Compare commits

..

277 Commits

Author SHA1 Message Date
Chris 5fdc16fec7 fix(ci): restore release checks after marker purge changes (#7918) 2026-09-15 23:20:29 +08:00
GatewayJ a9596debb9 fix(list): reconcile encoded directory objects (#7915) 2026-09-15 21:37:56 +08:00
hector 5249a90540 ci(table): pass --outcome to the backlog issue manager (#7914)
The manager step failed with 'the following arguments are required:
--outcome' in the first table run (hidden by continue-on-error): every
other suite workflow passes the test step outcome through.
2026-09-15 21:37:33 +08:00
cxymds 8c5ce4c9bc fix(heal): persist explicit delete-marker purges (#7908)
* fix(heal): persist explicit delete-marker purges

* fix(ecstore): remove unused object info wrapper

* test(rpc): use valid incarnation in digest gate

---------

Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>
2026-09-15 21:36:57 +08:00
GatewayJ 08a6f3ad42 fix(list): reconcile split overwrite metadata (#7910)
fix(list): fail closed on split overwrite metadata
2026-09-15 20:56:25 +08:00
Chris 2bdec2fdcd chore(release): merge main into release (#7913)
* feat(nightly): publish packages as assets of the rolling 'nightly' release (sync from release) (#7593)

feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)

Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).

- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
  the 'nightly' release via the REST API, deletes same-name assets,
  uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
  body with the build provenance (ref@sha, run link, sizes, SHA256).
  Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
  exercised end-to-end against the real release with probe files
  (create / upload / overwrite / download round-trip / body update).

* fix(ecstore): stop pruning at nonempty directories (#7616)

* fix(ecstore): stop pruning at nonempty directories

* test(ecstore): release pruning fixtures before temp cleanup

* fix(replication): close the pre-stable convergence gaps from backlog#2367 (#7626)

* fix(replication): total-order rule sort and honor V1 top-level Prefix

Rule matching had two defects from the pre-GA replication audit
(rustfs/backlog#2367 C-1 and C-2):

- The actionable-rule sort compared same-destination rules by priority but
  answered Equal for any other pair, which is not a total order; the
  standard library sort panics on such comparators once a slice exceeds the
  insertion-sort threshold, so an object matching more than 20 enabled rules
  across two or more targets could panic the PUT or DELETE task. Rules now
  sort by priority descending with destination and id as tie-breakers, and
  filter_target_arns preserves that order instead of draining a HashSet.

- A V1 rule written without a <Filter> carries its prefix at the top level;
  that field was never read, so <Prefix>logs/</Prefix> matched every object.
  ReplicationRuleExt::prefix now falls back to it, with a <Filter> keeping
  precedence. The existing prefix fixtures were built this way and had been
  asserting nothing.

* fix(admin): advertise data-usage and listen capabilities to rc

The rc client gated `rc du` and `rc watch` on a pinned contract that
matched server versions by the string prefix `1.0.0-rc.`; a server that
reports `1.0.0` no longer matches, and the dynamic `advertised` list did
not carry either name, so `rc du` against a GA server fails with an
unsupported-capability error (rustfs/backlog#2367 E-2).

Advertise `admin.data-usage` from the admin route inventory like the IAM
entries, and `listen_notification` for the bucket `?events=` extension
route the admin router dispatches. The client merges advertised entries
ahead of its pinned contract, so no version sniffing is needed.

* fix(site-replication): stop notifying the local site on remove and rotate

The pending-remove and pending-rotation notification loops skipped the
local site by endpoint only, while finalization identifies it by
deployment id or endpoint. The reconcile tick resolves the local peer from
the node's own listen address (and a handler from the request Host), so
`remove --all` dialed the site's registered endpoint, waited out the
request timeout against the lifecycle lock it was holding, and answered
`Partial: failed to notify 1 peer(s)` for a removal that had succeeded
(rustfs/backlog#2367 A-4, backlog#2195 item 3).

Both loops now iterate the peers still awaiting notification through one
helper that applies the finalization identity.

* fix(site-replication): promote and settle IAM retries without a tick of slack

Two retry-queue behaviours kept an IAM change from converging for ten to
twenty minutes after a peer came back (rustfs/backlog#2367 A-1 and A-3,
backlog#2305):

- The lightweight 30-second pass filtered its reachability probe to bucket
  ops, so a backed-off IAM or bucket-metadata snapshot waited for the
  600-second tick to notice the peer. It now probes every backed-off class
  and still replays only bounded bucket ops; promotion is a state flip the
  heavyweight tick acts on.

- Backoffs are multiples of the tick interval, so a failure stamped δ
  seconds after a tick was 600 − δ old at the next tick and slipped a whole
  extra interval. The heavyweight drain now evaluates backoff halfway to its
  next tick.

- An IAM entry first created by a non-deletion failure (the add bootstrap's
  snapshot send, the drain's own replay, an import-iam schedule) was never
  stamped `deletions_recorded`, so a later recorded deletion could not
  settle it and it escalated to the marker only `replicate repair` clears.
  Entries created by this binary now start recorded; a row persisted by an
  older binary keeps the escalation semantics.

* fix(site-replication): reload peer node caches after bucket wiring writes

Every S3 bucket-config write ends by asking the other nodes of the cluster
to reload the bucket's metadata; the site-replication writers never did.
On a multi-node site the node that ran the pairing (or applied a peer's
bucket-meta item) rewrote the bucket targets and the derived replication
rules on disk, while every other node kept serving its cached copy for up
to the 15-minute refresh. A `resync start` routed to such a node reported
every freshly wired bucket as `Config not found` and a bucket whose
operator target the pairing had replaced as `recorded remote target no
longer exists` (rustfs/backlog#2367 A-5, backlog#2195 item 2; functional
SITE-105).

Add one best-effort reload helper in the site-replication hooks and call it
after the bucket setup, versioning, peer bucket-meta apply, removed-peer
cleanup, make-with-versioning, and endpoint-refresh writes; the ensure
helpers now report whether they wrote so unchanged passes stay silent. The
resync manifest and start now read the persisted wiring instead of the
node-local cache, matching the target read the start path already did.

The new four-node e2e pairs two clusters and starts a resync through a
non-coordinator node right after pairing; it also covers an IAM user
created on a non-coordinator node converging to the peer site.

* test(e2e): cover delete-marker replication from a multi-node source

The functional suite reported delete markers created on a 3-node source
never reaching the target (rustfs/backlog#2195 item 4, REP-105). The report
was a probe defect, but the shape had no coverage: the existing
delete-marker e2e runs a single-node source. Pin it against a four-node
source replicating to a four-node peer and to a single-node target, with
the write and the delete issued through different nodes.

* ci(e2e): refresh the distributed selection for the new replication cases

Four distributed cases were added (two site-replication, two delete-marker
replication). The linux digest is derived from the last CI listing of the
lane (34 cases, matching the previous pin) plus the four new names; the
darwin digest is the local listing, which selects the same 38 cases.

* feat(console): support a configurable console URL prefix (#7634)

Co-authored-by: houseme <housemecn@gmail.com>

* chore(release): merge release into main for rc.6 (#7638)

* test(heal): cover MRF manifest CAS legacy transition (#7443)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(ci): enable release branch checks and repair test imports (#7441)

* test(scanner): structure heal release evidence lanes (#7442)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): require segment producer identities (#7444)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): expose recovery intent identity (#7445)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): summarize failed heal perf reports (#7446)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(common): retain unmatched MRF repair proofs (#7447)

Add a recorded verified-repair consumer that discharges only exact retained anchors for the requested bucket while leaving unmatched proofs in the event ring. This gives the future durable successor writer a fail-closed primitive before any tombstone or GC path is enabled.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(ci): route replication read plan through boundary (#7448)

* test(scanner): cover flat-bucket quantum fairness (#7449)

Add a production-entry scanner cohort regression that combines a wide flat bucket with a small bucket under a fixed object budget. The test keeps partial budgeted rounds unpublished, verifies small buckets are only marked after real execution, and confirms a later unbudgeted round can publish the complete aggregate.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(heal): reuse same admission request id (#7451)

Keep a retried heal start with the same request id from bypassing admission deduplication when the transport replay cache is unavailable but the manager still owns the task.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require perf summary evidence fields (#7453)

Fail closed when measured passing Scanner/Heal ABBA summaries omit W10/W11 foreground pressure, lock wait, or attempt-cost evidence.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): bind release evidence fields (#7452)

Require explicit scanner/heal release evidence field contracts for the scoped ACK and mixed-version rollback gates.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): tag dirty usage producer identities (#7454)

Record production-facing segment invalidation producer identities when existing object-level dirty usage hooks observe PUT, CopyObject, DeleteObject/DeleteMarker, and CompleteMultipartUpload mutations. Keep the data non-authoritative and process-local so segment reuse activation still requires durable generation-window proof.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): gate release evidence bundles (#7457)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require hard evidence ABBA manifest (#7459)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* feat(heal): add MRF committed snapshot writer (#7458)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(heal): cover EC8+4 restart shard rebuild (#7461)

Retry heal-control RPCs once after transport auth rejects a stale replay-scope epoch, and add a distributed EC8+4 restart heal evidence case that rebuilds a replaced drive with exact shard/body assertions.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): echo measured release evidence in ABBA fake adapter (#7460)

Keep the synthetic ABBA test adapter aligned with the measured release evidence contract so result validation covers release_evidence drift.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require complete ABBA summary matrix (#7462)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* heal: retain MRF replay journal after accepted/merged replays

Keep startup replay journal until a durable successor snapshot exists after Accepted/Merged admission.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* heal: reclaim superseded MRF snapshots after readback

Add a committed snapshot predecessor cleanup primitive that deletes only an older slot after the successor is read back as the current committed snapshot.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* heal: require exact owner for object receipts

Require object heal receipts to match the expected bucket incarnation before they can be recorded as positive repair evidence. This prevents stale or cross-incarnation receipts from clearing the wrong heal responsibility.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* heal: latch object receipt owner before repair

Capture the expected bucket incarnation before invoking object repair so a post-repair owner change cannot rewrite the responsibility that a storage receipt is allowed to prove.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* heal: replay committed MRF checkpoints durably (#7465)

Prefer committed MRF checkpoints during startup replay, retain accepted replay responsibilities until exact verified repair proofs arrive, and reclaim committed manifests only after discharge.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): bind hard evidence bundle provenance (#7467)

Require Scanner/Heal release bundle fields to carry source, run, window, timestamp, command, and artifact format provenance before a measured gate can pass.

Keep EC8+4 and performance gate fields tied to a single measurement window so unrelated artifacts cannot be stitched into a release approval.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* heal: reject dry-run object repair receipts

Do not record positive storage repair receipts for dry-run object heal tasks, even if a producer accidentally returns a matching receipt.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* heal: reject cancelled object repair receipts

Do not record positive storage repair receipts once an object heal task has been cancelled, even if the receipt still matches the requested owner and object identity.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(heal): reject failed object repair receipts

Cover the receipt consumer path where a storage repair result carries both an error and a matching positive receipt. The failure may be recorded, but the receipt must not create repaired, healthy, or absent proof.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(heal): cover bucket object repair receipts (#7468)

Cover bucket and root heal sweeps recording authoritative object outcomes only when storage receipts match the latched bucket incarnation.

Verify unavailable or stale receipt ownership keeps object repair execution intact while leaving canonical outcome proof as Unknown.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): add EC8+4 heal restart evidence (#7469)

Register and wire Scanner/Heal background target restart and crash evidence cases for the 3x4 EC8+4 topology.

Validate the observed data/parity geometry in scanner-heal evidence receipts so multi-drive runs cannot satisfy the gate without proving EC8+4 metadata.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* heal: verify replacement pool metadata repair (#7471)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(heal): cover quorum and mixed repair receipts

Add focused oracles for transient quorum results that carry a matching receipt and for mixed grace plus repaired receipt batches. Only the repaired object may produce positive proof.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* heal: verify admin recreate pool metadata (#7474)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* heal: preserve merged result for duplicate submits

Keep same-request-id replay receipts accepted for the receipt API, but preserve the legacy submit_heal_request duplicate admission result as Merged.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(heal): preserve EC84 restart semantics (#7478)

Keep the EC8+4 background restart lane on the graceful-stop path and assert clean-restart marker absence only for restart scenarios. This prevents the hard evidence gate from silently exercising the crash path when it claims restart coverage.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(heal): cover MRF snapshot torn successor recovery

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(heal): write EC84 distributed restart oracle (#7481)

Bind the distributed EC8+4 restart evidence lane to a scanner/heal oracle artifact so release validation can consume the real nextest run instead of accepting only a passing test.

Require the registry to assert 8+4 erasure geometry for the three-node, four-drive case.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(heal): harden MRF replay boundaries (#7483)

Reject journal records with unknown version-presence flags even when their CRC is valid, so rollback/future payloads cannot be accepted as known records.

Gate committed checkpoint cleanup by the writer owner captured from the replay source, preserving retained manifests from other owners inside the same sequence window.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): bind MRF manifest CAS dirsync recovery (#7482)

Cover the committed MRF manifest path through LocalDisk conditional CAS when the metadata directory fsync fails. The fixture proves the previous manifest anchor survives rollback, an unanchored first successor is removed, and the legacy MRF journal remains readable even while global durability is relaxed.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): derive evidence runner profile from registry (#7484)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require mixed-version evidence roles (#7485)

Tighten the Scanner/Heal release bundle checker so mixed-version, scoped-ACK, and rollback fields cannot reuse a generic versions list without proving the expected evidence role.

Require version lists to use source revision identities and include the tested source revision. Also require profile evidence fields to name the core profiling artifacts before release approval.

The release gate remains blocked until measured field evidence is present.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(heal): publish committed MRF runtime checkpoints (#7490)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): bind profile artifacts in release evidence (#7487)

Require Scanner/Heal release bundles to attach every required profiling artifact to P1 profile evidence with relative paths, artifact formats, non-empty files, hashes, and optional per-artifact measurement-window checks.

Document the tightened release bundle profile contract and cover missing, tampered, and mismatched-window profile artifact regressions in the existing checker self-test.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): harden measured ABBA evidence claims (#7491)

Reject measured Scanner/Heal ABBA manifests whose mixed-version evidence uses the same baseline and candidate source revision or binary hash.

Require crash fault modes and profile artifact names to match the exact supported sets, rejecting missing, duplicate, and unknown values.

Update harness fixtures and regression coverage for same-build mixed-version claims and exact-set release evidence fields.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(e2e): group scanner heal evidence payload (#7494)

Group the EC8+4 Scanner/Heal evidence writer inputs into a typed payload so the distributed e2e crate stays within the clippy argument limit without weakening the lint.

The evidence writer still validates the same S3 bodies, physical shard census, process restart PIDs, and node listings.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require MRF replay bundle fields (#7486)

Bind Scanner/Heal release bundle evidence for MRF durable replay to replay counts, retained responsibility anchors, and successor snapshot publication evidence.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): profile EC84 evidence case runs (#7495)

Give Scanner/Heal evidence cases explicit runtime profiles so EC8+4 background restart and crash cases use their own object count, object size, and partial-progress timeout defaults instead of inheriting the legacy 4x1 case assumptions.

Expose the runtime profile in plan-only output and cover every registry case in the script self-test.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): reject empty release evidence artifacts (#7496)

Require Scanner/Heal release bundle artifact paths to resolve to non-empty files before hashing them.

Cover empty hard-gate artifacts in the existing release bundle checker self-test and keep profile artifact size checking on the shared artifact boundary.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require G14 same-window field coverage (#7489)

Tighten the Scanner/Heal release bundle checker so G14 same-window evidence must name the EC8+4, multi-set, and multi-pool fields covered in that measurement window.

Keep the release gate blocked when same-window evidence omits one of the required G14 fields, without changing production runtime behavior.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require two-hour measured ABBA windows (#7493)

Reject measured Scanner/Heal release ABBA manifests and summaries whose evidence window is shorter than the W21 two-hour release requirement.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(heal): cover MRF idle checkpoint cleanup (#7497)

Add a runtime cleanup regression test that publishes both retained replay and runtime committed checkpoints, writes scoped and legacy journals, and verifies idle cleanup removes every recovery anchor from the registered local disks.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(e2e): ignore untracked files in build identity (#7498)

Align e2e_test build provenance with Scanner/Heal evidence receipts and server binary provenance by treating only tracked source changes as dirty.

This prevents unrelated untracked worktrees or evidence directories from causing compiled test identity mismatches before real evidence cases can run.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require MRF disk-full evidence fields (#7499)

Require the Scanner/Heal release registry and bundle checker to carry explicit G08 MRF capacity, disk-full, and replica-loss evidence fields before release approval can pass.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): bind release JSON artifact provenance (#7500)

Require scanner/heal release evidence JSON artifacts to repeat their measured source revision, run identity, measurement window, gate, and field identity inside the artifact payload. This keeps a refreshed outer bundle hash from accepting stale summary or profile JSON from another run.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(heal): cover MRF rollback mirror filtering (#7501)

Add a regression oracle that keeps scoped-only MRF responsibilities in the authoritative runtime snapshot while omitting them from the v1 legacy rollback mirror.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require segment activation evidence (#7504)

* test(scanner): require segment activation evidence

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): cover activation proof inputs

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require MRF crash matrix cases (#7505)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require release bundle domain evidence (#7502)

Reject scanner/heal release bundles that omit field-level domain evidence for scoped ACK, durable intent, mixed-version, scheduler pressure, profile cost, and two-hour pressure lanes.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require MRF retention GC evidence (#7506)

Require P4 retained-responsibility release bundle evidence to list the retained replay anchor and idle cleanup cases, prove a two-hour retention window, and record both idle cleanup and verified-proof discharge observations.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require MRF cleanup GC soak evidence (#7507)

Require the P4 release bundle to carry measured cleanup/GC soak evidence for retained MRF replay responsibilities. The bundle now needs a two-hour cleanup window, exact cleanup case coverage, observed verified idle GC, and zero pending responsibilities or stale journals after GC.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(heal): cover MRF disk-full commit anchors (#7509)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(e2e): report port allocator bind errors (#7510)

Surface the scanned port window, attempt count, and last bind error when the e2e port allocator cannot reserve a localhost port. This keeps Scanner/Heal evidence failures actionable when the environment blocks binds before business assertions run.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(sse): resolve 1.0.0 SSE/KMS blockers and P1 findings (#7511)

* fix(sse): resolve bucket default encryption per request

PUT and the POST-object/extract path resolved a bucket's default
encryption with a hard-coded "no explicit SSE-C" flag, so the default was
layered onto a request that already carried an SSE-C header triple and
then tripped that request's own mutual-exclusion check. Every bucket with
default encryption refused SSE-C single PUTs with 400 InvalidArgument,
while CreateMultipartUpload on the same bucket succeeded because it
resolves SSE elsewhere. Both call sites now derive the flag from the
request headers, as COPY already did.

The bucket default's KMS key id was also inherited independently of the
effective algorithm, so an explicit AES256 request against an aws:kms
default bucket produced a self-contradictory algorithm/key-id pair and
was rejected. The key id is now inherited only when the effective
algorithm is aws:kms, matching the storage-layer resolver.

Refs backlog#2368 B1, B2.

* fix(sse): refuse SSE-KMS without a running KMS service

A write requesting aws:kms on a node with no KMS service fell back to the
node-local SSE-S3 provider: the data key was wrapped with
RUSTFS_SSE_S3_MASTER_KEY while the object metadata still recorded
aws:kms and the requested KMS key id. The stored object claimed a KMS
protection it never had, under a key that was never consulted, and no
signal distinguished it from a genuine SSE-KMS object.

The managed-encryption path now asks the resolved DEK provider whether it
wraps with a node-local master key and refuses SSE-KMS in that case:
InvalidRequest when KMS was never configured, ServiceUnavailable when a
configured service is not running. The check sits after the per-key
authorization gate so an unauthorized caller still receives AccessDenied
whatever the KMS runtime state is, and asks the provider rather than a
parallel availability signal because the provider is what actually wraps
the key. A missing master key no longer answers an SSE-KMS request with
an SSE-S3-worded configuration error.

The SSE-S3 local fallback is unchanged.

Refs backlog#2368 B4.

* fix(ecstore): restore and archive tiers in stored coordinates

Multipart restore addressed the remote tier in plaintext coordinates
while the copy-back reads the stored representation. Each part received a
misaligned slice of the remote object whose length still satisfied the
range, the hash reader and the completion size check, so the restore
reported success and silently replaced the object's bytes. Encrypted and
compressed multipart objects were both affected. Restore now accumulates
stored part sizes, passes the stored length to the hash reader alongside
the plaintext length, and validates against the stored size.

The copy-back digests stored bytes, so its computed MD5 is not the
object's public ETag. Restore now preserves the object ETag on both the
single-part and multipart paths, and gives each restored part its own
recorded part ETag rather than the object-level value.

Transition also handed the tier the object's SSE headers and its
RustFS-wrapped data key as request headers. Any S3 target rejected an
SSE-C archive outright, an SSE-KMS archive asked the target to encrypt a
second time under a key id it does not own, and the wrapped DEK left the
cluster. The archive request now strips every SSE header and encryption
marker with the predicate the replication path already uses; the local
xl.meta keeps all of it, so read-through and restore are unaffected.

Objects restored by an affected release are not detected or repaired
retroactively and must be re-restored from the tier.

Refs backlog#2368 B3, B5; backlog#2369 P7.1.

* fix(rio): lock the v1 nonce layout within a segment

Decrypting a v1 segment tried three historical nonce layouts per frame,
independently for every frame. The last of them exists for streams
written before 1.0.0-alpha.91, which reused a segment's part nonce for
every block in it; because block zero's derived nonce equals that base
nonce, a frame encrypted at index zero authenticated at any position. An
attacker able to rewrite the underlying shards could replay it and have
the forged plaintext returned with 200 and an unchanged length. Shard
integrity uses a keyed-hash-free checksum, which such an attacker can
recompute, so it is not a barrier.

A segment now locks onto whichever layout decoded its first non-zero-index
frame and rejects any later frame needing a different one. That leaves one
residual shape: a stream built purely from repeats of frame zero has no
later frame to disagree. New RUSTFS_ENCRYPTION_LEGACY_NONCE_FALLBACK
(default true, so pre-alpha.91 objects keep decrypting) drops the third
layout entirely when set to false, which closes it. Turning it off refuses
pre-alpha.91 objects, so migrate them first by rewriting in place.

Refs backlog#2369 P2.

* fix(kms): reload a service that failed to start

POST /rustfs/admin/v3/kms/reload short-circuited whenever the persisted
configuration matched the in-memory one byte for byte. A node whose KMS
failed to start keeps that configuration and sits in Error, so the
documented recovery call returned "reloaded successfully" while leaving
the node down. Peers reached the same path through the reload broadcast,
so a cluster that lost Vault during a rolling restart had no working
recovery route other than the node-local start endpoint. Reload now
short-circuits only for a service that is actually running, and otherwise
reconfigures, which starts a service that is not running.

The AWS backend also advertised key-version enumeration through
kms/status, which its own documentation says it cannot do; the capability
and its golden snapshot now say false.

Refs backlog#2369 P1, P7.3.

* docs: record the SSE and KMS changes for 1.0.0

The Unreleased changelog section carried no entry for any encryption work
merged since 1.0.0-rc.5, including three items with operational impact:
the config-secret variable whose absence persists secrets in cleartext
with only a warning, the v2 frame write switch and its rolling-upgrade
constraint, and per-key authorization making a public bucket incompatible
with SSE-KMS objects. Adds those plus this batch, including the SSE-KMS
refusal as a breaking change with both routes out.

Also corrects four places where documentation contradicted the code: the
cleanup register still called encrypted range seek opt-in after its
default flipped, the Helm README claimed vault_mount_path only applies to
Transit while the template also feeds the KV2 mount, the disaster-recovery
drill listed bundle contents for backends whose export is refused with
501, and the Chinese README capability table predated most of the feature
set. Documents the SSE-S3 local master key as a first-class operational
mode with its rotation dead end, and what the v1 frame layout does and
does not authenticate.

Refs backlog#2369 P5.

* fix(kms): classify data-path KMS failures by what the caller can do

Only "key not found" and a backend outage were classified; every other
KMS failure that reached the S3 data path fell through to
500 InternalError with a generic message. A disabled or pending-deletion
key, a denied KMS grant, an encryption-context mismatch, an unsupported
algorithm, a credential or timeout failure, and a capability the
configured backend does not have all looked identical to a server fault.
SDKs therefore applied exponential backoff to configuration errors no
retry can fix, and monitoring counted every one of them against the
server's own error rate.

Unusable-key and request-side failures now answer 400, a denied grant
403, transient backend failures 503, and a missing backend capability
501. Damaged, unreadable, or unknown-format key material keeps its 500:
it is a server-side integrity fault, and existing tests pin it.

The classifier is deliberately separate from the admin lifecycle
mapping, which answers 404 for a missing key because there a key id is
the resource being addressed; on the data path it arrives inside a
request header or a bucket default. Messages either name what the caller
asked for or stay generic, with deployment-side detail left on the error
source the way the storage-IO mapping already does.

Refs backlog#2368 B6.

* fix(kms): track and renew static Vault tokens

Token authentication hard-coded "this token carries no lease", so the
renewal task never started, the remaining-TTL gauge was never published,
and nothing looked wrong. `vault token create` grants a 768-hour TTL by
default, so a cluster that had been healthy for a month turned every KMS
call into a 403 and could not recover without a restart or a
reconfigure. Production configuration validation only rejects the
literal dev-token, so an ordinary expiring token reaches a whole cluster.

The source now reads `auth/token/lookup-self` at login and adopts what
Vault reports. A token with no expiry behaves exactly as before. An
expiring renewable one is picked up by the existing renewal loop and
renewed at half TTL like every other auth method. An expiring
non-renewable one warns with its remaining lifetime and publishes the
gauge, so the fail-closed window is visible before it arrives.

The probe never fails the login: a policy that omits lookup-self, or a
Vault that is briefly unreachable, warns and falls back to exactly the
previous behaviour rather than taking down a deployment that works
today. The scripted Vault test double answers the lookup out of band so
existing scripts keep describing only the protocol under test.

Refs backlog#2369 P3.

* feat(sse): report SSE-C requests that arrive without TLS

An SSE-C request carries the customer's AES key in a request header, so
AWS S3 and MinIO both refuse one that did not arrive over TLS. RustFS
accepted them on any transport: a plaintext hop hands the key to anyone
on the path, and since the object cannot be read without that same key,
the exposure lasts as long as the object does.

Refusing outright is the correct end state but not a safe default to
adopt inside a release window, because the project's own s3-tests and
e2e lanes and most staging deployments speak plain HTTP. This release
reports instead: each such request increments
rustfs_ssec_plaintext_requests_total and logs one warning per process, so
an operator can confirm nothing would break before the default flips.
RUSTFS_SSE_C_REQUIRE_TLS=true opts into the AWS 400 now.

The verdict is per connection rather than per deployment: the layer is
built with whether this listener terminated TLS, and additionally accepts
an https protocol forwarded by a proxy the trusted-proxy configuration
already vetted. It sits beside the rate limiter, after the layer that
makes a forwarded protocol trustworthy and after the request context, so
a rejection can echo the request id.

Refs backlog#2369 P7.2.

* fix(kms): say what a node-local backend means for a cluster

The Local backend keeps key material on each node's own disk and
generates its Argon2id salt per node, so two nodes derive different keys
from the same master_key and an object encrypted on one node cannot be
decrypted on another. Behind a load balancer that surfaces as
intermittent 500s on reads that succeeded moments earlier, with nothing
tying the symptom to the cause: the only signal was a generic
"development, testing and demos only" positioning warning that says
nothing about what actually breaks.

Configuring or reconfiguring Local while the deployment is distributed
now logs a dedicated event and appends the consequence to the configure
response, so the operator who made the change sees it. The product
decision to warn rather than refuse is unchanged.

Refs backlog#2369 P7.4.

* docs: record the remaining SSE and KMS changes for 1.0.0

Adds changelog entries for the KMS data-path status classification, the
Vault static-token lease probe, the SSE-C plaintext-transport report and
its switch, and the node-local backend warning.

Documents two things the backend security guide never stated: that SSE-C
belongs on a secure transport, with the counter and switch to plan the
change around, and that the Local backend cannot be shared by a
multi-node deployment because each node derives different keys from the
same master key.

Refs backlog#2368 B6; backlog#2369 P3, P5, P7.2, P7.4.

* fix(kms): report an unreadable key store as an outage on the S3 path

A backend now distinguishes a key store it could not read from a key
that is genuinely absent, but the S3 boundary collapsed the first one
back onto 500 InternalError through the fallthrough for integrity
faults. The distinction was therefore invisible to the client: a
temporary key-directory outage looked exactly like a permanently damaged
key record, and neither the status nor the metric said the request was
worth retrying.

An unreadable key store joins the retryable class and answers 503, next
to a backend error and a credential failure. Damaged, unreadable or
unknown-format key material keeps its 500.

Refs backlog#2368 B6; builds on rustfs/rustfs#7470.

* test(storage): cover MRF cleanup delete ENOSPC anchor (#7513)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require heal retry stats evidence (#7514)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): add release bundle dry-run fixture (#7515)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): confirm recovery intent accept readback (#7516)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require MRF cleanup delete ENOSPC evidence (#7518)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require bounded retry window evidence (#7517)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(e2e): emit scanner heal G09 upgrade evidence (#7519)

Record measured Scanner/Heal G09 evidence artifacts from the upgrade compatibility lanes when a fresh evidence directory is provided.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(heal): persist MRF rollback mirror boundary (#7520)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): add G09 upgrade evidence runner (#7522)

* fix(replication): close the GA blocker set from backlog#2366 (#7503)

* fix(replication): close GA blockers from backlog#2366

Implements the P1 set from the pre-GA replication audit:

- Replication rule tag filters now require every And.Tag to match, replacing
  the s3s OR semantics with a local AND matcher that fails closed on a
  malformed tag.
- A replicated group membership change no longer writes the group status, so
  a membership update carrying the default Enabled status cannot silently
  re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
  peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
  carries its own ilm-expiry override, and no longer blocks a remove that
  drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
  node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
  follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
  support boundary section, and the Replication changelog section.

* fix(site-replication): resume only a locally driven endpoint refresh

The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.

Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.

* fix(site-replication): keep an explicit disabled group status on a snapshot

Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.

The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.

* fix(site-replication): schedule the import snapshot without recording a failure

`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.

Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.

* fix(admin): stop reporting replication failures as retries

`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.

* perf(site-replication): aggregate failure windows without cloning bucket stats

`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.

It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.

* fix(site-replication): reject a conflicting ilm-expiry override on a re-run

The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.

* fix(admin): do not fail a remote-target write on a peer reload error

set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.

* fix(site-replication): undo every bucket a cut-short refresh rewrote

When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.

* fix(site-replication): keep replay running while an endpoint refresh is pending

A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.

* test(e2e): cover the AND semantics of a two-tag replication filter

The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.

No new test function, so the nightly selection digest is unchanged.

* refactor(site-replication): fold the refresh state-change error into one constructor

The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.

* fix(site-replication): report a peer whose IAM snapshot waits for a repair

An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.

* docs(operations): state the group-status and escalation convergence limits

Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.

* fix(ci): bind performance runs to selected inputs (#7512)

* test(scanner): add G09 upgrade evidence runner

Add a reusable Linux x86_64 runner for the Scanner/Heal G09 mixed-version and rollback upgrade evidence lanes.

The helper reads the pinned previous-release asset metadata from the upgrade workflow, verifies the downloaded binary, builds the current head, runs both ignored E2E tests, and fails unless the expected G09 JSON artifacts exist.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* feat(scanner): implement V2 evidence preflights (#7523)

* feat(scanner): wire dirty usage producer identities

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): add segment activation preflight proof

Keep scanner segment reuse behind a structured activation preflight so release evidence can prove the production gate remains disabled until every producer, generation, overflow, cold-oracle, and distributed invalidation check is satisfied.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* feat(scanner): expose distributed invalidation evidence

Record an explicit distributed segment invalidation evidence summary when remote dirty usage snapshots are bound to the current activity window and the authenticated scoped ACK capability probe succeeds.

Reject peer dirty usage snapshots that contradict the peer activity pending bit so scoped ACKs fail closed instead of clearing an unadvertised remote mutation.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): assemble release evidence bundles (#7526)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): add G09 upgrade evidence runner (#7524)

* fix(replication): close the GA blocker set from backlog#2366 (#7503)

* fix(replication): close GA blockers from backlog#2366

Implements the P1 set from the pre-GA replication audit:

- Replication rule tag filters now require every And.Tag to match, replacing
  the s3s OR semantics with a local AND matcher that fails closed on a
  malformed tag.
- A replicated group membership change no longer writes the group status, so
  a membership update carrying the default Enabled status cannot silently
  re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
  peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
  carries its own ilm-expiry override, and no longer blocks a remove that
  drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
  node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
  follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
  support boundary section, and the Replication changelog section.

* fix(site-replication): resume only a locally driven endpoint refresh

The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.

Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.

* fix(site-replication): keep an explicit disabled group status on a snapshot

Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.

The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.

* fix(site-replication): schedule the import snapshot without recording a failure

`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.

Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.

* fix(admin): stop reporting replication failures as retries

`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.

* perf(site-replication): aggregate failure windows without cloning bucket stats

`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.

It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.

* fix(site-replication): reject a conflicting ilm-expiry override on a re-run

The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.

* fix(admin): do not fail a remote-target write on a peer reload error

set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.

* fix(site-replication): undo every bucket a cut-short refresh rewrote

When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.

* fix(site-replication): keep replay running while an endpoint refresh is pending

A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.

* test(e2e): cover the AND semantics of a two-tag replication filter

The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.

No new test function, so the nightly selection digest is unchanged.

* refactor(site-replication): fold the refresh state-change error into one constructor

The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.

* fix(site-replication): report a peer whose IAM snapshot waits for a repair

An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.

* docs(operations): state the group-status and escalation convergence limits

Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.

* fix(ci): bind performance runs to selected inputs (#7512)

* test(scanner): add G09 upgrade evidence runner

Add a reusable Scanner/Heal G09 runner for Linux PR-head validation. The script downloads the pinned previous release, builds the current checkout, runs the mixed-version and rollback upgrade E2E lanes, and validates the measured raw artifacts before they can be consumed by the release bundle gate.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): replay recovery intents while disabled (#7521)

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* test(scanner): preflight G09 evidence disk space (#7527)

* fix(replication): close the GA blocker set from backlog#2366 (#7503)

* fix(replication): close GA blockers from backlog#2366

Implements the P1 set from the pre-GA replication audit:

- Replication rule tag filters now require every And.Tag to match, replacing
  the s3s OR semantics with a local AND matcher that fails closed on a
  malformed tag.
- A replicated group membership change no longer writes the group status, so
  a membership update carrying the default Enabled status cannot silently
  re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
  peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
  carries its own ilm-expiry override, and no longer blocks a remove that
  drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
  node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
  follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
  support boundary section, and the Replication changelog section.

* fix(site-replication): resume only a locally driven endpoint refresh

The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.

Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.

* fix(site-replication): keep an explicit disabled group status on a snapshot

Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.

The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.

* fix(site-replication): schedule the import snapshot without recording a failure

`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.

Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.

* fix(admin): stop reporting replication failures as retries

`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.

* perf(site-replication): aggregate failure windows without cloning bucket stats

`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.

It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.

* fix(site-replication): reject a conflicting ilm-expiry override on a re-run

The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.

* fix(admin): do not fail a remote-target write on a peer reload error

set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.

* fix(site-replication): undo every bucket a cut-short refresh rewrote

When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.

* fix(site-replication): keep replay running while an endpoint refresh is pending

A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.

* test(e2e): cover the AND semantics of a two-tag replication filter

The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.

No new test function, so the nightly selection digest is unchanged.

* refactor(site-replication): fold the refresh state-change error into one constructor

The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.

* fix(site-replication): report a peer whose IAM snapshot waits for a repair

An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.

* docs(operations): state the group-status and escalation convergence limits

Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.

* fix(ci): bind performance runs to selected inputs (#7512)

* fix(targets): reject trailing batch items (#7508)

* test(scanner): preflight G09 evidence disk space

Fail the Scanner/Heal G09 upgrade evidence runner before downloading or building when the validation host does not have enough free space for a full raw evidence pass.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(scanner): respect cargo target dir in G09 runner (#7528)

* fix(replication): close the GA blocker set from backlog#2366 (#7503)

* fix(replication): close GA blockers from backlog#2366

Implements the P1 set from the pre-GA replication audit:

- Replication rule tag filters now require every And.Tag to match, replacing
  the s3s OR semantics with a local AND matcher that fails closed on a
  malformed tag.
- A replicated group membership change no longer writes the group status, so
  a membership update carrying the default Enabled status cannot silently
  re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
  peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
  carries its own ilm-expiry override, and no longer blocks a remove that
  drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
  node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
  follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
  support boundary section, and the Replication changelog section.

* fix(site-replication): resume only a locally driven endpoint refresh

The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.

Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.

* fix(site-replication): keep an explicit disabled group status on a snapshot

Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.

The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.

* fix(site-replication): schedule the import snapshot without recording a failure

`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.

Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.

* fix(admin): stop reporting replication failures as retries

`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.

* perf(site-replication): aggregate failure windows without cloning bucket stats

`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.

It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.

* fix(site-replication): reject a conflicting ilm-expiry override on a re-run

The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.

* fix(admin): do not fail a remote-target write on a peer reload error

set/remove-remote-target propagated the…

* feat: configure the console base path at build time (#7636)

Embed RUSTFS_CONSOLE_BASE_PATH into console routes, browser redirects, and startup URLs so OEM builds can use their own namespace. Preserve the default for an unset or empty build variable and keep route tests prefix-aware.

* chore(release): prepare 1.0.0-rc.6 (#7641)

* chore(release): prepare 1.0.0-rc.6

* ci: run offline enrollment boundary checks independently

* fix(heal): preserve retryable batch failures during recovery (#7642)

* fix(heal): preserve retryable batch failures during recovery

* test(heal): pin prebuilt hooks binaries in ci

* fix(s3): reject oversize single PUT early and map body errors to 4xx (#7635)

* fix(s3): reject oversize single PUT early and map body errors to 4xx

A single PutObject above the 5 GiB single-request ceiling was only
rejected after the client had streamed 5 GiB into s3s's read-time body
budget, and the resulting BodySizeLimitExceeded surfaced from the erasure
writer as 500 InternalError. A body whose connection hit EOF before
Content-Length bytes arrived (hyper's IncompleteBody) was also a 500.
SDKs retry 500s, so one oversize upload was resent from offset 0 five
times.

- PutObject and UploadPart reject a declared length above
  MAX_SINGLE_PUT_OBJECT_SIZE with 400 EntityTooLarge before reading the
  body; the constant moves to rustfs_config so the s3s limit and the
  admission check share one value.
- ApiError maps BodySizeLimitExceeded to EntityTooLarge and a hyper body
  EOF to IncompleteBody across both io::Error conversions.

Fixes #7596.

* test(s3): cover UploadPart admission, aws-chunked length, real s3s limit

- Poll-counting test body proves PutObject and UploadPart reject a
  declared size above the ceiling with zero body polls; exact-cap and
  zero-length parts pass admission.
- A STREAMING-* aws-chunked PUT whose framed Content-Length exceeds the
  cap is admitted when the decoded length is within it and rejected when
  the decoded length is over it.
- The display-based BodySizeLimitExceeded matcher is checked against the
  real error produced by the pinned s3s Body budget.

* fix(ecstore): make directory mtime fixture portable (#7623)

* fix(ecstore): make directory mtime fixture portable

* style(ecstore): format mtime fixture assertion

---------

Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>

* fix(storage): prevent readiness after native migration failures (#7652)

* fix(storage): prevent readiness after native migration failures

* fix(storage): skip unsupported IAM records before reading

* fix(storage): use stable typed migration metadata errors

* fix(storage): include migration record in startup errors

* test(storage): cover native migration startup failures

* test(storage): use array chunks in migration fixture

---------

Co-authored-by: RJ Regenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: cxymds <cxymds@gmail.com>

* fix(admin): expose OIDC account display fields (#7654)

Expose verified OIDC username and email claims as display-only metadata on self-account responses while preserving the virtual parent as the authorization identity.\n\nKeep rustfs-madmin public response structs unchanged by adding the optional wire fields through private handler response wrappers.

* fix(replication): correct peer joins and remote-state reporting (#7650)

* fix(replication): propagate verified peer deployment identities

* fix(replication): report actual remote peer state

* fix(replication): defer initial sync until all peers join

* test(replication): shut down TLS fixtures cleanly

---------

Co-authored-by: houseme <housemecn@gmail.com>

* feat(ci): add fault-tolerance degradation suite to the functional chain (#7663)

Adds a fault-tolerance suite that verifies read/write behavior under
drive and node loss against the erasure-coding contract and snapshots
health-endpoint responses at every degradation tier. Scenarios derived
from product source (default_parity_count, erasure set sizing):

- A: single-node 4 drives (EC:2, read quorum 2): hide 1/2/3 drives
- B: multi-node 4x1 (one set of 4, EC:2): stop 1/2/3 nodes
- C: multi-node 4x4 (one set of 16, EC:4, read quorum 12): 1 node down
  lands exactly on the read-quorum boundary; 2 nodes down breaks it
- C2: multi-node 4x4 with RUSTFS_STORAGE_CLASS_STANDARD=EC:8 (read
  quorum 8, write quorum 9, lock majority 9): 2 nodes down puts reads
  inside the reported divergence window (read quorum met while the
  lock majority is broken)

By default a reads-refused-despite-met-read-quorum observation is
reported as known-divergence without failing the suite; the strict
input escalates it. Chain order becomes:
upgrade -> s3 -> kms -> tier -> storage -> heal -> pool -> security ->
replication -> fault-tolerance -> performance.

* fix(ci): repair functional defaults and chain regression checks (#7664)

* fix(ci): default functional suites to nightly packages

* test(ci): follow the fault-tolerance chain handoff

* "feat(ci): add fault-tolerance degradation suite to the functional chain" (#7667)

Revert "feat(ci): add fault-tolerance degradation suite to the functional chain (#7663)"

This reverts commit 7c47c48e85.

* fix(ci): align security workflow tests with chain (#7679)

* test(kms): cover non-default Vault Transit paths (#7657)

* test(kms): cover custom Vault Transit metadata locations

* test(kms): include a non-default Transit mount in live coverage

* test(ecstore): tolerate cleanup quorum transition

* test(ci): restore ten-suite chain expectations

* test(ecstore): tolerate cleanup quorum transition in both causal polls

The unversioned duplicate-delete poll in batch_transitioned_delete_uses_free_version_per_item reads exact metadata while the same asynchronous free-version cleanup removes per-disk copies, so it can hit the same transient InsufficientReadQuorum as the versioned poll. Share one helper between both polls; every other error still fails immediately.

---------

Co-authored-by: overtrue <anzhengchao@gmail.com>

* fix(s3): bound stalled UploadPart request bodies (#7659)

* fix(s3): bound stalled UploadPart request bodies

* fix(ci): preserve the S3S footprint ratchet

* fix: enforce S3 permissions for recursive force deletion (#7661)

* fix: enforce S3 authorization for recursive deletion

* fix: satisfy the s3s footprint guard

* fix: restore list versions policy compatibility (#7686)

* fix(tables): reject reserved warehouse locations (#7671)

Co-authored-by: cxymds <cxymds@gmail.com>

* fix(e2e): require a verified server binary for every e2e run (#7687)

* fix(ci): share quick checks and lint workflows

* fix(ci): install actionlint from its verified release

* fix(ci): reject dependencies on required quick checks

* feat(test): verify the E2E server build and source identity

* test(e2e): register verified Darwin test membership

* test(e2e): record verified Linux receipt test membership

* test(e2e): record compiled Darwin receipt test membership

* test(e2e): record compiled Linux receipt test membership

* test(e2e): record Darwin e2e-full membership after merging main

* fix(test): route scanner/heal evidence E2E runs through the verified server binary

The evidence runners built rustfs with plain cargo and then ran e2e_test directly, which now fails without a run receipt. They build through scripts/e2e_binary.py and run the e2e_test invocations under e2e_binary.py run; the obsolete rustfs.features stamp is removed.

* docs(e2e): run server-backed e2e commands through the verified binary wrapper

* test(e2e): record Linux e2e-full membership from the branch CI listing

* fix(ci): bind nightly lanes to one resolved source (#7688)

* feat(ci): measure queue and execution time by run attempt (#7689)

* feat(ci): measure queue and execution time by run attempt

* fix(ci): bound timing samples and recognize the old workspace lane

* fix(ci): sample completed runs for stable timing comparisons

* fix(ci): verify complete functional chain evidence (#7690)

* fix(ci): bind nightly lanes to one resolved source

* fix(ci): verify complete functional chain evidence

* fix(kms): classify KMS/SSE error contracts and SSE-S3 headers (#7697)

* fix(sse): classify bare SSE-KMS writes when no KMS is available

A `aws:kms` request without a key id, on a bucket without a default key,
returned `500 InternalError` whenever no KMS service was running: the
"no KMS key available" branch exited with an untyped storage error before
the availability classification that the keyed form already received.

Route that branch through the same split: `503 ServiceUnavailable` while
a configured KMS is stopped, `400 InvalidRequest` when KMS was never
configured, and `400 InvalidRequest` naming the missing key id when a
running KMS has no default key. `CreateMultipartUpload` shares the path.

Adds a unit test for the bare form and an e2e module that stops KMS
through the admin API, runs a master-key-only node, and runs a Local KMS
without a default key; refreshes the e2e-full selection digests.

(cherry picked from commit c3259dadc3d603a9185a5b0ad9f83dfb884e61c8)

* fix(sse): keep KMS error classes on the encrypted read path

GetObject, CopyObject and UploadPartCopy on an SSE-KMS object whose key
no longer exists answered `500 InternalError` ("KMS key not found") while
PutObject under the same key already answered `400 KMS.NotFoundException`.
The read path carries its classification through ecstore's
`EncryptionResolutionErrorKind`, which had no kind for a missing key, a
denied KMS grant or a missing backend capability, so all three folded
onto `DecryptionFailed` and the S3 layer reported an internal fault.

Add `KeyNotFound`, `AccessDenied` and `NotImplemented` kinds, map them on
both sides of the boundary, and give an envelope the configured backend
cannot unwrap a diagnosable message while keeping its `500`.

Unit tests cover the kind round trip and the reader wrapping; a new e2e
test deletes a key immediately and checks GET/Copy return 400 with
`KMS.NotFoundException` while HEAD stays 200. The e2e-full selection
digests are refreshed from the current listing (the previous digests
predated the delete-authorization tests) and the e2e `create_default_key`
helper is updated to the accepted `EncryptDecrypt` spelling.

(cherry picked from commit 2523a9814e97caea318d4ff1a51bef3a4d4445b2)

* fix(kms): classify key-management errors on the admin routes

`POST /kms/keys`, the legacy `create-key` alias and `generate-data-key`
reported every backend refusal as `500`: a blank key name (which each
backend failed on differently, the Local backend by writing a key file
with an empty stem), a name already taken, an unknown key, a disabled key
and a capability the backend lacks. `delete` and the lifecycle routes
already classified the same errors.

Refuse a blank or whitespace name in `KmsManager::create_key` before any
backend sees it, and share one `KmsError` to status mapping across
create, delete and generate-data-key (400 for validation and key state,
404 for an unknown key, 409 for a taken name, 501 for a missing
capability, 500 only for damaged material). The XML-error routes carry
the same status explicitly since s3s derives none for a custom code.

The read-only Static backend now reports create, delete and
cancel-deletion as `UnsupportedCapability`, matching its rotate and
enable/disable answers, so the admin API returns 501 for all of them.

(cherry picked from commit e33cac5493c4d9d6662e0d2980b58ba2b24a6d1b)

* fix(sse): stop SSE-S3 responses from naming the wrapping KMS key

`x-amz-server-side-encryption-aws-kms-key-id` is defined for `aws:kms`
objects only, but PutObject, CopyObject, CreateMultipartUpload and
GetObject returned it for `AES256` objects too, carrying the KMS key that
wraps the SSE-S3 data key (the service default, or the literal `default`
on a node without KMS). The write paths copied `kms_key_id` from the
encryption material unconditionally, and the single-decrypt GET
classification did the same after resolving the key for authorization.

Add `EncryptionMaterial::response_kms_key_id`, which yields the id only
for SSE-KMS, use it at the four write-response sites, and gate the GET
classification the same way. CompleteMultipartUpload and HeadObject
already omitted the header.

Unit tests pin both directions; a new e2e test covers Put/Get/Head/Copy
and CreateMultipartUpload for AES256 with an aws:kms control. The
e2e-full selection digests are refreshed from the current listing.

(cherry picked from commit 29d793a63352b0b60fd53c565e80fdbede8964bb)

* fix(s3): validate PutBucketEncryption rules before storing them

A default-encryption rule naming an unknown `SSEAlgorithm` (for example
`AES128`), a rule without `ApplyServerSideEncryptionByDefault`, an empty
rule list, or a `KMSMasterKeyID` on an `AES256` rule was stored as
written: the only algorithm check on the route decided whether to fill
in the default KMS key. `GetBucketEncryption` then advertised that
configuration while the write path encrypted header-less writes under
its `AES256` fallback, so the bucket's declared and actual schemes
disagreed. Two comments claimed the route already refused unknown
algorithms.

Validate the configuration before any of it is applied: `MalformedXML`
for a malformed rule set or unknown algorithm, `InvalidArgument` for a
key id on a non-KMS rule, and nothing stored on refusal. Correct the two
comments to describe when the AES256 fallback is still reachable.

Unit tests cover every refusal and the accepted shapes; an e2e test
checks the refusals leave the previous configuration in place. The
e2e-full selection digests are refreshed from the current listing.

(cherry picked from commit 29e4486dce41197ed93f5253cdbabc57d27a4ddb)

* test(e2e): refresh e2e-full selection for the combined KMS/SSE fixes

* test: align two unit tests with the new KMS and bucket-encryption contracts

`scheduled_deletion_carries_a_deadline_and_can_be_cancelled` still
expects the state error (`InvalidOperation`) for cancelling a key that
is not pending deletion; only the Static backend's mutations moved to
`UnsupportedCapability`. The uninitialized-store PutBucketEncryption
test now sends a well-formed AES256 rule so it reaches the store lookup
instead of the new configuration validation.

* Collect bounded Connect environment inventory (#7710)

feat(connect): collect environment inventory

* Add Connect service license commands (#7711)

feat: add Connect service license client

* Add consent-bound diagnostic scheduling (#7713)

feat(connect): schedule consent-bound diagnostics

* feat(connect): advertise environment diagnostics (#7714)

* feat(connect): add consent-bound profile exports (#7716)

feat: add consent-bound profile exports

* feat(connect): add bounded local log capture (#7718)

* feat(connect): add bounded network performance producer (#7719)

* Add bounded local telemetry export commands (#7720)

feat(connect): add bounded telemetry producers

* Add bounded drive performance command (#7721)

feat(connect): add bounded drive performance producer

* Add bounded top diagnostic captures (#7722)

feat(connect): add bounded top diagnostic producers

* Add client-to-deployment performance diagnostics (#7726)

feat: add client performance diagnostics

* Add a local environment inventory command (#7728)

feat(connect): add local environment inventory command

* feat(connect): add bounded object performance diagnostics (#7734)

feat(connect): add object performance producer

* Add authenticated inter-node network performance probes (#7739)

* feat(connect): add authenticated inter-node network probes

* fix(connect): respect storage facade boundary

* fix(site-replication): keep an operator's bucket-level target to a peer instead of taking it over (#7709)

* fix(site-replication): keep an operator's bucket-level target to a peer instead of taking it over

Site replication wired each bucket by looking for an existing replication
target "to the same peer" and rewriting the first match in place as its own
same-name target. An operator's bucket-level target that happened to point
at that site (different target bucket, operator credentials) was the first
match whenever it pre-dated the join, and the reconciler repeats the pass
every 600s, so the takeover also depended on target order afterwards. The
operator's rule then named an ARN no target backed and their bucket
replication stopped silently, while the inherited bucket-level reset id
made every site resync report the bucket as owned by another resync
(rustfs/backlog#2479, rustfs/backlog#2489).

Follow MinIO's `getRemoteARN` / `getRemoteARNForPeer` shape instead:

- Wiring updates a target in place only under the same ARN, or when it is
  recognisably the site's own under an older ARN shape (same peer,
  same-name target bucket, site replication service account). Anything
  else gets the site target added next to it.
- The site resync manifest takes the target the derived
  `site-repl-<deployment id>` rule names (same-name shape as fallback), so
  an operator target to the peer neither aborts the bucket as "multiple
  remote targets matched peer" nor gets resynced into.
- Peer removal prunes only targets a pruned derived rule names or the
  same-name target bucket; operator targets stamped with the peer's
  deployment id survive together with their rules.

Unit tests cover the three predicates. e2e
`test_site_replication_keeps_operator_bucket_target_to_peer` runs a
bucket-level replication plus `replication-reset` to the future peer, joins
the sites, and requires the operator target untouched, both paths
delivering, the site resync completing against the site target, and the
operator target and rule surviving `replicate remove --all`; without the
fix it fails at the join with the operator target gone. The repl-nightly
selection digest is refreshed for the new case.

* test(site-replication): drop a redundant clone flagged by clippy

The reconcile unit test cloned the remote peer into the state map although
the binding is not used afterwards; workspace clippy (-D warnings) rejects
that as redundant_clone.

* chore(deps): update flake.lock (#7733)

* chore(deps): update flake.lock

Flake lock file updates:

• Updated input 'nixpkgs':
    'github:NixOS/nixpkgs/17de0b9' (2026-09-04)
  → 'github:NixOS/nixpkgs/aff8a0b' (2026-09-10)
• Updated input 'rust-overlay':
    'github:oxalica/rust-overlay/c361047' (2026-09-05)
  → 'github:oxalica/rust-overlay/228ecef' (2026-09-12)

* fix: satisfy Rust 1.98 clippy lints

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* chore(deps): update flake.lock (#7733)

* chore(deps): update flake.lock

Flake lock file updates:

• Updated input 'nixpkgs':
    'github:NixOS/nixpkgs/17de0b9' (2026-09-04)
  → 'github:NixOS/nixpkgs/aff8a0b' (2026-09-10)
• Updated input 'rust-overlay':
    'github:oxalica/rust-overlay/c361047' (2026-09-05)
  → 'github:oxalica/rust-overlay/228ecef' (2026-09-12)

* fix: satisfy Rust 1.98 clippy lints

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* feat(connect): support explicit enterprise proxies (#7745)

feat(connect): add explicit proxy transport

* feat(connect): emit drive unavailable log events (#7747)

* feat(connect): add local inspect export producer (#7750)

* feat(connect): add local inspect export producer

* fix(connect): use the storage inspection facade

* test(connect): cover nested allocator profile stats (#7717)

* test(connect): cover nested allocator profile stats

* test(connect): use async profile test lock

* test(security): allow synthetic redaction fixture

---------

Co-authored-by: Hauser <housemecn@gmail.com>

* docs(security): add presigned copy advisory lesson (#7754)

* fix(ecstore): refuse RMW and reads of unreadable bucket configs (#7759)

An XML bucket sub-config whose stored bytes cannot be parsed was still folded into "absent" on two paths: update_config_with handed it to mutate, which rebuilt it from nothing and overwrote the only copy of the bytes, and the tagging/lifecycle/CORS/website/logging/accelerate/request-payment getters reported ConfigNotFound.

Add an explicit ConfigState (Absent / Valid / Unreadable) over the existing retained parse failure, refuse the read-modify-write of an unreadable target config before mutate runs (per config, other configs stay writable), and make those getters fail closed. GetBucketLifecycle now only maps ConfigNotFound to NoSuchLifecycleConfiguration. The Swift tagging rewrite recognizes the refusal by type instead of a string sentinel.

Refs rustfs/backlog#1734

* refactor(filemeta): own persisted metadata key authority (#7760)

Add rustfs_filemeta::metadata_keys as the single source of the nine xl.meta meta_user keys, byte-identical to current literals, and migrate filemeta consumers off s3s::header and rustfs_utils header constants. Pin the literals, cross-check historical sources, and prove old xl.meta bytes still decode via a captured fixture and a per-character mutation sweep.

Refs rustfs/backlog#1735

* Sync network performance protocol fixtures (#7761)

test(connect): sync diagnostic protocol fixtures

* Sync site replication result fixtures (#7762)

test(protocol): sync site replication result fixtures

* Sync telemetry producer fixtures (#7763)

test(protocol): sync telemetry producer vectors

* refactor(rio): own trailer source and drop s3s dependency (#7764)

Move the aws-chunked trailing checksum handle behind a RustFS-owned rustfs_rio::TrailerSource (Pending/Missing/Present lookup with a documented EOF timing contract) and adapt s3s::TrailingHeaders once in the application crate. rio no longer depends on s3s; behaviour is unchanged.

Refs rustfs/backlog#1735

* Deliver diagnostic scheduler receipts to Connect (#7767)

feat(connect): deliver diagnostic scheduler receipts

* fix(ecstore): refuse writes on unreadable bucket configs with 503 (#7768)

Close the remaining paths where a stored bucket sub-configuration whose
bytes cannot be parsed still read as absent (rustfs/backlog#1734, slice 2):

- Object writes resolve versioning through BucketVersioningSys::get_for_write;
  RUSTFS_BUCKET_CONFIG_PARSE_MODE=strict refuses them, the default permissive
  mode keeps the historical unversioned write and records it.
- Versioning, Object Lock, encryption, public access block and notification
  getters and the delete-time versioning check return the typed
  UnreadableBucketConfig refusal, which ApiError maps to 503 naming the
  bucket, config and stored length. StorageError::clone keeps it typed.
- Object Lock checks stay on when the lock config is unreadable.
- Notification setup isolates an unreadable config to its bucket instead of
  clearing its rules; GetBucketNotificationConfiguration reports it.
- Add rustfs_bucket_metadata_parse_failed_total and
  rustfs_bucket_metadata_unparsable_current, an invalid-mode startup check,
  and the s3gate-parse-strict compat register entry.

* feat(connect): add site replication performance producer (#7769)

feat(connect): add site replication performance core

* refactor(ecstore): read persisted object-metadata keys from the filemeta authority (A3b) (#7770)

Migrate ecstore and rustfs-lifecycle consumers of the persisted xl.meta
meta_user keys (object lock, restore, replication status, storage class,
SSE read) from s3s::header / rustfs_utils header constants to
rustfs_filemeta::metadata_keys. HTTP header production is unchanged and
every lookup keeps its previous exact / case-insensitive mode.

- SSE key: persisted only as lowercase; the mixed-case spelling is
  outbound replication user metadata. Keep the case-insensitive read and
  pin it against the pre-A3a fixture.
- warm tier: strip promoted keys case-insensitively so the persisted
  X-Amz-Replication-Status is no longer forwarded to the tier.
- fix stale HashReader::add_checksum_from_s3s call in ecstore tests.

Refs rustfs/backlog#1735

* feat(connect): add device license renewal client (#7771)

* feat(connect): add approved artifact relay (#7772)

feat(connect): add approved artifact relay core

* fix(connect): export relay CLI types (#7773)

* feat(connect): add device report upload client (#7774)

* feat(connect): add typed telemetry trace source (#7775)

* fix(connect): avoid shadowing replication URL helper (#7777)

* fix(connect): restore site replication test nonce (#7778)

* fix(connect): restore rustfs build after site replication perf producer (#7779)

#7769 left rustfs/src/connect/diagnostics/perf_site_replication.rs failing
to compile: a local binding named object_url shadowed the object_url()
helper in the same scope (E0618), and a test put the consent nonce on the
request instead of LocalSiteReplicationConsent (E0063/E0560).

Rename the binding to source_url and move the test nonce into the consent.

* fix(rustfs): restore test compilation (#7780)

* feat(connect): sign site replication target pair (#7781)

* refactor(filemeta): own RestoreStatus and drop the s3s dependency (A3c) (#7782)

Replace s3s::dto::{RestoreStatus, Timestamp} in filemeta with a
filemeta-owned RestoreStatus (same field names, OffsetDateTime expiry).
RestoreStatusOps and parse_restore_obj_status keep their signatures and
persisted rendering; the ecstore restore finalize / lifecycle restore
writers and rustfs RestoreObject now build the filemeta type.

- crates/filemeta: drop s3s; tokio "time" becomes a dev-dependency
  (the metacache tests got it through s3s feature unification).
- metadata_keys: drop the s3s half of the historical-source cross-check;
  PINNED, the pre-A3a fixture and per-character mutation still pin keys.
- new test re-renders the pre-A3a fixture restore value byte-for-byte.
- s3s footprint baselines 210 -> 209 files, ecstore 37 -> 36.

Refs rustfs/backlog#1735

* feat(connect): add service license relay import (#7784)

* feat(admin): add a gateway key inventory for the S3 stack switch (#7785)

GET /rustfs/admin/v3/gateway-key-inventory (admin:InspectData) lists
every stored object key the RustFS S3 gateway would refuse on every
operation, so an operator can copy those objects to a safe key before
switching stacks. The rules mirror the gateway key floor; . and ..
segments never appear because ecstore refuses them on every write.

Refs rustfs/gateway#754

* feat(server): add RUSTFS_S3_STACK with a gateway GetBucketLocation path (#7786)

* fix(connect): restore the site replication producer build

The producer shadowed its object_url helper with a local of the same
name, and its test placed the consent nonce on the request, so neither
the rustfs library nor its tests compiled on main.

* feat(server): add RUSTFS_S3_STACK with a gateway GetBucketLocation path

RUSTFS_S3_STACK=legacy (default) keeps the s3s service as the whole S3
entry. RUSTFS_S3_STACK=gateway routes GetBucketLocation through the
RustFS Gateway pipeline pinned at rustfs/gateway@90b83a20 and falls back
to the same s3s service for every other request, decided before the
body is read. Refs rustfs/backlog#1752.

* revert: remove M1 gateway git dependency until CI can access rustfs/gateway (#7787)

Revert "feat(server): add RUSTFS_S3_STACK with a gateway GetBucketLocation path (#7786)"

This reverts commit b5c2e1da90.

* fix: retry IAM migration quorum failures on startup (#7788)

* fix: retry interrupted uploads through proxies (#7789)

fix: retry proxied upload interruptions

* fix(connect): capture telemetry from server runtime (#7790)

* fix: classify explicit proxy failures (#7791)

* fix: skip IAM migration when legacy volume is absent (#7792)

* fix(release): include CLI in Linux artifacts (#7794)

* fix(release): serialize Linux binary links (#7797)

* feat(connect): expose live lock count snapshots (#7801)

* feat(connect): capture live API activity (#7804)

* feat(connect): collect native Linux thread states (#7806)

Collect bounded aggregate thread states from Linux procfs while preserving explicit unsupported outcomes for unavailable scopes.

* feat(connect): capture live RPC activity (#7807)

* test(connect): verify top.disk release artifacts (#7808)

* test(connect): require native top.disk runner (#7809)

* feat(connect): capture bounded local CPU profiles (#7811)

* ci: retain top disk acceptance archive (#7812)

* fix(connect): observe host traffic in top net (#7814)

* ci: enable CPU profiling in supported release builds (#7815)

* test(connect): verify profile cpu release artifacts (#7818)

* test(connect): retain CPU profile verification key (#7819)

* test(connect): retain CPU profile import bundle (#7820)

* feat(connect): expose object inspect CLI (#7821)

* feat(connect): wrap diagnostic reports for upload (#7822)

* fix(connect): parse inspect paths as paths (#7826)

* feat(connect): verify typed diagnostic jobs (#7827)

* fix(connect): accept KMS report upload authorization (#7828)

* Run signed diagnostic jobs in the RustFS service (#7829)

feat(connect): run diagnostic jobs in service

* fix(connect): emit canonical report manifest time (#7830)

* Upload diagnostic job results through support bundles (#7831)

feat(connect): upload diagnostic job results

* fix(connect): emit canonical top envelope time (#7836)

* fix(connect): publish diagnostic producer capabilities (#7837)

* fix(io-metrics): drop the rustfs-common edge by injecting the S3 telemetry observer (#7795)

* fix(io-metrics): drop the rustfs-common edge by injecting the S3 telemetry observer

dc700d366 (#7775) made the io-metrics leaf crate depend on rustfs-common
to publish typed telemetry trace events from S3HttpRequestGuard, which
breaks the backlog#1834 leaf-crate rule (io-metrics may only depend on
rustfs-s3-ops).

S3HttpRequestGuard now takes an optional fn-pointer completion observer
(operation, latency, 2xx?) and knows nothing about the trace bus. The
server builds guards through rustfs::server::s3_http_request_guard, which
attaches the observer only while a telemetry subscriber exists and owns
the S3Operation -> TelemetryTraceOperation mapping.

* chore(guard): admit #7785 s3s ratchet growth (+1 file, +4 lines)

#7785 landed the gateway key inventory admin handler after the
baselines were verified, leaving check_s3s_footprint.sh red on main
and every branch cut from it (measured 210 files / 1592 lines vs
209/1588 baselines).

The handler follows the house admin convention whose Operation::call
signature is s3s-typed (S3Request/S3Result), so it cannot route
through a non-s3s seam until the s3gate admin migration replaces the
admin router (rustfs/backlog#1677 F1); no local refactor can shed the
file-level import. Record the measured growth with rationale:
files 209 -> 210, s3_error! lines 1588 -> 1592.

* fix

* fix: resolve clippy gate failures in connect and CLI surfaces

- Box the two large CommandResult performance variants and
  LicenseRenewalOutcome::Installed (clippy::large_enum_variant)
- Return RelayError instead of () from RelayTransport::deliver and the
  test destination (clippy::result_unit_err)
- Drop an unused mut on the protected relay file handle (unused_mut)
- Pass the digest by value to base64 encoding and drop a redundant
  result_json clone (clippy::needless_borrows_for_generic_args,
  clippy::redundant_clone)

* fix(connect): resolve the remaining site-replication clippy errors

- Group the endpoint credential triple into SiteReplicationCredentials
  so SiteReplicationEndpoint::new takes 6 arguments
  (clippy::too_many_arguments)
- Take the build-feature validator by &str (clippy::ptr_arg); the
  validator closure stays because &String needs the deref coercion

* style: apply rustfmt to the site-replication credential grouping

* fix(connect): keep the CPU profile fixture off the ecstore import scan

#7811 used "rustfs_ecstore::disk::read_object" as the raw-symbol fixture
of the profile redaction test, which the architecture guard counts as a
direct rustfs_ecstore reference outside the compatibility boundaries
(its scan deliberately includes inline test modules). The accumulator
treats symbols opaquely, so use the internal rustfs::storage:: path that
keeps the fixture realistic without matching the import scanner.

* fix

* fix

* fix

* fix

---------

Co-authored-by: Hauser <housemecn@gmail.com>

* fix(replication): count a bodiless 405 as a replicated delete marker (#7756)

* fix(replication): accept a bodiless 405 as a replicated delete marker during resync

A resync verifies each delete marker with `HEAD ?versionId=<marker>` on the
target. S3 targets (RustFS, MinIO, AWS) answer that with 405 and no body,
and the SDK only synthesizes an error code for 404, so the error arrived
with `code() == None`. `is_retryable_delete_replication_head_error` then
treated it as an ambiguous failure: every delete marker counted as a failed
object with `target service error`, and a site resync over any bucket that
holds a delete marker reported the whole bucket as failed
(rustfs/backlog#2479, SITE-105 on rc.6 and nightly).

Use the raw HTTP status the way the 404 path already does: a 405 without a
code confirms the marker propagated. Ambiguous statuses still fail.

- Unit tests drive `verify_resync_head_result` against a scripted target
  answering 405 (accepted) and 503 (still failed).
- e2e `test_site_replication_resync_replicates_delete_marker` joins two
  sites, converges a live object and a delete marker, and requires the site
  resync to complete with zero failed objects; the repl-nightly selection
  digest is refreshed for the new case.

* fix(replication): verify marker-version purges by absence during resync

A delete-marker resync entry with a pending or failed version purge asks
the target to remove the marker, so the bodiless 405 that proves a
created marker propagated proves the purge did not happen. Accept the
405-as-success mapping only for marker creation (empty
version_purge_status); a purge counts as replicated only when the target
answers not found, and any other HEAD outcome stays failed. Unit tests
drive both purge statuses against the 405 fixture and the 404 fixture.

* fix(kms): refuse key ids that leave the key prefix on the Vault backends (#7727)

Only the Local backend refused a key identifier containing a path
separator. On Vault KV2 a create with the name bad/name succeeded and
produced a nested KV2 path that the listing then reported as a
directory rather than a key, and an identifier containing .. addressed
a record outside the configured key prefix once the HTTP client
normalised the URL; Vault Transit built its transit key name and its
metadata path from the same unchecked identifier.

Lift the Local backend's containment rule into a shared segment check
(empty, /, backslash, NUL, . and ..) and apply it at the single point
where each backend turns the identifier into a path or a Transit key
name, so create, describe, encrypt, delete and the metadata writes all
refuse with InvalidKey before any request reaches Vault. The admin API
already maps that to 400. The AWS backend is untouched: it addresses
keys by ARN and alias, both of which contain /.

