned router entry points crate-visible

* test(auth): read storage-private parity facts through test accessors

The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.

* test(auth): owned and legacy entry points reach the same decisions

Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).

* fix(admin): drop the owned trait bound from S3Router's inherent impls

* test(auth): satisfy clippy on the parity test facade

* test(admin): cover zip download token redemption authorization

* test(auth): report every decision mismatch in the parity matrix

* test(auth): cover multipart staging in the owned/legacy decision matrix

* fix(admin): authorize warehouse locations with the owned commit request

* fix(admin): return the owned table catalog authorization result unchanged

* fix(table-catalog): restore owned request lines the main merge reverted

The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.

* fix(auth): make an absent caller secret unrepresentable as a key

RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.

* fix(auth): keep the test-only credentials rebuild out of the lib build

* fix(app): drop the PutObjectInput re-export main now provides

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 16:01:44 -05:00
Chris An 09811acf91 ci(parity): run dual-stack differential against pinned release (#9315)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* test(e2e): allow a pinned release binary as differential reference side

RUSTFS_E2E_REFERENCE_BINARY makes side A of the dual-stack differential a released rustfs binary, started without RUSTFS_S3_STACK. A missing, non-file or non-executable path fails the run instead of falling back to the same-binary mode. The report records which side is the reference and each side's --version output.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* test(e2e): update smoke selection for reference-binary unit tests

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* ci(parity): run the dual-stack differential against the pinned reference

Adds a differential job to reference-parity.yml: side A is the pinned release, side B the candidate artifact built for the s3-tests comparison. The job prints reference_side, version_a and version_b from the report, fails when side A is not the reference or both versions are equal, and lists every difference in the job summary.

* ci(parity): print the first version line in the differential summary

* chore: restore main's Cargo and baseline files after merging main

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 15:15:12 -05:00
Chris An 0872f0be9b ci(e2e): exclude reference unit tests from e2e-full selection (#9342)
ci(e2e): keep reference-selection unit tests out of e2e-full

The eight dual_stack_differential::reference tests added in #9285 entered the e2e-full selection and changed its digest. They are hermetic and already run in e2e-smoke on every pull request, so exclude them from e2e-full; the selection digest returns to the value recorded in .config/e2e-full-selection.txt.
2026-11-11 14:13:10 -05:00
Chris An 773a5c34a5 fix(admin): read the caller secret only where a handler uses it (#9339)
AddUser reads the current secret only for a self-rotation, orphan-bucket recovery only to seal a /minio/admin compat response, and a missing secret key answers AccessDenied instead of InternalError in AddUser, bucket recovery and ChangeOwnPassword.
2026-11-11 14:12:54 -05:00
唐小鸭 056ddce8f1 fix(kms): require a scheduled deletion before destroying a key (#9337)
On the Vault KV2 and Vault Transit backends, an immediate deletion of a
key that was not already pending deletion only marked it PendingDeletion
and still reported success, so objects under the key stayed readable
after the caller was told the key was gone.

Key destruction is now two explicit steps on the Local, Vault KV2 and
Vault Transit backends: a deletion is scheduled first, and
`force_immediate` only destroys a key that is already PendingDeletion.
A request against an Enabled or Disabled key is refused with an invalid
state error and changes nothing. Vault Transit's "encryption key not
found" answer for a destroyed key now maps to KeyNotFound instead of a
backend error.

Document the feature in docs/operations/kms-key-destruction.md with a
Chinese translation.
2026-11-11 14:07:20 -05:00
Chris An 153d6b880d build(deps): re-pin rustfs/gateway to 7915d069 (#9283)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* build(deps): re-pin rustfs/gateway to 371d91b2

* fix(protocols): pass copy sources as CopySourceValue

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* test(protocols): raise rustfs test-count baseline for copy source tests

* fix(protocols): keep refusing listings without object ETags

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* build(deps): re-pin rustfs/gateway to f9aa6045

* build(deps): re-pin rustfs/gateway to aa1d1a29

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 12:16:15 -05:00
唐小鸭 20c046af6c fix(targets): resolve default queue dirs per node (#9262)
The built-in notify and audit queue directories /opt/rustfs/events and
/opt/rustfs/audit are persisted cluster-wide as literal defaults. On
native Windows they have no drive prefix, so every target that kept the
default failed validation as a non-absolute path.

Treat those two literals as logical defaults and resolve them on each
node when a queue directory is validated or opened. A new
RUSTFS_TARGET_STORE_DIR relocates both default queues on any platform;
without it, Windows uses %ProgramData%\RustFS. Explicit operator paths,
the persisted configuration, and Linux/macOS behavior are unchanged, and
pending entries are not migrated when the root changes.

Expose the variable through the Helm chart as
config.rustfs.target_store_dir and document the resolution rules.
2026-11-11 11:01:00 -05:00
cxymds 1f823d4ee8 fix(lock): preserve batch ownership and bound peer waits (#9266)
* chore(observability): classify bulk delete failure stages

* fix(lock): retain cleanup ownership for batch acquisition

* fix(lock): bound batch waits and retry confirmed rejections
2026-11-11 10:54:38 -05:00
Chris An 0622419f65 fix(obs): bound the log directory with default settings (#9327)
* fix(obs): bound the log directory with default settings

With the defaults the active log file had no size limit (size rolling was off), and the cleaner counted only rolled files older than the minimum file age against the byte budget, on a 30-minute interval. A log storm could therefore fill the disk for up to two hours without the budget applying.

The active file now rolls at 256 MiB when the single-file limit is unset; an explicit 0 still turns size rolling off, and the cleaner's per-file trim keeps its previous default. The appender wakes the cleaner after every roll, and once the rolled files exceed the byte budget the cleaner processes the oldest ones regardless of age. The README no longer calls the budget a hard cap on the directory and states the actual bound.

* fix(obs): trim only what the log byte budget needs

Lifting the minimum file age for an over-budget pass merged fresh files into the regular selection, so the keep_files ceiling and the per-file limit applied to them too: one byte over the budget could process every fresh file but keep_files of them. The override is now a byte trim on the files that would remain, oldest first, until the budget holds.

An unset single-file limit now rolls at a quarter of a small byte budget instead of 256 MiB, so a freshly rolled file is not larger than the whole budget. Both logging setups open the appender through one function that returns the roll signal the cleanup task listens on. The README states that a log directory must not be shared by processes whose file names match the same pattern.
2026-11-11 10:47:23 -05:00
GatewayJ ac8d81319b fix(s3-tables): reclaim dropped table maintenance configs (#9331) 2026-11-11 10:43:57 -05:00
Chris An 1b3c477f05 fix(ecstore): bound bitrot and remote disk failure logs (#9328)
* fix(ecstore): bound bitrot and remote disk failure logs

A failing drive logs one error per shard block of every read it serves, and an unreachable peer logs one warning per in-flight operation. Neither had a rate limit, so a degraded drive or peer could produce log volume at the speed of the failing I/O.

The three bitrot read failures (short shard, hash mismatch, read error) and the two remote disk failures (timeout, network-like error) now log at most once per five seconds and report how many events were suppressed. The remote disk throttles belong to each disk handle, so one noisy peer cannot hide another peer's first warning. Error results, health marking and the per-operation counters are unchanged.

* fix(ecstore): bound reader retirement warnings in the decoder

A slow shard reader is retired once per stripe of every read it lags on, and a parity reader that cannot be aligned is retired with a warning each time. Both lines name only a shard index. They now log at most once per five seconds with the number suppressed; the retirement itself and the error recorded for the shard are unchanged.
2026-11-11 10:42:51 -05:00
唐小鸭 ea286defc6 fix(windows): release rebuild source pins and align test fixtures (#9263)
* fix(windows): release rebuild source pins and align test fixtures

Release the multipart source directory pin as soon as the upload head is
decoded during online index rebuild. On Windows the pin denies delete
sharing, so keeping it while indexing made a concurrent abort fail with a
sharing violation.

Align three test fixtures with Windows path and handle semantics:
- heal bucket pass targets use the endpoint string form, matching
  production disk endpoint identity;
- scanner erasure probe injection keys are normalized with path_join_buf
  so they match the scanner's lookup keys;
- the targets queue budget test changes mtime through a writable handle,
  which Windows requires.

* test(scanner): look up failed objects by the scanner's key form

The scanner records failed objects under keys built with path_join_buf,
which uses `/` separators on every platform. Three erasure probe tests
looked them up with a native `root.join(..)` path, so on Windows the
expected key never matched and the assertions failed. Build the expected
key the same way the scanner does; the assertions still require the exact
key to be present.
2026-11-11 10:39:00 -05:00
唐小鸭 7cfa5c3d28 fix(ecstore): name blocked migration records; port fixtures to Windows (#9261)
* test: bypass the disk independence check in path-only topology tests

These tests parse endpoints whose local paths are never created. Unix
leaves missing paths out of the physical-disk independence check, but
Windows resolves them to their volume, so every disk counted as one
shared device and the parsing assertions never ran. The check keeps its
own coverage in the dedicated shared-volume tests.

* fix(ecstore): name the target record when a migration write fails

The existence probe reports a blocked record with its path, but the
commit path returns bare disk errors. On Windows a regular file in the
record's place reads as missing, so migration only fails at the write,
and startup reported "File access denied" without naming the record.

* test: make app fixtures portable to native Windows

- Token- and cache-shaped keys use Windows-legal spellings at the same
  sort position, so pagination still runs without relaxing key admission.
- The TLS root test falls back to a directory junction only when a
  symlink needs a privilege the runner lacks, and asserts the root is a link.
- Snapshot timestamps step by 1 us, which Windows SystemTime can represent.
- The receiver disk URL uses a slash-led path instead of a raw drive path.
2026-11-11 10:38:01 -05:00
Chris An c44eebfe1c test(kms): use absolute fixture paths on Windows (#9274) 2026-11-11 10:35:54 -05:00
Chris An d62d63cdea test(sftp): match structured Windows host-key warning (#9273) 2026-11-11 10:35:00 -05:00
Chris An e5691e7d1a refactor(auth): share authorization core with owned entry points (#9281)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* refactor(auth): share authorization core with owned entry points

Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* fix(auth): keep owned authorization in the app layer and fail closed

Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.

* test(auth): move owned parity tests to the app layer

Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* test(auth): read storage-private parity facts through test accessors

The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.

* test(auth): owned and legacy entry points reach the same decisions

Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).

* test(auth): satisfy clippy on the parity test facade

* test(auth): report every decision mismatch in the parity matrix

* test(auth): cover multipart staging in the owned/legacy decision matrix

* fix(table-catalog): restore owned request lines the main merge reverted

The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.

* fix(auth): make an absent caller secret unrepresentable as a key

RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.

* fix(auth): keep the test-only credentials rebuild out of the lib build

* fix(app): drop the PutObjectInput re-export main now provides

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 09:43:29 -05:00
Chris An 46594e2dfd test(e2e): pinned release binary as differential reference side (#9285)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* test(e2e): allow a pinned release binary as differential reference side

RUSTFS_E2E_REFERENCE_BINARY makes side A of the dual-stack differential a released rustfs binary, started without RUSTFS_S3_STACK. A missing, non-file or non-executable path fails the run instead of falling back to the same-binary mode. The report records which side is the reference and each side's --version output.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* test(e2e): update smoke selection for reference-binary unit tests

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* chore: restore main's Cargo and baseline files after merging main

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 08:28:14 -05:00
Chris An 9fe0ff6d80 feat(gateway-adapter): audit refusals the gateway enforces (#9298)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(gateway-adapter): add IAM-backed CredentialProvider

Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).

- Pin rustfs-gateway at the existing gateway rev with
  default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
  adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
  is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
  legacy empty secret); IAM not ready or not initialized -> Unavailable;
  unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
  NotFound; other IAM errors -> Backend; invalid or "off" principals
  resolve disabled; STS credentials carry a SessionBinding, and an STS
  credential without an expiry is a Backend fault rather than a
  never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
  error text is dropped after classification.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* feat(gateway-adapter): add IAM-backed PolicySource

Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.

- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
  never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
  with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
  account's own secret for service accounts), and is_owner mirrors the
  legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* feat(gateway-adapter): add Observer and AuthzAuditSink adapters

Map the gateway's answered-request event onto the labels of
rustfs_s3_http_requests_total, bounded as the legacy counter bounds them,
and write one audit record per authorization decision (allow, deny and
indeterminate) in the shape of the legacy authorization-denial entry,
with the gateway's verified caller as accessKey.

Both adapters stop at RustFS-side sink traits. The legacy metric and
audit field names, with the file:line that emits each and the owner
that supplies it under the gateway, are committed as
tests/fixtures/observability-contract.json and held to the code.

* fix(gateway-adapter): share live root and refuse short secrets

Address the security review of the T2.1 adapters (rustfs/backlog#2760).

- Add RootCredentials (validated: root secret and STS signing key at
  least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
  RootCell. IamAdapters::new is now the only constructor of
  IamCredentials and IamPolicySource, so both read one live root source
  per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
  in the credential provider and DISABLED_PRINCIPAL in the policy
  source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
  instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
  accounts of root, the name live groups are read under, and another
  session's token.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* fix(gateway-adapter): effective secret length and unsplittable pair

Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).

- One rule for every secret: its length after trailing NUL bytes are
  removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
  so trailing NULs add nothing; interior NULs count. Applied to the root
  secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
  together through the consuming install(builder, make_authenticator);
  compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
  binary reads its live root accessor directly; RootCell is now a
  test-only helper.

* refactor(gateway-adapter): audit only refusals the gateway enforced

Drop the Observer adapter: request metrics stay with the outer tower
layer and the use-case code on both stacks, and the gateway already
logs every refusal it makes, so nothing is left for an observer to add.

Rework the AuthzAuditSink adapter to record only a Deny or
Indeterminate at an enforcing stage. An Allow and the GetObject
missing-object visibility probe produce no record. The audit switch
and the denial rate limiter are asked before a record is built, and
the record carries the legacy denial entry's fields only.

Remove the observability contract fixture and its tests.

* chore(gateway-adapter): drop the dependencies the observer needed

* docs(gateway-adapter): state what install guarantees about the provider handle

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 08:27:16 -05:00
Chris An 8125128d05 test(app): split lifecycle tests by owner and add use-case seams (#9316)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* test(app): add per-operation test seams for oracle use-case calls

* chore(codemods): add lifecycle transition test split codemod

* test(app): split lifecycle transition tests by operation owner

* test: call oracle use-cases through test seams in cross-owner tests

* ci: guard cross-owner tests to call use-cases through test seams

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 06:22:25 -05:00
Chris An ff84f2b5bf fix(ci): fix mint runner and Dockerfile.source rc arch (#9310)
* fix(ci): run the mint lane on ubuntu-latest, which has a Docker daemon

* fix(docker): let BuildKit populate TARGETARCH for the rc download

* fix(docker): derive the rc architecture when TARGETARCH is not set
2026-11-11 06:18:31 -05:00
Chris An def5418168 test(e2e): expect ServiceUnavailable for degraded ListParts after #9149 (#9313)
* test(e2e): expect ServiceUnavailable for degraded ListParts after #9149

PR #9149 made ServiceUnavailable the default API code for storage
read-quorum failures and limited SlowDownRead to GET/HEAD object reads.
ListParts maps its storage error through ApiError::from, so a degraded
ListParts now answers 503 ServiceUnavailable. The two distributed
acceptance cases still expected the previous SlowDownRead code and have
failed every nightly e2e-distributed run since 2026-11-05.

The 503 status and the fail-closed (non-empty-list) assertions are
unchanged; only the error code tracks the intended contract.

* style(e2e): apply rustfmt to the ListParts error-code assertion
2026-11-11 06:18:24 -05:00
Chris An 85f5cc9ead feat(gateway-adapter): host, bucket-owner and request-id adapters (#9289)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(gateway-adapter): add IAM-backed CredentialProvider

Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).

- Pin rustfs-gateway at the existing gateway rev with
  default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
  adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
  is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
  legacy empty secret); IAM not ready or not initialized -> Unavailable;
  unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
  NotFound; other IAM errors -> Backend; invalid or "off" principals
  resolve disabled; STS credentials carry a SessionBinding, and an STS
  credential without an expiry is a Backend fault rather than a
  never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
  error text is dropped after classification.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* feat(gateway-adapter): add IAM-backed PolicySource

Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.

- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
  never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
  with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
  account's own secret for service accounts), and is_owner mirrors the
  legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* feat(gateway-adapter): add host, bucket-owner and request-id adapters

* fix(gateway-adapter): avoid ecstore path in doc comment

* fix(gateway-adapter): keep the s3s path pattern out of docs

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* test(gateway-adapter): make the test carrier Clone for Extensions::insert

* fix(gateway-adapter): share live root and refuse short secrets

Address the security review of the T2.1 adapters (rustfs/backlog#2760).

- Add RootCredentials (validated: root secret and STS signing key at
  least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
  RootCell. IamAdapters::new is now the only constructor of
  IamCredentials and IamPolicySource, so both read one live root source
  per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
  in the credential provider and DISABLED_PRINCIPAL in the policy
  source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
  instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
  accounts of root, the name live groups are read under, and another
  session's token.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* fix(gateway-adapter): effective secret length and unsplittable pair

Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).

- One rule for every secret: its length after trailing NUL bytes are
  removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
  so trailing NULs add nothing; interior NULs count. Applied to the root
  secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
  together through the consuming install(builder, make_authenticator);
  compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
  binary reads its live root accessor directly; RootCell is now a
  test-only helper.

* test(gateway-adapter): use bucket names the rules accept in host tests

* refactor(gateway-adapter): never refuse on request id; owner is the reported constant

* docs(gateway-adapter): state what install guarantees about the provider handle

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 06:16:20 -05:00
hector 75292c6224 ci: add manual packaging of the origin/main tip (#9291)
Dispatch-only workflow that compiles the current main commit with a
caller-supplied version and uploads zip, deb, and rpm artifacts.

Co-authored-by: hector <majinghe@users.noreply.github.com>
2026-11-11 04:55:02 +00:00
Chris An 16e3071f84 feat(gateway-adapter): IAM CredentialProvider and PolicySource (#9284)
* feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411)

* refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)

Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734

* feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)

`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734

* ci: add the per-crate test-count ratchet (#8404)

Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734

* test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)

Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734

* ci: raise the test-count baseline to the integration tree (#8426)

* ci: make the s3s footprint baseline exact and lower-only (#8403)

* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734

* test(ecstore): reach the bucket-config codec through the test facade (#8428)

* refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)

Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734

* refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)

* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.

* ci(footprint): count only s3_error! lines still on s3s's macro

s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.

* test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)

Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)

* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface

* feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)

rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).

* refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* test(connect): restore one-second drive request budgets

Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.

* fix(test): compare legacy body wire parity as raw bytes

Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.

* fix: repair integration checks and IPC test readiness

Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.

* fix: remove redundant pending closure in disk test

Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.

* test(ecstore): isolate tier-free recovery fixture startup

The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.

* refactor(rpc): serve internode rpc bodies with the owned Body (#8441)

* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries

* fix(ecstore): bound bucket creation stack usage (#8466)

* fix(ecstore): retain creation fences through rollback

Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.

* fix(ecstore): box nested bucket rollback state

Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.

* test(ecstore): isolate rollback guard loss fixtures

Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.

* refactor(replication): move the replication config onto gateway types (#8443)

* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests

* fix(ci): restore integration test compilation

Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.

* fix(ecstore): recover delete batches with missing versions

Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired

* fix(ecstore): retry tier commit intent lock contention

Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.

* refactor(lifecycle): replace s3s domain types with Gateway DTOs

Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.

* refactor(admin): move error types to rustfs-s3-types (#8440)

* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.

* refactor(ecstore): move bucket configs onto gateway persisted types (#8709)

* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test

* refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)

Part of T1.5 (rustfs/backlog#2746), batch 1.

* refactor(s3select): run queries on gateway DTO request shapes (#8794)

* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.

* fix(heal): retry transient metadata conflicts (#8812)

* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline

* test: reserve nextest capacity for progress probes (#8818)

* test(e2e): use a non-default region for the differential negative control

Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).

* refactor(protocols): move StorageBackend to gateway types (#8825)

* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests

* fix(protocols): clear clippy failures after T1.5 merge (#8831)

fix(protocols): clear clippy failures after merge

* fix(ecstore): finalize restore metadata after local copy-back (#8836)

* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback

* refactor(storage): migrate option errors to domain types (#8839)

* refactor(s3): migrate private multipart validation errors (#8844)

* refactor(auth): derive policy conditions from AuthzFacts (#8442)

* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline

* refactor(admin): migrate health and prefix usage to owned requests (#8887)

* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request

* refactor(admin): complete the owned admin request boundary (#8949)

* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes

* refactor(admin): migrate identity and cluster handlers to owned requests (#8966)

* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.

* refactor(admin): drop the legacy target descriptor JSON response helper (#8968)

`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.

* test(ecstore): pin native history on cancellation under the cancellable queue

main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.

* chore(gateway): raise test-count rows for tests merged from main

* test(s3select): use the owned JSON input types in merged planner tests

* fix(ecstore): scope the merged direct-writer test hook to test builds

* fix(ecstore): create parents before admitted truncate opens

Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.

* chore(gateway): update test-count baseline after main sync

Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.

* feat(gateway-adapter): add IAM-backed CredentialProvider

Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).

- Pin rustfs-gateway at the existing gateway rev with
  default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
  adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
  is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
  legacy empty secret); IAM not ready or not initialized -> Unavailable;
  unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
  NotFound; other IAM errors -> Backend; invalid or "off" principals
  resolve disabled; STS credentials carry a SessionBinding, and an STS
  credential without an expiry is a Backend fault rather than a
  never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
  error text is dropped after classification.

* feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275)

* feat(gateway-adapter): add IAM-backed PolicySource

Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.

- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
  never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
  with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
  account's own secret for service accounts), and is_owner mirrors the
  legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.

* ci(gateway): make the test-count ratchet a floor, not exact (#9278)

ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.

* chore(gateway): record ignored microbenchmarks merged from main (#9290)

chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.

* fix(gateway-adapter): share live root and refuse short secrets

Address the security review of the T2.1 adapters (rustfs/backlog#2760).

- Add RootCredentials (validated: root secret and STS signing key at
  least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
  RootCell. IamAdapters::new is now the only constructor of
  IamCredentials and IamPolicySource, so both read one live root source
  per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
  in the credential provider and DISABLED_PRINCIPAL in the policy
  source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
  instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
  accounts of root, the name live groups are read under, and another
  session's token.

* ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288)

* fix(gateway-adapter): effective secret length and unsplittable pair

Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).

- One rule for every secret: its length after trailing NUL bytes are
  removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
  so trailing NULs add nothing; interior NULs count. Applied to the root
  secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
  together through the consuming install(builder, make_authenticator);
  compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
  binary reads its live root accessor directly; RootCell is now a
  test-only helper.

* docs(gateway-adapter): state what install guarantees about the provider handle

---------

Co-authored-by: rustfs-cla-assistant[bot] <273121464+rustfs-cla-assistant[bot]@users.noreply.github.com>
2026-11-11 04:29:40 -05:00
Chris An 04bcb57e6a fix(ecstore): pin multipart index markers while their root is published (#9318)
A multipart index marker is recorded before its staging root is published, and a listing prunes markers whose root is gone. The window in between was covered by a five-minute age check, which cannot prove that the publisher's filesystem work has ended: a publisher stalled past it lost its marker, and the upload it then published stayed out of ListMultipartUploads on that drive until restart.

The publisher now holds an in-memory publication pin from before it records the marker until the filesystem work that publishes the root has returned. The pin travels with that work (the blocking closure or the lease owner chain), so it also covers work that outlives a cancelled caller. Pruning reads the pin first and the staging root second, under the marker lease. The age check and the per-write marker touch are removed.
2026-11-11 03:22:46 -05:00
Chris An 31e1e42ad7 refactor: land the s3s decoupling groundwork on main (#9276)
Lands gateway/integration on main: the guard rails and the domain
decoupling for replacing s3s with rustfs/gateway (rustfs/backlog#2734,
Phase 0 and Phase 1). The S3 edge is still s3s and no wire behaviour
change is intended.

- Guard rails: lower-only s3s footprint baseline and edge allow-list,
  per-crate test-count floor, 39 byte-level goldens for the persisted
  bucket-config XML families, a two-server differential harness over
  all 73 S3 operations, a JUnit differ, and a reference-parity lane
  against the sha256-pinned 1.0.5 binary.
- Owned types: rustfs-s3-types (S3Error, S3ErrorCode, Body),
  RequestEnvelope, AuthzFacts.
- Engine crates off s3s: ecstore, lifecycle, replication, scanner,
  protocols, s3select, s3-client, rpc.
- Admin: error types moved; 300 of 314 Operation impls take the owned
  AdminRequest.
- Server: the s3s-compat tower layers grouped under
  server/legacy_compat; RUSTFS_S3_STACK=legacy|gateway selector, where
  gateway refuses to start until the gateway edge exists.

Fixes made on the branch that change ecstore and heal behaviour are
listed in the pull request description. The per-commit history stays
on gateway/integration.
2026-11-11 02:39:52 -05:00
Chris An 0e402b2534 fix(scanner): retain child objects beneath object prefixes (#9277) 2026-11-11 14:36:53 +08:00
Chris An db39cd5634 fix(ecstore): let missing-key deletes complete on UUID-named folders (#9280)
* fix(ecstore): let missing-key deletes complete on UUID-named folders

Deleting a key that does not exist probes the key's directory for
interrupted delete transactions. The probe was bounded at 4096 entries
per drive and charged every entry inside a UUID-named child, so a key
naming a folder of roughly 1,400 or more UUID-named child keys answered
503 SlowDown on every retry.

Inside a UUID-named child only journal files and data-directory markers
can be evidence, so every other name (a child key's own xl.meta, data
directories or children) is now skipped unread at 1/64 like plain
children of the folder. The per-call allowance of the bounded protocol
rises to 262,144 entries per drive; the resumable background step keeps
4096 and the request budget keeps its sizing, so the per-request total
is unchanged. The probe runs on the durable-mutation lane instead of
the one-worker foreground lane, and stops incomplete when its caller
goes away or after a third of the drive timeout (at most 10 s), so a
slow walk answers SlowDown instead of timing out the drive.

* test(ecstore): keep discovery fixtures meaningful under 1/64 charging

Part files inside a data directory are inert to object-scoped discovery
now, so reclaim_orphan_data_dirs_drains_empty_discovery_pages fills its
first step with the referenced data directories of many versions, which
still cost a full entry each. The charging test drives the walk directly
instead of through the wall-clock-limited disk entry point, so a loaded
machine cannot turn it into an incomplete probe.
2026-11-10 23:24:50 -05:00
Ramakrishna Chilaka 89d01aef4f perf(ecstore): reduce syscalls and directory re-opens in PUT and DELETE (#9264)
Co-authored-by: RustFS <hello@rustfs.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
2026-11-11 00:06:11 +00:00
dependabot[bot] 86c3395d07 chore(deps): bump the dependencies group across 1 directory with 12 updates (#9251)
Bumps the dependencies group with 12 updates in the / directory:

| Package | From | To |
| --- | --- | --- |
| [async-nats](https://github.com/nats-io/nats.rs) | `0.51.0` | `0.52.0` |
| [tar-codec](https://github.com/astral-sh/astral-codec) | `0.0.15` | `0.0.16` |
| [tar-framing](https://github.com/astral-sh/astral-codec) | `0.0.15` | `0.0.16` |
| [flate2](https://github.com/rust-lang/flate2-rs) | `1.1.10` | `1.1.11` |
| [smallvec](https://github.com/servo/rust-smallvec) | `1.16.4` | `1.16.5` |
| [starshard](https://github.com/houseme/starshard) | `2.4.0` | `2.4.1` |
| [zip](https://github.com/zip-rs/zip2) | `9.3.0` | `9.4.1` |
| [dial9](https://github.com/dial9-rs/dial9) | `0.5.7` | `0.5.8` |
| [rustfs-mimalloc](https://github.com/houseme/rustfs-mimalloc) | `0.7.3` | `0.7.4` |
| [hotpath](https://github.com/hotpath-rs/hotpath) | `0.30.3` | `0.31.1` |
| [rustfs-mimalloc-sys](https://github.com/houseme/rustfs-mimalloc) | `0.7.3` | `0.7.4` |
| [toml](https://github.com/toml-rs/toml) | `1.2.0+spec-1.1.0` | `1.2.1+spec-1.1.0` |



Updates `async-nats` from 0.51.0 to 0.52.0
- [Release notes](https://github.com/nats-io/nats.rs/releases)
- [Commits](https://github.com/nats-io/nats.rs/compare/async-nats/v0.51.0...async-nats/v0.52.0)

Updates `tar-codec` from 0.0.15 to 0.0.16
- [Release notes](https://github.com/astral-sh/astral-codec/releases)
- [Commits](https://github.com/astral-sh/astral-codec/compare/v0.0.15...v0.0.16)

Updates `tar-framing` from 0.0.15 to 0.0.16
- [Release notes](https://github.com/astral-sh/astral-codec/releases)
- [Commits](https://github.com/astral-sh/astral-codec/compare/v0.0.15...v0.0.16)

Updates `flate2` from 1.1.10 to 1.1.11
- [Release notes](https://github.com/rust-lang/flate2-rs/releases)
- [Changelog](https://github.com/rust-lang/flate2-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/rust-lang/flate2-rs/compare/1.1.10...v1.1.11)

Updates `smallvec` from 1.16.4 to 1.16.5
- [Release notes](https://github.com/servo/rust-smallvec/releases)
- [Commits](https://github.com/servo/rust-smallvec/compare/v1.16.4...v1.16.5)

Updates `starshard` from 2.4.0 to 2.4.1
- [Changelog](https://github.com/houseme/starshard/blob/main/CHANGELOG.md)
- [Commits](https://github.com/houseme/starshard/compare/2.4.0...2.4.1)

Updates `zip` from 9.3.0 to 9.4.1
- [Release notes](https://github.com/zip-rs/zip2/releases)
- [Changelog](https://github.com/zip-rs/zip2/blob/master/CHANGELOG.md)
- [Commits](https://github.com/zip-rs/zip2/compare/v9.3.0...v9.4.1)

Updates `dial9` from 0.5.7 to 0.5.8
- [Release notes](https://github.com/dial9-rs/dial9/releases)
- [Changelog](https://github.com/dial9-rs/dial9/blob/main/CHANGELOG.md)
- [Commits](https://github.com/dial9-rs/dial9/compare/dial9-v0.5.7...dial9-v0.5.8)

Updates `rustfs-mimalloc` from 0.7.3 to 0.7.4
- [Release notes](https://github.com/houseme/rustfs-mimalloc/releases)
- [Changelog](https://github.com/houseme/rustfs-mimalloc/blob/main/CHANGELOG.md)
- [Commits](https://github.com/houseme/rustfs-mimalloc/compare/v0.7.3...v0.7.4)

Updates `hotpath` from 0.30.3 to 0.31.1
- [Release notes](https://github.com/hotpath-rs/hotpath/releases)
- [Changelog](https://github.com/hotpath-rs/hotpath/blob/main/CHANGELOG.md)
- [Commits](https://github.com/hotpath-rs/hotpath/compare/v0.30.3...v0.31.1)

Updates `rustfs-mimalloc-sys` from 0.7.3 to 0.7.4
- [Release notes](https://github.com/houseme/rustfs-mimalloc/releases)
- [Changelog](https://github.com/houseme/rustfs-mimalloc/blob/main/CHANGELOG.md)
- [Commits](https://github.com/houseme/rustfs-mimalloc/compare/v0.7.3...v0.7.4)

Updates `toml` from 1.2.0+spec-1.1.0 to 1.2.1+spec-1.1.0
- [Commits](https://github.com/toml-rs/toml/compare/toml-v1.2.0...toml-v1.2.1)

---
updated-dependencies:
- dependency-name: async-nats
  dependency-version: 0.52.0
  dependency-type: direct:production
  update-type: version-update:semver-minor
  dependency-group: dependencies
- dependency-name: tar-codec
  dependency-version: 0.0.16
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: tar-framing
  dependency-version: 0.0.16
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: flate2
  dependency-version: 1.1.11
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: smallvec
  dependency-version: 1.16.5
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: starshard
  dependency-version: 2.4.1
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: zip
  dependency-version: 9.4.1
  dependency-type: direct:production
  update-type: version-update:semver-minor
  dependency-group: dependencies
- dependency-name: dial9
  dependency-version: 0.5.8
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: rustfs-mimalloc
  dependency-version: 0.7.4
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: hotpath
  dependency-version: 0.31.1
  dependency-type: direct:production
  update-type: version-update:semver-minor
  dependency-group: dependencies
- dependency-name: rustfs-mimalloc-sys
  dependency-version: 0.7.4
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: toml
  dependency-version: 1.2.1+spec-1.1.0
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
2026-11-11 00:04:47 +00:00
cxymds c9743f166e fix(s3): normalize leading-slash keys in bulk deletes (#9258)
* fix(s3): normalize leading-slash keys in bulk deletes

* test(s3): align bulk delete reserved-prefix guard expectations
2026-11-10 17:56:00 -05:00
Boyi (Elliot) Li 50707a610c test(utils,rio,checksums): add checksum SIMD equivalence and bench UTs (#9217)
Add unaligned-boundary SIMD vs scalar equivalence unit tests and on-demand (#[ignore]) utility-level throughput microbenchmarks across rustfs-utils, rustfs-rio, and rustfs-checksums:
- crates/utils/src/hash.rs: verify HighwayHasher SIMD (AVX2/SSE4.1/NEON) against highway::PortableHash scalar reference and contiguous hash_encode vs odd-chunked hash_encode_slices across unaligned tail boundaries; provide on-demand throughput microbenchmark.
- crates/rio/src/checksum.rs: verify SIMD-accelerated CRC32, CRC32C, and CRC64_NVME against bitwise scalar reference implementations across vector tail boundaries and measure utility-level throughput across all 10 BASE_CHECKSUM_TYPES.
- crates/checksums/src/lib.rs: verify streaming chunked update + finalize + headers() against one-shot digests across all 9 ChecksumAlgorithm variants for unaligned chunk and payload sizes, plus on-demand throughput microbenchmark.
2026-11-10 17:54:11 -05:00
Patrick Wicki ba3e0e1546 fix(admin): keep measured bucket usage when the overlay is unconverged (#9243)
The single-process usage overlay clears usage_snapshot_complete when it
holds counts it cannot reconcile with the persisted snapshot, for
example writes into a bucket that has no verified baseline. The admin
datausageinfo path then judged the overlaid document as structurally
incomplete and replaced it with an empty one, hiding every bucket the
scanner had measured. Because each write restarts that bucket's scanner
fence, a continuously written bucket kept the whole response empty
indefinitely.

Decide whether the persisted snapshot is usable before the overlay is
applied, and report overlay-induced incompleteness as a non-converged
snapshot instead, as is already done for buckets the scan never reached
(rustfs#5806).
2026-11-10 17:52:06 -05:00
Chris An 95e128336d ci: narrow checks for stable installation metadata (#9269)
* ci: narrow checks for stable installation metadata

* fix: reject release metadata marker collisions
2026-11-10 16:10:04 -05:00
Chris An 8b7bbdb17d chore(release): align installation references for 1.0.5 (#9268) 2026-11-10 14:48:02 -05:00
Chris An 2780bba67b ci: stage release builds and promote verified artifacts (#9265)
* ci: stage release builds and promote verified artifacts

* fix: preserve release package and channel retry contracts

* fix: align installation chart versions with sealed candidates
2026-11-10 13:15:05 -05:00
hector 3a23122104 ci: run macOS release builds on macos-latest-xlarge (#9260)
Use the larger GitHub-hosted macOS runner for the macos-aarch64
release target. The target id, triple, and other platforms stay the same.

Co-authored-by: hector <majinghe@users.noreply.github.com>
2026-11-10 18:55:19 +08:00
Ramakrishna Chilaka 0b1ebeffec perf(ecstore): reduce syscalls in multipart copy, commit, and delete (#9247) 2026-11-10 12:27:10 +08:00
Chris An 0f9258594c fix: preserve scanner backlog authority after pool replacement (#9252)
* fix(ecstore): allow bucket creation after failed decommission

* fix(scanner): preserve backlog membership across pool reindexing

* test(scanner): cover partial publication after pool reindexing
2026-11-09 20:46:20 -05:00
Chris An 33fc735ee2 chore(release): prepare 1.0.5 (#9249) 2026-11-09 17:19:35 -05:00
Chris An 509869cfc5 fix(tier): recover orphaned prepared mutations (#9246) 2026-11-09 22:18:14 +08:00
Ramakrishna Chilaka 395876ccd0 fix(ecstore): remove hardlinked backup during delete rollback (#9239)
When a fused recoverable delete is interrupted after publishing the transaction directory and before updating xl.meta, xl.meta and <transaction>/xl.meta.bkp remain hardlinks to the same inode. Under POSIX rename semantics, renaming xl.meta.bkp over xl.meta during rollback succeeds as a no-op without unlinking xl.meta.bkp, which leaves xl.meta.bkp in the transaction directory after journal removal and strands the transaction in DeleteRecoveryState::LegacyAmbiguous.

Unlink xl.meta.bkp after syncing the restored object directory and before syncing the rollback directory and removing journal markers, and extend delete_recovery_fused_prepare_checkpoint_reopens_before_head_publication to preserve the hardlink and verify rollback completion and retry.
2026-11-09 06:41:04 +08:00
Chris An 6083fbbeea fix(catalog): enumerate table owners without skipping namespaces (#9242) 2026-11-09 06:38:58 +08:00
Chris An 42d3267d88 fix(ecstore): decouple pool metadata health from the authority gate (#9241)
* fix(ecstore): share immutable pool metadata authority reads

* fix(ecstore): read pool metadata authority without the save gate

Health inferred pool metadata write authority from acquiring the local
authority gate within 100 ms. Sharing the gate among read-only
admissions still left held writers, and writers queued behind a reader
parked on the pool.bin fence, turning into cluster-write 503s.

Each writer now publishes the authority it leaves before releasing the
gate, and health reads that published state without acquiring it.
Transaction latches stay shared with the published copy; recovery
clears the latch and its failure under one lock so inspection never
observes a half-cleared state. The inspection-timeout path that can no
longer occur (check_timed_out, the check_timeout admin state, the
pool_metadata_check_timeout reason, the node timeout cache and its
metric) is removed.
2026-11-09 06:38:30 +08:00
Chris An 1d35e381b7 fix(rpc): bound replay memory and atomically admit signed requests (#9238)
* fix(rpc): index nonce expiry by signed validity

* fix(rpc): size replay cache from allocated storage layout

* fix(rpc): make replay admission atomic and release expired tables

* fix(rpc): preserve replay admission refusal at the S3 boundary
2026-11-09 06:36:55 +08:00
Chris An 0b109b4885 fix(select): bound LZ4 scratch and Arrow schema expansion (#9237)
* fix(select): admit legacy and linked LZ4 working memory

* fix(select): bound embedded Arrow schema expansion
2026-11-09 06:36:44 +08:00
cxymds 1dea00ffa7 ci: repair e2e selection and verify tool downloads via API (#9240)
* ci: align full e2e selection with retired catalog test

* ci: verify pinned tools through GitHub release asset API

* ci: fetch pinned typos through the release asset API

* ci: download pinned actionlint through the release asset API

* ci: ensure GitHub CLI exists before pinned mc download

* ci: budget full quick checks after tool installation
2026-11-08 14:09:26 +00:00
cxymds addf7a6219 fix: reduce scanner backoff and classify downstream closures (#9235) 2026-11-08 02:18:17 -05:00
Ramakrishna Chilaka 420cf32b2a perf(ecstore): optimize PUT, DELETE, and multipart commit hotpaths (#9227) 2026-11-08 02:12:40 -05:00
Chris An 907410b2f5 fix(select): bound Parquet allocations before decoding (#9231) 2026-11-08 01:36:12 -05:00
Chris An f10079f1a3 fix(rpc): size and reserve replay cache for compact entries (#9233) 2026-11-08 01:35:58 -05:00
Chris An a6c3016493 fix(cache): respect process cgroup memory limits (#9232) 2026-11-08 01:35:49 -05:00
Hauser Zhi 68fb52b752 chore(deps): update flake.lock (#9236) 2026-11-08 01:34:01 -05:00
cxymds 16f618d41b fix: correct scanner pacing and unverified MRF outcomes (#9225)
Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-11-08 06:48:25 +08:00
Henry Guo 565d262ede refactor(table-catalog): retire durable-strong backing (#9130)
* refactor(table-catalog): retire durable-strong backing

* fix(table-catalog): avoid backup locks during S3 authorization

* fix(table-catalog): preserve directory and maintenance behavior

* fix(table-catalog): back up retained v1 snapshot history

* test(table-catalog): cover retained v1 backup recovery

Exercise backup inventory sealing and restore after a v1-to-v2 upgrade, including missing or corrupt references, nonzero inline snapshot sequences, v2 manifests in retained v1 history, and unchanged commit admission rules.

Clarify when direct maintenance can replace reports and discard retry budgets, and require quiescing scheduler admission and workers before invocation.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Chris An <anzhengchao@gmail.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-08 05:03:55 +08:00
Chris An 7b010ddd70 fix(ci,ecstore): restore validation and defer capacity exhaustion (#9223) 2026-11-07 15:17:25 -05:00
Chris An 272b6587e0 fix(ci): bound workspace archive builds to two workers (#9222) 2026-11-07 06:32:41 -05:00
Chris An e3ed2cf2f4 fix(decommission): reserve owned source usage during activation (#9220) 2026-11-07 01:49:42 -05:00
Chris An bf03b1117a fix(swift): preserve bucket metadata with Swift tag values (#9218) 2026-11-07 01:49:12 -05:00
Boyi (Elliot) Li c3fe0f9649 test(rio,ecstore): add negative-branch durability unit tests (#9216)
Expand positive and negative branch unit test coverage across durability-critical modules:
- crates/rio/src/checksum.rs: Checksum::matches (unset hasher, multipart want_parts mismatch, digest mismatch), new_with_type, as_map, obj_type, from_header, add_part (CRC32/CRC32C/CRC64_NVME combine + error branches), and get_content_checksum header validation.
- crates/rio/src/hash_reader.rs: HashReader::new wrapping invariants (already-read inner reader, conflicting MD5 checksum, conflicting positive size, unbounded size propagation) and checksum helper error paths.
- crates/ecstore/src/set_disk/ops/bitrot_self_verify.rs: verify_written_bitrot_shards missing inline data, missing disk shard, and under-quorum rejection.
- crates/ecstore/src/erasure/coding/encode.rs: read_full_buf_or_eof immediate read error, InvalidData preservation after partial fill, and UnexpectedEof normalization.
- crates/ecstore/src/io_support/shard_integrity.rs: ShardVerifier out-of-bounds coding_index, empty proof sources fail-closed, and spilled (>1 MiB) index disk write + verify_index_file + restore_proof_replicas round-trip and all-corrupt fail-closed boundary.
- crates/ecstore/src/services/integrity/tests.rs: JobRequest::validate boundary/format checks with exact error messages and model::protection / model::unsupported classifications.
2026-11-07 02:38:43 +00:00
唐小鸭 6e31f6a183 fix(ecstore): complete and abort native multipart uploads on Windows (#9191) 2026-11-06 22:36:16 -05:00
Hauser Zhi d66d144309 feat(observability): record unary read RPC durations (#9202)
* feat(observability): record unary read RPC durations

Record complete server-side durations for ReadMultiple and BatchReadVersion, including error and cancellation paths.\n\nCo-Authored-By: heihutu <heihutu@gmail.com>\nCo-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(observability): cover unary duration handlers

Exercise ReadMultiple and BatchReadVersion missing-disk paths and assert operation duration histograms.\n\nCo-Authored-By: heihutu <heihutu@gmail.com>\nCo-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(observability): cache unary read RPC duration handles

Reuse cached duration histograms for ReadMultiple and BatchReadVersion once
the stable server label is available. Preserve the existing ReadVersion
handle and the fallback for other operations and backends.

Add an integration regression for handle reuse, startup fallback, labels,
and recorded values using the production cache path.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(observability): separate server duration from client RTT

Record unary ReadMultiple and BatchReadVersion handler lifetimes in a
separate server duration histogram while preserving existing client RTT
series and allocation-free cached handles for both measurements.

Cover client/server sample separation, cache reuse, startup and backend
fallbacks, and missing-disk handlers. Document the new server metric.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-11-07 09:16:18 +08:00
cxymds 150836d707 feat(tier): support native Azure Blob endpoints (#9200)
* feat(tier): support native Azure Blob endpoints

* fix(tier): guard Azure version cleanup and prefix limits

* fix(tier): preserve Azure quoted headers and document version gate

* fix(tier): handle Azure forbidden current-version deletion

* test(tier): control transition commit lock failure timing
2026-11-07 09:16:06 +08:00
Henry Guo e4057b6746 fix(table-catalog): reject storage credentials for catalog access (#9185)
* fix(table-catalog): reject storage credentials for catalog access

* fix(table-catalog): avoid growing the s3s error macro footprint

Use the existing S3Error constructor for the storage-credential rejection
while preserving its AccessDenied code and message. Keep the merged PR
within the current s3s footprint baseline without relaxing the guard.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-11-07 08:07:58 +08:00
Hauser Zhi cfdd705b62 fix(cors): preserve readiness and complete cache selectors (#9207)
Use a direct response future for originless requests and forward through
the polled-ready service. Nominate every retained CORS header input and
transfer evaluated headers without rebuilding the map.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-07 08:07:04 +08:00
Hauser Zhi a1d0fa41d0 fix: preserve usage generations and unify request tracing (#9204)
* fix(ecstore): prevent cached usage snapshot rollback

Order refreshed snapshots by their authoritative lineage before replacing cached usage. Share the rule with early bucket refreshes while retaining quota baselines, invalidation fencing, legitimate deletions, and clock recovery.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(server): skip trace propagation for disabled RPC spans

Avoid extracting and assigning a remote parent when RPC tracing is disabled after authentication and admission. Cover disabled logging and the production HTTP span propagation path.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): preserve usage ordering across refresh recovery

Retain the last good snapshot independently of negative-cache status. Order observations within the same authoritative baseline by their own coordinated epoch and cycle before wall time, including clock rollback and recovery. Capture persisted baseline identity without cloning its bucket maps.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(server): centralize request trace propagation

Let the HTTP span factory own parent extraction and assignment. Use actual span filtering, preserve span-only subscribers, and remove repeated tracing work from RPC authentication.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-07 08:06:47 +08:00
Chris An 7d4982f206 fix(storage): fence bounded deletes during rolling upgrades (#9214) 2026-11-07 08:06:28 +08:00
Chris An 1a7fb2461d fix(webdav): join connection and reload tasks on shutdown (#9213) 2026-11-07 08:06:14 +08:00
Chris An e1b9d1cb94 fix(ecstore): preserve ownership across multi-pool recovery (#9212) 2026-11-07 08:06:04 +08:00
Chris An 85313fc06f fix(runtime): release retained replay and allocator memory (#9211) 2026-11-07 08:05:46 +08:00
cxymds b5f3207378 fix(lock): preserve acquisition progress during multipart uploads (#9209)
* fix(lock): retain slow responses within the quorum deadline

* fix(lock): retain partial quorum timeout diagnostics

* fix(lock): avoid guard registry scheduling convoys

* chore(ecstore): trace metadata transaction lock purposes

* fix(scanner): keep capability probes on read fences

* fix(lock): preserve renewal and contention progress
2026-11-07 08:05:26 +08:00
Hauser Zhi 5490e493ab fix(s3): retain protected multipart ETags in object listings (#9208)
* fix(s3): retain protected multipart ETags in object listings

Record encrypted part ETag provenance, aggregate it at read quorum, and attest completed multipart ETags for keyless listings. Preserve legacy fingerprint protection and test versioned SSE-KMS and SSE-C upload, listing, and replay paths.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(s3): stream multipart ETag aggregation

Restore the preserved ETag fast path when selected parts lack protected provenance. Stream native part digests through a fixed stack buffer, preserve legacy hex-or-raw semantics, and strengthen exact-output and override regression coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): preserve encrypted ETag proof during data movement

Capture quorum-backed source proof before multipart completion metadata updates, require exact preserved ETag and version identity, and retain proof only when publication keeps the source version. Cover real two-pool rebalance, null versions, legacy sources, and injected or rewritten identities.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): retain encrypted multipart ETag proof on restore

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-11-07 08:04:54 +08:00
Hauser Zhi 134820c1e0 test(storage): reproduce HTTPS rejoin readiness in Docker (#9206)
* test(storage): reproduce HTTPS rejoin readiness in Docker

Compare cluster-only and node-ready/write gates on immutable native binaries. Preserve first-failure and latest-acknowledged-content evidence across recovery, capture lock diagnostics before restart, and limit cleanup to verified owned resources.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(testing): unify Docker repro ownership and controls

Use typed resource absence and one verified container inventory for staging, partial setup and retained nodes. Reject inherited experiment overrides before creating resources and remove duplicated state.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(testing): guard staging volumes and interrupted capture

Verify volume ownership before privileged staging and disable implicit image-content copying. Preserve failed evidence and continue owned finalization when capture or cleanup is interrupted.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(testing): capture live rejoin logs and verify trace coverage

Read live tmpfs logs inside the verified container and use one explicit stdout sink for diagnostics. Record bounded capture provenance and fail diagnostic coverage when acquisition, guard-drop or physical-release records are missing, without masking HTTP failures.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(testing): reject inherited aliases and finalize on SIGTERM

Reject inherited MINIO compatibility settings before Docker resource creation. Route SIGTERM through interrupt-aware finalization and restore the previous handler after each run. Cover real process signals and failure preservation.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(testing): normalize legacy controls and termination

Reject inherited MINIO compatibility aliases in neutral runtime images. Bridge run-mode SIGTERM into the existing interruption finalization and restore the caller signal handler on return or exception.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-07 08:04:28 +08:00
Chris An 2b9217b6f9 test(e2e): fix quota and conditional write fixtures (#9210) 2026-11-07 08:03:00 +08:00
Hauser Zhi 70a46d0e8c fix(webdav): support configured browser CORS access (#9205)
* fix(webdav): support configured browser CORS access

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Signed-off-by: Hauser Zhi <housemecn@gmail.com>

* perf(webdav): streamline CORS policy and preflight parsing

Borrow connection-owned policy state and clone the backend only for actual requests. Validate borrowed header names and normalize HTTP lists when required.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Signed-off-by: Hauser Zhi <housemecn@gmail.com>

---------

Signed-off-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 14:01:06 -05:00
Hauser Zhi a910ef0dd0 fix(cors): isolate cache variants and streamline policy evaluation (#9203)
Apply cache variation at the shared response boundary, preserve existing
Vary selectors, and reuse parsed global policy and compact CORS inputs.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 12:40:11 -05:00
Chris An 430ade191f fix(scanner): bound wide bucket-root fanout memory (#9193)
* fix(scanner): bound wide bucket-root fanout memory (#8961)

Root prefixes were excluded from ordinary compaction and force_compact only
flattened the root above a hardcoded 250k child ceiling, so buckets with
tens of thousands of top-level prefixes kept one cache entry each after
#8971. Compact wide roots outside checkpointed forward sweeps, and honor
force_compact's limit for root fanout.

* fix(scanner): keep root fanout on interrupted force_compact

Interrupted sweeps seal a resume frontier after force_compact. Applying
the ordinary 10k root limit there flattened frontier-named children and
made the next cycle replay completed prefixes. Use the emergency FORCE
ceiling on the interrupted path; successful completions still honor the
ordinary limit. Drop clippy assertions_on_constants in the new tests.

Signed-off-by: Chris An <anzhengchao@gmail.com>

* test(scanner): seal reloaded frontier after interrupted compaction

Const assertions keep the wide-root preconditions without tripping
clippy::assertions_on_constants. The interrupted and finished sweep
paths share one limit helper, and a cache wider than the ordinary
10k limit still seals its frontier child after reload.

Co-authored-by: Chris An <overtrue@users.noreply.github.com>

* fix(scanner): isolate unreadable children during root compaction

* fix(scanner): isolate compacted namespace child errors

* fix(scanner): preserve compacted scan accounting and coverage

Commit isolated namespace child usage only after successful traversal, while retaining completed accounting on cancellation and resource deferral. Synchronize reduced root totals before the cancellation-prone flush boundary.

Treat skipped namespaces as incomplete coverage and invalidate legacy sampling baselines until a fresh verification pass succeeds. Keep provisional usage out of progress updates and retain the upstream symlink regression.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): preserve legacy retry coverage

* test(scanner): regress cancel overwrite after wide-root reduce

houseme's 714f590 already refreshes the root accumulator from the
compacted cache entry before flush_pacing. Add a unit regression that
simulates the interrupt replace_hashed path so a future regression
cannot reintroduce dangling child links over the aggregate.

Signed-off-by: overtrue <anzhengchao@gmail.com>

---------

Signed-off-by: Chris An <anzhengchao@gmail.com>
Signed-off-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: Cursor Agent <cursoragent@cursor.com>
Co-authored-by: Chris An <overtrue@users.noreply.github.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 12:36:25 -05:00
Hauser Zhi c5b15b7279 fix(container): unify directory setup and startup diagnostics (#9201)
* fix(container): explain log directory initialization failures

Report failed log directory creation with ownership guidance and a Compose quote hint while preserving configured values. Add a corrected example and real entrypoint regression coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(container): unify startup directory preparation

Share directory creation, diagnostics, and best-effort ownership across data and log paths. Skip delimiter and regex subprocesses for ordinary volume paths without introducing a second parser. Expand real-entrypoint coverage for ownership, failures, delimiters, distributed ranges, and setup command counts.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 11:49:09 -05:00
cxymds 2a6da8208b fix(lock): converge cleanup after lost release acknowledgements (#9199)
* fix(lock): converge cleanup after lost release acknowledgements

* fix(log-analyzer): track updated unlock cleanup logs

* test(lock): align clocks in unlock cleanup regression
2026-11-06 10:40:28 -05:00
cxymds 93b704420f fix(ecstore): preserve multipart shards within write budgets (#9197) 2026-11-06 10:37:24 -05:00
Ramakrishna Chilaka dfd4d3e213 perf(ecstore): fuse overwrite commits and optimize delete recovery (#9194) 2026-11-06 03:32:34 -05:00
Hauser Zhi 1c1baa6b08 fix(observability): avoid duplicate process metric labels (#9182) 2026-11-05 23:07:02 -05:00
Chris An 0147b8671d ci: bump overtrue/cla-bot to v0.1.1 (#9189)
Co-authored-by: cursoragent <cursoragent@users.noreply.github.com>
2026-11-06 07:01:52 +08:00
Hauser Zhi 8cd751f9d1 feat(ecstore): record unary gRPC operation duration (#9187)
Record end-to-end durations for ReadAll, WriteAll, ReadMultiple, and BatchReadVersion alongside existing request, error, and payload metrics. This makes direct unary payload ABBA results observable through the internode operation duration family.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 07:01:38 +08:00
Hauser Zhi 5ea2991850 fix(ecstore): retry failed internode channel prewarm (#9186)
Release the per-peer prewarm deduplication marker when the best-effort dial fails, allowing a later RemoteDisk construction to retry the connection warmup without changing lazy connect fallback behavior.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 07:01:26 +08:00
Chris An 1556e05b8a fix(sftp): put directory objects as trailing-slash keys (#9180)
SFTP subdirectory mkdir and rmdir sent the on-disk __XLDIR__ marker
through the public S3 API. After the suffix was reserved, those calls
were rejected as invalid client keys, so ordinary directory operations
failed while bucket mkdir still succeeded.

Send the logical trailing-slash key and let storage encode the marker.

Co-authored-by: Cursor Agent <cursoragent@cursor.com>
Co-authored-by: Chris An <overtrue@users.noreply.github.com>
2026-11-06 07:00:58 +08:00
Hauser Zhi 32238a179c fix(server): bound rejoin waits and preserve recovery ownership (#9181)
* test(server): cover recovered-node admission boundaries

Document backend readiness and write-availability checks during rejoin.
Extend the existing regression through the production middleware order
without changing runtime admission or cluster-quorum semantics.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(server): bound rejoin waits and preserve recovery ownership

Enforce startup and unreachable-grace bounds while consuming peer replies.
Release admission when every set has its required peer majority and cancel
surplus read-only probes without carrying votes between rounds.

Bound local readiness observations and polling sleeps. Retain initialized
IAM across preparation failures, install the context once, and retry only
publication after readiness timeouts. Share preparation with inline startup.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(server): make peer admission folding incremental

Compile peer-to-set memberships once and retain compact per-edge votes.
Consume each reply once, discard its payload, and update only affected
set counters instead of rescanning all sets and retained responses.

Recheck the captured deadline after polling and folding a reply so late
work cannot admit the node or clear an expired unreachable grace period.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-06 07:00:36 +08:00
Chris An 6b70584dde chore(ci): bump overtrue/cla-bot to v0.1.0 (#9188)
Pin CLA Check to f054da99 (v0.1.0) so built-in bot allowlist skips
cursoragent, Dependabot, GitHub Actions, Renovate, and Copilot without
requiring a CLA signature.

Co-authored-by: cursoragent <cursoragent@users.noreply.github.com>
2026-11-05 23:54:13 +08:00
Chris An d6210ac17b fix(s3,ecstore,table-catalog): bound work driven by client input (#9172)
* fix(ecstore,heal,select): bound storage-layer work driven by client input

Scan findings in the erasure store, heal, file metadata and S3 Select
layers, grouped because they share the disk walk, the multipart staging
area, delete recovery and the select snapshot lease:

- Multipart: upload ids are canonicalized before they name a staging path
  or a lock key (backlog#3027); trailing-slash keys are encoded like every
  other handler (backlog#3055); unlisted parts are removed at completion
  (backlog#3106); per-bucket uploads are found through a signed per-disk
  index instead of a scan of the shared staging area (backlog#3121);
  encrypted part ETags carry a per-upload secret so a write-only user
  cannot confirm plaintext guesses (backlog#3044).
- Delete and recovery: recovery walks are bounded per request
  (backlog#3038); a delete marker on a key whose xl.meta path is a
  directory, and sidecar names used as child keys, no longer wedge the
  journal (backlog#3035, backlog#3105); over-quota PUTs no longer list the
  bucket under the ledger lock (backlog#3128).
- Listing: scan_dir sends metadata without inline data (backlog#3052),
  counts delete markers against max-keys (backlog#3108), and rejects a
  marker that carries the cursor tag (backlog#3059).
- Heal: bucket metadata and heal records live in separate namespaces so
  DeleteBucket cannot erase a drive rebuild (backlog#3039), a deleted
  bucket is skipped instead of failing the rebuild (backlog#3040), and
  directory objects are encoded on readback (backlog#3061).
- Restore and tiering: RestoreObject preserves tags and the version's
  modification time (backlog#3073, backlog#3074); Snowball transport
  headers are not forwarded to the tier (backlog#3090); an epoch
  modification time round-trips through xl.meta (backlog#3063).
- Locks: PutObject takes its bucket locks after the body is staged
  (backlog#3131); SelectObjectContent releases its namespace locks once
  the snapshot is taken (backlog#3132).
- RPC and peers: the v3 signature check consumes the v2 nonce
  (backlog#3129); a bucket-metadata reload timeout no longer marks the
  peer offline (backlog#3124); replication target requests carry an
  operation deadline (backlog#3102); the scanner resumes its interrupted
  wait after a lifecycle write (backlog#3118).
- S3 Select: bounded schema inference, column cap and budgeted CSV
  batches, Parquet dictionary bounds and pre-planner projection checks
  (backlog#3075, backlog#3076, backlog#3077, backlog#3078).

* test(e2e): seed legacy duplicate bucket tags offline for the OPA contract

* fix(s3): authorize what handlers store and bound request-driven work

Scan findings in the S3 request layer (access hooks, object use cases,
HTTP server layers), grouped because they share the authorization
condition builder, the PutObject admission path and the response
layers. Builds on the storage-layer batch for the bounded recovery and
multipart APIs it calls.

Authorization and policy conditions:
- copy source is percent-decoded and version-canonical before the
  s3:x-amz-copy-source condition (backlog#3135); CopyObject authorizes
  the tag set it copies (backlog#3034); HeadObject with the replication
  check header still authorizes s3:GetObject (backlog#3047); the
  x-rustfs-source-version-id header feeds s3:versionid (backlog#3072);
  recursive force-delete with a REPLICA header authorizes every
  descendant as a delete (backlog#3070); include-deleted listings require
  s3:ListBucketVersions (backlog#3099); the metadata listing route keeps
  table isolation and uses the same prefix it authorizes (backlog#3053,
  backlog#3054); If-Match probing needs read permission (backlog#3097);
  Object Lambda checks s3:GetObjectVersion (backlog#3058); replication
  proxy fallback keeps ExistingObjectTag denies (backlog#3089); HeadObject
  returns lock and tag headers only with permission (backlog#3113);
  IPv4 clients on the dual-stack listener match IPv4 SourceIp conditions
  (backlog#3049); bucket policies are parsed once and cached
  (backlog#3032); keystone: access keys no longer verify with an empty
  secret (backlog#3043).
Admission and resource bounds:
- GetObject releases disk-read permits when the client stops reading
  (backlog#3023); PutObject takes buffer and foreground admission only
  after body bytes arrive and bounds the wait (backlog#3031,
  backlog#3084); xl.meta size is bounded on the write path
  (backlog#3100); XML compat layers stream instead of buffering whole
  bodies (backlog#3094); tier GETs stream the remote body (backlog#3046); on-demand migration pulls release permits on
  unread GETs (backlog#3110); SSE-KMS key policy covers UploadPart and
  completion (backlog#3130); MinIO admin decryption runs Argon2id off the
  async worker (backlog#3024).
Input validation and leaks:
- replication headers are validated (source ETag shape, original size)
  (backlog#3092, backlog#3093); control characters in keys and lifecycle
  rule IDs are rejected (backlog#3101, backlog#3117); Snowball member
  mtime needs s3:ReplicateObject (backlog#3083); DeleteObjects checks
  Content-MD5 and admin/STS reject SigV2 replays with altered query or
  body (backlog#3037, backlog#3026); request logs redact presigned
  queries and handler spans skip credentials (backlog#3068,
  backlog#3107); SSE-C listings and completions withhold plaintext
  metadata and checksums (backlog#3120, backlog#3050); CORS resolves the
  bucket like s3s does (backlog#3104); PutBucketTagging rejects duplicate
  keys (backlog#3126); notifications fire after a client disconnect
  (backlog#3127); ListenNotification streams re-check access
  (backlog#3119).

* fix(api): drop imports left unused by the base merge

* test(s3): move the KMS multipart denial test to the app layer

The test drives app-layer multipart use cases, so it belongs with them;
living in the SSE module it imported app code from the infra layer and
failed the layer dependency guard. The SSE test helpers it borrows are
exposed through the storage and app facades.

* fix(s3): keep the SSE-C key fingerprint on keyless multipart completion

The backlog#3050 fix withheld both the plaintext checksums and the
customer-key MD5 header from a CompleteMultipartUpload that did not
present the key. The checksums are a digest of the plaintext and stay
hidden; the key MD5 identifies the key only, and the S3 conformance suite
(test_copy_part_enc) expects it on a keyless completion, so it is echoed
again.

* fix(tier): stream GET bodies and document replication budgets

* fix(ecstore,s3): keep the multipart index and cold fill off disk lifetimes

Two lifecycle regressions surfaced once the storage and request batches
ran together against main:

- The multipart index owner cloned the disk's pinned publication root and
  bootstrapped on a task of its own. That kept the mount alive past the
  last LocalDisk owner (the disk lifecycle allows exactly three holders of
  the root FD) and left a stray task behind, which the local-disk and
  read-repair tests detect. The owner now keeps only the root path and
  reopens it for identity checks, and the bootstrap scan rides the disk's
  existing cleanup task, where stopping the disk abandons it and a
  reconnect resumes it.
- The disk-read admission wrapper defers releasing its permit until an
  in-flight read completes, so a cancelled client cannot widen disk
  concurrency. The cold-fill producer, however, drops a read it has
  already classified as stalled when its deadline fires, and that permit
  stayed pinned for the lifetime of the stuck read. The producer now
  abandons the admission explicitly on timeout.

* test(ecstore): pass the index owner to the Linux cleanup-loop test

* fix(s3): release cold-fill admission after watchdog handoff

* fix(s3,ecstore): close the round-1 adversarial review findings

Adversarial review of the combined request- and storage-layer batch found
fixes that fell short of their issues, two behaviour regressions for
legitimate clients and several unrequested costs:

- backlog#3038: a bulk DeleteObjects reserved the whole per-disk
  inspection allowance up front for every key in flight and exhausted the
  16 Mi request budget on any set wider than eight drives, failing healthy
  keys with SlowDown. Calls are now admitted while budget remains and
  charged for the entries they actually visited. Object-scoped discovery
  charges plain child keys at one entry per 64 names instead of one each,
  so deleting a missing key that names a folder prefix completes instead
  of answering 503 forever while a hostile prefix stays bounded. A peer
  still on the previous binary is reported
  as an unsupported participant, the repository's rolling-upgrade
  contract, instead of as a budget verdict.
- backlog#3037/#3026: a SigV2 configuration PUT without Content-MD5 was
  still replayable with another body; it is refused with MissingContentMD5
  while SigV4 keeps the optional-MD5 contract.
- backlog#3072: DeleteObject now resolves x-rustfs-source-version-id before
  authorization like PUT and COPY, so a replica delete cannot remove a
  version the policy never saw.
- backlog#3121: the multipart index no longer fsyncs a marker and four
  directories per multipart metadata write (it is rebuilt on every start),
  and ListMultipartUploads discovers roots concurrently.
- backlog#3077: Parquet SelectObjectContent decodes budget-sized batches
  instead of one row per batch.
- backlog#3031: a full upload buffer pool hands out an unpooled buffer
  instead of refusing the upload; the progress floor already bounds stalls.
- backlog#3023: the GET disk-read idle cut-off is configurable
  (RUSTFS_GET_DISK_READ_IDLE_TIMEOUT_SECS, default 120 s) so a paused
  client is not truncated after 30 s.
- backlog#3075: JSON Lines schema inference keeps the sample collected at
  the 4 MiB bound instead of failing the query.
- backlog#3024: compat admin decryption queues briefly for a slot instead
  of refusing the third concurrent request.
- backlog#3113: HEAD skips its permission probes for the bucket owner.
- backlog#3117: control characters in a lifecycle rule ID are rejected on
  PutBucketLifecycle as well.

The lock-crate publication FIFO serves backlog#3111 and moves to the
table-catalog PR. Also fixed: a lossy admin error message, an unused
s3-client function, two unused test-util features, a duplicated key
validation, the s3s footprint baseline, and a stale log event name in the
reverse-proxy runbook. The ODM multipart write-back test runs on the large
test stack like its sibling.

* fix(table-catalog): bound maintenance work and isolate table namespaces (#9174)

* fix(table-catalog): bound maintenance work and isolate table namespaces

Scan findings in the Iceberg table catalog:

- Metadata maintenance deleted every unreferenced *.metadata.json in a
  table's directory without checking whether a renamed table in another
  namespace still owned those files (backlog#3060); it now resolves the
  owning table through the directory index before deleting.
- Manifest lists and manifests were decoded with the embedded Avro
  writer schema and no recursion depth limit; a self-referencing record
  schema overflowed the stack (backlog#3080). Schemas are validated for
  depth before decoding.
- Compaction decoded every input Parquet file into Arrow batches held in
  memory; a decompression bomb OOM-killed the server (backlog#3085). Row
  groups are streamed through a byte budget and oversized inputs are
  refused.
- An S3 request for a key outside an indexed table prefix listed the
  bucket's whole namespaces/ catalog prefix and failed once it held more
  than 4096 objects (backlog#3086); a per-bucket directory index answers
  index misses without the listing.
- The maintenance planner read whole orphan files to obtain their
  modification time (backlog#3087); it reads metadata only.
- A client disconnect between persisting active_rename_id and clearing it
  left the bucket's catalog entry locked at 503 (backlog#3088); the rename
  runs detached from the request future and clears the flag on every exit.
- Table commits held the bucket publication fence until publication,
  starving every object write (backlog#3111); commits now hold it under a
  deadline and object writes are admitted between commits.

The directory index is managed through three new admin routes under
{warehouse}/catalog/directory, registered in the admin route policy.

The durable-strong store is left as is (its snapshot partitioning for
backlog#3109 and the strong-path deadline are not ported): that backing
is being retired separately, so the new tests cover the object backing.

* fix(table-catalog): close the review gaps in the scan-fix batch

Adversarial review of the table-catalog batch found the fixes narrower
than the issues they close and two cost regressions:

- backlog#3085: the compaction footer check bounded nothing a page header
  could not override; parquet sizes its page buffers from the header.
  Walk every column chunk's page headers (Thrift compact, no decompression)
  and hold each page and the chunk total to the budget before decoding.
  The stored-input budget is per rewrite group, so a multi-group job no
  longer fails after writing earlier outputs.
- backlog#3086: the default index-miss scan still counted maintenance
  reports toward its 4096-object limit; only table entries count now, and
  the listing itself is bounded to 64 pages. The directory index remains
  an optional accelerator.
- backlog#3111: a create wrote its metadata file under the fence as the
  first durable mutation, which disarmed the deadline before the unbounded
  registration inventory. The write precedes publication now. The deadline
  gets its own knob (RUSTFS_TABLE_CATALOG_PUBLICATION_PREPARATION_TIMEOUT_SECS,
  default 30 s, never below the lock-acquire timeout) instead of reusing
  the 5 s lock timeout, and the ownership inventory reads entries
  concurrently.
- Directory candidates are written only while a directory exists; the
  backfill covers earlier entries. A directory on the migration-fence
  path is reported as a conflict instead of a parse error.
- Dead test hooks, a stale comment and the support-matrix text that did
  not match the code are removed or corrected.

* fix(select): preserve complete samples and Parquet batch limits

* fix(s3,ecstore): close the round-2 adversarial review findings

DeleteObject resolved x-rustfs-source-version-id for authorization on
every request while storage consumes it only for a REPLICA request, so a
non-replica caller with s3:DeleteObjectVersion could trigger a plain
delete of the current version. The hook now resolves the header under
the same predicate as storage, and the regression test covers the
non-replica case.

HEAD no longer skips its permission probes for the bucket owner; an
explicit bucket-policy Deny on the metadata actions binds the owner too.

Multipart index pages verify each root against the staging area and
prune markers whose staging root is gone, under the marker's own lease
with a re-check, so the per-drive index stays proportional to live
uploads instead of every key ever multipart-initiated on the drive.

SigV2 configuration PUTs that declare an empty body need no Content-MD5:
there is no body to replay. The minimum-progress floor stays independent
of RUSTFS_HTTP_REQUEST_BODY_READ_TIMEOUT; the knob's documentation now
says so instead of claiming 0 disables it. The quota bootstrap window
(503 until the background scan publishes the ledger) is kept, because
ledger admission must not come from scanner reporting; the compatibility
matrix now documents it.

The S3 compatibility matrix gains a section for the client-visible
validation bounds, and the drive-timeout tuning guide tabulates
RUSTFS_GET_DISK_READ_IDLE_TIMEOUT_SECS.

* fix(lock): queue table-bucket publication writers fairly

Table commits take the bucket publication fence as a write lock; under a
stream of commits the lock's try-and-retry acquisition let a new commit
jump ahead of object writers that had been waiting longer, which is part
of what starved them (backlog#3111). Requests for the publication lock
path now take a FIFO ticket per shard: a waiter is admitted only when it
is at the head of the queue, cancelled waiters release their turn, and
batch acquisitions join the same queue. Other lock paths are unchanged.

This moved here from the request-layer batch, where no cited issue
covered it; it serves the table-catalog issue this PR closes.

* fix(table-catalog): close the round-2 adversarial review findings

Parquet page-header walker: read the size fields by field id as parquet
does, accepting I16/I32/I64 wire kinds and rejecting any other kind, so
a header encoding uncompressed_page_size as I64 can no longer bypass the
budget while parquet allocates it. Bound every list, set and map count by
the bytes remaining in the chunk, and reject bool collection elements
(parquet skips them with zero width, so either width would desynchronize
the two parsers); this removes the 2^63-iteration spin on LIST<BOOL>.
Start each column-chunk walk at the dictionary page offset whenever the
footer declares one, exactly as parquet's byte_range does, instead of
min(dictionary, data).

Footer pre-walk: before parquet decodes a footer, walk FileMetaData with
the hardened cursor and charge the declared row_groups count times the
RowGroupMetaData size to the decode budget, because parquet 59 reserves
that Vec before reading one element.

Preparation deadline: clamp the
RUSTFS_TABLE_CATALOG_PUBLICATION_PREPARATION_TIMEOUT_SECS knob to 86,400
seconds so Instant + Duration cannot overflow.

Index-miss scan: after each listing page, jump the cursor past the
maintenance subtree the page ended in, and allow one extra page per table
entry already listed, so job-report history scales with the catalog while
a report flood under one table stays bounded.

Migration fence: read the fence-path object once and decide from its
stored kind whether it is directory state or a fence.

Expired or failed create: remove the initial metadata file when the
registration fails before any catalog write may have begun; nothing else
references it. Correct the comment and support matrix that claimed
maintenance reclaims it.

Tests cover each walker divergence, the footer row-group reservation, the
deadline ceiling, the paging budget for honest catalogs and for a report
flood, and the removal of the unpublished metadata file.

* test(admin): register the catalog directory routes in the route matrix

The table-catalog batch added GET, POST and DELETE
{warehouse}/catalog/directory on both the Iceberg and the compat admin
prefixes without listing them in the admin route matrix, so
test_admin_route_matrix_matches_registered_routes failed on CI.

* fix(s3,ecstore): close the round-3 adversarial review findings

Multipart index pages now treat the cursor as the last examined marker
rather than the last root, so a page that pruned a stale marker still
validates and ListMultipartUploads keeps using the index. A marker is
written before its staging root is published, so pruning spares markers
younger than a five-minute grace period and an existing marker is
touched on every new upload; the prune re-checks both under the marker
lease. Bounded delete-recovery inspection rides the durable-mutation
lane like the unbounded path instead of the one-worker foreground lane.
The on-demand-migration inline body budget scales with the object size
(at least 64 KiB/s) instead of a flat 120 s. The control-body digest
service honors RUSTFS_HTTP_REQUEST_BODY_READ_TIMEOUT=0 as "no
inactivity timeout" like every other reader of that knob.

Quota reconciliation throttle objects are deleted together with a
retired generation's ledger, so bucket turnover leaves no residue. The PUT guard
test shim is gone; tests call the shared guard. Bounded DiskAPI defaults
answer MethodNotAllowed like their siblings. Stale
budget docs, an unreachable CSV arm, an always-Some limit parameter,
commented-out constants and a misplaced doc comment are cleaned up;
weak test assertions name the expected error; lifecycle rule-ID control
characters gain a test. The compatibility matrix records the CopyObject
tag-copy permission, the exact SigV2 empty-body predicate, replica and
migration writes of control-character keys, and the SigV2 DeleteObjects
digest rule.

* fix(table-catalog,heal): close the round-3 review findings

A. Pack compaction rewrite groups to min(max-rewrite-bytes-per-job,
   TABLE_COMPACTION_MAX_STORED_BYTES), reject an over-ceiling group before
   any output is written, and name the ceiling in the commit-path errors;
   document the effective cap in the support matrix and scheduler runbook.
B. Keep TaskCancelled/TaskTimeout classification on replacement passes:
   the namespace verification runs only for completed or storage-failed
   passes, in the erasure healer and the task bucket prepass.
C. Compare the replacement bucket pass per bucket: a recorded identity
   that is gone or replaced still errors or restarts the pass, buckets
   created mid-pass are appended to the identities, pending_buckets and a
   persisted positional order without rewinding progress or the
   checkpoint; verification ignores additions.
D. Read the migration-fence object once in the object-backed write permit
   and dispatch on its kind.
E. Drop the strong store's copy of maintenance_cleanup_roots.
F. Remove the unused test hooks fail_put_prefix, corrupt_put_prefix and
   pause_after_metadata; make compact_parquet_data_files and
   PublicationTicket.state private.
G. Document the body-revision identity, the legacy revalidation budget
   and its HTTP 503 in the support matrix.
H. Define HEAL_REPLACEMENT_RECOVERY_DIR once in ecstore and consume it
   from heal through the storage_api facade.

* fix(ecstore): cap the index pages one disk may answer

Pruned multipart index pages may carry few roots, so the page cursor no
longer bounds how many pages a peer can make a listing fetch. Cut a disk
off after 4096 pages (about one million examined markers) so it
contributes no coverage and the listing falls back to the staging scan.

* fix(ecstore,table-catalog): close the round-4 adversarial review findings

Multipart index markers dated in the future (a backwards clock step
between recording a marker and publishing its staging root) were judged
old and could be pruned while their upload was in flight; a future-dated
marker is now kept. The marker touch on EEXIST is best effort, so a
filesystem that refuses to set times no longer fails the upload commit.
Pruning runs on the durable-mutation lane instead of the one-worker
foreground lane.

Quota reconciliation keeps one throttle object per bucket incarnation (a
quota revision change replaces it instead of orphaning the previous
revision's object), the retirement cleanup deletes it ahead of the ledger
and also when the ledger is already gone, and a scan the retirement
already refused writes nothing back. Bounded DiskAPI defaults answer
UnsupportedDisk, the verdict the aggregate gives a peer without the
protocol. The compaction ceiling pre-check runs over every rewrite group
before any output is written, and the worker's ceiling error no longer
names a placeholder group.

Docs: the inline on-demand-migration client budget, the protocol-2
downgrade conflict of replacement passes, the exact footprint numbers.
2026-11-05 23:32:54 +08:00
Chris An 158aa276e9 fix(storage): bound heal retries and recover pool metadata (#9164)
* fix(ecstore): retry metadata writes rejected before staging

* fix(ecstore): reuse registered disks during startup

* fix(ecstore): retain remote health monitors during reconnect

* test(heal): release the commit barrier during graceful shutdown

* test(e2e): register graceful shutdown barrier regressions

* fix(ecstore): roll back interrupted pool metadata commits

* test(upgrade): honor the 1.0.4 delete recovery protocol

* fix(heal): bound admission during object rate pressure

* test(e2e): handle rebalance completion before stop

* test(e2e): observe rebalance activity before the start reply

* test(rebalance): hold the first run until stop cancels admission
2026-11-05 21:42:19 +08:00
Hauser Zhi 3362421240 fix(obs): add fine-grained object lock histograms (#9177)
Use explicit buckets that preserve millisecond lock acquisitions while retaining visibility into long-held delete and recovery locks. Add an exporter-backed regression test for both histogram instruments.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-05 08:11:08 +00:00
GatewayJ 57df9181d0 fix(audit): preserve OIDC identity in S3 request audits (#9178) 2026-11-05 06:03:33 +00:00
Hauser Zhi 371f5e4ffc fix(ecstore): streamline lock RPC and listing ownership (#9176)
* fix(ecstore): preserve lock cleanup and listing trace context

Own remote lock admission and dispatched RPC cleanup across caller cancellation. Reuse bounded late-result cleanup and retain the listing request span in metacache tasks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): streamline lock RPC and listing fanout

Poll RPCs in callers and transfer pending work before channel eviction. Share walk options across producers and borrow cached peer keys. Keep deadline classification deterministic.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-05 05:59:05 +00:00
cxymds 8a5a2c9c93 fix(s3): treat duplicate CreateBucket as owned by the requester (#9167)
* fix(s3): treat duplicate CreateBucket as owned by the requester

The duplicate-bucket response was decided from the requester's root-owner
flag, so every IAM user recreating a bucket received 409
BucketAlreadyExists, including a user recreating a bucket it created.
BucketAlreadyExists means the bucket belongs to another account; a
deployment owns a single namespace, so the answer is purely region-based:
the default region returns the legacy 200 OK, any other region returns
BucketAlreadyOwnedByYou.

Both the existing-bucket fast path and the BucketExists path now share one
helper. Authorization still runs first, so a requester without
s3:CreateBucket gets AccessDenied and cannot probe bucket existence.

Refs #8493

* test(ci): refresh e2e selections for duplicate CreateBucket

The two new create_bucket_region cases join the e2e-smoke and e2e-full
selections, which main also extended with multipart_upload_id tests.

smoke is measured from a local nextest listing: removing the two new cases
reproduces main's committed digest exactly. e2e-full is derived the same way
from main's listing artifact (run 41933823399, babfeaed0) plus the two
multipart_upload_id cases, which reproduces main's committed linux digest
before the new cases are added; CI re-verifies both platforms.

test_bucket_create_exists_nonowner asserts BucketAlreadyExists for a second
identity, which a single-owner deployment cannot produce. Move it to
excluded_tests.txt with the deployment-ownership rationale; the IAM-user
duplicate paths stay covered by crates/e2e_test/src/create_bucket_region_test.rs.
2026-11-05 03:06:50 +00:00
Hauser Zhi babfeaed00 fix(io-core): preserve pooled capacity and accounting (#9171)
* fix(io-core): preserve pooled capacity and accounting

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(io-core): preserve pool allocation admission order

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* docs(io-core): clarify pool return locking

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-04 22:07:58 +00:00
Jose Meira 736bf777b4 feat(container): add declarative bucket bootstrap (#9162)
* feat(container): add declarative bucket bootstrap

* fix(container): handle false bucket versioning setting

* Update Rust base image to version 1.99.1-trixie

Signed-off-by: Hauser Zhi <housemecn@gmail.com>

* Update Rust base image version to 1.99.1

Signed-off-by: Hauser Zhi <housemecn@gmail.com>

---------

Signed-off-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
2026-11-04 16:59:50 +00:00
KarlEmm 7babc7d621 fix(s3): report malformed multipart upload IDs as NoSuchUpload (#9147)
UploadPart, UploadPartCopy, ListParts and CompleteMultipartUpload returned 400 InvalidArgument for a malformed upload ID, while AbortMultipartUpload returned 404 NoSuchUpload. AWS S3 documents NoSuchUpload for an upload ID that might be invalid.

Report MalformedUploadID as NoSuchUpload through one helper used by all operations that address an existing upload, replacing the Abort-only special case. ListMultipartUploads keeps InvalidArgument for a malformed upload-id-marker.

Add the multipart_upload_id_test e2e module to the e2e-smoke profile. It asserts 404 NoSuchUpload from every operation that addresses an existing upload, for a malformed upload ID and for an aborted one, and updates the e2e-smoke and Linux e2e-full selection digests.

Co-authored-by: Karl Bastarache <bastarachek@google.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
2026-11-04 16:25:00 +00:00
Hauser Zhi 4d46bd25f8 perf(ecstore): parallelize bulk-delete lock and metadata fan-out (#9155)
* perf(ecstore): probe bulk-delete write locks in parallel waves

Bulk delete acquired one distributed write lock per key in serialized
order, paying a full quorum round-trip per key. Probe the unique keys in
bounded parallel waves with a short timeout instead; any contention drops
the whole wave and the canonical serial order resolves it as before, so
two overlapping batches can never deadlock.

* perf(ecstore): probe bulk-delete transaction locks in parallel

The set-layer delete-transaction locks were also acquired one quorum
round-trip per key after the raw write locks. Apply the same optimistic
all-or-nothing probe wave with a canonical serial fallback, and keep the
per-key error reporting the fallback already provided.

* perf(ecstore): pre-fetch bulk-delete source metadata in parallel

The admission loop ran one metadata quorum fan-out per key in sequence
on top of the per-key lock round-trips. Pre-fetch the source reads the
loop needs with bounded parallelism under the locks already held, and
derive the per-key read inputs from one shared helper so the pre-fetch
and the loop cannot disagree.

* test(ecstore): drop unused import in batch-delete probe test

* refactor(ecstore,lock): await wave releases and unify probe waves

Adversarial review of the bulk-delete lock waves found three real
issues. Distributed guard release is fire-and-forget on drop, so the
serial fallback could re-acquire keys while unlock RPCs were still in
flight and block on locks it already owned: guards are now released
with an awaited unlock before the fallback runs. The wave also probed
every key after the first failure, adding up to one probe timeout per
chunk of pure overhead under contention: probing now stops at the
first failing chunk. Finally the two copy-pasted wave implementations
are replaced by one shared probe_lock_wave, and the per-key delete
read inputs are resolved once instead of being recomputed.

Tests now assert the wave/fallback counters so they prove which path
ran, and an overlapping-batch test pins the no-deadlock property.

* refactor(ecstore,lock): batch bulk-delete lock rounds per key

Replace the optimistic probe waves with the bulk lock primitive the lock
layer already supports on the wire: one lock_batch RPC per lock client
for a whole DeleteObjects key set, per-key quorum guards with the usual
TTL heartbeat, and per-key outcomes. The batched round is deadlock-free
by construction (every lock server orders concurrent batches by the
same global (shard, key) order), so the probe timeout, the wave
release-and-wait dance, and the canonical serial fallback all go away.

Per-key lock outcomes are now reported per key end to end: a locked-out
key fails alone in the response while the rest of the batch proceeds,
matching the S3 DeleteObjects contract and the set layer's existing
behavior. The set layer's raw-write-lock and delete-transaction-lock
waves fold into the same primitive via one shared resource-folding
helper, and the fast-lock batch fast path now counts acquisitions so
shard metrics keep their meaning.

* perf(ecstore): move journal publish off the one-worker namespace lane

A bulk delete publishes one recovery transaction per key, and every
journal inspection and settle-plan closure ran on the per-disk
foreground namespace lane (one worker), serializing the whole publish
phase per drive behind every other mutation. Route those closures onto
the durable-mutation lane the fused delete prepare already uses (eight
workers per disk, fsyncs coalesce in the filesystem journal), and keep
32 journal publications in flight so a 16-drive set can feed those
lanes.

* test(ecstore): flatten lock-error iteration in overlap test

* fix(ecstore,lock): refresh duplicate keys after recovery, bound unlock

Review findings on the batched lock rounds. A batch entry whose recovery
rolls back an interrupted prepared delete can bring a retained version
back; a later duplicate of the same key still held its pre-fetched
source-missing read, skipped the object-lock check, and deleted the
restored version. Recovery now evicts the pre-fetched reads of every
other entry naming the same object, so those entries take the loop's
live re-read and see the restored version.

The batch rollback release awaited the full unlock retry schedule,
including the deferred background pass, parking the request behind an
unreachable peer. The synchronous phase is now a single release pass
with the deferred retries spawned in the background.

* fix(ecstore): release local batch locks before deferred recovery

A set-layer batch delete that runs deferred key recovery re-acquires a
write lock on the same keys through recover_delete_object, but the raw
local batch guards were only ever released at function exit — the
distributed path releases its batch ids before the deferred loop and the
local path missed the mirror release, so the recovery deadlocked against
the batch's own locks and surfaced as a spurious Lock(Timeout) for every
deferred key.

A regression test plants the interrupted prepared delete this needs and
pins the end-to-end contract: a batch naming a GOVERNANCE-retained
version twice must deny both entries after the first entry's recovery
rolls the prepared delete back, and the restored version must survive.

* test(lock): cover batch acquire partial-grant rollback

The distributed acquire_guard_batch rollback path — a key granted by
fewer than quorum clients must fail alone and release its partial grants
before the call returns — was only reachable in distributed mode and had
no coverage. A scripted per-object LockClient pins both halves: the
below-quorum key reports QuorumNotReached with its partial vote, and the
orphaned grant is released synchronously while the quorate key's guard
stays held.
2026-11-04 13:20:13 +00:00
Ramakrishna Chilaka ff5f491c5a perf(ecstore): skip unmatched FdCache scans and maintenance wakeups (#9165)
Track active descriptor volumes, exact paths, and component prefixes in FdCacheTracker so unmatched invalidate_under, invalidate_volume, and invalidate_exact calls return without scanning Moka or waking the background maintenance task.
2026-11-04 13:12:11 +00:00
Hauser Zhi a8be876fd9 fix(s3): honor presigned x-amz-meta-* query parameters (#9146)
* fix(s3): honor presigned x-amz-meta-* query parameters

The AWS SDK presigners hoist signable x-amz-* headers into the query
string (smithy moveHeadersToQuery), and AWS S3 accepts the hoisted form
as the header it came from. RustFS read user metadata from headers only,
so a presigned PutObject carrying ?x-amz-meta-user-id=u1 returned 200 and
stored an object with empty metadata (rustfs/rustfs#9142).

Add one shared extractor for user-metadata query parameters and wire it
into every metadata-accepting write path (PutObject including snowball
members, CreateMultipartUpload, CopyObject REPLACE) plus the snowball
extract trigger, instead of normalizing per operation the way the
presigned UploadPart checksum fix did. The stored key form is produced by
the same helper as the header path, so the hoisted and header forms land
on disk identically.

Only a signature-covered query is honored: SigV4 signs the canonical
query string, while SigV2 signs headers plus a fixed subresource list
only, so honoring its query would let a presigned-URL holder add object
properties the presigner never authorized. Keys and values that could not
have arrived as a header are rejected rather than stored, since the read
path turns them into header fields and a control character would fail
every Head/Get of that object.

* refactor(s3): hoist signed x-amz query params at the request boundary

Replace the per-write-path query metadata extractor with one boundary
mechanism: restore the `x-amz-*` request properties the SigV4 presigners
hoist into the query (`@smithy/signature-v4` `moveHeadersToQuery`) as
request headers before s3s routes and deserializes the request.

One hook now covers every reader at once — s3s input parsing,
`extract_metadata_from_mime`, the snowball extract trigger and its
transport-key filter, tagging, storage class, object lock and copy
source — so PutObject, CreateMultipartUpload and CopyObject need no
changes at all. It also replaces repeated query parsing along the write
path with a single pass at the boundary.

An existing header always wins, so the hoist is purely additive and the
unsigned-header guard keeps rejecting anything the signer did not sign;
that guard now also accepts a header whose single value equals a
same-named query parameter, which is what the hoist produces and what
the signature covers.

`query_string_is_signed` rules out SigV2 before it trusts any SigV4
marker. SigV2's string-to-sign covers headers plus a fixed subresource
list rather than arbitrary query parameters, so a SigV2 presigned URL
stays valid after `X-Amz-Algorithm`/`X-Amz-Signature` markers are
appended to it; without this rule a URL holder could turn on
`x-amz-meta-snowball-auto-extract` and have a plain upload untarred
(review of #9146).

* fix(s3): hoist signed query params after s3s signature verification

The request-boundary hoist ran before s3s, so the restored `x-amz-*`
headers reached s3s's own verifier, which rejects any `x-amz-*` header
outside `X-Amz-SignedHeaders` (s3s `ops/signature.rs`,
`reject_unsigned_amz_headers`). A valid presigned PUT with
`SignedHeaders=host` and `?x-amz-meta-user-id=u1` therefore came back
with 403 AccessDenied before any handler ran (review of #9146).

Move the hoist to `authorize_request`, RustFS's shared authorization
entry: s3s has already verified the signature there, and policy
evaluation plus the handler read request properties after it, so the
restored headers reach every operation without ever appearing unsigned
to the verifier. The mechanism is unchanged — one gated, validated pass
over the signature-covered query.

CopyObject's replacement metadata now also reads the headers, because
s3s parsed `input.metadata` before the hoist ran.

The hoist itself and its tests stay in `server::layer`; the tower layer
is gone.

* perf(s3): single-pass signature-aware query hoist in auth

Move the query hoist into `auth.rs`, next to the unsigned-header rules it
is part of, so `storage` no longer reaches into `server` for it. Its
documented contract — which request properties the signature covers, and
why SigV2 must never be widened — now lives with the rule it protects.

Make the hot path allocation-free and single-pass. The caller no longer
clones the query just to satisfy the borrow checker, the function no
longer clones it again, and one `form_urlencoded::parse` pass both
recognizes the presigned-SigV4 marker set and stages the hoistable
parameters. Nothing is validated or applied until the gate passes, so a
request whose query is not signature-covered is never rejected here. A
single ASCII scan skips the whole thing when the query names no `x-amz-`
parameter at all, which is every ordinary `?versionId=`/`?uploadId=`
request and every queryless one.

The duplicate-parameter and header-value checks stay strict; only when
they moved, not how they behave.

* fix(s3): keep verifying a query-carried payload hash after the hoist

The hoist restores `?x-amz-content-sha256=<digest>` as a header, but it
runs after s3s has already built the request body. s3s reads its
payload-hash input from the headers only, so it installs no hash
validator for a digest that arrived in the query, and the restored header
then made `get_content_sha256_with_query` conclude the auth layer was
enforcing it. Neither layer verified the body, so a presigned PUT whose
digest exists only in the query accepted a modified payload (review of
#9146).

The question is not whether a digest header is present but whether the
digest reached the request as a query parameter: that one is always the
storage layer's to verify. A digest sent as a header is still left to the
auth layer, which wraps the body in a hash-validating reader for it, so
no payload is hashed twice.

* fix(auth): limit late query hoisting to user metadata

* refactor(s3): drop the stale payload-hash compensation, scope the pre-filter

Limiting the hoist to `x-amz-meta-*` user metadata means it never
manufactures an `x-amz-content-sha256` header, so the payload-hash
predicate's original signal — a digest header present at handler time is
one s3s is enforcing — is exact again. Restore it and drop the
query-aware form: that change existed only to undo a header the hoist is
no longer allowed to create, and it would have hashed a payload twice
for a presigned request that declared a real digest both in the query and
as a header.

Match the pre-filter to the same scope so a query carrying only a typed
property (`x-amz-tagging`, `x-amz-storage-class`, `versionId`) skips the
parse entirely instead of scanning past it.

* test(access): use explicit imports in the signed-query lock regression

The architecture migration rule requires RustFS storage-owner modules to
name their imports instead of pulling the parent module in wholesale, and
`signed_query_lock_permission_regression` was still on `use super::*`.
Import the two symbols it actually uses and drop the unused one.

* test(access): reference FS through the parent import

The layer dependency guard tracks `use crate::...` edges, and naming
`crate::storage::ecfs::FS` from the signed-query regression looked like a
new `infra -> interface` reverse dependency. `access.rs` already reaches
the same type through `use super::ecfs::FS`, so reuse that import instead
of introducing a second, tracked spelling of an edge the module has
always had. No baseline entry, no new edge.

---------

Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-11-04 10:41:52 +00:00
Hauser Zhi fe3ada0689 chore(deps): refresh Cargo dependencies (#9156)
* chore(deps): refresh Cargo dependencies

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): update rustfs kafka to 1.4.1

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-04 09:03:37 +00:00
Hauser Zhi 926355ae1f fix(api): keep SlowDownRead off write-path quorum failures (#9149)
* fix(api): keep SlowDownRead off write-path quorum failures

* refactor(api): write-safe quorum default, GET opts into SlowDownRead

* fix(api): keep object-read mapping behind error.rs architecture boundary

* refactor(api): drop redundant object-read mapper wrapper
2026-11-04 08:08:23 +00:00
Chris An 7f5fa4b8f6 fix(protocols,kms,keystone): enforce client CA, protect the KMS probe (#9168)
Scan findings in the alternate-protocol front ends and the KMS and
Keystone integrations:

- WebDAV and FTPS read RUSTFS_WEBDAV_CA_FILE / RUSTFS_FTPS_CA_FILE,
  checked that the file existed, and then built their TLS listeners
  with with_no_client_auth(), so mTLS was never enforced. A shared
  protocols::common::tls::server_config builds the rustls config with a
  client-certificate verifier from the configured CA, startup fails on
  an invalid CA, and a CA cannot be combined with cleartext
  (backlog#3069).
- The KMS readiness probe used a fixed key id that the key-lifecycle
  admin routes accepted like any customer key, so kms:DisableKey on it
  failed readiness on every node. The probe key is reserved from key
  management and a disabled probe key no longer counts as a backend
  failure (backlog#3115).
- The Keystone middleware answered anonymous requests carrying a junk
  X-Auth-Token with the configured Keystone URL in the body while
  Keystone was unreachable; failures no longer disclose upstream
  locations, and the login cache is bypassed when a subscription token
  refresh is required (backlog#3116).
2026-11-04 20:25:55 +08:00
Chris An a97c65895c fix(proxies,targets,obs): bound untrusted input in leaf crates (#9166)
Scan findings in crates whose behavior is driven by untrusted input and
that stand alone from the storage core:

- trusted-proxies: the simple implementation takes the client address
  from the right-most untrusted X-Forwarded-For hop instead of the
  left-most (backlog#3082); the legacy validator never falls back to the
  proxy identity when the chain is rejected and reads X-Forwarded-For
  unless RFC 7239 is explicitly selected (backlog#3051).
- targets: webhook and similar outbound clients drain responses up to a
  byte limit instead of buffering arbitrary bodies (backlog#3062); the
  on-disk notification queue has a shared byte budget in addition to the
  entry count, configurable via RUSTFS_TARGET_STORE_MAX_BYTES
  (backlog#3122); AMQP and Redis manifests declare the broker url as a
  secret and bind credentials to their connection fields, and the
  plugin-instance PUT refuses to restore a redacted secret when the
  connection fields changed (backlog#3065, backlog#3066).
- obs: the debug-level s3s response dump is filtered so STS and
  service-account credentials never reach the log (backlog#3029).
2026-11-04 19:49:53 +08:00
Chris An 73e7afa01a fix(iam): close identity, session and admin-authorization gaps (#9163)
Scan findings in the IAM crate and the admin identity handlers, grouped
because they share the IamCache mutation lock, the STS session sweep and
the admin client-address plumbing:

- Admin and STS authorization used the socket peer as aws:SourceIp
  behind a trusted proxy; they now read the verified client address the
  S3 path already uses (backlog#3025), and the admin usage route passes
  the bucket named in the path to the s3:ListBucket check (backlog#3033).
- AssumeRoleWithWebIdentity accepted HS256 ID tokens MACed with the OIDC
  client secret; only provider-signed tokens verify (backlog#3028), and
  JWKS refresh is single-flight with a failure cool-down (backlog#3103).
- A disabled group emptied the member's whole policy list, dropping
  every Deny; direct and other-group policies are preserved (backlog#3042).
- Identity rewrites (secret change, add-user, status) ran without a lock
  and without re-reading the record, so a user's password change could
  undo an admin disable or reset (backlog#3048). add-user on an existing
  user and in-flight AssumeRole both left sessions minted under the old
  secret valid (backlog#3071, backlog#3079); rotation now revokes under
  the per-key mutation lock and derived-credential publication is ordered
  with it.
- aws:groups never carried a built-in user's IAM group membership and
  jwt:iss was always the local marker, so group- and issuer-scoped
  Denies never matched; both now come from live IAM state
  (backlog#3095, backlog#3096).
- OPA mode skipped the account-status gates for service accounts and STS
  sessions of a disabled user (backlog#3057).
- The periodic IAM reload published nothing when any cache write raced
  it and kept stale partitions when a prefix listed empty, so a missed
  revocation never applied (backlog#3064, backlog#3114).
- update-group-members never evaluated admin:RemoveUserFromGroup
  (backlog#3098); ExportIAM compared the site-replicator account against
  a name it never has (backlog#3045); add-user accepted the access key of
  a live STS session or service account (backlog#3134); a service account
  could create or extend a lifetime beyond its own (backlog#3112);
  sts:DurationSeconds and svc:DurationSeconds were never populated
  (backlog#3136); temporary-account-info returned service accounts
  (backlog#3137); an access key the object layer refuses no longer holds
  the service-account lock through the write retries (backlog#3133).
2026-11-04 18:44:50 +08:00
Chris An e0f26a540d fix(ecstore): gate null-version overwrites under Object Lock (#9157)
A put-like write without a version id to a key that is not
versioning-Enabled replaces the key's null version in place. The
commit-time Object Lock gate in put_object_with_old_current_size_inner
ran only when the write carried an explicit version id, and the
request-layer pre-check reads the key's latest version. When the
retained null version was not the latest entry (a UUID version or a
delete marker sat above it), a user holding only s3:PutObject could
overwrite it together with its COMPLIANCE retention or legal hold, and
CompleteMultipartUpload had no commit-time gate at all.

Name the version a commit replaces (the explicit id, or the nil id when
the write is not versioned and the bucket's Object Lock snapshot is not
ConfirmedAbsent) and run the existing WORM gate against it, tolerating
a null delete marker. complete_multipart_upload gets the same gate at
its commit point, and ECStore::handle_complete_multipart_upload attaches
the bucket's Object Lock snapshot the way a single PUT already does.

Refs rustfs/backlog#3019 (ANT-2026-EH17ZP59).
2026-11-04 17:26:54 +08:00
Chris An 3b3cc018aa fix(policy): close condition, action, principal and resource gaps (#9160)
Eight scan findings in the shared policy engine, each a case where a
Deny did not apply or an Allow was broader than written:

- A bare `*` Action was parsed as `s3:*`, so `Deny *` never matched
  admin:, kms: or sts: actions. `Action::All` now denies every family
  while the historical S3-only Allow is preserved (backlog#3041).
- A bare IPv6 address in aws:SourceIp got `/32` appended, matching a
  2^96-address network; a bare address now means one host, and IPv4
  clients on a dual-stack listener are matched through their mapped
  form (backlog#3030).
- Date conditions on aws:EpochTime parsed the epoch seconds as RFC 3339
  and never matched, so a time-bounded Deny failed open (backlog#3036).
- NumericNotEquals and DateNotEquals evaluated to false when the key was
  absent; negated operators now follow the AWS rule and match
  (backlog#3123).
- Every trailing IfExists on a condition operator added a level of
  recursion without bound; the chain is rejected before parsing
  (backlog#3091).
- Policy variable substitution re-expanded its own output for up to ten
  passes, so an access key holding k placeholders grew to k^10; values
  are now substituted once as literal data (backlog#3067).
- A bucket-policy Service principal was matched against the signing
  access key, so a service account named after the service received its
  grants; Service principals round-trip but never match (backlog#3081).
- Resource matching cleaned the trailing slash off a directory object,
  so a Deny on `prefix/*` missed `prefix/` itself (backlog#3125).

