Compare commits

..

129 Commits

Author SHA1 Message Date
Nicolas Dorseuil e4a61537ff Implement API token compression to handle oversized tokens in URLs 2026-10-08 17:02:30 +02:00
conico974 679ea0706c Add support for visitor country hostnames via environment variable (#4668) 2026-10-08 11:35:18 +02:00
Peter White c366796756 Keep the embed open when switching section from the breadcrumbs (RND-12559) (#4670) 2026-10-08 11:26:04 +02:00
Peter White f35be52c80 Allow configuring the tab and page the Docs Embed opens on (RND-12456) (#4669) 2026-10-08 11:25:35 +02:00
conico974 848a39d1c8 Send visitor country in API requests for specific environments (#4667) 2026-10-07 18:08:57 +02:00
Peter White 9f447aab29 Open search in the current space from scoped search buttons (#4666) 2026-10-07 17:04:19 +02:00
Nolann B. 552538a0d9 Record proxied sites' markdown, llms.txt and RSS requests under their public URL (#4660) 2026-10-07 11:53:03 +02:00
Peter White 5c4a808ba8 Stop self-referencing nullable OpenAPI schemas from recursing when expanded (#4665) 2026-10-07 11:38:46 +02:00
Zeno Kapitein ad6262b6f9 Scope the site preview cookie to the preview route so customization/theme persists on navigation (RND-12191) (#4481)
Co-authored-by: Peter White <1788320+peterwhite@users.noreply.github.com>
2026-10-07 09:53:30 +02:00
Tomek 2137c2df7b Track Ask AI entry point in analytics (#4646) 2026-10-06 19:33:34 +02:00
Peter White 990e702035 Clarify not-found copy for login-protected pages (#4663) 2026-10-06 16:58:58 +02:00
Peter White 3ed448fed7 Keep ?ask out of the search field while integration assistants load (#4661) 2026-10-06 14:11:41 +02:00
conico974 4856a1f744 Add support for resolving missing page paths and redirecting to markdown versions (#4657) 2026-10-06 13:54:16 +02:00
Peter White ac843657ec Restore Next.js dev-mode OOM patch for 16.3.8 (#4662) 2026-10-06 13:33:50 +02:00
Brett Jephson b1102fcebe Prepare DocumentMarkColor to work with optional properties (#4659) 2026-10-05 17:55:22 +01:00
conico974 7996c362c1 Bump Next and OpenNext (#4658) 2026-10-05 15:48:35 +02:00
Steven H c7c1b79788 Improve the prompt asking agents for feedback on GitBook-powered docs (#4654) 2026-10-02 18:38:56 +01:00
Taran Vohra dff0c7903e Resolve cross-space repository page URLs when rendering sites (#4619)
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 18:31:20 +05:30
Tomek ffebd1790e Extract page title utility and add SEO title support (#4647)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
Co-authored-by: Nolann Biron <biron.nolann@gmail.com>
Co-authored-by: Nolann B. <100787331+nolannbiron@users.noreply.github.com>
2026-10-02 14:07:15 +02:00
Tomek 0e0085e49a Fix sidebar group titles being clipped while scrolling (#4623)
Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-10-01 14:31:00 +02:00
Tomek 8e131693ea Auto-scroll TOC to active item when it's not visible (#4653) 2026-10-01 09:14:01 +00:00
Peter White 96325161be Lazy-load Loom embeds so pages with many of them don't stay blank (RND-13147) (#4652) 2026-09-30 14:18:29 +02:00
Surai 9f5290bccc Fix Ask AI submissions when search state is empty (#4651) 2026-09-30 09:50:39 +02:00
Peter White 61992424af Mark text over a background cover in the first frame after hydration (#4650) 2026-09-30 08:21:31 +02:00
Peter White 380af10236 Send previousUrl with site insights events (#4640) 2026-09-29 16:43:14 +00:00
Peter White 0911abc55c Fix page cover image jumping on load (#4648) 2026-09-29 18:11:03 +02:00
Tomek d8dc59b1a9 Improve dark theme contrast for Mermaid edge labels (#4645)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-29 14:02:07 +02:00
Surai d04f8bc05e Update trademark landing page (#4644) 2026-09-29 11:13:52 +02:00
conico974 576a781a8f Bump versions of @opennextjs/aws and @opennextjs/cloudflare (#4643) 2026-09-29 10:51:30 +02:00
Peter White df2841cf36 Don't leak the internal route into the site auth login link (#4642) 2026-09-28 17:43:23 +02:00