Refs rustfs/backlog#2474 (KMS-213 CreateNegatives on vault-kv2).

Co-authored-by: Hauser <housemecn@gmail.com>

* Preserve safe profile job failure reasons (#7860)

fix(connect): preserve safe profile job failure reasons

* Freeze the heartbeat producer capability registry (#7861)

test(connect): freeze heartbeat producer capabilities

* fix: resume GET body after peer short EOF (#7852)

* fix: resume get body after short eof

Treat mid-stream short EOF errors as resumable when the S3 GET body has an attached resume context. This lets peer-kill reads reopen the same object version at the emitted offset instead of aborting the 200 response body.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(connect): surface TLS peer bootstrap failures

Map Connect registration TLS peer validation failures to the dedicated bootstrap error so wrong CA inputs fail closed with the sanitized TLS variant instead of the generic exchange error.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* ci: file scheduled-failure issues in rustfs/backlog (#7847)

Scheduled pipeline failures currently open [scheduled-failure] tracking
issues in rustfs/rustfs itself, adding bot noise to the code repository's
issue tracker. Route that alerting to rustfs/backlog instead.

- schedule-failure-issue gains target-repository (default rustfs/backlog);
  dedupe lookup, comment appends and issue creation target that repository.
- New source-token input (default ${{ github.token }}) reads the failed-job
  list from the reported run; the run still lives in and links to
  rustfs/rustfs. The issue body now carries a '- Repository:' line.
- All consumer workflows pass secrets.BACKLOG_ISSUE_TOKEN; the
  workflow-scoped GITHUB_TOKEN cannot open issues cross-repo. Alert job
  permissions blocks are unchanged.

* fix(admin): keep the gateway key inventory off the s3s surface (#7817)

The gateway key inventory handler added in #7785 imported s3s directly and built four errors with s3_error!, pushing the s3s footprint ratchet to 210 files and 1592 s3_error! lines on main. Route its S3 types and error construction through the crate::admin::storage_api::s3 facade like sibling admin handlers; the codes, HTTP statuses and messages are unchanged, and a new unit test pins them.

Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: Hauser <housemecn@gmail.com>

* fix(s3): honor presigned UploadPart checksum queries (#7748)

* fix(s3): honor presigned UploadPart checksum queries

* fix(s3): keep checksum errors within gateway boundary

---------

Co-authored-by: Hauser <housemecn@gmail.com>

* fix(auth): reject unsigned x-amz headers on header-signed SigV4 requests (#7796)

* fix(auth): reject unsigned x-amz headers on header-signed SigV4 requests

A SigV4 request authenticated with an Authorization header only binds the headers named in its SignedHeaders list, but RustFS acted on every x-amz-* header that arrived, so a replayed header-signed PutObject carrying an unsigned x-amz-copy-source became a CopyObject run as the signer that could copy any object the signer can read (GHSA-xm99-m3gq-83g8). The presigned form was already closed by GHSA-g8w9-qw9q-fghr.

reject_unsigned_amz_headers_on_sigv4_request now guards S3Access::check and S3Router::check_access: every SigV4 signed-header list the request carries must cover every x-amz-* header, the Authorization header is parsed with the verifier's own s3s-sigv4 parser and compared case-insensitively, the algorithm token is pinned to AWS4-HMAC-SHA256 because the upstream header path accepts any token, and the exempt set mirrors the upstream s3s fix (x-amz-content-sha256, x-amz-decoded-content-length, x-amz-trailer, x-amz-checksum-algorithm) plus x-amz-cf-id. Adds ghsa_xm99 unit, router and e2e regressions, raises the security smoke floor to 28, and records the advisory in docs/testing/security-regressions.md and CHANGELOG.md.

* chore(deps): switch s3s and s3s-sigv4 to crates.io 0.16.0

* fix(server): enforce the SigV4 header guard ahead of s3s dispatch

s3s 0.16 verifies the claimed algorithm as the first step of its own
signature flow, so a request whose Authorization header swaps the
AWS4-HMAC-SHA256 token was answered with 501 NotImplemented before
RustFS's access layer could rule on the unsigned x-amz-copy-source
(GHSA-xm99-m3gq-83g8). Add the SigV4HeaderGuardLayer as the innermost
external stack layer, running reject_unsigned_amz_headers_on_sigv4_request
in front of s3s and serializing its rejections as the same AccessDenied
S3 error document the access layer produces.

---------

Co-authored-by: Hauser <housemecn@gmail.com>

* fix(table-catalog): map transient lock failures to unavailable (#7841)

* Verify profile service jobs on native Linux (#7862)

ci: verify profile service jobs on native Linux

* Authorize the private Connect acceptance checkout (#7863)

ci: authorize private Connect harness checkout

* Run profile service acceptance directly (#7864)

ci: run profile service acceptance directly

* Retain profile service failure evidence (#7868)

ci: retain profile service failure evidence

* fix: update dependencies and preserve transport errors (#7798)

* chore(deps): bump ed25519-dalek in the dependencies group

Bumps the dependencies group with 1 update: [ed25519-dalek](https://github.com/dalek-cryptography/curve25519-dalek).


Updates `ed25519-dalek` from 2.2.0 to 3.0.0
- [Release notes](https://github.com/dalek-cryptography/curve25519-dalek/releases)
- [Changelog](https://github.com/dalek-cryptography/curve25519-dalek/blob/3.0.0/CHANGELOG.md)
- [Commits](https://github.com/dalek-cryptography/curve25519-dalek/compare/ed25519-2.2.0...3.0.0)

---
updated-dependencies:
- dependency-name: ed25519-dalek
  dependency-version: 3.0.0
  dependency-type: direct:production
  update-type: version-update:semver-major
  dependency-group: dependencies
...

Signed-off-by: dependabot[bot] <support@github.com>

* chore(deps): bump jiff, aws-sdk-s3, datafusion and smallvec

Bump the dependencies group:

- jiff 0.2.35 -> 0.2.37
- aws-sdk-s3 1.146.0 -> 1.146.1
- datafusion 55.0.0 -> 55.1.0
- smallvec 1.16.0 -> 1.16.1

Update Cargo.lock for the matching transitive bumps (datafusion
subcrates, hickory, cc, crc32fast, tinyvec, toml_edit and others);
tinyvec_macros is no longer required.

* chore(deps): use s3s 0.16.0 release and bump rust-version to 1.98.1

* fix: preserve ready reader errors during erasure write failures

When erasure writers fail after the producer has already surfaced a reader error, return the reader error instead of aborting the producer and masking it with the write-side failure.

This keeps UploadPart body read timeouts classified as RequestTimeout under loaded pipeline timing.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test: use current checksum API in multipart regressions

* fix: stabilize connect dependency update tests

Classify Connect proxy failures only when an explicit proxy is configured, preserve TLS classification across request error shapes, keep short object performance windows from spending too much budget on cleanup, and update multipart checksum tests for the current HashReader API.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Signed-off-by: dependabot[bot] <support@github.com>
Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Co-authored-by: Hauser <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: overtrue <anzhengchao@gmail.com>

* ci: expect BACKLOG_ISSUE_TOKEN in scheduled alert wiring checks (#7867)

#7847 routed schedule-failure alerting to rustfs/backlog by switching the
alert jobs' token to secrets.BACKLOG_ISSUE_TOKEN, but check_test_wiring.py
still asserts the literal 'github-token: ${{ secrets.GITHUB_TOKEN }}', so
Quick Checks fails on every open PR. Update the wiring assertions and the
self-test fixtures to the new literal.

Both `--self-test` (52 tests) and the full `validate()` pass locally.

* Pace diagnostic job result redelivery (#7869)

fix(connect): pace diagnostic result redelivery

* Execute authenticated top.api service jobs (#7872)

feat(connect): execute top.api service jobs

* feat(connect): execute top.locks service jobs (#7874)

* fix(ci): gate Connect acceptance on x86 build job (#7875)

* fix(ci): repair E2E inventory and network CLI coverage (#7871)

* ci: refresh Linux full E2E inventory after SigV4 tests

* test(connect): drive traffic for top net CLI export coverage

* feat(connect): execute performance network jobs (#7877)

* feat(connect): execute bounded drive performance jobs (#7878)

* Preserve the top API service job nonce (#7879)

fix(connect): preserve top api job nonce

* feat(connect): execute thread profile service jobs (#7880)

* Execute authenticated top.rpc service jobs (#7881)

feat(connect): execute top.rpc service jobs

* ci: add service diagnostic acceptance workflows (#7882)

* ci: add threads and RPC acceptance workflows (#7883)

* fix(connect): deliver diagnostic results until expiry (#7886)

* feat(connect): export signed environment inventory (#7887)

feat: export signed environment inventory

* fix: recover interrupted GETs and heal operations (#7876)

* fix(heal): retry interrupted internode shard writes

* fix(deps): update rustls for RUSTSEC-2026-0285

* fix(heal): retain RPC transport failures across metadata probes

* test(heal): wait for replacement disk and coordinator readiness

* test(connect): validate service-only diagnostic capabilities

* fix(s3): resume GET bodies after erasure read quorum loss

* fix: keep top locks within its capture window (#7888)

* fix: recover heal after peer boot epoch changes (#7889)

* test(heal): keep outage objects in the replacement erasure set

* fix(rpc): retry authenticated requests after peer epoch changes

* test(rpc): assert retryable rejection of stale boot epochs

* ci: bound concurrent heal clusters in the full E2E gate

* ci: register the table suite workflow on the default branch (#7893)

* ci: register the table suite workflow on the default branch

The table suite workflow (#7873) only exists on release so far, and
GitHub registers workflow_dispatch targets exclusively from the default
branch — the suite cannot be triggered until this file lands on main
(same mechanism that keeps the fault-tolerance suite undispatchable).

This adds the identical rustfs-table-test.yml (byte-for-byte the
release version) plus the contract-test registration (JOBS /
DIRECT_TESTS / upload allowlist), and nothing else from release.

* ci: pin actions in the table workflow to full commit SHAs

The default branch enforces check_workflow_pins.sh (unpinned
third-party action refs fail CI). Use the same pinned SHAs as the other
suite workflows on main: actions/checkout@9c091bb... (#v7) and
actions/upload-artifact@b7c566a... (#v6).

Note: the release copy of this workflow still uses @v4 tags; release
does not run the pin gate. Release and main will converge on the pinned
form during the full sync.

* test(ecstore): synchronize causal cleanup observations (#7894)

* fix(ecstore): create markers for repeated versioned deletes (#7884)

Co-authored-by: cxymds <cxymds@gmail.com>

* Preserve top.locks signed job nonce (#7898)

fix(connect): preserve top locks job nonce

* fix(ecstore): roll back failed delete marker writes (#7899)

* chore(deps): refresh RustFS tokio tar dependency (#7907)

* chore(deps): refresh RustFS tokio tar dependency

Switch the astral-tokio-tar workspace alias to the released rustfs-tokio-tar 0.7.1 crate and remove the obsolete cargo-deny git source allowance.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* chore(deps): align AWS smithy dependency family

Upgrade the AWS SDK and smithy crates together while patching aws-smithy-json 0.63.0 for the aws-smithy-types 1.7.0 DocumentObject API used by aws-config 1.12.0.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* revert(deps): use official AWS smithy compatible set

Remove the local aws-smithy-json patch and roll the AWS smithy family back to the latest official combination that compiles with aws-config 1.12.0.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* docs(architecture): retire tokio tar cleanup entry

Remove the stale cleanup-register entry after switching back to the released rustfs-tokio-tar crate, leaving no unmatched compatibility marker for the architecture guard.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* ci: restore table workflow failure contract

Align the table functional workflow with the quick-check guard by letting suite failures stay red, generating PASS reports only from complete successful evidence, and preserving the shared backlog issue fallback for harness failures.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(deps): expose rustfs tokio tar dependency name

Use the published rustfs-tokio-tar dependency key throughout the workspace while keeping source imports on the crate's tokio_tar lib target name.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

* fix(ci): retain failed functional chain reports and check runners (#7906)

---------

Signed-off-by: houseme <housemecn@gmail.com>
Signed-off-by: dependabot[bot] <support@github.com>
Signed-off-by: Hauser <housemecn@gmail.com>
Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: Henry Guo <marshawcoco@gmail.com>
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: RJ Regenold <rregenold@teamraft.com>
Co-authored-by: RJ Regenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: GatewayJ <835269233@qq.com>
Co-authored-by: Jason Kossis <jkossis@gmail.com>
Co-authored-by: Hiroaki KAWAI <hiroaki.kawai@gmail.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
2026-09-15 20:56:13 +08:00
GatewayJ c5a327df45 fix(heal): persist replacement intent on remote survivor (#7912) 2026-09-15 20:46:30 +08:00
cxymds 3774b75b93 fix(heal): fence canonical repair receipts (#7909)
* fix(heal): fence canonical repair receipts

* fix(heal): preserve unversioned receipt identity
2026-09-15 20:44:48 +08:00
cxymds 3b7d11037d fix(heal): quarantine corrupt root recovery records (#7905)
* fix(heal): quarantine corrupt root recovery records

Keep invalid root-heal records durable while isolating them from healthy recovery owners. Serialize startup replay with administrator admission and fence quarantined task IDs so independent compensation heals can proceed safely.

* fix(ci): align release workflow contract tests

* fix: satisfy root recovery clippy checks
2026-09-15 15:40:31 +08:00
GatewayJ e1e3cf4620 fix(s3): render null write version IDs consistently (#7904) 2026-09-15 15:33:46 +08:00
hector 3999544ece ci: rotate the shared functional-tests concurrency group to -v2 (#7900) 2026-09-15 11:44:15 +08:00
Chris 6a2dc68130 fix(ecstore): backport delete quorum rollback to release (#7902) 2026-09-15 11:43:31 +08:00
Hauser 230f31beff feat(obs): expose scanner usage freshness metrics (#7896)
Add Prometheus scanner metrics for dirty-usage pending buckets, usage-cache save/publication timestamps, publication result codes, and deferred publication state. This gives operators a direct scrape path for confirming scanner dirty ACK behavior without relying on admin JSON.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-15 08:59:34 +08:00
Hauser 646c7c087f test(ecstore): scope pending purge listing regression (#7897)
Keep the store-level pending purge listing regression focused on the ordinary recursive path and exact-prefix shortcut. The deeper delimiter CommonPrefix case is a separate physical-walker boundary and should not leave the release test suite red.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-15 08:59:22 +08:00
Hauser 756968d735 fix(ecstore): hide pending purge entries from listings (#7895)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-15 08:47:53 +08:00
overtrue 9e84ede33f ci: bound concurrent heal clusters in the full E2E gate
Apply the #7889 scheduling fix while preserving release test membership and zero retries.
2026-09-15 08:17:20 +08:00
overtrue 343cd86551 test(rpc): assert retryable rejection of stale boot epochs
(cherry picked from commit 1c4b39b99)
2026-09-15 08:17:20 +08:00
overtrue 2822cb408a fix(rpc): retry authenticated requests after peer epoch changes
Backport the stale-epoch recovery fix from main follow-up #7889. Keep invalid signatures and nonce replays terminal.
2026-09-15 08:17:20 +08:00
overtrue 63fec31f72 test(heal): keep outage objects in the replacement erasure set
(cherry picked from commit a669f50a366e35505e7745f8b680d8ecf1aa31be)
2026-09-15 08:17:20 +08:00
overtrue 14a464a313 fix(s3): resume GET bodies after erasure read quorum loss
(cherry picked from commit a38e859905)
2026-09-15 08:17:20 +08:00
overtrue a7deb27bcf fix(heal): retain RPC transport failures across metadata probes
(cherry picked from commit f48ec9f0c6e37b1f941620c666a9357c4b892d68)
2026-09-15 08:17:20 +08:00
overtrue 3dc4d9e40f test(heal): wait for replacement disk and coordinator readiness
(cherry picked from commit feeaa6f053aac4b7c8e32477c0ab5ebbd3dcdff3)
2026-09-15 08:17:20 +08:00
overtrue 1c06aa29a7 fix(deps): update rustls for RUSTSEC-2026-0285
(cherry picked from commit 938e1259d13da7832d85ac5c066a59ab3a28bc63)
2026-09-15 08:17:20 +08:00
overtrue b1b79d3c54 fix(heal): retry interrupted internode shard writes
(cherry picked from commit 0bd75f47b6326edd8167ee43b8776f6276692e92)
2026-09-15 08:17:20 +08:00
cxymds 002b000055 fix(heal): report verified normal shard repairs (#7890) 2026-09-15 08:16:20 +08:00
cxymds 12261efd1d test(ecstore): tolerate slow read-repair diagnostics CI (#7892) 2026-09-15 08:12:06 +08:00
hector e97dff1201 ci: add the S3 Tables (Iceberg REST Catalog) functional suite workflow (#7873)
New workflow rustfs-table-test.yml following the shared suite contract:
Initialize functional evidence (FUNCTIONAL_ARTIFACTS_DIR/LOG_FILE/
REPORT_FILE/TMPDIR), checkout for the report parser, auto-testing
clone with retry, continue-on-error on the run step, report generation
through scripts/functional_case_report.py with the product gate (case
failures stay green; harness breakdowns turn red), dashboard upload
under functional-reports/table/, backlog issue manager wiring
(--suite table --category table), artifact upload (report.md, cases.md,
suite.log), before/after environment cleanup, and the chain handoff
step (repository_dispatch only, next: pool expansion).

The suite script itself lives in rustfs/auto-testing (TBL-101..107,
paired PR). The run step passes the product smoke script path
(scripts/table-catalog/pyiceberg_smoke.py) via --smoke-script and the
log via --log-file, matching the other suites.

Contract tests: the table suite is registered in the generic evidence
and workflow matrices (JOBS/DIRECT_TESTS/allowlist) plus a dedicated
TableSuiteTests wiring check. Full run: 21/21.
2026-09-15 00:26:55 +08:00
overtrue 1c47ca22eb fix(ecstore): preserve ready read errors during encoding (#7798)
Backport the erasure fix from c95b65a7fc while retaining release shard integrity support. Dependency upgrades and the main-only Connect proxy and diagnostic fixes are excluded.
2026-09-14 23:18:32 +08:00
Henry Guo c9270c48a2 fix(table-catalog): map transient lock failures to unavailable (#7841)
(cherry picked from commit 5c73a3d602)
2026-09-14 23:18:32 +08:00
Chris 18547b1bb8 fix(s3): honor presigned UploadPart checksum queries (#7748)
* fix(s3): honor presigned UploadPart checksum queries

* fix(s3): keep checksum errors within gateway boundary

---------

Co-authored-by: Hauser <housemecn@gmail.com>
(cherry picked from commit a8ace89516)
2026-09-14 23:18:32 +08:00
overtrue 1eb14a8874 fix: resume GET body after peer short EOF (#7852)
Backport GET recovery from afc8861fec. The Connect TLS classification change requires the main-only proxy transport layer.
2026-09-14 23:18:32 +08:00
唐小鸭 3e69654f91 fix(kms): refuse key ids that leave the key prefix on the Vault backends (#7727)
Only the Local backend refused a key identifier containing a path
separator. On Vault KV2 a create with the name bad/name succeeded and
produced a nested KV2 path that the listing then reported as a
directory rather than a key, and an identifier containing .. addressed
a record outside the configured key prefix once the HTTP client
normalised the URL; Vault Transit built its transit key name and its
metadata path from the same unchecked identifier.

Lift the Local backend's containment rule into a shared segment check
(empty, /, backslash, NUL, . and ..) and apply it at the single point
where each backend turns the identifier into a path or a Transit key
name, so create, describe, encrypt, delete and the metadata writes all
refuse with InvalidKey before any request reaches Vault. The admin API
already maps that to 400. The AWS backend is untouched: it addresses
keys by ARN and alias, both of which contain /.

Refs rustfs/backlog#2474 (KMS-213 CreateNegatives on vault-kv2).

Co-authored-by: Hauser <housemecn@gmail.com>
(cherry picked from commit 2f2e775655)
2026-09-14 23:18:32 +08:00
唐小鸭 de60f6ad6e fix(replication): count a bodiless 405 as a replicated delete marker (#7756)
* fix(replication): accept a bodiless 405 as a replicated delete marker during resync

A resync verifies each delete marker with `HEAD ?versionId=<marker>` on the
target. S3 targets (RustFS, MinIO, AWS) answer that with 405 and no body,
and the SDK only synthesizes an error code for 404, so the error arrived
with `code() == None`. `is_retryable_delete_replication_head_error` then
treated it as an ambiguous failure: every delete marker counted as a failed
object with `target service error`, and a site resync over any bucket that
holds a delete marker reported the whole bucket as failed
(rustfs/backlog#2479, SITE-105 on rc.6 and nightly).

Use the raw HTTP status the way the 404 path already does: a 405 without a
code confirms the marker propagated. Ambiguous statuses still fail.

- Unit tests drive `verify_resync_head_result` against a scripted target
  answering 405 (accepted) and 503 (still failed).
- e2e `test_site_replication_resync_replicates_delete_marker` joins two
  sites, converges a live object and a delete marker, and requires the site
  resync to complete with zero failed objects; the repl-nightly selection
  digest is refreshed for the new case.

* fix(replication): verify marker-version purges by absence during resync

A delete-marker resync entry with a pending or failed version purge asks
the target to remove the marker, so the bodiless 405 that proves a
created marker propagated proves the purge did not happen. Accept the
405-as-success mapping only for marker creation (empty
version_purge_status); a purge counts as replicated only when the target
answers not found, and any other HEAD outcome stays failed. Unit tests
drive both purge statuses against the 405 fixture and the 404 fixture.

(cherry picked from commit 1ef3974bad)
2026-09-14 23:18:32 +08:00
overtrue 397ee852da test(kms): cover non-default Vault Transit paths (#7657)
Backport the Vault coverage from 4d31621f0a. Keep the release cleanup polls synchronized with object read locks.
2026-09-14 23:18:32 +08:00
Hauser 6fc748d6de test(scanner): stabilize W13 release evidence gates (#7870)
Add the object-only completion diagnostic case and make the evidence runner resolve CARGO_TARGET_DIR before recording the rustfs binary path.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-14 23:00:36 +08:00
Chris de0a7f1090 fix(release): repair acceptance checks and prepare 1.0.0 (#7866)
* test(e2e): stabilize release acceptance checkpoints

* chore(release): prepare 1.0.0
2026-09-14 22:03:24 +08:00
Hauser 7192eecbfb test: cover overlapped multipart staging copy (#7865)
Add Harbor-style E2E coverage for a CopyObject racing with CompleteMultipartUpload. The test allows the copy to observe an unpublished source as NoSuchKey, but rejects 5xx leakage and proves retrying the completed source remains readable.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-14 21:28:31 +08:00
cxymds 201e314dd9 fix(heal): scope nested walks and reject admin read-repair (#7851)
* fix(heal): scope nested walks and reject admin read-repair

* fix(ci): allocate stack for heal metadata regression
2026-09-14 21:04:19 +08:00
cxymds 28db20f7c4 fix(ecstore): scope recursive walks to object prefixes (#7850) 2026-09-14 17:27:41 +08:00
cxymds c020372948 fix(heal): persist pool/set outcomes and recovery scope (#7839)
* fix(heal): persist pool/set outcomes and recovery scope

* test(heal): verify selector receipts and process-crash recovery

* fix(heal): scope replacement pool metadata to its owning set

(cherry picked from commit a72a75569c)

* fix(heal): use domain imports in pool metadata regression test

(cherry picked from commit e8c5448e21)

* test(heal): set pool metadata regression recursion limit

---------

Co-authored-by: Hiroaki KAWAI <1468181+hkwi@users.noreply.github.com>
2026-09-14 16:16:50 +08:00
cxymds e40ed3c9e3 fix(heal): backport pool metadata scope to release (#7846)
* fix(heal): scope replacement pool metadata to its owning set

(cherry picked from commit a72a75569c)

* fix(heal): use domain imports in pool metadata regression test

(cherry picked from commit e8c5448e21)

* test(heal): set pool metadata regression recursion limit

---------

Co-authored-by: Hiroaki KAWAI <1468181+hkwi@users.noreply.github.com>
2026-09-14 16:16:34 +08:00
cxymds 9fbe8079af fix(heal): assign stable identities to scanner repair requests (#7823)
* fix(heal): assign stable identities to scanner repair requests

* test(s3): isolate UploadPart inactivity timing
2026-09-14 16:00:23 +08:00
cxymds 89fd23fcae fix(ci): restore Linux E2E selection and split offline enrollment (#7843) 2026-09-14 16:00:13 +08:00
GatewayJ 8c3b5afbea fix(tables): isolate protected S3 listings (#7676)
Co-authored-by: overtrue <anzhengchao@gmail.com>
2026-09-14 15:11:11 +08:00
cxymds 31d64c8ef2 fix(heal): recover replacement ownership across VM restarts (#7810)
* fix(heal): recover replacement ownership across VM restarts

* test(ecstore): isolate tier overwrite recovery scheduling

* test(ecstore): observe tier cleanup under object read locks

* fix(ecstore): bound decommission entry tracing

* test(ecstore): drain incarnation heal fixture writes

* fix(ecstore): reopen healthy hedged readers after peer loss

* test(heal): match debug server stack in deep heal fixtures

* test(heal): include identities in C06 count failures

* test(heal): drain PUT tails before inspecting B920 fixtures

* test(scanner): isolate retained MRF retry slots

* fix(ecstore): separate PUT cleanup intent from persisted metadata
2026-09-14 13:28:16 +08:00
cxymds 203a9e25ed fix(heal): retain terminal outcomes across restart (#7805)
* fix(heal): retain terminal outcomes across restart

* test(heal): use octal mode for terminal recovery fixture

* fix(ecstore): reopen healthy hedged readers after peer loss

* test(ecstore): isolate tier overwrite recovery scheduling

* test(ecstore): observe tier cleanup under object read locks

* fix(ecstore): bound decommission entry tracing

* test(ecstore): drain incarnation heal fixture writes

* test(heal): match debug server stack in deep heal fixtures

* test(heal): include identities in C06 count failures

* test(heal): drain PUT tails before inspecting B920 fixtures

* test(scanner): isolate retained MRF retry slots

* fix(ecstore): separate PUT cleanup intent from persisted metadata
2026-09-14 13:19:34 +08:00
cxymds 34d0b1b5bb fix(ecstore): capture failed object lock acquisitions (#7803)
* fix(ecstore): capture failed object lock acquisitions

* test(heal): include identities in C06 count failures

* test(heal): drain PUT tails before inspecting B920 fixtures

* fix(ecstore): reopen healthy hedged readers after peer loss

* test(ecstore): isolate tier overwrite recovery scheduling

* test(ecstore): observe tier cleanup under object read locks

* fix(ecstore): bound decommission entry tracing

* test(ecstore): drain incarnation heal fixture writes

* test(heal): match debug server stack in deep heal fixtures

* test(scanner): isolate retained MRF retry slots

* fix(ecstore): separate PUT cleanup intent from persisted metadata
2026-09-14 13:19:21 +08:00
cxymds 7abb0f5f1d fix(heal): bind admin traversal to bucket incarnation (#7802)
* fix(heal): bind admin traversal to bucket incarnation

* fix(ecstore): reopen healthy hedged readers after peer loss

* test(ecstore): isolate tier overwrite recovery scheduling

* test(ecstore): observe tier cleanup under object read locks

* fix(ecstore): bound decommission entry tracing

* test(ecstore): drain incarnation heal fixture writes

* test(heal): match debug server stack in deep heal fixtures

* test(heal): include identities in C06 count failures

* test(heal): drain PUT tails before inspecting B920 fixtures

* test(scanner): isolate retained MRF retry slots

* fix(ecstore): separate PUT cleanup intent from persisted metadata
2026-09-14 13:19:06 +08:00
cxymds 55f7514f90 fix(s3): preserve missing version errors on object reads (#7800)
* fix(s3): preserve missing version errors on object reads

* test(s3): align missing-version assertions with read contract
2026-09-14 12:27:58 +08:00
Chris 703b1a5c9c fix(auth): reject unsigned x-amz headers on header-signed SigV4 requests (release) (#7813) 2026-09-14 11:48:09 +08:00
Chris b61dc6519f fix(release): backport IAM migration startup fixes and recent main fixes (#7825) 2026-09-14 11:47:13 +08:00
cxymds 95e90dbbc9 fix(upgrade): probe legacy IAM namespace before migration (#7816) 2026-09-14 10:36:30 +08:00
GatewayJ e4031940e2 fix(tables): bound warehouse index recovery (#7677)
Co-authored-by: Chris <anzhengchao@gmail.com>
2026-09-14 09:58:52 +08:00
cxymds 73552e40bc fix(s3): return resolved object tagging version identities (#7757) 2026-09-14 08:38:30 +08:00
cxymds cb3efc4a98 fix(s3): return stored content language on local GET (#7755) 2026-09-14 08:38:19 +08:00
cxymds 5dd92bd783 fix(ci): restore release test compilation and e2e membership (#7799) 2026-09-14 08:32:42 +08:00
Chris 4e16705873 fix(release): backport main fixes and stabilize tier cleanup tests (#7793)
* fix(ecstore): stop pruning at nonempty directories (#7616)

* fix(ecstore): stop pruning at nonempty directories

* test(ecstore): release pruning fixtures before temp cleanup

(cherry picked from commit 8f150d1d8e)

* fix(heal): preserve retryable batch failures during recovery (#7642)

* fix(heal): preserve retryable batch failures during recovery

* test(heal): pin prebuilt hooks binaries in ci

(cherry picked from commit 5cd58319ed)

* fix(s3): reject oversize single PUT early and map body errors to 4xx (#7635)

* fix(s3): reject oversize single PUT early and map body errors to 4xx

A single PutObject above the 5 GiB single-request ceiling was only
rejected after the client had streamed 5 GiB into s3s's read-time body
budget, and the resulting BodySizeLimitExceeded surfaced from the erasure
writer as 500 InternalError. A body whose connection hit EOF before
Content-Length bytes arrived (hyper's IncompleteBody) was also a 500.
SDKs retry 500s, so one oversize upload was resent from offset 0 five
times.

- PutObject and UploadPart reject a declared length above
  MAX_SINGLE_PUT_OBJECT_SIZE with 400 EntityTooLarge before reading the
  body; the constant moves to rustfs_config so the s3s limit and the
  admission check share one value.
- ApiError maps BodySizeLimitExceeded to EntityTooLarge and a hyper body
  EOF to IncompleteBody across both io::Error conversions.

Fixes #7596.

* test(s3): cover UploadPart admission, aws-chunked length, real s3s limit

- Poll-counting test body proves PutObject and UploadPart reject a
  declared size above the ceiling with zero body polls; exact-cap and
  zero-length parts pass admission.
- A STREAMING-* aws-chunked PUT whose framed Content-Length exceeds the
  cap is admitted when the decoded length is within it and rejected when
  the decoded length is over it.
- The display-based BodySizeLimitExceeded matcher is checked against the
  real error produced by the pinned s3s Body budget.

(cherry picked from commit 50b31bc75b)

* fix(ecstore): make directory mtime fixture portable (#7623)

* fix(ecstore): make directory mtime fixture portable

* style(ecstore): format mtime fixture assertion

---------

Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
(cherry picked from commit b1cc286cac)

* fix(storage): prevent readiness after native migration failures (#7652)

* fix(storage): prevent readiness after native migration failures

* fix(storage): skip unsupported IAM records before reading

* fix(storage): use stable typed migration metadata errors

* fix(storage): include migration record in startup errors

* test(storage): cover native migration startup failures

* test(storage): use array chunks in migration fixture

---------

Co-authored-by: RJ Regenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: cxymds <cxymds@gmail.com>
(cherry picked from commit 0cbc3ffe61)

* fix(admin): expose OIDC account display fields (#7654)

Expose verified OIDC username and email claims as display-only metadata on self-account responses while preserving the virtual parent as the authorization identity.\n\nKeep rustfs-madmin public response structs unchanged by adding the optional wire fields through private handler response wrappers.

(cherry picked from commit f02bc947cd)

* fix(replication): correct peer joins and remote-state reporting (#7650)

* fix(replication): propagate verified peer deployment identities

* fix(replication): report actual remote peer state

* fix(replication): defer initial sync until all peers join

* test(replication): shut down TLS fixtures cleanly

---------

Co-authored-by: houseme <housemecn@gmail.com>
(cherry picked from commit 853ae63b6a)

* fix(s3): bound stalled UploadPart request bodies (#7659)

* fix(s3): bound stalled UploadPart request bodies

* fix(ci): preserve the S3S footprint ratchet

(cherry picked from commit 666dfd9f9f)

* fix(tables): reject reserved warehouse locations (#7671)

Co-authored-by: cxymds <cxymds@gmail.com>
(cherry picked from commit 414176c47f)

* fix(ci): bind nightly lanes to one resolved source (#7688)

(cherry picked from commit 01d8e4347f)

* fix(replication): close the pre-stable convergence gaps from backlog#2367 (#7626)

* fix(replication): total-order rule sort and honor V1 top-level Prefix

Rule matching had two defects from the pre-GA replication audit
(rustfs/backlog#2367 C-1 and C-2):

- The actionable-rule sort compared same-destination rules by priority but
  answered Equal for any other pair, which is not a total order; the
  standard library sort panics on such comparators once a slice exceeds the
  insertion-sort threshold, so an object matching more than 20 enabled rules
  across two or more targets could panic the PUT or DELETE task. Rules now
  sort by priority descending with destination and id as tie-breakers, and
  filter_target_arns preserves that order instead of draining a HashSet.

- A V1 rule written without a <Filter> carries its prefix at the top level;
  that field was never read, so <Prefix>logs/</Prefix> matched every object.
  ReplicationRuleExt::prefix now falls back to it, with a <Filter> keeping
  precedence. The existing prefix fixtures were built this way and had been
  asserting nothing.

* fix(admin): advertise data-usage and listen capabilities to rc

The rc client gated `rc du` and `rc watch` on a pinned contract that
matched server versions by the string prefix `1.0.0-rc.`; a server that
reports `1.0.0` no longer matches, and the dynamic `advertised` list did
not carry either name, so `rc du` against a GA server fails with an
unsupported-capability error (rustfs/backlog#2367 E-2).

Advertise `admin.data-usage` from the admin route inventory like the IAM
entries, and `listen_notification` for the bucket `?events=` extension
route the admin router dispatches. The client merges advertised entries
ahead of its pinned contract, so no version sniffing is needed.

* fix(site-replication): stop notifying the local site on remove and rotate

The pending-remove and pending-rotation notification loops skipped the
local site by endpoint only, while finalization identifies it by
deployment id or endpoint. The reconcile tick resolves the local peer from
the node's own listen address (and a handler from the request Host), so
`remove --all` dialed the site's registered endpoint, waited out the
request timeout against the lifecycle lock it was holding, and answered
`Partial: failed to notify 1 peer(s)` for a removal that had succeeded
(rustfs/backlog#2367 A-4, backlog#2195 item 3).

Both loops now iterate the peers still awaiting notification through one
helper that applies the finalization identity.

* fix(site-replication): promote and settle IAM retries without a tick of slack

Two retry-queue behaviours kept an IAM change from converging for ten to
twenty minutes after a peer came back (rustfs/backlog#2367 A-1 and A-3,
backlog#2305):

- The lightweight 30-second pass filtered its reachability probe to bucket
  ops, so a backed-off IAM or bucket-metadata snapshot waited for the
  600-second tick to notice the peer. It now probes every backed-off class
  and still replays only bounded bucket ops; promotion is a state flip the
  heavyweight tick acts on.

- Backoffs are multiples of the tick interval, so a failure stamped δ
  seconds after a tick was 600 − δ old at the next tick and slipped a whole
  extra interval. The heavyweight drain now evaluates backoff halfway to its
  next tick.

- An IAM entry first created by a non-deletion failure (the add bootstrap's
  snapshot send, the drain's own replay, an import-iam schedule) was never
  stamped `deletions_recorded`, so a later recorded deletion could not
  settle it and it escalated to the marker only `replicate repair` clears.
  Entries created by this binary now start recorded; a row persisted by an
  older binary keeps the escalation semantics.

* fix(site-replication): reload peer node caches after bucket wiring writes

Every S3 bucket-config write ends by asking the other nodes of the cluster
to reload the bucket's metadata; the site-replication writers never did.
On a multi-node site the node that ran the pairing (or applied a peer's
bucket-meta item) rewrote the bucket targets and the derived replication
rules on disk, while every other node kept serving its cached copy for up
to the 15-minute refresh. A `resync start` routed to such a node reported
every freshly wired bucket as `Config not found` and a bucket whose
operator target the pairing had replaced as `recorded remote target no
longer exists` (rustfs/backlog#2367 A-5, backlog#2195 item 2; functional
SITE-105).

Add one best-effort reload helper in the site-replication hooks and call it
after the bucket setup, versioning, peer bucket-meta apply, removed-peer
cleanup, make-with-versioning, and endpoint-refresh writes; the ensure
helpers now report whether they wrote so unchanged passes stay silent. The
resync manifest and start now read the persisted wiring instead of the
node-local cache, matching the target read the start path already did.

The new four-node e2e pairs two clusters and starts a resync through a
non-coordinator node right after pairing; it also covers an IAM user
created on a non-coordinator node converging to the peer site.

* test(e2e): cover delete-marker replication from a multi-node source

The functional suite reported delete markers created on a 3-node source
never reaching the target (rustfs/backlog#2195 item 4, REP-105). The report
was a probe defect, but the shape had no coverage: the existing
delete-marker e2e runs a single-node source. Pin it against a four-node
source replicating to a four-node peer and to a single-node target, with
the write and the delete issued through different nodes.

* ci(e2e): refresh the distributed selection for the new replication cases

Four distributed cases were added (two site-replication, two delete-marker
replication). The linux digest is derived from the last CI listing of the
lane (34 cases, matching the previous pin) plus the four new names; the
darwin digest is the local listing, which selects the same 38 cases.

(cherry picked from commit aeaba86d73)

* fix(e2e): require a verified server binary for every e2e run (#7687)

* fix(ci): share quick checks and lint workflows

* fix(ci): install actionlint from its verified release

* fix(ci): reject dependencies on required quick checks

* feat(test): verify the E2E server build and source identity

* test(e2e): register verified Darwin test membership

* test(e2e): record verified Linux receipt test membership

* test(e2e): record compiled Darwin receipt test membership

* test(e2e): record compiled Linux receipt test membership

* test(e2e): record Darwin e2e-full membership after merging main

* fix(test): route scanner/heal evidence E2E runs through the verified server binary

The evidence runners built rustfs with plain cargo and then ran e2e_test directly, which now fails without a run receipt. They build through scripts/e2e_binary.py and run the e2e_test invocations under e2e_binary.py run; the obsolete rustfs.features stamp is removed.

* docs(e2e): run server-backed e2e commands through the verified binary wrapper

* test(e2e): record Linux e2e-full membership from the branch CI listing

(cherry picked from commit 2909b1bfe1)

* fix(kms): classify KMS/SSE error contracts and SSE-S3 headers (#7697)

* fix(sse): classify bare SSE-KMS writes when no KMS is available

A `aws:kms` request without a key id, on a bucket without a default key,
returned `500 InternalError` whenever no KMS service was running: the
"no KMS key available" branch exited with an untyped storage error before
the availability classification that the keyed form already received.

Route that branch through the same split: `503 ServiceUnavailable` while
a configured KMS is stopped, `400 InvalidRequest` when KMS was never
configured, and `400 InvalidRequest` naming the missing key id when a
running KMS has no default key. `CreateMultipartUpload` shares the path.

Adds a unit test for the bare form and an e2e module that stops KMS
through the admin API, runs a master-key-only node, and runs a Local KMS
without a default key; refreshes the e2e-full selection digests.

(cherry picked from commit c3259dadc3d603a9185a5b0ad9f83dfb884e61c8)

* fix(sse): keep KMS error classes on the encrypted read path

GetObject, CopyObject and UploadPartCopy on an SSE-KMS object whose key
no longer exists answered `500 InternalError` ("KMS key not found") while
PutObject under the same key already answered `400 KMS.NotFoundException`.
The read path carries its classification through ecstore's
`EncryptionResolutionErrorKind`, which had no kind for a missing key, a
denied KMS grant or a missing backend capability, so all three folded
onto `DecryptionFailed` and the S3 layer reported an internal fault.

Add `KeyNotFound`, `AccessDenied` and `NotImplemented` kinds, map them on
both sides of the boundary, and give an envelope the configured backend
cannot unwrap a diagnosable message while keeping its `500`.

Unit tests cover the kind round trip and the reader wrapping; a new e2e
test deletes a key immediately and checks GET/Copy return 400 with
`KMS.NotFoundException` while HEAD stays 200. The e2e-full selection
digests are refreshed from the current listing (the previous digests
predated the delete-authorization tests) and the e2e `create_default_key`
helper is updated to the accepted `EncryptDecrypt` spelling.

(cherry picked from commit 2523a9814e97caea318d4ff1a51bef3a4d4445b2)

* fix(kms): classify key-management errors on the admin routes

`POST /kms/keys`, the legacy `create-key` alias and `generate-data-key`
reported every backend refusal as `500`: a blank key name (which each
backend failed on differently, the Local backend by writing a key file
with an empty stem), a name already taken, an unknown key, a disabled key
and a capability the backend lacks. `delete` and the lifecycle routes
already classified the same errors.

Refuse a blank or whitespace name in `KmsManager::create_key` before any
backend sees it, and share one `KmsError` to status mapping across
create, delete and generate-data-key (400 for validation and key state,
404 for an unknown key, 409 for a taken name, 501 for a missing
capability, 500 only for damaged material). The XML-error routes carry
the same status explicitly since s3s derives none for a custom code.

The read-only Static backend now reports create, delete and
cancel-deletion as `UnsupportedCapability`, matching its rotate and
enable/disable answers, so the admin API returns 501 for all of them.

(cherry picked from commit e33cac5493c4d9d6662e0d2980b58ba2b24a6d1b)

* fix(sse): stop SSE-S3 responses from naming the wrapping KMS key

`x-amz-server-side-encryption-aws-kms-key-id` is defined for `aws:kms`
objects only, but PutObject, CopyObject, CreateMultipartUpload and
GetObject returned it for `AES256` objects too, carrying the KMS key that
wraps the SSE-S3 data key (the service default, or the literal `default`
on a node without KMS). The write paths copied `kms_key_id` from the
encryption material unconditionally, and the single-decrypt GET
classification did the same after resolving the key for authorization.

Add `EncryptionMaterial::response_kms_key_id`, which yields the id only
for SSE-KMS, use it at the four write-response sites, and gate the GET
classification the same way. CompleteMultipartUpload and HeadObject
already omitted the header.

Unit tests pin both directions; a new e2e test covers Put/Get/Head/Copy
and CreateMultipartUpload for AES256 with an aws:kms control. The
e2e-full selection digests are refreshed from the current listing.

(cherry picked from commit 29d793a63352b0b60fd53c565e80fdbede8964bb)

* fix(s3): validate PutBucketEncryption rules before storing them

A default-encryption rule naming an unknown `SSEAlgorithm` (for example
`AES128`), a rule without `ApplyServerSideEncryptionByDefault`, an empty
rule list, or a `KMSMasterKeyID` on an `AES256` rule was stored as
written: the only algorithm check on the route decided whether to fill
in the default KMS key. `GetBucketEncryption` then advertised that
configuration while the write path encrypted header-less writes under
its `AES256` fallback, so the bucket's declared and actual schemes
disagreed. Two comments claimed the route already refused unknown
algorithms.

Validate the configuration before any of it is applied: `MalformedXML`
for a malformed rule set or unknown algorithm, `InvalidArgument` for a
key id on a non-KMS rule, and nothing stored on refusal. Correct the two
comments to describe when the AES256 fallback is still reachable.

Unit tests cover every refusal and the accepted shapes; an e2e test
checks the refusals leave the previous configuration in place. The
e2e-full selection digests are refreshed from the current listing.

(cherry picked from commit 29e4486dce41197ed93f5253cdbabc57d27a4ddb)

* test(e2e): refresh e2e-full selection for the combined KMS/SSE fixes

* test: align two unit tests with the new KMS and bucket-encryption contracts

`scheduled_deletion_carries_a_deadline_and_can_be_cancelled` still
expects the state error (`InvalidOperation`) for cancelling a key that
is not pending deletion; only the Static backend's mutations moved to
`UnsupportedCapability`. The uninitialized-store PutBucketEncryption
test now sends a well-formed AES256 rule so it reaches the store lookup
instead of the new configuration validation.

(cherry picked from commit e2e6a2535a)

* fix(site-replication): keep an operator's bucket-level target to a peer instead of taking it over (#7709)

* fix(site-replication): keep an operator's bucket-level target to a peer instead of taking it over

Site replication wired each bucket by looking for an existing replication
target "to the same peer" and rewriting the first match in place as its own
same-name target. An operator's bucket-level target that happened to point
at that site (different target bucket, operator credentials) was the first
match whenever it pre-dated the join, and the reconciler repeats the pass
every 600s, so the takeover also depended on target order afterwards. The
operator's rule then named an ARN no target backed and their bucket
replication stopped silently, while the inherited bucket-level reset id
made every site resync report the bucket as owned by another resync
(rustfs/backlog#2479, rustfs/backlog#2489).

Follow MinIO's `getRemoteARN` / `getRemoteARNForPeer` shape instead:

- Wiring updates a target in place only under the same ARN, or when it is
  recognisably the site's own under an older ARN shape (same peer,
  same-name target bucket, site replication service account). Anything
  else gets the site target added next to it.
- The site resync manifest takes the target the derived
  `site-repl-<deployment id>` rule names (same-name shape as fallback), so
  an operator target to the peer neither aborts the bucket as "multiple
  remote targets matched peer" nor gets resynced into.
- Peer removal prunes only targets a pruned derived rule names or the
  same-name target bucket; operator targets stamped with the peer's
  deployment id survive together with their rules.

Unit tests cover the three predicates. e2e
`test_site_replication_keeps_operator_bucket_target_to_peer` runs a
bucket-level replication plus `replication-reset` to the future peer, joins
the sites, and requires the operator target untouched, both paths
delivering, the site resync completing against the site target, and the
operator target and rule surviving `replicate remove --all`; without the
fix it fails at the join with the operator target gone. The repl-nightly
selection digest is refreshed for the new case.

* test(site-replication): drop a redundant clone flagged by clippy

The reconcile unit test cloned the remote peer into the state map although
the binding is not used afterwards; workspace clippy (-D warnings) rejects
that as redundant_clone.

(cherry picked from commit ecdc55fa4b)

* fix: enforce S3 permissions for recursive force deletion (#7661)

* fix: enforce S3 authorization for recursive deletion

* fix: satisfy the s3s footprint guard

* fix: restore list versions policy compatibility (#7686)

(cherry picked from commit 3fd1ce414d)

* fix(ci): repair functional defaults and chain regression checks (#7664)

* fix(ci): default functional suites to nightly packages

* test(ci): follow the fault-tolerance chain handoff

(cherry picked from commit 509a0fa90c)

* fix(ci): align security workflow tests with chain (#7679)

(cherry picked from commit d9e47d2813)

* test(ecstore): keep tier cleanup tests stable after immediate receipt queueing

Release PR #7766 made PUT/CopyObject overwrites queue the tier free-version cleanup receipt immediately, which broke two ecstore tests on release CI. In tier_overwrite_put_and_self_copy_recover_persisted_cleanup_owners the restarted store already runs expiry workers from the second iteration on, so they deleted the remote bytes before the test could assert that the commit leaves them in place; the test now fails the first remote DELETE via set_remove_failure(true) so the cleanup owner stays durable and the later restart still has to rediscover it from xl.meta (the failed remove does not bump remove_count, and the test re-enables removes before the recovery wait). In batch_transitioned_delete_post_commit_failures_roll_back_without_free_version_receipt the convergence loop now treats a transient InsufficientReadQuorum as "not yet converged", because cleanup rewrites xl.meta disk by disk and a racing read can briefly miss quorum (seen in the rio-v2 lane); any other error still panics.

* Revert "fix(ci): align security workflow tests with chain (#7679)"

This reverts commit 4544359f6d.

* Revert "fix(ci): repair functional defaults and chain regression checks (#7664)"

This reverts commit 5ba7ec0291.

* fix(ecstore): pass shard integrity to backported ingest-mode test

The stalled-reader test backported with #7659 used main's four-argument encode_with_ingest_mode, but release's signature takes an optional IntegrityBuilder, so pass None to keep the test focused on ingest-mode cleanup.

---------

Co-authored-by: Henry Guo <marshawcoco@gmail.com>
Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: RJ Regenold <rregenold@teamraft.com>
Co-authored-by: RJ Regenold <214054+rjregenold@users.noreply.github.com>
Co-authored-by: cxymds <cxymds@gmail.com>
Co-authored-by: GatewayJ <835269233@qq.com>
Co-authored-by: Jason Kossis <jkossis@gmail.com>
2026-09-14 07:51:15 +08:00
Hauser 8982b4a3d2 fix(tier): preserve cleanup scheduling for overwrites (#7766)
Queue committed tier free-version cleanup receipts for PUT and materialized CopyObject overwrites of transitioned null versions, while keeping remote deletion behind the existing persisted free-version cleanup path.

Tighten data-movement delete-marker retry equivalence by ignoring local bucket-incarnation fencing metadata, avoid retry fallback to the source pool, and keep version-list pagination from manufacturing an empty final page.

Refresh the e2e-distributed selector hash for the current release test set.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-14 01:31:12 +08:00
Hauser 568e8cbe0c fix(scanner): run bootstrap usage rebuild promptly (#7758)
Treat non-authoritative usage floor startup as pending bootstrap rebuild work so reset-published bootstrap markers cannot sit behind clean-idle or empty pause-backlog delay.

Wire recovery wakeups into the normal scanner cycle wait and expose the pending rebuild state in scanner status.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-14 01:22:45 +08:00
Hauser ed7baf534b test(ecstore): serialize tier cleanup owner matrix (#7765)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-14 01:20:15 +08:00
Hauser 0900d78877 fix(tier): classify invalid remote credentials (#7753)
* fix(tier): classify invalid remote credentials

Classify deterministic remote-tier auth rejections before the probe cleanup fallback, and preserve the admin 4xx status for invalid credential responses.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(ecstore): stabilize delete-marker movement regressions

Ignore target-local bucket incarnation fence metadata when comparing data-movement delete-marker identities, keep the release null-version listing fixture valid, and fix the nextest decommission-family filter so fault-hook tests actually join the serial group.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-14 01:04:40 +08:00
Hauser 8f6d06db21 fix(s3): classify copy source part read failures (#7746)
Map PartMissingOrCorrupt to SlowDownRead only at the GetObject/CopyObject source-reader boundary so quota metadata corruption keeps its internal fail-closed response.

Add store and e2e coverage for Harbor-style multipart staging CopyObject boundaries.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-13 22:57:25 +08:00
cxymds 3e156ee61e fix(heal): bind bucket recovery to its original incarnation (#7744)
* fix(heal): bind bucket recovery to its original incarnation

* fix(heal): preserve stable bucket heal task errors
2026-09-13 22:00:28 +08:00
cxymds 3ca3e26cec fix(rebalance): retry contended runtime metadata access (#7752)
* fix(rebalance): retry contended runtime metadata access

* chore(rebalance): shrink typed error ratchet baseline
2026-09-13 21:44:11 +08:00
cxymds 13093c5afc fix(s3): preserve version identities on suspended reads (#7751) 2026-09-13 21:44:01 +08:00
cxymds 41770983d6 fix(heal): preserve historical null version identity (#7749) 2026-09-13 21:43:43 +08:00
cxymds 244e7dfb99 fix(heal): retire stale delete markers after bucket recreation (#7743)
* fix(heal): prove completed historical version cleanup

* test(heal): use debug runtime stack for C06 regression

* fix(heal): retire stale delete markers after bucket recreation

* test(ecstore): fix Clippy in retired marker regressions
2026-09-13 21:26:11 +08:00
cxymds 17ddecb075 fix(ecstore): gate shard integrity and preserve legacy recovery (#7741)
* fix(ecstore)!: bind bitrot shards to immutable part identities

Verify part, coding-index, and block identity across write, GET, and Heal
paths. Preserve identities across metadata-only copies and repair, include
them in multipart quorum selection, and require payload proof for receipts.

Keep legacy decoding with conservative parity and target-digest validation,
and document its unsupported cases and additional verification I/O.

BREAKING CHANGE: New bound-v1 shards require compatible readers throughout
the fleet. Legacy objects without sufficient integrity evidence return an
error; binary rollback after new writes requires verified data migration.

Refs: rustfs/backlog#2497

* fix(ecstore): preserve shard framing with independent integrity

Commit immutable part-generation Merkle roots and replicated proof indexes without changing existing checksum frames. Verify reads, reconstruction and Deep Heal against metadata quorum; keep legacy reads and explicitly defer unproven legacy data repair.

Preserve multipart rollback generations, require acknowledged durable index publication, and add decoder compatibility and donor-shard regression coverage.

* fix(heal): verify protected partial-write replay
2026-09-13 21:25:58 +08:00
GatewayJ d0c7aec0b4 fix(tables): retain dropped warehouse protection (#7675) 2026-09-13 20:29:59 +08:00
cxymds 39ccd3abb0 fix(heal): prove completed historical version cleanup (#7736)
* fix(heal): prove completed historical version cleanup

* test(heal): use debug runtime stack for C06 regression

* test(ecstore): acknowledge partial PUT heal admission concurrently

* test(mrf): fix journal fault and ownership fixtures
2026-09-13 19:59:47 +08:00
cxymds f21b06dfd2 fix(heal): rebuild truncated xl.meta from healthy quorum (#7730)
* fix(heal): rebuild truncated xl.meta from healthy quorum

* fix(test): pass topology to heal overlap RPC regression

* fix(test): drive heal admission alongside partial PUT

Poll the partial PUT and its mock heal receiver together, bound their handshake, and retain the existing repair-scope assertions.

* fix(test): prepare durable MRF fixtures and Linux heal stack

* fix(test): drive tier cleanup recovery after deferred attempts

---------

Co-authored-by: Hauser <housemecn@gmail.com>
2026-09-13 19:39:02 +08:00
Hauser 71c002d467 fix(scanner): prove dirty ACK after confirmed root write (#7732)
Allow a confirmed scanner root data-usage CAS write to prove its own publication when the follow-up root readback cannot provide a proof. Keep AlreadyDurable and all stale or companion paths on the existing readback-only proof boundary.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-13 15:35:38 +08:00
cxymds 9b835bcca5 fix(heal): persist and retry partial-write repairs (#7729)
* fix(heal): persist and retry partial-write repairs

* test(heal): pass topology to overlap RPC tests

Use the existing coordinator endpoint fixture for the three overlap-test
calls to the endpoint-aware heal control executor. This repairs the E0061
test-build failure inherited from the release base.
2026-09-13 14:33:52 +08:00
cxymds 7a7b080265 fix(heal): verify inline shard bitrot during deep scans (#7731)
* fix(heal): verify inline shard bitrot during deep scans

* test(heal): fix CI lint and topology fixtures
2026-09-13 14:29:41 +08:00
Hauser cfe1d4d456 fix(heal): pass endpoints to overlap receipt test (#7738)
Reuse the heal-control endpoint fixture in the overlap receipt regression so the test matches the updated execution helper signature and selector validation boundary.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>

Co-authored-by: hehutu <hehutu@gmail.com>
2026-09-13 14:03:11 +08:00
cxymds ae8d079658 fix(heal): reject invalid admin selectors before admission (#7724) 2026-09-13 10:55:46 +08:00
cxymds 2cfefcfd65 fix(heal): reject overlapping admin heal owners (#7723) 2026-09-13 10:55:35 +08:00
hector 7776004977 ci: tolerate ANSI reset escapes in security verdicts; fix tier product counts (#7712)
The overnight run after #7708 proved the security verdict greps still
counted zero: real verdict lines are '\e[1;31m[FAIL]\e[0m STS-105 ...'
— the reset escape sits between the tag and the case id, and the
pattern only tolerated escapes before the tag. Allow escapes on both
sides; the fixture now emits the reset too, mirroring the real suite.

The tier case table is produced by rustfs_tier_report.py and its rows
lead with the topology column, so the case-ID-first table grep matched
nothing ('Product result: 0 passed, 0 failed'). Parse the PASS/FAIL
counts from the '## Case Summary' bullets the report always emits,
falling back to a topology-aware table grep.
2026-09-13 08:50:32 +08:00
hector 19c7ed68be ci: harden report steps after first full new-semantics run (#7708)
First full serial pass with the green-on-case-failure semantics
(run 34693745171 / 34695021651) exposed three report-layer defects:

security: the report step referenced LOG_FILE, which is undefined in
this workflow (set -u killed the step before writing report.md), and
the verdict greps could not match the ANSI-escaped [PASS]/[FAIL] tags
in the real suite log. Point it at the artifacts suite.log, allow any
number of color escapes before the verdict tag, and count [SKIP]
lines separately (45 passed, 6 failed, 3 skipped was reported as an
unbound-variable crash).

pool: warp is stopped early (SIGINT) at the storage threshold and
only writes its final report on a clean exit, so an empty warp.log is
the expected shape of a healthy run - require its presence, not its
size. A mid-script die() abort or a FAIL step verdict must also turn
the validator red now that the run step is continue-on-error.

tier: add the standard 'Product result: N passed, M failed' summary
line computed from the case table, matching the other suites.

The contract test fixture previously injected LOG_FILE into the
environment and wrote verdict lines without ANSI escapes, which hid
both real-world defects; the fixture now mirrors the real suite
(stdout+tee with color tags) and asserts the pass/fail/skip counters.
2026-09-12 23:48:37 +08:00
GatewayJ 455c36a3fd fix(tables): authorize reserved metadata reads (#7672) 2026-09-12 22:24:19 +08:00
houseme 684900fbb9 test(heal): remove unused G14 put helper (#7705)
Remove the superseded ServiceUnavailable-only PUT helper after the G14 outage PUT probe switched to the shared retry classifier.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-12 18:39:29 +08:00
houseme 023a674cd4 test(heal): retry G14 outage put probes (#7704)
Treat SlowDownRead as a retryable outage PUT probe response in the G14 multi-pool runner, and label terminal candidate failures with stage context.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-12 18:19:31 +08:00
houseme adfde0110b test(heal): retry G14 deferred outage put (#7703)
Treat SlowDownRead as a bounded retryable deferred PUT response after the target pool rejoins, and label terminal deferred outage PUT failures with stage context.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-12 18:07:33 +08:00
hector bcf5184a85 ci: green runs for case failures; red only for harness breakdowns (#7698)
A failing product case used to turn the whole workflow red, so the run
conclusion carried no signal beyond 'something failed' and the report
was suppressed. New semantics across the functional suites:

- Suite steps run with continue-on-error: the outcome is still recorded
  for the report and the backlog issue manager (security/tier already
  carried the flag).
- Generate report always publishes the full per-case table plus a
  'Product result: N passed, M failed' summary, and its exit gate is
  harness health: red only when the suite never reached case level (no
  case verdicts), failed wholesale (zero passes, >=3 failures), or was
  cancelled/skipped. performance is unchanged (parked).
- tier's structured gate no longer fails on case failures; it keeps red
  for evidence-init and missing-gate-result breakdowns.
- pool/performance keep their existing red sources (install/benchmark).

Workflow contract tests updated to the new exit semantics: the security
report matrix keys green off the suite outcome, the evidence matrix
expects green for failure outcomes with recorded case rows (except
performance), the heal staged-rerun block expects the per-step table to
always publish, and run steps are now required to carry
continue-on-error.

Verified locally: actionlint clean; test_security_workflow.py 21/21.
2026-09-12 17:33:29 +08:00
cxymds f90d4071a5 fix(heal): preserve settings in token status (#7691)
* fix(heal): preserve settings in token status

* fix(heal): group status response context

* fix(heal): decode partial status settings
2026-09-12 17:22:58 +08:00
houseme e3ecbf5db9 test(heal): label G14 recovery read failures (#7701)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-12 17:22:10 +08:00
houseme 59f1c68759 fix(scanner): require ABBA collector credentials (#7700)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-12 17:03:48 +08:00
hector 4f0e050b39 fix(pool): default the node-endpoints fallback to the 4-node fleet (#7696)
RUSTFS_POOL_NODE_ENDPOINTS has no secret/var configured, so the suite
ran with the workflow's inline 3-endpoint fallback and the explicit
--node-endpoints flag overrode the script default fixed in
rustfs/auto-testing#61 — every dispatch died at startup with 'must
provide at least 4 direct node endpoints' (run 34677538650). Add
rustfs-node4 to the fallback; explicit secret/var still wins.
2026-09-12 17:02:28 +08:00
houseme 741cd0ec3b test(heal): retry recovery readback SlowDownRead (#7695)
Allow the Scanner/Heal interruption oracle to retry transient retryable GET failures after replacement recovery has converged. The readback still verifies exact object bytes and keeps a bounded timeout, so permanently unreadable objects continue to fail the case.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-12 16:50:52 +08:00
houseme 824231ff1a test(scanner): report Linux descriptor drift ledger (#7692)
Add a read-only descriptor ledger mode to the Scanner/Heal Linux evidence planner so release operators can separate current-head measured descriptors from old-head measured artifacts and case-level inputs before final bundle assembly.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-12 13:29:29 +08:00
cxymds 66026d7d7b test(ecstore): stabilize cancelled rename test (#7684) 2026-09-12 11:22:49 +08:00
houseme 82a4083981 fix(storage): alias legacy meta bucket over internode rpc (#7685)
* fix(storage): alias legacy meta bucket over internode rpc

Retry read-only internode RPC metadata access from legacy .minio.sys to .rustfs.sys when mixed-version peers report missing metadata during rolling upgrades.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(ecstore): target durable ILM receipt quorum fixture

Use the actual durable ILM receipt object path when taking target disks offline so the test exercises receipt write quorum instead of whichever set owns the source record path.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-12 11:16:08 +08:00
hector 9f5ff23fd8 ci: manage backlog issues by signal instead of per-run filing (#7680)
* ci: manage backlog issues by signal instead of per-run filing

The suite workflows used to file one backlog issue per failed run
(dedup was by run ID, which never matched), so issues accumulated
without bound. Replace the inline filing step in every suite workflow
(s3, kms, tier, storage, heal, pool, security, replication, upgrade,
performance) with a single call to
auto-testing/scripts/issue_manager.py, which:

- dedups by signal: failing cases are searched among open issues by
  label (suite category + case ID); covered cases become a coalesced
  comment on the existing issue, only uncovered cases file a new one
- labels new issues with functional-test, the suite category, one
  label per failing case ID (lazily created), and env for
  bootstrap-class failures (no cases ran, wholesale failure, or
  404/ssh/clone/dpkg signatures in the log)
- closes open issues of the suite after a fully green run, citing the
  run as evidence; cancelled runs never file or close anything

The step is skipped cleanly when auto-testing (private checkout) does
not contain the manager, or when PF_TESTING_GH_TOKEN is unset.

* fix(ci): satisfy actionlint and workflow contract tests for the manager step

- heal and performance workflows have no rustfs_version dispatch input;
  referencing `${{ inputs.rustfs_version }}` in the manager step failed
  actionlint's expression type check. Their package source now resolves
  from package_url with the nightly fallback.
- scripts/test_security_workflow.py pinned the removed inline filing
  step. The wiring assertions now pin the manager step (manager path +
  per-suite report argument), and the evidence/stale-file tests assert
  the skip contract instead: without the private auto-testing checkout
  present, the step exits 0, publishes nothing, and leaves stale
  evidence untouched.

Verified locally: actionlint clean, shellcheck clean,
test_security_workflow.py 21/21.
2026-09-12 09:28:30 +08:00
hector 5fc92cdd27 ci: stop defaulting suite dispatches to a pinned release (#7681)
The rustfs_version dispatch input defaulted to 1.0.0-rc.4-preview.1,
which shadowed the nightly fallback and started 404ing once that
release was deleted. Manual dispatches with no inputs now fall through
to the nightly package (same contract the pool suite already has);
passing rustfs_version or package_url still pins the build exactly as
before. Chain (repository_dispatch) runs are unaffected: the inputs
context is empty there, so they always used the nightly fallback.
2026-09-12 09:28:21 +08:00
cxymds 7bd09a00b0 fix(get): reject pre-header read quorum failures (#7670)
* fix(get): reject pre-header read quorum failures

* fix(ci): unblock get pre-header quorum checks
2026-09-12 09:21:14 +08:00
hector 729cff5f32 feat(ci): add fault-tolerance degradation suite to the functional chain (#7669) 2026-09-12 09:05:45 +08:00
cxymds c478a392e7 fix(heal): select writable recovery intent owner (#7668) 2026-09-11 22:38:23 +08:00
cxymds c8ccc1e198 fix(heal): recover stale peer state after restart (#7665) 2026-09-11 22:37:48 +08:00
cxymds 74ba5c205c fix(ecstore): preserve multi-pool version histories (#7658)
* fix(ecstore): preserve multi-pool version histories

* fix(ecstore): satisfy clippy in rebalance test

* fix(ecstore): preserve decommission delete compatibility
2026-09-11 22:36:15 +08:00
hector 9fcd54734b Revert "feat(ci): add fault-tolerance degradation suite to the functional chain" (#7666)
This reverts commit 6eb200022e.
2026-09-11 22:30:16 +08:00
xiaomage 6eb200022e feat(ci): add fault-tolerance degradation suite to the functional chain
Adds a fault-tolerance suite that verifies read/write behavior under
drive and node loss against the erasure-coding contract and snapshots
health-endpoint responses at every degradation tier. Scenarios are
derived from product source (default_parity_count, erasure set sizing):

- A: single-node 4 drives (EC:2, read quorum 2): hide 1/2/3 drives
- B: multi-node 4x1 (one set of 4, EC:2): stop 1/2/3 nodes
- C: multi-node 4x4 (one set of 16, EC:4, read quorum 12): 1 node down
  lands exactly on the read-quorum boundary; 2 nodes down breaks it
- C2: multi-node 4x4 with RUSTFS_STORAGE_CLASS_STANDARD=EC:8 (read
  quorum 8, write quorum 9, lock majority 9): 2 nodes down puts reads
  inside the reported divergence window (read quorum met while the
  lock majority is broken)

By default a reads-refused-despite-met-read-quorum observation is
reported as known-divergence without failing the suite; the strict
input escalates it. Chain order becomes:
upgrade -> s3 -> kms -> tier -> storage -> heal -> pool -> security ->
replication -> fault-tolerance -> performance.

Covers the findings of the 2026-09 external degradation report
(reads at read quorum, health-endpoint readiness truthfulness,
degradedReasons capture) as automated regression probes.
2026-09-11 21:53:22 +08:00
houseme 92ce782999 fix(scanner): wait for ABBA telemetry window (#7660)
Size the scanner collector wait budget from the requested sample count and interval instead of using a fixed 120 second timeout. This preserves the full duration/60+1 telemetry sample set for measured ABBA runs.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-11 21:44:37 +08:00
cxymds bf425ca32c fix(heal): reuse API error boundary for decoding failures (#7647)
* fix(heal): reuse API error boundary for decoding failures

* Update heal.rs

Signed-off-by: houseme <housemecn@gmail.com>

* test(ecstore): synchronize batch cleanup metadata reads

Acquire object read locks while observing unversioned and explicit-version batch cleanup, then release them before waiting for progress. This prevents snapshots from spanning per-disk marker removal while retaining the existing quorum, timeout, and remote delete count assertions.

Validation: cargo fmt --all --check and git diff --check passed. The focused nextest test passed 20 stress iterations each with test-util and test-util,rio-v2, with retries disabled.

---------

Signed-off-by: houseme <housemecn@gmail.com>
Co-authored-by: houseme <housemecn@gmail.com>
2026-09-11 13:46:35 +08:00
houseme 0ae38aabbc test(e2e): target multi-set outage heal candidate (#7653)
* test(e2e): target multi-set outage heal candidate

Require the outage write used by EC8+4 multi-set root-heal evidence to miss the same erasure index owned by the selected replacement drive. This avoids accepting a candidate from a different set and turning a valid heal into a false negative.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(e2e): satisfy G14 heal lint gates

Remove clippy-only noise from the G14 multi-set heal evidence test and align the admin route policy inventory with the registered heal catch-all route.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* update

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-11 08:22:10 +08:00
houseme 77ba4f1b2e fix(e2e): record EC8+4 drive restart set size (#7648)
* fix(e2e): record EC8+4 drive restart set size

Include the erasure set drive count in the distributed EC8+4 drive restart oracle so Scanner/Heal release evidence matches the registry contract.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(s3): tighten s3s footprint ratchet

Replace release-merge s3_error! macro calls with equivalent S3Error constructors so the s3gate migration ratchet does not grow on the PR merge tree.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 22:52:06 +08:00
cxymds 7b6e45d372 fix(heal): preserve null-version tags and encoded object paths (#7644) 2026-09-10 21:10:32 +08:00
cxymds 09c85a5f29 test(ilm): restore noncurrent compensation tests to serial CI (#7645) 2026-09-10 20:36:32 +08:00
cxymds 00aeb12914 fix(ilm): preserve cleanup ownership on tiered overwrites (#7639)
* fix(ilm): preserve cleanup ownership on tiered overwrites

* fix(ci): refresh E2E selection for tier overwrite regression
2026-09-10 20:14:07 +08:00
houseme ffb18979f8 fix(scanner): find nextest junit fallback for evidence cases (#7643)
Handle cargo-nextest writing JUnit reports under the workspace target directory even when the Rust build uses CARGO_TARGET_DIR. This keeps measured Scanner/Heal evidence cases from passing the real test but failing final receipt packaging.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 19:58:00 +08:00
houseme 97c7b451d2 test(scanner): bound G14 multi-pool evidence size (#7640)
Keep the multi-pool evidence runner within the registry object budget while retaining deferred outage-write diagnostics for release-gate validation.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 18:08:02 +08:00
houseme 9ba95cac37 test(e2e): record deferred G14 outage writes (#7637)
Include optional outage-write diagnostics in G14 evidence oracles so deferred multi-pool outage writes bind their down-window refusals and post-rejoin acceptance.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 17:48:44 +08:00
houseme cec796328c test(e2e): keep G14 multi-set restart graceful (#7633)
test(e2e): keep multi-set restart graceful

Include the EC8+4 multi-set restart scenario in the graceful interruption lane so the unclean-shutdown marker assertion matches the scenario semantics.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 17:10:46 +08:00
houseme 1aa4fa145f fix(ecstore): use pool lock quorum for set writes (#7630)
Use the pool-wide namespace lock client domain for every set in a pool so degraded EC8+4 multi-set writes are gated by node-level lock quorum instead of the narrower per-set endpoint host slice.