Also deduplicate large Resource sets through a HashSet instead of a
quadratic scan.
2026-11-04 17:16:17 +08:00
Chris An f4f5635aab fix(auth): build policy conditions from the value a write stores (#9159)
PutObjectLegalHold and PutObjectTagging apply the value in their XML
body, and a POST upload applies its form fields, while the
s3:object-lock-legal-hold, s3:RequestObjectTag/<key> and
s3:RequestObjectTagKeys condition keys (and every other header-derived
key for POST) were built from the HTTP headers. The policy engine
therefore judged a value the handler did not store: absent when the
client sent no header, and whatever the caller wrote when it did. A
user limited by a Deny on the requested legal hold or tag value could
release a hold and delete the held version, or retag an object so a
tag-based grant exposed it.

Record the body value in request extensions before authorization, the
way PutObjectRetention already does, and let authorization_conditions
replace the header-derived keys with it. For POST uploads project the
parsed form fields over the headers that feed the condition map, removing
a header whose field is absent.

Refs rustfs/backlog#3018 (ANT-2026-KONBE376).
2026-11-04 17:00:42 +08:00
Chris An 36ad5a6b87 fix(ecstore): judge the null version a versionless delete removes (#9151)
DeleteObjects ran its Object Lock check on one version of a key and then
removed a different one. For an entry without a version id on a key that
is not versioning-Enabled, delete_objects_with_accounting judged the
key's latest entry and then had the disks remove the null version. When
a UUID version or a delete marker sat above a null version under
COMPLIANCE retention or legal hold, that retention was never read and a
user holding only s3:DeleteObject could remove the retained version. The
single-object DELETE on a Suspended key had the same gap.

Add SetDisks::check_null_version_object_lock_delete, which looks up the
null version under the lock the caller already holds and runs the
existing check_object_lock_delete against it when the latest entry
carries a UUID version id. The batch path is not gated on
source_missing because a delete marker on top makes the latest-version
lookup report the key as missing. Plain unversioned keys and
versioning-Enabled keys keep a single lookup and unchanged behavior.

Refs rustfs/backlog#3017 (ANT-2026-6ED2F7II).
2026-11-04 15:59:48 +08:00
Chris An 6c14128072 fix(s3): reserve the __XLDIR__ directory-marker suffix in client keys (#9153)
Storage encodes a directory object `photos/` as `photos__XLDIR__/xl.meta`
and LocalDisk::scan_dir decodes every directory entry ending in the
suffix back into a marker. The S3 write path never refused the suffix in
client keys, so a 1-byte PutObject to the key `__XLDIR__` made the walk
schedule the directory being scanned as its own child and recurse until
the stack overflowed, aborting the server on every restart until the
directory was removed by hand. Keys below a `*__XLDIR__/` segment were
stored but hidden from every listing and from quota accounting.

validate_object_key now rejects any client key containing the suffix,
which covers PutObject, CopyObject, Snowball extraction and the admin
internal put; CreateMultipartUpload and CompleteMultipartUpload now run
the same validation so uploads created before the key was reserved
cannot publish it. scan_dir additionally ignores a marker whose decoded
name is empty, so malformed markers left by older writers or corrupt
disks can no longer recurse into their parent.

Refs rustfs/backlog#3020 (ANT-2026-SBJ1JLC2).
2026-11-04 15:39:48 +08:00
Chris An addc258a24 fix(admin): keep Vault local-file reads on the operator connection (#9152)
POST /rustfs/admin/v3/kms/reconfigure and configure accepted
server-local file paths in the Vault request body (Kubernetes jwt_path,
AppRole secret_id_file, TokenFile path, TLS ca/client cert and key
paths), read the named file with the server's own authority and sent
its content to the Vault address given in the same body. A user holding
only kms:Configure could read any UTF-8 file the process can read,
including /proc/self/environ with the root credentials, and exfiltrate
it to an address of their choosing.

normalize_configure_request_secrets now runs
validate_vault_local_file_access for both handlers: a Vault request
that names a server-local file, or inherits the stored credentials by
sending a blank token, must keep the operator-configured address and
namespace, the same file-based auth method (role, path, mount) and the
same TLS paths and verification setting. Requests with explicit inline
credentials and no file paths are unchanged.

Refs rustfs/backlog#3021 (ANT-2026-F8MRFKCC).
2026-11-04 15:39:43 +08:00
Chris An 73ea527f55 fix(auth): canonicalize s3:VersionId before policy evaluation (#9150)
The object handlers accept several spellings of one version id (upper
case, unhyphenated, braced, urn:uuid:) and the storage layer resolves
all of them to the same version, but the s3:VersionId condition value
was the client string verbatim. A Deny with StringEquals on one version
could therefore be bypassed by re-spelling the id in ?versionId=.

Canonicalize the id once where the condition value is produced so every
hook and policy type (IAM, bucket, session) sees the spelling the server
emits: hyphenated lower-case UUID, with null in any case and the nil UUID
mapped to null. Non-UUID strings pass through unchanged and are rejected
by the handlers as before.

Refs rustfs/backlog#3022 (ANT-2026-O5MHY8VJ).
2026-11-04 15:39:38 +08:00
hector 55da14ad82 ci(nightly): embed the console UI in the GNU nightly build (#9158) 2026-11-04 15:21:41 +08:00
唐小鸭 116a5299b2 fix(replication): replay the MRF journal periodically (#9139)
* fix(replication): replay the MRF journal periodically

The persisted MRF journal was replayed only at startup. Delete-marker
purges whose watch window drained with targets unreachable, and
replications that overflowed the worker queues, reach the journal while
the server runs, so they waited for a restart to converge.

Move the startup pass into replay_mrf_journal and rerun it every five
minutes from a background loop. The existing recovery leader lock keeps
one pass at a time across the cluster, including the startup pass.

* fix(replication): space periodic MRF replay across nodes

Every node runs the MRF replay loop and the recovery leader lock only
serializes passes, so an N-node cluster replayed the same retained
backlog N times per interval while a target stayed down.

Record the start time of a pass that finds entries in a shared replay
stamp and skip a periodic pass when any node started one within the
interval. The startup pass still always runs.
2026-11-03 17:06:14 +00:00
Hauser Zhi fbc54f7212 fix(heal): treat SlowDown as a rate signal and bound page churn (#9144)
* fix(heal): treat SlowDown as a rate signal and bound page churn

* refactor(heal): unify page rate control and drop checkpoint clones

* refactor(heal): one pass-wide rate controller, single SlowDown observe

* fix(heal): address SlowDown backoff and checkpoint baseline review
2026-11-03 17:05:05 +00:00
Ramakrishna Chilaka 3aa492f5ee perf(ecstore,rpc): shard hot-path delete, multipart, and RPC lock tables (#9143)
Replace the single-mutex PREPARED_DELETE_RECEIPTS and ACTIVE_MULTIPART_SOURCE_HEADS maps in rustfs-ecstore with a 64-shard ShardedPathCache backed by SWAR canonical byte keys and xxh3_64 hashing. Replace PUT_FILE_TARGET_LOCKS in rustfs internode RPC with a 64-shard ShardedPutFileTargetLockRegistry using stack-buffered binary keys, in-place dead-Weak slot reuse, and amortized garbage collection.
2026-11-03 15:11:58 +00:00
Hauser Zhi 00a81b4048 chore(deps): refresh crate requirements and lockfile (#9140)
Run cargo update and cargo upgrade twice to bump compatible requirements (jiff, zip, dial9) and refresh transitive lockfile entries.
2026-11-03 15:04:29 +00:00
唐小鸭 20ef9ebf15 fix(replication): skip site-replication rules in replica delete fan-out (#9138)
* fix(replication): skip site-replication rules in replica delete fan-out

A site that receives a replicated delete forwards it to its own targets
so chained replication keeps propagating deletes. The fan-out used the
whole bucket config, including derived site-replication rules, so in a
site-replication mesh a replicated purge was echoed back to its origin
and duplicated to every other peer. The echo could remove the origin's
pending-purge version before its own delivery state was written back.

Ignore derived site-replication rules when computing the replica delete
fan-out. The origin already delivers and retries every delete to each
peer itself. Operator rules still fan out, so chained replication is
unchanged.

* fix(replication): keep operator rules matching the site-repl shape

Rule ids and target ARN shapes are not reserved for site replication:
an ordinary bucket target ARN carries its target id, so an operator rule
named site-repl-<target id> matched the derived shape and was dropped
from replica delete fan-out, breaking an A -> B -> C chain.

Skip a rule only when its deployment id is a current remote
site-replication peer, reading the peer set only when a rule has the
derived shape. If the state cannot be read, skip nothing.
2026-11-03 12:08:08 +00:00
Boyi (Elliot) Li cc08e0d11b feat(fips): route internode RPC HMAC through aws-lc-rs FIPS (#9137)
* feat(fips): route internode RPC HMAC through aws-lc-rs FIPS

* Revise KMS cryptographic compliance details

Updated the KMS cryptographic compliance documentation to reflect changes in HMAC authentication and added details about the internode RPC HMAC authentication.

Co-authored-by: Copilot Autofix powered by AI <175728472+Copilot@users.noreply.github.com>
Signed-off-by: Hauser Zhi <housemecn@gmail.com>

---------

Signed-off-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: Copilot Autofix powered by AI <175728472+Copilot@users.noreply.github.com>
2026-11-03 06:56:56 +00:00
Hauser Zhi 69294523d5 fix(heal): preserve lock, format, and repair identity (#9132)
* fix(heal): preserve lock, format, and repair identity

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): keep pool meta legacy error message stable for ratchet

Co-authored-by: houseme <4829346+houseme@users.noreply.github.com>

* fix(heal): drop redundant clone in MRF dedup test

Co-authored-by: houseme <4829346+houseme@users.noreply.github.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
Co-authored-by: copilot-swe-agent[bot] <198982749+Copilot@users.noreply.github.com>
Co-authored-by: houseme <4829346+houseme@users.noreply.github.com>
2026-11-03 04:59:06 +00:00
Chris An cd4d86f28a fix(replication): finish writeback for already purged versions (#9135) 2026-11-03 02:08:32 +00:00
Hauser Zhi 2f55cf69e1 perf(filemeta): grow metacache read chunks geometrically (#9133)
Large metacache elements (an xl.meta grown past 16 MiB with its version
history) were accumulated in fixed 64 KiB reads, paying hundreds of
read rounds per entry on the listing path. Double the per-round chunk up
to a 4 MiB bound so each reservation stays incremental and bounded
(rustfs/rustfs#2715 corrupt-length-prefix safety is unchanged) while
wide listings and oversized entries decode in far fewer rounds.

Add regression coverage for rustfs/rustfs#9120: a listing whose
aggregate stream exceeds the per-value 16 MiB bound, and an oversized
entry listed among ordinary neighbors with peek/skip interleaving.
2026-11-03 06:07:41 +08:00
Hauser Zhi fff6e94378 fix(metrics): reconcile peer-health gauge on successful RPCs and probes (#9134)
The rustfs_cluster_servers_offline_total gauge was event-driven only:
record_peer_reachable fired solely after a fresh connector.connect()
succeeded. When post-recovery traffic was served by a cached channel
(tonic auto-reconnect, addr-form cache-key split, or delete-recovery
channel), no fresh dial occurred and the gauge stayed stale until the
process restarted.

Add record_peer_reachable_if_offline (fast-path read / slow-path write)
and wire it into every successful peer interaction:
- remote-disk recovery probe success (gRPC DiskInfo)
- periodic TCP connectivity check success (bounded-interval reconcile)
- data-path RPC success (execute_with_timeout_for_op_and_health_action)
- lock-path RPC success (record_rpc_success and detached completion)

Fixes rustfs/rustfs#9119
Tracking: rustfs/backlog#3138
2026-11-02 19:07:37 +00:00
Hauser Zhi 41b13aeb8b fix(tls): unify FIPS provider policy across clients (#9125)
* fix(tls): enforce active FIPS provider at startup

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* ci: provision FIPS validation runner

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(tls): validate FIPS before observability startup

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(tls): reuse the installed crypto provider

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): gate Linux-only commit helpers

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(tls): centralize FIPS provider policy

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-11-02 16:58:42 +00:00
weile321 88587a8f94 fix(s3select-api): clamp overflowing u64 GetRange values to i64::MAX (#9118) 2026-11-02 14:05:07 +00:00
hector 8c8b5da63f ci(nightly): dispatch nightly-candidate-ready after asset publish (#9131)
After the nightly packages are on the auto-testing nightly release and
the schema 2 R2 candidate exists, post repository_dispatch to
rustfs/auto-testing. Vault lanes stay parallel, and the workflow_run
functional chain is left in place.

Co-authored-by: hector <majinghe@users.noreply.github.com>
2026-11-02 23:05:07 +08:00
Henry Guo 00a238f838 fix(table-catalog): resolve superseded staged commits (#9124)
fix(table-catalog): diagnose superseded staged commits

Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-11-02 23:04:22 +08:00
hector 965d805a4f ci: run distributed and upgrade e2e on schedule only (#9126)
Remove pull_request from the distributed and upgrade workflows. Distributed
stays on the nightly cron, and upgrade stays on the Monday cron plus
version tags. Both remain manual-dispatch lanes and stay outside the
required merge checks.

Co-authored-by: majinghe <majinghe@users.noreply.github.com>
2026-11-02 23:03:36 +08:00
Hauser Zhi 9d66e04ae3 test(e2e): honor namespace backpressure in mixed workload (#9122)
Give each mixed-workload request a bounded policy for the server's
explicit namespace lock timeout response and Retry-After advice. Keep
unrelated SDK failures and data mismatches immediately visible.

Preserve 24 workers, four rounds, cross-node checks and all retained
objects. Cover exhausted SDK retries, bodyless HEAD, fatal responses,
persistent contention and incorrect acknowledged bytes, and include the
new cases in the protected distributed profile inventory.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-02 23:02:22 +08:00
dependabot[bot] 12c58d25b5 chore(deps): bump the dependencies group across 1 directory with 5 updates (#9113)
* chore(deps): bump the dependencies group across 1 directory with 5 updates

Bumps the dependencies group with 5 updates in the / directory:

| Package | From | To |
| --- | --- | --- |
| [pulsar](https://github.com/streamnative/pulsar-rs) | `6.9.0` | `6.9.1` |
| [arrow-array](https://github.com/apache/arrow-rs) | `59.3.2` | `60.1.0` |
| [arrow-ipc](https://github.com/apache/arrow-rs) | `59.3.2` | `60.1.0` |
| [arrow-schema](https://github.com/apache/arrow-rs) | `59.3.2` | `60.1.0` |
| [parquet](https://github.com/apache/arrow-rs) | `59.3.2` | `60.1.0` |



Updates `pulsar` from 6.9.0 to 6.9.1
- [Release notes](https://github.com/streamnative/pulsar-rs/releases)
- [Commits](https://github.com/streamnative/pulsar-rs/compare/v6.9.0...v6.9.1)

Updates `arrow-array` from 59.3.2 to 60.1.0
- [Release notes](https://github.com/apache/arrow-rs/releases)
- [Changelog](https://github.com/apache/arrow-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/apache/arrow-rs/compare/59.3.2...60.1.0)

Updates `arrow-ipc` from 59.3.2 to 60.1.0
- [Release notes](https://github.com/apache/arrow-rs/releases)
- [Changelog](https://github.com/apache/arrow-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/apache/arrow-rs/compare/59.3.2...60.1.0)

Updates `arrow-schema` from 59.3.2 to 60.1.0
- [Release notes](https://github.com/apache/arrow-rs/releases)
- [Changelog](https://github.com/apache/arrow-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/apache/arrow-rs/compare/59.3.2...60.1.0)

Updates `parquet` from 59.3.2 to 60.1.0
- [Release notes](https://github.com/apache/arrow-rs/releases)
- [Changelog](https://github.com/apache/arrow-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/apache/arrow-rs/compare/59.3.2...60.1.0)

---
updated-dependencies:
- dependency-name: arrow-array
  dependency-version: 60.1.0
  dependency-type: direct:production
  update-type: version-update:semver-major
  dependency-group: dependencies
- dependency-name: arrow-ipc
  dependency-version: 60.1.0
  dependency-type: direct:production
  update-type: version-update:semver-major
  dependency-group: dependencies
- dependency-name: arrow-schema
  dependency-version: 60.1.0
  dependency-type: direct:production
  update-type: version-update:semver-major
  dependency-group: dependencies
- dependency-name: parquet
  dependency-version: 60.1.0
  dependency-type: direct:production
  update-type: version-update:semver-major
  dependency-group: dependencies
- dependency-name: pulsar
  dependency-version: 6.9.1
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
...

Signed-off-by: dependabot[bot] <support@github.com>

* chore(deps): update dependencies and pin pulsar 6.9.0

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): ignore pulsar 6.9 updates

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-02 23:01:55 +08:00
Ramakrishna Chilaka 1ac1d883f4 perf(ecstore): shard disk path lock registries with SWAR byte keys (#9127) 2026-11-02 23:00:48 +08:00
GatewayJ 45ba33291a fix(ecstore): release retained file descriptor cache invalidations (#9112)
* fix(ecstore): release retained descriptor cache invalidations

* test(ecstore): await descriptor cleanup after invalidation
2026-11-02 10:56:08 +00:00
hector 636eded277 ci(validation): resolve the newest nightly build on scheduled sweeps (#9114)
* ci(validation): resolve the newest nightly build on scheduled sweeps

The first scheduled sweep failed at candidate resolution: a schedule
carries no workflow inputs and resolve_functional_candidate.py only
derives a build from a workflow_run payload, so the empty
BUILD_RUN_ID crashed int(). Look up the newest successful
nightly-gnu run explicitly when the inputs are empty and feed it to
the resolver. Also downgrade the evidence artifact to
if-no-files-found: warn so an early infra failure does not cascade
into a second red step.

* ci(validation): read the resolver chain envelope correctly

CHAIN_OUTPUT is the chain envelope {schema, run_id, attempt,
workflow_sha, testing_sha, candidate}; the manifest lives under
candidate.manifest and the testing sha at the top level.

* ci(validation): sweep harness fixes from the first live run

- ssh -n in the inter-case cleanup loop: plain ssh consumed the case
  list from the loop's stdin, so the first dispatch executed only one
  of the twelve selected cases.
- Provide the managed Python 3.12 runtime for pool/ilm/replication
  cases, mirroring the chain validation job (pool.status reported
  INFRA_ERROR after its assertions passed; the missing runtime is the
  prime suspect).
- Record the auto-testing sha in the report step environment.
- Retain the last case's evidence tree in the sweep artifact so gate
  verdicts like INFRA_ERROR can be diagnosed from the run itself.

* ci(validation): install sweep Python client dependencies

Scheduled sweeps failed pool.status before any assertion because
pool_behavior.py exits when boto3 is missing. Install the auto-testing
validation requirements into a per-run virtualenv and put it on PATH,
matching the functional chain, so case scripts can import the client.

Co-authored-by: hector <majinghe@users.noreply.github.com>

---------

Co-authored-by: hector <majinghe@users.noreply.github.com>
2026-11-02 08:34:13 +00:00
Hauser Zhi ed4099ebe1 chore(deps): update crates and fix storage CI regressions (#9111)
* chore(deps): refresh crates and adopt openidconnect 4.1

Use published OIDC/OAuth2 releases and reject malformed HMAC signature
lengths before upstream verification. Refresh workspace and fuzz locks,
and advance the local zstd compatibility patch to 0.13.4 while retaining
the fixed 0.14.3 codec backend.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): refresh compatible lockfile resolutions

Resolve Prost build and derive dependencies with itertools 0.14 and
prefer windows-sys 0.61.2 within the existing supported version ranges.
Retain all package versions, sources and checksums.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(connect): separate cleanup checks from short probe windows

Use the functional measurement budget for the cleanup HTTP fixture so
setup and measured I/O can finish before checking delete status handling.
Exercise both normal scheduling and an in-flight PUT clock advance, and
include target classification in unexpected-failure diagnostics.

Retain the cleanup deadline, outer timeout and delete-stage assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): isolate stalled multipart disk timeouts

Apply the short injected timeout only to the deliberately stalled disk.
Healthy disks retain their normal operation budgets, while logical lock,
physical owner, immediate CopyObject and final shard assertions remain.

Keep overrides scoped across cloned and reconnected handles, preserve
shorter caller deadlines and explicit zero timeouts, and report drive
health when the real CopyObject assertion fails.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(rebalance): retry metadata write lock quorum admission

Recognize typed write-lock quorum failures for rebalance.bin within the
existing bounded metadata admission retry policy. Each attempt must
acquire quorum before loading or saving metadata; data writes are not
replayed by this retry.

Cover recovered and persistent quorum failures, cancellation after a
failed attempt, and rejection of unrelated resource or read-lock errors.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-02 06:49:24 +00:00
Boyi (Elliot) Li 3a1fac16e3 feat(tls): add opt-in fips feature for aws-lc-rs and rustls (#9084)
Add an opt-in `fips` Cargo feature to `rustfs` and `rustfs-tls-runtime`
that enables `rustls/fips` and `tokio-rustls/fips` (activating
`aws-lc-rs/fips` / `aws-lc-fips-sys` and `rustls-webpki/aws-lc-rs-fips`).

When compiled with `--features fips`, `startup_runtime_hooks` installs
`rustls::crypto::default_fips_provider()` as the process-wide default
crypto provider and asserts `provider.fips()` at startup.

Also lock `aws-lc-fips-sys v0.14.4` in `Cargo.lock`, allow the `OpenSSL`
license on `aws-lc-fips-sys` in `deny.toml`, and update
`docs/operations/kms-cryptographic-compliance.md` to document the scope
of `-p rustfs --features fips` vs. `rustfs-crypto`.

Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
2026-11-02 04:27:05 +00:00
Hauser Zhi b00e85f1a4 test(filemeta): cover visible version after tier cleanup (#9115)
Characterize how scanner metadata decoding and object listing handle a leading free version and a later delete marker.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-02 03:59:27 +00:00
Hauser Zhi ecbddc188a docs(scanner): define prefix statistics contract (#9116)
Define the scope, authority, coverage, persistence, and resource guarantees needed before scanner-derived current-object statistics can be enabled.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-02 02:43:28 +00:00
Chris An 2d63931bba fix(test): use available Docker privileges in OIDC live gate (#9109) 2026-11-02 09:03:15 +08:00
Ramakrishna Chilaka d429c6f792 perf(ecstore,rio,utils): accelerate MD5 ETag hashing and SWAR disk path checks (#9110) 2026-11-02 01:02:26 +08:00
hector e494dc2b4b ci(validation): sweep the migrated canonical validation cases nightly (#9107)
* ci(validation): sweep the migrated canonical validation cases nightly

The canonical release-validation cases migrated into auto-testing by
rustfs/auto-testing#113 (66 implemented, all non-heal) currently run
only through the manual validation flow; the last fleet executions
stopped on 2026-10-27 and nothing schedules them. Add a scheduled
validation sweep that closes the gap:

- nightly at 19:30 UTC (after the functional chain settles), rotating
  windows of the implemented catalog cases so the whole catalog is
  covered roughly weekly, with a bounded batch per night
- workflow_dispatch for a single case (--case), one module (--module),
  or an explicit batch (--limit), mirroring how the lanes are testable
  standalone
- fleet admission through functional_environment enter/finish with the
  same quarantine discipline as the lanes, inter-case node cleanup,
  per-case logs + reports retained as a sweep artifact
- a markdown sweep report uploaded to rustfs/dashboard under
  functional-reports/validation/ so the cases appear next to the lane
  reports, plus an alert-on-failure job for scheduled runs
- heal.* cases stay on the interactive validation flow: many need the
  reviewed native/tool collectors built by separate validation-tools
  runs before fleet execution

The registry gains the workflow responsibility (monitor: workflow,
max-age 60h so the watchdog notices a dead sweep) and the wiring test
baseline count moves with it.

Verified locally: check_wiring, check_test_wiring, test_validation_registry
(9/9), test_functional_chain + test_functional_chain_health +
test_security_workflow (99/99).

* ci(validation): group the sweep report by catalog module

The validation cases cover distinct areas (pool lifecycle, ILM
expiration, bucket/site replication, kms, data services, identity,
s3 compatibility), so a flat case table hides the category breakdown.
Render one section per catalog module with its own case table and a
Subtotal line, and keep the single grand - Total:/- PASS:/- FAIL:
block for the dashboard overview parser. Subtotals deliberately use
a different bullet prefix so the overview regexes cannot mistake a
module subtotal for the grand total.

* ci(validation): sweep the eight planned cases whose executors exist

The planned catalog entries are not all unimplemented: all eight
(kms.sse-kms-round-trip, tiering.transition-and-restore,
events.delivery, audit.request-correlation, iam.policy-enforcement,
oidc.login-and-session, s3.basic-object-round-trip and
scanner.usage-convergence) have dedicated executors routed in
run_validation_case.sh and live PASS evidence recorded in the
migration map. Widen the sweep filter to include them: the rotating
nightly batch now covers 74 cases (66 implemented + these 8), and the
fresh evidence each sweep produces feeds their acceptance review.
heal.* procedure-ready cases remain excluded - their executors need
the reviewed native/tool collectors built by separate
validation-tools runs before fleet execution.

---------

Co-authored-by: Hauser Zhi <housemecn@gmail.com>
2026-11-01 21:53:00 +08:00
Hauser Zhi 2b7c927ee8 perf(s3): streamline conditional multipart preflight (#9099)
* perf(s3): streamline conditional multipart preflight

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): isolate mc mirror fixture in full suite

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(connect): isolate cleanup deadline fixtures

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): avoid lock cleanup refcount race

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): defer decommission lookup lock loss

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-11-01 18:59:57 +08:00
Hauser Zhi 647846956f chore(deps): update flake.lock (#9108)
Flake lock file updates:

• Updated input 'nixpkgs':
    'github:NixOS/nixpkgs/674a202' (2026-10-24)
  → 'github:NixOS/nixpkgs/a078812' (2026-10-31)
• Updated input 'rust-overlay':
    'github:oxalica/rust-overlay/5b9f119' (2026-10-24)
  → 'github:oxalica/rust-overlay/6ecf534' (2026-10-31)
2026-11-01 06:26:39 +00:00
GatewayJ 04690f7da5 fix(s3-tables): clean empty catalogs and cache registration reads (#9063)
* fix(s3-tables): clean up empty tables and parallelize catalog reads

* fix(s3-tables): bound catalog registration index reads

* fix(s3-tables): cache validated registration ownership in memory
2026-11-01 04:49:50 +00:00
Ramakrishna Chilaka 3c0829049d perf(ecstore): optimize multipart commit, delete receipts, and fsync (#9105)
* perf(ecstore): fuse multipart commit, cache active upload heads, and scale fsync workers (#9077)

- Cache active multipart upload heads, committed part records, and per-part
  transaction state in ACTIVE_MULTIPART_SOURCE_HEADS with invalidation on
  mutation, retirement, abort, and delete paths.
- Fuse destination metadata preparation into MultipartFusedCommitOutcome,
  coalesce prepared metadata writes before sync_data(), and gate direct
  local part transaction settlement on disk.is_local().
- Retain quorum commit receipt publication before physical delete cleanup
  using PREPARED_DELETE_RECEIPTS, batch TARGET and PREPARED syncs, and skip
  redundant pre-reservation directory syncs for inline deletes.
- Scale DiskBlockingLane::Fsync to 8 workers per disk with idle_workers
  accounting and bounded per-disk batch fairness so concurrent fsyncs
  coalesce in the filesystem journal.
- Cache verified small stripe proof records in VERIFIED_STRIPE_RECORDS while
  recomputing payload digests on every read.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

* fix(ecstore): align test/prod commit and cache paths and hold source lock across cache publication

* fix(ecstore): preserve fused commit cancellation/panic semantics and retire excess idle fsync workers

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>

Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

---------

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-11-01 13:07:42 +08:00
Chris An 890a463218 test(e2e): stabilize mixed-version coordinator assertion against leader-lock refresh gaps (#9103)
Replace the immediate post-replacement leader identity comparison with a
polling stabilization loop (up to 20 x 500ms). A leader-lock refresh gap
during old-binary replacement can make leader() briefly observe a different
node; the loop waits for the measured new coordinator to be confirmed. A
persistent change to an old-binary node still fails with the observed
identity in the error message.

Removes the redundant immediate assertion that the stabilization loop
supersedes. Also consolidates the non-mixed leader/pid resolution to avoid
a double leader query.
2026-11-01 07:03:54 +08:00
Joep 25f45f6309 test(console): strengthen brotli buffer middleware test coverage (#9098)
Extend test_buffer_brotli_responses to verify body bytes are preserved
and Content-Length matches the exact body length.  Add two new cases:
non-brotli responses pass through unmodified, and a body stream error
strips Content-Encoding so clients do not attempt to decode an empty
body as brotli (covers the fix from #9085).
2026-11-01 05:10:43 +08:00
Ramakrishna Chilaka e3700614a1 perf(ecstore): optimize listing, versioned put, delete, and multipart (#9077) (#9094)
* perf(ecstore): optimize listing, versioned put, delete, and multipart (#9077)

- Buffer leaf object entries in LocalDisk::scan_dir and add zero-alloc
  FileMeta::buffers_match_strict, MetaCacheEntry::matches_strict_borrowed,
  and MetacacheReader::try_peek_buffered / skip_current for listing
- Add Linux PublicationRoot::open_directory_and_readonly_child and
  os::has_non_data_dir_entry_lazy_from_fd with RawDir stack buffer
- Fuse local versioned PUT overwrite commit, recoverable DELETE
  preparation/settlement, and multipart publication while preserving
  crash-consistency and fsync ordering invariants

Fixes #9077

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

* fix(app): use multipart storage domain facade

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): remove redundant multipart borrow

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
Co-authored-by: Hauser Zhi <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-10-31 16:26:52 +00:00
Chris An d4ab7704b3 fix(scanner): rebuild unreadable usage floor instead of stopping leader iteration (#9101)
backlog#2918 retires the usage floor as a quota proof. After dual-corruption
recovery has been attempted, an unreadable floor is reported and rebuilt
through a CAS overwrite with a bootstrap marker rather than stopping the
leader iteration for a supervisor retry. Transient I/O errors that prevent
reading the floor revision fall through to the existing stop-and-retry path.

The identity-less floor regression from rustfs/rustfs#8670 now verifies
automatic rebuild and recovery instead of bounded backoff.
2026-11-01 01:38:39 +08:00
Chris An 422e724051 fix(ecstore): clear stale BucketMetadataSys on ECStore drop (#9097)
When sequential test fixtures share the bootstrap InstanceContext, the
BucketMetadataSys stores a Weak<ECStore> to avoid a reference cycle. The
ExpiryState holds an Arc<ECStore> that keeps the store alive past the
test's own Arc drop; the next fixture's resize_workers releases it and
the weak goes dangling before init_bucket_metadata_sys installs a fresh
BucketMetadataSys. Any object_store() call in that window panicked.

Add Drop for ECStore that clears the context's BucketMetadataSys slot
when its weak handle is stale, so the next fixture always finds a clean
slot. Fixes the heal absence_receipt_regressions and dangling_grace
test failures under sequential execution.
2026-10-31 22:25:08 +08:00
overtrue e0bf54197d fix(ecstore): clear stale BucketMetadataSys on ECStore drop
When sequential test fixtures share the bootstrap InstanceContext, the
BucketMetadataSys stores a Weak<ECStore> to avoid a reference cycle. The
ExpiryState holds an Arc<ECStore> that keeps the store alive past the
test's own Arc drop; the next fixture's resize_workers releases it and
the weak goes dangling before init_bucket_metadata_sys installs a fresh
BucketMetadataSys. Any object_store() call in that window panicked.

Add Drop for ECStore that clears the context's BucketMetadataSys slot
when its weak handle is stale, so the next fixture always finds a clean
slot. Fixes the heal absence_receipt_regressions and dangling_grace
test failures under sequential execution.
2026-10-31 21:58:51 +08:00
Hauser Zhi b4af43c884 fix(s3): guard conditional multipart pool errors (#9092)
* test(s3): cover conditional writes over delete markers

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(s3): avoid repeated ETag regex compilation

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(s3): borrow conditional write headers

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): reject conditional completion on unknown pool

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ci): update e2e smoke selection digest

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ci): update full E2E selection for marker regression

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-10-31 20:48:34 +08:00
Chris An 1cb4c0ebe2 ci: stamp the plan contract and rename the workspace lint-and-build key (#9095)
* ci: gate the plan on a contract marker

A base planner predating the NIGHTLY_JOBS split still emits the old required
set, and the strict verifier would reject it. Select now stamps plan_contract=2
and the workflow refuses any plan without the current marker, falling back to
the full matrix, so a stale base planner can neither authorize the new narrower
selection nor force a job the new workflow no longer schedules.

* ci: rename the workspace lint-and-build job key and evidence path

The job key test-and-lint named a job that runs no tests: it does Clippy, the
test-binary archive, doctests and the log-rule anchors, while the tests live in
workspace-tests. Anyone reading needs: [test-and-lint] would conclude tests had
already gated that dependency. The key becomes workspace-lint-and-build to
match its display name, and the shared evidence directory becomes
artifacts/workspace so the path stops asserting the same thing. The aggregate's
display name stays Test and Lint because that is the live ruleset check
context. ci-gates.md also stops attributing the ECStore test run to the wrong
job.
2026-10-31 17:41:02 +08:00
Chris An e5563e6004 feat(release): gate publication on candidate certification (R01) (#9090)
Add a fail-closed release certification path so incomplete or substituted
evidence blocks every official publication exit. scripts/release/release_gate.py
validates the versioned release-validation plan, the candidate identity and the
G01 evidence-envelope set, then re-checks promoted bytes against the passed
list. build/docker/package/helm publication jobs require that certification and
stage artifacts before promoting identical bytes.
2026-10-31 16:53:18 +08:00
Chris An 0a72b29a34 chore(e2e): isolated harness event drill (close after evidence) (#9089)
chore(e2e): isolated harness drill
2026-10-31 16:52:19 +08:00
Chris An 51275cb7d8 ci: move specialized lanes off the pull-request path (#9093)
Connect Feature Boundaries, real io_uring and the rio-v2, Swift, SFTP and
HTTP/3 feature lanes no longer gate a merge. They run only in the scheduled
and manual full-validation runs, which report a regression within a day; on
the pull-request path they bought no earlier signal worth the runner
occupancy (Connect alone measured 53.5 median minutes and occasionally set
the wall). Workspace lint and tests, the short core contract, the debug
build, E2E smoke and the S3 lanes stay required on PRs and merge groups.
2026-10-31 16:52:03 +08:00
Chris An 3bf270b49f ci: record CI01 measurements, drill evidence and fix the OIDC live gate (#9091)
* ci: retain CI01 timing sample and fix the OIDC live gate tool

Record the measured PR feedback and runner occupancy for the CI plan's CI01
criterion, including the honest gap between the experimental targets and the
sampled medians, and replace the awscurl dependency in the live Keycloak gate
with the AWS CLI so the security suite runs on PEP 668 managed fleets.

* docs(testing): attach live run evidence to the event-drill index
2026-10-31 05:10:38 +00:00
Chris An d8d064bd18 docs(testing): index event-class drills and retained CI evidence (#9088) 2026-10-31 11:21:46 +08:00
Hauser Zhi e5653ca055 chore(deps): refresh workspace dependencies (#9080)
Run cargo update --verbose and cargo upgrade --verbose twice from the
current main baseline. Upgrade the Tonic family to 0.14.9, Redis to 1.8.1,
sysinfo to 0.40.1, and hotpath to 0.30.2 with compatible transitive updates.

Synchronize the standalone fuzz lockfile and retain its PKCS#1 rc.4
resolution for compatibility with pinned RSA rc.18.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
2026-10-31 10:36:21 +08:00
Chris An 6413a11889 test(heal): align cleanup tests with removal-disabled heals (#9087) 2026-10-31 10:35:56 +08:00
Chris An 9e4ea9fdd1 fix(console): strip Content-Encoding on brotli buffer failure (#9085)
When to_bytes fails in buffer_brotli_responses the error path replaced
the body with empty while keeping Content-Encoding: br, producing a
malformed response (empty body claiming brotli encoding). Strip the
header and log a warning so the degradation is visible and the client
does not attempt to decode a missing body.
2026-10-31 09:02:10 +08:00
Joep 1a841fb7c7 fix(console): buffer brotli responses to set Content-Length for Firefox (#9076) (#9079)
tower_http's CompressionLayer streams brotli via Transfer-Encoding: chunked
without a Content-Length header. Firefox's incremental brotli decoder aborts
on this combination (NS_BINDING_ERROR), making the web console unusable in
Firefox. Chrome and Safari buffer the full body before decoding so they are
unaffected.

Add a thin middleware (buffer_brotli_responses) that runs after CompressionLayer,
collects the complete body for any brotli response that lacks Content-Length, and
re-emits it with the correct length header.
2026-10-31 08:07:28 +08:00
Chris An b8ee0301e9 feat(scanner): fair bucket service across restarts and budgeted first enumeration (#9083)
* feat(scanner): bound first-build enumeration with the cycle budget

Charge raw directory entries and their name bytes, and let one bucket scan hold a child budget that stops its own token while charging the cycle. A count budget also bounds one directory listing, so a wide first build can no longer finish a full read_dir before the first object is charged.

The new stop reason maps onto the persisted Directories variant so older readers keep decoding checkpoints. A directory with queued children keeps its index until they end, and every index on the active walk path is saved as an optional map field: losing either one would recharge its replay and stop a fixed budget from advancing.

* feat(scanner): keep bucket service order across restarts

Save each set's first-in-first-out bucket order as an optional map field of its usage cache, including after an incomplete cycle, which otherwise writes nothing. Durable age now outranks the dirty-first and leader-local cohort orders, which only break its ties, so a restart cannot hand the budget back to the same first buckets. Failed turns add visible debt without moving a bucket forward; a budget stop or a resource veto adds none. A bucket that spends its quantum and saves forward motion returns to the queue tail within the cycle.

The order authorizes nothing: another movement epoch or a corrupt value starts a new one, and a recreated bucket joins as a new arrival.

* test(scanner): cover quantum handoff and saved service order

Run the real worker queue with injected bucket shares and verify a spent bucket yields to waiters, a share without durable motion ends its turn, and the saved order keeps certified coverage while rejecting older owners.

* docs(scanner): describe budgeted first build and service order

* test(scanner): pin index retention and requeue motion

Bound the nested restart fixture tightly enough that dropping a directory index fails it, and cover a repeated share whose frontier never moves.

* fix(scanner): keep service generations and owner stops intact

Queue a new bucket behind waiters but ahead of buckets that already had a turn, matching the leader-local cohort, and keep the set cache untouched when the owner was cancelled so an interrupted cycle cannot advance its revision. The order holds one record per inventory bucket, like the set cache's entries, so a truncating bound that could starve the long-waiting buckets is removed. Publish the incomplete scope before saving so a contended lock cannot delay it.

* ci(e2e): refresh the full selection digests

* fix(scanner): correct a comment spelling

* fix(scanner): separate service debt from vetoes and stale owners

Keep a resource veto and a remote count-budget stop out of failure debt,
settle the claim before a requeue exposes the bucket to another worker, and
stamp the service order with its leader so an older owner cannot replace it
after an incomplete save. The checkpoint fixture's budget now covers both
service orders.

* fix(ecstore): create parents before resource-scoped writes

#9064 moved parent creation into the lazy writer, so a write that holds a
resource unit reached the native open without its parent directory and
failed with FileNotFound on nested paths.

* fix(e2e): retry SlowDown codes during upgrade write readiness

The rolling-upgrade readiness probe only retried 503 ServiceUnavailable,
so a transient 503 SlowDown from a still-recovering node failed the
four_node_rolling_upgrade test immediately. Accept SlowDown and
SlowDownRead alongside ServiceUnavailable, matching the existing chaos
test transient-error set.
2026-10-31 07:57:18 +08:00
Chris An 0e5fe8c658 feat(storage): share physical admission across scanner and heal (#8911)
* feat(scanner): share node admission with background heal

* fix(scanner): drain candidates after listing completion

* fix(scanner): yield cache leases for shared node admission

* test(scanner): attest adaptive admission in process receipts

* fix(concurrency): declare Tokio time dependency

* feat(concurrency): retain bounded physical resource subsets

* fix(scanner): retain resource ownership in native filesystem jobs

* feat(concurrency): acquire physical groups before node work

* feat(scanner): gate background reads by physical device

* feat(concurrency): combine preallocated resource selections

* feat(scanner): share physical topology across disk plans

* fix(storage): retain only native disk resource subsets

* feat(storage): admit auxiliary physical resources without waiting

* feat(heal): admit physical resources before object repair

* fix(storage): retain resources during native format probes

* fix(storage): retain resources through direct writer I/O

* fix(storage): retain resources through buffered writer I/O

* fix(storage): retain physical resources through streamed reads

* fix(storage): retain resources through native filesystem jobs

* fix(storage): retain physical ownership during bitrot reads

* fix(ecstore): retain resources during positioned reads

* fix(ecstore): retain staged metadata write ownership

* fix(ecstore): retain native io_uring read ownership

* fix(ecstore): enforce receiver-side background admission

* fix(ecstore): retain resources through whole-file native I/O

* fix(ecstore): retain physical ownership during durable rename sync

* fix(storage): account for retained background stream buffers

* fix(storage): retain memory charges for background read results

* fix(storage): account for native io_uring read allocations

* fix(storage): retain memory charges for direct-write buffers

* fix(ecstore): account for heal and RPC reader buffers

* test(scanner): verify samples and clean concurrent collectors

* fix(storage): retain inline and HTTP writer memory reservations

* perf(rio): reuse reserved HTTP writer storage

* fix(rpc): reserve background scanner pipe storage

* perf(rpc): reuse reserved response reader storage

* feat(scanner): measure cache copy allocation requests

* fix(rpc): budget namespace scanner responses

* fix(scanner): retain the enabled supervisor task handle

* fix(scanner): budget namespace frame read staging

* fix(scanner): account namespace envelope decode storage

* fix(heal): retain and join the MRF consumer on shutdown

* test(heal): isolate process-global MRF consumer fixture

* fix(heal): join manager workers during shutdown

* test(heal): verify shutdown at native read boundaries

* fix(heal): drain channel commands before stopping MRF

* fix(heal): admit resume scans and retain replacement workers

* build: pin profiling sources and trust fixed ownership dependencies

* fix(heal): yield node admission while accepted native work drains

* fix(startup): retain shutdown work and preserve deadline failures

* fix(heal): admit inventory probes and retain replacement work

* fix(shutdown): preserve maintenance and frontend join failures

* fix(shutdown): retain HTTP child tasks through real retirement

* fix(shutdown): join actual TLS reload work before retirement

* test(multipart): preserve failures before fault barriers

* fix: keep physical admission inside repository guards

Route the multipart lock diagnostics filter through the e2e storage
compatibility module, reuse the parent module's s3s body aliases in the
namespace memory test, and share one Reed-Solomon verify error mapping
across the reserved-buffer and default paths.

* fix: reconcile physical admission with main's new call sites

Main added a source-admission metadata write layer, a CAS write fence,
fixture writers and scanner handoff tests against the old borrowed-slice
and node-permit shapes. Pass owned Bytes through the new metadata layer,
answer the scanner handoff with ScannerNodePermit, gate the test-only
disk lookup re-export, and clear the lint findings that stable 1.99
reports for the shutdown and admission code without suppressions.

* test(concurrency): name reversed attachment groups clearly

* fix(ecstore): box disk operation futures below admission layers

Every LocalDiskWrapper operation reaches the LocalDisk future through the
health, admission and timeout layers (track_cleanup_mutation, the
track_disk_health family, the io-permit and native-resource admission
split, and track_admitted_disk_operation). Each layer embedded that future,
and unoptimized builds copy it into every awaiting frame, so one local
delete cost about 1.3 MiB of stack and 16 tests overflowed libtest's
default 2 MiB stack.

Box the operation future once where track_admitted_disk_operation creates
it, through a non-async helper so the temporary never stays in a polled
frame. The layers above now hold only a pointer; the cost is one
allocation per local disk operation.

* fix(heal): box object heal futures below admission

The admission wrappers took the object heal future by value, so unoptimized
builds copied it into three awaiting frames, about 650 KiB per heal. Create
it through a non-async helper instead, leaving only a pointer in those frames.

* test(ecstore): count the I/O backend's root FD owner
2026-10-31 01:00:07 +08:00
Chris An e46877dd1c feat(scanner): certify cold peer buckets during hot writes (#8970)
* feat(scanner): certify cold peer buckets before scoped ACK

* test(e2e): keep peer evidence within JSON macro limits

* test(scanner): requalify mixed peers after rolling setup

* test(scanner): prove old-worker coverage with a fixed coordinator
2026-10-31 00:36:26 +08:00
Chris An 3fc610c8a2 fix(scanner): track heal generation and payload observations (#9008)
* fix(scanner): distinguish missing heal identity fields

* test(scanner): simplify identity case types

* fix(scanner): track heal generation and payload observations

* fix(scanner): treat heal results as observations

* test(scanner): route heal integration through storage boundary

* test(scanner): scope the heal generation fixture

* test(heal): fill observation fields in the retained outcome fixture
2026-10-31 00:19:13 +08:00
Chris An 4992034cc2 perf(scanner): batch proportional pacing in folder walkers (#8850)
* fix(heal): measure admission lock wait and hold separately

* fix(heal): exclude force-start cancellation from lock hold

* test(ecstore): drain guarded delete fixture rename tails

* feat(scanner): count object metadata visits

* test(ecstore): drain guarded delete fixture rename tails

* perf(scanner): batch proportional pacing in folder walkers

* test(ilm): isolate fixture recovery loop ownership

* test(scanner): drop the retired update cache from pacing fixtures

---------

Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-31 00:08:10 +08:00
Chris An b4c9bf9abb fix(heal): prevent lock timeouts during disk recovery (#9054)
* test(heal): isolate durable repair during root recovery

* test(heal): isolate the direct repair fallback

* fix(lock): use remaining acquire budget for retries

* test(lock): use virtual time for retry budget

* fix(lock): retain quorum failures across deadline retries

* test(heal): isolate multi-pool crash recovery

* fix(lock): retain quorum error on final timeout

* fix(heal): allow reads during read repair reconstruction

* fix(heal): retain deep scan retry for read repair

* test(heal): wait for metadata write tail
2026-10-31 00:07:50 +08:00
Chris An 7d45685d70 feat: classify scanner metadata calls by diagnostic prefix (#9052)
* feat: classify scanner metadata calls by diagnostic prefix

* fix: export zero scanner visit counts for diagnostic scope
2026-10-31 00:07:38 +08:00
Chris An 76bab81aa6 fix: reject unverified scanner performance evidence (#9049)
* fix: reject unverified scanner performance evidence

* fix: keep unverified G14 descriptors unpublished

* test: release scanner fixtures without signaling stale pids
2026-10-31 00:07:24 +08:00
Chris An 72ff5dbbad fix(heal): preserve data when removal is disabled (#9040) 2026-10-31 00:07:11 +08:00
Chris An 8ece50ff8c fix(scanner): report incomplete collector observations (#9012) 2026-10-31 00:06:59 +08:00
Chris An 7f13ebe2a5 fix(scanner): align unversioned overflow heal options (#9036)
fix(scanner): protect unversioned overflow heals
2026-10-31 00:06:47 +08:00
Chris An 696dc1496e fix(scanner): distinguish missing heal identity fields (#9000)
* fix(scanner): distinguish missing heal identity fields

* test(scanner): simplify identity case types
2026-10-31 00:06:35 +08:00
Chris An 68ee16bbbe docs: require removing task build output before handoff (#9078) 2026-10-31 00:03:03 +08:00
Chris An bc0706b2e3 fix(ci): accept binary target IDs in workspace shards (#9075) 2026-10-30 23:21:50 +08:00
Ramakrishna Chilaka c6152954f6 perf(ecstore): fuse local PUT/DELETE commit I/O and eliminate redundant metadata disk reads (#9038) (#9064)
* perf(ecstore): fuse local PUT/DELETE commit I/O and eliminate redundant metadata disk reads (#9038)

- Fuse authoritative bucket metadata existence and parse reads via tokio::join!, add a LOCAL_META_MUTATION_GEN-validated local authority cache, and piggyback one-shot quota snapshot reads onto single-PUT Object Lock snapshot loads.
- Reuse prepared ObjectOptions in post-write lifecycle transition checks instead of re-reading bucket versioning and Object Lock config after commit.
- Defer temporary shard file open/mkdir/write into a single spawn_blocking call via LazyLocalFileWriter, pre-sync single-block shards before page-cache reclaim, and fuse rename_data preparation + commit into a single Fsync-lane dispatch on Linux.
- Enable rename_data old_current_source reuse by default across all-local sets, guard early-ack commit on quorum source stability, and skip redundant post-commit tmp_delete when all online local disks succeeded.
- Enable data-first batch_shard_pread when deferred parity handles are available and replace zero-filled allocation with Vec::with_capacity + read_to_end for offset-0 shard reads.
- Defer pre-delete get_object_info_for_delete to PrefixAccessDenied error handling, skip redundant single-pool unversioned delete pre-stats, and add a fused local delete preparation and 2-barrier settlement fast path.

Fixes #9038

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

* fix(ecstore): preserve delete identity and durability policy

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): cover fused delete recovery stages

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): preserve inline versions after commit sync failure

* perf(ecstore,s3): accelerate PutObjectLegalHold, CopyObject, and large PUT fdatasync (#9038)

- Fuse LocalDisk::update_metadata (read xl.meta + FileMeta::load + update_object_version_with_opts + marshal_msg + staged tmp write + rename_all_with_precondition_and_parent_sync_std) into a single Fsync-lane blocking operation, and skip redundant get_bucket_info / get_object_info calls in put_object_legal_hold when object lock is enabled and replication is not configured (PutObjectLegalHold: 314.8 -> 988.3 ops/s, 3.14x faster, 0.95x of MinIO).
- Pass destination bucket as orig_volume through create_bitrot_writer_with_orig_volume into LocalDisk::create_file so single-shot non-inline part.1 writes under syncs_data_shards() durability run fdatasync before fadvise(POSIX_FADV_DONTNEED) and skip the duplicate sync_dir_files_std(src_data_path) in FusedCommitAttempt without fsyncing the temporary parent directory (warp PUT 1MiB: 658.3 vs MinIO 656.8 obj/s, 1.00x parity, p50 26.10ms vs MinIO 46.60ms).
- Add single_pool() fast paths to ECStore::handle_copy_object and ECStore::handle_new_multipart_upload, skip no-op destination prelookup get_object_info when put_like_write_creates_new_version is true, and backfill previous_current_size from OldCurrentSize in copy_object (CopyObject 1KB: 398.4 -> 1,086.1 ops/s, 2.73x faster, 1.01x faster than MinIO).

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

* fix(ecstore): provide non-Linux has_rename_data_test_failpoints stub for Windows CI

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

* fix(ecstore): preserve presynced shard directory durability

Sync the shard directory before publishing presynced payloads and keep the file sync test probe available on non-Linux targets.

* fix(ecstore,s3): fix non-consuming crash_inject check, test hooks, and rubber-duck findings (#9038)

- Add non-consuming crash_inject::is_armed(point, key) so FusedCommitAttempt and LocalDisk::update_metadata do not consume one-shot crash arms before the fallback path runs (fixes crash_consistency::* and meta_write_crash_consistency::* tests).
- Check INLINE_PREPARATION_BEFORE_BACKUP and RENAME_DATA_AFTER_FIRST_PUBLICATION in has_rename_data_test_failpoints so inline preparation admission and observed-owner panic tests run on their expected path.
- Resolve staged_dir via get_object_path_for_io in test_rename_data_presynced_shard_keeps_directory_sync and avoid premature orig_volume access check during tmp staging in put_object (fixes put_object_failure_cleans_tmp_workspace_inline).
- Address rubber-duck review findings: fall back from FusedCommitAttempt on any existing xl.meta when sync_commit_metadata is true, fsync object dir after activating delete rollback dir before unlinking xl.meta, classify data-dir entries before removal in fused delete finalization, include self_copy_lock in copy_prelookup_required, and avoid .expect() on non-test mutexes.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

* fix(ecstore): defer shard sync until destination is known

* test(rustfs): cover legal hold replication fast path

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Chris An <anzhengchao@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-10-30 23:20:45 +08:00
Damien Degois 0d2bf69e2d fix(s3select): case-insensitive enums, LINES key order, path names (#9021)
* fix(s3select): match request enum values case-insensitively

ExpressionType, CompressionType, CSV FileHeaderInfo, JSON Type and CSV
QuoteFields were compared exactly, so lowercase values such as
`lines`, `document` or `gzip` were rejected. MinIO accepts any case.

Match them ASCII case-insensitively in request validation and rewrite
them to the canonical uppercase spelling, so every later comparison
keeps working unchanged. Unknown values keep their existing errors.

* fix(s3select): keep source key order for JSON LINES input

Arrow's JSON schema inference walks each record as a serde_json::Map,
which sorts keys unless serde_json's process-wide preserve_order
feature is on. JSON LINES `SELECT *` therefore returned keys sorted,
and CSV output columns were permuted.

Infer the LINES schema from the same object bytes and record limit as
DataFusion's JsonFormat, keep Arrow's types, and reorder fields
(nested structs included) by first-seen key order. Enabling
preserve_order globally was rejected: it changes map ordering for the
whole binary.

Drop the test-only preserve_order dependency so the crate's tests run
with production features; the DOCUMENT inference reference now
compares against Arrow's types in source order.

* fix(s3select): name nested path projections after their last key

`SELECT s.obj0.id` returned the key `s.obj0[id]`, DataFusion's display
name for the field access. AWS names an unaliased path projection after
its last key, e.g. `{"id": ...}`.

Alias such projections to their last key when that name is unique among
the output and ORDER BY column names. Queries with a wildcard keep
today's names, since the expanded columns could collide.

* fix(s3select): preserve names beside computed projections

* fix(s3select): preserve names for ambiguous path projections

* fix(s3select): name path projections from the planned schema

Path projections that the SQL rewrite leaves unaliased are now named
after their last key once DataFusion has planned the query. A path takes
its key only if no other output column keeps or receives that name. A
colliding rename is dropped and the check repeats, so the final names
are unique whenever DataFusion's own names are.

The SQL rewrite is unchanged, so GROUP BY can still refer to the names
it assigns and every query that planned before still plans.

Review cases:
- s.obj0.id, s.obj1.id, s.obj2."s.obj0[id]" keeps the three generated
  names: the third key would duplicate the first retained name.
- s.obj."lower(s.id)", LOWER(s.id), in either order, keeps the generated
  path name: its key is the computed column's name.

Paths beside computed columns, beside duplicated keys, and in
parentheses now take their key, as AWS S3 Select names them. Paths stay
unnamed when an ORDER BY expression is not projected, as before.

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: GatewayJ <835269233@qq.com>
2026-10-30 23:19:18 +08:00
Mathew Beane 7e536843ea fix(audit): emit a bounded audit entry for authorization denials (#9073)
A request refused by the authorization layer was logged as
s3_authorization_denied but never reached the audit stream. Emit an audit
entry from DenialContext::deny with the account, bucket, object, denied
action and denial reason. Entries are bounded by a per-class token bucket
(lower for anonymous callers) with a suppressed count carried on the next
entry, quiet probe denials are skipped, DeleteObjects audits its refused
keys as one aggregate entry, and the S3 response is unchanged.
2026-10-30 23:18:42 +08:00
唐小鸭 7672867476 fix(replication): count force-delete outcomes in replication stats (#9072)
A replicated force-delete that a target rejected (for example a peer whose
credentials lack s3:ForceDeleteObject) was only logged; the per-target
replication counters never saw it, so `replication status` reported zero
failures while the sites had already diverged.

Build a ReplicatedTargetInfo for every target outcome of
replicate_force_delete_to_targets (missing client, offline target,
rejected remove, success) with a Pending previous status, and feed each
through ReplicationStats::update so rejections count as failures and
accepted force-deletes count as replicated.

Document that the managed site-replicator-0 policy must name
s3:ForceDeleteObject explicitly and that a bucket-replication target with
its own credentials needs the same grant.
2026-10-30 18:00:03 +08:00
Timo Otten c8f7f02817 fix(site-replication): grant replicator s3:ForceDeleteObject (#9069)
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
2026-10-30 17:59:36 +08:00
Hauser Zhi dcbec68d45 fix: preserve PUT lock failure diagnostics (#9062)
* fix: preserve PUT lock failure diagnostics

Propagate the request operation into spawned PUT commit tasks so lock failures retain their metric attribution. Record bounded lock error classifications without exposing lock resources.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test: remove redundant clone in PUT lock test

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix: bound PUT commit context stack usage

Pin the commit future before wrapping it with request context to reduce stack pressure in PUT callers.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-30 14:59:20 +08:00
hector 589b499e3b ci(ft,heal,chain): FT gate 54, heal budget, and a temporary performance lane disable (#9057)
* ci(ft): update the lane gate to the 54-case manifest with scenario F

auto-testing #118/#119 added FT scenario F and case B5, so the lane now
runs 54 cases over scenarios A,B,C,C2,D,E,F and passes 54/54 — but the
workflow gate still pinned the 44-case A-E manifest and failed the
report step. Align the gate and the contract-test fixture with the
54-case manifest.

* ci(heal): give heal a 90-minute run budget inside a 120-minute job

The heal task was still progressing (scanned 494 -> 571+, failed=0)
when the 45-minute step cap killed it, so the verification steps never
ran and the lane produced invalid evidence (chain 40796474356). The
step budget is now 90 minutes, and the job-level budget rises from 60
to 120 minutes so the enclosing job cannot cancel the raised step
budget. The timeout contract now records heal as the exception to the
shared 60/45 baseline.

* ci(chain): force the performance probe offline while pf-testing is broken

The pf-testing environment is temporarily broken, so every nightly
chain would end red in the performance lane. performance is
required=false in scheduled-validations.json, so forcing the probe's
performance_ready output to offline takes the chain through its
designed skip path: the lane job is skipped, aggregate receives
--allow-skipped performance, and the report records the optional-lane
skip with its reason. Marked TEMPORARY; restore the probe once the
environment is healthy again.

* test(table): drop a stale workflow-comment pin left by #9059

#9059 rewrote the table suite step comments but kept the assertion for
the old '# Red only for harness/environment breakdowns' line, so
test_security_workflow.py fails against current main. The semantics
stay pinned by the continue-on-error and HARNESS_OK assertions.
2026-10-30 14:03:22 +08:00
Mathew Beane 69f8e364b0 fix(audit): emit entries for multipart parts and bucket config writes (#9067)
* fix(audit): replay queued payloads for internal event names

Audit entries are persisted by the store targets and read back through
serde. Three internal events (CreateMultipartUpload, AbortMultipartUpload,
DeleteObjects) serialized to a string that EventName::deserialize rejected,
so every queued entry for them was dropped on replay. Read the persisted
event name through a lenient deserialize_with function; EventName's own
Deserialize and parse stay strict because they also back notification
configuration.

* fix(audit): emit entries for multipart parts and bucket config writes

UploadPart, UploadPartCopy, AbortMultipartUpload and the mutating bucket
configuration operations never produced an audit entry: the audit path
required a bucket notification event and these operations have none, or
(AbortMultipartUpload) never built a helper. Add an audit-only
OperationHelper constructor that builds no notification event and wrap
the S3 handlers for these operations with it. Operations without a
notification event use one coarse audit-only event name, with the
operation in api.name.

---------

Co-authored-by: Hauser Zhi <housemecn@gmail.com>
2026-10-30 11:58:54 +08:00
Chris An 191c95a469 ci: enforce affected validation and rehearse bounded shards (#9070)
* ci: enforce affected validation and rehearse bounded shards

* test(ci): keep regression output stable under forced color
2026-10-30 11:58:38 +08:00
Chris An dacb003856 ci: let failed-job reruns reuse the producer's test archives (#9071)
Since #9059 the shared test archives and debug binaries are named
with the run attempt, and the archive identity binds the attempt. A
"Re-run failed jobs" attempt does not rerun the successful producer,
so its consumers look for <name>-2, fail with "Artifact not found",
and every flaky test forces a full rerun.

Give those artifacts one name per run, overwrite them when a producer
does rerun, and bind the archive identity to the run instead of the
attempt. Source, tree, lock, toolchain and environment stay bound, and
an archive from another run is still rejected.
2026-10-30 11:16:10 +08:00
Chris An c67f9fc377 ci: qualify workspace packages that share a name with a dependency (#9065)
The planned package list is passed to cargo as bare -p names. The zstd
compat crate is named zstd so it can patch crates.io, and with zstd
0.14.3 also locked, cargo rejects -p zstd as ambiguous, failing
Workspace Lint and Build on main since #9059.

Qualify such names with the local version from Cargo.lock, and fail
loudly if even that cannot disambiguate.
2026-10-30 06:09:42 +08:00
Chris An 4fcbf60f10 ci: unify validation planning, artifacts and suite orchestration (#9059)
* ci: unify validation planning, artifacts and suite orchestration

* fix(ci): preserve JSON diagnostics for release checks

* fix(ci): keep manual attempts without plans visible

* fix(ci): distinguish nextest setup scripts from test results

* ci: reuse extracted archives and consolidate duplicate checks
2026-10-30 02:02:38 +08:00
Chris An b7ff09e357 chore: strengthen agent delivery standards and validation (#9058) 2026-10-29 18:01:05 +08:00
Hauser 84e24e7673 chore(deps): refresh crates and adopt released aws-sigv4 (#9047)
* chore(deps): refresh crates and adopt released aws-sigv4

Run two update/upgrade rounds for the main and standalone fuzz workspaces.
Replace the temporary SigV4a Git override with aws-sigv4 1.6.4 from the
registry and remove its obsolete source permission.

Pin OpenID Connect to e20ddbb01ca68356f2979bc125f5613ab45b4e7e. Upgrade
async-nats to 0.51.0, hotpath to 0.30.0, libunftp to 0.24.0, and the TOML
test dependency to 1.1.8. Retain Arrow/Parquet 59.3.2 for DataFusion 55.2.0
and keep the fuzz PKCS#1 version compatible with pinned RSA rc.18.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(deps): retain safe openidconnect pin against HMAC panic

The e20ddbb pin verifies HMAC signatures with mac.verify(signature.into()),
which panics in generic-array on malformed length instead of returning
InvalidIdentityToken. Retain the previous reviewed pin that uses
verify_slice and add a malformed-signature regression covering HS256,
HS384, and HS512.

* chore(deps): upgrade sysinfo to 0.40.0

Update the main and standalone fuzz lockfiles. Adapt fallible system
queries, CPU usage accessors, and OS-native network interface names.
Preserve process sampling fallbacks and report unavailable diagnostic
sources without panicking. Cover missing host and process collectors.

Validation: 167 focused tests passed; production and all five fuzz targets
passed cargo check. Formatting, logging guardrails, and the existing
dependency policy passed. Linux and Windows runtime checks were not run.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ci): use the admin error facade for sysinfo failures

Keep the sysinfo initialization error behind the existing admin S3 facade.
The facade builds the same error code and message without expanding the
direct S3 error-macro surface guarded by the migration ratchet.

Validation: S3 footprint guard, formatting, whitespace, and production
cargo check with sftp, hotpath, and connect_top_net passed.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): refresh hotpath and ctutils (#9055)

Run two cargo update/upgrade rounds in both the main and fuzz workspaces
on top of PR #9047. Upgrade the hotpath family to 0.30.1 and ctutils to
0.4.7. Retain fuzz pkcs1 0.8.0-rc.4 for the pinned RSA 0.10.0-rc.18;
rc.5 fails to compile against that RSA version.

Validation: 1096 library tests passed with 19 skipped; upstream ctutils
and hotpath-drain property/concurrency suites passed. Production and all
five fuzz targets passed cargo check. Formatting, S3 footprint, and the
existing dependency policy passed.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-29 13:02:21 +08:00
hector 4b87bd50c6 fix(storage): reject unwritable data volumes during startup (#9056)
Probe local data roots and fixed metadata directories before admitting disks. Report runtime and owner IDs with migration guidance for root-created volumes, while retaining unavailable registry slots for existing quorum handling.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
2026-10-29 13:01:42 +08:00
Hauser 2d69b90cfb perf(lifecycle): skip size reads for disabled rules (#9046)
* perf(lifecycle): skip size reads for disabled rules

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): keep health probe server alive for retries (#9053)

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-29 10:51:05 +08:00
Hauser e0444b519d feat(ecstore): add sampled batch CPU diagnostics (#9019)
* feat(ecstore): add sampled batch CPU diagnostics

Keep timing and request correlation in a separate default-off feature. Preserve the existing positioned-read backend, byte and error contracts.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): route batch diagnostics through storage facade

Keep the diagnostic implementation private to its owner and expose explicit feature-gated helpers through the existing storage boundary.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): retain diagnostic IDs across GET producer tasks

Capture request context before spawning the legacy producer. Keep the existing producer, cancellation and read-lock lifetime intact.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): avoid unused batch read index

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(obs): isolate local batch diagnostic JSON events

Omit span metadata and inferred parent IDs for diagnostic root events. Verify per-shard index order and document existing production metric timing.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): accelerate receipt fixture in CI

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(heal): allocate stack for bucket recovery fixture

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(s3): allocate stack for conditional GET fixture

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-29 10:32:06 +08:00
cxymds c90ba5922f fix(tiering): diagnose blocked tier deletion and retry cleanup (#9035)
* fix(tiering): diagnose blocked tier deletion and retry cleanup

* fix(tiering): reuse admin errors for deletion diagnostics
2026-10-29 09:06:23 +08:00
cxymds 4a63e53161 test(validation): run canonical cases and build pinned Heal tools (#8455)
* test(validation): add pinned auto-testing manual lane

* Install pinned ILM client for canonical validation lane

* Prepare Python client for pool validation cases

* Install validation client for replication cases

* test(validation): provide the Python client for Heal cases

* test(validation): build the candidate-bound Heal inspector artifact

* test(validation): expose tool artifacts through the existing manual lane

* test(validation): verify pinned Heal tools before fleet execution

* test(validation): verify Heal tools against released shard captures

* ci: audit retained validation environments before finalization

* test(validation): add optional native Heal regression tooling

* test(validation): route native tools through the existing driver

* Run validation tool resolution on hosted Linux without acquiring the fleet lock

* test(validation): bind C07 to pinned native authority evidence

* test(validation): build optional C10 fixture codec on hosted Linux

* test(ci): bind C10 execution to the verified shared codec

* feat(ci): expose read-only validation fleet inventory

* docs(ci): describe supported validation recovery

* test(ci): add isolated manager native validation builds

* test(ci): expose manager regressions through tools-only dispatch

* ci(validation): consume pinned manager native prerequisites

* fix(heal): preserve typed bucket errors for bounded retries

* fix(heal): preserve typed errors and SSE-C response headers

* ci(validation): publish isolated immutable candidate packages

* test(validation): enforce private candidate manifest schema

* test(validation): verify isolated package publication failures

* ci(validation): dispatch isolated packages through the driver

* fix(heal): deeply verify read repair payload failures

* test(ecstore): verify incarnation fence at repair commit

* ci(validation): verify C11 native storage evidence

* fix(ci): isolate validation package publication credentials

* test(ci): archive scoped F07 directory fsync evidence

* fix(ecstore): retain typed quorum errors for missing parts

* chore(ecstore): shrink typed-error ratchet baseline

* fix(ecstore): retain below-quorum data during no-remove heal

* fix(ci): allow recovery of completed cancelled validation runs

* fix(heal): retain exhausted admin batch repair receipts

* fix(observability): retain typed object error diagnostics

* fix(s3): map typed RPC unavailability to service refusal

* fix(filemeta): classify supported inline framing damage as corrupt

* test(ecstore): exercise heal during committed overwrite cleanup

* ci(validation): admit source-bound G01 native evidence before fleet execution

* test(ecstore): fence version races and bind cleanup slots

* ci(validation): require complete race native runtime preflight

* test(ecstore): fence marker and batch deletes during heal

* ci(validation): require G04 native and runtime admission

* test(ecstore): fence multipart continue complete and abort during heal

* test(ecstore): cover default heal owners and copy metadata races

* ci(validation): admit source-bound owner and copy race proofs

* test(scanner): assert typed corruption after metadata truncation

* fix(ci): require complete native admission for multipart races

* test(validation): wire I05 queued-successor native prerequisites

* fix(scanner): bind object heals to the scanning disk scope

* test(scanner): reuse storage boundary for scope regression

* style: format RPC digest precedence assertion

* fix(heal): query automatic tasks on their owning node

* test(admin): reuse error facade in heal query regression

* fix(heal): retain cancellation after successful bucket storage I/O

* fix(ci): retain validation evidence outside runner temp

* fix(heal): retain resolved object identity on terminal failures

* test(scanner): adapt scope regression to admission receipts

* ci(validation): inspect shared runner without fleet access

* ci(validation): prepare Python before creating client environments

* ci(validation): isolate each client virtual environment

* ci(validation): retain interrupted evidence without fleet recovery

* ci(validation): bind recovery to retained runner evidence

* ci(validation): wire persistence and lock source plans

* fix(validation): align read-only dispatch defaults

---------

Co-authored-by: Chris <anzhengchao@gmail.com>
2026-10-29 08:50:42 +08:00
Hauser 20de23f571 fix(ecstore): remove misleading remote lock log (#9042)
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-29 08:50:09 +08:00
Chris An 93462de9ed perf(heal): stream MRF intent digests (#9051)
* perf(heal): stream MRF intent digests

* fix(heal): remove redundant test import
2026-10-29 08:08:26 +08:00
Chris An 4e4a3eb226 fix: account for shared CPU pressure in background admission (#9050) 2026-10-29 07:59:55 +08:00
Hauser 9601a7c4bc fix(admin): protect notification target edits (#9048)
* fix(admin): protect notification target edits

Use a durable configuration revision and conditional mutation to preserve concurrent changes and inherited target settings.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(admin): use the gateway error boundary

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(admin): limit target detail health probes

Reuse normalized source information and probe only runtime targets matching the requested instance.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(admin): streamline target config validation

Preserve duplicate-key order when comparing snapshots, avoid copying secret values, and reuse the validated target configuration.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-29 04:07:12 +08:00
Hauser d16e3cf7b6 perf(ecstore): streamline local GET batch reads (#9043)
* perf(ecstore): avoid eager parity reads for demand-bound GET

Reuse the existing batch setup and quorum targets to retain deferred parity
without materializing bytes that demand-bound reads immediately discard.
Keep legacy all-shard batching and verify degraded and ranged recovery.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): validate batch reads on the opened shard

Avoid repeated pathname traversal by reading metadata from the descriptor
used for positioned I/O. Reject nonregular shards without blocking and
preserve range, metrics, and cancellation behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-29 02:05:01 +08:00
Chris An 3e056ffb4d fix: keep incomplete scanner measurements unknown (#9044)
* fix: keep missing scanner error rates unknown

* fix: keep incomplete pressure samples unknown
2026-10-29 01:23:44 +08:00
Chris An 72b4f6182f test(heal): keep rename-tail repair out of isolated root heal (#9041) 2026-10-29 00:22:19 +08:00
Hauser a9d3022f37 fix(ecstore): prove multipart part sizes before cleanup (#9037)
* fix(ecstore): prove multipart part sizes before cleanup

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(ecstore): merge strict multipart observation passes

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test: respect lifecycle architecture boundaries

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test: fix multipart E2E clippy warnings

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-29 00:14:32 +08:00
Chris An c232f1552d fix(metrics): reject missing histogram counts (#9039) 2026-10-28 22:25:09 +08:00
RustFS 7581a70412 feat(s3): serve Veeam SOSAPI system and capacity XML (#9007)
* feat(s3): serve Veeam SOSAPI system and capacity XML

Authenticated GET and HEAD of the two well-known SOSAPI keys return
generated XML, and read preconditions use that generated ETag and
Last-Modified. Mutations of those keys are rejected while the feature
is on.

Co-authored-by: RustFS <hello@rustfs.com>

* fix(s3): simplify Veeam quota metadata lookup

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): harden Veeam SOSAPI capacity and reads

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): bind Veeam capacity to bucket identity

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): protect virtual objects and coalesce refreshes

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): refresh Veeam profile selections

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): bound pagination fixture writes

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-28 22:04:49 +08:00
Ramakrishna Chilaka 8cb9296f20 perf(ecstore): reuse bucket incarnation fences across copy and metadata paths (#9034)
Eliminate redundant .bucket-incarnation/xl.meta quorum reads and distributed
bucket-metadata transaction read locks under held lifecycle read locks and
Object Lock configuration snapshots across put_object_metadata, CopyObject,
UploadPartCopy, RestoreObject, read_object_versions_for_lifecycle, and
get_bucket_incarnation_id_for_options_in.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-10-28 21:03:46 +08:00
Hauser b1ba6cdfdc test(targets): bound failing-delete replay observations (#9032)
Wait for eight completed delete attempts instead of auto-advancing through
300 seconds of replay scans against a durable on-disk store. Retain the
original virtual upper bound and assert hook/store state after cancelling
and joining the worker.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-28 20:10:18 +08:00
Chris An 0bfc7612d4 fix(heal): coordinate delete recovery and preserve transient errors (#9031) 2026-10-28 20:02:39 +08:00
Hauser 4c997519e8 refactor(storage): replay decoded dirty journal records (#9030)
Reuse the owned frame's decoded record with bounded canonical size checks
and the existing scanner validation/application core. Keep the complete
outer parser and own the journal state fields without a JSON round trip.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-28 20:01:43 +08:00
Hauser 95c5d108d1 test(storage): pin dirty journal JSON recursion boundary (#9029)
Cover the neighboring accepted and rejected nesting depths in an owned
replay frame so a future inner-root decode cannot relax its depth limit.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-28 16:47:48 +08:00
Chris An f6ad79dd58 feat(plugins): add minimal original-user runner integration (#9017)
* feat(plugins): add minimal original-user runner integration

* test(plugins): use the main storage fixture

* fix(plugins): reuse runner connections across requests

* test(plugins): allocate stack for delegation fixture
2026-10-28 13:06:26 +08:00
Hauser 82947d3595 refactor(storage): reuse dirty journal replay JSON frames (#9026)
Embed the validated producer frame without rebuilding an owned replay tree.
Preserve the owner wrapper, byte limits, compaction and unknown marker bytes.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-28 13:04:57 +08:00
hector aef67b6499 ci: move lightweight jobs to GitHub-hosted Ubuntu (#9027)
* ci: move lightweight jobs to GitHub-hosted Ubuntu

Move API-only control jobs and prebuilt Docker image packaging to ubuntu-latest. Keep lab suites and heavy compilation on their existing runners, and remove redundant GitHub CLI installation.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>

* ci: retain functional health on the automation runner

Restore smoke-testing and the GitHub CLI installation fallback for functional-chain health, as requested by the runner operator.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>

---------

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
2026-10-28 12:06:00 +08:00
Chris An 8e88419f3a feat(scanner): share node admission with background heal (#8903)
* feat(scanner): share node admission with background heal

* fix(scanner): drain candidates after listing completion

* fix(scanner): yield cache leases for shared node admission

* test(scanner): attest adaptive admission in process receipts

* fix(concurrency): declare Tokio time dependency

* fix(scanner): route test disk access through owner facade

* test(scanner): fix lint warnings
2026-10-28 11:57:29 +08:00
Hauser 0197a4b538 fix(ecstore): harden stale multipart cleanup (#9023)
* fix(ecstore): identify stale multipart cleanup failures

Preserve quorum failure metrics while avoiding an UploadPart warning for background cleanup. Keep the existing write quorum and source recovery checks intact.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): skip redundant stale upload part scans

Once the default deadline is due, lifecycle rules cannot make an upload ineligible. Avoid querying lifecycle and listing parts in that case while preserving the locked recheck.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): validate multipart lifecycle size

Skip part scans when no abort rule uses size. Treat unavailable, incomplete or overflowing sizes as unknown and keep size-independent lifecycle rules eligible.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-28 11:38:23 +08:00
Chris An 7a3bf8cdbd fix(ecstore): resolve dangling latest versions in metadata updates (#9009)
* fix(ecstore): select the latest version at read quorum like MinIO

GET and HEAD escalated latest-version selection to write quorum when
enough metadata answered and skipped a newer version below write quorum
on degraded reads. LIST and heal already pick the newer side of a split
write at read quorum, so such keys listed but answered 503 until heal.

Select with MinIO's getObjectFileInfo rule: the most common mod time
that reaches the object's data blocks wins, ties go to the newer time,
and one content identity at that time must reach the same quorum. Two
identities tied at the selected time fail instead of resolving by hash
order, and the selected identity's version-stack shape follows disk
order.

* fix(ecstore): resolve selection ties by disk order and guard writes

Review of the read-quorum selection found three gaps:

- Rejecting a same-time half split made explicit-version reads of a
  partially applied tagging update fail and blocked the retry that
  repairs it. Resolve ties to the identity on the lowest-index disk,
  for reads and heal alike, instead of rejecting or using map order.
- Delete markers and empty versions can lower the common read quorum
  below the selected version's data blocks, so HEAD could report a
  version GET cannot decode. Require that many copies, as MinIO's
  getLatestFileInfo does.
- A selection can now return exactly read-quorum disks, and partial
  metadata writes are not rolled back. Refuse an update before writing
  when its target disks cannot reach write quorum.

* fix(ecstore): count identity copies in the data-blocks guard

The first-candidate shortcut counts byte-identical copies, so copies
that differ only in identity-neutral fields such as replication status
were missing from the data-blocks check. When the shortcut's count
falls short, count every copy of the selected content identity before
refusing the version.

* fix(ecstore): keep commit-proof selection for system-bucket reads

Pool metadata's PREPARE/COMMIT recovery and identity epochs treat an
ordinary read of pool.bin as proof that the record committed. Under the
read-quorum rule, a COMMIT that reached only half of a 2+2 set was served
as committed, and the pool_meta_native_physical_* integration tests
failed.

Route reads through select_fileinfo_for_read: S3 buckets keep MinIO's
read-quorum rule, while is_meta_bucketname reads use the previous
algorithm unchanged as select_committed_fileinfo, so a split stays
unreadable until native recovery resolves it.

* fix(ecstore): serve the latest readable version past dangling versions

A failed versioned PUT whose rollback also failed can leave the new
version on top of fewer drives than its data blocks. Reading only each
drive's top version then left the committed version below it short of
read quorum, so GET and HEAD of the latest version answered 503 although
that version is intact in every stack. MinIO resolves the stacks in
pickLatestQuorumFilesInfo.

When every drive answered and an S3 latest read still cannot select a
version, walk the newest version headers of each stack through
exact-version reads: serve the readable version with the newest selected
modification time, skip versions whose exact read proves them dangling
(the NoSuchVersion an explicit GET reports) and queue heal for them, and
keep the read-quorum error on any other outcome. Candidates are ordered
by each version's newest modification time across drives, and at most
eight exact reads are spent.

Test PUTs now wait for every drive so tests that edit one drive's
metadata no longer race the PUT's background tail writes.

* fix(ecstore): resolve dangling latest versions in metadata updates

A failed versioned PUT whose rollback also failed can leave the new
version on fewer drives than its data blocks. GET and HEAD of the
latest version already look past such versions, but read-before-write
callers without a version id still answered 503: object tagging read
each drive's top version with the quorum-error read, and
put_object_metadata and the CopyObject source read selected from
read_all_xl, whose merged latest version is missing on the other
drives, so object_quorum_from_meta failed before selection.

Object tagging now reads through a variant that runs the same walk past
dangling versions as a latest GET while keeping the quorum error for a
dangling key. put_object_metadata and the CopyObject source try the walk
when their quorum or selection step fails with read quorum, before the
existing dangling cleanup could report a key with a committed version
absent. A version-only copy takes the served version's own copies and
write quorum. The walk still applies only to S3 buckets, latest reads,
and sets where every drive answered, and the update still targets only
the served version's disks, so a version below write quorum is refused
before writing.

* fix(ecstore): refuse version-only copies below write quorum up front

Review of the dangling-latest metadata updates found three gaps:

- A version-only CopyObject wrote the new version and reverted on a
  write-quorum miss; refuse it before writing when the served version's
  disks cannot reach its write quorum, like update_object_meta_with_opts.
- Replication status write-back, including the zero-write ValidateOnly
  mode, now keeps its read-quorum error and never walks past dangling
  versions, since the walk queues heal for the versions it skips.
- The erasure-coding doc overstated that these callers never report a
  dangling key as absent; put_object_metadata and CopyObject keep their
  existing dangling cleanup when the walk finds no readable version.
2026-10-28 08:59:37 +08:00
Hauser 3d3957a248 chore(deps): refresh fuzz workspace dependencies (#9024)
Run cargo update --verbose and cargo upgrade --verbose twice in the
standalone fuzz workspace. Refresh its lockfile, including the fixed
rustls-webpki, webpki-root-certs, zstd, and zstd-safe releases.

Repeat main's pinned SigV4a fix in the standalone workspace and redirect
its shared Smithy types to registry crates, removing crypto-bigint 0.5.5.

Keep pkcs1 at 0.8.0-rc.4 to remain compatible with the workspace-pinned
rsa 0.10.0-rc.18; rc.5 changes the PKCS#1 key types and fails to compile.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-28 08:40:55 +08:00
Hauser b4026b43b2 feat(observability): attribute local batch shard reads (#8991)
Record local batch eligibility, blocking queue and execution time, shard
outcomes, and actual read bytes behind the existing GET-stage metrics gate.
Keep captured metric handles with the blocking worker after cancellation
and use scoped low-latency histogram buckets for the new duration series.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-28 07:48:32 +08:00
Chris An 851c295753 fix(rebalance): reuse the target pool holding a dangling copy (#9018)
* fix(rebalance): reuse the target pool holding a dangling copy

Rebalance places a version with a fresh free-space choice whenever the
exact-version pool lookup finds no target copy. An attempt that loses
write quorum can leave the version on fewer drives than read quorum,
and object reads report such a copy as absent (#8963), so the retry
could commit the version on a different pool and leave it in two. The
distributed kill-before-source-cleanup case saw this: a delete marker
whose first copy failed with InsufficientWriteQuorum ended on pools 1
and 3 after the source was cleaned up.

Before the free-space fallback, data movement without a decommission
capacity owner now targets an eligible pool where any drive already
holds the exact version, so the retry rewrites that copy to full
quorum instead of creating a second one. This covers both the object
copy path and the delete-marker path.

* fix(rebalance): check free space before reusing a holding pool

The pool holding an earlier copy was returned before any space check,
so a full holder pinned every retry and could stall a deferred entry.
The holder now passes through the same filters as the free-space
choice (suspended, rebalancing and source pools, has_space_for for the
expected size, and the max-used filter), computed once per selection;
placement falls back to that weighted choice when the holder does not
qualify. The two free-space helpers share one implementation.

The tests no longer rely on random placement. A test-only override
pins each target pool's reported capacity so the free-space choice
always picks the non-holder pool, the earlier copies keep the version
ids but carry different bytes and modification times, and the moved
versions are checked for marker state, modification time, data on
every drive and readable bytes. A second test covers a full holder.

* chore(ci): shrink the error(format!) ratchet baseline for rebalance

The rebalance control and meta modules on main now have fewer
Error::other(format!) call sites than the baseline records, which
fails the shrink-only ratchet in Quick Checks. Record the smaller
counts.
2026-10-28 07:26:56 +08:00
Chris An f879946ead chore: remove redundant review skills (#9022) 2026-10-28 07:03:23 +08:00
Chris An d88f524d9f fix(ecstore): serve the latest readable version past dangling versions (#9004)
* fix(ecstore): select the latest version at read quorum like MinIO

GET and HEAD escalated latest-version selection to write quorum when
enough metadata answered and skipped a newer version below write quorum
on degraded reads. LIST and heal already pick the newer side of a split
write at read quorum, so such keys listed but answered 503 until heal.

Select with MinIO's getObjectFileInfo rule: the most common mod time
that reaches the object's data blocks wins, ties go to the newer time,
and one content identity at that time must reach the same quorum. Two
identities tied at the selected time fail instead of resolving by hash
order, and the selected identity's version-stack shape follows disk
order.

* fix(ecstore): resolve selection ties by disk order and guard writes

Review of the read-quorum selection found three gaps:

- Rejecting a same-time half split made explicit-version reads of a
  partially applied tagging update fail and blocked the retry that
  repairs it. Resolve ties to the identity on the lowest-index disk,
  for reads and heal alike, instead of rejecting or using map order.
- Delete markers and empty versions can lower the common read quorum
  below the selected version's data blocks, so HEAD could report a
  version GET cannot decode. Require that many copies, as MinIO's
  getLatestFileInfo does.
- A selection can now return exactly read-quorum disks, and partial
  metadata writes are not rolled back. Refuse an update before writing
  when its target disks cannot reach write quorum.

* fix(ecstore): count identity copies in the data-blocks guard

The first-candidate shortcut counts byte-identical copies, so copies
that differ only in identity-neutral fields such as replication status
were missing from the data-blocks check. When the shortcut's count
falls short, count every copy of the selected content identity before
refusing the version.

* fix(ecstore): keep commit-proof selection for system-bucket reads

Pool metadata's PREPARE/COMMIT recovery and identity epochs treat an
ordinary read of pool.bin as proof that the record committed. Under the
read-quorum rule, a COMMIT that reached only half of a 2+2 set was served
as committed, and the pool_meta_native_physical_* integration tests
failed.

Route reads through select_fileinfo_for_read: S3 buckets keep MinIO's
read-quorum rule, while is_meta_bucketname reads use the previous
algorithm unchanged as select_committed_fileinfo, so a split stays
unreadable until native recovery resolves it.

* fix(ecstore): serve the latest readable version past dangling versions

A failed versioned PUT whose rollback also failed can leave the new
version on top of fewer drives than its data blocks. Reading only each
drive's top version then left the committed version below it short of
read quorum, so GET and HEAD of the latest version answered 503 although
that version is intact in every stack. MinIO resolves the stacks in
pickLatestQuorumFilesInfo.

When every drive answered and an S3 latest read still cannot select a
version, walk the newest version headers of each stack through
exact-version reads: serve the readable version with the newest selected
modification time, skip versions whose exact read proves them dangling
(the NoSuchVersion an explicit GET reports) and queue heal for them, and
keep the read-quorum error on any other outcome. Candidates are ordered
by each version's newest modification time across drives, and at most
eight exact reads are spent.

Test PUTs now wait for every drive so tests that edit one drive's
metadata no longer race the PUT's background tail writes.

* chore(ci): shrink the error(format!) ratchet baseline for rebalance

The rebalance control and meta modules now have fewer
Error::other(format!) call sites than the baseline records, which
fails the shrink-only ratchet in Quick Checks. Record the smaller
counts.

* fix(ecstore): preserve canonical order in latest-version fallback
2026-10-28 06:16:19 +08:00
Chris An 54ac37ec0a test(decommission): cover held target lock and partial-copy resume (#9016)
* test(decommission): cover held target lock and partial-copy resume

Port two tests from the closed lock-recovery branch onto the deferral
that defers any typed namespace lock timeout on a version copy.

- A version commits, then every attempt at the next one times out on
  the target lock: the entry is deferred as a lock-timeout deferral, no
  failed item is counted, both source versions stay, and the resumed
  entry moves both versions with their exact bytes.
- A real write lock held on the target key makes target selection
  return a typed object-lock timeout, the entry defers instead of
  failing, and once the lock is released selection recovers and the
  resumed entry completes the move.

* chore(ci): shrink the error(format!) ratchet baseline for rebalance

The rebalance control and meta modules on main now have fewer
Error::other(format!) call sites than the baseline records, which
fails the shrink-only ratchet in Quick Checks. Record the smaller
counts.
2026-10-28 06:06:54 +08:00
Chris An 2b56666123 fix(lock): retain state during acquisition (#9014) 2026-10-28 04:57:46 +08:00
Chris An a24d305665 fix(scanner): summarize bucket root collection (#9013) 2026-10-28 04:05:44 +08:00
Martin Claesson c47c8f9f74 fix(sftp): allow bucket-scoped root listings (#8998)
* fix(sftp): allow bucket-scoped root listings

Listing the SFTP root required s3:ListAllMyBuckets. Without it a
bucket-scoped user got PermissionDenied on `ls /`; with it they saw every
bucket on the instance. S3 ListBuckets and the WebDAV root (#6298)
already fall back to a per-bucket filtered listing.

When the global ListAllMyBuckets check is denied, list buckets through
the session-aware ListBuckets path instead, so IAM filters the result to
buckets the principal may ListBucket or GetBucketLocation. Principals
with ListAllMyBuckets keep the unfiltered listing, and IAM outages and
timeouts still fail as before.

list_buckets_for_session and its request builder were WebDAV-only; they
are now also compiled with the sftp feature.

* fix(protocols): re-check the session key for bucket-scoped listings

list_buckets_for_session built its request from the identity captured at
login. Through the SFTP root-listing fallback, a service account disabled
or expired after login could keep listing bucket names, unfiltered when
its parent may list every bucket.

Validate the session key with check_key_valid_with_context, as
authorize_protocol_request does for every other protocol operation, build
the request from the fresh credentials and is_owner, map an invalid key
to AccessDenied, and attach the server context.

The SFTP fallback now passes the session's request headers and transport
security, like every other SFTP authorization. DummyBackend fails closed
when no session listing is queued, matching the trait default, and gains
a stall_authorization hook. New tests cover a service account disabled
mid-session, IAM outage and timeout on the global check (no fallback),
non-AccessDenied backend errors, truncation of fallback output and the
fail-closed default.

* test(protocols): compare error code without referencing s3s

The session-listing test compared against s3s::S3ErrorCode, which made
policy_test.rs a new s3s-referencing file and tripped the s3s footprint
ratchet (210 files against a baseline of 209). Compare the code's string
form instead.

* fix(protocols): refresh session bucket discovery without stale copies

Build bucket listing requests directly from freshly validated credentials
and server-scoped ownership instead of cloning and replacing login state.
Reuse the same authorization path for WebDAV capacity discovery.

Preserve typed access-denied checks through the protocol facade, and cover
request conditions, session-policy updates, revocation, listing bounds,
and fallback deadlines with regression tests.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-28 03:53:56 +08:00
Chris An 3a00e9bd42 fix(scanner): add context to set cache failures (#9010) 2026-10-28 03:53:45 +08:00
cxymds c0c60dd91d fix(admin): make pool diagnostics partial-outage safe (#8995) 2026-10-28 03:53:39 +08:00
Chris An b5c253f3ed docs(listing): describe degraded strict quorum limits (#8981) 2026-10-28 03:53:24 +08:00
Ramakrishna Chilaka 63d97f0877 perf(ecstore): coalesce rename_part and multipart completion I/O (#9001) 2026-10-28 03:50:06 +08:00
Chris An 4f04338ee1 test(connect): report drive probe timeout phases (#8977) 2026-10-28 03:27:49 +08:00
Chris An f96c94f950 fix(listing): treat key markers as literal keys (#8978)
* fix(listing): treat version markers as literal keys

* fix(listing): keep start-after and V1 markers literal

* docs(listing): state cursor compatibility removal condition

* fix(listing): resume protected table pages from raw keys

* test(listing): keep protected pagination coverage in app layer
2026-10-28 02:59:46 +08:00
Chris An 5b5d68a444 fix(decommission): defer copies that time out on a namespace lock (#9006)
A node killed mid-copy leaves its namespace lock on the peers until the
lock lease expires. When the restarted leader resumes the decommission
and reaches that key inside the lease, every in-place copy attempt times
out acquiring the lock, and the version was counted as a failed object,
so the pool decommission could no longer complete.

A lock acquisition timeout leaves the source in place, like a version
copy that lost drive quorum, so defer the entry to the end of the round
instead of counting it as failed. A replay that still times out pauses
the decommission through the existing durable-pause path, which is
relaunched automatically.

This is the intermittent failure of the distributed e2e case
scanner_heal_topology_decommission_kill_before_source_cleanup_resumes_without_loss.
2026-10-28 02:59:20 +08:00
Henry Guo 0fb650a408 fix(table-catalog): reload peers after table bucket toggle (#8994)
* fix(table-catalog): reload peers after table bucket toggle

* test(table-catalog): cover bucket toggles across cached peers
2026-10-28 01:57:55 +08:00
Hauser b9f01162b2 feat(tools): inspect BTF scalar member layouts (#9003)
Report selected integer offsets and widths with strict member and payload validation. Cross-check compiler fixtures with bpftool and independent C offsetof/sizeof results.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-28 01:37:31 +08:00
Chris An 5ab1d5191e fix(heal): pace and parallelize replacement recovery (#9005) 2026-10-28 01:10:44 +08:00
Chris An acebee4ea3 fix(ecstore): select the latest version at read quorum like MinIO (#8982)
* fix(ecstore): select the latest version at read quorum like MinIO

GET and HEAD escalated latest-version selection to write quorum when
enough metadata answered and skipped a newer version below write quorum
on degraded reads. LIST and heal already pick the newer side of a split
write at read quorum, so such keys listed but answered 503 until heal.

Select with MinIO's getObjectFileInfo rule: the most common mod time
that reaches the object's data blocks wins, ties go to the newer time,
and one content identity at that time must reach the same quorum. Two
identities tied at the selected time fail instead of resolving by hash
order, and the selected identity's version-stack shape follows disk
order.

* fix(ecstore): resolve selection ties by disk order and guard writes

Review of the read-quorum selection found three gaps:

- Rejecting a same-time half split made explicit-version reads of a
  partially applied tagging update fail and blocked the retry that
  repairs it. Resolve ties to the identity on the lowest-index disk,
  for reads and heal alike, instead of rejecting or using map order.
- Delete markers and empty versions can lower the common read quorum
  below the selected version's data blocks, so HEAD could report a
  version GET cannot decode. Require that many copies, as MinIO's
  getLatestFileInfo does.
- A selection can now return exactly read-quorum disks, and partial
  metadata writes are not rolled back. Refuse an update before writing
  when its target disks cannot reach write quorum.

* fix(ecstore): count identity copies in the data-blocks guard

The first-candidate shortcut counts byte-identical copies, so copies
that differ only in identity-neutral fields such as replication status
were missing from the data-blocks check. When the shortcut's count
falls short, count every copy of the selected content identity before
refusing the version.

* fix(ecstore): keep commit-proof selection for system-bucket reads

Pool metadata's PREPARE/COMMIT recovery and identity epochs treat an
ordinary read of pool.bin as proof that the record committed. Under the
read-quorum rule, a COMMIT that reached only half of a 2+2 set was served
as committed, and the pool_meta_native_physical_* integration tests
failed.

Route reads through select_fileinfo_for_read: S3 buckets keep MinIO's
read-quorum rule, while is_meta_bucketname reads use the previous
algorithm unchanged as select_committed_fileinfo, so a split stays
unreadable until native recovery resolves it.
2026-10-28 00:47:50 +08:00
Chris An 268a5519f1 test(ecstore): stabilize metadata fanout lifecycle checks (#8999) 2026-10-28 00:07:05 +08:00
Chris An e452d837dd docs(scanner): clarify incomplete census diagnostics (#9002) 2026-10-27 23:33:28 +08:00
Chris An 1451f3189b fix(listing): leave delete recovery out of list requests (#8980)
* fix(listing): leave delete recovery out of list requests

* test(listing): expect residue preservation across walks
2026-10-27 23:04:22 +08:00
hector 59bc6d7c94 ci: build linux-aarch64 releases on Ubicloud ARM (#8996) 2026-10-27 21:18:05 +08:00
Ramakrishna Chilaka a56104206e perf(ecstore): reduce multipart source fencing directory and read I/O (#8986)
- Resolve existing directories below base on Linux in a single openat2(BENEATH | NO_SYMLINKS) syscall in open_existing_directory_below_base_std instead of opening and closing every ancestor component.
- Reuse the pinned source directory guard across sibling metadata reads and control probes in validate_source_mutation, load_source, OrdinaryMultipartDeleteCheck::validate, and prepare_multipart_commit_staging.
- Read normal multipart source heads (<= 64 KiB) in a single pass in load_source while preserving constant-memory streaming observation for large prepared histories.
- Record root_missing during load_source, reuse loaded.original in restore_original, and coalesce finish source directory fsync into persist_with_source_sync.
- Reuse the opened commit directory in prepare_rename_commit_guard and LinuxCommitDirectories::validate when source_parent == destination_parent.
2026-10-27 20:23:32 +08:00
Hauser be485e6cab test(scanner): add memory acceptance runner and budget probes (#8988)
* test(scanner): add memory acceptance runner and budget probes

Add owned S3 workload phases with process, endpoint, cgroup and binary
identity checks for scanner memory and scanner-disabled request bursts.
Keep scale, restart, heap-attribution and overall-acceptance limits explicit.

Characterize healthy and seeded coverage-gap cache retention through the
real folder walker and production cache codec without changing runtime code.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): bind acceptance capacity to effective storage

Validate the serving process's complete local disk inventory before load
writes and during runtime sampling. Resolve each disk inside the owned
storage root, reject nested mounts and filesystem mismatches, and bind
storage observations to phase identity for container and native runs.

Cover the unused-mount bypass, CLI-overridden environment, native paths,
symlink escapes, named volumes and stable multi-disk inventory ordering.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): fence status observations before workload writes

Close each status API window with a second storage-bound process sample
before Phase entry can authorize bucket creation or PUT requests.

Add a fail-before regression for a process change during the initial status
request, asserting no ownership or workload writes occur.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-27 16:45:37 +08:00
Hauser fbd94e129d test(e2e): validate late multipart part transaction packets (#8989)
Retain original prepare and commit-settlement RPCs beyond failed replacement and Abort cleanup, with and without bucket recreation. Require typed refusal or a physically verified idempotent result, unchanged fresh-upload bytes and complete object reads.

Extend scoped proxy observations without rewriting signed frames or trailers, and preserve registered test membership and existing budgets.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-27 13:55:21 +08:00
Hauser cf5a9e0ba3 docs: define the dirty-journal metadata source contract (#8984)
* docs: define the dirty-journal metadata source contract

Specify the single node-owned journal scope: verified bootstrap, physical fencing and tail completion, reader-first replay, exact new responsibility settlement and retained legacy unknowns. Explicitly distinguish the proposed contract from the existing asynchronous hint implementation.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* docs: require receiving peers to revalidate source claims

Keep user metadata, decoded records and authenticated transport distinct from storage-verified dirty-journal authority.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-27 13:54:19 +08:00
Hauser 254592717a feat(tools): add read-only BTF prototype inspection (#8985)
* feat(tools): add read-only BTF prototype inspection

Expose bounded declared prototype headers through a standard-library CLI, preserve explicit void and failure semantics, and wire local contracts plus an independent compiler/bpftool reference into CI.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(tools): retain native reference failure diagnostics

Clear checkout credentials and capture bounded native stderr alongside stdout, preserving exact exit status and owned child cleanup. Keep the first reference failure unresolved rather than guessing its missing diagnostics.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* ci(tools): select a concrete bpftool file parser

The hosted PATH wrapper can exist without tools for its Azure kernel. Select an executable ELF by availability/version before comparing the fixed fixture, installing generic tools only when needed. Data comparison errors remain fatal and never trigger tool switching.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-27 12:51:57 +08:00
Hauser aba9e2e9e6 test(e2e): cover partial EC:4 node recovery (#8983)
Verify a sixteen-drive set rejects reads and writes after two nodes stop,
then resumes complete S3 reads and new writes when only one node returns.
Keep the fourth node stopped throughout checks from all three live
coordinators and verify the original 12+4 shard geometry on disk.

Let the existing GET recovery probe retry the compatible SlowDownRead
response only with HTTP 503, retaining fatal status and byte checks.

Register the case in both platform selections and document the boundary
between process recovery and physical disk reattachment acceptance.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-27 12:38:38 +08:00
Ramakrishna Chilaka 924700a24f docs(agents): add ecstore syscall and blocking-dispatch perf guardrails (#8987)
- Document rules in crates/ecstore/AGENTS.md and the adversarial performance lens against per-disk spawn_blocking hopping, parent-chain openat amplification, un-sized read_to_end buffers, and redundant state reloads under the same lock.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-10-27 11:52:20 +08:00
Chris An b8eef694c7 fix(heal): group newly attached replacement disks (#8973)
fix(heal): batch replacement targets before freezing recovery scope
2026-10-27 11:35:15 +08:00
hector 26d55bb04e ci: remove never-green Performance A/B workflow (#8979) 2026-10-27 11:09:32 +08:00
Hauser c9f7e48a44 fix(observability): correlate physical namespace lock releases (#8974)
* fix(observability): correlate physical namespace lock releases

Map logical namespace guards to their actual granted peer lock IDs and local physical guard identities. Record physical completion only after successful manager release and registry removal, and record validated positive remote unlock responses without changing release behavior.