Tomek 70bfdda39c Restore Next.js 16.3.6 dev-mode OOM patch (#4641) 2026-09-28 11:40:41 +00:00
Peter White afbc57c3e0 Don't track 404 page views for internal ~gitbook routes (#4639) 2026-09-25 12:32:54 +02:00
Tomek e4638f1833 Fix webframes inside modals not receiving visitor claims (#4635) 2026-09-25 12:13:44 +02:00
Peter White d7f2addb03 Improve PR description context guidance (#4636) 2026-09-25 09:11:47 +02:00
Tomek 7f8ab7dcc7 Add support for ChatGPT Search (OAI-SearchBot) user agent (#4633) 2026-09-24 09:49:33 +02:00
Nolann B. 8dd9444596 Track Insights link clicks on the file block Download button (#4632) 2026-09-23 17:16:06 +02:00
Peter White bdc2497771 Return 404 instead of looping on missing non-ASCII page paths (#4631) 2026-09-23 14:20:50 +00:00
Peter White 581abe0bb7 Announce pagination at the top of each llms-full.txt part (#4630) 2026-09-23 09:05:44 +02:00
conico974 4503be2f19 Update Next.js dependency to 16.3.6 (#4629) 2026-09-22 21:00:10 +02:00
Peter White bdfc98b97e Add PR description skill and template (#4628) 2026-09-22 17:32:53 +02:00
Brett Jephson 0f0cfde6ba Filter table with client side selection (#4616)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-22 09:28:07 +01:00
Peter White 357af3f6d2 Fix RSS discovery for pages without updates (#4626) 2026-09-21 11:45:24 +02:00
Tomek b95add7b27 Apply release notes tag filters from URL via CSS before first paint (#4613)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-18 16:16:07 +02:00
conico974 99984ebbb3 Implement bypass for URL lookup alternatives (#4620) 2026-09-18 13:50:06 +02:00
Tomek a52daf8b15 align dropdown chevron buttons between group items and page items (#4622) 2026-09-18 11:17:41 +00:00
conico974 f80429e4e8 Update @opennextjs/aws dependency and refine e2e tests (#4587) 2026-09-18 12:18:47 +02:00
spastorelli 6b4c453497 Add server card for published sites MCPs (#4618) 2026-09-18 10:16:27 +02:00
Peter White c7d042a733 Add Slapr PR reactions in engineering (#4617) 2026-09-17 14:04:03 +02:00
Tomek e94a5085eb Fix search popover keyboard focus trap (#4615)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-17 11:21:17 +02:00
Tomek 3ae1524a88 Hide Intercom launcher when Assistant opens (#4614)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-17 11:20:20 +02:00
Nolann B. b967b248e7 Request insights and visitor endpoints relative to the served origin (#4603) 2026-09-16 20:54:20 +02:00
Nolann B. a9e6814744 Let the AI Assistant report documentation findings to the site's team (#4576) 2026-09-15 18:03:37 +02:00
Brett Jephson 5725da19e2 Honour an explicit select slug on a tab (#4601)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-15 13:37:03 +01:00
Peter White 05cff0a03b Hide anchor links on landing pages (#4609) 2026-09-15 09:20:38 +02:00
Nolann B. 1e8c34a426 Let ContentKit webframes dispatch modal and URL actions (#4611) 2026-09-14 15:19:05 +02:00
spastorelli cd881f9ac1 Fix set-cookie in RSC requests conflicting with logout requests (#4606) 2026-09-14 14:45:32 +02:00
Greg Bergé 39316fc205 Add agent actions to the prompt block (#4610)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-09-14 12:01:04 +02:00
Brett Jephson c08d05ade5 Fix select filters on table and cards blocks (#4608)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-11 10:33:02 +00:00
Peter White b9453a92f8 Fix preview auth redirects dropping content paths (#4602) 2026-09-11 08:42:28 +02:00
Peter White 2c4d40ad97 Expose the site MCP tools through WebMCP in published docs (#4604) 2026-09-11 08:30:36 +02:00
Tomek 688515efcf Support fit-content width sizing for ContentKit buttons (#4605)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-10 15:50:37 +02:00
Tomek 931cbe717e Restore Edit on Git page actions (#4597)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
Co-authored-by: Viktor Renkema <49148610+viktorrenkema@users.noreply.github.com>