Keep namespace-lock domain deduplication tied to both the pool namespace and shared clients, and add regression coverage for three-locker degraded writes plus cross-pool domain separation.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 16:42:21 +08:00
houseme d286f3d06c chore(deps): refresh release dependencies (#7632)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 16:41:31 +08:00
houseme 3391528025 fix(ecstore): allow metadata snapshots at read quorum (#7627)
fix(ecstore): admit metadata snapshots at read quorum

Allow guarded bucket metadata snapshot existence checks to use read quorum so degraded erasure sets can continue Object Lock snapshot reads without weakening bucket mutation or object write quorum.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 15:34:13 +08:00
houseme 0d1490da3c test(scanner): verify deferred multipool outage evidence (#7629)
Validate the G14 multi-pool oracle field that records down-window outage PUT refusal and requires the deferred post-rejoin outage object to be accepted and checked through S3.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 15:32:13 +08:00
houseme 6421a7ff60 test(scanner): add G14 multi-pool background heal evidence (#7628)
test(scanner): align G14 multi-pool outage evidence

Treat the localhost multi-pool topology as whole-pool loss when the target node is down. If that topology cannot admit the outage object while the pool is offline, defer that object write until the pool rejoins and record the oracle marker instead of failing before the real crash/restart evidence runs.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 15:20:32 +08:00
houseme 27141f6312 test(scanner): report Linux evidence plan status (#7624)
Add a status mode for the Scanner/Heal Linux evidence planner so operators can identify missing or incomplete artifacts before final bundle assembly.

The status output stays plan-only and never reports release approval.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 15:10:14 +08:00
houseme 940e221988 test(e2e): select G14 replacement drive by evidence (#7622)
Choose the replacement disk from the target node by the presence of complete pool metadata instead of assuming the first configured drive is the scanner metadata holder. This keeps the G14 multi-set harness aligned with multi-drive EC layouts and adds clearer diagnostics when multi-pool outage writes fail closed.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 14:10:20 +08:00
houseme 8b66e9b62a test(scanner): plan Linux evidence validation (#7620)
Add a Scanner/Heal Linux release-evidence planner that emits a machine-readable execution manifest for the remaining measured validation lanes.

The planner can run only lightweight preflight checks and keeps plan-only output distinct from measured release evidence.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 14:09:13 +08:00
Zhengchao An 6a879be1fb test: report tier reference proof setup failures without hanging (#7608) 2026-09-10 13:35:01 +08:00
houseme 0b40d47a8a fix(scanner): bind scoped ack confirmation to generation (#7619)
Require lost scoped dirty-usage ACK reconciliation to observe a clean peer activity generation that covers the requested ACK generation. Apply the same guard in the scanner aggregation path so a stale clean activity snapshot cannot discharge pending maintenance after an uncertain ACK response.

Refs rustfs/backlog#2427

Refs rustfs/backlog#2281

Refs rustfs/backlog#2240

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 12:38:23 +08:00
houseme e292637ee0 test(scanner): collect status outcome raw evidence (#7618)
Normalize live Scanner/Heal status/outcome observations into the measured raw artifacts consumed by the G05/G06/R-D release descriptor producer.

Reject synthetic observations, incomplete required cases, and reused run/window identities before raw artifacts can enter the release bundle flow.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 12:37:11 +08:00
houseme 8b6b1e53a3 test(scanner): reject synthetic heal evidence inputs (#7617)
Harden the Scanner/Heal checkpoint restart and G14 EC evidence producers so release descriptors cannot be assembled from marked fixture, dry-run, or synthetic case inputs.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 12:20:27 +08:00
houseme 358bf6832d fix(scanner): harden heal release gates (#7614) 2026-09-10 12:03:55 +08:00
Zhengchao An 70fb8bf504 fix(ci): align release E2E gate and repair regression tests (#7607) 2026-09-10 12:03:27 +08:00
houseme 110f630a5c fix(scanner): bound native backlog fixture resources (#7609)
* fix(scanner): bound native backlog fixture resources

Keep native scanner backlog restart fixtures within low file descriptor limits by reducing the native-only disk layout, making fixture shutdown drain background work, and avoiding long-lived ECStore retention from background loops.

Convert ECStore-backed background refresh/recovery/monitor tasks to upgrade weak owners only while doing work so completed test stores release their disk graph before the next native fixture starts.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(tier): refresh release-merged failure fixtures

Reuse the raw legacy-transition fixture helper so delete-all expiry actually exercises Unknown transitioned history metadata after the release merge.

Rewrite restore-failure disk fixtures through per-disk xl.meta snapshots so stale destination identities can be persisted without tripping ordinary metadata update guards.

Update the SSE KMS mismatch expectation to the InvalidRequest/context_mismatch behavior now returned by the rio-v2 path.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 11:28:27 +08:00
houseme 54bd3c8e24 test(scanner): stabilize W13 release gate evidence (#7613)
* feat(nightly): publish packages as assets of the rolling 'nightly' release (sync from release) (#7593)

feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)

Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).

- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
  the 'nightly' release via the REST API, deletes same-name assets,
  uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
  body with the build provenance (ref@sha, run link, sizes, SHA256).
  Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
  exercised end-to-end against the real release with probe files
  (create / upload / overwrite / download round-trip / body update).

* test(scanner): stabilize W13 release gate evidence

Treat only real raw-entry windows as replayed scanner enumeration in the restart diagnostic, so final completion rounds without raw entries are not fail-closed as raw replays.

Allow the EC8:4 multi-pool heal evidence case to select an outage object key that routes to an online pool while an entire target pool is down, preserving strict behavior for single-pool cases.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: hector <42570491+majinghe@users.noreply.github.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 10:08:55 +08:00
Zhengchao An 1643cb29f1 test: align transition fixtures and KMS context expectations (#7610) 2026-09-10 10:07:50 +08:00
cxymds bf8d5a32b6 fix(ecstore): retry contended decommission cancel target locks (#7612) 2026-09-10 09:52:43 +08:00
houseme 230eeb5fb5 test(scanner): bind G14 case artifacts (#7611)
Require Scanner/Heal G14 release bundle JSON wrappers to mirror their outer evidence and carry self-contained case artifact provenance.

Copy proof-json case artifacts into the generated G14 descriptor bundle so assembled release bundles can validate case file hashes after relocation.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 08:07:08 +08:00
houseme 2c6f5f22c0 chore(deps): refresh workspace dependencies (#7606)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 01:23:27 +08:00
houseme d7b6a8c10d fix(scanner): avoid movement debt for stale remote lease (#7605)
Classify a final remote scanner publication lease validation failure from a fresh activity snapshot instead of treating every validation error as data movement. If the peer session and movement generation still match the granted leases and publication is otherwise allowed, keep the publication rejected as an activity-baseline miss without creating pause backlog movement debt. Preserve DataMovement for expired leases, peer restarts, movement generation changes, and active publication blocks.

Tests cover namespace-only validation invalidation and the remote fence-loss cases that must still defer as DataMovement.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 01:17:41 +08:00
houseme e8ffd72575 fix(heal): retry fully recoverable batch failures (#7604)
Allow recursive bucket and cluster heal attempts whose retained batch failure is entirely retryable to use the existing bounded manager retry budget. Permanent or mixed batch failures remain terminal so heal outcome semantics stay strict.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 01:14:39 +08:00
houseme 0b03d535c3 test(scanner): bind status outcome raw provenance (#7603)
Require measured G05/G06/R-D raw status, compatibility, and disposition artifacts to share run identity before producing release bundle descriptors.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 01:05:11 +08:00
houseme 3afb389247 test(scanner): harden scoped ack evidence proof (#7602)
Require Scanner/Heal G03 scoped ACK evidence fields to carry their own measured provenance and concrete ACK, capability, and mixed-peer observations before release-bundle gate verification.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 01:05:00 +08:00
houseme 86b6569071 test(scanner): harden durable producer evidence gate (#7601)
Require Scanner/Heal G11 maintenance evidence to prove durable dirty producer journal replay, replay-state hydration, generation-bound ACK clearing, and invalid journal fail-closed cases before segment reuse can be activated.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 00:49:47 +08:00
houseme 0940fbe1b2 test(heal): cover retry budget across attempts (#7600)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 00:49:33 +08:00
houseme 9e7c5dc932 fix(heal): surface first failed object in status (#7599)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 00:49:16 +08:00
houseme 45806bf295 test(scanner): bind raw profile artifacts (#7598)
Require Scanner/Heal release profile wrappers to carry bundled raw profile artifacts plus the matching profile cost metrics.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 00:49:01 +08:00
cxymds 42f00d8532 fix(scanner): seed current backlog members before committing (#7594)
* fix(scanner): seed current backlog members before committing

* test(app): run recursive force delete test on large stack

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-10 00:48:36 +08:00
houseme 3e46d61a91 test(ecstore): remove redundant transition clone (#7597)
Drop an unnecessary clone in the legacy transition state digest regression so release CI clippy lanes can run with warnings denied.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 23:43:44 +08:00
cxymds 88183daf10 feat(ilm): backfill proven legacy transition state (#7591)
* feat(ilm): backfill proven legacy transition state

* fix(ilm): remove redundant reconcile test clone

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 23:40:30 +08:00
houseme 8be1e9b2c1 test(scanner): add release bundle evidence descriptors (#7595)
* test(scanner): merge release evidence descriptors

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): add authority and legacy release descriptors

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): add scoped ack release descriptor

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): require all release evidence fields

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): add mrf release descriptor producer

Add a standalone W13 MRF descriptor producer for measured G07/G08/P4 raw artifacts, with fail-closed self-tests for missing responsibility cases, disk-full ENOSPC observations, synthetic artifacts, and short P4 cleanup soaks.

Also bind G12 quota path evidence to explicit case lists so W16 descriptors cannot pass without reset and settlement coverage.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): reuse mrf release descriptor producer

Route the W13 runner through the shared MRF descriptor producer so measured runs and offline re-packaging use the same fail-closed validation.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 22:55:43 +08:00
hector 9b4b366209 feat(nightly): publish packages as assets of the rolling 'nightly' release (#7592)
Replace the assets-branch scheme with a proper GitHub Release on
rustfs/auto-testing: a single 'nightly' release whose deb/rpm assets
are replaced in place on every build. This is the standard channel —
visible on the repo's Releases page, stable download URLs, no git
history growth (release assets live outside the repository).

- New scripts/release/publish_nightly_assets.sh: resolves-or-creates
  the 'nightly' release via the REST API, deletes same-name assets,
  uploads rustfs-nightly-latest.{deb,rpm}, then PATCHes the release
  body with the build provenance (ref@sha, run link, sizes, SHA256).
  Plain curl + python3, no gh CLI (the build fleet has none — #7586).
- The workflow step shrinks to invoking the script; full flow
  exercised end-to-end against the real release with probe files
  (create / upload / overwrite / download round-trip / body update).
2026-09-09 21:30:37 +08:00
houseme 43436ad5a7 fix(test): stabilize release CI heal fixtures (#7589)
Keep heal admission-only tests off durable root recovery so mock storage does not require local metadata disks. Align forceStart retry assertions with replacement semantics and fix the e2e metric clippy collapse.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 20:01:42 +08:00
Zhengchao An 0c7b6188b2 fix: reuse admin error boundary for legacy tier reconciliation (#7587) 2026-09-09 19:57:34 +08:00
houseme 3ffc3704af test(scanner): add release evidence ingestion gates (#7588)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 19:56:43 +08:00
houseme de3ac27a6a chore(release): merge main into release
Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-09 19:33:59 +08:00
cxymds 2d0e82e9f7 feat(ilm): inspect legacy transition version state (#7581) 2026-09-09 19:01:01 +08:00
cxymds c92fabea3a fix(ecstore): avoid Windows batch-delete cleanup sharing conflicts (#7579)
Co-authored-by: houseme <housemecn@gmail.com>
2026-09-09 19:00:39 +08:00
cxymds b3b0d892bb fix(metrics): prevent duplicate drive reporting across nodes (#7582)
Co-authored-by: houseme <housemecn@gmail.com>
2026-09-09 19:00:20 +08:00
houseme d9ae1654b6 fix(scanner): stabilize retired backlog survivor commits (#7585)
Treat an authoritative scanner pause-backlog commit as stable when every member in that commit stores the matching stable and committed record. Retired source replicas can remain missing in the observed topology while survivor membership is already stable.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 18:40:43 +08:00
hector 15949180c9 fix(nightly): push assets with plain git on release — the build fleet has no gh CLI (#7586)
fix(nightly): push assets with plain git — the build fleet has no gh CLI

The sm-standard-4 runners used by the nightly build have no gh binary
(functional-chain workflows run elsewhere, on the jumpbox). The assets
publish step died on 'gh: command not found' at the credential-helper
setup, and the preceding clone failure had been masked by 2>/dev/null,
misleading the step into the orphan path. Swap clone and remote setup
to plain git with the token embedded in the URL; push semantics are
unchanged.
2026-09-09 18:33:16 +08:00
houseme f65305e97f test: add scanner heal G14 multiset evidence (#7583)
Add EC8+4 multi-set and multi-pool scanner/heal release evidence coverage, including e2e registry cases, oracle checks, and a G14 descriptor assembler for measured case artifacts.

Signed-off-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 18:31:46 +08:00
houseme 28ac3ab4e7 test: add scanner heal scheduler pressure evidence (#7584)
Add measured G10/P1/P3 scheduler-pressure release descriptor generation, ABBA scheduler/profile provenance, and focused self-tests for the release bundle gate.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 18:30:08 +08:00
houseme cf41b1d3cf fix(scanner): persist dirty producer journal (#7580)
Persist scanner dirty producer replay records from committed replication and tier mutations, hydrate journal state on restart, and clear durable records only after acknowledged dirty generations.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 18:12:06 +08:00
houseme ca876930b3 test(scanner): bind profile artifact provenance (#7577) 2026-09-09 17:01:32 +08:00
Zhengchao An c05b3ee01e fix: preserve scanner backlog during pool retirement (#7555)
* fix: hand off native scanner backlog before pool retirement

* test: initialize optional proof in data usage fixtures

* perf: bound parallel V3 pool metadata phase writes

* test: keep native backlog fault errors typed

* test: skip unchanged pool metadata in crash barriers

---------

Co-authored-by: cxymds <cxymds@gmail.com>
2026-09-09 16:43:51 +08:00
cxymds 1076e2fb4f fix(health): report storage quorum in node readiness (#7566) 2026-09-09 16:41:11 +08:00
cxymds 51e6733a9c fix(storage): preserve retryable publication guard errors (#7561)
* fix(storage): preserve retryable publication guard errors

* fix(scanner): satisfy scoped cache clippy lint

Use bool::then_some for the scoped cold bucket reuse proof construction after merging the latest release branch.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 16:40:43 +08:00
houseme ed2b2cdd19 fix(heal): prune retained root terminal receipts (#7576)
Bound durable root-heal terminal receipt retention to the completed-status TTL while keeping expired receipts authoritative enough to retire stale pending intents before deleting the receipt itself.

Add a budgeted background GC pass and fail closed on corrupt or non-terminal receipt records.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 16:39:46 +08:00
cxymds 084477e079 fix(ci): align S3 KMS fixtures and default key expectations (#7573) 2026-09-09 16:39:07 +08:00
Zhengchao An bb1b5dea16 fix(ecstore): recover expansion buckets and resume retirement (#7574)
* fix(ecstore): recover partially created expansion bucket volumes

* fix(ecstore): resume retirement after startup safety checks
2026-09-09 16:32:17 +08:00
houseme 1c87413788 fix(scanner): mark committed replication and tier mutations (#7568)
* fix(scanner): mark committed replication and tier mutations

Bridge ECStore committed replication status writebacks and lifecycle tier expiration cleanup into scanner dirty-usage producer identity tracking. Only successful replication metadata updates mark Replication; validate-only, superseded, and retry paths remain unmarked.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* feat(scanner): replay durable dirty producer records

Add a strict scanner dirty-usage producer replay schema that can restore typed producer coverage after restart without treating ordinary process-local mutations as durable evidence. Replay records validate schema, cache key format, generations, scopes, producer identities, duplicate buckets, byte limits, and entry limits before modifying dirty state.

Keep segment activation fail-closed unless the restored bucket state came from durable replay; subsequent local mutations clear the durable authority bit for that bucket. Also fix the release scanner clippy lint in scoped cold-reuse proof creation.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 16:22:26 +08:00
houseme e1fee0569a fix(heal): persist scoped admin admission handoff (#7569)
* fix(heal): persist root admission handoff

Persist administrator root heal ownership before queue publication so crash restart can replay an admitted control-plane start without relying on process-local replay cache state.

Protect queued durable root owners from priority displacement; callers must use forceStart cancellation semantics to replace them.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(heal): persist admin heal handoff types

Extend durable admin heal admission handoff beyond cluster roots while preserving legacy root recovery records. Persist the heal type in schema v2, replay typed admin requests after restart, keep non-admin requests out of the durable control-plane handoff, and allow path cancellation to clear durable-only non-root records.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(heal): preserve disjoint durable admin owners

Limit admin forceStart durable-owner cleanup to overlapping heal requests after the admin recovery journal begins storing non-root work. Add fail-closed and displacement tests so durable bucket owners cannot be silently dropped by unrelated replacement or priority pressure.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* fix(heal): persist admin terminal receipts

Persist terminal receipts for durable administrator heal starts before retiring their pending intent so restart can answer completed or cancelled scoped tasks without replaying them.

Retain pending work when terminal publication fails and keep timeout owners on checkpoint-only replay semantics.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 16:22:15 +08:00
cxymds a6e5bdcbd2 docs(obs): correct metric export interval and explain alert timing (#7571) 2026-09-09 15:26:58 +08:00
hector 923f51cf12 chore(release): sync configurable nightly build workflow from main (#7567)
feat(nightly): make the build branch configurable (NIGHTLY_BRANCH var + dispatch input) (#7557)
2026-09-09 15:26:44 +08:00
cxymds e16274ab14 fix(s3): preserve delete marker read error headers (#7558) 2026-09-09 14:21:11 +08:00
houseme 5eecd657e7 fix(scanner): bind cold scoped cache reuse (#7565)
Record an explicit cold bucket reuse proof for scoped set scans and treat fully cold sets as valid cold-zero-walk reuse when the baseline and bucket incarnations are bound.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 14:20:16 +08:00
houseme 929d906131 fix(scanner): validate scoped ACK clear receipts (#7563)
Fail closed when a signed scoped ACK response claims more cleared entries than its request contained, while preserving partial-clear semantics and zero-mutation capability probes.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 14:19:26 +08:00
houseme 6b802a91eb fix(scanner): bind segment proof to typed dirty suffix (#7564)
Track producer identity completeness per pending bucket and retain process coverage across durable acknowledgements. Admit a prior same-process segment proof only for an exact or strictly earlier fully typed generation window.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 14:19:09 +08:00
cxymds 14b3cffe8f Merge branch 'main' into release
* main:
  fix(rebalance): align activation locks and preserve retryable causes (#7551)
2026-09-09 12:32:55 +08:00
houseme c62384e58d ci(test): enable local KMS for s3 compatibility tests (#7553)
Configure the s3-tests harness with a local KMS key so SSE-KMS cases run in CI without relying on an external KMS service.

Also move the anonymous POST default SSE-KMS regression onto the shared local KMS test environment.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 12:08:06 +08:00
houseme 3f30f6c139 test(heal): reduce W13 evidence helper arguments
Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-09 10:26:59 +08:00
houseme 584a52ce3d test(scanner): fix segment proof fixtures
Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-09 10:22:13 +08:00
houseme 76e025a50c test(scanner): add W13 MRF evidence runner (#7547)
Add a W13 durable MRF evidence runner that emits measured G07, G08, and P4 JSON artifacts and release descriptors through the existing scanner/heal bundle gate.

The runner now executes the ignored MRF replay evidence test with an exact full test path, validates raw artifact kinds and gate decisions, prepares Linux tmpfs-backed ENOSPC roots for G08, and documents the Linux/long-soak boundaries.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 10:08:59 +08:00
houseme b40eb193df test(scanner): roll out distributed e2e selection (#7549)
Refresh the committed e2e-distributed selection digest after the EC8+4 Scanner/Heal evidence case joined the profile, and document the registry-aware runner entry for the distributed case.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 10:08:49 +08:00
houseme 023c987397 test(scanner): run scoped fallback cases on dedicated stack (#7550)
Linux libtest defaults can abort these deep EC-store futures before the assertions run. Wrap the async scoped fallback cases in the repository's dedicated-stack test pattern so the default cargo test path exercises the oracle directly.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 10:00:06 +08:00
houseme a4b265bf77 feat(scanner): enable segment reuse activation gate (#7546)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 09:09:17 +08:00
houseme c176220a34 test(scanner): bind MRF release artifacts to evidence kinds (#7545)
Require Scanner/Heal G07/G08/P4 JSON artifacts to declare the exact MRF evidence kind expected for each release-bundle field. This keeps generic measured JSON from satisfying durable replay, ENOSPC, replica-loss, scale, replay-cost, retained-responsibility, or cleanup-GC soak gates.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 08:34:55 +08:00
houseme 82ac2dff05 feat(scanner): admit durable segment proof replay (#7544)
* feat(scanner): admit durable segment proof evidence

Validate complete set snapshot segment invalidation proof metadata against the current dirty usage generation window and scanner process epoch before clearing durable producer and restart-gap activation blockers.

Production segment reuse remains gated by the explicit activation flag.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* feat(scanner): replay segment proof from root snapshots

Carry segment invalidation proof metadata into root snapshot set states so a complete published baseline can replay the durable producer evidence recorded by each set cache.

Keep the field additive for older readers and leave incomplete or LKG set states unproven.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 08:34:50 +08:00
Zhengchao An e24eae9eaa fix: address release acceptance regressions (#7541) 2026-09-09 08:33:59 +08:00
houseme 8617f2701b test(scanner): add W16 release evidence runner (#7543)
Add a W16 Scanner/Heal evidence runner that executes the recovery-intent crash-boundary and quota-authority lanes, emits measured G04/G12 JSON artifacts, and validates the resulting single-gate release descriptors.

Wire its shell self-test into script-tests and document the release evidence entry point.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 08:26:13 +08:00
houseme 8d5592f83e test(scanner): list full P4 release evidence fields (#7542)
Align the Scanner/Heal release requirement registry with the release bundle gate for P4 so the closure checklist advertises MRF scale, replay cost, retained responsibility, and cleanup/GC soak evidence together.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 08:24:02 +08:00
houseme b5c9229e77 chore: integrate main CI gates into release
Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-09 08:02:35 +08:00
houseme a974e50b1d test(scanner): wait for EC8+4 heal control readiness (#7540) 2026-09-09 05:17:13 +08:00
houseme 081910e825 feat(scanner): persist segment invalidation proof metadata (#7539) 2026-09-09 05:17:03 +08:00
houseme 7f7e4fe40b feat(scanner): bind producer evidence to dirty generations (#7538)
Record scanner segment producer identities with the dirty usage generation they invalidated, then expose a cycle-local producer evidence snapshot for segment reuse activation preflight.

Production activation remains fail-closed until durable producer identity and restart-gap proof are available.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 01:11:05 +08:00
houseme 684e6f313a test(scanner): require hard evidence artifact payloads (#7537)
Require Scanner/Heal release bundle JSON artifacts to carry hard-domain evidence fields for mixed-version, crash, capacity, disk-full, replica-loss, and MRF cleanup gates. This prevents a descriptor from approving a hard gate while pointing at a generic measured artifact that lacks the boundary-specific oracle fields.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 01:10:48 +08:00
houseme b3a02f305e feat(scanner): surface cold segment reuse oracle (#7536)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 00:48:45 +08:00
houseme 0ea9c19569 feat(scanner): carry segment activation preflight evidence (#7535)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 00:25:46 +08:00
houseme ae662da256 test(heal): cover MRF replay proof cleanup (#7534)
Exercise the committed MRF replay checkpoint path with a real ECStore-backed bucket incarnation, retain the replay anchor until an exact verified proof arrives, then delete the proof-discharged checkpoint and prove a subsequent restart does not resurrect the replayed work.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 00:25:37 +08:00
houseme b5d33a1f4e fix(scanner): keep G09 source binary path clean (#7532)
Keep checksum verification output out of the command substitution that resolves the previous-release binary for the G09 runner.

Also tolerate non-GNU sha256sum in local self-tests by falling back to shasum when GNU --check support is unavailable.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 00:21:39 +08:00
houseme d288496752 fix(scanner): reject invalid G09 runner test selection (#7531)
Validate the selected G09 evidence lane before process-substitution case expansion so --plan-only cannot turn an unknown --test value into an empty successful plan.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 00:13:56 +08:00
houseme 40baedba4f Merge branches 'release', 'release' and 'main' of github.com:rustfs/rustfs into release
* 'release' of github.com:rustfs/rustfs:
  test(scanner): emit G09 release bundle gate evidence (#7530)
  test(e2e): add G09 upgrade evidence runner (#7525)
  fix(scanner): respect cargo target dir in G09 runner (#7528)
  test(scanner): preflight G09 evidence disk space (#7527)
  fix(scanner): replay recovery intents while disabled (#7521)
  test(scanner): add G09 upgrade evidence runner (#7524)
  test(scanner): assemble release evidence bundles (#7526)
  feat(scanner): implement V2 evidence preflights (#7523)
  test(scanner): add G09 upgrade evidence runner (#7522)

* 'release' of github.com:rustfs/rustfs:
  test(scanner): emit G09 release bundle gate evidence (#7530)
  test(e2e): add G09 upgrade evidence runner (#7525)
  fix(scanner): respect cargo target dir in G09 runner (#7528)
  test(scanner): preflight G09 evidence disk space (#7527)
  fix(scanner): replay recovery intents while disabled (#7521)
  test(scanner): add G09 upgrade evidence runner (#7524)
  test(scanner): assemble release evidence bundles (#7526)
  feat(scanner): implement V2 evidence preflights (#7523)
  test(scanner): add G09 upgrade evidence runner (#7522)

* 'main' of github.com:rustfs/rustfs:
  fix(targets): reject trailing batch items (#7508)
  fix(ci): bind performance runs to selected inputs (#7512)
  fix(replication): close the GA blocker set from backlog#2366 (#7503)
2026-09-09 00:10:33 +08:00
houseme 0c3fd48c22 test(scanner): emit G09 release bundle gate evidence (#7530)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)

* fix(replication): close GA blockers from backlog#2366

Implements the P1 set from the pre-GA replication audit:

- Replication rule tag filters now require every And.Tag to match, replacing
  the s3s OR semantics with a local AND matcher that fails closed on a
  malformed tag.
- A replicated group membership change no longer writes the group status, so
  a membership update carrying the default Enabled status cannot silently
  re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
  peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
  carries its own ilm-expiry override, and no longer blocks a remove that
  drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
  node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
  follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
  support boundary section, and the Replication changelog section.

* fix(site-replication): resume only a locally driven endpoint refresh

The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.

Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.

* fix(site-replication): keep an explicit disabled group status on a snapshot

Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.

The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.

* fix(site-replication): schedule the import snapshot without recording a failure

`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.

Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.

* fix(admin): stop reporting replication failures as retries

`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.

* perf(site-replication): aggregate failure windows without cloning bucket stats

`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.

It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.

* fix(site-replication): reject a conflicting ilm-expiry override on a re-run

The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.

* fix(admin): do not fail a remote-target write on a peer reload error

set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.

* fix(site-replication): undo every bucket a cut-short refresh rewrote

When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.

* fix(site-replication): keep replay running while an endpoint refresh is pending

A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.

* test(e2e): cover the AND semantics of a two-tag replication filter

The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.

No new test function, so the nightly selection digest is unchanged.

* refactor(site-replication): fold the refresh state-change error into one constructor

The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.

* fix(site-replication): report a peer whose IAM snapshot waits for a repair

An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.

* docs(operations): state the group-status and escalation convergence limits

Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.

* fix(ci): bind performance runs to selected inputs (#7512)

* fix(targets): reject trailing batch items (#7508)

* test(scanner): emit G09 release bundle gate evidence

Write a bundle-ready G09 gate descriptor from the Linux upgrade evidence runner and validate the single G09 gate with the shared release-bundle rules without approving the full Scanner/Heal release.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 00:06:59 +08:00
houseme 3e8b0e7c83 test(e2e): add G09 upgrade evidence runner (#7525)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)

* fix(replication): close GA blockers from backlog#2366

Implements the P1 set from the pre-GA replication audit:

- Replication rule tag filters now require every And.Tag to match, replacing
  the s3s OR semantics with a local AND matcher that fails closed on a
  malformed tag.
- A replicated group membership change no longer writes the group status, so
  a membership update carrying the default Enabled status cannot silently
  re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
  peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
  carries its own ilm-expiry override, and no longer blocks a remove that
  drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
  node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
  follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
  support boundary section, and the Replication changelog section.

* fix(site-replication): resume only a locally driven endpoint refresh

The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.

Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.

* fix(site-replication): keep an explicit disabled group status on a snapshot

Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.

The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.

* fix(site-replication): schedule the import snapshot without recording a failure

`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.

Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.

* fix(admin): stop reporting replication failures as retries

`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.

* perf(site-replication): aggregate failure windows without cloning bucket stats

`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.

It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.

* fix(site-replication): reject a conflicting ilm-expiry override on a re-run

The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.

* fix(admin): do not fail a remote-target write on a peer reload error

set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.

* fix(site-replication): undo every bucket a cut-short refresh rewrote

When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.

* fix(site-replication): keep replay running while an endpoint refresh is pending

A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.

* test(e2e): cover the AND semantics of a two-tag replication filter

The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.

No new test function, so the nightly selection digest is unchanged.

* refactor(site-replication): fold the refresh state-change error into one constructor

The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.

* fix(site-replication): report a peer whose IAM snapshot waits for a repair

An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.

* docs(operations): state the group-status and escalation convergence limits

Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.

* fix(ci): bind performance runs to selected inputs (#7512)

* test(e2e): add G09 upgrade evidence runner

Add a Linux x86_64 runner that downloads the pinned previous release, builds the current RustFS binary, runs the mixed-version and rollback upgrade compatibility lanes, and verifies the required Scanner/Heal G09 raw evidence artifacts.

Document the runner and add a shell self-test for help, dry-run, SHA validation, and non-empty artifact directory guards.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-09 00:05:36 +08:00
houseme dd2af9ff88 fix(scanner): respect cargo target dir in G09 runner (#7528)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)

* fix(replication): close GA blockers from backlog#2366

Implements the P1 set from the pre-GA replication audit:

- Replication rule tag filters now require every And.Tag to match, replacing
  the s3s OR semantics with a local AND matcher that fails closed on a
  malformed tag.
- A replicated group membership change no longer writes the group status, so
  a membership update carrying the default Enabled status cannot silently
  re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
  peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
  carries its own ilm-expiry override, and no longer blocks a remove that
  drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
  node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
  follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
  support boundary section, and the Replication changelog section.

* fix(site-replication): resume only a locally driven endpoint refresh

The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.

Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.

* fix(site-replication): keep an explicit disabled group status on a snapshot

Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.

The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.

* fix(site-replication): schedule the import snapshot without recording a failure

`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.

Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.

* fix(admin): stop reporting replication failures as retries

`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.

* perf(site-replication): aggregate failure windows without cloning bucket stats

`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.

It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.

* fix(site-replication): reject a conflicting ilm-expiry override on a re-run

The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.

* fix(admin): do not fail a remote-target write on a peer reload error

set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.

* fix(site-replication): undo every bucket a cut-short refresh rewrote

When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.

* fix(site-replication): keep replay running while an endpoint refresh is pending

A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.

* test(e2e): cover the AND semantics of a two-tag replication filter

The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.

No new test function, so the nightly selection digest is unchanged.

* refactor(site-replication): fold the refresh state-change error into one constructor

The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.

* fix(site-replication): report a peer whose IAM snapshot waits for a repair

An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.

* docs(operations): state the group-status and escalation convergence limits

Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.

* fix(ci): bind performance runs to selected inputs (#7512)

* fix(targets): reject trailing batch items (#7508)

* fix(scanner): respect cargo target dir in G09 runner

Write the RustFS feature stamp under the resolved Cargo target directory so remote validation hosts with CARGO_TARGET_DIR set can reuse the built PR-head binary.

Extend the runner plan/self-test path to cover relative target-dir resolution.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 23:58:20 +08:00
houseme 5db0e14d04 test(scanner): preflight G09 evidence disk space (#7527)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)

* fix(replication): close GA blockers from backlog#2366

Implements the P1 set from the pre-GA replication audit:

- Replication rule tag filters now require every And.Tag to match, replacing
  the s3s OR semantics with a local AND matcher that fails closed on a
  malformed tag.
- A replicated group membership change no longer writes the group status, so
  a membership update carrying the default Enabled status cannot silently
  re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
  peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
  carries its own ilm-expiry override, and no longer blocks a remove that
  drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
  node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
  follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
  support boundary section, and the Replication changelog section.

* fix(site-replication): resume only a locally driven endpoint refresh

The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.

Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.

* fix(site-replication): keep an explicit disabled group status on a snapshot

Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.

The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.

* fix(site-replication): schedule the import snapshot without recording a failure

`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.

Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.

* fix(admin): stop reporting replication failures as retries

`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.

* perf(site-replication): aggregate failure windows without cloning bucket stats

`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.

It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.

* fix(site-replication): reject a conflicting ilm-expiry override on a re-run

The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.

* fix(admin): do not fail a remote-target write on a peer reload error

set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.

* fix(site-replication): undo every bucket a cut-short refresh rewrote

When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.

* fix(site-replication): keep replay running while an endpoint refresh is pending

A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.

* test(e2e): cover the AND semantics of a two-tag replication filter

The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.

No new test function, so the nightly selection digest is unchanged.

* refactor(site-replication): fold the refresh state-change error into one constructor

The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.

* fix(site-replication): report a peer whose IAM snapshot waits for a repair

An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.

* docs(operations): state the group-status and escalation convergence limits

Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.

* fix(ci): bind performance runs to selected inputs (#7512)

* fix(targets): reject trailing batch items (#7508)

* test(scanner): preflight G09 evidence disk space

Fail the Scanner/Heal G09 upgrade evidence runner before downloading or building when the validation host does not have enough free space for a full raw evidence pass.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: cui fliter <imcusg@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 23:58:08 +08:00
houseme 9429225cf4 fix(scanner): replay recovery intents while disabled (#7521)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 23:50:13 +08:00
houseme 857584b3c2 test(scanner): add G09 upgrade evidence runner (#7524)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)

* fix(replication): close GA blockers from backlog#2366

Implements the P1 set from the pre-GA replication audit:

- Replication rule tag filters now require every And.Tag to match, replacing
  the s3s OR semantics with a local AND matcher that fails closed on a
  malformed tag.
- A replicated group membership change no longer writes the group status, so
  a membership update carrying the default Enabled status cannot silently
  re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
  peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
  carries its own ilm-expiry override, and no longer blocks a remove that
  drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
  node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
  follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
  support boundary section, and the Replication changelog section.

* fix(site-replication): resume only a locally driven endpoint refresh

The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.

Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.

* fix(site-replication): keep an explicit disabled group status on a snapshot

Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.

The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.

* fix(site-replication): schedule the import snapshot without recording a failure

`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.

Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.

* fix(admin): stop reporting replication failures as retries

`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.

* perf(site-replication): aggregate failure windows without cloning bucket stats

`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.

It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.

* fix(site-replication): reject a conflicting ilm-expiry override on a re-run

The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.

* fix(admin): do not fail a remote-target write on a peer reload error

set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.

* fix(site-replication): undo every bucket a cut-short refresh rewrote

When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.

* fix(site-replication): keep replay running while an endpoint refresh is pending

A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.

* test(e2e): cover the AND semantics of a two-tag replication filter

The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.

No new test function, so the nightly selection digest is unchanged.

* refactor(site-replication): fold the refresh state-change error into one constructor

The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.

* fix(site-replication): report a peer whose IAM snapshot waits for a repair

An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.

* docs(operations): state the group-status and escalation convergence limits

Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.

* fix(ci): bind performance runs to selected inputs (#7512)

* test(scanner): add G09 upgrade evidence runner

Add a reusable Scanner/Heal G09 runner for Linux PR-head validation. The script downloads the pinned previous release, builds the current checkout, runs the mixed-version and rollback upgrade E2E lanes, and validates the measured raw artifacts before they can be consumed by the release bundle gate.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 23:50:02 +08:00
houseme cfda9b451c test(scanner): assemble release evidence bundles (#7526)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 23:49:49 +08:00
houseme 354e49de4c feat(scanner): implement V2 evidence preflights (#7523)
* feat(scanner): wire dirty usage producer identities

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): add segment activation preflight proof

Keep scanner segment reuse behind a structured activation preflight so release evidence can prove the production gate remains disabled until every producer, generation, overflow, cold-oracle, and distributed invalidation check is satisfied.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* feat(scanner): expose distributed invalidation evidence

Record an explicit distributed segment invalidation evidence summary when remote dirty usage snapshots are bound to the current activity window and the authenticated scoped ACK capability probe succeeds.

Reject peer dirty usage snapshots that contradict the peer activity pending bit so scoped ACKs fail closed instead of clearing an unadvertised remote mutation.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 23:39:05 +08:00
houseme 8e987ce0a6 test(scanner): add G09 upgrade evidence runner (#7522)
* fix(replication): close the GA blocker set from backlog#2366 (#7503)

* fix(replication): close GA blockers from backlog#2366

Implements the P1 set from the pre-GA replication audit:

- Replication rule tag filters now require every And.Tag to match, replacing
  the s3s OR semantics with a local AND matcher that fails closed on a
  malformed tag.
- A replicated group membership change no longer writes the group status, so
  a membership update carrying the default Enabled status cannot silently
  re-enable a disabled group on the peer.
- A successful IAM import schedules one collapsed full-IAM snapshot per remote
  peer instead of leaving the imported entities local-only.
- A pending endpoint refresh is redriven by the heavyweight reconcile tick,
  carries its own ilm-expiry override, and no longer blocks a remove that
  drops every unacknowledged peer.
- Site metrics expose local replication failure totals and rolling windows;
  node-level counters no longer report a constructed zero.
- set/remove-remote-target notify peer metadata caches before returning, so a
  follow-up put-bucket-replication on another node sees the target.
- Adds the site-replication operations runbook, a docs index, a replication
  support boundary section, and the Replication changelog section.

* fix(site-replication): resume only a locally driven endpoint refresh

The peer-side edit handler journals a pending endpoint refresh with an empty
`remote_peers` map and commits it inside the same request through
`apply_internal_peer_edit`. The reconcile tick could not tell that journal
from the coordinator's own: with no required peers it reads as complete on
sight, so the tick committed it with `edit_state` - losing the local-name
sync - and cleared it under the request that owned it, whose commit then
reported the refresh as changed and denied the coordinator the peer
acknowledgement it was waiting for.

Resume now runs only for a journal that carries the fan-out topology. A
receiver's journal stays for the coordinator to redrive with the same
refresh id, which is the path that already recovers it.

* fix(site-replication): keep an explicit disabled group status on a snapshot

Skipping the group-status write whenever an item carries members stopped a
membership change from re-enabling a disabled group, but it also silenced the
full-IAM snapshot, which always sends members together with the sender's real
status. A peer that did not have the group yet created it through
`GroupInfo::new` - enabled - so a bootstrap, a repair, or the snapshot an IAM
import now schedules handed every member of a frozen group live access there.

The madmin wire maps an unset `groupStatus` to Enabled, so only Enabled can be
a default. Disabled is always explicit and is applied again.

* fix(site-replication): schedule the import snapshot without recording a failure

`import-iam` reused the failure-recording path to queue its full-IAM
snapshot. That raises `retry_count` on every call, so three imports - the
normal shape of a bulk migration done one archive at a time - escalated a
healthy peer to `retryStats.failed` with the scheduling note shown as
`lastError`, which is exactly the signal the runbook tells operators to
repair. A full retry queue also turned a completed import into a 503.

Scheduling now only ensures the collapsed entry exists, and a failure to
schedule is logged instead of failing the request: the entities are already
imported and the reconcile pass still closes the gap.

* fix(admin): stop reporting replication failures as retries

`retries` is the minio-go counter for redeliveries, and mc prints it as such.
Filling it with the failure count claimed a redelivery that never happens: a
failed object is not retried by an event today, it waits for the scanner heal
pass. `errors` keeps the failure counters; `retries` stays zero until there is
a real redelivery to count, and the runbook now says so.

* perf(site-replication): aggregate failure windows without cloning bucket stats

`site_metrics_snapshot` went through `get_all`, which clones every bucket's
stats, and then scanned each target's sample deque twice. That deque is
bounded only by the one-hour window, so an unreachable target under load -
the case an operator polls this endpoint for - made every
`mc admin replicate status` copy the whole backlog and hold the read lock
against the failure path while doing it.

It now folds under the read lock and takes both windows in one walk. The
`max` against the serialized `last_minute` / `last_hour` snapshots is dropped:
those are stamped onto per-bucket clones elsewhere and are always zero in this
node-local cache.

* fix(site-replication): reject a conflicting ilm-expiry override on a re-run

The commit now reads the ilm-expiry override back out of the pending refresh
journal, so a second edit that asks for a different value had it dropped while
the request still reported success. Re-running without the flag keeps pinning
the recorded value - that is the documented way to redrive a stuck refresh -
but an explicit different value is now rejected instead of ignored.

* fix(admin): do not fail a remote-target write on a peer reload error

set/remove-remote-target propagated the peer metadata reload error, so a
target that was already persisted and live on this node reported a 5xx to the
client whenever one peer could not be reached. Every S3 bucket-config write
path treats that reload as best effort and only warns; these two admin
handlers now do the same, and the reason is logged with the bucket and action.

* fix(site-replication): undo every bucket a cut-short refresh rewrote

When a remove accepted on another node clears the refresh journal mid-pass,
only the bucket holding the lock at that moment had its restored target
undone. The buckets rewritten earlier in the same pass kept a target pointing
at the removed peer whenever the remove's own cleanup had already walked past
them. The undo now covers every bucket this pass rewrote, attempting all of
them so one failure does not strand the rest.

* fix(site-replication): keep replay running while an endpoint refresh is pending

A pending endpoint refresh took the whole heavyweight pass with it, so a peer
that never came back froze IAM and bucket replay to every healthy peer too -
the stall this journal's resume path was meant to end. The refresh arm now
drains the retry queue before returning; it replays per-peer deliveries
against the endpoints currently committed in state, so it is unaffected by the
edit in flight. Bucket wiring reconciliation still waits, because it rewrites
the very targets the refresh is changing, and the runbook now says so.

* test(e2e): cover the AND semantics of a two-tag replication filter

The acceptance matrix only had a single-tag rule, which matches under both AND
and OR semantics and therefore proved nothing about the filter this fix
changed. It now also carries a two-tag `And` rule - the shape
`mc replicate add --tags "k1=v1&k2=v2"` writes - and asserts that an object
with one of the two tags is not admitted while an object with both is.

No new test function, so the nightly selection digest is unchanged.

* refactor(site-replication): fold the refresh state-change error into one constructor

The endpoint-refresh work added three `s3_error!` invocation lines, which the
s3s footprint ratchet is meant to prevent. Five copies of the same
concurrent-change error now share one constructor, so the surface nets one
line smaller than main; the baseline is retightened to match.

* fix(site-replication): report a peer whose IAM snapshot waits for a repair

An escalated snapshot entry records a deletion a snapshot cannot replay, so
only a repair settles it and the marker must survive. Scheduling an import
snapshot therefore leaves that peer's entry alone - and now says so, instead
of returning success while nothing was scheduled for it.

* docs(operations): state the group-status and escalation convergence limits

Two boundaries the fixes in this branch make load-bearing: a membership change
never carries an enable, so a group disabled on one site only has to be
re-enabled there explicitly; and a peer holding an escalated IAM entry does
not receive a scheduled snapshot, including the one a bulk import schedules,
until a repair settles it.

* fix(ci): bind performance runs to selected inputs (#7512)

* test(scanner): add G09 upgrade evidence runner

Add a reusable Linux x86_64 runner for the Scanner/Heal G09 mixed-version and rollback upgrade evidence lanes.

The helper reads the pinned previous-release asset metadata from the upgrade workflow, verifies the downloaded binary, builds the current head, runs both ignored E2E tests, and fails unless the expected G09 JSON artifacts exist.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: 唐小鸭 <tangtang1251@qq.com>
Co-authored-by: Zhengchao An <anzhengchao@gmail.com>
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 23:38:54 +08:00
houseme 929f836e40 test(heal): persist MRF rollback mirror boundary (#7520)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 23:22:41 +08:00
houseme c7dec044eb test(e2e): emit scanner heal G09 upgrade evidence (#7519)
Record measured Scanner/Heal G09 evidence artifacts from the upgrade compatibility lanes when a fresh evidence directory is provided.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 23:18:36 +08:00
houseme 14a59f7770 test(scanner): require bounded retry window evidence (#7517)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 23:10:02 +08:00
houseme 084e9c4b82 test(scanner): require MRF cleanup delete ENOSPC evidence (#7518)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 22:59:32 +08:00
houseme 921cc7ad94 fix(scanner): confirm recovery intent accept readback (#7516)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 22:53:21 +08:00
houseme bfa8df00e7 test(scanner): add release bundle dry-run fixture (#7515)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 22:53:04 +08:00
houseme 33a8469e27 test(scanner): require heal retry stats evidence (#7514)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 22:52:34 +08:00
houseme 128080ceb9 test(storage): cover MRF cleanup delete ENOSPC anchor (#7513)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 22:52:12 +08:00
唐小鸭 ae9fe62fb1 fix(sse): resolve 1.0.0 SSE/KMS blockers and P1 findings (#7511)
* fix(sse): resolve bucket default encryption per request

PUT and the POST-object/extract path resolved a bucket's default
encryption with a hard-coded "no explicit SSE-C" flag, so the default was
layered onto a request that already carried an SSE-C header triple and
then tripped that request's own mutual-exclusion check. Every bucket with
default encryption refused SSE-C single PUTs with 400 InvalidArgument,
while CreateMultipartUpload on the same bucket succeeded because it
resolves SSE elsewhere. Both call sites now derive the flag from the
request headers, as COPY already did.

The bucket default's KMS key id was also inherited independently of the
effective algorithm, so an explicit AES256 request against an aws:kms
default bucket produced a self-contradictory algorithm/key-id pair and
was rejected. The key id is now inherited only when the effective
algorithm is aws:kms, matching the storage-layer resolver.

Refs backlog#2368 B1, B2.

* fix(sse): refuse SSE-KMS without a running KMS service

A write requesting aws:kms on a node with no KMS service fell back to the
node-local SSE-S3 provider: the data key was wrapped with
RUSTFS_SSE_S3_MASTER_KEY while the object metadata still recorded
aws:kms and the requested KMS key id. The stored object claimed a KMS
protection it never had, under a key that was never consulted, and no
signal distinguished it from a genuine SSE-KMS object.

The managed-encryption path now asks the resolved DEK provider whether it
wraps with a node-local master key and refuses SSE-KMS in that case:
InvalidRequest when KMS was never configured, ServiceUnavailable when a
configured service is not running. The check sits after the per-key
authorization gate so an unauthorized caller still receives AccessDenied
whatever the KMS runtime state is, and asks the provider rather than a
parallel availability signal because the provider is what actually wraps
the key. A missing master key no longer answers an SSE-KMS request with
an SSE-S3-worded configuration error.

The SSE-S3 local fallback is unchanged.

Refs backlog#2368 B4.

* fix(ecstore): restore and archive tiers in stored coordinates

Multipart restore addressed the remote tier in plaintext coordinates
while the copy-back reads the stored representation. Each part received a
misaligned slice of the remote object whose length still satisfied the
range, the hash reader and the completion size check, so the restore
reported success and silently replaced the object's bytes. Encrypted and
compressed multipart objects were both affected. Restore now accumulates
stored part sizes, passes the stored length to the hash reader alongside
the plaintext length, and validates against the stored size.

The copy-back digests stored bytes, so its computed MD5 is not the
object's public ETag. Restore now preserves the object ETag on both the
single-part and multipart paths, and gives each restored part its own
recorded part ETag rather than the object-level value.

Transition also handed the tier the object's SSE headers and its
RustFS-wrapped data key as request headers. Any S3 target rejected an
SSE-C archive outright, an SSE-KMS archive asked the target to encrypt a
second time under a key id it does not own, and the wrapped DEK left the
cluster. The archive request now strips every SSE header and encryption
marker with the predicate the replication path already uses; the local
xl.meta keeps all of it, so read-through and restore are unaffected.

Objects restored by an affected release are not detected or repaired
retroactively and must be re-restored from the tier.

Refs backlog#2368 B3, B5; backlog#2369 P7.1.

* fix(rio): lock the v1 nonce layout within a segment

Decrypting a v1 segment tried three historical nonce layouts per frame,
independently for every frame. The last of them exists for streams
written before 1.0.0-alpha.91, which reused a segment's part nonce for
every block in it; because block zero's derived nonce equals that base
nonce, a frame encrypted at index zero authenticated at any position. An
attacker able to rewrite the underlying shards could replay it and have
the forged plaintext returned with 200 and an unchanged length. Shard
integrity uses a keyed-hash-free checksum, which such an attacker can
recompute, so it is not a barrier.

A segment now locks onto whichever layout decoded its first non-zero-index
frame and rejects any later frame needing a different one. That leaves one
residual shape: a stream built purely from repeats of frame zero has no
later frame to disagree. New RUSTFS_ENCRYPTION_LEGACY_NONCE_FALLBACK
(default true, so pre-alpha.91 objects keep decrypting) drops the third
layout entirely when set to false, which closes it. Turning it off refuses
pre-alpha.91 objects, so migrate them first by rewriting in place.

Refs backlog#2369 P2.

* fix(kms): reload a service that failed to start

POST /rustfs/admin/v3/kms/reload short-circuited whenever the persisted
configuration matched the in-memory one byte for byte. A node whose KMS
failed to start keeps that configuration and sits in Error, so the
documented recovery call returned "reloaded successfully" while leaving
the node down. Peers reached the same path through the reload broadcast,
so a cluster that lost Vault during a rolling restart had no working
recovery route other than the node-local start endpoint. Reload now
short-circuits only for a service that is actually running, and otherwise
reconfigures, which starts a service that is not running.

The AWS backend also advertised key-version enumeration through
kms/status, which its own documentation says it cannot do; the capability
and its golden snapshot now say false.

Refs backlog#2369 P1, P7.3.

* docs: record the SSE and KMS changes for 1.0.0

The Unreleased changelog section carried no entry for any encryption work
merged since 1.0.0-rc.5, including three items with operational impact:
the config-secret variable whose absence persists secrets in cleartext
with only a warning, the v2 frame write switch and its rolling-upgrade
constraint, and per-key authorization making a public bucket incompatible
with SSE-KMS objects. Adds those plus this batch, including the SSE-KMS
refusal as a breaking change with both routes out.

Also corrects four places where documentation contradicted the code: the
cleanup register still called encrypted range seek opt-in after its
default flipped, the Helm README claimed vault_mount_path only applies to
Transit while the template also feeds the KV2 mount, the disaster-recovery
drill listed bundle contents for backends whose export is refused with
501, and the Chinese README capability table predated most of the feature
set. Documents the SSE-S3 local master key as a first-class operational
mode with its rotation dead end, and what the v1 frame layout does and
does not authenticate.

Refs backlog#2369 P5.

* fix(kms): classify data-path KMS failures by what the caller can do

Only "key not found" and a backend outage were classified; every other
KMS failure that reached the S3 data path fell through to
500 InternalError with a generic message. A disabled or pending-deletion
key, a denied KMS grant, an encryption-context mismatch, an unsupported
algorithm, a credential or timeout failure, and a capability the
configured backend does not have all looked identical to a server fault.
SDKs therefore applied exponential backoff to configuration errors no
retry can fix, and monitoring counted every one of them against the
server's own error rate.

Unusable-key and request-side failures now answer 400, a denied grant
403, transient backend failures 503, and a missing backend capability
501. Damaged, unreadable, or unknown-format key material keeps its 500:
it is a server-side integrity fault, and existing tests pin it.

The classifier is deliberately separate from the admin lifecycle
mapping, which answers 404 for a missing key because there a key id is
the resource being addressed; on the data path it arrives inside a
request header or a bucket default. Messages either name what the caller
asked for or stay generic, with deployment-side detail left on the error
source the way the storage-IO mapping already does.

Refs backlog#2368 B6.

* fix(kms): track and renew static Vault tokens

Token authentication hard-coded "this token carries no lease", so the
renewal task never started, the remaining-TTL gauge was never published,
and nothing looked wrong. `vault token create` grants a 768-hour TTL by
default, so a cluster that had been healthy for a month turned every KMS
call into a 403 and could not recover without a restart or a
reconfigure. Production configuration validation only rejects the
literal dev-token, so an ordinary expiring token reaches a whole cluster.

The source now reads `auth/token/lookup-self` at login and adopts what
Vault reports. A token with no expiry behaves exactly as before. An
expiring renewable one is picked up by the existing renewal loop and
renewed at half TTL like every other auth method. An expiring
non-renewable one warns with its remaining lifetime and publishes the
gauge, so the fail-closed window is visible before it arrives.

The probe never fails the login: a policy that omits lookup-self, or a
Vault that is briefly unreachable, warns and falls back to exactly the
previous behaviour rather than taking down a deployment that works
today. The scripted Vault test double answers the lookup out of band so
existing scripts keep describing only the protocol under test.

Refs backlog#2369 P3.

* feat(sse): report SSE-C requests that arrive without TLS

An SSE-C request carries the customer's AES key in a request header, so
AWS S3 and MinIO both refuse one that did not arrive over TLS. RustFS
accepted them on any transport: a plaintext hop hands the key to anyone
on the path, and since the object cannot be read without that same key,
the exposure lasts as long as the object does.

Refusing outright is the correct end state but not a safe default to
adopt inside a release window, because the project's own s3-tests and
e2e lanes and most staging deployments speak plain HTTP. This release
reports instead: each such request increments
rustfs_ssec_plaintext_requests_total and logs one warning per process, so
an operator can confirm nothing would break before the default flips.
RUSTFS_SSE_C_REQUIRE_TLS=true opts into the AWS 400 now.

The verdict is per connection rather than per deployment: the layer is
built with whether this listener terminated TLS, and additionally accepts
an https protocol forwarded by a proxy the trusted-proxy configuration
already vetted. It sits beside the rate limiter, after the layer that
makes a forwarded protocol trustworthy and after the request context, so
a rejection can echo the request id.

Refs backlog#2369 P7.2.

* fix(kms): say what a node-local backend means for a cluster

The Local backend keeps key material on each node's own disk and
generates its Argon2id salt per node, so two nodes derive different keys
from the same master_key and an object encrypted on one node cannot be
decrypted on another. Behind a load balancer that surfaces as
intermittent 500s on reads that succeeded moments earlier, with nothing
tying the symptom to the cause: the only signal was a generic
"development, testing and demos only" positioning warning that says
nothing about what actually breaks.

Configuring or reconfiguring Local while the deployment is distributed
now logs a dedicated event and appends the consequence to the configure
response, so the operator who made the change sees it. The product
decision to warn rather than refuse is unchanged.

Refs backlog#2369 P7.4.

* docs: record the remaining SSE and KMS changes for 1.0.0

Adds changelog entries for the KMS data-path status classification, the
Vault static-token lease probe, the SSE-C plaintext-transport report and
its switch, and the node-local backend warning.

Documents two things the backend security guide never stated: that SSE-C
belongs on a secure transport, with the counter and switch to plan the
change around, and that the Local backend cannot be shared by a
multi-node deployment because each node derives different keys from the
same master key.

Refs backlog#2368 B6; backlog#2369 P3, P5, P7.2, P7.4.

* fix(kms): report an unreadable key store as an outage on the S3 path

A backend now distinguishes a key store it could not read from a key
that is genuinely absent, but the S3 boundary collapsed the first one
back onto 500 InternalError through the fallthrough for integrity
faults. The distinction was therefore invisible to the client: a
temporary key-directory outage looked exactly like a permanently damaged
key record, and neither the status nor the metric said the request was
worth retrying.

An unreadable key store joins the retryable class and answers 503, next
to a backend error and a credential failure. Damaged, unreadable or
unknown-format key material keeps its 500.

Refs backlog#2368 B6; builds on rustfs/rustfs#7470.
2026-09-08 22:37:53 +08:00
overtrue 929a9f27c4 chore(release): merge main into release
Merge main at 73957d0faf into release. Resolve the multipart test conflict with the current main fixture and remove its superseded ReadPlan test export.
2026-09-08 22:28:29 +08:00
houseme 15376a7fa6 test(e2e): report port allocator bind errors (#7510)
Surface the scanned port window, attempt count, and last bind error when the e2e port allocator cannot reserve a localhost port. This keeps Scanner/Heal evidence failures actionable when the environment blocks binds before business assertions run.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 22:25:04 +08:00
houseme 5d789006dd test(heal): cover MRF disk-full commit anchors (#7509)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 22:21:31 +08:00
houseme f4bd53a63c test(scanner): require MRF cleanup GC soak evidence (#7507)
Require the P4 release bundle to carry measured cleanup/GC soak evidence for retained MRF replay responsibilities. The bundle now needs a two-hour cleanup window, exact cleanup case coverage, observed verified idle GC, and zero pending responsibilities or stale journals after GC.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 22:13:00 +08:00
houseme 21fee7f7ff test(scanner): require MRF retention GC evidence (#7506)
Require P4 retained-responsibility release bundle evidence to list the retained replay anchor and idle cleanup cases, prove a two-hour retention window, and record both idle cleanup and verified-proof discharge observations.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 22:12:44 +08:00
houseme 23ed00fc85 test(scanner): require release bundle domain evidence (#7502)
Reject scanner/heal release bundles that omit field-level domain evidence for scoped ACK, durable intent, mixed-version, scheduler pressure, profile cost, and two-hour pressure lanes.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 22:00:18 +08:00
houseme f49ffa2fec test(scanner): require MRF crash matrix cases (#7505)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 21:55:37 +08:00
houseme ee5f287324 test(scanner): require segment activation evidence (#7504)
* test(scanner): require segment activation evidence

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

* test(scanner): cover activation proof inputs

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>

---------

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 21:49:08 +08:00
houseme 158c613d0e test(heal): cover MRF rollback mirror filtering (#7501)
Add a regression oracle that keeps scoped-only MRF responsibilities in the authoritative runtime snapshot while omitting them from the v1 legacy rollback mirror.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 21:48:42 +08:00
houseme a950f914ca test(scanner): bind release JSON artifact provenance (#7500)
Require scanner/heal release evidence JSON artifacts to repeat their measured source revision, run identity, measurement window, gate, and field identity inside the artifact payload. This keeps a refreshed outer bundle hash from accepting stale summary or profile JSON from another run.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 21:48:24 +08:00
houseme 1de9b40a30 test(scanner): require MRF disk-full evidence fields (#7499)
Require the Scanner/Heal release registry and bundle checker to carry explicit G08 MRF capacity, disk-full, and replica-loss evidence fields before release approval can pass.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 21:20:42 +08:00
houseme 831468b2e9 fix(e2e): ignore untracked files in build identity (#7498)
Align e2e_test build provenance with Scanner/Heal evidence receipts and server binary provenance by treating only tracked source changes as dirty.

This prevents unrelated untracked worktrees or evidence directories from causing compiled test identity mismatches before real evidence cases can run.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 21:20:20 +08:00
houseme 600d037b25 test(heal): cover MRF idle checkpoint cleanup (#7497)
Add a runtime cleanup regression test that publishes both retained replay and runtime committed checkpoints, writes scoped and legacy journals, and verifies idle cleanup removes every recovery anchor from the registered local disks.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 21:00:18 +08:00
houseme 3fa2b334be test(scanner): require two-hour measured ABBA windows (#7493)
Reject measured Scanner/Heal release ABBA manifests and summaries whose evidence window is shorter than the W21 two-hour release requirement.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 20:48:33 +08:00
houseme 1b549d5907 test(scanner): require G14 same-window field coverage (#7489)
Tighten the Scanner/Heal release bundle checker so G14 same-window evidence must name the EC8+4, multi-set, and multi-pool fields covered in that measurement window.

Keep the release gate blocked when same-window evidence omits one of the required G14 fields, without changing production runtime behavior.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 20:48:24 +08:00
houseme 11c4ce96eb test(scanner): reject empty release evidence artifacts (#7496)
Require Scanner/Heal release bundle artifact paths to resolve to non-empty files before hashing them.

Cover empty hard-gate artifacts in the existing release bundle checker self-test and keep profile artifact size checking on the shared artifact boundary.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 20:42:31 +08:00
houseme 4508a0985d test(scanner): profile EC84 evidence case runs (#7495)
Give Scanner/Heal evidence cases explicit runtime profiles so EC8+4 background restart and crash cases use their own object count, object size, and partial-progress timeout defaults instead of inheriting the legacy 4x1 case assumptions.

Expose the runtime profile in plan-only output and cover every registry case in the script self-test.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 20:42:22 +08:00
houseme ed1b9f25d6 test(scanner): require MRF replay bundle fields (#7486)
Bind Scanner/Heal release bundle evidence for MRF durable replay to replay counts, retained responsibility anchors, and successor snapshot publication evidence.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 20:41:56 +08:00
houseme 274c2bf402 fix(e2e): group scanner heal evidence payload (#7494)
Group the EC8+4 Scanner/Heal evidence writer inputs into a typed payload so the distributed e2e crate stays within the clippy argument limit without weakening the lint.

The evidence writer still validates the same S3 bodies, physical shard census, process restart PIDs, and node listings.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 20:41:31 +08:00
houseme 9aebcefa9c test(scanner): harden measured ABBA evidence claims (#7491)
Reject measured Scanner/Heal ABBA manifests whose mixed-version evidence uses the same baseline and candidate source revision or binary hash.

Require crash fault modes and profile artifact names to match the exact supported sets, rejecting missing, duplicate, and unknown values.

Update harness fixtures and regression coverage for same-build mixed-version claims and exact-set release evidence fields.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 20:32:52 +08:00
houseme 1748814bbf test(scanner): bind profile artifacts in release evidence (#7487)
Require Scanner/Heal release bundles to attach every required profiling artifact to P1 profile evidence with relative paths, artifact formats, non-empty files, hashes, and optional per-artifact measurement-window checks.

Document the tightened release bundle profile contract and cover missing, tampered, and mismatched-window profile artifact regressions in the existing checker self-test.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 20:32:37 +08:00
houseme ee5f76c180 fix(heal): publish committed MRF runtime checkpoints (#7490)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 20:32:22 +08:00
houseme 4d68c32b75 test(scanner): require mixed-version evidence roles (#7485)
Tighten the Scanner/Heal release bundle checker so mixed-version, scoped-ACK, and rollback fields cannot reuse a generic versions list without proving the expected evidence role.

Require version lists to use source revision identities and include the tested source revision. Also require profile evidence fields to name the core profiling artifacts before release approval.

The release gate remains blocked until measured field evidence is present.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 20:07:11 +08:00
houseme 8c6689ff13 test(scanner): derive evidence runner profile from registry (#7484)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 19:27:23 +08:00
houseme 595f9f662d test(ecstore): bind MRF manifest CAS dirsync recovery (#7482)
Cover the committed MRF manifest path through LocalDisk conditional CAS when the metadata directory fsync fails. The fixture proves the previous manifest anchor survives rollback, an unanchored first successor is removed, and the legacy MRF journal remains readable even while global durability is relaxed.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 18:53:58 +08:00
houseme 4a2b15cb82 fix(heal): harden MRF replay boundaries (#7483)
Reject journal records with unknown version-presence flags even when their CRC is valid, so rollback/future payloads cannot be accepted as known records.

Gate committed checkpoint cleanup by the writer owner captured from the replay source, preserving retained manifests from other owners inside the same sequence window.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 18:53:43 +08:00
houseme 2ba7f95547 test(heal): write EC84 distributed restart oracle (#7481)
Bind the distributed EC8+4 restart evidence lane to a scanner/heal oracle artifact so release validation can consume the real nextest run instead of accepting only a passing test.

Require the registry to assert 8+4 erasure geometry for the three-node, four-drive case.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 18:15:46 +08:00
houseme 7b3dad6bae test(heal): cover MRF snapshot torn successor recovery
Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-08 17:28:09 +08:00
houseme c0754f5b1c test(heal): preserve EC84 restart semantics (#7478)
Keep the EC8+4 background restart lane on the graceful-stop path and assert clean-restart marker absence only for restart scenarios. This prevents the hard evidence gate from silently exercising the crash path when it claims restart coverage.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 17:26:11 +08:00
houseme 5dc0e3b402 heal: preserve merged result for duplicate submits
Keep same-request-id replay receipts accepted for the receipt API, but preserve the legacy submit_heal_request duplicate admission result as Merged.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-08 16:59:58 +08:00
houseme cc5487e7de heal: verify admin recreate pool metadata (#7474)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 16:57:13 +08:00
houseme 0b05b6c6ff test(heal): cover quorum and mixed repair receipts
Add focused oracles for transient quorum results that carry a matching receipt and for mixed grace plus repaired receipt batches. Only the repaired object may produce positive proof.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-08 15:02:19 +08:00
houseme c507da8f75 heal: verify replacement pool metadata repair (#7471)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 14:56:41 +08:00
houseme 550dabeffd test(scanner): add EC8+4 heal restart evidence (#7469)
Register and wire Scanner/Heal background target restart and crash evidence cases for the 3x4 EC8+4 topology.

Validate the observed data/parity geometry in scanner-heal evidence receipts so multi-drive runs cannot satisfy the gate without proving EC8+4 metadata.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 14:52:07 +08:00
houseme 4d7f0344d3 test(heal): cover bucket object repair receipts (#7468)
Cover bucket and root heal sweeps recording authoritative object outcomes only when storage receipts match the latched bucket incarnation.

Verify unavailable or stale receipt ownership keeps object repair execution intact while leaving canonical outcome proof as Unknown.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 14:25:43 +08:00
houseme 084338add6 test(heal): reject failed object repair receipts
Cover the receipt consumer path where a storage repair result carries both an error and a matching positive receipt. The failure may be recorded, but the receipt must not create repaired, healthy, or absent proof.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-08 14:20:12 +08:00
houseme 8d339da706 heal: reject cancelled object repair receipts
Do not record positive storage repair receipts once an object heal task has been cancelled, even if the receipt still matches the requested owner and object identity.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-08 14:11:27 +08:00
houseme 817ad0a682 heal: reject dry-run object repair receipts
Do not record positive storage repair receipts for dry-run object heal tasks, even if a producer accidentally returns a matching receipt.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-08 14:04:15 +08:00
houseme 80321e5bb4 test(scanner): bind hard evidence bundle provenance (#7467)
Require Scanner/Heal release bundle fields to carry source, run, window, timestamp, command, and artifact format provenance before a measured gate can pass.

Keep EC8+4 and performance gate fields tied to a single measurement window so unrelated artifacts cannot be stitched into a release approval.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 14:03:37 +08:00
houseme e7475cfa4d heal: replay committed MRF checkpoints durably (#7465)
Prefer committed MRF checkpoints during startup replay, retain accepted replay responsibilities until exact verified repair proofs arrive, and reclaim committed manifests only after discharge.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 14:02:24 +08:00
houseme 8c15025a5a heal: latch object receipt owner before repair
Capture the expected bucket incarnation before invoking object repair so a post-repair owner change cannot rewrite the responsibility that a storage receipt is allowed to prove.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-08 13:48:29 +08:00
houseme 6f2ec66263 heal: require exact owner for object receipts
Require object heal receipts to match the expected bucket incarnation before they can be recorded as positive repair evidence. This prevents stale or cross-incarnation receipts from clearing the wrong heal responsibility.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-08 13:19:09 +08:00
houseme 62542ddc57 heal: reclaim superseded MRF snapshots after readback
Add a committed snapshot predecessor cleanup primitive that deletes only an older slot after the successor is read back as the current committed snapshot.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-08 13:09:39 +08:00
houseme a8bb53218d heal: retain MRF replay journal after accepted/merged replays
Keep startup replay journal until a durable successor snapshot exists after Accepted/Merged admission.