Exercise real distributed ownership, asynchronous cleanup, duplicate and disabled guards, stale-owner retirement, and explicit release followed by Drop. Document the required diagnostic filters and the remaining filesystem-tail boundaries.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): remove unused lock manager test import

The diagnostic regression uses inherent manager methods and does not need the LockManager trait import. Remove it to pass strict warning checks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-27 10:10:17 +08:00
Hauser 11e1662c90 fix(scanner): reduce memory retention and redundant scan work (#8971)
* fix(scanner): compact completed subtrees during checkpoint sweeps

Release completed object entries while preserving resumable frontier nodes,
including heal rewalks and coverage gaps. Borrow child links during usage
aggregation and remove duplicate update-cache subtree copies.

Add real-disk restart and allocation-retention regressions for #8961.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(scanner): avoid unused progress trees and traversal copies

Bind progress caches to actual subscribers and keep durable scanner metadata
in one authoritative cache. Remove mirror-only heal synchronization, use one
tagged folder queue, and consume child ownership when deleting subtrees.

Preserve observer output, restart coverage and failed-object retry semantics.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(scanner): compact completed leaf entries in place

Keep completed-folder eligibility and frontier handling in one compaction
boundary. Borrow leaf statistics and update the cached sampling flag without
cloning, deleting, or reinserting the entry; aggregate only non-leaf nodes.

Pin allocation identity, complete metadata, failure guards and caller state
with a regression that fails under the previous compaction implementation.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-27 10:01:46 +08:00
Chris An 7ea3aa2a93 fix(listing): keep the V1 NextMarker escape and document optimal limits (#8976)
A cursor for a key that literally ends in a legacy-shaped tag is issued
wrapped in one extra `[rustfs_cache:v2,return:]`, because the listing layer
still strips one legacy tag from incoming markers. ListObjects (V1)
unwrapped it in `calculate_next_marker`; the client then sent the bare key
back as `marker`, the listing layer stripped the key's own tail, and the
next page restarted at the stem and returned the same key forever. Keep the
wrapper in V1 NextMarker and cover the V1 resume path (marker sent back as
StartAfter) on a real store.

Document that sampled list quorum modes can also omit committed objects
whose copies mostly sit outside the sample, and recommend `strict` for
backup, sync, replication and lifecycle tooling.
2026-10-27 08:16:34 +08:00
Raphael Fakhri 4e48c390e7 fix(policy): substitute jwt and ldap variables in policies (#8927) 2026-10-27 06:07:52 +08:00
Ramakrishna Chilaka 02030f90a3 perf(ecstore): coalesce write and multipart metadata I/O paths (#8975)
- Coalesce InternalBuf::Ref and InternalBuf::Owned in write_all_internal
  onto a single blocking_queue operation, avoiding 3-5 extra spawn_blocking
  round-trips per disk on metadata writes.
- Short-circuit recover_part_transaction when no disk reports an active
  part transaction (new.meta), skipping redundant rollback and part.N.meta
  reads on normal UploadPart calls.
- Pre-allocate exact buffer capacity from file.metadata().len() in
  read_file_all and read_multipart_metadata, reducing per-file read()
  syscalls to 1 and avoiding Vec growth reallocations.
- Collapse os_mkdir_all and make_dir_all to a single fast-path blocking
  call via create_dir_all_std.
- Accept &Path in BucketExistenceCache and use cached_access in
  rename_file, create_file, and read_version.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-10-27 03:00:18 +08:00
Hauser d4d416ed47 fix(deps): upgrade russh and replace vulnerable zstd codecs (#8969)
* chore(deps): upgrade russh to 0.65.0 and refresh crates

Run two cargo update and cargo upgrade rounds from origin/main.
Adapt SFTP public-key callbacks to PublicKeyOffer and VerifiedPublicKey,
preserving explicit rejection and password-only authentication.
Cover the rejection policy with a pinned-host-key SSH handshake test.
Refresh Arrow, Parquet, Brotli, ZIP, and compatible dependencies.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(deps): route legacy zstd consumers to fixed codecs

Replace the old registry implementation with a private version-constraint
adapter backed only by zstd 0.14.3 and zstd-safe 8.2.0. Preserve legacy
features and Avro, Arrow IPC, Parquet, and Kafka formats.
Cover abandoned contexts, legacy decode errors, seekable bounds, stored
frames, consumer interoperability, and resolved implementation versions.
Record the adapter removal condition in the compatibility register.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-27 02:05:58 +08:00
Hauser fa0a056bc1 fix(ecstore): recover drives without serial reconnect delays (#8972)
* fix(ecstore): renew faulty local drives after partial recovery

Make local online detection honor the same faulty gate as foreground I/O
and remote drives, allowing the existing reconnect path to replace a
stranded handle once its original format is readable again.

Cover partial EC:4 recovery, health-state admission, and preserve explicit
test faults across handle renewal.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): reconnect set endpoints concurrently

Poll independent endpoint recovery futures within the existing maximum
erasure-set width so a stalled format probe cannot delay a ready drive.
Keep outer-set traversal and per-slot validation and publication unchanged.
Remove repetitive per-drive reconnect-loop info logs.

Add an authenticated two-peer regression that holds the first format read
while the second slot is admitted and serves data with its validated ID.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-27 02:04:46 +08:00
Chris An 1880bdca91 refactor(listing): list latest versions with MinIO's listing quorum (#8965)
* refactor(listing): list latest versions with MinIO's listing quorum

Latest-version SetDisks::list_path now follows MinIO's er.listPath:
ceil(asked/2) is the listing quorum for min_disks, directories and
objects, agreed entries are emitted as read, and a split sample goes
through MetaCacheEntries::resolve. One object can no longer fail a
page. A set with fewer than half of its drives online still fails the
page with ErasureReadQuorum.

Remove the write-quorum layer this replaces: ListingSupplement,
ListingReconciler and the LIST object read lock, the latest_listing_*
quorum helpers, resolve_agreed_entry, resolve_with_write_quorum and the
enforce_write_quorum / write_quorum_slack merge branches, and the
per-version listing quorum helpers in filemeta.

Make merge_file_meta_borrowed_streams pick a version id's most common
header regardless of reader order, so an interrupted null-version
overwrite no longer drops the committed generation from the merge.

* test(listing): do not assert sampled optimal listings are deterministic

optimal asks a random half of the drives, so an EC:8 object committed on nine
of sixteen drives can miss the four-copy listing quorum in roughly one sample
in six, exactly as in MinIO. Keep the deterministic assertion for strict and
for optimal when every online drive is asked.
2026-10-27 01:46:07 +08:00
Chris An 1c2f69eba9 fix(storage): 404 for dangling objects and strict list quorum default (#8963)
* fix(storage): 404 for dangling objects and strict list quorum default

Stage F.0 of the ListObjects quorum plan. Once listing returns to MinIO's listing quorum, a PUT that reached half of the drives but not read quorum becomes visible in LIST, so GET and HEAD must not answer it with a retryable 503.

GET, HEAD and prepared GET metadata now report a metadata read-quorum failure as ObjectNotFound or VersionNotFound when every drive answered with valid metadata of a single generation or not-found and is_object_dangling proves the object or version dangling, matching MinIO's getObjectFileInfo. Offline or unanswered drives, timeouts, corrupt xl.meta, two generations, remote versions and the meta bucket keep the read-quorum error. Nothing is deleted on the read path; heal keeps owning cleanup and its grace window. Read-before-write callers of get_object_fileinfo keep the quorum error.

RUSTFS_LIST_OBJECTS_QUORUM now defaults to strict, matching MinIO, and the operations doc explains that optimal samples drives and can briefly show deleted objects.

A new test pins the write-path precondition: a PUT that misses write quorum leaves no new version or data directory on any drive once its rollback completes.

* test(listing): prove the list quorum env var is read with a non-default value
2026-10-26 23:52:49 +08:00
Ramakrishna Chilaka e193d34444 perf(ecstore): optimize cold HEAD and GET metadata read paths (#8960)
* perf(ecstore): optimize cold HEAD and GET metadata read paths

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>

Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

* perf(ecstore): cache verified inline body and avoid early-stop allocations

- Store verified_inline_body on GetObjectMetadataCacheEntry so warm GET
  cache hits serve the pre-verified inline Bytes payload in O(1) without
  re-running HighwayHash256S bitrot verification across shards.
- Verify inline shard slices directly in verify_inline_body_from_observations
  without acquiring MODERN_REED_SOLOMON_CACHE or allocating InlineBitrotReaders.
- Gate MetadataFanoutDiagnostics timers and latency sorting on
  get_stage_metrics_enabled().
- Avoid pinning full xl.meta buffers in GetObjectMetadataCacheEntry by
  using stack Uuid::encode_buffer() lookup without Bytes::slice_ref.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

* fix(ecstore): restore inline verification test context

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-10-26 22:37:10 +08:00
Chris An fca714efe8 fix(listing): omit sub-quorum versions from ListObjectVersions (#8964)
Version listings bypassed listing quorum: SetDisks::list_path returned
early into list_versions_authoritatively, whose resolver seeds unread
slots as DiskNotFound. With any one drive of the set offline, every
version held by fewer than ceil(n/2) drives (for example a deleted
version kept by drives that were offline during the delete) failed the
whole page with ErasureReadQuorum, surfaced as S3 503.

Route merged version pages through the listing-quorum branch of
SetDisks::list_path, as MinIO's listPath does with requestedVersions =
0, so such versions are omitted instead of failing the page. Keep the
set-level floor: fewer than ceil(n/2) online drives still fails the
page.

Set walks (tier reference proofs, tier-delete journals, pool
maintenance) and the recursive prefix-delete scan act on absence, so
they keep the authoritative per-version scan and fail closed.
2026-10-26 22:24:20 +08:00
Chris An 65bd2d575b refactor(listing): make cursors plain keys and opaque V2 tokens (#8950)
* refactor(listing): make cursors plain keys and opaque V2 tokens

RustFS inherited MinIO's metacache cursor tag and appended
`[rustfs_cache:v2,id:<uuid>,src:walker,gen:live]` to every internal
continuation marker, although nothing ever consumed the id: four parsers
had drifted apart, V1 NextMarker had to be stripped on the way out, and
ListObjectVersions leaked the tag onto the wire as NextKeyMarker.

ecstore stops assigning `list_id` in `ECStore::list_path` and
`SetDisks::list_path_result`, drops `append_list_cache_id_to_marker` and
the `cache_id` parameters of the pagination helpers, and removes the
unused `ListPathOptions::encode_marker`; internal markers are the plain
last key, last common prefix or last raw scanned key.

The API layer builds the V2 NextContinuationToken as base64 of the
server-side cursor in one place and decodes it in one place; V1
NextMarker is the decoded cursor and the `public_list_marker` tag
stripper is gone; NextKeyMarker is the plain key. Base64 of the plain
key is what nodes from earlier releases already read, so a rolling
upgrade needs no switch.

Compatibility, registered as `listing-cursor-legacy-tag`: `parse_marker`
and `list_marker_key` still strip a trailing legacy tag from incoming
markers so a client that paginates across the upgrade keeps its position.

* fix(listing): preserve literal cache-tag cursor boundaries
2026-10-26 21:03:12 +08:00
Hauser 58cab30351 test: stabilize diagnostics and storage CI fixtures (#8944)
* test(e2e): wait for known quota reporting snapshots

Wait for the expected numeric usage before asserting quota statistics or
projected checks. Preserve null as unknown and keep the existing quota
assertions, authorization failures, and bounded convergence deadline.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): refresh full-suite membership locks

Regenerate the Darwin and Linux e2e-full digests from compiled nextest
listings after merging main. Both selections retain all base members
and add exactly the five quota reporting regressions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(s3-client): make range preflight assertion deterministic

Assert that an overflowing range returns its specific InvalidInput error
on the first poll instead of waiting for an idle shared TCP port.
This avoids unrelated connections affecting the local-validation oracle
and removes the listener-permission skip from this test.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): make lock error metric fixture deterministic

Pass a typed quorum failure through the existing admission result resolver
so the lock-error metric test does not race a real 250 ms acquire deadline.
Preserve the exact metric assertions and verify the typed storage error.
Existing acquisition tests retain distributed quorum and timeout coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): isolate durable I/O regression fixtures

Reserve nextest capacity for eight native storage regressions without
changing deadlines, retries, or internal concurrency. Observe physical
publication independently of expired async wrappers, and stop endpoint
reconnection before the fenced format-heal fixture takes ownership.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test: isolate drive provenance and receipt fixtures

Use the existing Linux shared-memory fixture pattern for the bounded
drive CLI provenance probe, retaining its one-second request and exact
binary/signature checks. Seed the full 1001-receipt pagination fixture
one durable source/target pair at a time instead of issuing 32 at once.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-26 20:09:40 +08:00
Hauser 5e863badc2 chore(deps): update crypto-bigint to 0.7.10 (#8962)
Replace the yanked crypto-bigint 0.7.7 release and raise ctutils to its required 0.4.6 minimum. Preserve all other package resolutions, features and dependency policy.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-26 19:35:11 +08:00
Hauser b78e2ad6e7 test(e2e): avoid rescanning publication lock logs (#8959)
* test(e2e): read publication logs incrementally

Retain the complete matching lock history while reading only appended bytes after an initial scan before remote DELETE is held. Keep the original field projection, file ordering, polling cadence, lock deadlines and same-attempt assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): remove redundant publication fixture clone

Serialize the existing root by reference through json! without cloning the Value. Keep all compatibility rows and assertions unchanged.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-26 19:07:45 +08:00
Jim Chen 605176fe75 fix(scanner): avoid per-set max_entries truncation before cross-set prefix usage merge (#8891)
* fix(scanner): avoid per-set max_entries truncation before cross-set prefix usage merge

compute_prefix_usage applies the caller's max_entries cap to each individual erasure set's loaded.prefix_usage(bucket, prefix, max_entries) before merging sub_prefix_map across sets, silently dropping and under-counting sub-prefix usage in multi-set deployments.

Root Cause:
In crates/scanner/src/prefix_usage.rs, compute_prefix_usage queries each erasure set with loaded.prefix_usage(bucket, prefix, max_entries) (line 178) and then merges the returned query.sub_prefixes across sets into sub_prefix_map (lines 216-218). When sets_total > 1 and the number of distinct child prefixes exceeds max_entries, any sub-prefix that ranks within the top max_entries on one set and outside the top max_entries on another set has its non-top set contributions discarded prior to merging, producing silently under-counted size, objects, versions, and delete_markers.

Fix:
Pass usize::MAX as the per-set limit when sets_total > 1 in compute_prefix_usage so each erasure set returns its full sub-prefix breakdown, and apply max_entries truncation only after merging and sorting sub_prefix_map across all sets.

Signed-off-by: czcbangkai <czcbangkai@google.com>

* test(scanner): use snake_case in prefix_usage regression test name

---------

Signed-off-by: czcbangkai <czcbangkai@google.com>
Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-26 17:50:01 +08:00
Hauser fea5a584c3 fix(storage): fence multipart and metadata recovery (#8919)
* perf(ilm): back off idle tier-delete journal recovery

Use bounded idle backoff only after complete empty journal and dispatch scans, while preserving immediate notifications and the retry cadence for observed work.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): reconcile interrupted pool metadata publication

Bind pool metadata CAS and Undo to exact native predecessors. Recover an interrupted physical publication only from an ordinary committed authority and complete verified identity, current and backup evidence, then require normal V3 CAS and quorum readback.

Preserve known-conflict gates, startup and heal lock ordering, targeted admission and the original kill-recovery deadline. Wake proof-ready recovery immediately and bound parallel capacity sampling without removing mutation fences.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): reuse proven pool metadata durability

Publish native rollback backups directly in their owned UUID directories. Reuse a one-shot data-durability receipt only for an exact hardlink to the pinned, fully synchronized head and root.

Preserve new-head and directory synchronization, native predecessor CAS, conditional Undo and uncertainty gates. Keep unknown, copied, raw-parent, cancelled and failed operations cold. Add bounded diagnostics, sync-call regressions and path-isolated test hooks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(multipart): exercise selective RPC delay and peer loss

Add authenticated method-entry barriers for metadata and lifecycle locks under e2e-test-hooks. Verify real dispatch, write quorum, prior part payloads, lock drain and incarnation isolation without changing production budgets.

Record cancellation separately from normal exits so late filesystem completion cannot overwrite Drop evidence.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* docs: define multipart delay gates and receipt invariants

Document RPC entry evidence, peer-loss and cancellation oracles, remaining incident attribution limits, and immutable head inodes required for durability receipts.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(readiness): expose missing runtime drive slots

Report configured slots without a runtime handle separately from unavailable inventoried drives. Preserve quorum and probe status semantics. Wait for every coordinator to regain its complete live inventory before multipart RPC fault windows and single-attempt recovery oracles.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): retry committed promotion convergence safely

Require peer reload convergence on every worker attempt, including unchanged retries. Recheck durable identity, replicas, namespace fence, generation and cancellation before allowing any data movement.

Keep known committed promotions active on a verified propagation pause. Release precise owners, retain queued successors and reuse the existing watchdog. Preserve uncertainty gates and terminal operation behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): guard native metadata mutation aliases

Reject protected RenamePart source and destination paths before I/O. Classify the protected namespace through the native path resolver, and require canonical conditional RenameData and Undo keys so aliases cannot create separate lease domains.

Preserve ordinary multipart and canonical CAS behavior, warm durability receipts and zero-allocation canonical fast paths. Cover real alias, byte identity, receipt and normal mutation behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): register Darwin multipart RPC delay gates

Update distributed membership from the actual Darwin listing. Preserve the full-profile digest and leave Linux unchanged until its own listing is produced, as required by the contributor guide.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(multipart): fence native publication and recovery

Publish multipart data through private hardlinks and atomically consume the
prepared source head. Bind exact compensation capabilities and native recovery
to the physical cohort, source generation and durable publication state. Require
fresh terminal confirmation for native replay and preserve indeterminate data
when no safe recovery witness exists.

Release logical guards only after validated irreversible quorum success while
retaining physical mutation leases, accounting and resource ownership through
actual callbacks. Preserve local instance proof authority and historical Copy
metadata without granting healed donors fresh publication authority.

Keep general movement identity strict while preserving directory capacity
compatibility in a separate checked comparison.

Cover native fault and cancellation boundaries, zero-byte objects, real Copy,
heal and migration, exact physical readback and distributed RPC delay. Retain
all quorum and durability requirements and document rollout limitations.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): fix ratchet scan and Windows fault hooks

Move native pool metadata inventory tests after production items so the
error-format ratchet sees the existing call site. Preserve the baseline
instead of accepting a false count decrease.

Make the directory-barrier failure hook available on every test platform
and exercise the parent-barrier failure/retry cases in Windows CI. Keep
production synchronization behavior and all existing assertions intact.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(protos): remove redundant recovery request clone

Move the baseline into its final struct update while retaining the earlier
clone needed to construct the first request variant.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): align RPC delay gates with native abort

* fix(storage): validate native source recovery and CI gates

Preserve wire layouts while bounding native response sizes and fix the
last-use recovery request clone. Avoid destination replay reads only for
fully observed initial native sources; keep upgraded and recovered sources
conservative. Cover real legacy publication after a cold restart.

Align upgrade acceptance with the native mixed-version mutation pause and
use exact upload-scoped test completion evidence before advancing time.
Keep all original quorum, ownership, byte and deadline assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): verify native abort under partial admission

Delay native cleanup at the exact upload root after all-participant closure.
Verify quorum-only admissions retain every source byte on refused Abort and
complete the same upload without creating a missing original participant.
Keep sub-quorum orphans and their discoverable identities isolated while a
fresh all-participant upload proves service recovery. Route shared constants
through the existing E2E storage facade.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): avoid formatting a fixed invalid upload path

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): align native MPU fault recovery assertions

Verify real source participants, preserved orphan bytes and same-upload completion after quorum-only admission. Require full physical inventories so an expected read-quorum error cannot hide unrelated leakage. Preserve ordinary quorum and recovery budgets, and document listing availability through the affected set.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): keep MPU tail deadlines on the wall clock

Global Tokio time advancement can expire drive-health probes while real
filesystem callbacks are pending. Use a short real drive deadline with the
existing physical-entry and cleanup barriers, retaining the byte, lock,
resource-permit and final-shard assertions.

Fixes #8937

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(storage): align native fixtures with instance ownership

Open independent disks for the simulated capacity-loss instance, scope four coordinator journal disks without rebinding source authority, and probe configured namespace keys while retaining physical I/O hooks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): isolate native multipart future construction

Construct optional native publication futures behind synchronous heap boundaries so ordinary rename callers do not carry their state machines. Preserve native guards and ownership without adding allocations to ordinary PUT, copy or heal branches.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(heal): assert coordinator journal scope after rejoin

Check the exact original four-member journal map after every rejoin and manager stop while preserving all sixteen native data slots. Reconnect expansion fails the test rather than being filtered away.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(heal): bound object repair future construction

Construct the normal and FileCorrupt deep-retry state machines behind a synchronous heap boundary. Preserve guards and cancellation while bounding the shared rename and deletion call stacks without increasing test stacks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): qualify fixture disk identity checks

Call the same DiskAPI method explicitly so the independently reopened disk identity assertion compiles under every target and feature combination.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): isolate native inspection from mutation state

Select a dedicated read-only inspection future behind the existing single Box allocation. Preserve validation, source ownership and the canonical inspection body while keeping mutation state out of inline read callers. Reject misrouted operations with typed errors and retain source evidence.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): pause abort time after native cleanup

Wait for durable source deletion on the wall clock before advancing the
capacity lease clock at the post-delete barrier. Paused time can otherwise
expire the barrier while native filesystem cleanup is still pending.

Retain lease-loss injection, durable inflight-byte accounting and restart
reconciliation assertions. Document the test-util feature required to
select the native decommission fixtures in package-scoped regressions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): reclaim data from owned multipart undo

Retain exact runtime-only Undo ownership through deferred snapshot cleanup. Revalidate every target metadata version and the retirement anchor, keep the delete claim through the physical callback, and remove the anchor after the payload barrier. Preserve generic cleanup refusal when metadata is missing.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): preserve unformatted bootstrap routes

Keep explicitly unformatted local paths reachable by an in-flight elected formatter while quarantining their service slots and disk-ID membership. Own bounded legacy-read handles so the actual asynchronous creator future remains Send.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): bound CopyObject tracing poll frames

Construct the business future behind an outlined single-Box boundary and lazily instrument its handle. Preserve Send, Unpin, span timing and cancellation without embedding concrete business-state construction in the tracing poll.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(mpu): observe recovery after direct legacy bootstrap

Seed all sixteen real previous-release sources before attaching the same-port method observers. Require exact per-peer disk-route Unimplemented responses with zero publication calls, retain byte and cleanup assertions, and remove superseded raw transport. Register the two new regressions from actual Linux and macOS listings.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(mpu): prepare the homogeneous previous-release fleet

Reuse the existing release baseline before creating the genuine legacy multipart sources. Restart old processes with their normal budgets and require every drive through the reduced-redundancy probes before installing the mixed-version observers and current fault budgets.

Keep standard EC:4, single-attempt calls, all mixed-version byte and reclamation assertions, and their original deadlines unchanged.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(mpu): isolate release compatibility from fault profiles

Keep normal component configuration for the observed mixed-release rollout, which injects no RPC delay or loss. Retain the short component profile in actual method-fault scenarios and preserve the single-attempt 45-second probe and every typed error, routing, source byte and reclamation assertion.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(mpu): use normal shutdown for planned release replacements

Use the existing bounded SIGTERM path during homogeneous release preparation and the observed mixed-version rollout. Preserve every multipart inventory, routing, quorum and byte assertion, and keep actual crash recovery on its original hard-kill path.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* revert: retain the verified release compatibility fixture

Restore the published fixture after the local configuration and lifecycle experiments failed to resolve the macOS startup failures. Keep their diagnostic records separate from the delivered implementation.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(copy): bound inherent handler polling stack

Build the inherent CopyObject future through a synchronous noinline
factory at the existing trait await. This keeps its large state out of
the trait wrapper's active polling frame during historical self-copy.
Preserve cancellation, tracing and post-write notifications, with one
additional allocation restricted to COPY.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): validate authoritative quota and native pool heals

Require actual authoritative quota usage in the existing readiness loop
instead of treating HTTP success or unknown usage as a numeric baseline.
Keep the original quota assertions and convergence budgets.

Allow the owning pool metadata CAS to republish into a fresh valid data
directory while retaining exact version, layout, completeness and shard
fingerprints. Require every node's real metadata/read/write readiness
before accepting recovery. Keep ordinary object manifests and the original
180-second recovery deadline unchanged, with negative oracle regressions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): distinguish certified native Abort recovery

Require native participants with a persisted full closure certificate to retire their heads and reclaim every surviving source on retry. Keep uncertified legacy authority below identity quorum conservative, while retaining actual partial-delete and committed-object byte checks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-10-26 12:39:54 +08:00
Chris An e28ac2c9d4 test(s3-client): make range preflight checks deterministic (#8952) 2026-10-26 12:03:45 +08:00
Chris An 4a96f06983 refactor(listing): remove env-gated ListObjects index provider (#8948)
* refactor(listing): keep paginated listing on ECStore only

`Sets` and `SetDisks` carried their own copies of `inner_list_objects_v2`,
`list_objects_generic`, `inner_list_object_versions`, `list_path` and
`list_merged`, plus a third copy of the task that converts merged raw entries
into the walk result stream. Only `ECStore` can answer a paginated listing,
since a page merges every set of every pool; the copies drifted (the `Sets`
copy still rejected `//` prefixes that #8605 made literal on `ECStore`) and
were reachable only from tests and one decommission helper.

Remove the `ListOperations` impls for `Sets` and `SetDisks` together with the
duplicated pagination code. `SetDisks::walk` stays as an inherent method for
set-scoped callers and now honors `versions_sort` like the store-wide walk;
`SetDisks::list_path_result` stays for the recursive delete lister. The walk
entry conversion moves into one `spawn_walk_entry_forwarder` shared by both
walks. The decommission receipt lister walks its pool's sets instead of
paginating through the removed `Sets` listing.

Tests that exercised the removed layers now exercise `ECStore` for pagination
or `SetDisks::walk` for per-pool version inspection. The architecture and
logging guard rows that pinned the removed `SetDisks`/`Sets` listing entry
points are dropped, and the error-other ratchet baseline shrinks by one.

* fix(listing): exclude synthetic directories from receipt walks

* refactor(listing): remove env-gated ListObjects index provider

Delete the experimental, default-off key-only / verified-page /
metadata-fast index provider from `ECStore::list_objects_generic` together
with everything only it drove: the `RUSTFS_LIST_OBJECTS_INDEX_*`,
`RUSTFS_LIST_OBJECTS_NAMESPACE_JOURNAL_*` and
`RUSTFS_LIST_OBJECTS_METADATA_FAST_*` readers, the persistent key-only
index and its on-disk format, the namespace mutation journal (state,
chaos injector, system/local backends, degraded set, global lock), the
index lifecycle/health/source-selection types, the verified-index
candidate pager, the `list-chaos` cargo feature, the
`rustfs_s3_list_objects_index_*` metrics and the archived bench script.

`list_objects_generic` now always walks. The write-path hooks
`observe_list_objects_mutation(s)` are gone; their callers bump the scanner
namespace generation directly through `observe_scanner_namespace_mutations`,
which is the sub-step the old hook performed before taking the journal
lock, so the generation observed by the scanner, the node RPC service and
the data-movement lease checks is unchanged while PUT/DELETE no longer take
a global tokio RwLock or read environment variables.

`ListSourceMode::{metadata_authority, requires_live_metadata_verification,
can_satisfy_strong_listing}` and `ListMetadataAuthority` were only reachable
from the provider and are removed as well; the enum, its variants, the
cursor encoding and `ListContinuationV2` are left untouched.

* docs(listing): define index retirement upgrade prerequisites

* fix(ci): retire the removed listing index test requirement
2026-10-26 12:02:15 +08:00
Hauser 927b3969bf test(e2e): validate conservative Abort recovery boundaries (#8941)
test(e2e): assert Abort refusal below identity quorum

Keep exactly-quorum success and recoverable cleanup assertions. For
minority staging authority, require typed refusal, zero further Delete
RPCs, unchanged per-disk metadata and the previous object body. This
aligns the phase matrix with the existing conservative recovery contract.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-26 10:19:05 +08:00
Hauser fab4bb0586 test(e2e): cover simultaneous multipart terminal contenders (#8943)
* test(e2e): assert Abort refusal below identity quorum

Keep exactly-quorum success and recoverable cleanup assertions. For
minority staging authority, require typed refusal, zero further Delete
RPCs, unchanged per-disk metadata and the previous object body. This
aligns the phase matrix with the existing conservative recovery contract.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): exercise simultaneous multipart terminal contenders

Retain the four pairwise resend cases and add live/cancelled three-way Complete, Abort and resend races. Observe distinct forwarded lock owners and verify terminal bytes and physical cleanup.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): freeze contender evidence before multipart cleanup

Retire the passive lock observer before terminal ListParts checks so the reported count identifies only the two contenders at the preparation barrier.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): require both multipart terminal race outcomes

Retain the free races and select both terminal winners with independently released, owner-scoped lock gates. Verify real contender admission, unchanged signed packets and exact terminal bytes for live and cancelled part waiters.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): isolate losing coordinator lock votes

Hold every remote vote for the losing coordinator while the same gate observes the winner. Prevent partial lock grants from delaying the requested terminal order and retain ordinary RPC caller lifetime.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-26 09:24:38 +08:00
Chris An b7b26a6a49 refactor(listing): keep paginated listing on ECStore only (#8936)
* refactor(listing): keep paginated listing on ECStore only

`Sets` and `SetDisks` carried their own copies of `inner_list_objects_v2`,
`list_objects_generic`, `inner_list_object_versions`, `list_path` and
`list_merged`, plus a third copy of the task that converts merged raw entries
into the walk result stream. Only `ECStore` can answer a paginated listing,
since a page merges every set of every pool; the copies drifted (the `Sets`
copy still rejected `//` prefixes that #8605 made literal on `ECStore`) and
were reachable only from tests and one decommission helper.

Remove the `ListOperations` impls for `Sets` and `SetDisks` together with the
duplicated pagination code. `SetDisks::walk` stays as an inherent method for
set-scoped callers and now honors `versions_sort` like the store-wide walk;
`SetDisks::list_path_result` stays for the recursive delete lister. The walk
entry conversion moves into one `spawn_walk_entry_forwarder` shared by both
walks. The decommission receipt lister walks its pool's sets instead of
paginating through the removed `Sets` listing.

Tests that exercised the removed layers now exercise `ECStore` for pagination
or `SetDisks::walk` for per-pool version inspection. The architecture and
logging guard rows that pinned the removed `SetDisks`/`Sets` listing entry
points are dropped, and the error-other ratchet baseline shrinks by one.

* fix(listing): exclude synthetic directories from receipt walks

* fix(listing): stop abandoned walks and filter directory entries
2026-10-26 09:05:11 +08:00
Chris An 197ab19f0c test(heal): verify backup recovery and tier owner handoff (#8935)
* test(heal): verify backup recovery and tier owner handoff

* test: prepare tier mover before holding remote delete
2026-10-26 08:00:42 +08:00
Hauser a5e1e9312d test(admin): cover target inventory HTTP acceptance (#8942)
* test(admin): cover target inventory HTTP acceptance

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(admin): wire inventory suite and cover temporary sessions

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ci): pin expanded inventory acceptance membership

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-26 06:17:12 +08:00
Remi Cattiau 62d148b045 fix(scanner): retry unreadable cycle state in remote walk fence poll (#8939)
While a remote namespace scanner walk runs, the fence watcher reads the
persisted cycle state every 5 s and stops the walk on any error. A read
that hits the 5 s distributed-lock timeout on .bloomcycle.bin is then
reported as a fence change: the bucket scan fails, the set cache is not
published and the cycle ends without a durable usage snapshot.

Return ScannerError::CycleStateUnavailable (same message as before) when
the state cannot be read, and let the watcher tolerate up to 12
consecutive such polls before stopping, logging a warning each time and
resetting the count after a successful poll. A mismatching fence and any
other error still stop the walk at once; the fence check when the stream
opens is unchanged.

Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 06:09:06 +08:00
Chris An 8e6dc42772 docs(release): reconcile main and clean completed release branches (#8945) 2026-10-26 05:46:16 +08:00
Chris An af10369f34 chore(release): align installation references for 1.0.4 (#8940) 2026-10-26 05:31:13 +08:00
Hauser c610d11e8f fix(storage): guard MPU recovery and startup RPC admission (#8934)
* fix(ecstore): preserve uncertainty after partial multipart abort

Keep recovery callers from reporting NoSuchUpload while minority primary metadata remains. Retain all quorum and deletion checks. Exercise actual partial Abort and explicitly retained late RPC packets after caller retirement, staging cleanup and bucket recreation.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): prevent retired multipart staging resurrection

Require the upload root to exist before preparing recovery publication. Preserve rooted directory walks for nested bases on non-Linux Unix and cover missing-source native work, configured aliases and pinned mixed-version coordinator recovery.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): use IPv4 peer aliases for pinned mixed recovery

Keep direct IPv6 S3 listeners behind IPv4 RPC proxies for the pinned previous release, whose peer health resolver rejects bracketed IPv6 hosts. Preserve signed authorities, ports and strict recovery assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): separate pinned startup from MPU fault budgets

Use the old fleet defaults during bootstrap, then apply the original short fault budgets to the current replacement. Keep direct S3 URLs aligned with IPv6 listeners and preserve all quorum and physical cleanup assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): seed legacy MPU through transparent transport

Retire raw proxy connections before enabling method faults so legacy streaming setup stays byte-transparent and every later scoped mutation must traverse the fault barrier. Verify raw and adapted protocol authority, bodies and trailers.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): retain direct listeners for legacy MPU peers

Advertise same-port localhost peers for the pinned resolver while retaining direct IPv4 S3 listeners. Exact scoped RPC hit counts still reject bypassed injection and all physical authority assertions remain unchanged.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(server): keep startup gRPC on the authenticated router

Use the hybrid protocol predicate for startup RPC admission so early control responses retain production authentication and owner validation. Keep REST FullReady gating and pinned replay capability rejection intact. Add deterministic regressions, scoped diagnostics and bounded legacy fixture resources.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ci): verify MPU recovery across upgrade source versions

Run the exact sixteen-drive mixed MPU case for every checksum-verified upgrade source, independently of generic compatibility failures. Require one listed test and retain per-version logs while preserving the historical distributed source pin and every recovery assertion.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ci): trigger upgrade MPU checks for fixture changes

Include distributed fixtures and the RPC fault proxy in the upgrade
workflow paths so test-only changes schedule the strict recovery gate.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(storage): verify resend owners across MPU finalization

Hold real part-transaction RPCs while another coordinator completes or
aborts the upload, with both live and cancelled client response waiters.
Require full object bytes, terminal upload state, and all staging roots
to remain consistent after the part owner drains.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-26 01:29:43 +08:00
Hauser c721416e4c test(ecstore): verify encoding inputs against released shards (#8933)
Compare borrowed, owned Vec, and BytesMut encoder outputs with pinned GF8 and historical GF16 shard payloads. Check pre-reserved buffer reuse and stale-tail padding without changing production behavior.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-26 00:01:50 +08:00
Chris An 7b29e9d65f test(scanner): verify checkpoint debt across process restarts (#8938)
test(scanner): preserve checkpoint debt across process restarts
2026-10-25 23:43:41 +08:00
Chris An 85231b71e6 fix(heal): gate unresolved MRF lifecycle writes on reader support (#8918)
* feat(heal): read retained MRF lifecycle v2 checkpoints

* feat(heal): advertise MRF lifecycle reader capability

* fix(heal): gate unresolved MRF lifecycle writes on reader support

* test(heal): use native path for CAS publication hook
2026-10-25 22:59:49 +08:00
Ramakrishna Chilaka ceddcdd878 perf(ecstore): coalesce delete inspection, settlement, and durability (#8932)
Eliminate redundant delete recovery inspections, inline-object data-dir scans, redundant directory fsyncs, and Fsync/Foreground worker-lane ping-pong during single-key and batch S3 DELETE commits.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-10-25 21:52:11 +08:00
Chris An 7728eeab1a feat(heal): advertise MRF lifecycle reader capability (#8916)
* feat(heal): read retained MRF lifecycle v2 checkpoints

* feat(heal): advertise MRF lifecycle reader capability
2026-10-25 21:08:43 +08:00
Hauser 13dc635d51 feat(scanner): expose startup phases and attempt deadlines (#8931)
* feat(scanner): expose startup phases and attempt deadlines

Share one node-local startup snapshot between native status and metrics.
Track actual waits and first attempts without changing admission timing,
coverage acknowledgement, or publication semantics.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): observe startup recovery before initialization

Create the observation owner at enabled startup entry and move it through
the existing initializer, preserving admission timing and disabled cleanup.
Cover blocked recovery discovery and cancellation through the public entry.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 20:54:41 +08:00
Jim Chen ead77d799f fix(s3): normalize UploadPartCopy source versionId and populate source versioning state (#8890)
* fix(s3): normalize UploadPartCopy source versionId and populate source versioning state

execute_upload_part_copy forwards CopySource::Bucket.version_id verbatim without normalizing 'null' to Uuid::nil() or validating UUID syntax up front (returning 500 InternalError instead of succeeding on versionId=null or returning 400 InvalidArgument on malformed versionId), and neither execute_upload_part_copy nor execute_copy_object populates src_opts.versioned / src_opts.version_suspended from BucketVersioningSys.

Root Cause:
Unlike execute_copy_object (issue #4238) and get_opts, execute_upload_part_copy in rustfs/src/app/multipart_usecase.rs extracts version_id from CopySource::Bucket without trimming, converting 'null' to Uuid::nil().to_string(), or validating UUID syntax via Uuid::parse_str, causing prepare_get_object_reader to fail with 500 InternalError when versionId=null or an invalid UUID is passed in x-amz-copy-source. Additionally, neither execute_upload_part_copy nor execute_copy_object populates src_opts.versioned and src_opts.version_suspended from BucketVersioningSys, and execute_upload_part_copy returns x-amz-copy-source-version-id without gating on whether versioning is enabled or suspended on the source bucket (issue #4976).

Fix:
Add normalize_copy_source_version_id() and format_copy_source_version_id() in rustfs/src/app/multipart_usecase.rs, populate src_opts.versioned and src_opts.version_suspended from BucketVersioningSys on both UploadPartCopy and CopyObject, and gate x-amz-copy-source-version-id on source bucket versioning state.

Signed-off-by: czcbangkai <czcbangkai@google.com>

* fix(s3): keep copy version validation within footprint guard

---------

Signed-off-by: czcbangkai <czcbangkai@google.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-25 20:06:43 +08:00
Chris An 67db0f241f fix(test): follow scanner schedules during multi-pool recovery (#8929)
* fix(test): follow scanner schedules during multi-pool recovery

* fix(test): retain active scanner completion budget

* test: preserve E2E membership for scanner wait regression
2026-10-25 20:00:13 +08:00
Chris An a94f625bc8 test(rio): cover maximum index varint totals (#8915) 2026-10-25 18:40:41 +08:00
Hauser b7835f0f9a test(ecstore): pin historical compression index reads (#8925)
* test(ecstore): pin historical compression index reads

Exercise fixed pre-varint index bytes through the production reader,
including full and ranged reads, index fallback, and body CRC failure.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): use typed compression plan offsets

Use the existing usize storage offsets directly in the compatibility fixtures, fixing the same-type conversion errors reported by Clippy. Keep the planned-offset and decoded-byte assertions unchanged.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 18:33:25 +08:00
Hauser 299609bb83 fix(quota): keep reads available without snapshot-wide copies (#8928)
* fix(quota): keep quota reads available during scans

Use optional scanner usage for read-only quota statistics across all
quota configurations. Preserve strict legacy write admission and durable
reservation enforcement while keeping unknown usage distinct from zero.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(usage): avoid snapshot copies for single-bucket reads

Project owned snapshots, scalar bucket sizes and refresh-only results
through the same TTL-bounded cache loader. Move loaded snapshots into
the cache without changing refresh serialization or generation fencing.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 18:06:35 +08:00
Hauser 1800b90d06 chore(deps): update flake.lock (#8922)
Flake lock file updates:

• Updated input 'nixpkgs':
    'github:NixOS/nixpkgs/a32edd7' (2026-09-17)
  → 'github:NixOS/nixpkgs/674a202' (2026-10-24)
• Updated input 'rust-overlay':
    'github:oxalica/rust-overlay/26a71e6' (2026-09-19)
  → 'github:oxalica/rust-overlay/5b9f119' (2026-10-24)
2026-10-25 15:50:27 +08:00
Hauser 2ccc8d8647 fix(admin): decouple target inventory from runtime convergence (#8921)
* fix(admin): list destinations without runtime reconciliation

Read configured notification destinations directly from persisted config and
merge existing runtime health without starting target reconciliation.

Cover blocked reconciliation, absent and live-only runtimes, corrupt config,
and authorization precedence through the real admin handler.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(admin): unify passive target inventory reads

Read one durable configuration alongside existing runtime observations for
event, audit, plugin, and extension inventories. Share the configuration
across plugin domains and retain strict mutation readiness separately.

Propagate module-state read failures and cover fresh configuration, secret
redaction, concurrent reads, cancellation, and runtime independence.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(admin): route inventory errors through the S3 facade

Keep the shared target reader behind the existing admin protocol boundary
and reuse its error factory without changing error codes or messages.

Tighten the error-macro ratchet to the actual reduced footprint.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 15:11:27 +08:00
Chris An 124cbfc00a feat(heal): read retained MRF lifecycle v2 checkpoints (#8913) 2026-10-25 14:34:57 +08:00
Jim Chen 3aa7964c58 fix(concurrency): prevent premature Workers::wait drain completion on slot handoff (#8892)
Workers::give() decrements in_use to 0 before calling semaphore.add_permits(1), while a queued Workers::take() task only increments in_use after its woken future is scheduled and polled, allowing Workers::wait() to return prematurely while a woken worker is still in flight.

Root Cause:
In crates/concurrency/src/workers.rs, Workers::give() decrements in_use inside self.in_use.send_modify() before calling self.semaphore.add_permits(1), while Workers::take() only increments in_use after self.semaphore.acquire().await returns and the woken task is scheduled and polled. During the handoff window when the last active worker calls give() and transfers its semaphore permit to a queued take() waiter (so semaphore.available_permits() < limit), in_use is 0, causing Workers::wait() (rx.wait_for(|&held| held == 0)) to complete prematurely while work is still in flight and Workers::available() to over-report available capacity.

Fix:
Require both held == 0 and self.semaphore.available_permits() == self.limit in Workers::wait(), notify self.in_use watchers after self.semaphore.add_permits(1) in Workers::give() and via an AcquireCancelGuard in Workers::take(), and bound Workers::available() by self.semaphore.available_permits().

Signed-off-by: czcbangkai <czcbangkai@google.com>
Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-25 14:22:35 +08:00
Ramakrishna Chilaka 42d376c6b7 perf(ecstore): isolate durable I/O and streamline disk dispatch (#8902)
* perf(ecstore): unify per-disk blocking workers with spin keep-alive and coalesce DELETE hops

Unify per-disk blocking I/O and fsync workers under a 3-lane DiskBlockingQueue
(Foreground, Isolated, Fsync) with MAX_NAMESPACE_WORKERS_PER_DISK = 1 and a
bounded user-space spin/yield keep-alive (WORKER_IDLE_SPIN_ITERS = 256), and
coalesce redundant blocking dispatches along the DELETE hot path:

- Expand DiskBlockingQueue to 3 lanes (Foreground, Isolated, Fsync) with 1
  warm worker per disk/lane and a 256-iteration spin/yield keep-alive before
  exiting spawn_blocking, preventing Tokio BlockingPool shared.idle futex
  wake/wait thrashing between back-to-back stages of PUT and DELETE.
- Route fsync_dir, fsync_dir_with_owner, and namespace file-sync barriers
  through the per-disk Fsync lane on FSYNC_RUNTIME, and replace LocalDisk's
  duplicate MetadataReadQueue with LocalDisk::run_metadata_read backed by
  self.blocking_queue.
- Route write_all_internal(Owned), open_file(O_TRUNC), remove_file_with_owner,
  and remove_dir_with_owner through DiskBlockingQueue with pre-execution
  cancellation checks.
- Coalesce DELETE directory scans in commit_reserved_version_delete and
  finish_version_delete into single blocking passes with periodic cancellation
  polling, batch rollback file writes in write_delete_rollback_files, batch
  rollback unlinks + directory fsync in remove_files_and_fsync_with_owner, and
  coalesce post-rename directory fsyncs in activate_delete_preparation.

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

* perf(ecstore): isolate durable work and reduce idle queue locking

Route coalesced writes and delete settlement through the fsync lane while preserving namespace leases, cancellation ownership, and durability ordering. Keep relaxed work on the foreground lane and replace idle mutex polling with an advisory atomic hint; dequeue and worker retirement remain mutex-protected.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): yield disk workers across shared blocking pools

Limit each draining task to 64 completed jobs and reuse the worker guard to reschedule remaining work behind other disks. Preserve per-disk FIFO, worker limits, and per-operation ownership. Add a deterministic two-disk regression with one blocking thread.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): release queued jobs when workers cannot start

Construct the worker guard before submission and track whether execution began. Release pending jobs outside the lane mutex when the last worker is rejected, so waiters, resource units, and self-owning namespace leases cannot remain stranded. Cover closed runtimes and shutdown during batch handoff.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(connect): synchronize restart with observed inventory

Wait for the received POST instead of treating transport backoff as proof of delivery. Inject a pre-HTTP connection drop and use a verified loopback IP fixture without changing timeout or replay assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(ecstore): unify disk worker lifecycle and drain loop

Represent submitted, running, and retired workers explicitly. Share dequeue, execution, idle recheck, and retirement in one loop while preserving bounded handoff and rejected-task ownership cleanup.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(storage): separate real I/O from paused-clock assertions

Complete durable fixtures before pausing virtual time, drive the immediate scanner tick before freezing time during filesystem waits, and keep checkpoint-backed retry accounting on a real clock. Preserve default fsync isolation, disk deadlines, retry counts, and all outcome assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-10-25 14:22:27 +08:00
Hauser 017b85a5bf fix(ecstore): preserve inactive multipart abort authority (#8920)
Retain per-disk recovery metadata through partial publication and require write-quorum proof for completion replay. Keep completed uploads terminal and strengthen RPC recovery acceptance.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 14:05:19 +08:00
Chris An 55023ecd86 fix(rebalance): move a version a delete-all expiry would apply inline (#8917)
A delete-all lifecycle expiry is a prefix delete that takes the bucket
lifecycle write lock, while the rebalance entry holds that lock for read
through the inline apply and its bucket incarnation fence. The write
waited out the lock timeout, stalled every lifecycle read in the bucket,
and failed the entry on every retry.

Like decommission (#8777), rebalance now moves such a version live and
lifecycle expires it on the target.

Refs rustfs/backlog#2873
2026-10-25 11:41:31 +08:00
Chris An 1cd62c4249 fix(listing): make page exhaustion explicit, carry limit stops in-band (#8908)
The listing pipeline signalled "this page exhausted the namespace" by
setting `MetaCacheEntriesSortedResult.err = Some(Error::Unexpected)` and
had every consumer filter that variant, so any future `Unexpected` on the
producer path would have been read as a complete listing. A second truth
source, the shared `producer_limit_reached` atomic, was last-writer-wins
across the disks of a page and was never serialized to remote peers.

Collectors now return `ListPage { entries, exhausted }`, errors surface as
errors, and the early empty-listing exits return an exhausted empty page.
The producer's stop reason travels in the metacache stream itself:
`MetacacheWriter::close_with_limit_reached` appends it after the `false`
terminator as repeated terminator markers (the only trailing bytes a
deployed reader tolerates, because `list_path_raw_inner` keeps polling
readers after EOF), `MetacacheReader::limit_reached` decodes it, and
`list_path_raw_inner` folds every reader's trailer into a
`ListPathRawOutcome` that reaches the collector. Remote disks therefore
report their per-disk limit stops as well, and the `producer_limit_reached`
fields on `WalkDirOptions`, `ListPathRawOptions` and `ListPathOptions` are
removed.
2026-10-25 11:07:32 +08:00
Hauser 0f24511535 test(e2e): harden multipart fault and TLS acceptance (#8907)
* test(e2e): tighten scoped multipart fault acceptance

Target Abort root deletion instead of child transaction cleanup, require
actual metadata peer hits, and keep faulted APIs single-attempt. Validate
bounded ordinary recovery and safe quorum refusal for partial mutations,
with the recovery enhancement tracked in backlog#2940.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(e2e): drive concurrent TLS reads independently

Give each coordinator its own supervised task and cooperative polling
budget while retaining the existing workload, deadline and byte/hash
assertions. Preserve node logs after fixture teardown and report the
operation, response phase and received bytes when a transfer times out.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 04:54:35 +08:00
Hauser 9517db6cf7 fix(listing): honor per-object quorum with borrowed metadata (#8901)
* fix(listing): honor persisted erasure quorum

Separate metadata admission and primary-reader sizing from each version's
persisted erasure requirements. Propagate agreed-entry uncertainty and
report LIST read-quorum failures as storage unavailability.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(listing): borrow metadata during quorum resolution

Keep validated metadata inspection and agreed-version selection in
filemeta. Resolve independent reader votes through borrowed slots and
retain owned buffers until a filtered result is required.

Preserve fixed-baseline legacy comparisons, cached latest fast paths,
quorum policy, and disk fan-out. Add ownership regressions and paired
release benchmarks for cold and cached version histories.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): remove redundant fallback clone

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 04:49:31 +08:00
Hauser 3bcba78ccb chore(deps): refresh allocator, profiling, and archive crates (#8910)
Run two cargo update and cargo upgrade rounds from origin/main.
Update mimalloc to 0.7.2, hotpath to 0.29.1, and ZIP to 9.1.0,
with compatible crypto, compression, and smallvec updates.
Retain the generic-array version required by crypto-common 0.1.7.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 04:49:20 +08:00
Hauser af4ce32528 perf(ecstore): reduce scanner metadata path allocation overhead (#8899)
* fix(scripts): collect scanner host telemetry on macOS

Use platform-supported iostat arguments and expose optional collector
failures without interrupting scanner-status collection.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): reuse validated metadata read path buffers

Share the checked bucket/object tuple across metadata read consumers and borrow clean normalization inputs without skipping filesystem validation. Keep Windows reconstruction and the second bucket check intact.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scripts): finalize scanner telemetry for failed runs

Initialize host telemetry artifacts before external captures so reused output directories cannot retain prior successes. Share normal and error-path finalization, reap collectors on request failure, and preserve the primary exit status even if status recording fails.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): distinguish unreadable recovery inventories

Treat only the exact system-prefix read-quorum result as incomplete during bounded polling. Preserve strict final reads and the shutdown/drain assertions, record failed observations, and cover interrupted empty streaks and unrelated errors.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 04:23:05 +08:00
Chris An 32c4593587 fix(heal): retain MRF state when bucket identity is unresolved (#8905)
* fix(heal): retain MRF state when bucket identity is unresolved

* test(heal): give real-storage replay fixture a bounded stack
2026-10-25 03:58:46 +08:00
Jim Chen 2f90fb19f5 fix(rio): ZigZag-encode signed delta varints and widen scratch buffer in compress_index (#8893)
* fix(rio): ZigZag-encode signed delta varints and widen scratch buffer in compress_index

Index::append_to passes signed delta residuals (c_off and u_off, which are negative whenever a compressed block is smaller than est_block_uncomp / 2) to write_varint(buf, v: i64), which checks while v >= 0x80 without ZigZag encoding and truncates every negative delta to a single byte, while tmp = [0u8; 8] panics out-of-bounds on 9-10 byte varints.

Root Cause:
In crates/rio/src/compress_index.rs, Index::append_to delta-encodes u_off and c_off (c_off -= prev.compressed_offset + c_predict, where c_predict starts at est_block_uncomp / 2) as signed i64 residuals and passes them to write_varint(buf, v: i64). However, write_varint checks while v >= 0x80 on the signed i64 without ZigZag encoding (unlike Go binary.PutVarint / binary.Varint in the S2 index format): for any negative v, v >= 0x80 is false, so write_varint writes a single truncated byte v as u8 without continuation bits, either silently corrupting compressed_offset on Index::load (when (v as u8) < 0x80) or desynchronizing the varint stream (when (v as u8) >= 0x80). Additionally, tmp = [0u8; 8] at line 223 panics with an out-of-bounds index when encoding 9-10 byte varints, and read_varint lacks an overflow check on 10-byte inputs.

Fix:
Use ZigZag encoding and decoding in write_varint and read_varint, reject 64-bit varint overflows in read_varint, and widen the scratch buffer tmp in Index::append_to from [0u8; 8] to [0u8; 10].

Signed-off-by: czcbangkai <czcbangkai@google.com>

* test(rio): use est_block_uncomp field and compare IndexInfo fields in compress_index test

---------

Signed-off-by: czcbangkai <czcbangkai@google.com>
2026-10-25 03:58:33 +08:00
Chris An 17aa75a175 fix(listing): keep the limit flag monotonic and fix metacache helpers (#8906)
`LocalDisk::walk_dir` stored its own `limit_reached` into the
`producer_limit_reached` flag that every producer of a page shares, so a
walk reaching EOF after a sibling stopped at its per-disk limit cleared the
signal and the collector reported a complete page. Use `fetch_or` so the
flag answers "did any bounded walk stop early", whatever the finish order.

`MetaCacheEntry::is_in_dir` stripped the directory prefix repeatedly, so
`a/a/b` counted as a direct child of `a/`. `MetaCacheEntriesSorted::
forward_past` kept every entry when none sorted after the marker and split
on an index computed over the flattened entries. Both are masked today by
the collector's pre-filtering; fix them and pin the contracts with tests.
2026-10-25 02:24:41 +08:00
Hauser d0f8475924 fix(multipart): recover aborts without retaining topology locks (#8904)
* fix(multipart): allow abort after partial commit

Read staging metadata at read quorum during Abort while retaining the
delete write quorum and generation checks. Bound post-fault lock recovery,
isolate quorum rows from peer breaker history, and cover the metadata and
deletion boundaries.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(multipart): release topology guards before metadata I/O

Read multipart metadata from owned disk snapshots so slow I/O does not
block registry renewal. Cover read and write lookups with a deterministic
paused-I/O regression.

Reuse one cluster per quorum matrix after observing fresh responses from
every peer. Preserve fault-hit and quorum assertions without repeatedly
starting clusters or disabling peer request breakers.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 02:01:12 +08:00
Hauser 7130f25af5 fix(ecstore): unblock delete replay and parallelize preparation (#8896)
* perf(ecstore): avoid head-of-line blocking in delete recovery

Recover independent keys through a bounded rolling window while preserving per-key hint generations, admission budgets, cancellation retry, and the existing transaction decision engine.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): bound durable delete preparation and bootstrap recovery

Prepare independent Linux delete transactions with bounded concurrency while retaining per-key result order and serial fallback for overlapping, rollback, and legacy requests. Preserve startup discovery until bucket metadata is initialized, and add release performance and process-crash acceptance runners.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): verify clean exits in recovery acceptance

Reject forced or OOM exits when measuring clean startup and verify original ETags across mixed-layout crash recovery and a second restart.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): distinguish prepared and decided batch crashes

Observe real preparation and receipt states separately, retain non-vacuous acknowledged-delete sentinels, and require read-only physical convergence before S3 reads can trigger cleanup.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): move final delete recovery options

Move the options value into the batch-ordering regression's final case
instead of cloning it. Keep the earlier clone needed for reuse.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): replay delete receipts after interrupted proof GC

Retire only the exact empty transaction leaf before journal activation. Preserve occupied directories and prefix children, and cover partial cross-disk proof GC without a fresh delete. Tighten crash evidence to distinguish directory-only remnants from retained content.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 01:12:34 +08:00
Hauser 900d082764 fix(scanner): make startup responsive and skip redundant config work (#8898)
* fix(scanner): bound implicit startup delay and publish config early

Limit warm-cache startup to the smaller of the cycle interval and one
minute before jitter, while preserving explicit startup settings.
Publish configuration gauges when applying runtime settings and retain
timeout diagnostics until an actual new cycle begins.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): unify startup waits and skip unchanged configuration

Bound read-only startup inspection and make startup and pre-leadership
retries respond to cancellation and configuration changes. Preserve one
startup deadline and discover replication behind lifecycle-only buckets.
Avoid irrelevant bucket listings and repeated per-disk reconfiguration.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): retain effective startup policy and fallback metrics

Keep the sampled startup deadline when configuration changes leave its
normalized policy unchanged. Initialize retained runtime metrics after
an invalid first refresh without suppressing the validation error or
replacing a newer accepted configuration.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 01:01:37 +08:00
Chris An b23723a51f feat(heal): add live node admission feedback (#8897)
* feat(heal): add live node admission feedback

* test(heal): use storage facade in admission regression

* fix(heal): preserve retryable node admission deferrals
2026-10-25 01:42:02 +09:00
Hauser 07b7d4fc18 fix(s3): preserve legacy plaintext multipart ETags in listings (#8900)
* fix(s3): preserve legacy plaintext multipart ETags in listings

Use stored object encryption markers for keyless LIST classification and rebuild persistent snapshots that discarded plaintext multipart ETags.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(s3): classify listing encryption metadata without allocations

Use fixed SSE header matching with the historical Unicode fallback. Fuse encrypted ETag proof validation into one metadata pass and clone snapshot ETags only after visibility filtering.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 01:41:03 +09:00
Jim Chen d60ef4873a fix(ecstore): avoid usize underflow when root_disk drives are offline or unknown (#8879)
get_online_offline_disks_stats() counts and demotes all root_disk entries regardless of drive state, underflowing online_disks[ep] (0usize - 1) and double-counting offline_disks[ep] when a root_disk drive is offline or unknown alongside healthy non-root drives.

Root Cause:
In crates/ecstore/src/diagnostics/admin_server_info.rs: (1) root_disk_count counts every drive with root_disk = true even if the drive was already classified into offline_disks or unknown_disks; (2) the subsequent demotion loop unconditionally decrements online_disks[ep] and increments offline_disks[ep] for every disk.root_disk without checking whether disk.state was classified as online (ok or unformatted). When an endpoint has an offline or unknown root_disk drive and zero online drives, *online_disks.get_mut(ep) -= 1 underflows 0usize (panicking in debug/checked builds or wrapping to usize::MAX) and inflates offline_disks.

Fix:
Introduce is_online_drive_state() and only count and demote root_disk drives whose state was classified as online (ok or unformatted), preserving the offline and unknown bucket tallies and keeping online + offline + unknown equal to disks_info.len().

Signed-off-by: czcbangkai <czcbangkai@google.com>
2026-10-25 00:29:15 +08:00
Hauser aaeedcd1d7 perf(rpc): remove stream boxing and verify distributed TLS reads (#8885)
* perf(rpc): remove redundant boxing from read streams

Keep the capped read stream concrete until StreamingBlob owns its type erasure. Add verified four-node TLS coverage for full, unaligned range and concurrent reads, with bounded client memory and explicit integrity checks.

Document protocol comparison commands and the old-node workaround during rolling upgrades.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): preserve TLS trust for alternate credentials

Derive credential-specific clients from the cluster configuration so they retain the generated CA. Exercise successful trusted reads and reject an invalid replacement identity instead of inheriting root credentials.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): collapse acceptance report path guard

Combine the optional report path and existing-file checks into a let chain
without changing the report or PID sidecar collision behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-25 00:12:59 +08:00
Jim Chen 8ebec9e71c fix(server): preserve UTF-8 boundaries in Content-Disposition filename parsing (#8880)
HttpCompressionConfig::extract_filename_from_content_disposition() calls header_value.to_lowercase() and slices &header_value[start..] using the byte index from lower.find("filename="), panicking on multi-byte Unicode characters whose UTF-8 byte length changes under case mapping and matching unanchored *filename= parameter suffixes.

Root Cause:
In rustfs/src/server/compress.rs, extract_filename_from_content_disposition() computes lower = header_value.to_lowercase() and uses the byte offset idx from lower.find("filename=") to slice &header_value[start..]. Because Unicode case mapping can expand or shrink UTF-8 byte lengths (e.g., U+0130 "İ" is 2 bytes in UTF-8 but lowercases to 3 bytes; U+212A "K" is 3 bytes in UTF-8 but lowercases to 1 byte), start can land inside a multi-byte UTF-8 codepoint or past the end of header_value, causing a runtime panic. In addition, lower.find("filename=") matches any parameter ending in filename= (such as x-filename=).

Fix:
Use header_value.to_ascii_lowercase() so byte offsets remain 1:1 with header_value, and require filename= to appear either at the start of the header or after a semicolon parameter delimiter.

Signed-off-by: czcbangkai <czcbangkai@google.com>
2026-10-24 23:49:24 +09:00
Jim Chen cced213b66 fix(ecstore): invalidate FdCache on in-place writes, rename_part, and directory rename_file (#8889)
StdBackend::pread_bytes caches FdCacheEntry { file, len } and skips fstat on cache hits, passing cached len directly to unsafe { mmap_options.map(file) }. However, StdBackend::open_write / UringBackend::open_write (create_file, append_file), LocalDisk::write_all_private (write_all), LocalDisk::rename_part, and directory LocalDisk::rename_file fail to invalidate FdCache, causing mmap past EOF (SIGBUS), false DiskError::FileCorrupt on grown files, or stale reads after renames.

Root Cause:
In crates/ecstore/src/disk/local.rs, StdBackend::pread_bytes caches open File handles and their initial fstat byte length in FdCache and uses the cached len directly for bounds checks and unsafe { mmap_options.map(file) }. While LocalDisk::rename_file (non-directory) and LocalDisk::delete invalidate FdCache, five mutation paths omit invalidation: (1) StdBackend::open_write (called by create_file with O_TRUNC and append_file), (2) LocalDisk::write_all_private (called by write_all with O_TRUNC), (3) LocalDisk::rename_part, (4) LocalDisk::rename_file when src_is_dir is true, and (5) UringBackend::open_write / unlink / rename which fail to forward invalidations to self.inner. Truncating a cached file across a page boundary causes mmap to map beyond EOF and trigger SIGBUS; growing a cached file causes false DiskError::FileCorrupt.

Fix:
Invalidate FdCache in StdBackend::open_write, UringBackend::open_write/unlink/rename, LocalDisk::write_all_private, LocalDisk::rename_part (both src and dst), and directory LocalDisk::rename_file (via invalidate_prefix on src and dst).

Signed-off-by: czcbangkai <czcbangkai@google.com>
2026-10-24 23:49:20 +09:00
Hauser 882217221e fix(lock): reach quorum behind silent voters (#8895)
* test(e2e): add MPU RPC quorum and recovery acceptance

Exercise separate storage and lock RPC delays across multipart phases,
including quorum boundaries, cancellation, bucket recreation, and bounded
eight-node load. Honor TMPDIR for isolated cluster drive directories.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(lock): probe healthy voters behind silent peers

Spread additional probes across the existing acquisition attempt budget
when the initial quorum-plus-spare wave stalls. Preserve quorum thresholds,
fast-path fan-out, and existing ownership and late-response cleanup.

Cover every four-node read-voter ordering, a stalled eight-node write
quorum, and normal fan-out. Extend MPU acceptance to EC12+4 at twelve and
eleven metadata acknowledgements.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-24 22:30:31 +08:00
Chris f279cefa9c feat(observability): track foreground response-body completion windows (#8894)
* feat(observability): track foreground response-body completion windows

* docs: correct foreground ownership spelling
2026-10-24 23:14:07 +09:00
Chris 8aba025bd6 feat(concurrency): retain resource leases through native I/O (#8886)
feat(concurrency): retain resource leases across owned disk work
2026-10-24 21:19:06 +08:00
Hauser 40837f67f8 perf(ecstore): avoid head-of-line blocking in delete recovery (#8884)
Recover independent keys through a bounded rolling window while preserving per-key hint generations, admission budgets, cancellation retry, and the existing transaction decision engine.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-24 20:35:29 +08:00
cxymds 042f6ba3aa fix(quota): persist lazily created populated shards (#8883) 2026-10-24 21:02:52 +09:00
Chris 63eac7a387 feat(observability): sample live cgroup resource limits (#8882) 2026-10-24 20:42:20 +09:00
Chris e13336a116 feat(scanner): expose publication and heal observation status (#8878) 2026-10-24 20:04:57 +09:00
Hauser 8d5af5981d fix(s3): preserve aws-chunked error responses (#8875)
* fix(s3): preserve aws-chunked error responses

Map named aws-chunked failures through the shared bounded body classifier,
keeping typed source precedence and the dependency's S3 response contract.
Cover exact responses, upload publication, and valid signed/trailer limits.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(s3): classify upload stream errors once per cause

Reuse the typed UploadStreamError result for digest and incomplete-body
classification while preserving the shared classifier's marker priorities.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): refresh aws-chunked profile selections

Record the two new aws-chunked regression cases in smoke and full profiles.
Verify exact additions against the CI Linux inventory and native Darwin
listings, recovering each previous digest when those two cases are removed.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-24 20:04:18 +09:00
Hauser f53c5d41d4 perf(ecstore): avoid heap allocation for shard descriptors (#8873)
Keep inline shard references through both encode backends and reconstruction
verification, retaining heap spill for wider layouts and existing codec bytes.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-24 18:11:09 +08:00
Chris 4096d05ca7 test(ilm): isolate fixture recovery loop ownership (#8881) 2026-10-24 18:47:50 +09:00
Hauser d2c1434a02 fix: isolate internode reads and migrate crypto dependencies (#8872)
* fix(rio): isolate internode streams with pooled HTTP/1.1

Default the internode HTTP data plane to reusable HTTP/1.1 connections so paused shard bodies cannot consume shared HTTP/2 receive credit. Retain explicit auto negotiation and the existing TLS, pooling, and recovery paths.

Refs rustfs/rustfs#8843 and rustfs/backlog#2934.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(rpc): frame bounded shard reads for connection reuse

Preserve the bounded read cap and stream-to-EOF sentinel while making connection completion independent of a chunked terminator. Cover exact reads without EOF polling, pooled TLS reuse, and partial-body truncation.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(deps): migrate signer and OIDC to patched crypto

Pin the requested signer fix and upstream OIDC/OAuth2 crypto migrations to immutable commits. Preserve registry SDK type identity, remove the old bigint and elliptic-curve chains, and verify independent login state, nonce, and PKCE values.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-24 17:41:55 +08:00
Chris c8f14dc337 test(scanner): attest running benchmark process identity (#8876)
* test(scanner): attest running benchmark process identity

* fix(scanner): reject aliased process receipt data roots

* fix(scanner): attest scheduled scan configuration
2026-10-24 18:22:11 +09:00
Chris 90c5050a0f fix(scanner): preserve unknown catch-up state on ledger failure (#8877) 2026-10-24 18:16:42 +09:00
Chris 334e8d9d3e test(scanner): verify retained versions with an independent oracle (#8870)
* test(scanner): add independent version content oracle

* test(ecstore): drain guarded delete fixture rename tails

* docs(scanner): record SDK seeding requirements
2026-10-24 18:12:06 +09:00
Ramakrishna Chilaka d8e8f6bfa4 perf(ecstore): coalesce inline PUT commit and bound disk namespace workers (#8871)
* perf(ecstore): coalesce inline PUT commit and bound disk namespace workers

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

* fix(ecstore): drop PreparedRenameSource before post-commit rollback on Windows

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a

---------

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-10-24 17:25:53 +09:00
Chris 4e64e86a29 feat(scanner): count object metadata visits (#8874)
* feat(scanner): count object metadata visits

* test(ecstore): drain guarded delete fixture rename tails
2026-10-24 17:24:17 +09:00
cozima d229c79e38 fix(s3): apply bucket CORS to virtual-hosted-style requests (#8860)
ConditionalCorsLayer took the bucket from the first path segment only.
With RUSTFS_SERVER_DOMAINS set, a virtual-hosted-style request such as
OPTIONS http://mybucket.localhost:9000/x.jpg was evaluated against a
bucket named "x.jpg", so a preflight never matched the bucket's CORS
configuration and returned 200 without Access-Control-* headers, while
the same request in path style succeeded.

Resolve the bucket from the host prefix first, reusing the virtual-host
matching that the API rate limiter already uses, and fall back to the
first path segment for path-style requests. A bucket-level request on a
virtual host ("/") is now treated as a bucket request instead of the
server root.

Co-authored-by: cozima <8464261+cozima@users.noreply.github.com>
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-24 16:53:36 +09:00
Hauser 0c8b05585e fix(scanner): classify erasure candidates in one budgeted walk (#8869)
* test(scanner): isolate async checkpoint log capture

Scope captured tracing subscribers to each future poll and cover the
competing-dispatcher failure without weakening checkpoint assertions.
Verify exact bounded erasure-probe accounting around the 64-entry limit.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): classify erasure candidates in one budgeted walk

Continue directory classification in cooperative 64-entry batches until
part evidence or EOF, retaining normal checkpoint and namespace work.
Defer metadata accounting and namespace reuse until classification ends.
Distinguish vanished opens from incomplete iteration and preserve quota,
sampling, failed-object and non-destructive heal behavior.

Pin test callsite interest alongside poll-scoped capture to prevent an
unsubscribed sibling from caching the checkpoint callsite as disabled.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-24 15:49:00 +08:00
Hauser 911ea265c5 fix(storage): apply and index explicit delete-marker removals (#8854)
* fix(ecstore): purge every explicit delete-marker version

Keep explicit marker removals on the canonical version-delete path so
same-key batches are not truncated and pending replication does not retain
source markers. Preserve marker identity and timestamps in the response.

Add real four-disk regressions for mixed version cleanup, duplicate marker
IDs, pending replication, and null/UUID marker removal.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(filemeta): index explicit delete-marker batches

Reuse the batch index and final compaction for ordinary marker removals.
Keep small marker-only histories on the scalar path and preserve fallback
for free versions and complex mutations.

Add scalar-equivalence, boundary, corruption and deterministic scan-count
coverage, a real-disk mixed-history regression, and reproducible marker
benchmark cases. Preserve existing benchmark defaults while honoring CLI
sampling overrides.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(filemeta): remove redundant marker fixture clone

Move the original metadata into its final test fixture after the last
borrow, avoiding the redundant clone reported by strict Clippy checks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(storage): validate explicit marker deletion and recovery

Exercise UUID/null and duplicate explicit marker removals over real HTTP
with retries disabled, including immediate four-node visibility and exact
retained payloads. Cover all-drive PREPARED/APPLIED/DECISION process
termination, rollback/commit recovery, and old-ID retries across a second
restart without deleting a fresh marker.

Use flat sampling and fixed per-case fixture batches in the metadata
benchmark. Update profile selection digests for the added regressions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(heal): synchronize crash fixture startup and flush readiness

Give disk setup and the durable flush boundary separate readiness gates,
keeping each phase bounded to ten seconds. Preserve the real SIGKILL and
restart assertions while reporting early child exits and retaining output.

Reap fixture children on assertion failure and cover early-exit diagnostics.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-24 16:34:31 +09:00
Chris 8c7b3996cb feat(scanner): extract OTLP histogram and counter windows (#8862)
* test(scanner): validate OTLP histogram measurement windows

* feat(scanner): extract exact integer counter windows

* test(ecstore): drain guarded delete fixture rename tails

* test(ilm): retain transition timeout evidence
2026-10-24 16:33:03 +09:00
Chris 68a5b2c89c fix(heal): measure admission lock wait and hold separately (#8863)
* fix(heal): measure admission lock wait and hold separately

* fix(heal): exclude force-start cancellation from lock hold

* test(ecstore): drain guarded delete fixture rename tails
2026-10-24 16:17:41 +09:00
Chris 7f1795f275 test(scanner): add recoverable benchmark service control (#8868) 2026-10-24 14:58:44 +09:00
Chris 3092792c3c fix(scanner): recover an interleaved pause backlog wedge after expansion (#8867)
* fix(scanner): roll a wedged pause backlog forward to its proven ledger

For rustfs/backlog#2873 defect E.

Two interleaved writers could leave a replica state that no claim could
leave. Writer B read writer A's partial commit and selected the stable
rollback point. A's commit then completed and A verified it. B's rollback
stabilization overwrote every member it had read after the commit, and A's
stabilization reached only the remaining member. No commit survived and the
stable fields differed, so every claim and every decommission retirement
failed with "neither a surviving membership commit nor a stable rollback
point".

- When no commit survives and stable consensus fails, select the unique
  newest stable ledger by (writer epoch, generation). A stable field is
  written only after its ledger was selected as authority, so that ledger is
  the last proven one. The next claim stabilizes it and advances normally.
- Keep failing closed for an invalid or unreadable replica, for two
  different stable ledgers at the newest key, and for a missing replica that
  a stored commit names as a member.
- A rollback proof written without an authoritative commit names only
  members that already store a record, so a failed first write to a new
  member cannot turn it into a named member that reads as lost.
- Retirement refuses a rolled-forward ledger until the writer has
  stabilized it, as a retryable handoff conflict rather than a terminal
  authority conflict.
- Tests replay the interleaving on real storage: it converges and retires,
  it converges after another expansion with a failed first write to a new
  member, and a same-key fork or a lost named member still refuses.

* fix(scanner): let retirement stabilize a rolled-forward pause backlog

Follow-up to the defect E roll-forward for rustfs/backlog#2873.

- Retirement no longer waits for a scanner writer. When no commit
  survives and the native selector over every read member (survivors,
  retiring source and queued pools) rolls forward, the planner commits and
  stabilizes that ledger on the survivors under the writers' object fence.
  The previous retryable handoff could exhaust its ~13.5 s budget long
  before a writer re-claimed, and failed the decommission terminally.
- A writer's roll-forward refuses when a stored commit names a member that
  is missing or outside its read, such as a retiring source excluded from
  the writable set. Retirement, which reads that member, decides instead.
- A writer stabilizing a rolled-forward ledger writes missing members
  first and stops at the first failure. A member that only read as missing
  rejects the create, so no surviving proof can omit its newer record.
- Docs describe the actual roll-forward preconditions and the retirement
  exit.
- Tests: retirement converges the wedge with no writer; a writer refuses to
  roll forward past an unread source that holds the newest ledger and
  retirement keeps it; a spurious missing read changes no record and the
  next claim converges on the newest ledger.

* fix(decommission): create missing pause backlog survivors first

Follow-up to the defect E retirement roll-forward for rustfs/backlog#2873.

- Retirement creates survivors that read as missing one at a time, before
  any stored survivor, and stops at the first failed create. A transient
  create failure on a new pool's set no longer leaves every other survivor
  holding a commit that names a still-missing member, which no later
  selection could leave.
- A rolled-forward retirement first seeds a rollback proof that names only
  the survivors that store a record; the commit still names every survivor.
- Retirement rolls forward only when the survivors cannot select a ledger
  on their own or select the same one. Survivors that agree on a different
  ledger keep the source-authority check.
- The scanner writer applies the same missing-first, stop-at-first-failure
  order to every stabilization with a missing member, including a seed from
  an old commit selected as the rollback proof.
- Tests: a failed new-pool create during retirement retries to convergence;
  a spurious missing read cannot seed an old commit over a newer member;
  the rolled-forward precedence over source stable records is pinned.

* docs(decommission): state the all-missing survivor limit of backlog roll-forward
2026-10-24 14:52:30 +09:00
Chris e542e62f07 feat(heal): record namespace lock acquisition waits (#8866) 2026-10-24 14:49:59 +09:00
Chris d90419f4dc feat(scanner): count cache save payload bytes per attempt (#8865) 2026-10-24 14:23:02 +09:00
Chris bbe2f5a3d3 fix(ecstore): skip orphan cleanup for leading-slash listings (#8864) 2026-10-24 13:22:06 +09:00
Chris b5f275ca3f fix(scanner): collect benchmark metrics from realtime route (#8859)
* fix(scanner): collect benchmark metrics from realtime route

* docs(scanner): align benchmark help with realtime route

* test(e2e): bound parallel seeding for scanner usage checks
2026-10-24 12:45:42 +09:00
Chris c2e6b974e1 test(e2e): bound parallel seeding for scanner usage checks (#8861) 2026-10-24 12:44:45 +09:00
Chris b39fcb2e85 test(heal): cover rc.5 upgrades and refresh ctutils (#8847)
* test(e2e): use the resumed decommission completion budget

* test(heal): exercise checkpoints written by rc.5

* test(heal): route upgrade fixtures through the storage facade

* fix(deps): update ctutils to address constant-time advisory

* test(lifecycle): gate recovery I/O while advancing test time
2026-10-24 11:20:05 +09:00
Chris 301e3a9f34 fix(decommission): count settled entries once, back off repeat pauses (#8848)
* fix(decommission): count settled entries once and back off repeated pauses

Follow-up to rustfs/rustfs#8824 for rustfs/backlog#2873 defect F.

- Count an entry's versions when the entry settles (copied and cleaned up,
  or retained) instead of as each version copies. A partially moved entry
  that is deferred, paused and resumed, or interrupted, no longer counts its
  already-moved versions again when the resumed pass finds them on the
  target.
- Hold the watchdog relaunch of a decommission that pauses again on the
  same cause without progress, doubling from 30 s up to 15 min, and warn with
  the cause. A first pause still relaunches on the next pass; the pause never
  becomes a terminal failure.
- Log each drive's error when a delete version loses write quorum, so the
  cause of a sub-quorum delete-marker copy is recorded instead of only its
  rollback.
- Tests: pause/resume counting, a target whose metadata is below read
  quorum, the copy-quorum pause cause, the relaunch backoff, and a rollback
  test that asserts the restore attempt instead of a tracing log.

* fix(decommission): measure pause progress by cleaned entries

Review follow-up on the pause/resume counting and relaunch backoff.

- A pause now carries this generation's progress counters into the
  pool metadata it persists, like a progress checkpoint. Before, everything
  counted since the last checkpoint was dropped at the pause.
- A retained entry (one whose source stays) is relisted by every resumed
  pass. A per-instance ledger counts its versions once per decommission
  generation, so retained versions no longer grow per round in one process.
- The relaunch backoff measures progress by entries moved off the pool and
  completed buckets, which a relisted retained entry cannot advance. Before,
  the recounted retained entry looked like progress and reset the backoff.
- Tests: exact totals across a pause and a resume from persisted metadata;
  a target kept below quorum defers the entry with nothing counted; a
  retained entry plus a repeated cause escalates the backoff over three
  pauses, with the watchdog path relaunching a first pause and holding a
  repeat.

* fix(ecstore): bound retained decommission accounting
2026-10-24 10:11:44 +09:00
Chris 6535c28f1a fix(scanner): recover backlog across interrupted pool expansions (#8858)
fix(scanner): recover stable membership after repeated expansion
2026-10-24 10:01:10 +09:00
Chris 76f4342ae2 feat(scanner): observe canonical heal task terminals (#8851) 2026-10-24 08:50:13 +09:00
Hauser 128634f102 fix(notify): preserve marker IDs and reduce event allocations (#8853)
* fix(notify): preserve delete marker version identities

Use the committed marker identity for batch creation notifications and map
null versions at the notification boundary. Keep explicit marker removals
and synthetic directory identities consistent with the S3 response.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(notify): remove redundant delete version fallback

Single-object storage results already normalize absent version IDs to nil
UUIDs for versioned and suspended buckets. Keep the existing response
projection and reserve marker fallback handling for batch results.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(notify): avoid redundant delete and event allocations

Skip successful response projection for quiet batches and move committed
names directly into lightweight notification data. Traverse committed
results through the single-object cache invalidator, removing the unused
batch wrapper and temporary key copies.

Consume owned event fields and use borrowed response-ID entries while
preserving version selection, metadata filtering, and dispatch semantics.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-24 04:14:26 +09:00
Chris abe14e2f97 feat(scanner): configure startup recovery backoff cap (#8845)
* feat(scanner): configure startup recovery backoff cap

* test(scanner): compare recovery retry count without narrowing

* docs(scanner): document recovery backoff cap and expose it in Helm

List scanner.recovery_backoff_cap in the runtime controls table, drop the
fixed ten-minute wording from the follower recovery section, and map
config.rustfs.scanner.recovery_backoff_cap_secs to
RUSTFS_SCANNER_RECOVERY_BACKOFF_CAP_SECS in the chart.
2026-10-24 03:09:39 +09:00
Hauser 7d6172e666 chore(deps): refresh crates and upgrade hotpath to 0.29.0 (#8852)
Run two cargo update and cargo upgrade rounds from origin/main.
Upgrade the hotpath crate family to 0.29.0 and refresh compatible
AWS, Redis, profiling, crypto, UUID, and certificate dependencies.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-24 03:09:34 +09:00
Chris 3254e79efd perf(scanner): transfer owned caches without redundant clones (#8849) 2026-10-24 00:49:07 +08:00
Chris da7dc74147 fix(quota): retire degraded floors from durable usage reports (#8832)
* fix(quota): retire degraded floors from durable usage reports

* docs(quota): clarify retained usage cache refresh behavior

* fix(admin): report unknown bucket usage as null in GetBucketQuota

GetBucketQuota serialized missing usage as size 0, which contradicted the
D3 rule that unknown usage is never reported as zero and, after retiring
degraded floors, made a bucket near its limit look empty. Make size
optional and stop collapsing a missing or unreadable usage snapshot to 0.
2026-10-24 01:46:02 +09:00
Chris db55098aa6 fix(scanner): recover dual corruption with retained epoch fencing (#8833)
* fix(scanner): recover dual corruption with retained epoch fencing

* fix(scanner): preserve recovery markers and legacy quota floors

* test(scanner): expect retained usage recovery marker state

* docs(scanner): register dual-corruption recovery evidence objects

Add the .bloomcycle.bin.dual-recovery/ evidence family to the persisted
objects table and describe its owner, write-once lifecycle and recovery
rule in Deletion And Recovery Rules.
2026-10-24 01:43:59 +09:00
Chris 47e1850d7e fix(scanner): preserve remote checkpoint coverage identity (#8827)
* fix(scanner): preserve remote checkpoint coverage identity

* test(scanner): verify remote plan identity propagation

* test(rpc): disambiguate scanner capability body collection
2026-10-24 00:22:49 +09:00
Chris 4e88ebcf30 fix(heal): preserve typed replacement readiness deferrals (#8823)
* fix(heal): preserve typed replacement readiness deferrals

* docs(heal): align retry compatibility markers with guards
2026-10-24 00:22:41 +09:00
Ramakrishna Chilaka cfee2ffaba perf(ecstore): bound xl.meta read workers and enable HEAD early-stop (#8846)
Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Copilot-Session: d85aaf47-2a4b-4c2c-97a3-dbe8c7717e2a
2026-10-23 22:32:48 +08:00
Chris 623601d2f9 fix(test): select the current G09 upgrade case (#8841) 2026-10-23 23:04:59 +09:00
Chris 2474adc50f feat(heal): inspect blocked checkpoint validation without mutation (#8838) 2026-10-23 23:03:57 +09:00
Hauser c8cb1d86d3 fix(scanner): streamline budgeted metadata walks (#8837)
* fix(scanner): budget directory enumeration I/O

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(scanner): skip redundant metadata walk work

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(scanner): share budgeted directory traversal

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-23 21:07:09 +09:00
Hauser 607393e6fa fix(ecstore): unify multipart generation fence lifetimes (#8830)
* fix(s3): expose typed causes for unavailable responses

Keep the existing S3 retry contract while distinguishing namespace lock
timeouts, other lock refusals, and storage write quorum failures. Reuse one
bounded typed-source walk and document multipart session attribution.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): preserve XML type on attributed errors

Keep application/xml when the pinned serializer replaces generated headers
with the custom cause map. Assert the media type on direct and wrapped lock
timeouts and namespace/write-quorum error responses.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): unify multipart generation fence lifetimes

Own registry registration before asynchronous incarnation validation so
cancellation cannot preserve a memo beyond real lifecycle-lock coverage.
Reuse successful validation for overlapping PUT and multipart operations,
and retain the full owner through detached part commits and orphan cleanup.

Keep cold validation concurrent and preserve authoritative snapshot,
borrowed-fence, and disabled-lock checks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): remove redundant pending closure

Pass std::future::pending directly to the incarnation validator in the
cancellation regression test so strict Clippy accepts the test target.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-23 20:14:34 +09:00
Chris daa9529fc6 fix(decommission): keep partially moved versions readable (#8824)
* fix(decommission): keep partially moved versions readable and defer lost-quorum copies

A version copy whose target write kept losing drive quorum was counted as a
permanent per-object failure, and a partially moved entry made every copied
version unreadable: the retained source lists all versions while the target
lists only the copied ones, and the cross-pool identity check treated that
version-list difference as a same-time conflict (SlowDownRead).

- Compare the version-list fields (num_versions, successor_mod_time,
  is_latest) only for exact identities; data-movement equivalent copies of a
  version stay readable while the entry is partially moved.
- Defer a delete marker, object or tiered version copy that exhausts its
  in-place retries on a drive quorum error to the end-of-round replay instead
  of counting it failed; a persistent loss pauses the decommission, which the
  local decommission watchdog resumes.
- Skip the backup rename when rolling back a delete transaction whose journal
  recorded no original metadata, so a marker created on a missing key no
  longer logs a NotFound that reads as the cause of the failed write.

Refs rustfs/backlog#2873

* fix(ecstore): close copy quorum and tiered read gaps

* test(ecstore): synchronize capacity fixtures by object
2026-10-23 16:33:16 +09:00
Chris 1820a4c40b fix(heal): list local blocks and quiet legacy ambiguity logs (#8826)
* fix(heal): list local blocks and quiet legacy ambiguity logs

* test(heal): cover storage and scheduler ambiguity logs
2026-10-23 13:40:00 +08:00
Chris 631cd0ceca fix(ecstore): preserve migrated reads and retry busy pool heals (#8821) 2026-10-23 12:09:38 +09:00
Hauser 5778384b68 chore(deps): refresh ICU and profiling dependencies (#8820)
Update Pyroscope to 2.1.4 and compatible ICU, yoke, and zerovec crates.
Cover normalized Unicode hostnames and loopback rejection in egress tests.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-23 11:03:04 +08:00
Hauser 44a73b0bef fix(s3): preserve typed upload errors across body readers (#8816)
* fix(s3): report payload SHA256 mismatches accurately

Distinguish signed payload SHA256 failures from MD5 and additional
checksum failures at the shared API error boundary. Preserve the
payload error through archive extraction and use typed s3s errors.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(s3): classify body failures in one bounded pass

Share typed body-error classification across direct and storage I/O.
Retain marker precedence while replacing repeated source-chain scans,
and map storage-wrapped short HashReader bodies to IncompleteBody.

Cover nested priorities, real short reads, and one traversal budget.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(s3): route upload stream errors through the app facade

Keep the real stream-error fixtures behind the existing test-only S3
boundary without increasing the direct s3s import footprint.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): preserve typed body failures across archive reads

Route TAR entry failures through the shared archive error adapter and
preserve every classified body error. Keep generic archive parsing as
InvalidArgument without formatting discarded transport diagnostics.

Use the existing timeout marker for PUT and Snowball body guards. Add
regressions for real stream verification after sniffing and timeout
responses, and tighten the reduced S3 macro footprint baseline.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-23 05:07:43 +09:00
唐小鸭 91007466c9 fix(site-replication): keep stored name on endpoint-only edits (#8817)
An edit that omits the name, as mc admin replicate update --endpoint
does, was normalized with a name inferred from the new endpoint host and
overwrote the stored peer, renaming the site on every peer map while its
own state name stayed unchanged.

update_peer now keeps the stored name for a known deployment ID when the
edit carries none, covering the public edit, the endpoint-refresh commit
and internal peer deliveries. The public handler also fills the stored
name before planning so the fan-out and refresh journal carry it to
receivers running older versions. Add and join of unknown peers still
infer the name from the endpoint.
2026-10-23 05:06:54 +09:00
唐小鸭 6e3484916f fix(replication): reject connection edits on site-replication targets (#8814)
A set-remote-target update with the creds group on a bucket target that
belongs to a site-replication peer skipped the connection change, logged a
warning, and still returned 200. The Console's bucket replication form sends
exactly that request when an endpoint changes, so operators saw success while
the stored endpoint, credentials, and TLS settings stayed unchanged.

Return 400 InvalidRequest instead, naming the target and the evidence that
makes it peer-owned, and pointing at a site-replication edit. The ownership
probes are unchanged; the decision is extracted so it can be unit tested.

Document how to change a site's address: the local endpoint is recorded once
at setup and never re-derived, edits must reach every other peer at its stored
endpoint, so sites move one at a time (or old addresses are restored
temporarily), followed by a resync. Commands use rc because mc's resync does
not work against RustFS and its update renames the site.
2026-10-23 02:29:13 +09:00
唐小鸭 e1e710cb5d fix(admin): serve bare madmin info bodies on the MinIO prefix (#8815)
GET /v3/info and /v3/storageinfo have wrapped the madmin InfoMessage and
StorageInfo under an `info` key since the cluster snapshot view (#3803).
madmin decodes these bodies directly, so `mc admin info` printed empty
values and `mc admin replicate resync start` rejected every alias because
the local deploymentID read as empty.

Requests on the MinIO-compatible /minio/admin prefix now receive the bare
madmin body, following the existing is_compat_admin_request convention.
The /rustfs/admin prefix keeps the envelope that rc (which requires the
`info` key), the console, e2e tests, and auto-testing scripts read.
2026-10-23 02:25:32 +09:00
Chris d9ab8760ee test(e2e): accept retried rebalance deferrals; retry busy decom preflight (#8813)
test(e2e): accept retried rebalance deferrals and retry busy decommission preflight
2026-10-23 02:10:04 +09:00
Ramakrishna Chilaka 67442a5ba3 perf(filemeta): fast-path canonical V3 header matching and borrowed version merges (#8811) 2026-10-23 00:39:23 +09:00
Hauser df10dc7864 fix(scanner): fence backlog writes against stale pool membership (#8799)
* perf(s3): borrow options during delete preflight

Pass the existing request options by reference to the metadata preflight instead of cloning them solely for that borrow. Keep the getter's mutable snapshot copy and the later owned-delete copy.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): fence backlog writes against stale pool membership

Reject native scanner publications unless their captured writable pool cohort
matches the fenced durable topology. A smaller startup view must not replace
an expanded membership commit with its older stable rollback.

Keep single-replica test injection fenced by the complete current cohort and
cover rejected startup claims, unchanged CAS revisions, and recovery of the
acknowledged expanded commit.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): use current cohort for healthy scanner CAS writes

Keep the writer's cached topology stale while explicitly capturing the
surviving membership for healthy-target publication and CAS checks. Also
assert that the old cohort rejects healthy-target writes without publishing.

Preserve retiring-source rejection, payload and ETag checks, and canceled
source membership repair without changing production admission.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 23:17:15 +08:00
Ramakrishna Chilaka 5c463ff8d3 perf(filemeta): avoid per-replica cloning during metacache quorum resolution (#8810) 2026-10-22 22:01:58 +09:00
Hauser 1e36e18265 feat(metrics): classify terminal remote walk failures (#8809)
Record a bounded failure boundary for each non-successful logical remote
walk while preserving the existing outcome, error source and retry behavior.
Distinguish stream open/read, downstream write/flush, wrapper admission and
deadline failures, and unfinished operations dropped before completion.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 20:12:51 +08:00
cxymds 0b25604503 fix(config): preserve persisted compatibility fields (#8803)
* fix(config): preserve persisted compatibility fields

Bound ignored configuration diagnostics, retain unsupported aliases and KVS attributes during saves, and prevent stale shadow values from resurfacing. Add a pinned MinIO fixture and regression coverage for decode, reset, encryption, and logging behavior.

* fix(config): satisfy ecstore clippy

* test(config): ignore JSON object key order in roundtrip

* fix(log-analyzer): recognize persisted config decode failures
2026-10-22 20:05:21 +08:00
Hauser 89c3282ae2 test(scanner): reserve capacity for all native backlog fixtures (#8802)
Include single-pool, status, and expansion fixtures in the existing
native scanner reservation without changing budgets or assertions.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 17:54:05 +08:00
Hauser 0d0e6d8497 fix(ecstore): preserve scanner authority during decommission (#8807)
Fence native backlog writes against their captured pool membership and retain
queued replicas as read-only proof members during retirement. Stabilize the
topology test workload and bound pre-ACK recovery separately.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 17:42:20 +08:00
Ramakrishna Chilaka f1a0263ab1 perf(utils,filemeta): vectorize path and metadata key hot loops with SWAR (#8806) 2026-10-22 17:40:07 +08:00
Hauser bea4be68a2 chore(deps): upgrade workspace parking_lot to 0.13 (#8801)
* chore(deps): upgrade workspace parking_lot to 0.13

Move all six direct workspace consumers to parking_lot 0.13 while
retaining the 0.12 dependency line required by upstream crates.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(connect): stabilize client failure classification

Use an ephemeral loopback listener that explicitly rejects proxy CONNECT
and direct TLS connection establishment instead of assuming fixed ports
will promptly refuse connections. Give classification its own bounded
transport and measurement budget while retaining the timeout tests.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 17:35:02 +08:00
Hauser 90a39a5083 perf(heal): borrow intents during retirement proof checks (#8800)
Share the existing canonical identity resolver with a non-authoritative source eligibility query. Group borrowed intents and create owned anchors only for retired generations, preserving cache and responsibility contracts and moving proof keys.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 17:22:37 +09:00
Hauser 11381c260f fix(ecstore): restore marker write quorum on decommission resume (#8793)
* fix(ecstore): restore marker write quorum on decommission resume

Verify equivalent target markers at write quorum and republish partial
copies before completion. Preserve exact marker creation semantics and
legacy birth identities while retaining ordinary delete and purge guards.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(odm): run delete marker regression on a bounded stack

Construct and run the deep real-storage future on the existing large-stack
test worker so the default libtest stack does not overflow. Preserve the
registered test name, serial guard, and single-part/multipart assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): use marker majority for resumed copies

Confirm existing and republished delete markers at the configured-set
majority used by their delete transaction instead of the EC data quorum.
For a twelve-drive EC4 set this accepts seven equivalent markers while
still rejecting six, including when the online inventory is shortened.

Cover named/null markers on a real rebalance retry with retained source
history. The regression fails with InsufficientReadQuorum before the fix.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): keep catch-up fixture timestamps consistent

Admit the seeded catch-up using its observation timestamp so a durable
writer claim crossing a wall-clock second cannot spuriously rate-limit it.
Model an older claim timestamp to exercise that boundary deterministically.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 17:20:56 +09:00
cxymds 89b98d65c2 fix(ecstore): skip empty tier recovery scans (#8804) 2026-10-22 15:53:50 +08:00
Hauser 335612f452 perf(heal): skip replay anchor clones for empty repair queues (#8798)
Use a conservative work hint for verified and typed legacy events, retaining the original capacity-maintenance pass and metrics publication. Preserve durable identities, journal retention, retries, and shutdown behavior, with isolated real-runtime and queue lifecycle regressions.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 16:38:06 +09:00
Ramakrishna Chilaka 0bade0ca3e perf(ecstore,filemeta): batch listings and buffer metacache streams (#8791)
* perf(ecstore,filemeta): batch local walk_dir metadata reads and buffer metacache streams

* fix(ecstore): stream completed listing metadata reads

Publish each result before starting the next blocking read, preserving
per-object progress and cancellation without a timed chunk queue.
Keep dispatch batching, byte limits, and namespace/error stops intact.
Cover multiple batches, page boundaries, and oversized-envelope resumption.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore,filemeta): verify production listing streams

Replace the simulated directory-walk benchmark with the public local disk
path. Validate fixture output before timing and retain metacache-only
stream benchmarks. Pin fragmented reads, read coalescing, and canonical
UUID namespace probing against the reference behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): route listing benchmark through storage API

Centralize local listing benchmark imports in the shared benchmark
storage API boundary required by the architecture migration rules.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): keep catch-up fixture timestamps consistent

Admit the seeded catch-up using its observation timestamp so a durable
writer claim crossing a wall-clock second cannot spuriously rate-limit it.
Model an older claim timestamp to exercise that boundary deterministically.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 14:54:34 +08:00
Hauser 5749752217 chore(deps): refresh cloud SDKs, runtime and profiling (#8787)
* chore(deps): refresh GCS, profiling and allocator dependencies

Update published GCS, Pyroscope, mimalloc, and PPMd crate versions.
Align the pinned erasure-fixture test recursion limit with ECStore
to compile GCS-enabled test targets.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): update AWS SDKs, Tokio and memmap2

Refresh compatible AWS service and Smithy dependencies, Tokio timers,
and memory mapping support with the regenerated lockfile.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 12:17:47 +08:00
Hauser 03c65bcba8 fix(ecstore): identify scanner retirement planner failure phases (#8796)
* fix(ecstore): identify scanner retirement planner failure phases

Bind the existing native planner error context to each retirement phase while preserving typed retry classification and all storage fences. Exercise the actual wrapper in an isolated process across unavailable and typed failures.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): type the unavailable retirement planner error

Replace the new formatted other error with a private typed error so the error-construction ratchet remains intact. Preserve all phase messages and the existing native retry classification.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): cover unavailable planner error identity

Check the private unavailable cause for every phase through the existing IO boundary. Retain native handoff classification and verify same-phase quorum bucketing after fallible disk narrowing.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 12:17:16 +08:00
Hauser 2feb09b8eb test(obs): cover contended identity under netlink denial (#8797)
* test(obs): cover contended identity under netlink denial

Check that the production identity entry stays nonblocking while a name
writer is held and real netlink discovery is denied, then observes the
published name after release. Release the writer before joining so a
blocking regression reports a bounded failure.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(obs): keep identity contention behind common helpers

Move the held-writer fixture behind a test-only common helper and enable
it through the Linux x86_64 obs dev-dependency. Preserve the timeout,
writer release before reader join, and identity restoration ordering.
Exercise callback completion and unwind cleanup in the common regression.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 12:09:53 +08:00
Hauser be8357f815 feat(metrics): observe HTTP entry-to-dispatch latency (#8788)
Record the first dispatch or undispatched termination at the existing
external request boundary, with entry-gated timing and owned task scope.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 11:27:53 +08:00
Hauser 8eb67ac38c perf(heal): reuse the verified repair proof queue (#8790)
* perf(heal): reuse the verified repair proof queue

Retain proof events in place under the existing registry lock and keep
the pre-consumption capacity target and exact identity matching.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(common): move the final proof mismatch fixture

Avoid a redundant clone in the last owned mismatch fixture.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 11:12:20 +08:00
Hauser a47649fb60 feat(metrics): expose allocator reclaim statistic totals (#8782)
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 09:15:15 +08:00
Ramakrishna Chilaka c0f3f9a108 perf(filemeta,ecstore): index metadata batches and trim decodes (#8784)
* perf(filemeta,ecstore): avoid redundant decodes and clones on xl.meta write and delete paths

* perf(filemeta): remove restore parsing allocations and add guards

Borrow restore header fields instead of allocating temporary vectors and
reuse the canonical dual-prefix metadata key guard. Cover scanner/full
decoder equivalence on historical and mutated records, restore grammar,
and the complete old-current observation tuple. Add the missing Criterion
entry for unshared data-directory selection.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* bench(filemeta): isolate metadata mutation and batch deletion costs

Move the metadata-only Criterion target to filemeta so it does not build
ECStore. Add deterministic physical and inline dense/sparse deletion
cases with the same fixtures available to baseline and candidate builds.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(filemeta): index ordinary metadata deletion batches

Use a batch-local version lookup, compact directory summaries, and lazy
physical reference counts for larger ordinary V2 deletion batches. Decode
each indexed body at most once and compact the version vector once.

Flush pending removals before canonical fallback and preserve per-request
validation, partial failures, inline-key aliases, and cleanup decisions.
Keep small batches and transition/legacy/ambiguous records on the scalar
path. Cover indexed/scalar state equivalence and fail-closed cache errors.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(filemeta): enforce linear batch decoding and safe fallbacks

Count V2 scans in tests to guard the indexed path's linear work contract.
Exercise marker, retention, restore, transition, free-version, and pending
purge requests against the canonical sequential path. Compare logical
state and deterministic headers for re-encoded maps while retaining exact
byte equality for ordinary indexed deletion and opaque metadata.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 09:14:14 +08:00
Hauser 956395a61b fix(diagnostics): preserve context across task handoffs (#8785)
Capture existing diagnostic operation, caller and first-entry context at bucket, background and tracked-mutation handoffs. Keep absent context absent and retain deferred work and admission ownership through the established storage facades.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 09:14:01 +08:00
Hauser 4597bb91a8 feat(metrics): count scanner wakeups and cycle attempts (#8786)
Expose selected outer-wait reasons separately from runner-call attempts.
Preserve scanner scheduling, pause, rate-limit and budget boundaries.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 09:13:37 +08:00
Hauser 87caf45cfe perf(s3): remove unused multi-delete result clones (#8789)
Keep the original storage results and all required request/replication
ownership while dropping two bindings with no consumers.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 09:13:21 +08:00
Hauser 15b7040e78 perf(scanner): move owned usage snapshot keys (#8792)
Consume completed aggregation entries at their terminal conversion so
bucket and replication target keys can move into the output maps.
Preserve validation, rejection and publication behavior.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 09:13:06 +08:00
Chris ffd94cfe1b fix(decommission): finish multipart null versions superseded on target (#8774)
* fix(decommission): finish multipart null versions superseded on target

A decommission entry for an unversioned multipart source whose key
already holds a newer null version on the target settles as superseded
and aborts its staged upload. The cleanup's target proof saw the newer
object, could not match it to the staged identity, and failed closed
with a capacity-blocked error, so the routine paused, the source was
never cleaned up, and the error read like a minimum-free-drive block.