Co-authored-by: conico974 <nicodorseuil@yahoo.fr>
2026-09-10 12:37:37 +02:00
Tomek 3ef1802e7e Add close button for modals in published sites (#4600)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-09 12:23:17 +02:00
Greg Bergé 8a0e0df84e Fix search section links not scrolling to the target section (#4598)
Co-authored-by: Claude Fable 5.1 <noreply@anthropic.com>
2026-09-09 11:40:58 +02:00
Peter White a9041a309a Fix fallback URL cleanup after successful page navigation (#4599) 2026-09-09 11:22:09 +02:00
conico974 625c108196 Add isRevalidationRequest function to handle specific requests (#4596) 2026-09-08 14:18:32 +02:00
Viktor Renkema 8e87856501 Fix page not found in preview links for sites with a custom homepage (#4594) 2026-09-08 11:27:07 +00:00
Tomek 9b822abbb6 Include page descriptions in markdown output (#4595)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-08 12:38:54 +02:00
Peter White 81dba6455b Resolve stable refs in HTML blocks of published markdown pages (#4592) 2026-09-08 09:45:14 +02:00
Johan Preynat 1faa57b812 Keep revision search results in preview (#4582) 2026-09-07 19:46:57 +02:00
Tomek 40150f0a6c Serve markdown with text/plain content-type for ChatGPT (#4591)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-07 17:13:19 +02:00
Brett Jephson bf29570bd5 RND-12706: measuring tabs fix (#4588)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-07 15:40:43 +01:00
Peter White e8e979b6c0 Serve permanent site redirects (#4586) 2026-09-07 16:07:40 +02:00
Tomek 1f250d1fa8 Add site structure e2e tests for external links (#4584) 2026-09-07 09:31:50 +02:00
Brett Jephson 46b3a18b25 Fix nested select css (#4583)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>
2026-09-04 16:20:52 +01:00
Nolann B. 2ff77e15b5 Attribute a markdown request from the page actions menu (#4581) 2026-09-04 12:17:00 +02:00
Tomek d7c867aa63 Fix MCP/Markdown copy confirmation closing dropdown instantly (#4579)
Co-authored-by: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-03 16:08:53 +02:00
Tomek bcd1c41aa1 Scroll to top when selecting current page in search (#4578)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-03 11:35:07 +02:00
Viktor Renkema 77058e3f17 Support merged cells (#4500)
Co-authored-by: OpenAI Codex <codex@openai.com>
2026-09-03 10:26:43 +02:00
Tomek 8ad7465801 Simplify carousel overflow with edge masks & fix carousel scroll (#4577)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-02 14:32:53 +00:00
arnau 1b7ac0e41b Open inline Ask AI questions in the configured assistant (#4574) 2026-09-02 12:05:37 +02:00
Tomek 5f88f4e680 Improve cross-space page breadcrumbs (#4571)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-09-02 11:43:35 +02:00
Peter White 7009bb9311 Drop the body-anchored cover gate from paragraph contrast text (#4573) 2026-09-02 11:24:54 +02:00
Johan Preynat e460ec381e Preserve linked page destinations in published search (#4566) 2026-09-01 15:06:26 +02:00
Johan Preynat 0a82628298 Trap keyboard focus within published search (#4567) 2026-09-01 13:12:01 +02:00
conico974 18ff11b68b Bump @opennextjs/aws and @opennextjs/cloudflare versions (#4570) 2026-09-01 12:14:55 +02:00
Peter White 3bf55cef10 Allow adding query params to the @webframe.navigate action (#4569) 2026-09-01 10:14:07 +02:00
Peter White e041e49f11 Wait for integrations to register before showing the cookie banner (#4568) 2026-09-01 09:09:15 +02:00
Johan Preynat c1b5be05eb Allow search to target any section (#4564) 2026-08-31 18:32:02 +02:00
Johan Preynat 7543eb83ad Prewarm Turbopuffer when published search opens (#4563) 2026-08-31 13:32:47 +00:00
Tomek 523b7cd4b6 Support external links (#4561)
Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com>
2026-08-31 13:11:13 +02:00
spastorelli af698a49f5 Extend MCP tests (#4562) 2026-08-31 11:59:46 +02:00
conico974 db67585ee2 Remove MCP authentication path from internal paths registry (#4560) 2026-08-28 14:57:21 +02:00