Co-Authored-By: heihutu <heihutu@gmail.com>

Co-Authored-By: zhi22915 <qiuzgang@gmail.com>
2026-09-08 12:54:01 +08:00
houseme 5355d9f8f8 test(scanner): require complete ABBA summary matrix (#7462)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 12:16:38 +08:00
houseme 50d7a049ee test(scanner): echo measured release evidence in ABBA fake adapter (#7460)
Keep the synthetic ABBA test adapter aligned with the measured release evidence contract so result validation covers release_evidence drift.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 12:03:21 +08:00
houseme 3149c87cf2 test(heal): cover EC8+4 restart shard rebuild (#7461)
Retry heal-control RPCs once after transport auth rejects a stale replay-scope epoch, and add a distributed EC8+4 restart heal evidence case that rebuilds a replaced drive with exact shard/body assertions.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 12:02:58 +08:00
houseme b7fa6a4615 feat(heal): add MRF committed snapshot writer (#7458)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 11:33:09 +08:00
houseme 6fe83f87a4 test(scanner): require hard evidence ABBA manifest (#7459)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 11:32:34 +08:00
houseme df6981d88e test(scanner): gate release evidence bundles (#7457)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 11:32:04 +08:00
houseme 590adad5ae fix(scanner): tag dirty usage producer identities (#7454)
Record production-facing segment invalidation producer identities when existing object-level dirty usage hooks observe PUT, CopyObject, DeleteObject/DeleteMarker, and CompleteMultipartUpload mutations. Keep the data non-authoritative and process-local so segment reuse activation still requires durable generation-window proof.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 10:51:13 +08:00
houseme be5d14c985 test(scanner): bind release evidence fields (#7452)
Require explicit scanner/heal release evidence field contracts for the scoped ACK and mixed-version rollback gates.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 10:14:57 +08:00
houseme 703086d71d test(scanner): require perf summary evidence fields (#7453)
Fail closed when measured passing Scanner/Heal ABBA summaries omit W10/W11 foreground pressure, lock wait, or attempt-cost evidence.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 10:14:41 +08:00
houseme a159f312f0 fix(heal): reuse same admission request id (#7451)
Keep a retried heal start with the same request id from bypassing admission deduplication when the transport replay cache is unavailable but the manager still owns the task.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 10:14:34 +08:00
houseme 2f6f095298 test(scanner): cover flat-bucket quantum fairness (#7449)
Add a production-entry scanner cohort regression that combines a wide flat bucket with a small bucket under a fixed object budget. The test keeps partial budgeted rounds unpublished, verifies small buckets are only marked after real execution, and confirms a later unbudgeted round can publish the complete aggregate.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 09:25:12 +08:00
cxymds efd8ef005f fix(ci): route replication read plan through boundary (#7448) 2026-09-08 09:24:56 +08:00
houseme 60fa33773a fix(common): retain unmatched MRF repair proofs (#7447)
Add a recorded verified-repair consumer that discharges only exact retained anchors for the requested bucket while leaving unmatched proofs in the event ring. This gives the future durable successor writer a fail-closed primitive before any tombstone or GC path is enabled.

Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 09:16:47 +08:00
houseme ee752b0b03 test(scanner): summarize failed heal perf reports (#7446)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 09:16:39 +08:00
houseme 99c1f4418b fix(scanner): expose recovery intent identity (#7445)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 09:16:33 +08:00
houseme 7ce0ac72cf fix(scanner): require segment producer identities (#7444)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 09:15:53 +08:00
houseme 944e26d432 test(scanner): structure heal release evidence lanes (#7442)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 08:43:43 +08:00
Zhengchao An f0b0a99260 fix(ci): enable release branch checks and repair test imports (#7441) 2026-09-08 08:28:46 +08:00
houseme 33ddc10ffd test(heal): cover MRF manifest CAS legacy transition (#7443)
Co-authored-by: zhi22915 <qiuzgang@gmail.com>
2026-09-08 08:28:08 +08:00
2018 changed files with 86004 additions and 567710 deletions
+27 -7
View File
@@ -1,13 +1,33 @@
# Adversarial Review Shape
Use when root `AGENTS.md` triggers adversarial validation or for a substantial PR review. Paths below are repository-relative. The root finding standard and completion rule apply; selecting a lens does not require finding a defect.
Use when root `AGENTS.md` triggers adversarial validation or for a substantial PR
review. Paths below are repository-relative. The root finding standard and
completion rule apply; selecting a lens does not require finding a defect.
Risk and review shape:
- **Exempt:** documentation, comments, formatting, or typos with no runtime, build, test, or agent-execution effect.
- **Mechanical:** changes shown to preserve behavior, such as a symbol rename with unchanged callers or a file move with equivalent wiring. Run correctness and simplicity lenses. Classify tests, tooling, CI, and agent instructions by the behavior and authority they change, not their file type; deleting regression protection or changing failure propagation, publishing, or destructive actions can be high risk.
- **Standard:** localized behavior changes. Run one integrated final-diff pass covering correctness, simplicity, and test coverage; add only domain lenses matched by the diff.
- **High risk / substantial PR review:** high risk includes locking, erasure/quorum/heal, replication, multipart, RPC, lifecycle/tiering, persistence/fsync, IAM/KMS/auth, cryptography, on-disk/on-wire formats, and S3-visible semantics. Cover the applicable lenses from two perspectives: first trace the intended contract and implementation, then independently challenge its assumptions, failure paths, and evidence. Use separate reviewers when delegation is authorized and useful, or fresh sequential passes otherwise. Choose staffing and split lenses to fit the risk; a fixed reviewer count or duplicated review is not the goal.
- **Outbound client defaults:** what `TargetClient`, `PutObjectOptions`, or the remote SDK configuration sends to every replication or migration target is high risk for every target class even when the change fixes one. Follow the SOP in `docs/postmortems/2026-09-03-replication-checksum-default-regression.md`: run the outbound target matrix, document each new env knob in the same PR, and list verified and unverified target classes in the PR Impact section.
- **Exempt:** documentation, comments, formatting, or typos with no runtime,
build, test, or agent-execution effect.
- **Mechanical:** renames, moves, test/tooling-only changes, and agent-rule
changes. Run correctness and simplicity lenses.
- **Standard:** localized behavior changes. Run one integrated final-diff pass
covering correctness, simplicity, and test coverage; add only domain lenses
matched by the diff.
- **High risk / substantial PR review:** high risk includes locking,
erasure/quorum/heal, replication, multipart, RPC, lifecycle/tiering,
persistence/fsync, IAM/KMS/auth, cryptography, on-disk/on-wire formats, and
S3-visible semantics. Cover all applicable lenses using exactly two
independent reviewers when delegation is explicitly authorized. Split the
lenses between them. Otherwise perform two fresh sequential passes.
- **Outbound client defaults:** what `TargetClient`, `PutObjectOptions`, or
the remote SDK configuration sends to every replication or migration target
is high risk for every target class even when the change fixes one. Follow
the SOP in `docs/postmortems/2026-09-03-replication-checksum-default-regression.md`:
run the outbound target matrix, document each new env knob in the same PR,
and list verified and unverified target classes in the PR Impact section.
Available domain lenses are security, concurrency/durability, compatibility, and performance; select only those matched by the change.
Available domain lenses are security, concurrency/durability, compatibility,
and performance. Select `.agents/skills/adversarial-validation/SKILL.md` for an
explicit adversarial request, a high-risk change, or a substantial PR review;
then read only its matching role references. A routine standard pass does not
load the playbook unless the reviewer needs a RustFS-specific probe.
+49 -63
View File
@@ -1,79 +1,65 @@
# Implementation Rules
These implementation, style, and quality rules apply to all contributions, regardless of author or editor. Paths below are repository-relative. Read only the relevant sections during read-only review; select verification from the root `AGENTS.md`.
## Shared Style Contract
- Use the toolchain declared in `rust-toolchain.toml`, respect the minimum supported Rust version in `Cargo.toml`, and let `rustfmt.toml` and the configured Rust/Clippy lints define mechanical style. Do not override repository settings with personal formatter or lint preferences.
- Follow the owning module's organization, imports, and domain terminology where repository rules leave a choice. Existing violations do not justify new ones; avoid unrelated cleanup in a focused change.
- Rules using "must" or "do not" are requirements. Rules using "prefer" are defaults; depart when correctness, ownership, performance, or readability benefits justify it. Explain consequential tradeoffs, not every idiomatic choice. Where several approaches meet the contract equally well, the implementer chooses.
- Follow the declared toolchain locally and the affected CI lane's toolchain for reproduction. The repository currently tracks `stable`; for a formatter/lint mismatch, compare `rustc -Vv`, `cargo fmt --version`, and `cargo clippy --version` with the failing run before changing code. Toolchain upgrades must keep local and CI settings aligned and pass their affected gates; do not silently raise `rust-version` or change lint policy to make a check pass.
Applies when changing code or running artifact-heavy work. Paths below
are repository-relative. Read only the relevant sections during read-only review.
## Worktree and Disk Hygiene
- For a new task, start from the latest `origin/main` unless a different base is requested, and confirm the requested change is not already present. When continuing existing work or a PR, preserve its branch, base, and task-owned changes; do not restart it from `main`.
- An existing clean, isolated task worktree is sufficient. Create another worktree only when the current checkout is shared, dirty with unrelated work, or belongs to another task.
- Start implementation from the latest `origin/main` and confirm the requested
change is not already present.
- An existing clean, isolated task worktree is sufficient. Create another
worktree only when the current checkout is shared, dirty with unrelated work,
or belongs to another task.
- Never commit from a shared checkout.
- Use a task-specific branch named `<type>/<topic>`, such as `fix/...`, `feat/...`, `test/...`, or `docs/...`, unless the user specifies a name.
- Do not include agent, tool, contributor, account, or organization names in branch names.
- Push to the user-requested remote or the repository's configured push remote. Do not hard-code or infer a remote from an account name.
- Check free space before artifact-heavy builds, tests, coverage, or downloads. Re-check before a broad gate when space is tight.
- Before handoff, remove the Cargo target directories and temporary worktrees the task created unless they stay intentionally or hold unmerged work. Identify build output by Cargo's markers (`.rustc_info.json`, `CACHEDIR.TAG`), not by directory name: `target` is also a source directory here.
- Remove only task-owned temporary/build artifacts. Never delete another task's worktree or uncommitted data.
- At handoff, mention disk or cleanup details only when they affected execution or artifacts/worktrees remain intentionally.
- For Docker verification, ensure the tested image contains the intended binary. `buildx build` without `--load` leaves the image in the build cache; use the Makefile's loaded image and rebuild without cache only when stale artifacts are evidenced.
- Use a task-specific branch named `<type>/<topic>`, such as `fix/...`,
`feat/...`, `test/...`, or `docs/...`, unless the user specifies a name.
- Do not include agent, tool, contributor, account, or organization names in
branch names.
- Push to the user-requested remote or the repository's configured push remote.
Do not hard-code or infer a remote from an account name.
- Check free space before artifact-heavy builds, tests, coverage, or downloads.
Re-check before a broad gate when space is tight.
- Remove only task-owned temporary/build artifacts. Never delete another task's
worktree or uncommitted data.
- At handoff, mention disk or cleanup details only when they affected execution
or artifacts/worktrees remain intentionally.
## Change Style
- Preserve unrelated control flow. Restructure touched code only when needed for the requested behavior or an explicitly requested refactor; style preferences alone do not justify changing execution order or cleanup behavior.
- Prefer a direct local edit over new files, wrappers, managers, or speculative abstractions.
- Add a helper only when it removes current duplication, names a real domain boundary, or isolates a non-trivial invariant. Keep helpers near the code they support when the module's organization permits it.
- Remove an in-scope path superseded by the change. If compatibility requires it, adapt at the boundary to one canonical core and use the repository's `RUSTFS_COMPAT_TODO` policy.
- Comments explain non-obvious invariants or reasons. Do not narrate code or record change history.
- Preserve existing control flow unless changing it is required for correctness.
- Prefer a direct local edit over new files, wrappers, managers, or speculative
abstractions.
- Add a helper only when it removes current duplication, names a real domain
boundary, or isolates a non-trivial invariant.
- Remove an in-scope path superseded by the change. If compatibility requires it,
adapt at the boundary to one canonical core and use the repository's
`RUSTFS_COMPAT_TODO` policy.
- Comments explain non-obvious invariants or reasons. Do not narrate code or
record change history.
- Mention unrelated problems when useful; do not fix them in a narrow task.
## Rust Style
These repository-owned rules incorporate selected ideas from the [OpenCode style guide](https://github.com/anomalyco/opencode/blob/dev/AGENTS.md#style-guide), adapted to RustFS. That link is background, not an additional rule source. Apply these defaults to new or changed code; correctness and domain invariants take priority.
- Default to immutable `let` bindings; use `mut` for actual state changes. Prefer `if` or `match` expressions when branches compute a value instead of initializing a placeholder and reassigning it.
- Use type inference for obvious local values. Add annotations when inference needs help or the numeric, collection, or error type matters to understanding the code. Keep explicit types in function signatures and public contracts.
- Keep the main path readable with guard clauses, `let ... else`, and `?` when immediate propagation is correct. Preserve explicit handling for recovery, cleanup, aggregation, and quorum decisions; `if`/`else` expressions and exhaustive `match` remain idiomatic.
- Prefer readable iterator chains for straightforward mapping and filtering. Keep loops when they make state changes, early exits, or async operations clearer. Do not add intermediate collections or clones just to use iterators.
- Inline trivial single-use expressions only when a binding adds no meaning. Keep names that explain domain concepts, aid debugging, or make ownership and guard lifetimes clear. Do not change lock release or drop timing for style.
- Keep pure parsing, validation, and option-building helpers synchronous unless an async interface contract requires otherwise. This does not make blocking I/O or CPU-heavy work safe to run on async executor threads; offload it when needed to keep those threads responsive.
## Reuse and Boundary Rules
- Before adding helpers, constants, fixtures, or wrappers, search the touched code and domain owner; check `crates/utils`, `crates/common`, and direct dependencies when they could own the behavior. Stop once the relevant reuse boundary is clear.
- Reuse requires matching semantics: normalization, error types, deadlines, durability, and compatibility must fit the call site. A narrowly named local helper is better than forced reuse with different semantics.
- Validate untrusted input at the boundary that owns it, then pass validated types inward without repeating checks whose guarantees still hold. Deserializing into a Rust type alone does not establish domain validity. Values newly read from disk, RPC, persistence, or another version must be validated at that consuming boundary.
- For destructive actions such as delete or overwrite and for quorum decisions, check the relevant identity, generation, and authority under the operation's existing synchronization or precondition contract. A separate unguarded recheck does not prevent a check/use race.
- Every new control-flow branch needs a concrete triggering input/state. For decoded or peer data, corruption and mixed-version input are valid triggers.
- Required values must return a typed error when absent or corrupt; do not use a default that converts corruption into a plausible result.
- Attach error context once where it is actionable. Do not erase typed errors below aggregation or quorum layers.
## Rust Boundaries
- Production `unwrap`/`expect` must follow a type guarantee or checked invariant; explain only non-obvious guarantees. Stricter scoped prohibitions, including `crates/AGENTS.md`, still apply. Invalid client, disk, or peer data must return errors rather than trigger panics.
- Public APIs do not return `Result<_, String>`. Library APIs use domain errors unless intentional erasure is part of the boundary contract; expose a stored inner error through `Error::source()`.
- Numeric conversions must not silently truncate. Use fallible conversions for untrusted values; validate finiteness, sign, and range before float-to-integer conversion. Clamp/saturate only when required by the domain.
- Do not add crate-root `#![allow(dead_code)]`.
- Before adding helpers, constants, fixtures, or wrappers, search the touched
crate, the domain-owning crate, `crates/utils`, `crates/common`, and relevant
direct dependencies.
- Reuse requires matching semantics: normalization, error types, deadlines,
durability, and compatibility must fit the call site. A narrowly named local
helper is better than forced reuse with different semantics.
- Validate untrusted input at its trust boundary, then trust the validated type.
Values crossing disk, RPC, persistence, or version boundaries remain
untrusted at every consumer.
- Re-check boundary values immediately before destructive actions such as
delete, overwrite, or quorum decisions.
- Every new branch needs a concrete triggering input/state. For decoded or peer
data, corruption and mixed-version input are valid triggers.
- Required values must return a typed error when absent or corrupt; do not use a
default that converts corruption into a plausible result.
- Attach error context once where it is actionable. Do not erase typed errors
below aggregation or quorum layers.
## Naming
Use Rust API naming: `SCREAMING_SNAKE_CASE` constants/statics, `snake_case` functions/variables/modules, and `PascalCase` types/traits. Name domain concepts and include units where a value would otherwise be ambiguous; do not optimize for short names. Do not rename public, serialized, or persisted fields merely to match a local style preference, or rename unrelated existing violations.
## API and Operational Contracts
- For new or changed public APIs, document the caller-visible behavior and relevant `# Errors`, `# Panics`, and `# Safety` conditions. Include a useful example or link to one when usage is non-obvious; avoid boilerplate sections that say nothing. Follow the [Rust API documentation guidelines](https://rust-lang.github.io/api-guidelines/documentation.html) within the scope of the change.
- For async or storage APIs, state cancellation, retry/idempotency, partial-completion, ownership, and durability guarantees when callers rely on them. Make failure cleanup and commit points explicit in code and tests; do not imply atomicity that the implementation does not provide.
- For protocol, persisted-format, configuration, dependency, or operational changes, check affected consumers and supported versions. Update relevant docs/examples and describe compatibility, upgrade/rollback limits, and new configuration defaults when they change. New dependencies must solve a current need and fit the workspace's license, toolchain, and feature policy.
- For hot-path or resource-management changes, check allocation/copying, blocking, unbounded work, and lock duration where affected. Support performance claims with an appropriate measurement or clearly label them as expectations; a benchmark is not required for unrelated changes.
## Behavioral Tests
- For behavior changes, add or update the narrowest test that calls the real implementation and asserts an observable result. Existing tests can provide coverage when they directly exercise the changed behavior; do not duplicate production logic as the test oracle.
- Cover the changed contract's relevant failure and boundary cases, not only success. A bug regression should fail without the fix; do not broaden assertions or rely only on a successful call when the result or side effect is what matters.
- Follow `docs/testing/README.md` for test layers, runners, isolation, synchronization, and flaky tests. Use controlled clocks or explicit synchronization for time/concurrency tests instead of fixed sleeps, and keep waits bounded.
- Report the checks actually run and their outcomes, including skipped or blocked checks and the behavior they leave unverified. Do not describe focused local checks as full CI coverage.
Use Rust API naming: `SCREAMING_SNAKE_CASE` constants/statics, `snake_case`
functions/variables, and `PascalCase` types. Do not rename unrelated existing
violations.
+35 -15
View File
@@ -1,31 +1,51 @@
# Git and Pull Request Rules
Applies to commits, pushes, PRs, and issue/discussion actions. Paths below are repository-relative. User authorization and root `AGENTS.md` still govern scope.
Applies to commits, pushes, PRs, and issue/discussion actions. Paths below are
repository-relative. User authorization and root `AGENTS.md` still govern scope.
## Final PR Preflight
Before creating or updating a PR, reuse completed review and verification:
- Verify the actual base (normally `origin/main`) and the complete task diff, including file names and whitespace. Exclude secrets, logs, generated artifacts, and unrelated edits. Retain an existing PR's base unless requested.
- Confirm the final diff passed the root verification tier; fix task-owned failures and run missing scoped checks. Report unresolved required checks or authority without expanding the task. Do not start another general review.
- Keep the English Conventional Commit title at most 72 characters. Use the template headings, actual checks, material risks, and rollback notes.
- Immediately before writing to GitHub, confirm the head and task diff are unchanged. Rerun only checks invalidated by edits or relevant state changes.
- Verify the actual base (normally `origin/main`) and the complete task diff,
including file names and whitespace. Exclude secrets, logs, generated
artifacts, and unrelated edits. Retain an existing PR's base unless requested.
- Confirm the final diff passed the root verification tier; fix task-owned
failures and run missing scoped checks. Report unresolved required checks or
authority without expanding the task. Do not start another general review.
- Keep the English Conventional Commit title at most 72 characters. Use the
template headings, actual checks, material risks, and rollback notes.
- Immediately before writing to GitHub, confirm the head and task diff are
unchanged. Rerun only checks invalidated by edits or relevant state changes.
## Pull Request Lifecycle
- Creating or updating a PR includes one immediate snapshot of checks, mergeability, reviews, and unresolved threads.
- Unless the user explicitly requests monitoring, a release workflow requires it, or an automation already owns it, hand off after the PR is open with the current state and next event to watch. Do not delay ordinary handoff with fixed quiet-period sleeps.
- For requested monitoring, use event-driven or bounded waits. Report only state changes, actionable failures, or a meaningful prolonged delay.
- Investigate failures/comments before changing code. Monitoring alone authorizes observation and diagnosis; fixes, pushes, replies, and thread resolution require their own existing task authority. When authorized, fix task-attributable issues, rerun affected verification, and resume the requested monitor. Otherwise report the concrete failure and next action without expanding scope.
- Merge only with existing user authorization and satisfied applicable reviewer, check, and branch-protection requirements. Reviewer approval does not grant merge authority; user authorization does not bypass repository protections.
- After an observed merge, verify the commit reached the base, then clean the task worktree/branch when safe. Preserve unmerged work for closed PRs unless deletion was explicitly authorized.
- Creating or updating a PR includes one immediate snapshot of checks,
mergeability, reviews, and unresolved threads.
- Unless the user explicitly requests monitoring, a release workflow requires
it, or an automation already owns it, hand off after the PR is open with the
current state and next event to watch. Do not delay ordinary handoff with
fixed quiet-period sleeps.
- For requested monitoring, use event-driven or bounded waits. Report only state
changes, actionable failures, or a meaningful prolonged delay.
- Investigate failures/comments before changing code. Fix task-attributable
issues, rerun affected verification, push, reply or resolve the thread, then
resume the requested monitor.
- Never merge without required reviewer approval or explicit authority.
- After an observed merge, verify the commit reached the base, then clean the
task worktree/branch when safe. Preserve unmerged work for closed PRs unless
deletion was explicitly authorized.
## Git and PR Baseline
- Follow Conventional Commits; keep the subject at most 72 characters.
- Source comments, commits, PR titles, and PR bodies are in English.
- Keep every heading from `.github/pull_request_template.md`; use `N/A` where needed and include commands actually run.
- Keep every heading from `.github/pull_request_template.md`; use `N/A` where
needed and include commands actually run.
- Use `--body-file` for multiline `gh pr create`/`gh pr edit` content.
- PR/issue/discussion content must not contain the literal sequence `\n` or hard-wrapped prose paragraphs.
- Do not include local absolute paths or tool-specific labels/prefixes in GitHub content.
- Resolve review threads after the underlying issue is fixed. If declining a suggestion, reply with a short evidence-based reason.
- PR/issue/discussion content must not contain the literal sequence `\n` or
hard-wrapped prose paragraphs.
- Do not include local absolute paths or tool-specific labels/prefixes in GitHub
content.
- Resolve review threads after the underlying issue is fixed. If declining a
suggestion, reply with a short evidence-based reason.
@@ -0,0 +1,48 @@
---
name: adversarial-validation
description: Review RustFS diffs or designs for explicit adversarial requests, high-risk changes under the repository review policy, or substantial PR reviews. Skip ordinary questions, diagnosis, planning, status, routine low-risk implementation, and prose with no execution effect.
---
# RustFS Adversarial Validation
Use the [repository risk tiers and review shape](../../references/adversarial-validation.md). This skill
routes a review to RustFS-specific probes without loading unrelated domains.
## Select Lenses
Read only the references required by the diff:
| Lens | When to read |
|---|---|
| [Correctness](references/correctness.md) | Every non-exempt adversarial review |
| [Simplicity](references/simplicity.md) | Mechanical/standard changes and production growth |
| [Test coverage](references/test-coverage.md) | Behavior or test changes |
| [Security](references/security.md) | Authn/authz, IAM, RPC trust, paths, secrets, parsing, browser, encryption |
| [Concurrency/durability](references/concurrency-durability.md) | Async shared state, locks, storage commit, cancellation, persisted queues |
| [Compatibility](references/compatibility.md) | S3 surface, MinIO interop, metadata, wire/disk formats, mixed versions |
| [Performance](references/performance.md) | Request/object hot paths, allocation, blocking work, fsync, fan-out |
Do not read all references as a precaution. A path name alone is insufficient;
the changed behavior must touch the lens's domain.
For a dedicated security audit or advisory analysis, use
`security-advisory-lessons` instead of loading it automatically during every
adversarial review.
## Review Protocol
1. Freeze the exact final diff/head (or the design under review) and list the
selected lenses.
2. Run the review shape required by the repository risk tier.
3. For each selected lens, either report a concrete finding or a null verdict
naming the attacks performed.
4. Apply root `AGENTS.md`'s finding standard. Test each candidate against callers,
existing coverage, and invariants before accepting it; an adversarial role
does not have to produce a defect.
5. Fix or rebut supported findings with code-path, test, or invariant evidence.
6. After a non-trivial edit, rerun only lenses affected by that edit against the
new exact diff.
Do not turn a null verdict into a long checklist. Record concise evidence that
the relevant failure classes were attacked, then stop under the root completion
rule. Keep the required per-lens verdicts for high-risk PRs.
@@ -0,0 +1,38 @@
# Compatibility Lens
- Internal metadata uses `metadata_compat` helpers for dual RustFS/MinIO keys,
including mixed casing and removal of both twins.
- Binary UUID metadata treats absent, empty, and nil as no value. Unversioned
remote tiers receive no `versionId`; versioned purge requests retain the real
version ID.
- `xl.meta` changes preserve supported header/meta versions, recompute
signatures, decode legacy fixtures, and remain readable by old RustFS/MinIO.
- Foreign/corrupt metadata validates parallel array lengths and missing fields;
it returns a decode error rather than indexing, panicking, or fabricating data.
- Do not “correct” byte-for-byte MinIO ports without legacy fixture evidence.
Bitrot framing, shard math, distribution, and inline prefixes are contracts.
- Client-visible metadata/events strip both internal prefixes
case-insensitively.
- Proto fields are appended, never reused/renumbered; FlatBuffers tables extend
compatibly and absent new fields fail closed where authorization/quorum is
involved.
- Replay real client request shapes and exact pagination boundaries for S3
handler changes.
- Bucket metadata/IAM/config parsing remains compatible with pinned real MinIO
fixtures and encrypted migration data.
- Compatibility shims use `RUSTFS_COMPAT_TODO(<task-id>)`, have a removal
condition, and default toward reading old data safely.
## Outbound targets
- A change to what the replication or migration client sends by default
(checksum policy, payload framing, headers, version-id addressing) is judged
against every target class, not the one it fixes. Name each target-side rule
the current default satisfies — checksum required with Object Lock
parameters, `aws-chunked` decoding, version-id adoption, ETag equals content
MD5 — and show which cell of
`crates/e2e_test/src/replication_target_matrix_test.rs` covers each.
- A test that asserts the fix ("no trailer header") is not evidence; the
matrix cell that asserts the target accepted and stored the object is.
- Every new environment escape hatch appears in
`docs/operations/replication-outbound-transport.md` in the same diff.
@@ -0,0 +1,23 @@
# Concurrency and Durability Lens
- For every changed lock, enumerate overlapping lock sets and construct the
ABBA interleaving. Multiple-lock order must be documented and consistent.
- Mark guard lifetimes and every `.await`, disk, and RPC call inside them.
Estimate contention and timeout behavior under concurrent requests.
- Object commits remain fenced if the distributed lock is lost after shard
writes and before metadata rename.
- For write/rename changes, trace `write tmp -> sync tmp -> rename -> sync parent
-> sync required ancestors`; simulate a crash after each step and honor the
configured durability gate.
- Multi-disk fan-out counts every result. Quorum-minus-one cannot become success;
heal remains best-effort per target where that is the established contract.
- At every new cancellable await between mutation and cleanup/commit, drop the
future and inspect leftover files, counters, permits, and replay state.
- Multipart operations on the same upload ID are serialized where required;
abort/complete/list races cannot delete parts before durable commit.
- Post-commit cleanup is best-effort, retry-safe, and cannot fail an already
committed write or delete the last surviving copy.
- Persisted read-modify-write uses serialization/CAS. Queue replay is crash-safe
and duplicate delivery has an idempotency contract.
- Streaming reconstruction failures after partial output surface as errors, not
successful EOF.
@@ -0,0 +1,29 @@
# Correctness Lens
Attack the changed behavior, not every subsystem in the repository.
- Trace new error paths to the caller. Inject the ignored/wildcard variants and
verify they cannot become success, not-found, or a plausible default.
- Exercise zero/empty/missing, maximum, and exact-boundary inputs for every
changed count, size, index, page limit, or optional value.
- For aggregation/quorum changes, test exactly quorum and quorum-minus-one with
mixed disk errors and nil/placeholder entries.
- For listing/pagination, test `n == max`, `n == max + 1`, delimiter folding,
continuation markers, and object/prefix name collisions.
- For EC/read/streaming changes, inject failure after partial output and verify
the client receives an error rather than a clean truncated body. Assert exact
bytes and length.
- For multipart/object commits, fail before/after rename and cleanup; committed
data must remain readable and pre-commit cleanup must not destroy parts.
- For version/index ordering, test `len - 1`, `len`, equal timestamps, missing
versions, and deterministic tie-breaking.
- For directory-object behavior, trace `__XLDIR__` at the store layer; branches
below the layer that sees trailing slashes are dead.
- For binary UUID metadata, absent, empty, and nil all mean no value. Never send
nil/empty `versionId` to an unversioned tier.
- For agent rules/skill routers, test a trigger matrix covering ordinary
inquiry, low-risk implementation, explicit review, high-risk code, PR
creation, release, and post-PR monitoring. Each case must select only the
intended workflow and retain required safety/authorization boundaries.
Null verdicts name only the probes relevant to the diff.
@@ -0,0 +1,20 @@
# Performance Lens
- For added clones/allocations on request/object/block paths, quantify copied
data and frequency. Recommend borrowing, move, `Bytes`/`Arc`, `Cow`, or
capacity reservation only for a concrete repeated cost.
- Route every new sync/flush through the durability-mode and bucket override
gates; mode `none` must not pay the new fsync.
- Keep blocking filesystem/CPU work off async runtime threads, but do not split
one small operation into many `spawn_blocking` round trips.
- Measure lock hold time across I/O and compare acquisition order for ABBA.
- Keep cleanup, extra stat/rename, and diagnostics out of the PUT commit critical
section when they need not be there.
- Detect per-item serial I/O/RPC in batch APIs and accidental quadratic scans;
use a gate or bounded concurrency when the concrete fan-out warrants it.
- Count buffer growth and byte copies in EC/bitrot paths; preserve pool gauge
balance and avoid repeated metadata decode/fetch per object.
- Repetitive success logs stay at `trace`; metrics/instrumentation on hot paths
require an existing gate.
- Claims of no impact on PUT/GET/commit/erasure paths need relevant benchmark or
A/B evidence, especially for 4 KiB objects.
@@ -0,0 +1,31 @@
# Security Lens
Use `security-advisory-lessons` only for a dedicated advisory/security audit.
For an ordinary matched diff, attack these boundaries:
- Admin routes: route registration, whitelist, handler authn, and the exact
`AdminAction` must agree. Read-only diagnostics still require admin authz.
- IAM/service accounts: treat parent, claims, keys, groups, status, and policy
names as attacker-controlled; prove ownership/root authority before writes.
- Protocol frontends: every changed/sibling command authorizes the matching S3
action before reaching storage.
- Secrets/signatures: use constant-time comparison, normalize public failures,
keep RPC/root/STS keys independent, and fail closed when secrets are absent.
- RPC: bind signatures to the exact method/path and timestamp; reject replay,
stale, malformed, truncated, and invalid-enum payloads without panic.
- Paths/object/archive entries: reject traversal, absolute/platform escapes,
and normalization differences between authz and storage.
- Copy/multipart/presigned POST: enforce source, destination, version-aware
actions, copy-source conditions, and every signed policy condition.
- Logging/errors: never expose credentials, tokens, expected signatures, raw
secret-bearing input, or merged configs—including via `Debug` and parse errors.
- Untrusted serde: reject unknown fields where compatible and validate
security-critical defaults/ranges before numeric conversion.
- SSE/browser/CORS/trusted proxy: inspect stored ciphertext and wrapper order;
isolate user content; never reflect credentialed arbitrary origins or trust
forwarded identity from direct clients.
- Object Lock: unreadable/fabricated/unparsable metadata fails closed across
foreground, lifecycle, scanner, and force-delete paths.
Security findings distinguish unauthenticated compromise from a
low-privileged authenticated bypass.
@@ -0,0 +1,22 @@
# Simplicity Lens
- Compare the production diff with the smallest equivalent local edit. Fewer
lines alone are not evidence; the replacement must preserve correctness,
compatibility, readability, and real boundaries.
- Search the touched crate, domain owner, `crates/utils`, `crates/common`, and
relevant dependencies for each new helper, constant, wrapper, or fixture.
- Reject forced reuse when normalization, error, deadline, or durability
semantics differ.
- Require a concrete trigger for every new defensive branch. Keep boundary
checks for disk/RPC/version data and checks immediately before destructive
actions.
- Flag one-caller helpers only when they merely forward or split a short linear
flow without adding domain naming, invariant isolation, or useful context.
- Ensure a replacement removes the superseded in-scope path or keeps one
canonical core behind a documented compatibility adapter.
- Remove narration/change-history comments; preserve concise safety, lock,
durability, and compatibility invariants.
- Treat tests, fixtures, generated code, and documentation separately from
production growth. Do not optimize away meaningful regression coverage.
A finding must include a concrete smaller design, not a style preference.
@@ -0,0 +1,25 @@
# Test-Coverage Lens
- For every behavior claim, name the focused test/check that fails if the
changed hunk is reverted. If none is practical, require the reason and
residual risk.
- Confirm tests exercise the real production path and distinguish the intended
behavior from the named regression. A success, `is_err()`, or no-panic check
can be sufficient when that is the actual contract; require exact values,
bytes, state, or error variants when those distinctions matter to the change.
- For new flags/modes, verify each branch and ask which test fails if the branch
is inverted.
- For new error propagation, inject the failure and assert the caller observes
it; mentally replacing `?`/`return Err` with success must break a test.
- Streaming GET tests assert the complete body and length under degraded reads.
- Disk/wire-format tests use pinned foreign/legacy fixtures; same-code
round-trips are insufficient for compatibility.
- Concurrency tests use readiness polling, isolate global state, and avoid fixed
sleeps or unrealistically short timeouts. Use nextest groups when process-level
serialization is required.
- Internal metadata tests assert both RustFS and MinIO keys, not only read-back
through a helper that prefers one key.
- Boundary companions are distinct coverage: `n == max` vs `max + 1`, and
absent vs empty vs nil UUID.
- A focused test proves only the targets/features it builds. Add compilation or
Clippy only for uncovered changed targets.
@@ -1,5 +1,9 @@
---
name: arch-checks
description: Diagnose failures from check_layer_dependencies.sh, check_architecture_migration_rules.sh, check_unsafe_code_allowances.sh, check_logging_guardrails.sh, check_doc_paths.sh, or check_no_planning_docs.sh. Use when one of these guards fails, not for every architecture question or documentation edit.
---
# Architecture Guard Troubleshooting
# Architecture Guard Checks
Read only the section for the failing guard. Use `.config/make/` and the current
workflow to verify its wiring; not every guard is part of every gate. Fix the
@@ -34,16 +38,6 @@ source lines. If it fails after a doc edit, you reworded or removed a
guarded line — restore the wording or update the script deliberately in the
same PR, with rationale.
## OIDC architecture boundaries
`check_architecture_migration_rules.sh` also runs `scripts/check_oidc_architecture_boundaries.sh`. Its rule identifier and `file:line` point to the source boundary that changed. Keep OIDC provider configuration, discovery, transport, state, and runtime under `crates/iam/src/oidc/`; keep verified identity mapping under `crates/iam/src/federation/mapper.rs`; construct the runtime in IAM startup and `rustfs/src/startup_auth.rs`; publish the federation service and OIDC query together through `AppContext`. The Keycloak workflow must include the OIDC module path for pull requests and pushes.
OIDC production modules must not reference RustFS `Credentials` or `FederatedSessionTransaction`. Federation orchestration creates the transaction, and the Admin session binding issues credentials.
The Admin OIDC handler delegates persisted configuration reads, updates, and provider validation to `admin/service/oidc_config.rs`. Site replication uses `OidcConfigQuery::site_replication_snapshot()` and receives only the fields required for its response, including a hashed client secret. The Keycloak workflow also tracks the Admin configuration service path for both events.
Run `bash scripts/check_oidc_architecture_boundaries.sh --self-test` after editing a rule. Its negative and accepted examples under `scripts/fixtures/architecture_migration_rules/oidc/` must produce the exact expected rule identifiers. Then run the full architecture guard.
## `check_unsafe_code_allowances.sh`
Every `#[allow(unsafe_code)]` needs a `SAFETY:` comment within a few lines.
@@ -57,7 +51,7 @@ consider adding it to the script's `checked_files` list.
## `check_doc_paths.sh`
Instruction docs (`AGENTS.md`, `ARCHITECTURE.md`) and every
Instruction docs (`AGENTS.md`, `CLAUDE.md`, `ARCHITECTURE.md`) and every
Markdown file under `docs/` (architecture, operations, testing, index) must not
reference repo file paths that no longer exist. If your refactor moved code,
update the docs that point at it — the error message lists `doc -> stale-path`
@@ -0,0 +1,51 @@
---
name: code-change-verification
description: Review a commit, PR, or merged patch when the user requests ordinary code-change verification. Do not combine with adversarial-validation; use that skill instead for explicitly adversarial, substantial, or high-risk RustFS reviews.
---
# Code Change Verification
Use this skill for an ordinary requested review. If the root policy or user calls
for adversarial validation, use `adversarial-validation` instead of running both.
## Core Workflow
### 1) Scope and assumptions
- Derive the change source, target branch, and relevant runtime/version from the
supplied diff and metadata. Ask only when missing context could change the verdict.
- Focus only on requested scope; avoid reviewing unrelated files.
### 2) Risk map
- Prioritize in this order:
- Data correctness and user-visible behavior
- API/contract compatibility
- Security and authz/authn boundaries
- Concurrency and lifecycle correctness
- Performance and resource usage
- Give higher priority to stateful paths, migration logic, defaults, and error handling.
### 3) Evidence-based inspection
- Read each modified hunk with neighboring context.
- Trace call paths and call-site expectations.
- Check for:
- invariant breaks and missing guards
- unchecked assumptions and null/empty/error-path handling
- stale tests, fixtures, and configs
- hidden coupling to shared helpers/constants/features
- Apply root `AGENTS.md`'s finding standard: try to disprove a candidate before
reporting it. Mention an unresolved question only when it could materially
change the verdict; do not fill the report with speculative possibilities.
#### Rust-specific checks
For changed Rust behavior, use the matching sections of [rust-code-quality](../rust-code-quality/SKILL.md). Reuse checks already performed by the selected review workflow. Comment-only or formatting-only Rust diffs do not require the full Rust checklist. Carry its P0–P3 ratings over unchanged and use this skill's output format.
### 4) Findings-first output
- Order supported findings by P0–P3 severity; preserve the Rust ratings above.
Include `path:line`, the failure and impact, a focused fix, and its validation.
- If no supported issues remain, state `No findings` with the reviewed scope and
any material verification limitation. Do not append optional improvements to
make a clean review look productive.
Close after the required review. Recommend additional verification only for an
identified unresolved risk or required gate; reuse evidence for unchanged code.
@@ -0,0 +1,4 @@
interface:
display_name: "Code Change Verification"
short_description: "Prioritize risks and verify code changes before merge."
default_prompt: "Use $code-change-verification for an ordinary requested diff review with prioritized findings."
+106 -7
View File
@@ -1,13 +1,112 @@
---
name: issue-triage
description: Verify issue completion against current implementation and merged work. Use for issue triage; comment, close, or change labels only when authorized.
description: Assess whether a GitHub issue is fixed, needs implementation, or can be closed by checking related work and current code. Use for issue completion/triage requests. Status questions are read-only; comment, close, or change labels only when the conversation authorizes that action.
---
# Issue Triage
- Resolve the issue repository separately from the implementation repository: `rustfs/backlog` tracks work in `rustfs/rustfs`. Pass `--repo` explicitly to GitHub queries.
- Read the issue body, relevant comments, linked PRs, checklist, and sub-issues with `gh issue view`. Search explicit links, the full issue URL, qualified references, and subject keywords; an empty search result does not prove implementation is absent.
- Fetch the implementation base and inspect its current code. For each merged candidate, verify `git merge-base --is-ancestor <merge-commit> <remote>/<base>`; a title, commit message, or merged state alone is insufficient. A local checkout may be stale or on another branch.
- Verify every checklist/sub-issue before declaring completion. For batches, paginate the entire requested issue scope, exclude PR entries, and filter by author only when requested.
- Recommend closing only when all requested behavior is present or evidence shows the issue is superseded. Otherwise name what remains. A status request is read-only; reuse existing authority for comments/closing/labels, and follow [Git and PR rules](../../references/pull-requests.md) before posting. Use Chinese for `rustfs/backlog`, existing repository labels only, and a closing comment naming the verified behavior and PRs.
Use this skill when the user provides a GitHub issue URL and asks "can this be closed?", "is this already implemented?", "check completion status", or similar triage questions.
Report the issue, current state, implementation evidence, remaining work, verdict, and action actually taken. Use a table for batches. Write multiline comments via `--body-file`; when closing, post the prepared comment before closing without an inline multiline body.
## Workflow
### 1. Fetch issue context
```bash
gh issue view <N> --repo <owner/repo> --json title,body,state,comments,labels,updatedAt
```
Read the issue body to understand what was requested. Extract:
- The specific feature/fix/behavior described.
- Any linked PRs or commits mentioned in the body or comments.
- Any checklist items or sub-issues.
Resolve the issue repository and implementation repository separately (for example, `rustfs/backlog` tracks work in `rustfs/rustfs`). Pass the implementation repository explicitly to PR queries; the current checkout may belong to another repository.
### 2. Search for related work
Search git history for commits referencing the issue:
```bash
git log --oneline --all --grep="<N>" | head -30
```
Search for related PRs:
```bash
gh pr list --repo <implementation-repo> --search "<issue-url>" --state all --json number,title,state,mergedAt
```
Also search qualified issue references and subject keywords; for same-repository
issues, include `#<N>`. Follow explicit links even without a text match. A search
page with no match does not prove the work is absent.
If the issue mentions specific PRs, check their status:
```bash
gh pr view <PR_N> --repo <implementation-repo> --json state,mergedAt,title,mergeCommit,baseRefName
```
### 3. Verify implementation
Fetch the implementation repository's current base branch. For each merged candidate, verify its merge commit is present and inspect the current code for the claimed behavior; a commit message match alone is not proof:
```bash
git fetch <implementation-remote> <base-branch>
git merge-base --is-ancestor <merge-commit> <implementation-remote>/<base-branch>
```
If the issue describes a specific defect, inspect the fetched base's code rather than assuming the current checkout contains it:
```bash
git show <implementation-remote>/<base-branch>:crates/<relevant>/src/<file>.rs
```
For issues with checklists, verify each item individually. If sub-items are tracked as separate issues, check those too:
```bash
gh issue view <SUB_N> --repo <owner/repo> --json state
```
### 4. Determine verdict
- **All items fixed and merged**: Recommend closing; name the verified PRs and behavior.
- **Some items fixed, some remaining**: Keep open; report each remaining item.
- **Not yet implemented**: Keep open; report what remains.
- **Superseded or no longer relevant**: Recommend closing with evidence.
### 5. Take action
For a status-only request, return the assessment without GitHub writes. If commenting, closing, or label edits are authorized, perform only those actions; do not ask again for authority already given. Prepare the final assessment before asking for any missing authority. Write `rustfs/backlog` issue content in Chinese.
Close with comment:
```bash
gh issue close <N> --repo <owner/repo> --comment "<body>"
```
Comment without closing:
```bash
gh issue comment <N> --repo <owner/repo> --body-file /tmp/triage.md
```
Update labels only when label changes are authorized, using existing repository labels; never add tool-specific labels:
```bash
gh issue edit <N> --repo <owner/repo> --add-label "<existing-label>"
```
Always use `--body-file` for multiline content, never inline `--body`.
### 6. Handle multi-issue batches
When the user asks to check multiple issues (e.g., "check all issues by user X" or "scan backlog for closable issues"):
1. List the full requested scope with pagination (for example `gh api --paginate 'repos/<repo>/issues?state=open&per_page=100'`, excluding entries with `pull_request`). Add an author filter only when the user requested one; the default page/limit is not evidence that all issues were checked.
2. For each issue, run steps 1-5 above.
3. Report a summary table of all triaged issues with verdicts.
## Report
Identify the issue and current state, verified implementation/PR evidence,
remaining items, verdict, and action actually taken. Use a table for batches;
a single issue does not require a heading for each field. Follow step 4's
verdicts without repeating the assessment in another template.
## Notes
- The user may ask in Chinese ("是否可以关闭", "检查完成情况"); respond in the same language.
- When closing, always include a summary of what was fixed and which PRs resolved it — this creates a useful audit trail.
- For issues in `rustfs/backlog`, use `--repo rustfs/backlog`.
- For issues in `rustfs/rustfs`, use `--repo rustfs/rustfs`.
- If the issue has sub-issues (GitHub sub-issues API), check each one's state before declaring the parent complete.
+52 -12
View File
@@ -16,28 +16,68 @@ The "plugin system" spans four surfaces that must stay consistent:
## Hard invariants (verify before merging)
1. **Secrets have one source of truth.** Secret config keys are declared only in the plugin manifest (`TargetPluginManifest.secret_fields`, `crates/targets/src/manifest.rs`) and flow to admin via `AdminTargetSpec.secret_fields`. Never add a hand-maintained per-service secret table in a handler; if redaction misses a field, fix the manifest.
1. **Secrets have one source of truth.** Secret config keys are declared only
in the plugin manifest (`TargetPluginManifest.secret_fields`,
`crates/targets/src/manifest.rs`) and flow to admin via
`AdminTargetSpec.secret_fields`. Never add a hand-maintained per-service
secret table in a handler; if redaction misses a field, fix the manifest.
2. **Redaction must round-trip.** Instance GET responses replace secret values with `***redacted***` (`REDACTED_SECRET_VALUE` in `plugins_instances.rs`). Instance PUT restores the stored secret when it receives that placeholder back (`restore_redacted_secret_values`). Any new read or write path for target config must keep both halves: redact on the way out, restore the placeholder on the way in. The placeholder literal must never be persisted.
2. **Redaction must round-trip.** Instance GET responses replace secret values
with `***redacted***` (`REDACTED_SECRET_VALUE` in `plugins_instances.rs`).
Instance PUT restores the stored secret when it receives that placeholder
back (`restore_redacted_secret_values`). Any new read or write path for
target config must keep both halves: redact on the way out, restore the
placeholder on the way in. The placeholder literal must never be persisted.
3. **Fixtures never reach production responses.** `example_external_webhook_plugin()` (`crates/targets/src/catalog/mod.rs`) is a test/demo fixture for control-plane planning tests. Production catalog/extension handlers must not include it; regression tests (`plugin_catalog_never_exposes_example_or_external_fixtures`, `extension_catalog_never_exposes_example_or_external_fixtures`) enforce it.
3. **Fixtures never reach production responses.**
`example_external_webhook_plugin()` (`crates/targets/src/catalog/mod.rs`)
is a test/demo fixture for control-plane planning tests. Production
catalog/extension handlers must not include it; regression tests
(`plugin_catalog_never_exposes_example_or_external_fixtures`,
`extension_catalog_never_exposes_example_or_external_fixtures`) enforce it.
4. **External plugin flow is planning-only and deny-by-default.** `plan_external_target_plugin_action` returns decisions, it executes nothing. `TargetPluginExternalFlowGate::default()` is fully closed and `TargetPluginInstallPolicy::default().allowed_download_hosts` is empty — keep it that way; tests opt in via explicit policies. Install validation requires https, an allowlisted host, a full 64-hex-char sha256 digest, signature and provenance URIs, and an artifact matching the host `target_triple`.
4. **External plugin flow is planning-only and deny-by-default.**
`plan_external_target_plugin_action` returns decisions, it executes
nothing. `TargetPluginExternalFlowGate::default()` is fully closed and
`TargetPluginInstallPolicy::default().allowed_download_hosts` is empty —
keep it that way; tests opt in via explicit policies. Install validation
requires https, an allowlisted host, a full 64-hex-char sha256 digest,
signature and provenance URIs, and an artifact matching the host
`target_triple`.
5. **Custom target types must not collide.** Unknown target types get an interned unique `custom:<type>` plugin id (`custom_plugin_id` in `manifest.rs`). Custom plugins with secrets must register via `TargetPluginDescriptor::with_manifest` and declare `secret_fields`; `::new` derives a manifest with no secrets.
5. **Custom target types must not collide.** Unknown target types get an
interned unique `custom:<type>` plugin id (`custom_plugin_id` in
`manifest.rs`). Custom plugins with secrets must register via
`TargetPluginDescriptor::with_manifest` and declare `secret_fields`;
`::new` derives a manifest with no secrets.
## Changing the admin JSON contract
- Shapes are locked twice in `plugin_contract.rs` tests: insta snapshots (`rustfs/src/admin/snapshots/`) plus literal `json!` assertions. Update both deliberately; a shape change is a console-facing API change.
- Field naming is `snake_case`, except discovery blocks (`runtimeCapabilities`, `clusterSnapshot`, `extensionsCatalog`) which are camelCase **by cross-endpoint convention** (same shape in `system.rs`, `console.rs`, `pools.rs`). Do not "fix" that inconsistency locally.
- Contract types deliberately duplicate `rustfs_targets` types (anti-corruption layer). Add a `From` impl; do not serialize internal types directly.
- Shapes are locked twice in `plugin_contract.rs` tests: insta snapshots
(`rustfs/src/admin/snapshots/`) plus literal `json!` assertions. Update
both deliberately; a shape change is a console-facing API change.
- Field naming is `snake_case`, except discovery blocks
(`runtimeCapabilities`, `clusterSnapshot`, `extensionsCatalog`) which are
camelCase **by cross-endpoint convention** (same shape in `system.rs`,
`console.rs`, `pools.rs`). Do not "fix" that inconsistency locally.
- Contract types deliberately duplicate `rustfs_targets` types
(anti-corruption layer). Add a `From` impl; do not serialize internal
types directly.
## Handler conventions
- Every new admin plugin/extension route needs authorization at the top of `call` and an `include_str!` guard test asserting it (repo-wide pattern — see `plugin_instance_handlers_require_admin_authorization_contract`). The source guard checks wiring, not runtime authorization; use focused behavior evidence for changed allow/deny semantics.
- Reads use `GetBucketTargetAction` (instances) or `ServerInfoAdminAction` (catalogs); writes use `SetBucketTargetAction`.
- Refresh persisted module switches once per request (`refresh_persisted_module_switches`), then evaluate the sync `module_disabled_block_reason` per domain — do not re-read the store per domain or per instance.
- Every new admin plugin/extension route needs authorization at the top of
`call` and an `include_str!` guard test asserting it (repo-wide pattern —
see `plugin_instance_handlers_require_admin_authorization_contract`).
- Reads use `GetBucketTargetAction` (instances) or `ServerInfoAdminAction`
(catalogs); writes use `SetBucketTargetAction`.
- Refresh persisted module switches once per request
(`refresh_persisted_module_switches`), then evaluate the sync
`module_disabled_block_reason` per domain — do not re-read the store per
domain or per instance.
## Generic bounds
Event-payload generics use the `PluginEvent` blanket trait (`crates/targets/src/plugin.rs`). Do not respell `Send + Sync + 'static + Clone + Serialize + DeserializeOwned`.
Event-payload generics use the `PluginEvent` blanket trait
(`crates/targets/src/plugin.rs`). Do not respell
`Send + Sync + 'static + Clone + Serialize + DeserializeOwned`.
+86 -13
View File
@@ -1,20 +1,93 @@
---
name: pr-review
description: Review a GitHub PR using its exact base/head and repository risk policy. Use for requested PR reviews; publish or fix only within conversation authorization.
description: Review a GitHub PR from a URL or number using its actual base/head and risk-appropriate code review. Use when the user asks for a PR review, not a status lookup or PR wording edit. Publish a review only when authorized; delegation and monitoring follow the requested scope and root AGENTS.md.
---
# PR Review
1. Resolve the PR repository and remote; the current checkout may belong elsewhere. Read the PR purpose and linked issues, then fetch the actual base and PR head:
Use this skill for PR context and review delivery. An ordinary review request is read-only unless the conversation also authorizes posting or fixes. Reuse that authorization without asking again; prepare the review before requesting any missing publication approval.
```bash
gh pr view <N> --repo <owner/repo> --json title,author,state,body,baseRefName,headRefName,baseRefOid,headRefOid
git fetch <repo-remote> <baseRefName> refs/pull/<N>/head
git diff <baseRefOid>...<headRefOid>
```
## Prerequisites
Record both SHAs; refresh if either moved during fetching. Follow relevant [implementation boundaries](../../references/implementation.md).
2. Apply the [risk policy](../../references/adversarial-validation.md), including its two perspectives for high-risk work. Ordinary reviews use the root finding standard directly. File count does not determine risk or authorize delegation; keep any delegated review within the authorized scope.
3. Check `gh pr checks <N> --repo <owner/repo>`. Investigate failures when relevant to a finding or a requested CI/readiness diagnosis. Distinguish pending, unavailable, pre-existing, flaky, and PR-caused states using evidence; a code review does not authorize unrelated repairs.
4. Report the reviewed SHAs, risk tier, supported findings or `No findings`, material verification limits, check state, and verdict. Set severity from evidenced impact, triggering conditions, reach, and urgency: P0 is a critical issue requiring immediate action with broad or unavoidable impact; P1 is a high-impact defect requiring prompt correction; P2 is an ordinary concrete correctness, compatibility, performance, or maintainability defect; P3 is an optional improvement only when requested. A remote trigger, crash, or deadlock does not by itself establish P0. P0/P1 findings block approval; evaluate other findings and verification gaps against the actual acceptance requirements rather than approving automatically below that threshold.
5. When posting is authorized, follow [Git and PR rules](../../references/pull-requests.md), recheck the remote base and head, and review any changed diff or integration assumptions before submitting. Reuse unaffected evidence. Use `gh pr review` with `--approve`, `--request-changes`, or `--comment` and `--body-file`; use [the API example](references/posting.md) for authorized inline comments. Reuse existing authorization.
6. Follow the repository PR lifecycle and explicit monitoring scope. Fetch new heads before comparing to the reviewed SHA; never rely on an unfetched `origin/pull/<N>/head`. Push fixes or resolve threads only when authorized; check `maintainerCanModify` before a fork push.
- Follow root `AGENTS.md`; classify risk with the [review policy](../../references/adversarial-validation.md) and consult relevant [change-style and boundary rules](../../references/implementation.md).
- Select `code-change-verification` for ordinary review or `adversarial-validation` for explicitly adversarial, substantial, or high-risk review; do not run both on the same diff.
## Workflow
### 1. Gather PR context
```bash
gh pr view <N> --repo <owner/repo> --json title,author,state,body,additions,deletions,changedFiles,commits,baseRefName,headRefName,baseRefOid,headRefOid
gh pr diff <N> --repo <owner/repo> --name-only
```
Read the PR body and linked issues to understand the change's purpose. If the PR references an issue, fetch that too:
```bash
gh issue view <ISSUE> --repo <issue-owner/repo> --json title,body,state
```
### 2. Fetch the diff and classify the change
```bash
git fetch <repo-remote> <baseRefName> refs/pull/<N>/head
git diff <baseRefOid>...<headRefOid> --stat
```
Resolve `<repo-remote>` to the PR repository; do not assume the current checkout's `origin` or `main` matches. Record the exact base/head used. If either moved during fetching, refresh the snapshot before reviewing. Classify using the repository review policy; instruction changes that affect agent execution are mechanical, not exempt.
### 3. Review the changed behavior
Group files by functional area to trace callers and invariants. Use the root risk tier's review shape and only matching lenses. File count does not authorize delegation. When delegation is explicitly authorized, high-risk/substantial reviews use exactly two independent reviewers with the applicable lenses split between them; otherwise use two fresh sequential passes. Reviewers do not spawn further agents.
Findings need a concrete failure scenario with `file:line`; a null verdict briefly names the relevant probes. Reuse existing evidence and choose local checks from the final diff under the root verification policy.
### 4. Check CI status
```bash
gh pr checks <N> --repo <owner/repo>
```
Investigate a failed check when it bears on a finding or the user requested CI diagnosis/merge readiness:
```bash
gh run view --repo <owner/repo> --log-failed --job=<JOB_ID>
```
Use current evidence to distinguish pre-existing, flaky, and PR-caused failures. Do not classify them by guesswork or turn a code-only review into unrelated CI repair.
### 5. Synthesize findings
Report the PR, reviewed base/head, and risk tier, then summarize the assessment.
Use the selected review's P0–P3 ratings and root finding standard: supported
findings with `file:line`, failure scenario, and fix, or `No findings`.
State the observed check status, including pending or unavailable checks, and
the verdict (`APPROVE`, `REQUEST_CHANGES`, or `COMMENT`). Do not infer a pass
from missing checks or add style nits to populate a clean review.
### 6. Post the review
Only when posting is authorized, write the review body to a temp file and post via CLI. Refresh the PR head first; if it changed, review the delta and update the verdict before posting:
```bash
# Request changes
gh pr review <N> --repo <owner/repo> --request-changes --body-file /tmp/pr_review.md
# Approve
gh pr review <N> --repo <owner/repo> --approve --body-file /tmp/pr_review.md
# Comment only (no verdict)
gh pr review <N> --repo <owner/repo> --comment --body-file /tmp/pr_review.md
```
For authorized inline comments, use [the submission example](references/posting.md).
Always use `--body-file` or `--input`, never inline multiline `--body`.
### 7. Handle follow-up
Follow the [PR lifecycle](../../references/pull-requests.md) and any explicit monitoring request. For follow-up, fetch the new head and compare the recorded reviewed SHA with the new SHA; revisit affected callers and findings. Never use an unfetched `origin/pull/<N>/head` ref as evidence. Update the posted review or resolve addressed threads only within existing authorization.
## Notes
- The user may ask for review in Chinese; respond in the same language but keep the review body in English per AGENTS.md rules.
- When the user asks for "多角色对抗 review", run the full adversarial validation protocol — this skill's step 3 covers that.
- If the PR is from a fork, check `maintainerCanModify` before attempting to push fixes.
- For very large PRs, batch the review by functional area while keeping the same bounded review shape.
@@ -4,20 +4,19 @@ Read only when an inline review is authorized. Recheck the PR head before postin
For inline comments on specific lines, use the GitHub API:
```bash
REVIEW_PAYLOAD=$(mktemp "${TMPDIR:-/tmp}/pr-review.XXXXXX")
cat > "$REVIEW_PAYLOAD" <<'EOF'
cat > /tmp/pr_review.json <<'EOF'
{
"commit_id": "<reviewed-head-sha>",
"body": "review body",
"event": "REQUEST_CHANGES",
"comments": [
{
"path": "crates/<crate>/src/<file>.rs",
"path": "crates/foo/src/bar.rs",
"line": 42,
"body": "finding description"
}
]
}
EOF
gh api --method POST /repos/{owner}/{repo}/pulls/<N>/reviews --input "$REVIEW_PAYLOAD" && rm -f "$REVIEW_PAYLOAD"
gh api --method POST /repos/{owner}/{repo}/pulls/<N>/reviews --input /tmp/pr_review.json
```
+116
View File
@@ -0,0 +1,116 @@
---
name: rust-code-quality
description: Run a focused Rust quality review when the user requests one or a selected review workflow needs Rust-specific checks for changed behavior. Do not auto-load for every implementation edit, comment-only or formatting-only Rust diff, or repeat an already completed review.
---
# Rust Code Quality Gate
Use this skill for a dedicated Rust review to cover rules that `cargo clippy`
does not catch.
Search matches and checklist items are candidates, not findings. Apply the root
finding standard; distinguish a demonstrated bug, an explicit rule violation,
and an optional preference. P2/P3 suggestions do not need to be invented or
included in an otherwise clean correctness review.
## Quick Start
1. Identify changed `.rs` files.
2. Run the matching candidate searches on changed files.
3. Apply the manual checklist sections whose behavior the diff touches.
4. Report or rebut every finding with evidence; P0/P1 findings block approval.
Fix them when implementation is authorized; a read-only review reports them.
## Automated Checks
Use these searches to find candidates in changed `.rs` files. Inspect syntax,
`#[cfg(test)]` scope, and the changed hunk before reporting a finding; text
filters do not reliably distinguish production code from tests.
```bash
# 1. unwrap/expect candidates
rg -n '\.unwrap\(\)|\.expect\(' <changed-files>
# 2. Silent type truncation via `as` cast
rg -n ' as (u8|u16|u32|u64|usize|i8|i16|i32|i64|isize)\b' <changed-files>
# 3. String as error type
rg -n 'Result<.*String>' <changed-files>
# 4. Box<dyn Error> in public APIs
rg -n 'Box<dyn.*Error' <changed-files>
# 5. println/eprintln in production
rg -n 'println!|eprintln!' <changed-files>
# 6. Ordering::Relaxed usage (verify each is intentional)
rg -n 'Ordering::Relaxed' <changed-files>
# 7. Default substituted for a possibly-required value (judge each: is the value optional by domain?)
rg -n 'unwrap_or_default\(\)|unwrap_or\(' <changed-files>
```
## Manual Review Checklist
For the Rust diff under review, verify:
### Error Handling
- [ ] Every production `unwrap()` or `expect()` is infallible by type or a checked invariant; explain only non-obvious invariants, using an existing type, a useful `expect` message, or a concise comment
- [ ] No `Result<_, String>` in public API signatures
- [ ] Public library APIs use domain errors unless deliberate error erasure at a boundary is part of the contract
- [ ] `Error::source()` is overridden when inner error is stored
- [ ] Error messages are actionable without exposing secret input
### Type Safety
- [ ] No silent `as` truncation (negative→unsigned, large→small)
- [ ] Fallible numeric conversions use `TryFrom`/`try_into()` and return a typed error; clamp or saturate only when the domain explicitly requires it
- [ ] Floating-point to integer conversion validates finiteness, sign, and range before conversion
### Concurrency
- [ ] Lock acquisition order is documented when multiple locks are used, and matches every other call site taking any overlapping subset (ABBA check)
- [ ] No `tokio::sync` lock guard (read or write) held across `.await` without bounded hold time — long-lived read guards wedge writers (#4195)
- [ ] Atomic read-modify-write uses the direct `fetch_*` operation when possible; use `compare_exchange` only for conditional updates
- [ ] `std::sync::Mutex` in async context is held only briefly, never across `.await`
### Memory and Performance
- [ ] On an identified hot path, report cloning or allocation only with a concrete per-request/per-object cost or benchmark signal
- [ ] Prefer borrowing, moving, `Bytes`/`Arc`, or capacity reservation only when it reduces that cost without obscuring ownership or APIs
### Recursion Safety
- [ ] Recursion over untrusted, persisted, or otherwise unbounded input has a depth limit or uses iterative traversal
- [ ] Tree/cache traversals handle corrupted/cyclic input safely
### Testing
- [ ] Tests have an observable failure criterion; delegated assertions, `#[should_panic]`, snapshot/property checks, and meaningful `Result` failures do not need a redundant `assert!`
- [ ] Use `expect` only when its message improves failure diagnosis; do not add boilerplate to self-evident test setup
- [ ] Test volume and line count are never treated as production-code growth
### Serde
- [ ] Structs from untrusted input reject unknown fields where the compatibility contract permits; otherwise validate security-critical fields explicitly and test the supported input shape
- [ ] `#[serde(default)]` not used on security-critical fields without validation
### Code Hygiene
- [ ] No `#![allow(dead_code)]` at crate root
- [ ] No camelCase statics or Hungarian notation
- [ ] New string literals don't duplicate existing constants
### Reuse and Necessity
- [ ] No new helper duplicates `crates/utils`, `crates/common`, the touched crate, the likely domain-owning crate, a relevant direct dependency, or plain std/tokio behavior; reused helpers match the call site's semantics
- [ ] No branch without a nameable concrete trigger; no re-validation of what a validated upstream layer on the same path already guarantees (Cross-Cutting Domain Invariant patterns and pre-destructive-action re-checks are load-bearing — keep them)
- [ ] Error context attached once where actionable, not re-wrapped at every hop; no typed→generic error conversion below aggregation/quorum layers
- [ ] Comments avoid narration and change history while completely stating non-obvious lock, `SAFETY`, durability, compatibility, and unwrap invariants
- [ ] No near-duplicate test pinning the same code path and poison-value class as an existing test (boundary companions — n==max vs max+1, absent/empty/nil UUID — are never near-duplicates)
## Severity Classification
- **P0 (Block merge)**: demonstrated data loss, security breach, remote crash, or deadlock
- **P1 (Must fix)**: concrete correctness, compatibility, or material hot-path regression
- **P2 (Should fix)**: avoidable duplication or maintainability issue with a concrete simpler replacement
- **P3 (Nice to fix)**: local style or clarity issue with no behavioral risk
## Output Template
Use the calling review's output format. For a standalone review, report supported
findings with severity, location, impact, fix, and validation, or `No findings`.
Include only material unverified checks. Candidate counts are not a quality
metric and do not need a separate scan report.
@@ -0,0 +1,34 @@
---
name: rustfs-logging-governance
description: Add or review RustFS `tracing` events with the repository field shape, level policy, privacy boundaries, and guardrails. Use when a change adds or edits a tracing macro/instrumentation site or the logging guardrail script.
---
# RustFS Logging Governance
Apply this skill only to changed logging sites; do not turn a local log edit into
a broad logging cleanup.
## Workflow
1. Read the changed function/module context and classify the site as lifecycle,
request/hot path, fallback, external fetch, or summary.
2. Match neighboring structured events and reuse existing `EVENT_*`,
`LOG_COMPONENT_*`, and `LOG_SUBSYSTEM_*` constants.
3. Put stable fields first (`event`, `component`, `subsystem`, `state`/`result`,
then context) and a short label last.
4. Select the level by operational meaning:
- `error`: behavior/security-affecting failure;
- `warn`: degraded/fallback/operator-actionable state;
- `info`: low-frequency lifecycle/mode change;
- `debug`: targeted diagnostics;
- `trace`: repetitive request/object/shard success paths.
5. Never log secrets, tokens, auth headers, credential payloads, raw
attacker-controlled bodies, or merged config dumps. Error strings and
`Debug` output are log surfaces too.
6. Prefer one aggregate summary over inventories or startup banners.
7. Run `./scripts/check_logging_guardrails.sh` and the checks selected by root
`AGENTS.md`.
Read [logging-governance.md](references/logging-governance.md) only for a broad
logging audit, event-model migration, or guardrail expansion. Ordinary single-
site edits do not require the full workspace scope map.
@@ -0,0 +1,4 @@
interface:
display_name: "RustFS Logging Governance"
short_description: "Standardize RustFS logs with structured events and guardrails."
default_prompt: "Use $rustfs-logging-governance to standardize or review RustFS logging, reduce noise, and update guardrails."
@@ -1,6 +1,5 @@
# Logging Audit and Migration Reference
Use the [root logging rules](../../AGENTS.md#logging) for individual events.
Read this reference only for a broad logging audit, an event-model migration,
or a change to `scripts/check_logging_guardrails.sh`. Use `Cargo.toml` for the
current workspace/crate list instead of maintaining one here.
+143 -25
View File
@@ -1,38 +1,156 @@
---
name: rustfs-release-publish
description: Publish a RustFS version through frozen Linux candidate acceptance, desktop completion, manifest approval, byte-preserving publication and post-release follow-up. Use only for an explicit release request.
description: "Run the end-to-end RustFS console gate, version bump, preview validation, human confirmation, and final-tag publication pipeline. Use only when the user explicitly asks to release or publish a RustFS version (发版/发布)."
---
# RustFS Release
# RustFS Release Publish (preview-validated pipeline)
Require the exact final SemVer target before version edits or publication. If unspecified, inspect releases/tags and ask with concrete candidates; do not guess the channel or bump. Reuse the user's confirmed target and authorized delivery scope. Independent read-only preflight may continue.
This skill orchestrates a full release. It wraps `rustfs-release-version-bump` (invoked here with the authorized commit/push/PR scope) with a mandatory preview-tag validation loop before the final tag is published.
## Invariants
The binary reports its build tag (`build::TAG` via shadow_rs; `SHORT_VERSION` in
`rustfs/src/config/cli.rs`), and `build.yml` derives asset names and preview
classification from that tag. Cargo.toml supplies only the no-tag fallback.
Preview and final tags must therefore share the validated source commit;
their tag-dependent version and asset names differ. The channel and cleanup
constraints are defined once under Preview tag naming and Hard rules below.
- Cargo and every candidate executable contain the final product version. `<target>-preview.<run_number>` is an immutable candidate identifier, not a public tag or displayed binary version.
- Freeze the exact source, reviewed workflow recipe, toolchain, Console, CLI, dependency lock, previous stable version and validation plan. Newer unrelated main or Console releases do not change those inputs.
- Retain `release/<target>` history when a release branch is used; backport only reviewed fixes. Pin `CANDIDATE_SHA` to its exact CI-validated commit. Never force-push a release branch or move a public tag.
- Build Linux first. Complete field acceptance before macOS/Windows and packaging. Full certification and final acceptance are required before publication; a partial Linux PASS grants no release authority.
- Promote the accepted bytes. Final publication never recompiles binaries or rebuilds packages/images. Infrastructure retries reuse successful artifacts; changed source or inputs require a new candidate and affected acceptance.
- Phase failures block dependents. No latest/default-channel update before versioned delivery. Use the [pipeline runbook](../../../docs/operations/release-pipeline.md) for executable entry points, locks and recovery.
Pipeline shape:
## Read by phase
```
check console main against its latest Release
-> if ahead: publish console -> wait for Release asset + latest API
-> bump RustFS version files to <target> (final version, ONE commit) -> merge
-> tag <preview-tag> at that commit -> CI green
-> verify preview Release assets -> run binary locally + console checks
-> validate with latest rc client
-> report preview acceptance results -> STOP for explicit human confirmation
-> tag <target> at the SAME commit (zero delta) -> re-verify CI/release
-> CI deletes the <target>-preview.N Releases (tags kept)
```
| Phase | Procedure |
|---|---|
| 0 | Clean tree, fetch main/tags, verify access, then complete the mandatory [Console gate](references/console-gate.md). |
| 1–2 | [Prepare the exact source and run branch CI](references/release-candidate.md). Version edits use `rustfs-release-version-bump`. |
| 3 | [Build and verify the Linux candidate](references/preview-release.md). |
| 4–5 | [Run artifact, field, Console and rc acceptance](references/preview-acceptance.md), then complete desktop/package/image/chart validation. |
| Confirmation | Report the complete manifest and obtain the confirmation below. |
| 6 | [Publish the accepted manifest](references/final-release.md). |
| 7 | [Reconcile advisories, milestones, installation references, website and release branch](references/post-release-updates.md). |
On validation failure: fix lands on main via normal PR (version files are already at `<target>`, no new bump PR), then tag `<preview-tag N+1>` at the new main commit and restart from Phase 2.
## Human confirmation
## Required inputs
After all acceptance passes, report the target, source SHA, source CI run, Linux and completion run URLs, final manifest SHA-256, accepted Console/CLI identities, compatibility/performance results and backlog report. Explicitly ask whether to publish this exact manifest and end the turn without dispatching publication.
- Final target version, for example `1.0.0-beta.10`.
- Preview iteration `N` (default: next unused preview tag for that target; check with `git tag -l '<target>-preview.*'` after `git fetch --tags`).
Only a new affirmative reply to that exact report authorizes Phase 6. An earlier general release request, silence or automatic continuation does not count. Reuse confirmation for retries of that same manifest; do not ask again merely because a destination failed. A changed source, input, manifest or acceptance result invalidates it and requires renewed acceptance/confirmation.
If the target version is missing or ambiguous, collect the current release/tag baseline and ask before version edits or publication. Continue independent read-only preflight while the answer is pending (see the semver gate below).
## Recovery and reporting
## Semver gate — resolve the target before version edits or publication
Resume failed infrastructure jobs without rebuilding successful units. Fix product defects on main, backport when needed, and start a new candidate. After a final tag exists, retry the same bytes or use a new patch version; never move the tag. Do not conflate implemented, CI-passed, field-accepted, approved, published and post-release-complete states. Report incomplete work and deviations with evidence; a tag or green build alone is not a completed release.
Versions follow [SemVer 2.0.0](https://semver.org/). Precedence reminder:
```
1.0.0-alpha < 1.0.0-alpha.1 < 1.0.0-beta.2 < 1.0.0-beta.11 < 1.0.0-rc.1 < 1.0.0 < 1.0.1 < 1.1.0 < 2.0.0
```
Numeric prerelease identifiers compare numerically (`beta.9 < beta.10`), not lexically — see [semver.org spec item 11](https://semver.org/#spec-item-11). Preview tags are internal validation tags layered on top of the target's prerelease channel — they are never themselves a deliverable version and never appear in version files.
Rules:
- A request like "发个版" / "release the next version" without an exact version string is ALWAYS ambiguous. Derive the current latest tag (`git tag --sort=-v:refname | head`), then ask the user to choose with concrete candidates, e.g. from `1.0.0-beta.10`: next prerelease `1.0.0-beta.11`, promote to `1.0.0-rc.1`, promote to stable `1.0.0`. Never guess between these — they have very different meanings (channel promotion vs. iteration) and different CI classification consequences.
- After a stable `X.Y.Z` exists, the next version must state which component bumps: patch `X.Y.(Z+1)` for fixes only, minor `X.(Y+1).0` for backward-compatible features, major `(X+1).0.0` for breaking changes. If the user names a bump type but not a number, compute it from the latest stable tag and echo the exact resulting version back for confirmation.
- Echo the final confirmed version string verbatim in your first status report; every later phase must use exactly that string. If at any point the user's wording and the confirmed version diverge, stop and re-confirm.
## Preview tag naming
- Use `<target>-preview.N` for every target, e.g. `1.0.0-beta.10-preview.3` or `1.1.0-preview.1`.
- The canonical suffix is exactly `-preview.<digits>`. `build.yml` recognizes it before alpha/beta/rc classification and routes it to the preview-only path; any other tag containing `-preview` fails closed instead of being treated as a release.
- A preview Release MUST be published with `isPrerelease=true` and `isLatest=false`. Any `*-latest` preview asset or preview-triggered `latest.json`, R2, Docker, or Helm publication is a pipeline failure.
- Preview Releases are cleaned up by the `cleanup-preview-releases` job after `publish-release` succeeds for the deliverable tag. It deletes every Release whose tag is exactly `<target>-preview.<digits>` and never passes `--cleanup-tag`, so the tags survive.
## Hard rules
- Version files (Cargo.toml, Cargo.lock, README, flake.nix, Chart.yaml, rustfs.spec) are bumped ONCE, directly to `<target>`. Never write a `-preview.N` suffix into any version file. If `rustfs-release-version-bump` is ever asked for a `-preview` version, that is a pipeline bug — stop.
- Preview Release assets are versioned and intentionally visible on the Releases page for the duration of validation. Do not label them Latest or use them to update any latest distribution channel.
- Never delete a preview Release by hand before Phase 6 finishes — Phase 4 downloads its assets and the final Release notes are generated while it still exists. Cleanup is CI's job; only step in manually (`gh release delete "<preview-tag>" --yes`, never `--cleanup-tag`) if `cleanup-preview-releases` failed.
- Tags have no `v` prefix. Always annotated: `git tag -a <tag> -m "Release <tag>"`.
- The final tag MUST point at exactly `PREVIEW_HASH` — the commit the validated preview tag points at. Never tag current `main` HEAD (commits merged after validation are unvalidated), and never create an extra version-bump commit between preview and final.
- When a previous deliverable exists, GitHub Release notes for the preview and final tags MUST use it as their shared comparison baseline: the most recently published non-preview Release before the target. Internal `-preview.N` Releases are explicitly excluded from that selection, even when they point at the same commit as the final tag — cleanup runs after the notes are generated, so the preview Release is still present and would otherwise be picked as the baseline. If no previous deliverable exists, omit `previous_tag_name` and record that GitHub's default baseline fallback was used.
- Generated Release notes carry a workflow-management marker so retries can repair them. Before manually curating a generated body, remove that marker; unmarked non-placeholder notes are preserved by later workflow runs.
- Phases run in order; a failure in any phase blocks everything after it. After the fix lands on main, restart from Phase 2 with the next preview iteration against the new `origin/main` hash — do not resume mid-pipeline against a stale hash.
- Completing preview acceptance does not authorize the final tag. After Phases 3–5 pass, report the acceptance evidence and stop until the user explicitly confirms continuation. The original release request, an earlier confirmation, silence, or an automated follow-up does not satisfy this gate.
- Confirmation is scoped to the reported `<target>`, `<preview-tag>`, and `PREVIEW_HASH`. A failed or repeated acceptance cycle, including any new preview iteration, invalidates prior confirmation and requires a new one.
- If the release is abandoned after Phase 1 merged, main's version files claim a version that was never tagged. Either revert the bump PR or leave it to be overwritten by the next release — but tell the user explicitly and record the decision.
- User-facing status updates in Chinese; commits, PR titles/bodies, and tag messages in English. No hard-wrapping in commit messages, PR bodies, or documentation prose — one logical line per sentence/paragraph, let soft wrap handle display.
## Phase 0 — Preflight
- `git status --short` clean; `git fetch origin main --tags`.
- `gh auth status` works; confirm you can view `gh release list -L 3`.
- Confirm the exact final target version with the user if not explicit.
### Console release gate
Read and complete [the Console gate](references/console-gate.md) before Phase 1. Verify the latest published Console asset and exact commit; if Console main is ahead, complete its release and asset verification first. A successful build alone does not satisfy this gate.