The staged upload is already proven absent and the target lookup is
exact: a different version id, or a null target with another
modification time (one null slot per key), is a different object, so
the staged copy holds nothing on the target and the pending intent is
cleared. Only a versioned target with the staged version id but another
modification time stays fail-closed. The remaining identity-proof
failures use a typed error without capacity wording.

Add three-pool decommission regressions for restored-transitioned and
plain multipart null sources superseded on the target.

* test(decommission): pin multipart target proof failures as terminal

Document the accepted residual of the null-slot proof: a metadata-only
self-copy keeps a published but uncharged staged copy's data while
moving its modification time, so its marker is released and one
object's bytes stay uncharged.

Add a three-pool routine test where the target already holds an
unowned null object with the source's exact identity: the cleanup's
ownership-proof failure fails the decommission with no capacity-blocked
reason instead of pausing it.
2026-10-22 09:22:24 +09:00
Chris 831029e5b6 docs(agents): add three-verdict finding contract to security skill (#8795)
Require every security candidate to name the lower-trust principal, the crossed boundary, the affected resource, and the observable result, and to land under exactly one of `confirmed`, `needs_validation`, or `rejected`. Only confirmed findings carry severity; a trace blocked on an unresolved deployment fact is reported as that fact instead of an assumption.
2026-10-22 08:06:34 +09:00
唐小鸭 1e817524e8 fix(replication): keep replicated multipart null versions as null (#8763)
A versioned multipart completion minted a new version when the staged version id was absent or nil, so an inbound replica of a source null version written by multipart landed under a fresh UUID. Keep the null version for authorized inbound replicas, and address the null version as versionId=null on the worker convergence HEAD like the other target reads.

Refs rustfs/rustfs#8747
2026-10-22 02:46:39 +08:00
Hauser 66bf2c0a75 perf(heal): aggregate MRF lifecycle metrics in one pass (#8773)
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 02:46:26 +08:00
Hauser f06ae3dc34 feat(metrics): observe local walk lifecycle and output bytes (#8775)
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 02:45:58 +08:00
Chris 8af4070d19 fix(decommission): move the free version of an expired tier version (#8777)
* fix(decommission): move the free version of an expired tier version

Decommission only queued the lifecycle expiry of a transitioned version, so a source cleanup that ran first deleted the version itself and appended its tier free version after the entry's last pass. The post-check then failed the decommission until an operator re-ran it.

Apply the expiry of a transitioned version synchronously, as rebalance does. Its free version is on the source before the cleanup preflight, which reports the entry changed, and the retried entry moves the record to a target in the same pass. An expiry that cannot be applied leaves the version live, so it moves like any other version.

Refs rustfs/backlog#2873

* fix(decommission): move a delete-all expired tier version live

Applying a delete-all expiry inline made its prefix delete wait for the bucket lifecycle write lock behind the entry's own read lock until the lock timeout, blocking every write in the bucket meanwhile. Move such a transitioned version live and leave the delete-all to lifecycle on the target.

Cover a genuinely unapplied expiry and a free-version worker that consumes the source record before the entry moves it.

Refs rustfs/backlog#2873
2026-10-22 02:45:47 +08:00
Hauser c1de42af2c fix(heal): type legacy MRF decisions and defer diagnostics (#8778)
* fix(heal): explain unverified legacy heal outcomes

Preserve storage diagnostics in canonical unknown outcomes and explain
legacy payload identity limits through the shared local/peer status path.
Borrow expected receipt identities while preserving all proof checks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(heal): keep diagnostics from pausing merged MRF repairs

Require the actual MRF executor before publishing legacy pause events.
An ordinary queued owner can retain a merged durable MRF notice without
having performed the specialized deep check. Preserve its diagnostic
without granting it authority to park the repair responsibility.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(heal): type MRF outcomes and defer status diagnostics

Carry storage-owned legacy observations in process and return a typed
terminal result only after the qualified MRF Deep check. Publish pause
events from that result and exact identities instead of source or text.
Keep object names out of retry classification and compute only the
status diagnostic selected by the canonical execution state.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 02:45:31 +08:00
Hauser 179e58d5ef fix(ecstore): preserve diagnostic context in config tasks (#8779)
Capture an existing ReadVersion caller and earliest entry before spawning config transactions. Restore them with the existing scoped wrapper while retaining default-feature operation propagation and detached task ownership.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 02:45:17 +08:00
Hauser 5f5485e332 fix(s3): return InvalidPart and streamline multipart completion (#8780)
* fix(s3): classify empty multipart completion as InvalidPart

Treat absent per-drive multipart transaction directories as empty listings so
completion reaches the existing InvalidPart validation. Preserve quorum and
transaction recovery, and cover the HTTP and degraded-drive boundaries.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): move multipart completion metadata in one pass

Reuse quorum-validated part metadata instead of repeatedly inserting, sorting,
finding and cloning parts. Keep legacy cleanup identities and ordering while
moving the original part allocation into the completion manifest. Compare ETags
by borrowing their normalized values.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 02:45:05 +08:00
Hauser 65f0599c70 feat(metrics): track usage outcomes and trim decommission probes (#8781)
* feat(metrics): expose usage candidate rejection outcomes

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): borrow usage candidate fixtures

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): reserve capacity for decommission probes

Reserve all nextest slots for the two eight-disk decommission fixtures under both default and CI profiles. Keep their internal concurrency, production lock budgets, assertions and zero-retry policy intact.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): scope prewrite capacity probes to the target pool

After persisting a new capacity intent, refresh only the target pool baseline. Preserve the global admission and finalization scans, lock order, fencing, and accounting formulas. Verify the reduced probe count with real disk metrics and preserve injected snapshot/error behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 02:44:49 +08:00
Hauser d5e037faac fix(ecstore): retain operation in detached mutations (#8776)
Capture the caller operation before the tracked mutation task is spawned. Keep detached completion, owned guards, result errors and panic join failures intact.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-22 00:41:03 +09:00
Chris 97e600ae69 fix(heal): hold unobserved legacy MRF responsibilities (#8772) 2026-10-22 00:04:16 +09:00
Chris 84e96512bd fix(ecstore): honor idle drive monitoring opt-out (#8770) 2026-10-21 23:29:41 +09:00
Ramakrishna Chilaka 62aafc6b95 perf(filemeta,ecstore): avoid intermediate clones in FileInfo decode (#8767) 2026-10-21 22:35:34 +09:00
Chris b06923beaf test(e2e): add scanner/heal topology protection matrix (#8705)
* test(e2e): add scanner/heal topology protection matrix

Add the S00 protection baseline for the Scanner/Heal program
(rustfs/backlog#2873, program rustfs/backlog#2872): seven
scanner_heal_topology_ cases in the distributed e2e lane that pin pool
expansion, rebalance and decommission behavior before the runtime changes.

The fixture seeds a deterministic inventory (empty, inline, external,
multipart, special and nested keys; a versioned bucket with an explicit
null version, three history versions and a delete marker per key; an
Object Lock bucket with legal hold and COMPLIANCE retention), records
every version with its requested and listed version id, length and
SHA-256, verifies the manifest through every node, reads physical
placement from xl.meta on the pool drives, and reads the strict
durability mode back from the admin API and the node logs.

Fault cases hold the mover at proven windows through file barriers that
compile only with the e2e-test-hooks feature: before the multipart target
commit and before source cleanup (shared by decommission and rebalance),
plus the existing pool-metadata before_publish cutpoint. An unreached
window fails the case. DistCluster gains capture_logs_under so a case can
read node startup events without a global environment variable.

docs/testing/scanner-heal-topology-gates.md maps the gates to the tests
and records the timeout basis.

* test(e2e): keep the barrier failure message static

The error(format!) ratchet rejects new formatted io::Error::other call
sites in ecstore. The reached observation already records the stage and
object, so the injected failure needs no per-call detail.

* test(e2e): require e2e-test-hooks for topology fault cases

The four scanner_heal_topology_ fault cases inject at server barriers that
exist only with the e2e-test-hooks feature. Against a default server they
waited for the barrier timeout and reported it as not reached. Check the
verified binary's features first so the missing prerequisite fails
immediately and is named.

* ci(e2e): build the distributed lane with e2e-test-hooks

Every other e2e lane builds and runs the fault-test hooks server. The
distributed lane alone used the default server, so the topology fault
cases could never reach their barriers there. Build and run with the same
feature so the receipt matches, and update the documented local commands.
The upgrade cases spawn the pinned previous release directly and do not
compare feature sets.

* test(e2e): keep topology artifacts under RUSTFS_E2E_LOG_DIR

The topology fixture captured node logs, barrier observations and evidence
in a temp dir removed on drop, so the distributed workflow uploaded nothing
for these cases. Fall back to RUSTFS_E2E_LOG_DIR, which the workflow
uploads, when no explicit evidence directory is set.

* test(e2e): remove retired pools before restart; race the pre-ACK start

The queue case restarted with decommissioned pools 0 and 1 still on the
command line, which the server rightly refuses. Add
remove_single_node_pools and restart without them, then expect the
remaining pools renumbered to 0 and 1.

The pre-ACK case now races the start request against the barrier. A start
that returns first, or stays in flight past the documented 60 s budget, is
reported as such instead of as an unreached barrier, and the evidence
records the reach latency.

capture_logs_under now overrides a log path assigned from
RUSTFS_E2E_LOG_DIR, so the seed node logs into the case directory too.

* test(e2e): bound fault-window waits by the movement budget

On Linux CI a busy target capacity gate delayed the first fault object by
about two minutes, past the 120 s wait borrowed from the server's release
poll. Wait for a movement window within the 240 s movement budget instead,
and fail at once when the decommission or rebalance ends without entering
the window, so an uninjected fault is never counted.

* test(e2e): bound status probes while waiting for a fault window

The admin decommission status request can wait on a mover held at a test
barrier until the barrier's own 120 s release timeout. The window wait
issued that request each loop, so a reached barrier went unnoticed until
the server timed it out and failed the decommission, which surfaced as a
false resume failure. Bound each status probe to 5 s and treat a slow probe
as still running.

* test(e2e): retry a busy decommission start

A decommission start that meets a busy movement gate can answer a
retryable 503 instead of waiting. The harness treated any non-proof
failure as fatal. Share one start helper that retries 503 within the
case's movement budget and the fleet-proof 500 for 45 s, and keeps every
other status fatal. The pre-ACK case retries 503 within its window budget.
2026-10-21 22:08:17 +09:00
hector 023f2e7258 ci(pool): finalize decommission removal and verify surviving pools (#8749)
ci(pool): finalize decommission removal and verify surviving pools (rustfs#8726)

Select suite step 10 together with step 9 and pass
--finalize-decommission so the nightly exercises the post-removal
survivor path: pool ids must stay unique, bucket metadata writes must
keep succeeding across a restart, and no node may log 'pool metadata
layout changed'. Step 10 self-skips when decommission is disabled.

Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-21 22:07:58 +09:00
Hauser 9fad6104c4 feat(metrics): observe remote directory walk lifecycles (#8765)
Track active walks, scratch capacity and accepted bytes while preserving the existing 1 MiB stream copy behavior.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-21 20:49:13 +08:00
Chris d2eda195e6 fix(decommission): defer source cleanup quorum failures (#8760)
* fix(decommission): defer source cleanup quorum failures

A quorum failure while deleting the source of an already copied entry
was fatal and marked the whole pool failed, although the copied source
is still in place and an uncommitted delete transaction is settled by
delete recovery. Carry the cleanup error typed and resolve a quorum
failure as Deferred: the entry is replayed at the end of the round, and
a deferral that persists takes the existing capacity-blocked pause path
instead of a terminal failure. Other cleanup errors and quorum errors
from other stages stay terminal.

Add set-level regressions for parent and child keys (`a/b`, `a/b/c`):
parent cleanup leaves every child file untouched, and parent cleanup
reaches quorum while the child is cleaned up or rewritten concurrently.

* test(ecstore): keep source cleanup errors typed in prefix cleanup tests

Return SourceCleanupError from the test helper instead of formatting it
into Error::other, and shrink the error(format!) ratchet baseline for
core/pools.rs, which lost one call site in the cleanup failure change.

* fix(decommission): retry cleanup quorum failures and count replays once

Retry a source cleanup quorum failure in place, up to three attempts
with the existing source-cleanup backoff, before deferring the entry.

Carry the versions an entry already counted on its deferral, so the
end-of-round replay does not add a fully counted entry to
items_decommissioned and bytes_done again.

A deferral that persists pauses the pool through the existing deferred
drain path. When source cleanup caused it, persist a reason led by
"source cleanup blocked" without the carrier error's free-drive wording,
and report waitingReason "source_cleanup" instead of "capacity".

Add a source_cleanup test fault stage and a routine test that drives a
cleanup quorum fault through deferral and replay to completion.

* fix(decommission): wait seconds between cleanup quorum retries

Give the in-place source cleanup quorum retry a fixed floor of one and
then two seconds, with the existing jitter on top, so it can ride out a
drive reconnect or health-check blip instead of retrying within a few
hundred milliseconds. The wait stays bounded and cancel-safe.

Find a source cleanup pause reason through stage wrappers, as the
capacity-blocked check does, and add a routine test where cleanup keeps
losing quorum: the decommission pauses with a source cleanup reason, the
bucket stays queued and the source stays in place.

Document the additive waitingReason value source_cleanup and its
compatibility with older nodes reading the same pool.bin.

* fix(decommission): never retry a lost source cleanup fence

The cleanup retry classifier used is_quorum_error(), which also matches
NamespaceLockQuorumUnavailable. The delete commit fence reports a lost
namespace lock or mutation fence with that variant, so a lost fence was
retried in place and only stopped later at the pre-cleanup fence check.

A lost fence means this worker no longer owns the key; it must stop
without retrying. Retry and defer only drive quorum failures:
ErasureReadQuorum, ErasureWriteQuorum, InsufficientReadQuorum and
InsufficientWriteQuorum.

---------

Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-21 20:30:22 +09:00
唐小鸭 311f27baa1 fix(ecstore): handle Windows trash cleanup deletion races (#8754)
Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-21 20:02:39 +09:00
Hauser 1ac35917c2 chore(deps): refresh dependencies and patch certificate trust (#8761)
* chore(deps): refresh dependencies and patch certificate trust

Update published dependencies and certificate verification/root data, and
upgrade rustfs-mimalloc to 0.7.0. Retain the known webpki-roots 0.26.11
compatibility-wrapper advisory without adding an audit exception.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* remove hyper dependency

* remove hyper dependency

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-21 16:40:33 +08:00
shurkus 73ff9a87e8 fix(s3): avoid mutation locks for existing buckets (#8745)
fix(s3): answer CreateBucket for existing buckets without locks

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-21 16:12:43 +09:00
Hauser 102cc18767 test(heal): retain unknown same-key repair across replay (#8759)
Cover actual journal and lifecycle checkpoint replay when an unknown historical source coexists with an exact source-bound repair. Reject a pre-restart lease and retain the complete unresolved record after the new repair is discharged and replayed again.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-21 15:02:01 +08:00
Chris 77a36d92a3 fix(decommission): let a failed start roll back its own activation (#8752)
* fix(decommission): let a failed start roll back its own activation

A fresh decommission start whose peer reload failed could not roll back:
the pool metadata stale-write guard from #6604 refuses any save that
clears a persisted active or queued decommission, so the pool stayed
active with no worker until the watchdog or a leader restart picked it
up.

The rollback save now carries the activation that start committed. The
guard exempts a pool only while its persisted record still equals that
activation field for field, so a worker checkpoint or a later start
keeps the rejection. A canceled record is not an active decommission
and is cleared by the rollback as well. Every other save path passes no
activation and is guarded as before.

A peer may already have reloaded the activation and started a worker
before the rollback. Saves are now fenced by decommission generation: a
write carrying a start_time is rejected when the persisted record
belongs to a later start, or has no decommission state and was updated
after that start_time, so such a worker cannot make the pool active
again. Its queued promotion and progress checkpoint also adopt the
persisted record and stop the worker.

Refs rustfs/backlog#2873

* fix(decommission): fence terminal writes of a withdrawn decommission

Terminal records carry no start_time, so the generation fence did not
cover them: after a start rollback, a peer worker of the rolled back
generation that failed (for example on a bucket completion) could still
persist a failed record over the restored pool. The merge now rejects a
failed, canceled or complete record over a persisted record without
decommission state; every attempt persists decommission state first, so
no legitimate path writes a terminal record there.

Peers also drop a withdrawn decommission sooner. A pool metadata reload
replaces a running decommission with a newer record that withdrew it,
even under an active worker; bucket completion adopts such a record like
promotion and progress checkpoints do; and a withdrawn progress
checkpoint stops the worker instead of logging a failed save and moving
more entries.

Tests cover the peer failure mark, a rollback retry that sees a worker
checkpoint land between attempts, and the reload withdrawal. A heal
fixture that wrote complete records over a fresh pool.bin now persists
the active attempt first.

Refs rustfs/backlog#2873

* fix(decommission): fence peer writes after a retry start rollback

A retry start replaces a failed or canceled record that keeps its
unresolved ledger, so its rollback restores that terminal record rather
than clearing the pool. The withdrawal checks only recognized a record
without decommission state, and the generation fence ignored a persisted
record without a start_time. A peer worker of the rolled back retry
could therefore checkpoint the pool back to active.

The generation fence now compares the persisted last_update whenever
the persisted record has no start_time of its own (cleared, terminal or
queued). The progress checkpoint also checks the generation against the
record read under the pool metadata lock, as bucket completion already
does, and the save-path withdrawal check treats a terminal record newer
than the running view as a withdrawal, so the peer adopts it and stops.

A reload still never lets a newer terminal record replace an active
worker's view, so after a retry's rollback a peer worker stops at its
next bucket completion or progress checkpoint rather than on reload.

Tests cover the retry rollback against a peer checkpoint and direct
write, and a peer bucket completion after a fresh start's rollback.

Refs rustfs/backlog#2873

* fix(decommission): keep a retry rollback's restored record intact

After a retry start rolls back, the restored record is failed, so a
peer worker's own failure mark passed every merge guard and replaced
it. A failure mark now saves through save_current_pool_meta_checked,
which runs the withdrawal check against the record read under the pool
metadata lock and adopts that record instead of writing.

The withdrawal check compared the restored record with the worker's
in-memory last_update, which a rejected save had already raised, so the
peer never adopted the rollback and the watchdog kept resuming it. It
now compares against the running generation (start_time), and a
rejected unresolved-entry save undoes its in-memory change.

save_current_pool_meta_for_decommission_start is also compiled for the
test-util feature again; a test-util helper still calls it, which broke
the workspace clippy and Connect builds.

Refs rustfs/backlog#2873

* fix(decommission): keep an unresolved entry when its own save fails

The rollback of a rejected unresolved-entry save also dropped the entry
on transient failures such as a quorum or lock-fence error, so the
following failure mark persisted a failed record without it and an
operator could clear a decommission that skipped an unreadable object.
Keep the entry and undo only the last_update bump, which is all a
withdrawn worker needs to still see the withdrawal.

Refs rustfs/backlog#2873
2026-10-21 15:45:48 +09:00
唐小鸭 444eb5ddba fix(scanner): admit dirty scope across the bucket-listing window and pace full-walk fallbacks (#8690)
Under sustained writes nearly every cycle fell back to a full walk: scope
admission required the global dirty generation to stay unchanged across the
bucket listing, and after a Complete cycle the dirty-usage wake ran the next
full walk immediately, back to back.

- Track dirty-map removals with a process-local removal generation and admit
  a scoped walk when no entry was removed or replayed during the listing
  (`covers_listed_pending`). Writes to listed buckets in the window join the
  start snapshot; unlisted buckets dirtied after the cutoff stay pending and
  are never cleared by compare-and-remove certification. The strict
  `covers_all_pending` still gates segment-reuse evidence.
- Classify scope fallbacks (removal during listing, generation exhausted,
  dirty-bucket overflow, no listed dirty bucket, baseline unavailable, peer
  scope unavailable), log `scoped_scan_fallback`, and report them in
  usage_freshness as additive serde(default) fields.
- Pace the cycle after a Complete fallback while dirty buckets remain on the
  capped retry schedule clamped to the cycle interval, with the dirty wake
  disabled; the paced timer wake still requests a scope.
- Update the per-bucket convergence design doc.

No persisted format or internode protocol change.

Co-authored-by: Chris <anzhengchao@gmail.com>
2026-10-21 13:55:18 +08:00
唐小鸭 bd7b7321a2 fix(replication): read source delete markers on multi-pool stores (#8756)
Delete-marker replication re-reads the source marker by version before sending. Multi-pool get_object_info rejects explicit marker version reads with MethodNotAllowed, so every marker failed verification and was never replicated. Add a defaulted ObjectOperations::get_object_info_for_delete, override it on ECStore with the marker-tolerant snapshot, and route both replication marker reads through it.

Fixes rustfs/rustfs#8746
2026-10-21 13:54:50 +08:00
Chris d122e8e6bc fix(ecstore): ignore child-key prefixes in delete settlement fingerprint (#8751)
* fix(ecstore): ignore child-key prefixes in delete settlement fingerprint

A batch delete of prefix-sharing keys (foo/bar and foo/bar/xyzzy) could
leave foo/bar's commit proof on disk: the child's finalization removed
foo/bar/xyzzy/ between the parent's GC inspection and settlement, the
fingerprint mismatch surfaced as OutdatedXLMeta, and publish_delete_commit
dropped the error. An immediate DeleteBucket then returned BucketNotEmpty.

Fingerprint only this key's protocol evidence (files, UUID dirs and the
transaction dir), retry published cleanup on OutdatedXLMeta with a fresh
inspection, and warn when cleanup is deferred to the recovery hint.

* test(ecstore): cover delete fingerprint narrowing and cleanup retry

Only canonical hyphenated UUID directories count as protocol evidence, so
a child key named as a simple-hex UUID cannot recreate the race. Add
negative fingerprint checks for this key's own changes, and tests for the
published-cleanup retry: success on retry, the attempt bound with the
deferred warning, and no retry after a lost fence.

* fix(ecstore): require canonical UUID names across delete recovery

Discovery, explicit legacy discard and staged-dir checks still accepted
simple, braced and URN UUID spellings. A child key named as the simple
form of a referenced data dir could then be deleted by DiscardLegacy.
Use one canonical-name predicate everywhere and register exactly one
test hook per expected cleanup attempt.
2026-10-21 14:47:34 +09:00
唐小鸭 30c1dffe48 fix(replication): replicate null versions written before versioning (#8757)
The scanner heal gate dropped Some(Uuid::nil()) along with None, so null versions in versioned buckets never reached existing-object replication. Skip only unversioned listings, matching MinIO, and recognize the nil UUID as the null version in the newer-target guard and version comparison.

Fixes rustfs/rustfs#8747
2026-10-21 13:35:47 +08:00
Hauser 2eeaca4cd0 fix(iam): derive bucket location conditions from XML (#8744)
* fix(iam): derive bucket location conditions from XML

Capture the parsed CreateBucket LocationConstraint at the access boundary
and move it into shared authorization conditions independently of signing
and server regions. Cover conditional allow/deny across user, session and
anonymous requests, including absent and spoofed values.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(iam): pass bucket location directly to authorization

Replace temporary request-extension storage with an explicit owned XML
argument to the single authorization core, keeping the public entry point
compatible. Remove the marker allocation and typemap insert/remove path.

Cover Object Lock and Versioning dependent authorizations with an absent
location condition and verify their enabled state through real HTTP.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(connect): isolate bounded object probe storage

Use an independent temporary volume on Linux shared memory when available
so the real endpoint/CLI fixture does not depend on contended CI disk IO.
Await server shutdown before dropping the caller-owned storage directory.
Retain the production cleanup deadline, measurement budget, assertions,
and existing nextest capacity reservation without adding retries.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-21 13:35:35 +08:00
Ramakrishna Chilaka 001e92226e test(filemeta,ecstore): cover listing metadata and msgpack decode paths (#8755) 2026-10-21 14:03:23 +09:00
cxymds 65a721d896 fix(ecstore): reindex pool metadata ids after removal (#8733)
* fix(ecstore): reindex pool metadata ids after removal

* ci(nextest): reserve resources for table catalog lock probe

* fix(ecstore): reindex retained decommission references

* fix(ecstore): use typed pool metadata rebuild errors
2026-10-21 13:36:48 +09:00
Hauser f1850f54d4 fix(runtime): isolate configured region per store instance (#8743)
* fix(runtime): isolate configured region per store instance

Resolve the default RegionInterface through the owning ECStore context
and keep ambient fallback only for requests without an explicit context.
Preserve ambient constructors and injected interfaces, with store and
real HTTP multi-instance regression coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(storage): stabilize quorum and heal crash fixtures

Keep forced-offline disks attached across reconnects and reconnect before every delete retry. Bound SIGKILL fixture I/O while preserving recovery scope, receipts, data integrity, and deadlines; include child execution phases in timeout diagnostics.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* docs(test): clarify forced-offline disk fixture behavior

Describe handle retention instead of claiming a newly reconnected health
tracker inherits the test outage. Execution and assertions are unchanged.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-21 13:06:54 +09:00
cxymds 2c55d9c8f0 fix(ecstore): allow repeated marker deletes at write quorum (#8750) 2026-10-21 11:31:59 +08:00
Chris 5efa6c2173 fix(rebalance): move tier free versions with their entry (#8753)
* fix(rebalance): move tier free versions with their entry

Rebalance built its version snapshot with MetaCacheEntry::file_info_versions,
which drops tier free versions, while the source-cleanup preflight reads the
exact snapshot that keeps them inline. Any entry holding a free version (left
by deleting a transitioned version) therefore failed the preflight on every
pass and was deferred forever, so the source pool could never be drained of it.

Mirror decommission: keep free versions in the snapshot, skip lifecycle and
the last-delete-marker policy for them, and move them to the target as tier
metadata through decommission_tiered_object. A free version reads as a delete
marker with no transition status, so the migrator routes it explicitly;
written as a delete marker it would drop the remote owner and orphan the
remote object. A moved free version may be consumed from the source before
cleanup, like decommission; free versions hold no pool data and stay out of
the rebalance stats.

Refs rustfs/backlog#2873

* test(rebalance): cover tier free version movement edge cases

Pin the lifecycle skip, the delete-marker count, the allowed-missing and
not-found consumption paths, the stats exclusion, multiple free versions per
entry, and the unversioned superseded source's free version moving on the
next pass.

Refs rustfs/backlog#2873
2026-10-21 12:25:30 +09:00
Hauser 2110348e58 fix(metrics): expose allocator observation availability (#8748)
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-21 10:34:27 +08:00
cxymds 2253ba9009 fix(tier): restore private endpoints and forced config removal (#8725)
* fix(tier): restore private endpoints and forced config removal

* test(tier): align proof failure with force semantics
2026-10-21 10:21:27 +08:00
GatewayJ 72d5c5bf2f fix(table-catalog): support manifest-only rewrites (#8731)
* fix(table-catalog): support manifest-only rewrites

* fix(table-catalog): preserve manifest rewrite metadata
2026-10-21 09:29:23 +08:00
Hauser 13c37bf8b9 fix(s3): validate bucket location constraints (#8739)
* fix(s3): validate bucket location constraints

Reject explicit bucket locations outside the configured server region
before mutation admission, preserve site-default and EU alias compatibility,
and return an empty GetBucketLocation element for us-east-1.

Cover matching and rejected locations over real S3 HTTP requests, including
rejection without creating a bucket.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): refresh bucket region profile selection digests

Include both new region regression tests in the smoke and Darwin/Linux
full selection pins without changing filters or checker behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-21 03:28:23 +09:00
Hauser 38595c1909 fix(metrics): preserve S3 operation across detached tasks (#8738)
Establish the first bucket operation before fresh-task dispatch and carry its bounded value into nested config and background work. Preserve cancellation, permit ownership, lock order, and error mapping without importing diagnostic owner or sampling instrumentation.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-21 01:22:28 +09:00
cxymds 9b41835580 fix(decommission): allow retry after unresolved failure (#8737) 2026-10-20 23:07:06 +08:00
cxymds a5ae294f42 fix(quota): refresh peer metadata after admin quota changes (#8735)
* fix(quota): refresh peer metadata after admin quota changes

* test(e2e): update distributed selection for quota regression
2026-10-20 23:06:18 +08:00
GatewayJ 4dba635d48 fix(table-catalog): authorize warehouse location claims (#8736) 2026-10-20 22:05:29 +08:00
Chris 7cc4a9dbd0 fix(ecstore): leave no source free version for a moved tier version (#8732)
* fix(ecstore): leave no source free version for a moved tier version

Data-movement source cleanup deletes each source version separately and
never set skip_tier_free_version, so every transitioned version that
decommission or rebalance had already copied to a target pool left a new
tier free version on the source. Decommission then failed its post-check
for any pool with tiered objects; rebalance left the record behind. The
record claims the remote object the target copy still reads and stays
blocked behind that live reference.

Decommission and rebalance now pass the identities of transitioned
versions whose copy committed on a target, and the cleanup skips the
free version for exactly those. A transitioned version that did not
move, such as one lifecycle expired during the move, still gets its free
version because that record is its only remote-delete owner.

Refs rustfs/backlog#2873, rustfs/backlog#2872

* fix(ecstore): keep the free version of a superseded moved source

Data movement treats a source null version as complete when a newer
unversioned object already sits on the target, without copying it.
That outcome returned the same Ok as a committed copy, so a restored
transitioned null version superseded this way was recorded as
transferred and lost its source free version, leaving its remote object
with no owner.

The copy paths now return DataMovementCopy::Committed or ::Superseded,
and decommission and rebalance record only committed copies of
transitioned versions. A superseded source keeps its free version.

Tests cover the superseded restored null version for rebalance and
decommission, a restored and a null transitioned version moving by
rebalance, an entry with one lifecycle-expired and one moved version,
the per-version skip with two versions of one key, and a directory
object. The tiered stale-target routine test from #8724 now expects the
decommission to complete. The ILM ownership contract and the
decommission notes describe the moved, superseded, expired and legacy
cases.

Refs rustfs/backlog#2873, rustfs/backlog#2872

* test(ecstore): build the decommission ILM fixtures without s3s

The superseded and expiry-mix decommission tests named s3s request and
lifecycle types directly, which added pools_test.rs to the ecstore
files that reference s3s and failed the footprint ratchet. Set the
restore request through ObjectOptions, and store the lifecycle rule as
bucket metadata XML and load it with get_expiry_configs, as the
decommission routine does.

* test(ecstore): pin restored decommission copies and multipart supersession

Decommission recorded a committed data copy of a restored transitioned
version without any test failing if the record were dropped; add a
routine-level decommission of a restored version that checks the post-
check passes, the source keeps nothing, and the target keeps the full
remote tuple. Add the multipart variant of the superseded restored null
version (rebalance), and a unit test that separates committed,
superseded and mismatched targets in the overwrite resume adjudication.
2026-10-20 22:20:12 +09:00
Hauser 928a369445 fix(obs): skip address discovery for initialized node identity (#8730)
* fix(obs): skip address discovery for initialized node identity

Check the nonblocking node name before resolving the local IP, retaining the final name recheck after fallback. Add portable publication regressions and Linux worker-local netlink fault coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(obs): keep identity contention checks in common

Exercise the real held-writer getter inside its owning module. Publish through the existing runtime helper from obs tests, retaining the kernel netlink failure and recovery coverage without bypassing architecture guards.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(obs): scope unsafe allowance to seccomp test helper

Document the bounded prctl FFI safety contract and allow unsafe code only
inside the Linux fault-filter installer so workspace unsafe-code denial
continues to apply everywhere else.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-20 20:17:55 +09:00
Chris 5313b72baa fix(decommission): run the leader-side start to completion (#8723)
* fix(decommission): run the leader-side start to completion

A forwarded decommission start awaits `ECStore::decommission` inline in
the RPC handler. When the forwarding node's RPC times out, the stream is
reset and the handler future is dropped wherever it is. Dropped after
`pool.bin` records the pool as active but before the peers reload and
the worker is spawned, the start left the pool active with no worker and
peers on the old metadata, and a retry was rejected as already active.
An admin client that disconnects can do the same.

Run the start in its own task and let the caller await only its result.
The start then always reaches its end: it fails before persisting
anything, or persists the pool, has the peers reload and spawns the
local workers, rolling back if the reload fails. A retry still cannot
start twice: it waits on the start gate held by the running start and
either reports the busy gate or is rejected because the pool is active.

`decommission` now takes `self: &Arc<Self>` and spawns workers on that
store instead of looking up the global object store, which is the same
store in production and makes the path testable; the unused
`require_decommission_store` helper is removed.

Refs rustfs/backlog#2873

* fix(decommission): detach the leader-side start from its caller

9ac4c10de carried only the reproduction (the testable entry point, the
peer-reload pause point and the proof test). This adds the fix it
describes: `ECStore::decommission` spawns the start as its own task and
awaits only its result, so a caller that stops waiting, such as a
forwarded start whose internode RPC timed out, can no longer drop the
start between persisting the pool as active and having the peers reload
and the local worker start.

Also prove a retry while the first start runs cannot start the pool
twice, update the operator and architecture docs for the new behavior,
and shrink the error(format!) ratchet baseline for the removed helper.

Refs rustfs/backlog#2873

* fix(decommission): single-flight start, recheck pool state under gate

Review of 3a5276c5b:

- A start re-checks the pool state under the start gate before it
  cancels routines, so a start racing another one can no longer cancel
  the worker the other start just spawned.
- Only one start runs per instance at a time: another request, including
  the retry of an operator whose request timed out, is rejected as
  already running instead of stacking a second detached start and its
  preflight heals. The start runs through `run_detached_mutation`, and a
  failure nobody waits for any more is logged.
- Tests: the proof test pins its drop after the save and requires a
  worker that persists a cancellation; the retry test really drops the
  first caller; new tests cover the under-gate recheck and a peer reload
  failure after the caller is gone. That last one shows the start
  rollback cannot clear a fresh start because the pool metadata
  stale-write guard refuses it; the gap is asserted and documented and
  tracked in rustfs/backlog#2873.
- The start tests run on their own large-stack thread: the io_uring lane
  (`uring_`, which also selects `during_`) runs them with libtest's 2 MiB
  default stack, where the proof test overflowed.
- Docs: single-flight starts, status and cancel during preflight, the
  rollback gap and its recovery, and the release requirement.

Refs rustfs/backlog#2873

* fix(decommission): turn away local start retries at the start slot

Second review of 29253430a:

- The leader-local admin pre-check refreshed rebalance metadata under
  the start gate before the start slot was checked, so a local retry
  waited out its 20 s gate budget behind a running start (which holds
  the gate through its peer reload) and then got a 503. The pre-check
  now checks the slot first and returns `DecommissionAlreadyRunning`,
  which the handler reports as a 400 that keeps the reason.
- Prove the reload-failure path really ran in the detached start (the
  injection is consumed), add a test that a fresh start's failed
  rollback reports both the reload error and the stale-write refusal,
  and assert an abandoned start stays tracked for shutdown.

Refs rustfs/backlog#2873
2026-10-20 18:20:13 +09:00
Chris f98d268f84 fix(decommission): retry every stale target selection without failing (#8724)
* fix(decommission): retry every stale target selection without failing

The tier free-version copy path counted a version as failed as soon as
a capacity failure came back and then handed the error to the entry
retry, so a retry that succeeded left the decommission failed. Return
the failure without counting it, like the other copy paths.

A selected pool can also stop fitting the mutation before admission
without going over a budget: the reservation estimate is exhausted, the
pending intent no longer fits the committed-copy budget, or a temporary
write no longer fits the headroom. Report these as "no longer fits the
selected mutation" and treat them like an over-budget pool under one
StaleTargetSelection class: retry, select again, defer once the retry
budget is spent.

Also refresh the over-budget gauge of every allocation before rejecting
growth, correct the sticky-target doc on stranded markers, and cover
each copy path, the pinned path and both retry branches with tests.

Refs rustfs/backlog#2873

* fix(decommission): name the last deferral cause in the pause reason

A round that ends with deferred entries pauses the routine with a
generic "deferred entries remaining" reason, so a pinned entry that no
longer fits its pool hides its cause in the logs. The pause reason now
appends the last deferral's error.

Keep the committed-copy check on the pending intent fatal: growth and
owner admission reject any mutation that would fail it first, so it
only fires on an inconsistent ledger.

Tests:
- a multipart part that does not fit target 1's temporary-copy
  headroom is deferred and pauses with the headroom shape;
- a pinned object whose remaining allocation is below its peak pauses
  with the exhausted-estimate cause, and the over-budget pinned test
  checks its own cause;
- the stale-target tests assert where the pause lands: the held entry
  is on neither target, the anchor is already on target 1, and target
  1 holds exact inflight bytes in the multipart cases;
- share the stale-target store, barrier and pinned-copy setup.

* fix(decommission): prefer a stale selection as the pause cause

The pause reason named whichever deferral of the set finished last, so
a transient busy gate could hide another entry's permanent shortfall.
A stale target selection, which waiting does not clear, now outranks
transient contention, and the reason reads "; deferral cause: <error>".

Tests:
- a pinned object that no longer fits and a later object whose gate is
  busy, in the same set, pause with the pinned cause; a unit test checks
  both orders;
- the tiered and intent-conflict tests check where the pause lands, and
  the tiered test asserts the known post-check failure so that fixing
  the source cleanup defect flips it.
2026-10-20 17:40:16 +09:00
Ramakrishna Chilaka f4f1743d04 perf(ecstore,filemeta): avoid inline-data reads and redundant decodes in list_objects (#8706) 2026-10-20 16:33:02 +09:00
Chris 8acfde3842 test(quota): cover early-reload routing and snapshot age boundaries (#8722) 2026-10-20 14:05:55 +09:00
overtrue f320f791a4 test(decommission): prove the shared gate budget and each bounded wait
Second review of 652c56875..0ef02a485:

- The operator doc and the budget comment claimed a forwarded start that
  outlives the internode RPC timeout still completes on the leader. The
  leader drops it wherever it is, possibly after pool.bin records the
  pool as active but before its worker starts or the peers reload.
  Document that state, the watchdog that resumes the worker, and the
  checks to run; the cancel-safety fix is tracked in rustfs/backlog#2873.
- Prove the budget is shared across waits (paused clock: a 60 ms wait
  leaves 40 ms for the next gate).
- Prove the rebalance-refresh start gate and activation gate waits and
  the decommission() entry are bounded and named.

Refs rustfs/backlog#2873
2026-10-20 13:29:14 +09:00
overtrue 4d2e362e23 fix(decommission): count only gate waiting in the start budget
Review of 652c56875 found that the 30 s start budget was a wall-clock
deadline fixed when the start began, so slow preflight work (bucket heals,
capacity scans) could spend it before the activation gates were reached.
A gate held for a few milliseconds then failed the start at once, and a
retry repeated the preflight.

- Replace the deadline with a budget that only counts time spent actually
  waiting for a gate; a free gate is always taken, and the lock timeout
  reports the time waited.
- Lower the budget to 20 s, below the default 30 s internode RPC timeout,
  so a forwarded start gets the leader's answer instead of an RPC timeout.
- Name each bounded wait (rebalance metadata refresh or decommission
  activation, and which gate), and route every start-gate rebalance load
  through one load_rebalance_meta_within.
- Move the admin pre-check error mapping into a function and test it.
- Add proof tests: a slow preflight followed by a brief gate wait still
  starts; the activation wait and the admin pre-check are bounded and
  named; the rebalance status read does not wait for an in-flight
  rebalance entry.
- Correct the operator doc: preflight bucket heals are outside the budget,
  and forwarded starts report a generic internal error.

Refs rustfs/backlog#2873
2026-10-20 13:29:14 +09:00
overtrue a55f2f671b fix(decommission): keep status reads and starts off the movement gate
The data-movement operation gate is a write-preferring RwLock. A scanner
publication lease stores a read guard on the leasing node, and the
coordinator's lease-scoped rename, delete and validation on that node
queued a second read. A movement writer queued in between (a decommission
start, a status refresh, a peer reload) then waited for the lease while
the coordinator's second read waited for the writer, so both stalled
until the 60 s lease TTL. Admin status reads also took the movement
writer, so every status call waited for the slowest in-flight copy or
cleanup and stalled new movement reads while it queued.

- Lease-scoped target admission shares the read admission the lease
  already holds instead of queueing a new read.
- Pool and rebalance status reads publish under the gates only when they
  are free; otherwise they merge the persisted metadata into a private
  copy and publish nothing.
- A decommission start bounds its start, activation and movement gate
  waits with one 30 s budget and fails with a retryable lock timeout
  before persisting anything; the admin handler maps it to 503 with
  Retry-After.

Refs rustfs/backlog#2873
2026-10-20 13:29:14 +09:00
Chris e7e53f07b2 fix(decommission): scope temporary-copy budget checks to the growth pool (#8721) 2026-10-20 13:28:51 +09:00
Chris da7fde0e62 fix(quota): stop pinning quota e2e readiness to the scanner leader (#8719) 2026-10-20 13:28:22 +09:00
Chris 6127deaa83 test(obs): pin daily rotation boundary test to fixed timestamps (#8716)
The test derived its inputs from Zoned::now() and assumed that now - 60s is still on the same local calendar day, so it failed deterministically in the first minute after local midnight. Build the inputs from fixed local wall-clock times instead, covering same day, previous day and the 23:59:59 -> 00:00:00 crossing.
2026-10-20 11:52:26 +09:00
Chris ea596b2e2d fix(decommission): adopt target intents left by a killed leader (#8710)
* fix(decommission): adopt target intents left by a killed leader

A decommission leader killed after persisting a target capacity intent and
before finalizing it left that intent in the exclusive pending slot of the
still-active reservation. The resumed routine derives the same reservation
identity, but every other mutation on that target was rejected as "another
mutation" until the interrupted object happened to be retried on the same
target, so the resumed decommission exhausted its retries and stalled.

At routine start, before any worker runs, the resumed routine now adopts the
reservation's pending intents: under the target fence (or the legacy pool
metadata fence) it moves each one into a mutation-scoped inflight marker that
keeps its identity and bytes. The interrupted mutation's retry settles the
marker through the existing commit, temporary-release and equivalent-target
paths, and an equivalent committed target now settles a mutation's own marker
when no pending intent remains. Adoption is pinned to the persisted
decommission start time and reservation identity, never runs mid-incarnation,
and a failure pauses the routine instead of marking the decommission failed.

* fix(decommission): keep adopted intents within budget and settle them once

Address the adversarial review of the leftover intent adoption.

- Merge an adopted intent into its mutation's staged marker by summing only
  while the target's temporary-copy budget allows, never below the larger of
  the two. A multipart completion moves its staged parts into the object, so
  summing them could exceed the budget and pause every later routine start;
  the adopted marker now exceeds the budget only where the completion's own
  finalize would have. Reuse resolve and record_inflight for the move.
- Distinguish a temporary release that proved the exact committed target from
  one that could not prove the target identity. When the committed mutation no
  longer has a pending intent, release only the bytes the cleanup freed and
  keep the adopted completion for the equivalent-target reconciliation.
- Let an equivalent target settle a mutation's own marker while another
  mutation holds the pending slot, instead of failing on that unrelated intent.
- Cover real leader kills before and after the target commit at routine level
  for both lock models, an injected adoption failure that pauses and then
  completes, an adopted multipart completion surviving a background abort, and
  a live legacy intent. Routine tests reuse the large-stack test helper.

* fix(decommission): pause instead of failing on target slot contention

The S00 leader-kill run with the null-version fix merged ended the resumed
decommission as failed. A re-run of a versioned key reconciled its delete
marker against an already charged target copy while another worker of the
same incarnation held the target's pending slot between a failed write and
its retry. The reconciliation rejected that unrelated intent, the entry
context wrapper flattened the error to a string the intent-conflict retry
could not recognize, and the bucket runner reported a sibling bucket's
OperationCanceled instead of the capacity block, so the routine marked the
decommission failed.

- An equivalent-target reconciliation, including the temporary checkpoint
  variant, no longer depends on another mutation's pending intent: a target
  holds one pending intent at a time, so this mutation has none to settle.
- The entry context keeps the typed cause, and the capacity-block and
  intent-conflict classifiers also recognize the rendered message that an
  error clone keeps.
- Concurrent bucket and listing failures keep the root cause over sibling
  cancellations, so a capacity block pauses the routine.

* test(decommission): delete marker copy waits for a busy target gate

The Linux run of the S00 matrix showed the delete marker copy meeting a busy
target capacity gate without any leader kill. The copy already waits on that
gate like an ordinary object copy; pin it with an entry-level test that holds
the gate, checks the entry keeps waiting, and expects the key to migrate once
the gate is released. Share the versioned delete marker fixture with the
foreign pending slot test.

* fix(decommission): keep an adopted completion unless the target is absent

Close the remaining path where an adopted completion could lose its record
before being charged. A multipart cleanup that found a target it could not
prove as the exact owned copy still dropped the whole marker of a mutation
without a pending intent, after which the equivalent-target reconciliation
would treat the commit as already charged.

Any cleanup that did not prove the exact target absent now releases only the
bytes it freed when the mutation has no pending intent, and leaves the rest
for the reconciliation. This makes the three-state release unnecessary, so
the release proof goes back to the existing clear-pending flag.

* chore(ci): shrink the error format ratchet baseline for pools.rs

9eae47ce8 removed one Error::other(format!) call site from crates/ecstore/src/core/pools.rs, so the ratchet requires the baseline to drop from 178 to 177.

* fix(decommission): keep adopted completions in their own capacity marker

An adopted completion shared the mutation's staged marker, so whether
it survived a cleanup depended on the pool-wide free-space delta, and a
cleanup that freed little space left staged bytes behind and repeated
forever.

Record each adopted intent under a mutation id derived from the
interrupted mutation (decommission_adopted_intent_mutation_id) as a
separate temporaryMutations entry. A commit or an equivalent-target
reconciliation settles both markers, a temporary cleanup releases the
staged marker as before, and only a cleanup that proved the exact
target absent drops the adopted one. While the target holds only that
adopted completion, a cleanup keeps the delayed-release exemption of
the published pending intent it replaced. Older nodes see an ordinary
temporary mutation they never release, which only over-reserves.

Also log capacity_intents_adopted as soon as the adopted ledger is
durable, merge the root-cause helpers into decommission_root_cause,
drop the decommission_capacity_blocked: prefix fallback, and log the
already-charged equivalent-target branch at debug level.

Refs rustfs/backlog#2873, rustfs/backlog#2872

* fix(decommission): return uncommitted retries to their adopted target

A retry that had not committed yet went to the reserved target with the
most remaining allocation. When that was not the target holding the
mutation's adopted completion, the commit settled only its own target
and the adopted marker stayed inflight until the reservation was
released.

Prefer a reserved target that holds the mutation's adopted marker while
it still fits the object (decommission_reserved_target_choice).

Also cover the remaining settlement paths of the derived marker
(non-growing replacement, equivalent temporary reconciliation and its
discovery gate, scanner backlog retirement), repeated adoption of one
mutation and the zero-byte staging record in both lock models, drop two
conditions that always equal another one, and correct the adopted-id
doc comment about nodes without adoption.

Refs rustfs/backlog#2873, rustfs/backlog#2872

* fix(decommission): count a completion adopted twice only once

A mutation killed twice leaves an adopted completion and then a new
intent for the same object version. Adoption added the two, so an
11-byte object counted 22 inflight bytes and could trip the capacity
check once later commits shrank the budget. Both reserve the same
completion, so merge them by their maximum before adding staged parts;
a single adoption is unchanged.

Also assert in the three-pool sticky test that no entry failed, the
retry is charged on its adopted target and the source is cleaned, run
it for the legacy lock model too, stop saying operators rely on the
adoption log before rollback, and document that the selection fallback
cannot help an adopted completion.

Refs rustfs/backlog#2873, rustfs/backlog#2872

* fix(decommission): log where an adopted retry is placed

An e2e run could not show whether a resumed retry went back to the
target holding its adopted completion. Target selection now logs
adopted_target_reused when it does, and adopted_target_bypassed with
the adopted target pools when the object no longer fits there and the
adopted marker stays behind. Both carry the mutation id and the source
and target pools.

Refs rustfs/backlog#2873, rustfs/backlog#2872
2026-10-20 11:28:22 +09:00
Chris 10a9b158d7 fix(ecstore): address the null version exactly during data movement (#8711)
* test(ecstore): pin null-version migration behind a delete marker

Decommission and rebalance must move a pre-versioning null version that
sits behind a delete marker, with its content and SHA-256 intact, before
removing the source entry (rustfs/backlog#2873).

* fix(ecstore): address the null version exactly during data movement

Decommission and rebalance read each source version with
`version.version_id.map(to_string)`. A null version, written before
versioning was enabled, has no version id, so the read used `None`,
which selects the latest version. Behind a delete marker that read
returned not found, the mover counted the version as already gone, and
source cleanup deleted the still-present null version with the entry.

Address the null version by the nil UUID, the existing exact selector,
on every data-movement lookup: the source read, the target put, new
multipart and complete options, the target resume lookup, and the
source revalidation before publication. The stale-target replacement
check treats the nil selector and an id-less null version as the same
identity, so unversioned buckets keep their current behavior. Target
pool selection still places a null version with the object's latest
version, as before, so a later null-slot overwrite replaces it there.

A version the mover skips as not found must also really be gone before
cleanup. It is dropped from the expected cleanup snapshot, so the
preflight reports SourceChanged while that exact version still exists
and the existing retry and exhaustion path retains the source.

Refs rustfs/backlog#2873, rustfs/backlog#2872

* fix(ecstore): prove multipart null-version staging absence exactly

The multipart staging cleanup proof in
abort_multipart_uploads_for_data_movement looked up the target with the
abort options' version id. Those options keep an id-less null version
as `None`, because the staged upload identity is derived from them, so
the proof resolved the target's latest version. Versions move newest
first, so it found the delete marker or newer version already moved and
refused every attempt with "cannot prove the exact staged identity is
absent". The legacy capacity model runs this proof on every attempt and
the exact model after any interrupted upload, so a multipart null
version behind a newer version could never be decommissioned. Look up
the exact null version for the proof and keep the abort options as they
are.

Cover the paths review found unprotected: multipart null versions under
the legacy model and after an interrupted upload, null versions behind
a newer version (lost without any not-found), the cleanup guard for
versions reported as not found while they still exist (decommission
read and delete-marker copy, rebalance read, and a control where the
version really vanished), and a retry after the null version committed
but before cleanup. The decommission fault hook can now inject a chosen
error, and rebalance gains a test-only source read fault.

Refs rustfs/backlog#2873, rustfs/backlog#2872
2026-10-20 10:12:59 +09:00
Chris 6f582b0548 fix(heal): decide object absence from storage evidence, not source (#8697)
* test(heal): add failing regressions for a source-independent absent verdict

Add the regression tests for backlog#2900 that fail on the current code,
where the same object-level not-found is treated as deleted on the plain
heal path but as recreate_failed on the recreate path, and where the
erasure-set healer, the task predicates and the error helpers disagree on
wrapped not-found and transient inputs.

Also add the per-object disposition cache module with its unit tests, the
manager admission tests for it, the compat register entry for the display
boundary, and the admission-invariant notes. The module and the manager
tests are not declared yet, so nothing is wired into the build.

* fix(heal): decide object absence from storage evidence, not request source

Replace the five heal error classifiers (erasure-set healer outcome
mapping, task-level not-found and lock predicates, error.rs recovery
helpers and the storage existence-check matcher) with one typed
classify_heal_error. An object-level not-found from the locked storage
read is Absent for every source and every recreate_missing value; the
recreate path, the usage-observation and scanner object-dir whitelists
are gone, and display-text matching survives only in the marked
classify_error_display boundary.

Add a bounded, expiring per-object disposition memory consulted before
queue admission so a best-effort producer cannot requeue an absent or
terminally failed object on every tick; durable MRF, admin, forced,
high-priority and dry-run requests bypass it. The read-repair producer no
longer forces recreate_missing.

* fix(heal): keep rendered grace windows out of task retries

A grace window rendered into a task message belongs to an attempt that
already finished; its owner schedules the next one. Only typed grace
errors replay the task, as before the classifier merge. Update the
ecstore read-repair black-box test: the producer no longer forces
recreate_missing.

* fix(heal): classify ambiguous legacy delete residue as permanent explicitly

* fix(heal): scope disposition memory and bound absence parsing
2026-10-20 00:11:49 +08:00
Chris f063a8e862 fix(readiness): hold startup readiness until peers re-admit the node (#8704)
A restarted node published FullReady from its own view while survivors still counted its drives unavailable (stale DNS for the old pod IP, then the Offline->Returning->Online hysteresis). A rolling update could then stop the next pod and cost a set its read quorum (#8669).

Add a read-only PeerDriveAdmission internode RPC that reports how a peer sees another host's drives, and gate the startup FullReady transition until a strict majority of each erasure set's peers count this node's drives online. The gate shares the startup budget, releases after 15s of unreachable peers, skips immediately when older peers cannot answer, and can be disabled with RUSTFS_STARTUP_PEER_READMISSION_ENABLE=false.
2026-10-20 00:28:48 +09:00
Chris 83fb90cb6e ci: move API-only and summary jobs to hosted runners (#8707)
Apply the placement rule in .github/workflows/README.md to the 22 jobs
still on sm-standard-2 that only call APIs, read workflow metadata, print
summaries or scan published images, including cla.yml, the busiest
workflow. Moving the ODM cloud-source lane also stops it restoring the
ci-odm-interop key across images, since its writer already runs on
ubuntu-latest; targets-live gets a -hosted cache key for the same reason.
2026-10-20 00:28:24 +09:00
Chris 473cddd7dc ci: gate pull requests on Clippy and warm its check artifacts (#8708)
Clippy ran only after merge, so lint regressions merged freely and then
failed every main run until fixed (10 of 12 main runs on 2026-10-17/18).
Run the workspace Clippy step on every event, warm its check-mode
artifacts in cache-warm with the identical invocation so pull requests
re-check only what they touch, and pin the unconditional step in the
ci_gate contract and its self-test.
2026-10-20 00:27:40 +09:00
Chris 9a1f3d2c4c fix(quota): keep ledger-admitted writes independent of scanner usage (#8699)
Hard quota admission is owned by the durable reservation ledger (decision
D3, rustfs/backlog#2872), but the request-path quota check still read
scanner usage on every write and mapped `UsageUnavailable` to a retryable
503 even for buckets the ledger admits. For a durable quota the checker now
treats scanner usage as reporting input: an unavailable lookup yields
`current_usage = None` and `allowed = true`, counted and logged at debug
level, and admin quota stats report the usage as null instead of zero.
Buckets without a reservation protocol keep the fail-closed snapshot path.

Quotas saved before the reservation protocols are re-saved under protocol
v2 with the same limit, type and created_at. The write goes through a new
guarded save that keeps the admin save's lifecycle/transaction guards,
incarnation check and fleet capability proof and additionally refuses when
the quota revision moved since the cached read, so a concurrent quota edit
wins. It is triggered lazily from the quota read path (background, one
attempt per bucket with a retry interval, never blocking the read) and in
bulk by `POST /rustfs/admin/v3/quota-migration`, which reports every bucket.

The ADR's Consequences section inventories the remaining scanner-usage
"authority" consumers with their meaning after D3, retirement condition and
compatibility window; the operations guide documents the migration and the
report-only usage semantics.

Refs rustfs/backlog#2904, rustfs/backlog#2872, rustfs/rustfs#8678,
rustfs/rustfs#5716, rustfs/rustfs#7350

Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-19 22:45:08 +09:00
Chris 7c75f319bc fix(scanner): stop treating an ordinary PUT as data movement in cycle termination (#8696)
* fix(scanner): stop treating an ordinary PUT as data movement in cycle termination

A continuously written deployment never reached a `Complete` scanner cycle
(#8494, #8305, #7108). Three places in the termination path vetoed the cycle
for an ordinary PUT; each now lets the write shade its bucket, the path
per-bucket certification (#8542) built, and keeps the data-movement fences.

1. Usage publication is fenced by data movement only.
   `scanner_data_usage_publication_blocked` no longer includes
   `namespace_commits_pending()`, so the post-walk probe, the local defer
   decision, the post-lease recheck and the usage-store route probes stop
   superseding or deferring a cycle for a pending rename fanout. The scanner
   publication leases (acquire, validate, target guard) drop the
   pending-commit rejection and the namespace-generation staleness check and
   keep the movement generation, the operation gate, generation exhaustion
   and the purpose/target restriction. A test-util probe lets fixtures wait
   for tails directly.

2. The plan identity is split into a coverage identity and a reuse identity.
   `scanner_activity_coverage_digest` (peer set, protocol, topology, movement,
   and a remote peer's generations) is what a bucket checkpoint is started
   and resumed under, through `ScannerBucketScanPlan::checkpoint_coverage_digest`,
   `DataUsageCacheReuseOptions::checkpoint_plan_digest` and
   `prepare_bucket_checkpoint_with_coverage`. The reuse identity
   (`scanner_activity_structural_digest`) keeps `instance_id` and
   `maintenance_generation`, so a restart or a maintenance change still
   invalidates the baseline and the set caches; a completed sweep is stored
   under it. `publication_blocked` leaves every digest and stays a guardrail
   veto. A remote worker still resumes under the single digest on the wire.

3. A bucket walk that stops early no longer makes the cycle `Incomplete`
   when the bucket has a certified value. The set scan stands in with the
   bucket's flattened value from its previous complete set cache
   (`carry_partial_bucket_values`), the cycle reports it pending
   (`ScannerBucketScanStatus::PartialCarried`), keeps it in the dirty map,
   and the next scoped cycle walks it because the baseline's pending list
   joins the dirty buckets. A bucket with no certified value keeps the cycle
   `Incomplete`; failed buckets are unchanged.

No persisted file, generation, receipt or environment variable is added.
Refs #8494, #8305, #7108, rustfs/backlog#2903.

* chore(ecstore): gate the namespace commit probe to test builds

The scanner publication barrier no longer consults
InstanceContext::namespace_commits_pending, so it has no production
caller left; keep it for tests and the test-util facade only.

* test(rustfs): observe namespace commit ownership directly in node_service tests

The scanner usage publication barrier is movement-only now, so it no
longer reports a pending rename. The node_service tests that assert a
cancelled handler keeps its physical owner, or that wait for rename
tails to drain, read the namespace commit state through a test-only
ECStore probe instead.
2026-10-19 22:23:59 +09:00
Chris c48ff0bbbd test(connect): hash test provenance before listener peer-cred probe (#8703) 2026-10-19 19:50:44 +09:00
Hauser 05b483b31a fix(storage): preserve scanner checkpoints and bound MRF journal I/O (#8692)
* fix(scanner): preserve checkpoints on identity read failures

Distinguish confirmed missing incarnation sidecars from lookup errors before
cache preparation. Preserve durable checkpoint progress when identity reads
are unavailable and report post-scan uncertainty separately from replacement.

Reuse the transaction-fenced reader for optional and required lookups while
retaining existing missing, malformed, system-bucket and lock-loss behavior.
Verify preservation and recovery through a real coordinator with the identity
sidecar write-locked, including unchanged cache revisions and dirty work.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(ecstore): share required incarnation conversion

Keep the missing-incarnation error contract in one conversion used by both
required lookup entry points. This removes a duplicate formatted error site
and satisfies the existing error-format ratchet without changing its baseline.

Pin the full missing-identity error text in the real SetDisks regression.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(heal): bound cross-disk MRF checkpoint I/O

Run independent journal disks with bounded concurrency while retaining each
replica's payload, companion and manifest ordering and the mirror phases.
Share encoded bodies, deduplicate local roots and collect every result
without changing receipt deadlines or persistence failure semantics.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-19 18:16:49 +08:00
Chris f3cef98afc fix(scanner): anchor the bitrot cadence and budget per-disk I/O (#8701)
* test(scanner): pin Normal mode when no bitrot start is recorded

Regression for rustfs/backlog#2905: three consecutive cycles that find no
recorded bitrot start currently run Deep through the selection window, and a
Normal cycle never records the cadence start.

* fix(scanner): anchor the bitrot cadence and budget per-disk I/O

Decide the scan mode from a recorded Deep window start only. A cycle that
finds no recorded start runs Normal and anchors the bitrot cadence in
process memory instead of opening the selection window; the Deep cycle that
follows the elapsed cadence records the window start exactly as before. A
missing record used to be read as a window that started at cycle 0, which
ran Deep for deep_window_cycles cycles whenever the start could not be read
back (rustfs/rustfs#8015). The recorded start is also remembered across a
skipped or failed save, and /v3/scanner/status reports the cadence state
under a new bitrot object.

Add a per-local-disk background I/O budget (operations and bytes per second,
defaults by detected media, auto|off|<rate>) that DynamicSleeper charges
before directory listings and object metadata reads as a hard ceiling
layered on the foreground-priority disk admission gate, with runtime config
keys, per-disk status, cycle metrics, pacing pressure, usage_freshness,
Prometheus series, Helm values, admin config help, and operator docs.

Refs rustfs/backlog#2905, rustfs/rustfs#8015, rustfs/rustfs#8377.

* test(scanner): expect Normal retries on erasure sets without a bitrot start

The pending-PUT retry fixture asserted that a 4-drive set revisits every
bucket because the cycle ran Deep. Without a recorded Deep window the cycle
now runs Normal on every layout and reuses the cold inventory.
2026-10-19 18:15:03 +08:00
Chris 2b57fa8758 fix(heal): block replacement and root records per entry (#8700)
Count only post-format rebuild failures against the replacement retry
budget; handoffs, format fences, outages, grace waits and conflicts keep
their durable reason without spending an attempt. Retired generations
(committed handoff or approved legacy migration) no longer own their set,
so fresh admission for other slots proceeds, and a committed predecessor
becomes collectible once its successor is verified.

Block discovery conflicts per generation instead of per set, re-evaluate
them on every pass, and expose the blocked entries with reasons. Report
root heal inventory conflicts per record and keep replaying the others.
Revalidate blocked checkpoints hourly with the current reader and clear
markers the reader accepts. Return a dedicated error for ambiguous legacy
delete residue instead of the retryable SlowDown.

Implements rustfs/backlog#2902. Fixes rustfs/rustfs#8664. Addresses
rustfs/rustfs#8366, rustfs/rustfs#8565, rustfs/rustfs#8645 and part of
rustfs/rustfs#8608.

Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-19 18:12:43 +08:00
Chris 20d9277ec3 ci: return pull-request build jobs to 2 after an IO-bound timeout at 3 (#8698)
The first pull-request run at CARGO_BUILD_JOBS=3 that met a contended
node (39193827281) hit the 75-minute nextest timeout before any test
started. Its sampler shows cargo spinning for 70 minutes with the pod's
io.pressure "full" at 86-88% and cpu.pressure at zero, with node-level
IO pressure already at 36% when the step began: three concurrent
workspace-scale compile units saturate the pod's shared storage, the
mechanism the original #5394 mitigation named. Keep 3 on main pushes and
dispatches, where three runs succeeded, and 2 on pull requests, in both
the nextest and the serial ILM step; pin the ILM budget guard back to
that expression and record the evidence in the step comment.
2026-10-19 17:54:57 +08:00
Chris 2534b6175b fix(scanner): startup gates back off, rebuild and run degraded (#8695)
* fix(scanner): give startup gates automatic exits instead of a pause

Every fail-closed scanner gate now has a bounded automatic exit without
deleting quarantine evidence or relaxing the leader, CAS, movement or
usage-floor fences (rustfs/backlog#2901).

- Recovery retries back off instead of pausing: after the short budget the
  observation reads `backoff`, stays retryable, names the next attempt and is
  capped at ten minutes; one success resets the count and a 24 h window
  restarts the budget (rustfs/rustfs#8297, #8670). The usage-floor failure no
  longer carries the retry count across attempts.
- A corrupt `.bloomcycle.bin` is rebuilt on the iteration after its quarantine
  marker is durable: the fenced leadership claim CAS-replaces the quarantined
  revision under a higher epoch and the marker stays as evidence.
  `future_schema` and `cleanup-pending` remain blocked.
- An unclaimable pause ledger runs the leader degraded: cycles run untracked
  behind the data-movement fence, `persistence_state` reports `degraded`, and
  the claim is retried at most every five minutes (rustfs/rustfs#8251).
- The usage-state full-rebuild reset starts from the empty baseline when every
  usage slot is corrupt and no cycle state exists (rustfs/rustfs#8670, #6951).
- A cycle-state save reconciles non-conflict failures against durable state
  and retries under the same epoch; an exhausted save reloads durable state in
  place. Only a newer owner or an unreadable primary ends the iteration, so
  peers see a changed fence only when ownership changed (rustfs/rustfs#8141).

* test(scanner): align usage-state reset tests with the empty-baseline rebuild

The full-rebuild reset no longer refuses corrupt or identity-less usage slots
when no cycle state exists (rustfs/rustfs#8670). The two tests that encoded
that refusal now check the new contract: the reset starts from the empty
baseline with a bootstrap-pending marker, never an authoritative zero floor,
and a valid backup still supplies the recovery floor.

---------

Co-authored-by: cxymds <cxymds@gmail.com>
2026-10-19 17:49:00 +08:00
Chris 54e39440d2 fix(ecstore): skip node-local prefix dirs in decommission listing (#8702)
Decommission listing failed closed on `.rustfs.sys/buckets/.heal/`, a
directory that holds only the node-local MRF journals on one drive and
no xl.meta. The partial-listing resolver rejected the single prefix
directory below dir quorum and recorded it as unresolved object
metadata, failing the run before the worker's directory skip ran.

Treat a partial sample made only of empty-metadata directory candidates
with zero disk errors as the prefix it is and hand it to the callback
like a quorum-resolved directory; the recursive walk lists any object
beneath it on its own. Samples with disk errors, objects below the
metadata quorum, and mixed samples stay unresolved.

Fixes #8667
2026-10-19 17:48:25 +08:00
cxymds daa3679160 fix(admin): avoid error logs for idle rebalance status (#8694)
* fix(admin): avoid error logs for idle rebalance status

* refactor(admin): reuse rebalance idle error message

---------

Co-authored-by: Chris <anzhengchao@gmail.com>
2026-10-19 18:03:51 +09:00
Chris 90749fbb06 ci: run feature lanes nightly and warm caches on a schedule (#8683) 2026-10-19 16:18:22 +09:00
Chris e6f76cb64f fix(ci): refresh the e2e-full selection for the new policy tests (#8693)
* fix(ci): refresh the e2e-full selection for the new policy tests

#8615 and #8671 added three e2e tests without refreshing the e2e-full
selection digest, so "Verify e2e full membership" has failed on every
main push since. Regenerate the Linux digest from the listing the failed
run uploaded; the same procedure reproduces the previously committed
value from the last green run's listing, and the name-level diff shows
three additions and no removals. The darwin digest is refreshed
separately from a real macOS listing.

* fix(ci): refresh the darwin e2e-full selection digest

Regenerated from a real `cargo nextest list --profile e2e-full -p e2e_test`
on macOS (rustc 1.99.0, cargo-nextest 0.9.140), so the local check on
macOS agrees with the three policy tests added by #8615 and #8671.
2026-10-19 14:04:23 +08:00
Chris 1ec620ac9c fix(ci): restore the release-profile short-credential guard (#8691)
#8682 replaced the cold `cargo check -p rustfs --release` with a
`cargo rustc ... -C debug-assertions=off` on the rustfs lib alone. That
leaves the dependencies on the dev-profile cfg, so the lib also fails on
items gated on one side of cfg(debug_assertions) only (E0599 on
Filenames::Embedded), and the step's "fails solely at the compile_error"
assertion can never hold; the lane has been red on main and every pull
request since. Restore the whole-graph release check, drop the two-job
limit that only a linking step needed, and record why the single-crate
variant is unsound.
2026-10-19 14:03:57 +08:00
Hauser b3bb9d3596 perf(ecstore): reuse fenced delete settlement inspection
Reuse the fingerprint-validated snapshot while the metadata owner fences an unchanged key. Refresh only after absent-key preparation, retaining destructive preflights, sibling refreshes and final inspection.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-10-19 11:40:51 +09:00
Hauser d156640451 fix(ecstore): recover deletes beside stale data backups
Treat valid foreign transaction markers as inert data-directory leaves during journal-free inspection. Permit fresh authorized missing-key deletion to reclaim safe legacy residue alongside certified absence receipts while preserving automatic ambiguity and generation fences.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-10-19 11:40:51 +09:00
Chris 441b501189 fix(ci): align the ILM build-budget guard with CARGO_BUILD_JOBS 3 (#8687) 2026-10-19 11:40:28 +09:00
Chris c72ed5e909 fix(helm): hold rolling updates until survivors re-admit a replaced pod (#8686) 2026-10-19 11:40:11 +09:00
Chris 392ccadb78 ci: build development packages nightly instead of on every main push (#8684) 2026-10-19 11:39:38 +09:00
Chris f7b2836d7d fix(helm): skip data PVCs when storageclass.dataStorageSize is empty (#8681)
An empty storageclass.dataStorageSize used to be the way to run on
user-supplied drives (extraVolumes/extraVolumeMounts, e.g. JBOD hostPath),
but the chart now always renders data PVC templates, with an invalid empty
storage request.

When the value is empty, render no data volumeClaimTemplates and no data
volumeMounts, drop the data directory preparation from the init container
(and the init container itself when there is nothing left to prepare), and
omit volumeClaimTemplates when no PVC template remains. Standalone mode skips
the data PVC and data volume unless existingClaim.dataClaim is set. Pools may
override the value independently. Default renders are byte-identical.

Fixes #8665
2026-10-19 09:24:00 +09:00
Chris 4d7cd23f8e ci: reuse the dev cache in Connect boundary lanes and raise build jobs (#8682)
Raise CARGO_BUILD_JOBS to 3 on every event in the workspace test lane and
record the closed backlog#1601 experiment: the test-profile compile took
28m21s at 2 on a pull request and 16-23 min at 3 across three successful
main runs.

Merge the two Connect boundary jobs into connect-feature-boundaries. The
offline enrollment gate no longer exports a fresh CARGO_TARGET_DIR, so it
rebuilds only the rustfs crate on top of the restored ci-dev cache; the E2E
root is isolated by the feature gate and the dedicated binary name, not by
the target directory. The short-credential release guard is now
`cargo rustc -p rustfs --lib --features connect-e2e-short-credentials --
-C debug-assertions=off`, which trips the same cfg(not(debug_assertions))
compile_error against cached dev-profile dependencies instead of a cold
release check of the whole graph. Every assertion of both lanes is kept.

Update ci_gate.py and the ci-gates.md PR matrix for the merged job.
2026-10-19 09:16:12 +09:00
Chris 0de680f4a1 chore(docker): upgrade Alpine base image to 3.24.2 (#8680) 2026-10-19 08:57:47 +09:00
Chris ff70c06cef fix(auth): restrict root-derived accounts and credential logs (#8674) 2026-10-19 08:57:31 +09:00
Chris fca83c72e4 ci: move compile-free and prebuilt-binary lanes to hosted runners (#8679)
* ci: move compile-free and prebuilt-binary lanes to hosted runners

Standard GitHub-hosted runners are free for this public repository, while
every sm-standard minute is paid self-hosted capacity. Move the jobs that
never compile (quick checks, typos, scope selection, the required-checks
aggregate, audit, closed-PR cancellation) and the two s3-tests lanes that
only run the prebuilt debug binary to ubuntu-latest, drop the wget install
the custom image needed for typos, and move the upgrade-compatibility
workflow, whose build shape already runs on hosted runners in
e2e-distributed, with renamed cache keys so the hosted and self-hosted
images never share a rust-cache entry. Gate the package summary job on
resolve having run, so development builds stop starting a pod to report a
skipped job.

* docs(ci): document runner billing and placement rules

Record in .github/workflows/README.md which runner labels GitHub bills
(none for this public repository), which ones RustFS pays for, the rule for
when a job may leave ubuntu-latest, the rust-cache single-writer and
same-image constraints, the patterns that have leaked self-hosted minutes,
and a checklist for new or moved jobs. Point to it from .github/AGENTS.md,
docs/testing/ci-gates.md and the ci.yml placement comment so the rule has a
single home.
2026-10-19 08:55:29 +09:00
Chris 22740876b3 docs(architecture): record scanner usage authority and PUT-tail decisions (#8678)
Supersede the 2026-09-03 decision: hard quota admission is owned by the
durable reservation ledger, and scanner data usage is best-effort reporting
input. Record that a pending ordinary PUT commit is a write-barrier event
rather than a usage-publication veto, and split the scanner plan identity
into a coverage identity and a reuse identity.

Refs rustfs/backlog#2872, rustfs/backlog#2903, rustfs/backlog#2904.
2026-10-19 08:33:28 +09:00
Chris ab7001a714 docs: unify agent instructions across tools (#8675) 2026-10-19 07:52:51 +09:00
Hauser b2770312f2 feat(policy): support object creation operation conditions (#8671)
* feat(policy): support object creation operation conditions

Derive the condition from the resolved S3 operation and keep multipart staging separate from object publication. Reject request and claim spoofing and cover policy evaluation and HTTP upload paths.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(protocols): preserve multipart staging authorization

Keep the trusted protocol operation until the shared policy context is built, so FTPS and SFTP honor object creation conditions on multipart staging. Reuse the server-only marker and test real backend decisions for IAM and bucket policies.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): cover ObjectCreationOperation in STS session policies

Run AWS's conditional-write example 1 as an inline AssumeRole session
policy: object publication needs a request header, while multipart
staging is exempt through s3:ObjectCreationOperation.

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: oc7o <oc7o@sloow.de>
Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-10-19 07:17:42 +09:00
Chris e0e18908d5 fix(heal): place checkpoint serialization impls before tests (#8663)
* fix(heal): move impls before test module to satisfy clippy items_after_test_module lint

Clippy in Rust 1.99 flags items defined after #[cfg(test)] mod tests.
Move Serialize and Deserialize impls for CheckpointJson before the
test module in crates/heal/src/heal/resume/checkpoint/integrity.rs.

* fix(heal): restore checkpoint integrity file newline

Add the missing final newline so cargo fmt --all --check passes.
The checkpoint serializer implementations and tests remain unchanged.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-19 07:08:49 +09:00
Ramakrishna Chilaka 34e883e16a perf(filemeta): avoid clones and intermediate allocations in xl.meta codec (#8661)
* perf(filemeta): avoid clones and intermediate allocations in xl.meta codec

- Slice version headers and metadata payloads directly from the xl.meta buffer in FileMeta::unmarshal_msg instead of allocating temporary header/metadata buffers per version.
- Decode FileInfo directly from borrowed xl.meta slices in get_file_info without constructing an intermediate FileMeta, Vec<FileMetaShallowVersion>, or InlineData copy.
- Validate and search InlineData keys on borrowed slices without per-key Vec/String allocations.
- Borrow FileMetaVersion in FileMetaVersionHeader::from and stream object/delete-marker signatures directly into Xxh64Writer instead of cloning full version structs and marshaling temporary buffers.
- Encode FileMetaVersionHeader into a stack buffer in FileMeta::marshal_msg and pre-size output buffers.
- Decode msgpack struct field names onto a 16-byte stack buffer via read_small_str and unwrap PrependByteReader after reading submap headers.

* test(filemeta): pin xl.meta codec compatibility

Pin pre-optimization signatures for historical RustFS and MinIO fixtures,
and cover direct reads across selectors and decode options. Preserve null
inline keys, free-version selection, empty histories, and allocation
boundaries for large version bodies.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-19 07:01:11 +09:00
0x70 3a5742c5fd feat(policy): support s3:if-none-match and s3:if-match condition keys (#8615)
* feat(policy): support s3:if-none-match and s3:if-match condition keys

Bucket, IAM, and STS session policies that enforce conditional writes
with s3:if-none-match or s3:if-match were rejected with "invalid key
name". Accept both keys and populate them from the If-None-Match and
If-Match request headers. A blank header is left out of the condition
values because the write ignores it, so it cannot satisfy a Null check
for a write that runs unconditionally.

* fix(policy): classify conditional write keys as request-derived

s3:if-match and s3:if-none-match are filled from request headers, but
is_server_derived() reported them as server-derived because their names
lack the x-amz- prefix. Add an explicit arm so header input is never
refused for these keys if they join COMMON_KEYS.

* fix(s3): reject non-wildcard If-None-Match on writes

S3 accepts If-None-Match on PutObject, CopyObject and
CompleteMultipartUpload only as "*" and answers other values with 501
NotImplemented. RustFS compared such a value as an ETag, so a write with
If-None-Match: "<other etag>" overwrote the key while satisfying a
policy that requires s3:if-none-match.

Reject ETag values in the three handlers before any I/O. The store-level
check now treats any non-blank If-None-Match as create-only, so a caller
that skips the handler check cannot weaken the precondition. Drop the
CompleteMultipartUpload ETag pre-check that the rejection supersedes.

* test: tighten conditional write policy coverage

Pin trimming and the non-UTF-8 case in the condition values, and drop
the auth test that re-ran policy evaluation already covered by the
policy crate. Run the three policy e2e scenarios on one server, assert
that ETag If-None-Match cannot overwrite under a Null: false policy and
that CompleteMultipartUpload with If-None-Match: * returns 412. Share
the AssumeRole response parser through common.rs.

* test(ecstore): isolate manual delete recovery from workers

Stop fixture background services before seeding recovery journals so the
explicit recovery pass owns the decisions its assertions inspect.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): enforce request-derived conditional write guards

Validate raw If-None-Match headers as well as DTO fields so POST form
uploads cannot skip rejection of unsupported ETag preconditions. Derive
conditional policy keys after identity claims and clear colliding claims
when the actual request has no usable precondition.

Align multipart and pinned Ceph regressions with wildcard-only writes,
retaining If-Match, object-content, version and delete-marker assertions.
Document that 501 is the implementation's unsupported-value response.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(s3): eliminate conditional write request copies

Borrow request headers during policy condition collection and exclude
conditional keys at the identity-claim boundary instead of inserting and
removing them. Preserve existing aliases and multivalue header behavior.

Move the CompleteMultipartUpload input out of its request, compare strong
ETags by reference, and remove the ETag If-None-Match branch made unreachable
by the write guard. Keep both form/HTTP input checks and storage commit
preconditions intact.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(s3): align ignored conditional PUT and COPY cases

Use If-None-Match: * for the existing-object 412 regressions and assert 501
for matching and nonmatching ETag values. Cover both header-only callers
and parsed DTO-plus-header requests in the serial ILM fixtures.

Check object bytes and live version counts after each rejected operation.
Keep the existing test names and ignored-test lane selection unchanged.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: overtrue <anzhengchao@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-19 07:00:21 +09:00
InitCool e2583ddcd6 feat(oidc): make the Console session duration configurable (#8568)
* feat(oidc): make the Console session duration configurable

The OIDC callback hard-coded the Console credential lifetime at 3600
seconds, so a Console session always ended after about an hour.
RUSTFS_CONSOLE_AUTH_TIMEOUT, the documented knob next to this behaviour,
is the Console HTTP request timeout and cannot extend a session.

Resolve the lifetime from the process-level
RUSTFS_CONSOLE_OIDC_SESSION_DURATION instead and forward it to
complete_authorization_code(). Unset, unparseable, zero, and negative
values keep DEFAULT_CONSOLE_OIDC_SESSION_DURATION_SECS (3600), so
existing deployments keep the previous behaviour and a misconfigured
variable can never issue an already expired credential. Values above
CONSOLE_OIDC_SESSION_DURATION_MAX_SECS (7 days) are clamped to that
maximum with a warning, which also caps how far an operator can stretch a
credential by accident.

Keep the Console logout token for that same lifetime. OidcStateStore
pinned the logout cache to a hard-coded hour, so a session configured to
last longer than that dropped its logout token while the credential was
still valid: RP-initiated logout could no longer resolve, and the browser
was sent back to the Console login page with the IdP session still
active. The logout cache now derives its TTL from the same
console_session_duration_secs(), which applies the same clamp, and the
callback reads its lifetime from that one function instead of a local
copy, so the credential lifetime and the logout-token retention cannot
drift apart. Add tests covering the default hour, an extended session,
the maximum, and out-of-range values.

The variable is deliberately not part of ENV_IDENTITY_OPENID_KEYS: that
list is suffix-scanned per provider, and this setting applies to every
provider. It has no identity_openid KVS equivalent and needs a restart,
like the other process-level settings in the same document.

Document the setting in the login flow, the process-level table, and the
troubleshooting table, and clarify that RUSTFS_CONSOLE_AUTH_TIMEOUT is a
request timeout rather than a session lifetime.

* test(ecstore): retain offline marker fixtures across reconnect

Keep simulated drive handles attached and reject I/O until explicit rejoin.
Attempt reconnect in the current-marker case so the former CI race is
deterministic while retaining physical cleanup and historical-data checks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(oidc): align session diagnostics and lifetime regression tests

Use structured IAM diagnostics for clamping and move configuration tests
to their owning crate. Cover duration boundaries, logout retention and
signed credential expiration through the federation binding.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Chris <anzhengchao@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-19 06:52:05 +09:00
Henry Guo 317191ce00 fix(scanner): scale backup deadline to checkpoint save cost (#8659) 2026-10-19 06:21:33 +09:00
Chris f3c4a790dd fix(listing): accept literal prefixes with repeated slashes (#8605)
Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-19 01:27:51 +08:00
Hauser 6681dd12e3 fix(scanner): expose mixed sweep checkpoint transitions (#8657)
* fix(scanner): expose mixed sweep checkpoint transitions

Correlate checkpoint admission, incomplete sweeps, and successful terminal
Partial persistence by bucket/source and cycle/leader epoch. Share the
traversal-position predicate and local/remote save diagnostic without
changing certification, acknowledgement, or persistence contracts.

Extend real-disk cache regressions across cycles and leader changes and
verify that failed terminal saves retain an older periodic frontier until
a successful terminal save permits fresh certification.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): report the aggregate incomplete sweep gate

Expose the existing unresolved_objects decision in the incomplete-sweep
event. Nested cache-entry failures can keep a sweep partial while both
the root counter and the capped diagnostic failure map are empty.

Extend the real-disk regression with diagnostics disabled and distinguish
this case from mixed-only coverage without adding another cache walk.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-18 16:50:42 +08:00
Henry Guo 3b0ee83466 fix(scanner): pace checkpoints by snapshot construction cost (#8656) 2026-10-18 13:36:58 +08:00
Henry Guo 02c4f4c97f fix(ecstore): clean completed PUT staging on pre-commit cancellation (#8654)
fix(ecstore): clean staged PUT data on pre-commit cancellation
2026-10-18 13:36:33 +08:00
Hauser c28e02a722 fix(ecstore): preserve inline heal rollback staging lifetime (#8650)
* fix(ecstore): preserve inline heal rollback staging lifetime

Retain the TMP source prefix in the existing publication lease until the owned receiver finishes rollback. Serialize recursive cleanup and stale GC with the same key, and avoid decoding an unused old version during inline healing.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): reuse staging lease during parent cleanup

Reuse the existing staging lease when pruning its parent directory, including already-missing prefixes, and retain it in the physical rmdir executor after cancellation. Match the inline-heal fsync test hook to the canonical group path on Linux.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-18 12:58:57 +08:00
Henry Guo 1df96624df feat(table-catalog): support conditional maintenance worker retries (#8562)
* feat(table-catalog): support conditional maintenance worker retries

* fix(table-catalog): refresh conditional worker claim time

* style(table-catalog): format conditional worker expiry test

---------

Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-10-18 10:03:58 +08:00
Henry Guo ee534fa19b test(table-catalog): validate current backing contracts (#8559)
* test(table-catalog): qualify current backing contracts

* fix(table-catalog): verify smoke cleanup after object rename

* fix(ci): include the baseline writer test in full E2E selection

* fix(ci): reserve test capacity for disk-backed lock probes

---------

Co-authored-by: Henry Guo <marshawcoco@users.noreply.github.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-10-18 10:03:30 +08:00
Chris 668bc7a4ba test(utils): cover mixed-case metadata alias conflicts (#8651) 2026-10-18 10:02:47 +08:00
Hauser e29a76f391 fix(heal): verify checkpoint integrity before applying defaults (#8649)
* fix(heal): verify checkpoint integrity before applying defaults

Validate the persisted JSON shape so intact signed legacy checkpoints can
reach the existing safe schema rewind. Preserve deployed field ordering and
read historical sorted-key digests without changing the checkpoint schema.
Reuse the signing value when saving and retain strict duplicate-field parsing.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(heal): preserve checkpoint writer rollback compatibility

Keep ordered checkpoint parsing local rather than enabling preserve_order
throughout the server. Sort writer keys recursively to retain the production
base reader's digest format while accepting both historical read orders.

Cover real writer canonicalization, nested scalar ordering and depth limits.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-18 04:03:16 +08:00
Chris 3ddd307304 chore(release): align installation references for 1.0.3 (#8646)
Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-18 02:58:32 +08:00
Ramakrishna Chilaka 9946c67b53 perf(filemeta): avoid clones and redundant map scans in into_fileinfo (#8647)
FileMetaShallowVersion::into_fileinfo and to_fileinfo_with_part_checksums previously decoded an owned FileMetaVersion and then converted it via shared reference (&self), cloning meta_user, meta_sys, part_etags, and part_indices before dropping the temporary FileMetaVersion and scanning the metadata map up to 10 times for optional internal suffixes. Additionally, metadata_compat helpers (get_str, contains_key_str, remove_str, get_consistent_value) allocated two temporary heap Strings via both_keys(suffix) on every absent-key fallback.

- Replace both_keys(suffix) in case-insensitive fallback scans with allocation-free prefix+suffix slice matching.
- Add consuming into_fileinfo_with_part_checksums on FileMetaVersion and MetaObject to move decoded part vectors and metadata maps in place.
- Fold transition-version metadata formatting and optional suffix presence detection into the single meta_sys pass, and skip target_delete_marker_versions in get_internal_replication_state when no delete-marker version keys are present.
2026-10-18 02:57:21 +08:00
Hauser 286e4cf30b perf(ecstore): keep inline heal rollback backups in staging (#8648)
* perf(ecstore): keep inline heal rollback backups in staging

Keep inline repair rollback local to the disk commit and avoid publishing
a live backup that needs a second cleanup operation. Preserve legacy peer
and non-inline backup reclamation, with production-mode rollback coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Co-Authored-By: Ramakrishna Chilaka <rkchilaka378@gmail.com>

* test(ecstore): route inline heal imports through test facade

Keep ECStore integration-test API access behind storage_api.rs to satisfy
the architecture migration boundary without changing test behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: Ramakrishna Chilaka <rkchilaka378@gmail.com>
2026-10-18 01:51:52 +08:00
Hauser 453be3dd84 fix(scanner): attribute incomplete census and lease waits (#8643)
* fix(scanner): attribute incomplete census and lease waits

Report bucket sweep blockers and correlate partial remote work and rejected
roots with their set and cycle. Keep distinct accepted bucket names in the
result collector so completion counts and missing-bucket attribution share
one source of truth, including during cancellation drain.

Distinguish worker completion from coverage, retain peer/purpose context in
lease failures without changing retry suffixes, and avoid claiming that an
unverified leader fence changed or a waiting scan was complete.

Document the census stages and preserve publication, dirty acknowledgement,
remote failure classification and checkpoint safety rules.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(scanner): move set caches through the result collector

Give the sole result collector exclusive ownership of the aggregate cache
and return it together with the accepted bucket names after channel drain.
Move that cache into complete persistence or incomplete updates instead of
sharing a mutex and cloning the terminal cache.

Return each accepted result's owned name from cache application so coverage
tracking also avoids an extra name allocation. Preserve worker joins,
cancellation drain, publication metadata and all certification fences.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-18 01:05:14 +08:00
唐小鸭 222beaba00 fix(scanner): certify dirty usage per bucket and complete cycles with pending buckets (#8542)
* fix(scanner): treat replication status writebacks as status-class hits

A replication status writeback (persist_replication_state_if_current in
Update mode, including the heals the scanner queues during its own walk)
marked the bucket dirty on the namespace path: it advanced the dirty-usage
generation, woke the scanner, reached the durable dirty journal and
entered the activity snapshot. Any replicated bucket therefore made every
scanner cycle Superseded, the authoritative usage baseline was never
certified and usage freshness stayed stale for as long as replication ran
(#8375).

The writeback is now status class: record_status_class_mutation records
only the process-local producer coverage bit and nothing else. There is
no rescan queue for it, because a deployment with an active replication
rule already walks every bucket on every cycle
(ScannerMaintenanceFeatures::needs_regular_cycle) and that walk refreshes
replication_stats. The routing lives in a named, unit-tested function in
rustfs/src/storage/storage_api.rs; tier-expiration cleanup removes data
and stays on the namespace path.

No persisted format, protocol, admin API or configuration changes.

This is phase 1 of docs/architecture/scanner-per-bucket-convergence.md,
which this change adds together with its index entry.

Refs #8375, #8494, rustfs/backlog#2816.

* fix(scanner): refresh replication statistics during maintenance

Refresh compacted prefixes and completed bucket caches during replication maintenance. Bind set execution reuse to the observed replication statistics so a same-cycle retry cannot restore older counters.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): avoid expanding the legacy S3 DTO surface

Decode the existing replication configuration type from a JSON fixture instead of adding direct S3 DTO references to a new file. Preserve the compacted-prefix and same-cycle assertions and the footprint ratchet.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* feat(scanner): attribute activity guardrail vetoes per field

The post-walk cluster activity proof compared the whole activity snapshot,
so any namespace or dirty-usage generation movement vetoed publication.
Veto only on the fields that change which heap the walk described
(peer set, instance id, protocol version, topology, maintenance
generation, data movement, movement generation, publication blocked) and
name the field and host in the log and in a new usage-freshness counter.
Generation movement is a shade signal consumed per bucket. A remote peer
whose dirty-usage state moved keeps the whole-cycle outcome until scoped
acknowledgements can name its buckets.

* feat(data-usage): carry pending-bucket certification in DataUsageInfo

Add the additive fields a per-bucket certified scanner snapshot needs:
the sorted list and count of buckets whose dirty-usage generation moved
during the walk, and an explicit observational marker for snapshots whose
authoritative publication was vetoed. All three default when absent and
are skipped when empty, so older readers see the existing snapshot shape.

* feat(scanner): certify dirty usage per bucket and complete cycles with pending buckets

A structurally complete walk that the guardrail did not veto is now
`Complete` even when the dirty-usage generation moved during the walk.
Certification keeps the compare-and-remove semantics of
clear_dirty_usage_buckets: buckets whose generation still equals the start
snapshot are cleared, buckets written during the walk stay in the dirty map
and are published as the pending set, so usage_snapshot_converged becomes
`pending == 0`. The authoritative object is written for such cycles; the
observed route is selected by the explicit observational mark that vetoed
cycles carry instead of by the convergence flag, and the root publication
proof is read for every authoritative save. The post-lease activity recheck
compares the guardrail fields, with the peer dirty-usage fallback, instead
of the full snapshot digest.

* feat(scanner): accept unconverged complete publications as the cache baseline

complete_scanner_cache_baseline_plan_digest required the authoritative
snapshot to be converged, so a site whose cycles always left a bucket
pending could never scope a rescan and every cycle was a full walk. The
authoritative object is now a structural baseline whenever it carries a
convergence marker and no observational mark; bucket-cache reuse is then
governed by certification, because pending buckets stay in the dirty map
and are selected for the rescan while certified buckets reuse their set
cache. Observed candidates keep requiring the unconverged marker, and
segment reuse evidence keeps requiring a converged baseline.

Add the single-disk cycle test: a bucket written during the walk is the
only pending bucket, the others are certified, the publication is
authoritative and unconverged, and the next cycle is scoped to that
bucket; a held PUT tail still supersedes onto the observed route.

* feat(admin): expose scanner guardrail vetoes in usage freshness

Carry the attributed guardrail veto counter, timestamp and <field>@<host>
reason from the scanner metrics report into the madmin scanner status so
an operator can tell a rebalance or a PUT tail from a broken probe. The
fields are additive with serde defaults and merge like the deferral
fields.

* docs(scanner): record per-bucket certification in the design and changelog

Amend the convergence design where the implementation deviates: pending
buckets carry their walked value, maintenance_generation stays a veto,
guardrail localisation and the remaining phase-2 items ship separately,
last_cycle_result keeps its success label, and the admin surface gains the
guardrail veto fields. Update the publication contract for the post-lease
guardrail recheck and the explicit observational routing mark.

* refactor(scanner): drop the unreachable failed-bucket input from the pending set

A failed bucket never reaches a Complete cycle, so the pending set only
needs the start snapshot. Also remove a redundant clone in the data-usage
round-trip test.

* test(scanner): name the activity field mutation table type

* test(scanner): fill the post-walk gate in merged replication fixtures

The replication maintenance fixture merged from main builds a
ScannerCycleRequest literal and predates the test-only post_walk_gate
field; give it the default so the test target compiles on the rebased
branch.

* ci(nextest): run the admin target-repair fixtures on the ecstore base stack

repair_transaction_rejects_a_bucket_recreated_after_target_validation
overflowed the 2 MiB libtest default twice in a row on Linux CI for this
branch. Measured by sweeping RUST_MIN_STACK with the ci profile on macOS
arm64: main (65f30bd5c) passes at 2032 KiB and overflows at 2016 KiB,
this branch passes at 2040 KiB and overflows at 2032 KiB; on both trees
the overflow is in the test's delete_bucket step on the real store, and
the futures on that path are small (the peak is nested poll depth, not
one large future). The module was given this stack in #7272 and removed
in #7280 to check that boxing (#7277) sufficed; with the default now
exhausted on main itself, give the fixtures the same 4 MiB base stack as
the other real-storage rustfs fixtures, in both profiles.

* test(scanner): fill the post-walk gate in the walkers-per-disk fixture

The merge from main brought the walkers_per_disk cycle fixture (#8539),
whose ScannerCycleRequest initializer predates the test-only
post_walk_gate field this branch adds; the scanner test target did not
compile. Fill the default so the merged head builds.

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-18 00:25:02 +08:00
Hauser aeae6f9980 fix(ecstore): reclaim rollback backups after object heal (#8641)
* fix(ecstore): reclaim rollback backups after object heal

Retire only the backup returned by a successful, fenced heal publication.
Keep child keys, live data directories, and delete recovery evidence safe.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): retain heal cleanup ownership through cancellation

Forward publication and repair key owners to the existing owned delete
executor so local unlink cannot outlive its exact-key serialization.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-18 00:03:00 +08:00
Hauser f64cb816db fix(scanner): preserve checkpoint progress across object failures (#8642)
Separate completed traversal from persisted object health debt so leader
handoffs reuse healthy subtrees and retry failures without losing progress.
Fence old readers with a new receipt digest domain and preserve exact
accounting under diagnostic eviction, compaction and punctuation ordering.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-17 23:33:47 +08:00
Hauser 816e18f2c8 fix(filemeta): read large metacache records incrementally (#8640)
* fix(filemeta): read large metacache records incrementally

Replace the aggregate 16 MiB guard with fallible chunked growth so
versioned xl.meta records remain listable without trusting length prefixes.
Discard skipped payloads with a bounded buffer and distinguish truncated
records from compatible empty or between-entry EOF.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(filemeta): remove redundant metacache reader copies

Track the returned entry with a boolean instead of cloning its metadata,
decode object names directly from the borrowed slice, and derive the read
position from buffer length. Preserve scratch reuse, exact output capacity,
wire framing, and sticky corruption errors.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-17 23:25:21 +08:00
Chris e98992bb87 docs(release): add post-release advisory reconciliation (#8639)
* docs(release): add post-release advisory reconciliation

* docs(release): remove hard wraps from advisory guidance
2026-10-17 22:01:08 +08:00
cxymds ce0c532740 fix(lifecycle): reject expiry from stale policy snapshots (#8637)
* fix(lifecycle): reject expiry from stale policy snapshots

* fix(lifecycle): keep expiry snapshots behind domain boundary

* test(ecstore): fix lifecycle fixtures without test-util
2026-10-17 21:45:30 +08:00
Chris 3defc19d5e fix(ci): refresh E2E selection and isolate disk lock probes (#8638)
* fix(ci): include the baseline writer test in full E2E selection

* fix(ci): reserve capacity for short-deadline disk lock probes
2026-10-17 21:04:04 +08:00
cxymds b1f3ebb184 fix(ecstore): converge partial pool identity writes (#8636)
* fix(ecstore): converge partial pool identity writes

* fix(ecstore): bound pool metadata CAS future state
2026-10-17 20:45:49 +08:00
唐小鸭 b40f1e5fab fix(utils): harden Win32 volume probes and flag Windows network drives (#8631)
* fix(utils): NUL-terminate and extend paths passed to Win32 volume APIs

`get_volume_name` returned the volume root truncated at its NUL and the
result was then passed to `GetVolumeInformationW` as a PCWSTR, an
out-of-bounds read. The disk-space and volume APIs also received the
caller's raw path, so they failed beyond MAX_PATH, and a UNC share root
lacked the trailing backslash these APIs require.

- Wrap every Win32 path in a NUL-terminated `WidePath` that rejects
  interior NULs; volume roots returned by `GetVolumePathNameW` keep
  their terminator.
- Convert inputs to the extended-length `\\?\` / `\\?\UNC\` form after
  `GetFullPathNameW` normalization, and give directory queries a
  trailing backslash.
- Query `GetDiskFreeSpaceW` and `GetVolumeInformationW` on the volume
  root as documented; size buffers to the documented MAX_PATH + 1 or
  the input length.
- Report Win32 error codes instead of raw HRESULTs so `ErrorKind`
  matches `std::fs`.
- Keep volume ids in their conventional `C:\` / `\\server\share\` form.

Add Windows-only `os::` tests for long directories, UNC share roots and
non-empty fstype, and run them in the Windows filesystem workflow.

* fix(utils): report Windows network volumes to the fs guard

Windows names the server's filesystem (usually NTFS) for SMB shares, so
the startup unsupported-filesystem guard, which matches fstype names
such as cifs or smb2, never fired for UNC paths or mapped drives.

- Add `DiskInfo::remote`. On Windows it is set when the directory handle
  answers `FileRemoteProtocolInfo` (only network redirectors do, and the
  handle follows symlinks and junctions to their target) or the volume
  root's `GetDriveTypeW` is `DRIVE_REMOTE`. Unix keeps it false because
  the client fstype already names network mounts.
- Treat remote volumes as unsupported in the startup guard and label
  them "<fstype> on network share".
- Cover UNC shares, paths beyond MAX_PATH below a share, a directory
  symlink to a share and a `net use` mapped drive with Windows-only
  `os::` tests that skip when `\\localhost\<drive>$` is unreachable;
  the Windows filesystem workflow maps the drive before running them.

* chore(deps): replace yanked inout 0.2.3 with 0.2.4

cargo-deny's advisories check rejects the yanked inout 0.2.3 that main's lockfile pins, failing every open PR. Lockfile-only patch bump.

* fix(utils): detect network targets from the final NT path

On the Windows runner, a directory symlink to \\localhost\C$ was reported as local: FileRemoteProtocolInfo did not identify it, and the volume root of the link is a fixed drive.

Also treat a handle whose final NT path (GetFinalPathNameByHandleW with VOLUME_NAME_NT) lies under \Device\Mup\ as remote; the Multiple UNC Provider fronts every UNC and mapped-drive target. The tests now assert the handle probe on its own for local and share paths and report both signals when it disagrees.

---------

Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-10-17 19:10:09 +08:00
唐小鸭 276cb24e26 fix(ecstore): share cache and lock identity across Windows key aliases (#8635)
* fix(ecstore): share metadata cache identity across Windows key aliases

Windows disks treat `\` as a path separator and `path_join_buf` drops the
empty segments that leaves, so `a\b`, `a\\b`, `\a\b` and `a\b\` all
address the xl.meta of `a/b`. The GetObject metadata cache keyed and
hashed the raw spelling, so DELETE `a\b` retired nothing cached for
`a/b`: GET/HEAD `a/b` kept returning the deleted object for up to the
2s cache TTL.

Fold the object name into the same segment form the disk resolves to
before computing the cache hash, key and lookup key. Off Windows the
name stays verbatim and borrowed, so `\` remains an ordinary key byte.

* fix(ecstore): serialize Windows backslash key aliases on one namespace lock

Windows disks treat `\` as a path separator and drop the empty segments
it leaves, so `a\b`, `a\\b`, `\a\b` and `a\b\` all address the xl.meta
of `a/b`. Namespace locks keyed the raw spelling, so writes, deletes and
heals through different spellings ran concurrently on one xl.meta and a
read-modify-write in rename_data could drop a version.