Peter White a566153d98 Chunk oversized visitor authentication cookies (#4554) 2026-08-28 12:28:53 +02:00
conico974 530f98a9c4 Skip internal paths in URL lookup (#4557) 2026-08-28 12:24:29 +02:00
Tomek 39391259c8 Disable zoom for inline images (#4555) 2026-08-28 11:32:19 +02:00
Nolann B. 35be3835f3 Skip rendering work for off-screen OpenAPI blocks (#4502) 2026-08-27 18:41:33 +02:00
Tomek 4452fd793c Fix link title showing site section name (4542) (#4553)
Co-authored-by: Kai Kewley <kaikewley@gmail.com>
2026-08-27 09:57:32 +02:00
conico974 90566879d2 Improve image signature handling and resizing functionality (#4511) 2026-08-26 15:55:57 +02:00
Zeno Kapitein 40a879ad5f Keep section group dropdown columns readable when space is tight (#4549)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-26 15:05:28 +02:00
Johan Preynat cc441c99c6 Fix published search scope fusion (#4552) 2026-08-26 14:22:33 +02:00
conico974 64e143a15b Bump Next.js to version 16.3.3 (#4547) 2026-08-26 12:32:56 +02:00
Peter White 8c10d92f77 Keep the section group menu open over the collapsed sidebar rail (#4548) 2026-08-26 12:16:13 +02:00
Zeno Kapitein 0a22eb5340 Stop expecting a cookies dialog in the faq.wanttopay.net e2e test (#4550)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-26 11:54:31 +02:00
Zeno Kapitein d9fc4608e3 Stop suggesting previously asked questions in the GitBook Assistant (#4546)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 18:00:30 +02:00
Zeno Kapitein ded2f560e3 Show loose sections in a section group dropdown as secondary links unless the group starts with one (#4545)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 17:14:58 +02:00
Zeno Kapitein a9c5d1b546 Fix the gap between columns in large section group dropdowns (#4544)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:45:41 +02:00
Zeno Kapitein 0ff21b7ae2 Hide the section tabs scroll button when all tabs already fit (#4540)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:35:38 +02:00
Zeno Kapitein 94a496c561 Match the Docs Embed widget to the page it is embedded in (#4533)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 16:34:54 +02:00
Johan Preynat 148a43ac01 Preserve backend ranking across site sections (#4541) 2026-08-25 14:55:17 +02:00
Johan Preynat 5da854f09c Preserve backend ranking in published search (#4537) 2026-08-25 12:54:24 +02:00
spastorelli b772f74c2b Evaluate <if> blocks when serving markdown pages (#4538) 2026-08-25 12:18:53 +02:00
Zeno Kapitein e0bd04f641 Render headings with the site's heading font (#4531)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-25 12:08:03 +02:00
conico974 8d7c3edda8 Disable metadata fetching in revision-related API calls (#4459) 2026-08-24 13:55:50 +02:00
conico974 80951e9889 Remove CODEOWNERS file for API data cache functions (#4536) 2026-08-24 13:43:37 +02:00
Nolann B. 185dd8337e Defer tracking scripts until after load and idle (#4529) 2026-08-24 12:18:30 +02:00
Peter White da7fb13d83 Fail closed in /~gitbook/revalidate when GITBOOK_SECRET is unset (#4535) 2026-08-24 12:11:40 +02:00
conico974 49c993f181 Add API token expiration check (#4532) 2026-08-21 11:29:38 +02:00
Zeno Kapitein 90b54682e5 Redesign the site OAuth consent screen for published sites MCP (RND-12071) (#4530)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 22:45:46 +02:00
Zeno Kapitein 1dccf8f06c Fix table-of-contents page group's first item cut off after navigation (RND-11314) (#4391)
Co-authored-by: Claude Opus 4.8 <noreply@anthropic.com>
Co-authored-by: copilot-swe-agent[bot] <198982749+Copilot@users.noreply.github.com>
Co-authored-by: zenoachtig <8304582+zenoachtig@users.noreply.github.com>
2026-08-20 15:28:02 +02:00
Nolann B. 810244e8a9 Stop preloading zoom-modal images at render time (#4528) 2026-08-20 15:02:00 +02:00
Tomek 0dd2f4fbcd Show containing section name when hovering direct space links (RND-12437) (#4525) 2026-08-20 14:06:10 +02:00