## Phase 1 — Version bump to the final target (once)
- If main's version files already read `<target>` (e.g. this is a restart after a failed preview), verify with `rg -n "<target>" Cargo.toml rustfs.spec helm/rustfs/Chart.yaml` and skip to Phase 2.
- Otherwise invoke the `rustfs-release-version-bump` skill with the final `<target>` (NOT a preview version), full GitHub flow (commit/push/PR).
- Get the PR merged into main. Record the resulting main commit:
```bash
git fetch origin main
PREVIEW_HASH=$(git rev-parse origin/main) # must contain the bump PR
```
`PREVIEW_HASH` is the single source of truth for the rest of the pipeline — report it to the user and reuse it verbatim in Phases 2 and 6. Both the preview tag and the final tag will point at it.
## Phase 2 — Publish the preview tag
```bash
git tag -a "<preview-tag>" -m "Release <preview-tag>" "$PREVIEW_HASH"
git push origin "<preview-tag>"
```
Pushing the tag triggers `.github/workflows/build.yml` ("Build and Release"); `docker.yml` chains off it via `workflow_run`.
The preview run builds versioned artifacts and publishes them in a GitHub prerelease. Its latest-channel, R2, Docker, and Helm jobs must be skipped. Those publication paths run only after the final tag is pushed.
On a restart (N+1), refresh `PREVIEW_HASH=$(git rev-parse origin/main)` first — it must contain the fix — and re-report it.
## Phase 3 — CI and preview Release verification
- Find and watch the tag build: `gh run list --workflow build.yml --branch "<preview-tag>" --limit 1` then `gh run watch <run-id>`. Every build matrix target must succeed (linux x86_64/aarch64 × musl/gnu, macos-aarch64, windows-x86_64).
- Confirm the Release publication jobs (`create-release`, `upload-release-assets`, and `publish-release`) succeed while `update-latest-version` is skipped.
- Verify `gh release view "<preview-tag>" --json isPrerelease,assets,url`: `isPrerelease` must be `true`, and the Release must contain all 6 versioned platform zips, checksums, SBOM, and provenance with no `-latest` assets. Confirm `gh api repos/{owner}/{repo}/releases/latest --jq .tag_name` does not return `<preview-tag>`.
- Record `PREVIOUS_DELIVERABLE`, selected from published Releases by `publishedAt` after excluding the current tag and every `-preview.N` tag. Verify `gh release view "<preview-tag>" --json body --jq .body` contains `## What's Changed` and, when `PREVIOUS_DELIVERABLE` exists, `**Full Changelog**: https://github.com/rustfs/rustfs/compare/<PREVIOUS_DELIVERABLE>...<preview-tag>`. For a repository with no previous deliverable, verify a Full Changelog link exists and record the GitHub baseline fallback.
- Confirm preview-triggered Docker and Helm jobs are skipped. Preview validation covers the built RustFS binaries, embedded console, and rc compatibility; Docker image construction and Helm publication are deferred to the final tag because the Dockerfiles consume GitHub Release assets.
## Phases 4–5 — Local artifact, Console, and rc acceptance
Read and complete [preview acceptance](references/preview-acceptance.md): verify the downloaded binary's tag/SHA and readiness, exercise Console CRUD with byte-identical download, and pass the full latest-rc command matrix. Any failure blocks final publication. Retain the results for the confirmation gate below.
### Manual confirmation gate
After every Phase 3–5 check passes, report the target, preview tag, `PREVIEW_HASH`, preview Release URL, console result, and rc matrix, then explicitly ask the user whether to publish the final tag. End the turn without creating or pushing `<target>`.
Continue to Phase 6 only after a new user reply explicitly confirms the reported target, preview tag, and commit. A clear affirmative reply to that exact report, such as `确认继续`, is sufficient; if the reply is ambiguous or any reported value changed, ask again.
## Phase 6 — Publish the final tag on the validated commit
No second version bump, no release branch. The final tag goes on the exact commit the preview validated:
```bash
git fetch origin --tags
git rev-parse "<preview-tag>^{commit}" # must equal PREVIEW_HASH — abort if not
git tag -a "<target>" -m "Release <target>" "$PREVIEW_HASH"
git push origin "<target>"
```
- CI rebuilds from the same source; the only changed input is the tag name, so the binary now self-reports `<target>`.
- Verify the final tag's complete publication path: all matrix and release jobs green; `gh release view "<target>"` shows the full versioned and `-latest` asset set plus checksums, SBOM, and provenance; Docker and Helm workflows succeed; `latest.json` points to `<target>`. A stable target must have `isPrerelease=false` and `isLatest=true`. An alpha/beta/rc target must have `isPrerelease=true`; GitHub does not permit prereleases to be Latest, but the project `latest.json` still advances to the final non-preview target.
- Verify the final Release body contains `## What's Changed` and a Full Changelog link. When `PREVIOUS_DELIVERABLE` exists, the link MUST be `https://github.com/rustfs/rustfs/compare/<PREVIOUS_DELIVERABLE>...<target>` and the baseline MUST equal the preview Release baseline; for example, both `1.0.0-beta.12-preview.1` and `1.0.0-beta.12` compare from `1.0.0-beta.11`.
- Verify the preview cleanup: `cleanup-preview-releases` must succeed, `gh release view "<preview-tag>"` must then report `release not found` for every preview iteration of this target, and `git rev-parse "<preview-tag>^{commit}"` must still resolve to `PREVIEW_HASH` (the tag is kept). If the job failed, delete the leftover Releases manually with `gh release delete "<preview-tag>" --yes` and report it.
- Optionally spot-check `./rustfs --version` from a final-tag artifact — it must report `<target>`.
## Output contract
Always report:
- Console gate result: previous/latest Console tags, whether merged changes required a release, `CONSOLE_HASH`, and Console run/Release URLs when a release was published.
- Target version, preview tag(s) used, `PREVIEW_HASH` (which both tags point at).
- Manual confirmation gate status (`WAITING_FOR_CONFIRMATION` or `CONFIRMED`) and its exact target, preview tag, and `PREVIEW_HASH`.
- Per-phase result (PASS/FAIL/BLOCKED) with key evidence: preview and final Release URLs, preview `isPrerelease`/`isLatest` state, final latest-channel state, console check results, the rc command matrix, and the preview-Release cleanup result (deleted Releases plus surviving tags).
- Any deviation from this pipeline and why the user approved it.
@@ -4,7 +4,7 @@ Read during Phase 0, before changing RustFS version files or tags. Follow the pa
### Console release gate
Complete this gate before changing any RustFS version file or creating any RustFS tag. Candidate creation resolves `repos/rustfs/console/releases/latest` once and freezes the exact asset for every build, so a successful Console build alone is insufficient. After freezing, later Console releases do not silently change or invalidate the accepted inputs.
Complete this gate before changing any RustFS version file or creating any RustFS tag. RustFS `build.yml` downloads the asset returned by `repos/rustfs/console/releases/latest`, so a successful Console build alone is insufficient.
1. Read the latest published Console tag and compare it with Console `main`:
@@ -37,7 +37,7 @@ git -C "$CONSOLE_SCRATCH/console" tag -a "<console-tag>" -m "Release <console-ta
git -C "$CONSOLE_SCRATCH/console" push origin "<console-tag>"
```
Console tags include the `v` prefix. Pushing the tag triggers the Console repository's [release workflow](https://github.com/rustfs/console/blob/main/.github/workflows/release.yml) (`🚀 Release`). Remove the task-owned `CONSOLE_SCRATCH` after the gate completes.
Console tags include the `v` prefix. Pushing the tag triggers `.github/workflows/release.yml` (`🚀 Release`). Remove `CONSOLE_SCRATCH` after the gate completes.
3. Find the exact tag run and wait for completion:
@@ -55,4 +55,4 @@ test "$(gh api "repos/${CONSOLE_REPO}/releases/tags/<console-tag>" \
--jq '[.assets[] | select(.name == "rustfs-console-<console-tag>.zip" and .state == "uploaded" and .size > 0 and (.digest | startswith("sha256:")))] | length')" -eq 1
```
Treat a missing/mismatched asset, digest, latest tag, or failed/cancelled workflow as BLOCKED. Do not start Phase 1 until the Console gate passes. Record `CONSOLE_TAG`, `CONSOLE_HASH`, the asset URL/SHA256, Console run URL, and Release URL for comparison with the inputs actually consumed by the RustFS builds and the final report.
Treat a missing/mismatched asset, digest, latest tag, or failed/cancelled workflow as BLOCKED. Do not start Phase 1 until the Console gate passes. Record `CONSOLE_TAG`, `CONSOLE_HASH`, Console run URL, and Release URL for the final report.
@@ -1,13 +0,0 @@
# Final release publication
Read only after fresh confirmation of the complete candidate report. The [parent confirmation gate](../SKILL.md#human-confirmation) applies.
Dispatch `release-publish.yml` on main with the successful completion run ID and approved `release-manifest.json` SHA-256. Do not create the tag manually. The workflow revalidates source, bytes and trusted certification, then creates the annotated final tag at `CANDIDATE_SHA`. A recipe change fails closed and requires a new candidate; unrelated main changes do not require a rebuild.
Require both versioned publication and channel publication jobs to succeed. Verify the final tag's commit and manifest identity; all six platform ZIPs and compatibility aliases; DEB/RPM, checksums, SBOM, provenance and evidence bundle; both multi-architecture image variants in Docker Hub, GHCR and Quay; and the accepted Helm chart in the chart repository. Download a host-compatible final artifact and confirm its digest is exactly the accepted candidate digest and its version/source output agrees.
For stable releases verify GitHub Latest, R2 download aliases and `latest.json` unless a newer stable release already owns those channels. Prereleases must remain GitHub prereleases and leave stable pointers unchanged. Verify generated release notes compare against the frozen previous stable release, excluding internal previews.
On infrastructure failure retry the same workflow/seal; matching destinations are reused. Never clobber an asset, force a tag, rebuild the image or silently accept a changed digest. A source fix after the final tag requires a new patch version. Cross-registry writes are not atomic: report the unfinished destination rather than claiming publication complete.
New candidates create no preview Releases to clean up. For a legacy preview release, preserve its tag and remove its Release only after final delivery and notes are verified. Do not pass `--cleanup-tag`. Complete the [post-release follow-up](post-release-updates.md) separately.
@@ -1,57 +0,0 @@
# Post-release Security Advisory, Milestone, Installation, and Website Updates
Read only after the final non-preview tag has passed Phase 6. Tag creation or a green binary build alone is insufficient: the release assets, source archive, container images, Helm package, and applicable latest channels must be available. Preview tags never enter this phase.
## Security Advisories
Reconcile advisories after every completed final release, including Console-only releases. Read-only preparation may start earlier; do not claim an unpublished artifact is an available fix.
1. Fetch every page of the repository's live Security Advisories, including triage, draft, published, and closed states. A permission error or partial response blocks reconciliation; it does not mean there are no advisories. Keep unpublished advisory details in private task artifacts, never in a public PR, release note, or issue.
2. For each potentially relevant advisory, map its fix to the exact published tag and verify the regression evidence. Main-branch reachability, a merged private fix, or a green build alone does not prove the shipped version is fixed. Check cherry-picked equivalents and reverted fixes explicitly. For embedded Console or dependency fixes, verify the shipped component version.
3. Determine the first available fixed release and affected version ranges from evidence. Preserve an earlier correct patched version; do not relabel all fixes as the current release. An unchanged server baseline such as a Console-only release requires checking the earlier server release as well. Leave unresolved reports and fixes absent from the tag pending; do not close them merely because a release shipped.
4. Prepare any necessary corrections to package identity, affected ranges, patched versions, fix/release links, and advisory text. Preserve unrelated fields, credit, CVE identifiers, and disclosure coordination. Apply updates only within existing user authorization; read back the result to verify it. Publishing a draft, requesting a CVE, or closing a report is a separate action: require explicit authorization for the concrete advisories and respect any embargo. Release-tag approval alone does not authorize those actions. Prepare the exact proposed changes before asking for missing authorization.
5. Record each relevant advisory's URL, current state, fix evidence, first fixed version, action taken or proposed, and remaining blocker in private task artifacts. Report advisory follow-up separately from artifact publication. A successful release with unresolved advisory work is not complete follow-up; retain that work for the release monitor or a concrete user decision.
## Version milestones
1. Query all pages of both open and closed milestones in the RustFS release repository, matching titles exactly to version strings without a `v` prefix. A failed or incomplete query is not evidence that a milestone is absent; resolve the lookup before making changes.
2. Close the milestone matching the published `<target>` if it is open; an already closed milestone needs no change. If it is missing, report the gap and continue checking the next version. Do not create a substitute for the released milestone or close/reassign its issues or PRs.
3. Use an explicitly planned next version when provided; otherwise, for a stable `X.Y.Z`, use `X.Y.(Z+1)`. For example, after `1.0.1` is published, close milestone `1.0.1` and ensure milestone `1.0.2` exists. For an alpha/beta/rc target with a trailing numeric counter, increment that counter within the same channel unless a different next version was specified. If the next version cannot be determined, ask for that version and report this follow-up as blocked. Creating a planning milestone does not confirm the target of a future release or bypass the semver gate.
4. Reuse an existing next-version milestone, whether open or closed; do not reopen it or create a duplicate. Only when the complete query confirms it is absent, create an open milestone with the exact next-version title. Do not invent a due date or description. After an uncertain creation result, query again before retrying.
5. Read back both milestones and report their titles, URLs, and actual states, including whether the next milestone was reused or created. A failed close, create, or verification leaves milestone maintenance incomplete; retry only the unfinished operation after refreshing live state. Continue independent installation and website work without moving or republishing the release tag.
## Installation references
1. Re-read the published deliverable state before edits or a retry. If a newer release has superseded this target, do not downgrade installation references or the website announcement. Report the superseding release and leave those defaults intact.
2. Invoke `rustfs-release-version-bump` with stage `post-release`, the exact target, and the authorized delivery scope. Prepare the follow-up on current main; do not edit or move either validated release tag. Cargo versions may already be preparing the next target and must remain untouched.
3. Verify the exact Docker image manifest, Release download links, RPM source archive, and Helm repository entry before publishing the installation PR. The chart is packaged and tested before sealing; publication uploads those same bytes only after versioned Docker images are available.
4. Report the installation PR and its merge state separately from the completed release. Reuse existing merge authorization and repository checks; do not infer new merge authority from this reference.
## rustfs.com top banner
Use the existing announcement configuration from [website PR #112](https://github.com/rustfs/rustfs.com/pull/112). Do not add a second banner or redesign the header.
1. In an isolated checkout of `rustfs/rustfs.com`, read its current `AGENTS.md`, PR template if present, `data/announcement.ts`, and the consuming header component. Search for an existing announcement PR for this target before creating another.
2. Update `homeAnnouncement` in `data/announcement.ts` after the release and installation availability checks pass. Keep `enabled: true`, `badge: 'New'`, and the existing component. For a stable release, use:
```ts
export const homeAnnouncement = {
enabled: true,
badge: 'New',
message: 'RustFS <target> is now available! Please',
linkText: 'upgrade and try',
href: '/download',
} as const
```
Replace `<target>` with the exact published version. Reserve GA wording for the actual first stable release. For a final alpha/beta/rc tag, explicitly call it a prerelease; use its GitHub Release URL if `/download` does not expose that target. Never announce a `-preview.N` build here.
3. Use the site's current package manager and required checks. For this config-only change, type-check and lint the changed file, build the site, and inspect the generated homepage for the version, visible link text, and destination. Confirm `/download` actually offers the announced version before using that link.
4. Commit, push, and create or update the website PR when included in the authorized release scope. Include the published RustFS Release URL and checks run. Keep merge and production-deployment authority separate; reuse permission already given, but this reference grants none by itself.
5. After an authorized merge/deployment, verify the live `https://rustfs.com/` banner and its destination. If only the PR is ready, report that state and URL; do not report the banner as deployed. A website failure does not invalidate or move the published release tag: retry this phase after resolving the failure.
## Reconcile main and remove the completed release branch
1. Compare the exact published tag with current main. Audit every release-side commit since their merge base, including inherited backports. An ahead count is a history difference, not proof of missing changes. Use ancestry and patch equivalence, then inspect current code and regression evidence for squashed, adapted, superseded, or reverted changes. Record each commit as present, superseded, release-only, or missing; a positive `git cherry` result alone does not prove a missing fix.
2. Bring missing shared changes to main through a reviewed PR and the required checks before closing the follow-up. Preserve main's later changes; decide version bumps and pinned Console configuration separately. If a history merge is needed, use a merge commit and verify the release commit is an ancestor of main; squash does not establish that ancestry. Do not merge main into the published release branch or move its tags. Report unresolved changes instead of claiming reconciliation is complete.
3. After publication and authorized follow-ups are complete, delete the remote `release/<target>` branch. Immediately before deletion, verify its HEAD still equals the published tag's commit and no open PR targets or originates from it. Preserve a branch with newer work or open PRs and report the blocker. Use a deletion with an expected-old-SHA check to avoid removing a concurrently advanced branch.
4. Verify the remote branch is absent and the final tag and any legacy preview tags still resolve to their recorded commits. Remove a local release branch only if it is task-owned, unchecked out, and has no unpreserved work. Record cleanup separately from artifact publication; an explicitly authorized deletion before reconciliation does not make unresolved main changes complete.
@@ -1,68 +1,52 @@
# Candidate Artifact Acceptance
# Preview Artifact Acceptance
Read after Phase 3 succeeds. Complete every check below before the parent skill's manual confirmation gate. These checks cover the downloaded artifact, embedded Console, and the rc release frozen in the candidate inputs.
Read after Phase 3 succeeds. Complete every check below before the parent skill's manual confirmation gate. These checks cover the downloaded artifact, embedded Console, and latest rc client.
## Phase 4 — Run the artifact locally, verify the console
Use a unique task-owned scratch directory. Select the versioned archive matching the acceptance host, and verify it against the sealed manifest before extraction. Before desktop completion, use the Linux acceptance environment rather than rebuilding for the local desktop. Do not substitute a different build when a matching artifact is unavailable; report that acceptance gap. The shell example below assumes the verified executable is at `RUSTFS_BINARY` (`rustfs.exe` on Windows), `SCRATCH` is the task directory, and `S3_PORT` and `CONSOLE_PORT` are distinct available ports. Use equivalent native commands when the shell differs.
Bind both listeners to loopback. Choose task-only credentials, set loopback proxy exclusions for the server/client processes, and record the server PID. A port probe does not reserve a port; retry startup with fresh ports on a bind conflict rather than connecting to an existing service.
Work inside the session scratchpad directory; never leave stray data dirs.
```bash
"$RUSTFS_BINARY" --version
mkdir -p "$SCRATCH/data"
S3_ENDPOINT="http://127.0.0.1:${S3_PORT}"
CONSOLE_ENDPOINT="http://127.0.0.1:${CONSOLE_PORT}"
RUSTFS_ACCESS_KEY="$PREVIEW_ACCESS_KEY" RUSTFS_SECRET_KEY="$PREVIEW_SECRET_KEY" \
"$RUSTFS_BINARY" server \
--address "127.0.0.1:${S3_PORT}" \
--console-enable \
--console-address "127.0.0.1:${CONSOLE_PORT}" \
"$SCRATCH/data" >"$SCRATCH/server.log" 2>&1 &
PREVIEW_SERVER_PID=$!
gh release download "<preview-tag>" -p "rustfs-macos-aarch64-v<preview-tag>.zip" -D "$SCRATCH"
cd "$SCRATCH" && unzip -o rustfs-*.zip
./rustfs --version # must report the PREVIEW TAG (build::TAG), not the Cargo.toml version, plus expected short SHA
mkdir -p data
RUSTFS_ACCESS_KEY=rustfsadmin RUSTFS_SECRET_KEY=rustfsadmin ./rustfs ./data
```
Defaults: S3 endpoint `:9000`, embedded console `:9001`.
Checks (all must pass):
- `"$RUSTFS_BINARY" --version` reports the exact final `<target>` and full `CANDIDATE_SHA`. A preview suffix, another version or another source is a failure.
- Wait with a bounded readiness deadline while checking the recorded server process remains alive; `curl --noproxy '*' -fsS "$S3_ENDPOINT/health/ready"` must return ready from this process's listener.
- `./rustfs --version` reports the preview tag name and the short SHA of `PREVIEW_HASH`. Reporting `<target>` without the `-preview.N` suffix means the build did not embed the tag — treat as FAIL and investigate before proceeding.
- `curl -fsS http://localhost:9000/health/ready` returns ready.
- Startup log shows the embedded console being served (this was the regression that `fix(release): require embedded console assets` guards).
- Open `CONSOLE_ENDPOINT` in the browser and log in with the task credentials. The dashboard must render without JS console errors; create a bucket, upload a file, download it back (byte-identical), and delete the object and bucket. Keep the server running for Phase 5.
- Open `http://localhost:9001` in the browser: login with `rustfsadmin`/`rustfsadmin`; dashboard renders without JS console errors; create a bucket, upload a file, download it back (byte-identical), delete the object and bucket. Keep the server running for Phase 5.
## Phase 5 — Validate with the pinned rc client
## Phase 5 — Validate with the latest rc client
`rc` is the RustFS CLI client from <https://github.com/rustfs/cli>.
- Read the CLI release and asset digests from `inputs.json`; verify the local client's version or download a host-compatible asset from that exact release into the task directory. If the host is a desktop, resolve its asset within the same pinned CLI release and record the digest; do not independently follow `latest`. Set `RC_BIN` to that executable and record its version/digest. Avoid changing the user's installed client for this check.
- Inspect the client's current help for an isolated configuration option and use it when supported. Otherwise choose a unique `PREVIEW_ALIAS` and confirm it is absent before creating it; never overwrite an existing alias. Use task-owned bucket/user names and input/output files. The names below are safe only inside the newly started isolated server.
- Point the client at `S3_ENDPOINT` with loopback proxy exclusions and run the command matrix, recording PASS/FAIL per command:
- Ensure the latest release is installed: compare `rc --version` against `gh api repos/rustfs/cli/releases/latest --jq .tag_name`; update via `brew upgrade rustfs/tap/rc` (or download the release binary).
- Point it at the preview server and run the command matrix, recording PASS/FAIL per command:
```bash
"$RC_BIN" alias set "$PREVIEW_ALIAS" "$S3_ENDPOINT" "$PREVIEW_ACCESS_KEY" "$PREVIEW_SECRET_KEY"
"$RC_BIN" ls "$PREVIEW_ALIAS/"
"$RC_BIN" mb "$PREVIEW_ALIAS/rel-check"
"$RC_BIN" cp <local-file> "$PREVIEW_ALIAS/rel-check/"
"$RC_BIN" stat "$PREVIEW_ALIAS/rel-check/<file>"
"$RC_BIN" cat "$PREVIEW_ALIAS/rel-check/<file>" # matches source
"$RC_BIN" cp "$PREVIEW_ALIAS/rel-check/<file>" "$SCRATCH/out"
cmp <local-file> "$SCRATCH/out"
"$RC_BIN" cp -r <local-dir>/ "$PREVIEW_ALIAS/rel-check/dir/"
"$RC_BIN" find "$PREVIEW_ALIAS/rel-check" --name "*"
"$RC_BIN" share download "$PREVIEW_ALIAS/rel-check/<file>" --expire 1h
# Fetch the presigned URL with curl --noproxy '*' and compare its body.
"$RC_BIN" rm "$PREVIEW_ALIAS/rel-check/<file>"
"$RC_BIN" rm -r --force "$PREVIEW_ALIAS/rel-check/dir"
"$RC_BIN" rb "$PREVIEW_ALIAS/rel-check"
"$RC_BIN" admin user list "$PREVIEW_ALIAS/"
"$RC_BIN" admin user add "$PREVIEW_ALIAS/" relcheckuser relchecksecret12
"$RC_BIN" admin user remove "$PREVIEW_ALIAS/" relcheckuser
"$RC_BIN" alias remove "$PREVIEW_ALIAS"
rc alias set preview http://localhost:9000 rustfsadmin rustfsadmin
rc ls preview/
rc mb preview/rel-check
rc cp <local-file> preview/rel-check/
rc stat preview/rel-check/<file>
rc cat preview/rel-check/<file> # matches source
rc cp preview/rel-check/<file> ./out && cmp <local-file> ./out
rc cp -r <local-dir>/ preview/rel-check/dir/
rc find preview/rel-check --name "*"
rc share download preview/rel-check/<file> --expire 1h # presigned URL fetchable via curl
rc rm preview/rel-check/<file> && rc rm -r --force preview/rel-check/dir
rc rb preview/rel-check
rc admin user list preview/
rc admin user add preview/ relcheckuser relchecksecret12
rc admin user remove preview/ relcheckuser
rc alias remove preview
```
- Any FAIL blocks acceptance. On success or failure, stop only the recorded task process and remove only task-created aliases/data after retaining the needed failure evidence. Do not erase an existing client configuration or unrelated server data.
## Field acceptance and desktop completion
Before accepting the Linux manifest, record Scanner/Heal, multi-pool, memory, major features, high-concurrency 503, performance and previous-version integrity/upgrade results in backlog. Preserve the release-specific agreed limits and baseline; a PASS label without artifact identities or test results does not satisfy acceptance.
Dispatch `release-complete.yml` only after that report passes, using the exact Linux manifest digest and backlog URL. Require native macOS/Windows checks, package extraction, image startup/scans, chart tests and complete certification to pass. Complete any desktop Console/client checks applicable to the release against these same archives. Record the completion run and final manifest SHA-256 before entering the parent confirmation gate. Partial Linux acceptance does not authorize final publication.
- Any FAIL blocks the release. Afterwards stop the server and delete the scratch data directory.
@@ -1,9 +0,0 @@
# Linux candidate verification
Read for Phase 3 after the source passed exact-SHA CI. The [parent invariants](../SKILL.md) apply; commands and recovery live in the [pipeline runbook](../../../../docs/operations/release-pipeline.md).
Dispatch `release-candidate.yml` on main with the confirmed final version and `CANDIDATE_SHA`. Record the run ID, frozen `inputs.json`, every Linux archive digest and `linux-manifest.json` SHA-256. Require the four Linux builds, native startup/S3 checks, previous-release upgrade matrix and Linux seal to succeed. Missing, skipped, cancelled or failed required work is incomplete acceptance.
Verify the frozen Console identity equals the one accepted in Phase 0. Every matrix job consumes that same digest and exact toolchain. The binary must report the final product version and source commit; its candidate ID is separate. No public tag, Release, registry tag, R2 release path, Helm repository or latest pointer should change during this stage.
A green Linux run is ready for field acceptance, not publication. The partial certification must have `publish_allowed: false`. Retain the exact Linux manifest for the next stage; a new source/build-input candidate must not inherit the old approval. A newer unrelated main commit does not invalidate this evidence.
@@ -1,28 +0,0 @@
# Release Candidate Preparation
Read for Phases 1–2. The [parent release invariants](../SKILL.md) and Console gate apply.
## Candidate Resume Preflight
- `git status --short` clean; `git fetch origin main --tags`.
- `gh auth status` works; confirm you can view `gh release list -L 3`.
- Confirm the exact final target version with the user if not explicit.
- Check whether `release/<target>` already exists before creating it; a resumed release reuses the existing branch and its history. For an in-flight release that already has a preview tag but no branch, anchor the new branch to that tag's commit only after verifying its target versions and prior acceptance evidence.
## Phase 1 — Source version bump to the final target (once)
- If `release/<target>` exists, verify its Cargo.toml and workspace members in Cargo.lock read `<target>` and skip the source bump, even if main has advanced. If the branch versions differ, stop and resolve the mismatch without downgrading main.
- If no branch exists but an unfinished preview tag does, verify its commit has `<target>` in both version files and skip the bump; Phase 2 anchors the branch to that commit. Stop if those files disagree. Otherwise, if main already has `<target>` in both files, skip the bump. Installation references intentionally retain the previous published deliverable during preview; if they were advanced to an unavailable target, restore that baseline before choosing the next candidate.
- Only when neither the release branch, an unfinished preview tag, nor current main already has `<target>`: if main is at a later version, select and verify a historical commit containing `<target>` rather than downgrading main; block if none exists. Otherwise invoke the `rustfs-release-version-bump` skill with stage `prepare`, the final `<target>` (NOT a preview version), and full GitHub flow (commit/push/PR).
- If a bump PR was needed, get it merged into main and record its merge commit. For a new release branch when main already has `<target>`, identify the main commit that introduced those versions. Phase 2 chooses a release candidate containing that commit; an existing release branch keeps its own history and a newer main HEAD is not required.
Do not wait for the moving latest main HEAD to become green. The release-branch CI in Phase 2 validates the chosen commit before a candidate build is dispatched.
## Phase 2 — Pin and validate the release source
- Use `release/<target>`. On the first attempt, create it from a selected main commit containing the version bump and intended changes; it need not be the latest main HEAD. On a restart, retain the existing branch and backport only reviewed fixes from main. Verify the branch's Cargo versions still equal `<target>`. A legacy preview can anchor source selection, but its tag and old artifacts do not constitute a candidate in the new protocol; freeze and verify a new candidate after the release recipe is aligned.
- The current `ci.yml` runs automatically on main pushes, not release-branch pushes. Dispatch it explicitly with `gh workflow run ci.yml --ref "release/<target>"`. Locate that dispatch run, verify its `head_sha` equals the release branch's remote HEAD, and require the full expected CI job set to pass, including `Quick Checks`, `Test and Lint`, and `End-to-End Tests (full merge gate)`. Treat a missing or skipped required lane as incomplete. A successful PR check or CI run for a different SHA does not qualify. If the branch advances or a run is cancelled, validate the new SHA again. Do not dispatch a candidate with failing or incomplete CI.
- Prefer protecting `release/*` against force pushes and deletion and requiring reviewed backport PRs. Check live rulesets rather than assuming the main ruleset covers release branches; report a missing release-branch rule as a gap.
- Set `CANDIDATE_SHA` to the CI-validated release-branch commit. Record the branch, exact commit and CI run URL. The new candidate protocol starts from a commit whose release recipe matches the reviewed main dispatcher; backport the recipe before freezing an older release branch if needed.
- Dispatch the Linux candidate as described in [candidate verification](preview-release.md). Do not create a preview or final tag here. The final executable already contains `<target>`; publication later promotes those same bytes.
- After a source or build-input change, run the affected source checks and create a new candidate. Reuse the frozen candidate after an infrastructure failure. Do not restart acceptance for unrelated main advances.
@@ -1,24 +1,118 @@
---
name: rustfs-release-version-bump
description: Prepare an exact RustFS Cargo version or align installation references after publication. Use for requested version bumps or the release workflow.
description: "Prepare the version-file and release-asset bump for an exact RustFS alpha/beta/stable target, with verification and optional commit/push/PR delivery. Use for an explicit version bump or when invoked by the release-publish workflow."
---
# Release Version Files
# RustFS Release Version Bump
Require an exact target; ask if missing or ambiguous. Reject targets containing `-preview`: those identify candidates, not product versions or new public tags. Infer `post-release` only from an explicit request or parent workflow; otherwise use `prepare`. Delivery defaults to local edit/verify; commit, push, PR, and merge follow existing authorization and [Git rules](../../references/pull-requests.md).
Use this skill to prepare and verify release version files. Commit, push, and PR steps apply only when included in the user's delivery scope; publishing release tags belongs to `rustfs-release-publish`.
| Stage | Files and constraints |
|---|---|
| `prepare` | Only `Cargo.toml` and `Cargo.lock`: workspace package, internal dependency, and workspace member versions become `<target>`. External dependencies stay unchanged. |
| `post-release` | Only `README.md`, `README_ZH.md`, `flake.nix`, `helm/rustfs/Chart.yaml`, and `rustfs.spec`. Cargo may already target the next release; leave it untouched. |
Validated baseline: release pattern used in PR `#2957`.
Before installation edits, verify the exact non-preview Release, downloadable assets/source archive, pullable `rustfs/rustfs:<target>` image manifest, and published Helm chart. Block on missing artifacts. Do not downgrade defaults if a newer deliverable superseded the target. Candidate preparation retains the previous published installation references; follow-up commits never replace validated tags or sealed artifacts.
## Required inputs
Packaging policy:
- Exact target version, for example `1.0.0-beta.4`.
- Delivery scope: local (`edit/verify`), git (`commit/push`), or GitHub
(`commit/push/PR`). Derive it from the conversation; when unspecified, prepare
and verify locally without blocking on a delivery question.
- Docker image tags have no `v` prefix. Derive chart/app versions with `scripts/helm_chart_version.sh <target>`; both equal the final product SemVer, including prerelease suffixes. Helm CI uses the frozen candidate version before sealing, so no early installation chart bump is required. Previously published chart versions remain unchanged.
- RPM `Version` is numeric; `Release` is the prerelease suffix or `1` for stable. Expanded `Source0` and the unpack directory must resolve to the exact target including its suffix. Add the changelog entry using current git identity, date, and target; never copy an example identity/date.
- Changing these mappings requires explicit confirmation.
If target version is missing or ambiguous, stop and ask before editing.
Verification follows root tiers: `prepare` validates Cargo metadata with the updated lockfile and checks every workspace/internal version with no unrelated lockfile updates. `post-release` renders Helm with the verified image, runs `scripts/test_helm_chart_version.sh` for chart version edits, and checks README, Nix, and RPM references. Run `git diff --check`; report unresolved required checks as `BLOCKED` without unrelated fixes.
Reject any target version containing `-preview`: preview identifiers are tag-only (see `rustfs-release-publish`) and must never be written into version files. If asked for one, stop and point to the release pipeline instead of editing.
For authorized commits, keep stages separate: `chore(release): prepare <target>` or `chore(release): align installation references for <target>`. Report target/stage, changed files, verification, material uncertainty, and actual commit/push/PR state.
## Read before editing
- `AGENTS.md` (root and nearest path-specific files).
- `.github/pull_request_template.md` only when preparing a PR.
- Current branch status and diff against `origin/main`.
## Default release file scope
Treat the following file list as the default checklist for each release bump:
- `Cargo.toml`
- `Cargo.lock`
- `README.md`
- `README_ZH.md`
- `flake.nix`
- `helm/rustfs/Chart.yaml`
- `rustfs.spec`
Only drop a file when the current repository release process clearly no longer requires it.
## Hard release policy
- Docker doc tags use `<version>` (for example `rustfs/rustfs:1.0.0-beta.4`), not `v<version>`.
- Helm chart version mapping follows `beta.N -> 0.N.0`.
- `rustfs.spec` `Release` uses prerelease suffix only (for example `beta.4`).
- Do not change these rules without explicit confirmation.
## Step-by-step workflow
1. Confirm intent and isolate scope
- Use the exact target and delivery scope already supplied; ask only for a missing or ambiguous target or a material release-policy choice.
- Inspect current branch and ensure only release-related files are touched for this task.
2. Update workspace versions
- Bump `[workspace.package].version` in `Cargo.toml`.
- Bump internal workspace crate dependency versions in `Cargo.toml`.
- Update `Cargo.lock` so workspace package versions match target version.
- Re-scan for partial leftovers.
3. Update release assets
- `README.md` and `README_ZH.md`: update versioned Docker examples to target version.
- `flake.nix`: update package version to target version.
- `helm/rustfs/Chart.yaml`:
- `appVersion` = target version.
- `version` follows chart mapping rule, for example:
- `1.0.0-beta.3` -> `0.3.0`
- `1.0.0-beta.4` -> `0.4.0`
- `rustfs.spec`:
- Set `Release` to prerelease suffix (example `beta.4`).
- Add/update top changelog entry with exact format:
- `* Thu May 20 2026 houseme <housemecn@gmail.com>`
- `- Update RPM package to RustFS 1.0.0-beta.4`
- Changelog identity and time must come from current environment:
- `git config --get user.name`
- `git config --get user.email`
- `date '+%a %b %d %Y'`
- Changelog version text must match target release version exactly.
4. Verify before shipping
- Run:
- `make pre-commit`
- If `make pre-commit` fails, fix task-attributable failures and rerun affected checks. Report unresolved required checks as `BLOCKED`; do not silently widen scope to fix unrelated issues.
5. Commit strategy (only when committing is authorized)
- Preferred split when both parts changed:
- `chore(release): prepare <version>` for `Cargo.toml` and `Cargo.lock`.
- `chore(release): align release assets for <version>` for docs and packaging files.
- If user asks for one commit, use one commit.
- Stage only intended release files; do not include unrelated working tree changes.
6. Push and PR (only for the authorized delivery scope)
- Push branch:
- Use the user-requested or configured push remote: `git push -u <push-remote> <branch>` (first push), or `git push` when tracking is already configured.
- Create PR with template headings unchanged:
- `gh pr create --base main --head <branch> --title ... --body-file ...`
- PR title/body must be English.
- Use `N/A` for non-applicable template sections.
- Include verification commands and any `BLOCKED` reason clearly.
## Recommended check commands
- `git status --short --branch`
- `git diff --name-only origin/main...HEAD`
- `git diff --stat origin/main...HEAD`
- `rg -n "<old_version>|<new_version>" Cargo.toml Cargo.lock README.md README_ZH.md flake.nix helm/rustfs/Chart.yaml rustfs.spec`
- `make pre-commit`
## Output contract
When using this skill, always report:
- Target version.
- Files changed.
- Any assumptions or uncertainties requiring confirmation.
- Verification result (`PASSED` or `BLOCKED`) with key evidence.
- Commit message(s) used.
- Push status and PR URL when GitHub flow is requested.
@@ -0,0 +1,4 @@
interface:
display_name: "RustFS Release Bump"
short_description: "Prepare RustFS release branches like PR #2957."
default_prompt: "Use $rustfs-release-version-bump to prepare and verify an exact RustFS release-version bump."
@@ -0,0 +1,41 @@
---
name: security-advisory-lessons
description: Perform a dedicated RustFS security/advisory review for authn/authz, IAM, RPC trust, paths, secrets, browser isolation, encryption, Object Lock, or other security boundaries. Use only when the user requests a security/advisory review or an adversarial review explicitly escalates to the full advisory map; do not auto-load solely because code touches a sensitive path.
---
# RustFS Security Advisory Lessons
Use this skill as the deep security lens. For a normal adversarial review with a
matched security surface, the concise security reference under
`adversarial-validation` is sufficient.
## Workflow
1. Freeze the exact diff/head and identify the changed trust boundaries.
2. Inspect the headings in [advisory-patterns.md](references/advisory-patterns.md),
then read the matching sections. Read the full map only for a broad security
audit. Useful headings are
auth/admin, IAM/STS/OIDC, policy/plugins, S3/copy/multipart, protocols, paths,
secrets/logging/RPC, browser/CORS/proxy, SSE, Object Lock, and serde.
3. Trace unauthenticated, low-privilege, wrong-action/owner/bucket, malformed,
and default-config cases. Security decisions must fail closed.
4. Require a focused negative regression test for the bypass/exploit form, not
only the intended success path. State residual risk when a test is impractical.
5. Report proven vulnerabilities separately from defense-in-depth hardening.
When advisory currentness matters, fetch the live inventory instead of treating
the reference as a status mirror:
```bash
gh api repos/rustfs/rustfs/security-advisories --paginate \
--jq '.[] | {ghsa_id,state,severity,summary,updated_at}'
```
Fetch an individual advisory only when the live summary indicates a new or
changed lesson.
## Finding Standard
Each finding includes severity, `file:line`, attacker prerequisites, concrete
input/path, impact, smallest safe fix, and a regression check. Do not exaggerate
unauthenticated impact when the actual issue requires authenticated low privilege.
@@ -0,0 +1,4 @@
interface:
display_name: "Security Advisory Lessons"
short_description: "Apply advisory lessons in reviews."
default_prompt: "Use $security-advisory-lessons for a dedicated RustFS security review grounded in past advisories."
@@ -0,0 +1,149 @@
# RustFS Advisory Pattern Map
This file is a lesson map, not an advisory inventory mirror. It keeps durable security patterns distilled from RustFS GitHub Security Advisories.
When current advisory state, severity, URLs, or full text matters, fetch it live:
```bash
gh api repos/rustfs/rustfs/security-advisories --paginate \
--jq '.[] | {ghsa_id,state,severity,summary,updated_at}'
gh api repos/rustfs/rustfs/security-advisories/<GHSA_ID>
```
Update this file only when an advisory adds or changes a reusable lesson, affected surface, validation pattern, or regression-test expectation. Do not update it for state-only, URL-only, count-only, or timestamp-only changes.
## Pattern Index
### Admin authorization and route exposure
- `GHSA-pfcq-4gjr-6gjm`: notification target endpoints accepted authenticated users but skipped admin authorization. Lesson: distinguish authn from authz; admin target CRUD must call the operation-specific admin authorization path.
- `GHSA-mm2q-qcmx-gw4w`: `ListServiceAccount` used `UpdateServiceAccountAdminAction`, while update lacked target ownership checks. Lesson: exact action constants and ownership checks are both required; information disclosure can chain into secret rotation and takeover.
- `GHSA-vcwh-pff9-64cc`: `ImportIam` checked `ExportIAMAction` for an import/write operation. Lesson: every admin handler must authorize the action it actually performs.
- `GHSA-jqmc-mg33-v45g` and `GHSA-8784-9m7f-c6p6`: `/profile/cpu` and `/profile/memory` were whitelisted from auth and allowed expensive diagnostics plus path disclosure. Lesson: profiling/debug endpoints need admin auth, opt-in, rate limits, and non-sensitive responses.
- `GHSA-f5cv-v44x-2xgf`: `/rustfs/admin/v3/metrics` accepted any authenticated IAM user and skipped admin authorization. Lesson: read-only metrics and diagnostic admin endpoints still require an operation-specific admin action check.
- `GHSA-796f-j7xp-hwf4`: `/rustfs/admin/v3/list-remote-targets` checked only that credentials existed and leaked replication target credentials. Lesson: replication target reads are privileged admin operations, and stored remote credentials require strict authz plus response redaction review.
- `GHSA-xp32-gxq2-3v52`: console license metadata endpoint was public and exposed subject and expiration fields. Lesson: management metadata endpoints should require admin auth or return only coarse public status.
### IAM import, service accounts, and privilege boundaries
- `GHSA-566f-q62r-wcr8`: `ImportIam` accepted attacker-controlled service account `parent`, `claims`, `accessKey`, and `secretKey`, enabling persistent backdoor accounts under root. Lesson: imported IAM payloads are untrusted data and must be validated against privilege boundaries.
- `GHSA-3495-h8r9-gfqg`: `ExportIAM` wrote regular-user and service-account secret keys into exported ZIP data. Lesson: IAM export is a credential-disclosure boundary; redact, seal, or strictly justify every exported secret before treating export permission as safe.
- `GHSA-5354-r3w2-34m8`: `AddServiceAccount` checked `CreateServiceAccountAdminAction` but trusted caller-supplied `target_user`, allowing service accounts under the root parent. Lesson: service-account create paths must validate parent ownership or root/admin authority, not only the create action.
- `GHSA-xgr5-qc6w-vcg9`: `deny_only=true` skipped allow checks and let restricted service accounts mint unrestricted children. Lesson: deny-only logic must never become implicit allow for privilege creation.
- `GHSA-mm2q-qcmx-gw4w`: leaked service account access keys plus update-without-ownership formed an escalation chain. Lesson: service-account identifiers are security-sensitive because update APIs consume them.
### STS, OIDC, and federation flows
- `GHSA-5qfg-mf7r-jp3w` and `GHSA-3473-5353-xhwh`: `AssumeRoleWithWebIdentity` was reachable through unauthenticated `POST /` routing and could issue temporary credentials from crafted web identity input. Lesson: every STS route needs explicit SigV4 or trusted identity-provider validation before role assumption, and unauthenticated exemptions must be narrowed to the exact action with uniform failure responses.
- `GHSA-jxrr-r6pv-h958`: unsigned JWT issuer data was decoded before verification to select an OIDC provider, and distinguishable failures could expose provider configuration. Lesson: web-identity routing may be unauthenticated, but pre-verification claims are untrusted routing hints; bound and rate-limit the request, normalize public errors, and verify signature, issuer, audience, and expiration before issuing credentials.
- `GHSA-ccrv-v8v9-ch9q`, `GHSA-48rf-7j3q-3hfv`, and `GHSA-xvfh-7c9g-hpw2`: service-account-controlled material could self-sign JWT session tokens with forged policy claims, and missing `exp` was accepted for service-account tokens. Lesson: session tokens must be signed by a trusted issuer/key path, enforce required claims and expiration, and reject self-signed or principal-controlled tokens.
- `GHSA-9pjf-w3c2-m32r`, `GHSA-4x2q-cpx9-9h26`, and `GHSA-xvpm-p3f7-34c3`: public OIDC authorize/callback flows trusted request `Host` or forwarded scheme when building credential-bearing redirects. Lesson: OIDC redirects must use configured allowlisted origins and trusted-proxy handling; never derive the post-login credential destination from direct client headers.
- `GHSA-m479-9x88-94w6`, `GHSA-frwq-mfqx-83p8`, `GHSA-q9q8-rf9r-fg9f`, and `GHSA-j5c2-hhf7-6gf5`: OIDC validation accepted attacker-controlled discovery URLs because hostname checks rejected only literal forbidden IPs, allowing DNS rebinding SSRF. Lesson: outbound federation URL validation must resolve and classify hostnames at the connection boundary and reject loopback, private, link-local, and rebound addresses.
### IAM policy conditions and external policy plugins
- `GHSA-6r96-hmgc-726c`: request headers collided with lowercase server-derived condition keys such as `userid`, `groups`, `versionid`, and JWT/LDAP claims. Lesson: never let caller-controlled headers append to or replace server-derived policy context; reserve trusted condition keys and keep intentional request-header keys separate.
- `GHSA-v9cp-qfw9-9pfp`: quantified negated string conditions applied negation after aggregation, transposing `ForAllValues` and `ForAnyValue` semantics. Lesson: push negation into the per-value predicate for quantified operators and test partially overlapping multi-value sets.
- `GHSA-5w8r-p896-6vq2`: OPA policy mode skipped `ExistingObjectTag/*` loading, so tagged objects looked untagged to external policies. Lesson: external authorization plugins need the same object-tag and request context as built-in policy evaluation before they decide.
### S3 object actions, copy, multipart, and upload policy validation
- `GHSA-g8w9-qw9q-fghr` and `GHSA-xm99-m3gq-83g8`: a valid presigned `PutObject` accepted extra `x-amz-*` headers omitted from `SignedHeaders`; `x-amz-copy-source` could turn that upload capability into a cross-bucket read performed as the signer. Lesson: a presigned URL is a bounded capability; inspect all received security-sensitive headers and reject unsigned ones before selecting the S3 operation or reaching storage.
- `GHSA-3ppv-fx5m-m749`: explicit `versionId` reads and copy sources authorized `s3:GetObject` instead of `s3:GetObjectVersion`. Lesson: version-specific object access must select version-specific actions for direct reads, `CopyObject`, and `UploadPartCopy`, with tests proving the backend is not reached on denial.
- `GHSA-x298-9x87-fvjq`: anonymous `ListObjectVersions` fell back to `ListBucket` and returned before public-access-block gates. Lesson: compatibility fallbacks must converge on the same post-authorization checks as direct grants, especially `RestrictPublicBuckets` and anonymous data-plane denies.
- `GHSA-mx42-j6wv-px98`: `UploadPartCopy` missed source authorization and allowed cross-bucket object exfiltration. Lesson: multipart copy must enforce the same source and destination contract as `CopyObject`.
- `GHSA-wfxj-ph3v-7mjf`: `UploadPartCopy` checked source and destination independently but missed destination copy-source policy constraints. Lesson: source read and destination write checks are not sufficient when policy constrains allowed copy sources.
- `GHSA-w5fh-f8xh-5x3p`: presigned POST accepted uploads without enforcing signed policy conditions. Lesson: parse and enforce all POST policy constraints server-side, including size, key prefix, and content type.
### Protocol frontends and IAM parity
- `GHSA-3g29-xff2-92vp`: FTP `RETR` and `SIZE`/`MDTM` read paths authenticated the user but skipped IAM before calling storage. Lesson: non-HTTP protocol frontends must enforce the same per-operation authorization as the S3 API before backend access.
- `GHSA-g3vq-vv42-f647`: FTPS `MKD` called `create_bucket` without checking `s3:CreateBucket`. Lesson: protocol command handlers need action-specific checks even when sibling handlers already authorize correctly.
- `GHSA-3p3x-734c-h5vx`: FTPS and WebDAV compared secret keys with early-return string equality, while FTPS also returned distinguishable invalid-user and invalid-password failures. Lesson: password-style protocol auth needs constant-time secret comparison, indistinguishable failures where practical, and rate limiting.
### Filesystem paths and object key traversal
- `GHSA-pq29-69jg-9mxc`: RPC `read_file_stream` joined untrusted paths under a volume directory without canonical boundary checks. Lesson: `PathBuf::join` plus length checks are not path security.
- `GHSA-8r6f-hmq2-28rg`: object keys containing traversal sequences bypassed bucket/object authorization when mapped to filesystem paths. Lesson: reject traversal at object-key parsing and verify final storage paths remain under the expected bucket/key root.
- `GHSA-f4vq-9ffr-m8m3`: Snowball auto-extract accepted archive entries such as `../victim-bucket/object`, authorized the raw attacker-bucket path, then storage path cleaning crossed bucket boundaries. Lesson: archive entries become object keys and need traversal rejection plus consistent authz/storage normalization before writes.
### Secrets, defaults, and cryptographic misuse
- `GHSA-j59h-h7q5-q348`, `GHSA-3wm5-wpm5-hmfm`, `GHSA-6wc8-xm48-qhmx`, `GHSA-9gf3-jx4p-4xxf`, `GHSA-63xc-c3w3-m2cf`, and `GHSA-ch63-6q4v-hwp5`: RustFS shipped known default root credentials that could authenticate to S3, admin APIs, IAM, KMS, console, and token-signing surfaces. Lesson: root credentials must be operator-provided or generated per install; known defaults and warnings are not acceptable for network-reachable deployments.
- `GHSA-h956-rh7x-ppgj`: gRPC used the hard-coded token `rustfs rpc` on both client and server. Lesson: source-visible shared tokens are authentication bypasses.
- `GHSA-r5qv-rc46-hv8q`: internode RPC HMAC secret fell back to the public default `rustfsadmin`. Lesson: RPC/internode auth must fail closed instead of silently using public defaults.
- `GHSA-75fx-qg6f-8rm7` and `GHSA-68cw-96m3-h2cf`: internode RPC secrets were derivable from known root credentials, making raw storage RPC signatures forgeable when explicit RPC secrets were unset. Lesson: RPC auth keys must be independent random secrets, never derived from S3 root credentials, and raw storage RPC should not share the public S3 listener without an internode-only boundary.
- `GHSA-m77q-r63m-pj89`: STS JWTs used the root secret key as the shared token signing key, allowing token forgery when the root secret was known. Lesson: STS signing keys need key separation, rotation, and key IDs; do not reuse root credentials for JWT/HMAC signing.
- `GHSA-923g-jp7v-f97f`: license verification embedded a production RSA private key and used private-key decryption as authenticity. Lesson: ship verifying/public keys only and use real signature verification.
### Sensitive logging and debug output
- `GHSA-r54g-49rx-98cr`: STS credentials were logged at info level. Lesson: generated credentials must never be logged in plaintext.
- `GHSA-8cm2-h255-v749`: debug logs leaked session tokens, secret keys, JWT claims, and raw STS response bodies. Lesson: redaction must cover custom `Debug` implementations and dependency response-body logging.
- `GHSA-333v-68xh-8mmq`: invalid RPC signature logging included the shared HMAC secret and expected signature. Lesson: error paths often leak secrets; never log raw secrets or derived authenticators.
### RPC input validation and panic safety
- `GHSA-gw2x-q739-qhcr`: malformed gRPC `GetMetrics` payloads reached `unwrap()` on deserialization and caused remote DoS. Lesson: every network/RPC deserialization failure returns an error, not a panic.
- `GHSA-h956-rh7x-ppgj` and `GHSA-r5qv-rc46-hv8q`: weak RPC auth increased reachability of otherwise internal handlers. Lesson: panic bugs become more severe when internode auth is weak or defaulted.
- `GHSA-c667-rgrv-99vj`: NodeService authentication signed the service prefix instead of the concrete generated method path, so valid metadata for one RPC could be replayed to another method during the timestamp window. Lesson: RPC HMAC payloads must bind exact gRPC method path, HTTP method surrogate, timestamp, and secret.
### Browser, CORS, and console isolation
- `GHSA-v9fg-3cr2-277j`: object preview rendered attacker-controlled HTML in a same-origin iframe, exposing console credentials stored in `localStorage`. Lesson: user content must be origin-isolated from the console and protected with `nosniff`, CSP, and strict content-type handling.
- `GHSA-7gcx-wg4x-q9x6`: an incomplete preview fix reintroduced extension-based PDF detection and bypassed the sandboxed fallback for attacker-controlled content. Lesson: browser-surface fixes need regression tests for alternate viewers and file-type branches, and preview trust must come from validated content type plus sandboxing rather than object names.
- `GHSA-x5xv-223c-8vm7`: default CORS reflected arbitrary origins with credentials. Lesson: never combine reflected origins with `Access-Control-Allow-Credentials: true`; default should be fail-closed.
### Trusted proxy and source IP conditions
- `GHSA-fc6g-2gcp-2qrq`: `aws:SourceIp` trusted client-supplied `X-Forwarded-For` or `X-Real-IP`. Lesson: forwarded IP headers are valid only behind configured trusted proxies; direct clients use socket peer IP.
### SSE and on-disk storage invariants
- `GHSA-xrrf-67jm-3c2r`: SSE metadata reported encryption while reader composition bypassed `EncryptReader` and stored plaintext. Lesson: test actual bytes on disk and wrapper order, not only API metadata.
### Object Lock and retention invariants
- `GHSA-j548-9grx-fh4f`: Object Lock enforcement treated unreadable, fabricated, or unparsable bucket metadata as absent configuration and allowed retained objects to be deleted or expired. Lesson: retention must fail closed unless Object Lock absence is authoritative, and every delete, lifecycle, scanner, force-delete, and default-retention path needs the same state distinction.
### Serde deserialization and input validation
- Reject unknown fields in untrusted S3 API XML/JSON, lifecycle, policy, and replication input where compatibility permits. Check the current type and supported payload fixtures; do not infer the repository's current coverage from an older audit. Where extra fields are part of the compatibility contract, validate security-critical values explicitly.
- `#[serde(default)]` on security-critical fields silently accepts missing values as zero/empty. Lesson: when a field has security implications (retention days, permissions, limits), validate the deserialized value explicitly rather than relying on defaults.
- Integer fields deserialized from user input and cast with `as` (e.g., `i32 as u32`) can wrap negative values to large positives. Lesson: validate ranges before casting; use `try_into()` with a typed error, or clamp only when the domain explicitly requires saturation.
- XML config typos (e.g., `"NoncurentDays"` instead of `"NoncurrentDays"`) are silently accepted when `deny_unknown_fields` is absent. Lesson: strict deserialization prevents silent misconfiguration that could cause data loss or unexpected retention behavior.
## Useful Search Seeds
Use these targeted searches when a diff touches security-sensitive code:
```bash
rg -n "validate_admin_request|check_permissions|AdminAction::|deny_only|is_allowed" rustfs crates
rg -n "authorize_operation|FtpsDriver|SftpDriver|RETR|MKD|SIZE|MDTM|CreateBucket|GetObject|HeadObject" crates/protocols rustfs
rg -n "UploadPartCopy|upload_part_copy|CompleteMultipart|PostObject|presign|SignedHeaders|x-amz-copy-source|collect_signed_headers|content-length-range|starts-with" rustfs crates
rg -n "ListBucketVersions|GetObjectVersion|versionId|VersionId|ExistingObjectTag|ForAllValues|ForAnyValue|POLICY_PLUGIN|opa" rustfs crates
rg -n "normalize_extract_entry_key|Snowball|auto-extract|PathBuf::join|canonicalize|\\.\\.|x-forwarded-for|x-real-ip|SourceIp" rustfs crates
rg -n "DEFAULT_SECRET|DEFAULT_ACCESS|TEST_PRIVATE_KEY|rustfs rpc|RUSTFS_RPC_SECRET" rustfs crates
rg -n "TONIC_RPC_PREFIX|verify_rpc_signature|check_auth|NodeServiceServer|x-rustfs-signature" rustfs crates
rg -n "debug!|trace!|info!|error!|\\?resp|\\?merged_config|session_token|secret_key" rustfs crates
rg -n "HashReader|EncryptReader|SSE|server-side encryption|Access-Control-Allow-Credentials|Origin" rustfs crates
rg -n "ObjectLock|object_lock|retention|COMPLIANCE|GOVERNANCE|delete_prefix|lifecycle|scanner" rustfs crates
rg -n "deny_unknown_fields|serde.default|as u32|as usize|as i32" rustfs crates
```
## Minimum Regression Test Expectations
- Authz fixes: include unauthenticated, valid low-privilege, wrong-action, correct-action, owner, non-owner, and root/admin cases as applicable.
- Protocol frontend authz fixes: include denied `RETR`, `SIZE`/`MDTM`, `MKD`, bucket probe, and sibling allowed-operation cases, and assert denied paths do not reach the storage backend.
- IAM fixes: include import/update/list service-account cases with attacker-controlled parent, claims, access key, secret key, and policy.
- Copy/upload fixes: include cross-bucket, cross-user, source-denied, destination-denied, copy-source-condition, and multipart completion cases.
- Presigned upload fixes: include a valid presign with extra unsigned tagging, redirect, storage-class, and cross-bucket copy-source headers; require rejection before source or destination storage access, and verify explicitly signed equivalents still work.
- Version-action fixes: include historical UUID, explicit current version, `null`, range, partNumber, presigned, STS/session, service-account, anonymous bucket-policy, copy source, and multipart-copy source cases.
- Policy-condition fixes: include reserved-key header collisions, missing keys, partially overlapping multi-value sets, plugin mode, and built-in policy mode.
- Path fixes: include encoded traversal, absolute path, nested traversal, archive entries with `..`, valid object keys that resemble traversal text but should be rejected, and canonical bucket/prefix boundary checks.
- Logging fixes: assert redacted output for structs and response bodies that may contain credentials.
- IAM export fixes: assert exported archives omit plaintext user and service-account secrets unless the format deliberately encrypts or seals them.
- RPC auth fixes: include captured metadata replay across two concrete methods, stale timestamps, wrong path, wrong method surrogate, wrong secret, and valid same-method calls.
- Browser/CORS fixes: assert no credentials on reflected/default origins, correct behavior for explicit allowlists, and no same-origin script execution for previewed object content.
- SSE fixes: inspect stored bytes and verify API metadata, read-back behavior, and on-disk ciphertext together.
- Object Lock fixes: include unreadable metadata, fabricated metadata defaults, unparsable config, confirmed absent config, COMPLIANCE/GOVERNANCE retention, lifecycle expiry, scanner sweeps, and force-delete paths.
@@ -0,0 +1,57 @@
---
name: test-coverage-improver
description: Analyze a supplied coverage report or perform an explicitly requested RustFS coverage assessment, rank uncovered risks, and propose focused tests. Do not trigger for ordinary implementation verification, a single regression test, documentation wording, or release preparation without a coverage request.
---
# Test Coverage Improver
Use this skill when you need a prioritized, risk-aware plan to improve tests from coverage results.
## Usage assumptions
- Focus scope is either changed lines/files, a module, or the whole repository.
- Reuse a supplied coverage artifact when its revision, scope, and format match.
- If required context is missing, call out assumptions explicitly before proposing work.
## Workflow
1. Define scope and baseline
- Derive the revision and scope from the request, diff, or supplied report.
- Default to the affected files/module; whole-workspace coverage requires that
scope in the request. Ask only if a wrong scope would change the result.
2. Obtain coverage evidence
- First inspect a matching existing artifact; do not regenerate it merely
because this skill was selected.
- If measurement is needed, read the Coverage section of
[the testing guide](../../../docs/testing/README.md#coverage), check disk
space/tool availability, and select package/test-scoped `cargo llvm-cov`
using the repository's nextest configuration. `make coverage` measures the
whole workspace (excluding E2E) and is only for that requested scope.
- Collect only metrics the report supports. Missing branch/changed-line
coverage is unknown, not zero.
- If measurement cannot run, continue with code-based test proposals and
mark measured coverage unverified; do not invent a coverage percentage.
3. Rank highest-risk gaps
- Prioritize changed code, branch coverage gaps, and low-confidence boundaries.
- Apply the risk rubric in [coverage-prioritization.md](references/coverage-prioritization.md).
- Report up to 5–8 evidenced gaps; do not pad a small scope.
- For each gap, capture: file, lines, uncovered branches, and estimated risk score.
4. Propose high-impact tests
- For each gap, name the behavior and regression, distinguishing assertions,
relevant normal/edge/failure cases, necessary setup, and estimated effort.
- Include only scenarios and setup that apply; reuse shared fixture details.
5. Close with validation plan
- State which gaps remain after proposals.
- Give a scoped verification command and behavior-based acceptance criterion;
use a coverage threshold only when the task or repository requires one.
- List assumptions or blockers (environment, fixtures, flaky dependencies).
## Report
Summarize the supported metrics, then combine each ranked gap with its proposed
test and validation. Include source lines only when supplied or inspected;
mark missing metrics or locations as unknown. Do not duplicate gaps and tests
in separate templates or fill empty categories for an otherwise small report.
@@ -0,0 +1,4 @@
interface:
display_name: "Test Coverage Improver"
short_description: "Find top uncovered risk areas and propose high-impact tests."
default_prompt: "Use $test-coverage-improver to analyze coverage for the requested scope, reuse matching reports, and propose tests for evidenced risks."
@@ -0,0 +1,25 @@
# Coverage Gap Prioritization Guide
Use this rubric for each uncovered area.
Score = (Criticality × 2) + CoverageDebt + (Volatility × 0.5)
- Criticality:
- 5: authz/authn, data-loss, payment/consistency path
- 4: state mutation, cache invalidation, scheduling
- 3: error handling + fallbacks in user-visible flows
- 2: parsing/format conversion paths
- 1: logging-only or low-impact utilities
- CoverageDebt:
- 0: 0–5 uncovered lines
- 1: 6–20 uncovered lines
- 2: 21–40 uncovered lines
- 3: 41+ uncovered lines
- Volatility:
- 1: stable legacy code with few recent edits
- 2: changed in last 2 releases
- 3: touched in last 30 days or currently in active PR
Sort by score descending, then by business impact.
+5
View File
@@ -0,0 +1,5 @@
# Bound individual tool outputs retained in context; retrieve relevant ranges
# from task-owned log files when more evidence is needed.
# https://learn.chatgpt.com/docs/config-file/config-reference
tool_output_token_limit = 4000
-16
View File
@@ -1,16 +0,0 @@
{
"schema_version": 1,
"rollout": "enforced",
"core_packages": ["rustfs", "rustfs-ecstore", "rustfs-filemeta", "rustfs-iam", "rustfs-policy"],
"connect_packages": [
"rustfs-credentials", "rustfs-config", "rustfs-common", "rustfs-crypto",
"rustfs-iam", "rustfs-policy", "rustfs-kms", "rustfs-license", "rustfs-security-governance",
"rustfs-utils", "rustfs-tls-runtime", "rustfs-trusted-proxies", "rustfs-filemeta",
"rustfs-lock", "rustfs-obs", "rustfs-signer", "rustfs-io-metrics", "rustfs-s3-ops"
],
"full_paths": [
"Cargo.toml", "Cargo.lock", "*/Cargo.toml", "rust-toolchain*", "rustfmt.toml",
"clippy.toml", ".cargo/*", ".config/*", ".github/*", "Makefile",
"scripts/*", "build.rs", "*.proto"
]
}
+2 -2
View File
@@ -1,2 +1,2 @@
sha256-linux=348fa5eed9ae58962c06b33283ff4f15122cff97bce9b4eb1e3ffcb227264b0b
sha256-darwin=348fa5eed9ae58962c06b33283ff4f15122cff97bce9b4eb1e3ffcb227264b0b
sha256-linux=21ab66fd172018682ce825a53f26aa8f286d57f3f687d8616d1850e56474dcd8
sha256-darwin=21ab66fd172018682ce825a53f26aa8f286d57f3f687d8616d1850e56474dcd8
+2 -2
View File
@@ -1,2 +1,2 @@
sha256-darwin=0374e6b9b061dd5d622686301386232a4aa1cb22eedc18af70d2a7411bc66f8d
sha256-linux=f2cee240f7a744ae991971820f48a6c9c28d19f525e8b2345fcb76eeaaf1e382
sha256-darwin=9e9687ded961aa4e619a15def6e1ee0a5153be05423d009ee7a58126624c83e7
sha256-linux=364666693c2bf258997643c9d87e07e7b7501e58175f190d201d53c81946eb20
+2 -2
View File
@@ -1,2 +1,2 @@
sha256-darwin=e84e04208f19dc0596b10d4d1b799ce43d6cc431415902f9c5458aa8232bc2d8
sha256-linux=1f9c7add72c44d1c12ef4ac050bb7917431be657c0c90b29f70c3df56f8bbae3
sha256-darwin=83a7dcaffd5a789517ae9f02a224f66a9713937885cff96fca2ad7e216f197ae
sha256-linux=626c10f8c964507ff987b6c86069e9019dc6d2ae7fb02db9be5df5aa8cc5145b
+2 -2
View File
@@ -1,2 +1,2 @@
sha256-darwin=a2cb67d91eb0d093928371d6e84a84b2dd41b2ba975a28094e81879bd65838ad
sha256-linux=82db0561cf9b111f11782d647d0859c9d2a44c5c68481b5e39c48505828bd392
sha256-darwin=55534a97fbd376f64c8f6c341d319017d11ff77cad6da8629a1a7f6a874e0315
sha256-linux=c06fb8c19aed6f388b9dc61cb8251b7a44f8561a9bf764ad2b9e635598f8dc17
+1 -1
View File
@@ -1 +1 @@
sha256=4eac269f9a59b2f9be4e7a87ea6aa38454f5ebe10ede35c9b8d4218137d2cd35
sha256=e4ee3898b840a8374cb02c64342cc15f8d7ecd1becaf4b4a2a4657290f9e7ff1
+1 -1
View File
@@ -1 +1 @@
sha256=21e9a1561ac20382503c38353bbb9b830658534a4f277c254a42d0afc6ebed8b
sha256=548a58d74f3cb3b5a1ab9dcd4d3f8625b9ddebe847a2e14de1d08c3b2e6292eb
+1 -301
View File
@@ -29,7 +29,7 @@
{
"invariant": "list-uncommitted-version",
"suite": "rustfs-filemeta",
"name": "metacache::tests::resolve_merge_keeps_the_newest_version_at_listing_quorum"
"name": "metacache::tests::resolve_with_write_quorum_slack_keeps_partial_latest_hidden_during_merge"
},
{
"invariant": "minio-object-fixture",
@@ -55,276 +55,6 @@
"invariant": "odm-source-contract-gcs",
"suite": "rustfs",
"name": "on_demand_migration::gcs::tests::gcs_native_backend_satisfies_the_shared_backend_contract"
},
{
"invariant": "rollback-inspection",
"suite": "rustfs-ecstore",
"name": "set_disk::core::io_primitives::tests::rename_rollback_incomplete_preserves_overwrite_data_dirs_and_staging"
},
{
"invariant": "rollback-closed-inspection-channel",
"suite": "rustfs-ecstore",
"name": "set_disk::core::io_primitives::tests::rename_rollback_closed_heal_receiver_preserves_recovery_material"
},
{
"invariant": "rollback-cancellation",
"suite": "rustfs-ecstore",
"name": "set_disk::core::io_primitives::tests::rename_rollback_incomplete_cancelled_task_is_not_success"
},
{
"invariant": "rollback-completion-equivalence",
"suite": "rustfs-ecstore",
"name": "set_disk::core::io_primitives::tests::rename_rollback_incomplete_matches_early_ack_and_full_wait_after_reopen"
},
{
"invariant": "rollback-physical-owner",
"suite": "rustfs-ecstore",
"name": "set_disk::core::io_primitives::tests::rename_rollback_children_keep_namespace_ownership_after_coordinator_panic"
},
{
"invariant": "late-ack-retains-commit",
"suite": "rustfs-ecstore",
"name": "set_disk::core::io_primitives::tests::rename_data_early_ack_post_mutation_tail_error_never_rolls_back_commit"
},
{
"invariant": "tail-drained-cas",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::object::put_object_tmp_cleanup_tests::tail_drained_put_waits_for_tail_and_allows_immediate_cas"
},
{
"invariant": "seeded-put-tail-pressure",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::object::put_object_tmp_cleanup_tests::seeded_put_completion_pressure_drains_every_real_tail"
},
{
"invariant": "borrowed-lock-tail",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::object::put_object_tmp_cleanup_tests::no_lock_put_waits_for_rename_tail_under_outer_guard"
},
{
"invariant": "cancelled-writer-owner",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::object::put_object_tmp_cleanup_tests::tail_drained_put_owned_commit_survives_waiter_cancellation"
},
{
"invariant": "get-body-reconstruction",
"suite": "rustfs-ecstore",
"name": "ecstore_validation_blackbox::blackbox_get_restores_body_after_one_shard_file_is_removed"
},
{
"invariant": "range-reconstruction",
"suite": "rustfs-ecstore",
"name": "ecstore_validation_blackbox::blackbox_range_read_restores_exact_slice_with_one_offline_disk"
},
{
"invariant": "multipart-abort-linearization",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::multipart::tests::abort_and_complete_linearize_for_plain_sse_and_legacy_layouts"
},
{
"invariant": "multipart-write-quorum",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::multipart::tests::abort_enforces_delete_write_quorum_boundary"
},
{
"invariant": "multipart-physical-owner",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::multipart::tests::complete_multipart_timeout_keeps_namespace_owner_until_physical_publication"
},
{
"invariant": "restore-abort-cleanup",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::object::transition_commit_failure_tests::multipart_restore_aborts_every_post_create_failure"
},
{
"invariant": "legacy-metadata",
"suite": "rustfs-filemeta",
"name": "filemeta::test::test_issue_2288_legacy_xlmeta_compatibility"
},
{
"invariant": "legacy-nil-version",
"suite": "rustfs-filemeta",
"name": "filemeta::test::test_into_fileinfo_reads_legacy_nil_uuid_inline_key"
},
{
"invariant": "commit-phase-schedule",
"suite": "rustfs-ecstore",
"name": "set_disk::core::io_primitives::tests::commit_fault_schedule_keeps_multiple_disk_phases_independent"
},
{
"invariant": "commit-phase-ownership",
"suite": "rustfs-ecstore",
"name": "set_disk::core::io_primitives::tests::commit_fault_schedule_rejects_duplicate_checkpoint_without_disarming_owner"
},
{
"invariant": "metadata-observation-all-four-slot-states-and-arrival-orders-preserve-reduction",
"suite": "rustfs-ecstore",
"name": "set_disk::core::metadata_quorum::tests::metadata_observation_all_four_slot_states_and_arrival_orders_preserve_reduction"
},
{
"invariant": "metadata-observation-mixed-current-identity-arrivals-preserve-selection",
"suite": "rustfs-ecstore",
"name": "set_disk::core::metadata_quorum::tests::metadata_observation_mixed_current_identity_arrivals_preserve_selection"
},
{
"invariant": "metadata-observation-pending-newer-version-and-same-time-different-directory-force-full-wait",
"suite": "rustfs-ecstore",
"name": "set_disk::core::metadata_quorum::tests::metadata_observation_pending_newer_version_and_same_time_different_directory_force_full_wait"
},
{
"invariant": "metadata-observation-duplicate-shard-cannot-supply-a-read-reserve",
"suite": "rustfs-ecstore",
"name": "set_disk::core::metadata_quorum::tests::metadata_observation_duplicate_shard_cannot_supply_a_read_reserve"
},
{
"invariant": "metadata-observation-null-versions-markers-and-invalid-success-keep-their-meaning",
"suite": "rustfs-ecstore",
"name": "set_disk::core::metadata_quorum::tests::metadata_observation_null_versions_markers_and_invalid_success_keep_their_meaning"
},
{
"invariant": "metadata-cache-real-get-and-range-preserve-body-across-read-modes",
"suite": "rustfs-ecstore",
"name": "set_disk::read::metadata_cache_tests::metadata_cache_real_get_and_range_preserve_body_across_read_modes"
},
{
"invariant": "late-metadata-refresh-rejects-changed-generation-and-mapped-shards",
"suite": "rustfs-ecstore",
"name": "set_disk::read::metadata_cache_tests::late_metadata_refresh_rejects_changed_generation_and_mapped_shards"
},
{
"invariant": "late-full-get-rejects-changed-object-generation",
"suite": "rustfs-ecstore",
"name": "set_disk::prepared_get_object_metadata_tests::non_inline_two_phase_get_rejects_generation_change_before_late_refresh"
},
{
"invariant": "list-objects-shared-corpus-static-namespace",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_static_namespace"
},
{
"invariant": "list-objects-shared-corpus-cross-subdirectory-limit",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_cross_subdirectory_limit"
},
{
"invariant": "list-objects-shared-corpus-max-and-max-plus-one",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_max_and_max_plus_one"
},
{
"invariant": "list-objects-shared-corpus-fixed-seed-marker-and-prefix",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_fixed_seed_marker_and_prefix"
},
{
"invariant": "list-objects-shared-corpus-offline-corrupt-and-minority-stale",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_offline_corrupt_and_minority_stale"
},
{
"invariant": "list-objects-shared-corpus-versions-delete-markers-and-free-versions",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_versions_delete_markers_and_free_versions"
},
{
"invariant": "list-objects-shared-corpus-orphan-cleanup-requires-authoritative-evidence",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_orphan_listing_preserves_inputs"
},
{
"invariant": "list-objects-shared-corpus-consumer-drop-joins-real-disk-producer",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_consumer_drop_joins_real_disk_producer"
},
{
"invariant": "list-objects-shared-corpus-cancelled-quorum-walk-releases-senders-and-disk-lock",
"suite": "rustfs-ecstore",
"name": "store::list_objects::differential_tests::list_objects_shared_corpus_cancelled_quorum_walk_releases_senders_and_disk_lock"
},
{
"invariant": "borrowed-context-boundary",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::object::put_object_tmp_cleanup_tests::borrowed_write_context_rejects_wrong_namespace_and_cache_flag"
},
{
"invariant": "borrowed-put-cancellation",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::object::put_object_tmp_cleanup_tests::borrowed_tail_drained_put_keeps_owner_after_caller_cancel"
},
{
"invariant": "borrowed-mpu-cancellation",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::multipart::tests::borrowed_complete_keeps_namespace_owner_after_caller_cancel"
},
{
"invariant": "pool-cas-owner",
"suite": "rustfs-ecstore",
"name": "core::pools::pools_tests::pool_meta_cas_context_retains_actual_owner_for_exact_target"
},
{
"invariant": "pool-cas-released-owner",
"suite": "rustfs-ecstore",
"name": "core::pools::pools_tests::pool_meta_cas_rejects_released_owner"
},
{
"invariant": "copy-tail-drained",
"suite": "rustfs-ecstore",
"name": "store::object::tests::borrowed_copy_tail_drained_waits_for_rename_tail"
},
{
"invariant": "catalog-borrowed-publication",
"suite": "rustfs",
"name": "admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition"
},
{
"invariant": "directory-marker-quorum",
"suite": "rustfs-filemeta",
"name": "metacache::tests::resolve_directory_marker_and_prefix_preserve_quorum_in_both_orders"
},
{
"invariant": "logical-prefix-limit",
"suite": "rustfs-ecstore",
"name": "store::list_objects::test::list_path_gather_results_counts_common_prefixes_before_page_limit"
},
{
"invariant": "quota-same-name-owner-and-disk-authority",
"suite": "rustfs-ecstore",
"name": "bucket::metadata_sys::tests::quota_snapshot_reuses_same_name_owner_and_rereads_disk_authority"
},
{
"invariant": "quota-snapshot-scope-and-owner",
"suite": "rustfs-ecstore",
"name": "bucket::metadata_sys::tests::quota_snapshot_rejects_wrong_scope_incarnation_and_transaction_guard"
},
{
"invariant": "quota-snapshot-lifecycle-and-incarnation",
"suite": "rustfs-ecstore",
"name": "bucket::metadata_sys::tests::quota_snapshot_rejects_lifecycle_loss_during_read_and_changed_disk_incarnation"
},
{
"invariant": "marker-purge-receipt-reopen",
"suite": "rustfs-ecstore",
"name": "set_disk::ops::object::marker_purge_receipt_tests::quorum_marker_purge_receipt_survives_reopen_with_stale_member"
},
{
"invariant": "external-minio-shards",
"suite": "rustfs-ecstore::pinned_erasure_fixtures_test",
"name": "pinned_minio_shards_decode_and_reconstruct_plaintext"
},
{
"invariant": "external-legacy-shards",
"suite": "rustfs-ecstore::pinned_erasure_fixtures_test",
"name": "pinned_legacy_shards_decode_and_reconstruct_plaintext"
},
{
"invariant": "external-shard-bitrot",
"suite": "rustfs-ecstore::pinned_erasure_fixtures_test",
"name": "pinned_erasure_shards_reject_bitrot_corruption"
},
{
"invariant": "external-shard-quorum-codec",
"suite": "rustfs-ecstore::pinned_erasure_fixtures_test",
"name": "pinned_erasure_shards_reject_insufficient_quorum_and_wrong_codec"
}
],
"fixtures": [
@@ -352,36 +82,6 @@
"path": "crates/ecstore/tests/fixtures/minio/bucket_metadata_full.xlmeta.hex",
"sha256": "3b6de589519c08a1614c8bd409bb8199c17d42043861b07bce513075e6fbfc12",
"source": "MinIO RELEASE.2025-07-23T15-54-02Z; crates/ecstore/tests/fixtures/minio/README.md"
},
{
"path": "crates/filemeta/tests/fixtures/issue_2288_legacy_xlmeta.hex",
"sha256": "b3e8d32f9950a38b5dc71f679519cc830a2b2a807e8b0b39f78840b238d8eacf",
"source": "Legacy xl.meta captured for rustfs/backlog#2288; filemeta::test::test_issue_2288_legacy_xlmeta_compatibility"
},
{
"path": "crates/filemeta/tests/fixtures/issue_2265_legacy_meta_v2_object.hex",
"sha256": "89dd7ec92d16e54b5d31e0c49c9edffff8a7aa58890aaeff59bc2ff84da0a62f",
"source": "Legacy metadata v2 object captured for rustfs/backlog#2265; crates/filemeta/src/test_data.rs"
},
{
"path": "crates/ecstore/tests/fixtures/list_namespace_keys.json",
"sha256": "5afddb60565deba0938e617470255563f0e15a15fab699645c59bb7ccc84898e",
"source": "Shared static LIST namespace corpus; ECStore differential tests and ODM list_through_static_namespace_boundary_matrix"
},
{
"path": "crates/ecstore/tests/fixtures/erasure-shards/minio/manifest.json",
"sha256": "c398f8dcb76903f6cf8eee07931c76592895ced201ff9d59ed4ff9b0ead2b13c",
"source": "MinIO RELEASE.2025-07-23T15-54-02Z; crates/ecstore/tests/fixtures/erasure-shards/README.md"
},
{
"path": "crates/ecstore/tests/fixtures/erasure-shards/legacy/manifest.json",
"sha256": "dce397d5b2f42748eb5091b4355bb9d133a50cbba003626fafac28095dbe540b",
"source": "RustFS 1.0.0-alpha.37; crates/ecstore/tests/fixtures/erasure-shards/README.md"
},
{
"path": "crates/ecstore/tests/fixtures/erasure-shards/plaintext.bin",
"sha256": "b5a83332327961a31b65a8731c64559fd04ff8ac9f6124022201dbbdba5ffa01",
"source": "Independent fixed SHA256 counter-stream oracle; crates/ecstore/tests/fixtures/erasure-shards/README.md"
}
]
}
-11
View File
@@ -70,16 +70,6 @@ s3s-footprint-check: ## Check the s3s dependency footprint ratchet stays frozen
@echo "📦 Checking s3s footprint ratchet..."
./scripts/check_s3s_footprint.sh
.PHONY: test-count-ratchet-check
test-count-ratchet-check: ## Check no workspace crate fell below its test floor or rose above its #[ignore] ceiling in the committed baseline
@echo "🧪 Checking per-crate test-count ratchet..."
./scripts/check_test_count_ratchet.sh
.PHONY: test-seams-check
test-seams-check: ## Check tests outside an operation's owner call its use-case only through rustfs/src/app/test_seams
@echo "🧪 Checking cross-owner test seams..."
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_seams.py
.PHONY: fips-wording-check
fips-wording-check: ## Check docs and crates/kms do not over-claim crypto capabilities
@echo "📣 Checking cryptographic capability wording guard..."
@@ -100,7 +90,6 @@ test-wiring-check: ## Check tests stay registered and selected by their intended
@echo "🧪 Checking test wiring..."
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_wiring.py
$(RUSTFS_PYTHON_BIN) ./scripts/ci_gate.py --check-workflow
$(RUSTFS_PYTHON_BIN) ./scripts/validation_registry.py check
.PHONY: log-analyzer-rules-check
log-analyzer-rules-check: core-deps ## Check log-analyzer rule anchors still exist verbatim in source
+2 -2
View File
@@ -20,11 +20,11 @@ planning-docs-check: ## Check that no planning-type documents are committed
./scripts/check_no_planning_docs.sh
.PHONY: pre-commit
pre-commit: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check test-count-ratchet-check test-seams-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check quick-check ## Run fast pre-commit checks without clippy/full tests
pre-commit: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check quick-check ## Run fast pre-commit checks without clippy/full tests
@echo "✅ All pre-commit checks passed!"
.PHONY: pre-pr
pre-pr: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check test-count-ratchet-check test-seams-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check log-analyzer-rules-check offline-enrollment-e2e-check clippy-check test ## Run full pre-PR checks with clippy and tests
pre-pr: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check log-analyzer-rules-check offline-enrollment-e2e-check clippy-check test ## Run full pre-PR checks with clippy and tests
@echo "✅ All pre-PR checks passed!"
.PHONY: dev-check
-40
View File
@@ -22,24 +22,13 @@ TEST_THREADS ?= 1
# differ from CI and .config/nextest.toml test-groups will NOT apply.
.PHONY: script-tests
.PHONY: release-package-tests
release-package-tests: ## Run release package integration on Linux with fpm, dpkg and rpm installed
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_packages.py
.PHONY: release-image-tests
release-image-tests: ## Run OCI integration with Docker, Go and skopeo; set RELEASE_IMAGE_VARIANT and RELEASE_IMAGE_OUTPUT
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_images.py
script-tests: ## Run shell script tests
@echo "Running script tests..."