Fold the object name into its disk identity (rustfs_utils::path::
object_name_disk_identity, a no-op off Windows) wherever a namespace
lock key is formed:
- SetDisks::new_ns_lock, which every object lock path goes through;
- the batch delete lock request and its dedup/lookups, which build
  ObjectKeys directly.

Two consumers compared lock identities by spelling and follow along:
- WriteCommitGuard records the folded key from the lock resource, so
  matching a borrowed guard now folds the target name too;
- CopyObject holds the source read guard until EOF on streaming reads.
  `a\b\` -> `a/b` is not a same-object copy by path_join_buf, but shares
  one lock, so it now takes the self-copy lock instead of waiting on
  itself until the lock timeout.

Distributed lock keys are folded by the requesting node only; lock
servers compare them verbatim.

* refactor(ecstore): key the metadata cache by the shared disk identity

The metadata cache fix carried its own copy of the Windows backslash
folding rule. Use rustfs_utils::path::object_name_disk_identity, which
namespace locks already use, so cache and lock identities cannot drift.

* ci(windows): run filesystem tests when key identity rules change

The Windows backslash folding for object names lives in utils path.rs
and is consumed by the namespace lock and write commit guard; run the
windows_ tests when any of them changes.
2026-10-17 18:06:29 +08:00
cxymds 508caab281 fix(lifecycle): skip empty delete replication tasks (#8628)
* fix(lifecycle): skip empty delete replication tasks

* test(lifecycle): route replication hooks through the sink

* test(e2e): make upgrade write readiness checks deterministic

* fix(deps): replace yanked inout 0.2.3 with 0.2.4
2026-10-17 17:15:37 +08:00
唐小鸭 776cdc517b fix(ecstore): keep Windows disk roots out of verbatim form (#8633)
* fix(ecstore): keep Windows disk roots out of verbatim form

The disk root comes from GetFinalPathNameByHandleW, which returns a
verbatim path. `simplified` only strips `\\?\C:` below MAX_PATH, so a
data directory past 260 characters (or one reached through a UNC share)
kept the prefix. Disk IO extends the root by joining `/`-separated
relative paths as strings (`read_raw` builds `<object>/xl.meta` with
`path_join`), and inside a verbatim path `/` is not a separator: the
first metadata read, pool.bin.identity, failed with ERROR_INVALID_NAME
until startup gave up.

Add `rustfs_utils::non_verbatim`, which strips the disk and UNC verbatim
prefixes without a length limit while still keeping paths whose
components Win32 would rewrite, and use it for the publication root.
std re-adds the extended-length prefix for long paths.

Cover a root past MAX_PATH with a disk-level read/write test and run all
`dunce::` tests in the Windows filesystem workflow.

* fix(ecstore): query Win32 volume APIs with extended long disk roots

A disk root past the legacy limit used to reach `rustfs_utils::os` in
verbatim form, which the Win32 volume APIs accept. Now that the root
stays non-verbatim, GetDiskFreeSpaceExW rejected it with
ERROR_PATH_NOT_FOUND and LocalDisk::new failed in the Windows filesystem
workflow. Pass long roots to `get_info` and `get_physical_device_ids` in
extended-length form; shorter roots stay unchanged so reported volume
identities keep their `C:\` form.
2026-10-17 17:04:21 +08:00
cxymds 8dd399cd58 fix(lifecycle): compact inline versions once per deletion batch (#8634) 2026-10-17 16:16:30 +08:00
唐小鸭 353e67bbf3 fix(ecstore): resolve Windows drive paths in URL endpoints (#8629)
On Windows, URL endpoints such as http://host:9000/C:/data{1...4} (the only
form multi-node and pool-expansion layouts accept) produced the disk path
`/C:/data1`: `try_from` stripped the synthetic slash, but `Url::set_path`
put it back, and `get_file_path` only removed it for `file` endpoints.
Windows resolves `/C:/data1` as an invalid `C:` component under the current
drive, so disk validation and `resolve_local_disk_root` failed.

- `get_file_path` now restores `/X:/...` to `X:/...` for every scheme on
  Windows; URL paths without a drive (`/export1`, `/C:foo`) are unchanged.
- UNC shares (`\\nas\share\d1`, `//nas/share/d1`, `\\?\UNC\...`) are rejected
  with an explicit error instead of becoming a file URL whose host is the
  share server and whose path drops the share name.
- A drive root (`http://host:9000/D:/`) is accepted in URL form, matching
  the path-style `D:\` endpoint that was already accepted.
- The "distinct physical disks" error explains on Windows that directories
  on one volume share a device identity, alongside the existing
  RUSTFS_UNSAFE_BYPASS_DISK_CHECK hint.
- The Windows filesystem lane now runs on layout changes and runs the
  layout::endpoint:: tests; new Windows tests carry the windows_ prefix.
- Document Windows endpoint forms, the same-volume check, and the SNSD
  expansion limit in cluster-lifecycle-operations.md.
2026-10-17 16:06:37 +08:00
唐小鸭 78ea655d87 fix(startup): drive startup on an explicitly sized thread (#8630)
`run_process` called `block_on(async_main())` on the native main thread,
so the whole startup chain ran on whatever stack the platform hands the
main thread: 8 MiB from `ulimit -s` on Linux and macOS, but the 1 MiB PE
default on Windows. A Windows debug build overflowed before it listened.
`RUST_MIN_STACK` does not reach the native main thread.

Run the runtime on a `rustfs-main` thread with an explicit 8 MiB stack,
keeping the budget Linux and macOS already had and making it independent
of the linker, toolchain (msvc/gnu) and `ulimit`. Panics are re-raised
on the main thread so the exit status is unchanged.

Measured on macOS arm64 by lowering the main-thread stack with
`ulimit -s` before this change: debug startup overflows at 1792 KiB and
reaches /health/ready at 2048 KiB; release overflows at 512 KiB and is
ready at 768 KiB. After it, debug starts with a 256 KiB main thread.

Add a Windows `Startup Smoke` job that builds the debug server, runs
`--version`, and waits for /health/ready on a single volume.
2026-10-17 16:06:19 +08:00
唐小鸭 5efae5baa6 fix(ecstore): unify object key admission for Windows hosts (#8632)
* fix(ecstore): admit CopyObject destinations like PutObject

Object-key platform checks were split across call sites with gaps:
CopyObject only ran check_bucket_and_object_names on its destination and
then reached the pools' put_object directly, so it admitted keys PutObject
rejects (over 1024 bytes, leading slash, and on Windows reserved characters
or unaddressable segments, the "writes but cannot be read" case of #3449).

- rustfs-utils: expose check_windows_file_name as the single per-segment
  Win32 rule set; dunce's simplified() reuses it. Reserved device names now
  include COM/LPT with superscript digits and CONIN$/CONOUT$.
- ecstore: replace the duplicated reserved-name table with that function;
  Windows also rejects control characters 0x01-0x1F (NUL keeps its
  platform-independent ObjectNameInvalid answer).
- ecstore: add check_new_object_args as the shared admission entry for
  PutObject, cross-key CopyObject destinations and CreateMultipartUpload.
  In-place copies (metadata replace, restore) keep the copy-only check so
  existing keys stay rewritable. CreateMultipartUpload now also rejects
  over-NAME_MAX segments up front instead of failing at completion.
- CI: run bucket::utils and dunce tests in the Windows filesystem job.

* fix(ecstore): reject new backslash keys on Windows hosts

A Windows disk treats '\' as a path separator, so a new key `a\b` lands on
the same xl.meta as `a/b` and the two keys overwrite each other.

Reject '\' only where a key enters the namespace (check_new_object_args:
PutObject, cross-key CopyObject destinations, CreateMultipartUpload) and
only on Windows. Reads, deletes, in-flight multipart operations, in-place
copies, data movement and internal meta buckets keep accepting it, so keys
already stored with '\' stay readable, deletable and movable.

Pending owner ruling: whether new '\' keys should be rejected at all, and
whether reads/deletes should keep accepting them.

* ci(windows): quote filtered test runs and drop duplicate path
2026-10-17 15:53:16 +08:00
Henry Guo 8110ab2893 fix(admin): preserve dirty usage over observed snapshots (#8627)
fix(data-usage): retain dirty counts over observations

Preserve unreconciled local mutations when an observed snapshot completes later. Add focused selection-to-overlay regressions for writes, deletes and authority boundaries.

Validation checkpoint: the pre-fix regression failed as expected. Post-fix tests, formatting and runtime verification were not run before the user stopped the task. This local commit is not ready for publication.
2026-10-17 15:10:11 +08:00
Ramakrishna Chilaka 59ea8bf8ce fix(s3): return 412 for conditional multipart uploads on existing keys (#8625) 2026-10-17 14:09:04 +08:00
Henry Guo 749a1686aa feat(table-catalog): plan maintenance on durable backing (#8567)
* feat(table-catalog): plan maintenance on durable backing

* test(table-catalog): bootstrap strong planning handler fixture
2026-10-17 12:06:02 +08:00
Chris 6db3158740 fix: resolve clippy warnings from Rust 1.99 lints (#8619)
- Combine identical if-block arms in runtime_sources.rs (clippy::if_same_then_else)
- Allow redundant_locals for cfg-gated closure captures in metadata_read.rs and read.rs
- Remove needless borrow in upgrade_compatibility_test.rs (clippy::needless_borrows_for_generic_args)
2026-10-17 11:46:33 +08:00
Henry Guo c07a5d292c fix(connect): retain bounded object cleanup diagnostics (#8624) 2026-10-17 10:57:39 +08:00
Chris 00d1f6ead2 chore(release): align installation references for 1.0.2 (#8617) 2026-10-16 23:19:34 +08:00
Henry Guo adfe60ec7d fix(connect): prepare profile fixtures before timed IPC (#8616) 2026-10-16 23:16:19 +08:00
Henry Guo a5c6f6195e fix(scanner): retain partial progress without a usage update (#8612) 2026-10-16 21:05:33 +08:00
Ramakrishna Chilaka ec0208480e fix(ecstore): publish delete rollback files via verbatim-safe rename (#8607) 2026-10-16 20:04:44 +08:00
唐小鸭 62b6b6149c fix(ecstore): publish delete rollback backups past Windows MAX_PATH (#8606)
tempfile's Windows `persist` passes the raw paths to MoveFileExW and
SetFileAttributesW, bypassing std's extended-length handling. Once
`<object>/<rollback>/xl.meta.bkp` reached 260 UTF-16 units every delete
of that key failed with 500, while PUT and GET kept working.

Add `rustfs_utils::extended_length_path`, which normalizes a path with
GetFullPathNameW and prefixes it with `\\?\` (or `\\?\UNC\`), and use it
for the staging directory and destination handed to tempfile. Cover the
single and batch delete paths with a deep-key regression test and run the
helper's Windows assertions in the Windows filesystem workflow.

Fixes #8545
2026-10-16 16:16:32 +08:00
唐小鸭 741de6f81c fix(replication): locate encrypted replicas without comparing ETags (#8602)
Since 1.0.2 an encrypted object's ETag is a keyed fingerprint, not the
plaintext MD5. A target that computes its own ETag (AWS S3, Wasabi) never
reports it, so every "find the existing replica by exact ETag" step missed
encrypted objects on targets that mint their own version ids:

- a heal / MRF re-drive after a lost PUT response wrote a second version;
- an existing-object resync re-PUT a replica its ledger already named
  (the ledger-located HEAD was confirmed by ETag only), and on the AWS
  400 shape the ledger was not consulted at all;
- resync verification counted such replicas as failed;
- a ledger-less version purge reported the replica as already gone.

Encrypted sources now recognise their replica by shape: the byte count the
replication PUT sent (plaintext for managed SSE, ciphertext for SSE-C) and
a target write time no earlier than the source version. An ETag match
still wins (RustFS/MinIO targets). The ledger is consulted first on both
the 404 and the AWS 400 shape. Without a ledger, only a unique shape match
among the unclaimed ListObjectVersions candidates is adopted and recorded;
several shape matches mean re-PUT for convergence and a refused purge. The
AWS current-version fallback stays ETag-only, and a listing the
target refuses on the 400/403 shape keeps that fallback (re-PUT) rather
than stalling. An unversioned target's `null` version is never matched by
shape: it holds whichever generation was written last. Plaintext sources keep exact
ETag identity.

Builds on the ETag-computing fake target mode and the ComputesOwnEtags
matrix row from rustfs#8583. Adds an SSE-S3 variant of the mint-own-ids
re-drive test (red before this change: the heal left two target versions),
and both variants now also assert the purge.
2026-10-16 13:44:33 +08:00
Chris f5ff8783f4 fix(ecstore): box large enum variant in CurrentDeleteGeneration (#8576) 2026-10-16 13:11:49 +08:00
cxymds 12ae143bee fix(quota): keep writes available with a degraded fleet (#8604) 2026-10-16 13:05:20 +08:00
cxymds 628663f468 fix(heal): recover replacements after pool removal (#8600)
* fix(heal): recover replacements after pool removal

* test(e2e): gate upgrade probes on writable baseline nodes

* test(e2e): register baseline readiness regression in smoke digest
2026-10-16 12:08:29 +08:00
唐小鸭 d457378c02 feat(scanner): decouple bucket walkers from disk count (#8539)
* fix(scanner): treat replication status writebacks as status-class hits

A replication status writeback (persist_replication_state_if_current in
Update mode, including the heals the scanner queues during its own walk)
marked the bucket dirty on the namespace path: it advanced the dirty-usage
generation, woke the scanner, reached the durable dirty journal and
entered the activity snapshot. Any replicated bucket therefore made every
scanner cycle Superseded, the authoritative usage baseline was never
certified and usage freshness stayed stale for as long as replication ran
(#8375).

The writeback is now status class: record_status_class_mutation records
only the process-local producer coverage bit and nothing else. There is
no rescan queue for it, because a deployment with an active replication
rule already walks every bucket on every cycle
(ScannerMaintenanceFeatures::needs_regular_cycle) and that walk refreshes
replication_stats. The routing lives in a named, unit-tested function in
rustfs/src/storage/storage_api.rs; tier-expiration cleanup removes data
and stays on the namespace path.

No persisted format, protocol, admin API or configuration changes.

This is phase 1 of docs/architecture/scanner-per-bucket-convergence.md,
which this change adds together with its index entry.

Refs #8375, #8494, rustfs/backlog#2816.

* fix(scanner): refresh replication statistics during maintenance

Refresh compacted prefixes and completed bucket caches during replication maintenance. Bind set execution reuse to the observed replication statistics so a same-cycle retry cannot restore older counters.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): avoid expanding the legacy S3 DTO surface

Decode the existing replication configuration type from a JSON fixture instead of adding direct S3 DTO references to a new file. Preserve the compacted-prefix and same-cycle assertions and the footprint ratchet.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(scanner): keep raw enumeration bookkeeping linear per entry

The page writer inserted into its building page with a push-and-sort on
every entry and committed each page through a clone. Insert in sorted
position and move the committed page into the index instead.

Add a regression test that records 20,000 entries in one prefix and pins
the cost to one hash per entry and well under a second, so the quadratic
re-normalization removed by #8114 (rustfs#8113) cannot return once pacing
builds on this walker.

* feat(scanner): decouple bucket walkers from disk count

Add the scanner key walkers_per_disk (RUSTFS_SCANNER_WALKERS_PER_DISK,
1 through 16, default 1). Each local coordinator disk of a set spawns that
many bucket walkers; remote disks keep one. The walker count is what
max_concurrent_disk_scans caps and the disk count stays the floor.

The walkers of one disk share its scanner admission through
LocalDiskAdmissionShare: the first walker to start a bucket takes the
per-disk permit and the last to finish releases it, so a peer's remote
request still sees one scan session per physical disk. Without the share
the second walker was rejected as busy and retired.

The disk_concurrency_budget log line reports walkers_per_disk, walkers and
the reason for the effective limit. The default stays 1 because no local
disk reports rotational media today; the design keeps a higher flash
default as the intent.

* docs(scanner): document walkers_per_disk in the Helm chart and configuration manuals

RUSTFS_SCANNER_WALKERS_PER_DISK was only described in the scanner runtime
controls table. Add it to the Helm chart (values, configmap rendering,
README table, template test), the configuration crate's environment
reference with operator guidance, and a short section in the operations
manual on when to raise it and how to confirm it took effect.

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-16 11:15:45 +08:00
cxymds e76cb67e93 fix(lifecycle): read exact object versions after writes (#8601)
* fix(lifecycle): read exact object versions after writes

* test(lifecycle): respect ECStore dependency boundaries
2026-10-16 11:09:55 +08:00
Hauser 8c8c74cbc3 fix(ecstore): unify bounded delete recovery across upgrades (#8594)
* fix(ecstore): complete delete recovery across upgrades and restarts

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): expect typed quorum error after delete rollback

Assert the exact InsufficientWriteQuorum bucket and object instead of the removed Io wrapper, retaining the rollback and cleanup ownership checks.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-16 11:09:50 +08:00
Hauser 9d85d21ee6 chore(deps): refresh workspace dependencies (#8597)
* chore(deps): refresh workspace dependencies

Run cargo update and cargo upgrade twice from origin/main.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(deps): pin Pulsar 6.9.0 until recovery is bounded

Keep Pulsar on 6.9.0 after reproducing background recovery and lookup activity after delivery timeout and target destruction in 6.9.1. Use an exact requirement to prevent a later cargo update from selecting the affected release.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-16 09:54:58 +08:00
Hauser 4e9b3818eb test(s3-select): fix schema reference field ordering (#8599)
Enable preserve_order for the Arrow JSON schema reference in tests and verify first-seen field ordering across nested records.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-16 09:12:37 +08:00
overtrue f0b584d61a fix(ci): stop PRs for sync conflicts 2026-10-16 08:06:27 +08:00
Chris d0fec44808 test(e2e): send the quota batch delete in verbose mode (#8589)
Since #8535 DeleteObjects honours Quiet=true the way S3 does and omits the
successful entries from the response, so the quota batch-delete test has
been asserting two Deleted entries against an empty list on every main run.
The test only needs the batch to succeed and free quota; make it verbose so
the existing assertion holds and check that no entry failed.
2026-10-16 06:07:29 +08:00
唐小鸭 b4f58b81cf test(e2e): gate the rc.5 baseline restarts on drive re-admission (#8595)
* test(e2e): gate the rc.5 baseline restarts on drive re-admission

The mixed-version rolling upgrade failed three times on unrelated branches
with `MultipartAcknowledgementDeadline { node: 2, key: "one-current-node/..." }`.
The baseline kills the next rc.5 node about 10 ms after the previous one
reports ListBuckets, while that node is still replaying its startup traffic.
Two failed operations drop the peer's drive to Offline on the pinned release,
and only the 2 s recovery probe brings it back three successes later. In both
failing runs node 2 held node 3's drive as `faulty` when the multipart load
started three seconds later; it then committed every upload at three of four
drives with a heal per object, and on a two-vCPU runner one upload exceeded
the 30 s acknowledgement budget. The green run on the same branch only
reached `suspect`. An all-rc.5 cluster reproduces the same degradation after
the same restart sequence and an all-current cluster shows none of it.

Write a slash-free probe object before the first restart and, after each
baseline restart, block until every node reports all four drives of that
object as `ok` through a dry-run object heal. `storageinfo` and `info` only
carry each node's local drives; the object heal runs on the receiving node and
classifies a short-circuited remote drive as `faulty`. The gate stays in the
all-rc.5 baseline: admin heal first probes every peer's heal-control
capability, and a mixed-version cluster fails that probe on both binaries.

Record every node's lock table in `mixed-multipart-failure.json`; the stalled
writer is a previous-release node whose table the current node cannot show.
The 30 s budget, layout, load and assertions are unchanged.

* test(e2e): probe drive re-admission with a parity-0 write per node

The dry-run heal gate observed only node 0: the pinned rc.5 admin heal
forwards start and status requests to the heal-control coordinator whatever
node receives them, so the loop checked node 0's drive handles four times
and never the restarted peers' handles.

Run the cluster with `RUSTFS_STORAGE_CLASS_RRS=EC:0` and probe each node
with a reduced-redundancy PUT instead. A parity-0 write on the four-drive
set needs all four drives (`write_quorum = data_drives`), so the PUT fails
with 503 `ServiceUnavailable` until the serving node writes through every
one of its own drive handles. The probe is plain S3 and executes on the
receiving node on both binaries, so the gate now also runs before each
mixed-version load and after the last upgrade. Standard-class objects keep
the default layout.

`parity_zero_write_needs_every_drive` pins the premise on the workspace
build: with one node down a standard write still commits, the
reduced-redundancy write fails with 503, and the gate converges once the
node returns. The diagnostic snapshot test now checks the per-node lock
probe array.
2026-10-16 05:03:31 +08:00
cxymds 7682a12b58 fix(rebalance): wait for readiness and admit peer workers (#8570)
* fix(rebalance): avoid contention when peers join the same run

* fix(rebalance): wait for fleet proof during initialization

* test(rebalance): check contextualized competing run errors

* fix(rebalance): retain typed worker admission lock errors

* test(rebalance): retry the init readiness 503 and pin the retry error shape (#8586)

The e2e harness only retried the pre-fix 500 carrying the fleet-proof
marker; the init stage now answers 503 + Retry-After after its own
readiness budget, so start_rebalance treats that as the same wait. The
missing-proof regression also asserts the typed error shape that the admin
handler's retry predicate depends on, not only the rendered message.

---------

Co-authored-by: Chris <anzhengchao@gmail.com>
2026-10-15 17:12:26 +00:00
cxymds 65f30bd5c1 fix(multipart): retain commit guards across request cancellation (#8571)
* fix(multipart): retain commit guards across request cancellation

* fix(multipart): preserve commit task error context

* fix(multipart): reclaim verified orphan upload staging (#8572)

* fix(multipart): reclaim verified orphan upload staging

* fix(multipart): share orphan guards across matching lock domains

* fix(multipart): preserve orphan cleanup task error context

* fix(ecstore): box guarded delete transition identity

* fix(multipart): keep NoSuchUpload when orphan recovery cannot prove absence (#8587)

Recovery is a side path of an idempotent Abort. An offline disk, lock
contention, partially overlapping lock domains or unreadable bucket
metadata all stop the staging-absence proof before any deletion; those
used to propagate as 503/500, where the base answered NoSuchUpload. They
now keep that answer and delete nothing; only failures inside the
deletion task remain request failures, because a retry can finish them.

---------

Co-authored-by: Chris <anzhengchao@gmail.com>
2026-10-15 17:05:48 +00:00
Hauser 7462c25319 feat(diagnostics): port read attribution to main (#8579)
* feat(diagnostics): attribute storage reads to request origins

Port the diagnostics instrumentation from its experiment base onto main
without carrying the base branch's unrelated changes.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(diagnostics): consolidate read context scopes

Keep caller and entry provenance in one task-local context, combine the object-read scope, and classify source paths without allocating.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-16 01:02:03 +08:00
Hauser 1c663b8207 fix(rpc): clarify stale epoch rejection diagnostics (#8585)
Read the connection peer address using the stored extension type and distinguish retryable stale epochs from terminal signature errors. Cover diagnostics and authenticated ReadAll recovery without changing replay protection.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-16 01:01:45 +08:00
cxymds cb2dfec17e fix(ecstore): merge migrated copies across inline layouts (#8588) 2026-10-16 01:01:10 +08:00
Hauser c1f906d128 fix(ecstore): quiet routine admin info timing logs (#8584)
Replace unconditional stage warnings with one trace-gated, monotonic
completion summary. Preserve topology and RPC failure diagnostics.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-16 00:26:59 +08:00
唐小鸭 b08331335a test(replication): cover SSE-S3 replicas on ETag-computing targets (#8583)
The outbound target matrix only modeled targets that adopt the forwarded
source ETag, so the post-PUT replica ETag audit was never exercised against
a target that computes its own ETag (AWS S3 and most compatible stores),
and no matrix shape was encrypted. That gap let the SSE-S3 "replica etag
mismatch" regression fixed in #8573 ship unnoticed.

Add an ignore_source_etags mode to the fake S3 target, a ComputesOwnEtags
matrix row that uses it, and an SseS3 object shape (the source runs with the
local KMS). The shape asserts its source ETag is not the plaintext MD5 so
the cell cannot pass vacuously. Against a build without #8573 the new row
fails exactly computes-own-etags/SseS3 with "replica etag mismatch"; with it
the whole matrix passes.

Also correct the #8573 docs and comment that called the replication PUT
checksum the integrity check for encrypted sources: managed-SSE sources
forward no checksum, so their replicas have no post-PUT content audit.
2026-10-16 00:07:54 +08:00
Hauser aae5cc4919 fix(scanner): persist partial progress after budget cancellation (#8578)
* fix(scanner): persist partial progress after budget cancellation

Separate progress-only cycles from observational and authoritative usage
updates. Keep peer movement leases alive under the parent cycle context
for a bounded drain after the scan budget stops the walk, while preserving
the existing strict publication fences for emitted usage updates.

Skip root rename fences and the usage persister when no update was emitted.
Cover real lease admission, cancellation, bounded retries, and durable
partial-cycle advancement without usage publication or dirty acknowledgement.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(scanner): consolidate publication policy and ownership

Classify emitted updates directly in the publication plan constructor and
exercise that single policy from the namespace-admission tests.

Share the parent cancellation state for read-only progress proof checks
and move the one-use root fence into the persister, avoiding a child token
allocation and a JSON string copy without changing lease or commit rules.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-15 23:27:26 +08:00
Chris 69e987b4de fix(ecstore): box the transition payload of CurrentDeleteGeneration (#8581)
`cargo clippy --all-targets -- -D warnings` fails on main since #8535:
`CurrentDeleteGeneration::Present` carries a `CurrentDeleteTransition`
(three Strings, an Option<String>, a 32-byte identity and two small
fields, ~211 bytes) while `Absent` carries nothing, which trips
clippy::large_enum_variant. The workflow only runs clippy on pushes to
main (`if: github.event_name != 'pull_request'`), so the PR CI stayed
green and main's CI has been red since 606d8a3a.

Store the transition behind a Box so the enum is pointer-sized plus the
small fields. The value is transient ("never persisted in object
metadata") and its serde form is unchanged, because serde treats Box<T>
transparently; PartialEq/Clone/Debug derive through it. The two tests
that matched the struct through the Option now bind the Box and check
the same fields in a guard.


Claude-Session: https://claude.ai/code/session_01CezCdjE9AdShFUi9tNk797

Co-authored-by: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-15 22:48:01 +08:00
Chris 7a32ca2adb fix(replication): skip the replica ETag audit for encrypted sources (#8573)
New encrypted writes store a keyed HMAC fingerprint as the object ETag
(docs/operations/encrypted-etags.md). Replication forwards that ETag on
x-rustfs-source-etag, but a target that computes its own ETag (AWS S3 and
most compatible stores) answers the plaintext PUT with the MD5 of what it
received. Both values are 32 hex characters, so verify_single_part_replica
treated the fingerprint as a comparable MD5 and failed every single-part
SSE-S3 / SSE-KMS replica with "replica etag mismatch"; MRF and resync then
retried the object forever. RustFS and MinIO targets adopt the source ETag
and were unaffected.

Exempt sources whose stored ETag cannot describe the wire bytes: any
managed-SSE or SSE-C source, decided by the existing replication
source-encryption classifier. The checksum header on the replication PUT
remains the integrity check for those objects; plaintext sources keep the
audit unchanged.


Claude-Session: https://claude.ai/code/session_01CezCdjE9AdShFUi9tNk797

Co-authored-by: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-15 22:01:08 +08:00
Chris d7156290d5 fix(s3): make an unsupported delete participant retryable and explain it (#8574)
A user-bucket delete fans out through the delete-transaction RPC. When a
participant answers Unimplemented (a peer still running a release without
that RPC, or a protocol-version mismatch) the coordinator reports
StorageError::UnsupportedDisk, which had no S3 mapping: clients received a
500 InternalError whose message was the variant's Display text,
"drive does not support O_DIRECT". That text describes the startup drive
probe and sends an operator mid-upgrade after the wrong cause.

Map UnsupportedDisk to 503 ServiceUnavailable with a constant message that
names the protocol-version cause and the remedy (finish upgrading every
node, then retry). The typed source is retained for diagnostics and no
Retry-After is added, since retrying the same node does not help until the
cluster upgrade completes. No request path other than delete recovery
produces this variant; the startup drive probe still fails startup as
before.


Claude-Session: https://claude.ai/code/session_01CezCdjE9AdShFUi9tNk797

Co-authored-by: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-15 21:48:46 +08:00
Henry Guo 6ec1942ba3 fix(data-usage): retain complete totals when a set is missing (#8558) 2026-10-15 19:09:06 +08:00
Ramakrishna Chilaka 606d8a3a8a fix(scanner): clear transient cycle recovery on follower lock contention (#8566) 2026-10-15 18:36:48 +08:00
Hauser 2c2c1133d4 fix(scanner): use observational leases for incomplete snapshots (#8561)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-15 15:49:38 +08:00
Hauser 8a96fedfdd fix(ecstore): retain pool metadata repair ownership (#8552)
* fix(ecstore): retain system metadata repair ownership

Return system metadata convergence failures to the fenced writer after
committed cleanup instead of submitting an unexecutable MRF handoff.
Drain system rename tails before acknowledging and preserve ordinary
incarnation-bound object repair.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(ecstore): separate PUT commit and completion outcomes

Keep committed metadata writes on their retained cleanup owner when the
writer must handle repair. Propagate the completion error at the API
boundary without a duplicate temporary-data deletion or worker wait.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): scope repair completion to pool metadata owners

Keep ordinary system metadata quorum-compatible and explicitly select
owner-observed repair completion for fenced pool metadata CAS writes.
Seed format-heal metadata before injecting the missing-format fault.
Preserve degraded bucket recreation and test all completion modes.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-14 21:02:41 -07:00
cxymds ce00d8f7e5 feat(s3): support conditional bulk deletes (#8535)
* feat(s3): support conditional bulk deletes

* fix(s3): report null marker identity in bulk delete responses

* fix(s3): isolate conditional bulk delete actions and tier guards

* fix(tier): preserve backend identity validation diagnostics

---------

Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-10-14 20:20:14 -07:00
Chris cbd53974f9 test(e2e): wait for heal control before deep heal after restart (#8554) 2026-10-15 07:07:12 +08:00
alpbeysir 65ea7db6a9 feat(iam): support wildcard in IAM policy resources (#8555)
Allow wildcard in IAM policy
2026-10-14 15:58:27 -07:00
Hauser bdc00c8d0d fix(s3): align raw disk-full failures with capacity refusals (#8553)
Map DiskFull through the existing StorageFull S3 response contract instead
of falling back to InternalError. Preserve the typed cause and keep lock
retry advice separate from capacity failures.

Reuse the PUT storage-failure fixture to cover capacity refusals and the
existing read-quorum stages without adding a runtime normalization layer.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-14 10:16:39 -07:00
Hauser 84f7ab1f5c chore(deps): refresh Rustls and TAR parser test crates (#8547)
* chore(deps): update Rustls patch release

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): update TAR parser test crates

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(heal): avoid collecting requests in test

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
2026-10-14 23:23:57 +08:00
Hauser 8b75145a29 fix(s3): preserve catalog lock failures at the error boundary (#8550)
Retain typed retryable catalog lock failures and route S3 publication
errors through the canonical storage conversion for bounded metrics,
public-message redaction, and existing retry advice.

Borrow CAS results for metrics instead of cloning opaque error sources.
Cover authorization under a real publication writer, HTTP serialization,
source preservation, recovery, and established catalog error categories.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-14 23:16:40 +08:00
唐小鸭 c9f88cff66 fix(scanner): treat replication status writebacks as status-class hints (#8509)
* fix(scanner): treat replication status writebacks as status-class hits

A replication status writeback (persist_replication_state_if_current in
Update mode, including the heals the scanner queues during its own walk)
marked the bucket dirty on the namespace path: it advanced the dirty-usage
generation, woke the scanner, reached the durable dirty journal and
entered the activity snapshot. Any replicated bucket therefore made every
scanner cycle Superseded, the authoritative usage baseline was never
certified and usage freshness stayed stale for as long as replication ran
(#8375).

The writeback is now status class: record_status_class_mutation records
only the process-local producer coverage bit and nothing else. There is
no rescan queue for it, because a deployment with an active replication
rule already walks every bucket on every cycle
(ScannerMaintenanceFeatures::needs_regular_cycle) and that walk refreshes
replication_stats. The routing lives in a named, unit-tested function in
rustfs/src/storage/storage_api.rs; tier-expiration cleanup removes data
and stays on the namespace path.

No persisted format, protocol, admin API or configuration changes.

This is phase 1 of docs/architecture/scanner-per-bucket-convergence.md,
which this change adds together with its index entry.

Refs #8375, #8494, rustfs/backlog#2816.

* fix(scanner): refresh replication statistics during maintenance

Refresh compacted prefixes and completed bucket caches during replication maintenance. Bind set execution reuse to the observed replication statistics so a same-cycle retry cannot restore older counters.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): avoid expanding the legacy S3 DTO surface

Decode the existing replication configuration type from a JSON fixture instead of adding direct S3 DTO references to a new file. Preserve the compacted-prefix and same-cycle assertions and the footprint ratchet.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): seed the ordinary-timeout peer fixture under the default drive deadline

The one-second ENV_DRIVE_MAX_TIMEOUT_DURATION in
target_ordinary_timeout_keeps_its_physical_namespace_owner wrapped the
whole test, so the fixture's write_metadata and the final read_version
were bounded by it too. On a loaded CI runner the seed took longer than a
second and the test failed with "seed real metadata: Timeout" before the
paused rename under test ran. Only the rename now runs under the
one-second deadline; the fixture and the tail read use the default.

---------

Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-10-14 23:10:57 +08:00
Chris 9408b90f13 chore(release): prepare 1.0.2 (#8549)
Co-authored-by: Hauser <housemecn@gmail.com>
2026-10-14 22:12:55 +08:00
Hauser 08ac1ec218 fix(s3): advise retry after typed lock timeouts (#8546)
Add a one-second Retry-After hint at the canonical S3 error conversion
only for ServiceUnavailable responses retaining a typed lock timeout.
Keep existing error codes, source chains, and lock budgets unchanged.

Cover actual HTTP/XML serialization, nested causes, private-resource
redaction, and unrelated disk/quorum/text failures. Document the response
contract and the limits of log-count and five-second timeout attribution.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-14 20:52:14 +08:00
cxymds 388d1f17e6 fix(heal): safely recover missing bucket directories by default (#8517)
* fix(heal): safely recover missing bucket directories by default

* fix(heal): allow bound admin recovery before namespace checks
2026-10-14 03:57:09 -07:00
Henry Guo 22c093e66b feat(table-catalog): add opt-in periodic maintenance queueing (#8537) 2026-10-14 03:55:36 -07:00
Chris 24ab34a5ee fix(ci): restore main lint and test reliability (#8543)
* fix(ci): remove needless returns from Linux disk helpers

* fix(test): verify encrypted purge replicas by version body

* fix(test): expire namespace timeout after fixture preparation

* fix(ci): remove remaining needless collection and borrows

* fix(test): wait for active admin heal at interruption checkpoint
2026-10-14 18:28:10 +08:00
Hauser 9068d83400 fix(heal): unblock automatic replacement recovery (#8533)
* fix(heal): unblock automatic replacement recovery

Repair bucket publication directories before adopting survivor delete proofs.
Keep explicit empty-volume removal after proof settlement and preserve the
admitted bucket incarnation for administrator replay.

Discover unfinished intents across every local set and resume the durable
owner with its exact target scope before admitting new sibling replacements.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(heal): route scanner fixtures through the storage boundary

Expose the existing disk-layout bootstrap symbols as test-only aliases in
heal::storage_api and use that boundary from scanner recovery regressions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(heal): index replacement discovery within each scan

Keep a single endpoint-keyed disk inventory with first-snapshot precedence
and deterministic discovery order. Index local target lookups and move
resume state into generation candidates instead of cloning it.

Retain fresh durable reads and the existing conflict and mutation fences.
Cover duplicate disk handles, endpoint uniqueness and discovery ordering.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(heal): retain committed journals in recovery fixtures

Build one certified survivor delete decision for both replacement and
empty-volume removal tests. Clear target contents without moving its root
inode so Linux disk handles observe the same empty target. Drain PUT tails
and assert the proof remains before the real Heal entry.

Expose the existing recovery state through the ECStore disk API for typed
fixture checks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(heal): use server stack for replacement regression

The replacement regression polls the composed Heal future on libtest's
smaller calling-thread stack and aborts before reporting an assertion.
Run it on a bounded 8 MiB test thread and Tokio workers, matching the
debug server's stack budget. Keep all storage and object assertions intact.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-14 17:04:36 +08:00
Hauser 20fc897036 chore(deps): refresh crates and use Pyroscope 2.1.2 (#8540)
* chore(deps): refresh crates and use Pyroscope 2.1.2

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): refresh lockfile

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-14 16:13:57 +08:00
Hauser a86117590c fix(ci): prepare pinned Compose for Connect acceptance (#8531)
* fix(ci): prepare pinned Compose for Connect acceptance

Install the verified Compose CLI through one local action shared by all 11 connected acceptance entry points. Publish only checksum-verified binaries and keep daemon, provenance and timeout gates unchanged.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ci): use daemon-visible Connect temporary inputs

Match the existing official Connect acceptance TMPDIR contract in all 11 real E2E invocations so daemon bind mounts can read generated inputs. Preserve key modes, read-only mounts and cleanup checks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-14 10:42:35 +08:00
Hauser ceb53fef85 fix(ci): select Python 3.14 for Connect acceptance (#8530)
The shared connected preflight uses uuid.uuid7, which is unavailable in older runner Python environments. Select Python 3.14 with the existing pinned setup action in all eleven acceptance callers.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-14 09:02:04 +08:00
Nikita Bakun 4e0ff037ec fix(replication): skip version-addressed marker pre-check on targets that mint their own version ids (#8492)
* fix(replication): skip version-addressed marker pre-check on targets that mint their own version ids

* fix(replication): keep bodiless 403 fail-closed and verify resynced markers on targets that mint their own ids

---------

Co-authored-by: Chris <anzhengchao@gmail.com>
2026-10-13 14:00:54 -07:00
Henry Guo fa0ac13e9b feat(table-catalog): support durable-strong table maintenance (#8523)
* feat(table-catalog): enable durable maintenance control

* fix(table-catalog): revalidate unlocked worker planning

* fix(table-catalog): preserve maintenance state across rename

* fix(table-catalog): fence maintenance reads across rename

* fix(table-catalog): bound scheduler history read fencing

* test(table-catalog): inject loss using the held client lease

* refactor(table-catalog): remove unused metadata log wrapper
2026-10-14 03:54:16 +08:00
Hauser c7848df9a0 fix(build): enforce GNU ABI floor and canonical target metadata (#8524)
* fix(build): pin gnu glibc baseline to 2.31 and report compile target in version metadata

gnu release binaries were built natively on Ubuntu 24.04, embedding
GLIBC_2.38/2.39 symbol references while the RPM/DEB metadata promised
glibc >= 2.31, so Rocky/RHEL 9 (glibc 2.34) could not run them (#8062).
The two linux-gnu legs now build through cargo-zigbuild pinned to the
2.31 baseline (same-arch; zig acts as the linker), with post-build
guards asserting both the embedded version metadata and the highest
referenced GLIBC symbol version, keeping the package declarations
honest.

Version metadata itself now comes from cargo's TARGET cfg instead of
shadow-rs' host stamping, so builds whose host differs from their
target (cross compilation, musl targets on a glibc-hosted toolchain)
report the platform they were compiled for (#8048 follow-up).

The cross toolchain (zig 0.14.x, cargo-zigbuild 0.23.4) is pinned in
the setup action now that it is load-bearing for releases, the build
job gets an explicit matrix-independent name so the connect-*
acceptance workflows keep matching it when matrix fields change, and
the preview-release workflow contract is updated for the TARGET_ARG
build commands.

Fixes #8062
Follow-up on #8048

* fix(build): enforce GNU ABI floor and canonical target metadata

Pin Zig 0.17.0 and cargo-zigbuild, isolate cross-toolchain caches, and
build GNU releases against the declared glibc 2.31 floor. Validate both
release ELF binaries using their loader version requirements.

Generate target metadata once through shadow-rs and check the actual
release version output without adding a parallel metadata facade.

Refs: rustfs/backlog#2824

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(build): reuse GNU release profile across binaries

Switching the CLI back to the default strip profile restarted 419
compilation units after the server build. Keep the profiling build
profile for both binaries, then strip only the CLI artifact.

Retain serial links, server profiling symbols, and post-strip ABI gates.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(build): limit release artifacts to the rustfs server

Build only rustfs in the release workflow and remove the CLI build,
strip, and packaging paths. Preserve GNU profiling symbols and catalog
sidecars, and align strict acceptance archive readers with the new set.

Exercise all six build targets, Linux package checks, and all four
strict acceptance extractors using their actual workflow scripts.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: majinghe <42570491+majinghe@users.noreply.github.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-13 12:00:40 -07:00
Hauser 4502a1f9b0 fix(ci): repair profiling and compact transition test gates (#8526)
* fix(deps): patch profiling dependency for RUSTSEC-2026-0344

Vendor the published Pyroscope package with an object 0.40 dependency and
lock ruzstd 0.9.1. Preserve runtime sources and profiling features, add
bounded decoder regressions, and run the patched package in audit CI.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Signed-off-by: Hauser <housemecn@gmail.com>

* fix(deps): correct vendored pyroscope documentation typos

Correct copied comments and changelog spelling for the repository typo
check, and describe these comment-only changes in the vendor provenance.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Signed-off-by: Hauser <housemecn@gmail.com>

* fix(ecstore): refresh compact transition proof per test case

Install the short-lived homogeneous fleet proof immediately before each
kill-point transaction. Earlier cancellation and recovery work must not
age the next case's writer capability fixture.
Report an early transition result instead of waiting for an unreachable
kill point. Preserve cancellation, remote-owner and payload assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
Signed-off-by: Hauser <housemecn@gmail.com>

---------

Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-13 11:59:59 -07:00
Hauser 93d51d172f fix(server): cancel request watchdogs with response futures (#8528)
Tie watchdog cancellation to response future ownership before the first
poll, and prefer cancellation when the watchdog deadline is also ready.
Preserve completion logging and genuine slow-request warnings.

Add paused-clock regression coverage for dropped, completed, panicking,
and still-pending request futures.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-13 11:19:22 -07:00
Hauser b80590f1a7 perf(heal): index replacement history reconciliation (#8527)
refactor(heal): index replacement generation reconciliation

Reconcile owned records and their definitive sources in one pass. Group claims by target slot and use a shared-anchor fast path while retaining pairwise ambiguity checks.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-13 11:06:21 -07:00
Hauser 025ed4c6d1 fix(heal): preserve retained replacement histories (#8525)
Keep definitive local histories while rejecting ambiguous overlapping peer records.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-14 00:36:33 +08:00
hector 3b428bffef fix(heal): merge disjoint replacement generations in cluster status (#8521) 2026-10-13 08:18:58 -07:00
Hauser da52303f2a fix(server): restore socket peer fallback for client rate limits (#8519)
Read the optional socket peer extension supplied by external ingress so
API and Console client limits remain effective without trusted proxies.
Keep validated client precedence and the existing missing-peer policy.

Exercise the full external stack across HTTP request versions, direct
IPv4/IPv6 peers, forged headers, and distinct trusted proxy clients.
Align API and Console fixtures with the production extension contract.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-13 20:32:27 +08:00
Chris a79c6072f1 fix: suppress clippy too_many_arguments on rename_data_commit_from_observations (#8515)
fix(ecstore): suppress clippy too_many_arguments on rename_data_commit_from_observations

The function takes 9 slice parameters for the renamedata commit phase.
Annotate with #[allow(clippy::too_many_arguments)] to match the existing
codebase pattern for internal multi-slice commit helpers.
2026-10-13 20:31:23 +08:00
Hauser ab512768d5 fix(ecstore): group rename data commit observations (#8516)
Group disk observations into a borrowed struct to keep the commit helper
within Clippy's argument limit without changing quorum snapshot logic.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-13 20:05:36 +08:00
cxymds adf17bbfba fix(heal): reject incomplete administrator bucket discovery (#8512) 2026-10-13 04:12:28 -07:00
GatewayJ fb5c002a30 refactor(iam): encapsulate federated authorization models (#8514) 2026-10-13 03:59:29 -07:00
Hauser 8a94c64934 fix(audit): preserve request identity and verified client address (#8513)
Capture the authenticated request access key when building the audit entry
and preserve it through completion instead of replacing it with root
credentials. Resolve remotehost from validated client context or the
socket peer, and ignore untrusted forwarding headers.

Cover request identities, completion outcomes, client address precedence,
and audit serialization without credential secrets.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-13 18:56:44 +08:00
Hauser 9ca0e9b717 fix(obs): isolate bucket usage dashboards by cluster (#8510)
Keep same-name buckets in independent clusters separate while deduplicating
replicated usage observations. Document the existing scanner-backed exporter
and cover its gauge contract and cluster-scoped queries.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-13 03:00:44 -07:00
Henry Guo bd83bd3f6b fix(table-catalog): allow commits after object-backed rename (#8508) 2026-10-13 17:12:00 +08:00
Hauser 34803e8165 perf(ecstore): isolate cleanup and preserve metadata authority (#8289)
* chore: pin s3s to upstream git revision

Use the upstream s3s git repository at 50c94aeb1e5ea9ef8e7393ef6bbc87b72f6891c6 for both s3s and s3s-sigv4.

Allow the official s3s git source in cargo-deny so source checks continue to pass.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): instrument put object hot path

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): split cleanup worker wait metrics

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* upgrade version

* chore(metrics): add PUT post-store stage probes

Add lightweight PUT post-store stage probes for issue 2615 validation.

* fix cargo deny check warn

* upgrade version

* perf(ecstore): bound and isolate cleanup execution (#8151)

* perf(ecstore): bound and isolate cleanup execution

* fix(ecstore): preserve cleanup cancellation and lease release

* feat(ecstore): default isolated cleanup to CPUs 1-2

* test(ecstore): decouple budget tests from CPU affinity

* upgrade version

* perf(ecstore): reuse pinned directory handles for object I/O

* feat(observability): add sampled local GetObject stage summaries

Add an opt-in GetObject stage aggregation path that works without the
OTLP metrics export. When RUSTFS_OBS_GET_STAGE_LOCAL_SUMMARY_ENABLED is
set, io-metrics keeps per-(path, stage, object class, size bucket)
sampled counts and duration totals in a bounded in-process map, and a
startup task flushes them periodically to
/var/log/rustfs/get-stage-summary.log, tunable via the sample rate and
interval env keys.

* build(deps): bump workspace dependency releases

Patch releases: async-compression 0.4.49, tokio-rustls 0.26.6,
xxhash-rust 0.8.19, suppaftp 12.1.1, russh-sftp 3.0.1. Minor release:
hotpath 0.27.0.

* fix(ecstore): fence distributed metadata cache mutations

Add authenticated cluster-wide mutation fences for the opt-in DistErasure GetObject metadata cache. Guard recursive prefix and batch deletes, fail closed on configuration mismatch or uncertain quorum, and cover replay, restart, peer loss, and mixed-configuration behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(metrics): consolidate PUT observers on improve/base (#8039)

* perf(object): instrument storage hot paths

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(metrics): consolidate PUT stage observation

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>

* build(deps): bump workspace dependency releases

* ci: allowlist rustix OFlags WRONLY in typos config

* refactor(storage): route ecstore symbols through storage_api boundaries

* perf(ecstore): cache quorum-selected early-stop metadata (#8308)

Publish eligible latest-version GET metadata after a validated read quorum
when early-stop cancels the remaining fanout. Keep metadata errors, selection
quorum, online read quorum, and mutation-generation checks as publication gates.
Add slow-peer repeat-hit and concurrent mutation-fence regression tests.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* chore: merge latest main into improve/base (#8332)

* refactor(storage): bind rename rollback to its commit context (#8324)

* refactor(storage): separate metadata scheduling from quorum decisions (#8327)

* test(storage): verify rejected rollback inspection on real disks (#8331)

* test(storage): make commit fault checkpoints independent (#8326)

* test(storage): make commit fault checkpoints independent

* test(storage): simplify commit checkpoint lookup

* fix(listing): count logical prefixes before pagination (#8328)

* fix(listing): count logical prefixes before pagination

* test(listing): normalize the fixed corpus seed

---------

Co-authored-by: Chris <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* perf(ecstore): borrow metadata cache lookup key (#8333)

Avoid request-scoped Arc<str> allocations on eligible cache lookups while preserving full key identity.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* chore: sync improve/base with latest main (#8334)

* refactor(storage): bind rename rollback to its commit context (#8324)

* refactor(storage): separate metadata scheduling from quorum decisions (#8327)

* test(storage): verify rejected rollback inspection on real disks (#8331)

* test(storage): make commit fault checkpoints independent (#8326)

* test(storage): make commit fault checkpoints independent

* test(storage): simplify commit checkpoint lookup

* fix(listing): count logical prefixes before pagination (#8328)

* fix(listing): count logical prefixes before pagination

* test(listing): normalize the fixed corpus seed

* fix(scanner): isolate and coalesce dirty usage journals (#8325)

* fix(scanner): isolate and coalesce dirty usage journals

Bind dirty replay records to a stable node owner so peers cannot overwrite
or delete another node's pending journal. Replace the unbounded command
queue with bounded coalesced state and revision-aware background saves.
Keep legacy records isolated and enforce replay byte limits with conservative
whole-bucket or unverified fallback. Add publication-stage diagnostics and
storage regressions for ownership, clearing, retry, and restart behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): collapse confirmed journal clear condition

Use a let-chain to retain the generation fence before removing a confirmed
bucket and updating its scope byte accounting. Satisfy collapsible_if
without changing journal clearing behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Chris <anzhengchao@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(obs): distinguish metrics by process identity (#8343)

Attach process.pid to the OpenTelemetry resource and promote it for Prometheus
so counter series from restarted processes remain distinct. Preserve the stable
RustFS node and service instance attributes.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* merge: sync origin/main into improve/base (#8345)

* refactor(storage): bind rename rollback to its commit context (#8324)

* refactor(storage): separate metadata scheduling from quorum decisions (#8327)

* test(storage): verify rejected rollback inspection on real disks (#8331)

* test(storage): make commit fault checkpoints independent (#8326)

* test(storage): make commit fault checkpoints independent

* test(storage): simplify commit checkpoint lookup

* fix(listing): count logical prefixes before pagination (#8328)

* fix(listing): count logical prefixes before pagination

* test(listing): normalize the fixed corpus seed

* fix(scanner): isolate and coalesce dirty usage journals (#8325)

* fix(scanner): isolate and coalesce dirty usage journals

Bind dirty replay records to a stable node owner so peers cannot overwrite
or delete another node's pending journal. Replace the unbounded command
queue with bounded coalesced state and revision-aware background saves.
Keep legacy records isolated and enforce replay byte limits with conservative
whole-bucket or unverified fallback. Add publication-stage diagnostics and
storage regressions for ownership, clearing, retry, and restart behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): collapse confirmed journal clear condition

Use a let-chain to retain the generation fence before removing a confirmed
bucket and updating its scope byte accounting. Satisfy collapsible_if
without changing journal clearing behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(storage): retain typed owners across borrowed writes (#8329)

* fix(storage): retain typed owners across borrowed writes

* fix(storage): preserve Copy write completion policy

* refactor(storage): remove redundant write owner references

* fix(ecstore): hide rollback backup residue in prefix listings

* test(connect): isolate short HTTP fixtures in nextest

* fix(protocols): enforce S3 policies for file protocol operations (#8262)

* test(ecstore): enforce main core regression gates (#8338)

* test(ecstore): enforce main core regression gates

* test(ecstore): pin external shards and completion regressions

* fix(test): restore authenticated cluster fault scenarios (#8340)

* fix(test): restore authenticated cluster fault scenarios

* fix(test): use the E2E storage API boundary

* ci: coerce the pool timeout input to a number

timeout-minutes requires a numeric value, but inputs.pool_timeout_minutes
is a string, so '${{ inputs.pool_timeout_minutes || 240 }}' evaluated to
the string '240' and the runner rejected the template: 'An error occurred
when attempting to determine the step timeout ... Unexpected value 240'
(chain run 36505625402 job at 02:25:52, standalone run 36393453114 at
07:46:37). Both pool runs since #8155 merged have therefore executed
without the intended step budget. Wrap the expression in fromJSON and
update the policy test that pinned the broken literal.

* ci: coerce the pool timeout input to a number

timeout-minutes requires a numeric value, but inputs.pool_timeout_minutes
is a string, so '${{ inputs.pool_timeout_minutes || 240 }}' evaluated to
the string '240' and the runner rejected the template: 'An error occurred
when attempting to determine the step timeout ... Unexpected value 240'
(chain run 36505625402 job at 02:25:52, standalone run 36393453114 at
07:46:37). Both pool runs since #8155 merged have therefore executed
without the intended step budget. Wrap the expression in fromJSON and
update the policy test that pinned the broken literal.

* fix(ecstore): own listing workers through cancellation (#8342)

Consolidate the three page collectors, preserve completed worker failures, and abort nested merges when their owner is dropped.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): route commit sync through guarded helper

Use the Linux-capable guarded directory sync entry point for both commit sync sites. This keeps group commit and file-sync admission behavior while ensuring the already-open commit directory remains the sync target.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): expose rename directory guard in production

The commit path now acquires the directory guard in production builds, not only tests, so destination metadata reads and durable sync share the guarded context.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: Chris <anzhengchao@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: GatewayJ <835269233@qq.com>
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>

* fix(ecstore): remove unsafe metadata cache admission paths

Keep distributed GET metadata on quorum reads and quota admission on authoritative storage. Preserve local cache invalidation, remove the experimental RPC surface, and gate diagnostic work.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): cover cold degraded mutation admission

Check first PUT and DELETE with one peer absent and no SDK retries, then verify that losing write quorum still rejects writes.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): retain guarded Linux destination metadata reads

Use the existing commit directory guard when reading old xl.meta on Linux. Cover symlinked destination metadata for inline and non-inline renames without changing the split commit structure.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(test): remove retired cache RPC import

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* merge: sync latest main into improve/base (#8349)

* test: allow cleanup fixture CI headroom (#8336)

* fix(s3): encode multipart listing response keys (#8347)

---------

Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: Chris <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* merge: sync main auth and scanner updates (#8352)

* test: allow cleanup fixture CI headroom (#8336)

* fix(s3): encode multipart listing response keys (#8347)

* perf(scanner): reduce scan and checkpoint peak allocations (#8346)

* perf(scanner): reduce scan and checkpoint peak allocations

* test(scanner): isolate partial commit recovery scenarios

* fix(auth): return ExpiredToken for retained STS credentials (#8344)

* fix(auth): return ExpiredToken for retained STS credentials

Validate session identity independently of credential expiry in both IAM
rejection and claims validation, and preserve typed S3 errors at the caller.
Keep token binding, disabled-account precedence, and service-account behavior.
Add exact expiry, IAM, and HTTP/XML regression coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): synchronize the metadata slowtail hedge regression

Park the slow metadata task at a test-only fault checkpoint and release
healthy reads after the fault is active. Assert the spare response and
cancelled-task drain without imposing a 300 ms disk/scheduler deadline.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ilm): synchronize copy compensation transition stages

Observe automatic compensation reaching the mock tier PUT checkpoint before
waiting for the final metadata commit. Assert forced enqueue failure,
automatic backfill, one completed tier upload, and payload integrity.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: Chris <anzhengchao@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): reject overlapping cleanup schedulers

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): reject overlapping cleanup schedulers

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* docs(ecstore): explain cleanup scheduler conflict

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(metrics): separate GET request and timeout outcomes (#8354)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* docs: refresh security advisory lessons (#8350)

* fix(heal): bound durable MRF rescheduling (#8351)

Reuse stable live-owner proof anchors to avoid duplicate in-flight admission. Pace unverified completions and unavailable attempts with bounded jitter while retaining checkpoints, exact proofs, and generation isolation.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(rustfs): route recovery errors through S3 gateway

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): update workspace dependencies

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(io-metrics): use is_multiple_of for sampling

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): satisfy strict Clippy pagination checks

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(heal): avoid cloning Copy purge identity

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* add ignore .mimosa

* fix(zip): adapt archive readers to zip 9 APIs

Upgrade zip and its required dependencies alongside fallible archive-name handling in log ingestion, report bundles, bucket metadata import, and archive tests. Preserve existing skip and error propagation behavior.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): reuse quorum metadata for body GETs

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ci): align storage test stacks and peer reset classification

Apply the existing bounded ECStore stack setup to the affected cross-crate storage fixtures. Validate conditional-only metadata publication separately from full body-layout cache reuse. Classify typed h2 shutdown resets as unreachable while retaining application, authentication, cancellation, and deadline distinctions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): update workspace dependencies

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): preserve omitted-disk GET recovery

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore: integrate published workspace dependency updates

Preserve the concurrent dependency refresh and retain the typed h2 reset classification and bounded storage-test stack setup.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): preserve snapshot size budget after fallback move

* fix(test): use one barrier for compensation COPY

Let the forced-enqueue helper own the PUT barrier and compensation assertions. Waiting on an outer barrier overwritten by the helper always timed out after the upload had completed.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(ecstore): apply current lint fixes

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): update sha2 to 0.11.1

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: GatewayJ <835269233@qq.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: Chris <anzhengchao@gmail.com>
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: cxymds <cxymds@gmail.com>
2026-10-12 22:07:50 -07:00
cxymds 9af2f7c04e fix(ilm): make missing lifecycle expiry targets idempotent (#8504)
fix(ilm): treat missing expiry targets as success
2026-10-12 20:05:21 -07:00
cxymds 9d6f48c325 fix(s3): match AWS duplicate bucket responses (#8503) 2026-10-12 19:25:12 -07:00
Hauser e7e6556f83 fix(scanner): bound superseded waits for regular maintenance (#8502)
Preserve ordinary lifecycle and replication cadence while retaining
usage-only convergence backoff, explicit cycle floors and publication
fencing. Cover repeated snapshots and the real convergence waiting path.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-13 07:04:27 +08:00
Hauser 0a6aeda191 test(e2e): bound scanner witnesses by the reported schedule (#8501)
* test(e2e): bound scanner witnesses by the reported schedule

Require a fresh completed observed walk and account once for planned
superseded waiting, preserving the active-cycle execution budget.
Cover invalid schedules and early wakeup, and refresh exact platform
selection digests without removing existing tests.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(e2e): refresh nightly scanner budget membership

Record the three scanner budget regressions in both platform nightly
selection digests, preserving every previously selected test.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-12 13:06:42 -07:00
Hauser 0e0f656ae1 test: isolate license and rebalance cancellation fixtures (#8500)
Preserve canonical claim encoding for the signature tamper test and pause the admin cancellation fixture at its existing run fence instead of durable deletion.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-12 10:59:46 -07:00
Hauser a57a3ae51d fix(scanner): reuse observations and expose complete usage (#8498)
* fix(scanner): reuse observations and expose complete usage

Allow superseded retries to reach the existing validated cache planner while
bootstrap remains pending. Serve complete observations in server info without
changing quota authority or dirty acknowledgements.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): route fixture setup through storage boundary

Keep the single-disk scanner fixture on the existing storage_api boundary
instead of importing the ECStore API facade directly.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-12 09:50:59 -07:00
GatewayJ 5d8e143505 fix(admin): add OIDC policy log fields (#8496) 2026-10-12 08:07:46 -07:00
Hauser d6fe5c30ce test(e2e): borrow URLs in internode RPC helpers (#8497)
Pass existing string slices directly to the client constructor to satisfy strict Clippy without temporary allocations.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-12 23:02:02 +08:00
Chris ac6cf8a50d fix(test): discover data dirs by listing instead of info.data_dir (#8495)
The conditional_get_304_uses_metadata_without_decoding_damaged_data test
constructed the data directory path from info.data_dir.to_string(), but
the on-disk directory name may not match the UUID string form. Switch to
iterating subdirectories of the object path (matching the
delete_object_part_shards helper) so the test is robust regardless of
the data_dir naming convention.

Verified: cargo nextest run -p rustfs -- conditional_get_304 → PASS
2026-10-12 23:01:37 +08:00
Hauser a7188a16b4 test(storage): make recovery and upgrade checks deterministic (#8491)
* test(upgrade): separate rc.5 data and candidate query checks

Verify historical fixture bytes before upgrading without requiring the
pinned rc.5 reader to satisfy the candidate's cross-part range contract.
Reuse the complete-body oracle and retain all upgraded range, partNumber,
attributes and replication assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): replace timing races with recovery evidence

Prove no_lock batch progress with the existing cleanup barrier while the
caller retains its guard. Check namespace counters and every drive's
metadata absence rather than using a one-second disk I/O deadline.

Keep durable ILM's manual recovery as the sole tier journal consumer and
verify exact migrated input before retaining the original recovery stats,
receipts and remote-version assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-12 21:17:58 +08:00
Chris 0195732a1f test(ecstore): cover delete cleanup crashes and retries (#8471)
fix(ecstore): preserve retry evidence during delete cleanup

Bind normal cleanup to the coordinator transaction after quorum succeeds, and remove the rollback backup before marked data. Preserve data and markers if backup cleanup fails.

Add deterministic LocalDisk crash and retry regressions plus real four-disk single and batch coordinator coverage. This prevents one post-quorum cleanup window; it does not resolve ambiguous inline or historical residue in #8464.

Co-authored-by: Zhengchao An <overtrue.us@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-12 21:02:03 +08:00
cxymds 0ef133bbb0 fix: refresh peer metadata without blocking bucket mutations (#8486)
* fix: refresh peer bucket metadata after creation

* fix(s3): release bucket mutation slots before peer reloads

* test(ecstore): distinguish delete lock waits from disk latency
2026-10-12 05:03:16 -07:00
GatewayJ 5228463a1c fix(oidc): recover providers after startup discovery failures (#8475)
* fix(oidc): recover providers after startup discovery failures

* fix(oidc): report recovery failures with throttled diagnostics
2026-10-12 03:40:07 -07:00
Hauser dd90bb7488 fix(s3): short-circuit conditional reads at metadata quorum (#8459)
* fix(s3): evaluate conditional reads before opening object bodies

Reuse locked metadata snapshots for conditional GETs and unify HEAD
preconditions and cache headers. Preserve body-cache hooks and validate
encryption metadata and key authorization before returning bodyless errors.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(s3): unify conditional reads at metadata quorum

Apply scoped metadata conditions to the existing reader pipeline instead
of maintaining parallel prepared-read branches. Preserve quorum checks,
early-stop, coalescing, and cache-hook behavior on condition misses.

Track metadata-only termination through selection and reject body access
or a changed decision. Keep concrete reader futures off request stacks.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(s3): strengthen conditional read acceptance evidence

Assert zero shard, decode, cache-fill, and remote-body calls on matching
conditions with live positive controls. Exercise GET and HEAD through
s3s and Hyper with conditional-header and precedence matrices.

Add reproducible paired application-read benchmarks with isolated
metadata controls and strict drift, artifact, and resource gates.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(s3): remove obsolete conditional comparison helper

Keep ETag comparison tests on the canonical read-condition evaluator,
remove unused date-trait imports, and name the HTTP case type.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): validate full conditional etag fields

Reject adjacent tags and malformed trailing list members before accepting a
match. Keep the existing request-scoped metadata read and authorization order,
while removing redundant validation wrappers and unused benchmark overrides.
Replace simulated phase coverage with real 304/412 cache-fill probes and extend
HTTP/1.1 and HTTP/2 ingress regressions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): cache terminal conditional metadata safely

Preserve quorum-validated conditional metadata when early termination
cancels the remaining fanout. Restrict those entries to terminal GET
readers; body and full-layout consumers still obtain their own metadata.

Serialize cache publication per key so conditional entries cannot replace
complete layouts or renew their TTL. Retain generation fencing and the
final selected-metadata predicate check before any body access.

Cover real four-disk hedging, nonterminal body and range reads, consumer
isolation, generation races, atomic publication and actual cache expiry.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(log-analyzer): align heal writer failure rule with current logs

Match the current structured all-targets failure, retain legacy log support, and reject partial or unrelated failures.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-12 16:59:21 +08:00
GatewayJ 0018bbf5d7 ci: guard OIDC architecture boundaries (#8447)
* ci: guard OIDC architecture boundaries

* fix(ci): guard OIDC session ownership

* fix(ci): ignore OIDC authorization destructuring

* fix(ci): accept typed authorization destructuring

---------

Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-10-12 16:13:36 +08:00
Hauser 13ee76a4a9 fix(ecstore): validate recovery evidence before mutation (#8487)
Reject causal cycles before source repair and share conservative backup
classification between discovery and inspection. Fence public raw deletion
and derive exact-key removals from successful settlement without an extra
metadata read. Preserve the existing physical phases and strict source checks.

Make outage and renewal fixtures deterministic without weakening their
convergence assertions, and complete strict TLS/RPC lint cleanup.

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-12 01:06:01 -07:00
cppudge 3dc09c9397 test(ecstore): deflake bucket sentinel and dispatch rollback tests (#8488)
* test(ecstore): bound sentinel tests by the lock wait, not recreation IO

Both bucket incarnation sentinel tests gave the bucket recreation that
follows the paused delete (force delete_bucket, make_bucket, put_object
on four fsync'ing disks) 10 s in total. The delete releases the sentinel
milliseconds after the barrier, but on a runner starved for IO the
recreation alone can exceed 10 s:
delete_objects_holds_bucket_incarnation_sentinel_through_commit failed
that way on main in run 37760321449 (job 113259251979).

That bound is not what catches a kept sentinel: delete_bucket waits for
it on its lifecycle write lock, which fails after the lock acquire
timeout, and the recreation's expect reports the lock error. Keep that
check and give the recreation 120 s only as a hang guard.

The recreation starts that lock wait before the barrier is released, so
the wait also has to cover the delete's own commit, and the 5 s default
leaves a starved runner little room for it. Run both tests with
RUSTFS_OBJECT_LOCK_ACQUIRE_TIMEOUT=30 and bound the delete, which was
not bounded, by the same 30 s. A kept sentinel still fails the tests,
after 30 s instead of 5 s.

Signed-off-by: Petr Slavyagin <disident47@gmail.com>

* test(ecstore): keep background recovery out of dispatch rollback tests

dispatch_manifest_detached_workers_are_store_bounded_and_shutdown_cancellable
seeds six aborting dispatch manifests, installs a pause hook and expects
its own recovery passes to park four detached workers on it. Its first
store also ran the background tier-delete journal recovery loop, which
runs a pass every TIER_DELETE_JOURNAL_RECOVERY_INTERVAL (60 s). When the
setup took longer than that, a background pass rolled the manifests
back before the hook was installed, no worker paused, and the 30 s wait
failed. This happened on main on a runner starved for IO, in run
37760321449 (job 113259251979).

Build the first store with background recovery suppressed, as the
neighbouring dispatch tests do. The restarted store keeps it: the second
half of the test checks that it picks up the retained manifests.

dispatch_manifest_rollback_bounded_concurrency_reaches_tail_behind_slow_member
and dispatch_manifest_page_timeout_detaches_one_deduplicated_worker_until_convergence
have the same exposure: each seeds an aborting manifest on a store with
background recovery and only then installs its slow-delete hook. They
have not failed in CI, but with the setup stretched past 60 s they fail
the same way. Suppress background recovery for them too.

Signed-off-by: Petr Slavyagin <disident47@gmail.com>

---------

Signed-off-by: Petr Slavyagin <disident47@gmail.com>
2026-10-12 01:02:33 -07:00
Hauser 71c0efa97d fix(scanner): account remote progress and preserve dispatch limits (#8485)
* fix(scanner): account remote progress and preserve dispatch limits

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): isolate remote progress by cycle

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-12 00:29:10 -07:00
Hauser 4166b9503f fix(ecstore): recover interrupted delete transactions (#8468)
* fix(ecstore): recover crash-interrupted delete retries

Retain set-quorum cleanup proof and restore metadata before dropping rollback
markers. Reclaim eligible exact-key residue during explicit delete retries,
with bucket identity, version, retention and namespace fencing guards.

Preserve prefix children and snapshot ownership through batched physical
cleanup, and cover interrupted transactions and failure boundaries.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): route recovery test imports through contracts

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): preserve missing-key deletes at quorum

* feat(ecstore): add certified set-wide delete recovery

Atomically prepare deletion journals and exact targets, publish durable set
receipts, and recover through one fenced disk/RPC core used by startup and
scoped administrator healing. Preserve returning generations, ordinary
missing-key quorum semantics, and legacy rollback wire compatibility.

Retain namespace and volume ownership through late physical operations,
order related transactions causally, and keep proof until full convergence.
Remove the superseded local-only recovery path and add storage, protocol,
RPC, durability and isolated Docker regression coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): reclaim completed multipart delete sidecars

* fix(ecstore): recover multipart sidecars with verified proofs

Recognize native multipart sidecars at the shared recovery boundary and
restore them without treating metadata or proof files as shard payloads.
Validate required proof generations and bind every present live/staged
shard copy to its metadata-bound Merkle proof before restoring metadata.

Cover protected native MPU rollback, split source layouts, missing or
corrupt proofs, and payload corruption with recomputed bitrot checksums.
Add real multipart Docker regressions in both integrity modes.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): settle superseded committed version deletes

Allow a validated committed decision to finish its own data cleanup after
a later decision removes current metadata. Prepared copies need an
inspected same-transaction receipt matching immutable local intent before
promotion, and retain their local journal without importing peer hashes.

Reuse the authority matcher for dry-run and settlement. Cover chained
explicit-version deletions, partial receipt publication, mismatch rejection
and no-resurrection, while retaining the no-decision absence protection.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): clarify delete recovery case label

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): restore recovery CI guard coverage

Keep production error sites visible to the ratchet by placing test modules last. Preserve native encoding errors, group preparation identity and ownership, and reduce RPC enum size without changing the wire payload.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(admin): preserve owned OIDC validation errors

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(ecstore): unify recovery authority and snapshot work

Use one user-bucket legacy settlement boundary and one adoption source predicate for preview and execution. Reuse immutable snapshot digests, consume owned generation metadata, index version membership, and prepare empty witnesses through the canonical journal path.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): preserve delete recovery invariants

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-10-12 13:47:37 +08:00
cxymds 201b5f62d2 fix(s3): normalize PUT read quorum failures as unavailable (#8484) 2026-10-11 21:55:23 -07:00
Chris 902c97ce05 fix: auto-repair breaking changes from acd26afd8 (#8483) 2026-10-11 20:09:55 -07:00
dependabot[bot] 7ad4fa439e build(deps): bump the dependencies group across 1 directory with 3 updates (#8481)
Bumps the dependencies group with 3 updates in the / directory: [datafusion](https://github.com/apache/datafusion), rust-embed and [hotpath](https://github.com/pawurb/hotpath-rs).


Updates `datafusion` from 55.1.0 to 55.2.0
- [Changelog](https://github.com/apache/datafusion/blob/main/CHANGELOG.md)
- [Commits](https://github.com/apache/datafusion/compare/55.1.0...55.2.0)

Updates `rust-embed` from 8.12.0 to 8.13.0

Updates `hotpath` from 0.28.5 to 0.28.6
- [Release notes](https://github.com/pawurb/hotpath-rs/releases)
- [Changelog](https://github.com/pawurb/hotpath-rs/blob/main/CHANGELOG.md)
- [Commits](https://github.com/pawurb/hotpath-rs/compare/v0.28.5...v0.28.6)

---
updated-dependencies:
- dependency-name: datafusion
  dependency-version: 55.2.0
  dependency-type: direct:production
  update-type: version-update:semver-minor
  dependency-group: dependencies
- dependency-name: hotpath
  dependency-version: 0.28.6
  dependency-type: direct:production
  update-type: version-update:semver-patch
  dependency-group: dependencies
- dependency-name: rust-embed
  dependency-version: 8.13.0
  dependency-type: direct:production
  update-type: version-update:semver-minor
  dependency-group: dependencies
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2026-10-11 19:09:19 -07:00
Hauser 1266d4c270 feat(tls): reload and publish external certificate generations (#8467)
* feat(tls): reload external certificate snapshots coherently

Pin projected certificate generations, validate complete TLS material, coordinate server consumers, and invalidate outbound RPC caches coherently. Add externally managed TLS Secret support and rotation guidance.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* feat(tls): publish server certificates through a fenced admin API

Add opt-in server-leaf publication with dedicated IAM actions, actual TLS
transport checks, immutable generations, durable captured-token CAS and
idempotent receipts. Preserve independent trust and client identity sources
and distinguish visible publication state from the full serving chain.

Validate 64 TLS tests, 41 TLS-runtime tests, the focused IAM policy test,
and eight live local API scenarios including least privilege and restart.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(admin): route certificate handler types through S3 facade

Use the existing admin S3 facade to keep direct s3s imports within the footprint ratchet.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(admin): include TLS certificate routes in route matrix

Account for the registered certificate-state GET and certificate publication POST without changing route behavior or weakening matrix assertions.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(tls): reconcile startup trust before skipping reloads

Compare the initialized listener bundle with coherently published outbound material, retain startup trust and client identity when sources disappear, and cover independent startup rotations through real reload passes.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(tls): reuse pinned generations and prepared listener state

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(tls): preserve startup trust source requirements

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-10-12 08:53:11 +08:00
Anton acd26afd8b fix(scanner): skip child prefixes removed before they are opened (#8479)
A child prefix can be deleted after its parent listed it and before scan_folder opens it. read_dir then returned NotFound, which propagated through the compacted subtree and dropped the whole top-level child (child_scan_failed), so the cycle never produced a durable usage snapshot under continuous deletes.

Treat NotFound on open like a directory that vanished during iteration for non-root folders. A missing bucket root still reports NotFound so namespace removal handling is unchanged.

Refs #8478

Co-authored-by: Anton <5527364+basic-system@users.noreply.github.com>
2026-10-11 15:25:14 -07:00
Rafael Kansy 5924a55931 fix(obs): honor RUSTFS_OBS_USE_STDOUT with per-signal endpoints (#8476)
use_stdout was forced to true whenever the root RUSTFS_OBS_ENDPOINT was
empty, so a deployment that sets only a per-signal endpoint such as
RUSTFS_OBS_TRACE_ENDPOINT could not turn the stdout exporters off: every
exported span was also printed to stdout as a multi-line text block.

Count a non-empty trace, metric or log endpoint as a configured endpoint.
With no endpoint at all the stdout default is still forced on. Add a test
covering each per-signal endpoint and an empty value.
2026-10-11 13:00:24 -07:00
GatewayJ 2d2679a710 refactor(oidc): isolate config updates and replication view (#8446) 2026-10-11 08:53:29 -07:00
Chris 257c9f11ae docs: refresh security advisory lessons (#8472) 2026-10-11 22:43:28 +08:00
Hauser 1324e296f8 test(scanner): bound expansion fixture preparation I/O (#8473)
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-11 22:43:08 +08:00
Hauser 38263ba896 fix(log-analyzer): match structured heal writer failures (#8469)
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-11 20:46:44 +08:00
Chris ba2047b184 ci: reuse workspace test builds for serial ILM checks (#8465) 2026-10-11 13:55:48 +08:00
GatewayJ da42266bfb refactor(iam): organize OIDC runtime modules (#8445) 2026-10-11 13:27:46 +08:00
Chris 367f13f3f9 ci: reduce repeated PR runner work (#8463) 2026-10-10 22:19:25 -07:00
Hauser 0263d5fcb9 fix(storage): preserve heal failures and timeout responses (#8462)
* fix(storage): preserve heal failures and timeout responses

Stop repairs with no writable target before opening source readers. Consolidate target failure aggregation, preserve typed causes, and distinguish all-ignored diagnostics from actual successful nil entries. Map typed disk timeouts to retryable S3 responses without changing quorum decisions.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* refactor(heal): unify staging failure cleanup

Route data-stage failures through one local result boundary after temporary
readers and writers are released. Preserve typed report failures, outer
reconstruction errors, partial repair, and the existing commit fences.

Exercise actual source loss after second-part writer admission using the
existing test pause registry. Assert all staged parts are removed, committed
metadata stays unchanged, and restoring the source allows a full-byte retry.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: Chris <anzhengchao@gmail.com>
2026-10-11 12:41:13 +08:00
Chris 93a64fdca3 fix(dev): restore VS Code debug configurations (#8450) 2026-10-11 12:34:41 +08:00
Hauser 9ecb00d388 fix(scanner): avoid placeholder retention and resume checkpoints (#8460)
* fix(scanner): bound old-cache lookups and recover checkpoint saves

Keep missing child lookups read-only and preserve the checkpoint receiver
after ordinary persistence errors. Reload on stale CAS or indeterminate
revision refresh, and report confirmed periodic saves separately.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): remove redundant checkpoint error conversion

Return the existing StorageError directly so strict Clippy passes.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* docs(scanner): clarify checkpoint persistence guarantees

Distinguish a confirmed periodic save from validated restart coverage.
Keep adoption and subtree-skip requirements explicit.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): preserve resumable periodic coverage

Materialize active ancestor accounting in bounded periodic snapshots and
seal completed coverage independently of raw enumeration state. Preserve
durable coverage during early resumed enumeration and exclude unfinished
out-of-order heal work from periodic and cancellation receipts.

Reuse ancestor frame slots to avoid growing child-set copies on descent,
retain compacted accumulator safety, and report checkpoint adoption resets.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): reject covered active ancestors in checkpoints

Check every suspended ancestor alongside the current folder before
certifying completed coverage. An unfinished covered ancestor must not
become a resumable subtree merely because its descendant sorts later.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): retain an incomplete root for missing namespaces

Create the empty bucket root explicitly at the missing-namespace boundary.
Preserve nonempty durable caches and keep namespace results unpublished.

Co-Authored-By: heihutu <heihutu@gmail.com>
Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: heihutu <heihutu@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-10-10 20:54:12 -07:00
cxymds b8889fccc9 fix(ecstore): allow cold-start recovery at EC read quorum (#8458)
* fix(ecstore): load existing formats at EC read quorum

* fix(ecstore): complete startup at EC read quorum
2026-10-11 11:50:24 +08:00
GatewayJ a424d10fa0 refactor(iam): construct OIDC runtime directly (#8436)
* refactor(iam): remove legacy OIDC federation paths

* refactor(iam): construct OIDC runtime directly
2026-10-10 04:01:40 -07:00
Chris 072b57b375 fix: auto-repair breaking changes from 446479791 (#8451)
* fix: repair s3s footprint ratchet violation, clippy warnings, and stack overflow

- Replace s3_error! macro with S3Error::with_message in ecfs.rs to keep
  s3s footprint ratchet at baseline (1586) after retention validation refactor
- Remove redundant clone on Copy type in list_objects.rs (clippy::redundant_clone)
- Remove clone_on_copy calls in access.rs test (clippy::clone_on_copy)
- Use manual thread with 8MB stack for heal_concurrent_delete_test to fix
  stack overflow on macOS (consistent with sibling tests in same file)