Nolann B. 8a700222e6 Only track embed view events once the frame is shown (RND-12362) (#4517) 2026-08-20 14:04:14 +02:00
Nolann B. b13fd91afc Compute the AI chat time greeting after mount to avoid a hydration mismatch (#4527) 2026-08-20 13:52:52 +02:00
Nolann B. 8a6baaba6a Load the admin toolbar and its CSS lazily (RND-12524) (#4526) 2026-08-20 13:47:49 +02:00
Zeno Kapitein 48fba7cb49 Fix: highlight a TOC link entry when on the page or section it points to (RND-11155) (#4476)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 12:48:45 +02:00
Zeno Kapitein 6928a9b00a Hide card fields that render no content (#4523)
Co-authored-by: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 12:48:37 +02:00
Nolann B. 7bab574c63 Self-host default fonts and inline only the ones a site uses (RND-12524) (#4522) 2026-08-20 12:36:55 +02:00
conico974 75bdff3ff3 Add support for AI agent detection and robots directives in markdown (#4524) 2026-08-20 12:18:17 +02:00
461 changed files with 19866 additions and 3392 deletions
@@ -0,0 +1,48 @@
---
name: write-pr-description
description: Write a concise, product-focused PR description from the changes and available discussion. Use when asked for a PR summary or description.
---
# Write a PR description
Read the full branch diff and commit history against the PR's base branch, not just the latest commit. Use the PR discussion and linked issues for context when available. The PR's changes are the source of truth for what ships if an issue describes something different.
Write for contributors and reviewers who may not know the area. Lead with what changes, prefer user or product impact when supported, and include implementation details only when they help review. Keep the proposed changes short, using bullets only when useful.
Include relevant validation and screenshots when available. Do not claim checks passed unless they ran. Use only information appropriate for a public repository; do not copy private issue details or customer information into the description.
## Template and changelog
Read `.github/pull_request_template.md` immediately before writing. Preserve its required section names and order. Include `Proposed changes` and `Changelog`; omit `Demo` when there is nothing to show. Add optional `Context` before `Changelog` only when it meets the rule below.
Write a short changelog entry describing what shipped. Use `[Feature]` for user-facing additions or improvements, `[Fix]` for user-facing bug fixes, and `[Chore]` for internal maintenance. For features and fixes, say what users can do or what no longer goes wrong in plain words. Keep chores useful to teammates without inventing user impact. Remove unused examples and placeholders. Usually one entry is enough; use more only for distinct changes. The PR changelog does not replace any changeset required by `AGENTS.md`.
## Optional context
Write `Proposed changes` and `Changelog` first. Add `Context` only when it tells someone unfamiliar with the area something material that the changelog does not. `Problem` names a concrete failure or limitation supported by the PR or discussion. `Outcome` names what this PR delivers at its actual scope. Omit the section if either field would repeat the changelog, describe only implementation, or guess at an impact.
```markdown
## Context
**Problem:** <concrete failure or limitation>
**Outcome:** <result delivered by this PR>
```
Keep each field to 1–2 short, non-technical sentences. Prefer user or product impact when supported. For infrastructure changes, explain the failure or limitation they caused. Do not invent an actor, customer segment, ownership, or impact, or force the change into a user story. Do not turn a preparatory change into a claim that the whole workflow is fixed. Keep the roles distinct: `Context` explains why this matters, `Changelog` says what shipped, and `Proposed changes` can explain implementation.