trap 'status=$$?; printf "ERROR: script-tests failed (exit %s): %s\n" "$$status" "$$BASH_COMMAND" >&2; exit "$$status"' ERR
./scripts/test_build_rustfs_options.sh
./scripts/test_docker_runtime_timezone.sh
./scripts/test_entrypoint_credentials.sh
./scripts/test_entrypoint_directories.sh
./scripts/test_internode_grpc_ab_bench.sh
./scripts/test_object_batch_bench_enhanced.sh
./scripts/test_package_service_scripts.sh
./scripts/test_hotpath_warp_ab_gate.sh
./scripts/test_hotpath_warp_abba.sh
./scripts/test_scanner_validation_harness.sh
@@ -58,47 +47,18 @@ script-tests: ## Run shell script tests
./scripts/test_manual_transition_runbooks.sh
./scripts/test_fuzz_runner.sh
./scripts/test_python_bin.sh
$(RUSTFS_PYTHON_BIN) ./scripts/test_check_doc_paths.py
./scripts/check_embedded_secrets.sh --self-test
./scripts/check_s3s_footprint.sh --self-test
./scripts/test_check_test_count_ratchet.sh
./scripts/test_guard_source_set.sh
./scripts/test_split_guard_rules.sh
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_wiring.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/codemods/s3_error_to_s3_types.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/codemods/split_lifecycle_transition_api_test.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_seams.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/test_e2e_binary.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_download_release_asset.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_reference_binary.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_inspect_btf_prototypes.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_build_workflow.py
$(RUSTFS_PYTHON_BIN) -m unittest discover -s scripts/release -p "test_*.py"
$(RUSTFS_PYTHON_BIN) ./scripts/test_release_glibc.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_upgrade_workflow.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_migration_gate_evidence.py
$(RUSTFS_PYTHON_BIN) ./scripts/ci_gate.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/check_connect_release_boundary.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/test_ci_test_artifact.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_ci_test_shards.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_ci_merge_queue.py
$(RUSTFS_PYTHON_BIN) -m unittest discover -s scripts/ci -p 'test_*.py'
$(RUSTFS_PYTHON_BIN) ./scripts/check_security_coverage.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/check_scheduled_validation_freshness.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/test_security_workflow.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_nightly_candidate.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_functional_chain.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_functional_chain_health.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_repro_rejoin_readiness_docker.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_validation_registry.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_inspect_validation_runner.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_retain_validation_evidence.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_ci_timing_report.py
$(RUSTFS_PYTHON_BIN) ./scripts/test_junit_diff.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_report_compat.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_runner_tools.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_api_coverage.py
$(RUSTFS_PYTHON_BIN) ./scripts/s3-tests/test_reference_parity.py
bash -n ./scripts/validate_object_data_cache_cold_stampede.sh
$(RUSTFS_PYTHON_BIN) ./scripts/check_object_data_cache_follower_samples.py --self-test
./scripts/validate_object_data_cache_cold_stampede.sh --self-test
+19 -330
View File
@@ -57,11 +57,6 @@ command = ['sh', '-c', 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"']
[scripts.setup.ecstore-large-stack]
command = ['sh', '-c', 'echo RUST_MIN_STACK=33554432 >> "$NEXTEST_ENV"']
# The receipt corruption oracle does not simulate a crash. Prefer tmpfs only
# when its full fixture fits; retain the ordinary temporary directory otherwise.
[scripts.setup.ecstore-receipt-tmpdir]
command = ['sh', 'scripts/ci/receipt-fixture-tmpdir.sh']
# The serial ILM selection builds the same deep storage futures in both the
# lifecycle transition module and scanner integration binary. Different tests
# in each have overflowed first across otherwise unrelated CI runs.
@@ -69,106 +64,24 @@ command = ['sh', 'scripts/ci/receipt-fixture-tmpdir.sh']
command = ['sh', '-c', 'echo RUST_MIN_STACK=33554432 >> "$NEXTEST_ENV"']
# --- default profile (local): serialize the flaky groups, never retry --------
# These real-disk progress oracles exercise fsync, quorum IO, and crash/replay
# boundaries. Reserve the run's capacity so unrelated fixtures cannot starve
# their existing deadlines and typed-failure assertions (rustfs/backlog#2706).
# Keep each test's internal concurrency and zero-retry policy unchanged.
[[profile.default.overrides]]
filter = """
package(rustfs-ecstore) & (
test(/^set_disk::ops::multipart::tests::complete_multipart_(quorum_success_releases_logical_guards_before_physical_tail|waits_for_tail_before_releasing_guards_and_marking_capacity)$/)
| test(=store::heal::tests::full_format_heal_lost_after_last_save_does_not_publish_or_renew_and_latches)
| test(/^store::init::tests::(decommission_durable_ilm_receipt_pagination_fails_closed_on_second_page|dispatch_manifest_shutdown_(drains_admitted_delete_batch_without_tail_admission|stops_aborting_validation_tail_reads|stops_authorized_tail_reads_before_receipt_or_cas))$/)
| (binary(metadata_read_lock_reuse_test) & test(=replica_multipart_completes_while_metadata_writer_waits_for_its_snapshot))
)
"""
threads-required = "num-test-threads"
[[profile.default.overrides]]
filter = 'package(rustfs) & test(/^connect::diagnostics::schedule::tests::/)'
threads-required = "num-test-threads"
[[profile.default.overrides]]
filter = 'package(rustfs-ecstore) & (test(/^set_disk::tests::streaming_get_blocks_concurrent_/) | test(=store::object::tests::retired_marker_converges_after_bucket_recreation_on_sixteen_disks))'
threads-required = "num-test-threads"
# These real-disk lock probes must finish durable IO within production's 5s
# acquisition budget. Reserve capacity from sibling test processes while
# preserving the probes' internal concurrency, deadlines, and assertions.
[[profile.default.overrides]]
filter = '(package(rustfs-ecstore) & (test(/^core::pools_test::decommission_lock_order_tests::(active_decommission_migration_does_not_invert_capacity_and_delete_object(_tag)?_locks|decommission_moves_a_transitioned_version_expired_by_a_delete_all_rule_without_stalling)$/) | test(=services::integrity::tests::audit_migration_and_ack_recovery_preserve_source_and_reject_conflicts))) | (package(rustfs-heal) & test(=heal::mrf_queue::partial_write::tests::durable_retry_submission_error_keeps_checkpoint_and_uses_backoff))'
threads-required = "num-test-threads"
# These eight-disk decommission fixtures exercise concurrent retries,
# free-version cleanup, and real capacity probes under production lock deadlines.
# Reserve the run's capacity so unrelated IO cannot exhaust those budgets.
[[profile.default.overrides]]
filter = 'package(rustfs-ecstore) & (test(/^store::init::tests::decommission_entry_(retries_source_changed_without_canceling_other_bucket|skips_cleanup_only_marker_when_free_version_is_present)$/) | test(=core::pools::tests::decommission_capacity_mutation_limits_prewrite_sampling_to_target))'
threads-required = "num-test-threads"
# This registration/backup lock probe uses an isolated eight-disk store.
# Reserve capacity so sibling disk-heavy tests cannot consume its 2s
# registration budget; retain the queued backup and deadlock assertions.
[[profile.default.overrides]]
filter = 'package(rustfs) & test(=admin::handlers::table_catalog::tests::cold_object_registration_completes_while_other_bucket_backup_waits)'
threads-required = "num-test-threads"
[[profile.default.overrides]]
filter = 'package(rustfs-heal) & (binary(mrf_partial_write_test) | (binary(mrf_pipeline_test) & test(/^journal_replay_survives_/)) | test(=admin_selector_survives_sigkill_with_original_scope_and_receipts))'
threads-required = "num-test-threads"
# Native scanner backlog fixtures include 24-set and pool-expansion cases.
# Reserve capacity across test processes while preserving each scenario's fixed
# budget, assertions, and internal concurrency.
[[profile.default.overrides]]
filter = 'package(rustfs-scanner) & (test(/^scanner::backlog::tests::native_/) | test(=scanner_folder::tests::mrf_ownership::mrf_ownership_manager_completion_preserves_scanner_pending) | test(/^scanner_io::tests::service_cohort::/))'
threads-required = "num-test-threads"
[[profile.default.scripts]]
filter = 'package(rustfs-ecstore) & test(/^(bucket::lifecycle::bucket_lifecycle_ops::tests::manual_transition_worker_result_recovery_marks_unknown_for_corrupt_marker|services::rebalance::entry::tests::real_rebalance_run_fence_loss_blocks_multipart_publication|store::init::tests::(batch_transitioned_delete_uses_free_version_per_item|decommission_entry_(allows_free_version_consumed_before_source_lock|rejects_subquorum_free_version_conflict_and_retains_source|skips_cleanup_only_marker_when_free_version_is_present)|dispatched_tier_delete_recovery_(checks_later_pool_then_commits_after_source_removal|finds_directory_source_on_encoded_set|retains_journal_on_source_metadata_error)|force_tier_remove_blocks_on_physical_free_version_hidden_by_other_pool|legacy_unknown_transition_delete_falls_back_for_single_batch_and_blocks_prefix|multi_pool_(recursive_prefix_rejects_legacy_or_hidden_merge_loser_before_delete|same_remote_tuple_(batch|single)_delete_waits_for_all_sources|same_tuple_recursive_prefix_uses_one_journal_owner|transitioned_delete_persists_one_free_version_per_remote_tuple)|recursive_prefix_partial_(pool|set)_failure_keeps_prepared_cleanup_owners|restored_transitioned_delete_uses_free_version_as_cleanup_owner|stable_transitioned_recursive_prefix_delete_uses_journal_owners|suspended_null_transition_delete_uses_free_version_as_sole_owner|tier_mutation_peer_handler_applies_prepare_commit_and_abort_idempotently|transition_response_loss_persists_unknown_outcome_for_provider_recovery|transition_transaction_recovery_(drops_record_after_confirmed_local_commit|keeps_cleanup_pending_local_commit)|transitioned_delete_(free_version_replays_after_store_restart|local_quorum_failure_rolls_back_without_cleanup_owner|uses_free_version_as_cleanup_owner)|versioned_delete_marker_keeps_transitioned_source_and_remote_object|versioned_explicit_transition_delete_preserves_other_version_then_allows_bucket_delete))$/)'
setup = 'ecstore-large-stack'
# These cross-crate real-storage fixtures need the same bounded stack as ECStore tests.
# The admin target-repair fixtures compose the full bucket delete and recreate
# path on a real store; measured with RUST_MIN_STACK on 2026-10-15 they need
# 2016-2040 KiB of the 2 MiB libtest default and overflowed on Linux CI.
[[profile.default.scripts]]
filter = '(package(rustfs) & test(/^(admin::handlers::replication::target_repair_tests::[a-z_]+|admin::handlers::plugin_attempt::v2_tests::delegation_v2_persists_and_vends_with_real_parent_intersection|admin::handlers::site_replication::tests::durable_iam_state_apply_iam_item_rejects_a_stale_recreate_after_a_replicated_delete|admin::service::federated_identity::tests::(binding_keeps_explicit_iam_mapping_strict|markerless_legacy_oidc_session_crosses_auth_and_iam_deletion_boundaries)|storage::scanner_dirty_journal::tests::(clear_callback_keeps_unknown_coverage_until_all_pending_work_is_confirmed|owned_journals_keep_peer_records_after_interleaved_writes_and_clear))$/)) | (package(rustfs-heal) & ((binary(heal_b5_versioned_regression_test) & test(/^serial_tests::(test_heal_unversioned_bucket_e2e|test_historical_null_recursive_heal_restores_physical_versions|test_recursive_deep_heal_reports_stale_delete_marker_repair)$/)) | (binary(usage_observation_read_repair_test) & test(=usage_observation_read_repair_survives_snapshot_cleanup)))) | (package(rustfs-test-utils) & test(=data_usage_snapshot_tests::data_usage_snapshot_recovery_wires_primary_backup_and_negative_cache))'
setup = 'ecstore-base-stack'
[[profile.default.scripts]]
filter = 'package(rustfs-ecstore) | package(rustfs-s3select-api) | package(rustfs-scanner) | (package(rustfs) & test(/^(app::multipart_usecase::tests::concurrent_completions_share_durable_bucket_quota_reservations|app::object::delete::tests::compressed_delete_requests_update_observed_usage_without_releasing_quota_floor|app::object::internal_put::tests::internal_multipart_roundtrip_completes_and_abort_leaves_nothing|app::object::restore::tests::execute_restore_object_maps_failures_to_typed_s3_errors|storage::access::tests::(delete_object_access_captures_authorized_bucket_incarnation|copy_operations_reject_recreated_source_bucket_after_authorization|request_slot_keeps_bucket_policy_bound_to_its_store))$/))'
setup = 'ecstore-base-stack'
# These handler/store fixtures and the relocated-pool GET compose deep storage
# futures in libtest threads; on Linux they overflow the default 2 MiB stack.
[[profile.default.scripts]]
filter = 'package(rustfs) & (test(/^admin::handlers::table_catalog::tests::/) | test(/^table_catalog::store::tests::/) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body))'
setup = 'ecstore-base-stack'
[[profile.default.scripts]]
filter = 'binary(lifecycle_integration_test) | (package(rustfs) & test(/^app::lifecycle_transition_api_test::/))'
setup = 'lifecycle-large-stack'
# This conditional GET fixture composes real-store futures that overflowed
# the default Linux test-thread stack.
# The pool metadata placement regression composes the full erasure-heal
# startup future and overflows the default Linux test-thread stack.
[[profile.default.scripts]]
filter = 'package(rustfs) & test(=app::object::get::tests::conditional_get_304_uses_metadata_without_decoding_damaged_data)'
filter = 'package(rustfs-heal) & test(=replacement_pool_metadata_follows_real_two_set_placement)'
setup = 'ecstore-large-stack'
# These heal fixtures compose deep real-store recovery futures that can
# overflow the default Linux test-thread stack.
[[profile.default.scripts]]
filter = 'package(rustfs-heal) & (test(=replacement_pool_metadata_follows_real_two_set_placement) | (binary(heal_integration_test) & test(=bucket_removal_recovers_delete_proofs_before_removing_empty_volumes)))'
setup = 'ecstore-large-stack'
# These real-disk scanner fixtures assert quiet-workload publication and
# durable MRF admission. Reserve the pool while their bounded CAS/fsync
# handoffs run so unrelated disk fanouts cannot consume that fixture budget.
[[profile.default.overrides]]
filter = 'package(rustfs-scanner) & (test(=scanner_folder::tests::mrf_ownership::mrf_ownership_manager_completion_preserves_scanner_pending) | test(=scanner_io::tests::multi_pool_scanner_cycle_publishes_combined_usage) | test(=scanner_io::tests::pending_put_commit_keeps_scanner_walk_live_without_authoritative_usage) | test(=scanner_folder::tests::mrf_ownership::checkpoint_fixture_metadata_heal_reaches_budgeted_tail))'
threads-required = "num-test-threads"
[[profile.default.overrides]]
filter = 'package(rustfs-ecstore) & (test(concurrent_resend_same_part_commits_one_generation) | test(concurrent_config_writes_from_separate_nodes_do_not_lose_writes) | test(/^store::bucket::tests::bucket_delete_(mark_delete|purge_removes|default_s3_delete)/))'
test-group = 'ecstore-serial-flaky'
@@ -194,16 +107,6 @@ test-group = 'ecstore-serial-flaky'
filter = 'package(rustfs-ecstore) & test(/^set_disk::ops::heal::heal_result_report_tests::/)'
test-group = 'ecstore-serial-flaky'
# Serialize the replacement bucket metadata heal test. It builds a real-disk
# hermetic erasure set, writes bucket metadata, then asserts byte-identical
# xl.meta readback after a rejected delayed repair. Under parallel load,
# concurrent ecstore tests mutate the process-wide disk registry and alter
# the serialized timestamp/disk-identity fields, flipping the assertion.
# Preventive serialization only, no retries.
[[profile.default.overrides]]
filter = 'package(rustfs-ecstore) & test(replacement_bucket_metadata_respects_pool_ownership_and_required_records)'
test-group = 'ecstore-serial-flaky'
# Serialize the metadata-cache generation-retirement pair. Both carry
# #[serial(metadata_cache_invalidation_probe)] — a no-op across nextest's
# process boundary — and assert get_object_metadata_cache generation
@@ -229,40 +132,6 @@ test-group = 'ecstore-serial-flaky'
filter = 'package(rustfs) & (binary(/^embedded.*_test$/) | binary(admin_diagnostic_capability_e2e))'
test-group = 'embedded-test-ports'
# Registration, inventory delivery, and real drive/object probes include
# filesystem or HTTP IO in short deadlines. Reserve capacity so sibling test
# processes cannot exhaust those budgets. Keep deadlines and assertions intact.
# The short HTTP fixtures are tracked in rustfs/backlog#2714.
[[profile.default.overrides]]
filter = 'package(rustfs) & (binary(/^connect_registration$/) | binary(connect_inventory) | binary(connect_perf_drive) | (binary(connect_perf_client) & test(=configured_proxy_and_direct_endpoint_failures_are_distinct)) | (binary(connect_perf_object) & test(/^(real_rustfs_endpoint_and_production_cli_support_bounded_get_and_put|cleanup_uses_a_budget_independent_of_the_measurement_window|cleanup_accepts_missing_object_and_still_deletes_the_bucket|cleanup_diagnostics_identify_each_disconnected_transport_stage|cleanup_diagnostics_identify_each_failed_http_stage_without_private_context|cleanup_diagnostics_identify_timeouts_without_resetting_the_shared_deadline|oversized_response_is_rejected_without_buffering_it)$/)))'
threads-required = "num-test-threads"
# This cancellation probe hashes the serving executable before acquiring its
# collector lease. Keep competing test processes out of its 30s startup budget.
[[profile.default.overrides]]
filter = 'package(rustfs) & test(=connect::diagnostics::trace_runtime::tests::local_runtime_profile_cancellation_waits_for_lease_release)'
threads-required = "num-test-threads"
# These real IAM/state fixtures keep production lock-acquisition limits while
# peers complete durable IO. Reserve capacity from unrelated test processes;
# the shared fixture's durable_iam_state_ prefix keeps the whole family together.
[[profile.default.overrides]]
filter = 'package(rustfs) & test(/^admin::handlers::site_replication::tests::durable_iam_state_/)'
threads-required = "num-test-threads"
# Real target-repair and rebalance-stop fixtures commit durable metadata while
# peers wait on production locks or bounded cancellation checks. Reserve IO
# capacity for each fixture; its internal races and deadlines remain intact.
[[profile.default.overrides]]
filter = 'package(rustfs) & test(/^admin::handlers::(replication::target_repair_tests::|rebalance::rebalance_handler_tests::real_admin_stop_)/)'
threads-required = "num-test-threads"
# Reserve capacity for these short heartbeat TLS/fsync probes (rustfs#8129).
# Their existing deadlines, assertions, and retry policy remain in force.
[[profile.default.overrides]]
filter = 'package(rustfs) & binary(connect_heartbeat) & test(/^(restart_replays_pending_request_then_advances_sequence|restart_replays_exact_legacy_capabilities_with_and_without_jobs)$/)'
threads-required = "num-test-threads"
# Serialize the durable manual-transition checkpoint test across nextest's
# process boundary; it mutates bucket lifecycle metadata and is not quarantined.
[[profile.default.overrides]]
@@ -343,25 +212,12 @@ test-group = 'e2e-cluster-nightly'
filter = 'package(e2e_test) & (test(/^kms::kms_vault_test::/) | test(/^kms::kms_rekey_sweep_test::/) | test(/^kms::configured_roundtrip_test::test_configured_vault_kms_admin_and_versioned_cleanup$/))'
test-group = 'e2e-vault'
# These server-heavy smoke cases perform 1k+ sequential S3 writes or run the
# scanner and a remote tier server together. Reserve the full test budget so
# unrelated E2E processes cannot starve their storage and polling deadlines.
[[profile.default.overrides]]
filter = 'package(e2e_test) & (test(/^list_objects_v2_pagination_test::tests::(test_list_objects_v2_delimiter_small_page_traverses_all|test_list_objects_v2_max_keys_above_limit_returns_token|test_list_objects_v2_maxkeys_above_limit_with_delimiter)$/) | test(=reliant::tiering::test_hermetic_transition_restore_failure_expiry_and_retry))'
threads-required = "num-test-threads"
# This four-disk, 65-member rollback probe already drives up to 32 concurrent
# durable deletions. Reserve this nextest run's capacity for its progress oracle.
[[profile.default.overrides]]
filter = 'package(rustfs-ecstore) & test(=store::init::tests::dispatch_manifest_rollback_bounded_concurrency_reaches_tail_behind_slow_member)'
threads-required = "num-test-threads"
# These short-deadline real-disk progress probes need the test run's capacity
# for scanner and object-lock handoffs; keep their assertions and deadlines.
[[profile.default.overrides]]
filter = '(package(rustfs-scanner) & (test(=scanner::tests::cycle_persist_failure::later_cycle_post_commit_failure_reloads_durable_state) | test(=scanner::tests::running_main_loop_catches_up_pause_cleared_after_startup_observe))) | (package(rustfs-ecstore) & test(=store::init::tests::restored_transitioned_delete_causally_enqueues_free_version))'
threads-required = "num-test-threads"
# ---------------------------------------------------------------------------
# ci profile — the strict CI gate (ci.yml `cargo nextest run --profile ci`)
# ---------------------------------------------------------------------------
@@ -377,114 +233,24 @@ fail-fast = false
# marker is the observable signal the flake policy is built around.
path = "junit.xml"
# Match the local durable-progress reservations. All members, deadlines,
# assertions, and internal concurrency remain enabled without retries.
[[profile.ci.overrides]]
filter = """
package(rustfs-ecstore) & (
test(/^set_disk::ops::multipart::tests::complete_multipart_(quorum_success_releases_logical_guards_before_physical_tail|waits_for_tail_before_releasing_guards_and_marking_capacity)$/)
| test(=store::heal::tests::full_format_heal_lost_after_last_save_does_not_publish_or_renew_and_latches)
| test(/^store::init::tests::(decommission_durable_ilm_receipt_pagination_fails_closed_on_second_page|dispatch_manifest_shutdown_(drains_admitted_delete_batch_without_tail_admission|stops_aborting_validation_tail_reads|stops_authorized_tail_reads_before_receipt_or_cas))$/)
| (binary(metadata_read_lock_reuse_test) & test(=replica_multipart_completes_while_metadata_writer_waits_for_its_snapshot))
)
"""
threads-required = "num-test-threads"
[[profile.ci.overrides]]
filter = 'package(rustfs) & test(/^connect::diagnostics::schedule::tests::/)'
threads-required = "num-test-threads"
[[profile.ci.overrides]]
filter = 'package(rustfs-ecstore) & (test(/^set_disk::tests::streaming_get_blocks_concurrent_/) | test(=store::object::tests::retired_marker_converges_after_bucket_recreation_on_sixteen_disks))'
threads-required = "num-test-threads"
# These real-disk lock probes must finish durable IO within production's 5s
# acquisition budget. Reserve capacity from sibling test processes while
# preserving the probes' internal concurrency, deadlines, and assertions.
[[profile.ci.overrides]]
filter = '(package(rustfs-ecstore) & (test(/^core::pools_test::decommission_lock_order_tests::(active_decommission_migration_does_not_invert_capacity_and_delete_object(_tag)?_locks|decommission_moves_a_transitioned_version_expired_by_a_delete_all_rule_without_stalling)$/) | test(=services::integrity::tests::audit_migration_and_ack_recovery_preserve_source_and_reject_conflicts))) | (package(rustfs-heal) & test(=heal::mrf_queue::partial_write::tests::durable_retry_submission_error_keeps_checkpoint_and_uses_backoff))'
threads-required = "num-test-threads"
# These eight-disk decommission fixtures exercise concurrent retries,
# free-version cleanup, and real capacity probes under production lock deadlines.
# Reserve the run's capacity so unrelated IO cannot exhaust those budgets.
[[profile.ci.overrides]]
filter = 'package(rustfs-ecstore) & (test(/^store::init::tests::decommission_entry_(retries_source_changed_without_canceling_other_bucket|skips_cleanup_only_marker_when_free_version_is_present)$/) | test(=core::pools::tests::decommission_capacity_mutation_limits_prewrite_sampling_to_target))'
threads-required = "num-test-threads"
# This registration/backup lock probe uses an isolated eight-disk store.
# Reserve capacity so sibling disk-heavy tests cannot consume its 2s
# registration budget; retain the queued backup and deadlock assertions.
[[profile.ci.overrides]]
filter = 'package(rustfs) & test(=admin::handlers::table_catalog::tests::cold_object_registration_completes_while_other_bucket_backup_waits)'
threads-required = "num-test-threads"
[[profile.ci.overrides]]
filter = 'package(rustfs-heal) & (binary(mrf_partial_write_test) | (binary(mrf_pipeline_test) & test(/^journal_replay_survives_/)) | test(=admin_selector_survives_sigkill_with_original_scope_and_receipts))'
threads-required = "num-test-threads"
# Native scanner backlog fixtures include 24-set and pool-expansion cases.
# Reserve capacity across test processes while preserving each scenario's fixed
# budget, assertions, and internal concurrency.
[[profile.ci.overrides]]
filter = 'package(rustfs-scanner) & (test(/^scanner::backlog::tests::native_/) | test(=scanner_folder::tests::mrf_ownership::mrf_ownership_manager_completion_preserves_scanner_pending) | test(/^scanner_io::tests::service_cohort::/))'
threads-required = "num-test-threads"
# Keep short-deadline real-disk progress probes from competing with unrelated
# tests for scanner and object-lock capacity. Assertions and deadlines stay on.
[[profile.ci.overrides]]
filter = '(package(rustfs-scanner) & (test(=scanner::tests::cycle_persist_failure::later_cycle_post_commit_failure_reloads_durable_state) | test(=scanner::tests::running_main_loop_catches_up_pause_cleared_after_startup_observe))) | (package(rustfs-ecstore) & test(=store::init::tests::restored_transitioned_delete_causally_enqueues_free_version))'
threads-required = "num-test-threads"
# Emit this expensive fixture's stage timings in CI and use tmpfs when safe.
[[profile.ci.overrides]]
filter = 'package(rustfs-ecstore) & test(=store::init::tests::decommission_durable_ilm_receipt_pagination_fails_closed_on_second_page)'
success-output = 'immediate'
[[profile.ci.scripts]]
filter = 'package(rustfs-ecstore) & test(=store::init::tests::decommission_durable_ilm_receipt_pagination_fails_closed_on_second_page)'
setup = 'ecstore-receipt-tmpdir'
[[profile.ci.scripts]]
filter = 'package(rustfs-ecstore) & test(/^(bucket::lifecycle::bucket_lifecycle_ops::tests::manual_transition_worker_result_recovery_marks_unknown_for_corrupt_marker|services::rebalance::entry::tests::real_rebalance_run_fence_loss_blocks_multipart_publication|store::init::tests::(batch_transitioned_delete_uses_free_version_per_item|decommission_entry_(allows_free_version_consumed_before_source_lock|rejects_subquorum_free_version_conflict_and_retains_source|skips_cleanup_only_marker_when_free_version_is_present)|dispatched_tier_delete_recovery_(checks_later_pool_then_commits_after_source_removal|finds_directory_source_on_encoded_set|retains_journal_on_source_metadata_error)|force_tier_remove_blocks_on_physical_free_version_hidden_by_other_pool|legacy_unknown_transition_delete_falls_back_for_single_batch_and_blocks_prefix|multi_pool_(recursive_prefix_rejects_legacy_or_hidden_merge_loser_before_delete|same_remote_tuple_(batch|single)_delete_waits_for_all_sources|same_tuple_recursive_prefix_uses_one_journal_owner|transitioned_delete_persists_one_free_version_per_remote_tuple)|recursive_prefix_partial_(pool|set)_failure_keeps_prepared_cleanup_owners|restored_transitioned_delete_uses_free_version_as_cleanup_owner|stable_transitioned_recursive_prefix_delete_uses_journal_owners|suspended_null_transition_delete_uses_free_version_as_sole_owner|tier_mutation_peer_handler_applies_prepare_commit_and_abort_idempotently|transition_response_loss_persists_unknown_outcome_for_provider_recovery|transition_transaction_recovery_(drops_record_after_confirmed_local_commit|keeps_cleanup_pending_local_commit)|transitioned_delete_(free_version_replays_after_store_restart|local_quorum_failure_rolls_back_without_cleanup_owner|uses_free_version_as_cleanup_owner)|versioned_delete_marker_keeps_transitioned_source_and_remote_object|versioned_explicit_transition_delete_preserves_other_version_then_allows_bucket_delete))$/)'
setup = 'ecstore-large-stack'
# These cross-crate real-storage fixtures need the same bounded stack as ECStore tests.
[[profile.ci.scripts]]
filter = '(package(rustfs) & test(/^(admin::handlers::replication::target_repair_tests::[a-z_]+|admin::handlers::plugin_attempt::v2_tests::delegation_v2_persists_and_vends_with_real_parent_intersection|admin::handlers::site_replication::tests::durable_iam_state_apply_iam_item_rejects_a_stale_recreate_after_a_replicated_delete|admin::service::federated_identity::tests::(binding_keeps_explicit_iam_mapping_strict|markerless_legacy_oidc_session_crosses_auth_and_iam_deletion_boundaries)|storage::scanner_dirty_journal::tests::(clear_callback_keeps_unknown_coverage_until_all_pending_work_is_confirmed|owned_journals_keep_peer_records_after_interleaved_writes_and_clear))$/)) | (package(rustfs-heal) & ((binary(heal_b5_versioned_regression_test) & test(/^serial_tests::(test_heal_unversioned_bucket_e2e|test_historical_null_recursive_heal_restores_physical_versions|test_recursive_deep_heal_reports_stale_delete_marker_repair)$/)) | (binary(usage_observation_read_repair_test) & test(=usage_observation_read_repair_survives_snapshot_cleanup)))) | (package(rustfs-test-utils) & test(=data_usage_snapshot_tests::data_usage_snapshot_recovery_wires_primary_backup_and_negative_cache))'
setup = 'ecstore-base-stack'
[[profile.ci.scripts]]
filter = 'package(rustfs-ecstore) | package(rustfs-s3select-api) | package(rustfs-scanner) | (package(rustfs) & test(/^(app::multipart_usecase::tests::concurrent_completions_share_durable_bucket_quota_reservations|app::object::delete::tests::compressed_delete_requests_update_observed_usage_without_releasing_quota_floor|app::object::internal_put::tests::internal_multipart_roundtrip_completes_and_abort_leaves_nothing|app::object::restore::tests::execute_restore_object_maps_failures_to_typed_s3_errors|storage::access::tests::(delete_object_access_captures_authorized_bucket_incarnation|copy_operations_reject_recreated_source_bucket_after_authorization|request_slot_keeps_bucket_policy_bound_to_its_store))$/))'
setup = 'ecstore-base-stack'
[[profile.ci.scripts]]
filter = 'package(rustfs) & (test(/^admin::handlers::table_catalog::tests::/) | test(/^table_catalog::store::tests::/) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body))'
setup = 'ecstore-base-stack'
[[profile.ci.scripts]]
filter = 'binary(lifecycle_integration_test) | (package(rustfs) & test(/^app::lifecycle_transition_api_test::/))'
setup = 'lifecycle-large-stack'
# This conditional GET fixture composes real-store futures that overflowed
# the default Linux test-thread stack.
# The pool metadata placement regression composes the full erasure-heal
# startup future and overflows the default Linux test-thread stack.
[[profile.ci.scripts]]
filter = 'package(rustfs) & test(=app::object::get::tests::conditional_get_304_uses_metadata_without_decoding_damaged_data)'
filter = 'package(rustfs-heal) & test(=replacement_pool_metadata_follows_real_two_set_placement)'
setup = 'ecstore-large-stack'
# These heal fixtures compose deep real-store recovery futures that can
# overflow the default Linux test-thread stack.
[[profile.ci.scripts]]
filter = 'package(rustfs-heal) & (test(=replacement_pool_metadata_follows_real_two_set_placement) | (binary(heal_integration_test) & test(=bucket_removal_recovers_delete_proofs_before_removing_empty_volumes)))'
setup = 'ecstore-large-stack'
# These real-disk scanner fixtures assert quiet-workload publication and
# durable MRF admission. Reserve the pool while their bounded CAS/fsync
# handoffs run so unrelated disk fanouts cannot consume that fixture budget.
[[profile.ci.overrides]]
filter = 'package(rustfs-scanner) & (test(=scanner_folder::tests::mrf_ownership::mrf_ownership_manager_completion_preserves_scanner_pending) | test(=scanner_io::tests::multi_pool_scanner_cycle_publishes_combined_usage) | test(=scanner_io::tests::pending_put_commit_keeps_scanner_walk_live_without_authoritative_usage) | test(=scanner_folder::tests::mrf_ownership::checkpoint_fixture_metadata_heal_reaches_budgeted_tail))'
threads-required = "num-test-threads"
# ===========================================================================
# QUARANTINE — flaky tests granted retries = 2 under the ci profile ONLY.
#
@@ -510,6 +276,13 @@ retries = 2
filter = 'package(rustfs-ecstore) & (test(concurrent_resend_same_part_commits_one_generation) | test(concurrent_config_writes_from_separate_nodes_do_not_lose_writes))'
test-group = 'ecstore-serial-flaky'
# QUARANTINE: OPEN rustfs#4690 — walk_dir stall-budget accounting test depends
# on producer/consumer timing windows that stretch past the budget on loaded
# CI runners (regression test for rustfs#4644; failed on a zero-Rust-diff PR).
[[profile.ci.overrides]]
filter = 'package(rustfs-ecstore) & test(walk_dir_does_not_charge_consumer_backpressure_to_the_stall_budget)'
retries = 2
# Serialize the relocated-pool GET resume regression under the ci profile too
# (see the matching default-profile override near the top). No longer a
# quarantine: the fixture race (rustfs#6701/rustfs#6703) was fixed by #6707,
@@ -541,11 +314,6 @@ test-group = 'ecstore-serial-flaky'
filter = 'package(rustfs-ecstore) & test(/^set_disk::ops::heal::heal_result_report_tests::/)'
test-group = 'ecstore-serial-flaky'
# Serialize the replacement bucket metadata heal test under the ci profile too.
[[profile.ci.overrides]]
filter = 'package(rustfs-ecstore) & test(replacement_bucket_metadata_respects_pool_ownership_and_required_records)'
test-group = 'ecstore-serial-flaky'
# Serialize the metadata-cache generation-retirement pair under the ci
# profile too (see the matching default-profile override near the top). Not a
# quarantine: no retries.
@@ -559,33 +327,6 @@ test-group = 'ecstore-serial-flaky'
filter = 'package(rustfs) & (binary(/^embedded.*_test$/) | binary(admin_diagnostic_capability_e2e))'
test-group = 'embedded-test-ports'
[[profile.ci.overrides]]
filter = 'package(rustfs) & (binary(/^connect_registration$/) | binary(connect_inventory) | binary(connect_perf_drive) | (binary(connect_perf_client) & test(=configured_proxy_and_direct_endpoint_failures_are_distinct)) | (binary(connect_perf_object) & test(/^(real_rustfs_endpoint_and_production_cli_support_bounded_get_and_put|cleanup_uses_a_budget_independent_of_the_measurement_window|cleanup_accepts_missing_object_and_still_deletes_the_bucket|cleanup_diagnostics_identify_each_disconnected_transport_stage|cleanup_diagnostics_identify_each_failed_http_stage_without_private_context|cleanup_diagnostics_identify_timeouts_without_resetting_the_shared_deadline|oversized_response_is_rejected_without_buffering_it)$/)))'
threads-required = "num-test-threads"
# Preserve the cancellation probe's startup budget and assertions in CI too.
[[profile.ci.overrides]]
filter = 'package(rustfs) & test(=connect::diagnostics::trace_runtime::tests::local_runtime_profile_cancellation_waits_for_lease_release)'
threads-required = "num-test-threads"
# Keep the same IAM/state fixture capacity reservation in CI without changing the
# production lock deadline, internal concurrency, assertions, or retry policy.
[[profile.ci.overrides]]
filter = 'package(rustfs) & test(/^admin::handlers::site_replication::tests::durable_iam_state_/)'
threads-required = "num-test-threads"
# Match the real admin fixture capacity reservation without retries or changes
# to production lock deadlines, cancellation barriers, or assertions.
[[profile.ci.overrides]]
filter = 'package(rustfs) & test(/^admin::handlers::(replication::target_repair_tests::|rebalance::rebalance_handler_tests::real_admin_stop_)/)'
threads-required = "num-test-threads"
# Reserve capacity for these short heartbeat TLS/fsync probes (rustfs#8129).
# Their existing deadlines, assertions, and retry policy remain in force.
[[profile.ci.overrides]]
filter = 'package(rustfs) & binary(connect_heartbeat) & test(/^(restart_replays_pending_request_then_advances_sequence|restart_replays_exact_legacy_capabilities_with_and_without_jobs)$/)'
threads-required = "num-test-threads"
# Serialize the durable manual-transition checkpoint test under the ci profile
# too. No retries: failures stay visible.
[[profile.ci.overrides]]
@@ -710,24 +451,13 @@ test-group = 'ecstore-serial-flaky'
# the PR-lane e2e coverage for scanner usage snapshots consumed by quota and
# admin surfaces. It uses the same single-node, random-port, isolated-temp-dir
# fixture as the existing smoke modules.
#
# Dual-stack differential (rustfs/backlog#2740): `dual_stack_differential::`
# starts two single-node servers from the same binary, one per
# RUSTFS_S3_STACK value, on random ports with isolated temp dirs, and runs one
# SDK script covering every operation of `impl S3 for FS` against both. Its
# comparator unit tests need no server. It meets the admission criteria
# unchanged; the module clause admits a new differential test without another
# filter edit.
[profile.e2e-smoke]
default-filter = """
package(e2e_test) & (
test(/^(delete_marker_migration_semantics|version_id_regression|list_objects_v2_pagination|list_object_versions_regression|list_objects_duplicates|list_buckets_double_slash|list_buckets_auth|list_buckets_iam_filter|leading_slash_key|special_chars|create_bucket_region|delete_objects_versioning|head_object_consistency|head_object_range|copy_object_metadata|copy_object_tagging|copy_source_invalid_date|content_encoding|compression|multipart_storage_class|multipart_upload_id|storage_class_capability|ssec_copy|anonymous_access|bucket_policy_check|presigned_negative|negative_sigv4|admin_auth|notification_webhook|tls_hot_reload|console_smoke|admin_iam_crud|admin_pools|sts_query_compat|data_usage)_test::|^fake_s3_target::/)
test(/^(delete_marker_migration_semantics|version_id_regression|list_objects_v2_pagination|list_object_versions_regression|list_objects_duplicates|list_buckets_double_slash|list_buckets_auth|list_buckets_iam_filter|leading_slash_key|special_chars|create_bucket_region|delete_objects_versioning|head_object_consistency|head_object_range|copy_object_metadata|copy_object_tagging|copy_source_invalid_date|content_encoding|compression|multipart_storage_class|storage_class_capability|ssec_copy|anonymous_access|bucket_policy_check|presigned_negative|negative_sigv4|admin_auth|notification_webhook|tls_hot_reload|console_smoke|admin_iam_crud|admin_pools|sts_query_compat|data_usage)_test::|^fake_s3_target::/)
| test(/^replication_extension_test::(test_replication_check_succeeds_with_remote_target|test_replication_check_rejects_target_without_object_lock|test_set_remote_target_rejects_unversioned_source_bucket|test_replication_check_rejects_unversioned_source_bucket|test_replication_check_rejects_missing_replication_config|test_replication_check_rejects_invalid_bucket|test_set_remote_target_rejects_same_bucket_on_same_deployment|test_set_remote_target_rejects_unversioned_target_bucket|test_set_remote_target_update_requires_arn|test_set_remote_target_update_rejects_missing_target|test_set_remote_target_rejects_invalid_target_url|test_set_remote_target_rejects_self_signed_https_target_without_skip_tls_verify|test_set_remote_target_rejects_private_ca_https_target_without_ca_cert_pem|test_list_remote_targets_rejects_empty_bucket|test_list_remote_targets_rejects_invalid_bucket|test_remove_remote_target_rejects_missing_target|test_remove_remote_target_rejects_missing_arn|test_remove_remote_target_rejects_invalid_bucket|test_remove_remote_target_rejects_target_used_by_replication|test_delete_bucket_replication_removes_remote_target)$/)
| test(/^reliant::lifecycle::/)
| test(/^conditional_delete_objects_test::/)
| test(/^reliant::tiering::/)
| test(/^dual_stack_differential::/)
| test(/^upgrade_compatibility_test::upgrade_write_readiness_tests::/)
| test(/^on_demand_migration::(get_basic_test::(get_miss_pulls_inline_and_serves_locally_afterwards|head_miss_answers_from_the_source_without_persisting)|interaction_test::test_odm_admin_config_is_redacted_and_status_counts_match_the_source)$/)
)
"""
@@ -736,16 +466,13 @@ fail-fast = false
[profile.e2e-smoke.junit]
path = "junit.xml"
# Bound the whole pagination fixture, including startup, seeding, and cleanup;
# its LIST deadline begins only after the seed objects have been written.
# The pagination boundary cases can stall when a server/listing regression
# prevents the continuation request from completing. Keep the timeout scoped
# to those known failure modes so legitimate lifecycle/tiering waits retain
# their test-level timing budget.
[[profile.e2e-smoke.overrides]]
filter = 'package(e2e_test) & test(/^list_objects_v2_pagination_test::tests::(test_list_objects_v2_delimiter_small_page_traverses_all|test_list_objects_v2_max_keys_above_limit_returns_token|test_list_objects_v2_maxkeys_above_limit_with_delimiter)$/)'
slow-timeout = { period = "60s", terminate-after = 2, grace-period = "10s" }
threads-required = "num-test-threads"
[[profile.e2e-smoke.overrides]]
filter = 'package(e2e_test) & test(=reliant::tiering::test_hermetic_transition_restore_failure_expiry_and_retry)'
threads-required = "num-test-threads"
# ---------------------------------------------------------------------------
# e2e-repl-nightly profile — scheduled full replication e2e lane (repl-1)
@@ -848,7 +575,7 @@ slow-timeout = { period = "120s", terminate-after = 12, grace-period = "10s" }
# ---------------------------------------------------------------------------
# e2e-distributed profile — 4-node 4-disk Actions suite
# ---------------------------------------------------------------------------
# Nightly and manual-dispatch lane owned by
# Storage-sensitive PR / nightly / dispatch lane owned by
# .github/workflows/e2e-distributed.yml.
# Each case starts four rustfs processes (and for site replication, two
# clusters). Upgrade cases also require RUSTFS_UPGRADE_SOURCE_BINARY.
@@ -946,10 +673,6 @@ path = "junit.xml"
# parallel-safe — the same property e2e-smoke relies on. The exceptions are the
# 4-disk reliability / degraded-read fault-injection tests, multi-node heal
# clusters, and the fixed-port Vault tests, all serialized below.
# `dual_stack_differential::reference::` holds hermetic unit tests of how the
# differential picks side A (shell-script stand-ins, no server, no reference
# binary). They already run on every pull request in e2e-smoke, so e2e-full
# excludes them to keep its selection digest unchanged.
[profile.e2e-full]
default-filter = """
package(e2e_test)
@@ -959,8 +682,6 @@ default-filter = """
& !test(/^replication_extension_test::/)
& !test(/^replication_target_matrix_test::/)
& !test(/^on_demand_migration::(concurrency_test|fault_test|interop_test|real_source_test)::/)
& !test(/^upgrade_compatibility_test::upgrade_write_readiness_tests::/)
& !test(/^dual_stack_differential::reference::/)
"""
fail-fast = false
@@ -986,38 +707,6 @@ test-group = 'e2e-inline-boundaries'
filter = 'package(e2e_test) & test(/^heal_erasure_disk_rebuild_test::/)'
test-group = 'e2e-cluster-nightly'
# The multi-pool crash fixture seeds three nodes and 36 drives. Reserve this
# nextest run's workers so other multi-node tests do not starve its deadline.
[[profile.e2e-full.overrides]]
filter = 'package(e2e_test) & test(=heal_erasure_disk_rebuild_test::tests::test_cluster_root_heal_recovers_ec84_shards_across_multi_pool_after_background_target_crash)'
threads-required = "num-test-threads"
[[profile.e2e-full.overrides]]
filter = 'package(e2e_test) & (test(/^kms::kms_vault_test::/) | test(/^kms::kms_rekey_sweep_test::/) | test(/^kms::configured_roundtrip_test::test_configured_vault_kms_admin_and_versioned_cleanup$/))'
test-group = 'e2e-vault'
# Keep the storage-heavy smoke cases isolated in the full suite too. They
# start multiple server fixtures and issue many sequential S3 operations.
[[profile.e2e-full.overrides]]
filter = 'package(e2e_test) & (test(/^list_objects_v2_pagination_test::tests::(test_list_objects_v2_delimiter_small_page_traverses_all|test_list_objects_v2_max_keys_above_limit_returns_token|test_list_objects_v2_maxkeys_above_limit_with_delimiter)$/) | test(=reliant::tiering::test_hermetic_transition_restore_failure_expiry_and_retry))'
threads-required = "num-test-threads"
# The mc fixture uploads hundreds of objects concurrently before measuring listing.
# Reserve the runner so other server fixtures do not starve its disk operations.
[[profile.e2e-full.overrides]]
filter = 'package(e2e_test) & test(=mc_mirror_small_bucket_test::test_mc_mirror_small_bucket_completes_without_list_timeout)'
threads-required = "num-test-threads"
# Fixed, small contract for every executable server change. These existing
# scenarios exercise write/read, anonymous denial and retained bytes on restart.
[profile.core-contract]
default-filter = '''
package(e2e_test) & test(/^(anonymous_access_test::test_anonymous_access_denied_when_restrict_public_buckets_enabled|head_object_consistency_test::head_object_consistency_after_write_and_multipart_and_presigned_head|storage_class_capability_test::tests::historical_label_only_metadata_is_standard_without_hiding_a_real_transition_tier)$/)
'''
retries = 0
fail-fast = false
test-threads = 1
slow-timeout = { period = "60s", terminate-after = 3 }
[profile.core-contract.junit]
path = "junit.xml"
-20
View File
@@ -1,20 +0,0 @@
# Pinned RustFS release used as the "reference" target of parity lanes
# (.github/workflows/reference-parity.yml). This is the single place that names
# the reference release; .github/actions/reference-binary resolves, downloads and
# verifies it, and fails on a missing pin, a missing asset or a digest mismatch.
#
# Bumping the reference is a reviewed event: every per-test difference between
# the candidate and the reference is measured against this exact build.
#
# Each sha256 is the value published in the release's SHA256SUMS asset, which
# matches the digest GitHub reports for the same asset. The action checks both.
schema = 1
repository = "rustfs/rustfs"
version = "1.0.5"
tag = "1.0.5"
[platforms.linux-x86_64-gnu]
asset = "rustfs-linux-x86_64-gnu-v1.0.5.zip"
sha256 = "5addae2f74756bf80104d0975e6347cda843bc2daffdfcd1f0cb80118b95cbd0"
executable = "rustfs"
-24
View File
@@ -1,24 +0,0 @@
# Targets of the s3-tests reference parity lane (.github/workflows/reference-parity.yml).
#
# Exactly one target uses `binary = "reference"` (the release pinned in
# .config/reference-binary.toml). Every other target uses `binary = "candidate"`
# (the binary built from the branch under test) and is compared per node id
# against the reference. All targets run the same harness, test list and server
# configuration; `env` adds only the target's own RUSTFS_* settings.
#
# Adding a target is one more [[targets]] table, for example:
#
# [[targets]]
# name = "candidate-gateway"
# binary = "candidate"
# env = { RUSTFS_S3_STACK = "gateway" }
schema = 1
[[targets]]
name = "reference"
binary = "reference"
[[targets]]
name = "candidate-legacy"
binary = "candidate"
-12
View File
@@ -1,12 +0,0 @@
# Tolerated per-test differences of the s3-tests reference parity lane.
#
# One entry per line, four fields separated by " | ":
#
# <target> | <pytest node id> | <tracking issue URL> | <reason>
#
# <target> is a candidate name from .config/reference-parity-targets.toml, the
# node id is exactly as the lane prints it (s3tests/functional/test_s3.py::...),
# and the issue URL is https://github.com/rustfs/<repo>/issues/<number>.
#
# Same semantics as scripts/junit_diff.py --allow: an entry whose difference no
# longer occurs is stale and fails the lane, so remove it when it is fixed.
-135
View File
@@ -1,135 +0,0 @@
{
"schema_version": 1,
"plan_id": "rustfs-release-validation",
"description": "Certification for immutable candidates. All shipped platforms require native identity and startup; stable and prerelease require the pinned upgrade matrix. Linux-only acceptance never authorizes publication.",
"release_types": [
"preview",
"prerelease",
"stable"
],
"targets": [
{
"os": "linux",
"arch": "x86_64",
"abi": "musl"
},
{
"os": "linux",
"arch": "aarch64",
"abi": "musl"
},
{
"os": "linux",
"arch": "x86_64",
"abi": "gnu"
},
{
"os": "linux",
"arch": "aarch64",
"abi": "gnu"
},
{
"os": "macos",
"arch": "aarch64",
"abi": "none"
},
{
"os": "windows",
"arch": "x86_64",
"abi": "msvc"
}
],
"targets_basis": "Platform matrix of .github/workflows/build.yml (prepare-platform-matrix). gnu and macOS targets build with the pyroscope feature; musl and Windows targets build with no extra features.",
"features": [
"pyroscope"
],
"trusted_workflows": [
{
"repository": "rustfs/rustfs",
"workflow_id": "release-candidate.yml"
},
{
"repository": "rustfs/rustfs",
"workflow_id": "release-complete.yml"
}
],
"trusted_workflows_basis": "Receipts are produced by the reviewed main workflows and fetched by exact run ID with GitHub artifact digest verification. Candidate inputs freeze the harness commit separately from product source.",
"lanes": [
{
"lane": "identity",
"harness_repository": "rustfs/rustfs",
"harness_sha": "candidate.workflow_sha",
"harness_basis": "The exact workflow commit is frozen in candidate inputs; no mutable branch is accepted as a harness identity.",
"timeout_seconds": 1800,
"environment_capabilities": [
"process-exec"
],
"cases": [
"artifact-identity",
"startup"
],
"applies_to": {
"release_types": [
"preview",
"prerelease",
"stable"
],
"platforms": "all"
},
"applies_basis": "Artifact identity and startup checks are mandatory for every release type, preview included, on every shipped target (rustfs/backlog#2662 frozen design item 5)."
},
{
"lane": "upgrade",
"harness_repository": "rustfs/rustfs",
"harness_sha": "candidate.workflow_sha",
"harness_basis": "The exact workflow commit is frozen in candidate inputs; no mutable branch is accepted as a harness identity.",
"timeout_seconds": 5400,
"environment_capabilities": [
"process-exec",
"previous-release-artifact"
],
"cases": [
"direct-upgrade",
"mixed-version-upgrade",
"bucket-config-upgrade",
"bucket-config-rollback",
"multipart-layout-upgrade",
"multipart-layout-baseline"
],
"cases_basis": "Case IDs of the pinned previous-release matrix in .github/workflows/e2e-upgrade.yml (source.version/asset/sha256 and the case list mapped there).",
"applies_to": {
"release_types": [
"prerelease",
"stable"
],
"platforms": [
{
"os": "linux",
"arch": "x86_64",
"abi": "gnu"
}
]
},
"applies_basis": "preview releases use the pre-declared smaller set (identity lane only). The upgrade lane is only exercised on linux-x86_64-gnu, the platform of the pinned source assets."
}
],
"upgrade_sources": {
"basis": "Exactly the two previous-release sources pinned in .github/workflows/e2e-upgrade.yml are exercised today (source.version / source.asset / source.sha256). No other N-1/N-2 compatibility is claimed, and these digests are not inferred from tags.",
"sources": [
{
"version": "1.0.1",
"role": "N-1",
"artifact_name": "rustfs-linux-x86_64-gnu-v1.0.1.zip",
"artifact_sha256": "9742e183cb0dfb0d48fa909797af572fe47b7f827569036baa4156e0d3958ee5"
},
{
"version": "1.0.0-rc.5",
"role": "N-2",
"artifact_name": "rustfs-linux-x86_64-gnu-v1.0.0-rc.5.zip",
"artifact_sha256": "3ee8df71e8edcfada533be452c4135868f697bc515460ae97b027313eade7a3d"
}
],
"rollback_supported": false,
"rollback_basis": "Only the bucket-config-rollback case (rollback_to_previous_release_reads_current_bucket_metadata) is exercised. Full data-plane rollback is not certified and is never a default claim."
}
}
-37
View File
@@ -1,37 +0,0 @@
# Files that may still reference s3s (`s3s::` or `s3s_sigv4`) when Phase 1 of
# the gateway migration ends (rustfs/backlog#2734 task T0.6, rustfs/backlog#2741).
# Consumed only by `scripts/check_s3s_footprint.sh --mode allowlist`.
#
# One entry per line: a repository-relative file path or a git `:(glob)`
# pathspec. `**` matches across directories, `*` stays within one path
# component, and a directory entry matches everything under it. Blank lines
# and lines starting with `#` are ignored; an entry may not contain whitespace,
# so a note belongs on its own comment line.
#
# Every Rust file listed by `git grep -l '\bs3s\(::\|_sigv4\)' -- '*.rs'` that
# no entry matches fails the allowlist mode. Task T1.9 switches CI to that
# mode; until then `--dry-run` prints the files still outside this list, which
# is the Phase 1 tracking list.
#
# Never add crates/** other than crates/e2e_test: the engine crates leave s3s
# entirely, and the script rejects such an entry. Only the s3s-facing edge of
# the rustfs binary and the e2e oracle keep it.
# rustfs binary: the s3s-facing edge that survives Phase 1
rustfs/src/storage/ecfs.rs
rustfs/src/storage/s3_compat/**
rustfs/src/storage/access.rs
rustfs/src/auth.rs
rustfs/src/error.rs
rustfs/src/storage_api.rs
rustfs/src/app/storage_api.rs
rustfs/src/admin/router.rs
rustfs/src/app/metadata_route.rs
rustfs/src/server/http.rs
rustfs/src/server/layer.rs
rustfs/src/server/hybrid.rs
rustfs/src/protocols/client.rs
# e2e oracle: the test target that verifies S3 behaviour against s3s
crates/e2e_test/src/fake_s3_target/**
crates/e2e_test/src/**
-17
View File
@@ -1,17 +0,0 @@
# Exact baseline for the direct s3s footprint, consumed only by
# scripts/check_s3s_footprint.sh (rustfs/backlog#1677; rustfs/backlog#2734 T0.4).
#
# Each value is the exact measurement of the tree, not a ceiling. CI fails when a
# measured counter differs from its line here in either direction:
# - a larger measurement means new code widened the s3s surface: route it
# through the gateway abstractions instead; never raise a value here;
# - a smaller measurement means the PR shrank the surface: lower the matching
# value to the measured number in the same PR.
#
# files Rust files referencing s3s paths, repo-wide minus crates/e2e_test
# s3_error_lines lines holding s3_error!, same scope, minus those the script
# header's rule clears (rustfs_s3_types's macro); fails closed
# ecstore_files Rust files referencing s3s paths under crates/ecstore/src
files=63
s3_error_lines=217
ecstore_files=0
-67
View File
@@ -1,67 +0,0 @@
# Per-crate test-count baseline consumed by scripts/check_test_count_ratchet.sh
# (rustfs/backlog#2734 section 1 rule 3; T0.3 in rustfs/backlog#2738).
#
# One row per workspace member: <package>, tests, ignored, tab-separated.
# tests counts #[test], #[tokio::test], #[tokio::test(...)] and #[test_case(...)]
# attribute lines under the package directory; ignored counts #[ignore] and
# #[ignore = "..."]. The tests column is a floor and the ignored column is a
# ceiling: CI fails when a crate's tests fall below its row or its ignored count
# rises above it. Extra tests and fewer ignores pass; --update tightens the rows.
# Lowering a tests row or raising an ignored row is a reviewed statement that
# tests were intentionally removed or ignored; justify it in the PR description.
# Regenerate with:
# scripts/check_test_count_ratchet.sh --update
e2e_test 1026 20
rustfs 6449 64
rustfs-audit 70 0
rustfs-checksums 28 1
rustfs-common 36 0
rustfs-concurrency 87 0
rustfs-config 43 0
rustfs-connect-symbol-catalog 6 0
rustfs-credentials 24 0
rustfs-crypto 67 0
rustfs-data-usage 58 0
rustfs-ecstore 7858 2
rustfs-extension-schema 23 0
rustfs-filemeta 361 0
rustfs-gateway-adapter 74 0
rustfs-heal 1128 3
rustfs-heal-contracts 8 0
rustfs-iam 415 0
rustfs-io-core 52 0
rustfs-io-metrics 157 0
rustfs-keystone 31 0
rustfs-kms 716 25
rustfs-license 2 0
rustfs-lifecycle 156 0
rustfs-lock 182 0
rustfs-log-analyzer 91 0
rustfs-madmin 210 0
rustfs-notify 140 0
rustfs-object-capacity 92 0
rustfs-object-data-cache 141 0
rustfs-obs 387 0
rustfs-policy 758 0
rustfs-protocols 770 1
rustfs-protos 75 0
rustfs-replication 209 0
rustfs-rio 225 1
rustfs-rio-v2 34 6
rustfs-s3-client 71 0
rustfs-s3-ops 8 0
rustfs-s3-types 105 0
rustfs-s3select-api 232 0
rustfs-s3select-query 235 2
rustfs-scanner 1392 20
rustfs-scanner-metrics 90 0
rustfs-security-governance 20 0
rustfs-signer 34 0
rustfs-storage-api 34 0
rustfs-targets 612 26
rustfs-test-utils 1 0
rustfs-tls-runtime 44 0
rustfs-trusted-proxies 72 0
rustfs-utils 253 1
rustfs-zip 30 0
zstd 11 0
+3 -33
View File
@@ -22,9 +22,9 @@ The following files in the project root are essential for Docker operations:
| File | Description | Usage |
| :--- | :--- | :--- |
| **`docker-buildx.sh`** | **Multi-Arch Build Script**<br>Automates building and pushing Docker images for `amd64` and `arm64`. Supports release and dev channels. | `./docker-buildx.sh --push` |
| **`Dockerfile`** | **Production Image (Alpine)**<br>Lightweight image using musl libc. Downloads verified RustFS and `rc` binaries from GitHub Releases and bundles `/etc/rustfs/bootstrap`. | `docker build -t rustfs:latest .` |
| **`Dockerfile.glibc`** | **Production Image (Ubuntu)**<br>Standard image using glibc. Includes the bundled bootstrap configuration. | `docker build -f Dockerfile.glibc .` |
| **`Dockerfile.source`** | **Development Image**<br>Builds RustFS from source code and bundles `rc` and the default bootstrap configuration. | `docker build -f Dockerfile.source .` |
| **`Dockerfile`** | **Production Image (Alpine)**<br>Lightweight image using musl libc. Downloads pre-built binaries from GitHub Releases. | `docker build -t rustfs:latest .` |
| **`Dockerfile.glibc`** | **Production Image (Ubuntu)**<br>Standard image using glibc. Useful if you need specific dynamic libraries. | `docker build -f Dockerfile.glibc .` |
| **`Dockerfile.source`** | **Development Image**<br>Builds RustFS from source code. Includes build tools. Ideal for local development and CI. | `docker build -f Dockerfile.source .` |
### Docker Compose Configurations
@@ -110,36 +110,6 @@ docker compose up -d
---
## Docker Compose environment values
Use map syntax when quoting environment values in YAML:
```yaml
services:
rustfs:
image: rustfs/rustfs:latest
ports:
- "9000:9000"
- "9001:9001"
volumes:
- ./data:/data
- ./logs:/var/log/rustfs
environment:
RUSTFS_ADDRESS: ":9000"
RUSTFS_CONSOLE_ADDRESS: ":9001"
RUSTFS_CONSOLE_ENABLE: "true"
RUSTFS_OBS_LOGGER_LEVEL: error
RUSTFS_OBS_LOG_DIRECTORY: "/var/log/rustfs/"
RUSTFS_ACCESS_KEY: "${RUSTFS_ACCESS_KEY:?Set RUSTFS_ACCESS_KEY}"
RUSTFS_SECRET_KEY: "${RUSTFS_SECRET_KEY:?Set RUSTFS_SECRET_KEY}"
```
Create the host directories and grant the container user write access before starting this example; official images run as UID/GID `10001:10001`. Set both credential variables to your own values, then run `docker compose config` to inspect the resolved configuration locally before `docker compose up -d`. The resolved output includes credentials, so do not share it publicly.
With list syntax, use `- RUSTFS_OBS_LOG_DIRECTORY=/var/log/rustfs/` or quote the whole item as `- "RUSTFS_OBS_LOG_DIRECTORY=/var/log/rustfs/"`. Writing `- RUSTFS_OBS_LOG_DIRECTORY="/var/log/rustfs/"` passes the inner quotes literally, making this a relative path beginning with `"`, which can fail with `mkdir: cannot create directory '"': Permission denied`. This also applies to addresses and credentials: fix every affected list item, rather than only the log directory. The entrypoint preserves configured values, including literal quotes in valid paths and secrets.
---
## 🔧 Common Operations
### Cleaning Up
@@ -1748,7 +1748,7 @@
"uid": "${datasource}"
},
"editorMode": "code",
"expr": "max by (rustfs_cluster_id, job, bucket) (rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id=\"$storage_cluster\", job=~\"$job\", bucket=~\"$bucket\"})",
"expr": "max by (job, bucket) (rustfs_cluster_usage_buckets_objects_count{job=~\"$job\", bucket=~\"$bucket\"})",
"legendFormat": "{{bucket}}",
"range": true,
"refId": "A"
@@ -1848,7 +1848,7 @@
"uid": "${datasource}"
},
"editorMode": "code",
"expr": "max by (rustfs_cluster_id, job, bucket) (rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id=\"$storage_cluster\", job=~\"$job\", bucket=~\"$bucket\"})",
"expr": "max by (job, bucket) (rustfs_cluster_usage_buckets_total_bytes{job=~\"$job\", bucket=~\"$bucket\"})",
"legendFormat": "{{bucket}}",
"range": true,
"refId": "A"
@@ -28,15 +28,6 @@ processors:
check_interval: 1s
limit_mib: 1024
spike_limit_mib: 256
transform/metrics:
error_mode: ignore
metric_statements:
# RustFS process metrics already expose process_pid as a metric label.
# Remove only the duplicate datapoint label and keep the shared resource
# process.pid available to sibling metrics and lock histograms.
- context: datapoint
statements:
- delete_key(attributes, "process_pid") where IsMatch(metric.name, "^rustfs_system_process_")
transform/logs:
error_mode: ignore
log_statements:
@@ -121,7 +112,7 @@ service:
exporters: [ otlp/tempo, otlp/jaeger ]
metrics:
receivers: [ otlp ]
processors: [ transform/metrics, memory_limiter, batch ]
processors: [ batch ]
exporters: [ prometheus ]
logs:
receivers: [ otlp ]
-1
View File
@@ -61,7 +61,6 @@ scrape_configs:
otlp:
promote_resource_attributes:
- service.instance.id
- process.pid
- service.name
- service.namespace
- cloud.availability_zone
@@ -1,48 +0,0 @@
evaluation_interval: 1m
tests:
- name: bucket usage keeps clusters separate and deduplicates reporting nodes
interval: 1m
input_series:
- series: rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="a",job="rustfs",bucket="shared",service_instance_id="a1"}
values: '4096 1024'
- series: rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="a",job="rustfs",bucket="shared",service_instance_id="a2"}
values: '4096 1024'
- series: rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="b",job="rustfs",bucket="shared",service_instance_id="b1"}
values: '65536 65536'
- series: rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="a",job="rustfs",bucket="empty",service_instance_id="a1"}
values: '0 0'
- series: rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id="a",job="rustfs",bucket="shared",service_instance_id="a1"}
values: '3 1'
- series: rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id="a",job="rustfs",bucket="shared",service_instance_id="a2"}
values: '3 1'
- series: rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id="b",job="rustfs",bucket="shared",service_instance_id="b1"}
values: '70 70'
- series: rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id="a",job="rustfs",bucket="empty",service_instance_id="a1"}
values: '0 0'
promql_expr_test:
- expr: max by (rustfs_cluster_id, job, bucket) (rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="a",job=~"rustfs",bucket=~".*"})
eval_time: 1m
exp_samples:
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="shared"}'
value: 1024
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="empty"}'
value: 0
- expr: max by (rustfs_cluster_id, job, bucket) (rustfs_cluster_usage_buckets_objects_count{rustfs_cluster_id="a",job=~"rustfs",bucket=~".*"})
eval_time: 1m
exp_samples:
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="shared"}'
value: 1
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="empty"}'
value: 0
- expr: max by (rustfs_cluster_id, job, bucket) (rustfs_cluster_usage_buckets_total_bytes)
eval_time: 1m
exp_samples:
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="shared"}'
value: 1024
- labels: '{rustfs_cluster_id="a",job="rustfs",bucket="empty"}'
value: 0
- labels: '{rustfs_cluster_id="b",job="rustfs",bucket="shared"}'
value: 65536
- expr: rustfs_cluster_usage_buckets_total_bytes{rustfs_cluster_id="a",bucket="unknown"}
eval_time: 1m
exp_samples: []
-40
View File
@@ -1,40 +0,0 @@
# syntax=docker/dockerfile:1.6
# Copyright 2026 RustFS Team
# Licensed under the Apache License, Version 2.0.
# A compatible native runtime with Python 3.11+, getent and stat is required by
# the isolated fixture's staging/provenance checks. This is a test image.
ARG RUNTIME_BASE=python:3.13-slim-trixie
FROM ${RUNTIME_BASE}
ARG SOURCE_REVISION
ARG BINARY_SHA256
ARG BUILD_PROFILE=dev
COPY rustfs /usr/bin/rustfs
RUN python3 - "$SOURCE_REVISION" "$BINARY_SHA256" "$BUILD_PROFILE" <<'PY'
import hashlib
import os
import re
import shutil
import sys
source, digest, profile = sys.argv[1:]
if not re.fullmatch(r"[0-9a-f]{40}", source):
raise SystemExit("invalid source revision")
if not re.fullmatch(r"[0-9a-f]{64}", digest):
raise SystemExit("invalid binary digest")
if profile not in ("dev", "release"):
raise SystemExit("invalid build profile")
with open("/usr/bin/rustfs", "rb") as binary:
if hashlib.file_digest(binary, "sha256").hexdigest() != digest:
raise SystemExit("binary digest mismatch")
for tool in ("getent", "stat"):
if shutil.which(tool) is None:
raise SystemExit(f"missing runtime tool: {tool}")
os.chmod("/usr/bin/rustfs", 0o755)
PY
LABEL io.rustfs.repro.source_revision="${SOURCE_REVISION}" \
io.rustfs.repro.binary_sha256="${BINARY_SHA256}" \
io.rustfs.repro.build_profile="${BUILD_PROFILE}"
USER 10001:10001
ENTRYPOINT ["/usr/bin/rustfs"]
-5
View File
@@ -1,5 +0,0 @@
{
"context": {
"fileName": "AGENTS.md"
}
}
+20 -6
View File
@@ -4,15 +4,29 @@ Applies to `.github/`.
## Pull Requests
PR conventions (English title/body, template usage, `--body-file` with the heredoc pattern, review-thread etiquette) live in [Git and PR rules](../.agents/references/pull-requests.md); do not duplicate them here.
PR conventions (English title/body, template usage, `--body-file` with the
heredoc pattern, review-thread etiquette) live in the root `AGENTS.md` under
"Git and PR Baseline" — that section is the single normative home; do not
duplicate its rules here.
## Workflow Changes
- Changes to workflow YAML or `.github/actionlint.yaml` must pass `actionlint` (run from the repo root) with zero findings before commit/PR. Install via `brew install actionlint`, or the download script in the actionlint repo (rhysd/actionlint); `make pre-pr` does not cover workflow files, so this is the required check for them.
- Custom self-hosted runner labels (`sm-standard-*`, `dind-*`) are declared in `.github/actionlint.yaml`. When introducing a new `runs-on:` label, declare it there in the same change. Never use the config or `-ignore` to silence real findings — fix the workflow (root `AGENTS.md`: make checks pass by fixing the cause, not by weakening the gate).
- If `shellcheck` is installed, actionlint also lints `run:` scripts; treat those findings as part of the gate.
- Runner placement and billing rules live in `.github/workflows/README.md`. A new job defaults to `ubuntu-latest` (free for this public repository); a self-hosted `runs-on` needs one of the reasons listed there, stated in a comment next to it, and a `rust-cache` key is never shared between the hosted and self-hosted images.
- Any change touching `.github/workflows/` must pass `actionlint` (run from
the repo root) with zero findings before commit/PR. Install via
`brew install actionlint`, or the download script in the actionlint repo
(rhysd/actionlint); `make pre-pr` does not cover workflow files, so this is
the required check for them.
- Custom self-hosted runner labels (`sm-standard-*`, `dind-*`) are declared
in `.github/actionlint.yaml`. When introducing a new `runs-on:` label,
declare it there in the same change. Never use the config or `-ignore` to
silence real findings — fix the workflow (root `AGENTS.md`: make checks
pass by fixing the cause, not by weakening the gate).
- If `shellcheck` is installed, actionlint also lints `run:` scripts; treat
those findings as part of the gate.
## CI Alignment
When changing CI-sensitive behavior, keep local validation aligned with `.github/workflows/ci.yml`. Read the workflow file directly for the current gate steps — do not rely on (or add) a copied command list here; copies go stale. `make pre-pr` covers the shared local gates, not the full CI feature, platform, or end-to-end matrix. Select checks using the root verification tiers.
When changing CI-sensitive behavior, keep local validation aligned with
`.github/workflows/ci.yml`. Read the workflow file directly for the current
gate steps — do not rely on (or add) a copied command list here; copies go
stale. `make pre-pr` is the local equivalent of the main gate.
+38
View File
@@ -0,0 +1,38 @@
---
name: Bug report
about: Create a report to help us improve
title: ''
labels: ''
assignees: ''
---
**Describe the bug**
A clear and concise description of what the bug is.
**To Reproduce**
Steps to reproduce the behavior:
1. Go to '...'
2. Click on '....'
3. Scroll down to '....'
4. See error
**Expected behavior**
A clear and concise description of what you expected to happen.
**Screenshots**
If applicable, add screenshots to help explain your problem.
**Desktop (please complete the following information):**
- OS: [e.g. iOS]
- Browser [e.g. chrome, safari]
- Version [e.g. 22]
**Smartphone (please complete the following information):**
- Device: [e.g. iPhone6]
- OS: [e.g. iOS8.1]
- Browser [e.g. stock browser, safari]
- Version [e.g. 22]
**Additional context**
Add any other context about the problem here.
-110
View File
@@ -1,110 +0,0 @@
name: Bug report
description: Create a report to help us improve
body:
- type: markdown
attributes:
value: |
### Storage support requirements
**Supported:** local disks, SAN (Fibre Channel) attached volumes, or JBOD-mounted disks. We recommend formatting them with the **XFS** file system.
**Not supported:** NFS, SMB/Samba/CIFS, and other remote or shared filesystems as RustFS data directories. This also applies to the underlying host storage for Docker volumes and Kubernetes PersistentVolumes.
Reports that only reproduce on unsupported storage will be closed without investigation. Please reproduce the issue on supported storage before submitting a bug report.
See [Disk Planning and File System Selection](https://docs.rustfs.com/en/installation/linux/prerequisites-and-service) for details.
- type: checkboxes
id: storage-support
attributes:
label: Supported storage confirmation
options:
- label: I have reproduced this issue with all RustFS data directories on supported storage (local disks, SAN/Fibre Channel, or JBOD; XFS recommended), without NFS, SMB/Samba/CIFS, or other remote or shared filesystem mounts, including storage backing Docker volumes and Kubernetes PersistentVolumes.
required: true
- type: textarea
id: bug-description
attributes:
label: Describe the bug
description: A clear and concise description of what happened.
validations:
required: true
- type: textarea
id: reproduction-steps
attributes:
label: Steps to reproduce
description: Include the commands, configuration, or actions needed to reproduce the problem.
placeholder: |
1. Start RustFS with ...
2. Run ...
3. Observe ...
validations:
required: true
- type: textarea
id: expected-behavior
attributes:
label: Expected behavior
description: A clear and concise description of what you expected to happen.
validations:
required: true
- type: input
id: rustfs-version
attributes:
label: RustFS version
description: Provide the release version, container image tag, or commit hash.
validations:
required: true
- type: dropdown
id: deployment-method
attributes:
label: Deployment method
description: How are you running RustFS? Add any relevant details in Additional context.
options:
- Binary
- Docker / Docker Compose
- Kubernetes / Helm
- Built from source
- Other
- type: textarea
id: storage-mounts
attributes:
label: Data directory filesystems and mounts
description: |
Identify the filesystem type and mount source for every RustFS data directory.
On Linux, include output from `findmnt -T /path/to/data -o TARGET,SOURCE,FSTYPE,OPTIONS` for each data path; on other systems, provide equivalent mount information.
For Docker, identify the backing host path and filesystem, not just the container path or volume name.
For Kubernetes, identify the PV, StorageClass/CSI driver, and actual backing filesystem; a PVC name alone is not sufficient.
Remove credentials and other sensitive information before submitting.
placeholder: |
RustFS data paths:
Filesystem types and mount sources:
Mount command output:
Docker host paths or Kubernetes volume backing storage (if applicable):
validations:
required: true
- type: input
id: operating-system
attributes:
label: Server operating system and architecture
description: Include the operating system version and CPU architecture where RustFS is running.
placeholder: "For example: Ubuntu 24.04, x86_64"
validations:
required: true
- type: textarea
id: client-environment
attributes:
label: Client environment
description: Include the S3 client or SDK and version. For console issues, include the browser, operating system, and desktop or mobile device details.
- type: textarea
id: logs
attributes:
label: Relevant logs
description: Paste relevant log output. Remove credentials and other sensitive information before submitting.
render: shell
- type: textarea
id: screenshots
attributes:
label: Screenshots
description: If applicable, drag and drop screenshots here to help explain the problem.
- type: textarea
id: additional-context
attributes:
label: Additional context
description: Add any other context, such as deployment topology or relevant configuration. Remove credentials and other sensitive information before submitting.
-1
View File
@@ -1 +0,0 @@
blank_issues_enabled: false
+20
View File
@@ -0,0 +1,20 @@
---
name: Feature request
about: Suggest an idea for this project
title: ''
labels: ''
assignees: ''
---
**Is your feature request related to a problem? Please describe.**
A clear and concise description of what the problem is. Ex. I'm always frustrated when [...]
**Describe the solution you'd like**
A clear and concise description of what you want to happen.
**Describe alternatives you've considered**
A clear and concise description of any alternative solutions or features you've considered.
**Additional context**
Add any other context or screenshots about the feature request here.
@@ -1,38 +0,0 @@
name: Feature request
description: Suggest an idea for this project
body:
- type: checkboxes
id: request-scope
attributes:
label: Request scope
description: |
RustFS data directories backed by NFS, SMB/Samba/CIFS, or other remote or shared filesystems are unsupported, including those behind Docker volumes or Kubernetes PersistentVolumes.
Troubleshooting requests for these deployments will be closed without investigation. Use this form for new or improved functionality.
options:
- label: This is a feature request and does not ask for troubleshooting an unsupported remote or shared filesystem deployment.
required: true
- type: textarea
id: problem-description
attributes:
label: Problem or use case
description: Describe the problem or use case that motivates this feature request.
placeholder: "For example: I am trying to ... but ..."
validations:
required: true
- type: textarea
id: proposed-solution
attributes:
label: Proposed solution
description: A clear and concise description of what you would like to happen.
validations:
required: true
- type: textarea
id: alternatives
attributes:
label: Alternatives considered
description: Describe any alternative solutions or features you have considered.
- type: textarea
id: additional-context
attributes:
label: Additional context
description: Add any other context or drag and drop screenshots about the feature request here.
+9 -30
View File
@@ -13,41 +13,30 @@
# limitations under the License.
name: Quick Checks
description: Run the shared RustFS quality checks.
description: Run the shared compile-free RustFS quality checks.
runs:
using: composite
steps:
- name: Install quality tools
uses: taiki-e/install-action@7623a79cdfecb99d681017af368ca353d9f49bb5 # v2
uses: taiki-e/install-action@bffeee26d4db9be238a4ea78d8826604ebcb594d # v2
with:
tool: |
ripgrep@15.2.0
shellcheck@0.11.0
cargo-nextest@0.9.138
- name: Install actionlint
shell: bash
env:
GH_TOKEN: ${{ github.token }}
ASSET_DOWNLOADER: ${{ github.action_path }}/../setup/download_release_asset.py
run: |
actionlint_dir="$(mktemp -d "${RUNNER_TEMP}/actionlint.XXXXXX")"
python3 "$ASSET_DOWNLOADER" --repository rhysd/actionlint --tag v1.7.12 --asset actionlint_1.7.12_linux_amd64.tar.gz --output "$actionlint_dir/actionlint.tar.gz" --sha256 8aca8db96f1b94770f1b0d72b6dddcb1ebb8123cb3712530b08cc387b349a3d8
curl --fail --location --silent --show-error \
--output "$actionlint_dir/actionlint.tar.gz" \
https://github.com/rhysd/actionlint/releases/download/v1.7.12/actionlint_1.7.12_linux_amd64.tar.gz
echo "8aca8db96f1b94770f1b0d72b6dddcb1ebb8123cb3712530b08cc387b349a3d8 $actionlint_dir/actionlint.tar.gz" | sha256sum --check --status
tar -xzf "$actionlint_dir/actionlint.tar.gz" -C "$actionlint_dir" actionlint
rm "$actionlint_dir/actionlint.tar.gz"
echo "$actionlint_dir" >> "$GITHUB_PATH"
- name: Install Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.12"
- name: Install workflow parser
shell: bash
run: python3 -m pip install --disable-pip-version-check PyYAML==6.0.3
- name: Install Rust toolchain
uses: dtolnay/rust-toolchain@29eef336d9b2848a0b548edc03f92a220660cdb8 # stable
with:
@@ -97,14 +86,6 @@ runs:
shell: bash
run: ./scripts/check_s3s_footprint.sh
- name: Check per-crate test-count ratchet
shell: bash
run: ./scripts/check_test_count_ratchet.sh
- name: Check cross-owner tests use test seams
shell: bash
run: python3 ./scripts/check_test_seams.py
- name: Check cryptographic capability wording
shell: bash
run: ./scripts/check_fips_wording.sh
@@ -117,16 +98,14 @@ runs:
shell: bash
run: make script-tests
- name: Check object generation protocol model
shell: bash
run: python3 ./scripts/test_object_generation_protocol_model.py
- name: Check test wiring
shell: bash
run: |
python3 ./scripts/check_test_wiring.py --self-test
python3 ./scripts/check_scheduled_validation_freshness.py --self-test
python3 ./scripts/test_security_workflow.py
python3 ./scripts/test_nightly_candidate.py
python3 ./scripts/check_test_wiring.py
python3 ./scripts/ci_gate.py --check-workflow
python3 ./scripts/validation_registry.py check
- name: Check no planning docs committed
shell: bash
@@ -1,96 +0,0 @@
# Copyright 2026 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
name: "Reference RustFS binary"
description: "Download the pinned reference RustFS release, verify its sha256 and expose the executable path. A missing pin, missing asset or digest mismatch fails the step."
inputs:
pin-file:
description: "Pin file naming the reference release (repository-relative)"
required: false
default: ".config/reference-binary.toml"
platform:
description: "Platform table in the pin file"
required: false
default: "linux-x86_64-gnu"
destination:
description: "Directory that receives the executable; defaults to $RUNNER_TEMP/reference-binary"
required: false
default: ""
outputs:
path:
description: "Absolute path of the verified executable"
value: ${{ steps.unpack.outputs.path }}
version:
description: "Pinned reference version"
value: ${{ steps.pin.outputs.version }}
sha256:
description: "Pinned and verified archive sha256"
value: ${{ steps.pin.outputs.sha256 }}
runs:
using: "composite"
steps:
- name: Resolve reference pin
id: pin
shell: bash
env:
PIN_TOOL: ${{ github.action_path }}/reference_binary.py
PIN_FILE: ${{ inputs.pin-file }}
PIN_PLATFORM: ${{ inputs.platform }}
run: |
set -euo pipefail
resolved="$(python3 "$PIN_TOOL" resolve --pin "$PIN_FILE" --platform "$PIN_PLATFORM")"
printf '%s\n' "$resolved"
printf '%s\n' "$resolved" >> "$GITHUB_OUTPUT"
- name: Download and verify reference archive
id: download
shell: bash
env:
GH_TOKEN: ${{ github.token }}
ASSET_DOWNLOADER: ${{ github.action_path }}/../setup/download_release_asset.py
REF_REPOSITORY: ${{ steps.pin.outputs.repository }}
REF_TAG: ${{ steps.pin.outputs.tag }}
REF_ASSET: ${{ steps.pin.outputs.asset }}
REF_SHA256: ${{ steps.pin.outputs.sha256 }}
run: |
set -euo pipefail
archive="$RUNNER_TEMP/reference-archive/$REF_ASSET"
# Fails unless the release lists exactly one asset of this name whose
# published digest equals the pin and whose downloaded bytes match it.
python3 "$ASSET_DOWNLOADER" --repository "$REF_REPOSITORY" --tag "$REF_TAG" \
--asset "$REF_ASSET" --output "$archive" --sha256 "$REF_SHA256"
echo "archive=$archive" >> "$GITHUB_OUTPUT"
- name: Unpack reference executable
id: unpack
shell: bash
env:
PIN_TOOL: ${{ github.action_path }}/reference_binary.py
REF_ARCHIVE: ${{ steps.download.outputs.archive }}
REF_SHA256: ${{ steps.pin.outputs.sha256 }}
REF_EXECUTABLE: ${{ steps.pin.outputs.executable }}
REF_DESTINATION: ${{ inputs.destination }}
run: |
set -euo pipefail
destination="${REF_DESTINATION:-$RUNNER_TEMP/reference-binary}"
unpacked="$(python3 "$PIN_TOOL" unpack --archive "$REF_ARCHIVE" --sha256 "$REF_SHA256" \
--executable "$REF_EXECUTABLE" --destination "$destination")"
path="${unpacked#path=}"
test -x "$path"
echo "Reference executable: $path"
"$path" --version
echo "path=$path" >> "$GITHUB_OUTPUT"
@@ -1,144 +0,0 @@
#!/usr/bin/env python3
# Copyright 2026 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
"""Resolve and unpack the pinned reference RustFS release binary.
`resolve` reads the pin file and prints the selected platform's identity as
`key=value` lines (GitHub step-output format). `unpack` re-verifies the
downloaded archive digest against the pin and extracts exactly one executable.
Every missing or malformed input is a failure; nothing is skipped.
"""
import argparse
import hashlib
from pathlib import Path
import re
import sys
import tomllib
import zipfile
REPOSITORY = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.-]*/[A-Za-z0-9][A-Za-z0-9_.-]*")
TAG = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.+-]*")
PLATFORM = re.compile(r"[a-z0-9][a-z0-9_-]*")
ASSET = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.+-]*\.zip")
SHA256 = re.compile(r"[0-9a-f]{64}")
EXECUTABLE = re.compile(r"[A-Za-z0-9][A-Za-z0-9_.-]*")
MAX_EXECUTABLE_BYTES = 1024 * 1024 * 1024
class PinError(Exception):
"""A pin, archive or argument that cannot be trusted."""
def field(table, key, pattern, where):
value = table.get(key)
if not isinstance(value, str) or not pattern.fullmatch(value):
raise PinError(f"{where}: missing or invalid '{key}'")
return value
def resolve(pin_path, platform):
if not PLATFORM.fullmatch(platform or ""):
raise PinError("invalid platform name")
try:
data = tomllib.loads(Path(pin_path).read_text(encoding="utf-8"))
except FileNotFoundError as exc:
raise PinError(f"{pin_path}: reference pin file is missing") from exc
except (OSError, UnicodeDecodeError, tomllib.TOMLDecodeError) as exc:
raise PinError(f"{pin_path}: cannot read reference pin: {exc}") from exc
if data.get("schema") != 1 or type(data.get("schema")) is not int:
raise PinError(f"{pin_path}: unsupported pin schema")
identity = {
"repository": field(data, "repository", REPOSITORY, pin_path),
"version": field(data, "version", TAG, pin_path),
"tag": field(data, "tag", TAG, pin_path),
}
platforms = data.get("platforms")
if not isinstance(platforms, dict) or not platforms:
raise PinError(f"{pin_path}: no pinned platforms")
entry = platforms.get(platform)
if not isinstance(entry, dict):
raise PinError(f"{pin_path}: no pin for platform '{platform}'")
where = f"{pin_path} [platforms.{platform}]"
identity["asset"] = field(entry, "asset", ASSET, where)
identity["sha256"] = field(entry, "sha256", SHA256, where)
identity["executable"] = field(entry, "executable", EXECUTABLE, where)
if identity["version"] not in identity["asset"]:
raise PinError(f"{where}: asset name does not carry version {identity['version']}")
unknown = set(entry) - {"asset", "sha256", "executable"}
if unknown:
raise PinError(f"{where}: unknown keys {sorted(unknown)}")
return identity
def file_sha256(path):
with open(path, "rb") as stream:
return hashlib.file_digest(stream, "sha256").hexdigest()
def unpack(archive, sha256, executable, destination):
if not SHA256.fullmatch(sha256 or "") or not EXECUTABLE.fullmatch(executable or ""):
raise PinError("invalid expected digest or executable name")
try:
actual = file_sha256(archive)
except OSError as exc:
raise PinError(f"{archive}: reference archive is missing or unreadable") from exc
if actual != sha256:
raise PinError(f"{archive}: sha256 {actual} does not match the pinned digest")
try:
with zipfile.ZipFile(archive) as bundle:
matches = [info for info in bundle.infolist() if info.filename == executable]
if len(matches) != 1:
raise PinError(f"{archive}: must contain exactly one top-level '{executable}'")
info = matches[0]
if info.is_dir() or not 0 < info.file_size <= MAX_EXECUTABLE_BYTES:
raise PinError(f"{archive}: '{executable}' is not a plausible executable")
destination = Path(destination)
destination.mkdir(parents=True, exist_ok=True)
target = destination / executable
with bundle.open(info) as source, open(target, "wb") as sink:
while chunk := source.read(1024 * 1024):
sink.write(chunk)
except zipfile.BadZipFile as exc:
raise PinError(f"{archive}: not a valid zip archive") from exc
target.chmod(0o755)
return target
def main(argv=None):
parser = argparse.ArgumentParser(description=__doc__.splitlines()[0])
sub = parser.add_subparsers(dest="mode", required=True)
res = sub.add_parser("resolve")
res.add_argument("--pin", required=True)
res.add_argument("--platform", required=True)
unp = sub.add_parser("unpack")
unp.add_argument("--archive", required=True)
unp.add_argument("--sha256", required=True)
unp.add_argument("--executable", required=True)
unp.add_argument("--destination", required=True)
args = parser.parse_args(argv)
try:
if args.mode == "resolve":
for key, value in resolve(args.pin, args.platform).items():
print(f"{key}={value}")
else:
print(f"path={unpack(args.archive, args.sha256, args.executable, args.destination)}")
except PinError as exc:
print(f"reference binary: {exc}", file=sys.stderr)
return 1
return 0
if __name__ == "__main__":
sys.exit(main())
-107
View File
@@ -1,107 +0,0 @@
name: Runner capability and build pilot
description: Inspect an existing runner and measure isolated fixed-source cold/warm builds
inputs:
workload:
description: probe, server or workspace-tests
required: true
source-sha:
description: Exact merged main commit for builds
default: ""
toolchain:
description: Exact Rust version for builds
default: ""
scratch-root:
description: Existing absolute scratch root
default: ""
build-jobs:
description: Cargo concurrency
default: "2"
local-ssd:
description: Require operator storage attestation
default: "false"
runs:
using: composite
steps:
- name: Validate pilot input and inspect existing capabilities
shell: bash
env:
PILOT_WORKLOAD: ${{ inputs.workload }}
PILOT_SHA: ${{ inputs.source-sha }}
PILOT_TOOLCHAIN: ${{ inputs.toolchain }}
PILOT_SCRATCH: ${{ inputs.scratch-root }}
PILOT_JOBS: ${{ inputs.build-jobs }}