* test: align CI assertions with version authorization rules
2026-10-09 17:01:48 -07:00
1782 changed files with 483806 additions and 83487 deletions
+7 -27
View File
@@ -1,33 +1,13 @@
# Adversarial Review Shape
Use when root `AGENTS.md` triggers adversarial validation or for a substantial PR
review. Paths below are repository-relative. The root finding standard and
completion rule apply; selecting a lens does not require finding a defect.
Use when root `AGENTS.md` triggers adversarial validation or for a substantial PR review. Paths below are repository-relative. The root finding standard and completion rule apply; selecting a lens does not require finding a defect.
Risk and review shape:
- **Exempt:** documentation, comments, formatting, or typos with no runtime,
build, test, or agent-execution effect.
- **Mechanical:** renames, moves, test/tooling-only changes, and agent-rule
changes. Run correctness and simplicity lenses.
- **Standard:** localized behavior changes. Run one integrated final-diff pass
covering correctness, simplicity, and test coverage; add only domain lenses
matched by the diff.
- **High risk / substantial PR review:** high risk includes locking,
erasure/quorum/heal, replication, multipart, RPC, lifecycle/tiering,
persistence/fsync, IAM/KMS/auth, cryptography, on-disk/on-wire formats, and
S3-visible semantics. Cover all applicable lenses using exactly two
independent reviewers when delegation is explicitly authorized. Split the
lenses between them. Otherwise perform two fresh sequential passes.
- **Outbound client defaults:** what `TargetClient`, `PutObjectOptions`, or
the remote SDK configuration sends to every replication or migration target
is high risk for every target class even when the change fixes one. Follow
the SOP in `docs/postmortems/2026-09-03-replication-checksum-default-regression.md`:
run the outbound target matrix, document each new env knob in the same PR,
and list verified and unverified target classes in the PR Impact section.
- **Exempt:** documentation, comments, formatting, or typos with no runtime, build, test, or agent-execution effect.
- **Mechanical:** changes shown to preserve behavior, such as a symbol rename with unchanged callers or a file move with equivalent wiring. Run correctness and simplicity lenses. Classify tests, tooling, CI, and agent instructions by the behavior and authority they change, not their file type; deleting regression protection or changing failure propagation, publishing, or destructive actions can be high risk.
- **Standard:** localized behavior changes. Run one integrated final-diff pass covering correctness, simplicity, and test coverage; add only domain lenses matched by the diff.
- **High risk / substantial PR review:** high risk includes locking, erasure/quorum/heal, replication, multipart, RPC, lifecycle/tiering, persistence/fsync, IAM/KMS/auth, cryptography, on-disk/on-wire formats, and S3-visible semantics. Cover the applicable lenses from two perspectives: first trace the intended contract and implementation, then independently challenge its assumptions, failure paths, and evidence. Use separate reviewers when delegation is authorized and useful, or fresh sequential passes otherwise. Choose staffing and split lenses to fit the risk; a fixed reviewer count or duplicated review is not the goal.
- **Outbound client defaults:** what `TargetClient`, `PutObjectOptions`, or the remote SDK configuration sends to every replication or migration target is high risk for every target class even when the change fixes one. Follow the SOP in `docs/postmortems/2026-09-03-replication-checksum-default-regression.md`: run the outbound target matrix, document each new env knob in the same PR, and list verified and unverified target classes in the PR Impact section.
Available domain lenses are security, concurrency/durability, compatibility,
and performance. Select `.agents/skills/adversarial-validation/SKILL.md` for an
explicit adversarial request, a high-risk change, or a substantial PR review;
then read only its matching role references. A routine standard pass does not
load the playbook unless the reviewer needs a RustFS-specific probe.
Available domain lenses are security, concurrency/durability, compatibility, and performance; select only those matched by the change.
+57 -50
View File
@@ -1,72 +1,79 @@
# Implementation Rules
Applies when changing code or running artifact-heavy work. Paths below
are repository-relative. Read only the relevant sections during read-only review.
These implementation, style, and quality rules apply to all contributions, regardless of author or editor. Paths below are repository-relative. Read only the relevant sections during read-only review; select verification from the root `AGENTS.md`.
## Shared Style Contract
- Use the toolchain declared in `rust-toolchain.toml`, respect the minimum supported Rust version in `Cargo.toml`, and let `rustfmt.toml` and the configured Rust/Clippy lints define mechanical style. Do not override repository settings with personal formatter or lint preferences.
- Follow the owning module's organization, imports, and domain terminology where repository rules leave a choice. Existing violations do not justify new ones; avoid unrelated cleanup in a focused change.
- Rules using "must" or "do not" are requirements. Rules using "prefer" are defaults; depart when correctness, ownership, performance, or readability benefits justify it. Explain consequential tradeoffs, not every idiomatic choice. Where several approaches meet the contract equally well, the implementer chooses.
- Follow the declared toolchain locally and the affected CI lane's toolchain for reproduction. The repository currently tracks `stable`; for a formatter/lint mismatch, compare `rustc -Vv`, `cargo fmt --version`, and `cargo clippy --version` with the failing run before changing code. Toolchain upgrades must keep local and CI settings aligned and pass their affected gates; do not silently raise `rust-version` or change lint policy to make a check pass.
## Worktree and Disk Hygiene
- Start implementation from the latest `origin/main` and confirm the requested
change is not already present.
- An existing clean, isolated task worktree is sufficient. Create another
worktree only when the current checkout is shared, dirty with unrelated work,
or belongs to another task.
- For a new task, start from the latest `origin/main` unless a different base is requested, and confirm the requested change is not already present. When continuing existing work or a PR, preserve its branch, base, and task-owned changes; do not restart it from `main`.
- An existing clean, isolated task worktree is sufficient. Create another worktree only when the current checkout is shared, dirty with unrelated work, or belongs to another task.
- Never commit from a shared checkout.
- Use a task-specific branch named `<type>/<topic>`, such as `fix/...`,
`feat/...`, `test/...`, or `docs/...`, unless the user specifies a name.
- Do not include agent, tool, contributor, account, or organization names in
branch names.
- Push to the user-requested remote or the repository's configured push remote.
Do not hard-code or infer a remote from an account name.
- Check free space before artifact-heavy builds, tests, coverage, or downloads.
Re-check before a broad gate when space is tight.
- Remove only task-owned temporary/build artifacts. Never delete another task's
worktree or uncommitted data.
- At handoff, mention disk or cleanup details only when they affected execution
or artifacts/worktrees remain intentionally.
- Use a task-specific branch named `<type>/<topic>`, such as `fix/...`, `feat/...`, `test/...`, or `docs/...`, unless the user specifies a name.
- Do not include agent, tool, contributor, account, or organization names in branch names.
- Push to the user-requested remote or the repository's configured push remote. Do not hard-code or infer a remote from an account name.
- Check free space before artifact-heavy builds, tests, coverage, or downloads. Re-check before a broad gate when space is tight.
- Before handoff, remove the Cargo target directories and temporary worktrees the task created unless they stay intentionally or hold unmerged work. Identify build output by Cargo's markers (`.rustc_info.json`, `CACHEDIR.TAG`), not by directory name: `target` is also a source directory here.
- Remove only task-owned temporary/build artifacts. Never delete another task's worktree or uncommitted data.
- At handoff, mention disk or cleanup details only when they affected execution or artifacts/worktrees remain intentionally.
- For Docker verification, ensure the tested image contains the intended binary. `buildx build` without `--load` leaves the image in the build cache; use the Makefile's loaded image and rebuild without cache only when stale artifacts are evidenced.
## Change Style
- Preserve existing control flow unless changing it is required for correctness.
- Prefer a direct local edit over new files, wrappers, managers, or speculative
abstractions.
- Add a helper only when it removes current duplication, names a real domain
boundary, or isolates a non-trivial invariant.
- Remove an in-scope path superseded by the change. If compatibility requires it,
adapt at the boundary to one canonical core and use the repository's
`RUSTFS_COMPAT_TODO` policy.
- Comments explain non-obvious invariants or reasons. Do not narrate code or
record change history.
- Preserve unrelated control flow. Restructure touched code only when needed for the requested behavior or an explicitly requested refactor; style preferences alone do not justify changing execution order or cleanup behavior.
- Prefer a direct local edit over new files, wrappers, managers, or speculative abstractions.
- Add a helper only when it removes current duplication, names a real domain boundary, or isolates a non-trivial invariant. Keep helpers near the code they support when the module's organization permits it.
- Remove an in-scope path superseded by the change. If compatibility requires it, adapt at the boundary to one canonical core and use the repository's `RUSTFS_COMPAT_TODO` policy.
- Comments explain non-obvious invariants or reasons. Do not narrate code or record change history.
- Mention unrelated problems when useful; do not fix them in a narrow task.
## Rust Style
These repository-owned rules incorporate selected ideas from the [OpenCode style guide](https://github.com/anomalyco/opencode/blob/dev/AGENTS.md#style-guide), adapted to RustFS. That link is background, not an additional rule source. Apply these defaults to new or changed code; correctness and domain invariants take priority.
- Default to immutable `let` bindings; use `mut` for actual state changes. Prefer `if` or `match` expressions when branches compute a value instead of initializing a placeholder and reassigning it.
- Use type inference for obvious local values. Add annotations when inference needs help or the numeric, collection, or error type matters to understanding the code. Keep explicit types in function signatures and public contracts.
- Keep the main path readable with guard clauses, `let ... else`, and `?` when immediate propagation is correct. Preserve explicit handling for recovery, cleanup, aggregation, and quorum decisions; `if`/`else` expressions and exhaustive `match` remain idiomatic.
- Prefer readable iterator chains for straightforward mapping and filtering. Keep loops when they make state changes, early exits, or async operations clearer. Do not add intermediate collections or clones just to use iterators.
- Inline trivial single-use expressions only when a binding adds no meaning. Keep names that explain domain concepts, aid debugging, or make ownership and guard lifetimes clear. Do not change lock release or drop timing for style.
- Keep pure parsing, validation, and option-building helpers synchronous unless an async interface contract requires otherwise. This does not make blocking I/O or CPU-heavy work safe to run on async executor threads; offload it when needed to keep those threads responsive.
## Reuse and Boundary Rules
- Before adding helpers, constants, fixtures, or wrappers, search the touched
crate, the domain-owning crate, `crates/utils`, `crates/common`, and relevant
direct dependencies.
- Reuse requires matching semantics: normalization, error types, deadlines,
durability, and compatibility must fit the call site. A narrowly named local
helper is better than forced reuse with different semantics.
- Validate untrusted input at its trust boundary, then trust the validated type.
Values crossing disk, RPC, persistence, or version boundaries remain
untrusted at every consumer.
- Re-check boundary values immediately before destructive actions such as
delete, overwrite, or quorum decisions.
- Every new branch needs a concrete triggering input/state. For decoded or peer
data, corruption and mixed-version input are valid triggers.
- Required values must return a typed error when absent or corrupt; do not use a
default that converts corruption into a plausible result.
- Attach error context once where it is actionable. Do not erase typed errors
below aggregation or quorum layers.
- Before adding helpers, constants, fixtures, or wrappers, search the touched code and domain owner; check `crates/utils`, `crates/common`, and direct dependencies when they could own the behavior. Stop once the relevant reuse boundary is clear.
- Reuse requires matching semantics: normalization, error types, deadlines, durability, and compatibility must fit the call site. A narrowly named local helper is better than forced reuse with different semantics.
- Validate untrusted input at the boundary that owns it, then pass validated types inward without repeating checks whose guarantees still hold. Deserializing into a Rust type alone does not establish domain validity. Values newly read from disk, RPC, persistence, or another version must be validated at that consuming boundary.
- For destructive actions such as delete or overwrite and for quorum decisions, check the relevant identity, generation, and authority under the operation's existing synchronization or precondition contract. A separate unguarded recheck does not prevent a check/use race.
- Every new control-flow branch needs a concrete triggering input/state. For decoded or peer data, corruption and mixed-version input are valid triggers.
- Required values must return a typed error when absent or corrupt; do not use a default that converts corruption into a plausible result.
- Attach error context once where it is actionable. Do not erase typed errors below aggregation or quorum layers.
## Rust Boundaries
- Production `unwrap`/`expect` must follow a type guarantee or checked invariant; explain only non-obvious guarantees.
- Production `unwrap`/`expect` must follow a type guarantee or checked invariant; explain only non-obvious guarantees. Stricter scoped prohibitions, including `crates/AGENTS.md`, still apply. Invalid client, disk, or peer data must return errors rather than trigger panics.
- Public APIs do not return `Result<_, String>`. Library APIs use domain errors unless intentional erasure is part of the boundary contract; expose a stored inner error through `Error::source()`.
- Numeric conversions must not silently truncate. Use fallible conversions for untrusted values; validate finiteness, sign, and range before float-to-integer conversion. Clamp/saturate only when required by the domain.
- Do not add crate-root `#![allow(dead_code)]`.
## Naming
Use Rust API naming: `SCREAMING_SNAKE_CASE` constants/statics, `snake_case`
functions/variables, and `PascalCase` types. Do not rename unrelated existing
violations.
Use Rust API naming: `SCREAMING_SNAKE_CASE` constants/statics, `snake_case` functions/variables/modules, and `PascalCase` types/traits. Name domain concepts and include units where a value would otherwise be ambiguous; do not optimize for short names. Do not rename public, serialized, or persisted fields merely to match a local style preference, or rename unrelated existing violations.
## API and Operational Contracts
- For new or changed public APIs, document the caller-visible behavior and relevant `# Errors`, `# Panics`, and `# Safety` conditions. Include a useful example or link to one when usage is non-obvious; avoid boilerplate sections that say nothing. Follow the [Rust API documentation guidelines](https://rust-lang.github.io/api-guidelines/documentation.html) within the scope of the change.
- For async or storage APIs, state cancellation, retry/idempotency, partial-completion, ownership, and durability guarantees when callers rely on them. Make failure cleanup and commit points explicit in code and tests; do not imply atomicity that the implementation does not provide.
- For protocol, persisted-format, configuration, dependency, or operational changes, check affected consumers and supported versions. Update relevant docs/examples and describe compatibility, upgrade/rollback limits, and new configuration defaults when they change. New dependencies must solve a current need and fit the workspace's license, toolchain, and feature policy.
- For hot-path or resource-management changes, check allocation/copying, blocking, unbounded work, and lock duration where affected. Support performance claims with an appropriate measurement or clearly label them as expectations; a benchmark is not required for unrelated changes.
## Behavioral Tests
- For behavior changes, add or update the narrowest test that calls the real implementation and asserts an observable result. Existing tests can provide coverage when they directly exercise the changed behavior; do not duplicate production logic as the test oracle.
- Cover the changed contract's relevant failure and boundary cases, not only success. A bug regression should fail without the fix; do not broaden assertions or rely only on a successful call when the result or side effect is what matters.
- Follow `docs/testing/README.md` for test layers, runners, isolation, synchronization, and flaky tests. Use controlled clocks or explicit synchronization for time/concurrency tests instead of fixed sleeps, and keep waits bounded.
- Report the checks actually run and their outcomes, including skipped or blocked checks and the behavior they leave unverified. Do not describe focused local checks as full CI coverage.
+15 -35
View File
@@ -1,51 +1,31 @@
# Git and Pull Request Rules
Applies to commits, pushes, PRs, and issue/discussion actions. Paths below are
repository-relative. User authorization and root `AGENTS.md` still govern scope.
Applies to commits, pushes, PRs, and issue/discussion actions. Paths below are repository-relative. User authorization and root `AGENTS.md` still govern scope.
## Final PR Preflight
Before creating or updating a PR, reuse completed review and verification:
- Verify the actual base (normally `origin/main`) and the complete task diff,
including file names and whitespace. Exclude secrets, logs, generated
artifacts, and unrelated edits. Retain an existing PR's base unless requested.
- Confirm the final diff passed the root verification tier; fix task-owned
failures and run missing scoped checks. Report unresolved required checks or
authority without expanding the task. Do not start another general review.
- Keep the English Conventional Commit title at most 72 characters. Use the
template headings, actual checks, material risks, and rollback notes.
- Immediately before writing to GitHub, confirm the head and task diff are
unchanged. Rerun only checks invalidated by edits or relevant state changes.
- Verify the actual base (normally `origin/main`) and the complete task diff, including file names and whitespace. Exclude secrets, logs, generated artifacts, and unrelated edits. Retain an existing PR's base unless requested.
- Confirm the final diff passed the root verification tier; fix task-owned failures and run missing scoped checks. Report unresolved required checks or authority without expanding the task. Do not start another general review.
- Keep the English Conventional Commit title at most 72 characters. Use the template headings, actual checks, material risks, and rollback notes.
- Immediately before writing to GitHub, confirm the head and task diff are unchanged. Rerun only checks invalidated by edits or relevant state changes.
## Pull Request Lifecycle
- Creating or updating a PR includes one immediate snapshot of checks,
mergeability, reviews, and unresolved threads.
- Unless the user explicitly requests monitoring, a release workflow requires
it, or an automation already owns it, hand off after the PR is open with the
current state and next event to watch. Do not delay ordinary handoff with
fixed quiet-period sleeps.
- For requested monitoring, use event-driven or bounded waits. Report only state
changes, actionable failures, or a meaningful prolonged delay.
- Investigate failures/comments before changing code. Fix task-attributable
issues, rerun affected verification, push, reply or resolve the thread, then
resume the requested monitor.
- Never merge without required reviewer approval or explicit authority.
- After an observed merge, verify the commit reached the base, then clean the
task worktree/branch when safe. Preserve unmerged work for closed PRs unless
deletion was explicitly authorized.
- Creating or updating a PR includes one immediate snapshot of checks, mergeability, reviews, and unresolved threads.
- Unless the user explicitly requests monitoring, a release workflow requires it, or an automation already owns it, hand off after the PR is open with the current state and next event to watch. Do not delay ordinary handoff with fixed quiet-period sleeps.
- For requested monitoring, use event-driven or bounded waits. Report only state changes, actionable failures, or a meaningful prolonged delay.
- Investigate failures/comments before changing code. Monitoring alone authorizes observation and diagnosis; fixes, pushes, replies, and thread resolution require their own existing task authority. When authorized, fix task-attributable issues, rerun affected verification, and resume the requested monitor. Otherwise report the concrete failure and next action without expanding scope.
- Merge only with existing user authorization and satisfied applicable reviewer, check, and branch-protection requirements. Reviewer approval does not grant merge authority; user authorization does not bypass repository protections.
- After an observed merge, verify the commit reached the base, then clean the task worktree/branch when safe. Preserve unmerged work for closed PRs unless deletion was explicitly authorized.
## Git and PR Baseline
- Follow Conventional Commits; keep the subject at most 72 characters.
- Source comments, commits, PR titles, and PR bodies are in English.
- Keep every heading from `.github/pull_request_template.md`; use `N/A` where
needed and include commands actually run.
- Keep every heading from `.github/pull_request_template.md`; use `N/A` where needed and include commands actually run.
- Use `--body-file` for multiline `gh pr create`/`gh pr edit` content.
- PR/issue/discussion content must not contain the literal sequence `\n` or
hard-wrapped prose paragraphs.
- Do not include local absolute paths or tool-specific labels/prefixes in GitHub
content.
- Resolve review threads after the underlying issue is fixed. If declining a
suggestion, reply with a short evidence-based reason.
- PR/issue/discussion content must not contain the literal sequence `\n` or hard-wrapped prose paragraphs.
- Do not include local absolute paths or tool-specific labels/prefixes in GitHub content.
- Resolve review threads after the underlying issue is fixed. If declining a suggestion, reply with a short evidence-based reason.
@@ -1,48 +0,0 @@
---
name: adversarial-validation
description: Review RustFS diffs or designs for explicit adversarial requests, high-risk changes under the repository review policy, or substantial PR reviews. Skip ordinary questions, diagnosis, planning, status, routine low-risk implementation, and prose with no execution effect.
---
# RustFS Adversarial Validation
Use the [repository risk tiers and review shape](../../references/adversarial-validation.md). This skill
routes a review to RustFS-specific probes without loading unrelated domains.
## Select Lenses
Read only the references required by the diff:
| Lens | When to read |
|---|---|
| [Correctness](references/correctness.md) | Every non-exempt adversarial review |
| [Simplicity](references/simplicity.md) | Mechanical/standard changes and production growth |
| [Test coverage](references/test-coverage.md) | Behavior or test changes |
| [Security](references/security.md) | Authn/authz, IAM, RPC trust, paths, secrets, parsing, browser, encryption |
| [Concurrency/durability](references/concurrency-durability.md) | Async shared state, locks, storage commit, cancellation, persisted queues |
| [Compatibility](references/compatibility.md) | S3 surface, MinIO interop, metadata, wire/disk formats, mixed versions |
| [Performance](references/performance.md) | Request/object hot paths, allocation, blocking work, fsync, fan-out |
Do not read all references as a precaution. A path name alone is insufficient;
the changed behavior must touch the lens's domain.
For a dedicated security audit or advisory analysis, use
`security-advisory-lessons` instead of loading it automatically during every
adversarial review.
## Review Protocol
1. Freeze the exact final diff/head (or the design under review) and list the
selected lenses.
2. Run the review shape required by the repository risk tier.
3. For each selected lens, either report a concrete finding or a null verdict
naming the attacks performed.
4. Apply root `AGENTS.md`'s finding standard. Test each candidate against callers,
existing coverage, and invariants before accepting it; an adversarial role
does not have to produce a defect.
5. Fix or rebut supported findings with code-path, test, or invariant evidence.
6. After a non-trivial edit, rerun only lenses affected by that edit against the
new exact diff.
Do not turn a null verdict into a long checklist. Record concise evidence that
the relevant failure classes were attacked, then stop under the root completion
rule. Keep the required per-lens verdicts for high-risk PRs.
@@ -1,38 +0,0 @@
# Compatibility Lens
- Internal metadata uses `metadata_compat` helpers for dual RustFS/MinIO keys,
including mixed casing and removal of both twins.
- Binary UUID metadata treats absent, empty, and nil as no value. Unversioned
remote tiers receive no `versionId`; versioned purge requests retain the real
version ID.
- `xl.meta` changes preserve supported header/meta versions, recompute
signatures, decode legacy fixtures, and remain readable by old RustFS/MinIO.
- Foreign/corrupt metadata validates parallel array lengths and missing fields;
it returns a decode error rather than indexing, panicking, or fabricating data.
- Do not “correct” byte-for-byte MinIO ports without legacy fixture evidence.
Bitrot framing, shard math, distribution, and inline prefixes are contracts.
- Client-visible metadata/events strip both internal prefixes
case-insensitively.
- Proto fields are appended, never reused/renumbered; FlatBuffers tables extend
compatibly and absent new fields fail closed where authorization/quorum is
involved.
- Replay real client request shapes and exact pagination boundaries for S3
handler changes.
- Bucket metadata/IAM/config parsing remains compatible with pinned real MinIO
fixtures and encrypted migration data.
- Compatibility shims use `RUSTFS_COMPAT_TODO(<task-id>)`, have a removal
condition, and default toward reading old data safely.
## Outbound targets
- A change to what the replication or migration client sends by default
(checksum policy, payload framing, headers, version-id addressing) is judged
against every target class, not the one it fixes. Name each target-side rule
the current default satisfies — checksum required with Object Lock
parameters, `aws-chunked` decoding, version-id adoption, ETag equals content
MD5 — and show which cell of
`crates/e2e_test/src/replication_target_matrix_test.rs` covers each.
- A test that asserts the fix ("no trailer header") is not evidence; the
matrix cell that asserts the target accepted and stored the object is.
- Every new environment escape hatch appears in
`docs/operations/replication-outbound-transport.md` in the same diff.
@@ -1,27 +0,0 @@
# Concurrency and Durability Lens
- For every changed lock, enumerate overlapping lock sets and construct the
ABBA interleaving. Multiple-lock order must be documented and consistent.
- Mark guard lifetimes and every `.await`, disk,
and RPC call; estimate contention/timeouts. Tokio read/write guards across
`.await` need bounded hold time; long-lived reads can wedge writers (#4195).
Keep `std::sync::Mutex` holds brief and never across `.await`.
- Use direct `fetch_*` for unconditional atomic read-modify-write and
`compare_exchange` for conditional updates.
- Object commits remain fenced if the distributed lock is lost after shard
writes and before metadata rename.
- For write/rename changes, trace `write tmp -> sync tmp -> rename -> sync parent
-> sync required ancestors`; simulate a crash after each step and honor the
configured durability gate.
- Multi-disk fan-out counts every result. Quorum-minus-one cannot become success;
heal remains best-effort per target where that is the established contract.
- At every new cancellable await between mutation and cleanup/commit, drop the
future and inspect leftover files, counters, permits, and replay state.
- Multipart operations on the same upload ID are serialized where required;
abort/complete/list races cannot delete parts before durable commit.
- Post-commit cleanup is best-effort, retry-safe, and cannot fail an already
committed write or delete the last surviving copy.
- Persisted read-modify-write uses serialization/CAS. Queue replay is crash-safe
and duplicate delivery has an idempotency contract.
- Streaming reconstruction failures after partial output surface as errors, not
successful EOF.
@@ -1,31 +0,0 @@
# Correctness Lens
Attack the changed behavior, not every subsystem in the repository.
- Trace new error paths to the caller. Inject the ignored/wildcard variants and
verify they cannot become success, not-found, or a plausible default.
- Exercise zero/empty/missing, maximum, and exact-boundary inputs for every
changed count, size, index, page limit, or optional value.
- For aggregation/quorum changes, test exactly quorum and quorum-minus-one with
mixed disk errors and nil/placeholder entries.
- For listing/pagination, test `n == max`, `n == max + 1`, delimiter folding,
continuation markers, and object/prefix name collisions.
- For EC/read/streaming changes, inject failure after partial output and verify
the client receives an error rather than a clean truncated body. Assert exact
bytes and length.
- For multipart/object commits, fail before/after rename and cleanup; committed
data must remain readable and pre-commit cleanup must not destroy parts.
- Bound recursion over untrusted or persisted input; handle corrupted/cyclic
tree and cache traversals safely.
- For version/index ordering, test `len - 1`, `len`, equal timestamps, missing
versions, and deterministic tie-breaking.
- For directory-object behavior, trace `__XLDIR__` at the store layer; branches
below the layer that sees trailing slashes are dead.
- For binary UUID metadata, absent, empty, and nil all mean no value. Never send
nil/empty `versionId` to an unversioned tier.
- For agent rules/skill routers, test a trigger matrix covering ordinary
inquiry, low-risk implementation, explicit review, high-risk code, PR
creation, release, and post-PR monitoring. Each case must select only the
intended workflow and retain required safety/authorization boundaries.
Null verdicts name only the probes relevant to the diff.
@@ -1,20 +0,0 @@
# Performance Lens
- For added clones/allocations on request/object/block paths, quantify copied
data and frequency. Recommend borrowing, move, `Bytes`/`Arc`, `Cow`, or
capacity reservation only for a concrete repeated cost.
- Route every new sync/flush through the durability-mode and bucket override
gates; mode `none` must not pay the new fsync.
- Keep blocking filesystem/CPU work off async runtime threads, but do not split
one small operation into many `spawn_blocking` round trips.
- Measure lock hold time across I/O and compare acquisition order for ABBA.
- Keep cleanup, extra stat/rename, and diagnostics out of the PUT commit critical
section when they need not be there.
- Detect per-item serial I/O/RPC in batch APIs and accidental quadratic scans;
use a gate or bounded concurrency when the concrete fan-out warrants it.
- Count buffer growth and byte copies in EC/bitrot paths; preserve pool gauge
balance and avoid repeated metadata decode/fetch per object.
- Repetitive success logs stay at `trace`; metrics/instrumentation on hot paths
require an existing gate.
- Claims of no impact on PUT/GET/commit/erasure paths need relevant benchmark or
A/B evidence, especially for 4 KiB objects.
@@ -1,31 +0,0 @@
# Security Lens
Use `security-advisory-lessons` only for a dedicated advisory/security audit.
For an ordinary matched diff, attack these boundaries:
- Admin routes: route registration, whitelist, handler authn, and the exact
`AdminAction` must agree. Read-only diagnostics still require admin authz.
- IAM/service accounts: treat parent, claims, keys, groups, status, and policy
names as attacker-controlled; prove ownership/root authority before writes.
- Protocol frontends: every changed/sibling command authorizes the matching S3
action before reaching storage.
- Secrets/signatures: use constant-time comparison, normalize public failures,
keep RPC/root/STS keys independent, and fail closed when secrets are absent.
- RPC: bind signatures to the exact method/path and timestamp; reject replay,
stale, malformed, truncated, and invalid-enum payloads without panic.
- Paths/object/archive entries: reject traversal, absolute/platform escapes,
and normalization differences between authz and storage.
- Copy/multipart/presigned POST: enforce source, destination, version-aware
actions, copy-source conditions, and every signed policy condition.
- Logging/errors: never expose credentials, tokens, expected signatures, raw
secret-bearing input, or merged configs—including via `Debug` and parse errors.
- Untrusted serde: reject unknown fields where compatible and validate
security-critical defaults/ranges before numeric conversion.
- SSE/browser/CORS/trusted proxy: inspect stored ciphertext and wrapper order;
isolate user content; never reflect credentialed arbitrary origins or trust
forwarded identity from direct clients.
- Object Lock: unreadable/fabricated/unparsable metadata fails closed across
foreground, lifecycle, scanner, and force-delete paths.
Security findings distinguish unauthenticated compromise from a
low-privileged authenticated bypass.
@@ -1,22 +0,0 @@
# Simplicity Lens
- Compare the production diff with the smallest equivalent local edit. Fewer
lines alone are not evidence; the replacement must preserve correctness,
compatibility, readability, and real boundaries.
- Search the touched crate, domain owner, `crates/utils`, `crates/common`, and
relevant dependencies for each new helper, constant, wrapper, or fixture.
- Reject forced reuse when normalization, error, deadline, or durability
semantics differ.
- Require a concrete trigger for every new defensive branch. Keep boundary
checks for disk/RPC/version data and checks immediately before destructive
actions.
- Flag one-caller helpers only when they merely forward or split a short linear
flow without adding domain naming, invariant isolation, or useful context.
- Ensure a replacement removes the superseded in-scope path or keeps one
canonical core behind a documented compatibility adapter.
- Remove narration/change-history comments; preserve concise safety, lock,
durability, and compatibility invariants.
- Treat tests, fixtures, generated code, and documentation separately from
production growth. Do not optimize away meaningful regression coverage.
A finding must include a concrete smaller design, not a style preference.
@@ -1,26 +0,0 @@
# Test-Coverage Lens
- For every behavior claim, name the focused test/check that fails if the
changed hunk is reverted. If none is practical, require the reason and
residual risk.
- Confirm tests exercise the real production path and distinguish the intended
behavior from the named regression. A success, `is_err()`, or no-panic check
can be sufficient when that is the actual contract; require exact values,
bytes, state, or error variants when those distinctions matter to the change.
- For new flags/modes, verify each branch and ask which test fails if the branch
is inverted.
- For new error propagation, inject the failure and assert the caller observes
it; mentally replacing `?`/`return Err` with success must break a test.
- Streaming GET tests assert the complete body and length under degraded reads.
- Disk/wire-format tests use pinned foreign/legacy fixtures; same-code
round-trips are insufficient for compatibility.
- Concurrency tests use readiness polling, isolate global state, and avoid fixed
sleeps or unrealistically short timeouts. Use nextest groups when process-level
serialization is required.
- Internal metadata tests assert both RustFS and MinIO keys, not only read-back
through a helper that prefers one key.
- Avoid duplicate tests of the same production path and poison-value class.
Boundary companions are distinct coverage: `n == max` vs `max + 1`, and
absent vs empty vs nil UUID.
- A focused test proves only the targets/features it builds. Add compilation or
Clippy only for uncovered changed targets.
+12 -52
View File
@@ -16,68 +16,28 @@ The "plugin system" spans four surfaces that must stay consistent:
## Hard invariants (verify before merging)
1. **Secrets have one source of truth.** Secret config keys are declared only
in the plugin manifest (`TargetPluginManifest.secret_fields`,
`crates/targets/src/manifest.rs`) and flow to admin via
`AdminTargetSpec.secret_fields`. Never add a hand-maintained per-service
secret table in a handler; if redaction misses a field, fix the manifest.
1. **Secrets have one source of truth.** Secret config keys are declared only in the plugin manifest (`TargetPluginManifest.secret_fields`, `crates/targets/src/manifest.rs`) and flow to admin via `AdminTargetSpec.secret_fields`. Never add a hand-maintained per-service secret table in a handler; if redaction misses a field, fix the manifest.
2. **Redaction must round-trip.** Instance GET responses replace secret values
with `***redacted***` (`REDACTED_SECRET_VALUE` in `plugins_instances.rs`).
Instance PUT restores the stored secret when it receives that placeholder
back (`restore_redacted_secret_values`). Any new read or write path for
target config must keep both halves: redact on the way out, restore the
placeholder on the way in. The placeholder literal must never be persisted.
2. **Redaction must round-trip.** Instance GET responses replace secret values with `***redacted***` (`REDACTED_SECRET_VALUE` in `plugins_instances.rs`). Instance PUT restores the stored secret when it receives that placeholder back (`restore_redacted_secret_values`). Any new read or write path for target config must keep both halves: redact on the way out, restore the placeholder on the way in. The placeholder literal must never be persisted.
3. **Fixtures never reach production responses.**
`example_external_webhook_plugin()` (`crates/targets/src/catalog/mod.rs`)
is a test/demo fixture for control-plane planning tests. Production
catalog/extension handlers must not include it; regression tests
(`plugin_catalog_never_exposes_example_or_external_fixtures`,
`extension_catalog_never_exposes_example_or_external_fixtures`) enforce it.
3. **Fixtures never reach production responses.** `example_external_webhook_plugin()` (`crates/targets/src/catalog/mod.rs`) is a test/demo fixture for control-plane planning tests. Production catalog/extension handlers must not include it; regression tests (`plugin_catalog_never_exposes_example_or_external_fixtures`, `extension_catalog_never_exposes_example_or_external_fixtures`) enforce it.
4. **External plugin flow is planning-only and deny-by-default.**
`plan_external_target_plugin_action` returns decisions, it executes
nothing. `TargetPluginExternalFlowGate::default()` is fully closed and
`TargetPluginInstallPolicy::default().allowed_download_hosts` is empty —
keep it that way; tests opt in via explicit policies. Install validation
requires https, an allowlisted host, a full 64-hex-char sha256 digest,
signature and provenance URIs, and an artifact matching the host
`target_triple`.
4. **External plugin flow is planning-only and deny-by-default.** `plan_external_target_plugin_action` returns decisions, it executes nothing. `TargetPluginExternalFlowGate::default()` is fully closed and `TargetPluginInstallPolicy::default().allowed_download_hosts` is empty — keep it that way; tests opt in via explicit policies. Install validation requires https, an allowlisted host, a full 64-hex-char sha256 digest, signature and provenance URIs, and an artifact matching the host `target_triple`.
5. **Custom target types must not collide.** Unknown target types get an
interned unique `custom:<type>` plugin id (`custom_plugin_id` in
`manifest.rs`). Custom plugins with secrets must register via
`TargetPluginDescriptor::with_manifest` and declare `secret_fields`;
`::new` derives a manifest with no secrets.
5. **Custom target types must not collide.** Unknown target types get an interned unique `custom:<type>` plugin id (`custom_plugin_id` in `manifest.rs`). Custom plugins with secrets must register via `TargetPluginDescriptor::with_manifest` and declare `secret_fields`; `::new` derives a manifest with no secrets.
## Changing the admin JSON contract
- Shapes are locked twice in `plugin_contract.rs` tests: insta snapshots
(`rustfs/src/admin/snapshots/`) plus literal `json!` assertions. Update
both deliberately; a shape change is a console-facing API change.
- Field naming is `snake_case`, except discovery blocks
(`runtimeCapabilities`, `clusterSnapshot`, `extensionsCatalog`) which are
camelCase **by cross-endpoint convention** (same shape in `system.rs`,
`console.rs`, `pools.rs`). Do not "fix" that inconsistency locally.
- Contract types deliberately duplicate `rustfs_targets` types
(anti-corruption layer). Add a `From` impl; do not serialize internal
types directly.
- Shapes are locked twice in `plugin_contract.rs` tests: insta snapshots (`rustfs/src/admin/snapshots/`) plus literal `json!` assertions. Update both deliberately; a shape change is a console-facing API change.
- Field naming is `snake_case`, except discovery blocks (`runtimeCapabilities`, `clusterSnapshot`, `extensionsCatalog`) which are camelCase **by cross-endpoint convention** (same shape in `system.rs`, `console.rs`, `pools.rs`). Do not "fix" that inconsistency locally.
- Contract types deliberately duplicate `rustfs_targets` types (anti-corruption layer). Add a `From` impl; do not serialize internal types directly.
## Handler conventions
- Every new admin plugin/extension route needs authorization at the top of
`call` and an `include_str!` guard test asserting it (repo-wide pattern —
see `plugin_instance_handlers_require_admin_authorization_contract`).
- Reads use `GetBucketTargetAction` (instances) or `ServerInfoAdminAction`
(catalogs); writes use `SetBucketTargetAction`.
- Refresh persisted module switches once per request
(`refresh_persisted_module_switches`), then evaluate the sync
`module_disabled_block_reason` per domain — do not re-read the store per
domain or per instance.
- Every new admin plugin/extension route needs authorization at the top of `call` and an `include_str!` guard test asserting it (repo-wide pattern — see `plugin_instance_handlers_require_admin_authorization_contract`). The source guard checks wiring, not runtime authorization; use focused behavior evidence for changed allow/deny semantics.
- Reads use `GetBucketTargetAction` (instances) or `ServerInfoAdminAction` (catalogs); writes use `SetBucketTargetAction`.
- Refresh persisted module switches once per request (`refresh_persisted_module_switches`), then evaluate the sync `module_disabled_block_reason` per domain — do not re-read the store per domain or per instance.
## Generic bounds
Event-payload generics use the `PluginEvent` blanket trait
(`crates/targets/src/plugin.rs`). Do not respell
`Send + Sync + 'static + Clone + Serialize + DeserializeOwned`.
Event-payload generics use the `PluginEvent` blanket trait (`crates/targets/src/plugin.rs`). Do not respell `Send + Sync + 'static + Clone + Serialize + DeserializeOwned`.
+3 -3
View File
@@ -13,8 +13,8 @@ description: Review a GitHub PR using its exact base/head and repository risk po
```
Record both SHAs; refresh if either moved during fetching. Follow relevant [implementation boundaries](../../references/implementation.md).
2. Apply the [risk policy](../../references/adversarial-validation.md). Ordinary reviews use the root finding standard directly. For explicit adversarial, substantial, or high-risk reviews, use [the domain probes](../adversarial-validation/SKILL.md). File count does not authorize delegation; use exactly two independent reviewers only when authorized, otherwise two fresh sequential passes for that risk tier. Reviewers do not spawn further agents.
2. Apply the [risk policy](../../references/adversarial-validation.md), including its two perspectives for high-risk work. Ordinary reviews use the root finding standard directly. File count does not determine risk or authorize delegation; keep any delegated review within the authorized scope.
3. Check `gh pr checks <N> --repo <owner/repo>`. Investigate failures when relevant to a finding or a requested CI/readiness diagnosis. Distinguish pending, unavailable, pre-existing, flaky, and PR-caused states using evidence; a code review does not authorize unrelated repairs.
4. Report the reviewed SHAs, risk tier, supported findings or `No findings`, material verification limits, check state, and verdict. P0/P1 findings block approval. Severity: P0 = demonstrated data loss, security breach, remote crash, or deadlock; P1 = correctness, compatibility, or material hot-path regression; P2 = a concrete maintainability defect; P3 = optional style, only when requested.
5. When posting is authorized, follow [Git and PR rules](../../references/pull-requests.md), recheck the remote head, and review any delta before submitting. Use `gh pr review` with `--approve`, `--request-changes`, or `--comment` and `--body-file`; use [the API example](references/posting.md) for authorized inline comments. Reuse existing authorization.
4. Report the reviewed SHAs, risk tier, supported findings or `No findings`, material verification limits, check state, and verdict. Set severity from evidenced impact, triggering conditions, reach, and urgency: P0 is a critical issue requiring immediate action with broad or unavoidable impact; P1 is a high-impact defect requiring prompt correction; P2 is an ordinary concrete correctness, compatibility, performance, or maintainability defect; P3 is an optional improvement only when requested. A remote trigger, crash, or deadlock does not by itself establish P0. P0/P1 findings block approval; evaluate other findings and verification gaps against the actual acceptance requirements rather than approving automatically below that threshold.
5. When posting is authorized, follow [Git and PR rules](../../references/pull-requests.md), recheck the remote base and head, and review any changed diff or integration assumptions before submitting. Reuse unaffected evidence. Use `gh pr review` with `--approve`, `--request-changes`, or `--comment` and `--body-file`; use [the API example](references/posting.md) for authorized inline comments. Reuse existing authorization.
6. Follow the repository PR lifecycle and explicit monitoring scope. Fetch new heads before comparing to the reviewed SHA; never rely on an unfetched `origin/pull/<N>/head`. Push fixes or resolve threads only when authorized; check `maintainerCanModify` before a fork push.
@@ -4,19 +4,20 @@ Read only when an inline review is authorized. Recheck the PR head before postin
For inline comments on specific lines, use the GitHub API:
```bash
cat > /tmp/pr_review.json <<'EOF'
REVIEW_PAYLOAD=$(mktemp "${TMPDIR:-/tmp}/pr-review.XXXXXX")
cat > "$REVIEW_PAYLOAD" <<'EOF'
{
"commit_id": "<reviewed-head-sha>",
"body": "review body",
"event": "REQUEST_CHANGES",
"comments": [
{
"path": "crates/foo/src/bar.rs",
"path": "crates/<crate>/src/<file>.rs",
"line": 42,
"body": "finding description"
}
]
}
EOF
gh api --method POST /repos/{owner}/{repo}/pulls/<N>/reviews --input /tmp/pr_review.json
gh api --method POST /repos/{owner}/{repo}/pulls/<N>/reviews --input "$REVIEW_PAYLOAD" && rm -f "$REVIEW_PAYLOAD"
```
+21 -25
View File
@@ -1,42 +1,38 @@
---
name: rustfs-release-publish
description: Publish a RustFS version through Console, release-branch CI, preview acceptance, human confirmation, and final publication. Use only for an explicit release request.
description: Publish a RustFS version through frozen Linux candidate acceptance, desktop completion, manifest approval, byte-preserving publication and post-release follow-up. Use only for an explicit release request.
---
# RustFS Release
Require the exact final SemVer target before version edits or publication. If unspecified, inspect current releases/tags and ask with concrete candidates; do not guess the channel or bump. A named bump type resolves to an exact version that still needs confirmation. Report the confirmed target verbatim; resolve any later mismatch before proceeding. Independent read-only preflight may continue.
Require the exact final SemVer target before version edits or publication. If unspecified, inspect releases/tags and ask with concrete candidates; do not guess the channel or bump. Reuse the user's confirmed target and authorized delivery scope. Independent read-only preflight may continue.
## Invariants
- Cargo stores `<target>`, never `-preview.N`. Before publication, installation defaults retain the previous available deliverable. Final and preview binaries embed their own tag names, so version/asset names differ despite identical source.
- Use annotated tags without `v`. Preview names are exactly `<target>-preview.<digits>`; choose the next unused iteration after fetching tags. Preview Releases are prereleases, never Latest; publish only versioned assets/exact Docker tags, never latest assets, R2, Helm, moving Docker channels, or installation/banner updates.
- `release/<target>` owns the candidate. Retain its history, backport only reviewed fixes, and never merge main wholesale or force-push it. Pin `PREVIEW_HASH` to its exact commit with complete passing CI. Preview and final tags both point there; never tag a later main/branch HEAD or insert another bump.
- Phase failures block dependents. Keep preview Releases until final publication and notes generation finish; CI removes Releases while retaining tags. Never move an existing preview or final tag.
- Cargo and every candidate executable contain the final product version. `<target>-preview.<run_number>` is an immutable candidate identifier, not a public tag or displayed binary version.
- Freeze the exact source, reviewed workflow recipe, toolchain, Console, CLI, dependency lock, previous stable version and validation plan. Newer unrelated main or Console releases do not change those inputs.
- Retain `release/<target>` history when a release branch is used; backport only reviewed fixes. Pin `CANDIDATE_SHA` to its exact CI-validated commit. Never force-push a release branch or move a public tag.
- Build Linux first. Complete field acceptance before macOS/Windows and packaging. Full certification and final acceptance are required before publication; a partial Linux PASS grants no release authority.
- Promote the accepted bytes. Final publication never recompiles binaries or rebuilds packages/images. Infrastructure retries reuse successful artifacts; changed source or inputs require a new candidate and affected acceptance.
- Phase failures block dependents. No latest/default-channel update before versioned delivery. Use the [pipeline runbook](../../../docs/operations/release-pipeline.md) for executable entry points, locks and recovery.
## Read by Phase
Read only the current phase's procedure; retain completed evidence across turns. Follow root verification, Git/PR, and authorization rules.
## Read by phase
| Phase | Procedure |
|---|---|
| 0 | Clean tree, fetch main/tags, verify GitHub access, then complete the mandatory [Console release gate](references/console-gate.md). A green Console build alone is insufficient. |
| 1–2 | [Prepare/reuse the release candidate and run exact-SHA branch CI](references/release-candidate.md). Source version changes use `rustfs-release-version-bump` with authorized delivery scope. |
| 3 | [Verify the preview build, assets, channels, and notes](references/preview-release.md). |
| 4–5 | [Run the downloaded binary, Console CRUD, and latest-rc matrix](references/preview-acceptance.md). Every check must pass. |
| Confirmation | Complete the gate below and end the turn. |
| 6 | After fresh confirmation, [publish and verify the final tag](references/final-release.md) at `PREVIEW_HASH`. |
| 7 | [Maintain milestones, installation references, and the website](references/post-release-updates.md) only after complete publication. |
| 0 | Clean tree, fetch main/tags, verify access, then complete the mandatory [Console gate](references/console-gate.md). |
| 1–2 | [Prepare the exact source and run branch CI](references/release-candidate.md). Version edits use `rustfs-release-version-bump`. |
| 3 | [Build and verify the Linux candidate](references/preview-release.md). |
| 4–5 | [Run artifact, field, Console and rc acceptance](references/preview-acceptance.md), then complete desktop/package/image/chart validation. |
| Confirmation | Report the complete manifest and obtain the confirmation below. |
| 6 | [Publish the accepted manifest](references/final-release.md). |
| 7 | [Reconcile advisories, milestones, installation references, website and release branch](references/post-release-updates.md). |
## Human Confirmation
## Human confirmation
After Phases 3–5 pass, recheck that the release branch still equals `PREVIEW_HASH`. Report the target, branch, preview tag/hash, branch CI run, preview Release URL, Console result, and rc matrix. Explicitly ask whether to publish the final tag and end the turn without creating/pushing it.
After all acceptance passes, report the target, source SHA, source CI run, Linux and completion run URLs, final manifest SHA-256, accepted Console/CLI identities, compatibility/performance results and backlog report. Explicitly ask whether to publish this exact manifest and end the turn without dispatching publication.
Only a new affirmative user reply to that exact report authorizes Phase 6. The original release request, earlier confirmation, silence, or automated follow-up does not count. Confirmation binds the target, preview tag, and hash; a changed value or repeated/failed acceptance cycle invalidates it. Revalidate and obtain fresh confirmation before continuing.
Only a new affirmative reply to that exact report authorizes Phase 6. An earlier general release request, silence or automatic continuation does not count. Reuse confirmation for retries of that same manifest; do not ask again merely because a destination failed. A changed source, input, manifest or acceptance result invalidates it and requires renewed acceptance/confirmation.
## Recovery
## Recovery and reporting
- Before the final tag exists, land fixes on main, backport to the candidate, verify target versions, and restart branch CI/acceptance. Use a new preview iteration once a preview was tagged; main may advance independently.
- Once the final tag exists, retry publication jobs for that exact tag. A source fix requires a newly confirmed target, not retagging or a newer preview. Phase 7 retries recheck artifact availability and superseding releases.
- If abandoned after the bump merged, report the unpublished version on main and record whether to revert or let the next release overwrite it. Deleting candidate branches or preview tags requires an explicit decision.
Report completed phase results and incomplete work with evidence: Console previous/latest tags, release need, hash and run/Release URLs; target, branch CI/SHA, previews and hash, confirmation state; preview/final assets, latest-channel state, Console/rc results and cleanup; both milestone states, installation PR checks/merge state, and website text/link/PR/deployment state. Keep artifact publication separate from follow-up delivery; do not call an open PR a live update. Report deviations and their authorization.
Resume failed infrastructure jobs without rebuilding successful units. Fix product defects on main, backport when needed, and start a new candidate. After a final tag exists, retry the same bytes or use a new patch version; never move the tag. Do not conflate implemented, CI-passed, field-accepted, approved, published and post-release-complete states. Report incomplete work and deviations with evidence; a tag or green build alone is not a completed release.
@@ -4,7 +4,7 @@ Read during Phase 0, before changing RustFS version files or tags. Follow the pa
### Console release gate
Complete this gate before changing any RustFS version file or creating any RustFS tag. RustFS `build.yml` downloads the asset returned by `repos/rustfs/console/releases/latest`, so a successful Console build alone is insufficient.
Complete this gate before changing any RustFS version file or creating any RustFS tag. Candidate creation resolves `repos/rustfs/console/releases/latest` once and freezes the exact asset for every build, so a successful Console build alone is insufficient. After freezing, later Console releases do not silently change or invalidate the accepted inputs.
1. Read the latest published Console tag and compare it with Console `main`:
@@ -37,7 +37,7 @@ git -C "$CONSOLE_SCRATCH/console" tag -a "<console-tag>" -m "Release <console-ta
git -C "$CONSOLE_SCRATCH/console" push origin "<console-tag>"
```
Console tags include the `v` prefix. Pushing the tag triggers `.github/workflows/release.yml` (`🚀 Release`). Remove `CONSOLE_SCRATCH` after the gate completes.
Console tags include the `v` prefix. Pushing the tag triggers the Console repository's [release workflow](https://github.com/rustfs/console/blob/main/.github/workflows/release.yml) (`🚀 Release`). Remove the task-owned `CONSOLE_SCRATCH` after the gate completes.
3. Find the exact tag run and wait for completion:
@@ -55,4 +55,4 @@ test "$(gh api "repos/${CONSOLE_REPO}/releases/tags/<console-tag>" \
--jq '[.assets[] | select(.name == "rustfs-console-<console-tag>.zip" and .state == "uploaded" and .size > 0 and (.digest | startswith("sha256:")))] | length')" -eq 1
```
Treat a missing/mismatched asset, digest, latest tag, or failed/cancelled workflow as BLOCKED. Do not start Phase 1 until the Console gate passes. Record `CONSOLE_TAG`, `CONSOLE_HASH`, Console run URL, and Release URL for the final report.
Treat a missing/mismatched asset, digest, latest tag, or failed/cancelled workflow as BLOCKED. Do not start Phase 1 until the Console gate passes. Record `CONSOLE_TAG`, `CONSOLE_HASH`, the asset URL/SHA256, Console run URL, and Release URL for comparison with the inputs actually consumed by the RustFS builds and the final report.
@@ -1,22 +1,13 @@
# Final Release Publication
# Final release publication
Read only after fresh user confirmation of the preview acceptance report. The [parent confirmation gate](../SKILL.md#human-confirmation) applies.
Read only after fresh confirmation of the complete candidate report. The [parent confirmation gate](../SKILL.md#human-confirmation) applies.
## Phase 6 — Publish the final tag on the validated commit
Dispatch `release-publish.yml` on main with the successful completion run ID and approved `release-manifest.json` SHA-256. Do not create the tag manually. The workflow revalidates source, bytes and trusted certification, then creates the annotated final tag at `CANDIDATE_SHA`. A recipe change fails closed and requires a new candidate; unrelated main changes do not require a rebuild.
No second source version bump. Before creating the final tag, recheck the remote `release/<target>` HEAD equals `PREVIEW_HASH`. If it moved after confirmation, the approval no longer applies; validate and obtain confirmation for a new preview. The final tag goes on the exact commit the preview validated:
Require both versioned publication and channel publication jobs to succeed. Verify the final tag's commit and manifest identity; all six platform ZIPs and compatibility aliases; DEB/RPM, checksums, SBOM, provenance and evidence bundle; both multi-architecture image variants in Docker Hub, GHCR and Quay; and the accepted Helm chart in the chart repository. Download a host-compatible final artifact and confirm its digest is exactly the accepted candidate digest and its version/source output agrees.
```bash
git fetch origin --tags
git rev-parse "<preview-tag>^{commit}" # must equal PREVIEW_HASH — abort if not
git tag -a "<target>" -m "Release <target>" "$PREVIEW_HASH"
git push origin "<target>"
```
For stable releases verify GitHub Latest, R2 download aliases and `latest.json` unless a newer stable release already owns those channels. Prereleases must remain GitHub prereleases and leave stable pointers unchanged. Verify generated release notes compare against the frozen previous stable release, excluding internal previews.
- CI rebuilds from the same source; the only changed input is the tag name, so the binary now self-reports `<target>`.
- Verify the final tag's complete publication path: all matrix and release jobs green; `gh release view "<target>"` shows the full versioned and `-latest` asset set plus checksums, SBOM, and provenance; Docker and Helm workflows succeed; `latest.json` points to `<target>`. A stable target must have `isPrerelease=false` and `isLatest=true`. An alpha/beta/rc target must have `isPrerelease=true`; GitHub does not permit prereleases to be Latest, but the project `latest.json` still advances to the final non-preview target.
- Verify the final Release body contains `## What's Changed` and a Full Changelog link. When `PREVIOUS_DELIVERABLE` exists, the link MUST be `https://github.com/rustfs/rustfs/compare/<PREVIOUS_DELIVERABLE>...<target>` and the baseline MUST equal the preview Release baseline; for example, both `1.0.0-beta.12-preview.1` and `1.0.0-beta.12` compare from `1.0.0-beta.11`.
- Verify the preview cleanup: `cleanup-preview-releases` must succeed, `gh release view "<preview-tag>"` must then report `release not found` for every preview iteration of this target, and `git rev-parse "<preview-tag>^{commit}"` must still resolve to `PREVIEW_HASH` (the tag is kept). If the job failed, delete the leftover Releases manually with `gh release delete "<preview-tag>" --yes` and report it.
- Optionally spot-check `./rustfs --version` from a final-tag artifact — it must report `<target>`.
On infrastructure failure retry the same workflow/seal; matching destinations are reused. Never clobber an asset, force a tag, rebuild the image or silently accept a changed digest. A source fix after the final tag requires a new patch version. Cross-registry writes are not atomic: report the unfinished destination rather than claiming publication complete.
Never pass `--cleanup-tag` when removing preview Releases. Remove them manually only if `cleanup-preview-releases` failed, after final publication and notes generation. Record deleted Releases and surviving tags.
New candidates create no preview Releases to clean up. For a legacy preview release, preserve its tag and remove its Release only after final delivery and notes are verified. Do not pass `--cleanup-tag`. Complete the [post-release follow-up](post-release-updates.md) separately.
@@ -1,7 +1,17 @@
# Post-release Milestone, Installation, and Website Updates
# Post-release Security Advisory, Milestone, Installation, and Website Updates
Read only after the final non-preview tag has passed Phase 6. Tag creation or a green binary build alone is insufficient: the release assets, source archive, container images, Helm package, and applicable latest channels must be available. Preview tags never enter this phase.
## Security Advisories
Reconcile advisories after every completed final release, including Console-only releases. Read-only preparation may start earlier; do not claim an unpublished artifact is an available fix.
1. Fetch every page of the repository's live Security Advisories, including triage, draft, published, and closed states. A permission error or partial response blocks reconciliation; it does not mean there are no advisories. Keep unpublished advisory details in private task artifacts, never in a public PR, release note, or issue.
2. For each potentially relevant advisory, map its fix to the exact published tag and verify the regression evidence. Main-branch reachability, a merged private fix, or a green build alone does not prove the shipped version is fixed. Check cherry-picked equivalents and reverted fixes explicitly. For embedded Console or dependency fixes, verify the shipped component version.
3. Determine the first available fixed release and affected version ranges from evidence. Preserve an earlier correct patched version; do not relabel all fixes as the current release. An unchanged server baseline such as a Console-only release requires checking the earlier server release as well. Leave unresolved reports and fixes absent from the tag pending; do not close them merely because a release shipped.
4. Prepare any necessary corrections to package identity, affected ranges, patched versions, fix/release links, and advisory text. Preserve unrelated fields, credit, CVE identifiers, and disclosure coordination. Apply updates only within existing user authorization; read back the result to verify it. Publishing a draft, requesting a CVE, or closing a report is a separate action: require explicit authorization for the concrete advisories and respect any embargo. Release-tag approval alone does not authorize those actions. Prepare the exact proposed changes before asking for missing authorization.
5. Record each relevant advisory's URL, current state, fix evidence, first fixed version, action taken or proposed, and remaining blocker in private task artifacts. Report advisory follow-up separately from artifact publication. A successful release with unresolved advisory work is not complete follow-up; retain that work for the release monitor or a concrete user decision.
## Version milestones
1. Query all pages of both open and closed milestones in the RustFS release repository, matching titles exactly to version strings without a `v` prefix. A failed or incomplete query is not evidence that a milestone is absent; resolve the lookup before making changes.
@@ -14,7 +24,7 @@ Read only after the final non-preview tag has passed Phase 6. Tag creation or a
1. Re-read the published deliverable state before edits or a retry. If a newer release has superseded this target, do not downgrade installation references or the website announcement. Report the superseding release and leave those defaults intact.
2. Invoke `rustfs-release-version-bump` with stage `post-release`, the exact target, and the authorized delivery scope. Prepare the follow-up on current main; do not edit or move either validated release tag. Cargo versions may already be preparing the next target and must remain untouched.
3. Verify the exact Docker image manifest, Release download links, RPM source archive, and Helm repository entry before publishing the installation PR. The chart workflow overrides chart/app versions from the final tag, pins the source checkout to that release, and waits for its default Docker image before packaging.
3. Verify the exact Docker image manifest, Release download links, RPM source archive, and Helm repository entry before publishing the installation PR. The chart is packaged and tested before sealing; publication uploads those same bytes only after versioned Docker images are available.
4. Report the installation PR and its merge state separately from the completed release. Reuse existing merge authorization and repository checks; do not infer new merge authority from this reference.
## rustfs.com top banner
@@ -38,3 +48,10 @@ Use the existing announcement configuration from [website PR #112](https://githu
3. Use the site's current package manager and required checks. For this config-only change, type-check and lint the changed file, build the site, and inspect the generated homepage for the version, visible link text, and destination. Confirm `/download` actually offers the announced version before using that link.
4. Commit, push, and create or update the website PR when included in the authorized release scope. Include the published RustFS Release URL and checks run. Keep merge and production-deployment authority separate; reuse permission already given, but this reference grants none by itself.
5. After an authorized merge/deployment, verify the live `https://rustfs.com/` banner and its destination. If only the PR is ready, report that state and URL; do not report the banner as deployed. A website failure does not invalidate or move the published release tag: retry this phase after resolving the failure.
## Reconcile main and remove the completed release branch
1. Compare the exact published tag with current main. Audit every release-side commit since their merge base, including inherited backports. An ahead count is a history difference, not proof of missing changes. Use ancestry and patch equivalence, then inspect current code and regression evidence for squashed, adapted, superseded, or reverted changes. Record each commit as present, superseded, release-only, or missing; a positive `git cherry` result alone does not prove a missing fix.
2. Bring missing shared changes to main through a reviewed PR and the required checks before closing the follow-up. Preserve main's later changes; decide version bumps and pinned Console configuration separately. If a history merge is needed, use a merge commit and verify the release commit is an ancestor of main; squash does not establish that ancestry. Do not merge main into the published release branch or move its tags. Report unresolved changes instead of claiming reconciliation is complete.
3. After publication and authorized follow-ups are complete, delete the remote `release/<target>` branch. Immediately before deletion, verify its HEAD still equals the published tag's commit and no open PR targets or originates from it. Preserve a branch with newer work or open PRs and report the blocker. Use a deletion with an expected-old-SHA check to avoid removing a concurrently advanced branch.
4. Verify the remote branch is absent and the final tag and any legacy preview tags still resolve to their recorded commits. Remove a local release branch only if it is task-owned, unchecked out, and has no unpreserved work. Record cleanup separately from artifact publication; an explicitly authorized deletion before reconciliation does not make unresolved main changes complete.
@@ -1,52 +1,68 @@
# Preview Artifact Acceptance
# Candidate Artifact Acceptance
Read after Phase 3 succeeds. Complete every check below before the parent skill's manual confirmation gate. These checks cover the downloaded artifact, embedded Console, and latest rc client.
Read after Phase 3 succeeds. Complete every check below before the parent skill's manual confirmation gate. These checks cover the downloaded artifact, embedded Console, and the rc release frozen in the candidate inputs.
## Phase 4 — Run the artifact locally, verify the console
Work inside the session scratchpad directory; never leave stray data dirs.
Use a unique task-owned scratch directory. Select the versioned archive matching the acceptance host, and verify it against the sealed manifest before extraction. Before desktop completion, use the Linux acceptance environment rather than rebuilding for the local desktop. Do not substitute a different build when a matching artifact is unavailable; report that acceptance gap. The shell example below assumes the verified executable is at `RUSTFS_BINARY` (`rustfs.exe` on Windows), `SCRATCH` is the task directory, and `S3_PORT` and `CONSOLE_PORT` are distinct available ports. Use equivalent native commands when the shell differs.
Bind both listeners to loopback. Choose task-only credentials, set loopback proxy exclusions for the server/client processes, and record the server PID. A port probe does not reserve a port; retry startup with fresh ports on a bind conflict rather than connecting to an existing service.
```bash
gh release download "<preview-tag>" -p "rustfs-macos-aarch64-v<preview-tag>.zip" -D "$SCRATCH"
cd "$SCRATCH" && unzip -o rustfs-*.zip
./rustfs --version # must report the PREVIEW TAG (build::TAG), not the Cargo.toml version, plus expected short SHA
mkdir -p data
RUSTFS_ACCESS_KEY=rustfsadmin RUSTFS_SECRET_KEY=rustfsadmin ./rustfs ./data
"$RUSTFS_BINARY" --version
mkdir -p "$SCRATCH/data"
S3_ENDPOINT="http://127.0.0.1:${S3_PORT}"
CONSOLE_ENDPOINT="http://127.0.0.1:${CONSOLE_PORT}"
RUSTFS_ACCESS_KEY="$PREVIEW_ACCESS_KEY" RUSTFS_SECRET_KEY="$PREVIEW_SECRET_KEY" \
"$RUSTFS_BINARY" server \
--address "127.0.0.1:${S3_PORT}" \
--console-enable \
--console-address "127.0.0.1:${CONSOLE_PORT}" \
"$SCRATCH/data" >"$SCRATCH/server.log" 2>&1 &
PREVIEW_SERVER_PID=$!
```
Defaults: S3 endpoint `:9000`, embedded console `:9001`.
Checks (all must pass):
- `./rustfs --version` reports the preview tag name and the short SHA of `PREVIEW_HASH`. Reporting `<target>` without the `-preview.N` suffix means the build did not embed the tag — treat as FAIL and investigate before proceeding.
- `curl -fsS http://localhost:9000/health/ready` returns ready.
- `"$RUSTFS_BINARY" --version` reports the exact final `<target>` and full `CANDIDATE_SHA`. A preview suffix, another version or another source is a failure.
- Wait with a bounded readiness deadline while checking the recorded server process remains alive; `curl --noproxy '*' -fsS "$S3_ENDPOINT/health/ready"` must return ready from this process's listener.
- Startup log shows the embedded console being served (this was the regression that `fix(release): require embedded console assets` guards).
- Open `http://localhost:9001` in the browser: login with `rustfsadmin`/`rustfsadmin`; dashboard renders without JS console errors; create a bucket, upload a file, download it back (byte-identical), delete the object and bucket. Keep the server running for Phase 5.
- Open `CONSOLE_ENDPOINT` in the browser and log in with the task credentials. The dashboard must render without JS console errors; create a bucket, upload a file, download it back (byte-identical), and delete the object and bucket. Keep the server running for Phase 5.
## Phase 5 — Validate with the latest rc client
## Phase 5 — Validate with the pinned rc client
`rc` is the RustFS CLI client from <https://github.com/rustfs/cli>.
- Ensure the latest release is installed: compare `rc --version` against `gh api repos/rustfs/cli/releases/latest --jq .tag_name`; update via `brew upgrade rustfs/tap/rc` (or download the release binary).
- Point it at the preview server and run the command matrix, recording PASS/FAIL per command:
- Read the CLI release and asset digests from `inputs.json`; verify the local client's version or download a host-compatible asset from that exact release into the task directory. If the host is a desktop, resolve its asset within the same pinned CLI release and record the digest; do not independently follow `latest`. Set `RC_BIN` to that executable and record its version/digest. Avoid changing the user's installed client for this check.
- Inspect the client's current help for an isolated configuration option and use it when supported. Otherwise choose a unique `PREVIEW_ALIAS` and confirm it is absent before creating it; never overwrite an existing alias. Use task-owned bucket/user names and input/output files. The names below are safe only inside the newly started isolated server.
- Point the client at `S3_ENDPOINT` with loopback proxy exclusions and run the command matrix, recording PASS/FAIL per command:
```bash
rc alias set preview http://localhost:9000 rustfsadmin rustfsadmin
rc ls preview/
rc mb preview/rel-check
rc cp <local-file> preview/rel-check/
rc stat preview/rel-check/<file>
rc cat preview/rel-check/<file> # matches source
rc cp preview/rel-check/<file> ./out && cmp <local-file> ./out
rc cp -r <local-dir>/ preview/rel-check/dir/
rc find preview/rel-check --name "*"
rc share download preview/rel-check/<file> --expire 1h # presigned URL fetchable via curl
rc rm preview/rel-check/<file> && rc rm -r --force preview/rel-check/dir
rc rb preview/rel-check
rc admin user list preview/
rc admin user add preview/ relcheckuser relchecksecret12
rc admin user remove preview/ relcheckuser
rc alias remove preview
"$RC_BIN" alias set "$PREVIEW_ALIAS" "$S3_ENDPOINT" "$PREVIEW_ACCESS_KEY" "$PREVIEW_SECRET_KEY"
"$RC_BIN" ls "$PREVIEW_ALIAS/"
"$RC_BIN" mb "$PREVIEW_ALIAS/rel-check"
"$RC_BIN" cp <local-file> "$PREVIEW_ALIAS/rel-check/"
"$RC_BIN" stat "$PREVIEW_ALIAS/rel-check/<file>"
"$RC_BIN" cat "$PREVIEW_ALIAS/rel-check/<file>" # matches source
"$RC_BIN" cp "$PREVIEW_ALIAS/rel-check/<file>" "$SCRATCH/out"
cmp <local-file> "$SCRATCH/out"
"$RC_BIN" cp -r <local-dir>/ "$PREVIEW_ALIAS/rel-check/dir/"
"$RC_BIN" find "$PREVIEW_ALIAS/rel-check" --name "*"
"$RC_BIN" share download "$PREVIEW_ALIAS/rel-check/<file>" --expire 1h
# Fetch the presigned URL with curl --noproxy '*' and compare its body.
"$RC_BIN" rm "$PREVIEW_ALIAS/rel-check/<file>"
"$RC_BIN" rm -r --force "$PREVIEW_ALIAS/rel-check/dir"
"$RC_BIN" rb "$PREVIEW_ALIAS/rel-check"
"$RC_BIN" admin user list "$PREVIEW_ALIAS/"
"$RC_BIN" admin user add "$PREVIEW_ALIAS/" relcheckuser relchecksecret12
"$RC_BIN" admin user remove "$PREVIEW_ALIAS/" relcheckuser
"$RC_BIN" alias remove "$PREVIEW_ALIAS"
```
- Any FAIL blocks the release. Afterwards stop the server and delete the scratch data directory.
- Any FAIL blocks acceptance. On success or failure, stop only the recorded task process and remove only task-created aliases/data after retaining the needed failure evidence. Do not erase an existing client configuration or unrelated server data.
## Field acceptance and desktop completion
Before accepting the Linux manifest, record Scanner/Heal, multi-pool, memory, major features, high-concurrency 503, performance and previous-version integrity/upgrade results in backlog. Preserve the release-specific agreed limits and baseline; a PASS label without artifact identities or test results does not satisfy acceptance.
Dispatch `release-complete.yml` only after that report passes, using the exact Linux manifest digest and backlog URL. Require native macOS/Windows checks, package extraction, image startup/scans, chart tests and complete certification to pass. Complete any desktop Console/client checks applicable to the release against these same archives. Record the completion run and final manifest SHA-256 before entering the parent confirmation gate. Partial Linux acceptance does not authorize final publication.
@@ -1,24 +1,9 @@
# Preview Release Verification
# Linux candidate verification
Read for Phase 3 after the candidate passed exact-SHA CI. The [parent release invariants](../SKILL.md) apply.
Read for Phase 3 after the source passed exact-SHA CI. The [parent invariants](../SKILL.md) apply; commands and recovery live in the [pipeline runbook](../../../../docs/operations/release-pipeline.md).
## Preview channels
Dispatch `release-candidate.yml` on main with the confirmed final version and `CANDIDATE_SHA`. Record the run ID, frozen `inputs.json`, every Linux archive digest and `linux-manifest.json` SHA-256. Require the four Linux builds, native startup/S3 checks, previous-release upgrade matrix and Linux seal to succeed. Missing, skipped, cancelled or failed required work is incomplete acceptance.
- Use `<target>-preview.N` for every target, e.g. `1.0.0-beta.10-preview.3` or `1.1.0-preview.1`.
- The canonical suffix is exactly `-preview.<digits>`. `build.yml` recognizes it before alpha/beta/rc classification and routes it to the preview-only path; any other tag containing `-preview` fails closed instead of being treated as a release.
- A preview Release MUST be published with `isPrerelease=true` and `isLatest=false`. Any `*-latest` preview asset or preview-triggered `latest.json`, R2, Helm, or moving Docker channel tag is a pipeline failure. Docker images may use the exact preview version tag, including its existing variant suffixes.
- Preview Releases are cleaned up by the `cleanup-preview-releases` job after `publish-release` succeeds for the deliverable tag. It deletes every Release whose tag is exactly `<target>-preview.<digits>` and never passes `--cleanup-tag`, so the tags survive.
Verify the frozen Console identity equals the one accepted in Phase 0. Every matrix job consumes that same digest and exact toolchain. The binary must report the final product version and source commit; its candidate ID is separate. No public tag, Release, registry tag, R2 release path, Helm repository or latest pointer should change during this stage.
## Phase 3 — CI and preview Release verification
- Find and watch the tag build: `gh run list --workflow build.yml --branch "<preview-tag>" --limit 1` then `gh run watch <run-id>`. Every build matrix target must succeed (linux x86_64/aarch64 × musl/gnu, macos-aarch64, windows-x86_64).
- Confirm the preview tag resolves to the Phase 2 CI-validated `PREVIEW_HASH`. If the release branch advances during acceptance, repeat Phases 2–5 with a new preview tag.
- Confirm the Release publication jobs (`create-release`, `upload-release-assets`, and `publish-release`) succeed while `update-latest-version` is skipped.
- Verify `gh release view "<preview-tag>" --json isPrerelease,assets,url`: `isPrerelease` must be `true`, and the Release must contain all 6 versioned platform zips, checksums, SBOM, and provenance with no `-latest` assets. Confirm `gh api repos/{owner}/{repo}/releases/latest --jq .tag_name` does not return `<preview-tag>`.
- Record `PREVIOUS_DELIVERABLE`, selected from published Releases by `publishedAt` after excluding the current tag and every `-preview.N` tag. Verify `gh release view "<preview-tag>" --json body --jq .body` contains `## What's Changed` and, when `PREVIOUS_DELIVERABLE` exists, `**Full Changelog**: https://github.com/rustfs/rustfs/compare/<PREVIOUS_DELIVERABLE>...<preview-tag>`. For a repository with no previous deliverable, verify a Full Changelog link exists and record the GitHub baseline fallback.
- Confirm Helm is skipped. If preview Docker images are published, confirm they use only exact preview tags (and variant suffixes), with no `latest`, `alpha`, `beta`, or `rc` channel updates. Preview validation covers the built RustFS binaries, embedded console, and rc compatibility; it does not authorize advancing any installation default.
## Release notes
- When a previous deliverable exists, GitHub Release notes for the preview and final tags MUST use it as their shared comparison baseline: the most recently published non-preview Release before the target. Internal `-preview.N` Releases are explicitly excluded from that selection, even when they point at the same commit as the final tag — cleanup runs after the notes are generated, so the preview Release is still present and would otherwise be picked as the baseline. If no previous deliverable exists, omit `previous_tag_name` and record that GitHub's default baseline fallback was used.
- Generated Release notes carry a workflow-management marker so retries can repair them. Before manually curating a generated body, remove that marker; unmarked non-placeholder notes are preserved by later workflow runs.
A green Linux run is ready for field acceptance, not publication. The partial certification must have `publish_allowed: false`. Retain the exact Linux manifest for the next stage; a new source/build-input candidate must not inherit the old approval. A newer unrelated main commit does not invalidate this evidence.
@@ -16,22 +16,13 @@ Read for Phases 1–2. The [parent release invariants](../SKILL.md) and Console
- Only when neither the release branch, an unfinished preview tag, nor current main already has `<target>`: if main is at a later version, select and verify a historical commit containing `<target>` rather than downgrading main; block if none exists. Otherwise invoke the `rustfs-release-version-bump` skill with stage `prepare`, the final `<target>` (NOT a preview version), and full GitHub flow (commit/push/PR).
- If a bump PR was needed, get it merged into main and record its merge commit. For a new release branch when main already has `<target>`, identify the main commit that introduced those versions. Phase 2 chooses a release candidate containing that commit; an existing release branch keeps its own history and a newer main HEAD is not required.
Do not wait for the moving latest main HEAD to become green. The release-branch CI in Phase 2 validates the chosen commit before a preview tag is created.
Do not wait for the moving latest main HEAD to become green. The release-branch CI in Phase 2 validates the chosen commit before a candidate build is dispatched.
## Phase 2 — Pin and validate the release candidate, then publish the preview tag
## Phase 2 — Pin and validate the release source
- Use `release/<target>`. On the first attempt, create it from a selected main commit containing the version bump and intended changes; it need not be the latest main HEAD. On a restart, retain the existing branch and backport only reviewed fixes from main. Verify the branch's Cargo versions still equal `<target>`. If adopting an existing preview, run this branch CI before continuing its acceptance; reuse the tag only when it points to the validated SHA.
- The current `ci.yml` runs automatically on main pushes, not release-branch pushes. Dispatch it explicitly with `gh workflow run ci.yml --ref "release/<target>"`. Locate that dispatch run, verify its `head_sha` equals the release branch's remote HEAD, and require the full expected CI job set to pass, including `Quick Checks`, `Test and Lint`, and `End-to-End Tests (full merge gate)`. Treat a missing or skipped required lane as incomplete. A successful PR check or CI run for a different SHA does not qualify. If the branch advances or a run is cancelled, validate the new SHA again. Do not tag a candidate with failing or incomplete CI.
- Use `release/<target>`. On the first attempt, create it from a selected main commit containing the version bump and intended changes; it need not be the latest main HEAD. On a restart, retain the existing branch and backport only reviewed fixes from main. Verify the branch's Cargo versions still equal `<target>`. A legacy preview can anchor source selection, but its tag and old artifacts do not constitute a candidate in the new protocol; freeze and verify a new candidate after the release recipe is aligned.
- The current `ci.yml` runs automatically on main pushes, not release-branch pushes. Dispatch it explicitly with `gh workflow run ci.yml --ref "release/<target>"`. Locate that dispatch run, verify its `head_sha` equals the release branch's remote HEAD, and require the full expected CI job set to pass, including `Quick Checks`, `Test and Lint`, and `End-to-End Tests (full merge gate)`. Treat a missing or skipped required lane as incomplete. A successful PR check or CI run for a different SHA does not qualify. If the branch advances or a run is cancelled, validate the new SHA again. Do not dispatch a candidate with failing or incomplete CI.
- Prefer protecting `release/*` against force pushes and deletion and requiring reviewed backport PRs. Check live rulesets rather than assuming the main ruleset covers release branches; report a missing release-branch rule as a gap.
- Set `PREVIEW_HASH` to the CI-validated release-branch commit and recheck the remote branch HEAD immediately before tagging. Report the branch, commit, and CI run URL; do not derive `PREVIEW_HASH` from a later `origin/main` fetch. When adopting an existing preview tag at this SHA, skip tag creation and continue Phase 3.
```bash
git tag -a "<preview-tag>" -m "Release <preview-tag>" "$PREVIEW_HASH"
git push origin "<preview-tag>"
```
Pushing the tag triggers `.github/workflows/build.yml` ("Build and Release"); `docker.yml` chains off it via `workflow_run`.
The preview run builds versioned artifacts and publishes them in a GitHub prerelease. Docker may publish exact preview image tags. Latest-channel, R2, and Helm publication must be skipped; installation references and the website announcement stay unchanged.
On a restart after a backport, re-run release-branch CI before setting the new `PREVIEW_HASH`. Use the next unused preview iteration when the validated commit differs from an existing preview tag; never move an existing tag.
- Set `CANDIDATE_SHA` to the CI-validated release-branch commit. Record the branch, exact commit and CI run URL. The new candidate protocol starts from a commit whose release recipe matches the reviewed main dispatcher; backport the recipe before freezing an older release branch if needed.
- Dispatch the Linux candidate as described in [candidate verification](preview-release.md). Do not create a preview or final tag here. The final executable already contains `<target>`; publication later promotes those same bytes.
- After a source or build-input change, run the affected source checks and create a new candidate. Reuse the frozen candidate after an infrastructure failure. Do not restart acceptance for unrelated main advances.
@@ -4,18 +4,18 @@ description: Prepare an exact RustFS Cargo version or align installation referen
---
# Release Version Files
Require an exact target; ask if missing or ambiguous. Reject targets containing `-preview`: those are tag-only. Infer `post-release` only from an explicit request or parent workflow; otherwise use `prepare`. Delivery defaults to local edit/verify; commit, push, PR, and merge follow existing authorization and [Git rules](../../references/pull-requests.md).
Require an exact target; ask if missing or ambiguous. Reject targets containing `-preview`: those identify candidates, not product versions or new public tags. Infer `post-release` only from an explicit request or parent workflow; otherwise use `prepare`. Delivery defaults to local edit/verify; commit, push, PR, and merge follow existing authorization and [Git rules](../../references/pull-requests.md).
| Stage | Files and constraints |
|---|---|
| `prepare` | Only `Cargo.toml` and `Cargo.lock`: workspace package, internal dependency, and workspace member versions become `<target>`. External dependencies stay unchanged. |
| `post-release` | Only `README.md`, `README_ZH.md`, `flake.nix`, `helm/rustfs/Chart.yaml`, and `rustfs.spec`. Cargo may already target the next release; leave it untouched. |
Before installation edits, verify the exact non-preview Release, downloadable assets/source archive, pullable `rustfs/rustfs:<target>` image manifest, and published Helm chart. Block on missing artifacts. Do not downgrade defaults if a newer deliverable superseded the target. Preview preparation retains the previous published installation references; follow-up commits never replace either validated tag.
Before installation edits, verify the exact non-preview Release, downloadable assets/source archive, pullable `rustfs/rustfs:<target>` image manifest, and published Helm chart. Block on missing artifacts. Do not downgrade defaults if a newer deliverable superseded the target. Candidate preparation retains the previous published installation references; follow-up commits never replace validated tags or sealed artifacts.
Packaging policy:
- Docker image tags have no `v` prefix. Derive chart/app versions with `scripts/helm_chart_version.sh <target>` (`beta.N -> 0.N.0`; other versions unchanged). Helm CI derives versions from the final tag, so no early chart bump is required.
- Docker image tags have no `v` prefix. Derive chart/app versions with `scripts/helm_chart_version.sh <target>`; both equal the final product SemVer, including prerelease suffixes. Helm CI uses the frozen candidate version before sealing, so no early installation chart bump is required. Previously published chart versions remain unchanged.
- RPM `Version` is numeric; `Release` is the prerelease suffix or `1` for stable. Expanded `Source0` and the unpack directory must resolve to the exact target including its suffix. Add the changelog entry using current git identity, date, and target; never copy an example identity/date.
- Changing these mappings requires explicit confirmation.
@@ -1,4 +0,0 @@
interface:
display_name: "RustFS Release Bump"
short_description: "Prepare RustFS release branches like PR #2957."
default_prompt: "Use $rustfs-release-version-bump to prepare and verify an exact RustFS release-version bump."
@@ -1,41 +0,0 @@
---
name: security-advisory-lessons
description: Perform a dedicated RustFS security/advisory review for authn/authz, IAM, RPC trust, paths, secrets, browser isolation, encryption, Object Lock, or other security boundaries. Use only when the user requests a security/advisory review or an adversarial review explicitly escalates to the full advisory map; do not auto-load solely because code touches a sensitive path.
---
# RustFS Security Advisory Lessons
Use this skill as the deep security lens. For a normal adversarial review with a
matched security surface, the concise security reference under
`adversarial-validation` is sufficient.
## Workflow
1. Freeze the exact diff/head and identify the changed trust boundaries.
2. Inspect the headings in [advisory-patterns.md](references/advisory-patterns.md),
then read the matching sections. Read the full map only for a broad security
audit. Useful headings are
auth/admin, IAM/STS/OIDC, policy/plugins, S3/copy/multipart, protocols, paths,
secrets/logging/RPC, browser/CORS/proxy, SSE, Object Lock, and serde.
3. Trace unauthenticated, low-privilege, wrong-action/owner/bucket, malformed,
and default-config cases. Security decisions must fail closed.
4. Require a focused negative regression test for the bypass/exploit form, not
only the intended success path. State residual risk when a test is impractical.
5. Report proven vulnerabilities separately from defense-in-depth hardening.
When advisory currentness matters, fetch the live inventory instead of treating
the reference as a status mirror:
```bash
gh api repos/rustfs/rustfs/security-advisories --paginate \
--jq '.[] | {ghsa_id,state,severity,summary,updated_at}'
```
Fetch an individual advisory only when the live summary indicates a new or
changed lesson.
## Finding Standard
Each finding includes severity, `file:line`, attacker prerequisites, concrete
input/path, impact, smallest safe fix, and a regression check. Do not exaggerate
unauthenticated impact when the actual issue requires authenticated low privilege.
@@ -1,4 +0,0 @@
interface:
display_name: "Security Advisory Lessons"
short_description: "Apply advisory lessons in reviews."
default_prompt: "Use $security-advisory-lessons for a dedicated RustFS security review grounded in past advisories."
@@ -1,155 +0,0 @@
# RustFS Advisory Pattern Map
This file is a lesson map, not an advisory inventory mirror. It keeps durable security patterns distilled from RustFS GitHub Security Advisories.
When current advisory state, severity, URLs, or full text matters, fetch it live:
```bash
gh api repos/rustfs/rustfs/security-advisories --paginate \
--jq '.[] | {ghsa_id,state,severity,summary,updated_at}'
gh api repos/rustfs/rustfs/security-advisories/<GHSA_ID>
```
Update this file only when an advisory adds or changes a reusable lesson, affected surface, validation pattern, or regression-test expectation. Do not update it for state-only, URL-only, count-only, or timestamp-only changes.
## Pattern Index
### Admin authorization and route exposure
- `GHSA-pfcq-4gjr-6gjm`: notification target endpoints accepted authenticated users but skipped admin authorization. Lesson: distinguish authn from authz; admin target CRUD must call the operation-specific admin authorization path.
- `GHSA-mm2q-qcmx-gw4w`: `ListServiceAccount` used `UpdateServiceAccountAdminAction`, while update lacked target ownership checks. Lesson: exact action constants and ownership checks are both required; information disclosure can chain into secret rotation and takeover.
- `GHSA-vcwh-pff9-64cc`: `ImportIam` checked `ExportIAMAction` for an import/write operation. Lesson: every admin handler must authorize the action it actually performs.
- `GHSA-jqmc-mg33-v45g` and `GHSA-8784-9m7f-c6p6`: `/profile/cpu` and `/profile/memory` were whitelisted from auth and allowed expensive diagnostics plus path disclosure. Lesson: profiling/debug endpoints need admin auth, opt-in, rate limits, and non-sensitive responses.
- `GHSA-f5cv-v44x-2xgf`: `/rustfs/admin/v3/metrics` accepted any authenticated IAM user and skipped admin authorization. Lesson: read-only metrics and diagnostic admin endpoints still require an operation-specific admin action check.
- `GHSA-796f-j7xp-hwf4`: `/rustfs/admin/v3/list-remote-targets` checked only that credentials existed and leaked replication target credentials. Lesson: replication target reads are privileged admin operations, and stored remote credentials require strict authz plus response redaction review.
- `GHSA-xp32-gxq2-3v52`: console license metadata endpoint was public and exposed subject and expiration fields. Lesson: management metadata endpoints should require admin auth or return only coarse public status.
### IAM import, service accounts, and privilege boundaries
- `GHSA-566f-q62r-wcr8`: `ImportIam` accepted attacker-controlled service account `parent`, `claims`, `accessKey`, and `secretKey`, enabling persistent backdoor accounts under root. Lesson: imported IAM payloads are untrusted data and must be validated against privilege boundaries.
- `GHSA-3495-h8r9-gfqg`: `ExportIAM` wrote regular-user and service-account secret keys into exported ZIP data. Lesson: IAM export is a credential-disclosure boundary; redact, seal, or strictly justify every exported secret before treating export permission as safe.
- `GHSA-5354-r3w2-34m8`: `AddServiceAccount` checked `CreateServiceAccountAdminAction` but trusted caller-supplied `target_user`, allowing service accounts under the root parent. Lesson: service-account create paths must validate parent ownership or root/admin authority, not only the create action.
- `GHSA-xgr5-qc6w-vcg9`: `deny_only=true` skipped allow checks and let restricted service accounts mint unrestricted children. Lesson: deny-only logic must never become implicit allow for privilege creation.
- `GHSA-mm2q-qcmx-gw4w`: leaked service account access keys plus update-without-ownership formed an escalation chain. Lesson: service-account identifiers are security-sensitive because update APIs consume them.
### STS, OIDC, and federation flows
- `GHSA-5qfg-mf7r-jp3w` and `GHSA-3473-5353-xhwh`: `AssumeRoleWithWebIdentity` was reachable through unauthenticated `POST /` routing and could issue temporary credentials from crafted web identity input. Lesson: every STS route needs explicit SigV4 or trusted identity-provider validation before role assumption, and unauthenticated exemptions must be narrowed to the exact action with uniform failure responses.
- `GHSA-jxrr-r6pv-h958`: unsigned JWT issuer data was decoded before verification to select an OIDC provider, and distinguishable failures could expose provider configuration. Lesson: web-identity routing may be unauthenticated, but pre-verification claims are untrusted routing hints; bound and rate-limit the request, normalize public errors, and verify signature, issuer, audience, and expiration before issuing credentials.
- `GHSA-ccrv-v8v9-ch9q`, `GHSA-48rf-7j3q-3hfv`, and `GHSA-xvfh-7c9g-hpw2`: service-account-controlled material could self-sign JWT session tokens with forged policy claims, and missing `exp` was accepted for service-account tokens. Lesson: session tokens must be signed by a trusted issuer/key path, enforce required claims and expiration, and reject self-signed or principal-controlled tokens.
- `GHSA-9pjf-w3c2-m32r`, `GHSA-4x2q-cpx9-9h26`, and `GHSA-xvpm-p3f7-34c3`: public OIDC authorize/callback flows trusted request `Host` or forwarded scheme when building credential-bearing redirects. Lesson: OIDC redirects must use configured allowlisted origins and trusted-proxy handling; never derive the post-login credential destination from direct client headers.
- `GHSA-m479-9x88-94w6`, `GHSA-frwq-mfqx-83p8`, `GHSA-q9q8-rf9r-fg9f`, and `GHSA-j5c2-hhf7-6gf5`: OIDC validation accepted attacker-controlled discovery URLs because hostname checks rejected only literal forbidden IPs, allowing DNS rebinding SSRF. Lesson: outbound federation URL validation must resolve and classify hostnames at the connection boundary and reject loopback, private, link-local, and rebound addresses.
### IAM policy conditions and external policy plugins
- `GHSA-6r96-hmgc-726c`: request headers collided with lowercase server-derived condition keys such as `userid`, `groups`, `versionid`, and JWT/LDAP claims. Lesson: never let caller-controlled headers append to or replace server-derived policy context; reserve trusted condition keys and keep intentional request-header keys separate.
- `GHSA-v9cp-qfw9-9pfp`: quantified negated string conditions applied negation after aggregation, transposing `ForAllValues` and `ForAnyValue` semantics. Lesson: push negation into the per-value predicate for quantified operators and test partially overlapping multi-value sets.
- `GHSA-5w8r-p896-6vq2`: OPA policy mode skipped `ExistingObjectTag/*` loading, so tagged objects looked untagged to external policies. Lesson: external authorization plugins need the same object-tag and request context as built-in policy evaluation before they decide.
### S3 object actions, copy, multipart, and upload policy validation
- `GHSA-g8w9-qw9q-fghr` and `GHSA-xm99-m3gq-83g8`: a valid presigned `PutObject` accepted extra `x-amz-*` headers omitted from `SignedHeaders`; `x-amz-copy-source` could turn that upload capability into a cross-bucket read performed as the signer. Lesson: a presigned URL is a bounded capability; inspect all received security-sensitive headers and reject unsigned ones before selecting the S3 operation or reaching storage.
- `GHSA-3ppv-fx5m-m749`: explicit `versionId` reads and copy sources authorized `s3:GetObject` instead of `s3:GetObjectVersion`. Lesson: version-specific object access must select version-specific actions for direct reads, `CopyObject`, and `UploadPartCopy`, with tests proving the backend is not reached on denial.
- `GHSA-gjph-xcgw-4p7w`: `PutObject` and browser POST accepted a caller-supplied `versionId` and replaced an unlocked historical version with only `s3:PutObject`. Lesson: only replication-authorized writes may choose an existing version ID; ordinary uploads must not rewrite version history.
- `GHSA-x298-9x87-fvjq`: anonymous `ListObjectVersions` fell back to `ListBucket` and returned before public-access-block gates. Lesson: compatibility fallbacks must converge on the same post-authorization checks as direct grants, especially `RestrictPublicBuckets` and anonymous data-plane denies.
- `GHSA-mx42-j6wv-px98`: `UploadPartCopy` missed source authorization and allowed cross-bucket object exfiltration. Lesson: multipart copy must enforce the same source and destination contract as `CopyObject`.
- `GHSA-wfxj-ph3v-7mjf`: `UploadPartCopy` checked source and destination independently but missed destination copy-source policy constraints. Lesson: source read and destination write checks are not sufficient when policy constrains allowed copy sources.
- `GHSA-w5fh-f8xh-5x3p`: presigned POST accepted uploads without enforcing signed policy conditions. Lesson: parse and enforce all POST policy constraints server-side, including size, key prefix, and content type.
### Protocol frontends and IAM parity
- `GHSA-3g29-xff2-92vp`: FTP `RETR` and `SIZE`/`MDTM` read paths authenticated the user but skipped IAM before calling storage. Lesson: non-HTTP protocol frontends must enforce the same per-operation authorization as the S3 API before backend access.
- `GHSA-g3vq-vv42-f647`: FTPS `MKD` called `create_bucket` without checking `s3:CreateBucket`. Lesson: protocol command handlers need action-specific checks even when sibling handlers already authorize correctly.
- `GHSA-3p3x-734c-h5vx`: FTPS and WebDAV compared secret keys with early-return string equality, while FTPS also returned distinguishable invalid-user and invalid-password failures. Lesson: password-style protocol auth needs constant-time secret comparison, indistinguishable failures where practical, and rate limiting.
- `GHSA-rhg6-jrf2-29c4`: WebDAV, FTP/FTPS, and SFTP used identity-policy checks with empty conditions and bypassed S3 bucket-policy explicit denies and condition-key denies. Lesson: alternate listeners must evaluate the same effective policy and trustworthy request context before storage access.
### Filesystem paths and object key traversal
- `GHSA-pq29-69jg-9mxc`: RPC `read_file_stream` joined untrusted paths under a volume directory without canonical boundary checks. Lesson: `PathBuf::join` plus length checks are not path security.
- `GHSA-8r6f-hmq2-28rg`: object keys containing traversal sequences bypassed bucket/object authorization when mapped to filesystem paths. Lesson: reject traversal at object-key parsing and verify final storage paths remain under the expected bucket/key root.
- `GHSA-f4vq-9ffr-m8m3`: Snowball auto-extract accepted archive entries such as `../victim-bucket/object`, authorized the raw attacker-bucket path, then storage path cleaning crossed bucket boundaries. Lesson: archive entries become object keys and need traversal rejection plus consistent authz/storage normalization before writes.
- `GHSA-g7fq-6xjm-mxf4`: versioned `DeleteObjects` accepted dot-segment keys, authorized the literal prefix, then wrote delete markers under a resolved sibling prefix. Lesson: validate each batch key before authorization and storage normalization, using the same object-name rules as single delete.
### Secrets, defaults, and cryptographic misuse
- `GHSA-j59h-h7q5-q348`, `GHSA-3wm5-wpm5-hmfm`, `GHSA-6wc8-xm48-qhmx`, `GHSA-9gf3-jx4p-4xxf`, `GHSA-63xc-c3w3-m2cf`, and `GHSA-ch63-6q4v-hwp5`: RustFS shipped known default root credentials that could authenticate to S3, admin APIs, IAM, KMS, console, and token-signing surfaces. Lesson: root credentials must be operator-provided or generated per install; known defaults and warnings are not acceptable for network-reachable deployments.