Examples:
- A dependency bump with no demonstrated user effect needs no `Context`.
- If creating the first change request leaves the user on an empty screen, say that it now opens after creation. Leave the animation-listener details in `Proposed changes`.
- If a PR indexes links for later checks, describe the indexing result. Do not claim every link has already been checked.
## Writing pass
- Use plain words and direct verbs: "use" instead of "leverage", "help" instead of "facilitate". Prefer active voice when the actor is known.
- Name the concrete behavior instead of saying "improves the experience" or "makes it more robust". Support performance claims with measurements.
- Cut filler, promotional language, and generic conclusions. If a sentence could fit almost any PR, make it specific or delete it.
- Keep one idea per sentence and use consistent names. Remove redundant hedging without hiding real uncertainty.
- Avoid "not just X, but Y", forced groups of three, em dashes, decorative emojis, and unnecessary bold text.
Return the description in a Markdown code block unless asked to update the PR. When asked to update it, apply the description with `gh pr edit` using a body file.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Stop the `?ask` query briefly appearing in the search field before an integration assistant opens.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Track which Ask AI entry point opened the chat in ask view analytics.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Add `leaveAgentFeedback` and `leaveUserFeedback` assistant tools, reporting documentation findings to the site's team through the same path as the MCP `sendFeedback` tool, and record an `agent_feedback` insights event on both surfaces.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Stop showing previously asked questions as suggestions in the GitBook Assistant
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Simplify carousel overflow with symmetric edge masks and visible-item paging. Replaces complex negative-margin bleed logic with transparent edge fades and page-by-visible-item scrolling.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Recolor text over a background page cover in the first frame after hydration.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Include published page descriptions in the page's Markdown output.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Bump Next.js to 16.3.3.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix select filters not working on table and cards blocks.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Chunk oversized visitor auth cookies to fix an infinite redirect loop when the visitor token exceeds the browser cookie size limit.
+5
View File
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Fix inline Ask AI buttons opening a configured custom assistant.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Compress oversized site API tokens in the rewritten URL to stay under URL length limits.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix ContentKit buttons to size to their content instead of stretching to the full container width.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Stop the built-in cookie banner from flashing on sites using a consent integration such as Osano or OneTrust.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix breadcrumbs for cross-space page links in grouped sites.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Automatically resolve GitHub and GitLab page links to matching pages in the same published site, including cross-space links imported before their target page was available.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Disable click-to-zoom for inline line sized images.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Give the prompt block a default "Copy prompt" action alongside "Open in Claude", "Open in Codex" and "Open in Cursor", and remember the visitor's last pick across every prompt block.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep the docs embed open when switching section, variant or language.
+6
View File
@@ -0,0 +1,6 @@
---
"@gitbook/embed": minor
"gitbook": patch
---
Add `defaultTab` and `defaultPage` options to the Docs Embed to choose where it opens. `defaultTab` opens the embed on the assistant, search or docs tab. `defaultPage` sets the page the docs tab opens on in place of the site's home page, and the embed opens on that page unless `defaultTab` says otherwise. Both work with the standalone script's `configure`, `frame.configure` and `<GitBookFrame>` props.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the Docs Embed widget rendering with a dark surface when the visitor's OS is in dark mode, even on a light page or a site published with a light theme. The embed script now accepts `?theme=light|dark` to force a scheme.
+5
View File
@@ -0,0 +1,5 @@
---
"@gitbook/embed": patch
---
Make the Docs Embed widget match the page it is embedded in rather than the visitor's OS: a widget on a light page stays light even when the visitor's system is in dark mode, and the widget's own chrome and the docs inside it always render in the same scheme. Sites published with a single theme impose it on the widget too, since they render in it regardless. The standalone script takes `?theme=light` on its URL, and calling `init` twice now updates the options instead of throwing.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": minor
---
Support external links in published site navigation.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Skip internal paths (`~gitbook/*`, `.well-known/oauth-protected-resource`, `llms.txt`, `robots.txt`, `sitemap.xml`, `rss.xml`) when building URL lookup alternatives, to avoid resolving URLs that can never match content.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep published search results within the selected site-space scope during local and remote result fusion.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix page cover image jumping on load
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Only advertise RSS feeds on pages with Updates blocks.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix page link titles showing the site section name instead of the target space title.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Use the DocumentTextColor type defined in API schema.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Serve Markdown responses as plain text to OpenAI's ChatGPT Search crawler.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Self-host default Google fonts and inline only the @font-face rules of the fonts a site uses, instead of shipping render-blocking stylesheets covering all 23 families on every page.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Hide heading and expandable anchor links on pages whose layout disables anchors (landing pages).