PILOT_SSD: ${{ inputs.local-ssd }}
run: |
[[ "$PILOT_WORKLOAD" =~ ^(probe|server|workspace-tests)$ ]]
[[ "$PILOT_JOBS" =~ ^([1-9]|1[0-6])$ ]]
if [[ "$PILOT_WORKLOAD" != probe ]]; then
[[ "$PILOT_SHA" =~ ^[a-f0-9]{40}$ ]]
[[ "$PILOT_TOOLCHAIN" =~ ^[0-9]+\.[0-9]+\.[0-9]+$ ]]
fi
scratch="${PILOT_SCRATCH:-$RUNNER_TEMP}"
[[ "$scratch" == /* && -d "$scratch" ]]
minimum_disk=1
minimum_memory=0
if [[ "$PILOT_WORKLOAD" == server ]]; then minimum_disk=24; minimum_memory=8; fi
if [[ "$PILOT_WORKLOAD" == workspace-tests ]]; then minimum_disk=90; minimum_memory=16; fi
extra=()
if [[ "$PILOT_SSD" == true ]]; then extra+=(--local-ssd-attestation /etc/rustfs-runner/storage.json); fi
python3 scripts/ci/runner_pilot.py --root "$scratch" \
--output "$RUNNER_TEMP/runner-pilot-evidence" \
--min-free-gib "$minimum_disk" --min-memory-gib "$minimum_memory" --architecture x86_64 "${extra[@]}"
- name: Checkout the trusted baseline history
if: inputs.workload != 'probe'
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
ref: main
path: .runner-pilot-source
fetch-depth: 0
persist-credentials: false
- name: Bind the build to a merged main commit
if: inputs.workload != 'probe'
shell: bash
env:
PILOT_SHA: ${{ inputs.source-sha }}
run: |
git -C .runner-pilot-source merge-base --is-ancestor "$PILOT_SHA" HEAD
git -C .runner-pilot-source checkout --detach "$PILOT_SHA"
- name: Install build dependencies
if: inputs.workload != 'probe'
shell: bash
run: |
sudo apt-get update
sudo apt-get install -y build-essential pkg-config libssl-dev cmake clang time
- name: Install the fixed protobuf compiler
if: inputs.workload != 'probe'
uses: rustfs/setup-protoc@a3705324d8f9bf5b6c3573fb6cf8ae421db55dd6 # v3.0.1
with:
version: "35.1"
repo-token: ${{ github.token }}
- name: Install the fixed flatbuffer compiler
if: inputs.workload != 'probe'
uses: Nugine/setup-flatc@698800de72a96bfb22cf60431dc21a2ff9a7e07b # v1
with:
version: "25.12.19"
- name: Install the requested exact Rust toolchain
if: inputs.workload != 'probe'
uses: dtolnay/rust-toolchain@29eef336d9b2848a0b548edc03f92a220660cdb8 # stable
with:
toolchain: ${{ inputs.toolchain }}
- name: Measure cold and warm builds without shared target caches
if: inputs.workload != 'probe'
shell: bash
env:
PILOT_WORKLOAD: ${{ inputs.workload }}
PILOT_SHA: ${{ inputs.source-sha }}
PILOT_TOOLCHAIN: ${{ inputs.toolchain }}
PILOT_SCRATCH: ${{ inputs.scratch-root }}
PILOT_JOBS: ${{ inputs.build-jobs }}
PILOT_SSD: ${{ inputs.local-ssd }}
run: |
extra=()
if [[ "$PILOT_SSD" == true ]]; then extra+=(--local-ssd-attestation /etc/rustfs-runner/storage.json); fi
python3 scripts/ci/runner_pilot.py --root "${PILOT_SCRATCH:-$RUNNER_TEMP}" \
--output "$RUNNER_TEMP/runner-pilot-evidence" \
--source .runner-pilot-source --source-sha "$PILOT_SHA" \
--toolchain "$PILOT_TOOLCHAIN" --benchmark "$PILOT_WORKLOAD" \
--jobs "$PILOT_JOBS" --timeout-seconds 3600 "${extra[@]}"
@@ -74,6 +74,7 @@ Notes:
- `.github/workflows/e2e-s3tests.yml` (weekly full s3-tests sweep)
- `.github/workflows/mint.yml` (weekly multi-SDK mint run)
- `.github/workflows/fuzz.yml` (nightly fuzz corpus jobs)
- `.github/workflows/performance-ab.yml` (nightly warp A/B gate)
- **Pending:** the ci-7 e2e nightly-full workflow does not exist yet
(backlog#1149 ci-7). When it lands, wire it up with the snippet above.
@@ -1,39 +0,0 @@
# Copyright 2024 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
name: Set up Docker Compose
description: Install the verified Compose CLI used by native Linux x86_64 Connect acceptance
runs:
using: composite
steps:
- name: Install verified Docker Compose CLI plugin
shell: bash
run: |
set -euo pipefail
[[ $(uname -s) == Linux && $(uname -m) == x86_64 ]]
plugin_dir="${DOCKER_CONFIG:-$HOME/.docker}/cli-plugins"
mkdir -p "$plugin_dir"
compose_download=$(mktemp "${RUNNER_TEMP:?}/connect-compose.XXXXXX")
compose_staged=$(mktemp "$plugin_dir/.docker-compose.XXXXXX")
trap 'rm -f "$compose_download" "$compose_staged"' EXIT
curl --fail --location --retry 3 \
https://github.com/docker/compose/releases/download/v2.40.3/docker-compose-linux-x86_64 \
--output "$compose_download"
printf '%s %s\n' \
dba9d98e1ba5bfe11d88c99b9bd32fc4a0624a30fafe68eea34d61a3e42fd372 \
"$compose_download" | sha256sum --check --strict
install -m 0755 "$compose_download" "$compose_staged"
mv -f "$compose_staged" "$plugin_dir/docker-compose"
[[ $(docker compose version --short) == 2.40.3 ]]
+7 -41
View File
@@ -36,16 +36,6 @@ inputs:
description: "Install cross-compilation tools"
required: false
default: "false"
zig-version:
description: >-
Zig version for cargo-zigbuild builds. Pinned so the `<target>.<glibc>`
baseline semantics cannot drift with an untested zig release.
required: false
default: "0.17.0"
cargo-zigbuild-version:
description: "cargo-zigbuild version installed for cross builds."
required: false
default: "0.23.4"
target:
description: "Target architecture to add"
required: false
@@ -66,7 +56,10 @@ inputs:
runs:
using: "composite"
steps:
# Use the pinned code generators rather than Ubuntu's older packages.
# protobuf-compiler is deliberately absent: the setup-protoc step below
# installs 35.1 into the tool cache and prepends it to PATH, so the apt
# build (older, and never version-matched) was shadowed on every run and
# simply never used.
- name: Install system dependencies (Ubuntu)
if: runner.os == 'Linux'
shell: bash
@@ -76,9 +69,7 @@ runs:
build-essential \
pkg-config \
libssl-dev \
ripgrep \
python3 \
gh
ripgrep
# musl-gcc is needed by the native musl release leg, and zip/unzip by the
# release packaging steps. No CI test lane touches any of them.
@@ -87,32 +78,13 @@ runs:
shell: bash
run: sudo apt-get install -y musl-tools zip unzip
- name: Install pinned code generators through GitHub API (Linux x64)
if: runner.os == 'Linux' && runner.arch == 'X64'
shell: bash
env:
GH_TOKEN: ${{ github.token }}
ASSET_DOWNLOADER: ${{ github.action_path }}/download_release_asset.py
run: |
python3 "$ASSET_DOWNLOADER" --repository protocolbuffers/protobuf --tag v35.1 --asset protoc-35.1-linux-x86_64.zip --output "$RUNNER_TEMP/protoc.zip"
python3 "$ASSET_DOWNLOADER" --repository google/flatbuffers --tag v25.12.19 --asset 'Linux.flatc.binary.g++-13.zip' --output "$RUNNER_TEMP/flatc.zip"
python3 -m zipfile -e "$RUNNER_TEMP/protoc.zip" "$RUNNER_TEMP/protoc"
python3 -m zipfile -e "$RUNNER_TEMP/flatc.zip" "$RUNNER_TEMP/flatc"
chmod +x "$RUNNER_TEMP/protoc/bin/protoc" "$RUNNER_TEMP/flatc/flatc"
"$RUNNER_TEMP/protoc/bin/protoc" --version
"$RUNNER_TEMP/flatc/flatc" --version
echo "$RUNNER_TEMP/protoc/bin" >> "$GITHUB_PATH"
echo "$RUNNER_TEMP/flatc" >> "$GITHUB_PATH"
- name: Install protoc
if: runner.os != 'Linux' || runner.arch != 'X64'
uses: rustfs/setup-protoc@a3705324d8f9bf5b6c3573fb6cf8ae421db55dd6 # v3.0.1
with:
version: "35.1"
repo-token: ${{ github.token }}
- name: Install flatc
if: runner.os != 'Linux' || runner.arch != 'X64'
uses: Nugine/setup-flatc@698800de72a96bfb22cf60431dc21a2ff9a7e07b # v1
with:
version: "25.12.19"
@@ -127,23 +99,17 @@ runs:
- name: Install Zig
if: inputs.install-cross-tools == 'true'
uses: mlugg/setup-zig@d1434d08867e3ee9daa34448df10607b98908d29 # v2
with:
version: ${{ inputs.zig-version }}
- name: Install cargo-zigbuild
if: inputs.install-cross-tools == 'true'
uses: taiki-e/install-action@a21ae4029b089b9ddc45704028756f51ab8abe48 # cargo-zigbuild
with:
tool: cargo-zigbuild@${{ inputs.cargo-zigbuild-version }}
- name: Install cargo-nextest
if: inputs.install-test-tools == 'true'
uses: taiki-e/install-action@96c7780c1d8a2b8723e12031def873a434d39d8d # nextest
with:
tool: cargo-nextest@0.9.138
- name: Setup Rust cache
uses: Swatinem/rust-cache@6323deb102c322ba6fcbdcafc7e3dddab59af2b6 # v2
uses: Swatinem/rust-cache@e18b497796c12c097a38f9edb9d0641fb99eee32 # v2
with:
# false is rust-cache's own default. With true, cleanup.ts returns
# *before* pruning ~/.cargo/registry/src, and config.ts archives the
@@ -158,5 +124,5 @@ runs:
# normalises, so cargo fingerprints stay valid.
cache-all-crates: false
cache-on-failure: true
shared-key: ${{ inputs.cache-shared-key }}${{ inputs.install-cross-tools == 'true' && format('-zig-{0}-zigbuild-{1}', inputs.zig-version, inputs.cargo-zigbuild-version) || '' }}
shared-key: ${{ inputs.cache-shared-key }}
save-if: ${{ inputs.cache-save-if }}
@@ -1,84 +0,0 @@
#!/usr/bin/env python3
"""Download a named GitHub release asset through its API and verify its digest."""
import argparse
import hashlib
import json
from pathlib import Path
import re
import subprocess
import sys
import tempfile
from urllib.parse import quote
def download(repository, tag, name, output, expected_sha256=None):
if not re.fullmatch(r"[A-Za-z0-9][A-Za-z0-9_.-]*/[A-Za-z0-9][A-Za-z0-9_.-]*", repository):
raise ValueError("invalid release repository")
if not tag or not name or "/" in name or "\\" in name:
raise ValueError("invalid release tag or asset name")
if expected_sha256 is not None and not re.fullmatch(r"[0-9a-f]{64}", expected_sha256):
raise ValueError("invalid pinned asset digest")
result = subprocess.run(
["gh", "api", "--hostname", "github.com", f"repos/{repository}/releases/tags/{quote(tag, safe='')}"],
check=True, capture_output=True, text=True, timeout=60,
)
release = json.loads(result.stdout)
if not isinstance(release, dict) or release.get("tag_name") != tag:
raise ValueError("release metadata does not match the requested tag")
assets = release.get("assets")
if not isinstance(assets, list) or any(not isinstance(asset, dict) for asset in assets):
raise ValueError("invalid release asset inventory")
matches = [asset for asset in assets if asset.get("name") == name]
if len(matches) != 1:
raise ValueError("release must contain exactly one named asset")
asset = matches[0]
asset_id, size, digest = asset.get("id"), asset.get("size"), asset.get("digest")
if type(asset_id) is not int or asset_id <= 0 or type(size) is not int or not 0 < size <= 512 * 1024 * 1024:
raise ValueError("invalid release asset identity or size")
if not isinstance(digest, str) or not re.fullmatch(r"sha256:[0-9a-f]{64}", digest):
raise ValueError("release asset has no valid SHA-256 digest")
sha256 = digest.removeprefix("sha256:")
if expected_sha256 is not None and expected_sha256 != sha256:
raise ValueError("release digest differs from the pinned digest")
output = Path(output)
output.parent.mkdir(parents=True, exist_ok=True)
temporary = None
try:
with tempfile.NamedTemporaryFile(dir=output.parent, prefix=".release-asset-", delete=False) as stream:
temporary = Path(stream.name)
# gh authenticates to the API; its HTTP client strips credentials on
# cross-host redirects. No browser URL or token is supplied in argv.
subprocess.run(
["gh", "api", "--hostname", "github.com", "--header", "Accept: application/octet-stream", f"repos/{repository}/releases/assets/{asset_id}"],
check=True, stdout=stream, timeout=300,
)
with temporary.open("rb") as stream:
actual = hashlib.file_digest(stream, "sha256").hexdigest()
if temporary.stat().st_size != size or actual != sha256:
raise ValueError("downloaded release asset failed size or SHA-256 verification")
temporary.replace(output)
print(f"Verified release asset: {repository} {tag} {name} sha256={actual}")
finally:
if temporary is not None:
temporary.unlink(missing_ok=True)
def main():
parser = argparse.ArgumentParser(description=__doc__)
parser.add_argument("--repository", required=True)
parser.add_argument("--tag", required=True)
parser.add_argument("--asset", required=True)
parser.add_argument("--output", required=True, type=Path)
parser.add_argument("--sha256")
args = parser.parse_args()
try:
download(args.repository, args.tag, args.asset, args.output, args.sha256)
except (ValueError, KeyError, TypeError, json.JSONDecodeError, subprocess.SubprocessError, OSError) as error:
print(f"Release asset download failed: {error}", file=sys.stderr)
return 1
return 0
if __name__ == "__main__":
raise SystemExit(main())
-16
View File
@@ -1,16 +0,0 @@
name: Verification runtime
description: Install the runtime for prebuilt test archives without a target cache
runs:
using: composite
steps:
- name: Install runtime tools
shell: bash
run: |
sudo apt-get update
sudo apt-get install -y libssl-dev ripgrep
- name: Install Rust toolchain
uses: dtolnay/rust-toolchain@29eef336d9b2848a0b548edc03f92a220660cdb8 # stable
- name: Install cargo-nextest
uses: taiki-e/install-action@96c7780c1d8a2b8723e12031def873a434d39d8d # nextest
with:
tool: cargo-nextest@0.9.138
-2
View File
@@ -32,8 +32,6 @@ updates:
- "overtrue"
- "majinghe"
ignore:
- dependency-name: "pulsar"
versions: [ "6.9.x" ]
- dependency-name: "object_store"
versions: [ "0.13.x" ]
- dependency-name: "libunftp"
+2 -1
View File
@@ -24,7 +24,8 @@ List relevant checks not run and the remaining risk. Use the validation tier in
## Impact
<!--
Describe user-facing, compatibility, API, deployment, configuration, or documentation impact. Use N/A when there is no expected impact.
Describe user-facing, compatibility, API, deployment, configuration, or
documentation impact. Use N/A when there is no expected impact.
-->
## Additional Notes
File diff suppressed because it is too large Load Diff
-85
View File
@@ -1,85 +0,0 @@
# Workflow runners: what is billed and where a job belongs
**Use this when:** adding a job, changing a `runs-on`, moving a lane between runner pools, or deciding whether a new check is worth its runner cost.
**Source of truth:** `runs-on` in each workflow file for current placement; `.github/actionlint.yaml` for the declared self-hosted labels; the organisation's Settings → Billing → Usage page for what is actually charged; `docs/testing/ci-gates.md` for which checks block a merge (that does not change when a runner changes).
## Billing facts
This repository is public. For a public repository, GitHub's standard hosted runners (`ubuntu-latest`, `windows-latest`, `macos-latest`) cost nothing and have no minute cap, whatever plan the organisation is on. GitHub bills only two things: larger hosted runners, including the `macos-latest-xlarge` release lane used here, and standard runners in private repositories.
Every other label in this repository is capacity RustFS pays for. ARC pods and lab machines accrue cost while the machine exists. A Ubicloud label is metered for the minutes a job holds its VM:
| Label | Paid by | What it is | Use it for |
|---|---|---|---|
| `ubuntu-latest` | nobody | GitHub-hosted, Ubuntu 24.04, 4 vCPU, 16 GB RAM, about 14 GB of free disk. Ships a C toolchain, `docker`, `gh`, `curl`, `wget`, `jq`, Python. Can `mount` tmpfs and loop devices; io_uring works | the default for every job |
| `windows-latest`, `macos-latest` | nobody | GitHub-hosted standard runners | Windows and macOS targets |
| `macos-latest-xlarge` | RustFS | GitHub-hosted larger Apple Silicon runner | macOS release builds, deferred until Linux acceptance for candidates |
| `sm-standard-2` | RustFS | ARC pod, Ubuntu 24.04, minimal image: no `gh`, no C toolchain; Docker only on the `dind-` label | only a job that a hosted runner cannot run (see the placement rule) |
| `sm-standard-4` | RustFS | ARC pod, Ubuntu 24.04, 14 CPUs and 28 GB (the label is not the core count), large disk | workspace-scale Cargo builds |
| `ubicloud-standard-16-arm` | RustFS | Ubicloud VM, alias of `ubicloud-standard-16-arm-ubuntu-2404`: Ubuntu 24.04 arm64, 16 vCPU, 48 GB, 300 GB disk. Reached through the `build.yml` matrix, so `actionlint.yaml` does not list it | native aarch64 release builds (`linux-aarch64-musl`, `linux-aarch64-gnu`) |
| `dind-sm-standard-2` | RustFS | ARC pod with Docker-in-Docker | Docker workloads with a measured resource or environment requirement beyond the hosted runner |
| `smoke-testing`, `pf-testing` | RustFS | long-lived lab machines | the packaged functional chain and performance suites |
The self-hosted pods and the hosted image are both Ubuntu 24.04, so a binary built on one runs on the other; `ci.yml` builds the debug binary on `sm-standard-4` and runs it on both pools.
## Placement rule
A job runs on `ubuntu-latest` unless it has one of these reasons, and the reason goes in a comment next to its `runs-on`:
1. **Disk.** It restores or produces the workspace `target/`: `cargo build` or `cargo test` with `--all-targets`, `cargo nextest run --all`, or any reader of the `ci-dev` / `ci-feat-*` caches. The workspace test build leaves about 64 GB in `target/`; a hosted runner has about 14 GB.
2. **Critical-path CPU.** It is a build that several downstream lanes wait on and would blow its timeout at 4 vCPU (`build-rustfs-debug-binary` gates the e2e and s3-tests lanes).
3. **Hardware or environment.** Native aarch64 or access to the lab machines. Docker alone is not a reason: hosted Ubuntu ships Docker and supports the QEMU and Buildx setup actions.
4. **Cache ownership.** It reads a `rust-cache` key that a self-hosted job writes (see the cache rule below).
Jobs that do only the following have no reason to be self-hosted: shell or Python scripts, `cargo fmt`, `cargo deny`, typos, actionlint, API calls (`gh`, dependency review, issue and stale bots, CLA checks), downloading an artifact and running a prebuilt binary, or a `cargo build -p rustfs` with its own cache key. `e2e-distributed.yml` and `e2e-upgrade.yml` build the server and the `e2e_test` harness on `ubuntu-latest` inside their budgets, so "it compiles something" alone is not a reason.
The functional chain's `prepare` and `complete-chain` jobs, the performance runner availability check, and runner hygiene use `ubuntu-latest`: they inspect APIs or artifacts, not the lab hosts. The actual functional and performance suites remain on their lab runners. Functional-chain health collection uses `ubuntu-latest` so a lab outage cannot also stop its independent monitor. Docker image packaging also uses `ubuntu-latest` for both musl and glibc variants; it wraps verified candidate binaries rather than compiling the workspace, and still sets up QEMU and Buildx explicitly.
Moving these jobs off AKS reduces capacity demand, not necessarily the Azure bill immediately. VM costs fall only when nodes scale down or smaller capacity replaces them.
A hosted runner is also the only choice for a few things the pods cannot do: `mount -o loop` and `mount -t tmpfs` fail inside the ARC pods, and a container runtime cannot guarantee that `io_uring_setup` is allowed. `uring-integration` and `e2e-distributed` are on `ubuntu-latest` for that reason, not for cost.
## Cache rule
`Swatinem/rust-cache` builds its key from the OS, architecture, toolchain and lockfile. It does not include the runner label or image, so a cache written on an `sm-standard-4` pod and one written on `ubuntu-latest` would overwrite each other under the same `shared-key`.
- Every `shared-key` has exactly one writer. `cache-warm.yml` owns `ci-dev`, `ci-feat-rio`, `ci-feat-proto` and `ci-uring`; every other `./.github/actions/setup` call states `cache-save-if` explicitly, and `scripts/security/check_cache_save_if.sh` fails the build when one does not.
- All readers of a key run on the same image as its writer. Keys that live on hosted runners say so in their name (`ci-uring` is warmed on `ubuntu-latest`; `ci-e2e-distributed-hosted`, `e2e-upgrade-server-hosted`, `e2e-upgrade-tests-hosted`).
- Moving a job between pools therefore means renaming its key. The new key is empty until a run from `main` (a scheduled run, or a manual dispatch of that workflow from `main`) saves it; until then that lane does a cold build. The `build.yml` aarch64 release legs append `-ubicloud-arm` for this reason. `cache-warm.yml` does not write those keys.
- `CARGO_BUILD_JOBS` and every other `CARGO*`, `CC*`, `CFLAGS*`, `CXX*`, `CMAKE*` and `RUST*` variable is hashed into the key. `ci.yml` sets `CARGO_BUILD_JOBS` at step level for that reason; promoting it to job level rotates the key for every lane that shares it.
## Where self-hosted minutes leak
These are the patterns that have cost real money here without validating anything more:
- An `if: always()` summary or alert job on a self-hosted label inside a `workflow_run`-triggered workflow. The upstream workflow completes many times a day, the real jobs skip, and the summary still starts a pod each time. Gate it on the upstream job having run, and keep it on `ubuntu-latest`.
- Per-push workflows on `main`. A merge triggers the applicable `ci.yml` matrix and cache warming; `build.yml` development builds are scheduled or manual; with tens of merges a day that is as much self-hosted time as all pull requests together. Anything that does not verify the merged tree itself belongs on a schedule or behind a `paths` filter.
- `apt-get install` of tools the hosted image already ships. It is only needed on the minimal pod images.
- A throttled `CARGO_BUILD_JOBS` on a 14-CPU pod. The limit exists for link-storm reasons documented in `ci.yml`; measure before raising it, and measure before lowering it further.
- Tiny jobs on ARC pods. Each one pays roughly a minute of pod start-up before its first step; a compile-free job that takes ten seconds costs more to schedule than to run.
## Measuring a run
To see which pool each job of a run used and for how long:
```bash
gh api "repos/rustfs/rustfs/actions/runs/<run_id>/jobs?per_page=100" \
--jq '.jobs[] | "\(.conclusion)\t\(.labels | join(","))\t\(.started_at)\t\(.completed_at)\t\(.name)"'
```
Rows using `macos-latest-xlarge` or a label starting with `sm-`, `dind-`, `ubicloud-`, `smoke-` or `pf-` use paid capacity. At the October 2026 review, a full pull-request run of `ci.yml` spent about 150 self-hosted minutes, a third of it in jobs that never compiled; treat that as the scale of what a placement mistake costs, not as a current figure.
## Checklist for a new or moved job
- `runs-on` is a literal label. A new self-hosted label is declared in `.github/actionlint.yaml` in the same change (`.github/AGENTS.md`).
- The job declares `timeout-minutes` (`scripts/security/check_job_timeouts.sh`).
- `actionlint` reports nothing.
- A self-hosted `runs-on` carries a comment naming its reason from the placement rule.
- Every `./.github/actions/setup` call states `cache-save-if`, and a key read from one pool is not written from the other.
- Moving a job does not change its check name, so the `main` ruleset and `docs/testing/ci-gates.md` stay as they are; renaming it does, and then that document's change checklist applies.
## Release stages
The [candidate release pipeline](../../docs/operations/release-pipeline.md) builds Linux first and defers paid desktop capacity until acceptance. Daily development builds also select Linux; use manual platform selection for desktop development artifacts. All six platforms remain required before publication. The pipeline records and promotes the exact tested bytes. Builder workflows have no public-release credentials. Keep periodic development builds, PR verification and field-test chains separate when their contracts differ; do not re-enable disabled workflows as part of a source-file migration.
Larger runners remain billed for public repositories; see [GitHub runner billing](https://docs.github.com/en/actions/concepts/runners/larger-runners#billing). Actual spending comes from organization billing, not runner labels or an estimated build duration.
@@ -0,0 +1,61 @@
# Copyright 2024 RustFS Team
#
# Licensed under the Apache License, Version 2.0 (the "License");
# you may not use this file except in compliance with the License.
# You may obtain a copy of the License at
#
# http://www.apache.org/licenses/LICENSE-2.0
#
# Unless required by applicable law or agreed to in writing, software
# distributed under the License is distributed on an "AS IS" BASIS,
# WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
# See the License for the specific language governing permissions and
# limitations under the License.
name: Architecture Migration Rules
on:
pull_request:
types: [ opened, synchronize, reopened, closed ]
branches: [ main ]
paths:
- "ARCHITECTURE.md"
- "docs/architecture/**"
- "scripts/check_architecture_migration_rules.sh"
- ".github/workflows/architecture-migration-rules.yml"
workflow_dispatch:
permissions:
contents: read
concurrency:
group: ${{ github.workflow }}-${{ github.event.pull_request.number || github.ref }}
cancel-in-progress: true
jobs:
cancel-closed-pr-runs:
name: Cancel Closed PR Runs
if: github.event_name == 'pull_request' && github.event.action == 'closed'
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- name: Explain cancellation run
run: echo "PR closed; this run only cancels older runs in the same concurrency group."
architecture-migration-rules:
name: Architecture Migration Rules
if: github.event_name != 'pull_request' || github.event.action != 'closed'
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
- name: Install ripgrep
uses: taiki-e/install-action@bffeee26d4db9be238a4ea78d8826604ebcb594d # v2
with:
tool: ripgrep@15.2.0
- name: Check architecture migration rules
run: ./scripts/check_architecture_migration_rules.sh
+19 -164
View File
@@ -23,19 +23,10 @@ on:
- 'deny.toml'
- '.github/actions/**'
- '.github/workflows/**'
- 'scripts/release/**'
- 'scripts/security/generate_release_supply_chain_assets.py'
- '.config/release-validation-plan.json'
- '.github/scheduled-validations.json'
- 'scripts/test_helm_release_workflow.py'
- 'scripts/test_release_packages.py'
- 'scripts/test_release_images.py'
- 'Dockerfile*'
- 'entrypoint.sh'
- 'bootstrap/**'
- 'scripts/test_package_service_scripts.sh'
- 'scripts/release/create_or_update_release.sh'
- 'scripts/release/package_versions.sh'
- 'scripts/test_package_versions.sh'
- 'scripts/test_docker_workflow.py'
- 'scripts/security/check_performance_ab_workflow.sh'
- 'scripts/security/check_preview_release_workflow.sh'
- 'scripts/security/check_tier_artifact_workflow.sh'
- 'scripts/security/check_workflow_pins.sh'
@@ -48,19 +39,10 @@ on:
- 'deny.toml'
- '.github/actions/**'
- '.github/workflows/**'
- 'scripts/release/**'
- 'scripts/security/generate_release_supply_chain_assets.py'
- '.config/release-validation-plan.json'
- '.github/scheduled-validations.json'
- 'scripts/test_helm_release_workflow.py'
- 'scripts/test_release_packages.py'
- 'scripts/test_release_images.py'
- 'Dockerfile*'
- 'entrypoint.sh'
- 'bootstrap/**'
- 'scripts/test_package_service_scripts.sh'
- 'scripts/release/create_or_update_release.sh'
- 'scripts/release/package_versions.sh'
- 'scripts/test_package_versions.sh'
- 'scripts/test_docker_workflow.py'
- 'scripts/security/check_performance_ab_workflow.sh'
- 'scripts/security/check_preview_release_workflow.sh'
- 'scripts/security/check_tier_artifact_workflow.sh'
- 'scripts/security/check_workflow_pins.sh'
@@ -100,12 +82,12 @@ jobs:
# database lookup with a second ignore list to maintain.
cargo-deny:
name: Cargo Deny
if: github.repository == 'rustfs/rustfs' && (github.event_name != 'pull_request' || github.event.action != 'closed')
if: github.event_name != 'pull_request' || github.event.action != 'closed'
runs-on: ubuntu-latest
timeout-minutes: 20
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
@@ -124,7 +106,7 @@ jobs:
# default is now "false", but state it explicitly — see
# scripts/security/check_cache_save_if.sh.
- name: Setup Rust cache
uses: Swatinem/rust-cache@6323deb102c322ba6fcbdcafc7e3dddab59af2b6 # v2
uses: Swatinem/rust-cache@e18b497796c12c097a38f9edb9d0641fb99eee32 # v2
with:
# Same reasoning as the setup composite: true archives every
# dependency's unpacked source tree.
@@ -134,7 +116,7 @@ jobs:
save-if: ${{ github.ref == 'refs/heads/main' }}
- name: Install cargo-deny
uses: taiki-e/install-action@7623a79cdfecb99d681017af368ca353d9f49bb5 # v2
uses: taiki-e/install-action@bffeee26d4db9be238a4ea78d8826604ebcb594d # v2
with:
tool: cargo-deny
@@ -143,41 +125,15 @@ jobs:
workflow-pin-report:
name: Workflow Pin Report
if: github.repository == 'rustfs/rustfs' && (github.event_name != 'pull_request' || github.event.action != 'closed')
if: github.event_name != 'pull_request' || github.event.action != 'closed'
runs-on: ubuntu-latest
timeout-minutes: 5
permissions:
contents: read
actions: read
outputs:
release_changed: ${{ steps.scope.outputs.release_changed }}
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
fetch-depth: 0
persist-credentials: false
- name: Scope native packaging checks to release changes
id: scope
env:
BASE_SHA: ${{ github.event.pull_request.base.sha || github.event.before }}
run: |
python3 - <<'PY'
import os, re, subprocess
event, base = os.environ['GITHUB_EVENT_NAME'], os.environ.get('BASE_SHA', '')
changed = event == 'workflow_dispatch'
if event in ('push', 'pull_request'):
if not re.fullmatch(r'[0-9a-f]{40}', base) or base == '0' * 40:
changed = True
else:
paths = subprocess.check_output(['git', 'diff', '--name-only', base, os.environ['GITHUB_SHA']], text=True).splitlines()
pattern = r'^(scripts/release/|scripts/test_release_|Dockerfile|entrypoint.sh$|bootstrap/|\.dockerignore$|\.config/release-validation-plan.json$|\.github/workflows/(audit|build|docker|package|helm-package|release-[^.]+)\.yml$)'
changed = any(re.match(pattern, path) for path in paths)
with open(os.environ['GITHUB_OUTPUT'], 'a') as output:
output.write(f'release_changed={str(changed).lower()}\n')
PY
- name: Report unpinned GitHub Actions
run: ./scripts/security/check_workflow_pins.sh --enforce
@@ -190,35 +146,11 @@ jobs:
- name: Check checkouts clear their credentials
run: ./scripts/security/check_persist_credentials.sh
- name: Check release candidate and promotion contracts
run: python3 -m unittest discover -s scripts/release -p 'test_*.py'
- name: Check preview release workflow policy
run: ./scripts/security/check_preview_release_workflow.sh
- name: Prepare artifact transport rehearsal
run: |
mkdir -p "$RUNNER_TEMP/release-transport"
printf '{"purpose":"transport contract, not release evidence"}\n' > "$RUNNER_TEMP/release-transport/transport.json"
- uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
with:
name: release-transport-contract-${{ github.run_attempt }}
path: ${{ runner.temp }}/release-transport/transport.json
if-no-files-found: error
retention-days: 1
- name: Verify actual GitHub artifact metadata and downloaded bytes
env:
GH_TOKEN: ${{ github.token }}
run: |
python3 - <<'PY'
import os, sys
from pathlib import Path
sys.path.insert(0, 'scripts/release')
import candidate as c
run = c.github(f"repos/{c.REPOSITORY}/actions/runs/{os.environ['GITHUB_RUN_ID']}")
destination = Path(os.environ['RUNNER_TEMP']) / 'release-transport-downloaded'
c.download_artifact(run, f"release-transport-contract-{os.environ['GITHUB_RUN_ATTEMPT']}", destination)
c.require(c.read_json(destination / 'transport.json') == {'purpose': 'transport contract, not release evidence'}, 'artifact round trip changed')
PY
- name: Check performance A/B workflow trust boundary
run: ./scripts/security/check_performance_ab_workflow.sh
- name: Check tier evidence workflow isolation
run: ./scripts/security/check_tier_artifact_workflow.sh
@@ -226,83 +158,6 @@ jobs:
- name: Check package version contract
run: ./scripts/test_package_versions.sh
- name: Check package service lifecycle contract
run: ./scripts/test_package_service_scripts.sh
release-package-contract:
name: Release package contract
needs: workflow-pin-report
if: needs.workflow-pin-report.outputs.release_changed == 'true'
runs-on: ubuntu-latest
timeout-minutes: 15
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Install real package managers
run: |
sudo apt-get update
sudo apt-get install -y ruby ruby-dev build-essential rpm fakeroot cpio
sudo gem install fpm --version 1.17.0 --no-document
- name: Exercise accepted and substituted payloads through both recipes
run: python3 scripts/test_release_packages.py
release-image-contract:
name: Release image contract (${{ matrix.variant }})
needs: workflow-pin-report
if: needs.workflow-pin-report.outputs.release_changed == 'true'
runs-on: ubuntu-latest
timeout-minutes: 35
strategy:
fail-fast: false
matrix:
variant: [musl, gnu]
env:
RELEASE_IMAGE_VARIANT: ${{ matrix.variant }}
NO_PROXY: 127.0.0.1,localhost,::1
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Install OCI tools
run: |
echo "RELEASE_IMAGE_OUTPUT=$RUNNER_TEMP/image-contract" >> "$GITHUB_ENV"
echo 'no_proxy=127.0.0.1,localhost,::1' >> "$GITHUB_ENV"
sudo apt-get update
sudo apt-get install -y skopeo
go version
- uses: docker/setup-qemu-action@c7c53464625b32c7a7e944ae62b3e17d2b600130 # v3
- uses: docker/setup-buildx-action@8d2750c68a42422c14e847fe6c8ac0403b4cbd6f # v3
- name: Exercise real OCI packaging, startup, registry retry and conflicts
run: python3 scripts/test_release_images.py
- name: Exercise amd64 OCI archive scanning
uses: aquasecurity/trivy-action@ed142fd0673e97e23eac54620cfb913e5ce36c25
env:
TRIVY_PLATFORM: linux/amd64
with:
input: ${{ runner.temp }}/image-contract-scan/image-${{ matrix.variant }}-amd64.tar
format: sarif
output: ${{ runner.temp }}/image-contract/scan-${{ matrix.variant }}-amd64.sarif
exit-code: "0"
- name: Exercise arm64 OCI archive scanning
uses: aquasecurity/trivy-action@ed142fd0673e97e23eac54620cfb913e5ce36c25
env:
TRIVY_PLATFORM: linux/arm64
with:
input: ${{ runner.temp }}/image-contract-scan/image-${{ matrix.variant }}-arm64.tar
format: sarif
output: ${{ runner.temp }}/image-contract/scan-${{ matrix.variant }}-arm64.sarif
exit-code: "0"
- name: Verify scan receipts before recording the archive
run: |
python3 - <<'PY'
import os, sys
from pathlib import Path
sys.path.insert(0, 'scripts/release')
import deliver, test_candidate
deliver.image_record(test_candidate.inputs(), os.environ['RELEASE_IMAGE_VARIANT'], Path(os.environ['RELEASE_IMAGE_OUTPUT']))
PY
dependency-review:
name: Dependency Review
runs-on: ubuntu-latest
@@ -313,7 +168,7 @@ jobs:
pull-requests: write
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
@@ -339,14 +194,14 @@ jobs:
# workflow produces, and until now it was only visible to whoever happened to
# open the Actions tab. Same ci-8 mechanism coverage.yml and
# e2e-replication-nightly.yml already use.
if: github.repository == 'rustfs/rustfs' && (always() && github.event_name == 'schedule' && contains(needs.*.result, 'failure'))
if: always() && github.event_name == 'schedule' && contains(needs.*.result, 'failure')
runs-on: ubuntu-latest
timeout-minutes: 10
permissions:
contents: read
issues: write
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
- uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
- name: Open or update failure-tracking issue
@@ -1,75 +0,0 @@
name: BTF prototype reference
on:
pull_request:
paths:
- "scripts/inspect_btf_prototypes.py"
- "scripts/test_inspect_btf_prototypes.py"
- "scripts/fixtures/btf_prototypes.c"
- ".github/workflows/btf-prototype-reference.yml"
workflow_dispatch:
permissions:
contents: read
concurrency:
group: btf-prototype-reference-${{ github.ref }}
cancel-in-progress: true
jobs:
reference:
runs-on: ubuntu-latest
timeout-minutes: 10
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.12"
- name: Check prototype and CLI contracts
run: python3 -B scripts/test_inspect_btf_prototypes.py
- name: Install only missing native reference tools
run: |
select_bpftool() {
local candidate
local candidates=()
if command -v bpftool >/dev/null; then
candidates+=("$(command -v bpftool)")
fi
for candidate in /usr/lib/linux-tools-*/bpftool /usr/lib/linux-tools/*/bpftool; do
if [[ -x "$candidate" ]]; then
candidates+=("$candidate")
fi
done
while IFS= read -r candidate; do
if [[ -x "$candidate" ]] && file -Lb "$candidate" | grep -q 'ELF' \
&& "$candidate" version >/dev/null 2>&1; then
printf '%s\n' "$candidate"
return 0
fi
done < <(printf '%s\n' "${candidates[@]}" | sort -Vr)
return 1
}
packages=()
command -v clang >/dev/null || packages+=(clang)
command -v llvm-objcopy >/dev/null || packages+=(llvm)
command -v gcc >/dev/null || packages+=(gcc)
select_bpftool >/dev/null || packages+=(linux-tools-generic)
if (( ${#packages[@]} )); then
sudo apt-get update
sudo apt-get install --no-install-recommends -y "${packages[@]}"
fi
# File parsing needs a working binary, not a host-kernel wrapper.
selected_bpftool="$(select_bpftool)"
"$selected_bpftool" version
printf 'BPFTOOL=%s\n' "$selected_bpftool" >> "$GITHUB_ENV"
- name: Compare declarations and layouts with independent references
run: |
clang -target bpf -O2 -g -c scripts/fixtures/btf_prototypes.c -o "$RUNNER_TEMP/prototypes.o"
llvm-objcopy --dump-section ".BTF=$RUNNER_TEMP/prototypes.btf" "$RUNNER_TEMP/prototypes.o"
gcc -std=c11 -Wall -Wextra -Werror -DRUSTFS_BTF_LAYOUT_REFERENCE \
scripts/fixtures/btf_prototypes.c -o "$RUNNER_TEMP/layout-reference"
"$RUNNER_TEMP/layout-reference" > "$RUNNER_TEMP/layout-reference.json"
python3 -B scripts/test_inspect_btf_prototypes.py --native-reference "$RUNNER_TEMP/prototypes.btf" \
--layout-reference "$RUNNER_TEMP/layout-reference.json"
File diff suppressed because it is too large Load Diff
+34 -43
View File
@@ -15,16 +15,16 @@
# Sole writer of the Rust dependency caches that ci.yml restores.
#
# Why this is a separate workflow rather than steps inside ci.yml: ci.yml's
# concurrency group originally cancelled in-progress main runs, while merges
# landed faster than its 70-minute pipeline. Over 15 consecutive main pushes:
# concurrency group cancels in-progress runs on main pushes, and merges land far
# faster than its 70-minute pipeline. Measured over 15 consecutive main pushes:
# 12 cancelled, 2 failed, 0 succeeded. A cancelled run never reaches
# Swatinem/rust-cache's post step (cache-on-failure does not cover cancellation),
# so the writer lanes were saving nothing and every PR paid a cold restore —
# 11.8-20.9 minutes of "Setup Rust environment" against 0.7-3.4 warm.
#
# Keep cache writing separate from validation: only these jobs publish the
# complete feature closure for each key. Main validation now also finishes its
# running baseline, while superseded PR attempts can still be cancelled.
# Splitting cache writing out of the test pipeline lets ci.yml keep cancelling
# superseded runs (which is correct — nobody needs test results for a commit
# that is already three merges behind) while the caches still get written.
#
# The group below deliberately does NOT cancel in progress; see the comment on
# it for how that bounds concurrency and why it is scoped by event.
@@ -42,23 +42,26 @@
name: Cache Warm
on:
schedule:
# Every six hours; the 22:41 UTC run lands before ci.yml's nightly 00:11
# UTC matrix. A reader restores the newest entry under its key and
# rebuilds whatever its own diff changed, so a cache up to six hours old
# costs a PR the handful of crates merged since. Warming after every merge
# (fourteen completed runs a day, about two sm-standard-4 hours each)
# spent far more than that to avoid it.
- cron: "41 4,10,16,22 * * *"
push:
branches: [ main ]
# A toolchain or lockfile change invalidates most of every key; those
# re-warm at once instead of waiting for the next slot.
paths:
- "Cargo.lock"
- "rust-toolchain.toml"
- ".github/actions/setup/**"
- ".github/workflows/cache-warm.yml"
# Mirrors ci.yml's push paths-ignore: if a commit cannot change what ci.yml
# compiles, it cannot change what ci.yml needs restored either.
paths-ignore:
- "**.md"
- "docs/**"
- "deploy/**"
- "scripts/dev_*.sh"
- "scripts/probe.sh"
- "LICENSE*"
- ".gitignore"
- ".dockerignore"
- "README*"
- "**/*.png"
- "**/*.jpg"
- "**/*.svg"
- ".github/workflows/build.yml"
- ".github/workflows/docker.yml"
- ".github/workflows/audit.yml"
workflow_dispatch:
inputs:
emit_timings:
@@ -72,7 +75,7 @@ on:
permissions:
contents: read
# Scoped by event. Scheduled, push and dispatch runs do not compete: GitHub keeps
# Scoped by event. A push run and a dispatch run do not compete: GitHub keeps
# one running plus one pending per group, so with a single shared group a
# manually dispatched run was displaced as pending by the next merge and
# cancelled — observed three times in a row, which made the --timings gate in
@@ -96,7 +99,7 @@ env:
RUST_BACKTRACE: 1
jobs:
# Readers: workspace-clippy, workspace-lint-and-build, workspace-tests (workspace and ILM), build-rustfs-debug-binary,
# Readers: test-and-lint, test-ilm-integration-serial, build-rustfs-debug-binary,
# e2e-tests, e2e-full.
warm-ci-dev:
name: Warm ci-dev
@@ -106,7 +109,7 @@ jobs:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
@@ -138,7 +141,7 @@ jobs:
- name: Upload cargo timings report
if: inputs.emit_timings
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
uses: actions/upload-artifact@b7c566a772e6b6bfb58ed0dc250532a479d7789f # v6
with:
name: cargo-timings-ci-dev
path: target/cargo-timings/
@@ -146,7 +149,7 @@ jobs:
if-no-files-found: error
# --all-targets covers the test binaries nextest builds, including
# e2e_test, which the workspace run excludes. The second build adds
# e2e_test, which test-and-lint's own run excludes. The second build adds
# the e2e-test-hooks feature resolution that build-rustfs-debug-binary uses
# and that no lint lane enables.
- name: Build ci-dev superset
@@ -159,17 +162,6 @@ jobs:
cargo build --workspace --all-targets
cargo build -p rustfs --bins --features e2e-test-hooks
# ci.yml runs Clippy on every pull request. Clippy's check-mode artifacts
# are separate from the build above, so warm them with the exact
# invocation ci.yml uses; a pull request then re-checks only what its diff
# touches. A lint failure on main must not stop the warm-up: the cache is
# still saved (cache-on-failure), and the failure belongs to ci.yml.
- name: Warm Clippy check artifacts
run: |
if ! cargo clippy --all-targets -- -D warnings; then
echo "::warning::cargo clippy reports findings on this commit; check artifacts are still cached"
fi
# Runs before rust-cache's post step, so these are the sizes it is about
# to archive. Reported so the cache-all-crates decision stays evidence-led:
# registry/src is what that flag prunes, registry/cache is what the pruned
@@ -193,10 +185,9 @@ jobs:
echo '```'
} >> "$GITHUB_STEP_SUMMARY"
# Readers: test-and-lint-rio-v2 (nightly schedule, merge group, dispatch),
# build-rustfs-debug-binary-rio-v2 (nightly schedule / manual dispatch only —
# dormant rio-v2 variant, see rustfs/backlog#1835 and
# docs/architecture/minio-file-format-compat.md).
# Readers: test-and-lint-rio-v2 (per-PR), build-rustfs-debug-binary-rio-v2
# (weekly schedule / manual dispatch only — dormant rio-v2 variant, see
# rustfs/backlog#1835 and docs/architecture/minio-file-format-compat.md).
# The second build below stays despite the reduced cadence: it warms the
# rio-v2,e2e-test-hooks feature resolution the scheduled build restores,
# which keeps that lane inside its 30-minute timeout.
@@ -208,7 +199,7 @@ jobs:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
@@ -239,7 +230,7 @@ jobs:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
@@ -269,7 +260,7 @@ jobs:
timeout-minutes: 60
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
@@ -1,60 +0,0 @@
name: CI Resource Accounting
on:
workflow_dispatch:
inputs:
since:
description: "Inclusive run creation timestamp, for example 2026-10-01T00:00:00Z"
required: true
type: string
until:
description: "Inclusive end timestamp; keep the window below 1000 runs"
required: true
type: string
permissions:
contents: read
actions: read
pull-requests: read
concurrency:
group: ci-resource-accounting
cancel-in-progress: false
jobs:
collect:
if: github.repository == 'rustfs/rustfs'
runs-on: ubuntu-latest
timeout-minutes: 30
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Collect all workflow attempts in the window
env:
GH_TOKEN: ${{ github.token }}
ACCOUNTING_SINCE: ${{ inputs.since }}
ACCOUNTING_UNTIL: ${{ inputs.until }}
ACCOUNTING_REPOSITORY: ${{ github.repository }}
run: |
python3 scripts/ci/actions_cost_report.py \
--repository "$ACCOUNTING_REPOSITORY" \
--since "$ACCOUNTING_SINCE" --until "$ACCOUNTING_UNTIL" \
--output "$RUNNER_TEMP/ci-accounting.json" \
--summary "$RUNNER_TEMP/ci-accounting.md"
- name: Show available accounting summary
if: always()
run: |
if [[ -f "$RUNNER_TEMP/ci-accounting.md" ]]; then
cat "$RUNNER_TEMP/ci-accounting.md" >> "$GITHUB_STEP_SUMMARY"
fi
- name: Retain recomputable accounting evidence
if: always()
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4
with:
name: ci-accounting-${{ github.run_id }}-${{ github.run_attempt }}
path: |
${{ runner.temp }}/ci-accounting.json
${{ runner.temp }}/ci-accounting.md
if-no-files-found: error
retention-days: 30
-92
View File
@@ -1,92 +0,0 @@
name: CI Runner Pilot
on:
workflow_dispatch:
inputs:
pool:
description: "Existing runner pool; no infrastructure is created"
required: true
type: choice
options: [hosted, arc]
default: hosted
workload:
description: "Probe only, or perform cold/warm fixed-source builds"
required: true
type: choice
options: [probe, server, workspace-tests]
default: probe
source_sha:
description: "Exact 40-character merged main SHA; required for builds"
type: string
toolchain:
description: "Exact Rust version such as 1.92.0; required for builds"
type: string
scratch_root:
description: "Existing absolute scratch directory; empty uses runner.temp"
type: string
build_jobs:
description: "Fixed Cargo concurrency for both comparisons (1-16)"
type: string
default: "2"
local_ssd:
description: "Require operator /etc/rustfs-runner/storage.json attestation"
type: boolean
default: false
permissions:
contents: read
concurrency:
group: ci-runner-pilot
cancel-in-progress: false
jobs:
hosted:
if: github.repository == 'rustfs/rustfs' && github.ref == 'refs/heads/main' && inputs.pool == 'hosted'
runs-on: ubuntu-latest
timeout-minutes: 150
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- uses: ./.github/actions/runner-pilot
with:
workload: ${{ inputs.workload }}
source-sha: ${{ inputs.source_sha }}
toolchain: ${{ inputs.toolchain }}
scratch-root: ${{ inputs.scratch_root }}
build-jobs: ${{ inputs.build_jobs }}
local-ssd: ${{ inputs.local_ssd }}
- name: Retain hosted pilot evidence
if: always()
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4
with:
name: runner-pilot-hosted-${{ github.run_id }}-${{ github.run_attempt }}
path: ${{ runner.temp }}/runner-pilot-evidence
if-no-files-found: error
retention-days: 30
arc:
if: github.repository == 'rustfs/rustfs' && github.ref == 'refs/heads/main' && inputs.pool == 'arc'
# Disk and hardware: measure the existing workspace build pool's storage.
runs-on: sm-standard-4
timeout-minutes: 150
steps:
- uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- uses: ./.github/actions/runner-pilot
with:
workload: ${{ inputs.workload }}
source-sha: ${{ inputs.source_sha }}
toolchain: ${{ inputs.toolchain }}
scratch-root: ${{ inputs.scratch_root }}
build-jobs: ${{ inputs.build_jobs }}
local-ssd: ${{ inputs.local_ssd }}
- name: Retain ARC pilot evidence
if: always()
uses: actions/upload-artifact@ea165f8d65b6e75b540449e92b4886f43607fa02 # v4
with:
name: runner-pilot-arc-${{ github.run_id }}-${{ github.run_attempt }}
path: ${{ runner.temp }}/runner-pilot-evidence
if-no-files-found: error
retention-days: 30
+328 -736
View File
File diff suppressed because it is too large Load Diff
+2 -2
View File
@@ -66,7 +66,7 @@ jobs:
steps:
- name: Report CLA result for merge queue
if: github.event_name == 'merge_group'
uses: actions/github-script@3a2844b7e9c422d3c10d287c895573f7108da1b3 # v9.0.0
uses: actions/github-script@ed597411d8f924073f98dfc5c65a23a2325f34cd # v8
with:
script: |
await github.rest.checks.create({
@@ -95,7 +95,7 @@ jobs:
- name: Run CLA Bot
if: github.event_name != 'merge_group'
uses: overtrue/cla-bot@4bd1387c19691168c42fcf5edfa17b15819b2ab3 # v0.1.1
uses: overtrue/cla-bot@5e5929846a60cfb42b16d0d38e135ef67d94fc88 # v0.0.9
with:
github-token: ${{ github.token }}
registry-token: ${{ steps.registry-token.outputs.token }}
@@ -1,206 +0,0 @@
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Connect diagnostic scheduler receipt acceptance
on:
workflow_dispatch:
inputs:
build_run_id:
description: Main-branch Build and Release run ID
required: true
type: string
artifact_id:
description: Linux x86_64 GNU artifact from that run
required: true
type: string
source_sha:
description: Exact RustFS source commit
required: true
type: string
artifact_digest:
description: GitHub artifact digest including sha256 prefix
required: true
type: string
binary_sha256:
description: Independently verified rustfs binary SHA-256
required: true
type: string
connect_sha:
description: Exact Connect scheduler acceptance harness commit
required: true
type: string
permissions:
actions: read
contents: read
jobs:
diagnostic-schedule:
name: Verify production scheduler receipts over mTLS
runs-on: sm-standard-2
timeout-minutes: 45
steps:
- name: Checkout exact RustFS source
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
path: rustfs-source
persist-credentials: false
ref: ${{ inputs.source_sha }}
- name: Checkout exact Connect harness
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
repository: rustfs/connect
path: connect-harness
persist-credentials: false
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
node-version: 25.8.1
cache: npm
cache-dependency-path: connect-harness/web/package-lock.json
- name: Verify official source and artifact identity
shell: bash
env:
GH_TOKEN: ${{ github.token }}
BUILD_RUN_ID: ${{ inputs.build_run_id }}
ARTIFACT_ID: ${{ inputs.artifact_id }}
SOURCE_SHA: ${{ inputs.source_sha }}
ARTIFACT_DIGEST: ${{ inputs.artifact_digest }}
BINARY_SHA256: ${{ inputs.binary_sha256 }}
CONNECT_SHA: ${{ inputs.connect_sha }}
run: |
set -euo pipefail
[[ "$BUILD_RUN_ID" =~ ^[0-9]+$ && "$ARTIFACT_ID" =~ ^[0-9]+$ ]]
[[ "$SOURCE_SHA" =~ ^[0-9a-f]{40}$ && "$CONNECT_SHA" =~ ^[0-9a-f]{40}$ ]]
[[ "$ARTIFACT_DIGEST" =~ ^sha256:[0-9a-f]{64}$ ]]
[[ "$BINARY_SHA256" =~ ^[0-9a-f]{64}$ ]]
[[ $(git -C rustfs-source rev-parse HEAD) == "$SOURCE_SHA" ]]
[[ $(git -C connect-harness rev-parse HEAD) == "$CONNECT_SHA" ]]
[[ $(git -C rustfs-source remote get-url origin) == https://github.com/rustfs/rustfs ]]
[[ $(git -C connect-harness remote get-url origin) == https://github.com/rustfs/connect ]]
run=$(gh api "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}")
jq -e --arg source "$SOURCE_SHA" --arg repository "$GITHUB_REPOSITORY" '
.head_sha == $source and .head_branch == "main"
and .head_repository.full_name == $repository
and .name == "Build and Release" and .path == ".github/workflows/build.yml"
and .status == "completed" and .conclusion == "success"
' <<<"$run" >/dev/null
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e '
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu\\)$"))] as $matches
| ($matches | length) == 1 and $matches[0].conclusion == "success"
' <<<"$jobs" >/dev/null
artifact=$(gh api "repos/${GITHUB_REPOSITORY}/actions/artifacts/${ARTIFACT_ID}")
jq -e --argjson run "$BUILD_RUN_ID" --arg source "$SOURCE_SHA" --arg digest "$ARTIFACT_DIGEST" '
.workflow_run.id == $run and .workflow_run.head_sha == $source
and .name == ("rustfs-linux-x86_64-gnu-dev-" + $source[0:7])
and .digest == $digest and .expired == false
and (.expires_at | fromdateiso8601) > now
and .size_in_bytes > 0 and .size_in_bytes <= 2147483648
' <<<"$artifact" >/dev/null
gh api "repos/${GITHUB_REPOSITORY}/actions/artifacts/${ARTIFACT_ID}/zip" > official-artifact.zip
printf '%s official-artifact.zip\n' "${ARTIFACT_DIGEST#sha256:}" | sha256sum --check --strict
- name: Extract the verified official binary
shell: bash
env:
SOURCE_SHA: ${{ inputs.source_sha }}
BINARY_SHA256: ${{ inputs.binary_sha256 }}
run: |
set -euo pipefail
python3 - <<'PY'
import io
import os
import pathlib
import stat
import zipfile
def regular(entry):
mode = entry.external_attr >> 16
return not entry.is_dir() and (stat.S_IFMT(mode) in (0, stat.S_IFREG))
package = f"rustfs-linux-x86_64-gnu-dev-{os.environ['SOURCE_SHA'][:7]}.zip"
with zipfile.ZipFile('official-artifact.zip') as outer:
entries = outer.infolist()
assert 1 <= len(entries) <= 16
assert len({item.filename for item in entries}) == len(entries)
assert all(regular(item) and pathlib.PurePosixPath(item.filename).name == item.filename for item in entries)
assert sum(item.file_size for item in entries) <= 2147483648
assert outer.testzip() is None
with zipfile.ZipFile(io.BytesIO(outer.read(package))) as inner:
entries = inner.infolist()
assert {item.filename for item in entries} == {'rustfs', 'rustfs.cpu-symbol-catalog.json', 'rustfs.cpu-symbol-catalog.sha256'} and len(entries) == 3
assert all(regular(item) and 0 < item.file_size <= 1073741824 for item in entries)
assert inner.testzip() is None
pathlib.Path('binary').mkdir()
with inner.open('rustfs') as source, open('binary/rustfs', 'xb') as destination:
import shutil
shutil.copyfileobj(source, destination)
PY
chmod 0755 binary/rustfs
printf '%s binary/rustfs\n' "$BINARY_SHA256" | sha256sum --check --strict
file binary/rustfs | grep -Eq 'ELF 64-bit LSB.*x86-64'
- name: Run the real scheduler and receipt delivery scenario
shell: bash
env:
SOURCE_SHA: ${{ inputs.source_sha }}
run: |
set -euo pipefail
git -C connect-harness diff --exit-code
printf '%s\n' "$SOURCE_SHA" >connect-harness/tests/e2e/connected/rustfs-ref
[[ $(git -C connect-harness diff --name-only) == tests/e2e/connected/rustfs-ref ]]
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
(cd connect-harness && ./tests/connectivity/diagnostic-schedule-evidence.test.sh)
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_DIAGNOSTIC_SCHEDULE_EVIDENCE="$GITHUB_WORKSPACE/diagnostic-schedule-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=diagnostic-schedule
- name: Bind and validate sanitized evidence
shell: bash
env:
BUILD_RUN_ID: ${{ inputs.build_run_id }}
ARTIFACT_ID: ${{ inputs.artifact_id }}
ARTIFACT_DIGEST: ${{ inputs.artifact_digest }}
BINARY_SHA256: ${{ inputs.binary_sha256 }}
CONNECT_SHA: ${{ inputs.connect_sha }}
SOURCE_SHA: ${{ inputs.source_sha }}
run: |
set -euo pipefail
jq -e --arg connect "$CONNECT_SHA" --arg source "$SOURCE_SHA" --arg binary "$BINARY_SHA256" '
.provenance.connectSha == $connect and .provenance.sourceSha == $source
and .provenance.binarySha256 == $binary
' diagnostic-schedule-evidence.json >/dev/null
jq --arg run "$GITHUB_RUN_ID" --arg build "$BUILD_RUN_ID" \
--arg artifact "$ARTIFACT_ID" --arg digest "$ARTIFACT_DIGEST" '
.provenance += {workflowRunId:$run,buildRunId:$build,artifactId:$artifact,artifactDigest:$digest}
' diagnostic-schedule-evidence.json > diagnostic-schedule-evidence.bound.json
mv diagnostic-schedule-evidence.bound.json diagnostic-schedule-evidence.json
node connect-harness/tests/connectivity/verify-diagnostic-schedule-evidence.mjs diagnostic-schedule-evidence.json --bound
- name: Upload verified receipt evidence
uses: actions/upload-artifact@b7c566a772e6b6bfb58ed0dc250532a479d7789f # v6
with:
name: connect-diagnostic-schedule-evidence-${{ github.run_id }}
path: diagnostic-schedule-evidence.json
retention-days: 14
if-no-files-found: error
@@ -1,244 +0,0 @@
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Connect bounded health service acceptance
on:
workflow_dispatch:
inputs:
build_run_id:
description: Successful main-branch Build and Release run ID
required: true
type: string
artifact_id:
description: Linux x86_64 GNU artifact from that run
required: true
type: string
source_sha:
description: Exact RustFS source commit
required: true
type: string
artifact_digest:
description: GitHub artifact digest including sha256 prefix
required: true
type: string
binary_sha256:
description: Independently verified rustfs binary SHA-256
required: true
type: string
connect_sha:
description: Exact Connect health service acceptance harness commit
required: true
type: string
permissions:
actions: read
contents: read
jobs:
health-service:
name: Verify bounded health service over mTLS
runs-on: dind-sm-standard-2
timeout-minutes: 45
steps:
- name: Checkout exact RustFS source
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
path: rustfs-source
persist-credentials: false
ref: ${{ inputs.source_sha }}
- name: Checkout exact Connect harness
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
repository: rustfs/connect
path: connect-harness
persist-credentials: false
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
node-version: 25.8.1
cache: npm
cache-dependency-path: connect-harness/web/package-lock.json
- name: Ensure GitHub CLI
shell: bash
run: |
if command -v gh >/dev/null 2>&1; then
gh --version
exit 0
fi
gh_version="2.101.0"
case "$(uname -m)" in
x86_64) gh_arch="amd64" ;;
aarch64|arm64) gh_arch="arm64" ;;
*)
echo "Unsupported Linux architecture for GitHub CLI: $(uname -m)" >&2
exit 1
;;
esac
gh_install_root="${RUNNER_TEMP:-$PWD}/gh-cli"
rm -rf "$gh_install_root"
mkdir -p "$gh_install_root/bin"
archive="$gh_install_root/gh.tar.gz"
curl --fail --location --retry 3 \
"https://github.com/cli/cli/releases/download/v${gh_version}/gh_${gh_version}_linux_${gh_arch}.tar.gz" \
--output "$archive"
tar -xzf "$archive" -C "$gh_install_root"
install -m 0755 \
"$gh_install_root/gh_${gh_version}_linux_${gh_arch}/bin/gh" \
"$gh_install_root/bin/gh"
echo "$gh_install_root/bin" >> "$GITHUB_PATH"
export PATH="$gh_install_root/bin:$PATH"
gh --version
- name: Verify official source and artifact identity
shell: bash
env:
GH_TOKEN: ${{ github.token }}
BUILD_RUN_ID: ${{ inputs.build_run_id }}
ARTIFACT_ID: ${{ inputs.artifact_id }}
SOURCE_SHA: ${{ inputs.source_sha }}
ARTIFACT_DIGEST: ${{ inputs.artifact_digest }}
BINARY_SHA256: ${{ inputs.binary_sha256 }}
CONNECT_SHA: ${{ inputs.connect_sha }}
run: |
set -euo pipefail
[[ "$GITHUB_REPOSITORY" == rustfs/rustfs ]]
[[ "$BUILD_RUN_ID" =~ ^[1-9][0-9]*$ && "$ARTIFACT_ID" =~ ^[1-9][0-9]*$ ]]
[[ "$SOURCE_SHA" =~ ^[0-9a-f]{40}$ && "$CONNECT_SHA" =~ ^[0-9a-f]{40}$ ]]
[[ "$ARTIFACT_DIGEST" =~ ^sha256:[0-9a-f]{64}$ ]]
[[ "$BINARY_SHA256" =~ ^[0-9a-f]{64}$ ]]
[[ $(git -C rustfs-source rev-parse HEAD) == "$SOURCE_SHA" ]]
[[ $(git -C connect-harness rev-parse HEAD) == "$CONNECT_SHA" ]]
[[ $(git -C rustfs-source remote get-url origin) == https://github.com/rustfs/rustfs ]]
[[ $(git -C connect-harness remote get-url origin) == https://github.com/rustfs/connect ]]
run=$(gh api "repos/rustfs/rustfs/actions/runs/${BUILD_RUN_ID}")
jq -e --arg source "$SOURCE_SHA" '
.head_sha == $source and .head_branch == "main"
and .head_repository.full_name == "rustfs/rustfs"
and .name == "Build and Release" and .path == ".github/workflows/build.yml"
and .status == "completed" and .conclusion == "success"
' <<<"$run" >/dev/null
jobs=$(gh api --paginate --slurp "repos/rustfs/rustfs/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e '
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu\\)$"))] as $matches
| ($matches | length) == 1 and $matches[0].conclusion == "success"
' <<<"$jobs" >/dev/null
artifact=$(gh api "repos/rustfs/rustfs/actions/artifacts/${ARTIFACT_ID}")
jq -e --argjson run "$BUILD_RUN_ID" --arg source "$SOURCE_SHA" --arg digest "$ARTIFACT_DIGEST" '
.workflow_run.id == $run and .workflow_run.head_sha == $source
and .name == ("rustfs-linux-x86_64-gnu-dev-" + $source[0:7])
and .digest == $digest and .expired == false
and (.expires_at | fromdateiso8601) > now
and .size_in_bytes > 0 and .size_in_bytes <= 2147483648
' <<<"$artifact" >/dev/null
jq -r '.expires_at' <<<"$artifact" > artifact-expires-at
gh api "repos/rustfs/rustfs/actions/artifacts/${ARTIFACT_ID}/zip" > official-artifact.zip
[[ $(stat --format=%s official-artifact.zip) == $(jq -r '.size_in_bytes' <<<"$artifact") ]]
printf '%s official-artifact.zip\n' "${ARTIFACT_DIGEST#sha256:}" | sha256sum --check --strict
- name: Extract only the verified official service binary
shell: bash
env:
SOURCE_SHA: ${{ inputs.source_sha }}
BINARY_SHA256: ${{ inputs.binary_sha256 }}
run: |
set -euo pipefail
python3 - <<'PY'
import io
import os
import pathlib
import shutil
import stat
import zipfile
def regular(entry):
mode = entry.external_attr >> 16
return not entry.is_dir() and stat.S_IFMT(mode) in (0, stat.S_IFREG)
package = f"rustfs-linux-x86_64-gnu-dev-{os.environ['SOURCE_SHA'][:7]}.zip"
with zipfile.ZipFile('official-artifact.zip') as outer:
entries = outer.infolist()
assert 1 <= len(entries) <= 16
assert len({entry.filename for entry in entries}) == len(entries)
assert all(regular(entry) and pathlib.PurePosixPath(entry.filename).name == entry.filename for entry in entries)
assert sum(entry.file_size for entry in entries) <= 2147483648
assert outer.testzip() is None
with zipfile.ZipFile(io.BytesIO(outer.read(package))) as inner:
entries = inner.infolist()
assert {entry.filename for entry in entries} == {'rustfs', 'rustfs.cpu-symbol-catalog.json', 'rustfs.cpu-symbol-catalog.sha256'} and len(entries) == 3
assert all(regular(entry) and 0 < entry.file_size <= 1073741824 for entry in entries)
assert inner.testzip() is None
pathlib.Path('binary').mkdir()
with inner.open('rustfs') as source, open('binary/rustfs', 'xb') as destination:
header = source.read(20)
assert header[:7] == b'\x7fELF\x02\x01\x01' and header[18:20] == b'\x3e\x00', 'Expected a little-endian ELF64 x86-64 binary'
destination.write(header)
shutil.copyfileobj(source, destination)
PY
chmod 0755 binary/rustfs
printf '%s binary/rustfs\n' "$BINARY_SHA256" | sha256sum --check --strict
- name: Run the real health service job
shell: bash
env:
SOURCE_SHA: ${{ inputs.source_sha }}
run: |
set -euo pipefail
git -C connect-harness diff --exit-code
printf '%s\n' "$SOURCE_SHA" >connect-harness/tests/e2e/connected/rustfs-ref
changed=$(git -C connect-harness diff --name-only)
[[ -z "$changed" || "$changed" == tests/e2e/connected/rustfs-ref ]]
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
(cd connect-harness && ./tests/connectivity/health-service-evidence.test.sh)
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_HEALTH_SERVICE_EVIDENCE="$GITHUB_WORKSPACE/health-service-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=health-service
- name: Bind and validate sanitized evidence
shell: bash
env:
BUILD_RUN_ID: ${{ inputs.build_run_id }}
ARTIFACT_ID: ${{ inputs.artifact_id }}
ARTIFACT_DIGEST: ${{ inputs.artifact_digest }}
BINARY_SHA256: ${{ inputs.binary_sha256 }}
CONNECT_SHA: ${{ inputs.connect_sha }}
SOURCE_SHA: ${{ inputs.source_sha }}
run: |
set -euo pipefail
jq -e --arg connect "$CONNECT_SHA" --arg source "$SOURCE_SHA" --arg binary "$BINARY_SHA256" '
.provenance.connectSha == $connect and .provenance.sourceSha == $source
and .provenance.binarySha256 == $binary
' health-service-evidence.json >/dev/null
jq --arg run "$GITHUB_RUN_ID" --arg build "$BUILD_RUN_ID" \
--arg artifact "$ARTIFACT_ID" --arg digest "$ARTIFACT_DIGEST" \
--arg expiry "$(cat artifact-expires-at)" '
.provenance += {workflowRunId:$run,buildRunId:$build,artifactId:$artifact,artifactDigest:$digest,artifactExpiresAt:$expiry}
' health-service-evidence.json > health-service-evidence.bound.json
mv health-service-evidence.bound.json health-service-evidence.json
node connect-harness/tests/connectivity/health-service-evidence.mjs health-service-evidence.json --bound
- name: Upload only verified sanitized evidence
uses: actions/upload-artifact@b7c566a772e6b6bfb58ed0dc250532a479d7789f # v6
with:
name: connect-health-service-evidence-${{ github.run_id }}
path: health-service-evidence.json
retention-days: 14
if-no-files-found: error
@@ -49,23 +49,23 @@ permissions:
jobs:
performance-drive:
name: Verify native Linux x86_64 performance.drive service job
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 45
steps:
- name: Checkout acceptance harness
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
- name: Checkout exact RustFS source
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
path: rustfs-source
persist-credentials: false
ref: ${{ inputs.source_sha }}
- name: Checkout exact Connect harness
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
repository: rustfs/connect
path: connect-harness
@@ -73,18 +73,10 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
node-version: 25.8.1
node-version: 22.22.2
cache: npm
cache-dependency-path: connect-harness/web/package-lock.json
@@ -115,7 +107,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu)'
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-2, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.[].jobs[] | select(.name == $name)] as $matches
@@ -130,7 +122,7 @@ jobs:
[[ $(jq -r '.expired' <<<"$artifact") == false ]]
- name: Download exact build artifact
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
uses: actions/download-artifact@37930b1c2abaa49bbe596cd826c3c89aef350131 # v7
with:
artifact-ids: ${{ inputs.artifact_id }}
path: artifact
@@ -162,7 +154,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_PERFORMANCE_DRIVE_EVIDENCE="$GITHUB_WORKSPACE/performance-drive-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=performance-drive
@@ -191,7 +183,7 @@ jobs:
- name: Upload acceptance evidence
if: ${{ always() && hashFiles('performance-drive-service-job-evidence.json') != '' }}
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
uses: actions/upload-artifact@b7c566a772e6b6bfb58ed0dc250532a479d7789f # v6
with:
name: connect-performance-drive-evidence-${{ github.run_id }}
path: |
@@ -49,23 +49,23 @@ permissions:
jobs:
performance-network:
name: Verify native Linux x86_64 performance.network service job
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 45
steps:
- name: Checkout acceptance harness
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
- name: Checkout exact RustFS source
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
path: rustfs-source
persist-credentials: false
ref: ${{ inputs.source_sha }}
- name: Checkout exact Connect harness
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
repository: rustfs/connect
path: connect-harness
@@ -73,18 +73,10 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
node-version: 25.8.1
node-version: 22.22.2
cache: npm
cache-dependency-path: connect-harness/web/package-lock.json
@@ -115,7 +107,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu)'
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-2, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.[].jobs[] | select(.name == $name)] as $matches
@@ -130,7 +122,7 @@ jobs:
[[ $(jq -r '.expired' <<<"$artifact") == false ]]
- name: Download exact build artifact
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
uses: actions/download-artifact@37930b1c2abaa49bbe596cd826c3c89aef350131 # v7
with:
artifact-ids: ${{ inputs.artifact_id }}
path: artifact
@@ -162,7 +154,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_PERFORMANCE_NETWORK_EVIDENCE="$GITHUB_WORKSPACE/performance-network-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=performance-network
@@ -191,7 +183,7 @@ jobs:
- name: Upload acceptance evidence
if: ${{ always() && hashFiles('performance-network-service-job-evidence.json') != '' }}
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
uses: actions/upload-artifact@b7c566a772e6b6bfb58ed0dc250532a479d7789f # v6
with:
name: connect-performance-network-evidence-${{ github.run_id }}
path: |
@@ -37,10 +37,6 @@ on:
description: Expected rustfs binary SHA-256
required: true
type: string
catalog_sha256:
description: Independently reviewed release CPU catalog SHA-256
required: true
type: string
connect_sha:
description: Exact 40-character RustFS Connect harness commit
required: true
@@ -53,23 +49,23 @@ permissions:
jobs:
profile-cpu:
name: Verify native Linux x86_64 profile.cpu service job
runs-on: dind-sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 45
steps:
- name: Checkout acceptance harness
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
- name: Checkout exact RustFS source
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
path: rustfs-source
persist-credentials: false
ref: ${{ inputs.source_sha }}
- name: Checkout exact Connect harness
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
repository: rustfs/connect
path: connect-harness
@@ -77,18 +73,10 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
node-version: 25.8.1
node-version: 22.22.2
cache: npm
cache-dependency-path: connect-harness/web/package-lock.json
@@ -113,27 +101,20 @@ jobs:
[[ $(git -C rustfs-source remote get-url origin) == https://github.com/rustfs/rustfs ]]
[[ $(git -C connect-harness remote get-url origin) == https://github.com/rustfs/connect ]]
github_api() {
curl --fail --silent --show-error \
--header "Authorization: Bearer $GH_TOKEN" \
--header 'Accept: application/vnd.github+json' \
"https://api.github.com/$1"
}
run=$(github_api "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}")
run=$(gh api "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}")
[[ $(jq -r '.head_sha' <<<"$run") == "$SOURCE_SHA" ]]
[[ $(jq -r '.head_branch' <<<"$run") == main ]]
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu)'
jobs=$(github_api "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-2, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.jobs[] | select(.name == $name)] as $matches
[.[].jobs[] | select(.name == $name)] as $matches
| (($matches | length) == 1 and $matches[0].conclusion == "success")
' <<<"$jobs" >/dev/null
artifact=$(github_api "repos/${GITHUB_REPOSITORY}/actions/artifacts/${ARTIFACT_ID}")
artifact=$(gh api "repos/${GITHUB_REPOSITORY}/actions/artifacts/${ARTIFACT_ID}")
[[ $(jq -r '.workflow_run.id' <<<"$artifact") == "$BUILD_RUN_ID" ]]
[[ $(jq -r '.workflow_run.head_sha' <<<"$artifact") == "$SOURCE_SHA" ]]
[[ $(jq -r '.name' <<<"$artifact") == rustfs-linux-x86_64-gnu-* ]]
@@ -141,39 +122,31 @@ jobs:
[[ $(jq -r '.expired' <<<"$artifact") == false ]]
- name: Download exact build artifact
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
uses: actions/download-artifact@37930b1c2abaa49bbe596cd826c3c89aef350131 # v7
with:
artifact-ids: ${{ inputs.artifact_id }}
path: artifact
run-id: ${{ inputs.build_run_id }}
github-token: ${{ github.token }}
- name: Extract exact RustFS binary and reviewed catalog
- name: Extract exact RustFS binary
shell: bash
env:
BINARY_SHA256: ${{ inputs.binary_sha256 }}
CATALOG_SHA256: ${{ inputs.catalog_sha256 }}
SOURCE_SHA: ${{ inputs.source_sha }}
run: |
set -euo pipefail
[[ "$BINARY_SHA256" =~ ^[0-9a-f]{64}$ ]]
[[ "$CATALOG_SHA256" =~ ^[0-9a-f]{64}$ ]]
short_sha=${SOURCE_SHA:0:7}
package=$(find artifact -type f -name "rustfs-linux-x86_64-gnu-dev-${short_sha}.zip" -print -quit)
[[ -n "$package" ]]
mkdir -p binary
unzip -qq "$package" rustfs rustfs.cpu-symbol-catalog.json rustfs.cpu-symbol-catalog.sha256 -d binary
unzip -qq "$package" rustfs -d binary
chmod +x binary/rustfs
printf '%s %s\n' "$BINARY_SHA256" binary/rustfs | sha256sum --check --strict
# The packaged digest is corroboration, never the independent trust input.
[[ $(cat binary/rustfs.cpu-symbol-catalog.sha256) == "$CATALOG_SHA256" ]]
printf '%s %s\n' "$CATALOG_SHA256" binary/rustfs.cpu-symbol-catalog.json | sha256sum --check --strict
chmod 0444 binary/rustfs.cpu-symbol-catalog.json
- name: Run signed service job acceptance
shell: bash
env:
CATALOG_SHA256: ${{ inputs.catalog_sha256 }}
SOURCE_SHA: ${{ inputs.source_sha }}
run: |
set -euo pipefail
@@ -181,10 +154,8 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_CPU_CATALOG="$GITHUB_WORKSPACE/binary/rustfs.cpu-symbol-catalog.json" \
CONNECT_E2E_CPU_CATALOG_SHA256="$CATALOG_SHA256" \
CONNECT_E2E_PROFILE_EVIDENCE="$GITHUB_WORKSPACE/profile-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=profile
@@ -212,7 +183,7 @@ jobs:
- name: Upload acceptance evidence
if: ${{ always() && hashFiles('profile-service-job-evidence.json') != '' }}
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
uses: actions/upload-artifact@b7c566a772e6b6bfb58ed0dc250532a479d7789f # v6
with:
name: connect-profile-cpu-evidence-${{ github.run_id }}
path: |
@@ -1,243 +0,0 @@
# Copyright 2026 RustFS Team
# SPDX-License-Identifier: Apache-2.0
name: Connect service memory profile acceptance
on:
workflow_dispatch:
inputs:
build_run_id:
description: Successful main-branch Build and Release run ID
required: true
type: string
artifact_id:
description: Linux x86_64 GNU artifact from that run
required: true
type: string
source_sha:
description: Exact RustFS source commit
required: true
type: string
artifact_digest:
description: GitHub artifact digest including sha256 prefix
required: true
type: string
binary_sha256:
description: Independently verified rustfs binary SHA-256
required: true
type: string
connect_sha:
description: Exact Connect memory acceptance harness commit
required: true
type: string
permissions:
actions: read
contents: read
jobs:
profile-memory:
name: Verify signed service memory profile over mTLS
runs-on: dind-sm-standard-2
timeout-minutes: 45
steps:
- name: Checkout exact RustFS source
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
path: rustfs-source
persist-credentials: false
ref: ${{ inputs.source_sha }}
- name: Checkout exact Connect harness
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
repository: rustfs/connect
path: connect-harness
persist-credentials: false
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
node-version: 25.8.1
cache: npm
cache-dependency-path: connect-harness/web/package-lock.json
- name: Ensure GitHub CLI
shell: bash
run: |
if command -v gh >/dev/null 2>&1; then
gh --version
exit 0
fi
gh_version="2.101.0"
case "$(uname -m)" in
x86_64) gh_arch="amd64" ;;
aarch64|arm64) gh_arch="arm64" ;;
*)
echo "Unsupported Linux architecture for GitHub CLI: $(uname -m)" >&2
exit 1
;;
esac
gh_install_root="${RUNNER_TEMP:-$PWD}/gh-cli"
rm -rf "$gh_install_root"
mkdir -p "$gh_install_root/bin"
archive="$gh_install_root/gh.tar.gz"
curl --fail --location --retry 3 \
"https://github.com/cli/cli/releases/download/v${gh_version}/gh_${gh_version}_linux_${gh_arch}.tar.gz" \
--output "$archive"
tar -xzf "$archive" -C "$gh_install_root"
install -m 0755 \
"$gh_install_root/gh_${gh_version}_linux_${gh_arch}/bin/gh" \
"$gh_install_root/bin/gh"
echo "$gh_install_root/bin" >> "$GITHUB_PATH"
export PATH="$gh_install_root/bin:$PATH"
gh --version
- name: Verify official source and artifact identity
shell: bash
env:
GH_TOKEN: ${{ github.token }}
BUILD_RUN_ID: ${{ inputs.build_run_id }}
ARTIFACT_ID: ${{ inputs.artifact_id }}
SOURCE_SHA: ${{ inputs.source_sha }}
ARTIFACT_DIGEST: ${{ inputs.artifact_digest }}
BINARY_SHA256: ${{ inputs.binary_sha256 }}
CONNECT_SHA: ${{ inputs.connect_sha }}
run: |
set -euo pipefail
[[ "$GITHUB_REPOSITORY" == rustfs/rustfs ]]
[[ "$BUILD_RUN_ID" =~ ^[1-9][0-9]*$ && "$ARTIFACT_ID" =~ ^[1-9][0-9]*$ ]]
[[ "$SOURCE_SHA" =~ ^[0-9a-f]{40}$ && "$CONNECT_SHA" =~ ^[0-9a-f]{40}$ ]]
[[ "$ARTIFACT_DIGEST" =~ ^sha256:[0-9a-f]{64}$ ]]
[[ "$BINARY_SHA256" =~ ^[0-9a-f]{64}$ ]]
[[ $(git -C rustfs-source rev-parse HEAD) == "$SOURCE_SHA" ]]
[[ $(git -C connect-harness rev-parse HEAD) == "$CONNECT_SHA" ]]
[[ $(git -C rustfs-source remote get-url origin) == https://github.com/rustfs/rustfs ]]
[[ $(git -C connect-harness remote get-url origin) == https://github.com/rustfs/connect ]]
run=$(gh api "repos/rustfs/rustfs/actions/runs/${BUILD_RUN_ID}")
jq -e --arg source "$SOURCE_SHA" '
.head_sha == $source and .head_branch == "main"
and .head_repository.full_name == "rustfs/rustfs"
and .name == "Build and Release" and .path == ".github/workflows/build.yml"
and .status == "completed" and .conclusion == "success"
' <<<"$run" >/dev/null
jobs=$(gh api --paginate --slurp "repos/rustfs/rustfs/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e '
[.[].jobs[] | select(.name | test("^Build RustFS \\(linux-x86_64-gnu\\)$"))] as $matches
| ($matches | length) == 1 and $matches[0].conclusion == "success"
' <<<"$jobs" >/dev/null
artifact=$(gh api "repos/rustfs/rustfs/actions/artifacts/${ARTIFACT_ID}")
jq -e --argjson run "$BUILD_RUN_ID" --arg source "$SOURCE_SHA" --arg digest "$ARTIFACT_DIGEST" '
.workflow_run.id == $run and .workflow_run.head_sha == $source
and .name == ("rustfs-linux-x86_64-gnu-dev-" + $source[0:7])
and .digest == $digest and .expired == false
and (.expires_at | fromdateiso8601) > now
and .size_in_bytes > 0 and .size_in_bytes <= 2147483648
' <<<"$artifact" >/dev/null
jq -r '.expires_at' <<<"$artifact" > artifact-expires-at
gh api "repos/rustfs/rustfs/actions/artifacts/${ARTIFACT_ID}/zip" > official-artifact.zip
[[ $(stat --format=%s official-artifact.zip) == $(jq -r '.size_in_bytes' <<<"$artifact") ]]
printf '%s official-artifact.zip\n' "${ARTIFACT_DIGEST#sha256:}" | sha256sum --check --strict
- name: Extract only the verified official service binary
shell: bash
env:
SOURCE_SHA: ${{ inputs.source_sha }}
BINARY_SHA256: ${{ inputs.binary_sha256 }}
run: |
set -euo pipefail
python3 - <<'PY'
import io
import os
import pathlib
import shutil
import stat
import zipfile
def regular(entry):
mode = entry.external_attr >> 16
return not entry.is_dir() and stat.S_IFMT(mode) in (0, stat.S_IFREG)
package = f"rustfs-linux-x86_64-gnu-dev-{os.environ['SOURCE_SHA'][:7]}.zip"
with zipfile.ZipFile('official-artifact.zip') as outer:
entries = outer.infolist()
assert 1 <= len(entries) <= 16
assert len({entry.filename for entry in entries}) == len(entries)
assert all(regular(entry) and pathlib.PurePosixPath(entry.filename).name == entry.filename for entry in entries)
assert sum(entry.file_size for entry in entries) <= 2147483648
assert outer.testzip() is None
with zipfile.ZipFile(io.BytesIO(outer.read(package))) as inner:
entries = inner.infolist()
expected = {'rustfs', 'rustfs.cpu-symbol-catalog.json', 'rustfs.cpu-symbol-catalog.sha256'}
assert {entry.filename for entry in entries} == expected and len(entries) == len(expected)
assert all(regular(entry) and 0 < entry.file_size <= 1073741824 for entry in entries)
assert inner.testzip() is None
pathlib.Path('binary').mkdir()
with inner.open('rustfs') as source, open('binary/rustfs', 'xb') as destination:
shutil.copyfileobj(source, destination)
PY
chmod 0755 binary/rustfs
printf '%s binary/rustfs\n' "$BINARY_SHA256" | sha256sum --check --strict
file binary/rustfs | grep -Eq 'ELF 64-bit LSB.*x86-64'
- name: Run the real service job under S3 workload
shell: bash
env:
SOURCE_SHA: ${{ inputs.source_sha }}
run: |
set -euo pipefail
git -C connect-harness diff --exit-code
printf '%s\n' "$SOURCE_SHA" >connect-harness/tests/e2e/connected/rustfs-ref
changed=$(git -C connect-harness diff --name-only)
[[ -z "$changed" || "$changed" == tests/e2e/connected/rustfs-ref ]]
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
(cd connect-harness && ./tests/connectivity/profile-memory-evidence.test.sh)
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_PROFILE_MEMORY_EVIDENCE="$GITHUB_WORKSPACE/profile-memory-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=profile-memory
- name: Bind and validate sanitized evidence
shell: bash
env:
BUILD_RUN_ID: ${{ inputs.build_run_id }}
ARTIFACT_ID: ${{ inputs.artifact_id }}
ARTIFACT_DIGEST: ${{ inputs.artifact_digest }}
BINARY_SHA256: ${{ inputs.binary_sha256 }}
CONNECT_SHA: ${{ inputs.connect_sha }}
SOURCE_SHA: ${{ inputs.source_sha }}
run: |
set -euo pipefail
jq -e --arg connect "$CONNECT_SHA" --arg source "$SOURCE_SHA" --arg binary "$BINARY_SHA256" '
.provenance.connectSha == $connect and .provenance.sourceSha == $source
and .provenance.binarySha256 == $binary
' profile-memory-evidence.json >/dev/null
jq --arg run "$GITHUB_RUN_ID" --arg build "$BUILD_RUN_ID" \
--arg artifact "$ARTIFACT_ID" --arg digest "$ARTIFACT_DIGEST" \
--arg expiry "$(cat artifact-expires-at)" '
.provenance += {workflowRunId:$run,buildRunId:$build,artifactId:$artifact,artifactDigest:$digest,artifactExpiresAt:$expiry}
' profile-memory-evidence.json > profile-memory-evidence.bound.json
mv profile-memory-evidence.bound.json profile-memory-evidence.json
node connect-harness/tests/connectivity/profile-memory-evidence.mjs profile-memory-evidence.json --bound
- name: Upload only verified sanitized evidence
uses: actions/upload-artifact@b7c566a772e6b6bfb58ed0dc250532a479d7789f # v6
with:
name: connect-profile-memory-evidence-${{ github.run_id }}
path: profile-memory-evidence.json
retention-days: 14
if-no-files-found: error
@@ -17,14 +17,6 @@ name: Connect profile.threads service-job acceptance
on:
workflow_dispatch:
inputs:
thread_scope:
description: Thread profile scope
required: true
type: choice
default: native
options:
- native
- runtime
build_run_id:
description: Main-branch Build and Release workflow run ID
required: true
@@ -56,24 +48,24 @@ permissions:
jobs:
profile-threads:
name: Verify Linux x86_64 profile.threads service job
runs-on: dind-sm-standard-2
name: Verify native Linux x86_64 profile.threads service job
runs-on: ubuntu-latest
timeout-minutes: 45
steps:
- name: Checkout acceptance harness
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
- name: Checkout exact RustFS source
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
path: rustfs-source
persist-credentials: false
ref: ${{ inputs.source_sha }}
- name: Checkout exact Connect harness
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
repository: rustfs/connect
path: connect-harness
@@ -81,54 +73,13 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
node-version: 25.8.1
node-version: 22.22.2
cache: npm
cache-dependency-path: connect-harness/web/package-lock.json
- name: Ensure GitHub CLI
shell: bash
run: |
if command -v gh >/dev/null 2>&1; then
gh --version
exit 0
fi
gh_version="2.101.0"
case "$(uname -m)" in
x86_64) gh_arch="amd64" ;;
aarch64|arm64) gh_arch="arm64" ;;
*)
echo "Unsupported Linux architecture for GitHub CLI: $(uname -m)" >&2
exit 1
;;
esac
gh_install_root="${RUNNER_TEMP:-$PWD}/gh-cli"
rm -rf "$gh_install_root"
mkdir -p "$gh_install_root/bin"
archive="$gh_install_root/gh.tar.gz"
curl --fail --location --retry 3 \
"https://github.com/cli/cli/releases/download/v${gh_version}/gh_${gh_version}_linux_${gh_arch}.tar.gz" \
--output "$archive"
tar -xzf "$archive" -C "$gh_install_root"
install -m 0755 \
"$gh_install_root/gh_${gh_version}_linux_${gh_arch}/bin/gh" \
"$gh_install_root/bin/gh"
echo "$gh_install_root/bin" >> "$GITHUB_PATH"
export PATH="$gh_install_root/bin:$PATH"
gh --version
- name: Verify source run and artifact identity
shell: bash
env:
@@ -156,7 +107,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu)'
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-2, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.[].jobs[] | select(.name == $name)] as $matches
@@ -171,7 +122,7 @@ jobs:
[[ $(jq -r '.expired' <<<"$artifact") == false ]]
- name: Download exact build artifact
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
uses: actions/download-artifact@37930b1c2abaa49bbe596cd826c3c89aef350131 # v7
with:
artifact-ids: ${{ inputs.artifact_id }}
path: artifact
@@ -197,19 +148,13 @@ jobs:
shell: bash
env:
SOURCE_SHA: ${{ inputs.source_sha }}
THREAD_SCOPE: ${{ inputs.thread_scope }}
run: |
set -euo pipefail
case "$THREAD_SCOPE" in
native) export CONNECT_E2E_THREAD_SCOPE=NATIVE_THREADS ;;
runtime) export CONNECT_E2E_THREAD_SCOPE=TOKIO_RUNTIME ;;
*) exit 1 ;;
esac
printf '%s\n' "$SOURCE_SHA" >connect-harness/tests/e2e/connected/rustfs-ref
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_PROFILE_THREADS_EVIDENCE="$GITHUB_WORKSPACE/profile-threads-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=profile-threads
@@ -223,7 +168,6 @@ jobs:
ARTIFACT_DIGEST: ${{ inputs.artifact_digest }}
CONNECT_SHA: ${{ inputs.connect_sha }}
SOURCE_SHA: ${{ inputs.source_sha }}
THREAD_SCOPE: ${{ inputs.thread_scope }}
run: |
set -euo pipefail
jq \
@@ -233,14 +177,13 @@ jobs:
--arg artifactDigest "$ARTIFACT_DIGEST" \
--arg connectSha "$CONNECT_SHA" \
--arg sourceSha "$SOURCE_SHA" \
--arg requestedThreadScope "$THREAD_SCOPE" \
'. + {workflowRunId: $workflowRunId, buildRunId: $buildRunId, artifactId: $artifactId, artifactDigest: $artifactDigest, connectSha: $connectSha, sourceSha: $sourceSha, requestedThreadScope: $requestedThreadScope}' \
'. + {workflowRunId: $workflowRunId, buildRunId: $buildRunId, artifactId: $artifactId, artifactDigest: $artifactDigest, connectSha: $connectSha, sourceSha: $sourceSha}' \
profile-threads-service-job-evidence.json >profile-threads-service-job-evidence.bound.json
mv profile-threads-service-job-evidence.bound.json profile-threads-service-job-evidence.json
- name: Upload acceptance evidence
if: ${{ always() && hashFiles('profile-threads-service-job-evidence.json') != '' }}
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
uses: actions/upload-artifact@b7c566a772e6b6bfb58ed0dc250532a479d7789f # v6
with:
name: connect-profile-threads-evidence-${{ github.run_id }}
path: |
@@ -49,23 +49,23 @@ permissions:
jobs:
top-api:
name: Verify native Linux x86_64 top.api service job
runs-on: sm-standard-2
runs-on: ubuntu-latest
timeout-minutes: 45
steps:
- name: Checkout acceptance harness
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
persist-credentials: false
- name: Checkout exact RustFS source
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
path: rustfs-source
persist-credentials: false
ref: ${{ inputs.source_sha }}
- name: Checkout exact Connect harness
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
uses: actions/checkout@9c091bb21b7c1c1d1991bb908d89e4e9dddfe3e0 # v7
with:
repository: rustfs/connect
path: connect-harness
@@ -73,18 +73,10 @@ jobs:
ref: ${{ inputs.connect_sha }}
token: ${{ secrets.PF_TESTING_GH_TOKEN }}
- name: Set up Docker Compose
uses: ./.github/actions/setup-docker-compose
- name: Set up Python
uses: actions/setup-python@5fda3b95a4ea91299a34e894583c3862153e4b97 # v7.0.0
with:
python-version: "3.14"
- name: Set up Node.js
uses: actions/setup-node@820762786026740c76f36085b0efc47a31fe5020 # v7.0.0
with:
node-version: 25.8.1
node-version: 22.22.2
cache: npm
cache-dependency-path: connect-harness/web/package-lock.json
@@ -115,7 +107,7 @@ jobs:
[[ $(jq -r '.head_repository.full_name' <<<"$run") == "$GITHUB_REPOSITORY" ]]
[[ $(jq -r '.name' <<<"$run") == "Build and Release" ]]
expected_job='Build RustFS (linux-x86_64-gnu)'
expected_job='Build RustFS (linux-x86_64-gnu, sm-standard-2, x86_64-unknown-linux-gnu, false, linux, pyroscope)'
jobs=$(gh api --paginate --slurp "repos/${GITHUB_REPOSITORY}/actions/runs/${BUILD_RUN_ID}/jobs?per_page=100")
jq -e --arg name "$expected_job" '
[.[].jobs[] | select(.name == $name)] as $matches
@@ -130,7 +122,7 @@ jobs:
[[ $(jq -r '.expired' <<<"$artifact") == false ]]
- name: Download exact build artifact
uses: actions/download-artifact@3e5f45b2cfb9172054b4087a40e8e0b5a5461e7c # v8.0.1
uses: actions/download-artifact@37930b1c2abaa49bbe596cd826c3c89aef350131 # v7
with:
artifact-ids: ${{ inputs.artifact_id }}
path: artifact
@@ -162,7 +154,7 @@ jobs:
npm --prefix connect-harness/web ci
connect-harness/web/node_modules/.bin/playwright install --with-deps chromium
make -C connect-harness e2e-connected-dispatch-check
TMPDIR="$GITHUB_WORKSPACE" RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_BINARY="$GITHUB_WORKSPACE/binary/rustfs" \
RUSTFS_WORKTREE="$GITHUB_WORKSPACE/rustfs-source" \
CONNECT_E2E_TOP_API_EVIDENCE="$GITHUB_WORKSPACE/top-api-service-job-evidence.json" \
make -C connect-harness e2e-connected E2E_SCENARIO=top-api
@@ -191,7 +183,7 @@ jobs:
- name: Upload acceptance evidence
if: ${{ always() && hashFiles('top-api-service-job-evidence.json') != '' }}
uses: actions/upload-artifact@043fb46d1a93c77aae656e7c1c64a875d1fc6a0a # v7.0.1
uses: actions/upload-artifact@b7c566a772e6b6bfb58ed0dc250532a479d7789f # v6
with:
name: connect-top-api-evidence-${{ github.run_id }}
path: |

Some files were not shown because too many files have changed in this diff Show More