- `GHSA-h956-rh7x-ppgj`: gRPC used the hard-coded token `rustfs rpc` on both client and server. Lesson: source-visible shared tokens are authentication bypasses.
- `GHSA-r5qv-rc46-hv8q`: internode RPC HMAC secret fell back to the public default `rustfsadmin`. Lesson: RPC/internode auth must fail closed instead of silently using public defaults.
- `GHSA-75fx-qg6f-8rm7` and `GHSA-68cw-96m3-h2cf`: internode RPC secrets were derivable from known root credentials, making raw storage RPC signatures forgeable when explicit RPC secrets were unset. Lesson: RPC auth keys must be independent random secrets, never derived from S3 root credentials, and raw storage RPC should not share the public S3 listener without an internode-only boundary.
- `GHSA-m77q-r63m-pj89`: STS JWTs used the root secret key as the shared token signing key, allowing token forgery when the root secret was known. Lesson: STS signing keys need key separation, rotation, and key IDs; do not reuse root credentials for JWT/HMAC signing.
- `GHSA-923g-jp7v-f97f`: license verification embedded a production RSA private key and used private-key decryption as authenticity. Lesson: ship verifying/public keys only and use real signature verification.
### Sensitive logging and debug output
- `GHSA-r54g-49rx-98cr`: STS credentials were logged at info level. Lesson: generated credentials must never be logged in plaintext.
- `GHSA-8cm2-h255-v749`: debug logs leaked session tokens, secret keys, JWT claims, and raw STS response bodies. Lesson: redaction must cover custom `Debug` implementations and dependency response-body logging.
- `GHSA-333v-68xh-8mmq`: invalid RPC signature logging included the shared HMAC secret and expected signature. Lesson: error paths often leak secrets; never log raw secrets or derived authenticators.
### RPC input validation and panic safety
- `GHSA-gw2x-q739-qhcr`: malformed gRPC `GetMetrics` payloads reached `unwrap()` on deserialization and caused remote DoS. Lesson: every network/RPC deserialization failure returns an error, not a panic.
- `GHSA-h956-rh7x-ppgj` and `GHSA-r5qv-rc46-hv8q`: weak RPC auth increased reachability of otherwise internal handlers. Lesson: panic bugs become more severe when internode auth is weak or defaulted.
- `GHSA-c667-rgrv-99vj`: NodeService authentication signed the service prefix instead of the concrete generated method path, so valid metadata for one RPC could be replayed to another method during the timestamp window. Lesson: RPC HMAC payloads must bind exact gRPC method path, HTTP method surrogate, timestamp, and secret.
### Browser, CORS, and console isolation
- `GHSA-v9fg-3cr2-277j`: object preview rendered attacker-controlled HTML in a same-origin iframe, exposing console credentials stored in `localStorage`. Lesson: user content must be origin-isolated from the console and protected with `nosniff`, CSP, and strict content-type handling.
- `GHSA-7gcx-wg4x-q9x6`: an incomplete preview fix reintroduced extension-based PDF detection and bypassed the sandboxed fallback for attacker-controlled content. Lesson: browser-surface fixes need regression tests for alternate viewers and file-type branches, and preview trust must come from validated content type plus sandboxing rather than object names.
- `GHSA-x5xv-223c-8vm7`: default CORS reflected arbitrary origins with credentials. Lesson: never combine reflected origins with `Access-Control-Allow-Credentials: true`; default should be fail-closed.
### Trusted proxy and source IP conditions
- `GHSA-fc6g-2gcp-2qrq`: `aws:SourceIp` trusted client-supplied `X-Forwarded-For` or `X-Real-IP`. Lesson: forwarded IP headers are valid only behind configured trusted proxies; direct clients use socket peer IP.
### SSE and on-disk storage invariants
- `GHSA-xrrf-67jm-3c2r`: SSE metadata reported encryption while reader composition bypassed `EncryptReader` and stored plaintext. Lesson: test actual bytes on disk and wrapper order, not only API metadata.
- `GHSA-wqmc-vjgv-jrpw`: SSE-C persisted and listed the plaintext MD5 as the ETag, allowing list-only users to confirm or brute-force low-entropy content and correlate equal plaintext across keys. Lesson: encrypted-object ETags must not expose deterministic plaintext fingerprints; protect them with per-object key material and keep listing, conditional, copy, and multipart semantics consistent.
### Object Lock and retention invariants
- `GHSA-j548-9grx-fh4f`: Object Lock enforcement treated unreadable, fabricated, or unparsable bucket metadata as absent configuration and allowed retained objects to be deleted or expired. Lesson: retention must fail closed unless Object Lock absence is authoritative, and every delete, lifecycle, scanner, force-delete, and default-retention path needs the same state distinction.
- `GHSA-28w4-rp2p-636w` and `GHSA-c7hx-vr97-45rg`: an authorized `DeleteBucket` with `x-rustfs-force-delete: true` removed active COMPLIANCE-retained versions even though ordinary version deletion was denied. Lesson: bucket force-delete must enforce retention across every version, including against root/owner callers.
### Serde deserialization and input validation
- Reject unknown fields in untrusted S3 API XML/JSON, lifecycle, policy, and replication input where compatibility permits. Check the current type and supported payload fixtures; do not infer the repository's current coverage from an older audit. Where extra fields are part of the compatibility contract, validate security-critical values explicitly.
- `#[serde(default)]` on security-critical fields silently accepts missing values as zero/empty. Lesson: when a field has security implications (retention days, permissions, limits), validate the deserialized value explicitly rather than relying on defaults.
- Integer fields deserialized from user input and cast with `as` (e.g., `i32 as u32`) can wrap negative values to large positives. Lesson: validate ranges before casting; use `try_into()` with a typed error, or clamp only when the domain explicitly requires saturation.
- XML config typos (e.g., `"NoncurentDays"` instead of `"NoncurrentDays"`) are silently accepted when `deny_unknown_fields` is absent. Lesson: strict deserialization prevents silent misconfiguration that could cause data loss or unexpected retention behavior.
## Useful Search Seeds
Use these targeted searches when a diff touches security-sensitive code:
```bash
rg -n "validate_admin_request|check_permissions|AdminAction::|deny_only|is_allowed" rustfs crates
rg -n "authorize_operation|FtpsDriver|SftpDriver|RETR|MKD|SIZE|MDTM|CreateBucket|GetObject|HeadObject" crates/protocols rustfs
rg -n "UploadPartCopy|upload_part_copy|CompleteMultipart|PostObject|presign|SignedHeaders|x-amz-copy-source|collect_signed_headers|content-length-range|starts-with" rustfs crates
rg -n "ListBucketVersions|GetObjectVersion|versionId|VersionId|ExistingObjectTag|ForAllValues|ForAnyValue|POLICY_PLUGIN|opa" rustfs crates
rg -n "normalize_extract_entry_key|Snowball|auto-extract|PathBuf::join|canonicalize|\\.\\.|x-forwarded-for|x-real-ip|SourceIp" rustfs crates
rg -n "DEFAULT_SECRET|DEFAULT_ACCESS|TEST_PRIVATE_KEY|rustfs rpc|RUSTFS_RPC_SECRET" rustfs crates
rg -n "TONIC_RPC_PREFIX|verify_rpc_signature|check_auth|NodeServiceServer|x-rustfs-signature" rustfs crates
rg -n "debug!|trace!|info!|error!|\\?resp|\\?merged_config|session_token|secret_key" rustfs crates
rg -n "HashReader|EncryptReader|try_resolve_etag|ETag|SSE|server-side encryption|Access-Control-Allow-Credentials|Origin" rustfs crates
rg -n "ObjectLock|object_lock|retention|COMPLIANCE|GOVERNANCE|delete_prefix|lifecycle|scanner" rustfs crates
rg -n "deny_unknown_fields|serde.default|as u32|as usize|as i32" rustfs crates
```
## Minimum Regression Test Expectations
- Authz fixes: include unauthenticated, valid low-privilege, wrong-action, correct-action, owner, non-owner, and root/admin cases as applicable.
- Protocol frontend authz fixes: include denied `RETR`, `SIZE`/`MDTM`, `MKD`, bucket probe, and sibling allowed-operation cases; test bucket-policy explicit denies and condition-key denies on each enabled listener against an S3 control, and assert denied paths do not reach storage.
- IAM fixes: include import/update/list service-account cases with attacker-controlled parent, claims, access key, secret key, and policy.
- Copy/upload fixes: include cross-bucket, cross-user, source-denied, destination-denied, copy-source-condition, and multipart completion cases.
- Presigned upload fixes: include a valid presign with extra unsigned tagging, redirect, storage-class, and cross-bucket copy-source headers; require rejection before source or destination storage access, and verify explicitly signed equivalents still work.
- Version-action fixes: include historical UUID, explicit current version, `null`, range, partNumber, presigned, STS/session, service-account, anonymous bucket-policy, copy source, and multipart-copy source cases.
- Version-write fixes: a `PutObject`-only principal must not replace an existing version through `PutObject` or browser POST `?versionId=`; verify replication-authorized writes and versioned, suspended, and unversioned buckets separately.
- Policy-condition fixes: include reserved-key header collisions, missing keys, partially overlapping multi-value sets, plugin mode, and built-in policy mode.
- Path fixes: include encoded traversal, absolute path, nested traversal, archive entries with `..`, valid object keys that resemble traversal text but should be rejected, and canonical bucket/prefix boundary checks; test per-key `DeleteObjects` errors and prefix-scoped denials on versioned buckets.
- Logging fixes: assert redacted output for structs and response bodies that may contain credentials.
- IAM export fixes: assert exported archives omit plaintext user and service-account secrets unless the format deliberately encrypts or seals them.
- RPC auth fixes: include captured metadata replay across two concrete methods, stale timestamps, wrong path, wrong method surrogate, wrong secret, and valid same-method calls.
- Browser/CORS fixes: assert no credentials on reflected/default origins, correct behavior for explicit allowlists, and no same-origin script execution for previewed object content.
- SSE fixes: inspect stored bytes and verify API metadata, read-back behavior, and on-disk ciphertext together; for ETags, upload equal plaintext under different keys and assert list-only callers cannot derive or correlate the plaintext digest, including multipart objects.
- Object Lock fixes: include unreadable metadata, fabricated metadata defaults, unparsable config, confirmed absent config, COMPLIANCE/GOVERNANCE retention, lifecycle expiry, scanner sweeps, and force-delete paths; an authorized force-delete must preserve active COMPLIANCE versions.
-5
View File
@@ -1,5 +0,0 @@
# Bound individual tool outputs retained in context; retrieve relevant ranges
# from task-owned log files when more evidence is needed.
# https://learn.chatgpt.com/docs/config-file/config-reference
tool_output_token_limit = 4000
+16
View File
@@ -0,0 +1,16 @@
{
"schema_version": 1,
"rollout": "enforced",
"core_packages": ["rustfs", "rustfs-ecstore", "rustfs-filemeta", "rustfs-iam", "rustfs-policy"],
"connect_packages": [
"rustfs-credentials", "rustfs-config", "rustfs-common", "rustfs-crypto",
"rustfs-iam", "rustfs-policy", "rustfs-kms", "rustfs-license", "rustfs-security-governance",
"rustfs-utils", "rustfs-tls-runtime", "rustfs-trusted-proxies", "rustfs-filemeta",
"rustfs-lock", "rustfs-obs", "rustfs-signer", "rustfs-io-metrics", "rustfs-s3-ops"
],
"full_paths": [
"Cargo.toml", "Cargo.lock", "*/Cargo.toml", "rust-toolchain*", "rustfmt.toml",
"clippy.toml", ".cargo/*", ".config/*", ".github/*", "Makefile",
"scripts/*", "build.rs", "*.proto"
]
}
+2 -2
View File
@@ -1,2 +1,2 @@
sha256-linux=233bd7a68777eda1f044b6cb77128056be2b6492583c0dfd114b21e98a6102ef
sha256-darwin=233bd7a68777eda1f044b6cb77128056be2b6492583c0dfd114b21e98a6102ef
sha256-linux=348fa5eed9ae58962c06b33283ff4f15122cff97bce9b4eb1e3ffcb227264b0b
sha256-darwin=348fa5eed9ae58962c06b33283ff4f15122cff97bce9b4eb1e3ffcb227264b0b
+2 -2
View File
@@ -1,2 +1,2 @@
sha256-darwin=98dff0961c6eb21d6128bfd2d4a6100a624ddf1fb7db05dba360a5d3d0a310c2
sha256-linux=890f5925b87e1bf3710c356253f3b2276d901e156df9ccc04ec9315374de6d22
sha256-darwin=0374e6b9b061dd5d622686301386232a4aa1cb22eedc18af70d2a7411bc66f8d
sha256-linux=f2cee240f7a744ae991971820f48a6c9c28d19f525e8b2345fcb76eeaaf1e382
+2 -2
View File
@@ -1,2 +1,2 @@
sha256-darwin=efe68675f4676a0d2901242c5815b1f7af5cdec8231f7cccd408f6dacf5c75db
sha256-linux=003ed6480935a0a95680cc061be143722fbd37bd477b8ff98607b1a064f3aef1
sha256-darwin=e84e04208f19dc0596b10d4d1b799ce43d6cc431415902f9c5458aa8232bc2d8
sha256-linux=1f9c7add72c44d1c12ef4ac050bb7917431be657c0c90b29f70c3df56f8bbae3
+1 -1
View File
@@ -1 +1 @@
sha256=e4ee3898b840a8374cb02c64342cc15f8d7ecd1becaf4b4a2a4657290f9e7ff1
sha256=4eac269f9a59b2f9be4e7a87ea6aa38454f5ebe10ede35c9b8d4218137d2cd35
+1 -1
View File
@@ -1 +1 @@
sha256=ba8f392b617cf9f2338142233a417e43927b28096635e628233ce8a60cf49d10
sha256=21e9a1561ac20382503c38353bbb9b830658534a4f277c254a42d0afc6ebed8b
+2 -7
View File
@@ -29,7 +29,7 @@
{
"invariant": "list-uncommitted-version",
"suite": "rustfs-filemeta",
"name": "metacache::tests::resolve_with_write_quorum_slack_keeps_partial_latest_hidden_during_merge"
"name": "metacache::tests::resolve_merge_keeps_the_newest_version_at_listing_quorum"
},
{
"invariant": "minio-object-fixture",
@@ -229,7 +229,7 @@
{
"invariant": "list-objects-shared-corpus-orphan-cleanup-requires-authoritative-evidence",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_orphan_cleanup_requires_authoritative_evidence"
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_orphan_listing_preserves_inputs"
},
{
"invariant": "list-objects-shared-corpus-consumer-drop-joins-real-disk-producer",
@@ -241,11 +241,6 @@
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_cancelled_quorum_walk_releases_senders_and_disk_lock"
},
{
"invariant": "list-objects-shared-corpus-enabled-index-contracts",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_enabled_index_contracts"
},
{
"invariant": "borrowed-context-boundary",
"suite": "rustfs-ecstore",
+11
View File
@@ -70,6 +70,16 @@ s3s-footprint-check: ## Check the s3s dependency footprint ratchet stays frozen
@echo "📦 Checking s3s footprint ratchet..."
./scripts/check_s3s_footprint.sh
.PHONY: test-count-ratchet-check
test-count-ratchet-check: ## Check no workspace crate fell below its test floor or rose above its #[ignore] ceiling in the committed baseline
@echo "🧪 Checking per-crate test-count ratchet..."
./scripts/check_test_count_ratchet.sh
.PHONY: test-seams-check
test-seams-check: ## Check tests outside an operation's owner call its use-case only through rustfs/src/app/test_seams
@echo "🧪 Checking cross-owner test seams..."
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_seams.py
.PHONY: fips-wording-check
fips-wording-check: ## Check docs and crates/kms do not over-claim crypto capabilities
@echo "📣 Checking cryptographic capability wording guard..."
@@ -90,6 +100,7 @@ test-wiring-check: ## Check tests stay registered and selected by their intended
@echo "🧪 Checking test wiring..."
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_wiring.py
$(RUSTFS_PYTHON_BIN) ./scripts/ci_gate.py --check-workflow
$(RUSTFS_PYTHON_BIN) ./scripts/validation_registry.py check
.PHONY: log-analyzer-rules-check
log-analyzer-rules-check: core-deps ## Check log-analyzer rule anchors still exist verbatim in source
+2 -2
View File
@@ -20,11 +20,11 @@ planning-docs-check: ## Check that no planning-type documents are committed
./scripts/check_no_planning_docs.sh
.PHONY: pre-commit
pre-commit: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check quick-check ## Run fast pre-commit checks without clippy/full tests
pre-commit: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check test-count-ratchet-check test-seams-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check quick-check ## Run fast pre-commit checks without clippy/full tests
@echo "✅ All pre-commit checks passed!"
.PHONY: pre-pr
pre-pr: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check log-analyzer-rules-check offline-enrollment-e2e-check clippy-check test ## Run full pre-PR checks with clippy and tests
pre-pr: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check test-count-ratchet-check test-seams-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check log-analyzer-rules-check offline-enrollment-e2e-check clippy-check test ## Run full pre-PR checks with clippy and tests
@echo "✅ All pre-PR checks passed!"
.PHONY: dev-check
+36
View File
@@ -22,12 +22,21 @@ TEST_THREADS ?= 1
# differ from CI and .config/nextest.toml test-groups will NOT apply.
.PHONY: script-tests
.PHONY: release-package-tests
release-package-tests: ## Run release package integration on Linux with fpm, dpkg and rpm installed
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_packages.py
.PHONY: release-image-tests
release-image-tests: ## Run OCI integration with Docker, Go and skopeo; set RELEASE_IMAGE_VARIANT and RELEASE_IMAGE_OUTPUT
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_images.py
script-tests: ## Run shell script tests
@echo "Running script tests..."
trap 'status=$$?; printf "ERROR: script-tests failed (exit %s): %s\n" "$$status" "$$BASH_COMMAND" >&2; exit "$$status"' ERR
./scripts/test_build_rustfs_options.sh
./scripts/test_docker_runtime_timezone.sh
./scripts/test_entrypoint_credentials.sh
./scripts/test_entrypoint_directories.sh
./scripts/test_internode_grpc_ab_bench.sh
./scripts/test_object_batch_bench_enhanced.sh
./scripts/test_package_service_scripts.sh
@@ -49,20 +58,47 @@ script-tests: ## Run shell script tests
./scripts/test_manual_transition_runbooks.sh
./scripts/test_fuzz_runner.sh
./scripts/test_python_bin.sh
$(RUSTFS_PYTHON_BIN) ./scripts/test_check_doc_paths.py
./scripts/check_embedded_secrets.sh --self-test
./scripts/check_s3s_footprint.sh --self-test
./scripts/test_check_test_count_ratchet.sh
./scripts/test_guard_source_set.sh
./scripts/test_split_guard_rules.sh
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_wiring.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/codemods/s3_error_to_s3_types.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/codemods/split_lifecycle_transition_api_test.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_seams.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/test_e2e_binary.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_download_release_asset.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_reference_binary.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_inspect_btf_prototypes.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_build_workflow.py
$(RUSTFS_PYTHON_BIN) -m unittest discover -s scripts/release -p "test_*.py"
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_glibc.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_upgrade_workflow.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_migration_gate_evidence.py
$(RUSTFS_PYTHON_BIN) ./scripts/ci_gate.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/check_connect_release_boundary.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/test_ci_test_artifact.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_ci_test_shards.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_ci_merge_queue.py
$(RUSTFS_PYTHON_BIN) -m unittest discover -s scripts/ci -p 'test_*.py'
$(RUSTFS_PYTHON_BIN) ./scripts/check_security_coverage.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/check_scheduled_validation_freshness.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/test_security_workflow.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_nightly_candidate.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_functional_chain.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_functional_chain_health.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_repro_rejoin_readiness_docker.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_validation_registry.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_inspect_validation_runner.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_retain_validation_evidence.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_ci_timing_report.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_junit_diff.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_report_compat.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_runner_tools.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_api_coverage.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_reference_parity.py
bash -n ./scripts/validate_object_data_cache_cold_stampede.sh
$(RUSTFS_PYTHON_BIN) ./scripts/check_object_data_cache_follower_samples.py --self-test
./scripts/validate_object_data_cache_cold_stampede.sh --self-test
+174 -12
View File
@@ -57,6 +57,11 @@ command = ['sh', '-c', 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"']
[scripts.setup.ecstore-large-stack]
command = ['sh', '-c', 'echo RUST_MIN_STACK=33554432 >> "$NEXTEST_ENV"']
# The receipt corruption oracle does not simulate a crash. Prefer tmpfs only
# when its full fixture fits; retain the ordinary temporary directory otherwise.
[scripts.setup.ecstore-receipt-tmpdir]
command = ['sh', 'scripts/ci/receipt-fixture-tmpdir.sh']
# The serial ILM selection builds the same deep storage futures in both the
# lifecycle transition module and scanner integration binary. Different tests
# in each have overflowed first across otherwise unrelated CI runs.
@@ -68,6 +73,17 @@ command = ['sh', '-c', 'echo RUST_MIN_STACK=33554432 >> "$NEXTEST_ENV"']
# boundaries. Reserve the run's capacity so unrelated fixtures cannot starve
# their existing deadlines and typed-failure assertions (rustfs/backlog#2706).
# Keep each test's internal concurrency and zero-retry policy unchanged.
[[profile.default.overrides]]
filter = """
package(rustfs-ecstore) & (
test(/^set_disk::ops::multipart::tests::complete_multipart_(quorum_success_releases_logical_guards_before_physical_tail|waits_for_tail_before_releasing_guards_and_marking_capacity)$/)
| test(=store::heal::tests::full_format_heal_lost_after_last_save_does_not_publish_or_renew_and_latches)
| test(/^store::init::tests::(decommission_durable_ilm_receipt_pagination_fails_closed_on_second_page|dispatch_manifest_shutdown_(drains_admitted_delete_batch_without_tail_admission|stops_aborting_validation_tail_reads|stops_authorized_tail_reads_before_receipt_or_cas))$/)
| (binary(metadata_read_lock_reuse_test) & test(=replica_multipart_completes_while_metadata_writer_waits_for_its_snapshot))
)
"""
threads-required = "num-test-threads"
[[profile.default.overrides]]
filter = 'package(rustfs) & test(/^connect::diagnostics::schedule::tests::/)'
threads-required = "num-test-threads"
@@ -76,18 +92,50 @@ threads-required = "num-test-threads"
filter = 'package(rustfs-ecstore) & (test(/^set_disk::tests::streaming_get_blocks_concurrent_/) | test(=store::object::tests::retired_marker_converges_after_bucket_recreation_on_sixteen_disks))'
threads-required = "num-test-threads"
# These real-disk lock probes must finish durable IO within production's 5s
# acquisition budget. Reserve capacity from sibling test processes while
# preserving the probes' internal concurrency, deadlines, and assertions.
[[profile.default.overrides]]
filter = '(package(rustfs-ecstore) & (test(/^core::pools_test::decommission_lock_order_tests::(active_decommission_migration_does_not_invert_capacity_and_delete_object(_tag)?_locks|decommission_moves_a_transitioned_version_expired_by_a_delete_all_rule_without_stalling)$/) | test(=services::integrity::tests::audit_migration_and_ack_recovery_preserve_source_and_reject_conflicts))) | (package(rustfs-heal) & test(=heal::mrf_queue::partial_write::tests::durable_retry_submission_error_keeps_checkpoint_and_uses_backoff))'
threads-required = "num-test-threads"
# These eight-disk decommission fixtures exercise concurrent retries,
# free-version cleanup, and real capacity probes under production lock deadlines.
# Reserve the run's capacity so unrelated IO cannot exhaust those budgets.
[[profile.default.overrides]]
filter = 'package(rustfs-ecstore) & (test(/^store::init::tests::decommission_entry_(retries_source_changed_without_canceling_other_bucket|skips_cleanup_only_marker_when_free_version_is_present)$/) | test(=core::pools::tests::decommission_capacity_mutation_limits_prewrite_sampling_to_target))'
threads-required = "num-test-threads"
# This registration/backup lock probe uses an isolated eight-disk store.
# Reserve capacity so sibling disk-heavy tests cannot consume its 2s
# registration budget; retain the queued backup and deadlock assertions.
[[profile.default.overrides]]
filter = 'package(rustfs) & test(=admin::handlers::table_catalog::tests::cold_object_registration_completes_while_other_bucket_backup_waits)'
threads-required = "num-test-threads"
[[profile.default.overrides]]
filter = 'package(rustfs-heal) & (binary(mrf_partial_write_test) | (binary(mrf_pipeline_test) & test(/^journal_replay_survives_/)) | test(=admin_selector_survives_sigkill_with_original_scope_and_receipts))'
threads-required = "num-test-threads"
# Native scanner backlog fixtures include 24-set and pool-expansion cases.
# Reserve capacity across test processes while preserving each scenario's fixed
# budget, assertions, and internal concurrency.
[[profile.default.overrides]]
filter = 'package(rustfs-scanner) & (test(/^scanner::backlog::tests::native_(writer|retirement)_/) | test(=scanner_folder::tests::mrf_ownership::mrf_ownership_manager_completion_preserves_scanner_pending) | test(/^scanner_io::tests::service_cohort::/))'
filter = 'package(rustfs-scanner) & (test(/^scanner::backlog::tests::native_/) | test(=scanner_folder::tests::mrf_ownership::mrf_ownership_manager_completion_preserves_scanner_pending) | test(/^scanner_io::tests::service_cohort::/))'
threads-required = "num-test-threads"
[[profile.default.scripts]]
filter = 'package(rustfs-ecstore) & test(/^(bucket::lifecycle::bucket_lifecycle_ops::tests::manual_transition_worker_result_recovery_marks_unknown_for_corrupt_marker|services::rebalance::entry::tests::real_rebalance_run_fence_loss_blocks_multipart_publication|store::init::tests::(batch_transitioned_delete_uses_free_version_per_item|decommission_entry_(allows_free_version_consumed_before_source_lock|rejects_subquorum_free_version_conflict_and_retains_source|skips_cleanup_only_marker_when_free_version_is_present)|dispatched_tier_delete_recovery_(checks_later_pool_then_commits_after_source_removal|finds_directory_source_on_encoded_set|retains_journal_on_source_metadata_error)|force_tier_remove_blocks_on_physical_free_version_hidden_by_other_pool|legacy_unknown_transition_delete_falls_back_for_single_batch_and_blocks_prefix|multi_pool_(recursive_prefix_rejects_legacy_or_hidden_merge_loser_before_delete|same_remote_tuple_(batch|single)_delete_waits_for_all_sources|same_tuple_recursive_prefix_uses_one_journal_owner|transitioned_delete_persists_one_free_version_per_remote_tuple)|recursive_prefix_partial_(pool|set)_failure_keeps_prepared_cleanup_owners|restored_transitioned_delete_uses_free_version_as_cleanup_owner|stable_transitioned_recursive_prefix_delete_uses_journal_owners|suspended_null_transition_delete_uses_free_version_as_sole_owner|tier_mutation_peer_handler_applies_prepare_commit_and_abort_idempotently|transition_response_loss_persists_unknown_outcome_for_provider_recovery|transition_transaction_recovery_(drops_record_after_confirmed_local_commit|keeps_cleanup_pending_local_commit)|transitioned_delete_(free_version_replays_after_store_restart|local_quorum_failure_rolls_back_without_cleanup_owner|uses_free_version_as_cleanup_owner)|versioned_delete_marker_keeps_transitioned_source_and_remote_object|versioned_explicit_transition_delete_preserves_other_version_then_allows_bucket_delete))$/)'
setup = 'ecstore-large-stack'
# These cross-crate real-storage fixtures need the same bounded stack as ECStore tests.
# The admin target-repair fixtures compose the full bucket delete and recreate
# path on a real store; measured with RUST_MIN_STACK on 2026-10-15 they need
# 2016-2040 KiB of the 2 MiB libtest default and overflowed on Linux CI.
[[profile.default.scripts]]
filter = '(package(rustfs) & test(/^(admin::handlers::replication::target_repair_tests::[a-z_]+|admin::handlers::plugin_attempt::v2_tests::delegation_v2_persists_and_vends_with_real_parent_intersection|admin::handlers::site_replication::tests::durable_iam_state_apply_iam_item_rejects_a_stale_recreate_after_a_replicated_delete|admin::service::federated_identity::tests::(binding_keeps_explicit_iam_mapping_strict|markerless_legacy_oidc_session_crosses_auth_and_iam_deletion_boundaries)|storage::scanner_dirty_journal::tests::(clear_callback_keeps_unknown_coverage_until_all_pending_work_is_confirmed|owned_journals_keep_peer_records_after_interleaved_writes_and_clear))$/)) | (package(rustfs-heal) & ((binary(heal_b5_versioned_regression_test) & test(/^serial_tests::(test_heal_unversioned_bucket_e2e|test_historical_null_recursive_heal_restores_physical_versions|test_recursive_deep_heal_reports_stale_delete_marker_repair)$/)) | (binary(usage_observation_read_repair_test) & test(=usage_observation_read_repair_survives_snapshot_cleanup)))) | (package(rustfs-test-utils) & test(=data_usage_snapshot_tests::data_usage_snapshot_recovery_wires_primary_backup_and_negative_cache))'
setup = 'ecstore-base-stack'
[[profile.default.scripts]]
filter = 'package(rustfs-ecstore) | package(rustfs-s3select-api) | package(rustfs-scanner) | (package(rustfs) & test(/^(app::multipart_usecase::tests::concurrent_completions_share_durable_bucket_quota_reservations|app::object::delete::tests::compressed_delete_requests_update_observed_usage_without_releasing_quota_floor|app::object::internal_put::tests::internal_multipart_roundtrip_completes_and_abort_leaves_nothing|app::object::restore::tests::execute_restore_object_maps_failures_to_typed_s3_errors|storage::access::tests::(delete_object_access_captures_authorized_bucket_incarnation|copy_operations_reject_recreated_source_bucket_after_authorization|request_slot_keeps_bucket_policy_bound_to_its_store))$/))'
setup = 'ecstore-base-stack'
@@ -102,10 +150,16 @@ setup = 'ecstore-base-stack'
filter = 'binary(lifecycle_integration_test) | (package(rustfs) & test(/^app::lifecycle_transition_api_test::/))'
setup = 'lifecycle-large-stack'
# The pool metadata placement regression composes the full erasure-heal
# startup future and overflows the default Linux test-thread stack.
# This conditional GET fixture composes real-store futures that overflowed
# the default Linux test-thread stack.
[[profile.default.scripts]]
filter = 'package(rustfs-heal) & test(=replacement_pool_metadata_follows_real_two_set_placement)'
filter = 'package(rustfs) & test(=app::object::get::tests::conditional_get_304_uses_metadata_without_decoding_damaged_data)'
setup = 'ecstore-large-stack'
# These heal fixtures compose deep real-store recovery futures that can
# overflow the default Linux test-thread stack.
[[profile.default.scripts]]
filter = 'package(rustfs-heal) & (test(=replacement_pool_metadata_follows_real_two_set_placement) | (binary(heal_integration_test) & test(=bucket_removal_recovers_delete_proofs_before_removing_empty_volumes)))'
setup = 'ecstore-large-stack'
# These real-disk scanner fixtures assert quiet-workload publication and
@@ -180,7 +234,7 @@ test-group = 'embedded-test-ports'
# processes cannot exhaust those budgets. Keep deadlines and assertions intact.
# The short HTTP fixtures are tracked in rustfs/backlog#2714.
[[profile.default.overrides]]
filter = 'package(rustfs) & (binary(/^connect_registration$/) | binary(connect_inventory) | binary(connect_perf_drive) | (binary(connect_perf_client) & test(=configured_proxy_and_direct_endpoint_failures_are_distinct)) | (binary(connect_perf_object) & test(/^(real_rustfs_endpoint_and_production_cli_support_bounded_get_and_put|cleanup_uses_a_budget_independent_of_the_measurement_window|oversized_response_is_rejected_without_buffering_it)$/)))'
filter = 'package(rustfs) & (binary(/^connect_registration$/) | binary(connect_inventory) | binary(connect_perf_drive) | (binary(connect_perf_client) & test(=configured_proxy_and_direct_endpoint_failures_are_distinct)) | (binary(connect_perf_object) & test(/^(real_rustfs_endpoint_and_production_cli_support_bounded_get_and_put|cleanup_uses_a_budget_independent_of_the_measurement_window|cleanup_accepts_missing_object_and_still_deletes_the_bucket|cleanup_diagnostics_identify_each_disconnected_transport_stage|cleanup_diagnostics_identify_each_failed_http_stage_without_private_context|cleanup_diagnostics_identify_timeouts_without_resetting_the_shared_deadline|oversized_response_is_rejected_without_buffering_it)$/)))'
threads-required = "num-test-threads"
# This cancellation probe hashes the serving executable before acquiring its
@@ -302,6 +356,12 @@ threads-required = "num-test-threads"
filter = 'package(rustfs-ecstore) & test(=store::init::tests::dispatch_manifest_rollback_bounded_concurrency_reaches_tail_behind_slow_member)'
threads-required = "num-test-threads"
# These short-deadline real-disk progress probes need the test run's capacity
# for scanner and object-lock handoffs; keep their assertions and deadlines.
[[profile.default.overrides]]
filter = '(package(rustfs-scanner) & (test(=scanner::tests::cycle_persist_failure::later_cycle_post_commit_failure_reloads_durable_state) | test(=scanner::tests::running_main_loop_catches_up_pause_cleared_after_startup_observe))) | (package(rustfs-ecstore) & test(=store::init::tests::restored_transitioned_delete_causally_enqueues_free_version))'
threads-required = "num-test-threads"
# ---------------------------------------------------------------------------
# ci profile — the strict CI gate (ci.yml `cargo nextest run --profile ci`)
# ---------------------------------------------------------------------------
@@ -319,6 +379,17 @@ path = "junit.xml"
# Match the local durable-progress reservations. All members, deadlines,
# assertions, and internal concurrency remain enabled without retries.
[[profile.ci.overrides]]
filter = """
package(rustfs-ecstore) & (
test(/^set_disk::ops::multipart::tests::complete_multipart_(quorum_success_releases_logical_guards_before_physical_tail|waits_for_tail_before_releasing_guards_and_marking_capacity)$/)
| test(=store::heal::tests::full_format_heal_lost_after_last_save_does_not_publish_or_renew_and_latches)
| test(/^store::init::tests::(decommission_durable_ilm_receipt_pagination_fails_closed_on_second_page|dispatch_manifest_shutdown_(drains_admitted_delete_batch_without_tail_admission|stops_aborting_validation_tail_reads|stops_authorized_tail_reads_before_receipt_or_cas))$/)
| (binary(metadata_read_lock_reuse_test) & test(=replica_multipart_completes_while_metadata_writer_waits_for_its_snapshot))
)
"""
threads-required = "num-test-threads"
[[profile.ci.overrides]]
filter = 'package(rustfs) & test(/^connect::diagnostics::schedule::tests::/)'
threads-required = "num-test-threads"
@@ -327,18 +398,62 @@ threads-required = "num-test-threads"
filter = 'package(rustfs-ecstore) & (test(/^set_disk::tests::streaming_get_blocks_concurrent_/) | test(=store::object::tests::retired_marker_converges_after_bucket_recreation_on_sixteen_disks))'
threads-required = "num-test-threads"
# These real-disk lock probes must finish durable IO within production's 5s
# acquisition budget. Reserve capacity from sibling test processes while
# preserving the probes' internal concurrency, deadlines, and assertions.
[[profile.ci.overrides]]
filter = '(package(rustfs-ecstore) & (test(/^core::pools_test::decommission_lock_order_tests::(active_decommission_migration_does_not_invert_capacity_and_delete_object(_tag)?_locks|decommission_moves_a_transitioned_version_expired_by_a_delete_all_rule_without_stalling)$/) | test(=services::integrity::tests::audit_migration_and_ack_recovery_preserve_source_and_reject_conflicts))) | (package(rustfs-heal) & test(=heal::mrf_queue::partial_write::tests::durable_retry_submission_error_keeps_checkpoint_and_uses_backoff))'
threads-required = "num-test-threads"
# These eight-disk decommission fixtures exercise concurrent retries,
# free-version cleanup, and real capacity probes under production lock deadlines.
# Reserve the run's capacity so unrelated IO cannot exhaust those budgets.
[[profile.ci.overrides]]
filter = 'package(rustfs-ecstore) & (test(/^store::init::tests::decommission_entry_(retries_source_changed_without_canceling_other_bucket|skips_cleanup_only_marker_when_free_version_is_present)$/) | test(=core::pools::tests::decommission_capacity_mutation_limits_prewrite_sampling_to_target))'
threads-required = "num-test-threads"
# This registration/backup lock probe uses an isolated eight-disk store.
# Reserve capacity so sibling disk-heavy tests cannot consume its 2s
# registration budget; retain the queued backup and deadlock assertions.
[[profile.ci.overrides]]
filter = 'package(rustfs) & test(=admin::handlers::table_catalog::tests::cold_object_registration_completes_while_other_bucket_backup_waits)'
threads-required = "num-test-threads"
[[profile.ci.overrides]]
filter = 'package(rustfs-heal) & (binary(mrf_partial_write_test) | (binary(mrf_pipeline_test) & test(/^journal_replay_survives_/)) | test(=admin_selector_survives_sigkill_with_original_scope_and_receipts))'
threads-required = "num-test-threads"
# Native scanner backlog fixtures include 24-set and pool-expansion cases.
# Reserve capacity across test processes while preserving each scenario's fixed
# budget, assertions, and internal concurrency.
[[profile.ci.overrides]]
filter = 'package(rustfs-scanner) & (test(/^scanner::backlog::tests::native_(writer|retirement)_/) | test(=scanner_folder::tests::mrf_ownership::mrf_ownership_manager_completion_preserves_scanner_pending) | test(/^scanner_io::tests::service_cohort::/))'
filter = 'package(rustfs-scanner) & (test(/^scanner::backlog::tests::native_/) | test(=scanner_folder::tests::mrf_ownership::mrf_ownership_manager_completion_preserves_scanner_pending) | test(/^scanner_io::tests::service_cohort::/))'
threads-required = "num-test-threads"
# Keep short-deadline real-disk progress probes from competing with unrelated
# tests for scanner and object-lock capacity. Assertions and deadlines stay on.
[[profile.ci.overrides]]
filter = '(package(rustfs-scanner) & (test(=scanner::tests::cycle_persist_failure::later_cycle_post_commit_failure_reloads_durable_state) | test(=scanner::tests::running_main_loop_catches_up_pause_cleared_after_startup_observe))) | (package(rustfs-ecstore) & test(=store::init::tests::restored_transitioned_delete_causally_enqueues_free_version))'
threads-required = "num-test-threads"
# Emit this expensive fixture's stage timings in CI and use tmpfs when safe.
[[profile.ci.overrides]]
filter = 'package(rustfs-ecstore) & test(=store::init::tests::decommission_durable_ilm_receipt_pagination_fails_closed_on_second_page)'
success-output = 'immediate'
[[profile.ci.scripts]]
filter = 'package(rustfs-ecstore) & test(=store::init::tests::decommission_durable_ilm_receipt_pagination_fails_closed_on_second_page)'
setup = 'ecstore-receipt-tmpdir'
[[profile.ci.scripts]]
filter = 'package(rustfs-ecstore) & test(/^(bucket::lifecycle::bucket_lifecycle_ops::tests::manual_transition_worker_result_recovery_marks_unknown_for_corrupt_marker|services::rebalance::entry::tests::real_rebalance_run_fence_loss_blocks_multipart_publication|store::init::tests::(batch_transitioned_delete_uses_free_version_per_item|decommission_entry_(allows_free_version_consumed_before_source_lock|rejects_subquorum_free_version_conflict_and_retains_source|skips_cleanup_only_marker_when_free_version_is_present)|dispatched_tier_delete_recovery_(checks_later_pool_then_commits_after_source_removal|finds_directory_source_on_encoded_set|retains_journal_on_source_metadata_error)|force_tier_remove_blocks_on_physical_free_version_hidden_by_other_pool|legacy_unknown_transition_delete_falls_back_for_single_batch_and_blocks_prefix|multi_pool_(recursive_prefix_rejects_legacy_or_hidden_merge_loser_before_delete|same_remote_tuple_(batch|single)_delete_waits_for_all_sources|same_tuple_recursive_prefix_uses_one_journal_owner|transitioned_delete_persists_one_free_version_per_remote_tuple)|recursive_prefix_partial_(pool|set)_failure_keeps_prepared_cleanup_owners|restored_transitioned_delete_uses_free_version_as_cleanup_owner|stable_transitioned_recursive_prefix_delete_uses_journal_owners|suspended_null_transition_delete_uses_free_version_as_sole_owner|tier_mutation_peer_handler_applies_prepare_commit_and_abort_idempotently|transition_response_loss_persists_unknown_outcome_for_provider_recovery|transition_transaction_recovery_(drops_record_after_confirmed_local_commit|keeps_cleanup_pending_local_commit)|transitioned_delete_(free_version_replays_after_store_restart|local_quorum_failure_rolls_back_without_cleanup_owner|uses_free_version_as_cleanup_owner)|versioned_delete_marker_keeps_transitioned_source_and_remote_object|versioned_explicit_transition_delete_preserves_other_version_then_allows_bucket_delete))$/)'
setup = 'ecstore-large-stack'
# These cross-crate real-storage fixtures need the same bounded stack as ECStore tests.
[[profile.ci.scripts]]
filter = '(package(rustfs) & test(/^(admin::handlers::replication::target_repair_tests::[a-z_]+|admin::handlers::plugin_attempt::v2_tests::delegation_v2_persists_and_vends_with_real_parent_intersection|admin::handlers::site_replication::tests::durable_iam_state_apply_iam_item_rejects_a_stale_recreate_after_a_replicated_delete|admin::service::federated_identity::tests::(binding_keeps_explicit_iam_mapping_strict|markerless_legacy_oidc_session_crosses_auth_and_iam_deletion_boundaries)|storage::scanner_dirty_journal::tests::(clear_callback_keeps_unknown_coverage_until_all_pending_work_is_confirmed|owned_journals_keep_peer_records_after_interleaved_writes_and_clear))$/)) | (package(rustfs-heal) & ((binary(heal_b5_versioned_regression_test) & test(/^serial_tests::(test_heal_unversioned_bucket_e2e|test_historical_null_recursive_heal_restores_physical_versions|test_recursive_deep_heal_reports_stale_delete_marker_repair)$/)) | (binary(usage_observation_read_repair_test) & test(=usage_observation_read_repair_survives_snapshot_cleanup)))) | (package(rustfs-test-utils) & test(=data_usage_snapshot_tests::data_usage_snapshot_recovery_wires_primary_backup_and_negative_cache))'
setup = 'ecstore-base-stack'
[[profile.ci.scripts]]
filter = 'package(rustfs-ecstore) | package(rustfs-s3select-api) | package(rustfs-scanner) | (package(rustfs) & test(/^(app::multipart_usecase::tests::concurrent_completions_share_durable_bucket_quota_reservations|app::object::delete::tests::compressed_delete_requests_update_observed_usage_without_releasing_quota_floor|app::object::internal_put::tests::internal_multipart_roundtrip_completes_and_abort_leaves_nothing|app::object::restore::tests::execute_restore_object_maps_failures_to_typed_s3_errors|storage::access::tests::(delete_object_access_captures_authorized_bucket_incarnation|copy_operations_reject_recreated_source_bucket_after_authorization|request_slot_keeps_bucket_policy_bound_to_its_store))$/))'
setup = 'ecstore-base-stack'
@@ -351,10 +466,16 @@ setup = 'ecstore-base-stack'
filter = 'binary(lifecycle_integration_test) | (package(rustfs) & test(/^app::lifecycle_transition_api_test::/))'
setup = 'lifecycle-large-stack'
# The pool metadata placement regression composes the full erasure-heal
# startup future and overflows the default Linux test-thread stack.
# This conditional GET fixture composes real-store futures that overflowed
# the default Linux test-thread stack.
[[profile.ci.scripts]]
filter = 'package(rustfs-heal) & test(=replacement_pool_metadata_follows_real_two_set_placement)'
filter = 'package(rustfs) & test(=app::object::get::tests::conditional_get_304_uses_metadata_without_decoding_damaged_data)'
setup = 'ecstore-large-stack'
# These heal fixtures compose deep real-store recovery futures that can
# overflow the default Linux test-thread stack.
[[profile.ci.scripts]]
filter = 'package(rustfs-heal) & (test(=replacement_pool_metadata_follows_real_two_set_placement) | (binary(heal_integration_test) & test(=bucket_removal_recovers_delete_proofs_before_removing_empty_volumes)))'
setup = 'ecstore-large-stack'
# These real-disk scanner fixtures assert quiet-workload publication and
@@ -439,7 +560,7 @@ filter = 'package(rustfs) & (binary(/^embedded.*_test$/) | binary(admin_diagnost
test-group = 'embedded-test-ports'
[[profile.ci.overrides]]
filter = 'package(rustfs) & (binary(/^connect_registration$/) | binary(connect_inventory) | binary(connect_perf_drive) | (binary(connect_perf_client) & test(=configured_proxy_and_direct_endpoint_failures_are_distinct)) | (binary(connect_perf_object) & test(/^(real_rustfs_endpoint_and_production_cli_support_bounded_get_and_put|cleanup_uses_a_budget_independent_of_the_measurement_window|oversized_response_is_rejected_without_buffering_it)$/)))'
filter = 'package(rustfs) & (binary(/^connect_registration$/) | binary(connect_inventory) | binary(connect_perf_drive) | (binary(connect_perf_client) & test(=configured_proxy_and_direct_endpoint_failures_are_distinct)) | (binary(connect_perf_object) & test(/^(real_rustfs_endpoint_and_production_cli_support_bounded_get_and_put|cleanup_uses_a_budget_independent_of_the_measurement_window|cleanup_accepts_missing_object_and_still_deletes_the_bucket|cleanup_diagnostics_identify_each_disconnected_transport_stage|cleanup_diagnostics_identify_each_failed_http_stage_without_private_context|cleanup_diagnostics_identify_timeouts_without_resetting_the_shared_deadline|oversized_response_is_rejected_without_buffering_it)$/)))'
threads-required = "num-test-threads"
# Preserve the cancellation probe's startup budget and assertions in CI too.
@@ -589,13 +710,23 @@ test-group = 'ecstore-serial-flaky'
# the PR-lane e2e coverage for scanner usage snapshots consumed by quota and
# admin surfaces. It uses the same single-node, random-port, isolated-temp-dir
# fixture as the existing smoke modules.
#
# Dual-stack differential (rustfs/backlog#2740): `dual_stack_differential::`
# starts two single-node servers from the same binary, one per
# RUSTFS_S3_STACK value, on random ports with isolated temp dirs, and runs one
# SDK script covering every operation of `impl S3 for FS` against both. Its
# comparator unit tests need no server. It meets the admission criteria
# unchanged; the module clause admits a new differential test without another
# filter edit.
[profile.e2e-smoke]
default-filter = """
package(e2e_test) & (
test(/^(delete_marker_migration_semantics|version_id_regression|list_objects_v2_pagination|list_object_versions_regression|list_objects_duplicates|list_buckets_double_slash|list_buckets_auth|list_buckets_iam_filter|leading_slash_key|special_chars|create_bucket_region|delete_objects_versioning|head_object_consistency|head_object_range|copy_object_metadata|copy_object_tagging|copy_source_invalid_date|content_encoding|compression|multipart_storage_class|storage_class_capability|ssec_copy|anonymous_access|bucket_policy_check|presigned_negative|negative_sigv4|admin_auth|notification_webhook|tls_hot_reload|console_smoke|admin_iam_crud|admin_pools|sts_query_compat|data_usage)_test::|^fake_s3_target::/)
test(/^(delete_marker_migration_semantics|version_id_regression|list_objects_v2_pagination|list_object_versions_regression|list_objects_duplicates|list_buckets_double_slash|list_buckets_auth|list_buckets_iam_filter|leading_slash_key|special_chars|create_bucket_region|delete_objects_versioning|head_object_consistency|head_object_range|copy_object_metadata|copy_object_tagging|copy_source_invalid_date|content_encoding|compression|multipart_storage_class|multipart_upload_id|storage_class_capability|ssec_copy|anonymous_access|bucket_policy_check|presigned_negative|negative_sigv4|admin_auth|notification_webhook|tls_hot_reload|console_smoke|admin_iam_crud|admin_pools|sts_query_compat|data_usage)_test::|^fake_s3_target::/)
| test(/^replication_extension_test::(test_replication_check_succeeds_with_remote_target|test_replication_check_rejects_target_without_object_lock|test_set_remote_target_rejects_unversioned_source_bucket|test_replication_check_rejects_unversioned_source_bucket|test_replication_check_rejects_missing_replication_config|test_replication_check_rejects_invalid_bucket|test_set_remote_target_rejects_same_bucket_on_same_deployment|test_set_remote_target_rejects_unversioned_target_bucket|test_set_remote_target_update_requires_arn|test_set_remote_target_update_rejects_missing_target|test_set_remote_target_rejects_invalid_target_url|test_set_remote_target_rejects_self_signed_https_target_without_skip_tls_verify|test_set_remote_target_rejects_private_ca_https_target_without_ca_cert_pem|test_list_remote_targets_rejects_empty_bucket|test_list_remote_targets_rejects_invalid_bucket|test_remove_remote_target_rejects_missing_target|test_remove_remote_target_rejects_missing_arn|test_remove_remote_target_rejects_invalid_bucket|test_remove_remote_target_rejects_target_used_by_replication|test_delete_bucket_replication_removes_remote_target)$/)
| test(/^reliant::lifecycle::/)
| test(/^conditional_delete_objects_test::/)
| test(/^reliant::tiering::/)
| test(/^dual_stack_differential::/)
| test(/^upgrade_compatibility_test::upgrade_write_readiness_tests::/)
| test(/^on_demand_migration::(get_basic_test::(get_miss_pulls_inline_and_serves_locally_afterwards|head_miss_answers_from_the_source_without_persisting)|interaction_test::test_odm_admin_config_is_redacted_and_status_counts_match_the_source)$/)
)
@@ -717,7 +848,7 @@ slow-timeout = { period = "120s", terminate-after = 12, grace-period = "10s" }
# ---------------------------------------------------------------------------
# e2e-distributed profile — 4-node 4-disk Actions suite
# ---------------------------------------------------------------------------
# Storage-sensitive PR / nightly / dispatch lane owned by
# Nightly and manual-dispatch lane owned by
# .github/workflows/e2e-distributed.yml.
# Each case starts four rustfs processes (and for site replication, two
# clusters). Upgrade cases also require RUSTFS_UPGRADE_SOURCE_BINARY.
@@ -815,6 +946,10 @@ path = "junit.xml"
# parallel-safe — the same property e2e-smoke relies on. The exceptions are the
# 4-disk reliability / degraded-read fault-injection tests, multi-node heal
# clusters, and the fixed-port Vault tests, all serialized below.
# `dual_stack_differential::reference::` holds hermetic unit tests of how the
# differential picks side A (shell-script stand-ins, no server, no reference
# binary). They already run on every pull request in e2e-smoke, so e2e-full
# excludes them to keep its selection digest unchanged.
[profile.e2e-full]
default-filter = """
package(e2e_test)
@@ -825,6 +960,7 @@ default-filter = """
& !test(/^replication_target_matrix_test::/)
& !test(/^on_demand_migration::(concurrency_test|fault_test|interop_test|real_source_test)::/)
& !test(/^upgrade_compatibility_test::upgrade_write_readiness_tests::/)
& !test(/^dual_stack_differential::reference::/)
"""
fail-fast = false
@@ -850,6 +986,12 @@ test-group = 'e2e-inline-boundaries'
filter = 'package(e2e_test) & test(/^heal_erasure_disk_rebuild_test::/)'
test-group = 'e2e-cluster-nightly'
# The multi-pool crash fixture seeds three nodes and 36 drives. Reserve this
# nextest run's workers so other multi-node tests do not starve its deadline.
[[profile.e2e-full.overrides]]
filter = 'package(e2e_test) & test(=heal_erasure_disk_rebuild_test::tests::test_cluster_root_heal_recovers_ec84_shards_across_multi_pool_after_background_target_crash)'
threads-required = "num-test-threads"
[[profile.e2e-full.overrides]]
filter = 'package(e2e_test) & (test(/^kms::kms_vault_test::/) | test(/^kms::kms_rekey_sweep_test::/) | test(/^kms::configured_roundtrip_test::test_configured_vault_kms_admin_and_versioned_cleanup$/))'
test-group = 'e2e-vault'
@@ -859,3 +1001,23 @@ test-group = 'e2e-vault'
[[profile.e2e-full.overrides]]
filter = 'package(e2e_test) & (test(/^list_objects_v2_pagination_test::tests::(test_list_objects_v2_delimiter_small_page_traverses_all|test_list_objects_v2_max_keys_above_limit_returns_token|test_list_objects_v2_maxkeys_above_limit_with_delimiter)$/) | test(=reliant::tiering::test_hermetic_transition_restore_failure_expiry_and_retry))'
threads-required = "num-test-threads"
# The mc fixture uploads hundreds of objects concurrently before measuring listing.
# Reserve the runner so other server fixtures do not starve its disk operations.
[[profile.e2e-full.overrides]]
filter = 'package(e2e_test) & test(=mc_mirror_small_bucket_test::test_mc_mirror_small_bucket_completes_without_list_timeout)'
threads-required = "num-test-threads"
# Fixed, small contract for every executable server change. These existing
# scenarios exercise write/read, anonymous denial and retained bytes on restart.
[profile.core-contract]
default-filter = '''
package(e2e_test) & test(/^(anonymous_access_test::test_anonymous_access_denied_when_restrict_public_buckets_enabled|head_object_consistency_test::head_object_consistency_after_write_and_multipart_and_presigned_head|storage_class_capability_test::tests::historical_label_only_metadata_is_standard_without_hiding_a_real_transition_tier)$/)
'''
retries = 0
fail-fast = false
test-threads = 1
slow-timeout = { period = "60s", terminate-after = 3 }
[profile.core-contract.junit]
path = "junit.xml"
+20
View File
@@ -0,0 +1,20 @@
# Pinned RustFS release used as the "reference" target of parity lanes
# (.github/workflows/reference-parity.yml). This is the single place that names
# the reference release; .github/actions/reference-binary resolves, downloads and
# verifies it, and fails on a missing pin, a missing asset or a digest mismatch.
#
# Bumping the reference is a reviewed event: every per-test difference between
# the candidate and the reference is measured against this exact build.
#
# Each sha256 is the value published in the release's SHA256SUMS asset, which
# matches the digest GitHub reports for the same asset. The action checks both.
schema = 1
repository = "rustfs/rustfs"
version = "1.0.5"
tag = "1.0.5"
[platforms.linux-x86_64-gnu]
asset = "rustfs-linux-x86_64-gnu-v1.0.5.zip"
sha256 = "5addae2f74756bf80104d0975e6347cda843bc2daffdfcd1f0cb80118b95cbd0"
executable = "rustfs"
+24
View File
@@ -0,0 +1,24 @@
# Targets of the s3-tests reference parity lane (.github/workflows/reference-parity.yml).
#
# Exactly one target uses `binary = "reference"` (the release pinned in
# .config/reference-binary.toml). Every other target uses `binary = "candidate"`
# (the binary built from the branch under test) and is compared per node id
# against the reference. All targets run the same harness, test list and server
# configuration; `env` adds only the target's own RUSTFS_* settings.
#
# Adding a target is one more [[targets]] table, for example:
#
# [[targets]]
# name = "candidate-gateway"
# binary = "candidate"
# env = { RUSTFS_S3_STACK = "gateway" }
schema = 1
[[targets]]
name = "reference"
binary = "reference"
[[targets]]
name = "candidate-legacy"
binary = "candidate"
+12
View File
@@ -0,0 +1,12 @@
# Tolerated per-test differences of the s3-tests reference parity lane.
#
# One entry per line, four fields separated by " | ":
#
# <target> | <pytest node id> | <tracking issue URL> | <reason>
#
# <target> is a candidate name from .config/reference-parity-targets.toml, the
# node id is exactly as the lane prints it (s3tests/functional/test_s3.py::...),
# and the issue URL is https://github.com/rustfs/<repo>/issues/<number>.
#
# Same semantics as scripts/junit_diff.py --allow: an entry whose difference no
# longer occurs is stale and fails the lane, so remove it when it is fixed.
+135
View File
@@ -0,0 +1,135 @@
{
"schema_version": 1,
"plan_id": "rustfs-release-validation",
"description": "Certification for immutable candidates. All shipped platforms require native identity and startup; stable and prerelease require the pinned upgrade matrix. Linux-only acceptance never authorizes publication.",
"release_types": [
"preview",
"prerelease",
"stable"
],
"targets": [
{
"os": "linux",
"arch": "x86_64",
"abi": "musl"
},
{
"os": "linux",
"arch": "aarch64",
"abi": "musl"
},
{
"os": "linux",
"arch": "x86_64",
"abi": "gnu"
},
{
"os": "linux",
"arch": "aarch64",
"abi": "gnu"
},
{
"os": "macos",
"arch": "aarch64",
"abi": "none"
},
{
"os": "windows",
"arch": "x86_64",
"abi": "msvc"
}
],
"targets_basis": "Platform matrix of .github/workflows/build.yml (prepare-platform-matrix). gnu and macOS targets build with the pyroscope feature; musl and Windows targets build with no extra features.",
"features": [
"pyroscope"
],
"trusted_workflows": [
{
"repository": "rustfs/rustfs",
"workflow_id": "release-candidate.yml"
},
{
"repository": "rustfs/rustfs",
"workflow_id": "release-complete.yml"
}
],
"trusted_workflows_basis": "Receipts are produced by the reviewed main workflows and fetched by exact run ID with GitHub artifact digest verification. Candidate inputs freeze the harness commit separately from product source.",
"lanes": [
{
"lane": "identity",
"harness_repository": "rustfs/rustfs",
"harness_sha": "candidate.workflow_sha",
"harness_basis": "The exact workflow commit is frozen in candidate inputs; no mutable branch is accepted as a harness identity.",
"timeout_seconds": 1800,
"environment_capabilities": [
"process-exec"
],
"cases": [
"artifact-identity",
"startup"
],
"applies_to": {
"release_types": [
"preview",
"prerelease",
"stable"
],
"platforms": "all"
},
"applies_basis": "Artifact identity and startup checks are mandatory for every release type, preview included, on every shipped target (rustfs/backlog#2662 frozen design item 5)."
},
{
"lane": "upgrade",
"harness_repository": "rustfs/rustfs",
"harness_sha": "candidate.workflow_sha",
"harness_basis": "The exact workflow commit is frozen in candidate inputs; no mutable branch is accepted as a harness identity.",
"timeout_seconds": 5400,
"environment_capabilities": [
"process-exec",
"previous-release-artifact"
],
"cases": [
"direct-upgrade",
"mixed-version-upgrade",
"bucket-config-upgrade",
"bucket-config-rollback",
"multipart-layout-upgrade",
"multipart-layout-baseline"
],
"cases_basis": "Case IDs of the pinned previous-release matrix in .github/workflows/e2e-upgrade.yml (source.version/asset/sha256 and the case list mapped there).",
"applies_to": {
"release_types": [
"prerelease",
"stable"
],
"platforms": [
{
"os": "linux",
"arch": "x86_64",
"abi": "gnu"
}
]
},
"applies_basis": "preview releases use the pre-declared smaller set (identity lane only). The upgrade lane is only exercised on linux-x86_64-gnu, the platform of the pinned source assets."
}
],
"upgrade_sources": {
"basis": "Exactly the two previous-release sources pinned in .github/workflows/e2e-upgrade.yml are exercised today (source.version / source.asset / source.sha256). No other N-1/N-2 compatibility is claimed, and these digests are not inferred from tags.",
"sources": [
{
"version": "1.0.1",
"role": "N-1",
"artifact_name": "rustfs-linux-x86_64-gnu-v1.0.1.zip",
"artifact_sha256": "9742e183cb0dfb0d48fa909797af572fe47b7f827569036baa4156e0d3958ee5"
},
{
"version": "1.0.0-rc.5",
"role": "N-2",
"artifact_name": "rustfs-linux-x86_64-gnu-v1.0.0-rc.5.zip",
"artifact_sha256": "3ee8df71e8edcfada533be452c4135868f697bc515460ae97b027313eade7a3d"
}
],
"rollback_supported": false,
"rollback_basis": "Only the bucket-config-rollback case (rollback_to_previous_release_reads_current_bucket_metadata) is exercised. Full data-plane rollback is not certified and is never a default claim."
}
}
+37
View File
@@ -0,0 +1,37 @@
# Files that may still reference s3s (`s3s::` or `s3s_sigv4`) when Phase 1 of
# the gateway migration ends (rustfs/backlog#2734 task T0.6, rustfs/backlog#2741).
# Consumed only by `scripts/check_s3s_footprint.sh --mode allowlist`.
#
# One entry per line: a repository-relative file path or a git `:(glob)`
# pathspec. `**` matches across directories, `*` stays within one path
# component, and a directory entry matches everything under it. Blank lines
# and lines starting with `#` are ignored; an entry may not contain whitespace,
# so a note belongs on its own comment line.
#
# Every Rust file listed by `git grep -l '\bs3s\(::\|_sigv4\)' -- '*.rs'` that
# no entry matches fails the allowlist mode. Task T1.9 switches CI to that
# mode; until then `--dry-run` prints the files still outside this list, which
# is the Phase 1 tracking list.
#
# Never add crates/** other than crates/e2e_test: the engine crates leave s3s
# entirely, and the script rejects such an entry. Only the s3s-facing edge of
# the rustfs binary and the e2e oracle keep it.
# rustfs binary: the s3s-facing edge that survives Phase 1
rustfs/src/storage/ecfs.rs
rustfs/src/storage/s3_compat/**
rustfs/src/storage/access.rs
rustfs/src/auth.rs
rustfs/src/error.rs
rustfs/src/storage_api.rs
rustfs/src/app/storage_api.rs
rustfs/src/admin/router.rs
rustfs/src/app/metadata_route.rs
rustfs/src/server/http.rs
rustfs/src/server/layer.rs
rustfs/src/server/hybrid.rs
rustfs/src/protocols/client.rs
# e2e oracle: the test target that verifies S3 behaviour against s3s
crates/e2e_test/src/fake_s3_target/**
crates/e2e_test/src/**
+17
View File
@@ -0,0 +1,17 @@
# Exact baseline for the direct s3s footprint, consumed only by
# scripts/check_s3s_footprint.sh (rustfs/backlog#1677; rustfs/backlog#2734 T0.4).
#
# Each value is the exact measurement of the tree, not a ceiling. CI fails when a
# measured counter differs from its line here in either direction:
# - a larger measurement means new code widened the s3s surface: route it
# through the gateway abstractions instead; never raise a value here;
# - a smaller measurement means the PR shrank the surface: lower the matching
# value to the measured number in the same PR.
#
# files Rust files referencing s3s paths, repo-wide minus crates/e2e_test
# s3_error_lines lines holding s3_error!, same scope, minus those the script
# header's rule clears (rustfs_s3_types's macro); fails closed
# ecstore_files Rust files referencing s3s paths under crates/ecstore/src
files=63
s3_error_lines=217
ecstore_files=0
+67
View File
@@ -0,0 +1,67 @@
# Per-crate test-count baseline consumed by scripts/check_test_count_ratchet.sh
# (rustfs/backlog#2734 section 1 rule 3; T0.3 in rustfs/backlog#2738).
#
# One row per workspace member: <package>, tests, ignored, tab-separated.
# tests counts #[test], #[tokio::test], #[tokio::test(...)] and #[test_case(...)]
# attribute lines under the package directory; ignored counts #[ignore] and
# #[ignore = "..."]. The tests column is a floor and the ignored column is a
# ceiling: CI fails when a crate's tests fall below its row or its ignored count
# rises above it. Extra tests and fewer ignores pass; --update tightens the rows.
# Lowering a tests row or raising an ignored row is a reviewed statement that
# tests were intentionally removed or ignored; justify it in the PR description.
# Regenerate with:
# scripts/check_test_count_ratchet.sh --update
e2e_test 1026 20
rustfs 6449 64
rustfs-audit 70 0
rustfs-checksums 28 1
rustfs-common 36 0
rustfs-concurrency 87 0
rustfs-config 43 0
rustfs-connect-symbol-catalog 6 0
rustfs-credentials 24 0
rustfs-crypto 67 0
rustfs-data-usage 58 0
rustfs-ecstore 7858 2
rustfs-extension-schema 23 0
rustfs-filemeta 361 0
rustfs-gateway-adapter 74 0
rustfs-heal 1128 3
rustfs-heal-contracts 8 0
rustfs-iam 415 0
rustfs-io-core 52 0
rustfs-io-metrics 157 0
rustfs-keystone 31 0
rustfs-kms 716 25
rustfs-license 2 0
rustfs-lifecycle 156 0
rustfs-lock 182 0
rustfs-log-analyzer 91 0
rustfs-madmin 210 0
rustfs-notify 140 0
rustfs-object-capacity 92 0
rustfs-object-data-cache 141 0
rustfs-obs 387 0
rustfs-policy 758 0
rustfs-protocols 770 1
rustfs-protos 75 0
rustfs-replication 209 0
rustfs-rio 225 1
rustfs-rio-v2 34 6
rustfs-s3-client 71 0
rustfs-s3-ops 8 0
rustfs-s3-types 105 0
rustfs-s3select-api 232 0
rustfs-s3select-query 235 2
rustfs-scanner 1392 20
rustfs-scanner-metrics 90 0
rustfs-security-governance 20 0
rustfs-signer 34 0
rustfs-storage-api 34 0
rustfs-targets 612 26
rustfs-test-utils 1 0
rustfs-tls-runtime 44 0
rustfs-trusted-proxies 72 0
rustfs-utils 253 1
rustfs-zip 30 0
zstd 11 0
+33 -3
View File
@@ -22,9 +22,9 @@ The following files in the project root are essential for Docker operations:
| File | Description | Usage |
| :--- | :--- | :--- |
| **`docker-buildx.sh`** | **Multi-Arch Build Script**<br>Automates building and pushing Docker images for `amd64` and `arm64`. Supports release and dev channels. | `./docker-buildx.sh --push` |
| **`Dockerfile`** | **Production Image (Alpine)**<br>Lightweight image using musl libc. Downloads pre-built binaries from GitHub Releases. | `docker build -t rustfs:latest .` |
| **`Dockerfile.glibc`** | **Production Image (Ubuntu)**<br>Standard image using glibc. Useful if you need specific dynamic libraries. | `docker build -f Dockerfile.glibc .` |
| **`Dockerfile.source`** | **Development Image**<br>Builds RustFS from source code. Includes build tools. Ideal for local development and CI. | `docker build -f Dockerfile.source .` |
| **`Dockerfile`** | **Production Image (Alpine)**<br>Lightweight image using musl libc. Downloads verified RustFS and `rc` binaries from GitHub Releases and bundles `/etc/rustfs/bootstrap`. | `docker build -t rustfs:latest .` |
| **`Dockerfile.glibc`** | **Production Image (Ubuntu)**<br>Standard image using glibc. Includes the bundled bootstrap configuration. | `docker build -f Dockerfile.glibc .` |
| **`Dockerfile.source`** | **Development Image**<br>Builds RustFS from source code and bundles `rc` and the default bootstrap configuration. | `docker build -f Dockerfile.source .` |
### Docker Compose Configurations
@@ -110,6 +110,36 @@ docker compose up -d
---
## Docker Compose environment values
Use map syntax when quoting environment values in YAML:
```yaml
services:
rustfs:
image: rustfs/rustfs:latest
ports:
- "9000:9000"
- "9001:9001"
volumes:
- ./data:/data
- ./logs:/var/log/rustfs
environment:
RUSTFS_ADDRESS: ":9000"
RUSTFS_CONSOLE_ADDRESS: ":9001"
RUSTFS_CONSOLE_ENABLE: "true"
RUSTFS_OBS_LOGGER_LEVEL: error
RUSTFS_OBS_LOG_DIRECTORY: "/var/log/rustfs/"
RUSTFS_ACCESS_KEY: "${RUSTFS_ACCESS_KEY:?Set RUSTFS_ACCESS_KEY}"
RUSTFS_SECRET_KEY: "${RUSTFS_SECRET_KEY:?Set RUSTFS_SECRET_KEY}"
```
Create the host directories and grant the container user write access before starting this example; official images run as UID/GID `10001:10001`. Set both credential variables to your own values, then run `docker compose config` to inspect the resolved configuration locally before `docker compose up -d`. The resolved output includes credentials, so do not share it publicly.
With list syntax, use `- RUSTFS_OBS_LOG_DIRECTORY=/var/log/rustfs/` or quote the whole item as `- "RUSTFS_OBS_LOG_DIRECTORY=/var/log/rustfs/"`. Writing `- RUSTFS_OBS_LOG_DIRECTORY="/var/log/rustfs/"` passes the inner quotes literally, making this a relative path beginning with `"`, which can fail with `mkdir: cannot create directory '"': Permission denied`. This also applies to addresses and credentials: fix every affected list item, rather than only the log directory. The entrypoint preserves configured values, including literal quotes in valid paths and secrets.
---
## 🔧 Common Operations
### Cleaning Up
@@ -1748,7 +1748,7 @@
"uid": "${datasource}"
},
"editorMode": "code",
"expr": "max by (job, bucket) (rustfs_cluster_usage_buckets_objects_count{job=~\"$job\", bucket=~\"$bucket\"})",
"expr": "max by (rustfs_cluster_id, job, bucket) (rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id=\"$storage_cluster\", job=~\"$job\", bucket=~\"$bucket\"})",
"legendFormat": "{{bucket}}",
"range": true,
"refId": "A"
@@ -1848,7 +1848,7 @@
"uid": "${datasource}"
},
"editorMode": "code",
"expr": "max by (job, bucket) (rustfs_cluster_usage_buckets_total_bytes{job=~\"$job\", bucket=~\"$bucket\"})",
"expr": "max by (rustfs_cluster_id, job, bucket) (rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id=\"$storage_cluster\", job=~\"$job\", bucket=~\"$bucket\"})",
"legendFormat": "{{bucket}}",
"range": true,
"refId": "A"
@@ -28,6 +28,15 @@ processors:
check_interval: 1s
limit_mib: 1024
spike_limit_mib: 256
transform/metrics:
error_mode: ignore
metric_statements:
# RustFS process metrics already expose process_pid as a metric label.
# Remove only the duplicate datapoint label and keep the shared resource
# process.pid available to sibling metrics and lock histograms.
- context: datapoint
statements:
- delete_key(attributes, "process_pid") where IsMatch(metric.name, "^rustfs_system_process_")
transform/logs:
error_mode: ignore
log_statements:
@@ -112,7 +121,7 @@ service:
exporters: [ otlp/tempo, otlp/jaeger ]
metrics:
receivers: [ otlp ]
processors: [ batch ]
processors: [ transform/metrics, memory_limiter, batch ]
exporters: [ prometheus ]
logs:
receivers: [ otlp ]
+1
View File
@@ -61,6 +61,7 @@ scrape_configs:
otlp:
promote_resource_attributes:
- service.instance.id
- process.pid
- service.name
- service.namespace
- cloud.availability_zone
@@ -0,0 +1,48 @@
evaluation_interval: 1m
tests:
- name: bucket usage keeps clusters separate and deduplicates reporting nodes
interval: 1m
input_series:
- series: rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="a",job="rustfs",bucket="shared",service_instance_id="a1"}
values: '4096 1024'
- series: rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="a",job="rustfs",bucket="shared",service_instance_id="a2"}
values: '4096 1024'
- series: rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="b",job="rustfs",bucket="shared",service_instance_id="b1"}
values: '65536 65536'
- series: rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="a",job="rustfs",bucket="empty",service_instance_id="a1"}
values: '0 0'
- series: rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id="a",job="rustfs",bucket="shared",service_instance_id="a1"}
values: '3 1'
- series: rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id="a",job="rustfs",bucket="shared",service_instance_id="a2"}
values: '3 1'
- series: rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id="b",job="rustfs",bucket="shared",service_instance_id="b1"}
values: '70 70'
- series: rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id="a",job="rustfs",bucket="empty",service_instance_id="a1"}
values: '0 0'
promql_expr_test:
- expr: max by (rustfs_cluster_id, job, bucket) (rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="a",job=~"rustfs",bucket=~".*"})
eval_time: 1m
exp_samples:
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="shared"}'
value: 1024
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="empty"}'
value: 0
- expr: max by (rustfs_cluster_id, job, bucket) (rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id="a",job=~"rustfs",bucket=~".*"})
eval_time: 1m
exp_samples:
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="shared"}'
value: 1
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="empty"}'
value: 0
- expr: max by (rustfs_cluster_id, job, bucket) (rustfs_cluster_usage_buckets_total_bytes)
eval_time: 1m
exp_samples:
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="shared"}'
value: 1024
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="empty"}'
value: 0
- labels: '{rustfs_cluster_id="b",job="rustfs",bucket="shared"}'
value: 65536
- expr: rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="a",bucket="unknown"}
eval_time: 1m
exp_samples: []
+40
View File
@@ -0,0 +1,40 @@
# syntax=docker/dockerfile:1.6
# Copyright 2026 RustFS Team
# Licensed under the Apache License, Version 2.0.
# A compatible native runtime with Python 3.11+, getent and stat is required by
# the isolated fixture's staging/provenance checks. This is a test image.
ARG RUNTIME_BASE=python:3.13-slim-trixie
FROM ${RUNTIME_BASE}
ARG SOURCE_REVISION
ARG BINARY_SHA256
ARG BUILD_PROFILE=dev
COPY rustfs /usr/bin/rustfs
RUN python3 - "$SOURCE_REVISION" "$BINARY_SHA256" "$BUILD_PROFILE" <<'PY'
import hashlib
import os
import re
import shutil
import sys
source, digest, profile = sys.argv[1:]
if not re.fullmatch(r"[0-9a-f]{40}", source):
raise SystemExit("invalid source revision")
if not re.fullmatch(r"[0-9a-f]{64}", digest):
raise SystemExit("invalid binary digest")
if profile not in ("dev", "release"):
raise SystemExit("invalid build profile")
with open("/usr/bin/rustfs", "rb") as binary:
if hashlib.file_digest(binary, "sha256").hexdigest() != digest:
raise SystemExit("binary digest mismatch")
for tool in ("getent", "stat"):
if shutil.which(tool) is None:
raise SystemExit(f"missing runtime tool: {tool}")
os.chmod("/usr/bin/rustfs", 0o755)
PY
LABEL io.rustfs.repro.source_revision="${SOURCE_REVISION}" \
io.rustfs.repro.binary_sha256="${BINARY_SHA256}" \
io.rustfs.repro.build_profile="${BUILD_PROFILE}"
USER 10001:10001
ENTRYPOINT ["/usr/bin/rustfs"]
+5
View File
@@ -0,0 +1,5 @@
{
"context": {
"fileName": "AGENTS.md"
}
}
+6 -20
View File
@@ -4,29 +4,15 @@ Applies to `.github/`.
## Pull Requests
PR conventions (English title/body, template usage, `--body-file` with the
heredoc pattern, review-thread etiquette) live in the root `AGENTS.md` under
"Git and PR Baseline" — that section is the single normative home; do not
duplicate its rules here.
PR conventions (English title/body, template usage, `--body-file` with the heredoc pattern, review-thread etiquette) live in [Git and PR rules](../.agents/references/pull-requests.md); do not duplicate them here.
## Workflow Changes
- Any change touching `.github/workflows/` must pass `actionlint` (run from
the repo root) with zero findings before commit/PR. Install via
`brew install actionlint`, or the download script in the actionlint repo
(rhysd/actionlint); `make pre-pr` does not cover workflow files, so this is
the required check for them.
- Custom self-hosted runner labels (`sm-standard-*`, `dind-*`) are declared
in `.github/actionlint.yaml`. When introducing a new `runs-on:` label,
declare it there in the same change. Never use the config or `-ignore` to
silence real findings — fix the workflow (root `AGENTS.md`: make checks
pass by fixing the cause, not by weakening the gate).
- If `shellcheck` is installed, actionlint also lints `run:` scripts; treat
those findings as part of the gate.
- Changes to workflow YAML or `.github/actionlint.yaml` must pass `actionlint` (run from the repo root) with zero findings before commit/PR. Install via `brew install actionlint`, or the download script in the actionlint repo (rhysd/actionlint); `make pre-pr` does not cover workflow files, so this is the required check for them.
- Custom self-hosted runner labels (`sm-standard-*`, `dind-*`) are declared in `.github/actionlint.yaml`. When introducing a new `runs-on:` label, declare it there in the same change. Never use the config or `-ignore` to silence real findings — fix the workflow (root `AGENTS.md`: make checks pass by fixing the cause, not by weakening the gate).
- If `shellcheck` is installed, actionlint also lints `run:` scripts; treat those findings as part of the gate.
- Runner placement and billing rules live in `.github/workflows/README.md`. A new job defaults to `ubuntu-latest` (free for this public repository); a self-hosted `runs-on` needs one of the reasons listed there, stated in a comment next to it, and a `rust-cache` key is never shared between the hosted and self-hosted images.
## CI Alignment
When changing CI-sensitive behavior, keep local validation aligned with
`.github/workflows/ci.yml`. Read the workflow file directly for the current
gate steps — do not rely on (or add) a copied command list here; copies go
stale. `make pre-pr` is the local equivalent of the main gate.
When changing CI-sensitive behavior, keep local validation aligned with `.github/workflows/ci.yml`. Read the workflow file directly for the current gate steps — do not rely on (or add) a copied command list here; copies go stale. `make pre-pr` covers the shared local gates, not the full CI feature, platform, or end-to-end matrix. Select checks using the root verification tiers.
+27 -5
View File
@@ -13,7 +13,7 @@
# limitations under the License.
name: Quick Checks
description: Run the shared compile-free RustFS quality checks.
description: Run the shared RustFS quality checks.
runs:
using: composite
@@ -24,19 +24,30 @@ runs:
tool: |
ripgrep@15.2.0
shellcheck@0.11.0
cargo-nextest@0.9.138
- name: Install actionlint
shell: bash
env:
GH_TOKEN: ${{ github.token }}
ASSET_DOWNLOADER: ${{ github.action_path }}/../setup/download_release_asset.py
run: |
actionlint_dir="$(mktemp -d "${RUNNER_TEMP}/actionlint.XXXXXX")"
curl --fail --location --silent --show-error \
--output "$actionlint_dir/actionlint.tar.gz" \
https://github.com/rhysd/actionlint/releases/download/v1.7.12/actionlint_1.7.12_linux_amd64.tar.gz
python3 "$ASSET_DOWNLOADER" --repository rhysd/actionlint --tag v1.7.12 --asset actionlint_1.7.12_linux_amd64.tar.gz --output "$actionlint_dir/actionlint.tar.gz" --sha256 8aca8db96f1b94770f1b0d72b6dddcb1ebb8123cb3712530b08cc387b349a3d8
echo "8aca8db96f1b94770f1b0d72b6dddcb1ebb8123cb3712530b08cc387b349a3d8 $actionlint_dir/actionlint.tar.gz" | sha256sum --check --status
tar -xzf "$actionlint_dir/actionlint.tar.gz" -C "$actionlint_dir" actionlint
rm "$actionlint_dir/actionlint.tar.gz"
echo "$actionlint_dir" >> "$GITHUB_PATH"
- name: Install Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.12"
- name: Install workflow parser
shell: bash
run: python3 -m pip install --disable-pip-version-check PyYAML==6.0.3
- name: Install Rust toolchain
uses: dtolnay/rust-toolchain@29eef336d9b2848a0b548edc03f92a220660cdb8 # stable
with:
@@ -86,6 +97,14 @@ runs:
shell: bash
run: ./scripts/check_s3s_footprint.sh
- name: Check per-crate test-count ratchet
shell: bash
run: ./scripts/check_test_count_ratchet.sh
- name: Check cross-owner tests use test seams
shell: bash
run: python3 ./scripts/check_test_seams.py
- name: Check cryptographic capability wording
shell: bash
run: ./scripts/check_fips_wording.sh
@@ -104,7 +123,10 @@ runs:
- name: Check test wiring
shell: bash
run: python3 ./scripts/check_test_wiring.py
run: |
python3 ./scripts/check_test_wiring.py
python3 ./scripts/ci_gate.py --check-workflow
python3 ./scripts/validation_registry.py check
- name: Check no planning docs committed
shell: bash
@@ -0,0 +1,96 @@
# Copyright 2026 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
name: "Reference RustFS binary"
description: "Download the pinned reference RustFS release, verify its sha256 and expose the executable path. A missing pin, missing asset or digest mismatch fails the step."
inputs:
pin-file:
description: "Pin file naming the reference release (repository-relative)"
required: false
default: ".config/reference-binary.toml"
platform:
description: "Platform table in the pin file"
required: false
default: "linux-x86_64-gnu"
destination:
description: "Directory that receives the executable; defaults to $RUNNER_TEMP/reference-binary"
required: false
default: ""
outputs:
path:
description: "Absolute path of the verified executable"
value: ${{ steps.unpack.outputs.path }}
version:
description: "Pinned reference version"
value: ${{ steps.pin.outputs.version }}
sha256:
description: "Pinned and verified archive sha256"
value: ${{ steps.pin.outputs.sha256 }}
runs:
using: "composite"
steps:
- name: Resolve reference pin
id: pin
shell: bash
env:
PIN_TOOL: ${{ github.action_path }}/reference_binary.py
PIN_FILE: ${{ inputs.pin-file }}
PIN_PLATFORM: ${{ inputs.platform }}
run: |
set -euo pipefail
resolved="$(python3 "$PIN_TOOL" resolve --pin "$PIN_FILE" --platform "$PIN_PLATFORM")"
printf '%s\n' "$resolved"
printf '%s\n' "$resolved" >> "$GITHUB_OUTPUT"
- name: Download and verify reference archive
id: download
shell: bash
env:
GH_TOKEN: ${{ github.token }}
ASSET_DOWNLOADER: ${{ github.action_path }}/../setup/download_release_asset.py
REF_REPOSITORY: ${{ steps.pin.outputs.repository }}
REF_TAG: ${{ steps.pin.outputs.tag }}
REF_ASSET: ${{ steps.pin.outputs.asset }}
REF_SHA256: ${{ steps.pin.outputs.sha256 }}
run: |
set -euo pipefail
archive="$RUNNER_TEMP/reference-archive/$REF_ASSET"
# Fails unless the release lists exactly one asset of this name whose
# published digest equals the pin and whose downloaded bytes match it.
python3 "$ASSET_DOWNLOADER" --repository "$REF_REPOSITORY" --tag "$REF_TAG" \
--asset "$REF_ASSET" --output "$archive" --sha256 "$REF_SHA256"
echo "archive=$archive" >> "$GITHUB_OUTPUT"
- name: Unpack reference executable
id: unpack
shell: bash
env:
PIN_TOOL: ${{ github.action_path }}/reference_binary.py
REF_ARCHIVE: ${{ steps.download.outputs.archive }}
REF_SHA256: ${{ steps.pin.outputs.sha256 }}
REF_EXECUTABLE: ${{ steps.pin.outputs.executable }}
REF_DESTINATION: ${{ inputs.destination }}
run: |
set -euo pipefail
destination="${REF_DESTINATION:-$RUNNER_TEMP/reference-binary}"
unpacked="$(python3 "$PIN_TOOL" unpack --archive "$REF_ARCHIVE" --sha256 "$REF_SHA256" \
--executable "$REF_EXECUTABLE" --destination "$destination")"
path="${unpacked#path=}"
test -x "$path"
echo "Reference executable: $path"
"$path" --version
echo "path=$path" >> "$GITHUB_OUTPUT"
+144
View File
@@ -0,0 +1,144 @@
#!/usr/bin/env python3
# Copyright 2026 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
"""Resolve and unpack the pinned reference RustFS release binary.
`resolve` reads the pin file and prints the selected platform's identity as
`key=value` lines (GitHub step-output format). `unpack` re-verifies the
downloaded archive digest against the pin and extracts exactly one executable.
Every missing or malformed input is a failure; nothing is skipped.
"""
import argparse
import hashlib
from pathlib import Path
import re
import sys
import tomllib
import zipfile
REPOSITORY = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.-]*/[A-Za-z0-9][A-Za-z0-9_.-]*")
TAG = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.+-]*")
PLATFORM = re.compile(r"[a-z0-9][a-z0-9_-]*")
ASSET = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.+-]*\.zip")
SHA256 = re.compile(r"[0-9a-f]{64}")
EXECUTABLE = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.-]*")
MAX_EXECUTABLE_BYTES = 1024 * 1024 * 1024
class PinError(Exception):
"""A pin, archive or argument that cannot be trusted."""
def field(table, key, pattern, where):
value = table.get(key)
if not isinstance(value, str) or not pattern.fullmatch(value):
raise PinError(f"{where}: missing or invalid '{key}'")
return value
def resolve(pin_path, platform):
if not PLATFORM.fullmatch(platform or ""):
raise PinError("invalid platform name")
try:
data = tomllib.loads(Path(pin_path).read_text(encoding="utf-8"))
except FileNotFoundError as exc:
raise PinError(f"{pin_path}: reference pin file is missing") from exc
except (OSError, UnicodeDecodeError, tomllib.TOMLDecodeError) as exc:
raise PinError(f"{pin_path}: cannot read reference pin: {exc}") from exc
if data.get("schema") != 1 or type(data.get("schema")) is not int:
raise PinError(f"{pin_path}: unsupported pin schema")
identity = {
"repository": field(data, "repository", REPOSITORY, pin_path),
"version": field(data, "version", TAG, pin_path),
"tag": field(data, "tag", TAG, pin_path),
}
platforms = data.get("platforms")
if not isinstance(platforms, dict) or not platforms:
raise PinError(f"{pin_path}: no pinned platforms")
entry = platforms.get(platform)
if not isinstance(entry, dict):
raise PinError(f"{pin_path}: no pin for platform '{platform}'")
where = f"{pin_path} [platforms.{platform}]"
identity["asset"] = field(entry, "asset", ASSET, where)
identity["sha256"] = field(entry, "sha256", SHA256, where)
identity["executable"] = field(entry, "executable", EXECUTABLE, where)
if identity["version"] not in identity["asset"]:
raise PinError(f"{where}: asset name does not carry version {identity['version']}")
unknown = set(entry) - {"asset", "sha256", "executable"}
if unknown:
raise PinError(f"{where}: unknown keys {sorted(unknown)}")
return identity
def file_sha256(path):
with open(path, "rb") as stream:
return hashlib.file_digest(stream, "sha256").hexdigest()
def unpack(archive, sha256, executable, destination):
if not SHA256.fullmatch(sha256 or "") or not EXECUTABLE.fullmatch(executable or ""):
raise PinError("invalid expected digest or executable name")
try:
actual = file_sha256(archive)
except OSError as exc:
raise PinError(f"{archive}: reference archive is missing or unreadable") from exc
if actual != sha256:
raise PinError(f"{archive}: sha256 {actual} does not match the pinned digest")
try:
with zipfile.ZipFile(archive) as bundle:
matches = [info for info in bundle.infolist() if info.filename == executable]
if len(matches) != 1:
raise PinError(f"{archive}: must contain exactly one top-level '{executable}'")
info = matches[0]
if info.is_dir() or not 0 < info.file_size <= MAX_EXECUTABLE_BYTES:
raise PinError(f"{archive}: '{executable}' is not a plausible executable")
destination = Path(destination)
destination.mkdir(parents=True, exist_ok=True)
target = destination / executable
with bundle.open(info) as source, open(target, "wb") as sink:
while chunk := source.read(1024 * 1024):
sink.write(chunk)
except zipfile.BadZipFile as exc:
raise PinError(f"{archive}: not a valid zip archive") from exc
target.chmod(0o755)
return target
def main(argv=None):
parser = argparse.ArgumentParser(description=__doc__.splitlines()[0])
sub = parser.add_subparsers(dest="mode", required=True)
res = sub.add_parser("resolve")
res.add_argument("--pin", required=True)
res.add_argument("--platform", required=True)
unp = sub.add_parser("unpack")
unp.add_argument("--archive", required=True)
unp.add_argument("--sha256", required=True)
unp.add_argument("--executable", required=True)
unp.add_argument("--destination", required=True)
args = parser.parse_args(argv)
try:
if args.mode == "resolve":
for key, value in resolve(args.pin, args.platform).items():
print(f"{key}={value}")
else:
print(f"path={unpack(args.archive, args.sha256, args.executable, args.destination)}")
except PinError as exc:
print(f"reference binary: {exc}", file=sys.stderr)
return 1
return 0
if __name__ == "__main__":
sys.exit(main())
+107
View File
@@ -0,0 +1,107 @@
name: Runner capability and build pilot
description: Inspect an existing runner and measure isolated fixed-source cold/warm builds
inputs:
workload:
description: probe, server or workspace-tests
required: true
source-sha:
description: Exact merged main commit for builds
default: ""
toolchain:
description: Exact Rust version for builds
default: ""
scratch-root:
description: Existing absolute scratch root
default: ""
build-jobs:
description: Cargo concurrency
default: "2"
local-ssd:
description: Require operator storage attestation
default: "false"
runs:
using: composite
steps:
- name: Validate pilot input and inspect existing capabilities
shell: bash
env:
PILOT_WORKLOAD: ${{ inputs.workload }}
PILOT_SHA: ${{ inputs.source-sha }}
PILOT_TOOLCHAIN: ${{ inputs.toolchain }}
PILOT_SCRATCH: ${{ inputs.scratch-root }}
PILOT_JOBS: ${{ inputs.build-jobs }}
PILOT_SSD: ${{ inputs.local-ssd }}
run: |
[[ "$PILOT_WORKLOAD" =~ ^(probe|server|workspace-tests)$ ]]
[[ "$PILOT_JOBS" =~ ^([1-9]|1[0-6])$ ]]
if [[ "$PILOT_WORKLOAD" != probe ]]; then
[[ "$PILOT_SHA" =~ ^[a-f0-9]{40}$ ]]
[[ "$PILOT_TOOLCHAIN" =~ ^[0-9]+\.[0-9]+\.[0-9]+$ ]]
fi
scratch="${PILOT_SCRATCH:-$RUNNER_TEMP}"
[[ "$scratch" == /* && -d "$scratch" ]]
minimum_disk=1
minimum_memory=0
if [[ "$PILOT_WORKLOAD" == server ]]; then minimum_disk=24; minimum_memory=8; fi
if [[ "$PILOT_WORKLOAD" == workspace-tests ]]; then minimum_disk=90; minimum_memory=16; fi
extra=()
if [[ "$PILOT_SSD" == true ]]; then extra+=(--local-ssd-attestation /etc/rustfs-runner/storage.json); fi
python3 scripts/ci/runner_pilot.py --root "$scratch" \
--output "$RUNNER_TEMP/runner-pilot-evidence" \
--min-free-gib "$minimum_disk" --min-memory-gib "$minimum_memory" --architecture x86_64 "${extra[@]}"
- name: Checkout the trusted baseline history
if: inputs.workload != 'probe'
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: main
path: .runner-pilot-source
fetch-depth: 0
persist-credentials: false
- name: Bind the build to a merged main commit
if: inputs.workload != 'probe'
shell: bash
env:
PILOT_SHA: ${{ inputs.source-sha }}
run: |
git -C .runner-pilot-source merge-base --is-ancestor "$PILOT_SHA" HEAD
git -C .runner-pilot-source checkout --detach "$PILOT_SHA"
- name: Install build dependencies
if: inputs.workload != 'probe'
shell: bash
run: |
sudo apt-get update
sudo apt-get install -y build-essential pkg-config libssl-dev cmake clang time
- name: Install the fixed protobuf compiler
if: inputs.workload != 'probe'
uses: rustfs/setup-protoc@a3705324d8f9bf5b6c3573fb6cf8ae421db55dd6 # v3.0.1
with:
version: "35.1"
repo-token: ${{ github.token }}
- name: Install the fixed flatbuffer compiler
if: inputs.workload != 'probe'
uses: Nugine/setup-flatc@698800de72a96bfb22cf60431dc21a2ff9a7e07b # v1
with:
version: "25.12.19"
- name: Install the requested exact Rust toolchain
if: inputs.workload != 'probe'
uses: dtolnay/rust-toolchain@29eef336d9b2848a0b548edc03f92a220660cdb8 # stable
with:
toolchain: ${{ inputs.toolchain }}
- name: Measure cold and warm builds without shared target caches
if: inputs.workload != 'probe'
shell: bash
env:
PILOT_WORKLOAD: ${{ inputs.workload }}
PILOT_SHA: ${{ inputs.source-sha }}
PILOT_TOOLCHAIN: ${{ inputs.toolchain }}
PILOT_SCRATCH: ${{ inputs.scratch-root }}
PILOT_JOBS: ${{ inputs.build-jobs }}
PILOT_SSD: ${{ inputs.local-ssd }}
run: |
extra=()
if [[ "$PILOT_SSD" == true ]]; then extra+=(--local-ssd-attestation /etc/rustfs-runner/storage.json); fi
python3 scripts/ci/runner_pilot.py --root "${PILOT_SCRATCH:-$RUNNER_TEMP}" \
--output "$RUNNER_TEMP/runner-pilot-evidence" \
--source .runner-pilot-source --source-sha "$PILOT_SHA" \
--toolchain "$PILOT_TOOLCHAIN" --benchmark "$PILOT_WORKLOAD" \
--jobs "$PILOT_JOBS" --timeout-seconds 3600 "${extra[@]}"
@@ -74,7 +74,6 @@ Notes:
- `.github/workflows/e2e-s3tests.yml` (weekly full s3-tests sweep)
- `.github/workflows/mint.yml` (weekly multi-SDK mint run)
- `.github/workflows/fuzz.yml` (nightly fuzz corpus jobs)
- `.github/workflows/performance-ab.yml` (nightly warp A/B gate)
- **Pending:** the ci-7 e2e nightly-full workflow does not exist yet
(backlog#1149 ci-7). When it lands, wire it up with the snippet above.
@@ -0,0 +1,39 @@
# Copyright 2024 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
name: Set up Docker Compose
description: Install the verified Compose CLI used by native Linux x86_64 Connect acceptance
runs:
using: composite
steps:
- name: Install verified Docker Compose CLI plugin
shell: bash
run: |
set -euo pipefail
[[ $(uname -s) == Linux && $(uname -m) == x86_64 ]]
plugin_dir="${DOCKER_CONFIG:-$HOME/.docker}/cli-plugins"
mkdir -p "$plugin_dir"
compose_download=$(mktemp "${RUNNER_TEMP:?}/connect-compose.XXXXXX")
compose_staged=$(mktemp "$plugin_dir/.docker-compose.XXXXXX")
trap 'rm -f "$compose_download" "$compose_staged"' EXIT
curl --fail --location --retry 3 \
https://github.com/docker/compose/releases/download/v2.40.3/docker-compose-linux-x86_64 \
--output "$compose_download"
printf '%s %s\n' \
dba9d98e1ba5bfe11d88c99b9bd32fc4a0624a30fafe68eea34d61a3e42fd372 \
"$compose_download" | sha256sum --check --strict
install -m 0755 "$compose_download" "$compose_staged"
mv -f "$compose_staged" "$plugin_dir/docker-compose"
[[ $(docker compose version --short) == 2.40.3 ]]
+38 -6
View File
@@ -36,6 +36,16 @@ inputs:
description: "Install cross-compilation tools"
required: false
default: "false"
zig-version:
description: >-
Zig version for cargo-zigbuild builds. Pinned so the `<target>.<glibc>`
baseline semantics cannot drift with an untested zig release.
required: false
default: "0.17.0"
cargo-zigbuild-version:
description: "cargo-zigbuild version installed for cross builds."
required: false
default: "0.23.4"
target:
description: "Target architecture to add"
required: false
@@ -56,10 +66,7 @@ inputs:
runs:
using: "composite"
steps:
# protobuf-compiler is deliberately absent: the setup-protoc step below
# installs 35.1 into the tool cache and prepends it to PATH, so the apt
# build (older, and never version-matched) was shadowed on every run and
# simply never used.
# Use the pinned code generators rather than Ubuntu's older packages.
- name: Install system dependencies (Ubuntu)
if: runner.os == 'Linux'
shell: bash
@@ -69,7 +76,9 @@ runs:
build-essential \
pkg-config \
libssl-dev \
ripgrep
ripgrep \
python3 \
gh
# musl-gcc is needed by the native musl release leg, and zip/unzip by the
# release packaging steps. No CI test lane touches any of them.
@@ -78,13 +87,32 @@ runs:
shell: bash
run: sudo apt-get install -y musl-tools zip unzip
- name: Install pinned code generators through GitHub API (Linux x64)
if: runner.os == 'Linux' && runner.arch == 'X64'
shell: bash
env:
GH_TOKEN: ${{ github.token }}
ASSET_DOWNLOADER: ${{ github.action_path }}/download_release_asset.py
run: |
python3 "$ASSET_DOWNLOADER" --repository protocolbuffers/protobuf --tag v35.1 --asset protoc-35.1-linux-x86_64.zip --output "$RUNNER_TEMP/protoc.zip"
python3 "$ASSET_DOWNLOADER" --repository google/flatbuffers --tag v25.12.19 --asset 'Linux.flatc.binary.g++-13.zip' --output "$RUNNER_TEMP/flatc.zip"
python3 -m zipfile -e "$RUNNER_TEMP/protoc.zip" "$RUNNER_TEMP/protoc"
python3 -m zipfile -e "$RUNNER_TEMP/flatc.zip" "$RUNNER_TEMP/flatc"
chmod +x "$RUNNER_TEMP/protoc/bin/protoc" "$RUNNER_TEMP/flatc/flatc"
"$RUNNER_TEMP/protoc/bin/protoc" --version
"$RUNNER_TEMP/flatc/flatc" --version
echo "$RUNNER_TEMP/protoc/bin" >> "$GITHUB_PATH"
echo "$RUNNER_TEMP/flatc" >> "$GITHUB_PATH"
- name: Install protoc
if: runner.os != 'Linux' || runner.arch != 'X64'
uses: rustfs/setup-protoc@a3705324d8f9bf5b6c3573fb6cf8ae421db55dd6 # v3.0.1
with:
version: "35.1"
repo-token: ${{ github.token }}
- name: Install flatc
if: runner.os != 'Linux' || runner.arch != 'X64'
uses: Nugine/setup-flatc@698800de72a96bfb22cf60431dc21a2ff9a7e07b # v1
with:
version: "25.12.19"
@@ -99,10 +127,14 @@ runs:
- name: Install Zig
if: inputs.install-cross-tools == 'true'
uses: mlugg/setup-zig@d1434d08867e3ee9daa34448df10607b98908d29 # v2
with:
version: ${{ inputs.zig-version }}
- name: Install cargo-zigbuild
if: inputs.install-cross-tools == 'true'
uses: taiki-e/install-action@a21ae4029b089b9ddc45704028756f51ab8abe48 # cargo-zigbuild
with:
tool: cargo-zigbuild@${{ inputs.cargo-zigbuild-version }}
- name: Install cargo-nextest
if: inputs.install-test-tools == 'true'
@@ -126,5 +158,5 @@ runs:
# normalises, so cargo fingerprints stay valid.
cache-all-crates: false
cache-on-failure: true
shared-key: ${{ inputs.cache-shared-key }}
shared-key: ${{ inputs.cache-shared-key }}${{ inputs.install-cross-tools == 'true' && format('-zig-{0}-zigbuild-{1}', inputs.zig-version, inputs.cargo-zigbuild-version) || '' }}
save-if: ${{ inputs.cache-save-if }}
@@ -0,0 +1,84 @@
#!/usr/bin/env python3
"""Download a named GitHub release asset through its API and verify its digest."""
import argparse
import hashlib
import json
from pathlib import Path
import re
import subprocess
import sys
import tempfile
from urllib.parse import quote
def download(repository, tag, name, output, expected_sha256=None):
if not re.fullmatch(r"[A-Za-z0-9][A-Za-z0-9_.-]*/[A-Za-z0-9][A-Za-z0-9_.-]*", repository):
raise ValueError("invalid release repository")
if not tag or not name or "/" in name or "\\" in name:
raise ValueError("invalid release tag or asset name")
if expected_sha256 is not None and not re.fullmatch(r"[0-9a-f]{64}", expected_sha256):
raise ValueError("invalid pinned asset digest")
result = subprocess.run(
["gh", "api", "--hostname", "github.com", f"repos/{repository}/releases/tags/{quote(tag, safe='')}"],
check=True, capture_output=True, text=True, timeout=60,
)
release = json.loads(result.stdout)
if not isinstance(release, dict) or release.get("tag_name") != tag:
raise ValueError("release metadata does not match the requested tag")
assets = release.get("assets")
if not isinstance(assets, list) or any(not isinstance(asset, dict) for asset in assets):
raise ValueError("invalid release asset inventory")
matches = [asset for asset in assets if asset.get("name") == name]
if len(matches) != 1:
raise ValueError("release must contain exactly one named asset")
asset = matches[0]
asset_id, size, digest = asset.get("id"), asset.get("size"), asset.get("digest")
if type(asset_id) is not int or asset_id <= 0 or type(size) is not int or not 0 < size <= 512 * 1024 * 1024:
raise ValueError("invalid release asset identity or size")
if not isinstance(digest, str) or not re.fullmatch(r"sha256:[0-9a-f]{64}", digest):
raise ValueError("release asset has no valid SHA-256 digest")
sha256 = digest.removeprefix("sha256:")
if expected_sha256 is not None and expected_sha256 != sha256:
raise ValueError("release digest differs from the pinned digest")
output = Path(output)
output.parent.mkdir(parents=True, exist_ok=True)
temporary = None
try:
with tempfile.NamedTemporaryFile(dir=output.parent, prefix=".release-asset-", delete=False) as stream:
temporary = Path(stream.name)
# gh authenticates to the API; its HTTP client strips credentials on
# cross-host redirects. No browser URL or token is supplied in argv.
subprocess.run(
["gh", "api", "--hostname", "github.com", "--header", "Accept: application/octet-stream", f"repos/{repository}/releases/assets/{asset_id}"],
check=True, stdout=stream, timeout=300,
)
with temporary.open("rb") as stream:
actual = hashlib.file_digest(stream, "sha256").hexdigest()
if temporary.stat().st_size != size or actual != sha256:
raise ValueError("downloaded release asset failed size or SHA-256 verification")
temporary.replace(output)
print(f"Verified release asset: {repository} {tag} {name} sha256={actual}")
finally:
if temporary is not None:
temporary.unlink(missing_ok=True)
def main():
parser = argparse.ArgumentParser(description=__doc__)
parser.add_argument("--repository", required=True)
parser.add_argument("--tag", required=True)
parser.add_argument("--asset", required=True)
parser.add_argument("--output", required=True, type=Path)
parser.add_argument("--sha256")
args = parser.parse_args()
try:
download(args.repository, args.tag, args.asset, args.output, args.sha256)
except (ValueError, KeyError, TypeError, json.JSONDecodeError, subprocess.SubprocessError, OSError) as error:
print(f"Release asset download failed: {error}", file=sys.stderr)
return 1
return 0
if __name__ == "__main__":
raise SystemExit(main())
+16
View File
@@ -0,0 +1,16 @@
name: Verification runtime
description: Install the runtime for prebuilt test archives without a target cache
runs:
using: composite
steps:
- name: Install runtime tools
shell: bash
run: |
sudo apt-get update
sudo apt-get install -y libssl-dev ripgrep
- name: Install Rust toolchain
uses: dtolnay/rust-toolchain@29eef336d9b2848a0b548edc03f92a220660cdb8 # stable
- name: Install cargo-nextest
uses: taiki-e/install-action@96c7780c1d8a2b8723e12031def873a434d39d8d # nextest
with:
tool: cargo-nextest@0.9.138
+2
View File
@@ -32,6 +32,8 @@ updates:
- "overtrue"
- "majinghe"
ignore:
- dependency-name: "pulsar"
versions: [ "6.9.x" ]
- dependency-name: "object_store"
versions: [ "0.13.x" ]
- dependency-name: "libunftp"
+1 -2
View File
@@ -24,8 +24,7 @@ List relevant checks not run and the remaining risk. Use the validation tier in
## Impact
<!--
Describe user-facing, compatibility, API, deployment, configuration, or
documentation impact. Use N/A when there is no expected impact.
Describe user-facing, compatibility, API, deployment, configuration, or documentation impact. Use N/A when there is no expected impact.
-->
## Additional Notes
File diff suppressed because it is too large Load Diff
+85
View File
@@ -0,0 +1,85 @@
# Workflow runners: what is billed and where a job belongs
**Use this when:** adding a job, changing a `runs-on`, moving a lane between runner pools, or deciding whether a new check is worth its runner cost.
**Source of truth:** `runs-on` in each workflow file for current placement; `.github/actionlint.yaml` for the declared self-hosted labels; the organisation's Settings → Billing → Usage page for what is actually charged; `docs/testing/ci-gates.md` for which checks block a merge (that does not change when a runner changes).
## Billing facts
This repository is public. For a public repository, GitHub's standard hosted runners (`ubuntu-latest`, `windows-latest`, `macos-latest`) cost nothing and have no minute cap, whatever plan the organisation is on. GitHub bills only two things: larger hosted runners, including the `macos-latest-xlarge` release lane used here, and standard runners in private repositories.
Every other label in this repository is capacity RustFS pays for. ARC pods and lab machines accrue cost while the machine exists. A Ubicloud label is metered for the minutes a job holds its VM:
| Label | Paid by | What it is | Use it for |
|---|---|---|---|
| `ubuntu-latest` | nobody | GitHub-hosted, Ubuntu 24.04, 4 vCPU, 16 GB RAM, about 14 GB of free disk. Ships a C toolchain, `docker`, `gh`, `curl`, `wget`, `jq`, Python. Can `mount` tmpfs and loop devices; io_uring works | the default for every job |
| `windows-latest`, `macos-latest` | nobody | GitHub-hosted standard runners | Windows and macOS targets |
| `macos-latest-xlarge` | RustFS | GitHub-hosted larger Apple Silicon runner | macOS release builds, deferred until Linux acceptance for candidates |
| `sm-standard-2` | RustFS | ARC pod, Ubuntu 24.04, minimal image: no `gh`, no C toolchain; Docker only on the `dind-` label | only a job that a hosted runner cannot run (see the placement rule) |
| `sm-standard-4` | RustFS | ARC pod, Ubuntu 24.04, 14 CPUs and 28 GB (the label is not the core count), large disk | workspace-scale Cargo builds |
| `ubicloud-standard-16-arm` | RustFS | Ubicloud VM, alias of `ubicloud-standard-16-arm-ubuntu-2404`: Ubuntu 24.04 arm64, 16 vCPU, 48 GB, 300 GB disk. Reached through the `build.yml` matrix, so `actionlint.yaml` does not list it | native aarch64 release builds (`linux-aarch64-musl`, `linux-aarch64-gnu`) |
| `dind-sm-standard-2` | RustFS | ARC pod with Docker-in-Docker | Docker workloads with a measured resource or environment requirement beyond the hosted runner |
| `smoke-testing`, `pf-testing` | RustFS | long-lived lab machines | the packaged functional chain and performance suites |
The self-hosted pods and the hosted image are both Ubuntu 24.04, so a binary built on one runs on the other; `ci.yml` builds the debug binary on `sm-standard-4` and runs it on both pools.
## Placement rule
A job runs on `ubuntu-latest` unless it has one of these reasons, and the reason goes in a comment next to its `runs-on`:
1. **Disk.** It restores or produces the workspace `target/`: `cargo build` or `cargo test` with `--all-targets`, `cargo nextest run --all`, or any reader of the `ci-dev` / `ci-feat-*` caches. The workspace test build leaves about 64 GB in `target/`; a hosted runner has about 14 GB.
2. **Critical-path CPU.** It is a build that several downstream lanes wait on and would blow its timeout at 4 vCPU (`build-rustfs-debug-binary` gates the e2e and s3-tests lanes).
3. **Hardware or environment.** Native aarch64 or access to the lab machines. Docker alone is not a reason: hosted Ubuntu ships Docker and supports the QEMU and Buildx setup actions.
4. **Cache ownership.** It reads a `rust-cache` key that a self-hosted job writes (see the cache rule below).
Jobs that do only the following have no reason to be self-hosted: shell or Python scripts, `cargo fmt`, `cargo deny`, typos, actionlint, API calls (`gh`, dependency review, issue and stale bots, CLA checks), downloading an artifact and running a prebuilt binary, or a `cargo build -p rustfs` with its own cache key. `e2e-distributed.yml` and `e2e-upgrade.yml` build the server and the `e2e_test` harness on `ubuntu-latest` inside their budgets, so "it compiles something" alone is not a reason.
The functional chain's `prepare` and `complete-chain` jobs, the performance runner availability check, and runner hygiene use `ubuntu-latest`: they inspect APIs or artifacts, not the lab hosts. The actual functional and performance suites remain on their lab runners. Functional-chain health collection uses `ubuntu-latest` so a lab outage cannot also stop its independent monitor. Docker image packaging also uses `ubuntu-latest` for both musl and glibc variants; it wraps verified candidate binaries rather than compiling the workspace, and still sets up QEMU and Buildx explicitly.
Moving these jobs off AKS reduces capacity demand, not necessarily the Azure bill immediately. VM costs fall only when nodes scale down or smaller capacity replaces them.
A hosted runner is also the only choice for a few things the pods cannot do: `mount -o loop` and `mount -t tmpfs` fail inside the ARC pods, and a container runtime cannot guarantee that `io_uring_setup` is allowed. `uring-integration` and `e2e-distributed` are on `ubuntu-latest` for that reason, not for cost.
## Cache rule
`Swatinem/rust-cache` builds its key from the OS, architecture, toolchain and lockfile. It does not include the runner label or image, so a cache written on an `sm-standard-4` pod and one written on `ubuntu-latest` would overwrite each other under the same `shared-key`.
- Every `shared-key` has exactly one writer. `cache-warm.yml` owns `ci-dev`, `ci-feat-rio`, `ci-feat-proto` and `ci-uring`; every other `./.github/actions/setup` call states `cache-save-if` explicitly, and `scripts/security/check_cache_save_if.sh` fails the build when one does not.
- All readers of a key run on the same image as its writer. Keys that live on hosted runners say so in their name (`ci-uring` is warmed on `ubuntu-latest`; `ci-e2e-distributed-hosted`, `e2e-upgrade-server-hosted`, `e2e-upgrade-tests-hosted`).
- Moving a job between pools therefore means renaming its key. The new key is empty until a run from `main` (a scheduled run, or a manual dispatch of that workflow from `main`) saves it; until then that lane does a cold build. The `build.yml` aarch64 release legs append `-ubicloud-arm` for this reason. `cache-warm.yml` does not write those keys.
- `CARGO_BUILD_JOBS` and every other `CARGO*`, `CC*`, `CFLAGS*`, `CXX*`, `CMAKE*` and `RUST*` variable is hashed into the key. `ci.yml` sets `CARGO_BUILD_JOBS` at step level for that reason; promoting it to job level rotates the key for every lane that shares it.
## Where self-hosted minutes leak
These are the patterns that have cost real money here without validating anything more:
- An `if: always()` summary or alert job on a self-hosted label inside a `workflow_run`-triggered workflow. The upstream workflow completes many times a day, the real jobs skip, and the summary still starts a pod each time. Gate it on the upstream job having run, and keep it on `ubuntu-latest`.
- Per-push workflows on `main`. A merge triggers the applicable `ci.yml` matrix and cache warming; `build.yml` development builds are scheduled or manual; with tens of merges a day that is as much self-hosted time as all pull requests together. Anything that does not verify the merged tree itself belongs on a schedule or behind a `paths` filter.
- `apt-get install` of tools the hosted image already ships. It is only needed on the minimal pod images.