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Hide card fields that render no content, along with their title
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Hide the Intercom launcher while the Assistant panel is open, so it no longer overlaps the message box.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix inline Ask AI inputs and buttons doing nothing before search is opened.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Track server-side Insights events (markdown, llms.txt, RSS, ask) with the site's public URL instead of the proxy URL.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Send the previous page's URL with site insights events so broken links can be traced to the page linking to them.
+5
View File
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Keep embed demos and frames on the deployment that served them.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix a hydration mismatch on every page load caused by the AI chat time-based greeting being computed in the server timezone.
-5
View File
@@ -1,5 +0,0 @@
---
"gitbook": patch
---
Load the OpenAPI, ContentKit, admin toolbar and PDF print stylesheets only on the pages that need them, cutting published pages from 8 render-blocking stylesheets to 3.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix Loom videos staying blank on pages with many Loom embeds by lazy-loading them.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Stop preloading the zoom-modal variant of every zoomable image at render time; it downloaded each image twice during the initial page load. The modal image still loads on hover or click.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Announce pagination at the top of every part of a multi-part llms-full.txt, with absolute links to the previous and next parts.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Serve an indexable `X-Robots-Tag` on markdown pages requested by AI agents
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Bump `@gitbook/api` to 0.199.0, and record a markdown request made from the page actions menu as a page action rather than an agent request.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the page-actions dropdown closing before the "Copied" confirmation could be shown when copying the MCP server URL, an MCP install command, or the page as Markdown.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Improve dark theme contrast for Mermaid edge labels.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Improve the prompt for agents to ask questions.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Missing pages with accented or non-Latin characters in the URL now return 404 instead of an endless redirect.
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Redesign the site OAuth consent screen for published sites MCP and translate its strings
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Drop a column instead of shrinking them all when a section group dropdown runs out of room
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Let a section group dropdown scroll when it is taller than the screen
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Skip the rendering work for off-screen OpenAPI blocks, so pages with many operations stay smooth to scroll.
+6
View File
@@ -0,0 +1,6 @@
---
"@gitbook/react-openapi": patch
"gitbook": patch
---
Fix OpenAPI schemas that reference themselves through a nullable union rendering forever when expanded, which crashed PDF exports.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Use the page's tag title, when set, for the HTML `<title>` of published pages.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Move paragraph block styles behind a single `paragraph` class and drop the `page-cover-background:` gate from the cover-contrast text. The gate combined with the per-paragraph `:not(:has(...))` made every DOM insertion re-style all paragraphs, which froze very long pages.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Serve Markdown responses to ChatGPT with a `text/plain` Content-Type for compatibility.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Preserve external page destinations returned by published search.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Use one canonical backend-ranked result set for published searches across site sections.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Preserve canonical backend ranking and present page or section context that matches each published search destination.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Preserve the full site preview path and query parameters when redirecting users to log in.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix previewed customization and theme overrides being lost when navigating between pages inside the site preview. The preview cookie was scoped to the site's canonical base path instead of the preview route it is actually served under, so the browser dropped it on the next in-preview navigation.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix pages resolving to "not found" when a root URL lookup resolves to a custom homepage, by no longer using the homepage pathname as a prefix for the requested page path.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep current-space search results inside revision previews.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Prewarm published search caches when readers open the search interface.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Clarify the not-found page on sites with login-protected content: prompt anonymous visitors to log in, and tell logged-in visitors they may not have access.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Inject site tracking scripts (analytics integrations) after `load` + idle instead of preloading them and executing them during the critical loading window.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Render horizontal and vertical merged table cells on published pages.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Pass page context to webframes opened from integration modals.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Apply release notes tag filters from the URL via CSS before first paint, so the filtered entries, the "page contents" section list, and the tag chip highlighting all show correctly from the start on cached pages, with no flash of unfiltered content. Also stop the "page contents" scroll highlight from defaulting to an entry hidden by the filter.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Scroll the table of contents to the active page after client-side navigation.
@@ -0,0 +1,7 @@
---
"gitbook": patch
---
Fix analytics and adaptive content silently breaking on sites served from a different host than the one configured (apex vs www, domain alias, CDN). The insights and visitor-claims endpoints are now requested relative to the page's own origin instead of the configured host, which a prerendered page cannot know.
Keep the traffic of GitBook's own preview deployments out of the sites' analytics, now that those requests reach the events endpoint.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Resolve stable page, space and file refs in images, definitions and HTML blocks of published markdown pages, instead of leaking internal `/pages/{id}`, `/spaces/{id}` and `/files/{id}` URLs.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Restore the Next.js dev-mode OOM patch that was silently dropped by the 16.3.8 upgrade.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Restore the Next.js dev-mode OOM patch that was silently dropped by the 16.3.6 upgrade (root `package.json`'s `patchedDependencies` still pinned it to the old `16.3.3` patch file, so Bun stopped applying it).
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fail closed in `/~gitbook/revalidate` when `GITBOOK_SECRET` is not configured, returning `403 Revalidation is disabled` instead of skipping the signature check, consistent with `force-revalidate`.
@@ -0,0 +1,5 @@
---
"@gitbook/react-contentkit": patch
---
Show a close button on ContentKit modals rendered on published sites.
@@ -0,0 +1,7 @@
---
"@gitbook/react-contentkit": patch
---
Let ContentKit webframes dispatch the built-in `@ui.*` actions. Actions posted from a webframe were forwarded to the integration as a plain re-render instead of being handled, so `@ui.modal.open`, `@ui.modal.close` and `@ui.url.open` did nothing — most visibly, an integration could not close a modal from inside its own webframe.
Keep `null` values and class instances such as `Date` intact when resolving dynamic bindings in an action, instead of throwing or flattening them to `{}`.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Scroll to the top when selecting a search result for the page already being viewed.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Add end-to-end coverage for root and nested external links in site section navigation.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix section links in search results opening the page without scrolling to the section.
+5
View File
@@ -0,0 +1,5 @@
---
'gitbook': patch
---
Allow published search to be scoped to any visible site section.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Let search buttons open search limited to the current space.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Keep keyboard focus within search while the results are open.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix keyboard focus getting trapped inside the header search popover, allowing Tab/Shift+Tab to exit it as expected.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show the containing section name when hovering a direct link to a space.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the section group menu dismissing while the mouse is still inside it, when the collapsed sidebar rail overlaps the menu on no-sidebar pages.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Show loose sections in a section group dropdown as secondary links unless the group starts with one
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Stop the section tabs in the header from showing a scroll button and faded edge when all tabs already fit.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Send the visitor country to resolvePublishedContentByUrl on dev, preview, staging and selected sites, using the forwarded `x-gitbook-country` header on revalidation requests.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the first item of a sidebar page group sometimes appearing cut off after navigating.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Use cached Git metadata (via @gitbook/api 0.201.0's `cachedMetadata` param) when rendering Edit on Git actions.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the site auth login link sometimes redirecting back to an internal URL after login.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Render headings with the site's heading font when one is configured, falling back to the main font otherwise.
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Don't track a page view for 404s on internal `~gitbook` routes, so they no longer appear as broken URLs.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Narrow a table or card grid to the reader's content selection: choosing an option in a tab or a select button now filters any select column that offers it. The table says what it has been narrowed to, and offers a Clear that drops the selection.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix the tabs "more" dropdown showing when no tab is overflowing, and stop a tab click re-rendering every tab group on the page.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Let a tab keep its content selection across a rename, by honouring an explicit slug set on the tab instead of always deriving one from its title.
+5
View File
@@ -0,0 +1,5 @@
---
"gitbook": patch
---
Fix tabs nested inside another tab group rendering an empty body once a tab in the outer group was selected.

Some files were not shown because too many files have changed in this diff Show More