- A throttled `CARGO_BUILD_JOBS` on a 14-CPU pod. The limit exists for link-storm reasons documented in `ci.yml`; measure before raising it, and measure before lowering it further.
- Tiny jobs on ARC pods. Each one pays roughly a minute of pod start-up before its first step; a compile-free job that takes ten seconds costs more to schedule than to run.
## Measuring a run
To see which pool each job of a run used and for how long:
```bash
gh api "repos/rustfs/rustfs/actions/runs/<run_id>/jobs?per_page=100" \
--jq '.jobs[] | "\(.conclusion)\t\(.labels | join(","))\t\(.started_at)\t\(.completed_at)\t\(.name)"'
```
Rows using `macos-latest-xlarge` or a label starting with `sm-`, `dind-`, `ubicloud-`, `smoke-` or `pf-` use paid capacity. At the October 2026 review, a full pull-request run of `ci.yml` spent about 150 self-hosted minutes, a third of it in jobs that never compiled; treat that as the scale of what a placement mistake costs, not as a current figure.
## Checklist for a new or moved job
- `runs-on` is a literal label. A new self-hosted label is declared in `.github/actionlint.yaml` in the same change (`.github/AGENTS.md`).
- The job declares `timeout-minutes` (`scripts/security/check_job_timeouts.sh`).
- `actionlint` reports nothing.
- A self-hosted `runs-on` carries a comment naming its reason from the placement rule.
- Every `./.github/actions/setup` call states `cache-save-if`, and a key read from one pool is not written from the other.
- Moving a job does not change its check name, so the `main` ruleset and `docs/testing/ci-gates.md` stay as they are; renaming it does, and then that document's change checklist applies.
## Release stages
The [candidate release pipeline](../../docs/operations/release-pipeline.md) builds Linux first and defers paid desktop capacity until acceptance. Daily development builds also select Linux; use manual platform selection for desktop development artifacts. All six platforms remain required before publication. The pipeline records and promotes the exact tested bytes. Builder workflows have no public-release credentials. Keep periodic development builds, PR verification and field-test chains separate when their contracts differ; do not re-enable disabled workflows as part of a source-file migration.
Larger runners remain billed for public repositories; see [GitHub runner billing](https://docs.github.com/en/actions/concepts/runners/larger-runners#billing). Actual spending comes from organization billing, not runner labels or an estimated build duration.
+152 -16
View File
@@ -23,13 +23,19 @@ on:
- 'deny.toml'
- '.github/actions/**'
- '.github/workflows/**'
- 'scripts/release/create_or_update_release.sh'
- 'scripts/release/package_service_scripts.sh'
- 'scripts/release/package_versions.sh'
- 'scripts/release/**'
- 'scripts/security/generate_release_supply_chain_assets.py'
- '.config/release-validation-plan.json'
- '.github/scheduled-validations.json'
- 'scripts/test_helm_release_workflow.py'
- 'scripts/test_release_packages.py'
- 'scripts/test_release_images.py'
- 'Dockerfile*'
- 'entrypoint.sh'
- 'bootstrap/**'
- 'scripts/test_package_service_scripts.sh'
- 'scripts/test_package_versions.sh'
- 'scripts/test_docker_workflow.py'
- 'scripts/security/check_performance_ab_workflow.sh'
- 'scripts/security/check_preview_release_workflow.sh'
- 'scripts/security/check_tier_artifact_workflow.sh'
- 'scripts/security/check_workflow_pins.sh'
@@ -42,13 +48,19 @@ on:
- 'deny.toml'
- '.github/actions/**'
- '.github/workflows/**'
- 'scripts/release/create_or_update_release.sh'
- 'scripts/release/package_service_scripts.sh'
- 'scripts/release/package_versions.sh'
- 'scripts/release/**'
- 'scripts/security/generate_release_supply_chain_assets.py'
- '.config/release-validation-plan.json'
- '.github/scheduled-validations.json'
- 'scripts/test_helm_release_workflow.py'
- 'scripts/test_release_packages.py'
- 'scripts/test_release_images.py'
- 'Dockerfile*'
- 'entrypoint.sh'
- 'bootstrap/**'
- 'scripts/test_package_service_scripts.sh'
- 'scripts/test_package_versions.sh'
- 'scripts/test_docker_workflow.py'
- 'scripts/security/check_performance_ab_workflow.sh'
- 'scripts/security/check_preview_release_workflow.sh'
- 'scripts/security/check_tier_artifact_workflow.sh'
- 'scripts/security/check_workflow_pins.sh'
@@ -77,7 +89,7 @@ jobs:
cancel-closed-pr-runs:
name: Cancel Closed PR Runs
if: github.event_name == 'pull_request' && github.event.action == 'closed'
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- name: Explain cancellation run
@@ -89,7 +101,7 @@ jobs:
cargo-deny:
name: Cargo Deny
if: github.repository == 'rustfs/rustfs' && (github.event_name != 'pull_request' || github.event.action != 'closed')
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 20
steps:
- name: Checkout repository
@@ -132,14 +144,40 @@ jobs:
workflow-pin-report:
name: Workflow Pin Report
if: github.repository == 'rustfs/rustfs' && (github.event_name != 'pull_request' || github.event.action != 'closed')
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 5
permissions:
contents: read
actions: read
outputs:
release_changed: ${{ steps.scope.outputs.release_changed }}
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
fetch-depth: 0
persist-credentials: false
- name: Scope native packaging checks to release changes
id: scope
env:
BASE_SHA: ${{ github.event.pull_request.base.sha || github.event.before }}
run: |
python3 - <<'PY'
import os, re, subprocess
event, base = os.environ['GITHUB_EVENT_NAME'], os.environ.get('BASE_SHA', '')
changed = event == 'workflow_dispatch'
if event in ('push', 'pull_request'):
if not re.fullmatch(r'[0-9a-f]{40}', base) or base == '0' * 40:
changed = True
else:
paths = subprocess.check_output(['git', 'diff', '--name-only', base, os.environ['GITHUB_SHA']], text=True).splitlines()
pattern = r'^(scripts/release/|scripts/test_release_|Dockerfile|entrypoint.sh$|bootstrap/|\.dockerignore$|\.config/release-validation-plan.json$|\.github/workflows/(audit|build|docker|package|helm-package|release-[^.]+)\.yml$)'
changed = any(re.match(pattern, path) for path in paths)
with open(os.environ['GITHUB_OUTPUT'], 'a') as output:
output.write(f'release_changed={str(changed).lower()}\n')
PY
- name: Report unpinned GitHub Actions
run: ./scripts/security/check_workflow_pins.sh --enforce
@@ -152,11 +190,35 @@ jobs:
- name: Check checkouts clear their credentials
run: ./scripts/security/check_persist_credentials.sh
- name: Check preview release workflow policy
run: ./scripts/security/check_preview_release_workflow.sh
- name: Check release candidate and promotion contracts
run: python3 -m unittest discover -s scripts/release -p 'test_*.py'
- name: Check performance A/B workflow trust boundary
run: ./scripts/security/check_performance_ab_workflow.sh
- name: Prepare artifact transport rehearsal
run: |
mkdir -p "$RUNNER_TEMP/release-transport"
printf '{"purpose":"transport contract, not release evidence"}\n' > "$RUNNER_TEMP/release-transport/transport.json"
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: release-transport-contract-${{ github.run_attempt }}
path: ${{ runner.temp }}/release-transport/transport.json
if-no-files-found: error
retention-days: 1
- name: Verify actual GitHub artifact metadata and downloaded bytes
env:
GH_TOKEN: ${{ github.token }}
run: |
python3 - <<'PY'
import os, sys
from pathlib import Path
sys.path.insert(0, 'scripts/release')
import candidate as c
run = c.github(f"repos/{c.REPOSITORY}/actions/runs/{os.environ['GITHUB_RUN_ID']}")
destination = Path(os.environ['RUNNER_TEMP']) / 'release-transport-downloaded'
c.download_artifact(run, f"release-transport-contract-{os.environ['GITHUB_RUN_ATTEMPT']}", destination)
c.require(c.read_json(destination / 'transport.json') == {'purpose': 'transport contract, not release evidence'}, 'artifact round trip changed')
PY
- name: Check tier evidence workflow isolation
run: ./scripts/security/check_tier_artifact_workflow.sh
@@ -167,9 +229,83 @@ jobs:
- name: Check package service lifecycle contract
run: ./scripts/test_package_service_scripts.sh
release-package-contract:
name: Release package contract
needs: workflow-pin-report
if: needs.workflow-pin-report.outputs.release_changed == 'true'
runs-on: ubuntu-latest
timeout-minutes: 15
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Install real package managers
run: |
sudo apt-get update
sudo apt-get install -y ruby ruby-dev build-essential rpm fakeroot cpio
sudo gem install fpm --version 1.17.0 --no-document
- name: Exercise accepted and substituted payloads through both recipes
run: python3 scripts/test_release_packages.py
release-image-contract:
name: Release image contract (${{ matrix.variant }})
needs: workflow-pin-report
if: needs.workflow-pin-report.outputs.release_changed == 'true'
runs-on: ubuntu-latest
timeout-minutes: 35
strategy:
fail-fast: false
matrix:
variant: [musl, gnu]
env:
RELEASE_IMAGE_VARIANT: ${{ matrix.variant }}
NO_PROXY: 127.0.0.1,localhost,::1
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Install OCI tools
run: |
echo "RELEASE_IMAGE_OUTPUT=$RUNNER_TEMP/image-contract" >> "$GITHUB_ENV"
echo 'no_proxy=127.0.0.1,localhost,::1' >> "$GITHUB_ENV"
sudo apt-get update
sudo apt-get install -y skopeo
go version
- uses: docker/setup-qemu-action@c7c53464625b32c7a7e944ae62b3e17d2b600130 # v3
- uses: docker/setup-buildx-action@8d2750c68a42422c14e847fe6c8ac0403b4cbd6f # v3
- name: Exercise real OCI packaging, startup, registry retry and conflicts
run: python3 scripts/test_release_images.py
- name: Exercise amd64 OCI archive scanning
uses: aquasecurity/trivy-action@ed142fd0673e97e23eac54620cfb913e5ce36c25
env:
TRIVY_PLATFORM: linux/amd64
with:
input: ${{ runner.temp }}/image-contract-scan/image-${{ matrix.variant }}-amd64.tar
format: sarif
output: ${{ runner.temp }}/image-contract/scan-${{ matrix.variant }}-amd64.sarif
exit-code: "0"
- name: Exercise arm64 OCI archive scanning
uses: aquasecurity/trivy-action@ed142fd0673e97e23eac54620cfb913e5ce36c25
env:
TRIVY_PLATFORM: linux/arm64
with:
input: ${{ runner.temp }}/image-contract-scan/image-${{ matrix.variant }}-arm64.tar
format: sarif
output: ${{ runner.temp }}/image-contract/scan-${{ matrix.variant }}-arm64.sarif
exit-code: "0"
- name: Verify scan receipts before recording the archive
run: |
python3 - <<'PY'
import os, sys
from pathlib import Path
sys.path.insert(0, 'scripts/release')
import deliver, test_candidate
deliver.image_record(test_candidate.inputs(), os.environ['RELEASE_IMAGE_VARIANT'], Path(os.environ['RELEASE_IMAGE_OUTPUT']))
PY
dependency-review:
name: Dependency Review
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 30
if: github.event_name == 'pull_request' && github.event.action != 'closed'
permissions:
@@ -0,0 +1,75 @@
name: BTF prototype reference
on:
pull_request:
paths:
- "scripts/inspect_btf_prototypes.py"
- "scripts/test_inspect_btf_prototypes.py"
- "scripts/fixtures/btf_prototypes.c"
- ".github/workflows/btf-prototype-reference.yml"
workflow_dispatch:
permissions:
contents: read
concurrency:
group: btf-prototype-reference-${{ github.ref }}
cancel-in-progress: true
jobs:
reference:
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.12"
- name: Check prototype and CLI contracts
run: python3 -B scripts/test_inspect_btf_prototypes.py
- name: Install only missing native reference tools
run: |
select_bpftool() {
local candidate
local candidates=()
if command -v bpftool >/dev/null; then
candidates+=("$(command -v bpftool)")
fi
for candidate in /usr/lib/linux-tools-*/bpftool /usr/lib/linux-tools/*/bpftool; do
if [[ -x "$candidate" ]]; then
candidates+=("$candidate")
fi
done
while IFS= read -r candidate; do
if [[ -x "$candidate" ]] && file -Lb "$candidate" | grep -q 'ELF' \
&& "$candidate" version >/dev/null 2>&1; then
printf '%s\n' "$candidate"
return 0
fi
done < <(printf '%s\n' "${candidates[@]}" | sort -Vr)
return 1
}
packages=()
command -v clang >/dev/null || packages+=(clang)
command -v llvm-objcopy >/dev/null || packages+=(llvm)
command -v gcc >/dev/null || packages+=(gcc)
select_bpftool >/dev/null || packages+=(linux-tools-generic)
if (( ${#packages[@]} )); then
sudo apt-get update
sudo apt-get install --no-install-recommends -y "${packages[@]}"
fi
# File parsing needs a working binary, not a host-kernel wrapper.
selected_bpftool="$(select_bpftool)"
"$selected_bpftool" version
printf 'BPFTOOL=%s\n' "$selected_bpftool" >> "$GITHUB_ENV"
- name: Compare declarations and layouts with independent references
run: |
clang -target bpf -O2 -g -c scripts/fixtures/btf_prototypes.c -o "$RUNNER_TEMP/prototypes.o"
llvm-objcopy --dump-section ".BTF=$RUNNER_TEMP/prototypes.btf" "$RUNNER_TEMP/prototypes.o"
gcc -std=c11 -Wall -Wextra -Werror -DRUSTFS_BTF_LAYOUT_REFERENCE \
scripts/fixtures/btf_prototypes.c -o "$RUNNER_TEMP/layout-reference"
"$RUNNER_TEMP/layout-reference" > "$RUNNER_TEMP/layout-reference.json"
python3 -B scripts/test_inspect_btf_prototypes.py --native-reference "$RUNNER_TEMP/prototypes.btf" \
--layout-reference "$RUNNER_TEMP/layout-reference.json"
File diff suppressed because it is too large Load Diff
+33 -24
View File
@@ -42,26 +42,23 @@
name: Cache Warm
on:
schedule:
# Every six hours; the 22:41 UTC run lands before ci.yml's nightly 00:11
# UTC matrix. A reader restores the newest entry under its key and
# rebuilds whatever its own diff changed, so a cache up to six hours old
# costs a PR the handful of crates merged since. Warming after every merge
# (fourteen completed runs a day, about two sm-standard-4 hours each)
# spent far more than that to avoid it.
- cron: "41 4,10,16,22 * * *"
push:
branches: [ main ]
# Mirrors ci.yml's push paths-ignore: if a commit cannot change what ci.yml
# compiles, it cannot change what ci.yml needs restored either.
paths-ignore:
- "**.md"
- "docs/**"
- "deploy/**"
- "scripts/dev_*.sh"
- "scripts/probe.sh"
- "LICENSE*"
- ".gitignore"
- ".dockerignore"
- "README*"
- "**/*.png"
- "**/*.jpg"
- "**/*.svg"
- ".github/workflows/build.yml"
- ".github/workflows/docker.yml"
- ".github/workflows/audit.yml"
# A toolchain or lockfile change invalidates most of every key; those
# re-warm at once instead of waiting for the next slot.
paths:
- "Cargo.lock"
- "rust-toolchain.toml"
- ".github/actions/setup/**"
- ".github/workflows/cache-warm.yml"
workflow_dispatch:
inputs:
emit_timings:
@@ -75,7 +72,7 @@ on:
permissions:
contents: read
# Scoped by event. A push run and a dispatch run do not compete: GitHub keeps
# Scoped by event. Scheduled, push and dispatch runs do not compete: GitHub keeps
# one running plus one pending per group, so with a single shared group a
# manually dispatched run was displaced as pending by the next merge and
# cancelled — observed three times in a row, which made the --timings gate in
@@ -99,7 +96,7 @@ env:
RUST_BACKTRACE: 1
jobs:
# Readers: test-and-lint, test-ilm-integration-serial, build-rustfs-debug-binary,
# Readers: workspace-clippy, workspace-lint-and-build, workspace-tests (workspace and ILM), build-rustfs-debug-binary,
# e2e-tests, e2e-full.
warm-ci-dev:
name: Warm ci-dev
@@ -149,7 +146,7 @@ jobs:
if-no-files-found: error
# --all-targets covers the test binaries nextest builds, including
# e2e_test, which test-and-lint's own run excludes. The second build adds
# e2e_test, which the workspace run excludes. The second build adds
# the e2e-test-hooks feature resolution that build-rustfs-debug-binary uses
# and that no lint lane enables.
- name: Build ci-dev superset
@@ -162,6 +159,17 @@ jobs:
cargo build --workspace --all-targets
cargo build -p rustfs --bins --features e2e-test-hooks
# ci.yml runs Clippy on every pull request. Clippy's check-mode artifacts
# are separate from the build above, so warm them with the exact
# invocation ci.yml uses; a pull request then re-checks only what its diff
# touches. A lint failure on main must not stop the warm-up: the cache is
# still saved (cache-on-failure), and the failure belongs to ci.yml.
- name: Warm Clippy check artifacts
run: |
if ! cargo clippy --all-targets -- -D warnings; then
echo "::warning::cargo clippy reports findings on this commit; check artifacts are still cached"
fi
# Runs before rust-cache's post step, so these are the sizes it is about
# to archive. Reported so the cache-all-crates decision stays evidence-led:
# registry/src is what that flag prunes, registry/cache is what the pruned
@@ -185,9 +193,10 @@ jobs:
echo '```'
} >> "$GITHUB_STEP_SUMMARY"
# Readers: test-and-lint-rio-v2 (per-PR), build-rustfs-debug-binary-rio-v2
# (weekly schedule / manual dispatch only — dormant rio-v2 variant, see
# rustfs/backlog#1835 and docs/architecture/minio-file-format-compat.md).
# Readers: test-and-lint-rio-v2 (nightly schedule, merge group, dispatch),
# build-rustfs-debug-binary-rio-v2 (nightly schedule / manual dispatch only —
# dormant rio-v2 variant, see rustfs/backlog#1835 and
# docs/architecture/minio-file-format-compat.md).
# The second build below stays despite the reduced cadence: it warms the
# rio-v2,e2e-test-hooks feature resolution the scheduled build restores,
# which keeps that lane inside its 30-minute timeout.
@@ -0,0 +1,60 @@
name: CI Resource Accounting
on:
workflow_dispatch:
inputs:
since:
description: "Inclusive run creation timestamp, for example 2026-10-01T00:00:00Z"
required: true
type: string
until:
description: "Inclusive end timestamp; keep the window below 1000 runs"
required: true
type: string
permissions:
contents: read
actions: read
pull-requests: read
concurrency:
group: ci-resource-accounting
cancel-in-progress: false
jobs:
collect:
if: github.repository == 'rustfs/rustfs'
runs-on: ubuntu-latest
timeout-minutes: 30
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Collect all workflow attempts in the window
env:
GH_TOKEN: ${{ github.token }}
ACCOUNTING_SINCE: ${{ inputs.since }}
ACCOUNTING_UNTIL: ${{ inputs.until }}
ACCOUNTING_REPOSITORY: ${{ github.repository }}
run: |
python3 scripts/ci/actions_cost_report.py \
--repository "$ACCOUNTING_REPOSITORY" \
--since "$ACCOUNTING_SINCE" --until "$ACCOUNTING_UNTIL" \
--output "$RUNNER_TEMP/ci-accounting.json" \
--summary "$RUNNER_TEMP/ci-accounting.md"
- name: Show available accounting summary
if: always()
run: |
if [[ -f "$RUNNER_TEMP/ci-accounting.md" ]]; then
cat "$RUNNER_TEMP/ci-accounting.md" >> "$GITHUB_STEP_SUMMARY"
fi
- name: Retain recomputable accounting evidence
if: always()
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4
with:
name: ci-accounting-${{ github.run_id }}-${{ github.run_attempt }}
path: |
${{ runner.temp }}/ci-accounting.json
${{ runner.temp }}/ci-accounting.md
if-no-files-found: error
retention-days: 30
+92
View File
@@ -0,0 +1,92 @@
name: CI Runner Pilot
on:
workflow_dispatch:
inputs:
pool:
description: "Existing runner pool; no infrastructure is created"
required: true
type: choice
options: [hosted, arc]
default: hosted
workload:
description: "Probe only, or perform cold/warm fixed-source builds"
required: true
type: choice
options: [probe, server, workspace-tests]
default: probe
source_sha:
description: "Exact 40-character merged main SHA; required for builds"
type: string
toolchain:
description: "Exact Rust version such as 1.92.0; required for builds"
type: string
scratch_root:
description: "Existing absolute scratch directory; empty uses runner.temp"
type: string
build_jobs:
description: "Fixed Cargo concurrency for both comparisons (1-16)"
type: string
default: "2"
local_ssd:
description: "Require operator /etc/rustfs-runner/storage.json attestation"
type: boolean
default: false
permissions:
contents: read
concurrency:
group: ci-runner-pilot
cancel-in-progress: false
jobs:
hosted:
if: github.repository == 'rustfs/rustfs' && github.ref == 'refs/heads/main' && inputs.pool == 'hosted'
runs-on: ubuntu-latest
timeout-minutes: 150
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- uses: ./.github/actions/runner-pilot
with:
workload: ${{ inputs.workload }}
source-sha: ${{ inputs.source_sha }}
toolchain: ${{ inputs.toolchain }}
scratch-root: ${{ inputs.scratch_root }}
build-jobs: ${{ inputs.build_jobs }}
local-ssd: ${{ inputs.local_ssd }}
- name: Retain hosted pilot evidence
if: always()
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4
with:
name: runner-pilot-hosted-${{ github.run_id }}-${{ github.run_attempt }}
path: ${{ runner.temp }}/runner-pilot-evidence
if-no-files-found: error
retention-days: 30
arc:
if: github.repository == 'rustfs/rustfs' && github.ref == 'refs/heads/main' && inputs.pool == 'arc'
# Disk and hardware: measure the existing workspace build pool's storage.
runs-on: sm-standard-4
timeout-minutes: 150
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- uses: ./.github/actions/runner-pilot
with:
workload: ${{ inputs.workload }}
source-sha: ${{ inputs.source_sha }}
toolchain: ${{ inputs.toolchain }}
scratch-root: ${{ inputs.scratch_root }}
build-jobs: ${{ inputs.build_jobs }}
local-ssd: ${{ inputs.local_ssd }}
- name: Retain ARC pilot evidence
if: always()
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4
with:
name: runner-pilot-arc-${{ github.run_id }}-${{ github.run_attempt }}
path: ${{ runner.temp }}/runner-pilot-evidence
if-no-files-found: error
retention-days: 30
+647 -284
View File
File diff suppressed because it is too large Load Diff
+3 -3
View File
@@ -46,7 +46,7 @@ jobs:
# Echoes one line; the run exists only so the concurrency group cancels the
# in-flight run of a closed PR.
permissions: {}
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- name: Explain cancellation run
@@ -61,7 +61,7 @@ jobs:
checks: write
issues: write
pull-requests: write
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 30
steps:
- name: Report CLA result for merge queue
@@ -95,7 +95,7 @@ jobs:
- name: Run CLA Bot
if: github.event_name != 'merge_group'
uses: overtrue/cla-bot@5e5929846a60cfb42b16d0d38e135ef67d94fc88 # v0.0.9
uses: overtrue/cla-bot@4bd1387c19691168c42fcf5edfa17b15819b2ab3 # v0.1.1
with:
github-token: ${{ github.token }}
registry-token: ${{ steps.registry-token.outputs.token }}
@@ -57,6 +57,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -94,7 +102,7 @@ jobs:
' <<<"$run" >/dev/null
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e '
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu, [a-z0-9-]+, x86_64-unknown-linux-gnu, false, linux, pyroscope\\)$"))] as $matches
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu\\)$"))] as $matches
| ($matches | length) == 1 and $matches[0].conclusion == "success"
' <<<"$jobs" >/dev/null
artifact=$(gh api "repos/${GITHUB_REPOSITORY}/actions/artifacts/${ARTIFACT_ID}")
@@ -137,7 +145,7 @@ jobs:
assert outer.testzip() is None
with zipfile.ZipFile(io.BytesIO(outer.read(package))) as inner:
entries = inner.infolist()
assert {item.filename for item in entries} == {'rustfs', 'rustfs-cli'} and len(entries) == 2
assert {item.filename for item in entries} == {'rustfs', 'rustfs.cpu-symbol-catalog.json', 'rustfs.cpu-symbol-catalog.sha256'} and len(entries) == 3
assert all(regular(item) and 0 < item.file_size <= 1073741824 for item in entries)
assert inner.testzip() is None
pathlib.Path('binary').mkdir()
@@ -162,7 +170,7 @@ jobs:
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
(cd connect-harness && ./tests/connectivity/diagnostic-schedule-evidence.test.sh)
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_DIAGNOSTIC_SCHEDULE_EVIDENCE="$GITHUB_WORKSPACE/diagnostic-schedule-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=diagnostic-schedule
@@ -57,6 +57,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -127,7 +135,7 @@ jobs:
' <<<"$run" >/dev/null
jobs=$(gh api --paginate --slurp "repos/rustfs/rustfs/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e '
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu, [a-z0-9-]+, x86_64-unknown-linux-gnu, false, linux, pyroscope\\)$"))] as $matches
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu\\)$"))] as $matches
| ($matches | length) == 1 and $matches[0].conclusion == "success"
' <<<"$jobs" >/dev/null
artifact=$(gh api "repos/rustfs/rustfs/actions/artifacts/${ARTIFACT_ID}")
@@ -172,7 +180,7 @@ jobs:
assert outer.testzip() is None
with zipfile.ZipFile(io.BytesIO(outer.read(package))) as inner:
entries = inner.infolist()
assert {entry.filename for entry in entries} == {'rustfs', 'rustfs-cli', 'rustfs.cpu-symbol-catalog.json', 'rustfs.cpu-symbol-catalog.sha256'} and len(entries) == 4
assert {entry.filename for entry in entries} == {'rustfs', 'rustfs.cpu-symbol-catalog.json', 'rustfs.cpu-symbol-catalog.sha256'} and len(entries) == 3
assert all(regular(entry) and 0 < entry.file_size <= 1073741824 for entry in entries)
assert inner.testzip() is None
pathlib.Path('binary').mkdir()
@@ -199,7 +207,7 @@ jobs:
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
(cd connect-harness && ./tests/connectivity/health-service-evidence.test.sh)
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_HEALTH_SERVICE_EVIDENCE="$GITHUB_WORKSPACE/health-service-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=health-service
@@ -73,6 +73,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -107,7 +115,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-4, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
expected_job='Build RustFS (linux-x86_64-gnu)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.[].jobs[] | select(.name == $name)] as $matches
@@ -154,7 +162,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_PERFORMANCE_DRIVE_EVIDENCE="$GITHUB_WORKSPACE/performance-drive-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=performance-drive
@@ -73,6 +73,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -107,7 +115,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-4, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
expected_job='Build RustFS (linux-x86_64-gnu)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.[].jobs[] | select(.name == $name)] as $matches
@@ -154,7 +162,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_PERFORMANCE_NETWORK_EVIDENCE="$GITHUB_WORKSPACE/performance-network-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=performance-network
@@ -77,6 +77,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -118,7 +126,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-4, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
expected_job='Build RustFS (linux-x86_64-gnu)'
jobs=$(github_api "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.jobs[] | select(.name == $name)] as $matches
@@ -173,7 +181,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_CPU_CATALOG="$GITHUB_WORKSPACE/binary/rustfs.cpu-symbol-catalog.json" \
CONNECT_E2E_CPU_CATALOG_SHA256="$CATALOG_SHA256" \
@@ -57,6 +57,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -127,7 +135,7 @@ jobs:
' <<<"$run" >/dev/null
jobs=$(gh api --paginate --slurp "repos/rustfs/rustfs/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e '
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu, [a-z0-9-]+, x86_64-unknown-linux-gnu, false, linux, pyroscope\\)$"))] as $matches
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu\\)$"))] as $matches
| ($matches | length) == 1 and $matches[0].conclusion == "success"
' <<<"$jobs" >/dev/null
artifact=$(gh api "repos/rustfs/rustfs/actions/artifacts/${ARTIFACT_ID}")
@@ -172,7 +180,7 @@ jobs:
assert outer.testzip() is None
with zipfile.ZipFile(io.BytesIO(outer.read(package))) as inner:
entries = inner.infolist()
expected = {'rustfs', 'rustfs-cli', 'rustfs.cpu-symbol-catalog.json', 'rustfs.cpu-symbol-catalog.sha256'}
expected = {'rustfs', 'rustfs.cpu-symbol-catalog.json', 'rustfs.cpu-symbol-catalog.sha256'}
assert {entry.filename for entry in entries} == expected and len(entries) == len(expected)
assert all(regular(entry) and 0 < entry.file_size <= 1073741824 for entry in entries)
assert inner.testzip() is None
@@ -198,7 +206,7 @@ jobs:
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
(cd connect-harness && ./tests/connectivity/profile-memory-evidence.test.sh)
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_PROFILE_MEMORY_EVIDENCE="$GITHUB_WORKSPACE/profile-memory-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=profile-memory
@@ -81,6 +81,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -148,7 +156,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-4, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
expected_job='Build RustFS (linux-x86_64-gnu)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.[].jobs[] | select(.name == $name)] as $matches
@@ -201,7 +209,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_PROFILE_THREADS_EVIDENCE="$GITHUB_WORKSPACE/profile-threads-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=profile-threads
@@ -73,6 +73,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -107,7 +115,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-4, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
expected_job='Build RustFS (linux-x86_64-gnu)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.[].jobs[] | select(.name == $name)] as $matches
@@ -154,7 +162,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_TOP_API_EVIDENCE="$GITHUB_WORKSPACE/top-api-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=top-api
@@ -68,6 +68,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -138,7 +146,7 @@ jobs:
' <<<"$run" >/dev/null
jobs=$(gh api --paginate --slurp "repos/rustfs/rustfs/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e '
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu, [a-z0-9-]+, x86_64-unknown-linux-gnu, false, linux, pyroscope\\)$"))] as $matches
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu\\)$"))] as $matches
| ($matches | length) == 1 and $matches[0].conclusion == "success"
' <<<"$jobs" >/dev/null
artifact=$(gh api "repos/rustfs/rustfs/actions/artifacts/${ARTIFACT_ID}")
@@ -183,7 +191,7 @@ jobs:
assert outer.testzip() is None
with zipfile.ZipFile(io.BytesIO(outer.read(package))) as inner:
entries = inner.infolist()
expected = {'rustfs', 'rustfs-cli', 'rustfs.cpu-symbol-catalog.json', 'rustfs.cpu-symbol-catalog.sha256'}
expected = {'rustfs', 'rustfs.cpu-symbol-catalog.json', 'rustfs.cpu-symbol-catalog.sha256'}
assert {entry.filename for entry in entries} == expected and len(entries) == len(expected)
assert all(regular(entry) and 0 < entry.file_size <= 1073741824 for entry in entries)
assert inner.testzip() is None
@@ -213,7 +221,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_TOP_DISK_EVIDENCE="$GITHUB_WORKSPACE/top-disk-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=top-disk
@@ -73,6 +73,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -107,7 +115,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-4, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
expected_job='Build RustFS (linux-x86_64-gnu)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.[].jobs[] | select(.name == $name)] as $matches
@@ -154,7 +162,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_TOP_LOCKS_EVIDENCE="$GITHUB_WORKSPACE/top-locks-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=top-locks
@@ -73,6 +73,14 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
@@ -107,7 +115,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-4, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
expected_job='Build RustFS (linux-x86_64-gnu)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.[].jobs[] | select(.name == $name)] as $matches
@@ -154,7 +162,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_TOP_RPC_EVIDENCE="$GITHUB_WORKSPACE/top-rpc-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=top-rpc
+1 -1
View File
@@ -45,7 +45,7 @@ on:
# 07:00 UTC Sunday — staggered clear of the other Sunday crons: ci (00:00),
# build (01:00), e2e-s3tests (02:00), audit (03:00), nix-flake-update
# (05:00), mint (06:00), and the daily fuzz (02:00), minio-interop (03:17),
# e2e-replication-nightly (04:00) and performance-ab (06:00) lanes.
# and e2e-replication-nightly (04:00) lanes.
- cron: "43 7 * * 0"
concurrency:
+72 -572
View File
@@ -1,599 +1,99 @@
# Copyright 2024 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
# Docker Images Workflow
#
# This workflow builds Docker images using pre-built binaries from the build workflow.
#
# Trigger Types:
# 1. workflow_run: Automatically triggered when "Build and Release" workflow completes
# 2. workflow_dispatch: Manual trigger for standalone Docker builds
#
# Key Features:
# - Only triggers when Linux builds (x86_64 + aarch64) are successful
# - Independent of macOS/Windows build status
# - Uses workflow_run event for precise control
# - Only builds Docker images for releases and prereleases (development builds are skipped)
name: Docker Images
# Permissions needed for workflow_run event and Docker registry access
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Build candidate images
on:
workflow_call:
inputs:
candidate_manifest:
type: string
required: true
permissions:
contents: read
packages: write
on:
# Automatically triggered when build workflow completes
workflow_run:
workflows: [ "Build and Release" ]
types: [ completed ]
# Manual trigger with same parameters for consistency
workflow_dispatch:
inputs:
push_images:
description: "Push images to registries"
required: false
default: true
type: boolean
version:
description: "Version to build (latest, v1.0.0, v1.0.0-alpha1, or v1.0.1-preview.1)"
required: false
default: "latest"
type: string
force_rebuild:
description: "Force rebuild even if binary exists (useful for testing)"
required: false
default: false
type: boolean
env:
CONCLUSION: ${{ github.event.workflow_run.conclusion }}
HEAD_BRANCH: ${{ github.event.workflow_run.head_branch }}
HEAD_SHA: ${{ github.event.workflow_run.head_sha }}
TRIGGERING_EVENT: ${{ github.event.workflow_run.event }}
DOCKERHUB_USERNAME: rustfs
CARGO_TERM_COLOR: always
REGISTRY_DOCKERHUB: rustfs/rustfs
REGISTRY_GHCR: ghcr.io/${{ github.repository }}
REGISTRY_QUAY: quay.io/rustfs/rustfs
DOCKER_PLATFORMS: linux/amd64,linux/arm64
actions: read
jobs:
# Check if we should build Docker images.
# Short-circuit at job level so per-merge development builds (workflow_run
# from a push to main) skip the whole run without spawning a checkout job:
# images are only published for tag builds — build.yml push triggers cover
# only main and tags, so a non-main head_branch is a tag name — and for
# manual dispatch.
build-check:
name: Docker Build Check
if: >-
github.event_name == 'workflow_dispatch' ||
(github.event.workflow_run.conclusion == 'success' &&
github.event.workflow_run.event == 'push' &&
github.event.workflow_run.head_branch != 'main')
runs-on: sm-standard-2
timeout-minutes: 30
outputs:
should_build: ${{ steps.check.outputs.should_build }}
should_push: ${{ steps.check.outputs.should_push }}
build_type: ${{ steps.check.outputs.build_type }}
version: ${{ steps.check.outputs.version }}
short_sha: ${{ steps.check.outputs.short_sha }}
is_prerelease: ${{ steps.check.outputs.is_prerelease }}
create_latest: ${{ steps.check.outputs.create_latest }}
source_ref: ${{ steps.check.outputs.source_ref }}
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
# For workflow_run events, checkout the specific commit that triggered the workflow
ref: ${{ github.event.workflow_run.head_sha || github.sha }}
- name: Check build conditions
id: check
env:
# dispatch inputs via env, not `${{ }}` interpolation: they are
# free-form strings and would otherwise be evaluated by bash.
INPUT_VERSION: ${{ github.event.inputs.version }}
INPUT_PUSH_IMAGES: ${{ github.event.inputs.push_images }}
INPUT_FORCE_REBUILD: ${{ github.event.inputs.force_rebuild }}
run: |
should_build=false
should_push=false
build_type="none"
version=""
short_sha=""
is_prerelease=false
create_latest=false
source_ref="$GITHUB_SHA"
# Pre-GA policy: until the first stable (vX.Y.Z) tag exists, every
# prerelease (alpha/beta/rc) also moves `latest`, so users pulling
# `latest` get the newest test build. Once a stable tag is published
# this returns false and `latest` follows stable releases only.
prerelease_moves_latest() {
local stable_tags
stable_tags=$(git ls-remote --tags --refs origin 2>/dev/null \
| awk '{print $2}' \
| grep -E '^refs/tags/v?[0-9]+\.[0-9]+\.[0-9]+$' || true)
if [[ -z "$stable_tags" ]]; then
return 0
fi
echo "ℹ️ Stable release tag(s) already exist; prereleases no longer update latest"
return 1
}
if [[ "${{ github.event_name }}" == "workflow_run" ]]; then
# Triggered by build workflow completion
echo "🔗 Triggered by build workflow completion"
# Check if the triggering workflow was successful
# If the workflow succeeded, it means ALL builds (including Linux x86_64 and aarch64) succeeded
if [[ "$CONCLUSION" == "success" ]]; then
echo "✅ Build workflow succeeded, all builds including Linux are successful"
should_build=true
should_push=true
else
echo "❌ Build workflow failed (conclusion: $CONCLUSION), skipping Docker build"
should_build=false
fi
# Extract version info from commit message or use commit SHA
# Use Git to generate consistent short SHA (ensures uniqueness like build.yml)
short_sha=$(git rev-parse --short "$HEAD_SHA")
source_ref="$HEAD_SHA"
# Determine build type based on triggering workflow event and ref
triggering_event="$TRIGGERING_EVENT"
head_branch="$HEAD_BRANCH"
echo "🔍 Analyzing triggering workflow:"
echo " 📋 Event: $triggering_event"
echo " 🌿 Head branch: $head_branch"
echo " 📎 Head SHA: $HEAD_SHA"
# Check if this was triggered by a tag push
if [[ "$triggering_event" == "push" ]]; then
# For tag pushes, head_branch will be like "refs/tags/v1.0.0" or just "v1.0.0"
if [[ "$head_branch" == refs/tags/* ]]; then
# Extract tag name from refs/tags/TAG_NAME
tag_name="${head_branch#refs/tags/}"
version="$tag_name"
elif [[ "$head_branch" =~ ^v?[0-9]+\.[0-9]+\.[0-9]+ ]]; then
# Direct tag name like "v1.0.0" or "1.0.0-alpha.1"
version="$head_branch"
elif [[ "$head_branch" == "main" ]]; then
# Regular branch push to main
build_type="development"
version="dev-${short_sha}"
should_build=false
echo "⏭️ Skipping Docker build for development version (main branch push)"
else
# Other branch push
build_type="development"
version="dev-${short_sha}"
should_build=false
echo "⏭️ Skipping Docker build for development version (branch: $head_branch)"
fi
# If we extracted a version (tag), determine release type
if [[ -n "$version" ]] && [[ "$version" != "dev-${short_sha}" ]]; then
# Remove 'v' prefix if present for consistent version format
if [[ "$version" == v* ]]; then
version="${version#v}"
fi
if [[ "$version" =~ -preview\.[0-9]+$ ]]; then
build_type="preview"
is_prerelease=true
echo "🔍 Building Docker image for preview: $version (version tags only)"
elif [[ "$version" == *"-preview"* ]]; then
echo "❌ Invalid preview tag: $version (expected suffix: -preview.<number>)" >&2
exit 1
elif [[ "$version" == *"alpha"* ]] || [[ "$version" == *"beta"* ]] || [[ "$version" == *"rc"* ]]; then
build_type="prerelease"
is_prerelease=true
# Pre-GA policy: prereleases update latest until the first stable tag exists.
if prerelease_moves_latest; then
create_latest=true
echo "🧪 Building Docker image for prerelease: $version (creating latest tag)"
else
echo "🧪 Building Docker image for prerelease: $version"
fi
else
build_type="release"
create_latest=true
echo "🚀 Building Docker image for release: $version"
fi
fi
else
# Non-push events
build_type="development"
version="dev-${short_sha}"
should_build=false
echo "⏭️ Skipping Docker build for development version (event: $triggering_event)"
fi
echo "🔄 Build triggered by workflow_run:"
echo " 📋 Conclusion: $CONCLUSION"
echo " 🌿 Branch: $HEAD_BRANCH"
echo " 📎 SHA: $HEAD_SHA"
echo " 🎯 Event: $TRIGGERING_EVENT"
elif [[ "${{ github.event_name }}" == "workflow_dispatch" ]]; then
# Manual trigger
input_version="$INPUT_VERSION"
version="${input_version}"
should_push="$INPUT_PUSH_IMAGES"
should_build=true
# Get short SHA
short_sha=$(git rev-parse --short HEAD)
echo "🎯 Manual Docker build triggered:"
echo " 📋 Requested version: $input_version"
echo " 🔧 Force rebuild: $INPUT_FORCE_REBUILD"
echo " 🚀 Push images: $should_push"
case "$input_version" in
"latest")
build_type="release"
create_latest=true
echo "🚀 Building with latest stable release version"
;;
*-preview*)
if [[ ! "$input_version" =~ ^v?[0-9]+\.[0-9]+\.[0-9]+(-[0-9A-Za-z.-]+)?-preview\.[0-9]+$ ]]; then
echo "❌ Invalid preview version: $input_version" >&2
exit 1
fi
build_type="preview"
is_prerelease=true
version="${input_version#v}"
echo "🔍 Building with preview version: $version (version tags only)"
;;
# Prerelease versions (must match first, more specific)
v*alpha*|v*beta*|v*rc*|*alpha*|*beta*|*rc*)
build_type="prerelease"
is_prerelease=true
# Pre-GA policy: prereleases update latest until the first stable tag exists.
if prerelease_moves_latest; then
create_latest=true
echo "🧪 Building with prerelease version: $input_version (creating latest tag)"
else
echo "🧪 Building with prerelease version: $input_version"
fi
;;
# Release versions (match after prereleases, more general)
v[0-9]*|[0-9]*.*.*)
build_type="release"
create_latest=true
echo "📦 Building with specific release version: $input_version"
;;
*)
# Invalid version for Docker build
should_build=false
echo "❌ Invalid version for Docker build: $input_version"
echo "⚠️ Only release versions (latest, v1.0.0, 1.0.0) and prereleases (v1.0.0-alpha1, 1.0.0-beta2) are supported"
;;
esac
if [[ "$should_build" == true && "$input_version" != "latest" ]]; then
tag_ref="refs/tags/$input_version"
if ! git ls-remote --exit-code origin "$tag_ref" >/dev/null 2>&1; then
if [[ "$input_version" == v* ]]; then
tag_ref="refs/tags/${input_version#v}"
else
tag_ref="refs/tags/v$input_version"
fi
fi
if ! git ls-remote --exit-code origin "$tag_ref" >/dev/null 2>&1; then
echo "❌ Release tag not found for Docker build: $input_version"
exit 1
fi
source_ref="$tag_ref"
fi
fi
{
echo "should_build=$should_build"
echo "should_push=$should_push"
echo "build_type=$build_type"
echo "version=$version"
echo "short_sha=$short_sha"
echo "is_prerelease=$is_prerelease"
echo "create_latest=$create_latest"
echo "source_ref=$source_ref"
} >> "$GITHUB_OUTPUT"
echo "🐳 Docker Build Summary:"
echo " - Should build: $should_build"
echo " - Should push: $should_push"
echo " - Build type: $build_type"
echo " - Version: $version"
echo " - Short SHA: $short_sha"
echo " - Is prerelease: $is_prerelease"
echo " - Create latest: $create_latest"
echo " - Source ref: $source_ref"
# Build multi-arch Docker images
# Strategy: Build images using pre-built binaries from dl.rustfs.com
# Supports both release and dev channel binaries based on build context
# Only runs when should_build is true (which includes workflow success check)
build-docker:
name: Build Docker Images
needs: build-check
if: needs.build-check.outputs.should_build == 'true'
runs-on: dind-sm-standard-2
timeout-minutes: 60
runs-on: ubuntu-latest
timeout-minutes: 90
strategy:
fail-fast: false
matrix:
include:
- variant: musl
file: Dockerfile
suffix: ""
- variant: glibc
- variant: gnu
file: Dockerfile.glibc
suffix: "-glibc"
env:
CANDIDATE_MANIFEST: ${{ inputs.candidate_manifest }}
VARIANT: ${{ matrix.variant }}
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: ${{ fromJson(inputs.candidate_manifest).source_sha }}
persist-credentials: false
ref: ${{ needs.build-check.outputs.source_ref }}
- name: Login to Docker Hub
uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
username: ${{ env.DOCKERHUB_USERNAME }}
password: ${{ secrets.DOCKERHUB_TOKEN }}
- name: Login to GitHub Container Registry
uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
registry: ghcr.io
username: ${{ secrets.GHCR_USERNAME }}
password: ${{ secrets.GHCR_PASSWORD }}
- name: Login to Quay.io
uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9 # v3
with:
registry: quay.io
username: ${{ secrets.QUAY_USERNAME }}
password: ${{ secrets.QUAY_PASSWORD }}
- name: Set up QEMU
uses: docker/setup-qemu-action@c7c53464625b32c7a7e944ae62b3e17d2b600130 # v3
- name: Set up Docker Buildx
uses: docker/setup-buildx-action@8d2750c68a42422c14e847fe6c8ac0403b4cbd6f # v3
- name: Extract metadata and generate tags
id: meta
- name: Reuse completed image
id: reuse
env:
GH_TOKEN: ${{ github.token }}
run: python3 scripts/release/deliver.py reuse --kind image --target "$VARIANT"
- name: Install OCI tools
if: steps.reuse.outputs.reused != 'true'
run: |
BUILD_TYPE="${{ needs.build-check.outputs.build_type }}"
VERSION="${{ needs.build-check.outputs.version }}"
CREATE_LATEST="${{ needs.build-check.outputs.create_latest }}"
VARIANT_SUFFIX="${{ matrix.suffix }}"
# Convert version format for Dockerfile compatibility. The former
# DOCKER_CHANNEL was "release" down every branch and was passed as a
# build-arg no Dockerfile declares, so it is gone.
case "$VERSION" in
"latest")
DOCKER_RELEASE="latest"
;;
v*)
# For versioned releases (v1.0.0), remove 'v' prefix for Dockerfile
DOCKER_RELEASE="${VERSION#v}"
;;
*)
# For other versions, pass as-is
DOCKER_RELEASE="${VERSION}"
;;
esac
echo "docker_release=$DOCKER_RELEASE" >> "$GITHUB_OUTPUT"
echo "🐳 Docker build parameters:"
echo " - Original version: $VERSION"
echo " - Docker RELEASE: $DOCKER_RELEASE"
# Generate tags based on build type
# Only support release and prerelease builds (no development builds)
TAG_BASE="${VERSION}${VARIANT_SUFFIX}"
TAGS="${{ env.REGISTRY_DOCKERHUB }}:$TAG_BASE,${{ env.REGISTRY_GHCR }}:$TAG_BASE,${{ env.REGISTRY_QUAY }}:$TAG_BASE"
# Add latest when requested (stable releases, and prereleases before GA)
if [[ "$CREATE_LATEST" == "true" ]]; then
TAGS="$TAGS,${{ env.REGISTRY_DOCKERHUB }}:latest${VARIANT_SUFFIX},${{ env.REGISTRY_GHCR }}:latest${VARIANT_SUFFIX},${{ env.REGISTRY_QUAY }}:latest${VARIANT_SUFFIX}"
fi
# Always add the channel tag for prereleases, independent of latest
if [[ "$BUILD_TYPE" == "prerelease" ]]; then
# Prerelease channel tags (alpha, beta, rc)
if [[ "$VERSION" == *"alpha"* ]]; then
CHANNEL="alpha"
elif [[ "$VERSION" == *"beta"* ]]; then
CHANNEL="beta"
elif [[ "$VERSION" == *"rc"* ]]; then
CHANNEL="rc"
fi
if [[ -n "$CHANNEL" ]]; then
TAGS="$TAGS,${{ env.REGISTRY_DOCKERHUB }}:${CHANNEL}${VARIANT_SUFFIX},${{ env.REGISTRY_GHCR }}:${CHANNEL}${VARIANT_SUFFIX},${{ env.REGISTRY_QUAY }}:${CHANNEL}${VARIANT_SUFFIX}"
fi
fi
# Output tags
echo "tags=$TAGS" >> "$GITHUB_OUTPUT"
# Generate labels
LABELS="org.opencontainers.image.title=RustFS"
LABELS="$LABELS,org.opencontainers.image.description=RustFS distributed object storage system"
LABELS="$LABELS,org.opencontainers.image.version=$VERSION"
SOURCE_REVISION="$(git rev-parse HEAD)"
LABELS="$LABELS,org.opencontainers.image.revision=$SOURCE_REVISION"
LABELS="$LABELS,org.opencontainers.image.source=${{ github.server_url }}/${{ github.repository }}"
LABELS="$LABELS,org.opencontainers.image.created=$(date -u +'%Y-%m-%dT%H:%M:%SZ')"
LABELS="$LABELS,org.opencontainers.image.build-type=$BUILD_TYPE"
echo "labels=$LABELS" >> "$GITHUB_OUTPUT"
echo "🐳 Generated Docker tags:"
echo "$TAGS" | tr ',' '\n' | sed 's/^/ - /'
echo "📋 Build type: $BUILD_TYPE"
echo "🔖 Version: $VERSION"
- name: Build and push Docker image
sudo apt-get update
sudo apt-get install -y skopeo
- uses: docker/setup-qemu-action@c7c53464625b32c7a7e944ae62b3e17d2b600130 # v3
if: steps.reuse.outputs.reused != 'true'
- uses: docker/setup-buildx-action@8d2750c68a42422c14e847fe6c8ac0403b4cbd6f # v3
if: steps.reuse.outputs.reused != 'true'
- name: Supply accepted binaries and pinned CLI
if: steps.reuse.outputs.reused != 'true'
env:
GH_TOKEN: ${{ github.token }}
run: python3 scripts/release/deliver.py image-prepare --target "$VARIANT"
- name: Build OCI archive without registry writes
if: steps.reuse.outputs.reused != 'true'
uses: docker/build-push-action@10e90e3645eae34f1e60eeb005ba3a3d33f178e8 # v6
with:
context: .
file: ${{ matrix.file }}
platforms: ${{ env.DOCKER_PLATFORMS }}
push: ${{ needs.build-check.outputs.should_push == 'true' }}
tags: ${{ steps.meta.outputs.tags }}
labels: ${{ steps.meta.outputs.labels }}
# No layer cache. This build compiles nothing — it downloads a
# release zip and runs apk/apt — so the cache could only save the
# minute or two those take, while creating a correctness problem: with
# RELEASE=latest the binary URL is resolved by curl *inside* a RUN
# layer, and the layer key does not include what that resolved to. A
# rebuild at the same RELEASE value (dispatch with version=latest, or
# a re-run of the same version) would hit the old layer and ship the
# previous release's binary. mode=max also consumed the same 10GB
# Actions cache quota the Rust lanes are fighting over.
#
# Only RELEASE is passed: it is the sole build-arg the Dockerfiles
# declare besides TARGETARCH. BUILDTIME, VERSION, BUILD_TYPE, REVISION
# and CHANNEL were never read by any stage (and BUILDTIME's $(date ...)
# was a literal here, not a shell substitution). BUILD_DATE and VCS_REF
# are declared by the Dockerfiles but deliberately left unset —
# supplying them would change the published image labels.
platforms: linux/amd64,linux/arm64
push: false
provenance: false
outputs: type=oci,dest=delivery/image-${{ matrix.variant }}.tar
build-args: |
RELEASE=${{ steps.meta.outputs.docker_release }}
provenance: true
sbom: true
# Add retry mechanism by splitting the build process
no-cache: false
pull: true
# Note: Manifest creation is no longer needed as we only build one variant
# Multi-arch manifests are automatically created by docker/build-push-action
# Report-only container image vulnerability scan
scan-docker-image:
name: Scan Docker Images
needs: [ build-check, build-docker ]
if: needs.build-check.outputs.should_build == 'true' && needs.build-check.outputs.should_push == 'true'
runs-on: sm-standard-2
timeout-minutes: 30
permissions:
contents: read
security-events: write
strategy:
fail-fast: false
matrix:
include:
- variant: musl
suffix: ""
- variant: glibc
suffix: "-glibc"
steps:
- name: Login to GitHub Container Registry
# docker/login-action v3
uses: docker/login-action@c94ce9fb468520275223c153574b00df6fe4bcc9
with:
registry: ghcr.io
username: ${{ secrets.GHCR_USERNAME }}
password: ${{ secrets.GHCR_PASSWORD }}
- name: Scan image with Trivy
# aquasecurity/trivy-action v0.36.0
BINARY_SOURCE=supplied
RELEASE=${{ fromJson(inputs.candidate_manifest).version }}
VCS_REF=${{ fromJson(inputs.candidate_manifest).source_sha }}
- name: Verify wrapped binaries and startup on both architectures
if: steps.reuse.outputs.reused != 'true'
run: python3 scripts/release/deliver.py image-smoke --target "$VARIANT"
- name: Scan amd64 image before sealing
if: steps.reuse.outputs.reused != 'true'
uses: aquasecurity/trivy-action@ed142fd0673e97e23eac54620cfb913e5ce36c25
env:
TRIVY_PLATFORM: linux/amd64
with:
image-ref: ${{ env.REGISTRY_GHCR }}:${{ needs.build-check.outputs.version }}${{ matrix.suffix }}
input: delivery-scan/image-${{ matrix.variant }}-amd64.tar
format: sarif
output: trivy-${{ matrix.variant }}.sarif
ignore-unfixed: true
vuln-type: os,library
severity: CRITICAL,HIGH
output: delivery/scan-${{ matrix.variant }}-amd64.sarif
exit-code: "0" # Keep the repository's report-only vulnerability policy.
- name: Scan arm64 image before sealing
if: steps.reuse.outputs.reused != 'true'
uses: aquasecurity/trivy-action@ed142fd0673e97e23eac54620cfb913e5ce36c25
env:
TRIVY_PLATFORM: linux/arm64
with:
input: delivery-scan/image-${{ matrix.variant }}-arm64.tar
format: sarif
output: delivery/scan-${{ matrix.variant }}-arm64.sarif
exit-code: "0"
# Surface findings in the Security tab; an artifact alone is write-only
# reporting nobody reviews.
- name: Upload scan results to code scanning
uses: github/codeql-action/upload-sarif@99df26d4f13ea111d4ec1a7dddef6063f76b97e9 # v4.37.0
- name: Record verified OCI identity
if: steps.reuse.outputs.reused != 'true'
run: python3 scripts/release/deliver.py image-record --target "$VARIANT"
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
if: steps.reuse.outputs.reused != 'true'
with:
sarif_file: trivy-${{ matrix.variant }}.sarif
category: container-image-${{ matrix.variant }}
- name: Upload container scan report
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: container-image-scan-${{ matrix.variant }}
path: trivy-${{ matrix.variant }}.sarif
name: image-${{ matrix.variant }}
path: delivery/*
if-no-files-found: error
retention-days: 30
# Docker build summary
docker-summary:
name: Docker Build Summary
needs: [ build-check, build-docker ]
if: always() && needs.build-check.outputs.should_build == 'true'
runs-on: sm-standard-2
timeout-minutes: 10
steps:
- name: Docker build completion summary
run: |
BUILD_TYPE="${{ needs.build-check.outputs.build_type }}"
VERSION="${{ needs.build-check.outputs.version }}"
CREATE_LATEST="${{ needs.build-check.outputs.create_latest }}"
echo "🐳 Docker build completed successfully!"
echo "📦 Build type: $BUILD_TYPE"
echo "🔢 Version: $VERSION"
echo "🚀 Strategy: Images using pre-built binaries (release channel only)"
echo ""
case "$BUILD_TYPE" in
"preview")
echo "🔍 Preview Docker image has been built with ${VERSION} tags"
echo "⏭️ Preview images do not update latest or prerelease channels"
;;
"release")
echo "🚀 Release Docker image has been built with ${VERSION} tags"
echo "✅ This image is ready for production use"
if [[ "$CREATE_LATEST" == "true" ]]; then
echo "🏷️ Latest tag has been created for stable release"
fi
;;
"prerelease")
echo "🧪 Prerelease Docker image has been built with ${VERSION} tags"
echo "⚠️ This is a prerelease image - use with caution"
# Prereleases move latest until the first stable tag exists (pre-GA policy).
if [[ "$CREATE_LATEST" == "true" ]]; then
echo "🏷️ Latest tag has been created for prerelease: $VERSION"
else
echo "🚫 Latest tag NOT created for prerelease"
fi
;;
*)
echo "❌ Unexpected build type: $BUILD_TYPE"
;;
esac
compression-level: 0
+5 -31
View File
@@ -17,8 +17,8 @@
# Each selected test starts a real localhost cluster via
# `RustFSTestClusterEnvironment` (4 processes; 4 drives per node unless the
# case is a two-site 4-node 1-drive pair or a 4-node upgrade). Membership is
# `[profile.e2e-distributed]` in `.config/nextest.toml`. Storage-sensitive PRs,
# nightly runs, and manual dispatches all execute the same fail-closed suite.
# `[profile.e2e-distributed]` in `.config/nextest.toml`. The nightly schedule
# and manual dispatches execute the same fail-closed suite.
# Upgrade cases download the same pinned previous release as e2e-upgrade.yml.
#
# Isolated pool filesystems: expand/decommission/rebalance cases require
@@ -33,32 +33,6 @@
name: e2e-distributed
on:
pull_request:
paths:
- "Cargo.lock"
- "Cargo.toml"
- ".config/nextest.toml"
- ".config/e2e-distributed-selection.txt"
- ".github/workflows/e2e-distributed.yml"
- "crates/audit/**"
- "crates/common/**"
- "crates/config/**"
- "crates/e2e_test/**"
- "crates/ecstore/**"
- "crates/filemeta/**"
- "crates/heal/**"
- "crates/iam/**"
- "crates/lock/**"
- "crates/madmin/**"
- "crates/notify/**"
- "crates/replication/**"
- "crates/s3-client/**"
- "crates/s3-ops/**"
- "crates/s3-types/**"
- "crates/scanner/**"
- "crates/storage-api/**"
- "crates/utils/**"
- "rustfs/**"
workflow_dispatch:
inputs:
filter:
@@ -153,7 +127,7 @@ jobs:
- name: Build rustfs binary
run: |
python3 scripts/e2e_binary.py build --bins
python3 scripts/e2e_binary.py build --bins --features e2e-test-hooks
- name: Verify distributed e2e membership
env:
@@ -170,9 +144,9 @@ jobs:
set -euo pipefail
rm -f target/nextest/e2e-distributed/junit.xml
if [ -n "${FILTER}" ]; then
python3 scripts/e2e_binary.py run -- cargo nextest run --profile e2e-distributed -p e2e_test -E "${FILTER}"
python3 scripts/e2e_binary.py run --features e2e-test-hooks -- cargo nextest run --profile e2e-distributed -p e2e_test -E "${FILTER}"
else
python3 scripts/e2e_binary.py run -- cargo nextest run --profile e2e-distributed -p e2e_test --no-tests=fail
python3 scripts/e2e_binary.py run --features e2e-test-hooks -- cargo nextest run --profile e2e-distributed -p e2e_test --no-tests=fail
fi
test -s target/nextest/e2e-distributed/junit.xml
@@ -38,8 +38,8 @@ name: e2e-nightly
on:
workflow_dispatch:
schedule:
# 04:00 UTC nightly — staggered clear of fuzz/e2e-s3tests (02:00),
# stale (01:30) and performance-ab (06:00).
# 04:00 UTC nightly — staggered clear of fuzz/e2e-s3tests (02:00)
# and stale (01:30).
- cron: "29 4 * * *"
# Only alert-on-failure needs more than read access; it declares its own
+1 -1
View File
@@ -371,7 +371,7 @@ jobs:
name: Upstream HEAD classification canary
if: github.event_name == 'schedule' || github.event_name == 'workflow_dispatch'
continue-on-error: true
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 20
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
+89 -70
View File
@@ -12,27 +12,19 @@
# See the License for the specific language governing permissions and
# limitations under the License.
# Single-node upgrade and rollback lane.
#
# The weekly Monday schedule, version tags, and workflow_dispatch run this
# suite. Distributed upgrade cases stay on the nightly e2e-distributed lane.
name: Upgrade Compatibility
on:
pull_request:
paths:
- ".github/workflows/e2e-upgrade.yml"
- "crates/e2e_test/src/common.rs"
- "crates/e2e_test/src/fake_s3_target/**"
- "crates/e2e_test/src/lib.rs"
- "crates/e2e_test/src/replication_extension_test.rs"
- "crates/e2e_test/src/upgrade_compatibility_test.rs"
- "crates/ecstore/**"
- "crates/filemeta/**"
- "crates/kms/**"
- "crates/storage-api/**"
- "rustfs/**"
- "Cargo.lock"
push:
tags:
- "[0-9]*.[0-9]*.[0-9]*"
schedule:
# 03:17 UTC every Monday.
- cron: "17 3 * * 1"
workflow_dispatch:
@@ -41,19 +33,16 @@ permissions:
concurrency:
group: ${{ github.workflow }}-${{ github.ref }}
cancel-in-progress: ${{ github.event_name == 'pull_request' }}
cancel-in-progress: false
env:
CARGO_TERM_COLOR: always
RUST_BACKTRACE: 1
UPGRADE_SOURCE_VERSION: 1.0.0-rc.5
UPGRADE_SOURCE_ASSET: rustfs-linux-x86_64-gnu-v1.0.0-rc.5.zip
UPGRADE_SOURCE_SHA256: 3ee8df71e8edcfada533be452c4135868f697bc515460ae97b027313eade7a3d
jobs:
build:
name: Build upgrade candidate
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 60
env:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
@@ -66,19 +55,11 @@ jobs:
- name: Setup Rust environment
uses: ./.github/actions/setup
with:
cache-shared-key: e2e-upgrade-server
cache-shared-key: e2e-upgrade-server-hosted
cache-save-if: ${{ github.ref == 'refs/heads/main' }}
install-build-packaging-tools: "false"
install-test-tools: "false"
- name: Download pinned previous release
run: |
mkdir -p target/debug
archive="target/debug/$UPGRADE_SOURCE_ASSET"
curl --fail --location --retry 3 --output "$archive" \
"https://github.com/${GITHUB_REPOSITORY}/releases/download/${UPGRADE_SOURCE_VERSION}/${UPGRADE_SOURCE_ASSET}"
echo "$UPGRADE_SOURCE_SHA256 $archive" | sha256sum --check --strict
- name: Build current RustFS binary
run: python3 scripts/e2e_binary.py build
@@ -89,49 +70,31 @@ jobs:
path: |
target/debug/rustfs
target/debug/rustfs.e2e.json
target/debug/${{ env.UPGRADE_SOURCE_ASSET }}
if-no-files-found: error
retention-days: 3
compression-level: 0
overwrite: true
upgrade:
name: ${{ matrix.name }}
name: Upgrade compatibility (${{ matrix.source.version }})
needs: build
runs-on: ubuntu-latest
timeout-minutes: 60
strategy:
fail-fast: false
matrix:
include:
# The two `_from_rc2_` tests keep their names: they assert
# release-independent object contracts and pass unchanged against the
# newer pinned source, so renaming them would only churn history and
# the CI required-check names. UPGRADE_SOURCE_VERSION above is the
# single source of truth for which release they actually run against.
- name: Direct upgrade from the previous release
test: direct_upgrade_from_rc2_preserves_object_contracts
artifact: direct-upgrade
- name: Mixed-version rolling upgrade from the previous release
test: rolling_upgrade_from_rc2_preserves_mixed_version_contracts
artifact: mixed-version-upgrade
- name: Bucket configuration survives the upgrade
test: direct_upgrade_from_previous_release_preserves_bucket_configuration
artifact: bucket-config-upgrade
- name: Rollback reads current bucket metadata
test: rollback_to_previous_release_reads_current_bucket_metadata
artifact: bucket-config-rollback
- name: ODM configuration recovery after rc.5 rollback
test: rc5_rollback_requires_restoring_odm_configuration
artifact: odm-config-rollback
- name: Multipart layouts survive the rc.5 upgrade
test: direct_upgrade_from_rc5_preserves_multipart_layouts
artifact: multipart-layout-upgrade
- name: rc.5 multipart replication baseline
test: rc5_baseline_replicates_multipart_layouts
artifact: multipart-layout-baseline
runs-on: sm-standard-2
timeout-minutes: 60
source:
- version: 1.0.0-rc.5
asset: rustfs-linux-x86_64-gnu-v1.0.0-rc.5.zip
sha256: 3ee8df71e8edcfada533be452c4135868f697bc515460ae97b027313eade7a3d
- version: 1.0.1
asset: rustfs-linux-x86_64-gnu-v1.0.1.zip
sha256: 9742e183cb0dfb0d48fa909797af572fe47b7f827569036baa4156e0d3958ee5
env:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
UPGRADE_SOURCE_VERSION: ${{ matrix.source.version }}
UPGRADE_SOURCE_ASSET: ${{ matrix.source.asset }}
UPGRADE_SOURCE_SHA256: ${{ matrix.source.sha256 }}
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
@@ -141,9 +104,8 @@ jobs:
- name: Setup Rust environment
uses: ./.github/actions/setup
with:
cache-shared-key: e2e-upgrade-tests
# One main-branch consumer warms the shared test-harness dependencies.
cache-save-if: ${{ github.ref == 'refs/heads/main' && matrix.artifact == 'direct-upgrade' }}
cache-shared-key: e2e-upgrade-tests-hosted
cache-save-if: ${{ github.ref == 'refs/heads/main' }}
install-build-packaging-tools: "false"
install-test-tools: "false"
@@ -157,12 +119,15 @@ jobs:
run: chmod +x target/debug/rustfs
- name: Verify and unpack pinned previous release
id: verify_source
env:
SOURCE_DIR: ${{ runner.temp }}/rustfs-upgrade-source
run: |
set -euo pipefail
mkdir -p "$SOURCE_DIR"
archive="target/debug/$UPGRADE_SOURCE_ASSET"
curl --fail --location --retry 3 --output "$archive" \
"https://github.com/rustfs/rustfs/releases/download/${UPGRADE_SOURCE_VERSION}/${UPGRADE_SOURCE_ASSET}"
echo "$UPGRADE_SOURCE_SHA256 $archive" | sha256sum --check --strict
unzip -q "$archive" -d "$SOURCE_DIR"
chmod +x "$SOURCE_DIR/rustfs"
@@ -170,22 +135,76 @@ jobs:
echo "RUSTFS_UPGRADE_SOURCE_BINARY=$SOURCE_DIR/rustfs" >> "$GITHUB_ENV"
echo "RUSTFS_E2E_LOG_DIR=$RUNNER_TEMP/rustfs-upgrade-logs" >> "$GITHUB_ENV"
- name: Run upgrade compatibility test
# Reuse one compiled harness, while keeping each case in its own process.
# Continue after a failure to retain the former matrix's complete verdict.
- name: Run upgrade compatibility tests
shell: bash
env:
RUSTFS_SCANNER_HEAL_G09_EVIDENCE_DIR: ${{ runner.temp }}/rustfs-upgrade-g09-evidence/${{ matrix.artifact }}
NO_PROXY: 127.0.0.1,localhost,::1
run: |
export no_proxy="$NO_PROXY"
python3 scripts/e2e_binary.py run -- cargo test --locked -p e2e_test \
"upgrade_compatibility_test::${{ matrix.test }}" \
-- --ignored --exact --nocapture
cases=(
direct-upgrade:direct_upgrade_from_previous_release_preserves_object_contracts
mixed-version-upgrade:rolling_upgrade_from_previous_release_preserves_mixed_version_contracts
bucket-config-upgrade:direct_upgrade_from_previous_release_preserves_bucket_configuration
bucket-config-rollback:rollback_to_previous_release_reads_current_bucket_metadata
multipart-layout-upgrade:direct_upgrade_from_previous_release_preserves_multipart_layouts
multipart-layout-baseline:previous_release_baseline_replicates_multipart_layouts
)
if [[ "$UPGRADE_SOURCE_VERSION" == "1.0.0-rc.5" ]]; then
cases+=(odm-config-rollback:rc5_rollback_requires_restoring_odm_configuration)
cases+=(checkpoint-upgrade:rc5_checkpoint_upgrade_rewinds_signed_progress_without_losing_objects)
else
cases+=(legacy-delete-reservation:stable_upgrade_deletes_foreign_reservations_without_losing_live_objects)
fi
status=0
for entry in "${cases[@]}"; do
artifact="${entry%%:*}"
test="${entry#*:}"
export RUSTFS_SCANNER_HEAL_G09_EVIDENCE_DIR="$RUNNER_TEMP/rustfs-upgrade-g09-evidence/$artifact"
export RUSTFS_E2E_LOG_DIR="$RUNNER_TEMP/rustfs-upgrade-logs/$artifact"
mkdir -p "$RUSTFS_E2E_LOG_DIR"
echo "::group::$test"
if python3 scripts/e2e_binary.py run -- cargo test --locked -p e2e_test \
"upgrade_compatibility_test::$test" -- --ignored --exact --nocapture \
2>&1 | tee "$RUSTFS_E2E_LOG_DIR/test.log"; then
echo "PASS: $test"
else
echo "::error::Upgrade compatibility failed: $test"
status=1
fi
echo "::endgroup::"
done
exit "$status"
- name: Run mixed-version MPU recovery
if: ${{ !cancelled() && steps.verify_source.outcome == 'success' }}
timeout-minutes: 15
env:
NO_PROXY: 127.0.0.1,localhost,::1
HTTP_PROXY: ""
HTTPS_PROXY: ""
ALL_PROXY: ""
RUSTFS_E2E_LOG_FILTER: "warn,rustfs_ecstore::cluster::rpc::client=debug"
run: |
set -euo pipefail
export no_proxy="$NO_PROXY"
export RUSTFS_E2E_LOG_DIR="$RUNNER_TEMP/rustfs-upgrade-logs/mpu-mixed-recovery"
mkdir -p "$RUSTFS_E2E_LOG_DIR"
mpu_test='distributed::multipart_fence_acceptance_test::mixed_version_failed_complete_requires_current_coordinator_for_abort'
python3 scripts/e2e_binary.py run -- cargo test --locked -p e2e_test --lib \
"$mpu_test" -- --list --exact | tee "$RUSTFS_E2E_LOG_DIR/list.log"
test "$(grep -Fxc "${mpu_test}: test" "$RUSTFS_E2E_LOG_DIR/list.log")" -eq 1
python3 scripts/e2e_binary.py run -- cargo test --locked -p e2e_test --lib \
"$mpu_test" -- --exact --nocapture --test-threads=1 \
2>&1 | tee "$RUSTFS_E2E_LOG_DIR/test.log"
- name: Upload scanner/heal G09 evidence
if: always()
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: ${{ matrix.artifact }}-g09-evidence-${{ github.run_number }}
path: ${{ runner.temp }}/rustfs-upgrade-g09-evidence/${{ matrix.artifact }}
name: upgrade-g09-evidence-${{ matrix.source.version }}-${{ github.run_number }}
path: ${{ runner.temp }}/rustfs-upgrade-g09-evidence
if-no-files-found: ignore
retention-days: 14
@@ -193,7 +212,7 @@ jobs:
if: always()
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: ${{ matrix.artifact }}-server-logs-${{ github.run_number }}
name: upgrade-server-logs-${{ matrix.source.version }}-${{ github.run_number }}
path: ${{ runner.temp }}/rustfs-upgrade-logs
if-no-files-found: warn
retention-days: 14
+2 -33
View File
@@ -12,44 +12,13 @@ concurrency:
jobs:
collect:
if: github.repository == 'rustfs/rustfs'
runs-on: smoke-testing
# Health remains available when either laboratory fleet is offline.
runs-on: ubuntu-latest
timeout-minutes: 15
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Ensure GitHub CLI
shell: bash
run: |
if command -v gh >/dev/null 2>&1; then
gh --version
exit 0
fi
gh_version="2.101.0"
case "$(uname -m)" in
x86_64) gh_arch="amd64" ;;
aarch64|arm64) gh_arch="arm64" ;;
*)
echo "Unsupported Linux architecture for GitHub CLI: $(uname -m)" >&2
exit 1
;;
esac
gh_install_root="${RUNNER_TEMP:-$PWD}/gh-cli"
rm -rf "$gh_install_root"
mkdir -p "$gh_install_root/bin"
archive="$gh_install_root/gh.tar.gz"
curl --fail --location --retry 3 \
"https://github.com/cli/cli/releases/download/v${gh_version}/gh_${gh_version}_linux_${gh_arch}.tar.gz" \
--output "$archive"
tar -xzf "$archive" -C "$gh_install_root"
install -m 0755 \
"$gh_install_root/gh_${gh_version}_linux_${gh_arch}/bin/gh" \
"$gh_install_root/bin/gh"
echo "$gh_install_root/bin" >> "$GITHUB_PATH"
export PATH="$gh_install_root/bin:$PATH"
gh --version
- name: Collect and publish verified chain health
env:
GH_TOKEN: ${{ secrets.PF_TESTING_GH_TOKEN }}
+1 -1
View File
@@ -60,7 +60,7 @@ jobs:
cancel-closed-pr-runs:
name: Cancel Closed PR Runs
if: github.event_name == 'pull_request' && github.event.action == 'closed'
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- name: Explain cancellation run
+31 -65
View File
@@ -6,29 +6,20 @@ name: Gateway Integration Sync
# Merges `main` into the long-lived `gateway/integration` branch every weekday
# so the s3s -> gateway migration (rustfs/backlog#2734, task T0.1 in #2736)
# never accumulates merge debt. A clean merge lands as a `--no-ff` merge commit
# pushed straight to the branch. A conflicting merge is aborted and surfaced as
# a pull request from `sync/<source>-<date>`, whose head is the un-merged
# source commit, so the conflict is resolved the same day, in review, with no
# other change riding along. The run itself stays green in that case: the pull
# request is the signal. Any other failure (push rejected, pull request not
# created) fails the run and, on the schedule, files the shared failure issue.
# pushed straight to the branch. A conflicting merge is aborted and fails the
# run after its summary records the source and target SHAs, run URL, and exact
# conflicting paths. It creates no sync branch or pull request. Resolve the
# merge in an isolated worktree based on the latest target, preserve the
# two-parent merge commit, and push only after the required checks pass and the
# target still matches the merge's first parent. If the target moves, restart
# from its new head.
#
# Resolving a conflict pull request: merge `origin/gateway/integration` into
# the sync branch, resolve, push, get the review. Land it with a fast-forward
# push of the resolved merge commit to `gateway/integration`, not with the
# squash button: a squash drops the merge ancestry and the same hunks conflict
# again on the next run.
#
# Write scope: only `gateway/integration` and `sync/*` are ever pushed, and
# both push targets below are literal refs. The pushes use a one-hour
# installation token of the organisation's own GitHub App (contents: write)
# because that app is the only non-admin bypass actor of the
# Write scope: only `gateway/integration` is ever pushed. The push uses a
# one-hour installation token of the organisation's GitHub App (contents:
# write) because that app is the only non-admin bypass actor of the
# `gateway/integration` ruleset; GITHUB_TOKEN cannot be a ruleset bypass actor,
# so it cannot push through the required reviews and checks. The conflict pull
# request is opened with FLAKE_UPDATE_TOKEN, the PAT that already opens the
# weekly flake.lock pull requests, because this repository keeps "Allow GitHub
# Actions to create and approve pull requests" switched off. GITHUB_TOKEN is
# therefore read-only here.
# so it cannot push through the required reviews and checks. GITHUB_TOKEN is
# read-only here.
#
# `schedule` fires only from the default branch, so the cron is live once this
# file exists on `main`. `workflow_dispatch` runs from any ref that carries the
@@ -94,6 +85,7 @@ jobs:
id: merge
env:
SOURCE_REF: ${{ inputs.source_ref || 'main' }}
RUN_URL: ${{ github.server_url }}/${{ github.repository }}/actions/runs/${{ github.run_id }}
run: |
set -euo pipefail
if ! [[ "$SOURCE_REF" =~ ^[A-Za-z0-9][A-Za-z0-9._/-]*$ ]] \
@@ -119,13 +111,25 @@ jobs:
fi
exit 0
fi
git diff --name-only --diff-filter=U > "$RUNNER_TEMP/conflicts.txt"
git merge --abort
if [[ ! -s "$RUNNER_TEMP/conflicts.txt" ]]; then
conflicts=$(git diff --name-only --diff-filter=U)
if [[ -z "$conflicts" ]]; then
git merge --abort || true
echo "::error::git merge failed without reporting conflicting paths; this is not a conflict"
exit 1
fi
echo "result=conflict" >> "$GITHUB_OUTPUT"
{
echo "## Gateway integration sync stopped on conflicts"
echo
echo "- Run: ${RUN_URL}"
echo "- Source: \`${SOURCE_REF}\` at ${source_sha}"
echo "- Target: \`${TARGET_BRANCH}\` at ${target_sha}"
echo
echo "Conflicting files:"
printf '%s\n' "$conflicts" | sed 's/^/- /'
} >> "$GITHUB_STEP_SUMMARY"
git merge --abort
echo "::error::${SOURCE_REF} cannot be merged cleanly into ${TARGET_BRANCH}; no branch or pull request was created"
exit 1
- name: Push the merge commit
if: steps.merge.outputs.result == 'merged'
@@ -137,50 +141,12 @@ jobs:
git push origin HEAD:refs/heads/gateway/integration
echo "Merged \`${SOURCE_REF}\` (${SOURCE_SHA}) into \`${TARGET_BRANCH}\` as $(git rev-parse HEAD)." >> "$GITHUB_STEP_SUMMARY"
- name: Open the conflict pull request
if: steps.merge.outputs.result == 'conflict'
env:
GH_TOKEN: ${{ secrets.FLAKE_UPDATE_TOKEN }}
SOURCE_REF: ${{ steps.merge.outputs.source_ref }}
SOURCE_SHA: ${{ steps.merge.outputs.source_sha }}
TARGET_SHA: ${{ steps.merge.outputs.target_sha }}
RUN_URL: ${{ github.server_url }}/${{ github.repository }}/actions/runs/${{ github.run_id }}
run: |
set -euo pipefail
date_utc=$(date -u +%Y-%m-%d)
sync_branch="sync/${SOURCE_REF//\//-}-${date_utc}"
git push origin "refs/remotes/origin/${SOURCE_REF}:refs/heads/${sync_branch}"
{
echo "The scheduled merge of \`${SOURCE_REF}\` into \`${TARGET_BRANCH}\` stopped on conflicts and was aborted; \`${TARGET_BRANCH}\` is unchanged."
echo
echo "This branch is the un-merged \`${SOURCE_REF}\` head. Merge \`origin/${TARGET_BRANCH}\` into it, resolve the files below, push, and get the review. Land the resolved merge commit with a fast-forward push to \`${TARGET_BRANCH}\`; a squash merge drops the merge ancestry and the same hunks conflict again on the next run. Do not include any change that is not conflict resolution."
echo
echo "- Run: ${RUN_URL}"
echo "- Source: \`${SOURCE_REF}\` at ${SOURCE_SHA}"
echo "- Target: \`${TARGET_BRANCH}\` at ${TARGET_SHA}"
echo
echo "## Conflicting files"
echo
echo "Output of \`git diff --name-only --diff-filter=U\` captured before \`git merge --abort\`:"
echo
sed 's/^/- /' "$RUNNER_TEMP/conflicts.txt"
} > "$RUNNER_TEMP/pr-body.md"
title="sync: merge ${SOURCE_REF} ${date_utc} (conflicts)"
existing=$(gh pr list --repo "$GITHUB_REPOSITORY" --base "$TARGET_BRANCH" --head "$sync_branch" --state open --json number --jq '.[0].number // empty')
if [[ -n "$existing" ]]; then
gh pr edit "$existing" --repo "$GITHUB_REPOSITORY" --title "$title" --body-file "$RUNNER_TEMP/pr-body.md"
pr_url=$(gh pr view "$existing" --repo "$GITHUB_REPOSITORY" --json url --jq .url)
else
pr_url=$(gh pr create --repo "$GITHUB_REPOSITORY" --base "$TARGET_BRANCH" --head "$sync_branch" --title "$title" --body-file "$RUNNER_TEMP/pr-body.md")
fi
echo "Conflicts in \`${SOURCE_REF}\` -> \`${TARGET_BRANCH}\`; pull request: ${pr_url}" >> "$GITHUB_STEP_SUMMARY"
alert-on-failure:
name: Alert on scheduled failure
needs: [sync]
# Same ci-8 mechanism audit.yml and coverage.yml use: a scheduled run that
# could not push or could not open the conflict pull request must not stay
# visible only in the Actions tab.
# could not push or encountered merge conflicts must not stay visible only
# in the Actions tab.
if: github.repository == 'rustfs/rustfs' && (always() && github.event_name == 'schedule' && contains(needs.*.result, 'failure'))
runs-on: ubuntu-latest
timeout-minutes: 10
+52 -185
View File
@@ -1,136 +1,26 @@
# Copyright 2024 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
name: Publish helm chart to artifacthub
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Build candidate Helm chart
on:
workflow_run:
workflows: [ "Build and Release" ]
types: [ completed ]
workflow_dispatch:
workflow_call:
inputs:
version:
description: "Release version to publish, e.g. 1.0.0-beta.1 or v1.0.0-beta.1"
required: true
default: "1.0.0-beta.1"
candidate_manifest:
type: string
required: true
permissions:
contents: read
actions: read
jobs:
build-helm-package:
runs-on: sm-standard-2
timeout-minutes: 30
if: |
(github.event_name == 'workflow_dispatch' && !contains(github.event.inputs.version, '-preview')) ||
(
github.event.workflow_run.conclusion == 'success' &&
github.event.workflow_run.event == 'push' &&
contains(github.event.workflow_run.head_branch, '.') &&
!contains(github.event.workflow_run.head_branch, '-preview')
)
outputs:
raw_tag: ${{ steps.version.outputs.raw_tag }}
app_version: ${{ steps.version.outputs.app_version }}
chart_version: ${{ steps.version.outputs.chart_version }}
package:
runs-on: ubuntu-latest
timeout-minutes: 15
steps:
- name: Checkout release source
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: ${{ github.event.workflow_run.head_sha || (startsWith(inputs.version, 'refs/tags/') && inputs.version || format('refs/tags/{0}', inputs.version)) }}
ref: ${{ fromJson(inputs.candidate_manifest).source_sha }}
persist-credentials: false
# Both inputs reach the shell through env rather than `${{ }}`
# interpolation. A git ref name may contain `$(...)` — anything without a
# space is a legal tag — and interpolation pastes it into the script
# verbatim, where bash would run it. Reading "$RAW_INPUT" instead makes it
# data.
- name: Normalize release version
id: version
env:
RAW_INPUT: ${{ github.event.inputs.version }}
RAW_BRANCH: ${{ github.event.workflow_run.head_branch }}
run: |
set -eux
if [ "${{ github.event_name }}" = "workflow_dispatch" ]; then
RAW="$RAW_INPUT"
else
RAW="$RAW_BRANCH"
fi
case "$RAW" in
refs/tags/*)
RAW_TAG="${RAW#refs/tags/}"
;;
*)
RAW_TAG="$RAW"
;;
esac
./scripts/helm_chart_version.sh "$RAW_TAG"
# Docker and Helm share the binary-build trigger. Do not publish a chart
# until the image selected by its default appVersion is pullable.
- name: Wait for release image
timeout-minutes: 20
env:
APP_VERSION: ${{ steps.version.outputs.app_version }}
run: |
set -euo pipefail
if [[ ! "$APP_VERSION" =~ ^[0-9]+\.[0-9]+\.[0-9]+(-[0-9A-Za-z.-]+)?$ ]] ||
[[ "$APP_VERSION" == *-preview* ]]; then
echo "Invalid deliverable image version: $APP_VERSION" >&2
exit 1
fi
for attempt in {1..60}; do
if token=$(curl --fail --silent --show-error --connect-timeout 10 --max-time 20 \
'https://auth.docker.io/token?service=registry.docker.io&scope=repository:rustfs/rustfs:pull' \
| jq -er '.token // empty') &&
curl --fail --silent --show-error --head --connect-timeout 10 --max-time 20 \
--header "Authorization: Bearer $token" \
--header 'Accept: application/vnd.oci.image.index.v1+json, application/vnd.docker.distribution.manifest.list.v2+json' \
"https://registry-1.docker.io/v2/rustfs/rustfs/manifests/$APP_VERSION" > /dev/null; then
echo "Release image is available: rustfs/rustfs:$APP_VERSION"
exit 0
fi
echo "Waiting for rustfs/rustfs:$APP_VERSION ($attempt/60)"
if (( attempt < 60 )); then
sleep 15
fi
done
echo "Release image is unavailable; refusing to publish Helm chart" >&2
exit 1
- name: Replace chart version and app version
env:
CHART_VERSION: ${{ steps.version.outputs.chart_version }}
APP_VERSION: ${{ steps.version.outputs.app_version }}
run: |
set -eux
sed -i -E "s/^version:.*/version: \"${CHART_VERSION}\"/" helm/rustfs/Chart.yaml
sed -i -E "s/^appVersion:.*/appVersion: \"${APP_VERSION}\"/" helm/rustfs/Chart.yaml
- name: Set up Helm
uses: azure/setup-helm@b9e51907a09c216f16ebe8536097933489208112 # v4.3.0
- name: Install yq
- uses: azure/setup-helm@b9e51907a09c216f16ebe8536097933489208112 # v4.3.0
- name: Install pinned yq
run: |
set -euo pipefail
yq_version="4.54.1"
@@ -145,66 +35,43 @@ jobs:
echo "$tools_dir" >> "$GITHUB_PATH"
"$tools_dir/yq" --version
- name: Test Helm Chart Templates
run: ./scripts/test_helm_templates.sh
- name: Package Helm Chart
run: |
set -eux
cp helm/README.md helm/rustfs/
helm package ./helm/rustfs \
--destination helm/rustfs/ \
--version "${{ steps.version.outputs.chart_version }}"
- name: Upload helm package as artifact
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: helm-package
path: |
helm/rustfs/*.tgz
helm/rustfs/README.md
retention-days: 1
publish-helm-package:
runs-on: sm-standard-2
timeout-minutes: 30
needs: [ build-helm-package ]
if: needs.build-helm-package.result == 'success'
steps:
- name: Checkout helm package repo
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
# persist-credentials-exempt: this checkout's token IS the push credential —
# the job git-pushes to rustfs/helm below. Clearing it breaks chart publishing.
repository: rustfs/helm
token: ${{ secrets.RUSTFS_HELM_PACKAGE }}
- name: Download helm package
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
with:
name: helm-package
path: ./
- name: Set up helm
uses: azure/setup-helm@b9e51907a09c216f16ebe8536097933489208112 # v4.3.0
- name: Generate index
run: helm repo index . --url https://charts.rustfs.com
# app_version is derived from the triggering tag name, and this job holds
# the cross-repository push token with rustfs/helm already checked out —
# the worst place in the repo to paste an attacker-influenced string into
# a shell line. Passed through env so bash treats it as data.
- name: Push helm package and index file
- name: Test and package the exact application version
id: chart
env:
GIT_USERNAME: ${{ secrets.USERNAME }}
GIT_EMAIL: ${{ secrets.EMAIL_ADDRESS }}
APP_VERSION: ${{ needs.build-helm-package.outputs.app_version }}
GH_TOKEN: ${{ github.token }}
CANDIDATE_MANIFEST: ${{ inputs.candidate_manifest }}
run: |
set -eux
git config --global user.name "${GIT_USERNAME}"
git config --global user.email "${GIT_EMAIL}"
git add .
git commit -m "Update rustfs helm package with ${APP_VERSION}." || echo "No changes to commit"
git push origin main
python3 - <<'PYCHART'
import sys, subprocess, shutil
from pathlib import Path
sys.path.insert(0, 'scripts/release')
import candidate as c, pipeline
inputs = pipeline.manifest_env()
current = pipeline.current_run('release-complete.yml')
if any(a['name'] == 'helm-package' for a in c.artifact_list(current['id'])):
c.download_artifact(current, 'helm-package', 'chart')
record = c.read_json('chart/chart.json')
c.require(record['inputs_sha256'] == c.digest(inputs), 'chart belongs to another candidate')
c.emit_output('reused', 'true')
else:
chart = Path('helm/rustfs/Chart.yaml')
import re
value = chart.read_text()
for key in ('version', 'appVersion'):
value, count = re.subn(rf'(?m)^{key}:.*$', f'{key}: "{inputs["version"]}"', value)
c.require(count == 1, 'ambiguous chart metadata')
chart.write_text(value)
subprocess.run(['bash', 'scripts/test_helm_templates.sh'], check=True)
shutil.copyfile('helm/README.md', 'helm/rustfs/README.md')
subprocess.run(['helm', 'package', 'helm/rustfs', '--destination', 'chart'], check=True)
path = Path('chart') / f"rustfs-{inputs['version']}.tgz"
c.write_json('chart/chart.json', {'version': inputs['version'], 'inputs_sha256': c.digest(inputs),
'name': path.name, 'sha256': c.file_digest(path), 'size': path.stat().st_size})
PYCHART
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
if: steps.chart.outputs.reused != 'true'
with:
name: helm-package
path: chart/*
if-no-files-found: error
retention-days: 30
+1 -1
View File
@@ -32,7 +32,7 @@ permissions:
jobs:
build:
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- uses: usthe/issues-translate-action@b41f55ddc81d7d54bd542a4f289fe28ec081898e # v2.7
+415
View File
@@ -0,0 +1,415 @@
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
# Manual packaging of the current origin/main tip. Workflow artifacts only.
# Dispatch uses this file from the selected branch. The build fetches
# refs/heads/main and checks out that commit, not the dispatch ref or a tag.
name: Manual main packages
on:
workflow_dispatch:
inputs:
architecture:
description: "Linux targets: x86 (x86_64 musl+gnu), arm (aarch64 musl+gnu), or all"
required: true
type: choice
options:
- x86
- arm
- all
default: all
version:
description: "Binary and package version: MAJOR.MINOR.PATCH, or MAJOR.MINOR.PATCH-(alpha|beta|rc).N. No leading v."
required: true
type: string
permissions:
contents: read
env:
CARGO_TERM_COLOR: always
RUST_BACKTRACE: 1
CARGO_INCREMENTAL: 0
jobs:
prepare:
name: Resolve main tip and version
if: github.repository == 'rustfs/rustfs'
runs-on: ubuntu-latest
timeout-minutes: 15
outputs:
source_sha: ${{ steps.pin.outputs.source_sha }}
version: ${{ steps.version.outputs.version }}
toolchain: ${{ steps.inputs.outputs.toolchain }}
console: ${{ steps.inputs.outputs.console }}
matrix: ${{ steps.matrix.outputs.matrix }}
steps:
- name: Checkout main
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: main
fetch-depth: 0
persist-credentials: false
- name: Pin the tip of origin/main
id: pin
shell: bash
run: |
set -euo pipefail
GIT_TERMINAL_PROMPT=0 git fetch --no-tags origin refs/heads/main
sha=$(git rev-parse FETCH_HEAD)
git checkout --detach "$sha"
test "$(git rev-parse HEAD)" = "$sha"
printf 'source_sha=%s\n' "$sha" >> "$GITHUB_OUTPUT"
printf 'Pinned origin/main %s\n' "$sha"
- name: Validate package version
id: version
shell: bash
env:
PACKAGE_VERSION: ${{ inputs.version }}
run: |
set -euo pipefail
bash scripts/release/package_manual_artifacts.sh validate \
--version "$PACKAGE_VERSION" \
--arch x86_64 \
--libc gnu | tee "$RUNNER_TEMP/package-version.txt"
printf 'version=%s\n' "$PACKAGE_VERSION" >> "$GITHUB_OUTPUT"
- name: Install stable Rust
uses: dtolnay/rust-toolchain@29eef336d9b2848a0b548edc03f92a220660cdb8 # stable
with:
toolchain: stable
- name: Resolve console assets and toolchain
id: inputs
shell: bash
env:
GH_TOKEN: ${{ github.token }}
run: |
set -euo pipefail
toolchain=$(rustc --version | awk '{print $2}')
[[ "$toolchain" =~ ^[0-9]+\.[0-9]+\.[0-9]+$ ]]
gh api repos/rustfs/console/releases/latest > console-release.json
TOOLCHAIN="$toolchain" python3 - <<'PY'
import json, os, sys
sys.path.insert(0, "scripts/release")
import candidate
console = candidate.console_asset(candidate.read_json("console-release.json"))
candidate.emit_output("console", json.dumps(console, separators=(",", ":")))
candidate.emit_output("toolchain", os.environ["TOOLCHAIN"])
print(f"toolchain={os.environ['TOOLCHAIN']}")
print(f"console={console['tag']} {console['name']}")
PY
- name: Select Linux targets
id: matrix
shell: bash
env:
ARCHITECTURE: ${{ inputs.architecture }}
run: |
set -euo pipefail
matrix=$(bash scripts/release/package_manual_artifacts.sh matrix "$ARCHITECTURE")
count=$(python3 -c 'import json,sys; print(len(json.loads(sys.argv[1])["include"]))' "$matrix")
[[ "$count" -gt 0 ]]
printf 'matrix=%s\n' "$matrix" >> "$GITHUB_OUTPUT"
printf 'Selected %s target(s) for %s\n' "$count" "$ARCHITECTURE"
package:
name: Package RustFS (${{ matrix.target_id }})
needs: prepare
if: github.repository == 'rustfs/rustfs'
# x86_64 uses sm-standard-4, the official release compile pool: the workspace
# release build needs that disk (placement rule: disk) and reads build.yml's
# cache without writing it. aarch64 uses ubicloud-standard-16-arm so the
# packaged binary and console smoke execute natively (placement rule: hardware).
runs-on: ${{ matrix.os }}
timeout-minutes: 210
env:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
RUSTUP_TOOLCHAIN: ${{ needs.prepare.outputs.toolchain }}
RUSTFLAGS: "${{ matrix.rustflags }}"
strategy:
fail-fast: false
matrix: ${{ fromJson(needs.prepare.outputs.matrix) }}
steps:
- name: Checkout the pinned origin/main commit
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: ${{ needs.prepare.outputs.source_sha }}
fetch-depth: 0
persist-credentials: false
- name: Confirm the checkout is that main commit
shell: bash
env:
SOURCE_SHA: ${{ needs.prepare.outputs.source_sha }}
run: |
set -euo pipefail
test "$(git rev-parse HEAD)" = "$SOURCE_SHA"
GIT_TERMINAL_PROMPT=0 git fetch --no-tags origin refs/heads/main
git merge-base --is-ancestor "$SOURCE_SHA" FETCH_HEAD
- name: Setup Rust environment
uses: ./.github/actions/setup
with:
rust-version: ${{ needs.prepare.outputs.toolchain }}
target: ${{ matrix.target }}
cache-shared-key: build-${{ matrix.target }}${{ matrix.glibc && format('-glibc-{0}', matrix.glibc) || '' }}${{ matrix.os == 'ubicloud-standard-16-arm' && '-ubicloud-arm' || '' }}
# build.yml owns this key. This job only restores it.
cache-save-if: 'false'
install-cross-tools: ${{ matrix.cross }}
install-build-packaging-tools: 'true'
install-test-tools: 'false'
- name: Download static console assets
shell: bash
env:
GH_TOKEN: ${{ github.token }}
CONSOLE_IDENTITY: ${{ needs.prepare.outputs.console }}
run: |
set -euo pipefail
python3 - <<'PYCONSOLE'
import json, os, pathlib, subprocess, zipfile
value = json.loads(os.environ["CONSOLE_IDENTITY"])
subprocess.run(["python3", ".github/actions/setup/download_release_asset.py",
"--repository", "rustfs/console", "--tag", value["tag"], "--asset", value["name"],
"--sha256", value["sha256"], "--output", "console.zip"], check=True)
destination = pathlib.Path("rustfs/static")
destination.mkdir(parents=True, exist_ok=True)
with zipfile.ZipFile("console.zip") as archive:
for member in archive.infolist():
path = pathlib.PurePosixPath(member.filename)
if path.is_absolute() or ".." in path.parts or "\\" in member.filename:
raise SystemExit("unsafe Console archive member")
archive.extractall(destination)
if not (destination / "index.html").is_file():
raise SystemExit("Console archive has no index.html")
PYCONSOLE
rm -f console.zip
- name: Build RustFS
shell: bash
env:
RUSTFS_BUILD_VERSION: ${{ needs.prepare.outputs.version }}
BUILD_TARGET: ${{ matrix.target }}
BUILD_OS: ${{ matrix.build_os }}
BUILD_FEATURES: ${{ matrix.features }}
BUILD_GLIBC: ${{ matrix.glibc }}
BUILD_CROSS: ${{ matrix.cross }}
run: |
set -euo pipefail
touch rustfs/build.rs
feature_args=()
if [[ -n "$BUILD_FEATURES" ]]; then
feature_args=(--features "$BUILD_FEATURES")
fi
# gnu targets pin glibc 2.31 through cargo-zigbuild (<target>.<glibc>).
target_arg="$BUILD_TARGET"
if [[ -n "$BUILD_GLIBC" ]]; then
target_arg="${target_arg}.${BUILD_GLIBC}"
fi
profile_args=()
if [[ "$BUILD_TARGET" == *-linux-gnu && "$BUILD_FEATURES" == pyroscope ]]; then
profile_args=(--config 'profile.release.strip="none"')
fi
case "$BUILD_CROSS" in
true)
cargo zigbuild --release --locked --target "$target_arg" "${feature_args[@]}" "${profile_args[@]}" -p rustfs --bin rustfs
;;
false)
cargo build --release --locked --target "$target_arg" "${feature_args[@]}" "${profile_args[@]}" -p rustfs --bin rustfs
;;
*)
printf 'unexpected cross flag: %q\n' "$BUILD_CROSS" >&2
exit 1
;;
esac
bin="target/${BUILD_TARGET}/release/rustfs"
version_output=$("$bin" --version)
first=${version_output%%$'\n'*}
if [[ "$first" != "rustfs ${RUSTFS_BUILD_VERSION}" ]]; then
printf 'binary version line is %q, expected %q\n' "$first" "rustfs ${RUSTFS_BUILD_VERSION}" >&2
printf '%s\n' "$version_output" >&2
exit 1
fi
if ! grep -Fxq "build target : ${BUILD_TARGET}" <<< "$version_output" || \
! grep -Fxq "build os : ${BUILD_OS}" <<< "$version_output" || \
! grep -Fxq "rust channel : stable-${BUILD_TARGET}" <<< "$version_output"; then
printf 'release binary reports an unexpected compile target\n' >&2
printf '%s\n' "$version_output" >&2
exit 1
fi
if [[ -n "$BUILD_GLIBC" ]]; then
python3 scripts/release/check_glibc.py "$BUILD_GLIBC" "$bin"
fi
- name: Generate the CPU symbol catalog
if: endsWith(matrix.target, '-linux-gnu') && matrix.features == 'pyroscope'
shell: bash
env:
BUILD_TARGET: ${{ matrix.target }}
run: |
set -euo pipefail
cargo metadata --locked --format-version 1 --filter-platform "$BUILD_TARGET" \
--features rustfs/pyroscope > "$RUNNER_TEMP/cpu-catalog-metadata.json"
features=$(jq -ce '
(.packages[] | select(.name == "rustfs") | .id) as $id |
.resolve.nodes[] | select(.id == $id) | .features | map(select(. != "default")) | sort
' "$RUNNER_TEMP/cpu-catalog-metadata.json")
release_dir="target/${BUILD_TARGET}/release"
rm -f "$release_dir/rustfs.cpu-symbol-catalog.json" "$release_dir/rustfs.cpu-symbol-catalog.sha256"
cargo run --locked -p rustfs-connect-symbol-catalog -- \
"$release_dir/rustfs" "$(git rev-parse HEAD)" "$BUILD_TARGET" "$features" \
"$release_dir/rustfs.cpu-symbol-catalog.json" > "$release_dir/rustfs.cpu-symbol-catalog.sha256"
- name: Install DEB and RPM tools
shell: bash
run: |
set -euo pipefail
sudo apt-get update
sudo apt-get install -y ruby ruby-dev build-essential rpm fakeroot cpio
sudo gem install fpm --version 1.17.0 --no-document
- name: Package zip, deb, and rpm
shell: bash
env:
PACKAGE_VERSION: ${{ needs.prepare.outputs.version }}
ARCH: ${{ matrix.arch }}
LIBC: ${{ matrix.libc }}
BUILD_TARGET: ${{ matrix.target }}
BUILD_FEATURES: ${{ matrix.features }}
SOURCE_SHA: ${{ needs.prepare.outputs.source_sha }}
run: |
set -euo pipefail
binary="target/${BUILD_TARGET}/release/rustfs"
extra=()
if [[ "$BUILD_TARGET" == *-linux-gnu && "$BUILD_FEATURES" == pyroscope ]]; then
extra=(
--zip-extra "target/${BUILD_TARGET}/release/rustfs.cpu-symbol-catalog.json"
--zip-extra "target/${BUILD_TARGET}/release/rustfs.cpu-symbol-catalog.sha256"
)
fi
bash scripts/release/package_manual_artifacts.sh package \
--version "$PACKAGE_VERSION" \
--arch "$ARCH" \
--libc "$LIBC" \
--binary "$binary" \
--output dist \
"${extra[@]}"
printf 'Packaged %s from origin/main %s\n' "$PACKAGE_VERSION" "$SOURCE_SHA"
- name: Verify the packaged binary
shell: bash
env:
PACKAGE_VERSION: ${{ needs.prepare.outputs.version }}
ARCH: ${{ matrix.arch }}
LIBC: ${{ matrix.libc }}
BUILD_TARGET: ${{ matrix.target }}
BUILD_OS: ${{ matrix.build_os }}
BUILD_FEATURES: ${{ matrix.features }}
run: |
set -euo pipefail
stem="rustfs-linux-${ARCH}-${LIBC}-v${PACKAGE_VERSION}"
package_file="dist/${stem}.zip"
[[ -f "$package_file" && -f "dist/${stem}.deb" && -f "dist/${stem}.rpm" ]]
[[ "$(find dist -maxdepth 1 -type f | wc -l)" -eq 3 ]]
archive_members=$(unzip -Z1 "$package_file" | sort)
if [[ "$BUILD_TARGET" == *-linux-gnu && "$BUILD_FEATURES" == pyroscope ]]; then
expected_members=$(printf '%s\n' rustfs rustfs.cpu-symbol-catalog.json rustfs.cpu-symbol-catalog.sha256 | sort)
else
expected_members=$(printf '%s\n' rustfs)
fi
if [[ "$archive_members" != "$expected_members" ]]; then
printf 'Linux package does not contain the expected files\n' >&2
printf '%s\n' "$archive_members" >&2
exit 1
fi
binary_dir=$(mktemp -d)
trap 'rm -rf "$binary_dir"' EXIT
unzip -q "$package_file" rustfs -d "$binary_dir"
version_output=$("$binary_dir/rustfs" --version)
first=${version_output%%$'\n'*}
if [[ "$first" != "rustfs ${PACKAGE_VERSION}" ]]; then
printf 'packaged binary version line is %q, expected %q\n' "$first" "rustfs ${PACKAGE_VERSION}" >&2
exit 1
fi
if ! grep -Fxq "build target : ${BUILD_TARGET}" <<< "$version_output" || \
! grep -Fxq "build os : ${BUILD_OS}" <<< "$version_output"; then
printf 'packaged binary reports an unexpected compile target\n' >&2
exit 1
fi
- name: Verify packaged console
if: matrix.target == 'x86_64-unknown-linux-gnu' || matrix.target == 'aarch64-unknown-linux-gnu'
shell: bash
env:
PACKAGE_VERSION: ${{ needs.prepare.outputs.version }}
ARCH: ${{ matrix.arch }}
LIBC: ${{ matrix.libc }}
run: |
set -euo pipefail
package_file="dist/rustfs-linux-${ARCH}-${LIBC}-v${PACKAGE_VERSION}.zip"
find_free_port() {
python3 - <<'PY'
import socket
with socket.socket() as sock:
sock.bind(("127.0.0.1", 0))
print(sock.getsockname()[1])
PY
}
package_dir=$(mktemp -d)
data_dir=$(mktemp -d)
log_file="${RUNNER_TEMP}/rustfs-console-smoke.log"
server_pid=""
trap '
if [[ -n "${server_pid:-}" ]]; then
kill "$server_pid" 2>/dev/null || true
wait "$server_pid" 2>/dev/null || true
fi
rm -rf "$package_dir" "$data_dir"
' EXIT
unzip -q "$package_file" -d "$package_dir"
api_port=$(find_free_port)
console_port=$(find_free_port)
console_url="http://127.0.0.1:${console_port}/rustfs/console/"
"$package_dir/rustfs" server \
--address "127.0.0.1:${api_port}" \
--console-enable \
--console-address "127.0.0.1:${console_port}" \
--access-key console-smoke \
--secret-key console-smoke-secret \
"$data_dir" >"$log_file" 2>&1 &
server_pid=$!
for _ in {1..40}; do
response=$(curl --silent --output /dev/null --write-out '%{http_code} %{content_type}' "$console_url" || true)
if [[ "$response" == 200\ text/html* ]]; then
exit 0
fi
sleep 0.25
done
printf 'Console endpoint did not return 200 text/html: %s\n' "$response" >&2
cat "$log_file"
exit 1
- name: Upload packages
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: packages-${{ matrix.target_id }}-v${{ needs.prepare.outputs.version }}
path: dist/*
if-no-files-found: error
compression-level: 0
retention-days: 30
+3 -1
View File
@@ -112,9 +112,11 @@ jobs:
# GitHub-hosted: reliably provides a running Docker daemon + buildx +
# python3. See the header note (ci-2) for why the self-hosted sm-standard-4
# label was abandoned (no docker.sock on the pod its only run landed on).
# sm-standard-2 has no docker.sock either (weekly runs failed at "Enable
# buildx" from 2026-09-27 to 2026-11-08), so keep this job on ubuntu-latest.
# TODO(ci-8): scheduled-failure alerting (auto-open issue on a red weekly
# run) is added by the ci-8 composite action; do not implement it here.
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 120
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
+290 -7
View File
@@ -45,7 +45,7 @@ jobs:
resolve-source:
if: github.repository == 'rustfs/rustfs'
name: Resolve nightly source
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 10
outputs:
source_sha: ${{ steps.source.outputs.sha }}
@@ -80,13 +80,212 @@ jobs:
- name: Setup Rust environment
uses: ./.github/actions/setup
with:
cache-shared-key: build-x86_64-unknown-linux-gnu
cache-shared-key: build-x86_64-unknown-linux-gnu-glibc-2.31
cache-save-if: 'false'
install-cross-tools: 'true'
target: x86_64-unknown-linux-gnu
install-build-packaging-tools: 'false'
install-test-tools: 'false'
- name: Download static console assets
shell: bash
env:
GITHUB_TOKEN: ${{ github.token }}
run: |
# Packaging tools are off on this lane, so setup does not install unzip.
if ! command -v unzip >/dev/null 2>&1; then
sudo apt-get update -qq
sudo apt-get install -y -qq unzip
fi
if ! command -v unzip >/dev/null 2>&1; then
echo "unzip is required to extract console assets" >&2
exit 1
fi
mkdir -p ./rustfs/static
verify_sha256() {
local expected="$1"
local file="$2"
local actual=""
local actual_line=""
if command -v sha256sum >/dev/null 2>&1; then
actual_line=$(sha256sum -- "$file") || return 1
elif command -v shasum >/dev/null 2>&1; then
actual_line=$(shasum -a 256 -- "$file") || return 1
else
echo "No SHA-256 verification tool found" >&2
return 1
fi
actual="${actual_line%%[[:space:]]*}"
if [ "$actual" = "$expected" ]; then
echo "SHA256 verified OK: $actual"
return 0
else
echo "SHA256 mismatch: expected=$expected actual=$actual" >&2
return 1
fi
}
download_console_assets() {
local curl_bin="curl"
local python_bin="python3"
local console_api="https://api.github.com/repos/rustfs/console/releases/latest"
local console_json="console-release.json"
local console_url
local console_sha256
local curl_auth_args=()
console_tag=""
chmod +w ./rustfs/static/LICENSE || true
if ! command -v "$python_bin" >/dev/null 2>&1; then
python_bin="python"
fi
if ! command -v "$python_bin" >/dev/null 2>&1; then
echo "No Python interpreter found for release metadata parsing" >&2
return 1
fi
if [[ -n "${GITHUB_TOKEN:-}" ]]; then
curl_auth_args=(-H "Authorization: Bearer ${GITHUB_TOKEN}" -H "X-GitHub-Api-Version: 2022-11-28")
fi
"$curl_bin" "${curl_auth_args[@]}" --fail -L "$console_api" \
-o "$console_json" --retry 3 --retry-delay 5 --max-time 300 || return 1
read -r console_tag console_url console_sha256 < <("$python_bin" - "$console_json" <<'PY'
import json
import re
import sys
with open(sys.argv[1], encoding="utf-8") as handle:
release = json.load(handle)
tag = release.get("tag_name", "") or "unknown"
for asset in release.get("assets", []):
name = asset.get("name", "")
digest = asset.get("digest", "")
url = asset.get("browser_download_url", "")
if name.startswith("rustfs-console-") and name.endswith(".zip") and digest.startswith("sha256:") and url:
sha256 = digest.split(":", 1)[1]
if not re.fullmatch(r"[0-9a-fA-F]{64}", sha256):
raise SystemExit(f"console zip asset has invalid sha256 digest: {sha256}")
sys.stdout.buffer.write(f"{tag} {url} {sha256}\n".encode("utf-8"))
break
else:
raise SystemExit("no console zip asset with sha256 digest found")
PY
) || return 1
if [[ -z "$console_url" || -z "$console_sha256" ]]; then
echo "Console release metadata is missing URL or SHA-256 digest" >&2
return 1
fi
echo "Console release: ${console_tag}"
echo "Downloading console asset: ${console_url}"
"$curl_bin" --fail -L "$console_url" -o console.zip --retry 3 --retry-delay 5 --max-time 300 || return 1
verify_sha256 "$console_sha256" console.zip || return 2
unzip -o console.zip -d ./rustfs/static || return 2
}
if download_console_assets; then
rm -f console.zip console-release.json
else
status=$?
rm -f console.zip console-release.json
if [[ "$status" -eq 2 ]]; then
echo "Console asset integrity verification failed" >&2
fi
echo "Failed to download verified console assets" >&2
exit 1
fi
if [[ ! -s ./rustfs/static/index.html ]]; then
echo "Console asset archive is missing static/index.html" >&2
exit 1
fi
asset_count=$(find ./rustfs/static -type f | wc -l | tr -d '[:space:]')
echo "Console assets ready: version=${console_tag:-unknown}, ${asset_count} files extracted to ./rustfs/static"
- name: Build RustFS
run: cargo build --release --locked --target x86_64-unknown-linux-gnu -p rustfs --bins
# Pin the glibc baseline (`<target>.<glibc>` for cargo-zigbuild) so
# nightlies run on older distros such as RHEL/Rocky 9 (glibc 2.34); #8062.
shell: bash
run: |
# Force rebuild by touching build.rs so a restored cache cannot
# reuse a rustfs artifact compiled before these console assets existed.
touch rustfs/build.rs
cargo zigbuild --release --locked --target x86_64-unknown-linux-gnu.2.31 -p rustfs --bin rustfs
- name: Verify glibc symbol baseline
run: |
python3 scripts/release/check_glibc.py 2.31 \
target/x86_64-unknown-linux-gnu/release/rustfs
target/x86_64-unknown-linux-gnu/release/rustfs --version | grep -Fx 'build target : x86_64-unknown-linux-gnu'
- name: Verify console
shell: bash
run: |
set -euo pipefail
find_free_port() {
python3 - <<'PY'
import socket
with socket.socket() as sock:
sock.bind(("127.0.0.1", 0))
print(sock.getsockname()[1])
PY
}
binary="target/x86_64-unknown-linux-gnu/release/rustfs"
data_dir="$(mktemp -d)"
log_file="${RUNNER_TEMP}/rustfs-console-smoke.log"
server_pid=""
trap '
if [[ -n "${server_pid:-}" ]]; then
kill "$server_pid" 2>/dev/null || true
wait "$server_pid" 2>/dev/null || true
fi
rm -rf "$data_dir"
' EXIT
if [[ ! -x "$binary" ]]; then
echo "rustfs binary not found: ${binary}" >&2
exit 1
fi
api_port="$(find_free_port)"
console_port="$(find_free_port)"
console_url="http://127.0.0.1:${console_port}/rustfs/console/"
"$binary" server \
--address "127.0.0.1:${api_port}" \
--console-enable \
--console-address "127.0.0.1:${console_port}" \
--access-key console-smoke \
--secret-key console-smoke-secret \
"$data_dir" >"$log_file" 2>&1 &
server_pid=$!
response=""
for _ in {1..40}; do
response="$(curl --silent --output /dev/null --write-out '%{http_code} %{content_type}' "$console_url" || true)"
if [[ "$response" == 200\ text/html* ]]; then
exit 0
fi
sleep 0.25
done
echo "Console endpoint did not return 200 text/html: $response" >&2
cat "$log_file"
exit 1
- name: Build DEB package
id: deb
@@ -335,12 +534,12 @@ jobs:
path: ${{ steps.publish.outputs.candidate_file }}
if-no-files-found: error
# Publish the deb/rpm pair to the auto-testing repo's `assets` branch so
# engineers can download and install the nightly directly. The branch is
# a single-commit orphan rewritten on every build, which keeps the repo
# small while the latest files stay reachable at stable raw URLs.
# Publish the deb/rpm pair as assets of the rolling `nightly` release on
# rustfs/auto-testing (see scripts/release/publish_nightly_assets.sh).
# The dispatch below runs only after this upload and the immutable R2
# candidate both succeed. It does not replace rustfs-functional-chain.yml,
# which still starts from this workflow's workflow_run completion.
# kms-vault-lane and kms-vault-ha-failover stay parallel with this job.
- name: Publish packages to auto-testing release assets
env:
ASSETS_TOKEN: ${{ secrets.PF_TESTING_GH_TOKEN }}
@@ -349,6 +548,90 @@ jobs:
DEB_DATE: ${{ steps.deb.outputs.deb_date }}
BUILD_REF: ${{ env.NIGHTLY_BUILD_REF }}
run: bash scripts/release/publish_nightly_assets.sh
# Cross-repo repository_dispatch cannot use GITHUB_TOKEN. The secret is a
# PAT or GitHub App token for rustfs/auto-testing: classic `repo` scope,
# or fine-grained Contents write (the permission GitHub checks for
# POST /repos/{owner}/{repo}/dispatches). A dispatch failure fails this
# step, and therefore this job, so the scheduled failure alert fires.
# GitHub allows at most 10 top-level client_payload properties, so the
# schema 2 candidate object is nested under `candidate` and the release
# fields sit beside it.
- name: Dispatch nightly candidate to auto-testing
if: ${{ steps.publish.outputs.candidate_file != '' }}
env:
DISPATCH_TOKEN: ${{ secrets.AUTO_TESTING_DISPATCH_TOKEN }}
CANDIDATE_FILE: ${{ steps.publish.outputs.candidate_file }}
DEB_DATE: ${{ steps.deb.outputs.deb_date }}
SOURCE_REPO: ${{ github.repository }}
shell: bash
run: |
set -euo pipefail
: "${DISPATCH_TOKEN:?AUTO_TESTING_DISPATCH_TOKEN is required to dispatch rustfs/auto-testing}"
: "${CANDIDATE_FILE:?nightly candidate manifest is required}"
: "${DEB_DATE:?DEB_DATE is required}"
[[ "${DEB_DATE}" =~ ^[0-9]{4}-[0-9]{2}-[0-9]{2}$ ]]
[[ "${SOURCE_REPO}" == "rustfs/rustfs" ]]
payload="${RUNNER_TEMP}/nightly-candidate-dispatch-${GITHUB_RUN_ID}-${GITHUB_RUN_ATTEMPT}.json"
jq -n --slurpfile candidate "${CANDIDATE_FILE}" \
--arg event_type "nightly-candidate-ready" \
--arg source_repo "${SOURCE_REPO}" \
--arg latest_alias_url "https://dl.rustfs.com/artifacts/rustfs/packages/nightly/rustfs-nightly-latest.deb" \
--arg auto_testing_release "https://github.com/rustfs/auto-testing/releases/tag/nightly" \
--arg channel "nightly" \
--arg deb_date "${DEB_DATE}" \
--arg nightly_workflow ".github/workflows/nightly-gnu.yml" \
'{
event_type: $event_type,
source_repo: $source_repo,
latest_alias_url: $latest_alias_url,
auto_testing_release: $auto_testing_release,
channel: $channel,
deb_date: $deb_date,
nightly_workflow: $nightly_workflow,
candidate: $candidate[0]
}' > "${payload}"
if ! jq -e '
.event_type == "nightly-candidate-ready"
and .source_repo == "rustfs/rustfs"
and .channel == "nightly"
and .deb_date == env.DEB_DATE
and .nightly_workflow == ".github/workflows/nightly-gnu.yml"
and .latest_alias_url == "https://dl.rustfs.com/artifacts/rustfs/packages/nightly/rustfs-nightly-latest.deb"
and .auto_testing_release == "https://github.com/rustfs/auto-testing/releases/tag/nightly"
and .candidate.schema == 2
and ((.candidate | keys | sort) == ["build_run_attempt","build_run_id","package_sha256","package_url","schema","source_ref","source_sha","workflow_sha"])
and ((keys | sort) == ["auto_testing_release","candidate","channel","deb_date","event_type","latest_alias_url","nightly_workflow","source_repo"])
' "${payload}" >/dev/null; then
echo "nightly dispatch payload does not match the nightly-candidate-ready contract" >&2
exit 1
fi
body="${RUNNER_TEMP}/nightly-candidate-dispatch-body-${GITHUB_RUN_ID}-${GITHUB_RUN_ATTEMPT}.json"
jq -n --slurpfile client_payload "${payload}" \
'{event_type: "nightly-candidate-ready", client_payload: $client_payload[0]}' > "${body}"
response="${RUNNER_TEMP}/nightly-candidate-dispatch-response-${GITHUB_RUN_ID}-${GITHUB_RUN_ATTEMPT}.txt"
status="$(curl -sS --retry 3 --connect-timeout 15 --max-time 60 \
-o "${response}" -w '%{http_code}' \
-X POST \
-H "Authorization: Bearer ${DISPATCH_TOKEN}" \
-H "Accept: application/vnd.github+json" \
-H "X-GitHub-Api-Version: 2022-11-28" \
-H "Content-Type: application/json" \
--data-binary @"${body}" \
https://api.github.com/repos/rustfs/auto-testing/dispatches)" || {
echo "repository_dispatch request to rustfs/auto-testing failed before an HTTP status" >&2
exit 1
}
if [[ "${status}" != "204" ]]; then
echo "repository_dispatch to rustfs/auto-testing failed: HTTP ${status}" >&2
if [[ -s "${response}" ]]; then
cat "${response}" >&2
fi
exit 1
fi
echo "dispatched nightly-candidate-ready to rustfs/auto-testing (deb_date=${DEB_DATE}, run=${GITHUB_RUN_ID}, attempt=${GITHUB_RUN_ATTEMPT})"
# Live-Vault lane for the rustfs-kms suite (rustfs/backlog#1774).
#
# RUSTFS_KMS_VAULT_TOKEN is the single switch that adds the Vault KV2 and
+1 -1
View File
@@ -34,7 +34,7 @@ jobs:
update-flake:
if: github.repository == 'rustfs/rustfs'
name: Update flake.lock
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 90
env:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"

Some files were not shown because too many files have changed in this diff Show More